PROCUREMENT PLAN (Textual Part) Project information: Central African Backbone SOP5 (P132821) Project Implementation agency: SOCOF Date of the Procurement Plan: February 2018 Period covered by this Procurement Plan: January 2018 – December 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 and revised November 2017) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Borrower’s Public Procurement Law No 10/010 of April 27, 2010 (PPL) and the Manual of Procedures of the PPL as per Borrower’s Decree No 10/22 of June 2, 2010, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (a) Standard Bidding Documents: All standard bidding documents to be used for the Project under NCB shall be found acceptable to the World Bank before their use during the implementation of Project; (b) Eligibility: Eligibility of bidders and acceptability of their goods and services shall not be based on their nationality and/or their origin; and association with a national firm shall not be a condition for participation in a bidding process. Therefore, except for the ineligibility situations referred to in paragraphs 1.10(a) (i) and 1.10(a) (ii) of the Procurement Guidelines, the eligibility of bidders must be based solely on their qualification, experience and capacity to carry out the contract related to the specific bidding process; (c) Advertising and Bid Preparation Time: Bidding opportunities shall be advertised at least in a national newspaper of wide circulation and on the website of the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics) and bidders should be given at least 30 days from the date of invitation to bid or the date of availability of the bidding documents, whichever is later; (d) Criteria for Qualification of Bidders: Qualification criteria shall only concern the bidder’s capability and resources to perform the contract taking into account objective and measurable factors. Such criteria for qualification of bidders shall be clearly specified in the bidding documents; (e) Bid Evaluation and Contract Award: A contract shall be awarded to the substantially responsive and lowest evaluated bidder provided that such bidder meets the qualification criteria specified in the bidding documents. No scoring system shall be allowed for the evaluation of bids, and no “blanket” limitation to the number of lots which can be awarded to a bidder shall apply. The criteria for bid evaluation and the contract award conditions shall be clearly specified in the bidding documents; (f) Preferences: No preference shall be given to domestic/regional bidders; to domestically/regionally manufactured goods; and to bidders forming a joint venture with a national firm or proposing national sub-contractors or carrying out economic activities in the territory of the Recipient; (g) Publication of Contract Award: Information on all contract awards shall be published in at least a national newspaper of wide circulation or in the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics) web-site; (h) Fraud and Corruption: In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy to sanction firms or individuals found to have engaged in fraud and corruption as set forth in the Procurement Guidelines; (i) Inspection and Audit Rights: In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy with respect to inspection and audit of accounts, records and other documents relating to the bid submission and contract performance; (j) Requirement for administrative documents and/or tax clearance certificate: The bidding documents shall not require foreign bidders to produce any administrative or tax related certificates prior to confirmation of awarding a contract; and (k) Modifications of a Signed Contract: Any change in the contract amount which, singly or combined with all previous changes, increases the original contract amount by fifteen (15) percent or more must be done through an amendment to the signed contract instead of signing a new contract. