PROCUREMENT PLAN for C COUNTRY: INDIA State: Madhya Pradesh METHOD OF PROCUREMENT ESTIMATED COST in lakh Rs. IDA No. of Scheme INITIATE TRANSMIT Package NO. CLEARANCE DESCRIPTION OF PREPARATION SPECIFIC- OF SPECIFIC- WORKS OF SPECIFIC- ATIONS AND ATION AND ATIONS AND BID BID BID DOCUMENT DOCUMENT DOCUMENTS S TO IDA S 1 2 3 4 5 6 7 A NARMADA-TAPTI BASIN INDORE 1 NT/20 Billi Tank W-10 18.20 2 NT/10B Bedawan Tank W-10 45.65 Awarded to concern WUA 3 NT/10C Rambaloda W-10 17.40 Awarded to concern WUA 4 NT/ 12C Burlai NCB 68.50 5 NT/12D Polaikhurd W-10 16.00 6 NT/12E Semlichacha W-10 22.20 7 NT/12A Baorikheda Tank NCB 73.10 8 NT/14 A Mendia w10 33.30 9 NT/14C Lakumadi w10 18.00 Awarded to concern WUA 10 NT/14 B Amlawati w10 47.40 11 NT/15A Siya w10 22.89 12 NT/15B Bhutia w10 31.70 13 NT/15C Chidawad w10 32.60 14 NT/15D Patadi w10 31.07 Awarded to concern WUA 15 NT/16 Gahntonda Tank W-10 43.90 16 Takrawad tank 14.50 NT/16 A W-2 Agreement Done with M/s Mahendra Jain Kaya 17 Dhabla Deval Tank 82.50 18 NT/17 Kundaliya Tank W-10 26.60 19 NT/19A Khatikhedi Tank W-10 18.80 20 NT/18B Kanardi (Old) Tank W-10 26.65 21 NT/18C Kanardi (NEW) Tank W-10 23.80 22 NT/18D Kharkhedi Tank W-10 18.80 23 NT/13/A Satbarli W10 18.10 24 NT/13B Aghera W10 31.60 25 NT/12B Borsali W10 15.30 26 NT/12 Ranthbhanwar W10 22.50 27 NT/18 Kadodia Tank W10 28.40 28 NT/8A Poladongar Tank w10 55.87 29 NT/8B Gopalpura Tank Cost of Package NCB 146.10 Siloda Tank(balance 30 NT/5 BW NCB 130.86 01.10.2013 work) Chillar Tank 31 NT/9 Cost of Package NCB 642.43 32 NT/10 Unhel Tank Cost of Package W-10 41.86 Awarded to concern WUA 33 NT/10A Jastakhedi Tank W-2 128.86 34 NT/12A Bhaniyakhedi W-10 35.52 Awarded to concern WUA 35 NT/18A Devikheda Tank NCB 240.03 36 NT/19A Nainawad Tank W-10 20.08 Awarded to concern WUA 37 NT/19 Undadasa Tank NCB 196.50 Deleted 38 NT/13A Nagda W-2 146.7 Agreement Done with M/s Pragati Cons Co Dewas on 22.06.20 39 NT/13B Kheda Old W-10 30.00 40 NT/13C Kheda New W-10 50.00 41 NT/17A Malgarh NCB 53.3 Deleted 42 NT/14 Mominpura NCB 82.9 Agreement Done with M/s Navbharat Buildcon on 22.06.201 43 Koop 42.9 Awarded to concern WUA 44 Pipalrrawan 48.86 Awarded to concern WUA W-10 45 Padliya 28.91 Awarded to concern WUA 46 Singhani 20.56 Awarded to concern WUA Total 2991.7 B CHAMBAL-BETWA BASIN BHOPAL 1 CB/20B Dhakoni W-10 31.00 2 CB/21 Fatehabad W-10 11.80 3 CB/21a Ramnagar W-10 30.3 4 CB/21b Singhpur Chalda W-10 11.2 5 CB/21c Vikrampur W-10 29.3 6 CB/22B Muradpur Minor Tank W-10 43.80 7 CB/34 Agar-Agri Tank W-2 105.36 8 CB/22a Baiheda Tank W-10 49.00 9 CB/22b Malawar Tank W-10 43.60 10 Hedapura tank 11 CB/27A Banda