PRIVATE SECTOR COMPETITIVENESS AND ECONOMIC DIVERSIFICATION PROJECT – ADDITIONAL FINANCING I. General 1. Bank’s approvalDate of the procurement Plan[15 November 2017] 2. Date of General Procurement Notice: 18 October 2017 3. Period covered by this procurement plan: The procurement period of project covered from year July 2017 to January 2022 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 2. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project – PSCEDP Phase II 3. Any Other Special Procurement Arrangements: No packages will be financed under retroactive financing 4. Summary of the Procurement Packages planned during the first 18 months after project effectiveness [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preferenc by Bank US$M e (Prior / (yes/no) Post) Summary of the NIL NIL No NIL ICB (Works) Summary of the NIL NIL No NIL ICB (Goods) Summary of the 2.05 3 No NIL NCB (Works) Summary of the NIL NIL No NIL NCB (Goods) Summary of the NIL NIL No NIL ICB (Non- Consultant Services) Summary of the 0.25 4 No NIL SHOPPING (Goods) Summary of the NIL NIL No NIL DC (Goods) 1 2 3 4 5 6 7 Re Contract Estimate Packages Domestic Review Comments f. (Description) d Preferen by Bank No Cost ce (Prior / . US$ M (yes/no) Post) GOODS Procure hardware 0.075 Post equipment for OBFC& Collateral Registry Public Access Sites Nil Procure furniture for OBFC 0.05 Nil Post & Collateral Registry Public Access Sites Procure furniture and 0.05 Nil Post equipment for PMU Farm Implements (chemicals 8 Post & fertilizers) 0.075 TOTAL 0.25 1 2 3 4 5 6 7 Review Comments Estimate Domesti by Bank Ref. Contract d Packages c (Prior / No. (Description) Cost Preferen Post) US$ M ce (yes/no) WORKS Construction of Tourism 1.5 Prior Information Centre NCB No Upgrade Irrigation System 0.25 Post at Mahobong NCB No Development of the pilot Post nursery 0.3 NCB No TOTAL 2.05 1 2 3 4 5 6 7 Ref Contract Estimate Packages Domesti Review Comments . (Description) d c by Bank No. Cost Preferen (Prior / US$ M ce Post) (yes/no) NON-CONSULTING SERVICES Systems support and Nil maintenance for MCC Construction Permit 0.03 No Prior Nil Implementation of OBFC communication strategy 0.1 No Post Mobile application system for Nil Collateral Registry and No Post leasing 0.1 Communication strategy for Nil leasing and secured transactions 0.12 No Post Design and Production of Nil Investment Promotion Material for Horticulture 0.05 No Post Investment Promotion 0.05 Nil No Roadshow for Horticulture Post TOTAL 0.45 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not Applicable 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Review Expected Comments Estimat by Proposal ed Bank Submissi Ref Cost US (Prior / on No. Description of Assignment $ Post) Date Engage a consulting firm for transformation of OBFC into a semi-autonomous legal entity; Implement the Business Registration and Licensing Law (including the design & implementation of e-licensing portal); Design and implement an inspection framework 0.88 including development of risk assessment tools, training modules, inspection manuals and checklists; and streamline OBFC business processes to align them with World Bank DB requirements for improvement of the country’s DB performance on starting a business; integration of OBFC Business June Registration with LRA TIN system - Prior 2018 Engage a consulting firm for review of credit related laws to provide for collection of consumer data including information on businesses; provide Technical Assistance to CBL and Credit Providers Association for development of systems and processes; and facilitate improvement of the 0.475 country’s performance on getting credit DB Prior April indicator 2018 TA for Central Bank of Lesotho (CBL) for Financial Leasing including development and implementation Novembe of Investment Promotion Program 0.25 Prior r 2017 Engage a Technical Advisor for Secured Transactions to improve access to finance and improve the country’s performance on getting a 0.1 May credit DB indicator Post 2018 Engage a consulting firm to review existing procedures for customs and other border Agencies, and develop and implement a trade automation system for all, and upgrade ASYCUDAWorld 1.3 Prior July 2018 Implementation support to the new entity(ies) post re-organisation of LNDC including implementation of February Management Information System or LNDC 0.8 Prior 2018 Horticulture Technical Advisor Novembe 0.5 Prior r 2017 Consultants to staff PMU (including LEAP) 2.31 Prior Only contracts and / >US$0.4m to be or Post July 2017 prior review TA for development and implementation of Insolvency Law to facilitate modernization of the 0.1 Insolvency Regime and improvement on DB February insolvency indicator Post 2018 TA for OPC institutional assessment in the areas of 0.15 technology, skills, human resources and sectoral April strategic plan Post 2018 Develop and implement a comprehensive Private Sector Strategy which includes inter alia a Coherent Incentive Regime and Trade Strategy February 0.15 Post 2018 TA for the development and implementation of February linkages program 0.125 Post 2018 Investment Promotion activities Develop and implement Business Plan for Crafts 0.25 Post July 2017 October Management of Pilot Nursery 0.2 Post 2018 Engage consultant to develop and facilitate implementation of quality and standards capacity 0.1 Septemb building program Post er 2018 Set-up governance structures for sustainability of 0.05 April orchards Post 2018 Engage a Business Development Consultant for Novembe basic business training of the farmers 0.05 Post r 2017 0.1 March Develop an exit strategy for the orchards Post 2018 Develop and implement a business plan for the February research centre 0.25 Post 2018 Develop and implement a marketing and