TAG TECHNICAL NOTE Number 9 Handbook for District Sanitation Coordinators Kebadire Basaako / Ronald D. Parker Robert B. Waller James G. Wilson Edited by John van Nostrand re1990 193 A joint contribution of the Goverment of Botswana, The United Nations Development Programme, and The World Bank to the International Drinking Water Supply and Sanitation Decade. Handbook for District Sanitation Coordinators Authors: Kebadire Basaako Ronald D, Parker Robert B. Waller James G. Wilson Editor: John van Nostrand Washington, DC December 1983 ACKNOWLEDGEMENTS The authors wish to acknowledge, with thanks, the advice and assistance of the Council Secretaries and Staff of Kgatleng and Southern Districts, the United States Agency for International Development (USAID), and the Technology Advisory Group (TAG) operating under the United Nations Development Programme Interregional Project INT/81/047 (executed by the World Bank). INTRODUCTION TO TAG REPRINT COPY The "Handbook for District Sanitation Coordinators" was originally prepared by two members of the USAID-funded team that had assisted in the development and implementation of the Environmental Sanitation and Protection (ESPP) Pilot Project in Botswana. TAG has been closely involved with ESPP since its inception, through participation in USAID project development missions and through technical support to the Senior Public Health Engineer (SPHE) in the Ministry of Local Government and Lands (MLGL) - an expatriate provided by UNDP through its project BOT/79/003. The SPHE supervised the project. TAG missions and headquarters staff were also responsible for the editing and production of the handbook. In view of the success of the rural sanitation programme in Botswana, which may provide a valuable model for other areas in the developing world, TAG has arranged, with the agreement of the Government of Botswana, to reprirlt the handbook so as to make it widely available to those concerned with the planning, design and implementation of rural sanitation programmes. Comments and suggestions on the publication should be addressed to the Project Manager, UNDP Project INT/81/047, Water Supply and Urban Development Department, The World Bank, 1818 H Street N.W., Washington, D.C. 20433, U.S.A. Copyright 0 1983 The International Bank for Reconstruction and Development/THE WORLD BANK 1818 H Street, N.W. Washington, D.C. 20433, USA All rights reserved ACRONYMS ACDO Assistant Community Development Officer BOTVIP Ventilated, Improved Single-Pit Latrines used in Botswana CFDA Communal First Development Area CPO Council Planning Officer DET District Extension Team DGS Department of Geological Surveys DO District Officer DSC District Sanitation Coordinator DSF District Sanitation Foreman DSPC District Sanitation Planning Committee DWA Department of Water Affairs ESPP Environmental Sanitation and Protection Project FWE Family Welfare Educator MLGL Ministry of Local Government and Lands REC II Revised Earth Closet Type II Latrine RO Revenue Officer RIO Rural Industries Officer ROEC Reeds Odourless Earth Closet SCDO Senior Community Development Officer SPHE Senior Public Health Engineer SWF Senior Works Foreman SWO Senior Water Officer TAG Technology Advisory Group of The World Bank USAID United States Agency for International Development VDC Village Development Committee VET Village Extension Team VSA Village Sanitation Assistant VSC Village Sanitation Coordinator Contents Map: Location of ESPP Pilot Project Villages 2 1.0 INTRODUCTION 7 2.0 BACKGROUND 9 2.1 Programme Objectives 10 2.2 History of the Environmental Sanitation 11 and Protection Pilot Project 3.0 SETTING UP THE DISTRICT PROGRAMME 15 3.1 District Sanitation Planning Committee 16 3.2 Tour of Previously Improved Villages 18 3.3 Selection of Villages to Be Improved 19 3.4 District Sanitation Plan 22 3.5 Logistics 24 3.6 Dissemination of Information 25 3.7 Other Agencies 27 4.0 THE PROGRAMME TEAM 29 4.1 Senior Public Health Engineer 30 4.2 District Sanitation Coordinator . 31 4.3 District Sanitation Foreman 32 4.4 Village Sanitation Coordinator 33 4.5 Village Sanitation Assistants 35 4.6 Village Development Committee/ 37 Village Extension Team 5.0 LATRINE DESIGN AND CONSTRUCTION 39 5.1 Latrine Design 40 5.2 Latrine Construction 42 6.0 VILLAGE IMPLEMENTATION 47 6.1 Meetings and Handouts 48 6.2 Village Baseline Survey 51 6.3 Selection of Latrine Design 52 6.4 Demonstration Latrines 54 6.5 Construction Training 56 6.6 Household Latrine Construction 58 6.7 Payment by Village Residents 60 6.8 Revenue Collection 62 6.9 Stores Controls 63 6.10 Payment of Village Staff 64 6.11 Purchasing 66 7.0 MONITORING THE PROGRAMME 67 8.0 APPENDICES 71 9.0 FIGURES 101 andbook for District Sanitation Coordinators -: - - - - - - - - -p 1 NAMIDIA T .. . . . .. . . . > ~- iM. t. . N -1 fl0 0. ~ j*o2r fN -, 1.0 Introduction N - & AII uIf?-w øy -- - - .>..t-V- 1 1.0 Introduction This handbook is written for the use of outline of the objectives of the component; Distiict Sanitation Coordinators (DSCs) and charged with designing and implementing District Sanitation Programmes in Botswana. third, au roh ilot ret These programmes form part of the National the initial team's experience so that, among Rural Sanitation Programme, which is admin- other things, its efforts and experiments will istered by the office of the Senior Public Health Engineer in the Ministry of Local Government and Lands. As the handbook is In other words, the handbook is composed of quite detailed, it may prove useful to other the Pilot Project team's recommendations to members.of the implementation team, particu- the DSCs on how best to implement the larly those working within the individual District Sanitation Programme. While villages. it is hoped that these recommendations will Botswana's current rural sanitation pro- serve as useful guidelines for the DSCs, gramme is derived, to a great extent, from the ultimately the DSCs will have to make final Environmental decisions based not only on previous expe- (ESPP) Pilot Project (hereafter referred to as immedial on the This i the the Pilot Project) which was funded by the United States Agency for International Devel- case, there will be a need to revise and opment and administered through the Minis- improve the handbook after it has been used try of Local Government and Lands between in the field for a couple of years. 1980 and 1982. Indeed, the contents of this handbook are largely drawn from the expe- rience of this Pilot Project. A brief history of the project is presented in the first sections of this handbook so that newly appointed DSCs might familiarize themselves with it. Following this historical outline, the hand- book presents a step-by-step description of those components of the District Sanitation Programme for which the DSCs will be either directly or indirectly responsible. The compo- nents are arranged in the order in which they are likely to be encountered when actually implemented in the field. In addition, each component is broken into three parts: first, a "Recommendation" to the DSCs on what needs to be done; second, an "Elaboration" of the recommen- dation, which presents a more detailed 8 2.0 Background ~Ilt, aa -up 9~ AkA wl IL * 4 I~. l4 At4 44 * ~ 4* 2.1 Programme Objectives In both rural and urban areas of Botswana, the Batswana share a common goal - improved health for themselves and their families. Many already understand the rela- tionship between improved community sanita- tion and better health. Many would like to have a private latrine for their household. However, many also lack the knowledge and funds required to build one. In addressing these conditions, the broadest goal of the District Sanitation Programme is to improve rural standards of health through a reduction in diseases caused by poor sanitation. More specifically, the programme seeks to prevent the indiscriminate dispersal of human excreta throughout villages by giving householders who do not, at present, own or use a latrine better access to the funds and knowledge required to build one. Ultimately, the pro- gramme seeks to promote strong, healthy families capable of working and contributing to rural society. The success of this pro- gramme will rely on the ability and persistencc of District Councils, village leaders and extension workers to stress the significance of improved sanitation. 10 2.2 History of the Environmental Sanitation and Protection Pilot Project The Environmental Sanitation and Protection technically appropriate, socially acceptable (ESPP) Pilot Project served as the test case for and affordable to rural householders.' the current rural sanitation programme. A brief outline of it is presented here so that the Prjc sa were alo aske tol ae District Sanitation Coordinators (DSCs) may wa i cte Pilot Prjetol be familiarize themselves with the historical devel- opment of this programme. moving from one District to another. Here opmentthe Government of Botswana requested that The ESPP Pilot Project was initiated by the the Pilot Project Government of Botswana and rural residents lay the groundworkfor a package which in recognition of the growing number of health problems associated with inadequate be used n a distriad which ca personal and community sanitary practices in be implemeted at adceralied le rural areas. In particular, it was clear that locartis i on it te most diarrhoeal and intestinal diseases, includ- ment eph District dee ing cholera, could be attributed largely to me pla w tisric defin improper disposal of human excreta. th pobm as it a The need for some form of improvement was first -voiced at the National Conference of In1 ult idiscipt nay t em of District Development Committees in 1976, Botswana to set up an initial design for the which resolved that a coordinated effort, on a Pilot Project. Together, they produced the national level, was necessary to improve sanitation. This need was reiterated at the fi l oje ctipe r continedta local level in the "Needs Assessment" which det pao act fothe was prepared for Southern District by the projet Tw Districts r Sot a n Rural Industries Innovation Centre in 1978. atng - we rea se lt itemn The survey carried out in association with this at a ot haiareay seect snt study indicated that rural residents considered as a l e proity the roectgo sanitation to constitute one of their most udrwytefloigya ihtearvl urgeatnto eeds, iueoeofterms in the field, of the Pilot Project team, which urgenthad been recruited by USAID and approved Responding to this expressed need, the by the Government of Botswana. Government of Botswana requested assistance The Pilot Project team began its work from the United States Agency for Interna- immediately by holding a four-day-long tional Development (USAID) in implementing seminar at the Rural Industries Innovation an experimental, village-based pilot project Centre in Kanye. The purposes of the seminar which would whichwouldwere to discuss rural sanitation needs and the develop, test and evaluate various educa- ways in which the project could be imple- tional techniques, media and messages mented. It was well attended and produced related to sanitation and the building and both a definition of the problem and a maintenance of appropriate latrines and preliminary list of development strategies, as refuse disposal systems; and test various well as methods for achieving them. types of latrines and refuse disposal Environmental Sanitation and Protection Project Design systems to determine which ones are Team, "Project Paper," i979. SIbid. replcatd aterard on naionl bsis The first task for the Pilot Project team was Ranaka, it was discovered that sandy soils identified as the development of latrine were incapable of supporting the weight of the designs which were "appropriate" to the superstructure above the pit. Thus, the sub- villages to be served. The original Project structures were strengthened, at an extra cost. Paper had recommended that three types of Similarly, it was originally proposed that the latrines be adopted: the Ventilated Improved team build low-, medium- and high-cost Single-Pit (BOTVIP), the Reeds Odourless demonstration models in each of the villages. Earth Closet (ROEC) and the Revised Earth However, the high-cost version was soon Closet Type II (REC II). The latter is a abandoned, as it was felt that anyone who ventilated double-pit latrine. It was originally could afford one had probably already built envisaged that these would be built by village it, and the team did vot feel that the quality residents themselves, with materials and tech- of the high-cost latrines was so much better nical assistance provided by the District that it justified the added expense. Council. In fact, as will emerge later in this Once the designs and construction methods handbook, the eventual ESPP Pilot Project handook th evntul ESP PlotProect were selected for the latrines, demonstration designs were based largely on the BOTVIP models were built in the six pilot villages by model alone. This was adopted to cut down Village Sanitation Assistan on costs and simplify training and construc- ts (Vns).Villaers tion techniques.weeivtdtwacthcosrtonp- tion echniues.cess, since they would later have to decide if The second task undertaken by the Pilot they wished to build a latrine for themselves. Project team was to review the list of pilot villages which had previously been selected by oncrrent ithate building ogdemonstra the District Councils (see Section 3.3). The tio rines, vla go wre oae by villages eventually selected were Artesia, Mab- th it te am To arss t e o alane and Olifants Drift in Kgatleng District, ofslitte in the g e o liotet and Ranaka, Selokolela and Keng in Southern District. A baseline social survey was com- team on the subject of ltter. They then dug pleted on these villages in early 1980. refuse pits at each group member's house and, in some villages, organized litter pick-up The third task initiated by the Plot Project campaigns. These moves were well received in team was the development of the educational most villages and resulted in the digging and component of the project. Materials were utilization of refuse pits on most plots. needed that would demonstrate the advantage When the demonstration latrines were of improved sanitation to the householders. Materials were produced for Family Welfare coeed Kotla m e (se Sectin3 Educators which illustrated the relationship wre hed tot abou emT biin g between health and sanitation. Booklets were processad ost were aed an all produced for village residents which gave a intrs hsehodrs wereaed tos step-? ,-step guide to building one's owncotas.Teeonrtstiutdhw latrine or digging a refuse pit. much the householder would pay and what latrne o diginga reuse it.he/she would receive in return. Approximately The latrine designs and educational mate- 250 contracts were signed by householders in rials were distributed, monitored and tested in the six villages. The District Sanitation Fore- each of the six pilot villages. As a result, man and VSAs then began visiting each of revisions and improvements were made to these people to complete the Council's portion them on an ongoing basis. For example, in of the construction and to encourage pay- Keng, most of Selokolela and a small part of ment. Once this was completed, the VSAs 12 worked exclusively on encouraging the house- programme in new villages. This handbook holder to complete his/her walls and roof and brings together much of this information. to finalize payment. Construction was com- What follows are the step§ which should be pleted by approximately half of those who followed in designing and implementing a had signed contracts before the rains began District Sanitation Programme. and people returned to the lands to plough. The Pilot Project team immediately began summarizing and recording project experience for use by the Districts in continuing the 3.0 Setting Up the District Programme 3. m1 T 3.1 District Sanitation Planning Committee Recommendation A District Sanitation Planning Committee should be set up at the outset of the programme under the secretaryship of the District Sanitation Coordinator. This Committee should meet on an ad hoc basis, as required, and report to the District Extension Team. The Committee should include the Senior Public Health Engineer, the District Sanitation Coordinator,.the Council Planning Officer, the Senior Water Officer (or Senior Works Foreman, whichever is more appropriate), the Paramount Chief or his delegate, and, where appropriate, the Communal First Development Area Coordinator. Elaboration Council Planning Officer (PO) Proper implementation of the District Sanita- The CPO is responsible for comprehensive tion Programme calls for the establishment of planning in the District. Therefore, he should effective lines of communication between the be included in order to ensure that the various parties involved. The creation of the sanitation programme is integrated with other District Sanitation Planning Committee is Council projects. Also, should additional critical to establishing these lines as early as financing be required, the CPO will be possible. In order to speed up its work, the responsible for preparing the Project Memo- Committee should meet on an ad hoc basis, randa or Addenda. that is, whenever it is necessary to do so and Senior Water Officer (SWO) / Senior Works there is something to discuss. The Committee Foreman (SWF) could meet weekly or biweekly during the The SWO (or SWF, depending on which early stages of the programme and monthly department the programme falls under) will be later on (see Figure 2). required to assist the DSC in ongoing The principal task for the Committee is the implementation of the programme. production of a detailed District Sanitation The Paramount Chief Plan (see Section 3.4). This plan will guide The Paramount Chief or his delegate repre- sanitation development in the District as a sents the senior tribal authority on the whole. In addition, the Committee should Committee, and his participation in the early monitor ongoing progress of the programme. planning stages is critical to the project's The following people should comprise this future acceptance in particular villages and its Committee: eventual success. Senior Public Health Engineer (SPHE) The Communal First Development Area The SPHE is in the Ministry of Local (CFDA) Coordinator Government and Lands. His office can place The CFDA Coordinator should be included the Pistrict's programme within the national on the Committee if any of the villages context. In addition, he arranges national identified for improvement fall within the financing for sanitation and has considerable CFDA in the District. He should ensure that expertise and experience in the field, the sanitation component is well coordinated District Sanitation Coordinator (DSC with other CFDA projects. The DSC should serve as Secretary of the The Committee may wish to invite other District Sanitation Planning Committee. He is persons to attend its meetings from time to also responsible for administering the District time as it sees fit. However, the DSC should Sanitation Plan. Finally, he supervises District ensure that the Committee does not become and local village staff associated with the unwieldy. programme. 