Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project * Project by the Loan of the World Bank RP386 VOL. 1 Resettlement Planning Report of Henan Towns Water (Supply and Drainage) Project the Peoples'Republic of China The Foreign-loan Project Management Office of Henan Zhengzhou Oct. 2005 *~~~~~ I Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Contents Preface .......................................................1 Definition of Special Terms .......................................................3 1. Brief introduction on Henan Towns Water (Supply and Drainage) Project ........................5 1.1 General state of the Project .......................................................5 1.1.1 Background .......................................................5 1.1.2 The guiding ideology .......................................................6 1.1.3 The overall objective ................... : .6 1.1.4 The basis of the Project ....................6 2. General social and economic condition of affected areas .......................................... 21 2 E 1 Natural, climate and water resource conditions .......................................... 21 _ 2.1.1 Climate ........ 21 2.1.2 water resources & water system ............................................... 21 2.2. Social and economic situation of project areas .................................... 22 2.2.1. General economic situation of Henan province ............................................... 22 2.2.1.1. Social economy ...................... 23 2.2.1.2 Educational situation ..................... 23 2.2.1.3 Sanitary course ...................... 23 2.2.1.4 Population ...................... 24 2.2.1.5 Expenditure of residents ..................... 24 2.2.1.6 Endowment insurance and social security .. ................... 24 2.2.2. The social and economic situation of project areas ..................... 25 2.3. Investigation on social economy of resettlement communities . .................... 25 2.3.1. Contents of investigation ..................... 26 2.3.2. The main economic indexes ..................... 26 2.3.3. Methods of investigation ..................... 27 2.3.4. Result of investigation ...................29:. : ................... 29 2.3.4. 1. Population .................................................................................... 29 2 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 2.3.4.2. Situation of receiving education ................................................................. 29 2.3.4.3. Yearly per capita net income of sample families ................................................ 30 2.3.4.4 The minority families & the weak groups ........................................................... 31 2.3.4.5 The choosing of taking compensation ................................................................. 31 2.3.4.6 Attitude of migrants to water supply & sewage treatment project construction .... 31 3. The influence of Henan Towns Water (Supply and Drainage) Project and its indexes of the material objects ................................................................. 33 3.1 The impact of land taken for Henan Towns Water (Supply and Drainage) Project ..... 33 3.1.1. The land taken for the water supply project and the sewage treatment project .... 33 3.1.2 The impact of the land taken for the water supply project ...................................... 35 3.1.3 The impact of the land taken for the water-heads ................................................... 36 3.1.4. Impacts of land taken for the sewage treatment project ...................................... 38 3.1.5 The building and article on the land taken for Henan Towns Water (Supply and Drainage) Project ................................................................. 38 3.1.6 The pulling down and resettling of the displaced people' houses ........................... 40 3.2 The impacts of the land occupied temporarily for the construction of Henan Towns Water (Supply and Drainage) Project ....................................... 41 3.2.1 Area of the temporary cultivated farmland taking and the demolished &.repaired road during laying of water supplying pipelines ..................................... 41. 3.2.2 The area of the temporary occupied farmland for laying the sewage pipelines and of the repaired roads during laying the sewage pipelines ....................................... 43 3.3 Cultural relics, minorities and weak groups ....................................... 44 3.4 The hot issues displaced people concern ........................................: 44 3.5 The analysis of the Project impacts ....................................... 44 4. The relevant laws and the resettling policies ....................................... 48 4.1 The relevant laws, regulations and policies concerning the resettlement arrangement of projects in China ................................ 48 4.1.1 The regulations of The Law of Land Management of the People's Republic of China, (August, 2004) prescribes: ................................ 48 4.1.2. The Implementing Regulations of The Law of Land Management of the People's Republic of China (No.256 Decree of the State Council, 1999) prescribes: .................... 51 3 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 4.1.3. Methods of implementing The Law of Land Management by Henan Province prescribe: ............................................................... 51 4.1.4. Decisions on Further Reform and Strict Land Management by the State. Council (No.28, 2004): ............................................................... 53 4.1.5 Guidance Proposals on Perfecting the Compensation System of taking land for use and Resettling by the Ministry of State Land Resources (Nov.3, 2004) ........................... 54 4. 1.6. Forest law of the People's Republic of China ....................................................... 57 4.2 The Operational Policies of the Involuntary Settlement by the World Bank . ............. 58 4.2.1 The Goal of the Policies on the Resettlement Arrangement by the World Bank ...... 58 4.2.2 The Measures of the Resettlement Arrangement by the World Bank ...................... 58 4.3. The Goal and Principles of the Resettlement Arrangement ...................................... 58 4.3.1 The Goal of the Resettlement Arrangement .58 4.4 Compensating Standards .60 4.4.1 Compensating qualifications and rights .60 4.4.2 Compensating Principles .60 4.4.3 The Compensating Standards of the Resettlement Arrangement .61 4.4.3.1 The Standards of Compensating for the Land Taken Permanently and Resettlement of the Water Supply Project ................................................................. 62 4.4.3.2. The standards of compensating for the young plants and crops growing on the fields taken permanently and occupied temporarily for the Water Supply Project ........... 62 4.4.3.3. The standards of compensating for buildings and articles affixed to the land taken for the the Water Supply Project ................................................................. 62 4.4.3.4 The Standards of Compensating for the Houses Pulled down on the Land for Henan Towns Water (Supply and Drainage) Project ....................................................... 68 4.4.3.5 The Standards of Compensating for the Land Taken for the Sewage Treatment Project and the Resettlement Arrangement ................................................................. 68 4.4.3.6 The Standards of Compensating for the Young Plants and Crops on the Fields Taken Permanent and Occupied Temporarily for the Sewage Treatment Project ..... ....... 69 4.4.3.7 The Standards of Compensating for the buildings and Articles affixed to the Land Taken for the Sewage Treatment Project ................................................................. 69 .4.4.3.8. The standards of taxes imposed on the land taken for the Project ...................... 70 5W The budget for resettlement arranging in the Project of Water Supply & Sewage Treatment in Towns of Henan Province ................................................................. 71 4 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 5.1 The compensation for the land taken for the Project of Water Supply & Sewage Treatment ......................................................... 71 5.1. I The compensation for the land taken, resettlement arranging and the young plants and crops because of the construction of the Water Supply Project ................................. 71 5.1.2. The compensation for the buildings and articles affixed to the land taken ............. 71 5.1.3. The compensation for the land taken, resettlement arranging and the young plants and crops because of the construction of the Sewage Treatment Project ......................... 75 5.1.4. Compensation for the Articles and Plants affixed to the land taken for the Sewage Treatment Project .................... 76 5.2. Compensation for the Land Occupied Temporarily and the Houses Pulled down on the Land for the Water Supply .................................... 77 5.2.1. Compensation for young plants and crops on the land occupied temporarily by the Water Supply project and for land re-using .................................... 77 5.2.3. Compensation for houses pulled down and resettling because of land taken for Henan Towns Water (Supply and Drainage) Project . 78 5.3. Compensation and payment for the land taken for Henan Towns Water (Supply and Drainage) Project .................................... 79 5.3.1. Compensation for the land taken for Henan Towns Water (Supply and Drainage) Project .................................... 79 5.3.2. Payment of the compensation for the land taken for Henan Towns Water (Supply and Drainage) Project .................................... 80 5.3.2.1. The objects compensated for .................................... 80 5.3.2.2 Processes of appropriating compensation .................................... 80 5.4 Costs of restoring the roads damaged temporarily by the water supply project ......... 81 5.5CI The total direct cost for the Project in all project counties (cities) ........................... 82 5.6 Taxes on the land taken for water supply and sewage treatment project ..................... 85 5.7 The budget of other kinds of costs ............................................ 88 5.8 The total budgetary estimate of the water-supply and sewage treatment project in Henan province ............................................ 91 5.9 The investment plan for the displaced people of the water-supply and sewage treatment project ............................................ 93 6. The Schedule of Resettlement Implementation ............................................ 95 6.1 The principles of making the resettlement implementation ....................................... 95 6.2 The schedule for displacing and resettlement ............................................ 95 5 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 7. The plan for resettlement and economy restoration ........................................................ 97 7.1 The plan for resettlement ................................................................ 97 7.1.1 The objects and tasks of the resettlement ............................................................... 97 7.1.2. The principles of resettlement arranging ......................................................,.97 7.1.3. The environment after the resettlement arranging .............................................. 98 7.1.4. The restoration of infrastructures ..................................................... 99 7.1:5. The plan of arranging the resettlement's farming . ................................................. 99 7.2. The protection of women and their rights ...................................... 103 8. Resettlement Agencies and Management ........................................ 104 8.1 The setup of resettlement agencies ............................................ 104 8.2 The responsibilities of the resettlement agencies at all levels . ....................... 104 8.2.1 The Managing Office of the Foreign-loan Project administrated by the Finance Department of Henan Province ..................................................... 104 8.2.2. The responsibilities of the resettlement agencies of the responsible project agencies and the implementing agencies in all project countiesO] citiesEO .................................. 105 8.2.3 Town governments ..................................................... 105 8.2.4 The relevant government agencies ..................................................... 106 8.2.5 The leading resettlement groups of the village committees .................................. 106 8.2.6 The design entities of the Project (the Project-consulting Cooperation of Henan Province) ..................................................... 106 8.2.7 The independent external monitoring and evaluating agencies ...............: ............. 107 8.3 The manning and office facilities of resettlement agencies at all levels ................... 107 8.3.1 Manning ..................................................... 107 8.3.2 Training of resettlement leaders ...................................................... 07 8.3.3. The office facilities of resettlement agencies .................................................... 108 9. The public participating and information disclosure .............................................. 109 9.1 The public participatin'0 9.1~~~~~~I mh ulcpriiaig ........................................................................ log 9.1.1 The publicity of the resettlement information ..................................................... 109 9.1.2 The process of public participation ..................................................... 109 9.1.3 The distribution of the resettlement plan ...................................................... 111 9.1.4 The plan for public participating ......................................................111 10O] The Mechanism of complaints and grievance ..................................................... 113 10.1. The Mechanism of complaints and grievance ..................................................... 113 6 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 10.2 The Means of Grievance .......................................... 113 10.3 The Procedure of complaints and grievance ..........................................1 114 10.4 Procedures of Grievance .......................................... 114 10.5 The structure diagram of grievance procedure .......................................... 115 11 ] The monitoring & evaluating and the reporting system ......................................... 116 11.1. Preface .......................................... 116 11.1 E 1 The internal monitoring and evaluating .......................................... 116 11.1.1 1 1. The contents of internal monitoring .......................................... 116 11.1.1.2 The objects of intemal monitoring .......................................... 116 11.2 The independent external monitoring and evaluating .......................................... 117 11.2.1 Purposes .......................................... 117 11.2.2 The background investigation .......................................... 117 11.2.3. The external monitoring and evaluating .119 11.2.4. The organizing of monitoring and evaluating .121 11.2.5. Consideration of the special events .121 11.2.6. The monitoring report and the submitted agency .121 7 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Resettlement Planning Report of Henan Towns Water (Supply and Drainage) Project Preface lbnan Touns V%ter (Suppl y and Dai nage) Proj ect, one of t he I argest i nvest rnnt pr oj ect s of l-nan pr ovi nci al gover nnent, w t h t he I oans f r om t he VWr I d Bank avai I abl e, i s i nt ended t o enhance t he cur r ent si t uat i on of eat er suppl y and sevage t reat nent as uel I as to hel p perfect t he rel evant i nf ra st r uct ures of sorTe t omns. Lhdert aken by t he Fbf orrii ng and Davel opi ng Oxrittee and t he h nance Depart nnt of HI-nan P ovi nce, t he Pr oj ect covers an area of 38 counti es affi I i ated to 12 ci ti es i n terns of mater suppl y, as uel I as 6 count i es i ncl uded i n sevage t r eat nent . I t i s t he I ar gest - ever Wr I d Bnk I oani ng programof t hi s ki nd i n I inan Rovi nce as t o i t s range, part i ci pat i ng unitsandhuranforce, i nvolvi ngatotal of 40countiesaffi liatedto12cities, account i ng f or 35% of t he count i es and 80% t he dr ai nage ar ea. Ther-e ar e t uo naj or par t s i n t he const r uct i on of t he Pr oj ect, nanel y t he VAt er Sippl y Faci I i t i es and t he avuage Tr eat nent Faci I i t i es. The ai m of t he P Voj ect i s to sol ve i n the I ong run the probl emof tap mater suppl y for the r esi dent s and i ndust r i es i n t he t ar get ar eas, enhance t he under - devel oped si t uat i on of t he mat er suppl y and seuage di sposal f aci I i t i es, and r el i eve t he suppl y- derrnd i ssue, t hus pr ovi di ng subst ant i al support f or t he sust ai nabl e devel opnent of lenan R ovi nce on t he count y, ci t y and r egi onal I evel s. 1006. 24 rmu of I and i s occupi ed per nanent I y f or t he R oj ect of t he Tap Vdt er R ant const r uct i on, i n uhi ch t he const r uct i on si t e of t he pl ant occupi es 916. 44 rmu, Aat er - heads 89. 8 nu. 979. 44 nu of t he t ot al I and i s t aken f r om col I ect i ve- oned I and. For t he r est, 2 rn i s t he nat i on- ouned I and f r om X n X ang (bunt y; 12 nu t he sel f -ouned l and f rom X n Ye (bunt y; 25 rnu t he nat i on- ouned I and f r om Lu Shan Cbunt y. The pl urTbi ng of t he t ap \at er pl ant occupi es 934. 5 nmu of col I ect i ve- ouned I and f or t enpor ar y use. 240. 56 rmi of I and i s t aken per rranent I y f or t he const r uct i on of t he Seuage Tr eat nnt R ant, and pl urnbi ng occupi es 34 ru of col I ect i ve- ovned I and f or t enpor ar y use. The R oj ect reset t l es a popul at i on of 970 househol ds, t hat i's, 3995 i n nunrber. 947 househol ds, 3903 peopl e ar e r el ocat ed as a r esul t of t he per rranent t aki ng of I and f or t he Pr oj ect const r uct i on, r esul t i ng i n t he envi r onnent change of product i on. 23 househol ds, 92 peopl e are rel ocat ed as a resul t of I i vi ng envi r onnent changes (i . e. house denul i t i on). 710 househol ds, 3100 peopl e ar e af f ect ed by t he t enpor ary t aki ng of I and f or pi unrbi ng. A I t he aff ect ed peopl e are reset t I ed by of f er i ng t hem houses, and none of t hem are r eset t I ed i n ot her uays. Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 2 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Definition of Special Terms Accor di ng t o t he r el evant I ams and r egul at i ons enact ed by t he FPopl e' s Republ i c of Chi na and Fenan pr ovi nce as uel I as t he \ocat i onal Pbl 4 cy CQ4. 12 and i t s Sippl enent ar y FP ovi si ons concer ni ng i nvol unt ar y r eset t I ernnt nade by t he VWIr d Bank, t he pl an f or r el ocat i on of af f ect ed r esi dent s i s f or rml at ed. Ippi ng out t he pl an f or r el ocat i ng and r est or i ng t he af f ect ed r esi dent s of Ibnan Towis V\ter ( Supp y and Dai nage) R q ect of Towis i n bnan, t he I ayout obj ect s t o ensure t he af f ect ed r esi dent s t o benef i t f r omt he r oj ect and ,nake thei r I i vi ng standard not I oaer but even better. 1. Proj ect: The FPoj ect herei n (wthout speci al expl anati ons) refers to l-enan Touns VAt er (Sippl y and D ai nage) R oj ect of Towis i n Fbnan. 2. The affect ed popul at i on refers t o peopl e uhose wr ki ng and I i vi ng sur r oundi ngs ar e under t he adver se i npact ar i si ng f r omt he const r uct i on of t he R oj ect . I t consi st s of t he f ol I ow ng: a. The natural persons or I egal persons (al I the natural persons i n i nper sonal ent i t i es) \Aho have t he use r i ght or ovner shi p t o t he I and occupi ed by t he R oj ect ( i ncl udi ng t he t enpor ar i I y occupi ed I and) and t he ar t i cl es affixed to the land. b. The natural persons or I egal persons (al I the natural persons i n the i rrper sonal ent i t i es) uhose uor ki ng and I i vi ng sur r oundi ngs ar e unf avor abl y af f ect ed ar i si ng f r om t'he i rrpl eent at i on of t he R oj ect . c. The natural persons or I egal persons (al I the natural persons i n i nper sonal ent i t i es) \Ahose I i vi ng st andar d i s under t he adver se i npact r esul t i ng f r om t he i npl enent at i on of t he Pr oj ect . The popul at i on af f ect ed by t he i npl enrent at i on of t he R oj ect r ef er s t o al I t he peopl e uho are af f ect ed. The af f ect ed popul at i on r ef er s t o al I t he peopl e whose uor ki ng and I i vi ng sur r oundi ngs ar e af f ect ed adver sel y as t he r esul t of t he const r uct i on of t he Pr oj ect . The af f ect ed popul at i on i s not I i n t ed onl y t o t hose who t ake up nanuf act uri ng and operat i ng act i vi t i es or I i vi ng act i vi t i es i n t he di st ri cts af f ect ed and havi ng r egi st er ed, and not I ni t ed t o t hose Aho have t he owner shi p of t he af f ect ed t hi ngs. 3. The r el ocat i on obj ect s t o rrke t he af f ect ed r esi dent s keep t hei r pr evi ous I i vi ng st andar d or achi eve bet t er one. The af f ect ed r esi dent s shoul d be corpensat ed f or t hei r nat er i al I oss accor di ng t o t he pr i nci pl e of " pr evi ous f unct i on, pr evi ous st andar d, and pr evi ous scal e" . Accor di ng t o t he st andar d of r epl acenent cost conpensat i on st i pul at ed by t he Wr I d Bank, any docki ng or di scount i ng i s not per ni t t ed uhen t he eval uat i on of pr opert y occur s. To t hose whose I and or ot her proper t y are af f ect ed and cannot acconpl i sh econorn c i nt erest s, t hey shoul d obt ai n hel p and be conpensat ed f or. t hei r I ost pr oper t y and obj ect s. To t hose nat ur al per sons uho do not o\in pr oper t y or I i ve 3 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project t enpor ar i I y, t hei r pr oduct i on and oper at i ng act i vi t i es i n busi ness, i ndust r y or agr i cul t ure sect or rnust get t he sane rest orat i on and hel p as t he per rranent resi dent s, and t hey shoul d gai n t he sane conpensat i on f or t hei r propert y I oss as t he perrrnent resi dent s; To t hose nat ural persons af f ect ed by t he F oj ect Wio has t aken up i ndust r i al and busi ness act i vi t i es bef ore t hei r I egal r egi st r at i on, t hey shoul d al so gai n t he sane conpensat i on f or t hei r pr oper t y I oss. 4. Rest or at i on neans t hat t he pr oduct i on and I i vi ng st andar d of t hose af f ect ed r esi dent s shoul d be r est or ed t o t he pr evi ous st andar d or even bet t er than bef ore. 5. The r el ocat i on cover s r el ocat i ng t he acconredat i on quar t er s and I i vi ng facilities; rearrangi ng new uork for those vhose product ion and life are af f ect ed by t he const r uct i on of t he Pr oj ect; r est or i ng or conpensat i ng t he af f ect ed pr oduct i ve r esour ces such as I and, uor kpl ace and i nf r ast r uct ur e r esul t i ng f r om t he Pr oj ect const r uct i on. Ther ef or e, t he unf avor abl e i npact ori gi nati ng fromthe roj ect on the I i vi ng standard of the affected popul ati on w I1 be el i rnnated. 