distribution May strategy 0.15 Post 2018 February Conduct a feasibility study for a packhouse 0.1 Post 2019 Alignment of country irrigation plans with horticulture March suitability maps 0.1 Post 2018 TA for development of Horticulture Investment February Attraction Strategy and Action Plan 0.1 Post 2018 Casual Labourers 0.45 On-going February Implementation of Horticulture Business Plan 0.1 Post 2018 April Engage Part-time Communications Specialist 0.03 Post 2018 TOTAL 6.92 PROCUREMENT Lesotho : Second Private Sector Competitiveness and Economic Diversification Prj PLAN General Information Country: Lesotho Bank’s Approval Date of the Original Procurement Plan: 2017-12-01 2019-11-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144933 GPN Date: 2017-10-25 Project Name: Second Private Sector Competitiveness and Economic Diversification Prj Loan / Credit No: IDA / 59610, IDA / 53090 Executing Agency(ies): Ministry of Trade and Industry WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LS-MTI-34651-CW-RFB / Construction of Tourism Supporting Economic Single Stage - One IDA / 59610 Post Request for Bids Open - National 1,500,000.00 1,596,712.06 Signed 2018-09-06 2018-09-11 2018-10-23 2018-11-22 2018-12-27 2019-06-25 Information and Crafts Diversification Envelope Centre LS-MTI-35966-CW-RFB / Supporting Economic Single Stage - One Upgrade Irrigation System IDA / 59610 Post Request for Bids Open - National 250,000.00 0.00 Canceled 2018-02-08 2018-02-13 2018-03-27 2018-04-26 2018-05-31 2018-11-27 Diversification Envelope at Mahobong LS-MTI-71235-CW-RFQ / Construction of Packhouses Supporting Economic Request for Single Stage - One IDA / 53090 Post Limited 35,000.00 0.00 Canceled 2018-09-08 2018-11-03 2019-05-02 at Likhetlane and Mahobong Diversification Quotations Envelope Farms LS-MTI-120391-CW-RFQ / Supporting Economic Request for Single Stage - One Construction of Packhouse IDA / 59610 Post Limited 40,000.00 11,452.11 Signed 2019-07-05 2019-08-30 2020-02-26 Diversification Quotations Envelope for Likhetlane Farm LS-MTI-120394-CW-RFQ / Supporting Economic Request for Single Stage - One Construction of Packhouse IDA / 59610 Post Limited 40,000.00 15,404.92 Signed 2019-07-05 2019-08-30 2020-02-26 Diversification Quotations Envelope for Maoa-Mafubelu LS-MTI-120395-CW-RFQ / Supporting Economic Request for Single Stage - One Construction of Chemical IDA / 59610 Post Limited 15,000.00 2,852.25 Signed 2019-07-05 2019-08-30 2020-02-26 Diversification Quotations Envelope Room for Likhetlane Farm LS-MTI-120396-CW-RFQ / Supporting Economic Request for Single Stage - One Construction of Chemical IDA / 59610 Post Limited 15,000.00 3,482.03 Signed 2019-07-05 2019-08-30 2020-02-26 Diversification Quotations Envelope Room for Likhothola LS-MTI-120398-CW-RFQ / Supporting Economic Request for Single Stage - One Construction of Chemical IDA / 59610 Post Limited 15,000.00 3,376.50 Signed 2019-07-05 2019-08-30 2020-02-26 Diversification Quotations Envelope Room for Maoa-Mafubelu LS-MTI-120399-CW-RFQ / Supporting Economic Request for Single Stage - One Construction of Workers IDA / 59610 Post Limited 20,000.00 11,227.90 Signed 2019-07-05 2019-08-30 2020-02-26 Diversification Quotations Envelope Room at Maoa-Mafubelu LS-MTI-120401-CW-RFQ / Supporting Economic Request for Single Stage - One Construction of Workers IDA / 59610 Post Limited 20,000.00 7,982.83 Signed 2019-07-05 2019-08-30 2020-02-26 Diversification Quotations Envelope Room at Likhetlane LS-MTI-120402-CW-RFB / Supporting Economic Request for Single Stage - One Construction of Workers IDA / 59610 Post Limited 20,000.00 10,234.75 Signed 2019-07-05 2019-08-30 2020-02-26 Diversification Quotations Envelope Room at Likhothola Farm GOODS Page 1 Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LS-MTI-34650-GO-RFQ / Request for Single Stage - One Procure Furniture and IDA / 59610 Project Implementation Post Limited 50,000.00 3,707.26 Signed 2018-02-03 2018-03-31 2018-09-27 Quotations Envelope equipment for PMU LS-MTI-35968-GO-RFQ / Supporting Economic Request for Single Stage - One Farm implements (chemical IDA / 59610 Post Limited 75,000.00 0.00 Canceled 2019-03-09 2019-05-04 2019-10-31 Diversification Quotations Envelope & fertilizers) LS-MTI-49601-GO-RFQ / Procure IT Equipment for Improving the Business Request for Single Stage - One IDA / 59610 Post Limited 50,000.00 37,636.88 Completed 2018-03-05 2018-04-30 2018-10-27 Office of Parliamentary Environment Quotations Envelope Counsel LS-MTI-49713-GO-RFB / Supply and Installation of Improving the Business Single Stage - One Equipment IDA / 59610 Post Request for Bids Open - National 400,000.00 49,724,532.83 Terminated 2018-03-19 2018-03-24 2018-05-05 2018-06-04 2018-07-09 2019-01-05 Environment Envelope for ASYCUDAWorld Backup and Redundancy LS-MTI-34588-GO-RFQ / Procure Furniture for OBFC Improving the Business Request for Single Stage - One IDA / 59610 Post Limited 50,000.00 5,404.08 Completed 2018-06-09 2018-08-04 2019-01-31 and Collateral Registry Environment Quotations Envelope Public Access Sites LS-MTI-34586-GO-RFQ / Procure hardware equipment Improving the Business Request for Single Stage - One IDA / 59610 Post Limited 75,000.00 10,236.56 Completed 2018-06-09 2018-08-04 2019-01-31 for OBFC and Collateral Environment Quotations Envelope Registry Public Access Sites LS-MTI-61020-GO-RFB / Improving the Business Single Stage - One Procure ICT Equipment for IDA / 53090 Post Request for Bids Open - National 150,000.00 56,967.68 Signed 2018-10-01 2018-10-06 2018-11-17 2018-12-17 2019-01-21 2019-07-20 Environment Envelope online e-Licensing LS-MTI-60876-GO-RFB / Procure IT equipment for Supporting Economic Single Stage - One IDA / 59610 Post Request for Bids Open - National 200,000.00 0.00 Canceled 