Government of the Islamic Republic of Afghanistan/GIRA Ministry of Public Works (MoPW) - Afghanistan Rural Access Project (ARAP): IDA Project ID - Procurement Activity Schedule: Works Domestic Review Procurement Prequalification Estimated Bid Opening Province District Contract Nu Description Surface Option Km Rm Preference by Bank Status Method (yes/no) Cost in USD Date (yes/no) (Prior / Post) Construction of 60 M RCC Deck Girder Pas MPW/WB/ARTF- Pul bridge in Kohistan District, Badakhshan Badakhshan Kohistan IDA/ARAP/BKN/BKN/001/C2/001 Province RCC 60.00 NCB No No Prior Review 779,794.89 26-Jun-12 First NOL to Bank Construction of 60 M Long RCC Deck MPW/WB/ARTF- Girder Bridge in Sultan Rubat (Dahn-e- Bamyan Waras IDA/ARAP/CHL/BMN/004/C2/001 Plan) Over Helmand River RCC 60.00 NCB No No Prior Review 840,730.59 28-Jun-12 First NOL to Bank Rehabilitation of road from Daykundi to MPW/WB/ARTF- Shahrstan Phase 3 Lot 1, Ch. 20+000 to Ch. Daykundi Daykundi IDA/ARAP/CHL/DKI/010/C2/001 30+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Daykundi to MPW/WB/ARTF- Shahrstan Phase 3 Lot 2, Ch. 30+000 to Ch. Daykundi Daykundi IDA/ARAP/CHL/DKI/010/C2/002 40+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Shahrstan to MPW/WB/ARTF- Kotal Qunaq Phase 1 Lot 1, Ch. 0+000 to Daykundi Shahristan IDA/ARAP/CHL/DKI/012/C2/001 Ch. 10+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Shahrstan to MPW/WB/ARTF- Kotal Qunaq Phase 1 Lot 2, Ch. 10+000 to Daykundi Shahristan IDA/ARAP/CHL/DKI/012/C2/001 Ch. 20+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Shahrstan to MPW/WB/ARTF- Kotal Qunaq Phase 1 Lot 3, Ch. 20+000 to Daykundi Shahristan IDA/ARAP/CHL/DKI/012/C2/001 Ch. 30+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Shahrstan to Kotal MPW/WB/ARTF- Qunaq Phase 2 Lot 1, Ch. 30+000 to Ch. 40+000 Daykundi Shahristan IDA/ARAP/CHL/DKI/013/C2/001 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Shahrstan to Kotal MPW/WB/ARTF- Qunaq Phase 2 Lot 2, Ch. 40+000 to Ch. 50+000 Daykundi Shahristan IDA/ARAP/CHL/DKI/013/C2/002 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 20-Feb-13 Will be surveyed Rehabilitation of road from Nahreen to Kotal MPW/WB/ARTF- Palfi Lot 1, Ch. 0+000 to Ch. 10+000 Km, (Gravel Baghlan Nahreen IDA/ARAP/NRHE/BGN/016/C2/001 Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 16-Dec-12 Constriction of 60 M RCC Bridge over Panjshir Provincial MPW/WB/ARTF- Panjsher Panjsher River at Ch. 23+280 in Frobal Centre IDA/ARAP/KBL/PJR/026/C2/001 RCC 60.00 NCB No No Prior Review 660,872.94 6-Jul-12 First NOL to Bank Road Rehabilitation of Road from Center of Panjsher Bazarak MPW/WB/ARTF- Panjsher to Parandi / Wadkhol Ch. 0+000 Will be surveyed IDA/ARAP/KBL/PJR/027/C2/001 to Ch.11+000 Km, Gravelling 11.00 NCB No No Prior Review 759,000.00 21-Aug-12 Rehabilitation of Road From Charbolak to MPW/WB/ARTF- Payn Joy Lot 1, Ch. 0+000 to Ch. 10+000 Balkh Charbolak IDA/ARAP/NTH/BLH/036/C2/001 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 16-Jan-13 Survey will start Rehabilitation of Road From Charbolak to MPW/WB/ARTF- Payn Joy Lot 2, Ch. 10+000 to Ch. 20+000 Balkh Charbolak IDA/ARAP/NTH/BLH/036/C2/002 