Bedra Tank NCB Cost of package 189.70 12 CB/27B Napanera Tank W-2 121.91 13 Deory Tank W-10 25.00 14 Fatehpur Tank W-10 48.50 15 Amanpur Tank Agreement yet to be done with M/s Surendra S CB/31A W-2 103.26 16 Deopur Tank 17 CB/22B Bhawankhedi W-10 49.60 18 CB/30A Chandana Tank w-2 62.28 Agreement done with M/s Ayaz Ali Raisen Kerwan (balance work 19 CB/3B of Dam & Distribution Deleted System) Kethan (distribution 20 CB/4B W-2 system) Cost of package 344.21 21 CB/5 Naren Tank W-2 Cost of package NCB 589.97 22 CB/10 Barod Tank Agreement yet to be done with M/s Chan Cost of package NCB 116.30 Main Canal, RBC and 23 CB/15 NCB 1647.70 Agreement yet to be done with M/s Swarna LBC of SAS Project Minors/D2 and D-3 / 24 CB-15A NCB 1405.90 Agreement done with M/s Swarna Cons.Co.Vija LBC/SAS All Minors of D1 and 25 CB-15B 1984.40 Agreement done with M/s Swarna Cons.Co.Vija D2/ SBC/SAS 26 CB/20A Jamakhedi 152.02 Agreement done with M/s Rajlaxmi Cons. Co. 27 CB/22A Ghosua Minor Tank Cost of Package W-10 49.00 28 CB-22C Ghaterababaji Cost of Package W-10 48.85 29 CB/23A Phupher Minor Tank Cost of Package W-10 46.64 30 CB/23 Jawari Minor Tank Cost of Package W-10 54.01 31 CB-23B Saklone Minor Tank Cost of Package W-10 51.72 Hataikheda 32 CB/24 Cost of Package NCB 117.19 33 CB/24A Ajnal PUW 223.21 34 Geretia 35 CB/25 Karondia Cost of Package NCB 346.50 36 CB/33 Gyaras Pura Agreement done with WUA Cost of Package W-10 48.10 37 Jamuniya 38 CB/33A Khaikheda Cost of Package NCB 125.40 39 CB-26 Mohri Tank NCB 128.41 Agreement done with M/s Dwarikadhees 40 CB-21A Bharoli 63.14 Agreement to be done with M/s Maa Va Balance work of 41 CB-16BW NCB 454.01 Koncha& Mola Tank 42 Jamuniya Rao CB-28 NCB 137.75 43 Tinonia 44 Kasturipura CB-30D NCB 111.16 Agreement done with M/s Shubham Cons Ra 45 Kolukhedi 46 Maina 1 47 CB-32 Guradiya Roopchand NCB 101.82 48 Bhoura 49 CB-32A Moondla NCB 71.66 Agreement done with M/s Public Relation Co. J 50 CB-30C Sudra NCB 70.61 Slop Protection work 51 CB/15D W-2 468.71 of SBC and D4 of SAS Slop Protection work 52 CB/15C W-2 571.43 of RBC of SAS Total Lakhs 10485.43 C GANGA BASIN REWA 1 GB/12 Kirhai Tank W-10 22.00 Agreement done with WU 2 GB/12A Asarar W-2 128.00 01.10.2013 3 GB/13 Birahna Tank W-2 160.57 4 Chitehra Tank 5 GB/13A Amua Tank W-2 6 Khutaha Diversion Cost of Package NCB 101.73 7 Amra Nalla Weir W10 18.26 Agreement done with WU 8 Kothi Weir W10 36.60 9 Kanhaiya Tank GB/3 227.96 Awarded to M/s Shivshakti Cons Rewa on 06.05.2013 10 Atari Tank 11 GB/5A Bhaiswar Tank 203.83 Awarded to M/s Mahendra Kumar Mishra Rewa on 22.05.20 12 Jamunhai Weir 13 GB/6 Govindgarh Tank 287.30 