2018-10-12 2018-10-17 2018-11-28 2018-12-28 2019-02-01 2019-07-31 LRA electronic single Diversification Envelope window LS-MTI-62633-GO-RFB / Improving the Business Single Stage - One Procure hardware equipment IDA / 59610 Post Request for Bids Open - National 100,000.00 0.00 Canceled 2018-07-04 2018-07-09 2018-08-20 2018-09-19 2018-10-24 2019-04-22 Environment Envelope for Government Printing LS-MTI-62626-GO-RFB / Improving the Business Open - Single Stage - One Redundancy and ICT support IDA / 59610 Post Request for Bids 150,000.00 0.00 Canceled 2018-11-12 2018-11-17 2018-12-29 2019-01-28 2019-03-04 2019-08-31 Environment International Envelope for the Credit Bureau LS-MTI-71163-GO-RFQ / Procure refrigerated Supporting Economic Request for Single Stage - One IDA / 53090 Post Open - National 30,000.00 57,509.98 Terminated 2018-09-05 2018-10-31 2019-01-29 containers for Likhetlane Diversification Quotations Envelope and Mahobong II Farms LS-MTI-71232-GO-RFQ / Procure server & accessories Request for Single Stage - One IDA / 53090 Project Implementation Post Limited 25,000.00 31,893.28 Completed 2018-08-20 2018-10-15 2019-04-13 and ICT equipment for the Quotations Envelope Project AF-WB-0005 / Supply and Installation of equipment for Supporting Economic Single Stage - One IDA / 59610 Post Request for Bids Open - National 400,000.00 451,978.68 Signed 2018-03-09 2018-03-14 2018-04-25 2018-05-25 2018-06-29 2018-12-26 ASYCUDAWorld backup and Diversification Envelope redundacy Page 2 LS-MTI-71158-GO-RFQ / Procure tractors and Supporting Economic Request for Single Stage - One associated accessories for IDA / 53090 Post Limited 80,000.00 0.00 Canceled 2018-10-14 2018-12-09 2019-06-07 Diversification Quotations Envelope Likhetlane and Mahobong Farms LS-MTI-55276-GO-RFB / Procure material for upgrade Supporting Economic Single Stage - One IDA / 59610 Post Request for Bids Open - National 250,000.00 0.00 Canceled 2019-11-11 2019-11-16 2019-12-28 2020-01-27 2020-03-02 2020-08-29 of irrigation system at Diversification Envelope Mahobong LS-MTI-143050-GO-RFQ / Under Procure refrigerated Supporting Economic Request for Single Stage - One IDA / 53090 Post Limited 75,000.00 0.00 Implementati 2019-11-02 2019-12-28 2020-06-25 containers for Likhetlane Diversification Quotations Envelope on and Maoa Mafubelu Farms LS-MTI-146126-GO-RFQ / Pending Procure 3 additional servers Improving the Business Request for Single Stage - One IDA / 59610 Post Limited 110,000.00 0.00 Implementati 2019-11-29 2020-01-24 2020-07-22 for Lesotho Revenue Environment Quotations Envelope on Authority (LRA) NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LS-MTI-35718-NC-DIR / Systems support and Improving the Business maintenance for Maseru City IDA / 59610 Prior Direct Selection Direct 30,000.00 14,722.48 Signed 2017-11-17 2017-11-22 2017-12-27 2018-06-25 Environment Council (MCC) Construction Permit LS-MTI-35738-NC-RFQ / Design and Production of Supporting Economic Request for Single Stage - One IDA / 59610 Post Limited 50,000.00 0.00 Canceled 2018-08-12 2018-10-07 2019-04-05 Investment Promotion Diversification Quotations Envelope Material for Horticulture LS-MTI-35965-NC-RFQ / Supporting Economic Request for Single Stage - One Investment Promotion IDA / 59610 Post Limited 50,000.00 0.00 Canceled 2018-08-25 2018-10-20 2019-04-18 Diversification Quotations Envelope Roadshow for Horticulture LS-MTI-35995-NC-DIR / Financial Management IDA / 59610 Project Implementation Prior Direct Selection Direct 20,000.00 21,970.00 Signed 2017-11-17 2017-11-22 2017-12-27 2018-06-25 System LS-MTI-35722-NC-RFB / Implementation of One Improving the Business Single Stage - Two Business Facilitation Centre IDA / 59610 Post Request for Bids Open - National 100,000.00 0.00 Canceled 2018-02-08 2018-02-13 2018-03-27 2018-06-09 2018-07-14 2019-01-10 Environment Envelope (OBFC) communication strategy LS-MTI-35733-NC-RFB / Communication Strategy for Improving the Business Single Stage - Two IDA / 59610 Post Request for Bids Open - National 120,000.00 0.00 Canceled 2018-07-31 2018-08-05 2018-09-16 2018-11-29 2019-01-03 2019-07-02 Leasing and Secured Environment Envelope Transactions LS-MTI-60868-NC-RFB / Procure services of a communication's company for Improving the Business Single Stage - One IDA / 59610 Post Request for Bids Open - National 120,000.00 0.00 Canceled 2018-07-17 2018-07-22 2018-09-02 2018-10-02 2018-11-06 2019-05-05 implementation of Environment Envelope communications strategy for insolvency Page 3 LS-MTI-60926-NC-DIR / Procure services of a Improving the Business IDA / 53090 Prior Direct Selection Direct 25,000.00 28,532.70 Signed 2018-05-21 2018-05-26 2018-06-30 2018-12-27 consulting firm for Client Environment Satisfaction Survey LS-MTI-62628-NC-RFB / Supporting Economic Open - Single Stage - One IDA / 59610 Post Request for Bids 200,000.00 0.00 Canceled 2018-07-11 2018-07-16 2018-08-27 2018-09-26 2018-10-31 2019-04-29 Develop LNDC ICT System Diversification International Envelope LS-MTI-62635-NC-RFQ / Supply and installation of Improving the Business Request for Single Stage - One IDA / 59610 Post Open - National 50,000.00 0.00 Canceled 2019-01-28 2019-03-25 2019-09-21 networking at the Office of Environment Quotations Envelope Parliamentary Counsel LS-MTI-62636-NC-DIR / Support to CBL electronic Improving the Business IDA / 59610 Prior Direct Selection Direct 100,000.00 39,933.25 Signed 2018-11-05 2018-11-10 2018-12-15 2019-06-13 system for supervision of Environment Credit Bureau LS-MTI-62631-NC-RFQ / Improving the Business Request for Single Stage - One Support ICT for Office of IDA / 59610 Post Open - National 175,000.00 0.00 Canceled 2019-01-21 2019-03-18 2019-09-14 Environment Quotations Envelope Parliamentary Counsel LS-MTI-64064-NC-RFB / Improving the Business Single Stage - One Support ICT for Office of IDA / 59610 Post Request for Bids Open - National 175,000.00 203,172.49 Signed 2018-07-18 2018-07-23 2018-09-03 2018-10-03 2018-11-07 2019-05-06 Environment Envelope Parliamentary Counsel LS-MTI-60907-NC-RFQ / Supply of Internet Services Improving the Business Request for Single Stage - One (ISP) for IT Redundancy IDA / 59610 Post Limited 50,000.00 0.00 Canceled 2018-06-16 2018-08-11 2019-02-07 Environment Quotations Envelope for Lesotho Revenue Authority (LRA) LS-MTI-70923-NC-DIR / Service Provision for the Improving the Business IDA / 59610 Prior Direct Selection Direct 50,000.00 43,493.01 Signed 2018-08-14 2018-08-19 2018-09-23 2019-03-22 Asycuda Redundancy Environment Internet Link LS-MTI-76885-NC-DIR / Service Provision for the Improving the Business IDA / 59610 Prior Direct Selection Direct 50,000.00 62,302.85 Signed 2018-09-14 2018-09-19 2018-10-24 2019-04-22 Asycuda Redundancy Environment Internet Link - Part II LS-MTI-61026-NC-DIR / Provide advance training Improving the Business and streamline business IDA / 53090 Prior Direct Selection Direct 50,000.00 0.00 Canceled 2018-11-05 2018-11-10 2018-12-15 2019-06-13 Environment processes for MCC CP System LS-MTI-82224-NC-RFP / Development of a system Improving the Business Request for Open - Single Stage - One and supply of related IDA / 59610 Prior 1,200,000.00 0.00 Canceled 2018-11-12 2018-11-17 2018-12-29 2019-01-28 2019-03-04 2019-08-31 Environment Proposals International Envelope equipment for National Single Window LS-MTI-82698-NC-RFB / Supply and delivery ICT Improving the Business Single Stage - One equipment and connectivity IDA / 53090 Post Request for Bids Open - National 500,000.00 246,754.46 Signed 2018-11-12 2018-11-17 2018-12-29 2019-01-28 2019-03-04 2019-08-31 Environment Envelope for Ministry of Trade and Industry LS-MTI-82705-NC-RFB / Supply and installation of Improving the Business Single Stage - One ICT equipment and IDA / 53090 Post Request for Bids Open - National 250,000.00 225,504.44 Signed 2018-11-16 2018-11-21 2019-01-02 2019-02-01 2019-03-08 2019-09-04 Environment Envelope connectivity for Maseru City Council Page 4 LS-MTI-82706-NC-DIR / Upgrade e-construction system for Maseru City Council and provide Improving the Business IDA / 53090 Prior Direct Selection Direct 200,000.00 59,995.00 Signed 2018-11-15 2018-11-20 2018-12-25 2019-06-23 advanced training and Environment develop website for the Architectural Association of Lesotho LS-MTI-82708-NC-RFP / Development and installation Improving the Business Request for Open - Single Stage - Two IDA / 59610 Prior 1,300,000.00 0.00 Canceled 2018-11-14 2018-11-19 2018-12-31 2019-03-15 2019-04-19 2019-10-16 of Lesotho National Single Environment Proposals International Envelope Window LS-MTI-82714-NC-DIR / Develop and install Central Improving the Business IDA / 59610 Prior Direct Selection Direct 250,000.00 0.00 Canceled 2019-01-25 2019-01-30 2019-03-06 2019-09-02 Bank of Lesotho credit Environment scoring system LS-MTI-82716-NC-RFB / Supply and delivery of Improving the Business Single Stage - One equipment and inter- IDA / 59610 Post Request for Bids Open - National 250,000.00 0.00 Canceled 2019-01-28 2019-02-02 2019-03-16 2019-04-15 2019-05-20 2019-11-16 Environment Envelope connectivity for the Law Reform Commission LS-MTI-82718-NC-RFB / Develop and implement Improving the Business Single Stage - One IDA / 59610 Post Request for Bids Open - National 500,000.00 327,403.73 Signed 2019-01-23 2019-01-28 2019-03-11 2019-04-10 2019-05-15 2019-11-11 Ministry of Law related Environment Envelope systems LS-MTI-83446-NC-DIR / Improving the Business LRA IT Connectivity solution IDA / 59610 Prior Direct Selection Direct 50,000.00 37,232.89 Signed 2018-10-31 2018-11-05 2018-12-10 2019-06-08 Environment with SARS. LS-MTI-83872-NC-DIR / Improving the Business Indexing of all statutory IDA / 59610 Prior Direct Selection Direct 250,000.00 137,177.59 Signed 2018-11-12 2018-11-17 2018-12-22 2019-06-20 Environment laws of Lesotho LS-MTI-84459-NC-RFQ / Request for Single Stage - One Procure services of a IDA / 59610 Project Implementation Post Limited 50,000.00 25,366.44 Signed 2018-11-24 2019-01-19 2019-07-18 Quotations Envelope communications company LS-MTI-106124-NC-DIR / Procure services for a local Improving the Business IT firm for Construction IDA / 59610 Prior Direct Selection Direct 35,000.00 0.00 Canceled 2019-04-01 2019-04-06 2019-05-11 2019-11-07 Environment Permit system support and maintenance LS-MTI-108933-NC-DIR / Procure services for a local Improving the Business IT firm for Construction IDA / 53090 Post Direct Selection Direct 35,000.00 25,437.25 Signed 2019-04-12 2019-04-17 2019-05-22 2019-11-18 Environment Permit system support and maintenance LS-MTI-113223-NC-RFB / Under Improving the Business Open - Single Stage - One Development of Lesotho IDA / 59610 Post Request for Bids 1,200,000.00 0.00 Implementati 2019-05-10 2019-05-15 2019-06-26 2019-07-26 2019-08-30 2020-02-26 Environment International Envelope National Single Window on LS-MTI-121306-NC-DIR / Development and Installation Improving the Business IDA / 59610 Post Direct Selection Direct 750,000.00 648,661.10 Signed 2019-07-12 2019-07-17 2019-08-21 2020-02-17 of Integrated Land Environment Information System LS-MTI-120404-NC-RFB / Development and Installation Supporting Economic Open - Single Stage - One IDA / 59610 Post Request for Bids 1,200,000.00 0.00 Canceled 2019-07-07 2019-07-12 2019-08-23 2019-09-22 2019-10-27 2020-04-24 of Lesotho National Single Diversification International Envelope Window Page 5 LS-MTI-144519-NC-RFB / Pending Re-tender - Supply and Improving the Business Open - Single Stage - One IDA / 59610 Post Request for