Documents & Reports

Nepal - Arun III Hydroelectric Project : Inspection Panel Report on the Request for Inspection (English)

Abstract

The Inspection Panel Report on the Request for Inspection summarizes the allegations of the Requesters that Bank has not followed its own policies and procedures in respect to the Arun III Hydroelectric Project in Nepal. The Inspection Panel has reviewed... See More +

Details

  • 1994/10/25
  • Inspection Panel Report and Recommendation
  • 28475
  • 1
  • 1
  • Nepal
  • South Asia
  • 2010/07/01
  • Nepal - Arun III Hydroelectric Project : Inspection Panel Report on the Request for Inspection
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Light-Weight Documents

Lighter (less MB) documents which may or may not be the final, official version.

Citation