4 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 1. Brief introduction on Henan Towns Water (Supply and Drainage) Project 1.1 General state of the Project 1.1.1 Background Wt h t he devel opnent of t he soci et y and econony, qui ckeni ng ur bani zat i on of Fenan, const ant i rTpr ovi ng of ur bani zi ng st andar d and br oadeni ng of t he ci t y scal es, t he expl oi t at i on and ut i I i zat i on of mat er r esour ces has becone ror e and rmre urgent to neet t he need of ci ty uat.er suppl y. Accordi ng to t he pr edi ct i ons of F-nan (bver nnent, ur bani zat i on i n I-enan Pr ovi nce w I I be up t o about 35% i n 2010 and over 50% i n 2020. Wt h qui ckeni ng ur bani zat i on, t he const r uct i on of ci t i es and t ons and t he I i vi ng of resi dent s W I I need r re and nor e mat er, but t her e i s a gr eat shor t age of v\at er r esour ces t o neet t he need i n lbnan. (Gneral I y t he average gross mat er- resource i s 414 hundred n I I i on i n t he past years; 440 t ons i s f or per person and t hat i s 1/5 of t he nati onal I evel . Ibnan i s one of the provi nces i n great need of vater. The 36 ci t i es i n t he Pr oj ect ar e al I def i ci ent i n mat er. Armng t heM rmst ar e i n bad need of mat er, and sorne ar e f aci ng i ncr easi ngl y ser i ous I ack of mat er r esour ces, even uor se. And t he shor t age of mat er has af f ect ed t he devel opnent of econorry and soci et y and t he nor rml I i f e of resi dent s. There i s a cornmn probl emi n rnst ci t i es and t ovns of F-nan: Oi one hand, uAat er r esour ce and sour ces ar e i .nsuf f i ci ent, sur f ace mat er i n sone pl aces has been ser i ousl y pol I ut ed, \uhi I e gr ounduat er has t aken t. he shape of f unnel; on t he ot her, t he basi c condi t i on of mat er suppl y i s r at her ueak, t he present uater-suppl y scal e i s far fromsuffi ci ency, the i nfrastructure i s bare, the pi pes t o di st r i but e mat er ar e agi ng and t he I ayout i s not r easonabl e, so t he pr obl em of mat er dr oppi ng, I eaki ng and ot her mays of \ast i ng uat er resources are very seri ous: 23 out of the under-proj ect cities have a leaking rate of about 20% The i ncr easi ng pr obl emof suppl y & derrand has been condi t i oni ng t he devel opnent of t o\uns i n Fbnan Pr ovi nce. Thus, t o change, t o sore ext ent, passi ve condi t i on of i nsuf f i ci ent uat er suppl y, t o qui cken t he pr ocess of ur bani zat i on and t o neet t he ur gent need of econony and soci et y devel opnent, t he onl y \Aay i s t o per f ect uat er - suppl y equi prrnt and i nf r ast r uct ur e, t o bui I d Mat er r esour ce pr oj ect, uat er - di st r i but i ng pr oj ect, and v\at er pi pes pr oj ect . Fur t her nor e, because of i ncr easi ng of hurran act i vi t y, semage t r eat nent has becone a bi g pr obl emand nany r i ver s or st r eans have been pol I ut ed t o di f f er ent degr ees. Pur i f i cat i on and pol I ut i on- f r ee di schar ge of se\age have becone a basi c pol i cy f or Chi na t o pr ot ect envi r onrnent . So, t he r oj ect of seuage- t r eat rrent - pl ant i s an i npor t ant neasur e t o cat er t o t he har rmni zed devel opnent bet ueen hurran bei ngs and nat ur e, and at t he sane t i ne i s t he ur gent need of econorny and soci et y devel opnent. 5 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Ther ef or e, w t h suf f i ci ent di scussi on and negot i at i on bet ueen t he Vbr d Bank and rel evant nat i onal ri ni st ri es and conmi ssi ons and under t he di rect I eader shi p of lenan r ovi nci al (bver nnnt, t he Cevel opi ng & Fbf or ni ng Oboni ssi on of Ibienan and t he Fi nance Dapart nrnt f WInan Provi rice put f or eword t o t he Pr oj ect of Vt er Supp y & Seuage Treat nent i n t ownsd oIbnan Provi nce armng 40 count i es/ ci t i es of 12 ci t i es under l-enan Provi nce by usi ng t he I oans of the VWrd Bank. 1.1.2 The guiding ideology Basi ng on t he over al I I ayout s of t he ci t i es i n t he PR oj ect di st r i ct, conbi ni ng t he pr esent si t uat i on of ci t y mat er - suppl y W t h mat er r esour ce condi t i on, W t h car ef ul consi der at i on of nedi um & I ong- t er m denand and ue shoul d, t aki ng t he advant age of t hi s proj ect, perf ect Mat er- suppl y and seuage- t r eat nent equi pnent and i nf r ast r uct ur es i n t o\Ans as soon as possi bl e and change t he pr esent passi ve condi t i on of i nsuf f i ci ent mat er suppl y, t o neet t he need of ci t y const r uct i on, pr oduct i on and I i vi ng, and t o i npr ove peopl e' s I i vi ng st andar d. Besi des, t hi s pr oj ect w I I al so bet t er t he sof t and har d i nvest nent envi r onnent, i npr ove ecol ogi cal condi t i on and r eal i ze sust ai nabl e devel opnent; f ur t her nmr e, t hi s pr oj ect w I I qui cken i ndust r i al i zat i on and ur bani zat i on, pr onot e t he har noni zed econoni c devel opnent bet ueen cent r al ci t i es and count i es and w I I I ay a good f oundat i on f or cent r al pl ai ns r i si ng and a thorough uel I of soci ety i n lbnan. 1.1.3 The overall objective Accor di ng t o t he ur ban devel opnent r ul es and t he over al I I ayout s of ci t i es i n each proj ect di st ri ct, t he overal I obj ect i veof t hi s proj ect i s toaccel erate t he const r uct i on of t he vat er- suppl y and seuage t reat nent prq ect i n t owis of Ibrian Province, to perfect water-supply &semage-treatnent equipnent and i nf rast ruct ure i n t ovns as soon as possi bl e, t o i nrprove t he condi t i on of wat er - suppl y & sewage t r eat mnt, t o rnake ef f ect i ve use of I i ni t ed uat er r esour ce t o sof t en t he shor t age of mat er r esour ces and t he pr obl embet \Aeen \Aat er suppl y and dermnd, t o change i nsuf f i ci ent uat er suppl y, t o i ncr ease uat er - suppl y popul ar i zat i on and sewage t r eat nent . I n t he I ong r un, t hi s pr oj ect w I I al so pr onot e t he i nf r ast r uct ur es i n t owns and i npr ove t he l evel of ur bani zat i on, w I I bet t er i nvest nent envi r onnent and br oaden f i nanci al channel s; w I I hel p t o r eal i ze sust ai nabl e devel opnrent and i ncr ease t he I evel of i ndust r i al i zat i on and w I I pr onrt e peopl e' s I i vi ng st andar d and hel p t o bui I d an overal I uel I -of f soci et y. 1.1.4 The basis of the Project 1. 3 Qjt I i ne of t he 10th Fi ve-Year R an for Nbti onal Econonic & Soci al Cevel oprrent of Ienan Pr ovi nce] 3 2. t he Nest er pl ans f or ever y ci t y i n t he R oj ect di st r i ct l 3. t he st udy r epor t of pr act i cabi I i t y, t he denenst r at i on r epor t of Mat er resources, and t he eval uat i on report of envi ronrent of each sub- pr oj ect 3 4. 3 l-bnan St at i st i cs Year BDok- 20033 E Chi na St at i st i cs R ess3i; 6 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 5. l Hbnanat y St at i st i cs Year EBok- 2003Z The soci al econony i nvest i gat i on t eam of Fbnan ci t i es]; 6. The qterat i onal Pol i ci es 4. 12 of t he I nvol unt ary Set t I ernent and t he appendix by the \WrId Bnk] 7. SDne other rel evant rateri al s3 8. The on- t he- spot i nvest i gat i on rat er i al s & dat a] 9. 3 The Land lknagernent Lavs of t he Peopl e' s Fepubl i c of Chi naO , Year 2004] 10. 1\kasures of i npl enent i ng The Land l\nagenent Laws of t he Feopl e' s Republ i c of Chi na i n l-bnan RFovi nce] Year 199931 11. 3 Deci si ons on Fur t her ef or m & St r i ct Land \kWnagenent by St at e Cepar t nent E 3 St at e par t nent O 20040 INb. 28] ] 12. S,ri r el evant I as, r egul at i ons, cr i t er i ons, et c. by our count r y or t r ades; 13. Fbgul at i ons on I and t aki ng i n t he count i es of t he Proj ect; 14. Fbgul at i on on pul l i ng down houses and r eset t I i ng i n pr oj ect count i es] 15. I nt ervi ew, sunmary of di scussi on and f ree t al k W t hi n t he R oj ect di st r i ct s] 16. I nt er vi ew & sunmr y of di scussi on W t h t he r el evant per sons i n char ge of t he i npl enent i ng or gani zat i onsO 17. I nf or nal di scussi on, quest i onnai re, and surmary of t he di scussi on w t h t he vi l lage & t owo I eader s and t he r el evant vi l lager s] 18. The sanpJ e quest i onnai res t o t he rel evant resi dent s, f rom January t o UIrch, i n 2005] 19. The on-the-spot data & nateri al s of the investigation teanO 20. Sunnar y of t he speci al di scussi on on envi r onnent and reset t I enent ] 21. Sinrmmry of the special neeti ng on resettl enent probl em 1.2. The Ganeral rerarks on the Pr ect F-bnan Toms VWt er ( Sippl y and D ai nage) R oj ect i s a i nf r ast r uct ur e pr oj ect nai nl y based on ur ban w3t er suppl y & sewage t r eat nent . The mat er - suppl y pr oj ect i ncl udes 36 sub- proj ect s, w t h t he desi gned scal e of 10000- 35000 tfons per day and the total scal e of 958000 tons per day. A together, i n the Froj ect there ar e 33 \vat er - heads, 35 wat er - pur i f yi ng pl ant s, 38 di st r i but i ng pi pes and 38 shared not i ng equi pnent . The se\ age t r eat rent pr oj ect i ncl udes 6 sub- pr oj ect s. The sewage t r eat nent sub- proj ect i n I\kngj i n count y has a desi gned capaci t y of 25000 t ons per day and 20000 t ons per day i n Baof eng count y, t he ot her f our have a capaci t y of 30000 t ons of each. The seage t r eat rent pr oj ect hel ps t o i ncr ease t r eat nent capaci t y by 165000 t ons per day and 60225000 t ons each year. The total i nvest nent of t hi s proj ect i s 2490175800 Yuan ( 1R8), 2073554500 Yuan on the water supply proj ect and 416621300 Yuan i n the sewage treat nent pr oj ect . The t ot al i nvest nent i s f i nanced by: 7 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Ch t he %at er suppl y pr oj ect, t he I oans of t he Wr I d Bank 124912900 dol I ar s (equal s t o 1036777300 Yuan ME6), t he I oans of t he donest i c bank(s) 349500000 Yuan, t he f unds of st at e debt s 4000000 Yuan, t he rrt chi ng f unds of f i nance 292500000 Yuan and t he f unds r ai sed by cor por at i ons 390777200 Yuan. ai the sevage treatrnent project: the loans of the \Wrd Bnk 25097700 dol I ars (equal s to 208310700 Yuan RF\B), t he I oans of t he donest i c bank(s) 72500000Yuan, t he nat chi ng f unds of f i nance 61500000 Yuan and t he f unds r ai sed by cor por at ions 74310700 Yuan. VAen t he R oj ect f i ni shed, pr obl emof rnet aphase and I ong- t er mvat er suppl y & sev^age di schar ge i n under - pr oj ect ar ea w I I be sol ved, t he I ag condi t i on of uat er- suppl y &di scharge equi pnent w I I be i nproved, t he cont radi ct i on bet v&een dernnd and suppl y of vat er r esour ce i n rnst ci t i es/ count i es w I I be v\eakened, semage di scharge probl em i n under-proj ect count i es W I I be sol ved and t he sust ai nabl e devel opnent of econony i n each count y area w I I be f or cef ul I y guar ant eed. 1.2.1 The scale, narm and the undertakers of each sub-project The scale, nane and the undertakers of each sub-proj ect are'show, in TabI el- 2- 1Z Tabl el - 2- 1 The VWt er Sevage Treat mrt Prq ect Scale (10 No. name thousand/ undertakers day) Water supply 1. Kaifeng city 1 1 Water-supply project in 3.5 The tap water company of Weishi county 2 2 Water-supply project in 3.5 The waterworks of Tongxu county Tongxu county 3 3 Water-supply project in 3 The tap water company of Lankao county _____ _ Lankao county 4 4 Water-supply project in Qi 2.5 The tap water company of Qi county 4 4 Water-supply pipes 2.5 The tap water company of Kaifeng county ___ project in Kaifeng county 2 T a to n igu 2. Luoyang city 6 1 Water-supply project in 2 The tap water company of Mengjin county Mengjin county seat 7 2 Water-supply project i 2.5 The tap water company of Yiyang county 7_ 2 Yiyang county area 2 T a to nf n u 8 3 Water-supply expand in 3 The tap water company of Song county Song county area 3.Pingdingshan city 9 1 Water-supply project in 1.5 The tap water company of Baofeng county Baofeng county seat Expanding project of 10 2 Water-supply in Jia 2 The tap water company of Jia county county area 8 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Water-supply project inl 11 3 W I The tap water company of Lushan county Lushan county 3 4. Xinxiang city Water supply project in 12 1 new county seat of 2 The tap water company of Xinxiang county Xinxiang 13 2 Water supply project in 3 The water supply co. ltd of Yuanyang county. Yuanyang county seat 14 4 Water supply project in 2.5 The tap water company of Fengqiu county _____ I Fenggiu county 5. Xuchang city Water supply project of 15 1 No.2 waterworks in 2 The tap water company of Xiangcheng county Xiangcheng county 6. Sanmenxia city 1 Water supply project of 16 1 No.3 waterworks in Shan 2 The tap water company of Shan county __ _ county 17 2 Water-supply pipes i 3.3 The tap water company of Yima city ___ Yima city 7. Shangqiu city Water supply project of 18 1 No.2 waterworks in Sui 2 The tap water company of Sui county ____ _ county proper Newly-built Water supply 19 2 Nect Wayi s unty 3 The tap water company of Xiayi county pro ect in Xiay count 20 3 Water supply project in 2 The tap water company of Zhecheng county ____I I Zhecheng county proper I__ 8. Nanyang city 1- 2-1Tabl e f or vat er suppl y & sevage t reat nrnt prq ect [ cort inued[] scale( 10 No. name thousand/day) organizer Water supply in 21 1 Dengzhou southem 3 The tap water company of Dengzhou city district No.2 waterworks of 22 2 Xinye county tap water 2 The building bureau of Xinye county I company 23 3 Water supply project in 2 The tap water company of Sheqi county Sheqi county 24 4 Water supply project in 2.5 The tap water company of Xichuan county Xichuan county proper 9. Zhu adian city Expanding project of 25 1 water supply in 1.5 The water-supply co. ltd. of Queshan county. Queshan county proper l l IWater supply project inII 26 2 W s 2 The tap water company of Xincai county Xincai county 9 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 27 3 Water supply project 'n 2 The waterworks of Xiping county _ Xiping county Water supply project in 28 4 Zhengyang county 1.5 The tap water company of Zhengyang county proper Expanding project of 29 5 water supply in Suiping 3 The waterworks of Suiping county I county 30 6 Water supply project in 3 The tap water company of Ru'nan county Ru'nan county proper 10. Zhoukou city 31 2 Water supply project in 2 The tap water company of Shenqiu county 1 Shengiu county 32 3 Water supply project in 3 The tap water company of Taikang county t Taikang county Water supply project in 33 4 new Xiangcheng 3 The waterworks of Xiangcheng county county 11. Xinyang city 34 1 Water supply project in 1 The Huaiquan water-supply co. ltd of Pingqiao district. Pinggiao district 35 2Water supply project in 2 The tap water comnpany of Xi county Xi county 36 3 Water supply project in 1.5 The water-supply comnpany of Luoshan county luoshan county 37 4New Yangshan city 5 The tap water comnpany of Xinyang city I proper 12. Jiaozuo city Water supply project in 38 1 Mengzhou county 3 The water-supply co. ltd. of Mengzhou proper The total scale 95.8 Sewage treatment project Sewage treatment 1 1 project in Mengjin 2.5 The tap water comnpany of Mengjin county county 3 2 Sewage treatment 3 The tap water company of Song county 2 project in Song county Sewage treatmnent 3 3 project in Baofeng 2 The tap water company of Baofeng county county seat Sewage treatment 4 4 project in Yuanyang 3 The building bureau of Yuanyang county county Sewage treatment 5 5 project in Neixiang 3 The tap water company of Neixiang county county Sewage treatment 6 6 project in Huangchuan 3 The public utilities bureau of Huangchuan county Icounty The total scale 16.5 10 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 1. 2. 2 The pl an f or scr eeni ng t he si t es By t he caref ul feasi bi I i ty research and dermnst rat i on, t he si tes f or wat er wr ks and t he si t es f or sewage t r eat rent pl ant s t r y ever y neans t o r educe t he adver se i rrpact on di spl aced peopl e, t o pr ot ect t he envi r onnent and t o get mr e econorr c & soci al pr of i t s. The bet t er si t es ar e deci ded by car ef ul consi der at i on i n t he f ol I ow ng aspect s: Tr y t o t ake f ar n and as I east as possi bl e; t r y t o derml i sh houses as I east as possi bI eEO Tr y , i f possi bl e, t o keep aw3y f r om vi I I ages, busi ness, f i nance and ent ert ai nnent f aci I i t i esOl Per f ect const r uct i on pI an, shor t en and rrnage r easonabl y t he const r uct i on peri odOl Cat er i ng t o t he r equi r enent of di spl aced peopl e, t he si t e of - t he sewage t r eat nent pl ant i s t o I ocat e i n t he or i gi nal vi I I age vWhi ch has been nDved t o t he easy - access cent r al vi I I ageO The si t e of Tai kang mat er wr ks I ocat es on t he si t e of t he abandoned vi I I age- r un ent er pr i se, and t he abandoned houses mer e denel i shed t o neet t he r equi r erient s of t he vi I I ager s. I n accor dance w t h t he pr i nci pl es above, t he pl an f or scr eeni ng t he si t es is show\n Table 1-2-2-1El Tabl e 1-2-2-1 The pl an f or screeri ng t he si t es ol t he vudaterwrks uni t ] M area of County/city site Specific location the site (mu) Wishi V'.st gate of N,rther n si de of county seat, j unct i on of B nhe road & eihuan road, north of the Fbdio 18.9 count y Chengguan t oWm & Tv bui I di ng Tongxu east Shui w vi I I age Nbrt her n si de of count y seat, j unct i on of 18. 9 county of Chengguan t omn Beihuan road &Jiefang road Lankao Nx t her n st r eet of Wst of Hianghe r oadDEest er n si de of f or ner 30 county Chengguan t o\wn b. 2 vat erw\mr ks t county- Ceguan village of Wst of countyseat, insideof VWihuanroad 30 Chengguan t o\wn Kai f eng Chengguan t ovn Chengguan t avn pi pes const r uct i onE E and count ~~~~~~~~~~~~~~~ ~~t aken Ktnij i n lbn vill I age, The f ar nti and i n t he nort heast er n count y n CFengguan v o\n Ipl anni ng area of t he count y (east sect i on of 24 county Chengguan toWn Hianghe road) Wst of count y pi anni ng ar ea, sout h of Li he Yc yang Cntang vil age, r oad, east of X huan r oad, 800 ret er s avay f r om 32 count y Chengguan t oun t he east of (Gnt ang vi I I age SDng Yaobei vi II age t he I ow I yi ng ar ea, nor t h of Ji ngsan r oad, 22.25 county vvest of ai yun road * of eng a vi I I age Nbr t hNst of count y seat, HFang\Aa vi I I age, top 17.59 count y an vl of Fenghuangi ing hil op 7.5 Ji a Yuchi vi II age rbr t heast of count y seat, east of Donghuan r oad 18. 3 11 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project county in the east section of l\kishan nain road Lushan Besi de 7haopi ngtai Ch state-run bare hi ll, besi de Zhaopi ngtai 25 count y r eser voi r r eser voi r X nxi ang X ngni ng vi I I age, Nbr t heast er n cor ner of j unct i on of X nhe . r ai I may & B nhe r oad, about 200 rnet er s amay f r om 20 count y Chengguan tOl o X nhe r ai I iay, east of Feopl e' s M ct or y Tr ench Yuanyang Xuecun VWst of Nbnghang r oad, nor t h sect i on of count y 37.05 count y vii lage, Chengguan proper, nort h of Bei huan road Fengqi u NItih sta reet SDut hNest of j unct i on of cent ur y r oad & Fenghua count y t oun road Table 1-2-2- 1 The pl an for screeri ng t he si tes of the vaterwrks[ catoi nuem uri t O nu area of the County/city site Specific location site (mu) Zhengnan hi ghvay (f r omZhengzhou to N angcheng . I\bnyang) i n t he uest, Lucj i e hi ghvay( f r om countgy Chengguan tavn Luoyang to Ji eshou, Hibei provi nce) i n 32. 1 count y ~~~~t he nor t hBout her nbank of Bei r uhe ri ver, 2km t o t he count y seat Sian count y Ganzhuang vill I age, 100 neters avay fromrthe north of 20 .ying t,mn Li anhuo expr essmay Y1 rr ci t y Chengguan taAn Reconst r uct i on of at er pi pes t aken -Sui count y Chengguan tovn Sout hvest of j unct i on of anhu road( t he 305 Sui count y n ~~~~cent r al st r eet ) & Bei huan r oad305 n ayi Luman vi I I age Luman vi I I age, Caoj i t own 30 count y___________________ Zhecheng Shaoyuan vi I I age Siaoyuan vi I I age, Siaoyuan t cWn 34. 5 count y ____________________ Dengzhou Siuth by east of county proper, vest of ci ty San i he r i ver Bei j i ng road & sout h of nanhuan road, 4km 71 Y________________ st r ai ght t o t he now uat er vor ks c nye Chengguan tavn Sout her n out ski r t s, ow- r un I and 12 count y.. N brthvest of county seat, southvsest of coeunty Chengguan t owi j unct i on of hongqi road & forner X huan 14. 7 county ~~~~~~road X chuan Nb. 1 group of S. zui Nbr t h of count y seat, nor t her n si de of count .I Ji ngxi hi ghuay, eastern si de of forrer 15.1 count y vill I age, Siangj i t owi I\b. 2 vat erwxor ks Qieshan hengguan East er n si de of pr ovi nce- run cerment 21.98 count y factory, foot of Gian rnunt ai n X nca Dal i ang vi 11 age Sout h of Dal i ang vi I Iage, vest of count y 23.6 i count y seat v X ping X aot i an vi I I age, VWst of Nb. 107 nat i onal hi ghvay i n 20.1 count y adrni ni st rat i ve agency t he ust of X pi ng count yE X aot i an 12 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project of Bait i ng vi I I age i n Bai t i ng agency, east si de of *et er - gui di ng t r ench Nxrth Nest of j uncti on of uestern Nb. 2 Zhengyang Zoul ou vi I I age r i ng r oad & nor t her n Nb. 2 r i ng r oad, 30 count y Zoul ou vi I I age, Chengguan t oun Sui pi ng Wlou var VWl ou vi I I age, 2km t o county 25.5 count y vilage pl anni ng area i n t he vest Besi de Kai yan hi ghvay, nor t h di st r i ct, cou nan Chuzhuang village sout h of O vi si on of Ti anzhong al cohol 30.6 count y f act ory Sout her n bank of Yi nghe r i ver, east si de S'henqi u Fengchanhe vi I I age, of Zhaof eng nai n road, Fengchanhe 18. 77 count y Iai di an t oun vi I I age, sout h si de of l\b. 2 hi gh school Wt hi n Cheng vi I I age, adj acent t o Tai gao Taikang Zengf en vi I i age, hi gh\ay, nor t h\est of county seat, the 20 count y Chengguan toun upper Xi nuo r i ver, 1 km aAay f r om rb. 311 nat i onal hi ghuay. Xi angcheng X e vi I I age, Junct i on of Hibi n road & sout h r i ng road, 44 ci ty Chengj i ao t oun st at e- ovned I and R ngqi ao (3ngzhuang village VMst of t he pr esent uat er suppl y st at i on, 23.4 0 st ri ct sout hvest of Nb. 107 nat i onal hi gh\ay A count y Chengguan t cmi Chengguan t ovn 20 Luoshan No land Chengguan town Pipes perfection taken Yangshan Chuwang village, Chuwang village pressure-increasing station & Duanwan neighborhood 30 district Yangshan village pressure-increasing station committee Mengzhou South street, Chengguan South of Technical SecondarySchool, 1.7km to 36.6 city town water reservoir The total 916.44 Tabl e 1- 2- 2- 2 The pl an f or screeni ng t he si t es of t he sevage t reat nert pl art s Ui It: nu County/city Name of village characteristic site (mu) Sout h of t he ci t y seat, f ar avay f r om ci t i zens &vi I I agers, t ransport at i on, t o t he ngj i n N ubuhe cent r al adni ni st r at i ve vi I I age, of Nb. 7 45 count y vi I I age vi I I ager s sol ved, conveni ent f or uast e di schar ge, sevage col I ect i on and dr ai nage of pur i f i ed i ndust r y uat er Nbrth of county seat, far amay from Sout h & nor t h ci t i zens & vi I I agers, consi der i ng Song count y st r eet , Chenggu i nvest nent benef i t s, conveni ent f or mast e 41 an t avn di schar ge, sevage col I ect i on and dr ai nage of * pur i f i ed i ndust r y eat er Yuanyang Nrt h Nxr t h of count y seat, f ar avay f r om 40 13 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project count y st reet, ci t i zens & vi I I ager s, consi der i ng Chengguan towi i nvest nent benef i t s, conveni ent for uast e di scharge, seuage col I ect i on and drai nage of pur i f i ed i ndust r y at er br t h of count y seat, f ar avay f r om Baof eng Da7zhangzhu ci t i zens & vi I I agers, consi deri ng count yean g viazhIangz i nvest nent benef i t s, conveni ent f or uast e 37.8 count y ang Vi I I age di schar ge, sevage cot I ect i on and dr ai nage of pur i f i ed i ndust r y at er southeast of county seat, far amay from .i xi' ang ci t i zens & vi I I ager s, consi der i ng countiy anengguap t ovn i nvest nent benef i t s, conveni ent f or mast e 35 di schar ge, sevage cot I ect i on and dr ai nage of pur i f i ed i ndust r y uat er Nxbrtheast of county seat, far avay from ci t i zens & vi I I ager s, consi der i ng Fiangchuan Xi anf eng i nvest nent benef i t s, conveni ent f or mast e 41.76 count y vii I I agedi schar ge, semage col I ect i on and dr ai nage of . pur i f i ed i ndust r y vat er The t ot al I _I _ 240.56 1. 