Bids 1,200,000.00 0.00 Implementati 2020-01-09 2020-01-14 2020-02-25 2020-03-26 2020-04-30 2020-10-27 Installation of the Lesotho Environment International Envelope on National Single Window CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LS-MTI-35970-CS-QCBS / Implementation support to the new entity post re- Supporting Economic Quality And Cost- Open - organisation of LNDC IDA / 59610 Prior 800,000.00 0.00 Canceled 2018-01-15 2018-02-05 2018-03-21 2018-04-18 2018-05-18 2018-06-22 2018-07-27 2019-07-27 Diversification Based Selection International including implementation of Management and Information system for LNDC LS-MTI-35979-CS-CQS / Engage a consultant to Consultant develop and facilitate Supporting Economic Open - IDA / 59610 Post Qualification 100,000.00 0.00 Canceled 2018-09-03 2018-09-24 2018-11-07 2018-12-07 2019-01-11 2019-07-10 implementation of quality Diversification International Selection and standards capacity building program LS-MTI-43391-CS-QCBS / Supporting Economic Quality And Cost- Open - Develop and Implement IDA / 59610 Post 250,000.00 247,572.60 Signed 2018-01-19 2018-02-09 2018-03-25 2018-04-22 2018-05-22 2018-06-26 2018-07-31 2019-07-31 Diversification Based Selection International Business Plan for Crafts LS-MTI-35969-CS-QCBS / Engage a consulting firm to review the existing procedures for customs & Improving the Business Quality And Cost- Open - other border Agencies, IDA / 59610 Prior 1,300,000.00 0.00 Canceled 2018-06-07 2018-06-28 2018-08-11 2018-09-08 2018-10-08 2018-11-12 2018-12-17 2019-12-17 Environment Based Selection International develop and implement a trade automation system for all and upgrade ASYCUDAWorld LS-MTI-35984-CS-QCBS / Develop and implement a Supporting Economic Quality And Cost- Open - IDA / 59610 Post 250,000.00 0.00 Canceled 2018-02-06 2018-02-27 2018-04-12 2018-05-10 2018-06-09 2018-07-14 2018-08-18 2019-08-18 business plan for the Diversification Based Selection International research centre LS-MTI-35985-CS-CQS / Consultant Develop and implement a Supporting Economic Open - IDA / 59610 Post Qualification 150,000.00 0.00 Canceled 2018-05-07 2018-05-28 2018-07-11 2018-08-10 2018-09-14 2019-03-13 marketing and distribution Diversification International Selection strategy LS-MTI-49694-CS-UN / Engage a consulting firm for transformation of OBFC into a semi-autonomous legal Improving the Business UN Agencies entity, implement the IDA / 59610 Prior Direct 880,000.00 775,180.00 Signed 2018-04-18 2018-10-15 Environment (Direct) business registration & licensing and design & implement inspection framework LS-MTI-49715-CS-UN / Improving the Business UN Agencies Upgrading of IDA / 59610 Prior Direct 500,000.00 1,233,960.00 Signed 2018-05-09 2018-11-05 Environment (Direct) ASYCUDAWorld System Page 6 LS-MTI-60929-CS-CQS / Procure services of a Consultant consulting firm to develop a Supporting Economic IDA / 53090 Prior Qualification Open - National 50,000.00 0.00 Canceled 2018-06-29 2018-07-20 2018-09-02 2018-10-02 2018-11-06 2019-05-05 diaspora engagement Diversification Selection strategy for investment attraction LS-MTI-35971-CS-CQS / Develop and implement a comprehensive Private Sector Consultant Supporting Economic Open - Strategy which includes IDA / 59610 Post Qualification 150,000.00 0.00 Canceled 2018-01-24 2018-02-14 2018-03-30 2018-04-29 2018-06-03 2018-11-30 Diversification International inter alia a Coherent Selection Incentive Regime and Trade Strategy LS-MTI-64454-CS-CQS / Business Process Re- Consultant engineering and the Supporting Economic Open - IDA / 59610 Post Qualification 200,000.00 0.00 Canceled 2018-06-18 2018-07-09 2018-08-22 2018-09-21 2018-10-26 2019-04-24 Establishment of an Diversification International Selection Enterprise Architecture for LNDC LS-MTI-35996-CS-QCBS / Engage a consulting firm for transformation of OBFC into a semi-autonomous legal entity, implement business Improving the Business Quality And Cost- Open - registration & licencing law, IDA / 59610 Prior 880,000.00 0.00 Canceled 2018-06-04 2018-06-25 2018-08-08 2018-09-05 2018-10-05 2018-11-09 2018-12-14 2019-12-14 Environment Based Selection International design and implement an inspection framework to improve country's DB performance on starting a business LS-MTI-61023-CS-CQS / Procure services of a Consultant Improving the Business consulting firm for IDA / 53090 Post Qualification Open - National 20,000.00 0.00 Canceled 2018-06-13 2018-07-04 2018-08-17 2018-09-16 2018-10-21 2019-04-19 Environment Construction Permit System Selection audit LS-MTI-61221-CS-CQS / Consultant Procure Services of a Media IDA / 59610 Project Implementation Post Qualification Open - National 50,000.00 0.00 Canceled 2018-05-21 2018-06-11 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Firm for Project's Publicity Selection LS-MTI-82713-CS-QCBS / Improving the Business Quality And Cost- Open - Development of Maseru City IDA / 59610 Prior 1,000,000.00 0.00 Canceled 2019-01-17 2019-02-07 2019-03-23 2019-04-20 2019-05-20 2019-06-24 2019-07-29 2020-07-28 Environment Based Selection International Masterplan LS-MTI-90103-CS-QCBS / Business Process Re- engineering and the Supporting Economic Quality And Cost- Open - IDA / 59610 Post 200,000.00 264,050.00 Signed 2018-12-14 2019-01-04 2019-02-17 2019-03-17 2019-04-16 2019-05-21 2019-06-25 2020-06-24 Establishment of an Diversification Based Selection International Enterprise Architecture and Governance Practice. LS-MTI-113222-CS-QCBS / Improving the Business Quality And Cost- Open - Development of Maseru City IDA / 59610 Post 1,000,000.00 1,808,422.40 Signed 2019-05-07 2019-05-28 2019-07-11 2019-08-08 2019-09-07 2019-10-12 2019-11-16 2020-11-15 Environment Based Selection International Masterplan INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 