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 16-Jan-13 Survey will start MPW/WB/ARTF- Construction of 68 M RCC Deck Girder Bridge in Under Technical Bid Baghlan Doshi IDA/ARAP/NRHE/BGN/037/C2/001 Zahrabi Kilagay Village, RCC 68.00 NCB No No Prior Review 705,705.21 17-Jul-12 Prepration Rehabilitation of Road From Khost to Fring (Dahn-e-Fring to District Center) Phase 2 MPW/WB/ARTF- Lot 1, Ch. 0+000 to Ch. 11+000 Km, Baghlan Fring IDA/ARAP/NRHE/BGN/039/C2/001 (Gravel Surface) Gravelling 11.00 NCB No No Prior Review 759,000.00 21-Aug-12 Under Design Rehabilitation of Road From Khost to Fring (Dan-e-Fring to Guzargah Noor District) MPW/WB/ARTF- Phase 2 Lot 2, Ch. 0+000 to Ch. 10+000 Baghlan Fring IDA/ARAP/NRHE/BGN/039/C2/002 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 21-Aug-12 Under Design Rehabilitation of Road from Warsaj to MPW/WB/ARTF- Khost Fring Phase 1 Lot 1, Ch. 0+000 to Takhar Warsaj IDA/ARAP/NRHE/TKR/042/C2/001 Ch. 10+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 11-Oct-12 Under survey Rehabilitation of Road from Warsaj to MPW/WB/ARTF- Khost Fring Phase 1 Lot 2, Ch. 10+000 to Takhar Warsaj IDA/ARAP/NRHE/TKR/042/C2/002 Ch. 20+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 11-Oct-12 Under survey Rehabilitation of Road from Warsaj to MPW/WB/ARTF- Khost Fring Phase 1 Lot 3, Ch. 20+000 to Takhar Warsaj IDA/ARAP/NRHE/TKR/042/C2/003 Ch. 30+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 11-Oct-12 Under survey Construction of 80 M RCC Deck Girder MPW/WB/ARTF- Bridge in Dawlat Yar Kyla Chy Khanabad Kunduz Khanabad IDA/ARAP/NRHE/KNZ/043/C2/001 District RCC 80.00 NCB No No Prior Review 901,836.98 4-Jul-12 First NOL to Bank Domestic Review Procurement Prequalification Estimated Bid Opening Province District Contract Nu Description Surface Option Km Rm Preference by Bank Status Method (yes/no) Cost in USD Date (yes/no) (Prior / Post) Rehabilitation of road from Aqtash Bridge MPW/WB/ARTF- to Darwaza Village Lot 1, Ch. 0+000 to Ch. Kunduz Khanabad IDA/ARAP/NRHE/KNZ/044/C2/001 10+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 16-Oct-12 Survey will be started Rehabilitation of road from Aqtash Bridge MPW/WB/ARTF- to Darwaza Village Lot 2, Ch. 10+000 to Kunduz Khanabad IDA/ARAP/NRHE/KNZ/044/C2/002 Ch. 20+000 Km, (Gravel Surface) Gravelling 10.00 NCB No No Prior Review 690,000.00 16-Oct-12 Survey will be started MPW/WB/ARTF- Construction of 300 M Long RCC Deck Girder Kandahar Arghistan IDA/ARAP/SOUTH/KNR/047/C2/001 Bridge over Arghistan River in Arghistan District RCC 300.00 NCB No No Prior Review 3,300,000.00 16-Jun-12 Under Design MPW/WB/ARTF- Construction of 144 M Long RCC Deck Girder Khost Khost IDA/ARAP/STHE/KHT/051/C2/001 Bridge in Zako khel (Qamar Sar Village) RCC 144.00 NCB No No Prior Review 1,185,494.63 4-Jul-12 First NOL to Bank MPW/WB/ARTF- Construction of 100 M Long RCC Deck Girder Khost Shamel IDA/ARAP/STHE/KHT/052/C2/001 Bridge in Bagh Fram (Farm bagh Village) RCC 100.00 NCB No No Prior Review 1,200,000.00 6-Jul-12 Under Design MPW/WB/ARTF- Construction of 60 M Long RCC Deck Girder Khost Khost IDA/ARAP/STHE/KHT/053/C2/001 Matoon bridge (Gulzar Aqa Village) RCC 60.00 