71845 Cairo Traffic Congestion Study Phase 1 Final Report November 2010 This report was prepared by ECORYS Nederland BV and SETS Lebanon for the World Bank and the Government of Egypt, with funding provided by the Dutch - Egypt Public Expenditure Review Trust Fund. The project was managed by a World Bank team including Messrs. Ziad Nakat, Transport Specialist and Team Leader, and Santiago Herrera, Lead Country Economist. i Table of Content Executive Summary xi  Study motivation xi  Study area xi  Data collection xi  Observed Modal Split xii  Identification of Causes, Types and Locations of Traffic Congestion xii  Estimation of Direct Economic Costs of Traffic Congestion in Cairo xiv  1  Introduction 17  1.1  Background 17  1.2  Objective of the Study 18  1.3  Structure of this report 18  2  Assessment of Information Needs and Collection of Additional Data 19  2.1  Introduction 19  2.2  Task Description/Objectives 22  2.3  Study area 22  2.4  Assessment of Data and Information Needs 24  2.5  Floating Car Survey and Traffic Counts 25  2.5.1  Data Collection Objectives 25  2.5.2  Data Collection Techniques 25  2.5.3  Technical Plan Development Methodology 25  2.5.4  Development of Data Collection Technical Plan 29  2.5.5  Data Collection Operational Plan 32  2.6  Peak Hours 35  2.7  Traffic Composition in the Corridors 36  2.8  Modal Split in the Corridors 36  2.9  Daily Traffic Volume 45  2.10 Traffic Survey Results 49  2.11 Trend Analysis of Travel Characteristics (2005-2010) 62  2.11.1 Changes in Modal Split 62  2.11.2 Changes in Traffic Patterns 66  2.11.3 Changes in Peak Hours 71  2.12 Overview of additional existing data 71  3  Identification of Causes, Types and Locations of Traffic Congestion 73  3.1  Introduction 73  3.2  Principal corridor assessment 73  3.2.1  Principal Corridor Collective Assessment 73  ii 3.2.2  Principal Corridor Individual Assessments 88  3.3  Network-wide qualitative assessment 106  3.3.1  Workshop Design and Process 106  3.3.2  Workshop Approach and Results 107  3.4  Integration / Comparison of the Floating Car Survey and Workshop Outcomes 112  4  Estimation of Direct Economic Costs of Traffic Congestion in Cairo 115  4.1  Introduction 115  4.2  Methods to Measure Direct Economic Costs of Congestion 115  4.2.1  Definition of congestion 115  4.2.2  How to measure congestion? 116  4.2.3  Economic Costs Elements and Calculation Method 117  4.3  Costs of Travel Time Delay 117  4.3.1  Estimation of Delay from Recurrent Traffic Congestion 118  4.3.2  Estimation of Delay from Nonrecurring Traffic Congestion 120  4.3.3  Total Delay Cost for 11 Corridors 122  4.4  Costs of Travel Time Unreliability 122  4.4.1  Observed Travel Time Unreliability 123  4.4.2  Cost of Unreliability for 11 Corridors 123  4.4.3  Unreliability in freight transport 124  4.5  Cost of Excess Fuel Consumption 124  4.6  Associated Cost of CO2 Emissions due to Excess Fuel Consumption 125  4.7  Total Direct Costs of Traffic Congestion for 11 Corridors 127  4.8  Sensitivity analysis 129  4.9  Total Direct Cost of Traffic Congestion for GCMA 129  4.10 Breakdown of Traffic Congestion costs 140  4.11 Zonal Based Direct Economic Cost of Traffic Congestion 142  4.12 Reflection of the Applied Methodology 149  5  Conclusions and some recommendations for Phase II 152  Annex 1: References 154  Annex 2: Glossary 159  Annex 3: Overview of Existing Data 160  Annex 4: Principal Corridors Collective and Individual Assessment, Estimation Procedures 195  Annex 5: Origin Destination Matrices 2005 and 2012 196  Annex 6: Non-classified Vehicle Counts 197  Annex 7: Classified Vehicle Counts 198  iii Annex 8: June 6th Workshop: List of Participants, Invitation, Objectives and Program 199  Annex 9: Measuring Congestion, Reliability Costs and Selection of Calculation Method Direct Costs 200  Congestion indicators 200  Commonly used performance measure(s) that reflects congestion levels on roads 205  Travel Time Reliability 208  Commonly used travel time reliability indictors 208  Selection of Performance Measures for GCMA 209  Annex 10: Equations used for Direct Cost Calculation 212  Travel Time Delay 212  Delay Estimation Causing By Recurrent Congestion 212  Delay Estimation due to Nonrecurring Events 214  Economic Cost of Unreliability 217  Cost of Excess Fuel Consumption 218  Emission Cost 221  Annex 11: Detailed Direct Economic Cost of Traffic Congestion 223  A- Delay Cost 223  B- Unreliability Cost 229  C- Excess Fuel consumption and Cost 232  D- Emission Cost 238  Annex 12: Overview of Data Used for the Calculation of Direct Cost of Congestion 241  iv List of Tables Table 2.1: New Cities around Greater Cairo- Type and Population 2 19  Table 2.2: Study Data and Information Needs 24  Table 2.3: Floating Car Survey Detailed Routes 33  Table 2.4: Number of Runs on Each Route during the Floating Cars Survey 34  Table 2.5: Traffic Counts Detailed Observation locations 35  Table 2.6  Traffic peak periods in the Greater Cairo Metropolitan Area 35  Table 2.7: Modal split summary in the eleven corridors (by percentage) 44  Table 2.8: The percentage of traffic volumes in peak hours 45  Table 2.9: Traffic counts in the eleven corridors (2005) 47  Table 2.10: Traffic counts in the eleven corridors (estimated for 2010) 48  Table 2.11: Traffic Survey Results- AM 50  Table 2.12: Traffic Survey Results-PM 50  Table 2.13: Comparable Traffic Count Locations 67  Table 2.14: Comparison between 2005 and 2010 Traffic Count Surveys Data: 67  Table 2.15: Comparison between 2005 and 2010 Traffic Count Surveys Data: 68  Table 2.16: Comparison of Peak Hour Factors at Traffic Count Locations 70  Table 3.1: Aggregate Qualitative Observations on Traffic influencing Events 88  Table 3.2: Daily Traffic Influencing Events, Route 1 89  Table 3.3: Daily Traffic Influencing Events, Route 2 90  Table 3.4: Daily Traffic Influencing Events, Route 3 92  Table 3.5: Daily Traffic Influencing Events, Route 4 93  Table 3.6: Daily Traffic Influencing Events, Route 5 95  Table 3.7: Daily Traffic Influencing Events, Route 6 97  Table 3.8: Daily Traffic Influencing Events, Route 7 99  Table 3.9: Daily Traffic Influencing Events, Route 9 101  Table 3.10: Daily Traffic Influencing Events, Route 10 104  Table 3.11: Daily Traffic Influencing Events, Route 11 105  Table 3.12: List of traffic congestion causes 109  Table 3.13: List of grouped “operationalâ€? causes 111  Table 3.14:Localized congestion causes mapped into congestion categories 112  Table 4.1: Vehicle occupancy factor for diverse vehicular modes (passenger) 121  Table 4.2: Truck Load capacity (Ton) 121  Table 4.3: Value of time for diverse transport user classes (adjusted for 2010) 122  Table 4.4:   Excess fuel cost in the Greater Cairo because of traffic congestion 125  Table 4.5: The emission rate for diverse vehicular modes 127  Table 4.6: Direct cost components of traffic congestion (approach 1) 127  Table 4.7: Direct cost components of traffic congestion (approach 2) 127  Table 4.8:Breakdown of traffic congestion costs for the entire GCMA (Approach 1) 141  v Table 4.9:Breakdown of traffic congestion costs for the entire GCMA (Approach 2): 141  Table 4.10: GCMA zones network types 145  Table 4.11: Predominant Land Use of GCMA 148  Table 4.12:   Traffic congestion cost in traffic zones in the GCMA 148  Table 4.13:   Traffic congestion cost in suburban traffic zones in the GCMA 149  Table A3.1: No. of licensed vehicles by type of vehicles & governorate up to Dec 2008 161  Table A3.2: Public Transport Daily Trip Generation 164  Table A3.3: Public Transport Daily Trip OD  Unit 1,000 trips 165  Table A3.4: Public transport Capacity in Cairo 166  Table A3.5: Public transport Capacity in Alexandria 166  Table A3.6: Public transport Capacity in Inside Cities 167  Table A3.7: Public transport Capacity in Outside Cities 169  Table A3.8: Public transport Capacity the Cairo – 6th of October Transport Corridor 169  Table A3.9: Fleet age and composition in Cairo 170  Table A3.10: Fleet age and composition in Alexandria 170  Table A3.11: Fleet age and composition Inside Cities 171  Table A3.12: Fleet age and composition Outside Cities 172  Table A3.13: Distribution of Bus and Microbus Following both Public and Private Licenses (2005) 173  Table A3.14: Public transport accident in Cairo 175  Table A3.15: Public transport accident in Alexandria 176  Table A3.16: Public transport accident in Inside Cities 176  Table A3.17: Public transport accident in Outside Cities 177  Table A3.18: Accident Seriousness Rate (Dead or Injured / Accident) by A.R.E Governorates (2008) 178  Table A3.19: The Most Vehicles Causing Accidents on Highways by Type (2008) 179  Table A3.20: Percentage Distribution of Accidents Causes on Highways (2008) 179  Table A3.21: Car Accidents by Causes (2008) 179  Table A3.22: Estimated Unit Vehicle Operating Cost 181  Table A3.23: Quantity, Value and Type of Fuel Used in Operation in Cairo - Value by 1000 2007/2008 183  Table A3.24: Quantity, Value and Type of Fuel Used in Operation in Alexandria - Value by 1000 L.E 2007/2008 183  Table A3.25: Quantity, Value and Type of Fuel Used in Operation in Inside Cities- Value by 1000 2007/2008 184  Table A3.26: Quantity, Value and Type of Fuel Used in Operation in Outside Cities -Revenues by 1000 L.E. 2007/2008 185  Table A3.27: The average household income by Household Income Group (2007) 186  Table A3.28: Socio-Economic Framework in the Study Area 187  Table A3.29: Average Monthly Income and Hourly Income per Worker 187  Table A3.30: Estimated Hourly Time Value for Transport Users from 2007 to 2027 188  Table A3.31: Monthly Income Indicator and Car Ownership per household (2007) 188  Table A3.32: Percentage of 16 hour traffic volume in the peak hour (2005) 190  Table A3.33: Peak Hour Traffic Volumes on Main Bridges and Arterial Roads (2005) 191  vi Table A3.34: Characteristics of Observed Traffic Volume at Different Count Stations in 2005 193  Table A3.35: Passenger Car Units (PCU) 194  Table A3.36: Vehicle Occupancy Factors (Passengers/Vehicle) 194  Table A10.1: TTI incident delay factor 215  Table A10.2: The Emission rate for diverse vehicular modes 221  vii List of Figures Figure 2.1: Location of the new cities around Greater Cairo 20  Figure 2.2: Administrative and Planning Boundaries in the Study Area (CREATS, 2003) 23  Figure 2.3: Greater Cairo Region Major Districts (CREATS, 2003) 24  Figure 2.4: Greater Cairo Region Roadway classification (CREATS, 2003) 26  Figure 2.5: Traffic counts observation locations (JICA, 2005) 27  Figure 2.6: Peak hour traffic volumes (JICA, 2005) 27  Figure 2.7: Traffic counts observation locations (JICA, 2007) 28  Figure 2.8: Cairo Ring Road Study, 2009 28  Figure 2.9: Preliminary Routes for the Floating Car Survey 30  Figure 2.10: Final Routes for Floating Car Survey 31  Figure 2.11: Traffic counts observation locations 31  Figure 2.12: Traffic counts observation locations 49  Figure 2.13: P1 - Ring Road / Between El Khosoos & Cairo-Alex Agr.Rd 51  Figure 2.14: P2 – Gesr El-Suez/between Ring Road and Ainshams Street 52  Figure 2.15: P3 – Suez Desert Road / Between KM 4.5 and Ring 52  Figure 2.16: P4 – Suez Desert Road / Between KM 4.5 and Ring Road 53  Figure 2.17: P5 – Ring Road / Above Cairo-Alex Desert Road 54  Figure 2.18: P6 – 26th July / Between Railway and Ring Road 54  Figure 2.19: P7 – Al-Ahram Street / Electricity Station 55  Figure 2.20: P8 - Middle of Abbas Bridge 56  Figure 2.21: P9 - 6 October Bridge between Zamalk and Agozah 56  Figure 2.22: P10 - Ahmed Helmy Str./ Before Abou Wafya Bridge 57  Figure 2.23: P11 – Ramses St. between Ghmara and Ahmed Said St. (One Way to Abasia) 58  Figure 2.24: P12 - Lotifi Al Said St. between Abasia and Ghamrah (One Way to Ramses Square) 58  Figure 2.25: P13 - Salah Salem Str./Between Elfangary and Abbasey 59  Figure 2.26: P14 – Kornish El-Nil /Between 15th May & El-Sahel Brdg 59  Figure 2.27: P15 – Gamal Abd El-Naser (El-Nile str)/Cornishe El- Agouza 60  Figure 2.28: Modal Split according to the Classified Vehicle Counts 62  Figure 2.29: Modal Split according to 2005 Survey on Suez Desert Road 63  Figure 2.30: Modal Split according to 2010 Survey on Suez Desert Road (P3) 64  Figure 2.31: Modal Split according to 2005 Survey on Salah Salem Street 64  Figure 2.32: Modal Split according to 2010 Survey on Salah Salem Street (P13) 65  Figure 2.33: Average Modal Split – 2005 66  Figure 2.34: Modal Split - 2010 66  Figure 3.1: Morning Peak Sample Travel Speed 76  Figure 3.2: Evening Peak Sample Travel Speeds 76  viii Figure 3.3: Principal Corridors Average Speeds- AM Direction 1- Routes 1 to 6 77  Figure 3.4: Principal Corridors Average Speeds- AM Direction 1- Routes 7 to 11 78  Figure 3.5: Principal Corridors Average Speeds- AM Direction 2- Routes 1 to 6 78  Figure 3.6: Principal Corridors Average Speeds- AM Direction 2- Routes 7 to 11 79  Figure 3.7: Principal Corridors Average Speeds- PM Direction 1- Routes 1 to 6 79  Figure 3.8: Principal Corridors Average Speeds- PM Direction 1- Routes 7 to 11 80  Figure 3.9: Principal Corridors Average Speeds- PM Direction 2- Routes 1 to 6 80  Figure 3.10: Principal Corridors Average Speeds- PM Direction 2- Routes 7 to 11 81  Figure 3.11: Principal Corridors Speed Indices 83  Figure 3.12: Principal Corridors Speed COVs, Direction 1 84  Figure 3.13: Principal Corridors Speed COV, Direction 2 84  Figure 3.14: Principal Corridors Buffer Index, Direction 1 85  Figure 3.15: Principal Corridor Buffer Index, Direction 2 86  Figure 3.16: Traffic Influencing Events Frequencies 87  Figure 3.17: Route 1 Schematic 88  Figure 3.18: Route 2 Schematic 90  Figure 3.19: Route 3 Schematic 91  Figure 3.20: Route 4 Schematic 93  Figure 3.21: Route 5 Schematic 95  Figure 3.22: Route 6 Schematic 97  Figure 3.23: Route 7 Schematic 98  Figure 3.24: Route 8 Schematic 100  Figure 3.25: Route 9 Schematic 101  Figure 3.26: Route 10 Schematic 103  Figure 3.27: Route 11 Schematic 105  Figure 3.28: Ranking of the Operational Causes 111  Figure 3.29: Congestion causes frequencies of occurrences 113  Figure 4.1  Total annual direct cost due to traffic congestion in 11 corridors (approach 1) 128  Figure 4.2  Total annual direct cost due to traffic congestion in 11 corridors (approach 2) 128  Figure 4.3  Distribution of total annual direct cost due to traffic congestion in GCMA (approach 1) 131  Figure 4.4  Distribution of total annual direct cost due to traffic congestion in GCMA (approach 2) 131  Figure 4.5   Local road types in GCMA 143  Figure 4.6   Traffic Network types in GCMA 144  Figure 4.7 Number of Lanes in Main corridors of GCMA 146  Figure 4.8 Land use and Network classes in the GCMA 147  Figure A10.1  Car’s age distribution in Egypt 219  Figure A10.2  Relative distribution of cars’ engine size between 2002-2006 in Egypt 220  Figure A11.1  Annual recurring and nonrecurring delay costs for passenger car users 223  Figure A11.2  Annual recurring and nonrecurring delay costs for motorcyclists 224  Figure A11.3  Annual recurring and nonrecurring delay costs for taxi users 224  Figure A11.4  Annual recurring and nonrecurring delay costs for transit users 225  ix Figure A11.5  Annual recurring and nonrecurring delay costs for freight transportation 225  Figure A11.6  Annual recurring and nonrecurring delay costs for all road users 226  Figure A11.7  Annual recurring and nonrecurring delay costs for passenger car users 226  Figure A11.8  Annual recurring and nonrecurring delay costs for motorcyclists 227  Figure A11.9  Annual recurring and nonrecurring delay costs for taxi users 227  Figure A11.10  Annual recurring and nonrecurring delay costs for transit users 228  Figure A11.11  Annual recurring and nonrecurring delay costs for freight transportation 228  Figure A11.12  Annual recurring and nonrecurring delay costs for all road users 229  Figure A11.13  Annual unreliability associated costs for passenger car users 230  Figure A11.14   Annual unreliability associated costs for motorcyclists 230  Figure A11.15  Annual unreliability associated costs for taxi and shared taxi Users 231  Figure A11.16  Annual unreliability associated costs for transit Users 231  Figure A11.17  Annual unreliability associated costs for all road users (Excluding freight transporters) 232  Figure A11.18  Annual excess gasoline consumption in the Greater Cairo (1st approach) 233  Figure A11.19  Annual excess Diesel consumption in the Greater Cairo (1st approach) 233  Figure A11.20  Annual excess gasoline costs as result of traffic congestion (1 st approach) 234  Figure A11.21  Annual excess diesel costs as result of traffic congestion (1 st approach) 234  Figure A11.22  Annual total excess fuel costs as result of traffic congestion 235  Figure A11.23  Annual excess gasoline consumption in the Greater Cairo (2nd approach) 235  Figure A11.24  Annual excess Diesel consumption in the Greater Cairo (2nd approach) 236  Figure A11.25  Annual excess gasoline costs as result of traffic congestion (2nd approach) 237  Figure A11.26  Annual excess diesel costs as result of traffic congestion (2nd approach) 237  Figure A11.27  Annual total excess fuel costs as result of traffic congestion (2nd approach) 237  Figure A11.28  Annual total excess CO2 emission weight due to traffic congestion (approach 1) 238  Figure A11.29  Annual excess CO2 emission costs due to traffic congestion (approach 1) 239  Figure A11.30  Annual total excess CO2 emission weight due to traffic congestion (approach 2) 239  Figure A11.31  Annual excess CO2 emission costs due to traffic congestion (approach 2) 240  x Executive Summary Study motivation The urban agglomeration of Cairo, designated as the Greater Cairo Metropolitan Area (GCMA), is the largest urban area in Egypt, Africa and the Middle East and amongst the most populous metropolises of the world. In 2006, its population reached 17 million people spread across the governorates of Cairo, Giza and Qalyobiya and a number of new cities. Despite the massive efforts by the Egyptian government to tackle traffic congestion and environmental deterioration, by introducing a metro system and a comprehensive bus network, traffic congestion remains a serious problem in the GCMA with substantial adverse effects on personal travel time, vehicle operating costs, air quality, public health, business environment and business operations. The causes of traffic congestion are complex, as are the range of possible policies and investments that could be arrayed to address the problem. The study is conducted to assess the baseline economic cost of current road traffic congestion in the GCMA, based on which to prepare policy recommendations and an action plan to reduce traffic congestion. The first phase involves the review of traffic congestion in the GCMA, its causes, types and locations, with the final objective of assessing the overall economic costs and the associated energy inefficiencies. Study area The study area is referred to as the Greater Cairo Metropolitan Area (GCMA), which mainly includes the governorates of Cairo, Giza and Qalyobiya in addition to the new cities of New Cairo City, 6th of October City, 15th May City, 10th of Ramadan City, El- Obour City and Badr City, and is consistent with the study area defined by the JICA study1 Data collection A comprehensive assessment of the data and information needs was first carried out. Under this task, several urban transport-related studies and development master plans of Greater Cairo were identified and reviewed, including the comprehensive transport plans proposed by JICA in the period 2002-2008. The lack of appropriate technical studies with 1 Greater Cairo Urban Transport Master Plan - CREATS, 2003 xi clear methodologies to assess the economic costs of congestion was identified. Sources and samples of existing data were also listed such as traffic data, GIS maps, vehicle and accident statistics, public transport data and cost factors, etc. Additional data were collected through various means. The study team conducted a Floating Car Survey (FCS) on 11 principal corridors including primary arterials and expressways within the Ring Road boundaries in the GCMA. The survey involved test drives along selected routes where travel distances as well as qualitative observations were recorded at specified time intervals. Additionally, the study team conducted a Traffic Count Survey (TCS), which included manual classified counts (MCC) at 15 observation locations, selected on the basis of consistency with the traffic counting efforts made by previous studies while maintaining an adequate overlap with the selected routes of the FCS. The FCS was conducted between 24/5/2010 and 1/6/2010, while the TCS was carried out between 05/07/2010 and 07/07/2010. Both surveys took place during the morning peak period (7:00 am to 11:00 am) and afternoon peak period (3:00 pm – 7:00 pm). Observed Modal Split The traffic composition in the study area was estimated based on the classified vehicle counts performed in the TCS. The analysis of the collected data shows that road traffic is still dominated by private cars with a share of 70%, followed by taxis with 15% share, then microbuses and minibuses with 7%, while large buses make up only 1% of the overall traffic. Small trucks and heavy trucks constitute 5% and 2% of road traffic, respectively. Identification of Causes, Types and Locations of Traffic Congestion The average traffic volumes were estimated for the morning and afternoon periods for each survey location. The highest volume during the morning peak (7,400 vehicles/hour) was recorded on the 6th October Bridge -between Zamalek and Agozah- in the direction of Al Mohandiseen and Al Doki; while the highest volume during the evening peak (9,605 vehicles/hour) was recorded on the Ring Road in the direction of Al Maadi. It also appears that the highest peak during the morning period occurs between 8 and 9 AM at most traffic count locations. On the other hand, volumes are comparable in the different afternoon hours and there does not seem to be any specific peaking pattern. A trend analysis of the travel characteristics in the period 2005 – 2010 was performed, utilizing the traffic data collected in this study and a consistent dataset obtained from the JICA’s Study. The analysis shows that traffic has generally increased on most traffic count locations