16 Pilot Project Experience An ESPP Committee was formed in Southern Both arrangements served the respective District to monitor project activities. It was Districts well in monitoring the Pilot Project. composed of the District Officer (Committee However, both had serious shortcomings. In Chairperson and Southern District Southern District, it was difficult to get people Coordinator), the Pilot Project team, the to attend on a regular basis because they did District Officer (Development), the Adult not see it as their responsibility and they felt Education Officer, the Personnel Officer, the they were overburdened with other meetings. Regional Health Inspector and the Senior In Kgatleng District, the DET had many Nursing Sister. other agenda items to cover at each meeting The Committee met every other month and, therefore, was unable to spend much during the first year of the Pilot Project. time discussing ESPP. The DET was very Progress during the preceding two months useful in monitoring progress but was incapa- was discussed, and proposals for the following ble of giving the necessary time to planning. A monthsmajor advantage to the DET was that the monts wee pt foth.Pilot Project team was able to work within In Kgatleng District, the same function was the Council and request assistance from other carried out during the regular meetings of the departments. District Extension Team (DET). It met monthly and discussed ESPP as one of its agenda items. 17 3.2 Tour of Previously Improved Villages Recommendation In order to better acquaint itself with the content of the programme, the District Sanitation Planning Committee should tour villages in a District which has been previously improved, as soon as possible after its first meeting. Elaboration The District Sanitation Coordinator should tion Coordinators and Village Sanitation organize a tour of the previously improved Assistants. Their experienCe could help the villages (see map at front of book) as soon as Committee in its future deliberations and possible after the first meeting of the District engender stronger programme spirit. Sanitation Planning Committee. This tour During the same tour, consideration should should give Committee members an opportun- be given to visiting some or all of the villages ity to gain first-hand experience of the under consideration for future improvement. problems, inputs and outputs of the ESPP It could prove helpful for the C-mmittee to Pilot Project. Pilo Proect.gain first-hand knowledge of these villages Committee members should also have an prior to preparing its District Sanitation Plan. opportunity to talk with the village Headman and, where possible, previous Village Sanita- Pilot Project Experience The Pilot Project team took visitors, and District and village staff on tours of the Pilot Project on many occasions. The team found that this led to increased interest in the Pilot Project on the part of those who were working in other villages. In other words, prioris believing." 18 3.3 Selection of Villages to Be Improved Recommendation If they have not already been identified in the Project Memorandum, the District Sanitation Planning Committee should select the clusters of villages which will be improved during the programme period. The major factors to be considered for this process are: 1. Proximity The villages within a single cluster should be located relatively close to one another. 2. Communal First Development Area If a Communal First Development Area has already been established in the District, the programme should commence within this area. 3. Numbers It will be difficult either to administer more than five villages or to build more than 400 latrines within a single 18-month implementation period. 4. Approvals The final selection must be approved by the District Council and, ultimately, the village residents. Elaboration Following the completion of its tour of d) to accomplish common tasks in all previously improved villages, the District the villages during restricted periods of Sanitation Planning Committee can begin implementation (e.g., building selecting the specific clusters of villages to be demonstration latrines during the short improved on an annual basis (see Figure 1). winter period). This will be a complex task, as a number of important factors come into play. The Com- on i tion er's sof villae mittee may decide to prioritize these factors, ne implement p e shul b o recognizing that its selections represent one of each will overlap and both will need to share the most important decisions in the the same staff and transportation. programme. The major factors which will need to be Ia Communal First Development Area considered include the following: I omnlFrtDvlpetAe a consderd iclue th folowng:already been designated within the District, 1. Proximity the Committee should seriously consider Villages within a single cluster, which are commencing its programme'within this area in being improved within a single 18-month order to reinforce central government policies. period, should be located in relatively close proximity to each other, in order: 3 ubro ilgsNme fLtie proxmit to achothr, i orer:Pilot Project experience demonstrated that it is a) to improve staff efficiency; difficult logistically either to administer more b) to reduce transportation costs; than five villages or to build more than 400 latrines within a single implementation cycle. c) to facilitate centralized manufacturing In reviewing its options, the Committee will and distribution of necessary building need to estimate the number of latrines it can materials; anticipate being constructed in each of the 19 villages it is considering. In order to calculate Extension Team should be called. At that the estimated number of latrines per village, meeting, these people should be told that their take the number of plots in the village that village is being considered for the programme, are actually occupied (from the census) and and the goals and potential benefits of the subtract 10 per cent; half of the remainder can programme should be explained. If this group be expected to build latrines. expresses an interest in continuing, a Kgotla 4. Final Approval meeting should be held during which the The Committee's recommendations regarding programme is explained and questions are the location and number of villages to be answered. At this meeting, a decision should improvedbe taken by the village as to whether and how imprvedwil ned t be orwrde tot~eto proceed. This will help villagers feel it is District Council for final approval. Ultimatezly, their programme, as opposed to something the residents of each village will also have to from the outside which is being forced on support the programme if it is to be a success. them by Council. Thus, a meeting of the Headman, the Village DevEnlopment Committee and the Village Pilot Project Experience In December of 1979, the District Develop- 4. The villages should vary in distance from ment Officer, the District Land Officer, the the District administration centres and the Council Secretary and the District Project railway line. During any pilot or experi- Officer of Southern and Kgatleng Districts mental phase, at least one remote village held meetings in Kanye and.Mochudi to select spat suffers from lack of communication six villages in each District that were consi- should be included. dered socially and geographically appropriate. 5. The presence of village development struc- The following are the sociological criteriah iles l which were used by this group to select the trsadhat aiiissol ay villages. The hydrogeological criteria, drawn up by Mr. 1. The villages should endorse the project, its H. Lann, the Head of Water Affairs, are goals and methods. This should be included in Appendix I. expressed at Kgotla. No village that is The final decision on which three villages, opposed to the project, or even lukewarm out of the six recommended by the Commit- in its support, should be included, not tee, should be included in the Pilot Project even for experimental purposes. was left to the respective District Councils. 2. The villages should represent different The three villages finally selected in Kga- sizes and population densities. tleng District were Artesia, Mabalane and 3 Olifants Drift. In Southern District they were Teovilles. uDifrepresnt difrentccpa Ranaka, Selokolela and Keng (for village tions, such as animal husbandry andriat mixed subsistence farming, should be One advantage in the final selection was included and possibly also specialized that the chosen villages provided the Pilot activities and rural industries. Project team with the opportunity to experi- ment with a wide variety of soil types and 20 conditions. However, it soon became clear waste of petrol and increased inefficiency, that the disadvantages outweighed the advan- particularly since the delivery trucks often tages. The overriding problem was that the carried only half a load. selected villages were too far away from each The Pilot Project team made an attempt to other. A considerable amount of staff time was lost simply moving from one village to supervise work and to hold meetings on another. In turn, this was expensive and an delivery days in order to cutdown on excessive amount of petrol was used. The transportation costs, but this was not always situation was further aggravated by the fact possible. Quite simply, had the villages been that the winter building season is short and, located within a single cluster, that is, closer asto each other, considerably more latrines months. In addition, it was impossiblex could have been built for less money. Every deliver building materials to more than one particlasrl sinece ther eiver trus ftaen village on a single trip. This led to a furthere ser to h tin g 21 3.4 District Sanitation Plan Recommendation A detailed District Sanitation Plan should be drawn up by the District Sanitation Planning Committee, under the direction of the District Sanitation Coordinator. This plan should be based on an implementation period of 18 months for each separate cluster of villages. Elaboration Following the selection and approval of an 18-month period of implementation for villages, the District Sanitation Planning ;ach cluster of villages, so as to cover two Colnittee is in a position to draft a detailed winter construction seasons. In turn, work on implementation plan for the entire District each cluster would begin one year apart (see (see Figure 1). This plan should identify Figure 1). separately the rajor components of District Each 18-month cycle should be broken into planning and include a rough time schedule for each. Next, the plan should identify the schedule for each village and each cluster of Phase I. Motivation and Demonstration - villages. The more detailed this plan is at the June to November (see Figure 3). beginning, the easier it will be to administer This phase should commence with and follow in the future. The District the calling of introductory Kgoda Sanitation Plan is important in three respects: meetings in each of the villages in the first cluster. These should be 1. It encourages the Committee to get followed by the selection of Vil- together to discuss the detailed objectives lage Sanitation Coordinators of the programme and how best to (VSCs) and Village Sanitation achieve these. Assistants (VSAs). This phase cul- 2. It establishes a sequence of events which inates with the construction of will need to be adhered to if these demonstration latrines at selected objectives are to be accomplished within sites in each village. Finally, a the available time and budget. second Kgoda meeting should be the called, just before people return to 3. It serves as a benchmark against which the lands, to look at the demon- the District Sanitation Coordinator can stration latrines and to explain the gauge and evaluate the programme's construction process, the overall progress. For example, by comparing costs for individuals and the projected and actual progress, he should methods of payment. be able to anticipate and prepare for scheduling problems before they arise. Paeemrerato for Cstru - Typically, the majority of village residents During this phase, the construc- may only reside in their home village during tion teams in each village should the dry winter season (June-November). Thus, be preparing for the coming win- because the programme relies not only on the ter. Slabs and ventpipes should be establishment of close contact with these centrally manufactured and dis- householders but also on their active partici- tributed to the villages for stock- pation in the construction process, a lot must piling, along with other local be accomplished during the winter season. building materials. Village Head- Traditionally, this is also the period when men should be encouraged to people build new houses or renovate old ones. commence the collection of pay- In light of these factors, it is recommended ments from individual residents. A that the District Sanitation Plan be based on rule of thumb should be that 50 22 per cent of the total cost should constructiorr of their latrines, be collected by the time construc- assisted by the VSAs. Also, the tion begins in June. Contracts VSC should ensure that outstand- must be signed with each house- ing payments are collected before holder who wants to build a construction is completed. latrine. Phase III: Construction - June to November (see Figure 5). During this phase, individual householders will undertake the Pilot Project Experience The following Pilot Project experiences led to 5. The training and supervision of the VSC the recommendation of an 18-month, three- and VSAs had to be done carefully and, phase programme. once again, took a great deal of time. 1. The Pilot Project team found that it took 6. Many times, women wanted to sign a VSAs three to four months to complete contract but could not do so until they the demonstration latrines. This construc- had spoken with their husbands, who tion could not begin before the VSAs had often were working away from the village completed their own harvesting. and would not return for some months. 2. During the second year, the Pilot Project 7. Informing the householders about the team attempted to get villagers to come project required repeated contacts and back from the lands and start construction took a great deal of the Pilot Project of the latrines before June. This met with team's time. total failure. It was not that the villagers 8. The completion of the demonstration were not interested but, rather, that they latrines generated a great deal of interest were busy with the harvest. Also, they knew that they would be back in their am e householdersnd villages in a month or so and decided that they could start then. Throughout the project, the Pilot Project team 3. The Pilot Project team found that many of adnc plannionbandecopletionof people who wanted to build latrines required time to accumulate enough ongoing activities. money to pay for them. 4. The tendering and production supervision of the slabs and ventpipes took a great deal of time. Transportation of these materials to the villages was also very time-consuming. 23 3.5 Logistics Recommendation The District Sanitation Coordinator should familiarize himself with the-logistical iequirements of the programme as early as possible. Elaboration The District Sanitation Coordinator (DSC) Next, it is important to meet with the should familiarize himself thoroughly with the District Work Supervisor. He may eventually Project Memorandum for his District Sanita- need to hire, or lend one or two builders to tion Programme as soon as possible. The serve as Village Sanitation Foremen and Project Memorandum should describe the should be made aware of this. The implemen- logistical supports (e.g., transportation, staff, tation of the programme may also require the revenue, etc.) which are required to implement services of additional casual labourers from the programme, and the DSC should arrange time to time from the Work Supervisor's meetings with the District personnel con- department. cerned. It is essential to prepare for the The DSC should also contact the Revenue implementation period as far ahead of time as possible. It is also essential to coordinate the activities of other Council departments in policies. Money reverting to the Council from order to achieve the project goals on schedule. the sale of latrine materials in the villages will be passing through his department. It will also It is especially important to meet with the be necessary to discuss and decide on methods District Transport Officer to ensure that the of payment and revenue collection at the necessary vehicles (i.e., at least one five-ton village level. lorry and one four-wheel-drive vehicle) are or will be available when they are required in the Finally, tenDSCon to Dvisent winter season. CuclsSno omnt eeomn wintr seson.Officer to contact all Assistant Community The DSC should also contact the Council Development Officers in the villages to request Stores Officer, as most programme materials their assistance in explaining and implement- will be bought through him using Local ing the programme. Similarly, the Senior Purchase Orders. Remember that tendering Nursing Sister will need to advise the village processes are long and should begin imme- Family Welfare Educators. diately. The DSC should attempt to familiar- ize the Council Stores Officer with the kinds of demands that the sanitation programme will place upon him. Pilot Pro ect Experience Pilot Project experience emphasiZL3 the need advertised for a period of a month. The to make arrangements for all project activities schedules of Council officers often fill up early well in advance. The Local Purchase Order as well. Talk to them well ahead of time so system is time-consuming, as several signa- that the programme's activities will occur on tures are required. Transport must be availa- schedule. ble for delivery of goods. Purchasing early will Pilot Project experience indicates that every- ensure that the programme is not delayed due thing takes more time than is estimated. to late arrival of materials. The tendering system is long because tenders must be 24 3.6 Dissemination of Information Recommendation Village residents and members of the project team should be kept fully informed of the progress and content of the programme at all times. Elaboration The importance of thorough and accurate should be distributed on a Friday so that dissemination of information during the imple- those householders working or living at mentation period cannot be overemphasized. the lands might receive word over the This means informing not only the village weekend from their visiting children. residents but also the project staff, who will be c) The meeting can be announced by loud- passing on what they know to the public. speaker on the day it is to take place and The two most important forms of commun- drop more handouts as you travel through ication are as follows: the village. 