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Other Relevant Procurement Information. “Not Applicable” PROCUREMENT Eastern Africa : AFR RI-Central African Backbone SOP5 PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2018-02-10 2020-12-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P132821 GPN Date: Project Name: AFR RI-Central African Backbone SOP5 Loan / Credit No: IDA / H9810 Centrale Central African Backbone Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component B - Construction, CAB5-REF-13 / Management and Réhabilitation du Siège de la Single Stage - One 2019-02- IDA / H9810 Commercialization of the A posteriori Demande de prix Limited 500,000.00 0.00 Annulé 2018-09-27 2018-11-22 SOCOF SA (bâtiment affecté Envelope 20 CAB5 Infrastructure through par le Gouvernement) a PPP Scheme Component B - Construction, CAB5-REF-15 / Travaux de Management and Single Stage - One 2019-03- construction-Carrier Hôtel IDA / H9810 Commercialization of the A posteriori Appel d'offres Open - International 1,200,000.00 0.00 Annulé 2018-05-22 2018-05-27 2018-07-26 2018-08-25 2018-09-29 Envelope 28 Cluster 1 à Kinshasa CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-REF-16 / Management and Single Stage - One 2018-04- Aménagement des bureaux de IDA / H9810 Commercialization of the A posteriori Demande de prix Limited 20,000.00 0.00 Annulé 2018-01-27 2018-03-24 Envelope 23 la SOCOF SA (cloisonnement) CAB5 Infrastructure through a PPP Scheme CAB5-REF-12 / Travaux et fournitures relatifs à la Passation de Component A - Emergence of 2019-05- réahabilitation de la FO de la IDA / H9810 A posteriori marché de gré à Direct 600,000.00 0.00 Annulé 2018-08-15 2018-08-20 2018-10-24 an Inclusive Digital Economy 22 SCPT-Axe Muanda-Kinshasa gré (avec HUAWEI) CAB5-REF-11 / Travaux de Component A - Emergence of Single Stage - One 2019-05- construction du Centre de IDA / H9810 A posteriori Appel d'offres Open - National 3,000,000.00 0.00 Annulé 2018-07-30 2018-08-04 2018-09-15 2018-10-15 2018-11-19 an Inclusive Digital Economy Envelope 18 traitement D3E CAB5-REF-14 / Travaux et Component B - Construction, Fournitures relatifs à la Management and construction de la FO-Axe Single Stage - One 50,000,000.0 2019-08- IDA / H9810 Commercialization of the A priori Appel d'offres Open - International 0.00 Annulé 2018-03-15 2018-03-20 2018-06-18 2018-07-18 2018-08-22 LUBUMBASHI-TENKE-DILOLO Envelope 0 22 CAB5 Infrastructure through et TENKE-KABALO-KALEMIE- a PPP Scheme GOMA (Cluster Sud et Est) CAB-REF-PPP-9 BIS-20 / Component B - Construction, Partenariat Public Privé avec la Management and Single Stage - One 10,000,000.0 En attente 2023-01- SOCOF SA pour l’exploitation IDA / H9810 Commercialization of the A priori Appel d'offres Open - International 0.00 2020-12-14 2021-03-01 2021-03-01 2020-12-19 2021-05-10 2021-06-09 2021-07-14 Envelope 0 d'exécution 05 et la maintenance de son CAB5 Infrastructure through réseau de fibres optiques a PPP Scheme GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component B - Construction, CAB5-REF-3 / Acquisitions Management and Single Stage - One des tablettes et logiciels IDA / H9810 Commercialization of the A posteriori Demande de prix Limited 53,000.00 0.00 Annulé 2018-04-20 2018-06-15 2018-07-30 Envelope informatiques CAB5 Infrastructure through a PPP Scheme Component B - Construction, Management and CAB5-REF-4 / Fournitures de Single Stage - One IDA / H9810 Commercialization of the A posteriori Demande de prix Limited 10,000.00 4,527.55 Achevé 2018-01-27 2018-03-28 2018-03-24 2018-05-03 2018-04-23 2018-05-08 bureau SOCOF 2018 Envelope CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-REF-7 / Acquisition Management and Single Stage - One d'un véhicule tout terrain pour IDA / H9810 Commercialization of the A posteriori Demande de prix Limited 42,000.00 0.00 Annulé 2018-02-17 2018-04-14 2018-05-29 Envelope le suivi des travaux CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-REF-8 / Acquisition du Management and Single Stage - One En cours matériel audio visuel pour la IDA / H9810 Commercialization of the A posteriori Demande de prix Limited 12,000.00 0.00 2018-01-27 2018-02-16 2018-03-24 2018-04-23 Envelope d'exécution SOCOF SA CAB5 Infrastructure through a PPP Scheme CAB5-REF-10 / Acquisition du matériel informatique, du Component C - Enabling matériel audio visuel et des Single Stage - One En cours IDA / H9810 Environment and Regulatory A posteriori Appel d'offres Open - National 500,000.00 492,790.59 2018-01-22 2018-04-05 2018-01-27 2018-04-10 2018-03-13 2018-06-19 2018-04-12 2018-08-10 2018-05-17 2018-07-16 logiciels pour le nouveau Envelope d'exécution Effectiveness système d'information de l'ARPTC Component B - Construction, CAB5-REF-2 / Mobilier de Management and Single Stage - One bureau pour nouveau IDA / H9810 Commercialization of the A posteriori Demande de prix Limited 2,000.00 0.00 Annulé 2018-02-27 2018-04-24 2018-05-24 Envelope personnel CAB5 Infrastructure through a PPP Scheme CAB5-REF-1 / Fournitures des équipements et Component A - Emergence of Single Stage - One installations de l'intranet du IDA / H9810 A priori Appel d'offres Open - International 3,250,000.00 0.00 Annulé 2018-08-05 2018-08-10 2018-10-09 2018-11-08 