PROCUREMENT PLAN (Textual Part) Project information: Cote d’Ivoire Electricity Transmission and Access Project(P157055) Project Implementation agency: CI-ENERGIES Date of the Procurement Plan: September 7, 2017 Period covered by this Procurement Plan: September 2017- December 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements , such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing is not applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is not applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable Works: is not applicable PROCUREMENT Cote d'Ivoire : Cote d'Ivoire - Electricity Transmission and Access Project PLAN General Information Country: Cote d'Ivoire Bank’s Approval Date of the Original Procurement Plan: 2017-09-25 2021-03-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157055 GPN Date: 2017-08-23 Project Name: Cote d'Ivoire - Electricity Transmission and Access Project Loan / Credit No: IDA / 59990 C Executing Agency(ies): I-ENERGIES WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CI-CI-ENERGIES-27208-CW- RFB / Construction du poste source 225/90/33/15 kV de Gagnoa Rehabilitation, lot 1: Travaux de création du Reinforcement, and Extension Single Stage - One 13,900,000.0 15,774,796. 2019-06- poste source IDA / 59990 of Distribution Systems in A priori Appel d'offres Open - International Signé 2017-09-05 2017-09-19 2017-10-06 2017-10-31 2018-01-04 2017-11-30 2018-01-19 2018-01-04 2018-02-26 Envelope 0 66 28 lot 2: Travaux de création de Abidjan and 10 Regional l'entrée en coupure des ligne Capital cities 225 et 90 kV lot 3 : Télétransmission du poste source CI-CI-ENERGIES-27217-CW- RFB / Construction des postes sources 225/90kV de Yopougon 1, Treichville et Bia Rehabilitation, Sud Reinforcement, and Extension lot 1: Poste 225kV incluant 1 Single Stage - One 43,000,000.0 35,966,613. En cours 2019-08- IDA / 59990 of Distribution Systems in A priori Appel d'offres Open - International 2017-09-12 2017-11-08 2017-09-21 2018-02-11 2017-11-02 2018-04-17 2017-12-03 2019-01-24 2018-01-08 2019-01-21 transfo 225/90kV 100MVA Envelope 0 45 d'examen 05 Abidjan and 10 Regional lot 2: Poste 225kV incluant 2 Capital cities transfo 225/90kV 100MVA lot 3: Poste 225kV incluant 2 travées transfo 225/90kV 100MVA CI-CI-ENERGIES-30306-CW- RFB / Extension et Reinforcement of Single Stage - One 41,900,000.0 27,326,220. 2019-10- renforcement des réseaux de IDA / 59990 A priori Appel d'offres Open - International Signé 2018-01-16 2018-02-20 2018-02-13 2018-02-21 2018-03-27 2018-04-18 2018-04-26 2019-01-24 2018-05-22 2019-01-23 Transmission Systems Envelope 0 21 16 distribution dans 10 chefs lieux de régions- 3 lots CI-CI-ENERGIES-30308-CW- RFB / Passage en souterrain de réseaux HTA aériens Reinforcement of Single Stage - One 40,000,000.0 En cours 2020-03- d'Abidjan et remplacement IDA / 59990 A priori Appel d'offres Open - International 0.00 2018-03-13 2018-12-19 2018-04-10 2019-01-10 2018-05-22 2018-06-21 2018-07-17 Transmission Systems Envelope 0 d'examen 25 des câbles HTA de type CPI en câble HTA de type CIS dans les DRAS et DRYOP - 3 lots CI-CI-ENERGIES-30313-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 15,700,000.0 2019-11- IDA / 59990 Support to Electricity for All A priori Appel d'offres Open - International 0.00 Annulé 2018-03-13 2018-04-10 2018-05-22 