Awarded to M/s Dayal Engineering Itawa (Rs215.02 Lakhs) 14 GB/6A Loni Tank 129.05 Awarded to M/s Ravi Cons. Co. Itawa (Rs 119.49 Lakhs) 15 GB/9A Lilgee Reservoir NCB 116.56 16 Singhpur Tank GB-10 NCB 272.03 Awarded to M/s Maa Sheronwali Cons Rewa on 22.04.2013 17 Chheuda 18 GB/7 Chamara Diversion 9.92 W-10 Awarded to concern WUAs 19 Nimi Weir W-10 9.55 Awarded to concern WUAs 20 Jhura Nalla Wier 17.88 Total 1741.24 D DHASAN KEN BASIN SAGAR Distribution Network 1 DK-13A NCB 1,947.10 Agreement yet to be done with M/s P. Venkat Ramnaiy of Bila Tank Balance work of 2 DK-0B W-2 109.94 Awarded to M/s Keshari Singh Damoh (Rs 129.6 Majhgawan Hansraj Balance work of Mala 3 DK/25BW W-2 599.92 Tank Total 2656.96 E YAMUNA BASIN GWALIOR Balance work- 1 YB/7B (BW) NCB 198.77 Khirawali Tank 2 YB/11 Jalalpur PUW NCB 226.32 3 ABC/4 ABC- 32R to 58R NCB 1945.53 Agreement Awarded to M/s Sarthi Co Km 0 to 12 of Bhind 4 BMC/1 NCB 2938 Agreement Awarded to M/S Sri Sai Laxmi C Main Canal Km 12 to 27.493 of 5 BMC/2 NCB 2930 Agreement Awarded to M/s Sarthi Co Bhind Main Canal Km 27.493 to 40.88 of 6 BMC/3 NCB 3053.19 Agreement Awarded to M/s Sarthi Co Bhind Main Canal Km 40.88 to 78.181 of 7 BMC/4 NCB 5366.67 Agreement Awarded to M/S Sri Sai Laxmi C Bhind Main Canal 8 BMC/6 3 L /BMC 1600.09 Agreement Awarded to M/S KKRC,Se MBC(RD 1615 M to 9 MBC/6 NCB 182.38 Agreement Awarded to M/s Sri Sai Laxmi C 3962) ABC147.279- 10 ABC/6 NCB 1070.37 Agreement Awarded to M/s Sri Sai Laxmi C 162.367,60R&61R Mou Branch Canal Km 11 BMC/5 NCB 2574.03 Agreement Awarded to M/S Sarthi Con 0 to45.50 Lining of balance 12 CRMC/8 BR reaches of CRMc NCB 2714.12 10/07/2013 between 0-60Km Lining of balance 13 CRMC/9 BR reaches of CRMc NCB 3607.95 10/07/2013 between 0-60Km Lining of balance CRMC/10 14 reaches of CRMc NCB 3061.74 10/07/2013 BR between 0-60Km 15 YB/PA2 Parwati Aquuduct NCB 94.32 Total 31563.48 F WAINGANGA BASIN SEONI 1 WG-1 Gurjee Tank W-2 162.51 Agreement done with M/sSantosh Kumar Gupta 2 WG-2 Simra Khudri Tank W-2 97.50 Agreement done with M/sSantosh Kumar Gupta Wainganga Main Canal 3 WG-3 W-2 1116.06 0 to 306 Chain Wainganga Main Canal 4 WG-4 W-2 1151.45 307 th to 618 Chain Wainganga Main Canal 5 WG-5 W-2 1140.59 619th to 963 Chain Wainganga Main Canal 6 WG-6 W-2 1272.78 10.07.2013 964th to 1356 Chain Waraseoni Branch 7 WG-7 W-2 922.12 Canal 0 to 330 Chain Medki Branch Canal 0 8 WG-8 W-2 1864.69 10.07.2013 to 700 Chain Medki Branch Canal 9 WG-9 W-2 970.50 700 to 1181 Chain Dadiya Disty, Khari Disty, Pathari Feeder 10 WG-10 and Behrai Disty of W-2 1030.64 Wainganga Canal system Beni Disty, Thanegaon Disty, and Navegaon 11 