2018-12-13 2019-04-12 an Inclusive Digital Economy Envelope Gouvernement+Formation des utlisateurs Page 1 CAB5-REF-9 / Acquisition et Component C - Enabling installation des équipements Single Stage - One IDA / H9810 Environment and Regulatory A priori Appel d'offres Open - International 1,500,000.00 0.00 Annulé 2018-06-06 2018-06-11 2018-07-23 2018-08-22 2018-09-26 2019-03-25 de cybersécurité et intégrité Envelope Effectiveness des réseaux CAB5-REF-42 / Acquisition Component B - Construction, du matériel audiovisuel ( 2 Management and Single Stage - One Appareils photo et 1 vidéo IDA / H9810 Commercialization of the A posteriori Demande de prix Limited 2,960.00 0.00 Annulé 2018-02-27 2018-09-04 2018-04-24 2018-10-21 Envelope retrojecteur) en faveur de la CAB5 Infrastructure through SOCOF SA a PPP Scheme CAB-REF-F-1-20 / Conception, fourniture et Component C - Enabling montage d’une plateforme de Single Stage - One IDA / H9810 Environment and Regulatory A posteriori Appel d'offres Open - International 800,000.00 1,246,767.00 Signé 2020-04-13 2020-03-31 2020-04-18 2020-04-01 2020-05-30 2020-06-22 2020-06-29 2020-08-24 2020-08-03 2020-09-28 2021-01-30 contrôle de volume de trafic, Envelope Effectiveness des revenus des opérateurs et des services du mobile money CAB-REF-F-2-20 / Conception, fourniture et Component C - Enabling montage d’une plateforme de Single Stage - One En cours IDA / H9810 Environment and Regulatory A posteriori Appel d'offres Open - International 525,000.00 262,117.00 2020-04-13 2020-03-31 2020-04-18 2020-04-01 2020-05-30 2020-06-23 2020-06-29 2020-07-17 2020-08-03 2021-01-30 contrôle de la qualité de Envelope d'exécution Effectiveness service et de la performance des réseaux mobiles Component B - Construction, CAB-REF-DC-4-20 / Management and Single Stage - One Fourniture de bureau et IDA / H9810 Commercialization of the A posteriori Demande de prix Limited 8,000.00 0.00 Annulé 2020-04-18 2020-06-13 2020-12-10 Envelope consommables informatiques CAB5 Infrastructure through a PPP Scheme CAB-REF-DC-12-20 / Acquisition de matériels informatiques pour le Component A - Emergence of Single Stage - One Ministère des PTNTIC dans le IDA / H9810 A posteriori Demande de prix Limited 200,000.00 200,978.93 Signé 2020-09-19 2020-08-13 2020-11-14 2020-09-10 2021-05-13 an Inclusive Digital Economy Envelope cadre du renforcement du système d l’information pour la lutte contre le COVID 19 CAB-REF-DC-13-20 / Fourniture de matériel informatique et installation Component A - Emergence of Single Stage - One d’un système de IDA / H9810 A posteriori Demande de prix Limited 955,000.00 937,354.00 Signé 2020-08-15 2020-08-21 2020-10-10 2020-09-10 2021-04-08 an Inclusive Digital Economy Envelope vidéoconférence sur un intranet sécurisé pour le gouvernement (E-GovMeeting) CAB-REF-DC-14-20 / Fourniture de matériels informatique et installation Component A - Emergence of Single Stage - One IDA / H9810 A posteriori Demande de prix Limited 950,000.00 943,425.55 Signé 2020-08-26 2020-08-31 2020-09-08 2020-09-23 2020-11-16 d'un réseau national pour la an Inclusive Digital Economy Envelope riposte à la pandémie de la COVID 19 - CAB-REF-DC-15-20 / Fourniture et installation des matériels informatiques pour la mise en place d'un système Component A - Emergence of Single Stage - One de gestion électronique des IDA / H9810 A posteriori Demande de prix Limited 350,000.00 0.00 Annulé 2020-09-08 2020-09-18 2020-10-30 an Inclusive Digital Economy Envelope documents pour le Ministère des PTNTIC d'un réseau intranet national pour la riposte du COVID 19 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component B - Construction, CAB5-REF-5 / Sélection Management and d'une société de maintenance Single Stage - One IDA / H9810 Commercialization of the A posteriori Demande de prix Limited 10,000.00 0.00 Annulé 2018-03-27 2018-05-22 2019-05-22 des équipements Envelope CAB5 Infrastructure through informatiques et bureautiques a PPP Scheme Component B - Construction, CAB5-REF-41 / Connexion Management and Single Stage - One internet des bureaux de la IDA / H9810 Commercialization of the A posteriori Demande de prix Limited 54,000.00 18,685.66 Signé 2018-02-03 2018-02-15 2018-03-27 2018-03-06 2019-03-27 Envelope SOCOF CAB5 Infrastructure through a PPP Scheme CAB-REF- 70-ASC / Component B - Construction, Renouvellement du contrat Management and Passation de d'entretien des bureaux de IDA / H9810 Commercialization of the A posteriori marché de gré à Direct 13,500.00 7,680.00 Signé 2019-10-09 2019-03-29 2019-10-14 2019-03-29 2019-11-18 2019-03-29 2020-05-16 l'UCP CAB- SOCOF SA