7 LS-MTI-35616-CS-CDS / TA for Central Bank of Lesotho for Financial Leasing Improving the Business including development and IDA / 59610 Prior Direct Selection Direct 250,000.00 0.00 Canceled 2017-11-07 2017-11-17 2018-01-21 2018-07-20 Environment implementation of Investment Promotion Program LS-MTI-35622-CS-INDV / TA for development and implementation of Insolvency Individual Law to facilitate Improving the Business IDA / 59610 Post Consultant Open 100,000.00 0.00 Canceled 2018-01-15 2018-03-05 2018-03-26 2018-04-30 2018-10-27 modernization of the Environment Selection Insolvency Regime and improvement on DB insolvency indicator LS-MTI-35623-CS-INDV / TA for Office of Parliamentary Council Individual Improving the Business institutional assessment in IDA / 59610 Post Consultant Open 150,000.00 0.00 Canceled 2018-01-10 2018-02-28 2018-03-21 2018-04-25 2018-10-22 Environment the areas of technology, Selection skills, human resources and sectoral strategic plan LS-MTI-35628-CS-INDV / Individual Supporting Economic Horticulture Technical IDA / 59610 Prior Consultant Open 50,000.00 0.00 Canceled 2017-11-15 2018-01-03 2018-01-24 2018-02-28 2018-08-27 Diversification Advisor Selection LS-MTI-35972-CS-INDV / Technical Advisor for the Individual Supporting Economic development and IDA / 59610 Post Consultant Open 125,000.00 0.00 Canceled 2018-01-29 2018-03-19 2018-04-09 2018-05-14 2018-11-10 Diversification implementation of linkages Selection program LS-MTI-35981-CS-INDV / Engage a Business Individual Supporting Economic Development Consultant for IDA / 59610 Post Consultant Open 50,000.00 0.00 Canceled 2017-11-17 2018-01-05 2018-01-26 2018-03-02 2018-08-29 Diversification basic business training of Selection the farmers LS-MTI-35982-CS-INDV / Individual Supporting Economic Develop an exit strategy for IDA / 59610 Post Consultant Open 100,000.00 0.00 Canceled 2018-03-01 2018-04-19 2018-05-10 2018-06-14 2018-12-11 Diversification the orchards Selection LS-MTI-35993-CS-INDV / Individual Engage a Part-time IDA / 59610 Project Implementation Post Consultant Open 30,000.00 0.00 Canceled 2018-04-10 2018-05-29 2018-06-19 2018-07-24 2019-01-20 Communications Specialist Selection LS-MTI-35994-CS-INDV / Individual Consultants to staff Project IDA / 59610 Project Implementation Prior Consultant Direct 2,314,428.00 0.00 Canceled 2017-11-13 2017-11-23 2017-12-14 2018-01-18 2018-07-17 Management Unit (including Selection LEAP staff) LS-MTI-44592-CS-CDS / Review of the Structure and Supporting Economic IDA / 59610 Prior Direct Selection Direct 120,000.00 115,600.00 Signed 2018-01-31 2018-02-10 2018-04-16 2018-10-13 Functioning of LNDC - Diversification Phase II Implementation LS-MTI-44594-CS-CDS / Engage a consulting firm for transformation of OBFC into a semi-autonomous legal Improving the Business IDA / 59610 Prior Direct Selection Direct 880,000.00 0.00 Canceled 2018-02-01 2018-02-11 2018-04-17 2018-10-14 entity, implement Business Environment Registration and Licensing Law, design and implement an inspection framework Page 8 LS-MTI-35980-CS-INDV / Individual Supporting Economic Set-up governance structures IDA / 59610 Post Consultant Open 50,000.00 0.00 Canceled 2018-04-02 2018-05-21 2018-06-11 2018-07-16 2019-01-12 Diversification for sustainability of orchards Selection LS-MTI-35989-CS-INDV / Individual Alignment of country Supporting Economic IDA / 59610 Post Consultant Open 100,000.00 0.00 Canceled 2018-03-08 2018-04-26 2018-05-17 2018-06-21 2018-12-18 irrigation plans with Diversification Selection horticulture suitability maps LS-MTI-35990-CS-INDV / Technical Advisor for Individual Supporting Economic development of Horticulture IDA / 59610 Post Consultant Open 100,000.00 0.00 Canceled 2018-02-09 2018-03-30 2018-04-20 2018-05-25 2018-11-21 Diversification Investment Attraction Selection Strategy and Action Plan LS-MTI-35991-CS-INDV / Individual Supporting Economic Implementation of IDA / 59610 Post Consultant Open 100,000.00 0.00 Canceled 2018-02-01 2018-03-22 2018-04-12 2018-05-17 2018-11-13 Diversification Horticulture Business Plan Selection LS-MTI-49597-CS-CDS / Technical Advisor to provide Improving the Business IDA / 59610 Prior Direct Selection Direct 100,000.00 116,231.50 Signed 2018-02-28 2018-03-10 2018-05-14 2018-11-10 support to the Office of Environment Parliamentary Counsel LS-MTI-49687-CS-CDS / Individual Procure Services of a Project IDA / 59610 Project Implementation Post Consultant Open 175,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Accountant Selection LS-MTI-49689-CS-CDS / Individual Procure Services o a Project IDA / 59610 Project Implementation Post Consultant Open 125,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Manager Selection LS-MTI-49615-CS-CDS / Individual Procure Services of a Project IDA / 59610 Project Implementation Post Consultant Open 78,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Driver Selection LS-MTI-49626-CS-CDS / Individual Procure services of LEAP IDA / 59610 Project Implementation Post Consultant Open 148,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Officer Selection LS-MTI-49627-CS-CDS / Individual Procure services of an Office IDA / 59610 Project Implementation Post Consultant Open 24,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Assistant Selection LS-MTI-49632-CS-CDS / Individual Procure services of a IDA / 59610 Project Implementation Post Consultant Open 353,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Procurement Manager Selection LS-MTI-49635-CS-CDS / Individual Procure Services of an IDA / 59610 Project Implementation Post Consultant Open 172,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Administrative Secretary Selection LS-MTI-49678-CS-CDS / Individual Procure Services