2018-06-21 2018-07-17 de localités dans la région du Envelope 0 28 Program Gbôklè - 5 lots CI-CI-ENERGIES-30315-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 19,100,000.0 2019-11- IDA / 59990 Support to Electricity for All A priori Appel d'offres Open - International 0.00 Annulé 2018-03-13 2018-04-10 2018-05-22 2018-06-21 2018-07-17 de localités dans la région du Envelope 0 26 Program Haut Sassandra - 5 lots CI-CI-ENERGIES-30316-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 15,000,000.0 2019-11- IDA / 59990 Support to Electricity for All A priori Appel d'offres Open - International 0.00 Annulé 2018-03-13 2018-04-10 2018-05-22 2018-06-21 2018-07-17 de localités dans la région de Envelope 0 26 Program la Nawa - 5 lots CI-CI-ENERGIES-30317-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 18,600,000.0 2019-11- IDA / 59990 Support to Electricity for All A priori Appel d'offres Open - International 0.00 Annulé 2018-03-13 2018-04-10 2018-05-22 2018-06-21 2018-07-17 de localités dans la région de Envelope 0 26 Program San Pédro - 5 lots CI-CI-ENERGIES-30548-CW- RFB / Fourniture et Installation de Rehabilitation, transformateurs à Kossou, Reinforcement, and Extension Ferké, Man, Abobo, Taabo et Single Stage - One 55,500,000.0 44,940,082. 2019-11- IDA / 59990 of Distribution Systems in A priori Appel d'offres Open - International Signé 2018-01-16 2018-03-09 2018-02-12 2018-03-20 2018-03-26 2018-05-29 2018-04-25 2018-07-23 2018-05-22 2018-09-27 Renforcement et Sécurisation Envelope 0 83 26 Abidjan and 10 Regional des postes de Agboville, Capital cities Attakro, Ayamé, Bongo, Bouaké 1, Abengourou, Dabou, Daloa, Danané et Dimbokro Gagnoa - 4 lots CI-CI-ENERGIES-95225-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 15,700,000.0 2020-11- IDA / 59990 Support to Electricity for All A priori Appel d'offres Open - International 0.00 Annulé 2019-04-24 2019-05-21 2019-07-10 2019-07-26 2019-08-23 rurale des localités dans la Envelope 0 15 Program région du Gboklê - 5 Lots CI-CI-ENERGIES-95232-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 18,600,000.0 2020-10- IDA / 59990 Support to Electricity for All A priori Appel d'offres Open - International 0.00 Annulé 2019-03-26 2019-04-23 2019-06-12 2019-06-28 2019-07-26 des localités dans la région de Envelope 0 18 Program San Pédro- 5 lots CI-CI-ENERGIES-95234-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 19,100,000.0 13,630,277. 2020-10- IDA / 59990 Support to Electricity for All A priori Appel d'offres Open - International Signé 2019-03-26 2019-03-31 2019-04-23 2019-04-04 2019-06-12 2019-05-21 2019-06-28 2019-11-12 2019-07-26 2020-01-09 des localités dans la région du Envelope 0 91 18 Program Haut- Sassandra- 5 lots CI-CI-ENERGIES-95236-CW- Rural Electrification and RFB / Travaux d'électrification Single Stage - One 15,000,000.0 11,691,486. 