CAB5 Infrastructure through gré (SOCIETE AFRICAN TRADE a PPP Scheme AND DEVELOPMENT) CAB-REF-69-ASC-19 / Component B - Construction, Renouvellement de contrat de Management and Passation de gardiennage des locaux de IDA / H9810 Commercialization of the A posteriori marché de gré à Direct 41,100.00 41,100.00 Signé 2019-10-09 2019-03-29 2019-10-14 2019-03-29 2019-11-18 2019-03-29 2020-05-16 l'UCP CAB5-SOCOF SA (LE CAB5 Infrastructure through gré GROUPE MAISHA SECURITE a PPP Scheme PROTECTION) CAB-REF-PPP-9-20 / Component B - Construction, Partenariat Public Privé avec la Management and Single Stage - One En cours SOCOF SA pour l’exploitation IDA / H9810 Commercialization of the A priori Appel d'offres Open - International 10,000,000.00 0.00 2020-05-29 2020-06-19 2020-08-14 2020-12-13 2020-08-14 2020-06-03 2020-08-17 2020-10-23 2020-11-22 2020-12-27 2022-06-20 Envelope d'exécution et la maintenance de son CAB5 Infrastructure through réseau de fibres optiques a PPP Scheme CAB-REF-ASC-11-20 / Component B - Construction, Renouvellement du contrat Management and Passation de d'entretien des bureaux de IDA / H9810 Commercialization of the A posteriori marché de gré à Direct 4,000.00 3,840.00 Signé 2020-07-07 2020-07-07 2020-07-12 2020-07-07 2020-08-16 2020-07-07 2021-02-12 l'UCP CAB- SOCOF SA CAB5 Infrastructure through gré (SOCIETE AFRICAN TRADE a PPP Scheme AND DEVELOPMENT) CONSULTING FIRMS Page 2 Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CAB5-REF-17 / Assistance Sélection fondée technique-conception de Component A - Emergence of IDA / H9810 A priori sur la qualité et le Open - International 500,000.00 268,805.67 Signé 2017-01-15 2018-02-19 2017-02-05 2017-03-21 2018-04-24 2017-04-18 2018-02-23 2017-05-18 2018-04-25 2017-06-22 2018-05-11 2017-07-27 2018-06-09 2018-07-27 l'intranet du Gouvernement y an Inclusive Digital Economy coût compris supervision CAB5-REF-24 / Recrutement Component B - Construction, d'une firme chargée de la Management and Sélection fondée supervision des travaux de IDA / H9810 Commercialization of the A priori sur la qualité et le Open - International 1,500,000.00 809,444.81 Signé 2016-12-15 2018-02-19 2017-01-05 2017-02-18 2018-04-05 2017-03-18 2018-02-22 2017-04-17 2018-04-05 2017-05-22 2018-06-04 2017-06-26 2018-06-19 2018-06-26 construction FO-KINSHASA- CAB5 Infrastructure through coût MUANDA (Cluster Ouest) a PPP Scheme CAB5-REF-25 / Recrutement d'une firme chargée de la Component B - Construction, supervision des travaux de Management and Sélection fondée construction FO- IDA / H9810 Commercialization of the A priori sur la qualité et le Open - International 1,500,000.00 0.00 Annulé 2018-01-15 2018-03-19 2018-02-05 2018-03-22 2018-03-21 2018-07-11 2018-04-18 2018-09-04 2018-05-18 2018-06-22 2018-07-27 2019-07-27 LUBUMUBASHI-TENKE-DILOLO CAB5 Infrastructure through coût et TENKE-KABALO-KALEMIE- a PPP Scheme GOMA (Cluster Sud et Est) Component B - Construction, Sélection fondée CAB5-REF-26 / Elaboration Management and sur les du Plan en faveur des IDA / H9810 Commercialization of the A posteriori Open - National 150,000.00 160,018.20 Signé 2017-06-20 2017-03-08 2017-07-11 2017-08-24 2018-02-09 2017-09-23 2018-03-28 2017-10-28 2018-04-04 2017-12-27 qualifications des Populations Autocthones CAB5 Infrastructure through consultants a PPP Scheme CAB5-REF-28 / Proposition de la structure Component B - Construction, Sélection fondée organisationnelle et Management and sur les élaboration du manuel de IDA / H9810 Commercialization of the A posteriori Open - National 70,000.00 0.00 Annulé 2018-02-15 2018-03-06 2018-03-08 2018-04-21 2018-05-21 2018-06-25 2018-09-23 qualifications des procédures de gestion CAB5 Infrastructure through consultants administrative, fiancière et a PPP Scheme comptable Component B - Construction, Sélection fondée CAB5-REF-33 / Recrutement Management and sur les d'un Cabinet d'Avocats pour IDA / H9810 Commercialization of the A posteriori Open - National 30,000.00 0.00 Annulé 2018-03-15 2018-04-05 2018-05-19 2018-06-18 2018-07-23 2019-07-23 qualifications des assistance juridique CAB5 Infrastructure through consultants a PPP Scheme CAB5-REF-37 / Recrutement Component B - Construction, Sélection fondée d'un cabinet pour la mesure Management and sur les de l'impact du déploiement de IDA / H9810 Commercialization of the A posteriori Open - International 100,000.00 0.00 Annulé 2019-02-15 2019-03-08 2019-04-21 2019-05-21 2019-06-25 2019-08-24 qualifications des la Fibre sur l'axe MUANDA- CAB5 Infrastructure through consultants KINSHASA a PPP Scheme CAB5-REF-39 / Etudes de faisabiloité et assistance