such as the Ring Road, Gesr El Suez, Suez Desert Road, etc. while it decreased on fewer links such as Abbas Bridge, Ahmed Helmy Street, etc. These changes can be attributed to certain changes in transport demand and supply and land use characteristics in the GCMA, such as population growth in the new peripheral cities, the expansion of the Central Business District, the operation of the new Maryotiya corridor, the upgrade of El Khalafawy Corridor and the significant increase in the overall car ownership. The morning peak period has remained between 7:00 and 9:00 AM while the xii afternoon peak period has shifted from (13:00 – 16:00) to (15:00-18:00). The comparison of modal splits in 2010 and 2005 indicates that the share of passenger cars remains the highest and has generally increased since 2005, while the share of microbuses, minibuses and taxis has moderately increased. On the other hand, the large bus share has dropped and so has the share of trucks. The latter could be a result of banning trucks on most of the city roads during working hours. The adopted approach to identify the causes, types and locations of road congestion in the GCMA involved a quantitative assessment which identified the causes and locations of congestion along the study corridors and a network-wide qualitative assessment that focused on the causes of traffic congestion across the GCMA without reference to specific locations. Reduced travel speeds and more widespread congested conditions have been observed in the evening peak in comparison to the morning peak. Some insights into the observed congestion patterns are highlighted through the classification of the study area into four area types. The average speeds for all surveyed corridors within the area bounded by the Ring Road fall in the range of 20 - 45 km/hr for the entire morning peak duration, for both travel directions. Reduced travel speeds have been observed for the evening peak ranging from 15 to 30 km/hr. The average speed along the Ring Road is slightly higher, varying between 30 and 60 km/hr depending on the peak period and direction. The analysis results reveal that the average speed indices, being the ratio between the route average speed to its free flow speed, for all surveyed routes range from 0.31 (PM peak period) to 0.63 (AM peak period). In general, the speed indices of the afternoon peak period seem to be constantly lower than those recorded during the morning peak period, implying slower speeds and more congestion. The reliability analysis is based on the estimated coefficients of variation of the corridors average speeds. The estimated Coefficients of Variation for all surveyed corridors, except for the 26th of July/15th of May travel corridor, fall in the range of 0.25 to 0.65. An increased variability in travel speeds is estimated for the evening peak compared to the morning peak for all surveyed corridors, with the exception of two locations. The highest variability in travel speeds is estimated for the 26th of July/15th of May travel corridor. Among the numerous causes of travel time variability, traffic influencing events are major contributors. The most notable event type is vehicle breakdowns, which occur at a daily rate that is substantially higher than other traffic influencing events along all surveyed routes. It was also observed that higher frequencies of accidents, security checks and breakdowns occurred more on urban primary highways compared to the urban primary arterial routes. The analysis also reveals the substantial occurrence of both random microbus stops and random pedestrian crossings on most surveyed routes. The quantitative analysis also involved an assessment of the individual principal corridors, in which the aggregate as well as localized congestion causes were identified. The analysis includes average speeds, coefficient of variation, frequencies of daily traffic influencing events, conclusions from space-time plots and a description of distinct congestion locations and causes along the route. xiii The network-wide qualitative assessment was performed through a consultative workshop involving a panel of experts. Through a structured approach known as Nominal Group Technique (NGT), a list of 35 causes of traffic congestion in the GCMA was compiled. The causes of traffic congestion in the GCMA were classified into “operationalâ€? and “strategicâ€?. Through the NGT, the panel of experts ranked the operational causes by degree of importance as follows: traffic management and control, design features of the road network, law observance and enforcement, awareness of road etiquette and manners, parking supply and behavior, traffic demand related factors, traffic influencing events and work zones. The comparative assessment of qualitative and quantitative outcomes is summarized for each of the identified congestion cause categories, which include traffic management and control, design features of the road network, law observance and enforcement, awareness of road etiquette and manners, parking supply and behavior, traffic demand related factors, traffic influencing events, and work zones. For example, the “design features of the road networkâ€? was evaluated as one of the most salient causes of traffic congestion by both qualitative and qualitative assessments. Estimation of Direct Economic Costs of Traffic Congestion in Cairo The next step in the study was to estimate the direct economic costs of traffic congestion in the GCMA. A selection of suitable methods of measurement of congestion levels are described for this purpose. Then the adverse components of traffic congestion are identified. The adopted procedure consists of two parts: first a calculation of direct congestion costs on the 11 Principal Corridors and second an extension of the calculation to cover the complete GCMA. Two methods were used to estimate the cost, namely Speed Plot and Volume-to-Capacity Ratio. Based on the literature review, the direct cost elements commonly used to calculate the direct costs of traffic congestion include: (a) cost of travel time delay imposed on users (passengers as well as freight); (b) cost of travel time unreliability in passenger transportation; (c) cost of excess fuel consumption in vehicular transportation (Diesel and Gasoline) and (d) the associated cost of Carbon Dioxide (CO2) emissions due to excess fuel consumption. The annual recurring and nonrecurring cost of travel time delay for the 11 corridors amounts to 2.6 billion LE using the speed plots approach and 2.4 billion LE using the volume to capacity ratio (V/C) approach. The share of recurrent delay costs is estimated to be approximately 40% leaving 60% for the non-recurrent delay (consistent in both approaches). The estimation is based on the methodology developed by the Texas Transportation Institute in which ratios have been determined for recurrent and non- recurrent delays. In general, reliability is highly valued by travelers and commercial vehicle operators. Although a congested network is not necessarily unreliable, congestion increases the likelihood of unreliability. The total cost of passenger travel time unreliability for the 11 corridors is estimated approximately 1.7 billion LE. The total unreliability cost for freight xiv transportation is roughly estimated around 13.5 Million LE per year for the 11 corridors based on the annual tonnage of cargo transported in the region. The total excess fuel costs for the 11 corridors due to traffic congestion are estimated to be 2.85 billion LE using the speed plots approach and 2.38 billion LE using the volume to capacity ratio (V/C) approach. The share of the costs to the user is 45% with the remaining 55% of the total amount incurred by the Government. The total costs of CO2 emission due to traffic congestion for the 11 corridors is estimated approximately at 97 million LE per annum using the speed plots approach and 86 million LE per annum using the volume to capacity ratio (V/C) approach. The total direct traffic congestion cost for the 11 corridors is therefore estimated to exceed 7.0 billion LE according the first approach and 6.6 billion LE according to the second approach. The main cause of difference between results of these two approaches is the applied method to determine the congested part of the corridors. In order to estimate congestion cost for the entire GCMA, and in the absence of complete information needed to calculate the volume to capacity ratios for the entire transport network, an alternative method was used to extend the estimated direct economic cost of traffic congestion from the 11 corridors to the GCMA. The applied methodology consisted of developing a traffic model using Emme/3 based on the trip generation and distribution tables of the JICA study and the 11 major corridors attributes and alignments. The percentage of the traffic in Greater Cairo carried by the 11 major corridors was calculated based on a comparison between the actual traffic counts and the traffic model volumes on these corridors, which entail the ratios of 50.4% in the morning peak period and 50.9% in the evening peak period. Based on the traffic counts, the total number of vehicles in the peak hours (both AM and PM) in the 11 corridors is estimated around 605.000 PCU. Similarly, the total number of vehicles in peak hours in the entire GCMA is approximated to 1,210,000 PCU. Consequently, the total annual direct congestion costs for the GCMA is estimated in the range of 13 to 14 billion LE. The highest shares of the total direct cost are those of the travel time delay cost (36%), consisting of recurrent and non-recurrent congestion costs, and excess fuel cost (37%), of which half is paid by users (retail price of fuel) and the other half is additional costs to the Government (fuel subsidies); followed by unreliability cost (25%); and finally, the CO2 emissions cost has a fairly small share of less than 1% of total costs. To determine direct economic cost at a disaggregate level for each zone of GCMA, several factors were considered such as geographic size, local road types, traffic network types, number of available lanes in the traffic network and land use. The factors used to determine the share of congestion costs by each traffic zone included the number of zonal trip origins and destinations from the adjusted 2010 OD matrix (based on JICA study) as a proxy for traffic flow, network type(s) as a proxy for design road capacity and free flow speed, number of trips per lane-kilometer as a proxy for actual road capacity and average speed, and land use as a proxy for level of congestion and the network length. xv The congestion costs in the 11 corridors cover the following zones: Salam City, Nasr City, Khaleefa, Giza, Dokki, CBD, Masr El Gadida, Shoubra, Shoubra El Khima, Part of Imbaba Markaz and Ain Shams. The share of each zone is calculated based on the trip production/attraction, the network type and the network capacity. Nasr City is found to have the highest share of congestion (23.6%), followed by Masr El Gadida (19%) and Giza (14.7%). The congestion costs for traffic zones located in the suburbs are also estimated. The Qanater area had the highest share (24.5%), followed by Qalioub (22.8%), then Maadi (13.5%) and Imbaba Markaz (13.2%). xvi 1 Introduction 1.1 Background The total population of Egypt over the ten-year period between 1996 and 2006 increased from 59 million to 73 million, with an average annual growth rate at 2.04%. The Greater Cairo Metropolitan Area (GCMA) hosts the largest share of population, economy, industry, and human resources in Egypt. With a population that stood at 17 million in 2006 and fast rate of urbanization (expected to reach 24 million in 2027), GCMA is one of the largest mega cities in the World and is Egypt’s largest agglomeration (22% of Egypt’s population). Traffic congestion is a serious problem in the Cairo metropolitan area with substantial adverse effects on personal travel time, vehicle operating costs, air quality, public health, business environment and business operations. The causes of traffic congestion are complex, as are the range of possible policies and investments that could be arrayed to address the problem. In CGMA, about 2/3 of all motorized trips are made by public transport (mostly taxis and minibuses), and there are therefore tremendous opportunities for improving traffic congestion through accelerated modal shift to mass transit systems. The government has committed itself to significantly support modal shift, improve fuel efficiency in the urban transport sector, and identify cost effective investments and measures. The government’s vision for transforming the urban transport sector in GCMA is reflected in the Greater Cairo Urban Transport Master Plan. The implementation of plans for GCMA has been slower than envisioned and traffic has increased more than originally expected. For instance, the previous JICA 2003 report projected a reduction of the travel speed from 19 km/h to 12 km/h by 2020 in the worst case scenario. The most recent estimates indicate that the travel speed had fallen to around 12 km/h in 2005, notably due an increased car ownership associated with higher income growth and urbanization. Part of the problem for properly addressing urban congestion arises from the lack of appropriate technical studies, with clear methodologies, specifically aimed at assessing the economic costs of congestion. These studies would help assess the magnitude of the problem, its types, and locations, therefore providing a solid ground for making appropriate policies and investments recommendations. Cairo Traffic Congestion Study. Final report 17 1.2 Objective of the Study The Objective of this study is at first to assess the baseline and economic cost of current congestion in GCMA, based on which to prepare policy recommendations and an action plan to reduce traffic congestion. In order to achieve this important objective, the study will be carried in two main phases: ï‚· The first phase will at the outset involve the review of traffic congestion in GCMA, its causes, types and location, with the final objective of assessing the overall economic costs and the associated energy inefficiencies. This will permit depicting a clearer image of CGMA’ complex traffic congestion problems and associated costs, and inform policy makers about their real magnitude. ï‚· The Second phase will involve prioritizing and recommending a package of specific fiscal (congestion pricing schemes, fuel subsidies), regulatory (vehicle inspection norms and standards, regulation of public transport, public transport pricing), and investment (traffic management and public transportation investments) measures. This assignment will cover the first phase of the study only. The first phase will involve the following activities: ï‚· Task 1: Review literature, organize first consultative workshop, and prepare inception report ï‚· Task 2: Assess information need, and collect additional data as necessary. ï‚· Task 3: Identify the causes, types and locations of traffic congestion. ï‚· Task 4: Quantify the direct economic costs of traffic congestion. 1.3 Structure of this report Section 2 presents a comprehensive assessment of the data and information needs of this study, identifying sources and samples of existing data and describing additional data that were collected as part of Task 2. Section 3 presents an analysis of the extent of traffic congestion in the GCMA, its main causes and key locations. Specifically, the section describes the detailed analysis performed on the Floating Car Survey (FCS) data and discusses the results. The section also presents the results of the consultative workshops we conducted with traffic experts from academia, industry and Ministry of Interior. In section 4, we present the estimation of the direct economic cost of traffic congestion in Cairo. In this stage, economic costs of travel time delay, travel time unreliability, costs of excess fuel consumption, the associated cost of CO2 emission due to fuel consumption, and eventually total direct economic costs of traffic congestion in Cairo will be estimated. 18 2 Assessment of Information Needs and Collection of Additional Data 2.1 Introduction Greater Cairo Area and Population Cairo or rather the urban region of the Greater Cairo Metropolitan Area is the largest urban area in Egypt, Africa and the Middle East and amongst the most populous metropolises of the world. It occupies the 10th rank within mega cities across the world in 2 the period between 2000 and 2015 . Greater Cairo has been the centre of gravity for many of Egypt’s activities. It has grown mainly due to increased migration from rural areas, and high growth rates were witnessed during the second half of the 20th century vis-à-vis investments, economic activities, job opportunities and number of students. At the turn of the 21st century, Greater Cairo started to get its contemporary structure as a “main dense urban areaâ€? with varied socioeconomic levels encircled by the Ring Road and an “outer beltâ€? of 8 new satellite cities as shown in Figure 2.1. In 2006, the population of Greater Cairo Area reached 17 million people spread across Cairo, Giza and Qaylobiya and the new cities listed in Table 2.1 below. The urbanization continues to progress, and the performance of the entire transport system is less than desirable, despite the massive efforts striven by the Egyptian government to tackle traffic congestion and environmental deterioration, by introducing a metro system and a comprehensive bus network. 3 Table 2.1: New Cities around Greater Cairo- Type and Population City Type Population in 2006 6 October Industrial 500,000 Al Sheikh Zayed Residential 48,000 15 May Industrial 180,000 Al Oboor Industrial 100,000 Badr Industrial 60,000 Al Shorooq Residential 62,000 New Cairo Residential 302,000 2 “World Urbanization Prospects, the 2001 Revisionâ€?, Department of Economic and Social Affairs, Population Division, United Nations Publications, UN, 2002. Cairo Traffic Congestion Study. Final report 19 10 Ramadan Industrial 500,000 3 Figure 2.1: Location of the new cities around Greater Cairo Previous transport studies and relevance to this study There exist several urban transport-related studies and development master plans for Greater Cairo to date. The most recent were reviewed by the Consultant and mainly include: ï‚· “Transportation master Plan and feasibility Study of Urban Transport Project in Greater Cairo Region in the Arab Republic of Egyptâ€? Greater Cairo Urban Transport Master Planâ€? (CREATS), JICA – 2002: was the first attempt to delineate a comprehensive transport master plan, covering the entire metropolitan areas of Greater Cairo Region. It adopts approaches designed to mitigate urban transport problems and contribute to the sustainable development of the Greater Cairo Region. Its key objectives are to formulate a master plan for the urban transport network in the Study Area to the year 2022; to conduct a feasibility study for the priority project(s) identified under the master plan (however, this object was to be undertaken as a follow-up effort to the master plan study); and to carry out technology transfer to the Egyptian counter personnel in the course of the study. ï‚· “Public-Private Partnership Program for Cairo Urban Toll Expressway Network Developmentâ€?, JICA – 2006. The study’s main objectives are to review and update the traffic demand, routing and development phasing plan of the Cairo urban expressway network proposed in the CREATS Master Plan of 2002; set up the toll 3 Research Study on Urban Mobility in Greater Cairo, Trends and Prospects, Final Report, February 2009 – by the Development Research and Technological Planning Center, Cairo University 20 road system for the sustainable development of the proposed Expressway network; and formulate a comprehensive strategy for the introduction of a PPP program for the development of the Expressway network. ï‚· “Strategic Urban Development Master Plan Study for Sustainable Development of the Greater Cairo Region in the Arab Republic of Egyptâ€?, JICA – 2008 (Updated in 2009). The objectives of the study include: formulating a strategic development master plan for the study area in the target year of 2027 to achieve the sustainable social-economical development through well-balanced urban development; formulating an implementation scheme for priority development corridor(s), considering the effective urban development being integrated with transportation development; and exchanging experience related to urban planning and urban development. ï‚· “Research Study on Urban Mobility in Greater Cairo, Trends and Prospectsâ€?, Development Research and Technological Planning Center, Cairo University – 2009. This study mainly covered evolution trends of urban development, transport and energy/environment in Greater Cairo area so as to call attention of decision-makers and other stakeholders to the related effects on sustainable development and sustainable transport. ï‚· “Greater Cairo: A Proposed Urban Transport Strategyâ€?, Urban & Transport Unit, Middle East and North Africa Region, World Bank – 2006. The study provided an assessment of the urban transport system in Greater Cairo, identified the most pressing urban transport problems, and proposed a framework for urgent policy actions and investment priorities that would be the basis of a formal transport strategy to be adopted and implemented by the authorities of the metropolitan area of Cairo. ï‚· “Proposed Cairo Urban Transport Strategy & Priority Programâ€?, Greater Cairo Development Project, Ministry of Housing and the World Bank – 2010. This study includes a short and medium term priority program, which depends on institutional strengthening, development of public transport system, traffic management and enforcement, toll roads facilities and sustainable funding. In addition to the above-mentioned studies, the following attempts to develop a transport master plan for Greater Cairo were made: ï‚· A study dating back to 1973 undertaken with French support under Transport Planning Authority (PTA), MOT, focusing on the Metro Line Development ï‚· A study conducted in 1989 with the technical support of JICA under Cairo Governorate ï‚· The “Public Transport Studyâ€? with French support in 1999 under NAT. The Egyptian Government also issues Five Years Plans for the nation as a whole and for the Governorates, which include the projects and the programs to be implemented in the various sectors during the upcoming five years in consideration. The World Bank has been assisting the Egyptian Government in elaborating its urban transport policy and prioritizing interventions and has committed financing to urban transport projects from IBRD, the Clean Technology Fund, and Carbon Finance sources to contribute to the cost of short-term investment needs based on the above government plans. Cairo Traffic Congestion Study. Final report 21 Nevertheless, part of the problem for properly addressing urban congestion, in most countries, arises from the lack of appropriate technical studies with clear methodologies, specifically aimed at assessing the economic costs of congestion. There is therefore a critical need to assess the magnitude of the problem, its types, and locations, therefore providing a solid ground for developing appropriate policies and investments recommendations. Based on the above, the scope of the current study includes the following activities (amongst others): ï‚· Assessing information need, and collecting additional data as necessary (Task 2): After review of the existing studies on urban transport in Greater Cairo, the consultant shall assess the data collection needs and methodologies to obtain the necessary information for carrying out this assignment and shall perform additional data collection where needed, including site surveys, to update and complement the existing information. ï‚· Identifying the causes, types and locations of traffic congestion (Task 3): The consultant shall identify the locations, types and causes of traffic congestion in metropolitan Cairo. 