2020-08- IDA / 59990 Support to Electricity for All A priori Appel d'offres Open - International Signé 2019-01-23 2019-01-29 2019-02-19 2019-02-04 2019-04-10 2019-03-26 2019-04-26 2019-06-06 2019-05-24 2019-08-27 des localités dans la région de Envelope 0 30 16 Program la Nawa- 5 lots Page 1 CI-CI-ENERGIES-168080-CW- RFQ / Electrification des localités de Bolorouko, Diomandé carrefour, Leledou, Louloudou, Zuzuoko, Rural Electrification and Single Stage - One 2021-09- Zakareko et Yakassé, IDA / 59990 Support to Electricity for All A posteriori Demande de prix Limited 3,900,000.00 0.00 Annulé 2020-04-15 2020-04-17 2020-06-10 Envelope 03 Dassioko et Kpata Abidou, Program Gbabililié/Kroukrou(Yoberi), Grogbaledou, Mahamankro, Wawakro, Wawapéko,Zakpberi et Zériberi CI-CI-ENERGIES-168081-CW- RFQ / Electrification des localités de Gnago I et Gnago Rural Electrification and Single Stage - One 2021-07- II, Tripoko, Gnégrouboué, IDA / 59990 Support to Electricity for All A posteriori Demande de prix Limited 3,600,000.00 0.00 Annulé 2020-04-15 2020-04-17 2020-06-10 Envelope 05 Gobroko, Bolo V1, Bolo V2, Program Bolo V3, Boutoubré I et Zégréboué CI-CI-ENERGIES-168083-CW- RFQ / Construction des lignes MT/BT Gaoulou-Grihiri et Rural Electrification and Single Stage - One 2021-09- Beyo-PK 31 et électrification IDA / 59990 Support to Electricity for All A posteriori Demande de prix Limited 4,100,000.00 0.00 Annulé 2020-04-15 2020-06-10 Envelope 03 des localités de Grihiri, Program Godekro, Tiazalé, Vodieko, Lohiri (Godiè) et Madinatché CI-CI-ENERGIES-168085-CW- RFQ / Electrification des Rural Electrification and Single Stage - One 2021-06- localités de Balokouya, IDA / 59990 Support to Electricity for All A posteriori Demande de prix Limited 2,100,000.00 0.00 Annulé 2020-04-15 2020-04-17 2020-06-10 Envelope 05 Gréguibré I, Lobakuya, Medon Program et Zaebré CI-CI-ENERGIES-168086-CW- RFQ / Electrification des Rural Electrification and Single Stage - One 2021-09- localités de Labakuya, Lossan IDA / 59990 Support to Electricity for All A posteriori Demande de prix Limited 2,000,000.00 0.00 Annulé 2020-04-15 2020-04-17 2020-06-10 Envelope 03 Kouamekro, Pauly brousse, Program Sahoua et Sialloukro CI-CI-ENERGIES-168087-CW- RFQ / Electrification des localité de Djimimbo, Gliké- Rural Electrification and Est, Iratéké, Trahé, Mani Single Stage - One 2021-06- IDA / 59990 Support to Electricity for All A posteriori Demande de prix Limited 3,700,000.00 0.00 Annulé 2020-05-06 2020-07-01 Béréby, Iboké, Grélé, Néro- Envelope 26 Program Brousse, ouro, Pataké, Grélelon et Roc douGbalél/Roc Oulidié/ SUF CI-CI-ENERGIES-168088-CW- RFQ / Electrification des Rural Electrification and localités de Baba, Dimoulé, Single Stage - One 2021-06- IDA / 59990 Support to Electricity for All A posteriori Demande de prix Limited 4,700,000.00 0.00 Annulé 2020-05-06 2020-07-01 Taboké, Waté, Dagadji, Envelope 26 Program Djapadji, Gagny, Gnepasso, Dahoro, Gligbeuadji et Goh CI-CI-ENERGIES-168089-CW- RFQ / Electrification des localités de Blahou, Kpoté, Rural Electrification and petit Pedro, Kounouko, Ligne Single Stage - One 2021-09- IDA / 59990 Support to Electricity for All A posteriori Demande de prix Limited 3,700,000.00 0.00 Annulé 2020-05-06 2020-07-01 Gabiadji-san Pédro, Envelope 24 Program Monogaga, Bloho, Gnity cailloux, Gnaké, Touih et Touré Dougou/SUF CI-CI-ENERGIES-168090-CW- RFQ / Electrification des localités de Soumahorodougou, Rural Electrification and Single Stage - One 2021-06- Cantondougou, Pont Bascule, IDA / 59990 Support to Electricity for All A posteriori Demande de prix Limited 4,300,000.00 0.00 Annulé 2020-05-06 2020-07-01 Envelope 26 Béoué, Karie, Nekawuinho Program (Neka village), Petit Grabo, Poutou, Youkou, Néro village, petit Guiglo, Podoué et Soto CI-CI-ENERGIES-168091-CW- RFQ / Electrification des localités de Blidouba, Dapo Rural Electrification and Single Stage - One 2021-06- Iboké, Dégné, Déhé, Georges- IDA / 59990 Support to Electricity for All A posteriori Demande de prix Limited 2,200,000.00 0.00 Annulé 2020-05-06 2020-07-01 Envelope 26 Town, Gnénaholoké, Néro V1 Program et Nero V2, Niplou et tépo Iboké/ SUF CI-CI-ENERGIES-178152-CW- RFB / Electrification des localités de Bolorouko, Diomandé carrefour, Leledou, Louloudou, Zuzuoko, Rural Electrification and Single Stage - One 2,910,065.8 2021-10- Zakareko et Yakassé, IDA / 59990 Support to Electricity for All A posteriori Appel d'offres Open - National 3,900,000.00 Signé 2020-06-16 2020-06-16 2020-06-23 2020-06-24 2020-07-23 2020-07-17 2020-08-13 2020-08-27 2020-08-27 2020-11-03 Envelope 6 21 Dassioko et Kpata Abidou, Program Gbabililié/Kroukrou(Yoberi), Grogbaledou, Mahamankro, Wawakro, Wawapéko,Zakpberi et Zériberi CI-CI-ENERGIES-178153-CW- RFB / Electrification des localités de Gnago I et Gnago Rural Electrification and Single Stage - One 2,743,732.9 2021-08- II, Tripoko, Gnégrouboué, IDA / 59990 Support to Electricity for All A posteriori Appel d'offres Open - National 3,600,000.00 Signé 2020-06-16 2020-06-16 2020-06-23 2020-06-24 2020-07-23 2020-07-17 2020-08-13 2020-08-27 2020-08-27 2020-11-03 Envelope 1 22 Gobroko, Bolo V1, Bolo V2, Program Bolo V3, Boutoubré I et Zégréboué CI-CI-ENERGIES-178156-CW- RFB / Construction des lignes MT/BT Gaoulou-Grihiri et Rural Electrification and Single Stage - One 2,915,531.2 2021-10- Beyo-PK 31 et électrification IDA / 59990 Support to Electricity for All A posteriori Appel d'offres Open - National 4,100,000.00 Signé 2020-06-16 2020-06-16 2020-06-23 2020-06-24 2020-07-23 2020-07-17 2020-08-13 2020-08-27 2020-08-27 2020-11-03 Envelope 9 21 des localités de Grihiri, Program Godekro, Tiazalé, Vodieko, Lohiri (Godiè) et Madinatché CI-CI-ENERGIES-178157-CW- RFB / Electrification des Rural Electrification and Single Stage - One 1,466,529.3 2021-08- localités de Balokouya, IDA / 59990 Support to Electricity for All A posteriori Appel d'offres Open - National 2,100,000.00 Signé 2020-06-16 2020-06-16 2020-06-23 2020-06-24 2020-07-23 2020-07-17 2020-08-13 2020-08-27 2020-08-27 2020-11-03 Envelope 4 22 Gréguibré I, Lobakuya, Medon Program et Zaebré Page 2 CI-CI-ENERGIES-178159-CW- RFB / Electrification des Rural Electrification and Single Stage - One 1,532,244.1 2021-08- localités de Labakuya, Lossan IDA / 59990 Support to Electricity for All A posteriori Appel d'offres Open - National 2,000,000.00 Signé 2020-06-16 2020-06-16 2020-06-23 2020-06-24 2020-07-23 2020-08-27 2020-08-13 2020-08-27 2020-08-27 2020-11-03 Envelope 6 22 Kouamekro, Pauly brousse, Program Sahoua et Sialloukro CI-CI-ENERGIES-178161-CW- RFB / Electrification des localité de Djimimbo, Gliké- Rural Electrification and Est, Iratéké, Trahé, Mani Single Stage - One 257,870,66 2021-10- IDA / 59990 Support to Electricity for All A posteriori Appel d'offres Open - National 3,700,000.00 Signé 2020-06-23 2020-06-30 2020-06-30 2020-07-09 2020-07-30 2020-08-18 2020-08-20 2020-12-03 2020-09-03 2021-03-04 Béréby, Iboké, Grélé, Néro- Envelope 3.61 28 Program Brousse, ouro, Pataké, Grélelon et Roc douGbalél/Roc Oulidié/ SUF CI-CI-ENERGIES-178164-CW- RFB / Electrification des Rural Electrification and localités