NCB No No Prior Review 720,000.00 11-Jul-12 Under Design Rehabilitation of Road in Malistan (Kundali to MPW/WB/ARTF- Shinday/Tangi) Phase 2 Lot 1, Ch. 15+200 to Ch. Ghazni Malistan IDA/ARAP/STHE/GHI/065/C2/001 24+200 Km, (Gravel Surface) Gravelling 9.00 NCB No No Prior Review 762,997.04 11-Jun-12 Design Completed Rehabilitation of Road from Kishim to MPW/WB/ARTF- Tagab District Lot 1 (Ch 0+000 to Ch. Badakhshan Tagab Kishim IDA/ARAP/BKN/BKN/002/C2/001 7+500 Km) Gravelling 7.50 NCB No No Post Review 285,000.00 26-Aug-12 Design Completed Rehabilitation of Road from Kishim to MPW/WB/ARTF- Tagab District Lot 2 (Ch. 7+500 to Ch. Badakhshan Tagab Kishim IDA/ARAP/BKN/BKN/002/C2/002 15+000 Km) Gravelling 7.50 NCB No No Post Review 487,500.00 26-Aug-12 Design Completed Rehabilitation of Road from Kishim to MPW/WB/ARTF- Tagab District Lot 3 (Ch. 15+000 to Ch. Badakhshan Tagab Kishim IDA/ARAP/BKN/BKN/002/C2/003 22.50) Km Gravelling 7.50 NCB No No Post Review 525,000.00 26-Aug-12 Will be surveyed Rehabilitation of Road from Kishim to MPW/WB/ARTF- Tagab District Lot 4 (Ch. 22.50+ Ch. Badakhshan Tagab Kishim IDA/ARAP/BKN/BKN/002/C2/004 30+000) Km Gravelling 7.50 NCB No No Post Review 525,000.00 26-Aug-12 Will be surveyed MPW/WB/ARTF- Construction of 18 M Long RCC Deck Girder first Under Technical Bid Bamyan Sayghan IDA/ARAP/CHL/BMN/003/C2/001 bridge in (Deh Man) RCC 18.00 NCB No No Post Review 90,233.43 24-Jun-12 Prepration Construction of 28 M Long RCC Second MPW/WB/ARTF- bridge (Takht-e-Khawan) in Jar Bamyan Sayghan IDA/ARAP/CHL/BMN/003/C2/002 Kharkhoshak RCC 28.00 NCB No No Post Review 390,000.00 24-Jun-12 Under Design Rehabilitation of Road From Saighan to Kamard MPW/WB/ARTF- Lot 1, Ch. 0+000 to Ch. 9+000Km, (Gravel Bamyan Sayghan IDA/ARAP/CHL/BMN/006/C2/001 Surface) Gravelling 9.00 NCB No No Post Review 621,000.00 6-Oct-12 Survey Completed Rehabilitation of Road From Saighan to Kamard MPW/WB/ARTF- Lot 2, Ch.9+000 to Ch. 18+000 Km, (Gravel Bamyan Sayghan IDA/ARAP/CHL/BMN/006/C2/002 Surface) Gravelling 9.00 NCB No No Post Review 621,000.00 6-Oct-12 Survey Completed Rehabilitation of Road From Saighan to Kamard MPW/WB/ARTF- Lot 3, Ch.18+000 to Ch. 27+000 Km, (Gravel Bamyan Sayghan IDA/ARAP/CHL/BMN/006/C2/003 Surface) Gravelling 9.00 NCB No No Post Review 621,000.00 6-Oct-12 Survey Completed Rehabilitation of Road from Waras District MPW/WB/ARTF- Center to Kotal-e-Qanaq Phase 1 Lot 1, Ch. Bamyan Waras IDA/ARAP/CHL/BMN/007/C2/001 0+000 to Ch. 8+400 Km, (Gravel Surface) Gravelling 8.40 NCB No No Post Review 579,600.00 14-Jul-12 Under Design Rehabilitation of Road from Waras District MPW/WB/ARTF- Center to Kotal-e-Qanaq Phase 1 Lot 2, Ch. Bamyan Waras IDA/ARAP/CHL/BMN/007/C2/002 8+400 to Ch. 16+800 Km, (Gravel Surface) Gravelling 8.40 NCB No No Post Review 579,600.00 14-Jul-12 Under Design Rehabilitation of Road from Waras District MPW/WB/ARTF- Center to Kotal-e-Qanaq Phase 1 Lot 3, Ch. Bamyan Waras IDA/ARAP/CHL/BMN/007/C2/003 16+800 to Ch. 25+200 Km, (Gravel Surface) Gravelling 8.40 NCB No No Post Review 579,600.00 14-Jul-12 Under Design Rehabilitation of Road from Waras District MPW/WB/ARTF- Center to Kotal-e-Qanaq Phase 2 