2.2 Task Description/Objectives Chapter 2 of this report presents a comprehensive assessment of the data and information needs of this study, in line with Task 2 of the study, identifying sources and samples of existing data and describing additional data that were collected. The chapter also provides a detailed description of the Floating Car Survey (FCS) which the study team conducted on 11 principal corridors in the Greater Cairo Metropolitan Area (GCMA). In addition to the FCS, the study team conceived a detailed plan for collection of traffic counts; however this plan faced prolonged delays in obtaining the required security clearances for the field surveyors, despite persistent efforts to secure the clearances from the responsible authorities in a timely manner. The traffic counts were finally conducted in July, and are reported in Section 2.10 and Annexes 6 and 7. 2.3 Study area Previous studies in Greater Cairo and local ministries have been using different study areas or planning boundaries, making it difficult to compare the study results on the same ground. In other words, there is no clearly defined boundary for the Greater Cairo Region or Greater Cairo Metropolitan Area. For the purpose of this study, the scope will relate to the study area defined by the JICA study (Greater Cairo Urban Transport Master Plan - CREATS, 2003), as recommended in the project’s Terms of Reference. The Study Area therefore consists of the Greater Cairo Region, including the new cities of New Cairo City, 6th of October City, 15th May City, 10th of Ramadan City, El-Obour City and Badr City, as shown in the Figure 2.2 below. 22 Figure 2.2: Administrative and Planning Boundaries in the Study Area (CREATS, 2003) In administrative terms, the Study Area covers Cairo Governorate, Giza Governorate and part of Qalubia and Sharqia Governorates. Alternatively, the study area is identified as the envelope of the 11 major districts identified by the JICA study, as follows (Figure 2.3): 1- Central Cairo 2- Central Giza 3- Heliopolis/Nasr City 4- Shoubra/Shoubra El Kheima 5- Mataryia 6- Maadi/Qatamiya Road 7- Shibin El Qanater/ El Obour 8- 10th of Ramadan/Badr/El Shorook 9- New Cairo 10- Helwan/15th of May 11- 6th of October/El Sheikh Zayed Cairo Traffic Congestion Study. Final report 23 7 8 5 4 3 2 1 9 11 6 10 Figure 2.3: Greater Cairo Region Major Districts (CREATS, 2003) 2.4 Assessment of Data and Information Needs The table below outlines the data and information needs. The table includes the potential sources of this data and their relevance to the assignment.   Table 2.2: Study Data and Information Needs Data/ Information item Source/ method Derived from the results of the study of “Public Private Origin/Destination (O/D) matrices by traffic mode Partnership Program for Cairo Urban Toll Expressway Network Developmentâ€? GIS maps of network characteristics Ministry of Housing, Ministry of Transport Current traffic volumes Field traffic counts at selected corridors Current traffic speeds Floating car surveys at selected corridors Difference between design capacity and actual Based on noted observations made by floating car survey capacity personnel Frequency of incidents (at an appropriate level of Based on noted observations made by floating car survey disaggregation) personnel Analysis of collected data plus two workshops with MOI Locations, types and causes of congestion personnel and traffic experts The total number of vehicles (by type) Egypt Government, offered by the WB Public transport capacity, fleet composition & age Egypt Government, offered by the WB Accident data and information Egypt Government, offered by the WB Based on an analysis of actual performance data collected Unit vehicle operating cost from different transport operators, as well as automobile dealers Obtained by interviewing gasoline stations and some car Fuel cost dealers Household income and value of time Based on a household opinion poll survey that was carried 24 out in the Cairo master plan in June and July 2007 Based on the Public Private Partnership Program for Cairo Percentage of daily traffic in peak hour Urban Toll Expressway Network Development study Based on the strategic urban development master plan Passenger Car Unit (PCU) study for sustainable development of the greater Cairo region in the Arab republic of Egypt (March 2008) Based on the strategic urban development master plan Vehicle Occupancy Factor study for sustainable development of the greater Cairo region in the Arab republic of Egypt (March 2008)     2.5 Floating Car Survey and Traffic Counts 2.5.1 Data Collection Objectives The floating car survey and collection of traffic counts were intended to: ï‚· Fill major data gaps identified upon consolidation of traffic data from previous studies; ï‚· Facilitate the development of growth factors that could be used to update traffic data from previous studies; and ï‚· Enable the quantitative assessment of congestion levels, locations and causes along selected travel corridors. 2.5.2 Data Collection Techniques ï‚· Floating Cars: test drives along selected routes where travel distances as well as qualitative observations are recorded at specified time intervals. ï‚· Traffic Counts: manual classified traffic counts at selected locations. 2.5.3 Technical Plan Development Methodology Study Area and Road Classification The focus of this study is for the within ring road area. However the main corridors connecting all external cities to the within ring road area are included: 26th of July corridor carrying traffic from 6th of Oct city; Cairo/Suez Desert road carrying traffic from new Cairo, ElShorouq, and Badr; Cairo/ Ismailia Desert road carrying traffic from Obour, 10th of Ramadan, and Elshorouq; Cairo/Alex agriculture road carrying traffic from El- Qalyoubya; and Cornish El-Nile carrying traffic from 15th of May city. According to the JICA study, the roadway network of the GCR is classified into 7 categories/levels as shown in Figure 2.4 and listed next. 1- Inter-Urban Primary Arterial Highway 2- Regional Primary Arterial Highway 3- Urban Expressway 4- Urban Primary Arterial Street 5- Urban Secondary Arterial 6- Collector/Distributor Street Cairo Traffic Congestion Study. Final report 25 7- Local Street Due to budget and time constraints, the scope of our data collection is limited to levels 1, 2, 3, and 4. Figure 2.4: Greater Cairo Region Roadway classification (CREATS, 2003) Consolidation of traffic data from previous studies The JICA study of 2005 (Cairo Urban Toll Expressway Network Development) conducted traffic surveys at 28 locations within the GCR. Traffic counts as well as classification data were collected at the 28 locations, for both travel directions, for 16 hrs. The observation locations and peak hour traffic volumes are shown in Figure 2.5 and Figure 2.6, respectively. 26 Figure 2.5: Traffic counts observation locations (JICA, 2005) Figure 2.6: Peak hour traffic volumes (JICA, 2005) The JICA study of 2007 (CUTE) conducted traffic count surveys at 8 locations as identified in Figure 2.7. Classified traffic volumes were manually observed for both directions of the 8 locations for 16 hrs. Cairo Traffic Congestion Study. Final report 27 Figure 2.7: Traffic counts observation locations (JICA, 2007) The Cairo Ring Road study of 2007 (Upgrading of Greater Cairo Regional Ring Road to an Integrated Transport Corridor) conducted traffic count surveys along the Ring Road. Continuous traffic counts ranging from 16-hr to 24-hr were performed at each approach of the 23 interchanges of the Ring Road as shown in Figure 2.8. Figure 2.8: Cairo Ring Road Study, 2009 28 Selection criteria for additional data collection sites Floating cars ï‚· Maintaining an adequate representation of all identified districts within the GCR ï‚· Maintaining an adequate representation of different road hierarchy levels (considering only the levels from 1 to 4, as defined previously). ï‚· Capturing the impacts of the recent substantial growth in the new settlements on the periphery of the ring road. The main radial corridors carrying traffic demand from those areas, crossing the ring road, to the centre of the city are to be considered. ï‚· Capturing critical corridors with excessive delays considering inputs from the traffic police, professionals, and results reported in previous studies. ï‚· Capturing the severely congested segments of the ring road. ï‚· Maintaining a round-trip travel time within 2 hours (on average) to be able to conduct more than one round trip during the peak period. Traffic Counts ï‚· Duplicating the traffic counting efforts made by previous studies at a few selected locations. This duplication will enable the estimation of realistic growth factors that could assist in updating the rest of the data. ï‚· Maintaining an adequate representation of areas/corridors where major recent land use developments have been realized. A focus will be dedicated to major traffic corridors connecting GCR new settlements (including 6th of October, El Sheik Zayed, 10th of Ramadan, Obour, Badr, Elshorouk, New Cairo, 15th of May) with the city centre. At least one data collection location is to be defined along the main corridor connecting each of those areas with the ring road. ï‚· Maintaining an adequate overlap with the selected routes of the floating car study. This overlap will allow for the consolidation of different data types which enable a more insightful assessment of traffic conditions. 2.5.4 Development of Data Collection Technical Plan Floating Cars Floating Car Routes A preliminary plan was developed for the floating car routes based on the previously stated route selection criteria. The plan identifies 10 travel routes as candidates for the floating car surveys. The selection process was based on several brainstorming sessions with a number of transportation professionals. Figure 2.9 depicts the formulated preliminary plan. Cairo Traffic Congestion Study. Final report 29 Figure 2.9: Preliminary Routes for the Floating Car Survey The preliminary plan was subsequently updated based on brainstorming sessions with traffic police representatives and transportation experts. The objective of such sessions was to encapsulate different experiences into the data collection plan. The main feedback obtained was: ï‚· The Ring Road is a crucial travel corridor needs to be entirely surveyed. ï‚· Abass Bridge is a critical high volume flyover that mandates surveillance. ï‚· The appropriateness of "Route 6" in the preliminary plan is not well established. Concerns pertaining to road segments functional hierarchy as well as congestion levels have been expressed. The preliminary plan was modified in accordance to the above feedback. The entire Ring Road as well as Abass Bridge were included in the updated plan. The final plan constitutes 11 floating car routes, as depicted in Figure 2.10. 30 Figure 2.10: Final Routes for Floating Car Survey Traffic Counts Based on the previously outlined selection criteria, 15 observation locations were identified along the floating car routes for traffic counts. Figure 2.11 displays the selected observation locations. Figure 2.11: Traffic counts observation locations Cairo Traffic Congestion Study. Final report 31 2.5.5 Data Collection Operational Plan Floating cars ï‚· Reported Observations: Travel distance, actual number of lanes, judgmental congestion level, incidents, unpredictable pedestrian crossing (i.e. Jaywalking), microbus drop-offs/pickups, security checks, and intersections. A sample observation sheet is included in Annex 4. ï‚· Surveyed Routes: (Table 2.3) presents the details of the identified 11 routes. Each route is to be covered by 2 floating cars traveling in opposite directions. ï‚· Drivers/Observers: 22 drivers and 22 observers were recruited to perform the floating car survey. A training session was conducted to get drivers/observers familiar with their assignments. ï‚· Date: the survey was conducted during the following days: - Monday 24/5/2010 - Tuesday 25/5/2010 - Monday 31/5/2010 - Tuesday 1/6/2010 ï‚· Time: the survey took place during the following peak periods: - Morning peak period: 7:00 am to 11:00 am - Afternoon peak period: 3:00 pm – 7:00 pm On each route and during each peak period of each day listed above, two cars were traveling in opposite directions and making two way trips (departure and return). The total number of runs (complete loops) made on the 4 days per route and peak period ranges between 10 (Route 9, PM peak period) and 22 (Route 8, AM and Route 11, PM), as indicated in Table 2.4 below, and the average number of runs for all routes is 16. 32 Table 2.3: Floating Car Survey Detailed Routes Road % Route Name O/D (Direction 1) Main Streets Class Length 26th of July/ 26th July Street 3 3 15th May Cairo-Alex Desert 15th of May Bridge 3 13 1 Travel Road/ 26th of July corridor 2 78 Corridor El-Esaaf Cairo-Alex Desert Road 1 7 Cairo-Suiz Desert Road 2 Ring Road North Interchange/ El-Wahaat Ring Road 2 100 Road Cairo-Suez Desert Road 3 Ring Road South Interchange/ Cairo Alex Ring Road 2 100 Desert Road El Corniche- El-Kablat Str. 4 9 East/ El-Matareya Sqr/ Terat Al-Ismaileya Road 4 16 4 El-Matareya Maadi Corniche Said Salem Str. 4 7 Square Kornish El-Nile Road(East) 4 69 Roud El-Farag Bridge 4 7 Kornish El-Nile Road(West) 4 13 Gamal Abdel Naser(El- Rod El Farag/ Roud El-Farag-Bridge/ 4 16 Nile)Str. 5 El-Remaya Remaya Sqr El-Giza (Sharl De Gol) str. 4 12 Morad Str. 4 3 El-Giza Bridge 4 3 El-Ahram Str. 4 44 Ahmad El-Zomor Str. (El 4 30 Methaq Str.) Cairo-Suez Mobarak Academy Zaker Hussein Str. 4 5 6 Desert for Security (5th El-Tayaran Str. 4 20 Road/El- District)/ El-tayaran Tunnel 4 5 Qallaa El-Qalaa Salah Salem 4 40 El-Nasr Road/Autostrad 4 70 Autostrad/ Autostrad-Thawra Salah Salem 4 19 Giza Square Intersection/Giza Sqr Hassan El-Anwar Str. 4 5 7 El Rawda 4 2 Abbas Bridge 4 2 Al-Ahram Str. 4 2 El-Orouba/ Cairo Int Airport/ El-Orouba Str. 4 54 8 6th of October ElBatal Ahmed 6th of October Bridge 3 46 Bridge AbdElaziz Cairo-Ismaillia Obour City/ Cairo-ismaileya Desert Road 1 30 9 Desert Road/El-Qubba El-Qubba Bridge Gesr El-Suize Str. 4 70 Cairo-Alex Agricultural 1 25 Road(Quesna-Qalyoub Road) Upstream RingRoad Ahmed Helmy Str. 4 34 Cario-Alex Agr Interchange/El-Qubba Ahmed Badawy Str. 4 3 10 Road Bridge El-Qubba Shoubra Str. 4 4 El-Galaa Str. 4 4 Ramsis Str. 4 23 El-Khaleefa El-Ma'moon Str. 4 6 Cairo-Suiz Desert Road 1 71 Cairo-Suiz Desert Road Cairo-Suez Desert El-Thawra Str. 4 10 (Rehab Entrance)/ 11 Road/Ebn-ElHakam Ibn El-Hakam Sqr. El-Nozha Str. 4 6 Square Abo Bakr Al-Sedeeq Str. 4 10 Ibn El-Hakam Str. 4 2 Cairo Traffic Congestion Study. Final report 33 Table 2.4: Number of Runs on Each Route during the Floating Cars Survey No of Runs/Complete Loops Additional Number of Incomplete (departure and return trips were Loops (return trip could not be completed) made in the specified period) Route 1 (AM) 19 5 (PM) 20 4 Route 2 (AM) 13 6 (PM) 11 6 Route 3 (AM) 16 4 (PM) 16 0 Route 4 (AM) 16 3 (PM) 14 3 Route 5 (AM) 19 3 (PM) 19 2 Route 6 (AM) 17 2 (PM) 13 3 Route 7 (AM) 16 1 (PM) 13 5 Route 8 (AM) 22 1 (PM) 14 5 Route 9 (AM) 17 7 (PM) 10 6 Route 10 (AM) 12 3 (PM) 12 2 Route 11 (AM) 21 1 (PM) 22 1 Traffic Counts: ï‚· Data Types: Traffic counts at all observation locations, traffic composition at selected observation locations ï‚· Survey locations: defined in Table 2.5. ï‚· Date: The schedule was determined based on clearances from the Ministry of Interior. The survey was conducted on Monday 05/07/2010, Tuesday 06/07/2010 and Wednesday 07/07/2010. ï‚· Time: Morning peak (7:00 am to 11:00 am) and the afternoon peak period (3:00 pm – 7:00 pm). ï‚· All traffic counts were conducted at normal days during which no local or regional special events were noted. 34 Table 2.5: Traffic Counts Detailed Observation locations Code Description Date of survey P1 Ring Road / Between El Khosoos & Cairo-Alex Agr.Rd Tues - 06 July P2 Gesr El-Suez/between Ring Road and Ainshams Str. Mon - 05 July P3 Suez Desert Road / Between KM 4.5 and Ring Road Tues - 06 July P4 Ring Road / Carrefour El-Maadi Wed - 07 July P5 Ring Road / Above Cairo-Alex Desert Road Wed - 07 July P6 26th July / Between Railway and Ring Road Tues - 06 July P7 Al-Ahram Street / Electricity Station Mon - 05 July P8 Middle Abbas Bridge Mon - 05 July P9 6th October Bridge / Zamalek-Agouza Wed - 07 July P10 Ahmed Helmy Str./ Before Abou Wafya Bridge Mon - 05 July P11 Ramsis Str./Between Ghamra and Ramsis Srq Mon - 05 July P12 Lotfy El-Sayed/between Abaseya&Demerdash Metro stn Mon - 05 July P13 Salah Salem Str./Between Elfangary and Abbaseya Wed - 07 July P14 Kornish El-Nil /Between 15th May & El-Sahel Brdg Tues - 06 July P15 Gamal Abd El-Naser (El-Nile str)/Cornishe El- Agouza Tues - 06 July 2.6 Peak Hours According to the Public-Private Partnership Program for Cairo Urban Toll Expressway Network Development traffic count survey (May 2006), the morning peak (07:00 – 9:00) occurred in 29% of traffic count stations, followed by the afternoon peak (13:00 – 16:00), which accounts for 27%. Moreover, other peak periods exist during the day such as the evening peak (20:00 – 21:00). It is interesting to notice that even the period (10:00 – 12:00) was observed to have the peak traffic volume in some locations (e.g., 15th of May Bridge). The table below classifies peak periods for Cairo based on the results of Public-Private Partnership Program for Cairo Urban Toll Expressway Network Development study (2006): Table 2.6 Traffic peak periods in the Greater Cairo Metropolitan Area Percentage of occurrence in Peak Period traffic count stations Morning 07:00-09:00 29.1 %* 10:00-12:00 21.8 % Afternoon 13:00-16:00 27.3 % 17:00-18:00 9.1 % Evening 20:00-21:00 12.7 % Total 100 % *e.g. the morning peak (07:00 – 9:00) occurred in 29.1% of traffic count stations Cairo Traffic Congestion Study. Final report 35 Given table 2.6, hours between [9:01-9:59], [12:01-12:59], [16:01-16:59], [18:01- 19:59], and [21:01-6:59] won’t be considered as peak hours. 2.7 Traffic Composition in the Corridors Traffic composition is one of the essential characteristics of traffic flow, especially when the need arises to convert the traffic flow from vehicles into passenger car unit (PCU). Fortunately, the manual classified count (MCC) procedure, which was followed in this study, provides the opportunity to identify the share of each vehicle type within the traffic flow per site per direction per hour. The traffic composition consists of twelve vehicle types which are listed below: ï‚· Passenger Car ï‚· Taxi (metered taxi and intercity taxi). ï‚· Microbuses (shared taxi) ï‚· Public Transport minibus ï‚· Public Transport bus ï‚· Private Bus (school bus, company bus, tourist bus, etc.) ï‚· Light commodity vehicle (pickup and vans) ï‚· 2-Axles truck ï‚· 3-Axles truck ï‚· Heavy truck (more than 3-axle, trailer, semi-trailer). ï‚· 2-wheeler (bicycle and motorcycle) ï‚· Others (military, police, ambulance, etc.) 2.8 Modal Split in the Corridors Based on the results of Public-Private Partnership Program For Cairo Urban Toll Expressway Network Development study (2006) and given the diverse mode composition in all eleven corridors, the following pie charts illustrate the modal split for each studied corridor: Corridor 1: 26th of July/15th of May Travel Corridor 36 The share of passenger car is the highest in corridor 1. Corridor 2: Ring Road (Northern segment) The share of public transportation is fairly low in corridor 2. Corridor 3: Ring Road (Southern Segment): Cairo Traffic Congestion Study. Final report 37 The share of passenger car is the highest and the share of public transportation is low in corridor 3. Corridor 4: El Corniche-East/El-Matareya Square The share of passenger car and taxi is almost the same in corridor 4. 