de Baba, Dimoulé, Single Stage - One 2,930,439.7 2021-08- IDA / 59990 Support to Electricity for All A posteriori Appel d'offres Open - National 4,700,000.00 Signé 2020-06-23 2020-06-30 2020-06-30 2020-07-09 2020-07-30 2020-08-18 2020-08-20 2020-12-03 2020-09-03 2021-03-16 Taboké, Waté, Dagadji, Envelope 0 29 Program Djapadji, Gagny, Gnepasso, Dahoro, Gligbeuadji et Goh CI-CI-ENERGIES-178165-CW- RFB / Electrification des localités de Blahou, Kpoté, Rural Electrification and petit Pedro, Kounouko, Ligne Single Stage - One 2,417,694.6 2021-10- IDA / 59990 Support to Electricity for All A posteriori Appel d'offres Open - National 3,700,000.00 Signé 2020-06-23 2020-06-30 2020-06-30 2020-07-09 2020-07-30 2020-08-18 2020-08-20 2020-12-03 2020-09-03 2021-03-09 Gabiadji-san Pédro, Envelope 9 28 Program Monogaga, Bloho, Gnity cailloux, Gnaké, Touih et Touré Dougou/SUF CI-CI-ENERGIES-178166-CW- RFB / Electrification des localités de Soumahorodougou, Rural Electrification and Single Stage - One 1,626,547.9 2021-08- Cantondougou, Pont Bascule, IDA / 59990 Support to Electricity for All A posteriori Appel d'offres Open - National 4,300,000.00 Signé 2020-06-23 2020-06-30 2020-06-30 2020-07-09 2020-07-30 2020-08-18 2020-08-20 2020-12-14 2020-09-03 2021-03-16 Envelope 5 29 Béoué, Karie, Nekawuinho Program (Neka village), Petit Grabo, Poutou, Youkou, Néro village, petit Guiglo, Podoué et Soto CI-CI-ENERGIES-178168-CW- RFB / Electrification des localités de Blidouba, Dapo Rural Electrification and Single Stage - One 1,251,188.0 2021-08- Iboké, Dégné, Déhé, Georges- IDA / 59990 Support to Electricity for All A posteriori Appel d'offres Open - National 2,200,000.00 Signé 2020-06-23 2020-06-30 2020-06-30 2020-07-09 2020-07-30 2020-08-18 2020-08-20 2020-12-14 2020-09-03 2021-02-26 Envelope 0 29 Town, Gnénaholoké, Néro V1 Program et Nero V2, Niplou et tépo Iboké/ SUF CI-CI-ENERGIES-189370-CW- DIR / Passage en 225 kV du Rural Electrification and Passation de 1,720,403.5 2021-07- poste de Bia Sud: Collecte et IDA / 59990 Support to Electricity for All A priori marché de gré à Direct 1,700,000.00 Signé 2020-08-24 2020-09-09 2020-08-31 2020-09-25 2020-09-26 2020-10-21 5 23 transfert des terres et eaux Program gré polluées aux micropolluants GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening Institutional CI-CI-ENERGIES-30322-GO- Capacity of the Electricity Single Stage - One RFQ / Acquisition et entretien IDA / 59990 A posteriori Demande de prix Limited 862,000.00 724,363.68 Achevé 2017-09-27 2017-09-25 2017-11-03 2017-10-30 2017-12-20 2017-12-23 Sector and Project Envelope de véhicules Management CI-CI-ENERGIES-30325-GO- Strengthening Institutional RFQ / Acquisition de Camion Capacity of the Electricity Single Stage - One IDA / 59990 A posteriori Demande de prix Limited 400,000.00 0.00 Annulé 2018-01-10 2018-02-22 2018-04-10 Labo y compris formation et Sector and Project Envelope pièces de réchanges Management CI-CI-ENERGIES-95231-GO- RFB / Passage en souterrain de réseaux HTA aériens et Reinforcement of Single Stage - One IDA / 59990 A priori Appel d'offres Open - International 40,000,000.00 44,302,794.00 Signé 2019-01-17 2019-01-17 2019-02-26 2019-02-26 2019-03-14 2019-03-19 2019-04-18 2019-04-19 2020-12-08 remplacement des câbles HTA Transmission Systems Envelope de type CPI en CIS dans la ville