WG-11 W-2 1150.02 Disty of Wainganga Canal system Minors of Wainganga 12 WG-12 W-2 600.00 01.10.2013 Main Canal Minors of Waraseoni 13 WG-13 W-2 600.00 01.10.2013 Branch Canal Minors of Medki 14 WG-14 W-2 600.00 01.10.2013 Branch Canal Total 12678.86 ROCUREMENT PLAN for Civil Works for 2013-14 WB LOANT/ CREDIT No. IN-4750 EVENTS TRANSMIT IDA EVALUATION ISSUE CLEARANC CONSTRUCTIO CONSTRUCT CONSTRUCTI REPORT AND AWARD INVITATION OPEN BIDS E OF N 25% ION 50% ON 75% AWARD CONTRACT TO BID RECOMME COMPLETE COMPLETE COMPLETE RECOMMENDATIO NDA-TIONS NS TO IDA 8 9 10 11 13 13 14 15 01.08.13 15.10.13 29.12.13 14.03.14 Awarded to concern WUA Awarded to concern WUA 05.07.2013 10.08.13 31.01.14 24.07.14 14.01.15 01.09.13 15.11.13 29.01.14 14.04.14 01.09.13 15.11.13 29.01.14 14.04.14 05.07.2013 10.08.13 31.01.14 24.07.14 14.01.15 15.09.13 29.11.13 12.02.14 28.04.14 Awarded to concern WUA 15.09.13 29.11.13 12.02.14 28.04.14 15.09.13 29.11.13 12.02.14 28.04.14 15.09.13 29.11.13 12.02.14 28.04.14 15.09.13 29.11.13 12.02.14 28.04.14 Awarded to concern WUA 15.09.13 29.11.13 12.02.14 28.04.14 Done with M/s Mahendra Jain Kayampur on 20.05.2013 30.09.13 14.12.13 27.02.14 13.05.14 30.09.13 14.12.13 27.02.14 13.05.14 30.09.13 14.12.13 27.02.14 13.05.14 30.09.13 14.12.13 27.02.14 13.05.14 30.09.13 14.12.13 27.02.14 13.05.14 10.10.13 24.12.13 09.03.14 23.05.14 10.10.13 24.12.13 09.03.14 23.05.14 10.10.13 24.12.13 09.03.14 23.05.14 10.10.13 24.12.13 09.03.14 23.05.14 10.10.13 24.12.13 09.03.14 23.05.14 10.10.13 24.12.13 09.03.14 23.05.14 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 08.10.2013 11.11.2013 15.12.2013 01.05.2014 15.09.2014 29.01.2015 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 d to concern WUA 25.07.2013 01.09.2013 22.02.2014 15.08.2014 05.02.2015 d to concern WUA 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 d to concern WUA Deleted Pragati Cons Co Dewas on 22.06.2013 20.10.13 03.01.14 19.03.14 02.06.14 20.10.13 03.01.14 19.03.14 02.06.14 Deleted s Navbharat Buildcon on 22.06.2013 d to concern WUA d to concern WUA d to concern WUA d to concern WUA 01.08.2013 15.10.13 29.12.13 14.3.14 15.08.2013 29.10.13 12.1.14 28.3.14 01.08.2013 15.10.13 29.12.13 14.3.14 15.08.2013 29.10.13 12.1.14 28.3.14 01.08.2013 15.10.13 29.12.13 14.3.14 20.08.2013 3.11.13 17.1.14 2.4.14 07.08.2013 10.09.2013 23.2.14 8.8.14 21.1.15 01.09.2013 15.11.13 29.1.14 14.4.14 01.09.2013 15.11.13 29.1.14 14.4.14 25.07.2013 01.09.2013 22.02.2014 15.08.2014 05.02.2015 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 01.09.2013 15.11.13 29.1.14 14.4.14 01.09.2013 15.11.13 29.1.14 14.4.14 yet to be done with