38 Corridor 5: Rod El Farag/El-Remaya: The share of microbus (Shared taxi) in quite high in corridor 5. The share of bus services is almost zero in this corridor. Corridor 6: Cairo-Suez Desert Road/El-Qalaa The share of passenger car is the highest in corridor 6. Cairo Traffic Congestion Study. Final report 39 Corridor 7: Autostrad/Giza Square: The share of passenger car is the highest in corridor 7. Corridor 8: El-Orouba/6th of October Bridge The share of passenger car is the highest in corridor 8. The share of freight transport is negligible in corridor 8. The roads between Cairo and 6th of October City and certainly the end of the Ring Road and 26th of July Corridor have small trucks in substantial volumes. These roads are used to transport industrial and agricultural products to the 40 factories and the wholesale market respectively and later on to Cairo and other destinations for final consumption. Corridor 9: Cairo-Ismaillia/El-Qubba: The share of passenger car is the highest in corridor 9. Ismailya Desert Road is characterized by dense truck traffic (over 10,000 PCU per day per direction) that serves four specific areas, namely Oboor City (in particular the wholesale market), 10th of Ramadan City, Ismailya and the Ports of Port Said and Damietta. The effect of truck traffic on the extension inside the Ring Road remains limited, with only Gesr El Suez (extension of the Ismailya Desert road) showing a density above 5,000 PCU per day per direction. Truck density on Ismailya Agriculture Road is below 5,000 PCU per day per direction. Trucks on this road do not cause problems, not even at its extension inside the Ring Road. The effects of heavy trucks can therefore be ignored. Corridor 10: Cario-Alex Agr Road/ El-Qubba Bridge Cairo Traffic Congestion Study. Final report 41 The share of passenger car and Microbus (Shared Taxi) is the same in corridor 10. The Alexandria Agricultural Road is at present the most important truck route. Pick Up trucks and two-axle trucks represent 79% of total trucks while the largest truck type is responsible for only 19% of total volume, going to / coming from Alexandria port and serving the factories (car assembly, glass, cement, etc…) that are located in that Lower Delta region. Up north on Alexandria Agricultural Road, there is a clear separation between heavy and light trucks. While light trucks continue on Alexandria Agricultural Road, heavy trucks predominantly divert to the west towards the road to Belqas, which over its entire length has a share of heavy trucks above 50%. This could indicate that this road is frequently used by heavy trucks as alternative for Alexandria Agricultural Road. But the total number of trucks remains low on this alternative road where capacity is sufficient to accommodate traffic. Corridor 11: Cairo-Suez Desert Road/Ebn-ElHakam Square 42 The share of passenger car is the highest in corridor 11. The share of Trucks is negligible in corridor 11. Truck traffic on this corridor is on average below 10,000 PCU per day per direction but is dominated by heavy trucks, predominantly entering the Ring Road via Suez Desert Road. In addition to trucks coming from Suez port, trucks serving the large number of cement factories along this road generate the high volume of heavy trucks. Contrary to Suez Desert Road, Qatameya Road has a share of heavy trucks that remains below 50% while the density is also between 5,000 and 10,000 PCU per day per direction. The high number of heavy trucks accessing the Ring Road via Suez Desert Road joins traffic of the northern section of the Ring Road, making the stretch between Ismailya Desert Road and Suez Desert Road in terms of heavy trucks the most dense road section of the entire road network. That particular section has a density of over 10,000 PCU per day per direction, of which more than 50% are heavy trucks. Concluding figures above, in most of corridors the share of passenger cars is the highest (Table 2.6 summarizes the figures in the eleven corridors). The average share of passenger cars is approximately estimated 42% for the aforementioned corridors. Moreover, corridors in which the share of public buses is low are usually served by taxies and share taxies instead. The average share of taxies and share taxies is approximately 28% overall. Finally, in corridors 2 (ring road), 9 (Cairo-Ismaillia Desert Road/El-Qubba) and 10 (Cario-Alex Agr Road El-Qubba) the modal share of freight and public transportation (Diesel cars) are higher than that of other corridors. The modal share of freight and public transportation for corridors 2, 9, and 10 is around 60%, 47%, and 53.5% respectively. Cairo Traffic Congestion Study. Final report 43 Table 2.7: Modal split summary in the eleven corridors (by percentage) Corridor Car % Taxi % Microbus % Minibus % Public bus Private bus Pickup % > 3- Axle 2 Axle 3 Axle Motorcycle Other % % % Truck % Truck % Truck % % 1  46.5  25.1  10.2  4.3  1.0  3.1  4.6  0.9  0.1  0.0  3.5  0.1  2  28.8  4.1  14.2  0.2  0.2  2.9  26.1  17.9  0.8  7.8  0.8  0.5  3  59.4  13.0  6.9  0.3  0.2  2.6  8.6  4.8  1.2  1.4  1.1  0.5  4  30.0  29.1  13.1  0.1  3.2  5.7  10.2  3.1  0.2  0.2  3.9  1.1  5  23.9  25.1  28.3  0.0  0.0  0.2  7.5  3.0  0.0  0.0  10.4  1.6  6  39.6  6.5  16.2  0.0  0.3  1.9  10.4  14.2  2.0  8.0  0.4  0.5  7  49.5  19.0  11.7  2.3  4.3  2.9  6.4  2.1  0.1  0.2  0.9  0.7  8  67.8  17.0  4.3  0.4  1.1  1.8  3.4  1.5  0.8  0.0  1.7  0.1  9  44.0  4.0  13.0  0.0  2.0  3.0  15.0  14.0  2.0  3.0  0.0  0.0  10  28.1  3.2  26.1  2.3  2.2  5.1  14.6  11.3  1.7  4.3  0.9  0.2  11  61.8  11.4  7.5  1.7  1.1  4.5  6.8  2.6  0.7  0.3  1.1  0.6  44 Table 2.8 summarizes the percentage of traffic volumes during peak period. As the table shows, the percentages range from 46% in corridor 4 to 72% in corridors 1. Table 2.8: The percentage of traffic volumes in peak hours Corridor Count Site Direction  % of traffic volumes in the peak period Cairo  68%  1  15th of May Bridge  Giza  68%  Qalyobeya  55%  2  Warraq Bridge  Giza  50%  Cairo  60%  3  Moneeb Bridge  Giza  60%  Mataria Sq.  50%  4  Kablat St.  Ismailia Canal  46%  Cairo  50%  5  Imbaba Bridge  Giza  50%  Cairo Airport  50%  6  Autostrade  Helwan  50%  Cairo Airport  69%  7  Nasr Road  Helwan  65%  Cairo  60%  8  6th of October Bridge  Giza  65%  Ismailia  51%  9  Ismailia Desert Road  Cairo  58%  Alexandria  72%  10  Alex. Agriculture Road  Cairo  56%  Suez  47%  11  Suez Desert Road     Cairo  51%  2.9 Daily Traffic Volume Table 2.8 summarizes the traffic counts including 16 hours, 24 hours, and 24 hours PCU for the eleven corridors in 2005 according to the JICA study of (Cairo Urban Toll Expressway Network Development) conducted traffic surveys at 28 locations within the GCR. Traffic counts as well as classification data were collected at the 28 locations, for both travel directions, for 16 hrs. The JICA counts have been matched with the defined corridors by the consortium. Table 2.9 summarizes the estimated traffic counts for 2010 using growth rate factors for the period 2005-2010 as provided in the JICA report. For the sake of comparison among different traffic volumes with different traffic compositions, it is preferable to convert the unit of traffic volume from vehicle to passenger car unit (PCU) by applying passenger car equivalencies. The gross-up factors of expanding the traffic volume from 16-hour count into 24-hour volume and passenger car equivalencies (PCE) are given in table 2.5 and are Cairo Traffic Congestion Study. Final report 45 derived from the JICA study of (Cairo Urban Toll Expressway Network Development). These factors were applied to the total observed traffic counts in 2005 to estimate the traffic volume expressed in PCU per day. 46 Table 2.9: Traffic counts in the eleven corridors (2005) Corridor Count Site  Direction  16 Hour Count (2005)  Total  24â€? Hour vehicles (2005)  24â€?Hour PCU (2005)  ADT (2005)  Growth rate PCU (%)  Cairo  47456  63793  1  15th of May Bridge  118548  141847  159359  2.6  Giza  71092  95566  Qalyobeya  24820  44899  2  Warraq Bridge  45992  56161  83198  5.5  Giza  21172  38299  Cairo  43707  61122  3  Moneeb Bridge  104066  125381  145532  16.9  Giza  60359  84410  Mataria Sq.  12214  17208  4  Kablat St.  22565  26991  31791  2.4  Ismailia Canal  10351  14583  Cairo  8500  11276  5  Imbaba Bridge  21574  25898  28619  3.9  Giza  13074  17343  Cairo Airport  14445  26034  6  Autostrade  32579  39984  58716  2.9  Helwan  18134  32682  Cairo Airport  92674  131724  7  Nasr Road  169714  202874  241226  3.1  Helwan  77040  109502  Cairo  144986  183790  8  6th of October Bridge  259798  311933  329331  6.0  Giza  114812  145541  Ismailia  38960  64020  9  Ismailia Desert Road  79534  95907  130693  1.0  Cairo  40574  66673  Alexandria  43959  77950  10  Alex. Agriculture Road  89080  107287  157960  0.6  Cairo  45121  80010  Suez  27525  37815  11  Suez Desert Road   51872  62032  71264  2.4  Cairo  24347  33449  Cairo Traffic Congestion Study. Final report 47 Table 2.10: Traffic counts in the eleven corridors (estimated for 2010) Peak Periods ADT (PCU) 2010 Peak Periods ADT (NON PCU) 2010 Corridor Count Site Direction  24- Hour vehicles (NON PCU) (2010) ADT (PCU) (2010) (total peak hours) (total peak hours) Cairo  64559  72529  49342  43920  1  15th of May Bridge  Giza  96713  108653  73884  65765  Qalyobeya  39611  58681  32558  21978  2  Warraq Bridge  Giza  33789  50056  24822  16755  Cairo  114960  133436  80062  68976  3  Moneeb Bridge  Giza  158759  184274  110564  95255  Mataria Sq.  16449  19374  9723  8255  4  Kablat St.  Ismailia Canal  13940  16419  7539  6401  Cairo  12355  13653  6826  6177  5  Imbaba Bridge  Giza  19003  21000  10500  9501  Cairo Airport  20452  30034  14872  10128  6  Autostrade  Helwan  25676  37704  18852  12838  Cairo Airport  129051  153447  105830  89004  7  Nasr Road  Helwan  107280  127560  82498  69382  Cairo  232960  245953  148388  140548  8  6th of October Bridge  Giza  184477  194766  127295  120570  Ismailia  49377  67286  34382  25231  9  Ismailia Desert Road  Cairo  51422  70074  40556  29762  Alexandria  54551  80316  57964  39369  10  Alex. Agriculture Road  Cairo  55993  82440  46325  31464  Suez  37060  42576  20139  17530  11  Suez Desert Road     Cairo  32781  37660  19134  16655  48 2.10 Traffic Survey Results Summary sheets for the non-classified and classified vehicle counts conducted on the 5th, 6th and 7th of July 2010 are included in Annex 6 and Annex 7 respectively. Counts were taken at 15 minute intervals during the following times and periods: ï‚· 7:00 to 11:00 - AM ï‚· 3:00 to 7:00 - PM Figure 2.12: Traffic counts observation locations Tables 2.9 and 2.10 indicate the average traffic volumes recorded on each location in the AM and PM periods respectively, while Figures 2.13 through 2.27 indicate the traffic volumes recorded for each 15 minute interval during the AM and PM survey periods. It appears that the highest peak during the morning period occurs from 8 to 9 at most traffic counts locations. On the other hand, volumes are comparable in the different afternoon hours and there does not seem to be any specific peaking pattern. Cairo Traffic Congestion Study. Final report 49 Table 2.11: Traffic Survey Results- AM Traffic Traffic Count Count Traffic Count Number & Road Name Direction Direction 1 2 (veh/hr) (veh/hr) P1  Ring Road / Between El Khosoos & Cairoâ€?Alex Agr.Rd  3299  3212  P2  Gesr Elâ€?Suez/between Ring Road and Ainshams Str.  5708  2766  P3  Suez Desert Road / Between KM 4.5 and Ring Road  3051  1890  P4  Ring Road / Carfour Al Maadi  6969  6716  P5  Ring Road / Above Cairoâ€?Alex Desert Road  3418  2981  P6  26th July / Between Railway and Ring Road  4389  2398  P7  Alâ€?Ahram Street / Electricity Station  2242  2813  P8  Middle of Abbas Bridge  1512  2022  P9  6 October Bridge between Zamalk and Agozah  7400  7154  P10  Ahmed Helmy Str./ Before Abo Wafya Bridge  651  497  P11  Ramses St. between Ghmara and Ahmed Said St. (One Way to Abasia)  4244    P12  Lotifi Al Said St. between Abasia and Ghamrah (One Way to Ramses Square)  4093    P13  Salah Salem Str./Between Elfangary and Abbasey  3873  3600  P14  Cornish Elâ€?Nil /Between 15th May & Elâ€?Sahel Bridge  2535  4016  P15  Gamal Abd Elâ€?Naser (Elâ€?Nile St.)/Kornish al Agouza  4058  3000  Table 2.12: Traffic Survey Results-PM Traffic Traffic Count Count Traffic Count Number & Road Name Direction Direction 1 2 (veh/hr) (veh/hr) P1  Ring Road / Between El Khosoos & Cairoâ€?Alex Agr.Rd  2968  2985  P2  Gesr Elâ€?Suez/between Ring Road and Ainshams Str.  5532  2821  P3  Suez Desert Road / Between KM 4.5 and Ring Road  3996  2009  P4  Ring Road / Carfour Al Maadi  7821  9605  P5  Ring Road / Above Cairoâ€?Alex Desert Road  2765  2958  P6  26th July / Between Railway and Ring Road  3323  2499  P7  Alâ€?Ahram Street / Electricity Station  3267  2318  P8  Middle of Abbas Bridge  1765  2464  P9  6 October Bridge between Zamalk and Agozah  5695  3197  P10  Ahmed Helmy Str./ Before Abo Wafya Bridge  606  726  P11  Ramses St. between Ghmara and Ahmed Said St. (One Way to Abasia)  4448    P12  Lotifi Al Said St. between Abasia and Ghamrah (One Way to Ramses Square)  4111    P13  Salah Salem Str./Between Elfangary and Abbasey  3773  5454  P14  Cornish Elâ€?Nil /Between 15th May & Elâ€?Sahel Bridge  3460  3249  P15  Gamal Abd Elâ€?Naser (Elâ€?Nile St.)/Kornish al Agouza  3513  4192  50 Volume (Veh/ 15 min) Volume (Veh/ 15 min) 1,000 1,200 1,400 1,600 1,800 2,000 0 200 400 600 800 1,000 0 100 200 300 400 500 600 700 800 900 7:00 - 7.15 7:00 - 7.15 7:15 - 7:30 7:15 - 7:30 7:30 - 7:45 7:30 - 7:45 7:45 - 8:00 7:45 - 8:00 Cairo Traffic Congestion Study. Final report 8:00 - 8:15 8:00 - 8:15 8:15 - 8:30 8:15 - 8:30 8:30 - 8:45 8:30 - 8:45 8:45 - 9:00 8:45 - 9:00 9:00 - 9:15 9:00 - 9:15 9:15 - 9:30 9:15 - 9:30 9:30 - 9:45 9:30 - 9:45 9:45 - 10;00 9:45 - 10;00 10:00 - 10:15 10:00 - 10:15 10.15 - 10.30 10.15 - 10.30 10.30 - 10.45 10.30 - 10.45 10.45 - 11.00 10.45 - 11.00 51 3.00 - 3.15 3.00 - 3.15 Time of the Day Time of the Day 3.15 - 3.30 3.15 - 3.30 3.30 - 3.45 3.30 - 3.45 3.45 - 4.00 3.45 - 4.00 4.00 - 4.15 4.00 - 4.15 Figure 2.13: P1 - Ring Road / Between El Khosoos & Cairo-Alex Agr.Rd 4.15 - 4.30 4.15 - 4.30 4.30 - 4.45 4.30 - 4.45 4.45 - 5.00 4.45 - 5.00 5.00 - 5.15 5.00 - 5.15 5.15 - 5.30 5.15 - 5.30 5.30 - 5.45 5.30 - 5.45 5.45 - 6.00 5.45 - 6.00 6.00 - 6.15 6.00 - 6.15 6.15 - 6.30 6.15 - 6.30 6.30 - 6.45 6.30 - 6.45 6.45 - 7.00 6.45 - 7.00 Volume (Veh/ 15 min) 0 200 400 600 800 1000 1200 7:00 - 7.15 1400 7:15 - 7:30 7:30 - 7:45 7:45 - 8:00 8:00 - 8:15 8:15 - 8:30 8:30 - 8:45 8:45 - 9:00 9:00 - 9:15 9:15 - 9:30 9:30 - 9:45 9:45 - 10;00 10:00 - 10:15 10.15 - 10.30 10.30 - 10.45 10.45 - 11.00 52 3.00 - 3.15 Time of the Day 3.15 - 3.30 3.30 - 3.45 3.45 - 4.00 Figure 2.15: P3 – Suez Desert Road / Between KM 4.5 and Ring 4.00 - 4.15 4.15 - 4.30 Figure 2.14: P2 – Gesr El-Suez/between Ring Road and Ainshams Street 4.30 - 4.45 4.45 - 5.00 5.00 - 5.15 5.15 - 5.30 5.30 - 5.45 5.45 - 6.00 6.00 - 6.15 6.15 - 6.30 6.30 - 6.45 6.45 - 7.00 Volume (Veh/ 15 min) 1,000 1,500 2,000 2,500 3,000 0 500 Volume (Veh/ 15 min) 7:00 - 7.15 1,000 0 100 200 300 400 500 600 700 800 900 7:15 - 7:30 7:00 - 7.15 7:30 - 7:45 7:15 - 7:30 7:45 - 8:00 7:30 - 7:45 7:45 - 8:00 8:00 - 8:15 Cairo Traffic Congestion Study. Final report 8:15 - 8:30 8:00 - 8:15 8:30 - 8:45 8:15 - 8:30 8:45 - 9:00 8:30 - 8:45 8:45 - 9:00 9:00 - 9:15 9:15 - 9:30 9:00 - 9:15 9:30 - 9:45 9:15 - 9:30 9:45 - 10;00 9:30 - 9:45 9:45 - 10;00 10:00 - 10:15 10.15 - 10.30 10:00 - 10:15 10.30 - 10.45 10.15 - 10.30 10.45 - 11.00 10.30 - 10.45 10.45 - 11.00 53 3.00 - 3.15 Time of the Day 3.15 - 3.30 3.00 - 3.15 3.30 - 3.45 Time of the Day 3.15 - 3.30 3.45 - 4.00 3.30 - 3.45 3.45 - 4.00 4.00 - 4.15 4.15 - 4.30 4.00 - 4.15 4.30 - 4.45 Figure 2.16: P4 – Suez Desert Road / Between KM 4.5 and Ring Road 4.15 - 4.30 4.45 - 5.00 4.30 - 4.45 4.45 - 5.00 5.00 - 5.15 5.15 - 5.30 5.00 - 5.15 5.30 - 5.45 5.15 - 5.30 5.45 - 6.00 5.30 - 5.45 5.45 - 6.00 6.00 - 6.15 6.15 - 6.30 6.00 - 6.15 6.30 - 6.45 6.15 - 6.30 6.45 - 7.00 6.30 - 6.45 6.45 - 7.00 Volume (Veh/ 15 min) 1,000 1,200 1,400 0 200 400 600 800 7:00 - 7.15 7:15 - 7:30 7:30 - 7:45 7:45 - 8:00 8:00 - 8:15 8:15 - 8:30 8:30 - 8:45 8:45 - 9:00 9:00 - 9:15 9:15 - 9:30 9:30 - 9:45 9:45 - 10;00 10:00 - 10:15 10.15 - 10.30 10.30 - 10.45 10.45 - 11.00 54 3.00 - 3.15 Time of the Day 3.15 - 3.30 3.30 - 3.45 3.45 - 4.00 Figure 2.17: P5 – Ring Road / Above Cairo-Alex Desert Road Figure 2.18: P6 – 26th July / Between Railway and Ring Road 4.00 - 4.15 4.15 - 4.30 4.30 - 4.45 4.45 - 5.00 5.00 - 5.15 5.15 - 5.30 5.30 - 5.45 5.45 - 6.00 6.00 - 6.15 6.15 - 6.30 6.30 - 6.45 6.45 - 7.00 Volume (Veh/ 15 min) Volume (Veh/ 15 min) 1,000 0 100 200 300 400 500 600 0 100 200 300 400 500 600 700 800 900 7:00 - 7.15 7:00 - 7.15 7:15 - 7:30 7:15 - 7:30 7:30 - 7:45 7:30 - 7:45 7:45 - 8:00 7:45 - 8:00 Cairo Traffic Congestion Study. Final report 8:00 - 8:15 8:00 - 8:15 8:15 - 8:30 8:15 - 8:30 8:30 - 8:45 8:30 - 8:45 8:45 - 9:00 8:45 - 9:00 9:00 - 9:15 9:00 - 9:15 9:15 - 9:30 9:15 - 9:30 9:30 - 9:45 9:30 - 9:45 9:45 - 10;00 9:45 - 10;00 10:00 - 10:15 10:00 - 10:15 10.15 - 10.30 10.15 - 10.30 10.30 - 10.45 10.30 - 10.45 10.45 - 11.00 10.45 - 11.00 55 3.00 - 3.15 3.00 - 3.15 Time of the Day Time of the Day 3.15 - 3.30 3.15 - 3.30 3.30 - 3.45 3.30 - 3.45 3.45 - 4.00 3.45 - 4.00 Figure 2.19: P7 – Al-Ahram Street / Electricity Station 4.00 - 4.15 4.00 - 4.15 4.15 - 4.30 4.15 - 4.30 4.30 - 4.45 4.30 - 4.45 4.45 - 5.00 4.45 - 5.00 5.00 - 5.15 5.00 - 5.15 5.15 - 5.30 5.15 - 5.30 5.30 - 5.45 5.30 - 5.45 5.45 - 6.00 5.45 - 6.00 6.00 - 6.15 6.00 - 6.15 6.15 - 6.30 6.15 - 6.30 6.30 - 6.45 6.30 - 6.45 6.45 - 7.00 6.45 - 7.00 Volume (Veh/ 15 min) 1,000 1,500 2,000 2,500 3,000 3,500 0 500 7:00 - 7.15 7:15 - 7:30 7:30 - 7:45 7:45 - 8:00 8:00 - 8:15 8:15 - 8:30 8:30 - 8:45 8:45 - 9:00 9:00 - 9:15 9:15 - 9:30 9:30 - 9:45 9:45 - 10;00 10:00 - 10:15 10.15 - 10.30 10.30 - 10.45 10.45 - 11.00 56 3.00 - 3.15 Time of the Day 3.15 - 3.30 3.30 - 3.45 Figure 2.20: P8 - Middle of Abbas Bridge 3.45 - 4.00 4.00 - 4.15 Figure 2.21: P9 - 6 October Bridge between Zamalk and Agozah 4.15 - 4.30 4.30 - 4.45 4.45 - 5.00 5.00 - 5.15 5.15 - 5.30 5.30 - 5.45 5.45 - 6.00 6.00 - 6.15 6.15 - 6.30 6.30 - 6.45 6.45 - 7.00 Volume (Veh/ 15 min) Volume (Veh/ 15 min) 1,000 1,200 1,400 0 200 400 600 800 0 50 100 150 200 250 300 7:00 - 7.15 7:00 - 7.15 7:15 - 7:30 7:15 - 7:30 7:30 - 7:45 7:30 - 7:45 7:45 - 8:00 7:45 - 8:00 Cairo Traffic Congestion Study. Final report 8:00 - 8:15 8:00 - 8:15 8:15 - 8:30 8:15 - 8:30 8:30 - 8:45 8:30 - 8:45 8:45 - 9:00 8:45 - 9:00 9:00 - 9:15 9:00 - 9:15 9:15 - 9:30 9:15 - 9:30 9:30 - 9:45 9:30 - 9:45 9:45 - 10;00 9:45 - 10;00 10:00 - 10:15 10:00 - 10:15 10.15 - 10.30 10.15 - 10.30 10.30 - 10.45 10.30 - 10.45 10.45 - 11.00 10.45 - 11.00 57 3.00 - 3.15 3.00 - 3.15 Time of the Day 3.15 - 3.30 Time of the Day 3.15 - 3.30 3.30 - 3.45 3.30 - 3.45 3.45 - 4.00 3.45 - 4.00 4.00 - 4.15 4.00 - 4.15 Figure 2.22: P10 - Ahmed Helmy Str./ Before Abou Wafya Bridge 4.15 - 4.30 4.15 - 4.30 4.30 - 4.45 4.30 - 4.45 4.45 - 5.00 4.45 - 5.00 5.00 - 5.15 5.00 - 5.15 5.15 - 5.30 5.15 - 5.30 5.30 - 5.45 5.30 - 5.45 5.45 - 6.00 5.45 - 6.00 6.00 - 6.15 6.00 - 6.15 6.15 - 6.30 6.15 - 6.30 6.30 - 6.45 6.30 - 6.45 6.45 - 7.00 6.45 - 7.00 Volume (Veh/ 15 min) Volume (Veh/ 15 min) 1,000 1,200 1,400 1,600 0 0 200 400 600 800 1000 1200 1400 1600 200 400 600 800 7:00 - 7.15 7:00 - 7.15 7:15 - 7:30 7:15 - 7:30 7:30 - 7:45 7:30 - 7:45 7:45 - 8:00 7:45 - 8:00 8:00 - 8:15 8:00 - 8:15 8:15 - 8:30 8:15 - 8:30 8:30 - 8:45 8:30 - 8:45 8:45 - 9:00 8:45 - 9:00 9:00 - 9:15 9:00 - 9:15 9:15 - 9:30 9:15 - 9:30 9:30 - 9:45 9:30 - 9:45 9:45 - 10;00 9:45 - 10;00 10:00 - 10:15 10:00 - 10:15 10.15 - 10.30 10.15 - 10.30 10.30 - 10.45 10.30 - 10.45 10.45 - 11.00 10.45 - 11.00 58 3.00 - 3.15 3.00 - 3.15 Time of the Day Time of the Day 3.15 - 3.30 3.15 - 3.30 3.30 - 3.45 3.30 - 3.45 3.45 - 4.00 3.45 - 4.00 4.00 - 4.15 4.00 - 4.15 4.15 - 4.30 4.15 - 4.30 4.30 - 4.45 4.30 - 4.45 4.45 - 5.00 4.45 - 5.00 Figure 2.23: P11 – Ramses St. between Ghmara and Ahmed Said St. (One Way to Abasia) Figure 2.24: P12 - Lotifi Al Said St. between Abasia and Ghamrah (One Way to Ramses Square) 5.00 - 5.15 5.00 - 5.15 5.15 - 5.30 5.15 - 5.30 5.30 - 5.45 5.30 - 5.45 5.45 - 6.00 5.45 - 6.00 6.00 - 6.15 6.00 - 6.15 6.15 - 6.30 6.15 - 6.30 6.30 - 6.45 6.30 - 6.45 6.45 - 7.00 6.45 - 7.00 Volume (Veh/ 15 min) Volume (Veh/ 15 min) 1,000 1,200 1,400 0 200 400 600 800 1,000 1,200 1,400 1,600 0 200 400 600 800 7:00 - 7.15 7:00 - 7.15 7:15 - 7:30 7:15 - 7:30 7:30 - 7:45 7:30 - 7:45 7:45 - 8:00 7:45 - 8:00 Cairo Traffic Congestion Study. Final report 8:00 - 8:15 8:00 - 8:15 8:15 - 8:30 8:15 - 8:30 8:30 - 8:45 8:30 - 8:45 8:45 - 9:00 8:45 - 9:00 9:00 - 9:15 9:00 - 9:15 9:15 - 9:30 9:15 - 9:30 9:30 - 9:45 9:30 - 9:45 9:45 - 10;00 9:45 - 10;00 10:00 - 10:15 10:00 - 10:15 10.15 - 10.30 10.15 - 10.30 10.30 - 10.45 10.30 - 10.45 10.45 - 11.00 10.45 - 11.00 59 3.00 - 3.15 3.00 - 3.15 Time of the Day 3.15 - 3.30 Time of the Day 3.15 - 3.30 3.30 - 3.45 3.30 - 3.45 3.45 - 4.00 3.45 - 4.00 4.00 - 4.15 4.00 - 4.15 4.15 - 4.30 Figure 2.25: P13 - Salah Salem Str./Between Elfangary and Abbasey Figure 2.26: P14 – Kornish El-Nil /Between 15th May & El-Sahel Brdg 4.15 - 4.30 4.30 - 4.45 4.30 - 4.45 4.45 - 5.00 4.45 - 5.00 5.00 - 5.15 5.00 - 5.15 5.15 - 5.30 5.15 - 5.30 5.30 - 5.45 5.30 - 5.45 5.45 - 6.00 5.45 - 6.00 6.00 - 6.15 6.00 - 6.15 6.15 - 6.30 6.15 - 6.30 6.30 - 6.45 6.30 - 6.45 6.45 - 7.00 6.45 - 7.00 Figure 2.27: P15 – Gamal Abd El-Naser (El-Nile str)/Cornishe El- Agouza 60 Cairo Traffic Congestion Study. Final report 61 Classified vehicle counts were performed on locations of P3 (Suez Desert Road / Between KM 4.5 and Ring Road) and P13 (Salah Salem Str./Between Elfangary and Abbaseya), while vehicle counts on the remaining locations were non-classified. Figure 2.28 below gives some indication about the modal split on the roads in Greater Cairo based on the classified vehicle counts performed on locations P3 and P13. It appears that road traffic is dominated by private cars with a share of 70%, followed by taxis with 15% share, then the microbuses and minibuses with 7%, while the big buses make up only 1% of the traffic. Small trucks and heavy trucks constitute 5% and 2% of road traffic respectively. 