2. 3 The pl an for screeni ng t he si tes of veater-heads Accordi ng t o t he dernnst r at i on r epor t of mat er r esour ces and af t er consi der abl e conpar i son, t he si t es of uat er - heads shoul d be chosen on t he basi s of r educi ng adver se i rrpact on di spl aced peopl e, I ocat i ng on t he pl aces w t h vat er of hi gh qual i t y, uonder f ul envi r onnent, di st i nct i ve benef i t s, I ess- pol I ut ed ground & surf ace uat er. The pl an f or scr eeni ng t he si t es of uat er- heads i s shovn i n Tabl el- 2- 3- 1. Table 1- 2- 3-1 hoi ce of vat er resources and vat er-heads . Area of the No. project Sources type Location of sources land taken |(mu) 1. Kaifeng city I 1 Weishi Groundwater North of county seat, within an area of 3 square 4 ______ - county Groundwater__- km, 200 meters in the north of Brikanggou river Tongxu G dt North of county seat, within an area of 3 square 3 2___ -county Groundwater_ km. west of Wohe river Lankao Northwest of county seat, junction of Lanka6 4 county Groundwater arterial canal and Lanshang arterial canal Tabl e 1- 2- 3-1 Tabl e f or Aat er resource & sources] cont i nuedE] Area of the No. project Sources type Location of sources land taken (mu) 4 Qi county Groundwater Plowland of Xiguan village, west of county seat 2 1 Kaifeng Water supplied I Kcaoiuf e nty by Kaifeng Pipes networks construction 0 county 1city I______________________ _____ 14 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 2. Luoyang city | I 1 Mengjin Groundwater Southern bank of Taohuayu reservoir, north of 2 county county seat 2 Yiyang Surface water The dam, 800 meters in the north to Dingwan 0.3 county of Lu river village, Liuquan town 3 Song Underground Along the lower reaches of Yinhe bridge, left 0 1county ___ ___bank of Luhun reservoir_____ 3. Pingdingshan city Baofeng Water of 1 Baoenty Longxingsi Northeast of Longxingsi reservoir 2 county Reservoir 2 Jia county Groundwater Water-head is Wangji village 1.5 Lushan Water of 3 coushn Shaopingtai Zhaopingtai reservoir 0 county reservoir 4. Xinxiang city Xinxiang Tap water Water-head is drinking water of Xinxiang city 0 county waterworks corporation Yunyang Northwest of county seat,west side of Yuanxin 2 uanyyg Groundwater highway & north of Wenyan trench, adjacent to 0 county water-purified factory 3 Fengqiu Groundwater Along Jiangzhuang village, southwest of county 18 county seat 5. Xuchang city . 1 Xiangcheng Groundwater Along Beiruhe river, southern side of county seat 1 county 6. Sanmenxia city 1 Shan Water-head is in first & second class land, north ____1_ county Groundwater of Guanzhuang village 4 2 Yirna city Pipes Pipes reconstruction 0 reconstruction 7. Shangqiu city Weidikou, Tangmiao, Chenlou, liuxiao and I Sui county Groundwater ,.2.6 Huangchengzhai villages, north of county seat 2 Xiayi Northeast of county seat 3 county . 3 Zhecheng Groundwater Along Xuyuan village, west of county seat 3 county ___________________________ 8. Nanyang city 1 Dengzhou Danjiangkou Zhanggou village, northern bank of Danjiangkou I city reservoir reservoir 2 Xinye Groundwater Water-head is near the film company 2 3 Sheqi Groundwater Water-head is northern side of Chengying village 3 county l ~~~~~Xichuan Surface water 0 e4 Xichun Sfro river Northeast is only relied on water works 0 e ~~~~~~~~~county from river Table 1-2-3-1 Table for vater resource & sourcesO corti nued!_ _ [ I I I I i Area of the No. project Sources type Location of sources | land taken _ _ l l _ _ _ | _ _ _ _ _ _ _ _ _ _ _ I (m u) 9. Zhumadian city 1 w | iQueshan Water from Near the bank of Boshan reservoir . 2 county boshan 15 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project reservoir 2 Xincai Underground From Daliangzhuang village to Shilipu village, 3 county water south of Xiaohonghe river, west of county seat 3 Xiping Groundwater Along Xiaotianzhuang village, west of Xiping 1.6 county county seat 4 Zhengyang Groundwater Along Yanzhuang, Zoulou village, Shenshui town 2 county Suiping Groundwater Along Lianhuan Lake Farm, west of county seat county ___________________________ 6 Ru'nan Groundwater From Dayangzhuang village to Liulou & 2 county Groundwater Gaozhuang village, northwest of county seat 10. Zhoukou city 2 Shenqiu Groundwater From Gaoying village to Yanzhai village, 4 county southeast of Shengiu county seat 3 Taikang Groundwater Water-head is in Cheng village, northwest of 2 county county seat 4 Xiangcheng Groundwater Along Zhoulou & Kongzhuang village, southwest 8.8 city of county proper 11. Xin ang city Minggang Water from 1 town hongshizui Southern bank of Hongshizui reservoir 4 reservoir 2_ Xi county Groundwater _ Outside of planning area, northeast of county seat 3 Luoshan Water from 3 Luoshan former pipes networks perfection 0 county waterworks 4 iYangshan Water from Pressure-increasing station & pipes networks district waterworks perfection 12. Jiaozuo city _ Groundwater tMengzhou river The beach, northern bank of Yellow River 0 bottomland The total 89.8 1. 3. The nunber of t he cli spl aced peopl e af f ect ed by t he I and t aken The I and t aken f or t he per nanent si t es of at er vor ks W I I af f ect 601 fanl i es (i . e. 2884 persons), and that of pernranent mater-heads WI I affect 87 f ani I i es ( i . e. 354 persons). A t oget her, t he I and t aken per nanent I y i nf I uences 788 f ari I i es ( i . e. 3238 per sons); t he I and occupi ed t enpor ar i I y f or pi pes i nf I uences 720 f ani I i es ( ( i . e. 2870 per sons) . The I and t aken f or t he per rrnent si t es of semage t r eat nmnt pl ant s w I I af f ect 195 f ani I i es ( i . e. 806 persons), of uhi ch 23 f ani I i es ( i . e. 92 persons) ar e t he di spl aced peopl e r el ocat ed, and 30 f ani I i es ( ( i . e. 126 per sons) ar e t he di spl aced peopl e af f ect ed by t he col I ect i ve I and occupi ed t errpor ar i I y f or pi pes. The I and t aken per nrnent I y f or t he uat er- suppl y and sevage t reat nent prq ect i nf I uences 983 f ani I i es ( i . e. 4044 persons), of Whi ch 23 f arn I i es ( i . e. 92 per sons) ar e t he di spl aced peopl e r el ocat ed, 960 f arn I i es ((i.. e. 3952 16 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project per sons) bei ng t he di spl aced peopl e af f ect ed by t he I and t aken, 760 f an, I i es ( ( i . e. 3101 per sons) bei ng t he di spl aced peopl e af f ect ed by t he col I ect i ve I and occupi ed teenporari I y f or pi pes. Cetai I s are shovn i n Tabl e 1-3 and Tab! e attached 1- 3-1. Table 1-3 The d spaced people affectedy thevater-stqply aridsetagetreatnert pr ect e permanent land temporary land occupation relocated occupation name families displaced people FaiisDisplaced Dipae people displaced displaced Families people people people Land taken for 701 2884 waterworks 788 3238 Land taken 78 323 for 87 354 water-heads Land occupied by 720 2975 temiporary pipes__ __ Land taken for sewage 195 806 195 806 23 92 treatrnent plant__ _ _ _ Land occupied by 30 126 30 126 temiporary ,pipes _ _ _ _ _ _ _ _ The total 983 4044 23 92 750 3101 And al so, sone ot her publ i c ser vi ce f aci I i t i es, i nf r ast r uct ur es and speci al f aci I i t i es w I I be i nf I uenced, such as t el egr aph pol es, povmer I i nes, t r ees, t orTbs, agr i cul t ur al i r r i gat i on appar at us and r oads; as f or t he peopl e, t hose vihose I and has been t aken and vho have t o r eset t I e w I I be i nf I uenced. There are 4 ki nds of I and f or t he const r uct i on of t he Proj ect: 1. Lhi t - o\Aned I and: The present mat erwor ks i s const r uct ed on t he uni t - o\Aned I and owmed by t he f or rnr mat erw\or ks i n char ge of t he i rrpl ernent at i on of t he Proj ect . That Aaterv\.orks has \Aorked for a I ong peri od, and t he conpensat i on f or t he I and has gi ven t o t he di spl aced peopl e M^hen t he I and Mas t aken. The ovner shi p of t he I and has been i n t he Aat er w\or ks and, so, t her e i s no pr obl em of conpensat i on and di spl aced peopl e. I The si t e of t he at erw\or ks i n A nye count y i s i n t he uni t - ovned I and. 2. St at e- owAned I and: The present at erv or ks i s const r uct ed on t he st at e- owAed I and, such as t he ^at er v\or ks and t he at er - head i n Lushan count y, t he \Aat er - heads i n Song count y, Yuanyang count y, X chuan and l\ngzhou; t r ansf or rrt i on and const r uct i on of t he pi pel i nes i n t he ci t i es and t owis di st r i ct of t he R oj ect i s al so per f or ned on t he st at e- owned I and. 17 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 3. The I and t aken recent I y: The I and t aken recent I y has been used, accor di ng to t he ci ty pl anni ng, for t he i nf rast ruct ure I and. The I and ori gi nal I y bel ongs t o t he col I ect i ve of t he resi dent s i n t he suburbs. Accordi ng t o t he regul at i ons of The Lawco Land l\nagenent of the Fbople' s Fbpublic of CiMnaE]" to reet t he needs of t he publ i c i nt erest s, t he I and can be t aken w t h conpensat i on" Pai d use of st at e - owned I and" , t he uni t s i n char ge of t he i rnpl enent at i on of t he R oj ect obt ai n t he r i ght t o use t he I and af t er t hey have pai d f or ki nds of conpensat i on and t axes. 4. The col I ect i ve- owned I and used t enpor ar i I y: The pi pel i nes of t he vat er-heads, sore of the vater-suppl y pi pel i nes, and the seAage pi pel i nes are I ai d on t he col I ect i ve-owved I and and occupy tenporari I y t he I and of t he far ner s. 1. 4 Soci al and econan c i npact s ao Ibnan Towis VMt er ( Sppl y and Dai nage) Pr c ect The v%at er - suppl y and sem^age t r eat nent pr oj ect w I I hel p t he adrn ni st r at i on t o nake speci f i c pol i ci es t o pr ovi de publ i c ent er pr i se and envi r onnent al servi ces, hel p t o i nt roduce conprehensi ve net hods of nanagi ng t he wat er- suppl y pi pel i nes, mater resources, and the control of m^ater pol I uti on. -y way of per f ect i ng mat er - suppl y f aci I i t i es and semage t r eat nent f aci I i t i es, t hi s pr oj ect w I I hel p t o i npr ove t he qual i t y of dr i nki ng mat er and t he heal t h of the pubi c, hel p to better mater qual i ty i n the di stri ct of the FPoj ect and i n i t s I ovter reaches3 hel p t o bet t er at er envi ronnent and t o reduce di sease caused by vat er, hel p t o bet t er t he I i vi ng envi ronnent of aquat i c I i vi ng- t hi ngs, hel p t o r est or e and bet t er t he ecol ogi cal envi r onnent s, hel p t o i npr ove t he I i vi ng st andar d of t he poor i n t he ci t i es, hel p t o guar ant ee t he qual i t y of dr i nki ng mat er and i npr ove t he nanagerent of mat er - suppl y and semage. Fur t her nor e, t hi s pr oj ect w I I accel er at e soci al and econoni c devel opnent of t he count i es or ci t i es i n t he Pr oj ect . The const r uct i on and i npl enent at i on of t he R oj ect w I I di r ect I y cr eat e enpl oynent chances t o t he I ocal s, i ncr ease t hei r econoni c i ncone, i npr ove I i vi ng st andar d t o st i mul at e t he devel opnent of busi ness i t he const r uct i on of t he i nf r ast r uct ur es w I I per f ect I ocal i nvest nent envi r onnent, hel p t o at t r act nor e f unds f r om out si de, hel p t o enhance t he I ocal i ndust r y , agr i cul t ur e and busi ness, hel p t o i ncr ease ernpl oynent chances of t he I ocal s and t hei r i ncone, and hel p t o enf or ce I ocal sci ence & t echnol ogy and i t s ent er pr i se nanagenent 3 t he out si de i nvest nent w I I cr eat e rnr e and rrmr e appr eci at e chances f or t he I ocal s whi I e t he wnderf ul i nf r ast r uct ur e and envi r onnent w I I at t r act and st i nrul at e t our i sM t oget her w t h conner ci al s and ser vi ces. The const r uct i on of t he R oj ect w I I di r ect I y i ncr ease t axes, and t he out si de i nvest nent, devel opnent of t our i sM busi ness pr osper i t y, devel opnent of t hi r d i ndust r y w I I al so i ncr ease t axes f or t he I ocal gover nnent . These t axes becone f i nance f oundat i on f or f ur t her econoni c devel opnent and soci al ser vi ces. The const r uct i on of t he Pr oj ect pr ormt es t he change of t he soci al i deol ogy. R of i t i ng f r om i npl enent at i on of " hunan bei ngs- cent er ed" thoughts, the 18 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project f r ont - end dernnst r at i on of t he Wr I d Bank Loans, t he Ft oj ect dermnst r at i on, pr oj ect i rpi erent at i on and i t s nanagermnt st yl e, t he soci al i deol ogy w I I be i rpr oved and changed. Li t t I e by I i t t I e, nanagi ng pat t er ns and rTanagi ng st andar d of t he Vr I d Bank W I I ef f ect i vel y i nf I uence al I t he part i ci pant s unconsci ousl y. Thus, t hei r sci ent i f i c nanagenent sense and huran bei ngs- cent er ed sense, t hei r hunan- nat ur e har rmny sense, envi r onnent al pr ot ect i on, and t he senses of I aw and pol i cy of t he of f i ci al s at al I I evel s and of part i ci pant s, et c. w I I be r ei nf or ced t o, i n t ur n, be benef i ci al t o t he har noni zed devel oprent and stabi I i ty and uni tyO Because w\onen and i nf ant s W I I suf fer nrr e easi I y i n poor background and f I oodi ng per i od, t hey w I I benef i t nuch rmr e f r om t he R oj ect . To be br i ef, t he at er - suppl y pr oj ect' pr ovi di ng dr i nki ng wat er al I t he day r ound W I I bet t er t he qual i t y of dr i nki ng \at er; t he sewage t r eat rnt pr oj ect w I I i npr ove t he I evel of sewage t reat nent and vat er envi ronrent and W I I be benef i ci al t o t he heal t h of I ocal resi dent s and t he resi dent s i n t he I omer r*eaches and t o t he devel opnent of agri cul t ure and i ndust ry. The acconpi i shnent of t hi s pr oj ect w I I provi de new sevage t r eat rnt ser vi ce, and pr ovi de cheap, opt i onal uat er f or t he ent er pr i ses usi ng r ecycl ed vat er. 10 The d rect and iindi rect benefits o the vater supply prq ect 10 lThe d rect benef i t Dr i ng t he const r uct i on, shor t - t er m enpl oynent and I ocal i ncone w I I go up3] D.jri ng the operati on, I ong-termenpl oynent and I ocal i ncone w II go up[] Local peopl e i ncl udi ng t he poor w I I i ncr ease t he under st andi ng of \vat er suppl y est abl i shnent, oper at i ng t echnol ogy and ranagi ng neasur es3] I ncr ease t he saf e and hi gh- qual i t y dr i nki ng \ at er, bet t er t he qual i t y and quant i t y of \at er provi ded f or resi dent s, i ndust ry and busi nessEl DCcrease t he danger s of wat er- caused di seases, reduce t he rat e of \wat er - r el evant di sease deat h r at e, r educe t he r el evant nedi cal f ees and t he loss caused by di sease, especi al I y reduce t he danger s t o t he poor ,the young, t he ol d and t he f enal eOl Sve t i ne spent on carryi ng Aat er. Fbduce t he t i n t o get dri nki ng vat er 37 23 The i nci rect benef i ts I ncr ease t he r el evant addi t i onal benef i t s of t he cor por at i ons, busi nesses, I ocal pur chasi ng and ser vi ce uni t sli ETpIl oynent chance w I I be i ncr eased because of I ocal r aw not er i al purchasi ngO Bet t er t he envi r onnent qual i t y t o at t r act rmr e donest i c and f or ei gn i nvest rnent and t o accel er at e t our i srrE Boost the devel opnent and val ue of real est ate a3 By ay of st i rml at i ng over al I econoni c devel opnent t o al I evi at e t he pover t y pr obl em ar i si ng f r om " no pr oj ect s" 2. The c rect and i nci rect benefit of the semage treatn nt prq ect 3 1L The d rect benef i t s 19 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Dr i ng t he const r uct i on, shor t - t er m errpl oynent and I ocal i ncone w I I go up Dir i ng t he oper at i on, I ong- t er m errpl oynent and I ocal i ncone w I I go upoE Local peopl e i ncl udi ng t he poor w I I i ncrease t he underst andi ng of t he sewage t r eat nent est abl i shrnent, oper at i ng t echnol ogy and rmnagi ng reasur esE Better the vater quality of the I oer reaches of the river receiving the recycl ed water and i ts bi ol ogi cal di versi tyOE I rrprove t he I i vi ng envi ronryent and I i vi ng qual i t y of I ocal peopl eL Dacr ease t he dangers of vat er - caused di seases, r educe t he rat e of vat er - r el evant di sease deat h r at e, r educe t he r el evant rnedi cal f ees and t he I oss caused by di sease, especi al I y r educe t he dangers t o t he poor, t he young, t he ol d and t he f enal eO Agr i cul t ur al i r r i gat i on pr obl em of t he I oaer r eaches w I I be sol ved, and t hen t he agr i cul t ur al out put and i ncone w I I be i ncr eased. O 20 The i rc rect benef i ts Bpl oynent chance w I I be i ncr eased because of I ocal raw rrt er i al s purchasi ng of t he sevage t reat nent proj ect El RorTte the local tourismand the appreciating value of vater body of ri versO Per f ect t he envi r onrnent qual i t y t o at t r act nur e donest i c and f or ei gn i nvest rnent ol I rrprove t he I i vi ng envi r onnent and I i vi ng qual i t y of I ocal peopl eEO By way of stimulating overall economic development to alleviate the poverty problem arising from "no projects" 20 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 2. General social and economic condition of affected areas 2E 1 Natural, climate and water resource conditions The Project covers thoroughly 12 cities, Henan province. Henan Province situates in the middle by east, middle & lower reaches of Yellow River, within geographically east longitudellO° 21' E 116° 39' and north latitude 310 23' 0 36° 22' . It abuts Hebei province, Shanxi province, Shanxi province, Hubei province, Anhui province and Shandong province, 580 km from east to west and 550 km from south to north. Covering an area of 167000 square km, Henan Province is 17th in area. Hypsography is high in the west and low in the east, physiognomy is different clearly. In the west, the mountains heave with a high altitude and in the east, hypsography is low and even. From west to east, the physiognomy changes from mid-height mountains to low-height hill, from knaps to plains with 2390.6-meter fall. 2.1.1 Climate With warm climate, rich sunshine, and sufficient rain, Henan province lies in Northern semitropical and warm temperate zone, which is good for agriculture, forestry, fishing and animal husbandry. Divided by Qin Mountain & Huai River, it is warm temperate zone with half-moist and half-dry characteristic in the northern side, covering 70% of the total area; it is semitropical zone with moist and half-moist characteristic in the south, covering 30% of the total area. The climate characterizes by transition. It is mild in Henan, the yearly average temperature is 12.8-15.50 with clear difference in different seasons. Rain is focused in summer, 45-60% of the yearly total. The non-proportion of rain will easily lead to flooding and drought. 2.1.2 water resources & water system Average possession of water resources is rather low in Henan province, the total superficial underground water is 20500 million tube meters, the plains and central basin taking 3/4, the mountain area taking 1/4. Throughout Henan province, water of cranny hill cave cranny immersion covers an area of 52310 square kms; water of cranny immersion in the plains covers 108794 square km, and deep confined water covers 84700 square km. At the same time, the flowing area is in short of water resources and pipes construction is in a low-level, short and waste of water resources exist simultaneously and recycling utilization of water in industry is in a low degree. Most rivers in Henan province originate from western mountain area, fanned out to the 21 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project east, the north or the south. Henan province has total runoff of 16570 million tube meter; It is rich in rivers in Henan Province, having493 rivers with flowing area of 100 square km, 61 rivers with flowing area of 100 square km and 16 rivers with flowing area of 1000 square km. All the rivers can be divided into four river systems, Haihe River system, Yellow River system, Huaihe River system and Yangtze River system from north to south Taking 5.1% of its total flowing area and 21.7% of provincial area, Yellow river flows 720 km within Henan province with a flowing area of 36000 square kmo originating from Tongbai mountains and out of Henan boundary in the east Huaibin county, taking 46.2% of its total flowing area and 52.8% of provincial area, Huaihe river flows 340 km within Henan province with a flowing area of 88300 square km; belonging to Yangtze river system, Tang river, Bai river and Danjiang river are branches of Han river, with a flowing area of 27400 square km, occupying 16.3% of total provincial area; originating from Taihang mountain and the main branch of Hai river, Weihe river has a flowing area of 15300 square km with over 400 km in Henan province, occupying 92.% of provincial area. In 2004, the total water resources is 40500 million tube meters, per capita 417 tube meter per capita, and the yearly average rain is 80, mm. In 2004, out of 83 surface water environmental quality monitoring cross-sections in the four river basins throughout Henan province, 45.8% cross- sections meet standard of national Class III of water quality, going up 7.2% than that of last year; water of 3.6% cross-sections belongs to Class IV, dropping 3.6%; 8.4% cross-sections is in Class V, achieving 1.2% increase; 42.2% cross-sections satisfy Class V, dropping 4.8%. Up to the end of 2004, Henan Province governs 17 provincially administered municipalities, one province-governing city, 21 county-level cities, 48 municipal districts, 89 counties, 2123 towns, 48000 villages. The provincially administered municipalities are: Zhengzhou, Anyang, Hebi, Puyang, Luohe, Kaifeng, Luoyang, Xinxiang, Jiazuo, Pingdingshan, Xuchang, Sanmenxia, Nanyang, Shangqiu, Xinyang, Zhoukou and Zhumadian, and the one province-governing city is Jiyuan. 2.2. Social and economic situation of project areas 2.2.1. General economic situation of Henan province The Project concerns 12 cities under the Henan Procincial Government except Zhengzhou, Anyang, Hebi, Jiyaun, Puyang, Luohe, including Kaifeng, Luoyang, Xinxiang, Jiaozuo, Pingdingshan, Xuchang, Sanmenxia, Nanyang, Shangqiu, Xinyang, Zhoukou, Zhumadian etc, whose social and economic developing condition is fundamentally on the same level, but some index marks are a little lower. According to National Economy & 22 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Social Development Statistics Bulletin in 2004 issued by Henan Province Statistics Department] Henan Province yearly gross product is 881509 million, among which, the primary industry achieves 164748 million increase, the secondary industry achieves 451535 million increase and the tertiary industry achieves 265226 million increase. 