M/s Surendra Singh Sisodia, Rajgarh 15.09.2013 29.11.13 12.2.14 28.4.14 ment done with M/s Ayaz Ali Raisen on 04.05.2013 Deleted 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 ment yet to be done with M/s Chandrahaas Sharma nt yet to be done with M/s Swarna Cons.Co.Vijaywada done with M/s Swarna Cons.Co.Vijaywada on 19.04.2013 done with M/s Swarna Cons.Co.Vijaywada on 19.04.2013 done with M/s Rajlaxmi Cons. Co. Guna on 17.04.2013 01.08.2013 15.10.13 29.12.13 14.3.14 01.08.2013 15.10.13 29.12.13 14.3.14 15.08.2013 29.10.13 12.1.14 28.3.14 20.08.2013 3.11.13 17.1.14 2.4.14 20.08.2013 3.11.13 17.1.14 2.4.14 25.07.2013 01.09.2013 22.02.2014 15.08.2014 05.02.2015 25.07.2013 01.09.2013 22.02.2014 15.08.2014 05.02.2015 25.07.2013 01.09.2013 22.02.2014 15.08.2014 05.02.2015 ent done with WUA 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 ment done with M/s Dwarikadheesh Cons. Gwalior on 15.04.2013 ement to be done with M/s Maa Vaishnao Builders, Teekamgarh 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 t done with M/s Shubham Cons Rajgarh on 06.06.2013 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 one with M/s Public Relation Co. Jodhpur on 10.06.2013 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 Agreement done with WUA 08.10.2013 11.11.2013 15.12.2013 01.05.2014 15.09.2014 29.01.2015 25.07.2013 01.09.2013 22.02.2014 15.08.2014 05.02.2015 25.07.2013 01.09.2013 22.02.2014 15.08.2014 05.02.2015 Agreement done with WUA 01.08.2013 15.10.13 29.12.13 14.3.14 shakti Cons Rewa on 06.05.2013 a Kumar Mishra Rewa on 22.05.2013 Engineering Itawa (Rs215.02 Lakhs) Cons. Co. Itawa (Rs 119.49 Lakhs) 25.07.2013 01.09.2013 22.02.2014 15.08.2014 05.02.2015 eronwali Cons Rewa on 22.04.2013 d to concern WUAs d to concern WUAs e done with M/s P. Venkat Ramnaiyha & Co Nagpur M/s Keshari Singh Damoh (Rs 129.65 Lakhs) 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 25.07.2013 01.09.2013 22.02.2014 15.08.2014 05.02.2015 25.07.2013 01.09.2013 22.02.2014 15.08.2014 05.02.2015 greement Awarded to M/s Sarthi Cons Gwalior on 30.05.2013 ent Awarded to M/S Sri Sai Laxmi Co Co,Vijayawada on 29.04.2013 greement Awarded to M/s Sarthi Cons Gwalior on 29.04.2013 greement Awarded to M/s Sarthi Cons Gwalior on 29.04.2013 ent Awarded to M/S Sri Sai Laxmi Co Co,Vijayawada on 06.05.2013 reement Awarded to M/S KKRC,Secunderabad on19.06.2013 ent Awarded to M/s Sri Sai Laxmi Co Co,Vijayawada on 14.05.2013 ent Awarded to M/s Sri Sai Laxmi Co Co,Vijayawada on 27.05.2013 eement Awarded to M/S Sarthi Cons Co Gwalior on 27.05.2013 18/07/2013 8/19/2013 01.10.2013 09.03.2014 15.08.2014 21.01.2015 