51 188 61 1% 5% 2% 247 7% Private  Car Taxi Microbus & Minibus Big Bus Small Truck 503 Heavy Truck 15% 2405 70% Figure 2.28: Modal Split according to the Classified Vehicle Counts 2.11 Trend Analysis of Travel Characteristics (2005-2010) 2.11.1 Changes in Modal Split As mentioned in Section 2.10 of this Report classified vehicle counts at the following two locations have been carried out: ï‚· P3: Suez Desert Road / Between KM 4.5 and Ring Road ï‚· P13: Salah Salem Street/Between Elfangary and Abbasia The resulting modal distributions are compared with those of the “Public-Private Partnership Program for Cairo Urban Toll Expressway Network Developmentâ€? study at the same locations, based on a survey conducted in 2005. For the sake of comparison, the compositions related to the following modes were considered equivalent: 62 2  3  > 3  Private  Public  Private  2005  Taxi  Microbus  Minibus  Pickup  Axle  Axle  Axle  Car  bus  bus  Truck  Truck  Truck  Private  Microbus and  2010  Taxi  Big Bus  Small Truck  Heavy Truck  Car  Minibus  The modal splits at Suez Desert Road are illustrated in the following pie charts: Figure 2.29: Modal Split according to 2005 Survey on Suez Desert Road Cairo Traffic Congestion Study. Final report 63 Figure 2.30: Modal Split according to 2010 Survey on Suez Desert Road (P3) A moderate decrease is observed in the share of passenger cars (around 4%), which continues to be the highest among other transport modes share in 2010. The taxi use seems to have slightly increased by 0.3% while the use of microbuses and minibuses has increased by 3.6%. The big bus share however has decreased from 6% to 1.2%, which could be due to some shift to taxi, microbus and minibus throughout the past 5 years. The shares of small and heavy trucks have increased by 3.7% and 3.1% respectively. The modal splits at Salah Salem Street are illustrated in the following pie charts: Figure 2.31: Modal Split according to 2005 Survey on Salah Salem Street 64 Figure 2.32: Modal Split according to 2010 Survey on Salah Salem Street (P13) Differently from the results shown on the above-mentioned location, the private car share on Salah Salem Street was originally around 50% in 2005, compared to 75% on Suez Desert Road. Yet this share increased to 69% in 2010, implying the persistence of the undesirable situation of car dominance. The taxi share increased notably from 16% in 2005 to 23% in 2010. However, the overall bus utilization including microbus, minibus and the big bus, has dropped significantly by around 11% at this location. The construction of a new metro station is taking place in this area, which could have caused a temporary change in bus routes. While the share of small trucks decreased unaccountably by some 10%, the number of heavy trucks almost doubled. Finally, if we compare the overall modal split charts, on one hand the average modal composition based a survey of 11 corridors in 20054 and on the other hand the one based on the classified vehicle counts performed in 2010, it may be concluded that: - The share of passenger cars is not only the highest but in a continuous increase - The taxi share increased by less than 1.5% - The overall microbus and minibus share almost doubled - The big bus share dropped by more than 3% - The number of small trucks decreased by around 6%, - The number of heavy trucks decreased by around 7% The decrease in the number of trucks could be a result of banning them from using most of the city roads during working hours. 4 Public-Private Partnership Program For Cairo Urban Toll Expressway Network Development study Cairo Traffic Congestion Study. Final report 65 Figure 2.33: Average Modal Split – 2005 51 188 61 1% 5% 2% 247 7% Private  Car Taxi Microbus & Minibus Big Bus Small Truck 503 Heavy Truck 15% 2405 70% Figure 2.34: Modal Split - 2010 2.11.2 Changes in Traffic Patterns To develop an idea about the changes in traffic patterns in the past 5 years, the following two data sources were compared: a. 2005 data, as per the survey in the JICA Study (Cairo Urban Toll Expressway Network Development), presented in Table 2.9 b. 2010 data obtained from the survey of Cairo Congestion Study, and presented in Tables 2.11 and 2.12. 66 In order to compare the results of 2005 and 2010 surveys, the following common traffic counts locations were identified: Table 2.13: Comparable Traffic Count Locations Traffic Count Location Traffic Count Location Code (WB Study-2010) (JICA Study-2005) P1  Ring Road / Between El Khosoos & Cairoâ€?Alex Agr.Rd  Warraq Bridge (TC no.1)*  P2  Gesr Elâ€?Suez/between Ring Road and Ainshams Str.  Gesr El Suez St (TC no.18)  P3  Suez Desert Road / Between KM 4.5 and Ring Road  Suez Desert Road (TC no.12)  P6  26th July / Between Railway and Ring Road  26th of July Corridor (TC no.11)  P8  Middle Abbas Bridge  Giza Bridge (TC no.8)  P9  6th October Bridge / Zamalekâ€?Agouza  6th October Bridge (TC no.5)  P10  Ahmed Helmy Str./ Before Abou Wafya Bridge  Ahmed Helmy (TC no.24)  P11  Ramsis Str./Between Ghamra and Ramsis Srq  Ramsis St (TC no.25)  Lotfy Elâ€?Sayed/between Abaseya&Demerdash Metro  P12  Lotfy El sayed (TC no.22)  stn  P13  Salah Salem Str./Between Elfangary and Abbaseya  Salah Salem Road (TC no.26)  * locations are not exactly similar but volumes maybe comparable Based on the above, the average traffic volumes per direction were compared at each location for the same peak periods (7:00 to 11:00 AM and 3:00 to 7:00 PM) as shown in the following tables. Table 2.14: Comparison between 2005 and 2010 Traffic Count Surveys Data: Average Traffic Volumes per Direction for the AM Peak Period (7:00 to 11:00) 2010 2005 Percent Traffic Count Number & Road Name Direction (veh/hr) (veh/hr) Difference Ring Road / Between El Khosoos  To East Cairo  3,299  1,674  97%  P1  & Cairoâ€?Alex Agr.Rd  To West Cairo  3,212  1,271  153%  Gesr Elâ€?Suez/between Ring Road  To CBD  5,708  1,576  262%  P2  and Ainshams Str.  To Ismailia  2,766  1,952  42%  Suez Desert Road / Between KM  To Cairo  3,051  1,204  154%  P3  4.5 and Ring Road  To Suez  1,890  1,314  44%  26th July / Between Railway and  To Cairo  4,389  3,562  23%  P6  Ring Road  To 6th Oct City  2,398  2,812  â€?15%  To Cairo  1,512  2,328  â€?35%  P8  Middle of Abbas Bridge  To Giza  2,022  2,452  â€?18%  6 October Bridge between  To Al Mohandeseen &Al Doki  7,400  6,346  17%  P9  Zamalk and Agozah  To Cairoâ€?Alx Agr Rd  7,154  11,823  â€?39%  Ahmed Helmy Str./ Before Abo  To Shobra  651  733  â€?11%  P10  Wafya Bridge  To Ramsis  497  1,616  â€?69%  Ramses St. between Ghmara and  P11  To Abasiah (1 way)  4,244  1,772  139%  Ahmed Said St. (One Way to  Cairo Traffic Congestion Study. Final report 67 Abasia)  Lotifi Al Said St. between Abasia  P12  and Ghamrah (One Way to  To Ramses Sq (1 way)  4,093  3,696  11%  Ramses Square)  Salah Salem Str./Between  To Abasiah  3,873  3,367  15%  P13  Elfangary and Abbasey  To Cairo Airport  3,600  2,399  50%    Table 2.15: Comparison between 2005 and 2010 Traffic Count Surveys Data: Average Traffic Volumes per Direction for the PM Peak Period (3:00 to 7:00) 2010 2005 Percent Traffic Count Number & Road Name Direction (veh/hr) (veh/hr) Difference Ring Road / Between El  To East Cairo  2,968  1,381  115%  P1  Khosoos & Cairoâ€?Alex Agr.Rd  To West Cairo  2,985  2,049  46%  Gesr Elâ€?Suez/between Ring  To CBD  5,532  2,566  116%  P2  Road and Ainshams Str.  To Ismailia  2,821  2,455  15%  Suez Desert Road / Between  To Cairo  3,996  1,250  220%  P3  KM 4.5 and Ring Road  To Suez  2,009  1,270  58%  26th July / Between Railway  To Cairo  3,323  3,177  5%  P6  and Ring Road  To 6th Oct City  2,499  2,252  11%  To Cairo  1,765  2,723  â€?35%  P8  Middle of Abbas Bridge  To Giza  2,464  2,977  â€?17%  6 October Bridge between  To Al Mohandeseen and Al Doki  5,695  6,860  â€?17%  P9  Zamalk and Agozah  To Cairoâ€?Alx Agr Rd  3,197  8,426  â€?62%  Ahmed Helmy Str./ Before Abo  To Shobra  606  1,143  â€?47%  P10  Wafya Bridge  To Ramsis  726  1,055  â€?31%  Ramses St. between Ghmara  P11  and Ahmed Said St. (One Way  To Abasiah (1 way)  4,448  2,562  74%  to Abasia)  Lotifi Al Said St. between  P12  Abasia and Ghamrah (One Way  To Ramses Sq (1 way)  4,111  2,937  40%  to Ramses Square)  Salah Salem Str./Between  To Abasiah  3,773  2,484  52%  P13  Elfangary and Abbasey  To Cairo Airport  5,454  3,416  60%  Most of the changes in traffic patterns can be attributed to variants in terms of transport demand and supply and land use characteristics within the last 5 years. The following major changes were identified in the GCMA: 1. Population growth in new cities on the peripheral areas of the Ring Road (6th of October, El Obour, El Rehab, etc). However, many of the new settlers still work in the CBD, implying the central area surrounded by the Ring Road. 2. With many residents leaving the central area to the GCMA periphery, an expansion in commercial and business activities is observed in certain areas such 68 as El-Mohandeseen and El Doki. The use of many residential facilities has been transformed into commercial and/or business, resulting in an extended CBD. The changes in demand and land use mentioned in points 1 and 2 explain some of the observed increase in traffic volumes during the AM peak (to work trips) on the corridors leading to the extended CBD such as (26th of July in the direction to Lebanon square). Consequently there is an increase in the PM peak going out form the extended CBD. 3. A major change in supply has been perceived with the opening of the new Maryottya corridor that connects El Moneeb Bridge and the Ring Road. The new corridor has attracted a large portion of traffic going from/to the south (El Maadi and Helwan) and east areas (Nasr city) to/from the west area (6th of October City and Cairo/Alexandria Desert Road). This major supply change caused the reduction in traffic volumes along major routing alternatives such as (Abbas Bridge, 6th of October Bridge, etc). 4. Upgrading El Khalafaway corridor (north of Shobra and Ein Shams areas) into a limited access travel corridor. This corridor currently attracts traffic from surrounding areas; reducing their traffic load. The corridor also facilitates access to the north/west sections of the Ring Road in the vicinity of Cairo/Alexandria Agricultural Road. 5. A remarkable increase in car ownership in GCMA. With reference to Table 2.14, it is clear that traffic in the AM period has increased remarkably on most traffic count locations including: - The Ring Road, Between El Khosoos and Cairo Alex Agricultural Road in both directions. Such increase may have resulted from the changes identified in points 1, 4 and 5 described above.Gesr El Suez, between Ring Road and Ain Shams Street in both directions (points 1, 4, 5) - Suez Desert Road, between KM 4.5 and Ring Road in both directions (points 1 and 5) - 26th July Corridor, between Railway and Ring Road in the direction of Central Cairo (points 1, 2 and 5) - 6th October Bridge in the direction of Al Mohandeseen and Al Doki (points 2 and 5) - Ramses St. between Ghmara and Ahmed Said Street, in the direction to Abasia (points 2 and 5) - Lotifi Al Said Street between Abasia and Ghamrah, in the direction to Ramses Square (points 2 and 5) - Salah Salem Street, between Elfangary and Abbasey in both directions (points 2 and 5) On the other hand, traffic has decreased on the following links: - Abbas Bridge in both directions (attributed to the change identified in point 3) - 6th October Bridge in the direction of Cairo-Alexandria Agricultural Road (points 3 and 4) Cairo Traffic Congestion Study. Final report 69 - Ahmed Helmy Street in both directions (attributed to the change identified in point 4, in addition that only one-way movement of traffic is currently allowed one a large segment of Ahmed Helmy street) - 26th July Corridor in the direction of 6th October City (points 1, 2 and 3) As seen in Table 2.15 above, the differences in traffic volumes in the PM period are generally consistent with those in the AM Period, in other words, traffic has increased or decreased at almost the same count locations, but the magnitude of the difference has sometimes switched directions. The exceptions are: - 26th July Corridor in the direction of 6th October City: traffic decreased in the AM period by 15%, but increased at the same location by 11% during the PM peak period - 6th October Bridge in the direction of Al Mohandeseen and Al Doki: traffic increased in the AM period by 17%, but then decreased at the same location by 17% during the PM peak period The highest increase (220%) is observed at Suez Desert Road in the direction of Cairo. The highest decrease (-62%) is however seen at the 6th of October Bridge in the direction to Cairo-Alexandria Road. Peak Hour Factor The peak hour factors (PHF) calculated on the selected corridors based on the latest survey results generally range between 0.85 and 0.95, which is typical for urban peak hour conditions. In comparison with JICA study, the PHF increased on five out of eight locations as shown in the table below, from an average of 0.81 (2005) to 0.91 (2010), implying more variation of the traffic volumes within the peak hours at these locations. On the other hand, the PHF decreased at the three remaining locations from an average of 0.94 (2005) to 0.90 (2010), but this drop can be considered as minor since the factors are still within the same range. Table 2.16: Comparison of Peak Hour Factors at Traffic Count Locations PHF PHF Code Traffic Count Location (WB Study-2010) (JICA Study-2005) P1  Ring Road / Between El Khosoos & Cairoâ€?Alex Agr.Rd  0.93  0.72  P2  Gesr Elâ€?Suez/between Ring Road and Ainshams Str.  0.92  0.87  P6  26th July / Between Railway and Ring Road  0.91  0.84  P8  Middle Abbas Bridge  0.89  0.93  P9  6th October Bridge / Zamalekâ€?Agouza  0.86  0.78  P10  Ahmed Helmy Str./ Before Abou Wafya Bridge  0.92  0.86  P11  Ramsis Str./Between Ghamra and Ramsis Srq  0.93  0.94  Lotfy Elâ€?Sayed/between Abaseya&Demerdash Metro  P12  0.87  0.95  Stn  70 2.11.3 Changes in Peak Hours According to the Public-Private Partnership Program for Cairo Urban Toll Expressway Network Development traffic count survey (May 2006), and as shown in Section 2.6, traffic peak periods in GCMA are as follows: ï‚· The morning peak (07:00 – 9:00) ï‚· The afternoon peak (13:00 – 16:00) ï‚· The evening peak (20:00 – 21:00) ï‚· The period (10:00 – 12:00) was observed to have the peak traffic volume in some locations (e.g., 15th of May Bridge) The current study’s survey took place during the following peak periods: ï‚· Morning peak period: 7:00 am to 11:00 am ï‚· Afternoon peak period: 3:00 pm – 7:00 pm The following observations could be made: ï‚· The highest peak during the morning period occurs from 8 to 9 at most traffic counts locations, which is consistent with the highest peak identified in 2005 as 7:00 to 9:00 AM. ï‚· According to 2010 data, volumes are comparable in the different afternoon hours and there does not seem to be any specific peaking pattern. ï‚· Additionally, as per 2010 data, congested conditions in the afternoon peak period are more widespread across the network relative to the morning peak period. ï‚· What has notably changed from 2005 till 2010 is that the afternoon peak period has shifted from (13:00 – 16:00) to (15:00-18:00 pm) 2.12 Overview of additional existing data The following remaining data items listed in Table 2.have not yet been addressed: A) The total number of vehicles (by type) B) Public transport capacity, fleet composition and age C) Accident data and information D) Unit vehicle operating cost E) Fuel cost F) Household income and value of time G) Car ownership H) Percentage of daily traffic in peak hour I) Passenger Car Unit (PCU) J) Vehicle Occupancy Factor K) OD Matrix (by Mode) It is noted that only a few of these data items are actually needed to calculate the economic costs of congestion (Chapter 4), namely E) Fuel cost, F) value of time, H) Percentage of daily traffic in peak hour, I) Passenger car units and J) Vehicle Occupancy Cairo Traffic Congestion Study. Final report 71 Factor. The other data items are interesting to present to get a comprehensive overview of the urban transport situation in Cairo; however these are not crucial for the calculation. In Annex 3 the detailed information on all data items is presented. 72 3 Identification of Causes, Types and Locations of Traffic Congestion 3.1 Introduction This section concerns primarily with identifying the causes, types and locations of road congestion in the GCMA. The strategic purpose of this task is to serve as input into phase 2 of the study which aims at determining and prioritizing congestion relief interventions. In addition, part of the information will be used in the calculation of economic costs of congestion (Chapter 4), in particular the information on average speeds in peak and off- peak periods. In this section, we adopt a hybrid approach consisting of (1) a quantitative assessment of a limited number of principal corridors; and (2) a network-wide qualitative assessment. In the quantitative assessment, we identify the causes and locations of congestion along the study corridors, while in the network-wide assessment we focus on the causes of traffic congestion across the GCMA without reference to specific locations. 3.2 Principal corridor assessment This section presents the analysis of the floating car survey data and discussion of results. The collected data were principally travel distances per time interval for each direction of each route, for multiple runs during the morning and afternoon peaks. Observations on some traffic influencing events were also recorded. The analysis also encapsulates information from other sources, namely traffic police monitoring center and road features visual inspections. The performed analysis is discussed at two levels; a collective assessment level and an individual one. The principal corridors collective assessment level aims at providing a bird's eye view on the traffic conditions along the study corridors. Route aggregate operational performance indicators serve as the backbone of the intended analysis. On the other hand, the principal corridor individual assessment level provides more insightful details pertaining to localized congestion conditions. 3.2.1 Principal Corridor Collective Assessment The objective of this analysis phase is twofold, first to provide a wide scope network condition assessment and second to enable the comparative assessment of the different individual corridors. To achieve these objectives the following analysis dimensions are investigated: ï‚· Speed and Reliability Analysis ï‚· Traffic Influencing Events Analysis Cairo Traffic Congestion Study. Final report 73 Speed and Reliability Analysis Segmented Speed Analysis Identification of congestion patterns from a network perspective could be adequately represented through the analysis of speed patterns. Figures 3.1 and 3.2 display a sample of estimated travel speeds along surveyed routes for the morning and evening peak periods, respectively. Reduced travel speeds have been observed in the evening peak in comparison to the morning one, as shown in Figures 2.10 and 2.11. It is clear from the figures that congested conditions in the evening period are more widespread across the network relative to the morning peak period. In the following, some insights pertaining to the observed congestion patterns are highlighted. Area Type (1) City centre gateways on the radial corridors connecting the peripheral areas to the city center. Description Near City center portions of the radial corridors connecting the peripheral areas to the city center. Those portions represent the main gateways to the CBD. Several physical and operational bottlenecks have been observed on those gateways. Example locations Morning Peak Within the Ring Road portion of the 26th of July corridor, Gesr ElSuez, Salah Salem near El- Abasseya, ElHaram Street near ElHaram Tunnel, and Cornish El-Nile. Evening Peak Extended segments on: Ahmed Helmy street in Shobra, El-Thawra Street in between Orouba/Salah Salem and El-Nasr/Autostrad, and within ring road portion of the 26th of July/15th of May corridor, Cairo/Ismailia Desert Road Area Type (2) Centre Business District (CBD) surface street network Description High density traffic network with several traffic conflicts and inefficient traffic controls. Frequent operational bottlenecks (such as random microbus stops) and traffic influencing event (such as random pedestrian crossing) are among the main causes of traffic congestion on this area type. Example locations Ramsis Street and El-Tahrir Square. Area Type (3) Segments of major East-West/North-South arterials Description East-West/North-South travel corridors are high volume arterials connecting the city ends. Several physical and operational bottlenecks have been observed along those arterials. In addition, intersections-related delays (mainly inefficient traffic controls, and u-turns delays) have been among the causes of observed congestion. Example locations Morning Peak ELkablat Street, and Salah Salem from ElMokatam till Abbass Bridge Evening Peak Extended segments on Salah Salem in between ElAbasseya and Ein Elsira, El Nasr/Autostrad from Sheraton till 6th of October Bridge, 6th of October Bridge in between Cornish El-Nile and El- Orouba exit. Area Type (4) 74 Ring Road segments in the vicinity of major interchanges Description Congestion along the Ring Road is predominantly due to operational and physical bottlenecks. Operational bottlenecks are mostly observed near major interchanges; due to the high volume of traffic using those interchanges. The high traffic volume exceeds the exits/entrances capacities at most of the identified locations. In addition, frequent random microbus stops are observed at those locations. Example locations Morning Peak Limited segments near: 26th of July corridor interchange, Cairo/Alexandria road interchange, El- Maryoutya interchange, El-Khosous interchange, Cairo/Ismailia interchange, Cairo/Suez interchange, and Carrefour Shopping mall interchange Evening Peak Extended segments near: 26th of July corridor interchange, Cairo/Alexandria road interchange, ElMaryotaya interchange, Cairo/Ismailia interchange, Cairo/Suez interchange, and Carrefour Shopping mall interchange Cairo Traffic Congestion Study. Final report 75 Figure 3.1: Morning Peak Sample Travel Speed Figure 3.2: Evening Peak Sample Travel Speeds 76 Corridor Average Speed Analysis From an aggregate corridor perspective, average travel speeds as well as speed indices (ratio of the average speed to the free flow speed) are estimated to enable the principal corridors comparative assessment. The detailed estimation procedure is provided in Annex 