à Component C - Enabling Sélection fondée l'acquisition du matériel pour IDA / H9810 Environment and Regulatory A priori sur la qualité et le Open - International 500,000.00 162,150.00 Signé 2017-11-15 2018-02-19 2017-12-06 2018-01-19 2018-04-26 2018-02-16 2018-06-01 2018-03-18 2018-07-09 2018-04-22 2019-06-09 2018-05-27 2019-08-10 2019-05-27 l'intégrité et la sécurité du Effectiveness coût réseau Component B - Construction, CAB5-REF-30 / Recrutement Management and Sélection fondée En cours Auditeur CAB5, Exercices IDA / H9810 Commercialization of the A posteriori sur la qualité et le Open - National 30,000.00 0.00 2018-06-15 2018-04-12 2018-07-06 2018-08-19 2018-09-11 2018-09-16 2018-10-16 2018-11-20 2018-12-25 2020-05-13 d'exécution 2018 - 2019 et clôture CAB5 Infrastructure through coût a PPP Scheme CAB5-REF-19 / Formation Sélection fondée des cadres du MINIPTNTIC en Component A - Emergence of sur les IDA / H9810 A posteriori Open - International 50,000.00 0.00 Annulé 2018-03-15 2017-10-23 2018-04-05 2018-05-19 2018-06-18 2018-07-23 2018-09-21 recyclage des déchets an Inclusive Digital Economy qualifications des électriques et électroniques consultants Sélection fondée CAB5-REF-18 / Etudes EIES Component A - Emergence of sur les IDA / H9810 A posteriori Open - International 100,000.00 0.00 Annulé 2018-01-15 2018-02-05 2018-03-21 2018-04-20 2018-05-25 2018-07-24 du Centre D3E an Inclusive Digital Economy qualifications des consultants CAB-REF-C-67-19 / Recrutement d'une ONG Component B - Construction, spécialisée dans la Management and Organisations à cartographie et évaluation des IDA / H9810 Commercialization of the A posteriori Direct 50,000.00 49,255.00 Signé 2019-12-30 2019-10-21 2020-02-08 2019-11-25 2020-03-14 2019-11-26 2020-09-10 but non lucratif risques VBG en faveur du CAB5 Infrastructure through projet CAB5 ( CARITAS – a PPP Scheme DEVELOPPEMENT BOMA) Component B - Construction, Sélection fondée CAB-REF-71-SQC-19 / Management and sur les Recrutement d'un agence de IDA / H9810 Commercialization of the A posteriori Open - National 200,000.00 0.00 Annulé 2020-02-25 2020-03-17 2020-04-30 2020-05-30 2020-07-04 2020-12-31 qualifications des communication CAB5 Infrastructure through consultants a PPP Scheme CAB-C-ONG- 3-20 / Component B - Construction, Recrutement d’une ONG Sélection fondée Management and chargée de la mise en œuvre sur les En cours IDA / H9810 Commercialization of the A posteriori Open - National 400,000.00 0.00 2020-03-16 2020-03-17 2020-04-06 2020-05-20 2020-04-27 2020-06-19 2020-07-24 2021-01-20 des activités de prévention et qualifications des d'exécution CAB5 Infrastructure through réponse aux Violences Basées consultants a PPP Scheme sur le Genre (VBG) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CAB5-REF-23 / Protocole d'Accord avec l'Agence Component B - Construction, Congolaise de Management and Sélection de l'Environnement pour le Suivi IDA / H9810 Commercialization of the A priori consultants par Direct 100,000.00 0.00 En cours d'examen 2018-05-15 2018-07-10 2018-06-12 2018-08-31 2019-08-31 Environnemental des activités CAB5 Infrastructure through entente directe du Projet CAB5-Cluster Est et a PPP Scheme Sud (Phase 1) CAB5-REF-29 / Component B - Construction, Recurutement d'un Consultant Management and individuel chargé de IDA / H9810 Commercialization of the A posteriori Individuel Open 48,000.00 0.00 Annulé 2017-01-15 2018-03-06 2017-03-05 2017-03-26 2017-04-30 2018-04-30 communication du Projet CAB5 Infrastructure through CAB5 a PPP Scheme Page 3 Component B - Construction, Management and CAB5-REF-31 / Recrutement IDA / H9810 Commercialization of the A posteriori Individuel Limited 14,000.00 0.00 Annulé 2018-03-15 2018-03-20 2018-04-10 2018-05-15 2019-05-15 d'un deuxième chauffeur CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-REF-34 / Recrutement Management and d'un consultant individuel IDA / H9810 Commercialization of the A posteriori Individuel Limited 15,000.00 22,034.00 Achevé 2018-01-15 2018-02-20 2018-01-20 2018-01-24 2018-02-10 2018-02-08 2018-03-17 2018-02-16 2018-05-16 2018-03-30 pour appuyer la revue à mi- CAB5 Infrastructure through parcours du Projet CAB5 a PPP Scheme Component B - Construction, CAB5-REF-35 / Recrutement Management and de deux consultants IDA / H9810 Commercialization of the A posteriori Individuel Open 96,000.00 0.00 Annulé 2018-03-15 2018-05-03 2018-05-24 2018-06-28 2019-06-28 individuels ingénieurs des CAB5 Infrastructure through télécommunications a PPP Scheme Component B - Construction, Management and CAB5-REF-36 / IDA / H9810 Commercialization of the A