2.2.1.1. Social economy Quality of economic operation improved greatly. All state-run corporations and all non- state-run enterprises with yearly sales income of over 5000 thousand RMB got benefits of 3765.2million RMB. In 2004, totally 55500 thousand persons were employed, achieving 150 thousand increase than last year. The town employments are 8500 thousand, increasing 100 thousand. The town unemployment rate is 3.4% at the end of the year. Totally, the food supplies output is 42600 thousand tons: summer grain crops are 25209.8 thousand tons, and autumn grain crops 17390.2 thousand tons. The total output of oil plants is 4087.5 thousand tons] cotton 666.7 thousand tons, tobacco leaf 257.5 thousand tonsOlvegetable 52375.2 thousand tons, meat 6430 thousand tonsOeggs 3474 thousand tons] milk 745 thousand tons and aquatic products 422 thousand tons. 2.2.1.2 Educational situation All over Henan Province, the number of postgraduates enrolment is 5408 in 2004, 11853 are studying postgraduate courses and 2036 graduated; the number of college entrance enrolment is 257400 each year, 702800 are studying college courses and 134300 graduated; the number of adults education enrolment is 151000 each year, 337400 are studying adult courses and 86800 graduated; the number of secondary technical school and vocational schools enrolment is 439600, 1099500 are studying their courses and 292700 graduated; the number of senior schools enrolment is 613300, 1687500 are studying their senior schools courses and 424800 graduated; the number of secondary schools enrolment is 1963200, 5913500 are studying their courses and 1985200 graduated; the number of primary schools enrolment is 1624900, 10140600 are studying their courses and 2035400 graduated; the number of special education enrolment is 2700, 19100 are studying their courses; 1490200 infants are in nursery schools. 4817700 adults accept technical training in training schools, and 136700 young adults have been literate. 2.2.1.3 Sanitary course Sanitary course persistently develops. At the end of the year, there are altogether 14119 sanitary agencies] including 3201 hospitals & public health centers, 166 health centers for 23 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project women & children, 37 special hospitals for diseases, 206800 sickbeds3 hospitals & public health centers have 196700 sickbedslLlthere are 288800 health personnelt3l 12400 practicing physicians and assistant practicing physicians3 and 78000 registered nurses; there are 182 Diseases Protection & Control Centers (health care stations) with 14100 health personnel working in, 33 sanitary inspection & verification agencies with 988 health personnel, 2065 hospitals in towns with 50900 sickbeds and 69200 health personnel. 2.2.1.4 Population Natural growth rate. continuously drops. The total population is 9717000QO at the end of the year: 1130000 were born with birth rate of 11.67%o3 630000 were dead with death rate 6.47%o. 500000 increase with the natural growth rate of 5.2%o: There are 28090000 persons in towns, occupying 28.9% of the total. There are 69080000 farmers, occupying 71.1% of the total. There are 7190000 persons over 65 years old, about 7.4% of the total. 2.2.1.5 Expenditure of residents The average governable income of the towns is 7704.9RMB, achieving 11.2% increase; average expenditure payout is 5294.2RMB, achieving 7.1% increase. the yearly net income of the farmers is 2553.15RMB, achieving 14.2% increase; the average individual consumption is 1664.09RMB, achieving 10.3% increase. The habitation condition is continuously being improved: 31152300 square meter housing areas have being completed in towns, and that in countryside are 91770000 square meters. The sale area of commercial housing is 10553700 square meter, achieving 22.3% increase. 2.2.1.6 Endowment insurance and social security To the end of the year, 7796300 join in basic pension insurance, of which 5984300 are employers and 1812000 are the retired or the resigned. Increased by 20400 last year, 6816400 join unemployment insurance. 5900000 join in hospitalization insuranceDichieving 231500 increase, and 4533000 are employers and 1367900 are the retired or the resigned. The govemment distributed 910 million RMB of minimum standard of living pension to 1350000 persons in towns, 4.8% of population of all towns. Henan province government regulates: the rural residents having no labor ability and living source, at the same time, having no fostering responsibility, or those disabled, elder residents and minors although having fostering responsibility, if they live together, they can receive at least 1200 Yuan per year, but if they are separated, they can receive at least 1000 Yuan every year. The money is gained from extra tax of agriculture to mainly government finance investment. According to the statistics of the investigation, at present there are 24 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 492,600 families who enjoy the five guarantees, 517,600 people in the whole province, i.e. 6.7% of the whole population. As for the poor families in the countryside, the standard for social security is monthly average income 70 RMBI that is, 84ORMB per person per yearE. For those whose income is under the standard, the shortage will be balanced by the government. As for social welfare, the cares, with 63800 sickbeds, accept 47100 persons; 3155 community service establishment are built, including 349 community service centers. Social welfare fund raises 321million RMBEI all walks of life donate 18140000 yuan RMBv1 note]3 the gross product and added-value of industries in accordance with the present price, increment speed in accordance with comparable prices] . 2.2.2. The social and economic situation of project areas The social and economic situations of the 12 counties/cities are rather good throughout Henan Province, staying moderate level and a little better than average. During the course of affluent society construction and central plain's rising development, the Project zone will and can do its contribution. According to the statistic data in 2004, the 12 counties /cities cover an area of 115226 square km, 69% of Provincial area, with a population of 76920 000, 79.6% of that of the province. GDP of the 12 counties/cities goes up to 485100 million in 2003, 69% of the provincial gross economy and the budget income is15180 million, 44.9% of the provincial budget income total. See table 2-2-labout the basic situation of each county/city] see table 2-2-1 about the GDP( 10 thousand RMB) in 2004 of each county/city. 2.3. Investigation on social economy of resettlement communities The aim of investigation on planning in influenced area is to have an overall knowledge of the social economy of resettlement community and the influence on resettlement community. 1. Resettlement planning investigation program has been set down. The systematic, complete program tries every means to be strict in organization, reasonable, in construction, complete in content and system. Also, the questionnaire is in a limpid style and easily understood to be accepted by all walks of life and different professions. 2. After the first draft finished, holding panel discussion attended by relevant experts and participants to put heads together and to carefully survey the content of thie program in order to perfect the feasibility of the program. 25 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 2.3.1. Contents of investigation The main items for investigation to the influence area areO - -population ] investigation and statistics to migrants structure; educational situation] --social economy] investigation to social and economic development of the influenced area] -housing] may classified into living houses, adjunct tenements, and appurtenances considering its use. Housing may be classified into reinforced concrete and brick construction, wood and brick construction, wood and soil construction, plank wood construction. Square meter is the unit of the floor space when investigate -municipal-service facilities]Oincluding roads, bridges and culverts, water and drain establishment, electricity equipment, post and telegram installment, entertainment, medical care and educational amenity.] -land] may classified into state demesne and collective-owned according to the ownership. It may be classified into farmland, ground, forest land, homestead, industrial an mining enterprises land, transportation land and water area (rivers and streams, reservoir an poles), etc.] -production and living establishment] --water conservancy & hydroelectric power installment] agriculture-pumping stations, agricultural-wells, penstocks, etc.. ] -transportation system] highway and express way, shortcut, etc.. electricity equipment] transformers, 10kv electric lines, 380v high voltage wires, etc.. - cultural relic & historic site] investigation on their names, locations, and scales, etc.. 2.3.2. The main economic indexes O .families-social economy indexes Characteristic of population-family style, family structure, ratio between male & female, ratio between adults & infants, educational situation, situation of body health] Economic situation-source & level of income, possession situation, profession, employment chances and income] 26 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Living environment-housing, sanitary, water supply, electricity, utilization & situation of infrastructure and public establishment Social' environment - social impact of the general formal social organization, non-governmental organization and informal organization. Also, how these organizations show care to the old, the handicapped and their social impact, entertainment equipment, etc. E .resettlement villages-social economy indexes Population-population, ratio between male and female, ratio between adults and infants, career groups, agricultural & non-agricultural products and resettlement and moving of population3 Economy-natural resources, situation of agricultural production, agricultural outcome, crop farming and livestock breeding, situation of the secondary & tertiary industry El Infrastructure and surroundings - situation of villages infrastructure, community facilities, agricultural establishment, water-heads, electricity and environment?l Social organization - social governmental organization, non-governmental organization, private association, women's association and the social & economic * networks7 2.3.3. Methods of investigation 1. Screening the sample families The land taken permanently for the Project affect 983 displaced families, i.e. 4044 displaced people. 170 sample families (689 people) are investigated, occupying 17.1% of the displaced people affected by land taken permanently. Screening sample families is important to guarantee the precision and accuracy of the investigation. There are 4 the principles of screening sample families: r- From regions, to consider the wideness of the regions where sample families live; L. From sociology, to consider the rationality of the sample families at all levels, to consider the difference between the social environment and the impacts of the Project and the preference of the social value, and to consider the participation of people with different benefits E.L From economics, to consider the typicality of economic development; From statistics consideration, the quantity of sample families should be considered. The investigations pay special attention to the scope of sample families. The screening * of the subjects of investigation is as follows: 27 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project a. The project counties (cities) and the relevant responsible entities to implement the Project are screened as samples b. The committees of the villages where land is taken for the Project is screened as sample villages. c. Among the 5 sample families, 1 family relatively rich, 1 family relatively poor, 3 families moderate. If there are especially poor old single people or one-parent families, I more family is chosen as sample, and the assistance from the local govemments or social groups is to be investigated carefully. d. Besides the above, investigations are made at random on the project counties (cities). The sample families investigated at random should cover various social classes and trades. We should pay attention to the different problems arising from different education, the different opinions of the relevant benefit groups and of different benefit groups, so as to make the sample families cover all social classes and benefit groups of the resettlement communities. 2. Methods of investigation In general, the planning investigation is to have free talks and interviews by way of "from upper class to lower class" and from "macroscopic view to microscopic view" First, we discuss with the relative branches of the local govenmment. The branches attending the discussion include the Water Conservancy Bureau, the City Construction Bureaus, the Health Bureaus, the Epidemic Prevention Stations, the Environmental Protection Bureaus, the Statistics Bureaus, the Civil Administration Bureau, the Land Bureaus, Chengguan Town and the Running Water Company. From the discussion, we can get to know, from micro level, the economic development level, environmental condition, medical cire level, the interrelationship between drinking water and health, the productive and living standard of the groups of the concerned social interests in the Project County, and various policies adopted by the govemments of each level about the construction of the Water Work and the displaced people. Second, according to the task of the social evaluation, the plan and outline of the investigation, different teams of experts have been sent to the inhabitants' committees of the city and the resettlement villages to carry out the interview, informal discussion and questionnaire investigation. Then they can get the information about the general situation of the inhabitants' committees, the economic development of the communitids, the social economy of the local counties, urban communities and families in quantitative statistics, the contents of the inner labor division and,income shifting of the sample families and the basic 28 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project understanding, opinions and suggestions of the inhabitants' committees, resettlement village' s committees and the interests concemed groups for the construction of the waterworks or sewage treatment plants. Three, conversazione and interview. The aim is to truly understand displaced peoples' situation of production and life, their attitudes on the Project, their requirement of compensation and the situation of land taken. Four, on- the- spot survey and measurement. The aim of survey & measurement is to know the real situation, to master true influence of land imposing on displaced villages, to check substantial index and its quantity & type of demolishment and engineering construction. To ensure accuracy of data, the investigation should note down detailed statistics and check with displaced people themselves. 2.3.4. Result of investigation 2.3.4.1. Population The permanent land imposing in water-supply engineering concems 36 villages, 34425-mu land. With average farmland of 1.76 mu, the number of farmers is 19578. The permanent land imposing in sewage treatment engineering concerns 6 villages, 12517.9-mu land. With average farmland of 1.88 mu, the number of farmers is 6583. Villagers in villages of sites of water supply project and places of water-heads are permanent residents who are really natives. Among 689 persons, the male are 361 persons and the female are 328 persons; ratio between is 1:0.91. Each family has 4.05 persons on average. 18.72%, that is 129 persons are under 16 years old; 76.49%, that is 527 persons are 17 to 60 years old. 4.79%, that is 33 persons are over 60 years old. See Table 2-3-4-1. Table 2-3-4-1 Age framework of resettlement sampling families Age Sample population percent7l % Cl Children LI D 16 years oldZ 129 18.72 From 17-60 years old 527 76.49 Over 60 years old 33 4.79 The total 689 100 2.3.4.2. Situation of receiving education Among 689 sample displaced people 10.01%, that is 69 persons received basically primary education and 19.74%, that is, 136 received primary education. Those mainly are 29 Resettlement Planning Report of Henan Towns Water (Supply and Draiagey Project children and the old. 68.07%, that is, 469 persons graduated from middle school or senior high school. In the countryside, nine-year obligatory education has been popularized, then the youth have chance to receive secondary or senior high school education; among the families, 2.18%, that is , 15 sons or daughters are receiving professional or college education. See Table 2-34-20D Table 2-3-4-2 condition on education of sampling families Condition on education Sample population percentO %E Basic learning 69 10.01 Primary school 136 19.74 Middle/high school 469 68.07 Undergraduate O special 15 2.18 training course includedE The total 689 100 2.3.4.3. Yearly per capita net income of sample families Sample displaced families are 170 families, 689 persons, and yearly the per capita net income is 2299.2 RMB. 54.71% of the total, that is, 377 persons in 93 families have equal or less average net income among all sample families; 45.29%, that is, 312 persons in 77 families have more average net income. Thus, the average net income is olive-sized distributing, the discreteness of data is rather focused, and income of displaced people is nearly on average. 65.29%, that is, 550 persons in 111 families have net income of between 2000 and 3000RMB. The phenomena of inequality distribution are less seriou*s than that of the towns. Among the displaced families, the least yearly net income is 1500RMB, and the highest, 4 persons in one family, is 7000RMB, which is 4.67 times than the lowest. See Table 2-3-4-3. Table 2-3-4-3 yearly average net income profile of sample family Per capita income Number of families Number of population Percent 1500~~~~Qnt ent s of synrposi urrs unty tine part i ci pant agreements (ci t y) AM of The head of the county in 0 Survey of the Project, including the size 0 Affirm the size and the location of the charge and the main officials Febr uar y of Development and Reform and location of Waterworks, the amount Waterworks and the amount of the land taken or Commission, Price Bureau, of the land taken or occupied temporarily. occupied temporarily. 1 8, 2005 Finance Bureau, Water Resource Bureau, 0 The consultative experts introduce the 0 Determine the compensation standard of young Construction Bureaus, Health Bureaus, Epidemic effect of project construction on the crops, land resettlement allowance, articles affixed Prevention Stations, displaced people. to land, restoration of farmland and town roads. Environmental Protechon Bureaus, Civil 0 The Operational Policies 4.12 of the * Determine the range standard of deciding the Administration Bureau, Involuntary Settlement and its annex. material object targets affected by the Project.. Public Serice Bureau, Land Bureau, Traffic Bureaus, 0 The relevant laws, regulations and * Determine the procedures and supervision ways of Govemment, Masses policies on land taking. The distributing compensation. Visiting Office, Residents' compensation standard is set be the * Determine the resettlement measures and the rights 25. Committee, Investigation Q snCommittee, Religion actual situation. of the displaced people. Queshan Management Commissions * The ways of deciding the material object * Determine the ways of public participation and County and Disabled targets affected by the Project. information disclosure. Federations. 2 * The procedure and supervision of * Determine the ways and methods of carrying out persons are present. distributing compensation. the relevant resettlement policies of the World . The resettlement policies and measures. Bank and our government. * The rights of the displaced people; the * Carry out the rights of the vulnerable groups and resettlement institutions and protection policies. management. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. 221 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project PM of Land Bureau, 0 Survey of the Project, including the size * Agree with the size of water plant, the project February project and location of Waterworks, the amount site, the amount of the land taken or occupied 18, 2005 implementing of the land taken or occupied temporarily. temporarily. institutions, 0. The opinions and suggestions about the * Believe that it is necessary to build the water Village affected people about land taking. plant; mention the compensation for land taken, Commissions, 0 The consultative experts introduce the the construction of farmland facilities and output Public Security effect of the project construction on per mu; resettlement allowance is used to help Commissions, displaced people.. displaced people to develop planting, breeding Women. * The Operational Policies 4.12 of the and raising and business to increase their income. Federations, the Involuntary Settlement and its annex. * By discussion, an agreement is reached on the representatives of * The idea and suggestions on compensation standard of young crops, land, residents and compensation standard. resettlement allowance, articles affixed to land, displaced people. * Opinions and suggestions of the ways of restoration of farmland and roads. Altogether 18 deciding the material object targets * Agree on the standard of deciding the material persons. affected by the Project. object targets affected by the Project. * The opinions and suggestions about the * Agree on the procedures and supervision way of procedure and supervision of distributing distributing compensation. compensation. * Agree on the resettlement measures and the * The opinions and suggestions about the rights of the displaced people. resettlement policies and measures. * Agree on the ways of public participation and * Discussion on the rights of the displaced information disclosure. people. * Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection policies. participation, information disclosure and * Discuss the ways of rearranging land. grievance. * Ideas and suggestions about 'the rights and protection of the vulnerable groups. 222 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project (Bunt y ti r p . (Qnt ent s of synposi urn (ci ty) part I Ci pant agreements AM of The head of the county in * Survey of the Project, including the size * Affirm the size and the location of the charge and the main officials Febr uar y of Development and Reform and location of Waterworks, the amount Waterworks and the amount of the land taken or 19, 2005 Commission, Price Bureau, of the land taken or occupied temporarily. occupied temporarily. Resource Bureau, 0 The consultative experts introduce the 0 Determine the compensation standard of young Constuction Bureaus, Health Bureaus, Epidemic effect of project construction on the crops, land resettlement allowance, articles affixed Prevention Staeions, displaced people. to land, restoration of farmland and town roads. Environmental Protection Bureaus, Civil * The Operational Policies 4.12 of the * Determine the range standard of deciding the PubAic Service Bureau, Land Involuntary Settlement and its annex. material object targets affected by the Project.. Bureau, Truffic Bureaus, * The relevant laws, regulations and * Determine the procedures and supervision ways of Planning Bureaus, Tiositn policies on land taking. The distributing compensation. Government, Masses Visiting 26. Office, Residents' compensation standard is set be the actual 0 Determine the resettlement measures and the rights Xincai Committee, Investigation situation. Xincai ~~~~~Commifttee, Religion Management Comminee, eisions sltuatlon.of the displaced people. County Management Commissions * The ways of deciding the material object * Determine the ways of public participation and and Disabled Federations. E 26 persons are targets affected by the Project. information disclosure. present. 