4. As previously mentioned, the floating car survey data included travel distances that were recorded only every 5 minutes, together with the start and end times of each trip. Observations on some traffic influencing events were also recorded, yet not when the end of a queue was reached or at major intersections. Figures 3.3 through 3.10 display the estimated average speeds for the different travel directions for both peak periods. It is noteworthy that direction 1, in the analysis results, represents the movement towards the Central Business District (to-CBD) and direction 2 represent the movement from the CBD (from-CBD). The only exception is the Ring Road, as direction 1 represents counter-clockwise for Route 2 and clockwise for Route 3. AM Direction 1 70.000 Route 1 60.000 Route 2 50.000 40.000 Route 3 30.000 Route 4 20.000 Route 5 10.000 Route 6 0.000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM Figure 3.3: Principal Corridors Average Speeds- AM Direction 1- Routes 1 to 6 Cairo Traffic Congestion Study. Final report 77 AM Direction 1 70.000 Route 7 60.000 50.000 Route 8 40.000 Route 9 30.000 20.000 Route 10 10.000 Route 11 0.000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM Figure 3.4: Principal Corridors Average Speeds- AM Direction 1- Routes 7 to 11 AM Direction 2 70.000 Route 1 60.000 Route 2 50.000 40.000 Route 3 30.000 Route 4 20.000 Route 5 10.000 Route 6 0.000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM Figure 3.5: Principal Corridors Average Speeds- AM Direction 2- Routes 1 to 6 78 AM Direction 2 70.000 Route 7 60.000 50.000 Route 8 40.000 Route 9 30.000 20.000 Route 10 10.000 Route 11 0.000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM Figure 3.6: Principal Corridors Average Speeds- AM Direction 2- Routes 7 to 11 PM Direction 1 70.000 Route 1 60.000 Route 2 50.000 Route 3 40.000 30.000 Route 4 20.000 Route 5 10.000 Route 6 0.000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM Figure 3.7: Principal Corridors Average Speeds- PM Direction 1- Routes 1 to 6 Cairo Traffic Congestion Study. Final report 79 PM Direction 1 70.000 Route 7 60.000 50.000 Route 8 40.000 Route 9 30.000 20.000 Route 10 10.000 Route 11 0.000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM Figure 3.8: Principal Corridors Average Speeds- PM Direction 1- Routes 7 to 11 PM Direction 2 70.000 Route 1 60.000 Route 2 50.000 40.000 Route 3 30.000 Route 4 20.000 Route 5 10.000 Route 6 0.000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM Figure 3.9: Principal Corridors Average Speeds- PM Direction 2- Routes 1 to 6 80 PM Direction 2 70.000 Route 7 60.000 50.000 Route 8 40.000 Route 9 30.000 20.000 Route 10 10.000 Route 11 0.000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM Figure 3.10: Principal Corridors Average Speeds- PM Direction 2- Routes 7 to 11 The graphs provide the following insights: ï‚· Average speeds for all surveyed corridors within the area contained by the Ring Road but not including the Ring Road (routes 4 to 11) fall in the range of 20 - 45 km/hr for the entire morning peak duration, for both travel directions. Reduced travel speeds have been observed for the evening peak ranging from 15- 30 km/hr. ï‚· The average speed along the Ring Road (routes 2 and 3) is in the range of 45 – 60 km/hr for the westbound (direction 1) during the morning peak. This range is further extended to 30 – 65 km/hr during the evening peak. ï‚· The average speed along the Ring Road (routes 2 and 3) is in the range of 50 – 60 km/hr for the eastbound (direction 2) during the morning peak. Reduced average travel speeds have been observed for the evening peak ranging from 30 to 50 km/hr. ï‚· The average speed along the 26th of July/15th May Travel Corridor (Route 1) is in the range of 30–50 km/hr for the morning peak of the "to-CBD" direction (direction 1). Reduced travel speeds have been observed for the evening peak ranging from 25 to 35 km/hr. ï‚· The average speed along the 26th of July/15th of May Travel Corridor (Route 1) is in the range of 20–40 km/hr for the morning peak and evening peaks of the "from-CBD" direction (direction 2). ï‚· A reduced morning peak period 8:00-10:00 am could be observed on most of the surveyed corridors. A reduced evening peak period of 5:00-7:00 pm for the "to-CBD" direction could also be observed for most surveyed corridors. Similar to the corridor average speed analysis, a speed index has been estimated for each surveyed route. The speed index, representing a measure of congestion, is calculated as Cairo Traffic Congestion Study. Final report 81 the ratio between the route average speed to its free flow speed. The free flow speed estimation procedure is outlined in Annex 4. In many areas of the world, the speed index is close to 1 on inter-urban highways, where the average speed is almost equal to the free flow speed, and starts decreasing in urban areas where congestion starts to take effect. One example of time-dependent speed profiles on urban expressways is given for the Swedish road network by a White paper on Travel Time Measurements using GSM and GPS Probe Data. Although Sweden usually only suffers moderately from congestion compared to other European capitals, some of the bigger roads in the area of Stockholm also show rush hour behavior, including the Western stretch of the Essingeleden highway. On Monday morning, the average speed sharply drops to about half the free flow speed on a regular basis (resulting in a speed index of 0.5). Similarly, on Monday afternoon, there are significant speed drops on some of the city’s highway stretches and on its major roads compared to free flow conditions. The analysis results revealed that the average speed indices for all surveyed routes range from 0.31 (PM peak period) to 0.63 (AM peak period), as shown in Figure 3.11. In general, the speed indices of the afternoon peak period seem to be constantly lower than those recorded during the morning peak period, implying slower speeds and more congestion. Surveyed routes are ranked in descending order of the average speed index (considering AM and PM periods) as follows: ï‚· Route 3 (0.57) ï‚· Routes 2, 6 (0.55) ï‚· Route 7 (0.49) ï‚· Route 8 (0.48) ï‚· Route 11 (0.47) ï‚· Route 5 (0.46) ï‚· Route 4 (0.44) ï‚· Route 10 (0.41) ï‚· Route 1 (0.38) ï‚· Route 9 (0.36) An average speed index of 0.5 implies that the speed experienced by the driver on a certain route under uncongested (free flow) conditions is reduced to half during actual, congested conditions. Routes 1, 4, 9 and 10 seem to be witnessing the most delays as their speed indices are below the 0.5 threshold. Motorists on routes 5, 7, 8 and 11 seem to be experiencing the situation where the free flow speed is reduced to half, while those on routes 2, 3 and 6 seem to be experience a fairly better situation. Considering the effect on travel time, the lower speed index values are particularly onerous. For roads with similar free flow speeds, such as Routes 1 and 11 where free flow speed are near 80 Kph, the travel time on Route 1 would take around 1 more minute for every 2.65 Km travelled compared to Route 11, due to the drop in the speed index. 82 Figure 3.11: Principal Corridors Speed Indices Reliability Analysis Network reliability could be captured by measuring the variability in observed travel speeds from multiple floating car runs. On average 16 runs were recorded for each direction of each route for each peak period through the FC survey. Variations in trips' length caused some alterations. As such, the undertaken reliability analysis is based on the estimated coefficients of variation of the corridors average speeds. Figures 3.12 and 3.13 depict the analysis results. The following insights are made: ï‚· Estimated COVs for all surveyed corridors, except for the 26th of July/15th of May travel corridor, fall in the range of 0.25 to 0.65. ï‚· An increased variability in travel speeds has been estimated for the evening peak compared to the morning peak for all surveyed corridors, with the exception of direction 2 of routes 5 and 10. ï‚· A significantly higher variability in travel speeds has been estimated for the 26th of July/15th of May travel corridor (route 1) with a COV ranging from 0.69 to 0.85. Cairo Traffic Congestion Study. Final report 83 0.90 0.80 0.70 Average Speed COV 0.60 0.50 AM PM 0.40 0.30 0.20 0.10 0.00 1 2 3 4 5 6 7 8 9 10 11 Route Number Figure 3.12: Principal Corridors Speed COVs, Direction 1 0.90 0.80 0.70 Average Speed COV 0.60 0.50 AM PM 0.40 0.30 0.20 0.10 0.00 1 2 3 4 5 6 7 8 9 10 11 Route Number Figure 3.13: Principal Corridors Speed COV, Direction 2 The shown variability in traffic speeds is likely to encapsulate both day to day variability in traffic volumes as well as within-day variability due to situational differences (such as the random stop of a microbus) and personal differences (such as drivers’ experiences and responsiveness). Another measure for travel time reliability is the buffer index. The buffer index is estimated as the difference between the 95th percentile speed and the average speed divided by the average speed. The buffer index represents the additional time travelers need to consider in the planning phase of their trip to ensure on-time arrival. As the buffer 84 index increases the travel time reliability decreases. Figures 3.14 and 3.15 present the estimated buffer indices for the 11 surveyed corridors. Analysis results indicate the following: ï‚· Estimated buffer indices range from 0.36 to 1.61. ï‚· As revealed from the COV analysis, higher values for the buffer indices are estimated for the evening peak compared to the morning one. Exceptions are direction 2 of routes 5 and 10. ï‚· Estimated buffer index for the 26th of July corridor ranges from 1.2 to 1.6, which means that the 95th percentile speed is more than double the average speed. This high buffer index value reflects the lack of reliability on this crucial travel corridor. ï‚· Above unity value for the buffer indices are estimated for the evening periods of routes 6, 7, 8, and 9. This high value reflects the decreased travel time reliability on those routes, where the 95th percentile speed5 exceeds double the average speed. While Routes 6, 7, 8 and 9 are not the most congested as observed in the average speed graphs presented earlier, the analysis of traffic performance along the corridors would benefit from considering both reliability and traffic congestion. 1.80 AM PM 1.60 1.40 1.20 Buffer Index 1.00 0.80 0.60 0.40 0.20 0.00 1 2 3 4 5 6 7 8 9 10 11 Route Number Figure 3.14: Principal Corridors Buffer Index, Direction 1 5 It should be noted that with 16 runs recorded through the floating car survey the valid number would be at the 93.75th percentile Cairo Traffic Congestion Study. Final report 85 1.60 AM PM 1.40 1.20 1.00 Buffer Index 0.80 0.60 0.40 0.20 0.00 1 2 3 4 5 6 7 8 9 10 11 Route Number Figure 3.15: Principal Corridor Buffer Index, Direction 2 Traffic Influencing Events Analysis Traffic influencing events are considered one of the main causes of travel time variability. Figure 3.16 depicts the average daily frequencies of three main traffic influencing events, namely; accidents, security check points, and vehicle breakdowns, along all surveyed routes over the four days of the FC survey. The reported daily frequencies encapsulate morning and evening peaks for both travel directions. The following insights could be made: ï‚· The daily rates of vehicle breakdowns on all surveyed routes are significantly higher than the other traffic influencing events. ï‚· Increased frequencies of accidents, security checks and breakdowns are observed on all urban primary highways (routes 1, 2, and 3) compared to the urban primary arterial routes (dominant portions of routes 4, 5,6,7,8,9,10, and 11). ï‚· Route 3 (Southern portion of the Ring Road) witnesses the highest frequencies of all traffic influencing events. ï‚· Route 1 (26th of July/15th of May corridor) witness high frequencies of vehicle breakdowns as well as security check points. ï‚· Route 2 (Northern portion of the Ring Road) and Route 3 witness relatively high accidents rates. 86 18 Route 1 Route 2 16 Route 3 14 Route 4 Route 5 Average Daily Frequency 12 Route 6 Route 7 10 Route 8 Route 9 8 Route 10 Route 11 6 4 2 0 Accidents Security Checks Breakdowns Traffic Influencing Events Figure 3.16: Traffic Influencing Events Frequencies In addition to the quantitative analysis of the above listed traffic influencing events, a qualitative analysis is conducted with respect to two additional types of events, namely; random microbus stops and random pedestrians crossing. Table 3.1 summarizes the analysis results, where "H" denotes High rates, “M" for Medium and "L" for Low. The analysis reveals the substantial occurrence of both events on most surveyed routes. Cairo Traffic Congestion Study. Final report 87 Table 3.1: Aggregate Qualitative Observations on Traffic influencing Events Random Pedestrian Routes Random Microbus Stops Crossings 1 H M 2 M L 3 H M 4 H H 5 H H 6 M M 7 H H 8 NA NA 9 H L 10 H H 11 L H 3.2.2 Principal Corridor Individual Assessments This section discusses in detail the analysis results of the collected data for each surveyed route independently. Aggregate as well as localized congestion causes are identified along each route. The key analysis results are included in this section, for conciseness purposes. More details on space-time plots and field photos are included in Annex 4. Route 1: 26th of July/15th of May Travel Corridor Traffic Turbulences  Direction (1) Random microbus stops   Direction (2)  Physical Bottlenecks   5 4 3 2   1 Figure 3.17: Route 1 Schematic This route stretches from the Cairo - Alexandria desert road in the west and heads eastwards into downtown Cairo crossing the Ring Road, Lebanon Square, Zamalek and ending at Elesaaf (Figure 3.17). The total length of the route is approximately 20km. The route is considered a vital traffic corridor in Cairo as it is the main link connecting Cairo with 6th of October City and the Cairo-Alexandria Desert Road. Most of route 1 belongs to road class 2 (urban primary highway), with an 80 Km/hr speed limit. Less than 25% of that route belong to road class 3 (urban expressway), with a 60 km/hr speed limit. 88 The estimated average speed along the route is 31 km/hr with a speed index of 0.38. Significant variations of travel speeds have been experienced on that route, with an average speed COV of 0.77. In addition many traffic influencing events have been reported as depicted in Table 3.2. Table 3.2: Daily Traffic Influencing Events, Route 1 Average Accidents 0.2 Daily Security Checks 4.5 Frequency Vehicle Breakdowns 7.4 Qualitative Random Microbus Stops High observation Random Pedestrian Crossings Medium Analysis results from space-time plots of multiple runs along route 1 together with obtained information from the traffic police control centre indicate that causes of congestion are predominantly due to physical bottlenecks. The majority of these bottlenecks occur at the entrance and exit ramps along the route. The following is a description of distinct congestion location/causes along the route: Location (1) Cause: Physical Bottleneck 4 entrances to 15th of May bridge (2 lanes each with high demand) merge into a 4-lane 180 m segment crossing the Nile. The route then shrinks into a 2-lane overpass over Zamalek. Location (2) Cause: Physical Bottleneck Direction-2: Three traffic streams from Abou El-Feda, Zamalek and through traffic from 15th of May Bridge all merge into a 3-lane overpass crossing the Nile. Direction-1: Three entrances to 15th of May bridge, located at a very short distances merge into 3 lanes across the River Nile. The distance along the segment crossing the river Nile is insuffecient for waeving for vehicles to reach El-Zamalek and El-Gabalaya exits. Location (3) Cause: Conflicts inducing traffic turbulences + Physical Bottleneck Direction-2: Surface flow merges with the travel corridor at Tersana Club. This causes conflicts and turbulences to the through traffic. Three traffic streams (two lanes each) merge into two lanes. These lanes continue till the interchange of the Ring Road. After the interchange, the road widens into a 4-lane road till the end of the route. Location (4) Cause: Physical Bottleneck Direction-1: Reduction in number of lanes; from 4 lanes to 2 lanes in addition to extra merging traffic from the Ring Road. Location (5) Cause: Operational Bottleneck Passengers from surface roads board and un-board microbuses frequently at this location causing an induced reduction in road capacity Cairo Traffic Congestion Study. Final report 89 Route 2: Ring Road (Northern segment)          2 1 3 4  Traffic Turbulences    Operational Bottlenecks   Physical Bottlenecks      5 Figure 3.18: Route 2 Schematic This route stretches from the east end of Cairo at the intersection of Suez Desert Road with the Ring Road along the northern and western segments of the Ring Road until the Wahat Desert Road (Figure 3.18). The total length of the route is approximately 60km. The route passes along some major interchanges of the Ring Road with regional highways like the Ismailia Desert Road, The Alexandria Agricultural Road, El-Khosous and the 26th of July Corridor. The estimated average speed along the route is 50 km/hr with a speed index of 0.55. An average COV of observed speeds is estimated to be 0.53. An observed day-to-day variability in travel speeds significantly contributes to the overall speed variability. This section of the Ring Road experiences some traffic influencing events on a daily basis, most notably, daily accidents. Table 3.3 provides a summary of observed traffic influencing events. Table 3.3: Daily Traffic Influencing Events, Route 2 Average Accidents 1.1 Daily Security Checks 1.2 Frequency Vehicle Breakdowns 2.1 Qualitative Random Microbus Stops Medium observation Random Pedestrian Crossings Low Analysis results indicate that causes of congestion along route 2 are predominantly due to operational and physical bottlenecks. Operational bottlenecks are mostly observed near major interchanges, most notably, the 26th of July interchange. The following is a description of distinct congestion location/causes along route 2: 90 Locations (1, 2, 3, 4) Cause: Operational Bottleneck Observed operational bottlenecks are due to the volume of traffic using those major interchanges which exceeds the exits/entrances capacities at most of the identified locations. In addition, frequent random microbus stops are observed at those locations. Location (5) Cause: Physical Bottleneck A reduction in the number of lanes from 4 lanes to 2 lanes in section of the Ring Road from El- Maryoutya interchange to El-Wahat Desert Road. Route 3: Ring Road (Southern Segement) Traffic Turbulences  Direction (1)   Random microbus stops    Direction (2)   Physical Bottlenecks    6   5  3 2 1 4    Figure 3.19: Route 3 Schematic This route stretches from the east end of Cairo at the intersection of Suez Desert Road with the Ring Road along the southern segments of the Ring Road until the Alexandria Desert Road (Figure 3.19). The total length of this route is approximately 40km. The route passes along some major interchanges that include the Autostrad, and Maryouteya interchanges. The estimated average speed along the route is 51 km/hr with a speed index of 0.57. An average COV of observed speeds of 0.42 has been estimated. Observed day-to-day variability in travel speeds are rather limited for this section of the Ring Road. This section of the Ring Road experiences many traffic influencing events on a daily basis (Table 3.4). In addition, pedestrian flows across the Ring Road reflect a crucial hazard phenomenon. Cairo Traffic Congestion Study. Final report 91 Table 3.4: Daily Traffic Influencing Events, Route 3 Average Accidents 2 Daily Security Checks 5 Frequency Vehicle Breakdowns 17 Qualitative Random Microbus Stops High observation Random Pedestrian Crossings Medium Analysis results indicate that causes of congestion along route 3 are predominantly due to operational and physical bottlenecks. The following is a description of distinct congestion location/causes along route 3: Location (1) Cause: Operational Bottleneck Both directions of the route are impacted by frequent Microbus stops alongside the Carrefour shopping complex. This was further substantiated by the floating car survey and is shown in the time-space plots. Location (2) Cause: Operational Bottleneck + Traffic Turbulences This occurs at both directions of the route at the Autostrad interchange. This was caused by the following: ï‚· High traffic demand at entrances with high percentage of trucks. ï‚· Frequent microbus stops ï‚· Pedestrian Crossing ï‚· Turbulences induced by conflicting traffic movements near the exit ramp Location (3, 4) Cause: Operational Bottleneck Frequent random microbus stops and a security checkpoint cause congestion in direction 2. Location (5) Cause: Operational Bottlenecks Direction (1): Alexandria desert road exits: High traffic volume exiting the Ring Road to Cairo/Alex Desert road. Peak hour exiting traffic volume exceeds the exiting ramp capacity causing accumulation of traffic queues on the Ring Road. Location (6) Cause: Physical bottlenecks A Physical bottleneck occurs from the Maryouteya interchange to El-Wahat Desert Road The number of lanes is reduced from 4 lanes to 2 lanes. 