d'Abidjan - 3 lots CI-CI-ENERGIES-95240-GO- Strengthening Institutional RFQ / Acquisition du camion Capacity of the Electricity Single Stage - One IDA / 59990 A posteriori Demande de prix Limited 400,000.00 0.00 Annulé 2019-01-29 2019-02-11 2019-03-13 2019-07-11 labo y compris formation et Sector and Project Envelope pièce de réchange Management CI-CI-ENERGIES-95242-GO- Strengthening Institutional RFQ / Acquisition Capacity of the Electricity Single Stage - One IDA / 59990 A posteriori Demande de prix Limited 300.00 0.00 Annulé 2019-01-28 2019-03-07 2019-04-22 d'instruments de mesures et Sector and Project Envelope de controle- 2 Lots Management CI-CI-ENERGIES-95244-GO- Strengthening Institutional RFQ / Acquisition de materiel Capacity of the Electricity Single Stage - One IDA / 59990 A posteriori Demande de prix Limited 8,500.00 0.00 Annulé 2019-01-22 2019-02-14 2019-03-01 informatique, de bureau et Sector and Project Envelope consommables informatiques Management Strengthening Institutional CI-CI-ENERGIES-146023-GO- Passation de Capacity of the Electricity DIR / FOURNITURES DE DEUX IDA / 59990 A posteriori marché de gré à Direct 601,000.00 585,667.64 Signé 2019-11-25 2019-06-24 2019-11-30 2019-06-24 2020-01-04 2019-12-04 2020-08-31 2020-08-13 Sector and Project CAMIONS LABORATOIRE gré Management NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Page 3 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-CI-ENERGIES-22356-CS- QCBS / Ingénieurs-Conseils pour le contrôle et la Strengthening Institutional Sélection fondée surveillance des travaux de Capacity of the Electricity IDA / 59990 A priori sur la qualité et le Open - International 8,300,000.00 0.00 Annulé 2017-09-05 2017-09-12 2017-09-28 2017-10-09 2018-02-11 2017-11-21 2018-02-27 2017-12-12 2018-03-19 2017-12-21 2018-01-25 2019-08-31 transport, distribution et Sector and Project coût électrification rurale - Lot 1: Management Transport- Distribution et Lot 2: Électrification rurale CI-CI-ENERGIES-222501-CS- QCBS / Ingenieurs-Conseils pour le contrôle et la Strengthening Institutional Sélection fondée surveillance des travaux de Capacity of the Electricity IDA / 59990 A priori sur la qualité et le Open - International 4,700,000.00 0.00 En cours d'examen 2021-03-03 2021-03-08 2021-03-17 2021-03-09 2021-04-30 2021-05-28 2021-06-27 2021-08-01 2021-09-05 2023-02-27 transport, distribution et Sector and Project coût électrification rurale: Contrôle Management et surveillance des travaux de Transport et de Distribution CI-CI-ENERGIES-222502-CS- QCBS / Ingenieurs-Conseils pour le contrôle et la Strengthening Institutional Sélection fondée surveillance des travaux de Capacity of the Electricity IDA / 59990 A priori sur la qualité et le Open - International 3,600,000.00 0.00 En cours d'examen 2021-03-03 2021-03-08 2021-03-17 2021-04-30 2021-05-28 2021-06-27 2021-08-01 2021-09-05 2023-04-28 transport, distribution et Sector and Project coût électrification rurale: Contrôle Management te surveillance des travaux d'Electrification Rurale CI-CI-ENERGIES-220229-CS- QCBS / Ingenieurs-Conseils pour le contrôle et la Strengthening Institutional Sélection fondée surveillance des travaux de Capacity of the Electricity IDA / 59990 A priori sur la qualité et le Open - International 4,700,000.00 0.00 Annulé 2021-02-17 2021-02-24 2021-03-03 