0 The procedure and supervision of 0 Determine the ways and methods of carrying out distributing compensation. the relevant resettlement policies of the World * The resettlement policies and measures. Bank and our government. * The rights of the displaced people; the 0 Carry out the rights of the vulnerable groups and resettlement institutions and management. protection policies. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. 223 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project RFM of Land Bureau, 0 Survey of the Project, including the size 0 Agree with the size of water plant, the project February project and location of Waterworks, the amount site, the amount of the land taken or occupied 19, 2005 implementing of the land taken or occupied temporarily. temporarily. institutions, 0 The opinions and suggestions about the 0 Believe that it is necessary to build the water Village affected people about land taking. plant; mention the compensation for land taken, Commissions, 0 The consultative experts introduce the the construction of farmland facilities and output Public Security effect of the project construction on per mu; resettlement allowance is used to help Commissions, displaced people.. displaced people to develop planting, breeding Women 0 The Operational Policies 4.12 of the and raising and business to increase their income. Federations, the Involuntary Settlement and its annex. 0 By discussion, an agreement is reached on the representatives of * The idea and suggestions on compensation standard of young crops, land, residents and compensation standard. resettlement allowance, articles affixed to land, displaced people. * Opinions and suggestions of the ways of restoration of farmland and roads. Altogether 18 deciding the material object targets 0 Agree on the standard of deciding the material persons. affected by the Project. object targets affected by the Project. * The opinions and suggestions about the 0 Agree on the procedures and supervision way of procedure and supervision of distributing distributing compensation. compensation. * Agree on the resettlement measures and the rights * The opinions and suggestions about the of the displaced people. resettlement policies and measures. 0 Agree on the ways of public participation and * Discussion on the rights of the displaced information disclosure. people. 0 Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection policies. participation, . information disclosure and 0 Discuss the ways of rearranging land. grievance. * Ideas and suggestions about the rights and protection of the vulnerable groups. 224 ** Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Abunt y t i re . i Cbnt ent s of synposi urrs (. y partiX Cl pant agreements (Cl t Y) M of The head of the county in * Survey of the Project, including the size * Affirm the size and the location of the charge and the main officials February of Development and Reform and location of Waterworks, the amount Waterworks and the amount of the land taken or 20, 2005 FComission, Prce Bureau, of the land taken or occupied temporarily. occupied temporarily. Resource Bureau, * The consultative experts introduce the * Determine the compensation standard of young Construction BureauLs, Health Bureaus, Epidemic effect of project construction on the crops, land resettlement allowance, articles affixed Prevention Stations, displaced people. to land, restoration of farmland and town roads. Environmental Protection Bureaus, Civil * The Operational Policies 4.12 of the * Determine the range standard of deciding the Administration Bureau, Involuntary Settlement and its annex. material object targets affected by the Project.. Public Service Bureau, Land Bureau, Traffic Bureaus, * The relevant laws, regulations and * Determine the procedures and supervision ways of Planning Bureaus, Town policies on land taking. The distributing compensation. Government.t Masses Visitingon ldTh 27. Office, Residents' compensation standard is set be the actual * Determine the resettlement measures and the rights Committee, Investigation Xipinig Committee, Religion situation. of the displaced people. County Management Commissions * The ways of deciding the material object 0 Determine the ways of public participation and and Disabled Federations. 26 persons are present. targets affected by the Project. information disclosure. * The procedure and supervision of * Determine the ways and methods of carrying out distributing compensation. the relevant resettlement policies of the World * The resettlement policies and measures. Bank and our government. * The rights of the displaced people; the * Carry out the rights of the vulnerable groups and resettlement institutions and management. protection policies. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. 225 Resettlement Planning Report-of Henan Towns Water (Supply and Draiage) Project FM of Land Bureau, 0 Survey of the Project, including the size * Agree with the size of water plant, the project February project and location of Waterworks, the amount site, the amount of the land taken or occupied 20, 2005 implementing of the land taken or occupied temporarily. temporarily. institutions, 0 The opinions and suggestions about the 0 Believe that it is necessary to build the water Village affected people about land taking. plant; mention the compensation for land taken, Commissions, 0 The consultative experts introduce the the construction of farmland facilities and output Public Security effect of the project construction on per mu; resettlement allowance is used to help Commissions, displaced people.. displaced people to develop planting, breeding Women 0 The Operational Policies 4.12 of the and raising and business to increase their income. Federations, the Involuntary Settlement and its annex. * By discussion, an agreement is reached on the representatives of * The idea and suggestions on compensation standard of young crops, land, residents and compensation standard. resettlement allowance, articles affixed to land, displaced people. * Opinions and suggestions of the ways of restoration of farmland and roads. Altogether 18 deciding the material object targets 0 Agree on the standard of deciding the material persons. affected by the Project. object targets affected by the Project. * The opinions and suggestions about the * Agree on the procedures and supervision way of procedure and supervision of distributing distributing compensation. compensation. * Agree on the resettlement measures and the rights * The opinions and suggestions about the of the displaced people. resettlement policies and measures. 0 Agree on the ways of public participation and * Discussion on the rights of the displaced information disclosure. people. * Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection policies. participation, information disclosure and * Discuss the ways of rearranging land. grievance. * Ideas and suggestions about the rights and protection of the vulnerable groups. 226 **d Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project (bunt y ti ne pbnt ent s of synposi urm (ciy)par t icipant agreements (cit y) AM of The head of the county in * Survey of the Project, including the size 0 Affirm the size and the location of the charge and the main Febr uar y officials of Development and location of Waterworks, the amount Waterworks and the amount of the land taken or and Reform Commission, o 21, 2005 Price Bureau, Finance of the land taken or occupied occupied temporanly Bureau, Water Resource temporarily. * Determine the compensation standard of young Bureau. Constmction Bureaus, Health Bureaus, The consultative experts introduce the crops, land resettlement allowance, articles affixed Epidemic Prevention effect of project construction on the to land, restoration of farmland and town roads. Stations, Environmental Protection Bureaus, Civil displaced people. * Determine the range standard of deciding the PubAic Servioc Bureau 0 The Operational Policies 4.12 of the material object targets affected by the Project.. Land Bureau, Traffic Involuntary Settlement and its annex. 0 Determine the procedures and supervision ways of Bureats, Planning Bureass, * The relevant laws, regulations and - distributing compensation. Town Govemment, Masses dsTbtn opnain Visiting Office, Residents' policies on land taking. The 0 Determine the resettlement measures and the 28. Committee, Investigation compensation standard is set be the rights of the displaced people. Committee. Religion Zhengyang Management actual situation. 0 Determine the ways of public participation and County Commissions and * The ways of deciding the material object information disclosure. Disabled Federations. 26 persons are targets affected by the Project. 0 Deterrnine the ways and methods of carrying out present. * The procedure and supervision of the relevant resettlement policies of the World distributing compensation. Bank and our government. * The resettlement policies and measures. 0 Carry out the rights of the vulnerable groups and * The rights of the displaced people; the protection policies. resettlement institutions and management. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. 227 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project PM of Land Bureau, 0 Survey of the Project, including the size 0 Agree with the size of water plant, the project February project and location of Waterworks, the amount site, the amount of the land taken or occupied 21, 2005 implementing of the land taken or occupied temporarily. institutions, temporarily. 0 Believe that it is necessary to build the water Village 0 The opinions and suggestions about the plant; mention the compensation for land taken, Commissions, affected people about land taking. the construction of farmland facilities and output Public Security * The consultative experts introduce the per mu; resettlement allowance is used to help Commissions, effect of the project construction on displaced people to develop planting, breeding Women displaced people.. and raising and business to increase their Federations, the * The Operational Policies 4.12 of the income. representatives Involuntary Settlement and its annex. 0 By discussion, an agreement is reached on the of residents and * The idea and suggestions on compensation standard of young crops, land, displaced people. compensation standard. resettlement allowance, articles affixed to land, Altogether 20 * Opinions and suggestions of the ways of restoration of farmland and roads. persons. deciding the material object targets 0 Agree on the standard of deciding the material affected by the Project. object targets affected by the Project. * The opinions and suggestions about the * Agree on the procedures and supervision way of procedure and supervision of distributing compensation. distributing compensation. * Agree on the resettlement measures and the * The opinions and suggestions about the rights of the displaced people. resettlement policies and measures. 0 Agree on the ways of public participation and * Discussion on the rights of the displaced information disclosure. people. 0 Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection policies. participation, information disclosure and * Discuss the ways of rearranging land. grievance. * Ideas and suggestions about the rights and protection of the vulnerable groups. 228 ** Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project C)unt y ti ne c pbnt ent s of agreements (ci ty) parti AM of The head of the county in * Survey of the Project, including the size 0 Affimi the size and the location of the charge and the main officials Febr uar y of Development and Reform and location of Waterworks, the amount Waterworks and the amount of the land taken or 22,C2005 Fmianio Prce Bureau, of the land taken or occupied temporarily. occupied temporarily. Resource Bureau, 0 The consultative experts introduce the 0 Determine the compensation standard of young Constrction Bureaus, Health Bureaus, Epidemic effect of project construiction on the crops, land resettlement allowance, articles affixed Prevention Stations, displaced people. to land, restoration of farmland and town roads. Environmental Protection Bureaus, Civil 0 The Operational Policies 4.12 of the * Determine the range standard of deciding the Administration Bureau, Involuntary Settlement and its annex. material object targets affected by the Project.. Public Service Bureau, Land Bureau, Traffic Bureaus, * The. relevant laws, regulations and * Determine the procedures and supervision ways of Planning Bureaus, To.wn policies on land taking. The distributing compensation. Government, Masses Visiting tkn.dsrbtn opnain Office, Residents' compensation standard is set be the actual * Determine the resettlement measures and the rights 29. Committee, Investigation Suipi.g Committee, Religion situation. of the displaced people. Suiping Management Commissions * The ways of deciding the material object * Determine the ways of public participation and County and Disabled Federations. 29 persons are targets affected by the Project. information disclosure. present. 0 The procedure and supervision of 0 Determine the ways and methods of carrying out distributing compensation. the relevant resettlement policies of the World * The resettlement policies and measures. Bank and our govemment. * The rights of the displaced people; the * Carry out the rights of the vulnerable groups and resettlement institutions and protection policies. management. * Public participation, information disclosure and grievance. .* The rights and protection of the vulnerable groups. 229 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project R\I of Land Bureau, 0 Survey of the Project, including the size 0 Agree with the size of water plant, the project February project and location of Waterworks, the amount site, the amount of the land taken or occupied 22, 2005 implementing of the land taken or occupied temporarily. temporarily. institutions, 0 The opinions and suggestions, about the 0 Believe that it is necessary to build the water Village affected people about land taking. plant; mention the compensation for land taken, Commissions, 0 The consultative experts introduce the the construction of farmland facilities and output Public Security effect of the project construction on per mu; resettlement allowance is used to help Commissions, displaced people.. displaced people to develop planting, breeding Women 0 The Operational Policies 4.12 of the and raising and business to increase their income. Federations, the Involuntary Settlement and its annex. 0 By discussion, an agreement is reached on the representatives of * The idea and suggestions on compensation standard of young crops, land, residents and compensation standard. resettlement allowance, articles affixed to land, displaced people. * Opinions and suggestions of the ways of restoration of farmland and roads. Altogether 19 deciding the material object targets 0 Agree on the standard of deciding the material persons. affected by the Project. object targets affected by the Project. * The opinions and suggestions about the 0 Agree on the procedures and supervision way of procedure and supervision of distributing distributing compensation. compensation. * Agree on the resettlement measures and the rights * The opinions and suggestions about the of the displaced people. resettlement policies and measures. 0 Agree on the ways of public participation and * Discussion on the rights of the displaced information disclosure. people. 0 Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection poticies. participation, information disclosure and * Discuss the ways of rearranging land. grievance. * Ideas and suggesti1ons about the rights and protection of the vulnerable groups. 230 ** Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project (bunt y ti ne ci nt ent s of synposi urs (ci t y) parti tt of agreeients AM of The head of the county in * Survey of the Project, including the size * Affirm the size and the location of the charge and the main officials Febr uar y of Development and Reform and location of Waterworks, the amount Waterworks and the amount of the land taken or 23, 2005 Commission, Price Bureau, of the land taken or occupied temporarily. occupied temporarily. 23, 2005 Finance Btireau. Water Resource Bureau., The consultative experts introduce the 0 Determine the compensation standard of young Construction Bureaus. Health Bureaus. Epidemic effect of project construction on the crops, land resettlement allowance, articles affixed Prevention Stations, displaced people. to land, restoration of farmland and town roads. Environmental Protection Bureaus, Civil 0 The Operational Policies 4.12 of the 0 Determine the range standard of deciding the Administration Bureau, Involuntary Settlement and its annex. material object targets affected by the Project.. Public Service Bureau, Land Bureau, Traffic Bureaus, 0 The relevant laws, regulations and 0 Determine the procedures and supervision ways of Planning Bureaus, Town policies on land taking. The distributing compensation. Govemment, Masses Visiting 30. Office, Residents' compensation standard is set be the actual 0 Determine the resettlement measures and the rights Ru' nan Committee, Investigation stain Committee, Religion situation. of the displaced people. County Management Commissions 0 The ways of deciding the material object 0 Determine the ways of public participation and and Disabled Fcderations. 36 persons are present. targets affected by the Project. information disclosure. * The procedure and supervision of * Determine the ways and methods of carrying out distributing compensation. the relevant resettlement policies of the World * The resettlement policies and measures. Bank and our government. * The rights of the displaced people; the * Carry out the rights of the vulnerable groups and resettlement institutions and management. protection policies. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. 231 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project FM of Land Bureau, 0 Survey of the Project, including the size 0 Agree with the size of water plant, the project February project and location of Waterworks, the amount site, the amount of the land taken or occupied 23, 2005 implementing of the land taken or occupied temporarily. temporarily. institutions, 0 'The opinions and suggestions about the 0 Believe that it is necessary to build the water Village affected people about land taking. plant; mention the compensation for land taken, Commissions, 0 The consultative experts introduce the the construction of farmland facilities and output Public Security effect of the project construction on per mu; resettlement allowance is used to help Commissions, displaced people.. displaced people to develop planting, breeding Women - 0 The Operational Policies 4.12 of the and raising and business to increase their income. Federations, the Involuntary Settlement and its annex. 0 By discussion, an agreement is reached on the representatives of * The idea and suggestions on compensation standard of young crops, land, residents and compensation standard. resettlement allowance, articles affixed to land, displaced people. * Opinions and suggestions of the ways of restoration of farmland and roads. Altogether 28 deciding the material object targets 0 Agree on the standard of deciding the material persons. affected by the Project. object targets affected by the Project. * The opinions and suggestions about the * Agree on the procedures and supervision way of procedure and supervision of distributing distributing compensation. compensation. 0 Agree on the resettlement measures and the rights * The opinions and suggestions about the of the displaced people. - resettlement policies and measures. * Agree on the ways of public participation and * Discussion on the rights of the displaced information disclosure. people. 0 Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection policies. participation, information disclosure and 0 Discuss the ways of rearranging land. grievance. * Ideas and suggestions about the rights and protection of the vulnerable groups. 232 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project (bunty tine part i ci pant (bntents of synposiuns agreements (ci t y) Qtnso yps AM of The head of the county in * Survey of the Project, including the size 0 Affirm the size and the location of the charge and the main officials Febr uar y of Development and Rcform and location of Waterworks, the amount Waterworks and the amount of the land taken or Commission, Price Bureau, of the land taken or occupied temporarily. occupied temporarily. 24, 2005 Finance Bureau, Water Resource Bureau, 0 The consultative experts introduce the 0 Determine the compensation standard of young Construction Bureaus, Health Bureaus, Epidemic effect of project construction on the crops, land resettlement allowance, articles affixed Prevention Stations, displaced people. to land, restoration of farmland and town roads. Environmental Protection Bureaus, - ocivil 0 The Operational Policies 4.12 of the * Determine the range standard of deciding the Administration Bureau, Involuntary Settlement and its annex. material object targets affected by the Project.. Public Service Bureau, Land Bureau, Traffic Bureaus, 0 The relevant laws, regulations and * Determine the procedures and supervision ways of Planning Bureaus, Town policies on land taking. The Government, Masses Visitingon ldTh Govcmment, M.asses Visiting ~~~~distributing compensation. Office, Residents' compensation standard is set be the actual * Determine the resettlement measures and the rights 3 1. Committee, Investigation Committee, Religion situation. of the displaced people. Shenqiqu Management Commissions 0 The ways of deciding the material object * Determine the ways of public participation and County and Dpsabled Federations. targets affected by the Project. information disclosure. present. 0 The procedure and supervision of * Determine the ways and methods of carrying out present. distributing compensation. the relevant resettlement policies of the World * The resettlement policies and measures. Bank and our govemment. * The rights of the displaced people; the * Carry out the rights of the vulnerable groups and resettlement institutions and protection policies. management. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. 233 Resettlement Planning Report of Henan Towns Water (Supply and Dralage) Project PM of Land Bureau, 0 Survey of the Project, including the size 0 Agree with the size of water plant, the project Febr uary~ project and location of Waterworks, the amount site, the amount of the land taken or occupied 24, 2005 implementing of the land taken or occupied temporarily, temporarily. institutions, 0 The opinions and suggestions about the 0 Believe that it is necessary to build the water Village affected people about land taking. plant; mention the compensation for land taken, Commissions, 0 The consultative experts introduce the the construction of farmland facilities and output Public Security effect of the project construction on per mu; resettlement allowance is used to help Commissions, displaced people.. displaced people to develop planting, breeding Women 0 The Operational Policies 4.12 of the and raising and business to increase their income. Federations, the Involuntary Settlement and its annex. 