Lot 1, Ch. Bamyan Waras IDA/ARAP/CHL/BMN/008/C2/001 25+200 to Ch. 33+600 Km, (Gravel Surface) Gravelling 8.40 NCB No No Post Review 579,600.00 14-Jul-12 Under Design Rehabilitation of Road from Waras District MPW/WB/ARTF- Center to Kotal-e-Qanaq Phase 2 Lot 2, Ch. Bamyan Waras IDA/ARAP/CHL/BMN/008/C2/002 33+600 to Ch. 42+000 Km, (Gravel Surface) Gravelling 8.40 NCB No No Post Review 579,600.00 14-Jul-12 Under Design Domestic Review Procurement Prequalification Estimated Bid Opening Province District Contract Nu Description Surface Option Km Rm Preference by Bank Status Method (yes/no) Cost in USD Date (yes/no) (Prior / Post) Rehabilitation of Road From Pol-e- MPW/WB/ARTF- Warzang to Bandi Bota Lot 1, Ch. 0+000 to Bamyan Waras IDA/ARAP/CHL/BMN/009/C2/001 Ch. 8+000 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 1-Jan-13 Survey Completed Rehabilitation of Road From Pol-e- MPW/WB/ARTF- Warzang to Bandi Bota Lot 2, Ch. 8+000 to Bamyan Waras IDA/ARAP/CHL/BMN/009/C2/002 Ch. 16+000 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 1-Jan-13 Survey Completed Rehabilitation of road from Daykundi to MPW/WB/ARTF- Shahrstan Phase 4 Lot 1, Ch. 40+000 to Ch. Daykundi Shahristan IDA/ARAP/CHL/DKI/011/C2/001 48+000 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 15-Feb-13 Will be surveyed Rehabilitation of road from Daykundi to MPW/WB/ARTF- Shahrstan Phase 4 Lot 2, Ch. 48+000 to Ch. Daykundi Shahristan IDA/ARAP/CHL/DKI/011/C2/002 56+000 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 15-Feb-13 MPW/WB/ARTF- Construction of 40 M Long RCC Deck Wardak Behsood IDA/ARAP/CHL/DKI/015/C2/001 Girder Bridge in Tajikan Sorkh Abad Road RCC 40.00 NCB No No Post Review 499,019.33 4-Jul-12 First NOL to Bank Rehabilitation of road from Nahreen to Kotal MPW/WB/ARTF- PalfiLot 2, Ch. 10+000 to Ch. 18+000 Km, Baghlan Nahreen IDA/ARAP/NRHE/BGN/016/C2/002 (Gravel Surface) Gravelling 9.00 NCB No No Post Review 621,000.00 16-Nov-12 Rehabilitation of road from Nahreen to Kotal MPW/WB/ARTF- Palfi Lot 3, Ch. 18+000 to Ch. 26+000 Km, Baghlan Nahreen IDA/ARAP/NRHE/BGN/016/C2/003 (Gravel Surface) Gravelling 9.00 NCB No No Post Review 621,000.00 16-Nov-12 MPW/WB/ARTF- Construction of 40 M RCC Bridge in Archino Nuristan Nuristan IDA/ARAP/EAST/NRN/020/C2/001 (First Bridge) Nuristan District RCC 40.00 NCB No No Post Review 546,000.00 26-Aug-12 Plan to do the survey MPW/WB/ARTF- Construction of 20 M RCC Bridge over Parwan Charikar IDA/ARAP/KBL/PRN/028/C2/001 Parwan Irrigation Canal in Gangal Bagh RCC 20.00 NCB No No Post Review 240,000.00 16-Jun-12 Under Design Rehabilitation of Road From Andkhoy to MPW/WB/ARTF- Kham Ab Phase 1 Lot 1, Ch. 0+000 to Ch. Jowzjan Khamyab IDA/ARAP/NTH/JWN/029/C2/001 8+000 Km, (gravel surface) Gravelling 8.00 NCB No No Post Review 397,252.65 20-Jul-12 First NOL to Bank Rehabilitation of Road From Andkhoy to MPW/WB/ARTF- Kham Ab Phase 1 Lot 2, Ch. 8+000 to Ch. Jowzjan Khamyab IDA/ARAP/NTH/JWN/029/C2/002 18+000 Km, (gravel surface) Gravelling 10.00 NCB No No Post Review 534,279.73 20-Jul-12 First NOL to Bank Rehabilitation of Road From Andkhoy to MPW/WB/ARTF- Kham Ab Phase 1 Lot 3, Ch. 18+000 to Jowzjan Khamyab