posteriori Individuel Limited 15,000.00 0.00 Annulé 2018-03-15 2018-03-20 2018-04-10 2018-05-15 2019-05-15 Recurutement d'un Archiviste CAB5 Infrastructure through a PPP Scheme CAB5-REF-38 / Recrutemet Component B - Construction, d'un consultant individuel Management and architecte pour les études de IDA / H9810 Commercialization of the A posteriori Individuel Limited 15,000.00 0.00 Annulé 2018-03-15 2018-03-20 2018-04-10 2018-05-15 2018-08-13 réhabilitation du bâtiment de CAB5 Infrastructure through la SOCOF SA a PPP Scheme CAB5 -REF-40 / Renforcement des capacités sur l'utilisation et la Component C - Enabling Sélection de maintenance des équipements IDA / H9810 Environment and Regulatory A priori consultants par Direct 500,000.00 0.00 Annulé 2018-07-15 2018-07-25 2018-09-28 2019-09-28 de gestion des spectres de Effectiveness entente directe fréquences radioélectriques ( avec LS TELECOM) CAB5-REF-20 / Formation des cadres du MINIPTNTIC en Sélection de gestion de projets de mise en Component A - Emergence of IDA / H9810 A posteriori consultants par Direct 100,000.00 94,700.00 Achevé 2017-11-15 2017-12-06 2017-11-25 2018-01-19 2018-01-29 2018-02-01 2018-03-30 2018-04-30 place des infrastructures à an Inclusive Digital Economy entente directe fibres optiques+ intranet (avec ST2i CONSULTING) CAB5-REF-22 / Protocole d'Accord avec l'Agence Component B - Construction, Congolaise de Management and Sélection de l'Environnement pour le Suivi IDA / H9810 Commercialization of the A posteriori consultants par Direct 50,000.00 23,000.00 Signé 2018-01-15 2018-04-20 2018-02-12 2018-06-25 2018-04-18 2018-08-06 2019-04-18 Environnemental des activités CAB5 Infrastructure through entente directe du Projet CAB5-Axe Kinshasa- a PPP Scheme Muanda CAB5-REF-27 / Protocole Component B - Construction, d'accord avec COPIREP pour la Management and Sélection de mise en œuvre de la feuille de IDA / H9810 Commercialization of the A posteriori consultants par Direct 250,000.00 0.00 Annulé 2018-03-15 2018-03-25 2018-05-29 2019-05-29 route de restructuration de la CAB5 Infrastructure through entente directe SCPT et la mise en œuvre des a PPP Scheme PPP Component B - Construction, Management and CAB5-REF-32 / Recrutement IDA / H9810 Commercialization of the A posteriori Individuel Open 36,000.00 0.00 Annulé 2017-10-13 2018-03-06 2017-12-01 2017-12-22 2018-01-26 2019-01-26 d'un auditeur interne CAB5 Infrastructure through a PPP Scheme CAB5-REF-21 / Contractualisation avec la firme IDEA CONSULT Component B - Construction, INTERNATIONAL pour les Management and Sélection de Etudes complémentaires IDA / H9810 Commercialization of the A posteriori consultants par Direct 400,000.00 395,550.00 Signé 2017-12-15 2017-11-22 2017-12-25 2018-02-05 2018-02-28 2018-02-02 2018-05-29 d'impact environnemental et CAB5 Infrastructure through entente directe social et plan de réinstalation a PPP Scheme des popolations du Projet CAB5 CAB5-REF-43 / Protocole Component B - Construction, d'accord avec COPIREP pour la Management and Sélection de mise en œuvre de la feuille de IDA / H9810 Commercialization of the A posteriori consultants par Direct 50,000.00 54,000.00 Signé 2018-08-20 2017-03-13 2018-08-30 2018-08-27 2018-11-03 2018-08-29 2019-05-02 route de restructuration de la CAB5 Infrastructure through entente directe SCPT et la mise en œuvre des a PPP Scheme PPP Component B - Construction, CAB5-REF-44 / Management and Renouvellement de contrat du IDA / H9810 Commercialization of the A priori Individuel Direct 264,000.00 252,000.00 Signé 2019-03-01 2019-04-03 2019-03-07 2019-04-11 2019-03-12 2020-11-17 2019-03-13 2020-04-07 2020-03-12 Directeur Général CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-REF-45 / Management and Renouvellement de contrat du IDA / H9810 Commercialization of the A posteriori Individuel Direct 154,000.00 84,000.00 Signé 2019-03-01 2019-03-28 2019-03-07 2019-04-11 2019-03-08 2019-04-11 2019-03-11 2019-04-12 2020-03-10 Directeur Administratif et CAB5 Infrastructure through Financier a PPP Scheme Component B - Construction, CAB5-REF-46 / Management and Renouvellement de contrat du IDA / H9810 Commercialization of the A posteriori Individuel Direct 154,000.00 84,000.00 Signé 2019-03-01 2019-03-29 2019-03-07 2019-04-11 2019-03-08 2019-04-11 2019-03-11 2019-04-12 2020-03-10 Directeur Technique CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-REF-48 / Management and Renouvellement de contrat de IDA / H9810 Commercialization of the A posteriori Individuel Direct 55,000.00 30,000.00 Signé 2019-03-01 2019-03-29 2019-03-07 2019-04-11 2019-03-08 2019-04-01 2019-03-11 