0 By discussion, an agreement is reached on the representatives of *0 The idea and suggestions on compensation standard of young crops, land, residents and compensation standard. resettlement allowance, articles affixed to land, displaced people. * Opinions and suggestions of the ways of restoration of farmland and roads. Altogether 19 deciding the material object targets 0 Agree on the standard of deciding the material persons. affected by the Project. object targets affected by the Project. * The opinions and suggestions about the 0 Agree on the procedures and supervision way of procedure and supervision of distributing distributing compensation. compensation. S Agree on the resettlement measures and the rights * The opinions and suggestions about the of the displaced people. resettlement policies and measures. S Agree on the ways of public participation and * Discussion on the rights of the displaced informnation disclosure. people. S Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection policies. participation, information disclosure and S Discuss the ways of rearranging land. gnievance. * Ideas and 'suggestions about the 'rights and protection of the vulnerable groups. 234 * * * Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project (bunt y ti r pnt ent s of synposi urns (ciy)par t icipant agreements (ci t y) AM of The head of the county in Survey of the Project, including the size 0 Affirm the size and the location of the charge and the main officials Febr uar y of Development and Reform and location of Waterworks, the amount Waterworks and the amount of the land taken or Commission, Price Bureau, of the land taken or occupied temporarily. occupied temporarily. 25, 2005 Finance Bureau, Water Resource Bureau, 0 The consultative experts introduce the 0 Determine the compensation standard of young Construction Bureaus, Health Bureaus, Epidemic effect of project construction on the crops, land resettlement allowance, articles affixed Prevention Stations, displaced people. to land, restoration of farmland and town roads. Environmental Protection Bureaus, Civil The Operational Policies 4.12 of the 0 Determine the range standard of deciding the Administration Bureau, Involuntary Settlement and its annex. material object targets affected by the Project.. Puhblic Servicc Bureau, Land Bureau, Traffic Bureaus, 0 The relevant laws, regulations and 0 Determine the procedures and supervision ways of Govenment, Masses Visiting policies on land taking. The distributing compensation. Office, Residents' compensation standard is set be the actual * Determine the resettlement measures and the rights 32. Committee, Investigation Committee, Religion situation. of the displaced people. Taikang Management Commissions 0 The ways of deciding the material object 0 Determine the ways of public participation and County and Disabled Federationis. 28 persons are targets affected by the Project. information disclosure. . present. 0 The procedure and supervision of 0 Determine the ways and methods of carrying out distributing compensation. the relevant resettlement policies of the World * The resettlement policies and measures. Bank and our government. * The rights of the displaced people; the * Carry out the rights of the vulnerable groups and resettlement institutions and protection policies. management. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. 235 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project FPM of Land Bureau, 0 Survey of the Project, including the size 0 Agree with the size of water plant, the project February project and location of Waterworks, the amount site, the amount of the land taken or occupied 25, 2005 implementing of the land taken or occupied temporarily. temporarily. institutions, * The opinions and suggestions about the * Believe that it is necessary to build the water Village affected people about land taking. plant; mention the compensation for land taken, Commissions, 0 The consultative experts introduce the the construction of farmland facilities and output Public Security effect of the project construction on per mu; resettlement allowance is used to help Commissions, displaced people.. displaced people to develop planting, breeding Women 0 The Operational Policies 4.12 of the and raising and business to increase their income. Federations, the Involuntary Settlement and its annex. 0 By discussion, an agreement is reached on the representatives of * The idea and suggestions on compensation standard of young crops, land, residents and compensation standard. resettlement allowance, articles affixed to land, displaced people. * Opinions and suggestions of the ways of restoration of farmland and roads. Altogether 18 deciding the material object targets 0 Agree on the standard of deciding the material persons. affected by the Project. object targets affected by the Project. * The opinions and suggestions about the 0 Agree on the procedures and supervision way of procedure and supervision of distributing distributing compensation. compensation. * Agree on the resettlement measures and the rights * The opinions and suggestions about the of the displaced people. resettlement policies and measures. * Agree on the ways of public participation and * Discussion on the rights of the displaced information disclosure. people. * Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection policies. participation, information disclosure and * Discuss the ways of rearranging land. grievance. * Ideas aild suggestions about the rights and protection of the vulnerable groups. 236 ** Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project (bunt y t i ne i a tnt ent s of synposi ures (city)t P cl pant agreemeofntsosiun (Cl t y). AM of The head of a city in * Survey of the Project, including the size * Affirm the size and the location of the charge, the Development Febr uar y and Reform Commission, and location of Waterworks, the amount Waterworks and the amount of the land taken or Price Bureau, Finance of the land taken or occupied occupied temporarily. 26, 2005 Bureau, Water Resource Bureau, Constuction temporarily. * Determine the compensation standard of young Epidemic Preventiun 0 The consultative experts introduce the crops, land resettlement allowance, articles Stations, Environmental effect of project construction on the affixed to land, restoration of farmland and town Protection Bureaus, Civil Administrarion Bureau, displaced people. roads. Public Service Bureau, 0 The Operational Policies 4.12 of the 0 Determine the range standard of deciding the Land Bureau, Traffic Bureaus, Planning Involuntary Settlement and its annex. material object targets affected by the Project Goveument, Masses * The relevant laws, regulations and * Determine the procedures and supervision ways Visiting Office, Residents' policies on land taking. The of distributing compensation. 33. Committee, Investigation compensation staniard Is set be the * Determine the resettlement measures and the Committee, Religion sadr h Xiangcheng Managemrent actual situation. rights of the displaced people. City Commissions and * The ways of deciding the material * Determine the ways of public participation and Disabled .Federations. 30 persons are object targets affected by the Project. information disclosure. present. 0 The procedure and supervision of * Determine the ways and methods of carrying out distributing compensation. the relevant resettlement policies of the World * The resettlement policies and measures. Bank and our government. * The rights of the displaced people; the * Carry out the rights of the vulnerable groups resettlement institutions and and protection policies. management. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. 237 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project PM of Land Bureau, * Survey of the Project, including the size * Agree with the size of water plant, the project February project and location of Waterworks, the amount site, the amount of the land taken or occupied 26, 2005 implementing of the land taken or occupied temporarily. institutions, temporarily. * Believe that it is necessary to build the water Village 0 The opinions and suggestions about the plant; mention the compensation for land taken, Commissions, affected people about land taking. the construction of farmland facilities and Public Security 0 The consultative experts introduce the output per mu; resettlement allowance is used to Commissions, effect of the project construction on help displaced people to develop planting, Women displaced people.. breeding and raising and business to increase Federations, the 0 The Operational Policies 4.12 of the their income. representatives Involuntary Settlement and its annex. 0 By discussion, an agreement is reached on the of residents and * The idea and suggestions on compensation standard of young crops, land, displaced compensation standard. resettlement allowance, articles affixed to land, people. * Opinions and suggestions of the ways of restoration of farmland and roads. Altogether 20 deciding the material object targets 0 Agree on the standard of deciding the material persons. affected by the Project. object targets affected by the Project. * The opinions and suggestions about the 0 Agree on the procedures and supervision way of procedure and supervision of distributing compensation. distributing compensation. * Agree on the resettlement measures and the * The opinions and suggestions about the rights of the displaced people. resettlement policies and measures. 0 Agree on the ways of public participation and * Discussion on the rights of the displaced information disclosure. people. 0 Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection policies. participation, information disclosure and * Discuss the ways of rearranging land. grievance. * Ideas and suggestions about the rights and protection of the vulnerable groups. 238 ** Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project (bunt y ti ne tnt ent s of synposi ures (ci t y) parti ci of sgreemenrs AM of The head of a district in * Survey of the Project, including the size 0 Affirm the size and the location of the charge, the Developmsent O Febr uar y and Reformt Commission, and location of Waterworks, the amount Waterworks and the amount of the land taken or 27, 2005 BPice Bureau, Finance of the land taken or occupied occupied temporarily. Bureau, Construction temporarily. 0 Determine the compensation standard of young Bureaus, Health Bureaus,ladlowne afid Epidemic Prevention * The consultative experts introduce the crops, land resettlement allowance, articles affixed Stations, Environmental effect of project construction on the to land, restoration of farmland and town roads. Protection Bureaus, Civil Administration Bureau, displaced people. 0 Determine the range standard of deciding the Public Servce Bureau, Land Bureau, Traffic Bureaus, The Operational Policies 4.12 of the material object targets affected by the Project.. Planning Bureaus, Town Involuntary Settlement and its annex. 0 Determine the procedures and supervision ways of Vsiting Office, Residents' The relevant laws, regulations and distributing compensation. Committee, Investigation policies on land taking. The 0 Determine the resettlement measures and the rights 34. Management Commisslions compensation standard is set be the of the displaced people. Pingqiao and Disabled Federations. actual situation. 0 Determine the ways of public participation and District 26 persons are * The ways of deciding the material object information disclosure. present. targets affected by the Project. 0 Determine the ways and methods of carrying out * The procedure and supervision of the relevant resettlement policies of the World distributing compensation. Bank and our government. * The resettlement policies and measures. 0 Carry out the rights of the vulnerable groups and * The rights of the displaced people; the protection policies. resettlement institutions and management. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. 239 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project PM of Land Bureau, 0 Survey of the Project, including the size * Agree with the size of water plant, the project February project and location of Waterworks, the amount site, the amount of the land taken or occupied 27, 2005 implementing of the land taken or occupied temporarily. institutions, temporarily. * Believe that it is necessary to build the water Village 0 The opinions and suggestions about the plant; mention the compensation for land taken, Commissions, affected people about land taking. the construction of farmland facilities and output Public Security 0 The consultative experts introduce the per mu; resettlement allowance is used to help Commissions, effect of the project construction on displaced people to develop planting, breeding Women displaced people.. and raising and business to increase their income. Federations, the * The Operational Policies 4.12 of the 0 By discussion, an agreement is reached on the representatives of Involuntary Settlement and its annex. compensation standard of young crops, land, residents and * The idea and suggestions on resettlement allowance, articles affixed to land, displaced people. compensation standard. restoration of farnland and roads. Altogether 18 0 Opinions and suggestions of the ways of * Agree on the standard of deciding the material persons. deciding the material object targets object targets affected by the Project. affected by the Project. * Agree on the procedures and supervision way of * The opinions and suggestions about the distributing compensation. procedure and supervision of distributing * Agree on the resettlement measures and the compensation. rights of the displaced people. * The opinions and suggestions about the 0 Agree on the ways of public participation and resettlement policies and measures. information disclosure. * Discussion on the rights of the displaced * Agree on the rights of the vulnerable groups and people. protection policies. * Ideas and suggestions about public * Discuss the ways of rearranging land. participation, information disclosure and grievance. * Ideas and suggestions about the rights and protection of the vulnerable groups. 240 * 0 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Cbunt y t i ne Abnt ent s of synposi unsa (city)par ti ci pant agreements (ci t y) v of The liead of the county in * Survey of the Project, including the size 0 Affirm the size and the location of the charge and the main officials February of Development and Reform and location of Waterworks, the amount Waterworks and the amount of the land taken or 25, 2005 Commission, Price Bureau, of the land taken or occupied temporarily, occupied temporarily. Resource Bureau, * The consultative experts introduce the * Determine the compensation standard of young Construction Bureaus, Health Butraus, Epidemic effect of project construction on the crops, land resettlement allowance, articles affixed Prevention Statons, displaced people. to land, restoration of farmland and town roads. Environmental Protection Bureaus, Civil 0 The Operational Policies 4.12 of the * Determine the range standard of deciding the Administration Bureau, Involuntary Settlement and its annex. material object targets affected by the Project.. Public Service Bureau, Land Bureau, Traffic Bureaus, 0 The relevant laws, regulations and 0 Determine the procedures and supervision ways of Planning Bureaus, VTioiwn policies on land taking. The distributing compensation. Government, Masses VisitingTh 35. Office, Residents' compensation standard is set be the actual 0 Determine the resettlement measures and the rights Committee, Investigation Xixian Committee, Religion situation. of the displaced people. County Management Commissions 0 The ways of deciding the material object 0 Determine the ways of public participation and and Disabled Federatiois. 26 persons are present. targets affected by the Project. information disclosure. * The procedure and supervision of 0 Determine the ways and methods of carrying out distributing compensation. the relevant resettlement policies of the World * The resettlement policies and measures. Bank and our government. * The rights of the displaced people; the * Carry out the rights of the vulnerable groups and resettlement institutions and management. protection policies. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. 241 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project PM of Land Bureau, * Survey of the Project, including the size 0 Agree with the size of water plant, the project February project and location of Waterworks, the amount site, the amount of the land taken or occupied 28, 2005 implementing of the land taken or occupied temporarily. temporarily. institutions, 0 The opinions and suggestions about the * Believe that it is necessary to build the water Village affected people about land taking. plant; mention the compensation for land taken, Commissions, 0 The consultative experts introduce the the construction of fanrland facilities and output Public Security effect of the project construction on per mu; resettlement allowance is used to help Commissions, displaced people.. displaced people to develop planting, breeding Women 0 The Operational Policies 4.12 of the and raising and business to increase their income. Federations, the Involuntary Settlement and its annex. 0 By discussion, an agreement is reached on the representatives of * The idea and suggestions on compensation standard of young crops, land, residents and compensation standard. resettlement allowance, articles affixed to land, displaced people. * Opinions and suggestions of the ways of restoration of farmland and roads. Altogether 18 deciding the material object targets 0 Agree on the standard of deciding the material persons. affected by the Project. object targets affected by the Project. * The opinions and suggestions about the * Agree on the procedures and supervision way of procedure and supervision of distributing distributing compensation. compensation. * Agree on the resettlement measures and the rights * The opinions and suggestions about the of the displaced people. resettlement policies and measures. * Agree on the ways of public participation and * Discussion on the rights of the displaced information disclosure. people. 0 Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection policies. participation, -information disclosure and * Discuss the ways of rearranging land. grievance. *' Ideas and suggestions about the rights and protection of the vulnerable groups. 242 * * R Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project (bunt y t i re participant bnt ent s of syosi ur (ci t y) pat t E ae AM of The head of the county in charge and * Survey of the Project, * Make sure of the size of pipe set and position of project. br ch the main officials of Development and including the size of pipe set * Make sure of the compensation standard of town road 1, 2005 Refonn Commission, Price Bureau, and position of project. recovery through discussion. Finance Bureau, Water Resource * Public participation, 0 Determine the ways of public participation and Bureau, Construction Bureaus, Health information disclosure and information disclosure. Bureaus, Epidemic Prevention grievance. * Carry out the rights of the vulnerable groups and Stations, Environmental Protection * The weak group's rights and protection policies. Bureaus, Civil Administration protection. Bureau, Public Service Bureau, Land Bureau, Traffic Bureaus, Planning Bureaus, Town Government, Masses Visiting Office, Residents' 36. Committee, Investigation Committee, Luoshan Religion Management Comrissions County and Disabled Federations. 26 persons are present.26 L n FM of Land Bureau, project implementing * Survey of the Project, * Agree with the size of pipe set and position of project. Ur ch institutions, Village Commissions, including the size of pipe set * Believe that it is necessary to build the water plant. 1,2005 Public Security Commissions, Women and position of project. * Agree with the compensation standard of town road Federations, the representatives of * Ideas and suggestions about recovery through discussion. residents and displaced people. public participation, * Agree on the ways of public participation and Altogether 18 persons. information disclosure and information disclosure. grievance. * Agree on the rights of the vulnerable groups and * Ideas and suggestions about protection policies. the rights and protection of the vulnerable groups. 243 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Abunt y ti ne p Cbnt ent s of synposi urn (ci t y) part Ci pant agreements AM of The head of a district in * Survey of the Project, including the size 0 Affirm the size and the location of the charge, the Development and UIbr ch Reform Commission, Price and location of Waterworks, the amount Waterworks and the amount of the land taken or . 2, 2005 Bureau. Finance Bureau, of the land taken or occupied temporarily. occupied temporarily. Constructon Bureaus, Health 0 The consultative experts introduce the 0 Determine the compensation standard of young Bureaus, Epidemic Prevention Stations, effect of project construction on the crops, land resettlement allowance, articles affixed Environmental Protection displaced people. to land, restoration of farmland and town roads. Bureaus, Civilpel.lad Administration Bureau, * The Operational Policies 4.12 of the 0 Determine the range standard of deciding the Public Service Bureau, Land Involuntary Settlement and its annex. material object targets affected by the Project.. Bureau, Traffic Bureaus, Planning Bureaus, Town * The relevant laws, regulations and * Determine the procedures and supervision ways of Govcmment, MasseRs sVising policies on land taking. The distributing compensation. Office, Residents' Committee, Investigation compensation standard is set be the actual 0 Determine the resettlement measures and the rights - 37. Committee, Religion Yangshan Management Comniissions situation. of the displaced people. and Disabled Federations. 0 The ways of deciding the material object * Determine the ways of public participation and District 35 persons are targets affected by the Project. information disclosure. present. 0 The procedure and supervision of 0 Determine the ways and methods of carrying out distributing compensation. the relevant resettlement policies of the World * The resettlement policies and measures. Bank and our government. * The rights of the displaced people; the * Carry out the rights of the vulnerable groups and resettlement institutions and protection policies. management. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. 244 * *4 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project R\A of Land Bureau, 0 Survey of the Project, including the size 0 Agree with the size of water plant, the project I\r ch project and location of Waterworks, the amount site, the amount of the land taken or occupied 2, 2005 implementing of the land taken or occupied temporarily. temporarily. institutions, 0 The opinions and suggestions about the 0 Believe that it is necessary to build the water Village affected people about land taking. plant; mention the compensation for land taken, Commissions, * The consultative experts introduce the the construction of farmland facilities and output Public Security effect of the project construction on per mu; resettlement allowance is used to help Commissions, displaced people.. displaced people to develop planting, breeding Women 0 The Operational Policies 4.12 of the and raising and business to increase their income. Federations, the Involuntary Settlement and its annex. 