1. The Kgotla Meeting d) The meetings can be made more lively by The Kgotla is the traditional focus of informa- using slides, film, theatre, etc. tion exchange and public communications. Information distributed here will gain added 2. House Calls legitimacy because it is supported by the Chief In some villages, attendance at Kgoda meet- or Headman, who, in turn, feels more a part ings may be low. Consequeptly, it is essential of the programme. that the Village Sanitation Coordinator (VSC) A recent problem with the Kgotla is that follow up the meetings with individual house meetings have tended to attract fewer and calls to all occupied plots in the village. This fewer people. Four things can be done to will ensure that everyone receives the correct improve attendance at the meetings where information. During the call, the VSC should sanitation is discussed: outline the entire programme, focusing on its major components, costs to the plot-holder, a) The sanitation programme can be inte- the plot-holder's input and District Council's grated with those of other organizations, role in the implementation. It should also be such as the Land Board. possible for householders to sign a contract b) The meeting can be advertised a week in (see Appendix VI) at this point if they want advance by sending written handouts (see to. Finally, the VSC should leave another Appendix III) home with schoolchildren. copy of the handout with each householder to These handouts should detail the time, ensure that he/she has a copy to refer to. place and content of the meeting and Pilot Project Experiemei The distribution of accurate information was programme should proceed with fewer one of the most perplexing problems encoun- problems. tered by the Pilot Project team. Most major Three different approaches were employed. problems resulted from misinformation or a The Kgotla, the traditional method of dissemi- total lack of information. nating information, was used first. Attendance It cannot be emphasized strongly enough was fair to good in most villages. However, in how important this aspect of the project is. If Ranaka, where attendance was better than it is done carefully and thoroughly, the elsewhere, it still only amounted to about 7 25 per cent of the total village population. Since Towards the end of the Pilot Project, the it was realized that this was not enough, VSCs were sent out to visit houses door-to- efforts were then directed at ways of improv- door in order to explain the contracts and the ing attendance at the meetings. The Pilot building procedure. This proved to be most Project team drove through the village and effective. The situation that best illustrates this announced the upcoming meeting over loud- happened in Ranaka. Duringa well-attended speakers. This met with some success, but the Kgola meeting, organized to explain the cost of the equipment was considered beyond contract and encourage people to sign up, the means of most villages. However, if the villagers were told that they should visit the District already has the equipment, then it Revenue Officer as soon as possible to sign should be used.'The major problem with a contraE. After one week, only 11 contracts public-address system is that it is only good had been signed. The VSC, VSAs and the for people in the village. Those at the lands District Sanitation Foreman then visited every cannot hear it. house and explained the procedures and Another method used to enhance Kgotla offered to sign contracts. In the next three attendance was the distribution of written days, 104 more contracts were signed. Door- notices to schoolchildren one week before the to-door visits are, by far, the best way to meeting. The results of this were very good inform the villagers. While they are time- and boosted attendance by more than 100 per consuming and costly, the Pilot Project team cent. However, it required much advance members felt that the time and cost were well planning and an additional trip to the village. worth it. When this advance notice included basic information about the project, it served two purposes and therefore was much more effective. 26 3.7 Other Agencies Recommendation The program should make use of the expertise available in other government ministries and agencies concerned with sanitation. Elaboration There are several tasks that need to be monitored. Construction booklets need to be performed as part of the sanitation pro- reproduced. Currently, this kind of expertise gramme that require special skills or equip- does not exist at the District level. There are, ment not possessed in the District. For however, departments of government that do example, an analysis of subsurface geology in this work routinely and that make their programLme villages is necessary prior to personnel available to do such work for selecting the final substructure design. This Councils. These departments should be should be done by the Department of requested to help when needed. Geological Surveys. Water tables must also be located by the Department of Water Affairs (DWA). Borehole water may need to be Pilot Project Experience The Pilot Project was designed in such a way written materials produced for the Pilot that the two Districts would work closely with Project by the Project Materials Producer. The the Department of Non-Formal Education in MLGL administered the Pilot Project in the Ministry of Education, the Ministry of liaison wit e the Districts. The DWA carried Local Government and Lands (MLGL), and out all of the water testing. Without these the DWA. The Department of Non-Formal inputs, the Pilot Project could not have Education was ultimately responsible for the succeeded. 27 生 4.1 Senior Public Health Engineer Recommendation The Ministry of Local Government and Lands should appoint the office of the Senior Public. Health Engineer to oversee the design and implementation of District Sanitation Programmes throughout Botswana. Elaboration The office of the Senior Public Health 4. promote the National Rural Sanitation Engineer (SPHE) is obviously the key agency Programme by addressing District and effecting the National Rural Sanitation Local Councils when requested; Programme. The office of the SPHE should: 5. review all technical aspects of the District 1. advise District Sanitation Coordinators Sanitation Programmes; (DSCs) on all aspects of programme 6. approve all latrine designs selected for planning and implementation; specific villages; 2. work in close liaison with Senior Water 7. initiate monitoring and evaluation Officers or Senior Works Foremen and programmes for completed components of the DSC in setting up and administering the District Sanitation Programme. ongoing sanitation training programmes; 3. initiate and investigate requests for additional donor funding relating to sanitation and rural environmental improvement; Pilot Project Experience The Pilot Project was coordinated by a team funded by the, United States Agency for International Development. During the later stages of the Pilot Project, a national counterpart was assigned to the SPHE, and he coordinated the first National Rural Sanitation Programme. 30 4.2 District Sanitation Coordinator Recommendation A full-time District Sanitation Coordinator should be appointed in -each District undertaking a sanitation programme, and he should remain in the post until the end of the programme. Elaboration The District Sanitation Coordinator (DSC) 7. supervise payment of village-based staff; should: should:8. complete regular end-of-month progress 1. serve as Secretary of the District reports for the Senior Public Health Sanitation Planning Committee; Engineer; 2. 'work with the Senior Public Health 9. keep a day-to-day diary ahd ensure that Engineer to plan, organize and implement all project sfaff do the,same; training programmes for project staff at the District and village level (see Fore and Vilage Sanitation Appendices XVI and XVII); FrmnadVlaeSntto Appedics XI an XVI);Coordinators in-preparing their weekly or 3: report regularly to the District Extension biweekly work plans; Team, the District Officer and the Senior 11. coordinate ongoing monitoring of the Public Health Engineer on implementation programme. progress; Distict aniatio Forman It is clear from the Pilot Project experience 4. supervise the Districtthat the DSC must be appointed on a fll- in the construction phases of the time basis, and should, if at all possible, programme; remain in the post over the entire period of 5. supervise the procurement of construction implementation of the District programme. tools and materials; 6. ensure that proper stores procedures are followed at both Council and village levels; Pilot Project Experience The original ESPP Project Paper called for Census and were lost to the Pilot Project for Kgatleng and Southern Districts to each four critical months in the winter building provide a District Officer (DO) to work half- season. Finally, the SCDO was transferred time with the Pilot Project team. Southern altogether and not replaced. Some attempt District appointed the DO, and Kgatleng, the was made to replace the DO with another Senior Community Development Officer Council staff member but he was equally (SCDO). In both cases,*,they already had busy. In summary then, the Pilot Project team heavy work loads and, thus, were faced with never really had the assistance of a District competing responsibilities, not all of which Sanitation Coordinator and, thus, came to could be'achieved. Subsequently, both the realize his importance. SCDO and DO were assigned to. the National 31 4.3 District Sanitation Foreman Recommendation A District Sanitation Foreman should be hired on a full-time basis to coordinate and supervise the construction of all the latrines in each cluster of villages. Elaboration Reporting to the.District Sanitation 5. liaise with the VSC in setting up the Coordinator (DSC), the District Sanitation village storeroom and stores procedures; Foreman (DSF) should: 6. instruct the VSAs in techniques of latrine 1. coordinate and supervise all latrine construction; construction activities at the village level, 7. keep a daily journal. including both demonstration and household latrines; It should be noted that one DSF should be 2. be responsible for organizing assigned to each cluster of villages (not more transportation of materials to the villages; than five villages in one cluster). When the implementation of the programme in one 3. work closely with the Village Sanitation village overlaps with that of another, a single Coordinator (VSC) in the preparation of foreman will not be able to train the VSAs in construction schedules, weekly work plans one cluster of villages at the same time that he and village payment sheets for the Village is supervising the construction of household Sanitation Assistants (VSAs); latrines in another. 4. supervise the VSAs; Pilot Project Experience Both District Sanitation Foremen were trained said that each day's activities were dependent during the building of the demonstration on the preceding day's progress and that a latrines for the Kgatleng District Agricultural plan was, therefore, difficult to write. While Show in July 1981. Soon after that, they this may be true, it does not eliminate the began supervision of construction activities in need for a weekly plan, even'if it needs to be their respective Districts and conducted altered. DSFs should draw up such a plan, in further training of VSAs. They were indispens- consultation with the DSC, on a weekly basis. able to the Pilot Project. The plan should keep activities on schedule They both did their own planning on a and economize on transport costs, which can weekly basis, using a form supplied by the become excessive if trips to and from the Pilot Project (see Appendix VII - Planning programme area are not rationalized. and Report Form) but disliked doing so. They 32 4.4 Vilage Sanitation Coordinator Recommendation A village resident should be selected to serve as the Village Sanitation Coordinator in each village. Elaboration The post of Village Sanitation Coordinator and complete payment sheets at the end (VSC) is a key one. The VSC should be of each month; selected by the District Sanitation Coordinator (DSC) with considerable care. The DSC 3. be responsible for village stores and keep should consult with the village Headman in(sign- thisl slcton.utwt h ilaeHamni ing in materials delivered by Ccuncil, and thissigning out tools and mateals taken by The VSC should have the following VSAs); qualifications: 4. work closely with the village Headman a) be at least 20 years old; and the Village Extension'Team; b) have at least junior college education 5. organize Kgotla meetings; (Cambridge exams, if possible); 6. work closely with the Family Welfare c) be a resident of the village he/she will Educator and the Revenue Officer in be working in; the collection of materials payments; d) be literate in Setswana and English; 7. keep a daily diary which should include e) have a knowledge of basic mathematics; problems encountered, questions, mate- rials and -tools needed, etc.; f) be recommended by the Headman. 8. coordinate the Village Baseline Survey; The VSC shall report to the DSC and should: 9. maintain a physical progress record on 1. visit all householders in the village to household latrines (see Appendix VIII explain the programme, the need for - Village Latrine Inventory): latrines, the method of construction, and the contract; 2. keep a daily record of what each Village Sanitation Assistant (VSA) does Pilot Project Experience The position of Village Sanitation Coordi- villages were transferred (only the one in nator (VSC) was a late addition to the Pilot Keng remained), and only two of the Project. It was first thought that the original EWEs remained (in Ranaka and organizational work in the village could be Keng). done by the Assistant Community Develop- Lack of motivation is also a problem. ment Officer (ACDO) or the Familyaml w fa Welfare Educator (EWE). However, this SevlaerEctr s a hveue O shon thi turned out not to be the case. During the ma ane AOe neer e their duration of the project, the ACDOs Acoone CO the Pilot Projecte Sve assigned to five of the six Pilot ProjectvExperience 33 believed that if he did nothing he would were responsible for housecalls to explain soon be transferred to a better place, as he the project, for signing contracts, for was unhappy in his present post. Some also encouraging payment, and for coordinating had a very heavy work load (i.e., FWEs in the Councils' component of latrine con- Ranaka and Keng). Some were also sta- struction. They were also responsible for tioned in other villages and had no coordinating the VSAs' schedules, recording transport to project villages (ACDOs in their working hours, and relaying problems Ranaka, Selokolela, Keng, Mabalane). to Council project staff. For these reasons, the VSCs were hired and turned out to be very effective. They 34 4.5 Village Sanitation Assistants Recommendation At least two village residents should be selected by the Headman and the Vilage Development Committee to serve as Village Sanitation Assistants. Elaboration On average, two Village Sanitation Assistants d) preferably, have some history of sala- (VSAs) will be required in each village. ied employment; Preferably, one should be male and one female to ensure that, together, they have experience in the full range of modem (male) and traditional (female) building techniques. te CoAsdshal or to the Vill For example, while a man may not make mud bricks, a woman may not dig a pit. The VSAs 1. build demonstration latrines as part of should be selected by the village Headman their training; and/or the Village Development Committee, and should have the following qualifications: 2.tcons r en ose olders' a) be old enough to have participated in the construction of their own house;encouraging villager b) be residents of the village where they participation. are to be employed; c) have a reputation for honesty and hard work; Pilot Project Experience VSAs were selected by Headmen, often in Ranaka and Selokolela often spoke in favour conjunction with the Village Development of the project at Kgorta meetings and Committee. This worked satisfactorily and, in explained things that were unclear. Males most cases, produced adequate Pilot Project usually did not speak. The female VSA in village staff. The important characteristics of a Ranaka often did motivational work on her good VSA can be outlined as follows: owas without being asked. Age: VSAs ranged in age from 23 to more Literacy: A few of the VSAs were literate and than 60. Two younger assistants who were thus helpful when contracts were being signed. chosen in Olifants Di" were ultimately They were also able to interpret the substruc- rejected. Neither had any experience building ture manuals which were produced. with either traditional or modem materials. The 60-year-old female VSA performed her Previous Work Experience: Those VSAs with a work very well. However, she was not previous history of salaried employment required to do any heavy concrete work, worked more quickly and efficiently than the others. All had previous experience with Sex: Of the 12 VSAs, nine were male and traditional building, and all worked in this three were female. There was no appreciable area satisfactorily. Some had previous expe- difference in work performance between male rience with concrete construction but still had and female VSAs. The female VSAs in difficulty producing slabs that did not crack. 35 Strength: Most of the work required by the programme is not heavy. There is, however, some loading of sand and earth into a truck, loading and off-loading of concrete slabs and packets of cement, and operating a jack- hammer. When one VSA was unable to do this work, it was done by another, by Council labour or by a labourer hired on the spot. 36 4.6 Village Development Committee/ Village Extension Team Recommendation Where possible, the Village Development Committee and the Village Extension Team should be encouraged to become actively involved in the Village Sanitation Programme. A special eff6rt should be made to gain the assistance of the Family Welfare Educator in promoting the educational compo- nents of the programme. Elaboration In many villages in Botswana, the Village could provide the link between the pro- Development Committee (VDC) and the gramme and the VET; and, second, the Village Extension Team (VET) are very active, sanitation programme would be linked to village-based organizations. If approached in other village activities. the proper way, they can be of great help to The Family Welfare Educator (FWE) is the the programme. village health educator. This person is charged The VDC is chosen by the Kgotla every two with the job of encouraging better health years and is responsible to the Kgotla. Its practices. The FWE does this by making major task is identifying and organizing house visits, talking to people at the health village development projects. The village post or clinics, and giving monthly talks at the Headman is a key member because he has the Kgoda and clinics. One of the subject areas authority and power to mobilize the villagers. covered is environmental sanitation. Recent The VDC might best be used as a consultative studies have shown the EWE to be one of the committee in setting up programme activities most effective and best known of the village in the village, and the initial contact in the extension staff. Therefore, the involvement of village should be made through it. A word of the EWE in the programme could be very warning - if an effort is not made to work beneficial. However, the FWE will probably with the VDC during the initial phases of the be very busy already, and any additional programme, the programme could suffer a demand on her time could be met by stiff serious loss of support and its progress could opposition. It will, therefore, be necessary to be impeded. approach the EWE carefully by suggesting The VET is made up of the village-level that she might help inform the'villagers about extension staff. It will normally consist of the the og her rese ouse visits Assistant Community Development Officer asked to hand out written material. (A series (Secretary), the Agricultural Demonstrator, of educational materials were produced during the Staff Nurse, the Family Welfare Educator the ESPP Pilot Project. These materials can be and the Head Teacher. These extension obtained from the Senior Public Health workers are in daily contact with the people and, in most cases, are well known by them. en n tnsta Therefore, it is advisable to keep these Oeople well informed and to encourage them to play an active role in informing all those house- holders they come in contact with about the programme. It might be advisable to ask the VET if the Village Sanitation Coordinator (VSC) could sit in on VET meetings during the programme's duration in the village. This would have two advantages: first, the VSC 37 Pilot Project Experience In the first year of the ESPP Pilot Project, a were very poorly attended and changes were great effort was made to involve the VDC in cleared with the Headman instead. the development of the project. If no VDC existed, then a Village Sanitation Committee Liaso ith the Vf ws ever h was created. The Pilot Project team found it pered by the trf of it the r difficult to organize meetings with either of Prtseof te cor tnat the it these groups. When dates and times were set, Poject e vere t the Assisat only a few members would show up. On the C omu ny ment i ll y other hand, when well attended, these meet- ings proved quite effective, and useful sugges- residents. In part, these persons were supposed tions were forthcoming. to attend to several villages at one time and were usually without transportation. Generally After the first year, the Pilot Project team speaking, extension workers were encountered adopted the VDC as strictly a consultative on a one-to-one basis and would lend a hand, body. In other words, meetings were only depending on their work load and degree of called when there was a change in direction or interest. a new component of the project to discuss. In a number of villages, meetings with the VDC 38 5.0 atrine Design and Construction - &~'- S - - i±. 