2021-04-16 2021-05-14 2021-06-13 2021-07-18 2021-08-22 2023-04-14 transport, distribution et Sector and Project coût électrification rurale: Management Contrôle et surveillance des travaux de Transport et de Distribution CI-CI-ENERGIES-220225-CS- QCBS / Ingenieurs-Conseils pour le contrôle et la Strengthening Institutional Sélection fondée surveillance des travaux de Capacity of the Electricity IDA / 59990 A priori sur la qualité et le Open - International 3,600,000.00 0.00 Annulé 2021-02-17 2021-02-24 2021-03-03 2021-04-16 2021-05-14 2021-06-13 2021-07-18 2021-08-22 2022-08-22 transport, distribution et Sector and Project coût électrification rurale- Contrôle Management te surveillance des travaux d'Electrification Rurale CI-CI-ENERGIES-226512-CS- QCBS / Ingenieurs-Conseils pour le contrôle et la Strengthening Institutional Sélection fondée surveillance des travaux de Capacity of the Electricity En attente IDA / 59990 A priori sur la qualité et le Open - International 4,700,000.00 0.00 2017-09-05 2017-09-26 2017-11-09 2017-12-07 2018-01-06 2018-02-10 2018-03-17 2019-03-17 transport, distribution et Sector and Project d'exécution coût électrification rurale- Contrôle Management et surveillance des travaux de Transport et de Distribution INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening Institutional CI-CI-ENERGIES-95249-CS- Sélection de Capacity of the Electricity CDS / Audit comptable et IDA / 59990 A priori consultants par Direct 93,000.00 0.00 En cours d'examen 2019-01-23 2019-01-28 2018-10-08 2019-02-11 2019-03-01 Sector and Project financier du projet entente directe Management CI-CI-ENERGIES-95251-CS- Strengthening Institutional INDV / Consultant individuel Capacity of the Electricity court-terme en appui au IDA / 59990 A posteriori Individuel Limited 10,500.00 10,144.86 Signé 2019-01-21 2019-02-05 2019-01-26 2019-02-08 2019-02-06 2019-04-03 2019-02-15 2019-04-03 2019-02-15 Sector and Project spécialiste genre et Management développement social. CI-CI-ENERGIES-146017-CS- Strengthening Institutional INDV / Recrutement d'un Capacity of the Electricity Consultant International en IDA / 59990 A posteriori Individuel Limited 75,000.00 112,900.00 Signé 2019-11-20 2019-11-28 2019-11-25 2019-11-29 2019-12-16 2020-01-09 2020-01-20 2020-01-30 2021-01-19 Sector and Project Appui à la Mise en Œuvre des Management Sauvegardes CI-CI-ENERGIES-157500-CS- Strengthening Institutional INDV / Recrutement d'un Capacity of the Electricity IDA / 59990 A posteriori Individuel Limited 50,000.00 0.00 En cours d'examen 2020-02-06 2020-01-28 2020-02-20 2020-02-27 2020-03-08 2020-07-06 assistant en passation de Sector and Project marchés Management CI-CI-ENERGIES-174199-CS- CDS / Recrutement d'une firme (Hydrogen) en vue de la Strengthening Institutional réalisation du CIES du Projet Sélection de Capacity of the Electricity de fourniture, d’installation, IDA / 59990 A posteriori consultants par Direct 55,000.00 48,057.22 Achevé 2020-05-22 2020-06-16 2020-06-01 2020-06-16 2020-06-15 2020-07-06 2020-07-15 2020-08-31 Sector and Project de systèmes de stockage entente directe Management d'énergie par batteries 300 MWh & des équipements de synchronisation CI-CI-ENERGIES-207215-CS- INDV / Consultant International en appui technique à la mise en œuvre Strengthening Institutional des sauvegardes