of a IDA / 59610 Project Implementation Post Consultant Open 353,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Financial Manager Selection LS-MTI-49682-CS-CDS / Individual Procure Services f a LEAP IDA / 59610 Project Implementation Post Consultant Open 187,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Manager Selection LS-MTI-49683-CS-CDS / Procure services of a IDA / 59610 Project Implementation Prior Direct Selection Direct 386,000.00 384,127.99 Signed 2018-02-28 2018-03-10 2018-05-14 2018-11-10 Horticulture Coordinator and M&E Specialist Page 9 LS-MTI-49686-CS-CDS / Individual Procure Services of a IDA / 59610 Project Implementation Post Consultant Open 112,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Receptionist & IT Support Selection LS-MTI-51812-CS-INDV / Individual Procure services of Deputy IDA / 59610 Project Implementation Post Consultant Open 340,000.00 0.00 Canceled 2018-03-12 2018-04-30 2018-05-21 2018-06-25 2018-12-22 Project Manager Selection LS-MTI-51863-CS-INDV / Individual Supporting Economic Procure services of a IDA / 59610 Post Consultant Open 87,000.00 0.00 Canceled 2018-03-12 2018-04-30 2018-05-21 2018-06-25 2018-12-22 Diversification Horticulture Field Manager Selection LS-MTI-51866-CS-INDV / Individual Supporting Economic Procure services of a Farm IDA / 59610 Post Consultant Open 87,000.00 0.00 Canceled 2018-03-12 2018-04-30 2018-05-21 2018-06-25 2018-12-22 Diversification Manager Selection LS-MTI-55049-CS-CDS / Procure services of a Project IDA / 59610 Project Implementation Post Direct Selection Direct 78,000.00 77,311.31 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Driver LS-MTI-55057-CS-CDS / Procure Services of a LEAP IDA / 59610 Project Implementation Post Direct Selection Direct 148,000.00 147,547.74 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Officer LS-MTI-55064-CS-CDS / Procure Services of an Office IDA / 59610 Project Implementation Post Direct Selection Direct 24,000.00 23,254.34 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Assistant LS-MTI-55142-CS-CDS / Procure services of an IDA / 59610 Project Implementation Post Direct Selection Direct 172,000.00 169,838.63 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Administrative Secretary LS-MTI-55149-CS-CDS / Procure services of a Project IDA / 59610 Project Implementation Post Direct Selection Direct 175,000.00 151,914.60 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Accountant LS-MTI-55156-CS-CDS / Procure services of a IDA / 59610 Project Implementation Post Direct Selection Direct 112,000.00 110,707.76 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Receptionist LS-MTI-55169-CS-CDS / Procure service of a LEAP IDA / 59610 Project Implementation Post Direct Selection Direct 187,000.00 184,875.14 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Manager LS-MTI-55171-CS-CDS / Procure services of a Project IDA / 59610 Project Implementation Post Direct Selection Direct 125,000.00 123,455.35 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Manager LS-MTI-55172-CS-CDS / Procure services of a IDA / 59610 Project Implementation Post Direct Selection Direct 353,000.00 351,302.51 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Procurement Manager LS-MTI-55254-CS-CDS / Procure Services of a IDA / 59610 Project Implementation Post Direct Selection Direct 353,000.00 349,112.73 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Financial Manager LS-MTI-55258-CS-CDS / Procure services of Deputy IDA / 59610 Project Implementation Post Direct Selection Direct 340,000.00 326,408.44 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Project Manager LS-MTI-55265-CS-CDS / Procure services of a Farm IDA / 59610 Project Implementation Post Direct Selection Direct 87,000.00 81,594.83 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Manager Page 10 LS-MTI-55269-CS-CDS / Procure Services of IDA / 59610 Project Implementation Post Direct Selection Direct 87,000.00 20,913.22 Signed 2018-04-03 2018-04-13 2018-06-17 2018-12-14 Horticulture Field Manager LS-MTI-60860-CS-CDS / Procure services of a consultant to enable Improving the Business IDA / 59610 Prior Direct Selection Direct 10,000.00 9,355.12 Signed 2018-05-31 2018-06-10 2018-08-14 2019-02-10 electronic payment module Environment within the construction Permit System LS-MTI-60862-CS-INDV / Procure services of a TA for Individual Improving the Business development and IDA / 59610 Post Consultant Open 100,000.00 0.00 Canceled 2018-06-13 2018-08-01 2018-08-22 2018-09-26 2019-03-25 Environment implementation of Insolvency Selection Law LS-MTI-61206-CS-INDV / Individual Supporting Economic Procure services of a Farm IDA / 59610 Post Consultant Open 20,000.00 16,397.22 Signed 2018-06-18 2018-08-06 2018-08-27 2018-10-01 2019-03-30 Diversification Manager at Mahobong II Selection LS-MTI-61208-CS-INDV / Individual Supporting Economic Procure services of a Farm IDA / 59610 Post Consultant Open 20,000.00 16,397.22 Signed 2018-06-18 2018-08-06 2018-08-27 2018-10-01 2019-03-30 Diversification Manager at Likhetlane Selection LS-MTI-61211-CS-INDV / Individual Procures Services of a Supporting Economic IDA / 59610 Prior Consultant Direct 12,000.00 11,099.50 Signed 2018-05-18 2018-05-28 2018-06-18 2018-07-23 2019-01-19 Horticulture Infrastructure Diversification Selection Technician for Mahobong II LS-MTI-61215-CS-CDS / Procure services of a Supporting Economic IDA / 59610 Post Direct Selection Direct 12,000.00 11,811.01 Signed 2018-05-11 2018-05-21 2018-07-25 2019-01-21 Horticulture Infrastructure Diversification Technician for Likhetlane LS-MTI-61218-CS-INDV / Individual Procure services of a Supporting Economic IDA / 59610 Prior Consultant Direct 15,000.00 7,481.73 Signed 2018-05-21 2018-05-31 2018-06-21 