5.1 Latrine Design Recommendation The design of latrines used in the District Sanitation Programme should: 1. eliminate offensive odours; 2. control the movement of flies and other insects to and from the pit; 3. provide for latrines which are safe to use and perceived as such by the users; 4. be affordable to village residents; 5. be attractive, hygienic and easily maintained. Elaboration Although most people in rural areas would latrine is properly designed and if appropriate like to have a latrine for health, privacy, methods of construction are used (see Section convenience, status or other reasons, very few 5.2 - Latrine Construction). The advantages have actually built them. When asked why, a of having a latrine are numerous, and when it number of reasons are given: they smell bad is properly designed, most people will choose and are unpleasant to enter; they may collapse to build one. Currently, four BOTVIP designs with someone inside; children may fall have been approved for use in rural areas (see through the hole into the pit; they attract flies Figures 14-17). to the household; or they are too expensive. All of these objections can be overcome if the Pilot Project Experience the sunnier north side of the latrine and using The first task of the Pilot Project was to a dark-coloured pipe to absorb as much heat design a latrine that would overcome people's as possible. objections to them. Some of the observations and procedures used were as follows: Efies: Flies lay their eggs in human excreta. They are attracted by the smell of the oxcreta, Odour: Excreta in a latrine pit undergoes whether it is on the ground or in a latrine pit. natural decomposition by micro-organisms. Flies mature in the excreta and then leave it, Decomposition is good because it reduces the carrying with them disease germs that are volume of the waste so the latrine lasts longer, often then carried to people's food. If nothing and also because it destroys the germs that is done to prevent the exit of flies from the cause disease. However, this decomposition latrine pit, the number of flies in the area of produces unpleasant-smelling gases. If these the household will increase and cause a gases rise up into the latrine superstructure, greater health hazard. they make entering the latrine unpleasant. To It is almost impossible to prevent some flies avoid this, the design must ensure that these from entering a latrine pit, and even one fly gases are vented to the outside of the superstructure. The ventpipe will do this if (1) it is at least 150 mm in diameter; (2) it is taller to prevent most of these flies from escaping than the latrine so that wind blowing over thedo this. top pulls odours out; and (3) it is positioned in such a way that the sun heats the air inside and the exterior. Use of physical barriers so that it rises and is vented. The latter can be requires that all entrances to the pit be accomplished by positioning the ventpipe on blocked. These include the hole for the 40 ventpipe, which must be blocked by a screen. rests on undisturbed ground rather than on The seat can be blocked with a cover or the slab over the pit (seeFigure 14). Second, screen but must be regularly unblocked when the slabs across the pit are extended well it is in use. beyond the edge of the pit so that they also The alternative approach is to provide a been nrow ed ro the i desno preferred exit for the flies, and then to screen ree the o the sl beaing. it. Flies in a dark place will only fly toward Third, the pit is strengthened against collapse. light. Thus, the Pilot Project latrines were designed so that the only light seen by flies insbl e sols thima pi a c ret inside the pit came down the ventpipe. TheIn unstable flies would thus attempt to exit the pitsoils, the pits are lined from top to bottom. In through the ventpipe and would be blocked the Pilot Project, this was done in two ways: by the screen secured to its top end. It is with the wire-mesh and filter-fabric lining, and important to ensure that the inside of the with a trapezoidal brick lining (see Appendices latrine is kept dark so that light entering the IX-XI for descriptions of these methods). pit through the seat will not attract the flies to exit there. The small internal wall in both The seat insert was designed so that the top superstructure types is designed for this was large enough to be comfortable for adult purpose. use, but tapered to a small hole at the bottom, so as to alleviate fears of children Physical Safety: There are many stories of falling through. latrines that have collapsed into their pits while the owner was inside. There are also Te Pilt ojectfea ent wthua widespread fears that small children will fall through seat holes and be trapped in the pit. tures and superstructures before selecting the In order to alleviate these fears, latrines must superstructures all thin be designed which are stable. They shouldsuesrcrsthtweatalybitihn bae desgedthl which r sal Teynouldha the six Pilot Project villages. These_are called have a seat hole which is small enough that BTIs n a ecmie ocet no one will be afraid that children may fall Ber of dfn desine Figures through.14-17). Stability is accomplished in three ways. First, the superstructure is offset from the pit. Thus, most of the weight of the superstructure 41 5.2 Latrine Construction Recommendation The construction techniques and materials used in building the District Sanitation Programme latrines should be chosen to minimize the householder's costs and to maximize the degree to which the householder can participate in the construction process. Elaboration The main reason that most people in rural cost so much is that the householder had to areas do not have latrines is because they hire someone else to build his latrine because cannot afford them. Those which do exist he thought that it had to be built of concrete may have cost anywhere from P250 to P600 block, a material which was unfamiliar. Thus, to build, that is, more than most families' the contractor needed specialized skills and, in annual income. Consequently, it is critical that addition, cement had to be brought to the construction costs be kept as low as possible village from outside, both of which added to without sacrificing quality. the costs. In contrast, materials which are There are two ways of reducing costs: first, available locally are often suitable for latrine encourage self-help construction; and, second, construction; they will be familiar to village make greater use of building materials availa- residents and it is likely that the villagers ble locally. In fact, the two are closely related. already know how to work with them. For example, the reason many existing latrines Pilo t Project Experience Once the latrine was designed, the method District Council does not, line the latrines it used to construct it was simplified. The best biilds in these villages. The Pilot Project did method for building each of the latrine not line pits in Mabalane, Artesia, Olifants components was found on a trial-and-error Drift or most of Ranaka, and none of the pits basis. The following is a description of Pilot have collapsed. Project experience, focusing on each compo- The problem has been simplified somewhat onscby the development of low-cost methods of Latrine Pits: The most difficult and important pit lining by the Pilot Project. With the decision to be made in constructing a latrine availability of these linings and the unknown pit is whether or not the soil around the pit is quality of most soils, the Pilot Project would strong enough to support the weight of a recommend that all pits be lined except those superstructure without some kind of reinforc- in rock. The latter should be dug using a ing. In the villages, soils vary widely over a jackhammer (see Appendix XIII) or be very small distance. In Selokolela, for exam- partially elevated. ple, the subsurface soils change from alluvial sand and cobbles to brown sand-clay to red Ringbeam: A concrete ringbeam was con- sand to very hard sandstone over a distance structed around the top of each pit to prevent of only 500 metres. In addition, different soil inflow of rainwater (see Appendix IX). Eveni types may be found at different levels in the good soil is susceptible to erosion if water pit, and soil evaluations also mat not yield runs over an exposed edge. On the first entirely useful information. All soil analyses demonstration latrines, the pit was dug first done in Ranaka and Selokolela indicated that and the concrete ringbeam was placed around latrine pits should be lined. However, when the top, using wood or corrugated-metal existing latrines were surveyed, it was found shutters. However, it was found that these pits that only half had lined pits and that no one were often dug too wide for the standard cou d remember a latrine collapsing. Southern slabs and also that considerable labour was 42 required to place the shutters and pour the 7). These blocks were made by a block yard concrete. The Pilot Project discovered that if in Kanye on special order. The pit lined with the ringbeam was built first, both of these them in Keng (at the home of the Headman) problems could be solved. -The ringbeam then was quite successful. However, costs and served as a guide to those digging the pit. It logistics were excessive. The bricks cost P32 also eliminated the need to use shutters. A per metre of pit lining. It is a fairly complex ringbeam has also been used with the block and requires a skilled block-making wire-mesh and filter-fabric lining (see Appen- crew to make it. A five-ton truck can carry dix X and Figures 15 and 17). This is only enough blocks for one latrine, so essentially fo support of the slab. transport is also expensive. Latrine Pit Lining: Soils in Keng were This block was then modified to a straight structurally unstable, so some type of lining trapezoidal brick that could be made in the was required. The common open-jointed, village with a low cement/sand ratio'(see cement-block type was ruled out because of Figure 8). These bricks, -when.placed end to the cost of material and labour. It was end, also form a circle (see Figure 10). They suggested that a lining be formed by stacking can be made in the village in the same way two or three 200-litre drums, without their that mud bricks are made. *Two householders ends, in the pit and backfilling around them. in Keng have borrowed the project mould and This was done with the loose sand in Keng have each made hundreds of bricks with and worked very well. However, the cost of minimal instruction and no supervision* Two drums proved prohibitive and this practice pits have been lined with the bricks to a depth was discontinued. of 2.5 and 6 metres. Permeability and Anoter ethd tied t Kng nvovedcrushing-strength tests performed at the Bots- Another method tried at Keng involvedwaaPltcncsothbrksobef bending welded reinforcing mesh in a circle aa stength One ackto e wl and covering it with fibreglass flyscreen. ake 0rofth brick d of t However, it was found that the sand was so modified brick d d e AtP e fine it passed through the flyscreen. The flyscreen was then replaced with a filter fabric, packet of cement, this lining will cost P5.60 andper metre with the original brick (exclusive of capable of holding back even the smallest labour) and P4.90 permetre with the modified sand particle. It is felt that the steel may rust excu ed f lbr T ecn lineua or corrode below the level of the waste over a 2.5-metre pi with Tse n ab hree period of years and that a pit with this lining hourse(se igures 5 an 17). is probably not pumpable, although further tests are required (see Appendix X and Slabs: Initially, serious consideration was Figures 15 and 17). given to using wooden poles to cover the pit A lining of curved interlocking' blocks was in order to reduce costs. This was not done also installed in Keng. A straight block that for several reasons. First, large numbers of interlocks with those above and below is straight poles are difficult to find. Second, available from Ngami Construction in Jwa- Kgotla meetings expressed reservations about neng. This concept was modified by Rural their safety. Third, wood in the ground is Industries Innovation Centre in Kanye to rapidly attacked by ants and termites. Several curvilinear blocks which, when placed end to suggestions were made to alleviate some of end, formed a circle of one square metre area, these problems. Some thought motor oil or the same as the rectangular pit (see Figure panted on the poles would keep insects away. 43 Others suggested that the ash of certain aloe adequate supervision had not,been provided trees covering the poles would protect them to ensure good quality.) from insects, as the same ash is traditionally Tenders for slabs built by one organization mixed with grain for protection. Another possibility considered was a treatment with a willrhelponsue oo iy sla Evnlo bitumen. The owner of Timber Treatment in sisi Gaborone, hoWever, advised that this would have to be done under conditions of heat and Walls: The techniques for building wall. and pressure. Lack of previous experience led the Pilot Project to focus its attention on the use rost locan ral are We knoempby of concrete slabs. ary 1oiwapas (households) contain both mod- Concrete slabs were designed to extend 60 em and traditional house types, the traditional cm beyond the edge of the narrow pit to types are more popular. These are solid, and distribute the load above the pit as widely as ideally suited to climatic conditions. possible. This minimized the risk of collapse Moreover, except for the shape of the walls, it of uncertain soils under the weight of a latrine is not necessary to train the householder to superstructure but increased the cost, the construct a latrine using thesc traditional weight of the slabs; and the,quantities of techniques. Pit latrines can be maintained with cement required. Three slabs were used an annual application of a mud-dung mixture instead of one. Even so, the slabs were quite in the same way that the houses are. heavy and four people were required to move The wall configurations used wee the one over a distance. A light-weight, fibreglass- reinforced slab was tested but proved much deeled by th eeMinistysof5Han more expensive, and was abandoned because of excessive deflection. A circular slab was Zimbabwe, and a comparable rectilinear designed to cover the round pits (see Figure version (see Figures 14 and 16) suggested by 12). local village groups. The'two shapes are ideal 12). for keeping the seat area darkened, as both The original plan for slab construction was have small interior walls which block the light. to require each householder to build his/her own slabs - with moulds, materials and Dosto tatrhe uer cul attain advice being supplied by Councils. Village d t Sanitation Assistants (VSAs) in all villages privacy in the latrine without having to except Keng were trained to build slabs for purchase a door. Many householders in the the demonstration latrines. However, the Pilot Project villages chose to add a door, quality of many of these was poor. Sometimes using materials they had available. Demon- not enough cement was used. Sometimes too stration latrines should continue to be built much water was used. One batch of sand used out doors, as the programme will notbe was found to have a very high portion of providing doors. People who decide they want* fines, Given that a0equate supervision of ten doors should plan for them before commenc- VSAs was difficult, it was decided that ing construction. supervision of slab making in hundreds of The walls on the double-radius model were households was virtually impossible. (Even marked using the traditional cord and stick one large batch of slabs at Kanye Brigades method. A centre was selected, and a stick on construction yard had to be rejected because the end of a cord was used to trace a circle on the ground. Two different centres, each with a 44 measured cord, were used to mark the two Ventpipes: Except in Keng, demonstration semicircles of the walls. Using this method latrines were built with 15(-mm pvc pipe, proved difficult in standardizing the size of the painted black, because the lower-cost cement- walls and door. Fibreglass patterns for both wash hessian ventpipes were not available at round- and square-wall configurations were the time the prototypes were being built. The then developed (see Figure 13). Bricks were Keng latrines used the hessian pipes. The large placed around the edge of the pattern. This ventpipe was used at the recommendation of a proved much more satisfactory.. The VSAs World Bank study on ventilation that was took the patterns to the home of the builder conducted in Botswana concurrently with the and asked if a round or square latrine was Pilot Project. Both the pvc and cement-wash desired. Once the shape was selected, the VSA hessian (see Appendix XII) ventpipes proved marked the walls, using the appropriate adequate in ventilation. The hessian pipe was pattern. definitely cost-effective (P6, as opposed to P22 Initially, the VSAs merely marked out the for the pvc pipe), but some difficulties were walls by tracing around the pattern with a experienced in procurement of materials. stick. However, it was discovered that if the More training and organization are needed if householder did not begin his/her walls the hessian ventpipe is used. The Pilot Project immediately, these marks disappeared and the also 6onsidered the possibility of using a VSA would have to return and replace them. plastered mud-brick ventpipe. It was felt that, It was also discovered that some householders as it could not be-plastered on the inside, it were not sure how to begin their walls would soon be washed away by raln. because of the difference in height between the Seats: Experience throughout Botswana has slabs and grade. Subsequently, VSAs began placing the first two or three courses of bricks shown that ms poep to use an in the traditional fashion, beginning with the atal se as oppo sed to aq p t first course below the ground surface. Bricks wasdasote p n ePrese in mos for this were provided by the householder, whodemonstration latrines were therefore all built whd ooefa. rqie o opee h al with seats. The seats were built by placing a . and roof. small concrete slab on a plastered mud-brick Roof: All roofs on the demonstration latrines pedestal. The *oncrete slab had a small were200-mm hole in it so that it would be safe for were in public places where maintenance was tha thile Atsm or thmptoiue unlikely. The Pilot Project had hoped that comftaby he ro interior was als most householders would use traditional thatch. In fact, however, most householders difficult to clean. chose to use corrugated-iron roofs on their At the recommendation of an evaluation own latrines. This was due partially to a report, a fibreglass seat insert was designed for recent drought, which meant that adequate use in the latrine. This