92 Route (4): El Corniche-East/El-Matareya Square This route stretches from the north end of Cairo in Materya square, along Kablat street westwards till it meets Corniche ElNile-East-bank street near Roud El Farg Bridge (Figure 3.20). The route then runs south along Corniche El-Nile-Eastbank street till Maadi. This route is quite different from the first three routes as it is mostly an Urban Primary Arterial Street and has several signalized and un-signalized intersections, with a dominant speed limit of 60 km/hr. Corniche ElNile-Eastbank Street is a critical travel corridor in the City as it is considered one of the main North-South corridors near the centre of the City.   2 1 3 Direction (1)   Direction (2)  4 5 Traffic Turbulences   Operational Bottlenecks   Physical Bottlenecks  Figure 3.20: Route 4 Schematic The estimated average speed along the route is 25 km/hr with a speed index of 0.44. An average COV of observed speeds of 0.5 has been estimated. Most of the observed speed variability is attributed to inconsistencies in intersection-related delays and random microbus stops. Table 3.5 summarizes the observed daily traffic influencing events on route 4. Table 3.5: Daily Traffic Influencing Events, Route 4 Average Accidents 0.3 Daily Security Checks 1.4 Frequency Vehicle Breakdowns 1.4 Qualitative Random Microbus Stops High observation Random Pedestrian Crossings High Cairo Traffic Congestion Study. Final report 93 Analysis results revealed widespread traffic disturbances along this route compared to the more localized problems that were encountered along the first three routes. Physical/operational bottlenecks and intersections-related delays are the main causes of traffic congestion on this route. The following is a description of distinct congestion location/causes along route 4. Location (1) Cause: Operational Bottleneck The Aboud location is a well-known microbus stop for travellers heading to the Delta Governorates. The space time plots show a noticed impact on travel times in this vicinity especially in Direction-2. Location (2) Cause: U-turns inducing traffic turbulences This occurs along Corniche ElNile-East-bank Street till Arkadia Mall. The primary reason for these turbulences is a series of U-Turns carrying high traffic volumes and lacking acceleration and deceleration lanes. Location (3) Cause: Physical bottlenecks The entrance ramp to the 15th of May Bridge that occupies a portion of main corridor physical capacity causing a physical bottleneck along direction-1. Location (4) Cause: Traffic Turbulences Various traffic turbulences due to conflicting traffic movements from exits of both 15th of May and 6th of October bridges. In addition, inadequate traffic controls have been observed in this location. Location (5) Cause: Physical bottlenecks Successive fluctuations in the number of lanes have been observed along this section of Cornish ElNile-East-bank Street. Route (5): Rod El Farag/El-Remaya This route stretches from Rod El-Farag bridge in Cairo, across the bridge to the Corniche ElNile-West-bank street (Figure 3.21). The route continues southward along Corniche El- Nile street, Morad steet, Giza Square, westwards on El-Haram street, past the Pyramids ending in the Remaya Square. This route mainly belongs to the urban primary arterial class with a dominant speed limit of 60 km/hr. The route has several signalized intersections. Corniche ELNile-East-bank street is a one of the main North/South Corridors in Giza city. 94 Traffic Turbulences  Operational Bottleneck 1 Physical Bottlenecks 2 3 4 5 6     Figure 3.21: Route 5 Schematic The estimated average speed along the route is 24 km/hr with a speed index of 0.46. An average COV of observed speeds of 0.4 has been estimated. Observed variability in travel speeds is rather limited. Most of the observed variability is attributed to random pedestrian crossings and random microbus stops. Table 3.6 summarizes the observed daily traffic influencing events on route 5. Table 3.6: Daily Traffic Influencing Events, Route 5 Average Accidents 0.4 Daily Security Checks 0.2 Frequency Vehicle Breakdowns 1.6 Qualitative Random Microbus Stops High observation Random Pedestrian Crossings High Analysis results revealed widespread traffic disturbances along this route. Physical/operational bottlenecks, geometric design and access management inefficiencies are main causes of traffic congestion on this route. In addition, unique observations that contribute to a reduction in the route capacity (such as animal-driven carts and on-street trash boxes) have been reported for this route. The following is a description of distinct congestion location/causes along Route 5. Cairo Traffic Congestion Study. Final report 95 Location (1) Cause: Road Geometry/Access management inefficiencies Direction-2: Traffic conflicts due to merging traffic from minor connectors to the main arterial on a horizontal curve segment. Location (2) Cause: Operational Bottleneck + Access management inefficiencies Operational bottleneck at KitKat square due to several random microbuses. In addition the failure of the roundabout to handle existing traffic flows. Location (3) Cause : Access management inefficiencies Direction-1, near the exit ramp from 6th of October bridge (Agouza exit). High exiting traffic volumes (in 2 lanes) merges with the through traffic from the main road (2 lanes) on a 3 lane road segment. Location (4) Cause: Physical bottlenecks A lane reduction from 4 lanes to 3 lanes occurs in front of the Giza Police Headquarters. Location (5) Cause: Physical bottlenecks Direction-1: Before El-Giza Bridge a reduction in the number of lanes coming from El-Giza tunnel (4 lanes) into 2 lanes heading to El-Giza Bridge Location (6) Cause: Operational Bottleneck Several operational bottlenecks on El-Harm street due to; a series of successive u-turns, tourists' buses heading towards the pyramids area, and illegal on-street parking 96 Route 6: Cairo-Suez Desert Road/El-Qalaa   Direction (1) Direction (2)  3 4     5          2 1 Traffic Turbulences  Operational Bottleneck   Figure 3.22: Route 6 Schematic This route stretches from the 5th District in New Cairo in front of the Mubarak Police Academy making its way westwards along Ahmed El-Zomor street towards Nasr City. At Nasr City the route continues north along Tayaran street and then west along Salah Salem via the Tayaran street tunnel (Figure 3.22). The route is approximately 22 km in length. It is entirely an Urban Primary Arterial with several signalized intersections. The estimated average speed along the route is 30 km/hr with a speed index of 0.55. An average COV of observed speeds of 0.53 has been estimated. Day-to-day variability in travel speed has been observed for route 6 which indicates a possible variation in daily traffic volumes. Random pedestrian crossings and random microbus stops also contribute to the observed variability in travel speeds. Table 3.7 summarizes the observed daily traffic influencing events on route 6. Table 3.7: Daily Traffic Influencing Events, Route 6 Average Accidents 0 Daily Security Checks 0 Frequency Vehicle Breakdowns 3 Qualitative Random Microbus Stops High observation Random Pedestrian Crossings High Analysis results highlight the impact of illegal parking on the operational efficiency of a number of segments along route 6. In addition operational concerns arising from the excessive use of u-turns as a dominant access management strategy are perceived. The following is a description of distinct congestion location/causes along route 6. Cairo Traffic Congestion Study. Final report 97 Location (1) Cause: Occasional Operational Bottleneck Friday's open air car market at Ahmad El-Zomor Street induces excessive traffic volumes on this location. Random car stops and illegal parking outside the specified parking area are main causes of congestion. Location (2) Cause: Occasional Operational Bottleneck + Access management inefficiencies In the vicinity of El-Salam Mosque; frequent illegal parking in front of the mosque causes severe traffic congestion. In addition, a series of inefficiently designed U-turns along this segment, with inadequate weaving lengths, contribute to observed congestion. Location (3) Cause : Operational Bottleneck Direction (1): At Rabaa El-Adaweya Intersection, Public buses stop upstream of the traffic signal causing reduction in the actual capacity. Location (4) Cause : Occasional Operational Bottleneck In the vicinity of El-Salam Mosque; frequent illegal parking in front of the mosque. Location (5) Cause : Traffic Turbulences Direction (1): Conflicting traffic movements near the entrance of ElAzhar tunnel. Occasional spillbacks due to tunnel congestion. Route (7): Autostrad/Giza Square   2 1  3  4  5  Traffic Turbulences  Operational Bottleneck  Physical Bottlenecks    Figure 3.23: Route 7 Schematic This route stretches from ELNasr/Autostrad and ElThawra intersection in the east side of the city heading west along ElNasr/Autostrad Street till Salah Salem Interchange at ElMokatem. At ElMokatem, the route continues west along Salah Salem to ElGiza square via Abbass Bridge (Figure 3.23). The route is approximately 18 km in length. It is entirely an Urban Primary Arterial with several high volume crossing streets. Most of those major intersections are manipulated through u-turns along route 7. 98 The estimated average speed along the route is 27 km/hr with a speed index of 0.49. An average COV of observed speeds of 0.54 has been estimated. Observed variability in travel speeds is more vivid in the evening peak compared to the mourning one. Frequent random microbus stops, random pedestrian crossing and inconsistencies in intersection- related delays contribute to the observed variability in traffic speeds. Table 3.8 summarizes the observed daily traffic influencing events on route 7. Table 3.8: Daily Traffic Influencing Events, Route 7 Average Accidents 0.4 Daily Security Checks 0.2 Frequency Vehicle Breakdowns 1.1 Qualitative Random Microbus Stops High observation Random Pedestrian Crossings High Analysis results highlight the negative impacts of the series of implemented u-turns along the corridor. The high traffic volume using those u-turns significantly contributes observed delays on this route. The following is a description of distinct congestion location/causes along Route 7. Location (1) Cause :Operational Bottleneck + Traffic Turbulences A series of successive u-turns on both directions along the segment from Ahmed Fakhry street to Abbas El-Akkad street. Minimal weaving lengths are provided which contributes to frequent localized grid-locks. In addition, on-street parking and frequent random microbus stops (including within u-turn stops) significantly contributes to observed operational bottlenecks. Location (2) Cause: Physical Bottlenecks Near Yousef Abbas intersection there is a reduction in the number of lanes from 6 lanes to 4 lanes. Location (3) Cause : Traffic Turbulences Direction-2: In front of the Arab Contractors Hospital, traffic turbulences due to U-Turn Location (4) Cause : Physical Bottlenecks + Traffic Turbulences Direction -2: Near the Deweqa entrance reduction in the number of lanes from 4 lanes to 3 lanes. In addition, u-turn-induced traffic turbulences were observed. Location (5) Cause : Operational + Traffic Turbulences Near ElMokataam entrance, traffic turbulences due to conflicting traffic movements. In addition frequent random microbus stops. Cairo Traffic Congestion Study. Final report 99 Route (8): El-Orouba/6th of October Bridge   1  2  3 Traffic Turbulences  5  4  Operational Bottleneck  6  Physical Bottlenecks    Figure 3.24: Route 8 Schematic This route stretches from El-Orouba/Salah Salem Street near Cairo International airport to ElDoKki (at ElBatal Ahmed AbdElaziz) via 6th of October Bridge (Figure 3.24). The route is approximately 22 km in length. El-Ourouba/Salah Salem is a major east/west arterial street with several grade-separated intersections. On the other hand, 6th of October Bridge is a crucial urban expressway that crosses the river Nile and flies over the CBD. The estimated average speed along the route is 29 km/hr with a speed index of 0.48. An average COV of observed speeds of 0.6 has been estimated. Day-to-day variability in travel speeds has been observed, in the evening peak. Limited traffic influencing events have been recorded on that route, except for daily vehicle breakdowns. Analysis results indicate that causes of congestion along route 8 are predominantly due to physical and operational bottlenecks mostly along 6th of October bridge and sections of El-Orouba street. The following is a description of distinct congestion location/causes along route 8. Location (1) Cause :Physical Bottleneck El-Galaa Bridge; reduction in the number of lanes from 4 on the main corridor to 2 lanes on the bridge Location (2) Cause: Physical Bottlenecks El-Orouba Tunnel; reduction of number of lanes from 4 on the main corridor to 2 lanes entering the tunnel. Location (3) Cause : Operational Bottleneck Direction-2: In front of the Central Agency for Public Mobilization And Statistics (CAPMAS), employees’ busses inducing excessive delays. Location (4) Cause : Physical Bottlenecks Direction -1: El-Orouba Entrance to 6th October Bridge; traffic from El-Orouba (2 lanes) and traffic from 6th October Bridge (2 lanes) merges together into a 2 lane segment of 6th of October Bridge. 100 Location (5) Cause : Physical Bottlenecks Direction -1: Ghamra Bridge entrance; merging traffic (2 lanes) from Ghamra Bridge into 2 lanes of through traffic without additional lanes. Location (6) Cause : Physical Bottlenecks Direction -1: In between Ramsis Exit and El-Tahrir Entrance; two physical lanes are dedicated for the merging traffic from El-Tahrir square causing a bottleneck for the through traffic. This bottleneck (at high traffic volumes) causes queues to spill backward blocking Ramsis Exit. Route 9: Cairo-Ismaillia/El-Qubba       1 2  3 Traffic Turbulences  4   Operational Bottlenecks Physical Bottlenecks Figure 3.25: Route 9 Schematic This route stretches from El-Obour on Cairo/Ismaillia Desert Road crossing the Ring Road towards El-Qubba Bridge via Gesr El-Suez (Figure 3.25). The length of this route is approximately 20 km. Gesr El-Suez area is a high density population area with mixed residential/commercial land use patterns. While, the larger portion of this route belongs to the urban primary arterial class, the rest of the route is an inter-urban highway that connects the cities of Cairo and Ismaillia. The estimated average speed along the route is 24 km/hr with a speed index of 0.36. The low value of the estimated average speed index reflects the deteriorated level of service of that route. An average COV of observed speeds of 0.54 has been estimated. Day-to-day variability in travel speeds, in the evening peaks, has been observed at Gesr El-Suez area. Frequent random microbus stops also contribute to the observed variability. Table 3.9 summarizes the observed daily traffic influencing events on route 9. Table 3.9: Daily Traffic Influencing Events, Route 9 Average Accidents 0.09 Cairo Traffic Congestion Study. Final report 101 Daily Security Checks 0.18 Frequency Vehicle Breakdowns 1.4 Qualitative Random Microbus Stops High observation Random Pedestrian Crossings Low Analysis results indicate that this route is one of severely congested arterials. Observed causes of congestion are predominantly due to high traffic volumes and inadequate traffic management strategies. A unique feature of Gesr El-Suez Street is the on-street shopping activities. Mobile sellers are distributed at several locations along Gesr El-Suez selling various products and severely impacting traffic operations. The following is a description of distinct congestion location/causes along route 9. Location (1) Cause :Operational Bottleneck In the vicinity of El-Asher public bus station; frequent random microbus stops outside the station. In addition the high traffic volume using the Ring Road interchange contributes to perceived congestion. Location (2) Cause: Physical Bottlenecks + Traffic Turbulences Direction (1): Under the Hikesteb Bridge; reduction in number of lanes from 3 lanes to 2 lanes. In addition, observed u-turn-related delays. Location (3) Cause : Physical Bottleneck + Traffic Turbulences In the vicinity of At Abd el Aziz Fahmy intersection, the following contribute to observed congestion: ï‚· Railway at-grade crossing ï‚· Physical bottleneck ï‚· Inappropriate u-turn location Location (4) Cause : Traffic Turbulences Direction (2): Upstream of El-Qubba Intersection; multiple access points to Gesr ElSuez Street (El-Sheikh Abo-Elnour and El-Kanadi streets) inducing extremely high traffic volume at El-Qubba intersection. Both Directions: At El-Qubba Intersection; access management and geometric design inefficiencies. 102 Route 10: Cario-Alex Agr Road/ El-Qubba Bridge   Traffic Turbulences  Operational Bottlenecks Physical Bottlenecks 1 2 3 4 5 6 Figure 3.26: Route 10 Schematic This route stretches south along the Cairo Alexandria Agricultural Road from Qwesna- Qalyub Road, then along Ahmed Helmy street and then east along Ramsis street, Ain Shams University ending in El-Khalifa El-Mamoun (Figure 3.26). The first 6 km of the route are along an inter-urban Highway while the remainder of the route is along an arterial street. The estimated average speed along the route is 25 km/hr with a speed index of 0.41. The relatively low value of the estimated average speed index highlights congestion conditions. An average COV of observed speeds of 0.53 has been estimated. Space-time plots for this route indicates the presence of day-to-day variability in observed speeds. In additions within-day variability is also perceived. Several traffic influencing events have been observed on this route, most notably; security checks, random microbus stops, and random pedestrian crossings. Table 3.10 summarizes the observed daily traffic influencing events on route 10. Cairo Traffic Congestion Study. Final report 103 Table 3.10: Daily Traffic Influencing Events, Route 10 Average Accidents 0.26 Daily Security Checks 1.9 Frequency Vehicle Breakdowns 1.2 Qualitative Random Microbus Stops High observation Random Pedestrian Crossings High Analysis results indicate that congestion along this route is predominantly due to operational and physical bottlenecks. In addition u-turns related delays have also been perceived. The following is a description of distinct congestion location/causes along route 10. Location (1) Cause: Operational Bottleneck Both directions of the route in front of Ain Shams University due to several random pedestrian crossings between both sides of the campus Location (2) Cause: Operational Bottleneck Direction (1): At El-Demerdash Metro Station (Loutfi El-Sayed Street), random microbus stops to load/unload passengers from the Metro station cause a bottleneck. Also many random pedestrian crossings impact traffic flows. Location (3) Cause : Operational Bottleneck Both Directions :Under Ghamra bridge. Random Microbus and Bus stops Location (4) Cause : Physical Bottlenecks + Operational Bottleneck Direction (1): Under pedestrian crossover near 6th of October-Ghamra Exit; work zone causing a reduction in the number of lanes from 4 lanes to 3 lanes. Direction (1): In front of Ramsis light rail station, several random Bus and microbus stops causing congestion that spills back until the previous physical bottleneck location. Location (5) Cause : Operational Bottleneck + Traffic Turbulences + Physical Bottleneck Direction (1): Under 6th of October bridge (El-Galaa Street); frequent random microbus stops in front of El-Azbakeya police station. Direction (1:) At the beginning of Shoubra tunnel; U-Turn-related delays. Direction (2): Reduction in number of lanes from 5 lanes (coming from Shoubra tunnel) into 3 lanes. In addition to U-Turn-related traffic conflicts. Location (6) Cause : Traffic Turbulences Direction (2): Traffic conflicts due to insufficient weaving distance (~100 m) for traffic coming from Gamaaiet El-Shabab El-Muslimin street to Abd El-Khaleq Sarwat street, given a high traffic volume in Ramsis Street. 104 Route 11: Cairo-Suez Desert Road/Ebn-ElHakam Square 2 Direction (1) Direction (2) Traffic Turbulences 1 Figure 3.27: Route 11 Schematic The route stretches from El-Rehab along Cairo/Suez Desert Road heading east to El- Thawra Street and then north via El-Nozha Street till Abou-Bakr EL-Sedik Street. East on Abou-Bakr EL-Sedik and Ebn ElHakam Street till Ebn El-Hakam square (Figure 3.27). This route mostly belongs to the urban primary arterial class, except for the Cairo/Suez Desert Road portion. The route length is approximately 21 km. The estimated average speed along the route is 37 km/hr with a speed index of 0.47. An average COV of observed speeds of 0.5 has been estimated. Observed variations in travel speeds are mainly attributed to some traffic influencing events, as summarized in Table 3.11. Table 3.11: Daily Traffic Influencing Events, Route 11 Average Accidents 0.3 Daily Security Checks 0.6 Frequency Vehicle Breakdowns 0.3 Qualitative Random Microbus Stops Low observation Random Pedestrian Crossings High Analysis results indicate an impact of traffic influencing events on the performance of this route. In addition the high traffic volume in the vicinity of the Ring Road interchange induces extra delays. The following is a description of distinct congestion location/causes along route 11. Location (1) Cause : Traffic Turbulences In the vicinity of the interchange with the Ring Road; conflicting traffic manoeuvres as well as high traffic volume using this interchange. Location (2) Cause : Traffic Turbulences Both Directions: El-Mahkama Intersection; congestion spilling over upstream of the intersection due to inadequate traffic signal control. Cairo Traffic Congestion Study. Final report 105 3.3 Network-wide qualitative assessment The network-wide assessment was performed to supplement the quantitative corridor- based assessment which has a relatively limited scope, both spatially (due to the relatively small number of corridors surveyed) and content-wise (due to the difficulty of capturing all key causes through a quantitative analysis). The network-wide assessment was performed through a consultative workshop involving a panel of experts. 