IDA/ARAP/NTH/JWN/029/C2/003 Ch. 28+000 Km, (gravel surface) Gravelling 10.00 NCB No No Post Review 467,532.11 20-Jul-12 First NOL to Bank Rehabilitation of Road From Andkhoy to MPW/WB/ARTF- Kham Ab Phase 1 Lot 4, Ch. 28+000 to Jowzjan Khamyab IDA/ARAP/NTH/JWN/030/C2/001 Ch. 38+000 Km, (gravel surface) Gravelling 10.00 NCB No No Post Review 488,033.91 20-Jul-12 First NOL to Bank Rehabilitation of Road From Andkhoy to MPW/WB/ARTF- Kham Ab Phase 1 Lot 5, Ch. 38+000 to Jowzjan Khamyab IDA/ARAP/NTH/JWN/030/C2/002 Ch. 48+155 Km, (gravel surface) Gravelling 10.16 NCB No No Post Review 421,337.38 20-Jul-12 First NOL to Bank MPW/WB/ARTF- Construction of 40 M RCC Deck Girder Samangan Aybak IDA/ARAP/NTH/SMN/031/C2/001 Bridge over Darya Khan Road RCC 40.00 NCB No No Post Review 511,897.37 24-Jun-12 First NOL to Bank Rehabilitation of Road from Mimana Sari MPW/WB/ARTF- House to Lolash Phase 1 Lot 1, Ch. 0+000 Faryab Maymana IDA/ARAP/NTH/FRB/032/C2/001 to Ch. 8+000 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 29-Oct-12 Survey will start Rehabilitation of Road from Mimana Sari MPW/WB/ARTF- House to Lolash Phase 1 Lot 1, Ch. 8+000 to Ch. Faryab Maymana IDA/ARAP/NTH/FRB/032/C2/002 17+000 Km, (Gravel Surface) Gravelling 9.00 NCB No No Post Review 621,000.00 29-Oct-12 Survey will start Rehabilitation of Roaf from Mimana Sari House MPW/WB/ARTF- to Lolash Phase 2 Lot 1, Ch. 17+000 to Ch. Faryab Maymana IDA/ARAP/NTH/FRB/033/C2/001 26+000 Km, (Gravel Surface) Gravelling 9.00 NCB No No Post Review 621,000.00 29-Oct-12 Survey will start Rehabilitation of Roaf from Mimana Sari House MPW/WB/ARTF- to Lolash Phase 2 Lot 2, Ch. 26+000 to Ch. Faryab Maymana IDA/ARAP/NTH/FRB/033/C2/002 35+000 Km, (Gravel Surface) Gravelling 9.00 NCB No No Post Review 621,000.00 29-Oct-12 Survey will start Rehabilitation of Road From Nahrin to Khost wa Dahn-e- Fring After Kotal Polefi MPW/WB/ARTF- Phase 1 Lot 1, Ch. 0+000 to Ch. 8+000 Baghlan Khost IDA/ARAP/NRHE/BGN/038/C2/001 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 27-Jul-12 Under Design Rehabilitation of Road From Nahrin to Khost wa Dahn-e- Fring After Kotal Polefi MPW/WB/ARTF- Phase 1 Lot 2, Ch. 8+000 to Ch. 16+000 Baghlan Khost IDA/ARAP/NRHE/BGN/038/C2/002 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 27-Jul-12 Under Design Rehabilitation of Road From Nahrin to Khost wa Dahn-e- Fring After Kotal Polefi MPW/WB/ARTF- Phase 1 Lot 3, Ch. 16+000 to Ch. 24+000 Baghlan Khost IDA/ARAP/NRHE/BGN/038/C2/003 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 27-Jul-12 Under Design Domestic Review Procurement Prequalification Estimated Bid Opening Province District Contract Nu Description Surface Option Km Rm Preference by Bank Status Method (yes/no) Cost in USD Date (yes/no) (Prior / Post) Rehabilitation of Road From Nahrin to Khost wa Dahn-e-Fring After Kotal Polefi MPW/WB/ARTF- Phase 1 Lot 4, Ch. 24+000 to Ch. 30+000 Baghlan Khost IDA/ARAP/NRHE/BGN/038/C2/004 Km, (Gravel Surface) Gravelling 6.00 NCB No No Post Review 414,000.00 27-Jul-12 Under Design Rehabilitation of Road From Khost to Fring Phase 3 Lot 1(from Miyan Shahr to Center MPW/WB/ARTF- of Khost District), Ch. 0+000 to Ch. 8+000 