Capacity of the Electricity IDA / 59990 A posteriori Individuel Direct 108,950.00 0.00 En cours d'examen 2020-11-30 2020-12-04 2020-12-09 2020-12-19 2021-12-14 environnementales et Sector and Project sociales, santé et sécurité au Management travail, gestion des plaintes et aspects genre et vulnérabilité dans le cadre du projet CI-CI-ENERGIES-207228-CS- INDV / Recrutement d'un(e) Strengthening Institutional consultant(e) pour Capacity of the Electricity En attente l'élaboration du CIES du projet IDA / 59990 A posteriori Individuel Direct 52,000.00 0.00 2020-12-02 2020-12-14 2020-12-28 2021-01-11 2021-02-10 Sector and Project d'exécution de construction et de Management restructuration du réseau HTA de Gagnoa CI-CI-ENERGIES-207241-CS- Strengthening Institutional INDV / Recrutement d'un(e) Capacity of the Electricity IDA / 59990 A posteriori Individuel Limited 86,200.00 3,605.88 Signé 2020-11-30 2020-06-12 2020-12-05 2020-06-18 2020-12-26 2020-11-18 2021-01-30 2020-11-26 2022-12-31 spécialiste en Développement Sector and Project Social et Genre Management Page 4 CI-CI-ENERGIES-207252-CS- Strengthening Institutional INDV / Recrutement d'un(e) Capacity of the Electricity IDA / 59990 A posteriori Individuel Limited 86,200.00 0.00 En cours d'examen 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2022-12-31 spécialiste en sauvegarde Sector and Project environnemental Management CI-CI-ENERGIES-215321-CS- CDS / Contrat avec EDF CI pour le contrôle, la Sélection de supervision , la surveillance Reinforcement of IDA / 59990 A priori consultants par Direct 3,300,000.00 0.00 Annulé 2021-01-25 2021-01-29 2021-03-01 2022-06-24 et le suivi environnemental et Transmission Systems entente directe social des ouvrages de Transport et Distribution du PTDAE CI-CI-ENERGIES-207236-CS- INDV / Recrutement d'un(e) Strengthening Institutional consultant(e) pour Capacity of the Electricity l'actualisation du PAR de la IDA / 59990 A posteriori Individuel Direct 34,500.00 0.00 Annulé 2020-12-03 2020-12-15 2021-01-05 2021-01-19 2021-02-18 Sector and Project DRAS dans le cadre du Management passage en souterrain de câbles CI-CI-ENERGIES-207232-CS- INDV / Recrutement d'un(e) Strengthening Institutional consultant(e) pour Capacity of the Electricity l'élaboration du PAR du projet IDA / 59990 A posteriori Individuel Direct 43,000.00 0.00 Annulé 2020-12-03 2020-12-15 2021-01-05 2021-01-19 2021-02-18 Sector and Project de construction et de Management restructuration du réseau HTA de Gagnoa CI-CI-ENERGIES-207238-CS- INDV / Recrutement d'un(e) Strengthening Institutional consultant(e) pour Capacity of the Electricity l'actualisation du CIES de la IDA / 59990 A posteriori Individuel Direct 43,000.00 0.00 Annulé 2020-12-03 2020-12-15 2021-01-05 2021-01-19 2021-02-18 Sector and Project DRAS dans le cadre du Management passage en souterrain de câbles CI-CI-ENERGIES-157499-CS- INDV / RECRUTEMENT D’UN(E) CONSULTANT(E) INDIVIDUEL(LE) CHARGE(E) DE L’ELABORATION DU PLAN Strengthening Institutional D’ACTION DE Capacity of the Electricity IDA / 59990 A posteriori Individuel Limited 44,000.00 0.00 Annulé 2020-02-06 2020-01-02 2020-02-11 2020-03-03 2020-04-07 2021-04-07 REINSTALLATION (PAR) Sector and Project PERSONNES AFFECTEES PAR Management LES TRAVAUX DE CONNEXION DU NOUVEAU POSTE DE GAGNOA AU CHEF-LIEU DE REGION DU GOH Page 5