18/07/2013 8/19/2013 01.10.2013 09.03.2014 15.08.2014 21.01.2015 18/07/2013 8/19/2013 01.10.2013 09.03.2014 15.08.2014 21.01.2015 05.07.2013 10.08.2013 31.01.2014 24.07.2014 14.01.2015 one with M/sSantosh Kumar Gupta, Panna on 10.04.2013 one with M/sSantosh Kumar Gupta, Panna on 10.04.2013 07.08.2013 20.09.2013 6.3.14 20.8.14 3.2.15 07.08.2013 20.09.2013 6.3.14 20.8.14 3.2.15 07.08.2013 20.09.2013 6.3.14 20.8.14 3.2.15 20.07.2013 22.08.2013 30.09.2013 01.03.2014 31.07.2014 29.12.2014 07.08.2013 20.09.2013 6.3.14 20.8.14 3.2.15 20.07.2013 22.08.2013 30.09.2013 01.03.2014 31.07.2014 29.12.2014 09.07.2013 20.08.2013 3.2.14 20.7.14 3.1.15 09.07.2013 20.08.2013 3.2.14 20.7.14 3.1.15 09.07.2013 20.08.2013 3.2.14 20.7.14 3.1.15 08.10.2013 11.11.2013 15.12.2013 01.05.2014 15.09.2014 29.01.2015 08.10.2013 11.11.2013 15.12.2013 01.05.2014 15.09.2014 29.01.2015 08.10.2013 11.11.2013 15.12.2013 01.05.2014 15.09.2014 29.01.2015 CONSTRUCTIO Post/Prior N 100% Review COMPLETE Case 16 17 28.05.14 Post Post Post 07.07.15 Post 28.06.14 Post 28.06.14 Post 07.07.15 Post 12.07.14 Post Post 12.07.14 Post 12.07.14 Post 12.07.14 Post 12.07.14 Post Post 12.07.14 Post Post Post 27.07.14 Post 27.07.14 Post 27.07.14 Post 27.07.14 Post 27.07.14 Post 06.08.14 Post 06.08.14 Post 06.08.14 Post 06.08.14 Post 06.08.14 Post 06.08.14 Post 07.07.2015 Post Post 14.06.2015 Post Post 07.07.2015 Post Post Post 29.07.2015 Post Post 07.07.2015 Post Post Post Post 16.08.14 Post 16.08.14 Post Post Post Post Post Post Post 28.5.14 Post 11.6.14 Post 28.5.14 Post 11.6.14 Post 28.5.14 Post 16.6.14 Post 6.7.15 Post 28.6.14 Post 28.6.14 Post Post Post 29.07.2015 Post 07.07.2015 Post 28.6.14 Post 28.6.14 Post Post Post 12.7.14 Post Post Post Post 07.07.2015 Post Post 07.07.2015 Post Post Post Post Post Prior Post Post 28.5.14 Post Post 28.5.14 Post Post 11.6.14 Post Post 16.6.14 Post Post 16.6.14 Post Post 29.07.2015 Post 29.07.2015 Post Post Post 29.07.2015 Post Post Post Post Post 07.07.2015 Post Post Post 07.07.2015 Post Post 07.07.2015 Post Post Post Post 07.07.2015 Post Post Post 07.07.2015 Post 07.07.2015 Post 07.07.2015 Post Post 14.06.2015 Post 29.07.2015 Post Post Post Post 29.07.2015 Post Post 28.5.14 Post Post Post Post Post Post Post 29.07.2015 Post Post Post Post Post Post Prior Post 07.07.2015 Post 29.07.2015 Post 29.07.2015 Post Prior Prior Prior Prior Prior Post Post Post Prior 29.06.2015 Prior 1 29.06.2015 Prior 1 29.06.2015 Prior 1 07.07.2015 Post Post Post 20.7.15 Post 20.7.15 Post 20.7.15 Post 29.05.2015 Post 20.7.15 Post 29.05.2015 Post 19.6.15 Post 19.6.15 Post 19.6.15 Post 14.06.2015 Post 14.06.2015 Post 14.06.2015 Post