0 By discussion, an agreement is reached on the representatives of * The idea and suggestions on compensation standard of young crops, land, residents and compensation standard. resettlement allowance, articles affixed to land, displaced people. * Opinions and suggestions of the ways of restoration of farmland and roads. Altogether 18 deciding the material object targets 0 Agree on the standard of deciding the material persons. affected by the Project. object targets affected by the Project. * The opinions and suggestions about the * Agree on the procedures and supervision way of procedure and supervision of distributing distributing compensation. compensation. * Agree on the resettlement measures and the rights * The opinions and suggestions about the of the displaced people. resettlement policies and measures. 0 Agree on the ways of public participation and * Discussion on the rights of the displaced information disclosure. people. * Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection policies. participation, information disclosure and * Discuss the ways of rearranging land. grievance. * Ideas and suggestions about the rights and protection of the vulnerable groups. 245 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project (bunt y t i rci agemtbnt ent s of sysposi urr (ci ty) parti pant agreofents AM of The head of a city in chiarge, * Survey of the Project, including the size * Affirm the size and the location of the the Development and U\r ch Reform Commission, Price and location of Waterworks, the amount Waterworks and the amount of the land taken or Bureau, Finance Bureau, of the land taken or occupied temporarily. occupied temporarily. 3,2005 Water ReSOUrCe Bureau, Construction Bureaus, 0 The consultative experts introduce the 0 Determine the compensation standard of young Health Bureaus, Epidemic Prevention Stations, effect of project construction on the crops, land resettlement allowance, articles affixed Environmental Protection displaced people. to land, restoration of farmland and town roads. Bureaus, Civil Administration Bureau, 0 The Operational Policies 4.12 of the 0 Determine the range standard of deciding the Public Service Bureau, Land Involuntary Settlement and its annex. material object targets affected by the Project.. Bureau, Traffic Bureaus, Planning Bureaus, Town 0 The relevant laws, regulations and 0 Determine the procedures and supervision ways of GoVemnti f, Mssidents' policies on land taking. The distributing compensation. Visiting Office, Residents' Committee, Investigation compensation standard is set be the actual * Determine the resettlement measures and the rights 38. Committee, Religion Mengzhou Management Commissions situation. of the displaced people. and Disabled 0 The ways of deciding the material object 0 Determine the ways of public participation and City Federations. 24 targets affected by the Project. information disclosure. persons are * The procedure and supervision of 0 Determine the ways and methods of canrying out present. distributing compensation. the relevant resettlement policies of the World * The resettlement policies and measures. Bank and our government. * The rights of the displaced people; the * Carry out the rights of the vulnerable groups and resettlement institutions and protection policies. management. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. 246 ** Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project PMv of Land Bureau, 0 Survey of the Project, including the size 0 Agree with the size of water plant, the project I\r ch project and location of Waterworks, the amount site, the amount of the land taken or occupied 3, 2005 implementing of the land taken or occupied temporarily. temporarily. institutions, 0 The opinions and suggestions about the * Believe that it is necessary to build the water Village affected people about land taking. plant; mention the compensation for land taken, Commissions, 0 The consultative experts introduce the the construction of farmland facilities and output Public Security effect of the project construction on per mu; resettlement allowance is used to help Commissions, displaced people.. displaced people to develop planting, breeding Women 0 The Operational Policies 4.12 of the and raising and business to increase their income. Federations, the Involuntary Settlement and its annex. 0 By discussion, an agreement is reached on the representatives of * The idea and suggestions on compensation standard of young crops, land, residents and compensation standard. resettlement allowance, articles affixed to land, displaced people. 0 Opinions and suggestions of the ways of restoration of farmland and roads. Altogether 22 deciding the material object targets 0 Agree on the standard of deciding the material persons. affected by the Project. object targets affected by the Project. * The opinions and suggestions about the * Agree on the procedures and supervision way of procedure and supervision of distributing distributing compensation. compensation. * Agree on the resettlement measures and the * The opinions and suggestions about the rights of the displaced people. resettlement policies and measures. * Agree on the ways of public participation and * Discussion on the rights of the displaced information disclosure. people. 0 Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection policies. participation, information disclosure and 0 Discuss the ways of rearranging land. grievance. * Ideas and suggestions about the rights and protection of the vulnerabie groups. 247 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Cbunt y ti ne .c . ant ent s of synposi ura e (ci t y) part cl pant agreements A M of The head of the county in * Survey of the Project, including the size 0 Affirm the size and the location of the charge and the main officials IUkr ch of Development and Reform and location of Waterworks, the amount Waterworks and the amount of the land taken or Commission, Price Bureau, of the land taken or occupied temporarily. occupied temporarily. 4, 2005 Finance Bureau, Water Resource Bureau, 0 The consultative experts introduce the * Determine the compensation standard of young Construction Bureaus, Health Bureaus, Epidemic effect of project construction on the crops, land resettlement allowance, articles affixed Prevention Stations, displaced people. to land, restoration of farmland and town roads. Environmental Protection Bureaus, Civil 0 The Operational Policies 4.12 of the 0 Determine the range standard of deciding the Administration Bureau, Involuntary Settlement and its annex. material object targets affected by the Project.. Pubhlic Service Bureau, Land Bureau, Traffic Bureaus, 0 The relevant laws, regulations and * Determine the procedures and supervision ways of Planning Bureaus, Town policies on land taking. The compensation distributing compensation. 39. Govemment, Masses Visiting tkn. cmesto Office, Residents' standard is set be the actual situation. 0 Determine the resettlement measures and the rights Neixiang ~~~Committee, Investigation Neixianig Committee, Religion 0 The ways of deciding the material object of the displaced people. County Management Commissions targets affected by the Project. 0 Determine the ways of public participation and and Disabled Federations. 36 The procedure and supervision of information disclosure. persons are distributing compensation. 0 Determine the ways and methods of carrying out present. 0 The resettlement policies and measures. the relevant resettlement policies of the World present. * The rights of the displaced people; the Bank and our government. resettlement institutions and management. 0 Carry out the rights of the vulnerable groups and * Public participation, information protection policies. disclosure and grievance. * The rights and protection of the vulnerable groups. 248 * * s Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project P. M of Land Bureau, 0 Survey of the Project, including the size 0 Agree with the size of water plant, the project Ibr ch project and location of Waterworks, the amount site, the amount of the land taken or occupied 4, 2005 implementing of the land taken or occupied temporarily. temporarily. institutions, 0 The opinions and suggestions about the 0 Believe that it is necessary to build the water Village affected people about land taking. plant; mention the compensation for -land taken, Commissions, 0 The consultative experts introduce the the construction of farmland facilities and output Public Security effect of the project construction on per mu; resettlement allowance is used to help Commissions, displaced people.. displaced people to develop planting, breeding Women 0 The Operational Policies 4.12 of the and raising and business to increase their income. Federations, the Involuntary Settlement and its annex. 0 By discussion, an agreement is reached on the representatives of * The idea and suggestions on compensation standard of young crops, land, residents and compensation standard. resettlement allowance, articles affixed to land, displaced people. * Opinions and suggestions of the ways of restoration of farmland and roads. Altogether 28 deciding the material object targets 0 Agree on the standard of deciding the material persons. affected by the Project. object targets affected by the Project. * The opinions and suggestions about the * Agree on the procedures and supervision way of procedure and supervision of distributing distributing compensation. compensation. * Agree on the resettlement measures and the rights * The opinions and suggestions about the of the displaced people. resettlement policies and measures. 0 Agree on the ways of public participation and * Discussion on the rights of the displaced information disclosure. people. * Agree on the rights of the vulnerable groups and * Ideas and suggestions about public protection policies. participation, information disclosure and * Discuss the ways of rearranging land. grievance. * Ideas and suggestions about the rights and protection of the vulnerable groups. 249 Resettlement Planning Report of Henan Towns Water (Supply and Dralage) Project (bunt y tine (bnt ent s of synposi unrs (city)part i ci pant agreements ( ci t y) A M of Theheadofthecountyincharge * Survey of the Project, including the size * Affirm the size and the location of the U\r ch Developmmnt and Refoa and location of Waterworks, the amount Waterworks and the amount of the land taken or 2005 Finance Bureau, Water Resource of the land taken or occupied occupied temporarily. 5,W5Bureau, Construction Bureaus, Health Bureaus, Epidemic temporarily. * Determine the compensation standard of young Prevention Stations, Environmental Protecton 0 The consultative experts introduce the crops, land resettlement allowance, articles affixed Bureaus, Civil Admninistratio Bureau, PuCicl Service Burea,o effect of project construction on the to land, restoration of farmland and town roads. Land Bureau Traffic Bureaus, displaced people. 0 Determine the range standard of deciding the Government Masses Visiting 0 The Operational Policies 4.12 of the material object targets affected by the Project.. Office, Residents' Committee, Investigation Committee, Involuntary Settlement and its annex. 0 Determine the procedures and supervision ways of Religion Management Commissions and Disabled * The relevant laws, regulations and distributing compensation. Federations. 26 policies on land taking. The * Determine the resettlement measures and the 40. persons are compensation standard is set be the rights of the displaced people. H.angchuan present. actual situation. 0 Determine the ways of public participation and cbunt y 0 The ways of deciding the material object information disclosure. targets affected by the Project. 0 Determine the ways and methods of carrying out * The procedure and supervision of the relevant resettlement policies of the World distributing compensation. Bank and our govemnment. * The resettlement policies and measures. 0 Carry out the rights of the vulnerable groups and * The rights of the displaced people; the protection policies. resettlement institutions and management. * Public participation, information disclosure and grievance. * The rights and protection of the vulnerable groups. P. M of Land Bureau, * Survey of the Project, including the size and location * Agree with the size of water plant, the project . . ~~~~~~~of Waterworks, the amount of the land taken or project site, the amount of the land taken or occupied 250 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project I\br ch implementing occupied temporarily. temporarily. 2005 institutions, 0 The opinions and suggestions about the affected 0 Believe that it is necessary to build the water 5, ~~~~~~~~~~people about land taking. Village * The consultative experts introduce the effect of the plant; mention the compensation for land taken, Commissions, project construction on displaced people.. the construction of farmland facilities and output Public Security e The Operational Policies 4.12 of the Involuntary per mu; resettlement allowance is used to help Commissions, 0 The idea and suggestions on compensation standard. displaced people to develop planting, breeding Women * Opinions and suggestions of the ways of deciding the and raising and business to increase their material object targets affected by the Project. Federations, the * The opinions and suggestions about the procedure and income. representatives of supervision of distributing compensation. 0 By discussion, an agreement is reached on the residents and * The opinions and suggestions about the resettlement compensation standard of young crops, land, policies and measures. displaced people. * Discussion on the rights of the displaced people. resettlement allowance, articles affixed to land, Altogether 18 0 Ideas and suggestions about public participation, restoration of farmland and roads. persons. information disclosure and grievance. 0 Agree on the standard of deciding the material * Ideas and suggestions about the rights object targets affected by the Project. and protection of the vulnerable groups. 0 Agree on the procedures and supervision way of distributing compensation. * Agree on the resettlement measures and the rights of the displaced people. * Agree on the ways of public participation and information disclosure. * Agree on the rights of the vulnerable groups and protection policies. * Discuss the ways of rearranging land. 251 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Appendix to 9-2. Open Information in the Project Counties (cities) Sample Handbook of Displaced people arranging The Project counties (cities) have printed displaced people settlement handbook and put them up in public places and the regions affected by the Project. Displaced-people may have a reference and consultation to the implementation units. Television and radio projects have also been made use of to publicize the Projects so that all the concerned people may be well informed of. What follows are the samples of displaced people settlement handbook. I. The outline of the Project Location of the Project The water supply plants or sewage treatment plant are to be built in village town, which is meters from the village, meters from the town with an area of mu. The water-heads locates in village, _ town, which is meters from the water supply plants with an area of mu. Major construction contents The Project includes running water supply plant, water transportation pipes net, water supplying pipes net, facilities in the water-heads and pressure adding station (Sewage treatment plant project includes facilities for second level treatment, regenerated water treatment instrument, sewage-treatment pipes net in the outer of the plant and regenerated water transportation pipes.) The running water supply plant has a capacity of providing ten thousand tons per day, which ensures the water supply for the life of the people in the city or the town, the production of some enterprises so as to guarantee the quality of drinking water and People's health. The sewage-treatment- treatment plant treats sewage-treatment ten thousand tons per day, which can solve the sewage-treatment- treatment problem to guarantee the water quality in the city and its lower reaches. The Project is to build water pipes net (sewage-treatment pipes net) _ km[] water supplying pipes kmLlwhich may cover temporarily an area of mu in village, town and the roads of km in the city. II. Investment estimation and implementation procedures Investment estimation The estimated investment is 10,000 yuanCI which include fund asserts 252 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project investment 10,000 yuan and interest in the construction period 10,000 yuan. Sources of the fund The sources of the fund are loans from the World Bank ten thousand dollars( 10,000 yuan RMB)73 local auxiliary fund _ 10,000 yuan which includes loan from the home banks 10,000 yuan3 provincial financial subsidy 10,000 yuan]l national debt 10,000 yuan and independently raised funds 10,000 yuan by the local government and project units. General arrangement of the Project The social evaluation report is to be finished in June 2005, the research report, displaced people settlement plan and environmental impact evaluation report iu September 2005, the preliminary design and examination and approval of the Project in December, 2005. The Project will begin in 2006 and complete in 2008 according to the plan. The Schedule of Resettlement Arranging The work of collecting land and displaced people' settlement will begin in 2006 and finish in 2006. III. Social economic benefits The Project will help the city make practical policies, provide service to the public causes and environment of the city as well as learn the comprehensive methods of water supply management, water sources sites management and control on water pollution. By improving the basic facilities for water supply and sewage treatment plant instrument, the Project will improve the quality of People's drinking water, public health, the surface and underground water quality in the places of the Project and its lower reaches so as to improve water environment quality, reduce the outbreak of diseases caused by water, improve the living environment for sea life, and renew and improve the ecological environment. Meanwhile, the Project will improve the living quality of the poor people in the city, guarantee the quality of drinking water and strengthen the management on water supply and sewage-treatment treatment. The Project will speed up the social economic development of the Project cities. The construction and implementation of the Project will provide the local people with employment chances, increase their economic income, raise the level of their material 253 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project consumption ahd their living, and promote the development of the trades. The construction of the infrastructures will improve the local investment condition so as to attract the foreign funds for the development of local agriculture, industry and trade to increase the employment chances and economic income of the local people, and raise the level of local science and technology development and enterprises management. The development of local sources by foreign investment will create employment chances from the extra value. The improved infrastructures and conditions will attract and activate development of local tourism to drive development of trade and services, and prosper social economy. The construction pf the Project will increase the revenue income of local government directly. The Project by foreign investment, the development of tourism, the prosperity of trade and the further development of service will increase the local revenue and financial income, which means the increase of financial input sources for further economic development and social service items. IV. Types of loss caused by land taking In accordance with the preliminary design of the Project and field investigation, the following types of loss due to land taking, old buildings pulling down and displaced people are asserted: Loss of the cultivated land; Pulling down of the houses (for the Project of sewage-treatment treatment in Mengjin); Temporary occupation of land; Infrastructures; Other losses: the attachments to the land such as trees and young crops, etc. V. Gathering of the items affected by the Project 1. Basic object index and impact of land taking Land taken Land taken Permanent Temporary Damaged County Location for wakr for land occupied roads for (City) plant supply water-heads taking pipes and pipelines plant (mu) (mu) (mu) wells r mI l Name of Name of the county (city) the village _ 254 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Names of the attachment on the land for water supply plants, water sources sites and pipes County Nursery (City) Electric Young Grown- of Well Farm poty lestrees Yo ung tro - young Bridges Culverts depth Tombs infrastructures plants (in) Li, m l_____ ______ Ai muLi ____ ________ Displaced people affected by Displaced people from Displaced people affected by County land occupied by the water water-heads land occupied temporanly by (City) supply plants pipelines Families Persons Families Persons Families Persons 2E Compensation Standards: Averag Coin The cost The pensaTh Average e ton cornpen standard costi' Average Corn product nn sation ofcot production Com Standar ion p stand standar County per mu in es d of pr Corn ard of standar restonng d of tion in ation d of the land fp (City) tte previous i land displa repairin | | Count | Unit prlce ompe ni priceof mUtipl ce y rleofn temoUait g U thpie o ( yuanrmu ples s aonursy 3 peo crops ly rad s lIpoles oung|uDyuan/musi years | (yuan! occupied road (yuan! e(yua mu) (yuan/mu (yuan! trees i re (unn/mu) m2) Compensation standard of the buildings and articles affixed to the land for water supply plants, water-heads and pipelines Unt Unit Price Unit County price of Unit price of Unit price of Unit Unit price of (Ct) price Ui (Ct) of each nursery of price Unito the price farm elcrcof grown young plants of price of t fof ifatrcue polesti on p F yuan/mull bridges cuvrswl ob 1yuan/mn E pls trees trees (yuan/rn)________ The tax standards of the taken land for Henan Towns Water (Supply and Drainage) Project According to the policies made by Henan Provincial Land Resource Departmnent and Revenue Bureau, the land used in the Project will be paid 30 yuan per square meter, the 255 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project arable land cultivation fee will double the land compensation fee, spare land fee 2000 yuan per mu, management fee of the taken land will take up 1.5% of the total taken land fee, and revenue for occupied land will be 4.5 yuan per square meter. 