was designed to be roofing grass was unavailable. Also, many large enough at the top (300 mm) to be people had a sheet or so of used corrugated comfortable for use by adults and small roofing available and found it easier to install, enough where it tapers to pass through the more permanent, and less expensive. In either slab (150 mm) at the base that parents would case, householders easily built their own roofs, not worry about children falling through it. It 45 is also easily cleaned. The lower opening has the fibreglass insert and mud mortar is placed since been enlarged to 200 mm diameter. over the frame. The insert is then pressed into The VSAs have been trained to install these the mud so that the base of the insert passes inserts at people's homes 2nd are paid to do through the hole in the slab. so. A frame i' built of mud bricks the size of 46 劉 6.1 Meetings and Handouts Recommendation Meetings should be held with village residents on a regulur *basis, to listen to their views and keep them informed of the programme's progress. Where appropriate, handouts should be distributed to give residents full and comprehensive programme information. Elaboration To a great extent, the success of the 5. organizing a village-wide programme will rely on how well the village Kgqtla meeting to obtain residents are kept.informed of the progress of villagers' approval. the programme. The most important forum for this exchange is the Kgoda. Information to June 15-20 Distribute Handout A (see be presented at a Kgoda meeting should be Appendix III) to primary discussed well ahead of time and printed on school children. handouts which can be distributed at the June 23-30 First Kgoda meeting. Topics meeting in conjunction with the oral presenta- to be discussed include: tion. Questions should be encouraged and 1. reasons for and descrip- answered at the Kgoda meeting. All important tion of the programme; Kgoda meetings should be held near major 2. schedule of events over public holidays to ensure that all members of the next six months; the household (who are usually home for the 3. date of follow-up holiday) are able to attend. meetings; The following is a list of the meetings which 4. recruiting of VSC and should be held and their approximate dates. A VSAs. brief outline of the kind.of information which Distribute Handout B (see should be covered is also included. Appendix I. Meetings and Handouts. Phase IlYear 1: June July 1-5 Meet with VDC/VET to to November (see Figure 3) select VSC and VSAs. June 1-10 Meet with the Village September 10-15 Meet with VDC to organize Development Committee second Kgotla meeting for (VDC) and Village Exten- the end of September. Topics sion Team (VET) to explain to be discu8sed include: the objectives and content 1. official opening of the of the Village Sanitation demonstration latrines Programme. Topics to be and invitations to the discussed at this meeting Paramount Chief, the include: local M.P. and Council- 1. overall implementation lors to attend, schedule; 2. date and time for cere- mony and Kgoda. meeting; 2. potential hiring of the 3. agenda for Kgoda Village Sanitation Coor- meeting. dinator (VSC) and Vil- lage Sanitation Assistants September 17-22 Distribute Handout A to (VSAs); primary school children. 3. construction procedures September 24 Demonstration latrines must and costs; be completed by this date. 4. demonstration latrines; 48 September 25-30 Second Kgotla meeting. This receive their mobilization fee even though there meeting. includes official will be little work. If payment were to stop, the opening of demonstration VSAs might leave the programme for other jobs latrines by dignitaries. Topics and new people would have to be hired and to be discussed include: trained. 1. construction methods; 2. use of local materials to Meetings and Handoutg Phase Hl1/Year 2: reduce costs; June to November (see Figure 5) 3. overall cost to house- June 1-5 Meet with VDC to organize holder and methods of third Kgoda meeting for the payment; 4. explanation of contract and where to sign. June 6l11 Distribute Handout A to Distribute Handout C (see primary school children. Appendix V). June 12-16 Third Kgotla meeting. The October 1-15 VSC will visit all house- purposes of this meeting holders without latrines and should include: explain the programme. This 1. payment of first 50 per explanation should include: cent, and reminders to 1. what the contract is and save to pay the second what protection it offers; half; 2. how much householders 2. encouraging people to pay; sign contracts; 3. what they receive for 3. scheduling for the next their money; six months; 4. when they must pay; 4. demonstration of con- 5. when construction struction techniques by begins. VSAs. The object of this meeting is Distribute Handout C (see to encourage the householder Appendix V). to sign a contract. August 12-16 VSC should visit all house- Meetings and Handouts: Phase If/Year 1: remin d atrhe t December to May (see Figure 4) complete pat by Aust During Phase II, there will be almost no work 31 if they are to receive a for the VSC and VSAs because the villagers are ventpipe and seat insert. at the lands. During this time the VSC should work half-time, visiting people who have signed contracts and reminding them to pay. There will most likely be other people who will want to sign contracts. The VSAs should continue to 49 Pilot Project Experience The distribution of accurate information was meeting. The results of this were very good one of the most perplexing problems encoun- and boosted attendance by more than 100 per tered by the Pilot Project. Most major cent. However, it required much advance problems resulted from misinformation or a planning and an additional trip to the village. total lack of information. It cannot be When this advance notice included basic emphasized strongly enough how.important information about the project, it served two this aspect of the project is. If it is done purposes and therefore was much more carefully and thoroughly, the programme effective. should proceed with fewer problems. shoud pocee wih feer roblms.Towards the end of the Pilot Project, the Three different approaches were employed. VSCs were sent out to visit houses door-to- The Kgotla, the traditional method of dissemi- door in order to explain the contracts and the nating information, was used first. Attendance building procedure. This proved to be most was fair to good in most villages. However, in effective. The situation that best illustrates this Ranaka, where attendance was better than happened in Ranaka. During a wall-attended elsewhere, it still only amounted to about 7 Kgotla meeting, organized to explain the per cent of the total village population. Since contract and encourage people to sign up, it was realized that this was not enough, villagers were told that they should visit the efforts were then directed at ways of improv- Revenue Officer as soon as possible to sign ing attendance at the meetings. The Pilot contracts. After one week, only iI contracts Project team drove through the village and had been signed. The VSC, VSAs and the announced the upcoming meeting over loud- District Sanitation Foreman then visited every speakers. This met with some svccess, but the house and explained the procedures and cost of the equipment was considered beyond offered to sign contracts. In the next three the means of most villages.'However, if the days, 104 more contracts were signed. Door- District already has the equipment, then it to-door visits are, by far, the best way to should be used. The major problem with a inform the villagers. While they are time- public-address system is that it is only good consuming and costly, the Pilot Project team for people in the village. Those at the lands members felt that the time and cost were well cannot hear it. worth it. Another method used to enhance Kgotla attendance was the distribution of written notices to schoolchildren one week before the 50 6.2 Village Baseline Survey Recommendation A Village Baseline Survey should be conducted in each village under the direction of the Village Sanitation Coordinator. Elaboration A door-to-door Village Baseline Survey (see project, its objectives and its potential benefits. Appendix XIV) should be conducted under Third, as a result of the visits,,the VSC will be the direction of the Village Sanitation Coordi- more easily identified as the residents' main nator (VSC) before any construction commen- contact and will also be more aware of ces. This will serve three important purposes. residents' attitudes towards health, self-help, First, it will collect essential information which etc. In other words, the survey is a critical will be needed to gauge the work that lies part of the overall programme, and it serves ahead. This information includes the number as an important vdhicle for communication. of occupied plots; the number of existing In preparation for the survey, Uie District latrines; the number of people willing to Sanitatio Coordinator should ensure that the undertake their own construction and to pay for materials; and identification of existing village groups or organizations which need to fully understand the questions being asked. be contacted during the implementation pro- cess. Second, because the VSC must visit every household door-to-door, he has an opportun- ity to tell residents somdtthing about the Pilot Project Experience See Pia Kjaer-Olsen, Environmental Sanitation and Protection Project: Report on Baseline Survey/Social Study of Pilot Villages (Gabo- rone, February 1980). 51 6.3 Selection of Latrine Designs Recommendation TI e District Sanitation Planning Committee should approve appropriate latrine substructure designs for each village. Village residents should select their own superstructure design. Scale models of optional superstructures should be made available for review by the Village Development Committee and village residents. Elaboration Following the completion of the Village ground level should use a Baseline Survey, the District Sanitation Coor- round pit lined with trape- dinator (DSC) should meet with the Senior zoidal brick. Public Health Engineer (SPHE), the Village Sanitation Coordinator and staff from the c) Vacuum Tanker Truck: All latrines built in a Departments of Geological Surveys (DGS) va c tanke trc and Water Affairs (DWA) to select approp- su alsocus aroundrpit riate substructure designs for each particular lined with traod bi village. Their choice should be approved by the District Sanitation Planning Committee d) Others: All other latrines should use and presented to the Village Development a'wire-mesh and filter- Committee. fabric lining. Substructure Design: The design of the latrine substructure will be determined largely by Superstructure Design: Design options for the cost, existing soil conditions, the presence of superstructures (or latrine buildings) will be rock or other unpickable soils, and ground- determined largely by the nature of available water conditions. Assistance is needed from local materials and local building techniques. the DGS and DWA in determining the latter. The incorporation of these materials and Once subsurface conditions have been identi- techniques in the design is likely to ensure that fled (or, if need be, investigated and tested in the walls and roof can be constructed and the field), the selection group should identify afforded by householders. appropriate substructure designs based on the Scale Models: The SPHE and the DSC should following guidelines: follwin guielies:ensure that scale models and/or drawings of a) Rocky Areas: All latrines built on rock different design options are available for should use an unlined rec- viewing by the selection committee and village tangular pit with a concrete residents. If carefully built, these models can ringbeam. be used to demonstrate how the latrine is b) Loose Soils: All latrines built on loose assembled, how it eliminates odours and soils where the groundwater prevents the movement of insects, and how table is less than three different superstructures can be used with metres below natural common substructures. 52 Pilot Project Experience Substructure Design: In fact, the demonstra- option for a door to be added later on. tion latrines in all Pilot Project villages were Builders in the Pilot Project chose their own built before detailed plans were completed for materials, and these ranged from traditional the optional substructures. Rectangular mud-brick or cement-brick walls to thatched unlined pits with concrete ringbeams were or corrugated-iron roofs. built in Mabalane, Artesia, Olifants Drift, Ranaka and Selokolela (see Figures 14 and Scale Models: Many of the ideas for the ESPP 15). Pits lined with wire mesh and filter fabric latrine design had been developed before were built in sandy soils at Ranaka, Selokolela anything was built that could be used for and Keng (see Figures 16 and 17). Two demonstration purposes. It was necessary, different options - one, where the pit was however, to have some type of scale model lined with trapezoidal bricks, and the other that could be used for Kgotla and VDC with curvilir,ear interlocking bricks - were meetings in the villages and for meetings with also built at Keng (see Figures 16 and 17). tribal, District, Ministry and donor officials. It was the experience of the Pilot Project This problem was solved by building a small that not all pits located in loose soils needed car d ba od atcod to be lined. For example, at Ranaka, over 100 unlined substructures were built in looser soil A model was built that represented two and, to date, none have collapsed. Generally, types of pits and three types of latrine however, the extra cost of lining was found to buildings, with different roof types. For be small, and all pits should be lined if there purposes of comparison, a square is any doubt about their stability. conventional-type latrine building was placed From a cost point of view, the Pilot Project over a square pit to show how easy it was for discovered that the round pit lined with wire such a building to collapse. mesh and filter fabric required one less slab The ESPP-type latrine was then placed (i.e., two in total) and a smaller concrete offset over a narrow trench to illustrate the ringbeam than the others. In addition, it was advantage of this method of construction. The found that the one pit lined with trapezoidal round and square wall shapes were also brick did not require a ringbeam. Thus, here illustrated in order to stir up discussion ofi the were two lined pits which were relatively potential building materials for walls, roofs inexpensive. and ventpipes. Superstructure Design: Rectangular and circu- Finally, the scale models proved to be lar wall-forms were chosen by the Pilot valuable because many suggestions were made Project for more detailed investigation. Both during these demonstrations that were eventu- were considered to provide village residents ally incorporated into the final latrine design. with a reasonable range of options as far as building materials and techniques were con- cerned. The major criterion for the wall-forms is that they block sunlight from reaching the latrine seat so as to discourage the passage of flies to and from the pit. The wall must also establish some privacy without a door being used, while at the same time leaving the 53 6.4 Demonstration Latrines Recommendation Demonstration latrines should be built as examples to householders of good, yet inexpensive, latrine building technol- ogy. Sites for these latrines should be selected by Kgotla decision with the advice of the District Sanitation Coordinator. The demonstration latrines should be located where they will be seen by the greatest number of people. Elaboration The latrine designs developed as part-of a They should not be built near a well or village sanitation programme are likely to be borehole or for public use except at the different from conventional latrines both in Kgotla. design and in materials. Some demonstration Demonstration latrines may be built in is therefore needed both for the householders, who must decide whether or not to build, and for he illge aniatio Asistnts(VSs), place they will be kept clean. Kgotla latrines for the Village Sanitation Assistants (VSAs), aekp la eas ftecrmna who will help those who choose to build, The aekp la eas ftecrmna who illhelpthoe wh chose o bild.The nature of the Kgotla itself. School latrines are construction of demonstration latrines by the cleaned because student labour is available. VSAs will form an important part of their training. It also allows interested householders ouehold ane are the resoni of to watch the construction process and view exclusive use. the final product before being asked to pay for it. Finally, it establishes a more accurate If private latrines are built by Council for base for cost estimates (see Appendix XV). demonstration purposes, the manner in which In keeping with project philosophy, the the households qn-, selected is important. If Kgotla should make the final decision on the villagers feel favoritism has been shown to an location of the demonstration latrines. The individual, for whatever reason, it may affect District Sanitation Coordinator should advise the popularity of the programme and adver- the Kgotla prior to the decision being made. sely influence the number of people who The latrines should be built where a maxi- choose to build latrines under the programme. mum number of people can watch the construction process and see the final product. Pilot Project Experience Demonstration latrines were built in all Pilot 1. Public Latrines Project villages as the means of both introduc- World-wide and local experience with public ing the householders to the construction latrines has not been good. There is generally component of the Pilot Project and investigat- no one to clean and maintain them, and they ing costs (see Appendix XV). Construction quickly become eyesores and health hazards. also served as training for the VSAs who built This was the advice given at Kgotla meetings them, and established the building process held to select sites for demonstration latrines. that would be used in the ev-nctual construc- In spite of this advice, Kgotlas were chosen as tion of household latrines. They were essential sites for latrines in Ranaka, Selokolela, to the success of the Pilot Project and are Mabalane and Artesia. The project team was likewise considered essential to the success of told that a Kgotla latrine was important and an expanded District programme. The deImon- that arrangements would be made for cleaning stration models were built as Kgotla latrines, and maintenance. The team supported this primary school latrines and private latrines, approach and, as it turned out, the villagers All of these sites have proven satisfactory. were correct in all four cases. The latrines are 54 used and are kept clean at all times. This may thought that the Kgotla or the Village be due to the pride taken in the entire Kgotla Development Committee would not be able to area as the special area for village activities. select a site without some people feeling that favoritism had been shown to the. recipient. 