2019-04-11 2020-03-10 l'Assistant DG et Chargé de CAB5 Infrastructure through Suivi d'exécution des Marchés a PPP Scheme Component B - Construction, CAB5-REF-49 / Management and Renouvellement de contrat de IDA / H9810 Commercialization of the A posteriori Individuel Direct 66,000.00 27,000.00 Signé 2019-03-01 2019-03-29 2019-03-07 2020-03-16 2019-03-08 2020-04-07 2019-03-12 2020-04-07 2020-03-11 la Comptable CAB5 Infrastructure through a PPP Scheme Page 4 Component B - Construction, CAB5-REF-51 / Recrutement Management and En cours d'un Spécialiste en sauvegarde IDA / H9810 Commercialization of the A posteriori Individuel Limited 88,000.00 0.00 2019-03-01 2019-03-29 2019-03-06 2019-03-20 2019-04-01 2020-03-31 d'exécution environnementale et sociale CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-REF-52 / Recrutement Management and d'un Spécialiste en Suivi- IDA / H9810 Commercialization of the A posteriori Individuel Limited 88,000.00 0.00 Annulé 2019-03-01 2019-03-29 2019-03-06 2019-03-27 2019-04-21 2020-04-20 évaluation CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-REF-53 / Management and Renouvellement de contrat de IDA / H9810 Commercialization of the A posteriori Individuel Direct 33,000.00 13,500.00 Signé 2019-03-01 2019-03-29 2019-03-07 2020-03-16 2019-03-08 2020-04-07 2019-03-11 2020-04-07 2020-03-10 la Trésorière CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-REF-54 / Management and Renouvellement de contrat de IDA / H9810 Commercialization of the A posteriori Individuel Direct 29,700.00 16,200.00 Signé 2019-03-01 2019-03-29 2019-03-07 2019-04-11 2019-03-08 2019-04-11 2019-03-11 2019-04-12 2020-03-10 l'Intendant CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-REF-55 / Management and Renouvellement de contrat du IDA / H9810 Commercialization of the A posteriori Individuel Direct 26,400.00 14,400.00 Signé 2019-03-01 2019-03-29 2019-03-07 2019-04-01 2019-03-08 2019-04-01 2019-03-11 2019-04-01 2020-03-10 chauffeur CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-REF-47 / Management and Renouvellement de contrat du IDA / H9810 Commercialization of the A priori Individuel Direct 231,000.00 0.00 Annulé 2019-03-01 2019-05-22 2019-03-07 2019-03-12 2019-03-13 2020-03-12 Spécialiste Principal en CAB5 Infrastructure through Passation des Marchés a PPP Scheme Component B - Construction, CAB5-REF-47B / Management and Recrutement d'un Spécialiste IDA / H9810 Commercialization of the A posteriori Individuel Open 100,000.00 96,000.00 Signé 2019-06-05 2019-09-24 2019-07-24 2019-08-13 2019-08-14 2019-08-19 2019-09-18 2019-08-22 2020-03-16 en Passation des Marchés CAB5 Infrastructure through a PPP Scheme CAB5-REF-64 / Component B - Construction, Renouvellement de contrat du Management and Consultant Point focal Chef de IDA / H9810 Commercialization of the A posteriori Individuel Direct 49,920.00 26,400.00 Signé 2019-07-31 2019-10-08 2019-08-10 2020-04-06 2019-08-31 2020-04-06 2019-10-05 2020-04-06 2020-04-02 la composante C du projet CAB5 Infrastructure through CAB5 a PPP Scheme CAB5- CI-66-19 / Component B - Construction, Recrutement du Responsable Management and En cours Administratif, Financier et IDA / H9810 Commercialization of the A posteriori Individuel Open 84,000.00 0.00 2019-09-30 2019-09-27 2019-11-18 2019-12-09 2020-01-13 2020-07-11 d'exécution Comptable de CAB5-SOCOF CAB5 Infrastructure through SA a PPP Scheme CAB5-REF-63 / Recrutement Component B - Construction, d'un cabinet/ONG spécialisé Management and Sélection de (e) dans la cartographie et IDA / H9810 Commercialization of the A posteriori consultants par Direct 150,000.00 0.00 Annulé 2019-07-12 2019-08-07 2019-07-22 2019-09-25 2020-03-23 évaluation des risques VBG en CAB5 Infrastructure through entente directe faveur du projet CAB5 a PPP Scheme Component B - Construction, Management and CAB5-REF-61 / Secrétaire IDA / H9810 Commercialization of the A posteriori Individuel Limited 18,000.00 0.00 Annulé 2019-12-30 2020-01-04 2020-01-25 2020-02-29 2021-02-28 Administratif CAB5 Infrastructure through a PPP Scheme CAB5-REF-65 / Component B - Construction, Renouvellement de contrat du Management and Consultant Point focal PTNTIC IDA / H9810 Commercialization of the A posteriori Individuel Direct 49,920.00 0.00 Annulé 2019-07-31 2020-04-06 2019-08-10 2019-08-31 2019-10-05 2020-04-02 Chef de la composante A du CAB5 Infrastructure through projet CAB5 a PPP Scheme Component B - Construction, Management and CAB5-REF-62 / Chargé des IDA / H9810 Commercialization of the A posteriori Individuel Open 48,000.00 0.00 Annulé 2019-12-30 2020-02-17 2020-03-09 2020-04-13 