3. Various compensation and revenue Unit: 10,000 yuan County Taken land for water Land Settlement Compensation (City) supply plants compensation compensation for young Total _ _ _ _ _ _ _ _ _ _ _ _ I _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ tc ro p s Total Taken land for compensation County water-heads Land settlement Compensation Total for land taken (City) (mu) compensation compensation for young crops for the water _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ______________ _ _ _ _ _ _ supp ly project Compensation standard of the buildings and articles affixed to the land for water supply plants, water-heads and pi elines Coun Total Cou c t nurserie Far compen (City electri young Grown- s of bridge culver m To infrastructure for U t lf inrsrutr for poles trees up trees young s ts wel mbs buli plants Iss buindi _ _ _ _ _ _ _ _______ __ _ _ _ _ _ _ _ _ __ _______ _ _ _ _ _ _ _ ______________ _______ a rtic le s Total Compensation for Cost of restoring Compensation County rg for land Total cost of road repairing (City) young crops (10,000 farmland (10,000 occupied (10,000 yuan) yuan) yuan) temporarily (10,000 yuan) 256 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project compensation Total cost for young cropsofrpin g Total Total compensation affixed to land f repring Total for houses occupied the roads direct County compensation articles and for douse mporarily damaged by t (City) for land taken buildings pulled down temporarily by pipeline in cost ((i 0 000 yuan) (yuan) and resettling pipelines and towns (10,000 (10,000 yuan) (yuan) (yuan) for recovery of (10t000 yuan) farnland (1000 (10,000 yuan) yuan costs for for prepared reconnai monitoring money for Prepared money Total ssance and Managemen compensating for price indirect County and evaluating(2 t costs (3% Technical for substantial fluctuation costs (City) designon % of direct of direct training cost objects (compensation (10,000 direct cost) c (compensation x 5%) yuan) cost) feex 10%) Total County Total direct costs Total indirect costs Total tax on land taken budgetary (City) (10,000 yuan) (10,000 yuan) permanently (10,000 yuan) estimate (10,000 yuan E . Rights of the displaced people In accordance with the stipulations of the Implementing Regulations of the administrative Law of Land of the People's Republic of China: all fees for land collecting should be completely paid in 3 months since the approval of the compensation and allocation plan of land collecting. Requirements of Resettlement Principles _ 1 The affected people get the economic compensation and their living standard _ ~~~~~should at least remain the original or be improved. -~ ~~~5 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 2 All the people concerned should get economic compensation and allocation assistance. The economic compensation will assure every person can at least remain the original living standard after removing and allocation. Land compensation fee, allocation subsidy, young crops compensation fee and compensation fee for the attachments on land should be fully paid. The compensation multiple should be raised with the approval of the provincial People's government if the pleasant whose lands are takenstill can not remain the original living siandard, and 4 cannot afford their social security fares after the above fees are delivered; If the land compensation and allocation subsidy multiplied by 30 times is still not enough for the peasants to remain their original living standard, the local People's government will give them extra subsidy from the payment of state-owned land usage. The affected people should be well informed of the qualification, ways and 5 standard of compensation, plans of production and income resuming, project schedule, and take part in the implementation of the settlement plans. 6 The present land situation cannot be changed without the satisfaction of the affected people with the compensation and settlement plans. 7 The implementing agencies and independent monitoring and evaluation agencies of the Project will be responsible for the settlement and delivery of the subsidies. The underprivileged group should benefit from the relevant assistant policies of 8 the government to assure their living standard and political treatments. 9 The affected people should have the opportunity to benefits from the Project. 1 0 The displaced people settlement plan should be in line with the general plans of the Project county (city) VII. The deadline The deadline for the determination of the compensation quality: before the illegal land taking is approved, the local stated-owned land resources department should inform in the written form the peasants and collective economy organizations in the countryside of the function, location, compensation standard and settlement approaches. Having been informed, they will not be compensated from the attachment and young crops which are 258 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project rush-planted or rush-built on the land. VIII. The procedures of distributing the compensation 1. The procedures of distributing the compensation for land taken permanently and for the buildings and articles affixed to the land Running water or sewage-treatment corporation in the Project counties (cities). Bureaus, of state land and resources in the Project counties (cities) Property right Village committees Influenced owners in the I pr oper ty ovner si enterprises Land cont r act or 259 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 2. The procedures of distributing the compensation for land taken temporarily Running water of sewage-treatment plant in the Project counties (cities) State-owned Land Resources Department Village committee project companies of the Land l municipal administration cont r act or IX. Measures to recover economy The village which has mobile land makes adjustment in the land taken by the Project for the villagers right in the year the Project is implemented. The adjusted land should be the same in quality and quantity as the original taken land. The village without mobile land available holds meetings for the villagers and adjusts land with the agreement of two-thirds of the villagers. The compensation should be paid to the peasants whose land is taken at the end of the year before land adjustment. After the adjusting, the rest settlement subsidies should be divided averagely by all the. villagers whose land is adjusted. The village committee may use the land compensation to develop the second and third industry and transfer the employment of the labor force. Launch production technology training to improve the production techniques and qualities of the peasants. The employment opportunities offered by the implementation of the Project. The others. 260 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project X. Agencies * Displaced people management office of the Project management unit (The Water Conservancy Bureau or City-building Bureau in the county) Displaced people management office of the Project implementation unit (the running water or sewage-treatment treatment companies) The guiding group for displaced people settlement in the village committee The relevant functional departments in the govemment The outer independent monitoring and evaluation agencies XI. Grievance procedure I ndependent nrni t or i ng and Project management eval uat i on People's Court in the office in Henan agenci es province, city or county Project management _ ~~~~~~~~~~~~~~~agencies in the Ladbra People's Letters Project county (city) in the Project and Calls Office county (eity) in the province, T city or county Town govenmment t Village committee Influenced natural person or corporation 261 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project Appendix: An Outline of Monitoring and Evaluating of Resettlement Of Henan Towns Water (Supply and Drainage) Project Down by Henan Province by means of Loans from the World Bank I. Background The water supply & sewage treatment project in towns of Henan Province is a big one to utilize the loan from the World Bank, whose purpose is to improve the condition of water supply and sewage treatment and to perfect the infrastructure of water supply and sewage treatment in towns. This project is undertaken by the Development and Reform Committee of Henan Province and the Finance Bureau of Henan Province. The water supply project concerns 38 counties under 12 cities of the whole province, while the sewage treatment project concems six counties. Altogether, the water supply & sewage treatment project concerns 40 counties of twelve cities of the whole province, covering 35% counties of the whole province and 80% drainage area. This project covers the largest areas, with the biggest number of people and departments participated in recent years in Henan Province. The Project includes two aspects: water supply establishment and sewage treatment establishment. The implement of the Project will solve the water supply problem and ease up the contradiction of water supply and demand existing among the inhabitants and factories for a long time in the Project area. It will also raise the phases of water supply and sewage treatment establishment, which will provide an important guarantee for the persisting development of the regional economy of Henan province. In this project, lands are exploited as follows: the construction of water plant will permanently occupy 1006.24mu, including the site 916.44mu; water-head 89.8mu; the pipe laying of the water plant 969.24mu temperately; while the sewage treatment plant 240.56mu permanently, the pipe laying 34mu temperately. This project concerns 970 families (3995 persons) whose land is exploited permanently, among which 947 families (3903 persons) will resettle in different surroundings because of permanent land exploitation, and 23 families (92 persons) will have to change their living conditions because of the removed houses. 727 families (2995 persons) will be affected by the temporary pipe laying. Arranging new land does the resettlement for settlers. 262 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project The internal and external monitoring on the relevant taking and resettlement should be * made in the process of and after the Project in order to accord with the Principle of the Resettlement Plan, So it is the case. II. The basis of monitoring and evaluation The World Bank Unwilling ResettlementCl the Professional policy OP4 12 and the Attachmentl; n the Resettlement Planl; El the Land Law of the People's Republic of China C ,2004; *] the City House Removing Managing Regulations of the People's Republic of China ] ,2001; E the Land Law of the People's Republic of China ]I performing measures of Henan province. 1999; E the Decision on Deepening the Reform, strict the land management of the State Department3 (state E 2004] No. 28); the relevant law, regulations, rules; the relevant regulations on taking of land in the Project counties(cities); the relevant regulations on house removing management in the Project counties(cities); III. The scope and requirement of monitoring and evaluation The scope of monitoring and evaluation on the resettlement's social economic development can be divided into three parts: the carrying out, paying and using of the compensation; the construction of the resettlement's living service, farming, public infrastructure; the social economic development of the resettlement community and the adjustment of the resettlement's social adaptability. 1. The carrying out, paying and using of the compensation It is mainly supervised how the compensation is carried out, when and how the compensation is paid, and how the displaced people use it and what profit they get. 2. The construction of the resettlement's living service, farming, public infrastructure. a. To supervise the way of distributing the resettlement's living land and the quantity, the progress of resettlement's removing, and the quantity, quality and progress of house construction. b. Supervise the quantity and quality of the resettlement's farming land, the way of farming, production and profit. 263 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project c. Supervise the restoration and construction of the infrastructure in the resettlement community including the highroad and the transmission line. 3. Supervise the social economic development in the resettlement community and the adjustment of the resettlement's social adaptability. a. Supervise the recovery of family income after the resettlement. b. Supervise the social economic development of community after the resettlement. c. Investigate, harmonize and propose to solve the problems that occur in the process of resettlement between the settlers and the resettlement-executing agency. d. Supervise the favorable policy to the weak group and the recovery of the production economy, the protection of the women and children's legal rights. e. Supervise the degree of settler's participation in democratic consultation in the resettlement, the extent of adopting the settler's suggestions and the settler's comments on resettlement. f. Supervise the settler's training of production skills, the propaganda of the resettlement policy and the result; g. Supervise the fulfillment of the resettlement's preferential policy. h. Supervise the adjustment degree of the resettlement's social adaptability as an individual and as a whole community. i. Supervise the working system and efficiency of the local resettlement office, and the training of the resettlement workers. j. Supervise the resettlement's complaints and grievance. k. Supervise the function of non-government organizations in the process of resettlement. IV. The methods of supervising and evaluation 1. The sampling principles of monitoring and evaluation In order to ensure that the monitoring and evaluation are comprehensive and systematic and that the sampling is representative, the monitoring and evaluation of the social economic development of the resettlement community in the water supply & sewage treatment project should comply with the following principles: a. The resettlement's income shall be properly evaluated; b. All the resettlement villages are the sample villages; c. The sample population is no lower than 10%; d. The sample families can generally represent the resettlement's ideas and voice; 264 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) project e. The sample families can represent all levels of income (i.e., pure agricultural families, mainly agricultural families with other manifold income, and the non-agricultural families, etc.). 2. Monitoring methods The method of monitoring is mainly the data collection, following-up investigation, visiting and colloquia of the sociology, with the way of necessary economics and techniques. a. Data collection. There are three main purposes of data collection: description, explanation and forecasting. Therefore, the data can be divided into three kinds. The describing data is to answer "who", "when", "where", " what happened", which have nothing to do with "why" and "whether it is normal for something happened", while the last two questions need reasoning and explanation. Therefore, the data for the infrastructure before the resettlement and the construction progress of resettlement and also for the affected people's living and income after removal only record, not account for, the present condition and progress. Therefore, the data getting from the resettlement and the carrying out agency are mainly describing data, which are obtained from surveys and questionnaires. The explanative data and forecasting data can help the supervising and evaluating staff understand the phenomenon, process, time and why it happens or does not happen at this moment and the possible result. Generally, the staff need to reason. the relationship between cause and effect, which is usually give in the formn of qualitative data, reflects the displaced people' and the grassroots leaders' attitude and ideas on relevant events. The resettlement and the grassroots leaders do not participate in the long-term forecast of the resettlement result. Under the most circumstances, they only forecast some variable within a short time. In the investigation on the spot, they get the data by way of questioning, colloquia and other qualitative methods. In order to meet the need with collecting data, there should be different ways of investigation on the spot according to different quality and data. Mainly: .the way of investigation statistic table, supposed questionnaire, communication and questioning, colloquia and observation on the spot, etc. b. Following-up investigation. The following-up investigation is to ensure the continuity, integrality of data and events, the closing of the process. It is managed by doing long-term following-up investigation on the four sample resettlement villages decided beforehand so as to ensure the facilities, continuity and timeliness of the data. 265 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project c. Colloquia communication. In the colloquia, investigate the common problems of the resettlement, the participating people should be decided according to different colloquia content; the focus is to communicate some sensitive problems and hot problems with some representative resettlement. According to different investigating content, the communication can choose the random sampling or choose some representative resettlement. 3. Evaluation methods The purpose of the monitoring and evaluation on the resettlement's social economic development in water supply & sewage treatment project is not only to know the condition of each resettlement family and the resettling site but also to make a comprehensive and key evaluation on the resettlement's resettling condition, the result of which can be referred to by the owner, loan agency and the performing agency. In the evaluation, firstly filter, reason and order the problems in the resettlement arranging, make a reasonable analysis on the importance of the problems and then calculate in the way of qualification and quantification, generally as follows: The way of analyzing the data statistic. In the way of regression analysis and the analysis of Markov, calculate, reason the supervising date to get valuable result, to propose different policy according to different results. The way of judging by experience. After deal with the problems in the monitoring and the data, judge in the way of Delphic to find the regulation to forecast the future of the problems and propose the relative policy. The way of overall evaluation. The way of overall evaluation is a new way of forecasting the macro-problems in the recent years nationally. It is a new evaluating way formed by combining the analysis of data statistic and experience judging. Mainly there are the way of the gray theory judging and the fuzzy teaching judging. V. The procedures of monitoring and evaluation. The monitoring and evaluation of the resettlement's social economic development in water supply & sewage treatment can be divided into three stages: the preparing stage, the monitoring on the spot stage and the analyzing evaluation stage. 1.The preparing stage a. Supervise the outline of performing the evaluation and investigation table. b. The monitoring and evaluation experts study and communicate, and make reasonable division of the supervising task. c. Choose the subject of monitoring. 266 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project 2. The process of the monitoring on the spot a. Fill in the monitoring investigation table. b. Investigate on the spot. c. Colloquia. d. Collect the materials. 3. The analysis of evaluation a. Decide the way of evaluation. b. Analyze the problems. c. Write the report. VI. The organizing of monitoring and evaluation 1. The establishing of the agencies The scientific and reasonable establishment of agencies is the basis to ensure timely and exact monitoring and evaluation. In accordance with the scopes, the monitoring and evaluation can be divided into three parts, each of which has its own responsibility. Corresponding agencies are established to deal with the following: the settlers'. living arrangements, the development of production and the adjustment of their social adaptability. * 2. Personnel It is composed of experts and technical personnel, whose professional characteristics are as follows: Resettlement planning Construction of towns Construction of agricultural water conservancy Second and third industry Economics Sociology Psychology 3. The organizing of monitoring and evaluation activities According to the demand of the unwilling resettlement D] the professional policy OP4. 12] of the World Bank, "monitoring is a continuous judge", " evaluation is stage judge on the urgent, performing, efficiency and the result of the purpose of the proposed project." In order to realize the scheduled purpose of the monitoring and evaluation, to realize the continuity and truth of the supervising process, the performing organizing can be divided into four stages: 267 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project a. The plan stage. This stage is mainly to make preparation of the supervising work. Before the investigation on the spot, study the past data and materials, make sure of the important problems of the monitoring and evaluation, write the plan of the monitoring and evaluation, distribute the monitoring task to the experts and the technical personnel. b. The performing stage. It is the work of filling in the investigation table, colloquia and collecting materials on the spot according to the plan. c. The checking stage. Check the result of the investigation on the spot. Correct and make up the wrong information n the data and materials in the investigation on the spot, to make sure of the exact of the data information. d. Solving stage. Put in the data of the investigation on the spot into the computer to process, deal with the relevant information according to the demand of the monitoring and evaluation; write the report of the monitoring and evaluation, analyze the problems in resettling the resettlement and the social economic development in the resettlement community, propose warn and suggestions of the important problems; give remedy measures on poorness in this monitoring and evaluation especially the investigation on the spot, to perfect in the next monitoring and evaluation. VII. Writing the report of monitoring and evaluation 1. Requirements of writing the report The report is a demand of reflecting the result of monitoring and evaluation, but monitoring is a continuous evaluation. Therefore, the report needs to be written in order of time, events. The report can not only reflect the process and change of the subject of this monitoring and be relevant with the events from the time. 2. Contents of the report The content of the report is to be prepared according to the content of the monitoring and evaluation. The format is as follows: i. the page of responsibility ii. catalogue iii. text iv. important problems v. main suggestions and conclusions vi. attachment of the investigation data According to the Resettlement Plan, in the process of taking land permanently and house removing, the external independent resettlement monitoring and evaluation agency 268 Resettlement Planning Report of Henan Towns Water (Supply and Draiage) Project should provide the report of monitoring and evaluation to the World Bank and the Project Office of Henan Province. After the sub-project completes their resettlement completing report, the external independent resettlement monitoring and evaluation agency should provide the report of monitoring and evaluation of the year within the next two years. The report of monitoring and evaluation should be written in Chinese and English, and the English report should be given to the World Bank after the Project Office of the province review. The Project Office is responsible for providing the report of monitoring and evaluation agency with the process, condition and all the information of the taking and the resettlement's activity. VIII. The time and frequency of monitoring and evaluation The monitoring and evaluation agency works from 2006 to 2008, three years altogether. According to the Resettlement Plan, the monitoring and evaluation agency make an external monitoring and evaluation each year before permanent land taking and house removing, two months each time. The irivestigation can be going on according to the process of each sub-project. 269 f ! f~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~