The World Bank Implementation Status & Results Report Central Highlands Connectivity Improvement Project (P159238) Central Highlands Connectivity Improvement Project (P159238) EAST ASIA AND PACIFIC | Vietnam | Transport Global Practice | IBRD/IDA | Investment Project Financing | FY 2017 | Seq No: 8 | ARCHIVED on 28-Jun-2021 | ISR47098 | Implementing Agencies: Socialist Republic of Vietnam, Projects Management Unit No. 2 Key Dates Key Project Dates Bank Approval Date: 22-Jun-2017 Effectiveness Date: 22-May-2018 Planned Mid Term Review Date: 06-Dec-2021 Actual Mid-Term Review Date: Original Closing Date: 30-Jun-2023 Revised Closing Date: 30-Jun-2023 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) To improve the connectivity, safety and climate-resilience of the National Highway 19. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Road Improvements:(Cost $145.00 M) Implementation Support:(Cost $8.70 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Unsatisfactory Moderately Unsatisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions The Project was approved by the Board on June 22, 2017, the Financing Agreement was signed on December 27, 2017, and the effectiveness was declared on May 22, 2018. After initial delays due to the late allocation of funds, the Detailed Design Consultant was mobilized in September 2019. The COVID19 pandemic and restrictions related to travel and meetings had an impact on the timelines for completion the surveys and conducting public consultations, resulting in some delays in finalizing the detailed design documents (DDDs) and safeguards documents. As of June 14, 2021, all three consulting service contracts and two civil works contracts have been signed. Construction activities are to be commenced in June 2021. 6/28/2021 Page 1 of 5 The World Bank Implementation Status & Results Report Central Highlands Connectivity Improvement Project (P159238) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Low Low Low Macroeconomic Low Low Low Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Moderate Substantial Substantial Institutional Capacity for Implementation and Moderate Substantial Substantial Sustainability Fiduciary Substantial Substantial Substantial Environment and Social Moderate Substantial Substantial Stakeholders Moderate Moderate Moderate Other Low Low Low Overall Moderate Substantial Substantial Results PDO Indicators by Objectives / Outcomes To improve the connectivity, safety and climate-resilience of the National Highway 19 IN01003885 ►Annual average daily traffic (AADT) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 4,950.00 4,694.00 5,130.00 6,600.00 Date 31-Mar-2017 12-Feb-2020 25-Feb-2021 30-Jun-2023 IN01004066 ►Average travel time on the NH19 Corridor (Hours, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 6.00 5.50 6.00 5.00 Date 31-Mar-2017 12-Feb-2020 25-Feb-2021 30-Jun-2023 The increase of travel time compared to the previous result is attributed to the travel speed reduction due to the poor road conditions at the road section from Km90+000 to Km108+000, where the pavement has Comments: been deteriorated severely. This road section was originally under a proposed Government-led BOT project and is not included in this project. IN01004067 6/28/2021 Page 2 of 5 The World Bank Implementation Status & Results Report Central Highlands Connectivity Improvement Project (P159238) ►Number of kilometers of International Road Assessment Program (iRAP) 3-star rating or above for both cars and motorcycles on the NH19 Corridor (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 75.00 75.00 75.00 228.00 Date 31-Mar-2017 20-Nov-2020 27-May-2021 30-Jun-2023 IN01004068 ►Kilometers of roads that are upgraded in compliance with climate/disaster resilient design standards (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 31-Mar-2017 20-Nov-2020 27-May-2021 30-Jun-2023 Intermediate Results Indicators by Components Road Improvements IN01004069 ►Roads rehabilitated, Non-rural (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 153.00 Date 31-Mar-2017 16-Apr-2019 27-May-2021 30-Jun-2023 IN01004072 ►Share of citizens from affected communes who participated in consultations (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 74.00 70.00 Date 31-Mar-2017 16-Apr-2019 27-May-2021 30-Jun-2023 IN01004073 ►Share of women from affected communes who participated in consultations (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 36.00 20.00 Date 31-Mar-2017 16-Apr-2019 27-May-2021 30-Jun-2023 Implementation Support IN01004070 ►Manual for motorcycle lane design and specifications (Yes/No, Custom) 6/28/2021 Page 3 of 5 The World Bank Implementation Status & Results Report Central Highlands Connectivity Improvement Project (P159238) Baseline Actual (Previous) Actual (Current) End Target Value No Yes Yes Yes Date 31-Mar-2017 29-Oct-2019 29-Oct-2019 30-Jun-2023 Draft Manual has been prepared Comments: IN01004071 ►Guidelines for resilient road design and standards (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 31-Mar-2017 29-Oct-2019 29-Oct-2019 30-Jun-2023 Guidelines preparation is ongoing Comments: Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P159238 IDA-61080 Effective USD 140.50 140.50 0.00 3.90 142.67 2.7% P159238 IDA-61090 Effective USD 9.50 9.50 0.00 0.00 9.59 0% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P159238 IDA-61080 Effective 22-Jun-2017 27-Dec-2017 22-May-2018 30-Jun-2023 30-Jun-2023 P159238 IDA-61090 Effective 22-Jun-2017 27-Dec-2017 22-May-2018 30-Jun-2023 30-Jun-2023 Cumulative Disbursements 6/28/2021 Page 4 of 5 The World Bank Implementation Status & Results Report Central Highlands Connectivity Improvement Project (P159238) PBC Disbursement Achievement Disbursed amount in Disbursement % PBC ID PBC Type Description Coc PBC Amount Status Coc for PBC Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 6/28/2021 Page 5 of 5