Baghlan Fring IDA/ARAP/NRHE/BGN/040/C2/001 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 27-Jul-12 Under Design Rehabilitation of Road From Fring to Kotal MPW/WB/ARTF- Warsaj Phase 1 Lot 1, Ch. 0+000 to Ch. Baghlan Fring IDA/ARAP/NRHE/BGN/056/C2/002 6+000 Km, (Gravel Surface) Gravelling 6.00 NCB No No Post Review 414,000.00 5-Sep-12 Under Design Construction of 12 M RCC Deck Girder MPW/WB/ARTF- Molah Dost Mohammad Shahed bridge in Takhar Bangi IDA/ARAP/NRHE/TKR/041/C2/001 Ceia Ab Bangi district RCC 12.00 NCB No No Post Review 117,828.92 27-Jun-12 First NOL to Bank Rehabilitation of road from Main Road to Qala - MPW/WB/ARTF- e- Zal Bridge Phase 1 Lot 1, Ch. 0+000 to Ch. Kunduz Qala-e-Zal IDA/ARAP/NRHE/KNZ/045/C2/001 8+000 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 11-Nov-12 Survey will be started Rehabilitation of road from Main Road to Qala - MPW/WB/ARTF- e- Zal Bridge Phase 1 Lot 2, Ch. 8+000 to Kunduz Qala-e-Zal IDA/ARAP/NRHE/KNZ/045/C2/002 Ch.16+000 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 11-Nov-12 Survey will be started Rehabilitation of road from Main Road to Qala - MPW/WB/ARTF- e- Zal Bridge Phase 2 Lot 1, Ch. 16+000 to Ch. Kunduz Qala-e-Zal IDA/ARAP/NRHE/KNZ/046/C2/001 24+000 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 11-Nov-12 Survey will be started Rehabilitation of road from Main Road to Qala - MPW/WB/ARTF- e- Zal Bridge Phase 2 Lot 2, Ch. 24+000 to Kunduz Qala-e-Zal IDA/ARAP/NRHE/KNZ/046/C2/002 Ch.32+000 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 11-Nov-12 Survey will be started Rehabilitation of road from Main Road to Qala - MPW/WB/ARTF- e- Zal Bridge Phase 2 Lot 3, Ch.32+000 to Kunduz Qala-e-Zal IDA/ARAP/NRHE/KNZ/046/C2/003 Ch.40+000 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 11-Nov-12 Survey will be started MPW/WB/ARTF- Construction of 40 M Long RCC Deck Paktia Ahmad Khel IDA/ARAP/STHE/PKY/057/C2/001 Girder Bridge in Mushak Charkh Kaly RCC 40.00 NCB No No Post Review 480,000.00 6-Jul-12 Under Design Rehabilitation of Road from Farah to Lash Wa Juwayn ( from Poli Tuchk to Lash wa MPW/WB/ARTF- Juwayn) Phase 2 Lot 1, Ch. 0+000 to Ch. Farah Farah IDA/ARAP/WEST/FAH/064/C2/001 8+000 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 31-Aug-12 Survey will be started Rehabilitation of Road from Farah to Lash Wa Juwayn ( from Poli Tuchk to Lash wa MPW/WB/ARTF- Juwayn) Phase 2 Lot 2, Ch. 8+000 to Ch. Farah Farah IDA/ARAP/WEST/FAH/064/C2/002 16+000 Km, (Gravel Surface) Gravelling 8.00 NCB No No Post Review 552,000.00 31-Aug-12 Survey will be started Rehabilitation of Road from Farah to Lash Wa Juwayn ( from Poli Tuchk to Lash wa Juwayn) MPW/WB/ARTF- Phase 2 Lot 3, Ch. 16+000 to Ch. 23+710 Km, Farah Farah IDA/ARAP/WEST/FAH/064/C2/003 (Gravel Surface) Gravelling 7.71 NCB No No Post Review 531,990.00 31-Aug-12 Survey will be started Construction of 28 M Long RCC Deck Girder Bridges on Tagab Ismail Kandalan MPW/WB/ARTF- Road (Bridges Over shela river ) Kandalan Badghis Qala-e-Naw IDA/ARAP/WEST/BDS/062/C2/001 Bridge RCC 28.00 NCB No No Post Review 461,249.92 9-Jul-12 First NOL to Bank Construction of 20 M Long RCC Deck Girder Bridges on Tagab