2020-10-10 questions juridiques CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-REF-60 / Recrutement Management and d'un Spécialiste de Violence IDA / H9810 Commercialization of the A posteriori Individuel Open 48,000.00 0.00 Annulé 2019-05-24 2019-07-12 2019-07-12 2019-08-02 2019-09-06 2020-03-04 basée sur le Genre SVGB CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB-REF- 68-CI-19 / Management and Recrutement d'un Spécialiste IDA / H9810 Commercialization of the A posteriori Individuel Limited 48,000.00 44,000.00 Signé 2019-12-30 2019-10-21 2020-01-04 2019-11-06 2020-01-25 2020-01-08 2020-02-29 2020-02-03 2020-08-27 de Violence basée sur le CAB5 Infrastructure through Genre SVGB a PPP Scheme Component B - Construction, Management and CAB-REF-73-CI-19 / IDA / H9810 Commercialization of the A posteriori Individuel Open 36,000.00 0.00 Annulé 2020-01-31 2020-03-20 2020-04-10 2020-05-15 2020-11-11 Recrutement d'un Auditeur CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB5-74-CI-19 / Management and Recrutement d'un Spécialiste IDA / H9810 Commercialization of the A posteriori Individuel Open 52,000.00 0.00 Annulé 2020-01-31 2020-01-24 2020-03-20 2020-04-10 2020-05-15 2020-11-11 en Communication CAB5 Infrastructure through a PPP Scheme CAB5-75-CI- ED-19 / Recrutement de Ndukuma Adjayi Kodjo Expert juridique Sélection de Component A - Emergence of pour l'élaboration des IDA / H9810 A posteriori consultants par Direct 25,000.00 35,000.00 Signé 2020-03-31 2020-01-10 2020-04-10 2020-01-14 2020-06-14 2020-01-14 2020-12-11 an Inclusive Digital Economy mesures d’encadrement sur entente directe certains articles de la loi de Telecom Page 5 CAB5-75-CI- 19 / Recrutement d'un Expert Component A - Emergence of juridique pour l'analyse IDA / H9810 A posteriori Individuel Limited 50,000.00 0.00 Annulé 2019-12-31 2019-12-06 2020-01-05 2020-01-26 2020-03-01 2020-08-28 an Inclusive Digital Economy critique sur les articles de la loi de Telecom Component B - Construction, CAB5-REF-50 / Recrutement Management and d'un Chargé de Passation des IDA / H9810 Commercialization of the A posteriori Individuel Limited 66,000.00 0.00 Annulé 2019-03-01 2019-09-13 2019-03-06 2019-06-04 2019-03-27 2019-04-15 2020-04-14 Marchés CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB-REF-CI-4-20 / Contrat Management and de l’Assistant du Directeur IDA / H9810 Commercialization of the A posteriori Individuel Direct 22,000.00 22,500.00 Signé 2020-04-30 2020-03-16 2020-05-10 2020-03-16 2020-05-31 2020-04-07 2020-07-05 2020-04-07 2021-01-01 Général et Chargé de suivi CAB5 Infrastructure through d’exécution des marchés a PPP Scheme Component B - Construction, Management and CAB-REF-CI-5-20 / Contrat IDA / H9810 Commercialization of the A posteriori Individuel Direct 11,000.00 10,800.00 Signé 2020-04-30 2020-03-16 2020-05-10 2020-03-16 2020-05-31 2020-04-07 2020-07-05 2020-04-07 2021-01-01 de Chauffeur CAB5 Infrastructure through a PPP Scheme Component B - Construction, Management and CAB-REF-CI-6-20 / Contrat IDA / H9810 Commercialization of the A posteriori Individuel Direct 62,000.00 63,000.00 Signé 2020-04-30 2020-03-16 2020-05-10 2020-03-16 2020-05-31 2020-04-07 2020-07-05 2020-04-07 2021-01-01 du Directeur Technique CAB5 Infrastructure through a PPP Scheme Component B - Construction, CAB-REF-CI-7-20 / Contrat Management and du Spécialiste en Passation IDA / H9810 Commercialization of the A posteriori Individuel Direct 71,000.00 72,000.00 Signé 2020-04-30 2020-03-16 2020-05-10 2020-03-16 2020-05-31 2020-04-07 2020-07-05 2020-04-07 2021-01-01 des Marché CAB5 Infrastructure through a PPP Scheme Component B - Construction, Management and CAB-REF-CI-8-20 / Contrat IDA / H9810 Commercialization of the A posteriori Individuel Direct 12,000.00 12,150.00 Signé 2020-04-30 2020-03-16 2020-05-10 2020-03-16 2020-05-31 2020-03-16 2020-07-05 2020-04-07 2021-01-01 de l'Intendant CAB5 Infrastructure through a PPP Scheme CAB-REF-CI-10- 20 / Recrutement du Point Focal Component A - Emergence of PNTIC Chef de la composante IDA / H9810 A posteriori Individuel Direct 24,000.00 21,000.00 Signé 2020-06-29 2020-05-18 2020-07-09 2020-04-24 2020-07-30 2020-05-28 2020-09-03 2020-06-01 2021-03-02 an Inclusive Digital Economy A du projet CAB5 (MUTONJI MAYAND Eric ) Component B - Construction, CAB-REF-CI- ED- 17-20 / Management and En cours Recrutement Réceptionniste - IDA / H9810 Commercialization of the A posteriori Individuel Direct 5,500.00 0.00 2020-08-17 2020-08-03 2020-08-27 2020-09-17 2020-10-22 2021-04-20 d'exécution Chantal Bitete CAB5 Infrastructure through a PPP Scheme Page 6