2. Primary School Latrines This could have an adverse effect on the The Kgotla in Mabalane chose the primary adoption of the latrine by others. For that school and primary school annex as sites for reason, a raffle system was used in Ranaka, demonstration latrines. These proved espe- Selokolela and Keng. A number was given to cially beneficial as the latrines were thus each of those attending the Kgotla meeting introduced to all of the village children. The and a matching number was put in a hat. A children saw firsthand that this latrine smelled number was therf drawn from the hat by a less than other latrines with which they had Qhild, and the person who had the matching experience. It is logical to assume that this number had a demonstration latrine built at information was transmitted to parents and his/her home by Council. This was considered was translated into more home latrines. fair and added some excitement to the Kgotla School lat-fnes are easily kept clean, since the meeting. In Artesia and Olifants Drift, demon- headmaster will assign children the task. stration latrines were built in the homes of destitutes. This was also well accepted in these 3. Private Households villages and was especially helpful to one Demonstration latrines were built in private woman in Artesia who is unable to walk. households in all the Pilot Project villages except Mabalane. The households were chosen in different ways in different villages. It was 55 6.5 Construction Training Recommendation The Village Sanitation Assistants should receive formal instruction from the District Sanitation Foreman in the construction of the approved pit latrines. They should then assist in the construction of the demonstration latrines and share their knowledge with village residents who decide to build their own latrines. Elaboration Both the Village Sanitation Assistants (VSAs) ringbeam, lining the pit, placing slabs, build- and the village residents need to receive ing the foundation and superstructure, and training in the construction of the latrine types installing the ventpipe and seat insert. selected for their village. This should be Third, with this knowledge in hand, the VSAs accomplished in three steps: should be in a position to instruct village First, the VSAs should receive formal residents who want to save money by building instruction in construction techniques (see their own latrines. Appendix XVI). This instruction should be It is critical that the training be carried out augmented by visits to previously completed carefully, using experienced teachers. The latrines in other villages where construction may evenlatrines, in particular, will be an influential Second, the VSAs should learn from the factor in the village's choice to proceed with practical experience acquired by constructing the programme or not. Ultimately, the VSAs' the village's demonstration latrines. skill and ability to transfer it will determine Techniques to be learned include building a the quality of the latrines which are built. Pilot Project Experience As the design and construction procedures latrines to be completed. This caused an used in the ESPP latrines were entirely new, overall delay in building demonstration everyone involved in building them had to be latrines in other villages but was beneficial, as trained in each aspect of construction. It was it served as training for the two people who, a decided that VSAs would be trained to build month later, were to become the District the latrines and that they would then train Sanitation Foremen (DSFs) in each District. those in the village who were interested in The Works Department builder who was lent building their own. This training was slow to the project for the Agricultural Show because it also served as a trial-and-error latrines was later assigned permanently as process of determining the best method of Project Foreman for Kgatleng District. The constructing the latrine. Each component was Construction Foreman for the Agricultural built for the first time during the construction Show was later hired by the Southern District of the demonstration latrines. This process Water Department as half-time ESPP Fore- included not only the building of demonstra- man and half-time Rural Water Foreman. tion latrines and the training of the VSAs, but These two people then began to help with the also the determining of the best construction training for and construction of the village techniques. demonstration latrines. During the building of the demonstration A two-day formal training session was held latrines in the villages, it was decided that at the Denman Rural Training Centre'to ESPP model latrines should be built for supplement the field experience. The main publicity purposes at the Agricultural Show in purpose of this session was to train the DSFs, Mochudi. These were the first demonstration VSAs and Village Extension Team members 56 in construction of the medium-cost, hessian- square hesF,n latrine at the Kgotla in Ranaka type latrine. Training in hessian technology is one of the latrines originally used for was conducted by staff from the Selective training. Promotions Company, who were involved in During the second day of this session, marketing a round hessian latrine in Bots- wana. They brought with them components of tr as als fiven i ling h a square hessian latrine designed to the Pilot ire mesh a nd wallr fr bln Project's specifications. These were used to diubeau mkin outr alls by t dsobe-raiu thethode (lrigngued tora demonstrate the construction process. The pattern) and building a mud-brick seat. 57 6.6 Household Latrine Construction Recommendation Householders should be encouraged to participate in the construction of their latrines to the greatest extent possible. Elaboration Most latrines can be built by householders, 3. Slabs: placed by the VSA with assistance with advice and assistance from the trained from the householder. Village Sanitation Assistants (VSAs), provided 4. Superstructure Foundation: built by the that local materials and familiar construction VSA with assistance and building mate- techniques are used. The following gives a rals from the householder. rough outline of what the construction respon- sibilities should be: 5. Superstructure: built by the householder 1. Ringbeam: built by the VSA with assist- under the supervision of the VSA. ance from the householder. 6. Ventpipe/Seat Insert: installed by the VSA 2. Pit: excavated by the householder under with assistance and building materials from supervision of the VSA. the householder. Pilot Project Experience The Pilot Project explored various construc- 3. Round Pit with Trapezoidal-Brick Lining tion methods designed to include the house-o he u ode holder~~ ~ ~ ~ ~. Someeoftructeuwe: builtllbysthe)householderdupitoaethf between 2.5 and 3.0 metres and 1.15 1. Rectangular Pit with RingIbeam metres in diameter. a) Council transported ringbeam materials to b) Council transported cement and moulds the village, to the village. b) VSAs transported materials to household. c) Householder or VSA made trapezoidal bricks. c) Householder selected latrine site. d) Householder or VSA lined pit with d) Householder carried water to the latrine site, trapezoidal bricks (see Appendix XI). e) VSA built ringbeam (see Appendix IX). 4. Slabs f) Householder excavated the pit inside the ringbeam to a depth of three metres. a)C 2. Round Pit with Wire-Mesh and Filter- b) Council transported slabs to the plot. Fabric Lining c) VSA placed slabs over the ringbeam and a) Householder dug the pit to a depth of 2.4 pit. metres. b) Council transported lining materials to the 5 Wall foundation village. a) Householder furnished 40 bricks (9" x 6" x c) VSA installed the lining and ringbeam (see 41/2") to the latrine site. Appendix X). b) Householder selected round or square wall shapev. 58 c) VSA built wall foundation around. the c) VSA stippled the ventpipe. edge of the wall pattern (see Figure 13). d) VSA installed the ventpipe. 6. Walls 9. Seat Insert Householder completed building walls a) Contractor fabricated seat insert. with the advice of the VSA. b) Council transported seat insert to the 7. Roof village. a) Householder selected roofing materials. c) Householder supplied mud bricks to b) Householder roofed the latrine. latrine site. d), VSA installed seat insert. 8. Hessian Ventpipe a) Contractor completed hessian ventpipe to the slurry stage (see Appendix XII). b) Council transported slurried ventpipes to the village. 59 6.7 Payment by Village Residents Recommendation Village householders should pay for- the cost of all materials bsed in building their latrines. A simple contract should be drawn up which states the contribution and responsibilities of both the District Council and the householder. Elaboration During the Pilot Project, it was discovered that 5. The householder pays the outstanding 50 per village residents were reluctant to pay for their cent. latrines in advance of construction. On the other 6. The seat insert and ventpipe are delivered hand, the District Council was reluctant to have and installed. villagers postpone payment until after the com- pletion of construction because this could cause The advantages to this method of,payment serious delays. With these two observations in mind, it is recommended that householders sign a contract (see Appendix VI) with the District 1. A signed contract minimizes any conflicts. Council, agreeing to pay for the cost of materials, 2. In paying 50 per cent up front, the in phase with construction, as follows: householder demonstrates his/her commit- 1. The householder pays 50 per cent of the ment to the programme and assumes cost before the end of Phase I (see Section responsibility for building the latrine. 3.4 - District Sanitation Plan). 3. Releasing the ventpipes and seat inserts 2. Following the initial payment, the Village after final payment reduces the risk of loss Sanitation Assistant (VSA) visits the plot by the Council. and constructs the ringbeam. 4. Splitting the payments allows the house- 3. The householder digs the pit. holder more time to save. 4. The VSA ensures that the slabs are delivered and placed, and lays the first three courses of the superstructure foundation. Pilot Project Experience The original Pilot Project Paper called for half Several arrangements for payment were the householders to receive a subsidy in the tried. In Ranaka, Mabalane, Selokolela and form of building materials. Subsequently, Olifants Drift, people paid after receiving their however, local, District and Ministry staff materials. (By December 1982, about 60 to 70 attending the Project Planning Seminar per cent of the accounts were paid off in decided that there should not be a subsidy Ranaka and Mabalane; however, only 10 per until one was proven absolutely necessary. cent had paid in Olifants Drift.) In Artesia, Council argued that transport could already people were initially asked to pay the full be considered a form of subsidy. Following a amount in advance. However, in a month of series of further discussions between the door-to-door visits, only one person was Ministry of Local Government and Lands, the prepared to sign a contract under these United States Agency for International Devel- conditions. As soon as this arrangemen was opment and the Councils, it was decided that, modified to phase payment with construction, while it was preferable to have householders an additional nine people signed contracts. pay in advance of delivery, this would not be possible during the early stages of the project. 60 A side effect observed by the Pilot Project team was that, once a householder had paid, he/she took it upon himself/herself to ensure that the VSA attended to his construction duties on the householder's plot. 61 6.8 Revenue Collection Recommendation Payments for latrines should be collected by the local Council. officer charged with the collection of other Council payments, provided this person is known to village residents. Elaboration There are a number of Council employees the next), it is important to remember that the assigned to most villages. However, only three person who is most familiar with, and to, the of them are permitted to collect money: the village residents will be able to undertake the Revenue Officer, the Court Clerk and the task most effectively. The more time he/she Family Welfare Educator (FWE). One of spends in the village, the more likely that these people must be selected to collect residents will be forthcoming with their residents' payments for their latrine and payments. Experience has shown that, in most materials. In determining who would be best cases, the FWE is the best person to collect for this job (it will vary from one village to payments. Pilot Project Experience During the Pilot Project, an effort was made FWEs are located in most villages. They are to use all three Council officers in the selected from the village and are therefore collection of residents' payments. The Revenue familiar with its people. They do most of their Officer collected money in Ranaka and work in that village, are associated in people's Mabalane; the FWE in Keng, Artesia and minds with health activities, and already Olifants Drift; and the Court Clerk in collect health post fees. These are all strong Selokolela. While one might assume that points in favour of asking the FWE to collect Revenue Officers were the officers most suited payments. The FWEs who collected latrine to the task, they did not always prove to be payments during the Pilot Project,generally the best choice. As there are few of them, tliey did well. Some felt more commitment to the are often required to cover a large area. This Pilot Project than others and therefore pushed means spending less time in any given harder to have people pay. location. There was a Revenue Officer located Court Clerks are also found in most villages in Ranaka, but he was often assigned a re aonfoun m m l collection duties in other parts of the District and normally collect money in the normal and was therefore away for long periods of course of tleir duties. To tle extent that they time. The Revenue Officer from Mmatubu- are familiar with the village, they.may also be dukwane collected payments in Mabalane. cliosen to collect payments. The low rate of While shle liad transport to Mabalane only payment to the Court Clerk in Selokolela is one morning per week and was unfamiliar thouglt to be due more to lack of money i with the location of people in the village, she. Clerk's part. did have the highest rate of collection of all collectors. 62 6.9 Stores Controls Recommendation Stores controls and storerooms should be established for the sanitation programme at both the District and village levels. Elaboration District Level: Stores controls and regulations village. These should be administered by the should be established for each District based Village Sanitation Coordinator (VSC) (see on those already existing for other Council Appendices XVIII and XIX) - basically, to departments. The sanitation stores controls keep track of tools which are issued and should be clearly separated from the others, materials received from the District. The VSC and adequate storerooms identified for pro- should be the only person responsible for gramme use. Stores should be administered by signing out tools, the District Sanitation Foreman (DSF) under the supervision of the District Sanitation Inventory: An inventory of both the District Coordinator (DSC). and village stores should be carried out in June and December of every year, that is, at Village Level: A relatively simple set of stores the end of each separate phase of controls should also be prepared for each construction. Pilot Project Experience In both Southern and Kgatleng Districts, weatherproof and easy to lock. In the villages corrugated-iron site buildings were used as where storerooms were not erected, other storerooms. In Southern District, these build- facilities were used. In Selokolela, the Village ings were at the Council Water Department Development Committee (VDC) storeroom and were supervised by the Council Stores was used. This caused considerable problems Officer (CSO). Having the CSO keep the key because the key was kept by the VDC caused a few problems because there were chairman, who left the village frequently. The times when the DSF needed things from the storeroom also was not weatherproof, thereby stores when the CSO was not available. In causing the loss of much cement. In Keng, the Kgatleng District, the DSF kept the key, and health post was used and found to be very this reduced problems considerably. good. However, because Keng is a very small In most villages the corrugated-iron site village, few supplies were needed. buildings were found to be ideal because they were easy to transport, simple to put together, 63 6.10 Payment of Viflage Staff Recommendation The Village Sanitation Coordinator (VSC) and Village Sanitation Assistants (VSAs) should be hired on short-term (i.e., six-month) contracts. The VSC should be paid a monthly salary at Council rates, and the VSAs should receive a monthly mobilization fee plus piece rates for all construction activities. Elaboration All village-level staff should sign six-month necessary to use the VSAs as labourers (e.g., contracts (see Appendices XX and XXI) that loading and unloading sand or latrine slabs), will be renewed for as long as necessary. The they should be paid a daily rate equal to what VSAs should be paid a P20 mobilization fee a Council labourer would get minus the P1 (approximately P1 per working day). This is mobilization fee. paid to cover the non-construction activities (e.g., mobilization of villagers) that.the VSAs Th S hl be id t Couci teS will be required to do. For construction should submit a Construction Work Record activities, the VSAs should be paid by piece-rate, not by the day. Appendix XXIII (set presents a list of construction activities and the comparable pay for each activity. For When hiring the VSC and VSAs, be sure to example, if two VSAs install a ringbeam and explain every aspect of their employment in the payment list indicates that P3 is paid for detail. If this is not done carefully, one can installing a ringbeam, they each get P1.50, not anticipate trouble in the future. It would be P3. However, if only one VSA installs a wise to give them a copy of their contract and ringbeam, that person gets the entire P3. The the Construction Activities Payment Sheet (see VSC should keep a daily record of what each Appendix XXIII). VSA does so that the payment sheet can be There should be a staff meeting of village filled out at the end of the month (see Appendix VIII). It is the responsibility of the staff on a monthly basis to talk over VSC to make sure the VSAs have completed to The District Sanitation orema n,e what they are being paid for. The VSC should do spot checks to ensure that the quality of and the VSAs should all attend. the work is up to standard. If it should be Pilot Pro ect Experience One of the most consistent problems expe- The reason for piece-rate payment is that, if rienced by the Pilot Project team was paying villagers are to pay a set amount for the the VSAs. Almost every time a Pilot Project latrine, then the cost of installing the concrete team member went into the village, a VSA ringbeam and building the foundation must had a complaint about his or her pay. To also be set. If the VSAs were paid by the day, avoid these problems, a special effort should then the cost of the latrine would go up be made to explain to the VSAs before they substantially. The amounts paid to the VSAs start work how they will be paid and that for each activity are based on the Council rate they are temporary staff. They should then paid to casual labourers (i.e., P4.43 perr day). sign a contract and be given a copy with the If the VSA built only one ringbeam in a day, list of construction activities and the amount he/she received P3 for that and P1 as a they 'till be paid for each activity, mobilization fee, bringing the total to P4. It is 64 easy to build one ringbeam a day; in fact, This has already started happening in most of the VSAs built two in one day, many villages. Throughout the Pilot Pro- earning a total of P7 per.day, above the ject, the YSAs were enc6uraged to take average rate for unskilled labour. piece-work on the weekends. If the VSAs On many occasions it was suggested that mov.d with the programme, there would the VSC any be no one left in the village with the Council staff. There were several reasons why beend of t Pilt P roje the this was not done. b h n ftePltPopt h thiswas ot dne.villagers get to know the VSAs and realize 1. It is important to have village staff who work a d o it well. know the village and the villagers well. When the project first hired VSCs, they 3. Shortly before the programme moves to were university students on long leave. the next group of villages, the names of These people worked very well but did the VSAs should be given to the Rural not know the village and had great Industries Officer (RIO). The RIO should difficulty finding people to sign contracts. visit these VSAs and help them to get Whenever construction materials had to started in their own business. Two things be delivered to householders, the VSCs would be achieved. First, employment did not know where to go, so a VSA had would be created at the village level, and, to be taken from whatever work he/she second, there would be a local business was doing to show where to find the encouraging latrine construction. There house. house.are long-ranging benefits that could be The successes the Pilot Project achieved achieved by this system. The Pilot Project in the villages were attributed to the fact team feels that there is an excellent that it was in the best interests of the opportunity here that should not be VSAs to get people to build latrines. The missed. more contracts, the more work. moreconract, te moe wrk.4. It is important that each person in the When the university students returned village believes that he or she can build a to school, they were replaced with school- latrine. Having VSAs who are from the leavers from that village. These people village, rather than Council professionals, had no difficulty doing the work and, in will help in convincing people that it is an fact, were more effective when it came easy process that can be accomplished by time to visit the householders to check on all. payments. 