2018-07-26 2019-01-22 Horticulture Technical Field Diversification Selection Advisor LS-MTI-35974-CS-INDV / Individual Supporting Economic Management of Pilot IDA / 59610 Post Consultant Open 200,000.00 0.00 Canceled 2019-04-15 2019-06-03 2019-06-24 2019-07-29 2020-01-25 Diversification Nursery Selection LS-MTI-61226-CS-CDS / Engage consultant to develop and facilitate implementation Supporting Economic of quality and standards IDA / 53090 Prior Direct Selection Direct 100,000.00 7,948.12 Signed 2018-06-18 2018-06-28 2018-09-01 2019-02-28 Diversification capacity building program for horticulture sub- component LS-MTI-62638-CS-CDS / Implementation of the Supporting Economic findings from the review of IDA / 59610 Prior Direct Selection Direct 120,000.00 115,600.00 Signed 2018-05-31 2018-06-10 2018-08-14 2019-02-10 Diversification the structure and functioning of LNDC LS-MTI-60858-CS-INDV / Engage a consultant for Individual Improving the Business review and amendment of IDA / 59610 Post Consultant Open 100,000.00 0.00 Canceled 2018-06-26 2018-08-14 2018-09-04 2018-10-09 2019-04-07 Environment Construction Permit related Selection laws LS-MTI-71523-CS-CDS / Procure services for a Supporting Economic IDA / 53090 Prior Direct Selection Direct 10,000.00 1,530.89 Signed 2018-08-17 2018-08-27 2018-10-31 2019-04-29 Labour Relations Expert to Diversification support Horticulture Page 11 LS-MTI-71460-CS-CDS / Implementation of Global Supporting Economic G.A.P. Quality and IDA / 53090 Prior Direct Selection Direct 5,000.00 6,680.83 Signed 2018-08-27 2018-09-06 2018-11-10 2019-05-09 Diversification Standards including Preparation of Audits LS-MTI-70970-CS-CDS / Development of a system Supporting Economic and hand-holding of Lesotho IDA / 53090 Prior Direct Selection Direct 100,000.00 99,900.00 Signed 2018-08-24 2018-09-03 2018-11-07 2019-05-06 Diversification Post Bank on Agricultural Financing LS-MTI-75599-CS-INDV / Procure services of a Individual Supporting Economic consultant for strengthening IDA / 53090 Post Consultant Open 50,000.00 27,840.00 Signed 2018-09-14 2018-11-02 2018-11-23 2018-12-28 2019-06-26 Diversification Diaspora engagement in Selection Lesotho LS-MTI-83522-CS-CDS / TA Improving the Business for the development of IDA / 59610 Prior Direct Selection Direct 100,000.00 135,040.00 Signed 2018-11-19 2018-11-29 2019-02-02 2019-08-01 Environment Maseru City Masterplan LS-MTI-84456-CS-INDV / Individual Procure services of an IDA / 59610 Project Implementation Post Consultant Open 60,000.00 0.00 Canceled 2018-11-30 2019-01-18 2019-02-08 2019-03-15 2019-09-11 Procurement Officer Selection LS-MTI-106119-CS-INDV / Individual Procure services of IDA / 59610 Project Implementation Post Consultant Open 60,000.00 60,792.19 Signed 2019-04-22 2019-06-10 2019-07-01 2019-08-05 2020-02-01 Procurement Officer Selection LS-MTI-113305-CS-INDV / Individual Procure services of a IDA / 59610 Project Implementation Post Consultant Open 130,000.00 0.00 Canceled 2019-05-17 2019-07-05 2019-07-26 2019-08-30 2020-02-26 Procurement Manager Selection LS-MTI-118164-CS-CDS / Procure services of a Supporting Economic IDA / 53090 Post Direct Selection Direct 32,000.00 29,149.23 Signed 2019-06-14 2019-06-24 2019-08-28 2020-02-24 Horticulture Technical Field Diversification Manager LS-MTI-118405-CS-CDS / Procure services of Supporting Economic IDA / 59610 Post Direct Selection Direct 10,000.00 6,568.66 Signed 2019-06-14 2019-06-24 2019-08-28 2020-02-24 Environmental and Social Diversification Management Specialist LS-MTI-109940-CS-INDV / Individual Development of a Linkages Supporting Economic IDA / 53090 Post Consultant Open 100,000.00 0.00 Canceled 2019-04-26 2019-06-14 2019-07-05 2019-08-09 2020-02-05 Strategy and action plan for Diversification Selection implementation LS-MTI-120470-CS-INDV / Procure Services of Economic Individual Supporting Economic Sector Delivery Specialist for IDA / 59610 Post Consultant Open 45,000.00 0.00 Canceled 2019-07-05 2019-08-23 2019-09-13 2019-10-18 2020-04-15 Diversification Prime Minister's Delivery Selection Unit LS-MTI-120466-CS-INDV / Procure services of Individual Supporting Economic Performance Management IDA / 59610 Post Consultant Open 40,000.00 0.00 Canceled 2019-07-05 2019-08-23 2019-09-13 2019-10-18 2020-04-15 Diversification Specialist for Prime Selection Minister's Delivery Unit LS-MTI-120467-CS-INDV / Procure Services of a Individual Supporting Economic Communication Specialist for IDA / 59610 Post Consultant Open 30,000.00 0.00 Canceled 2019-07-05 2019-08-23 2019-09-13 2019-10-18 2020-04-15 Diversification Prime Minister's Delivery Selection Unit Page 12 LS-MTI-120468-CS-INDV / Individual Procure services of Prime Supporting Economic IDA / 59610 Post Consultant Open 50,000.00 0.00 Canceled 2019-07-05 2019-08-23 2019-09-13 2019-10-18 2020-04-15 Minister's Delivery Unit Diversification Selection Head LS-MTI-35612-CS-INDV / Engage a Technical Advisor for Secured Transactions to Individual Improving the Business Pending improve access to finance IDA / 59610 Post Consultant Open 100,000.00 0.00 2020-01-20 2020-03-09 2020-03-30 2020-05-04 2020-10-31 Environment Implementation and improve the country's Selection performance on getting a credit DB indicator LS-MTI-130150-CS-CDS / Horticulture Technical Supporting Economic Under Specialist to carry out initial IDA / 59610 Post Direct Selection Direct 2,000.00 0.00 2019-09-30 2019-10-10 2019-12-14 2020-06-11 Diversification Implementation needs assessment of the Farms LS-MTI-130149-CS-CDS / Horticulture Technical Supporting Economic Under Expert to carry out technical IDA / 59610 Post Direct Selection Direct 5,000.00 0.00 2019-09-30 2019-10-10 2019-12-14 2020-06-11 Diversification Implementation needs assessment on the 3 Farms Page 13