Ismail Kandalan MPW/WB/ARTF- Road (Bridges Over shela river ) Baghban Badghis Qala-e-Naw IDA/ARAP/WEST/BDS/062/C2/002 Bridge RCC 20.00 NCB No No Post Review 427,442.82 9-Jul-12 First NOL to Bank Rehabilitation of Road in Malistan (Kundali to MPW/WB/ARTF- Shinday/Tangi) Phase 2 Lot 2, Ch. 24+200 to Ch. Ghazni Malistan IDA/ARAP/STHE/GHI/065/C2/002 33+339 Km, (Gravel Surface) Gravelling 9.14 NCB No No Post Review 480,919.03 15-Jul-12 Design Completed Hirat, Ghor, Farah MPW/WB/ARTF- Community based routine maintenance of Community Based Prior / Post West Region Badghis IDA/ARAP/STHE/GHI/065/C2/002 gravel roads (10 contracts) Gravelling 100.00 (Direct Contract) No No Review 150,000.00 N/A Plan Kabul, Panjsher, Kabul Parwan, Logar, MPW/WB/ARTF- Community based routine maintenance of Community Based Prior / Post Region Kapisa IDA/ARAP/STHE/GHI/065/C2/002 gravel roads (10 contracts) Gravelling 100.00 (Direct Contract) No No Review 150,000.00 N/A Plan North East Kunduz, Baghlan MPW/WB/ARTF- Community based routine maintenance of Community Based Prior / Post Region and Takhar IDA/ARAP/STHE/GHI/065/C2/002 gravel roads (10 contracts) Gravelling 100.00 (Direct Contract) No No Review 150,000.00 N/A Plan Government of the Islamic Republic of Afghanistan/GIRA Ministry of Public Works (MoPW) - Afghanistan Rural Access Project (ARAP): IDA Project ID - Procurement Activity Schedule: Goods Estimate Cost in Prior/Post Review Prequalification Domestic Preference Contract Ref. QTY Description of Goods Procurement Method Bid Opening Date USD Status (Yes/No) (Yes/No) MPW/WB- DC Prior No No ARTF/ARAP/GDS/AF/011/C2/001 Verious STAAD Pro (1) SAP (2) 30,000.00 MPW/WB- ICB Prior No Yes 28-Sep-12 ARTF/ARAP/GDS/AF/001/C2/001 15 4X4 field vehicles (11 Pick ups and 4 regular) 572,000.00 MPW/WB- ICB Prior No Yes 14-Apr-13 ARTF/ARAP/GDS/AF/007/C2/001 1 Construction Quality testing equipment 490,000.00 MPW/WB- ICB Prior No Yes 28-Jan-13 ARTF/ARAP/GDS/AF/006/C2/001 Verious Surveying Equipment (Total Station, GPS, Levels ETC) 260,000.00 MPW/WB- IT equpment (Stabilizers, UPS, Servers Operating NCB Prior No No 1-Nov-12 ARTF/ARAP/GDS/AF/003/C2/001 Verious System, Backup system, E-mail System ETC 98,500.00 MPW/WB- NCB Prior No No 15-Jan-13 ARTF/ARAP/GDS/AF/004/C2/001 Verious Office furniture and equipment 90,200.00 MPW/WB- NCB Prior No No 13-Aug-13 ARTF/ARAP/GDS/AF/009/C2/001 26 AutoCAD Software including Civil 3D ETC 150,000.00 MPW/WB- Shoping Post No No 24-Aug-12 ARTF/ARAP/GDS/AF/002/C2/001 41 30 Digital Camera, 9 Video Camera, 4 Projector 42,500.00 MPW/WB- Communication equipmnet (Handheld Radios, HF Shoping Post No No 24-Nov-12 ARTF/ARAP/GDS/AF/005/C2/001 Verious Base station, Docking Station for Mobile Phones, 40,000.00 MPW/WB- Shoping Post No No 9-Feb-13 ARTF/ARAP/GDS/AF/008/C2/001 1 Cogim 20*3 foot 40,000.00 MPW/WB- General Computer software (Adobe, Microsoft, Visio, Shoping Post No No 30-Nov-12 ARTF/ARAP/GDS/AF/010/C2/001 Verious Dictionary ETC 35,000.00 Government of the Islamic Republic of Afghanistan/GIRA Ministry of Public Works (MoPW) - Afghanistan Rural Access Project (ARAP): IDA Project ID - Procurement Activity Schedule: Consultancy Consultancy