5. If VSAs are working in villages other than 2. When the programme is finished, the VSA their own, housing and transport to will no longer be paid by Council. programme villages will have to be However, just because the programme is provided by Council, and this would moving to another village does not mean greatly increase the cost and complexity of that there will be no more latrines built in the programme. that village. The hope is that the VSAs will start making contracts for piece-work and be paid directly by the householder. 65 6.11 Purchasing Recommendation Quotations should be solicited from the suppliers of building materials and tools before any purchases are made. Elaboration Suppliers of tools and materials use two sets lower. Savings rendered through purchase of prices. One is quoted over the counter to by quotation can be used to build more those who walk in off the street. The other latrines in the long run. is quoted to government agencies solicitiig tenders. The latter is usually considerably Pilot Project Experience See Appendix XXIV. 66 ! [ 7.1 Monitoring the Programme Recommendation The District Sanitation Coordinator should ensure that ongoing physical, economic and social changes associated with the District and Village Sanitation Programmes are closely monitored and evaluated. Elaboration Completed village programmes should be 3. Have all t.he substructures been lined monitored and evaluated during the period within the proper distance from the December to June, Phase II (see Figure 4) boreholes? (Check with the Department of when there are fewer demands on the District Geological Surveys.) Sanitation Coordinator (DSC). The DSC or his delegate should arrange to visit villages to 4. How many latrines have been built since talk with the village Headman and, where the completion of the programme in this appropriate, to conduct house-to-house village? surveys in order to assess various results of Economic Changes ffie programme. Some examples of the kinds of questions which could be asked are given 1. Has everyone who constructed a latrine below: under the programme paid for his/her building materials? If not, why not? Physical Changes 2. What is the current cost of a latrine? 1. a) What is the total number of new 3. Are the Village Sanitation Assistants still latrines built under the District employed? programme? b) Are all the latrines completed? Social Changes c) Are all the latrines in good repaif? If not, what are the principal problems being 1. a) Do all household members who have encountered? access to a latrine actually use it? d) What types of substructures/super- b) If not, who does not and why not ' ? structures have been built? 2. Why have people without a latrine not e) Are the householders pleased with built one? their latrines? 2. What effect have the new latrines had on 3. a) Has the incidence of diarrhoeal or the village water supply? (Ask the intestinal disease been reduced since Department of Water Affairs to test the the end of the programme? water at the borehole.) b) Can this be attribuied to the new latrines? Pilot Project Experience The Pilot Project Paper called for monitoring out to be inapplicable in Pilot Project villages. of borehole water in Pilot Project villages to The reasons are as follows: be sure that project-built latrines were not polluting the drinking wate-. Pollution of Keng: No borehole; water comes from wells in boreholes would be suspected if there was a Keng Pan that are highly polluted from significant increase in the numbers of animal wastes and buckets thrown in to draw indicator bacteria in water samples talcen from water. the borehole after completion of a number of latrines. While this was, and still is, a valid Selokoleld: No borehole; water comes from concern in the building of latrines, it turned wells in the valley passing through the centre 68 of the village and is highly polluted by animal picture of a goat standing on top of the wastes and buckets thrown in to draw water; pump); no way of knowing where any the new borehole is eight kilometres from the indication of pollution came from. village. The potential for pollution of boreholes by pit Ranaka: Borehole a kilometre from the village latrines is great. Boreholes located in central across the river; groundwater flow that would Mochudi are well known to be polluted, and carry pollution from latrines to the borehole the many pit latrines there are an obvious does not generally cross rivers. source of that pollution. It is, however, impractical to require an entire village to build Mabalane: Borehole two kilometres from its pit latrines a few kilometres from the village in area where cattle graze; any village. It is the borehole that must be sited in indicator bacteria found in water would more such a way that it will not receive pollutants likely have come from cattle than from from pit latrines that must be located at latrines in village. people's homes. Ohfants Dr'ft: Borehole one kilometre from i The Pilot Project also monitored its impact ithe villages continuously on an informal village near river and beside path used by cattle to get to the river to drink; indicator basis and periodically on a formal basis. The bacteria would more likely have come from comments of those building their own latrines cattle than from latrines. as to. likes or dislikes and ease or difficulty of cattlebuilding served as feedback to the Pilot Artesia: Borehole in village, and possibility of Project. Revisi&ns were made accordingly. pollution exists; nearest latrines are those built Regular technical and social impact by Kgatleng Council for Council buildings; evaluations were carried out that were very cattle and goats are frequently found within helpful in the ongoing improvement of the the borehole enclosure (the Pilot Project has ac 69 ----·…■.-...■-■---·---..---&&-&-·--·-------&-·-■.…;&-& 훵8●O Appendices j APPENDICES Appendix I Hydrogeological Criteria for the Selection of 73 the Six Villages in the ESPP Appendix II Summary Descriptions of the Six Pilot Project 74 Villages Appendix III Handout A - Announcement of Kgotla Meeting 76 Appendix IV Handout B - The District Sanitation Programme 77 Appendix V Handout C - Building Yout Own Latrine 78 Appendix VI Householder's Latrine Contract (English and 79 Setswanra) Appendix VII Planning and Report Form 81 Appendix VIII Village Latrine Inventory 82 I., Appendix I ;, Construction of Rectangular Pit with Ringbeam 83 Appendix X Construction of Pit Lining with Wire Mesh and 84 Filter Fabric Appendix XI Lining of Pit with Trapezoidal Bricks 85 Appendix XII Construction of Hessian Ventpipes 86 Appendix XIII Compressor and Jackhammer 87 Appendix XIV Village Baseline Survey Form 88 Appendix XV Cost of Demonstration Latrines 90 Appendix XVI Training Programme. Task Analysis - 92 District Sanitation Coordin tor and Village Sanitation Coordinator Appendix XVII Training Programme. Task Analysis - 93 Village Sanitation Assistants Appendix XVIII Wiage Stores Control (Tools) 94 Appendix XIX Village Stores Control (Building Materials) 95 Appendix XX Village Sanitation Coordinator's Contract 96 (English) Appendix XXI Village Sanitation Assistant's Contract 97 (Setswana) Appendix XXII Construction Work Record 98 Appendix XXIII Construction Activities Payment Sheet 99 Appendix XXIV Availability of Construction Materials 100 72 Appendix I Hydrogeological Criteria for the Selection of the Six Villages in the ESPP 1. No village should be selected whose waste products from the latrines in the pit-latrine construction programme will have a negative influence on the water quality of the groundwater supplies in the village. (Minimum requirements - no new pit latrines around boreholes or open wells.) 2. The groundwater pollution monitoring programme, which hopefully will be carried out in three of the six villages, requires that the pit-latrine construction programme be conducted in villages with different thicknesses of soil cover. One village ought to be a village with Kalahari-sand, another village with a thin soil cover and shallow groundwater table. (The groundwater should, in the latter case, not be used as the water supply.) 3. Recommended measures to protect against pollution of the drinking water should be included in the education campaign in the ESPP. Therefore, different types of water-quality problems ought to be represented. a) One village ought to be a cattle-keeping village, with large numbers of cattle around the water suppiy. and in the village. b) One village should have open wells as the only water supply, e.g., Kokong. 4. From a public health point of view, one of the villages should be representative of the kind of village that has health problems often related to polluted surface water, a dam or a small stream. Hans Lann Senior Water Engineer (Pollution) Gaborone, 7th November, 1979 73 Appendix II Summary Descriptions of the Six Pilot Project ViUr ges Kgatleng District Council selected the following villages: Artesia Approximate population- 566 Terrain - sandy Water - borehole with standpipes at Railway Camp, school and clinic Economy - predominantly cattle; employment at railway station People - predominantly Bakgatla, Bakwena, Bakgalagadi and Basarwa. Railway Camp consists of people from other parts of Botswana Density - fairly dispersed except at Railway Camp Accessibility - good dirt road with regular transport to major centres Mabalane Approximate population - 681 Terrain - rocky, with possible high water table Water -dam, river and standpipes (if the borehole is pumping sufficieni water) Economy - mixed; cattle and arable agriculture with a large number of migrant labourers People - predominantly Bakgatla Density - houses in very close proximity to each other Accessibility - good dirt road with regular transport to major centres Olifants Drift Approximate population - 323 Terrain - rocky, with possible high water table Water - borehole and river Economy - mixed; cattle and arable agriculture with a large number of migrant labourers People - predominantly Bakgatla Density - very dispersed Accessibility - remote; poor dirt road with patches of heavy black mud; transport to major centres very irregular 74 Southern District Council selected the following villages: Ranaka Approximate population- 1,914 Terrain - hardveld and rocky Water - borehole with reticulation and dam Economy - mixed; arable agriculture and livestock People - Bangwaketse Density - households fairly close together in parts Accessibility - good; about 15 kilometres from Kanye Selokolela Approximate popu.non- 512 Terrain - boundary between sandv-.Id and hardveld Water - hand-dug wells and rain catchment areas Economy - mixed; arable agriculture and cattle People - Bangwaketse and Bakgalagadi Density - dispersed Accessibility - fairly isolated; about 14 kilometres from Moshaneng Keng Approximate population- 387 Terrain - sandveld Water - hand-dug wells Economy - predominantly cattle People - Bakgalagadi (Baswaela), Bangwaketse and Balala Density - very dispersed Accessibility - very remote; heavy sand road and irregular transport 75 Appendix III Handout A - Announcement of Kgotla Meeting Instructions: To be printed in Setswana for distribution to schoolchildren at beginning of programme [see Figure 3]. Many people throughout District have told Council that they wish to improve sanitation in their villages. In response to this, Council has developed a District Sanitation Progrmme which will help people accomplish this improvement. Last year, this programme was introduced in Ranaka, Selokolela, Keng, Artesia, Mabalane and Olifants Drift and, as a result, over 250 householders have completed their own latrines. District Council will soon be selecting villages for this year's programme. Thus, Council officials will be visiting on , at to discuss the programme and its objectives and to answer questions. If you are interested in seeing a District Sanitation. Programme introduced in your village, please attend this meeting and bring along your family and neighbours. If the village accepts.this programme, you could be building a new latrine for yourself within a year or so. Sincerely, (District Sanitation Coordinator) 76 Appendix IV Handout B - The District Sanitation Programme Instructions: To be printed in Setswana and distributed to all householders in each programme village [see Figure 3]. District Council's Rural Sanitation Programme is about to be introduced in your village. The main objective of this programme is to help you protect your family from disease by ensuring that rubbish and human excreta are not left in the open air where flies can carry germs from them to your food. This programme will show you how to build a proper latrine for your family and a pit for your rubbish. These can be built by you for a small amount of money. In the next two months or so, the Village Sanitation Coordinator and the Village Sanitationf Assistants selected from your village will be constructing demonstration latrines in the village. You can watch to see how these are constructed. When they have been completed, a meeting will be called at the Kgotla to discuss your opinions. At that time you will have to decide whether or not you want to build a latrine like one of these for your own use. If you decide you want to build your own latrine, the procedure will be outlined at this Kgotla meeting. You will also be informed of the cost and method of payment. You will need to decide where to build the latrine, what shape you prefer, and what materials you wish to use. The Village Sanitation Assistants will be available to assist you in constructing your new latrine. So watch the demonstration latrines being built, talk about them with your family and friends, decide if you want to build your own and come to the Kgotla meeting when it is announced. (District Sanitation Coordinator) 77 Appendix V Handout C - Building Your Own Latrine Here is how you can build your own latrine with the help of the District Council. 1. First, you will be required to pay P for the materials that Council will bring to you. Half of the total payment, P , must be paid before 1st July. The second half, P - , must be paid by 31st August. 2. After you have paid the first half, the Village Sanitation Assistant will visit your house and, with your help, construct a concrete ringbeam. When this is done, you will have to dig the pit. When the pit is finished, you should contact the Village Sanitation Coordinator in your village and he will send the Village Sanitation Assistant back to your house. Then, with your help, the Village Sanitation Assistant will place the slabs over the pit and build a foundation for the superstructure with the mud (or concrete) bricks you have made. 3. Following that, it will be time for you to build the latrine superstructure and put the roof on. 4. After the second payment is made, the Village Sanitation Assistant will bring your ventpipe and seat insert and help you install them. See how easy it is to build your own latrine. This offer is only good for this year. Next year, the programme will move to another village. (District Sanitation Coordinator) 78 Appendix VI Householder's Latrine Contract I of village, District, agree to pay the sum of Pula to the Council Revenue Officer. In return for this fee District Council will provide me with: a) 3 latrine slabs b) 1 ventpipe c) the technical assistance necessary to construct my own latrine d) 1 3-metre piece of Typar e) 1 3-metre piece of wire mesh f) labour and materials necessary to install a reinforced concrete ringbeam (Delete that which does not apply) The terms of payment will be Signature of Home Owner Date Signature of Headman Date Signature of Council Secretary Date 79 Maitlamo a Mong Wa Nilwana Ya Boithomelo Nna wa motse.wa o o mo kgaolong ya Ke itlama go duela madi a P , ke a neela mophuta madi wa Khansele. Fa ke duetse madi a Khansele e tia nneela: a) Dikhurumefo kana diselebe tsa mosinla wa ntlwana ya boithomelo di le tharo (3). b) Pompo ee ntshang mowa e le nngwe fela (1). c) Setilo sa ntlwana ua boitomelo. d) Baitseanape ba matlwana a boithomelo. e) Wairi le polasetiki ee itsand gore mosima o seka wa wela. f) Ditena tse di itsang gore mosima o seka wa wela. g) Dilo tse di agang lesaka la mosima. Ke tta duela jaana P Kgwedi le kgwedi go Fitthela ke fetsa. Seatta sa mong wa Iwapa Kgwedi Seatla sa Kgosi/Kgosana Kgwedi Seatla sa Mokwaledi wa Khansele Kgwedi 80 Appendix VII Planning and Report Form Plan for the week of: District: Name/Designation Monday Tuesday Wednesday Thursday Friday Saturday Sunday Record of Actual Work Monday Tuesday Wednesday Thursday Friday Saturday Sunday Prepared by: Date: Approved: Date: 81 Appendix VIII Village Latrine Inventory Village Village Sanitation Assistant Wire/ Name of Ringbeam Pit Typar Slabs Slabs Foundation Walls Ventpipe Roof Seat Payment Builder Completed Dug Placed Delivered Placed Completed Completed Delivered Completed Completed Instructions: Record date on which each activity is completed. Appendix IX Construction of Rectangular Pit with Ringbeam (see Figures 14 and 15) 1. Village Sanitation Assistant (VSA) places ringbeam pattern, 850 mm by 1550 mm, in north-south direction over site of latrine and stakes down the corners. 2. VSA digs trench, 125 mm by 125 mm, around the outside of the pattern. 3. VSA bends a 6-metre length of 8-mm reinforcing bar in the shape of the trench. 4. VSA fills trench with cement, placing the bent reinforcing bar in centre with 25-mm cover, and allows to cure and dry. 5. Plot-holder excavates pit inside rim to depth of 3 metres. 83 Appendix X Construction of Pit Lining with Wire Mesh and Filter Fabric The wire-mesh and filter-fabric lining is a low-cost method of supporting a latrine pit from collapse due to poor soil structure. It should be used in areas where the probability of using a vacuum tanker pump truck to empty a full pit is small. This will be in village areas remote from District capitals. This type of lining is simple and inexpensive. The following steps should be followed in lining the pit: 1. Dig the pit 0.9 metres in diameter and to a depth of 2.4 metres. This diameter should be maintained as closely as possible. 2. Unroll 14 sections of 193 wire mesh, being careful not to bend the wire. (A roll is superior to a flat sheet because it is already bent at the desired curvature and will be stronger in resisting outside forces in hoop compression.) 3. Cut wire with bolt-cutter in centre of 15th section. 4. Rewrap the mesh in a circle and bend the cut ends around the first transverse wire with pliers. 5. Unroll 3.2 metres of filter fabric cut to a width of 2.1 metres (half of 4.2-metre-width roll). 6. Cut with scissors or knife. 7. Wrap filter fabric around wire mesh so that the edge of the fabric is even with the first wire at one end. Pull tight. 8. Fasten the filter fabric together at the overlap with four or five long thorns or short pieces of wire. 9. Drop the assembly into the pit with the matched ends at the top. 10. If the pit has been incorrectly dug and is too wide, backfilling may be necessary at this point. 11. Dig a circular trench, 125 mm by 125 mm, around the top of the assembly. 12. Bend the exposed 100-mm ends of wire mesh outwards into trench. This will be a 180-degree bend. 13. Fill trench with wet cement mixture and allow to dry. 14. Place slab or slabs. 84 Appendix XI Lining of Pit with Trapezoidal Bricks (see Figures 15 and 17) Trapezoidal (Trap) bricks are ideal for lining a latrine pit. They can be constructed on site using available sand with a low cement/sand ratio. They are made with a simple mould in the way mud bricks are traditionally made. Steps to completion of the pit are simple. First, a pit 1.3 metres in diameter is dug to the desired depth - usually 2 to 3 metres. It is important that the walls of the pit be straight and vertical. Is is also important that the bottom be flat and level. The first ring of bricks should be placed with a level. After that it is just a matter of stacking, making sure each new course covers the joints in the course below it. If there is any question of settling, each brick of the first course should be set on a piling (see Figure 9). This is made from a straight stick 300-350 mm in length and 30 50 mm in diameter. It is sharpened at one end and driven into the earth below the brick wit.h a hammer. The brick is then placed and levelled. Each succeeding brick of the first course is placed the same way. When the lining is completed to the top, the slab can be placed directly over it. A pit lined in this way may be pumped and reused. 85 Appendix XII Construction of Hessian Ventpipes The stippled-wire-and-hessian ventpipe is an inexpensive alternative to fibreglass or plastic pipes. However, the construction must be well organized and supervision is required. The ventpipes are constructed as follows: 1. The roll of wire mesh is 2.4 metres wide. Cut across the roll w;t before the 12th transverse wire. This will yield a piece 10 squares wide and leave an end wire. 2. Wrap the piece in a circle and fasten it by folding the cut ends around the first transverse wire of the other side. 3. Choose one end of this tube on which to place the flyscreen and bend the wire ends to the inside perpendicular to the pipe. 4. Cut a 300-mm square of fibreglass flyscreen. 5. Hessian is available in rolls 1.8 metres wide; cut this lengthwise in thirds to a width of 0.6 metres. 6. From these, cut pieces 2.4 metres long and wrap tightly around the wire mesh. 7. Place flyscreen over one end and tuck inside the hessian. 8. Sew in the flyscreen along the cut edge of the hessian with a large curved needle and twine. 9. Mix well 6 kg salt, 50 kg cement and 70 litres warm water in a long horizontal bath (made from a 200-litre drum cut in half and welded end to end). Allow salt to dissolve. Stir continuously throughout the process to prevent cement from settling. 10. Roll each ventpipe slowly in the bath, making sure it is well soaked. Stand to dry. This will not plug the flyscreen. Pipes can now be stored for transport to latrine sites. 11. Mix 6 parts sand, one part cement and water to the consistency of thick soup (some experimentation may be necessary to get the consistency correct the first time). 12. Throw this mixture onto the pipe with a large plastering brush, covering it completely except for the flyscreen. Keep moist for 4 days and then allow to dry. 13. The pipe may now be plastered for extra rigidity, as the wire may corrode over time. 14. Install ventpipe on latrine. 86 Appendix XIII Compressor and Jackhammer Recommendation In villages characterized by a shallow horizon of rock or unpickable soils, District Council should be prepared to use a jackhammer to excavate latrine pits, provided householders are prepared to contribute towards the cost. Elaboration Most of eastern Botswana is characterized by the existence of rock or unpickable soils which can hamper surface excavations. Previously, the presence of rock had discouraged village residents from building pit latrines. However, in some villages, a jackhammer can be used successfully for these purposes. Pilot Project Experience The Pilot Project team initially rented two compressors to dig pits in Mabalane. Pits, varying from 1.5 to 2.5 metres in depth, were dug in a single day, depending on the rock texture. One of the two compressors wAs rented from Kgatleng District for P30 per day. Three labourers were required to run the compressor and each was paid P5.95 per day. This compressor used a total of 3 barrels of diesel fuel in the 18 days it was used at Mabalane. The second compressor was rented from Maxwell at P108 per day, including labour but excluding fuel. This compressor used 4.5 barrels of diesel fuel in 17 days. Total average cost per pit (as of July 1982)= 108 + 30+(3) (595) 2 = P83.83 each (excluding fuel) Householders were asked to contribute P6 of this amount. At Olifants Drift, the Pilot Project team experimented with a different machine - a jackhammer. This smaller machine is more easily handled and can be easily transported on a regular pick-up truck. After testing an older machine, the Pilot Project team purchased a new jackhaimer for Kgatleng District at a cost of P2,500. This machine digs a 2.5-metre-deep pit in 1.5 days. It is operated by one labourer who is paid P16 per day, and it uses 1.5 litres of diesel fuel per pit. Total average cost per pit= 16 + (0.70) (1.5) = P17.05 per pit (including fuel) In summary, the jackhammer proved considerably more advantageous than the compressor. Its use also means that plot-holders can be requested to pay a larger proportion of the costs, say, P8 per pit. 87 Appendix XIV Vilage Baseline Survey Form 1. Name of head of household 2. Names of other householders 3. Number of other people living here PEOPLE LIVING IN HOUSEHOLD Name Sex Age Working Not Student In Village Outside Working 4. How many times has someone in the family had stomach sickness in the last year? 5. Have you ever lost money at the Botswana Meat Commission because of measles in your cattle? 6. Are you aware that using a latrine can improve your health and prevent your cattle from getting measles? 7. Do you have a latrine? If yes: a) Did you build it yourself? b) Did you hire someone to build it for you? c) How much did it cost? d) Did you line the pit with bricks? Do you think it was necessary to line the pit? e) Did you hit rock in the pit? If so, what did you use to break the rock? f) Did you hit water in the pit? 88 g) When was it built? h) Do the children use it? If no, why don't they use it? i) Why did you built-it? If no, a) Do you want a latrine? If yes: i) Why haven't you built one? ii) Would you be willing to pay P for the materials for a latrine you build yourself? iii) Is there someone who lives here who could help to build a latrine? If no: i) Why don't you want a latrine? 89 Appendix XV Cost of Demonstration Latrines The quantities included in this calculation of costs of building demonstration latrines are (1) the retail costs of the materials for the project; (2) the transport of those materials to the villages; and (3) the labour cost of building the latrines, paid mostly to.Village Sdnitation Assistants. Not included are salaries of Council staff who organized or supervised construction or drove. Also not included is a factor for any waste and loss of building materials that may have occurred. The unit prices of materials for the demonstration latrines were as follows (as of July 1982): Item Quantity Price Cement 50 kg packet P3.05 Reinforcing mesh 193 mesh P7.20 2 m x 2.4 m Reinforcing bar 6 mx 8 mm P1.78 Ventpipe (pvc) 3 m x 160 mm P23.00 Roofing grass (motsikiri) 200-mm bundle P0.16 Roofing twine 1 kg P1.85 Roofing wire 1 kg P0.78 Rafters (dithlomeso) Unit PO.50 Perlins (dipalelo) One roof P4.00 Supports (meotwana) Unit P0.50 Perimeter perlins (mepako) Unit P0.25 Gravel m3 no cost Sand m3 no cost Water 1 litre no cost Transport cost of materials was calculated in the following manner. All materials for demonstration latrines were transported in Council J5 Bedford 5-ton trucks. Total running cost of these trucks is P0.55 per kilometre. A total of 14 demonstration latrines were built in Southern District and 13 in Kgatleng District. In each District, one trip to Gaborone would be required to return the required materials to the District capital. One additional trip would be required to each village from the District capital to deliver these materials. An additional trip or two to a site within or near the village would be required to collect sand, gravel and roofing materials. The cost of the trip to Gaborone is divided equally over all demonstration latrines built in the District. The cost of the delivery trip to the village is divided over all latrines built in that village. 90 These costs are as follows: Distance Total Cost Cost per Trip Return (km) (July 1982) Latrine Gaborone- 100 P55.00 P4.23 Mochudi Mabalane- 115 P63.25 P12.65 Mochudi Artesia- 200 P107.25 P17.88 Mochudi Oifants Drift- 225 P126.50 P63.25 Mochudi Gaborone- 270 P148.50 P10.61 Kanye Ranaka- 75 P41.25 P5.16 Kanye Selokolela- 100 P55.00 P18.33 Kanye Keng- 435 P239.25 P79.75 Kanye The extra 25 kilometres in village trips is to load sand and collect roofing materials locally. The labour cost was determined from a schedule that was given to each Village Sanitation Assistant as the basis for his or her payment. The rates were set in such a way that a person pursuing a given activity for an 8-hour day would earn approximately the minimum wage of P4.43. 91 Appendix XVI Training Programme Task Analysis - District Sanitation Coordinator 1. Plan of procedures - importance of advance planning 2. Council procurement procedures 3. Completion of payment sheets - costs and prices of labour and* commodities 4. Compiling questionnaire results 5. Importance and functioning of latrine 6. basic health 7. Basic latrine building procedure 8. Organize courses for District Sanitation Foremen and Village Sanitation Coordinators Task Analysis - Village Sanitation Coordinator 1. Working with Village Extension Team 2. Completion of payment sheets - cost and prices of labour and commodities 3. Administering questionnaire 4. Importance and functioning of latrine 5. Basic health related to fecal diseases 6. Basic latrine building procedure 92 Appendix XVII Training Programme Task Analysis - Village Sanitation Assistants 1. Reasons for building a latrine 2. Principles of latrine design 3. Place pattern 4. Dig trench around pattern 5. Mix concrete 6. Place concrete 7. Cure concrete 8. Dig pit 9. Place slabs 10. Build mud-bricks 11. Use wall patterns 12. Build foundation 13. Build walls 14. Make trapezoidal bricks 15. Place trapezoidal bricks 16. Set mini-piling (if necessary) 17. Level bricks 18. Alternative wire-mesh and filter-fabric lining 93 Appendix XVIII Village Stores Control (Tools) Signature of Date Date Person Taking Item Name Quantity Taken Out Returned Tools 94 Appendix XIX Village Stores Control (Building Materials) Signature of Date Date Village Sanitation Item Name Quantity Received Given Out Coordinator 95 Appendix XX VWage Sanitation Coordinator's Contract has been hired for the 6-month period from to by the District Council at the rate of pay of P per month. The above-named person will work full-time/part- time in the Village of and will be responsible for the satisfactory completion of the tasks on the attached Job Description (see Secton 4.4). Two weeks' notice of termination must be given by either the contractor or the contractee. Signature of Contractee Date - Signature of Council Secretary Date Signature of Headman Date - 96 Appendix XXI Maitlamo a go Thapa Baagi Ba Matlwana a Boithomelo Nna ke thapilwe ke Khansele go thusa mo kagong ya matlwana a boithomelo mo motseng wa Maitlamoa mpateletsa go dira mo motseng malatsi a le matlhano, go tsweng ka go fitlhelela ka Ga ke ne go dira ka malatsi a boikhutso a ga Goromente. Ke tla duelwa gore ke se ka ka tswa mo motseng ka nako ya tiro. Ke tla amogela ka kgwedi. Ke itlama go dira tiro nngwe le go gakolola kana go thusa beng ba matlwana a boithomelo, Ke tla duelwa ka fa maitlamo a A a buang ka teng. Ke tla duelelwa ntlwana nngwe le nngwe e ke thusitseng gore e agwe. Seatla sa mothapiwa Kgwedi Seatla sa Kgosi/Kgosana Kgwedi Seatla sa Mikwaledi wa Khansele Kgwedi 97 Appendix XXII Construction Work Record FROM: District Sanitation Coordinator TO: Council Secretary DATE: Construction Work Record Please furnish me with cheques for the following activities: NAME: VILLAGE: By How Rate From Amount Many Payment To Be Date Work Completed Workers? Schedule Paid Subtotal Mobilization Fee TOTAL Signature of District Sanitation Coordinator The rate from the payment schedule, divided by the number of workers, should equal the amount to be paid. 98 Appendix XXIII Construction Activities Payment Sheet Digging pit P10.00 Digging one cubic metre of mud for bricks P 1.00 Digging and pouring concrete rim P 3.00 Levelling and installing first row of trapezoidal bricks P 1.50 (including making pilings) Installing wire ' P 1.00 Making 200 mud bricks (approximately 9" x 8" x 4") P 9.00 Constructing mud walls P10.00 Smearing walls with mud/dung mixture (twice) P10.00 Loose-thatch roof (including framing) P10.00 Professional thatch roof (including framing) P30.00 Building foundation (including placing slabs) P 3.00 Stippling ventpipe P 0.50 Installing ventpipe P 0.50 Installing plastic seat insert P 1.00 99 Appendix XXIV Availability of Construction Materials All project materials for demonstration latrines and for household latrines were purchased in Gaborone, although some were ordered specially from South Africa. Below is a list of materials used and potential suppliers. Item Supplier. No. 193 wire mesh (2.4-m x 60-m roll - BMB or Haskins 200-mm grid) Ventpipe wire mesh (2.4-m x 30-m BMB (by order) at least two months in roll - 2-mm x 50-mm grid) advance Hessian (1.83-m width) BMB or Haskins Filter fabric (4.2-m x 100-m roll) BMB (by order) at least two months in advance Salt (50-kg. sack) Kanye Co-operative Block moulds RIIC (Kanye) or Cliff (Gaborone) (by order) Rectangular slab wire mesh, Reference BMB (by order) at least two months Jo433 (6 m x 2.4 m) in advance Reinforcing bar (8 mm x 6 m or 13 m) BM3 or Haskins Cement (50-kg packet) Anywhere Flyscreen (4' x 100' roll fibreglass) Gaborone Hardware 100 9.0 Figures FIGURES Figure 1 District Sanitation Programme 103 Figure 2 District Sanitation Programme: Setting Up 104 Figure 3 Village Sanitation Programme: Phase 1 105 Figure 4 Village Sanitation Programme: Phase 11 106 Figure 5 Village Sanitation Programme: Phase 111 107 Figure 6 Programme Organization Chart 108 Figure 7 Plan and Elevations of Circular Brick 109 Figure 8 ESPP Trapezoidal Brick 110 Figure 9 Trapezoidal Brick Supported on Small Piling il1 Figure 10 Trapezoidal Brick Pit 112 Figure 11 ESPP Rectangular Slab 113 Figure 12 ESPP Circular Slab 114 Figure 13 Circular and Rectangular Superstructure Wall Patterns 115 Figure 14 BOTVIP Latrine Type Al - Plan and Section 116 Figure 15 BOTVIP Latrine Type A2 - Plan 118 Figure 16 BOTVIP Latrine Type BI - Plan 119 Figure 17 BOTVIP Latrine Type B2 - Plan and Section 120 Figure 18 BOTVIP Seat Insert - Plan and Section 122 102 Figure 1 District Sanitation Programme ACTIVITY YEAR 1 YEAR 2 YEAR 3 J F M A M J J A S O N D J F M A M J J A S O N D J FM A M J J A S O N D SETTING-UP IMPLEMENT CLUSTER 1 Phase 1 Phase Il Phase 1Il Village A D Em IMPLEMENT CLUSTER 2 Phase I Phase Il Phase 1I1 Village F G H ........................................ ....... M,ä...... IMPLEMENT CLUSTER 3 Phase I Village K L m -------------- N 0 1. ..... Figure 2 District Sanitation Programme: Setting Up ACTIVITY DEC JAN FEB MAR APR MAY 1. APPOINT DISTRICT SANITATION COORDINATOR 2. FORM DISTRICT SANITATION PLANNING COMMITTEE 3. TOUR PREVIOUSLY IMPROVED VILLAGES 4. DISTRICT COMMITTEE MEETINGS 0 0 5. SELECT VILLAGES TO BE IMPROVED 6. PREPARE DISTRICT SANITATION PROGRAMME 7. SELECT DISTRICT SANITATION FOREMEN 8. TRAIN DISTRICT SANITATION FOREMEN Figure 3 Vilage Sanitation Programme: Phase I ACTIVITY JUN JUL AUG SEP OCT NOV 1. MEET WITH VDC/VET 2. DISTRIBUTE HANDOUT A 3. KGOTLA MEETING - DISTRIBUTE HANDOUT B 4. SELECT VSC AND VSAs 5. PLAN TRAINING SESSION 6. CONDUCT TRAINING SESSION 7. ASSEMBLE MATERIALS FOR DEMONSTRATION LATRINES 8. CONSTRUCT DEMONSTRATION LATRINESW1 9. CONDUCT VILLAGE SURVEY (VSC) 10. CONDUCT HOUSE-TO-HOUSE VISITS (VSC) Figure 4 Vilage Sanitation Programme: Phase I ACTIVITY DEC JAN FEB MAR APR MAY 1. DISTRICT PLANNING COMMITTEE MEETS g 2. PLANNING TEAM VISITS VILLAGES g 3. PREPARE TENDERS FOR SLABS, VENT PIPES AND SEAT INSERTS 4. AWARD TENDERS 5. MANUFACTURE SLABS, VENTPIPES AND SEAT INSERTS . . 6. DELIVER SLABS, VENTPIPES AND SEAT INSERTS TO VILLAGES 7. MONITOR/EVALUATE PREVIOUS VILLAGE SANITATION PROGRAMMES 8. HIRE/TRAIN DISTRICT SANITATION FOREMEN FOR SECOND CLUSTER OF VILLAGES Figure 5 Village Sanitation Programme: Phase III ACTIVITY JUN JUL AUG SEP OCT NOV 1. MEET WITH VDC/VET .2. DISTRIBUTE HANDOUT A 3. KGOTLA MEETING - DISTRIBUTE HANDOUT C S 4. DEADLINE FOR FIRST HALF-PAYMENT 5. DEADLINE FOR FINAL PAYMENT 6. DELIVER SLABS TO HOUSEHOLDS 7. VSAs INSTALL RINGBEAMS 8. HOUSEHOLDERS DIG PITS 9. VSAs PLACE SLABS AND BUILD FOUNDATION 10. HOUSEHOLDERS BUILD SUPERSTRUCTURES 11. DELIVER VENTPIPES AND SEAT INSERTS 12. VSAs INSTALL VENTPIPES AND SEATS Figure 6 Programme Organization Chart PS MLGL SENIOR > PUBLIC HEALTH ENGINEER COUNCIL SECRETARY DISTRICT SANITATION PLANNING DISTRICT COMMITTEE DISTRICT SENIOR 1- EXTENSION SANITATION - WATER IE TEAM COORDINATOR OFFICER 1- DISTRICT SANITATION FOREMEN VILLAGE VDC/VET ------------ SANITATION COORDINATOR LU VILLAGE - SANITATION -j ASSISTANT HOUSEHOLDER 108 Figure 7 Plan and Elevations of Circular Brick PLAN R=575 INTERNAL ELEVATION LO TRUE END ELEVATION 9100 109 Figure 8 ESPP Trapezoidal Brick (for latrine lining in sandy soil) 308 75 75 105 105 241 308 0 C) 241 110 Figure 9 Trapezoidal Brick Supported on Small Piling Trap Brick C) Stick cut from tree branch 25-40 111 Figure 10 Trapezoidal Brick Pit 112 Figure 11 ESPP Rectangular Slab 1200 ._600 600 J SLAB A 600 Mesh ref 344 placed centrally NOTES: 1. AlL slabs to have min. 25mm cover. 2. Concrete to be min. 20 MPa, SLAB B some but without central hole 113 Figure 12 ESPP Circular Slab 900 0 CN 1050 I _ _* I 0 0 150 0 150 150 150 0 150 to 0- O o 0 04 900 1200 150 0 150 0 S 225 11 225 All .reinforcing 8mm NOTES: placed centrally 1. All slabs to have min. of 25mm cover 2. Concrete to be min. of 20MPa 114 Figure 13 Circular and Rectangular Superstructure Wall Patterns 1650 650 T ( I 900 Rectangular Wall Pattern 4 350 I 150 Circular Wall Pattern 115 劇 Figure 14 (cont'd) BOTVIIP Latrine Type Al - Section L-J 117 叫 Figure 16 BýTVIP Latrine Type B1 Plan 119 Figure 17 BOTVEP Lafflne Type B2 -Plan ..................... 120 Figure 17 (cont'd) BOTVIP Latrine Type B2 - Section 121 Figure 18 BOTVIP Seat Insert - Plan and Section 0 Plan Section 122