Assignments with Selection Methods and Time Schedule (consultants) 1 2 3 4 5 6 7 8 Review by Bank Expected Proposals Ref. No. Description of Assignment Length Estimated Cost Selection Method Comments (Prior / Post) Submission Date Consultancy services for survey, geotechnical Central High Lands Region - MPW/WB/ARTF- investigations, detailed engineering design and 40.00 326,880.00 QCBS Prior 20-Sep-12 Under REOI IDA/ARAP/EOI/AF/001/C2/001 construction supervision Consultancy services for survey, geotechnical East Region - MPW/WB/ARTF- investigations, detailed engineering design and 170.00 963,730.00 QCBS Prior 20-Sep-12 Under REOI IDA/ARAP/EOI/AF/001/C2/001 construction supervision Consultancy services for survey, geotechnical North Region - MPW/WB/ARTF- investigations, detailed engineering design and 60.00 424,920.00 QCBS Prior 20-Sep-12 Under REOI IDA/ARAP/EOI/AF/001/C2/001 construction supervision Consultancy services for survey, geotechnical South Region - MPW/WB/ARTF- investigations, detailed engineering design and 65.00 553,930.00 QCBS Prior 20-Sep-12 Under REOI IDA/ARAP/EOI/AF/001/C2/001 construction supervision Consultancy services for survey, geotechnical South East Region - MPW/WB/ARTF- investigations, detailed engineering design and 94.00 687,422.00 QCBS Prior 20-Sep-12 Under REOI IDA/ARAP/EOI/AF/001/C2/001 construction supervision Consultancy services for survey, geotechnical West Region - MPW/WB/ARTF- investigations, detailed engineering design and 54.00 379,134.00 QCBS Prior 20-Sep-12 Under REOI IDA/ARAP/EOI/AF/001/C2/001 construction supervision MPW/WB/ARTF- Cosultancy for Economic Analysis and 120,000.00 Individual Consultant Prior 15-Jul-12 Under Advertisment IDA/ARAP/EOI/AF/002/C2/001 Network Advisory Service (Tr. Ec) MPW/WB/ARTF- Consultancy Services for Financed 810,000.00 Individual Consultant Prior 30-Sep-12 Plan IDA/ARAP/EOI/AF/003/C2/001 Management (Finance Specialist) Component C Creating a complete set of rural road network inventory including its length and condition and a system for its continuous updating, and MPW/WB/ARTF- updating and strengthening a network planning, 2,500,000.00 QCBS Prior 1-Jan-13 Plan IDA/ARAP/EOI/AF/004/C2/001 development and management system including the definition of appropriate service levels and using appropriate economic appraisal techniques Setting up a system for the short, medium and long term maintenance of the rural road MPW/WB/ARTF- network including bridges and a system to 1,300,000.00 QCBS Prior 2-Jan-13 Plan IDA/ARAP/EOI/AF/004/C2/002 respond to emergency maintenance works and support for its implementation MPW/WB/ARTF- Prepare and Establish a system for preparing a 500,000.00 QCBS Prior 3-Jan-13 Plan IDA/ARAP/EOI/AF/004/C2/003 rolling 5 year investment plan for rural roads Developing a comprehensive set of rural roads MPW/WB/ARTF- design standards, and cost estimation 500,000.00 QCBS Prior 10-Dec-12 Plan IDA/ARAP/EOI/AF/005/C2/001 system,improvement of productivity norm, and updating the technical specifications. MPW/WB/ARTF- Developing program-base financial 200,000.00 QCBS Prior 1-Dec-12 Plan IDA/ARAP/EOI/AF/006/C2/001 management system