3.3.1 Workshop Design and Process The primary objective of the workshop was to identify and prioritize the causes of traffic congestion in the GCMA. It was recognized initially that the causes listed in Task 2 of the TOR under the three categories of “physical infrastructure featuresâ€?, “traffic demand patternsâ€? and “traffic influencing eventsâ€? have to do mainly with the road network characteristics and its operational performance. Therefore, we labelled all such causes as “operational causesâ€?, and we hypothesized that traffic congestion in Cairo could have more operational causes than those listed in the TOR (one example being the wide-spread phenomenon of jaywalking). We also recognized at the outset of the study that additional factors, of a strategic and systemic nature, contribute to traffic congestion in Cairo. These include characteristics of the multi-modal transport system, land use, population, etc. We labelled such characteristics as “strategic causesâ€?, and we intended to address them in the study, since they lend themselves to a different set of congestion relief strategies than operational causes. Therefore, the workshop was designed to address the two following questions: ï‚· What are the operational causes of traffic congestion in the GCMA? ï‚· What are the strategic causes of traffic congestion in the GCMA? In order to address the above questions adequately in the workshop, the study team identified a set of characteristics and criteria to select the workshop participants. Specifically, we sought a group of participants that: ï‚· Possess in-depth technical knowledge of traffic congestion and causes across Greater Cairo; ï‚· Have long, first-hand experience in managing traffic congestion in Cairo; and ï‚· Have long experience in traffic congestion assessment and related policies and interventions. In addition, it was deemed desirable to have the workshop participants come from different parts of Cairo in order to ensure a fair and uniform treatment of traffic congestion across the GCMA. Finally, the number of participants was desired to be moderate, not too small to ensure varied and rich input but not too large to ensure effective management of the workshop. 106 Based on the above criteria, we identified and invited 10 experts as follows6: ï‚· Two professors of highway and traffic engineering from Cairo University; ï‚· Two professors of transport and traffic engineering from Ain Shams University; ï‚· One transportation engineering professor from Al-Azhar University who has also been a longstanding consultant on the JICA transport study; ï‚· Three senior consultants; ï‚· Head of the Road Department, Cairo Governorate; and ï‚· Head of the Research and Planning Unit, Cairo Traffic Administration, Ministry of Interior. We sent to each expert an invitation letter and information sheet7 describing the background, objective, approach, program and venue of the workshop. The invitation package was delivered by various means (e-mail, fax, and hand) and followed up with a phone call by a study team member. All experts accepted the invitation and turned up at the workshop venue on June 6th in due time. 3.3.2 Workshop Approach and Results The conventional approach of brainstorming and open group discussion, although widely employed in consultative workshops, was deemed risky to use in our workshop due to the following reasons: ï‚· The panel may spend a disproportionate time discussing a limited set of causes, while leaving out other important ones. This is particularly a problem in our case, because there could be many more causes of traffic congestion in Cairo beyond the obvious ones. Therefore, it was deemed desirable to use a method that generates as many causes of traffic congestion as possible. ï‚· Some participants may over-emphasize some causes and steer the discussion towards those causes. This may happen if some participants are vocal and have strong opinions, potentially suppressing potentially useful contributions of others. Therefore, it was deemed desirable to use a method that ensures even contribution by all participants, the passive ones as well as the more vocal. ï‚· The open discussion approach does not usually allow for ranking the various causes in terms of importance (i.e. relative contribution to congestion). It was deemed desirable for the used method to produce a prioritized list of traffic congestion causes. The above concerns led to the adoption of an alternative approach, known as the Nominal Group Technique (NGT), in our workshop. The approach, first developed in 19718, has seen wide application in various disciplines9. In transportation, it was used recently to identify and prioritize the problems and issues of the bus network in Melbourne10. The NGT has several reported advantages over alternative approaches to decision making and information gathering such as brainstorming. Specifically, the NGT helps generate many 6 The list of participants is included in Annex C. 7 Both are included in Annex C. 8 Delbecq, A and A. VandeVen, 1971. "A Group Process Model for Problem Identification and Program Planning," Journal of Applied Behavioral Science VII, pp. 466 -91. 9 A simple search on Google will return a large number of case study examples. 10 Currie, G. and K. Tivendale, 2010. “An Inclusive Process for City Wide Bus Network Restructuring: Experience and Impactsâ€?, CD Proceedings of the 89th Annual Transportation Research Board Meeting, Washington D.C. Cairo Traffic Congestion Study. Final report 107 ideas beyond the obvious ones, balance the opinions and inputs of participants (i.e. avoids the domination of one idea or one vocal person), prioritize/rank the different ideas, build consensus among the participants, and provide a sense of closure on the addressed question. Those advantages are all relevant to the context of our study and to the qualitative assessment intended for the workshop. Our initial plan was to use the NGT to answer the two questions of the workshop in two separate sessions (see the workshop program in Annex 8). In each session, we planned to follow the standard NGT four-step process as follows: ï‚· Generate causes: each participant brainstorms silently and writes down on a piece of paper as many causes as possible. ï‚· Record causes: In a round-robin format, participants share one cause at a time which is recorded on a flip chart seen by the entire group. In this step, all causes are exhaustively recorded and similar ones are grouped. ï‚· Discuss causes: Each cause is discussed by all participants to establish clarity of definition and degree of importance. Further grouping is possible in this step. ï‚· Rank causes: participants vote privately to rank the causes. The June 6th workshop started according to plan with a presentation of the study objective, workshop objective and approach. In the discussion that followed the presentation, the participants agreed to the importance of treating not only operational but also strategic causes of traffic congestion, yet there was some disagreement as to where to draw the line between the two classes of causes. In order to the keep the workshop on track and avoid un-necessary delays, we made a slight modification to the plan of the workshop which proceeded as follows: ï‚· Generate causes: In a silent brainstorming session of about 10 minutes, each participant generated a list of causes without specifying the type (operational or strategic). Each participant wrote down his/her list on a paper supplied by the study team. ï‚· Record and discuss causes: Over a period of about two hours, each participant around the table shared with the group 2-3 causes which were recorded promptly on a flipchart by a workshop assistant. Upon recording of each cause, a moderated discussion took place, which was intended to establish a common understanding of the cause and its extent of influence. Initial grouping of similar causes were implemented by the group as the list of causes unfolded. At the end of this session, the list consisted of 35 causes of traffic congestion in the GCMA. Table 3.12 displays the entire list. ï‚· Extract and group operational causes: Following a short break, the panel of experts together with the study team extracted the operational causes from the long list and combined them into 8 groups of causes. The discussion in the previous step helped build consensus among the experts on the final list of operational causes. Table 3.13 presents the list. ï‚· Rank operational causes: Each participant ranked the 8 causes according to the relative contribution to traffic congestion in the GCMA. Each participant was given an index card, and was asked to rank the 8 causes by assigning a score of 8 to the most important cause, 7 to the second, etc. A total of 12 completed cards were collected and the results were tallied on a flipchart. Figure 3.28 depicts the final results. 108 Due to the constrained time of the workshop and the desire of several participants to depart, the “strategicâ€? causes were not grouped and ranked similar to the operational causes. Table 3.12: List of traffic congestion causes Cause Effect on Traffic Congestion 1 Inadequate public transport system Offers limited ability to attract auto users, thus ï‚· Limited capacity and coverage keeping traffic volumes at high levels. ï‚· Poor quality of service ï‚· Scarce human and financial resources 2 Lax procedures and practices of issuing Result in majority of drivers lacking proper driver’s licenses training and sufficient knowledge of traffic laws 3 Poor driver’s observance of traffic lanes Causes turbulence to traffic flow which contributes to congestion 4 Lack of coordination among the multiple Results in localized, ad-hoc approach to traffic agencies responsible for traffic management management and congestion relief and planning 5 Dearth of qualified personnel Results in sub-standard traffic engineering, planning and management practices 6 Deficient traffic management Results in poor utilization of the existing road ï‚· Lack of traffic control at sensitive capacity and high accident frequency locations ï‚· Manual traffic control at key intersections during peak periods ï‚· Sub-optimal timings of traffic signals where they exist ï‚· Lack of modern technologies for traffic management 7 Traffic measures inconsistent with the road Cause un-necessary interruption to major class hierarchy traffic flows ï‚· Many speed bumps at key arteries 8 Inadequate traffic and transport laws 9 Lack of road etiquette and manners by Results in illegal and random usage of the various entities existing road capacity, and gives rise to road accidents 10 Lax and inconsistent enforcement of traffic Causes frequent occurrence of traffic laws violations and accidents on the road, ï‚· Many road users elude consequences contributing to congestion of traffic violations or secure exemptions 11 Poor control at locations of traffic conflicts Results in inefficient use of road capacity and (e.g. intersections, approaches to increased frequency of road accidents flyovers/underpasses, etc.) 12 Wide transformation of intersections into U- Result in extensive weaving sections and turn strips for the purpose of autonomous/self bottlenecks control of conflicting traffic streams 13 Insufficient parking capacity Leads to illegal on-street parking (reducing effective road capacity) and to roaming traffic looking for parking space 14 Sudden vehicle breakdowns Create incidents that reduce road capacity, and ï‚· Due to poor vehicle inspection and often result in bottlenecks hot weather 15 Random stopping behaviour of microbuses Causes interruption to traffic flow and in and regular buses many cases to bottlenecks Cairo Traffic Congestion Study. Final report 109 16 Absence of transport demand management Results in high traffic demand at peak times 17 Fuel subsidy policy Contributes to low vehicle operating cost, thus increasing auto use 18 High auto ownership and usage rates Increases traffic volumes 19 Absence of a “comprehensive securityâ€? Contributes to the limited scope of traffic concept enforcement across the road network, leading ï‚· General security personnel are not to high rates of violations and incidents utilized to improve traffic safety and security 20 Confined presence of traffic police staff to a Contributes to the limited scope of traffic small set of locations (mainly intersections) enforcement across the road network, leading ï‚· Lack of ubiquitous monitoring of to high rates of violations and incidents traffic across the network 21 Major changes to land use without conducting Creates an imbalance between travel demand traffic impact studies and road supply 22 Lack of compliance with road occupancy Reduces effective road capacity policies by individuals, private companies and agencies. 23 Poor urban planning and lack of coordination Creates an imbalance between travel demand with transportation and road supply 24 Public services centralized at a few Creates locations of very high traffic demand government agencies 25 Limited financial resources available for Results in transport supply expansion lagging transport improvements behind growth in traffic demand 26 Lack of intermodal integration Offers auto users limited ability to transfer to ï‚· E.g. inadequate park and ride transit facilities 27 Interference of higher authorities in transport Results in decisions that impact adversely the decision making road capacity and usage 28 Disorderly use of the road network by Causes inefficient use of road capacity vehicles, pedestrians, truck, etc. 29 Wide-spread jaywalking phenomenon Deteriorates road safety and interrupts traffic flow 30 Ubiquitous bottlenecks due to road design Result in congestion as demand approach the irregularities bottleneck capacity 31 Poor connectivity of the road network Results in poor distribution of traffic demand across the network 32 Poor road surface conditions Affects speed and flow of traffic ï‚· Poor quality of pavement, speed bumps, etc. 33 Special events and VIP motorcades Disrupts base traffic flow and creates traffic jams 34 Absence of a single agency responsible for Offers limited ability to analyze traffic collection of traffic related data patterns and prioritize measures to curb traffic congestion 35 Inefficient traffic network Results in poor utilization of the existing road capacity 110 Table 3.13: List of grouped “operationalâ€? causes Operational Cause 1 Design features of the road network ï‚· physical bottlenecks, poor network connectivity, U-turns, poor road surface quality, speed bumps, etc. Several physical bottlenecks examples were perceived from the principal corridor analysis such as route 1 location 1 and route 5 location 4. Examples of U-turns include route 4 locations 2 and route 5 location 6. 2 Parking supply and behaviour ï‚· limited parking capacity, illegal on-road parking, etc. 3 Traffic influencing events ï‚· road accidents, vehicle breakdowns, security checkpoints, VIP motorcades, etc. Examples include route 3 locations 3 and 4. 4 Traffic management and control route 11 location 2 ï‚· poor control at intersections (such as route 11 location 2) and approaches to flyovers/underpasses (such as route 6, location 5) ï‚· lack of modern technologies for traffic management 5 Awareness of road etiquette and manners by various entities ï‚· no lane discipline, ubiquitous jaywalking, illegal stops by transit and other vehicles, etc. 6 Traffic demand related factors ï‚· special events (such as route 6 locations 1 and 2), inflexible work hours, etc. 7 Work zones (such as route 10 location 4) 8 Law observance and enforcement ï‚· poor observance and enforcement of traffic laws and road occupancy policies (e.g. on- street vendors, animal drawn carts as observed on route 6). Traffic management & control 70 Design features of the road network 68 Law observance & enforcement 63 Awareness of road etiquette & manners 62 Parking supply & behaviour 56 Traffic demand related factors 41 Traffic influencing events 41 Work zones 27 0 10 20 30 40 50 60 70 80 Total score Figure 3.28: Ranking of the Operational Causes Cairo Traffic Congestion Study. Final report 111 3.4 Integration / Comparison of the Floating Car Survey and Workshop Outcomes To gain further insights into the main causes of traffic congestion in GCR, the outcomes of the FC survey were mapped into the network-wide assessment framework. In the qualitative assessment (section 3.3), congestion causes were grouped into 8 different categories. In the quantitative assessment (section 3.2), localized congestion causes were identified from the FC survey. Mapping is realized through the re-arrangement of localized congestion causes to fit within the identified 8 main categories. Table 3.14 presents congestion locations and causes based on the network-wide categorization schema. For clarity purposes, the same results are displayed in a frequency diagram (Figure 3.29). Table 3.14:Localized congestion causes mapped into congestion categories Route # Location Category # Operational Cause 1 1, 2, 3, 4 2 1,2,3,4,5 3 5,6 4 2,3,5 Design features of the road network 5 1,3,4,5,6 1 ï‚· physical bottlenecks, poor network connectivity, U- 6 1 turns, poor road surface quality, speed bumps, etc. 7 1,2,3,4 8 1,2,4,5,6 9 2,3,4 10 4,5,6 5 6 Parking supply and behaviour 6 1,2, 4 2 ï‚· limited parking capacity, illegal on-road parking, etc. 7 1 Traffic influencing events 3 3,4 3 ï‚· road accidents, vehicle breakdowns, security checkpoints, VIP motorcades, etc. 1 3 3 2 4 3 Traffic management and control 5 2 ï‚· poor control at intersections and approaches to 4 6 5 flyovers/underpasses 7 5 ï‚· lack of modern technologies for traffic management 9 3,4 11 1,2 1 5 2 1,2,3,4 3 1,2,3,4 4 1 Awareness of road etiquette and manners by various entities 5 2,6 5 ï‚· no lane discipline, ubiquitous jaywalking, illegal 6 3 stops by transit and other vehicles, etc. 7 1,5 8 3 9 1 112 10 1,2,3,4,5 5 6 Traffic demand related factors 6 6 1,2 ï‚· special events, inflexible work hours, etc. 10 4 7 Work zones Law observance and enforcement ï‚· Poor observance and enforcement of traffic laws and 8 road occupancy policies (e.g. on-street vendors, animal drawn carts as observed on route 6). Traffic  Management  and  Control Design Features  of the  road network Law observance  and enforcement Awarness of Road  etiquette   and manners Parking Supply  and Behaviour Traffic  demand  related factors Traffic  Influencing  Events Work Zones 0 5 10 15 20 25 30 35 40 Figure 3.29: Congestion causes frequencies of occurrences The comparative assessment of qualitative and quantitative outcomes could be summarized for each congestion cause category as follows: 1- Traffic Management and control: this category was identified in the qualitative assessment as the most salient congestion cause in GCR. A relatively high frequency of occurrence of localized congestion resulting from the lack of proper traffic management and controls has been reported. However, this category ranks third in the quantitative assessment compared to first in the qualitative one. Examples of prominent cases could be recognized along route 11 where congestion is mostly attributed to the failure of traffic signal controls such at El- Mahkama intersection; causing extensive upstream spillbacks. 2- Design features of the road network: both qualitative and qualitative assessments recognized this cause as one of the most salient causes of traffic congestion in GCR. Results of the quantitative analysis revealed that the highest frequency of occurrences of localized congestion causes from the FC survey was attributed to this category. Two main observations were repeatedly encountered in most surveyed corridors; 1) the inconsistency in the number of lanes assigned to a given corridor along its entire length, 2) the extensive deployment of improperly Cairo Traffic Congestion Study. Final report 113 designed u-turns. Examples of prominent cases of inconsistency in number of lanes include the section of the 26th of July corridor (route 1) in between the Ring Road and Lebanon square. Another example of an inadequate u-turns is the series of successive u-turns along El-Haram Street (route 5, location 6). It is noteworthy that the number of buses using El-Haram Street to access the pyramids area is substantial, which adds to the magnitude of congestion induced by u-turns. 3- Law observance and enforcement: while this category ranked 3rd in the qualitative assessment, it was not captured through the FC survey due to the nature of the surveying method. 4- Awareness of road etiquette and manners: high frequency of occurrence was observed for this cause in the quantitative assessment (ranking 2nd among all 8 categories). Most of the field observations of congestion causes under this category attributed congestion to frequent random microbus stops. The extensive random micro-bus stops along each of the surveyed corridor have been recognized as system wide phenomena that significantly impact traffic operations by reducing the operational capacity of all corridors. Examples include locations along all surveyed corridors, most notably near major intersections/interchanges. 5- Parking supply and behavior: the scope of the FC survey was limited to road levels 1, 2, 3, and 4 (section 2.5.3), where level 4 represents primary arterials. On-street parking was generally restricted on most of the surveyed corridors. Apparently, most of the parking-related issues are more pronounced along local streets. Nonetheless, some illegal parking observations were reported on routes 5, 6, and 7. 6- Traffic demand related factors: It has been observed that some special events induced congestion in the vicinity of their locations. Examples included Friday's open air car market at Ahmad El-Zomor and the vicinity of El-Salam Mosque. 7- Traffic influencing events: several traffic influencing events have been reported through the FC survey. However their contribution to perceived congestion has been rather limited. Examples of prominent cases include the security check points on route 3 (Ring Road) locations 3 and 4. 8- Work Zones: due to the seasonal nature of such a cause only a single work zone has been encountered during the FC survey (route 10 location 4). 114 4 Estimation of Direct Economic Costs of Traffic Congestion in Cairo 4.1 Introduction This section provides the calculation of estimated direct economic costs of traffic congestion in the Greater Cairo Metropolitan Area (GCMA). In order to estimate costs of congestion, first a definition of congestion is presented. Then, based on a literature review a selection of suitable methods of measurement of congestion levels is described. The next step is to identify the adverse components of traffic congestion. For each element a calculation method is explained and proposed, based on literature review. This resulted into two main approaches to calculate in particular the delay costs for the GCMA (one of the components). The approaches are divided into two parts: first a calculation on direct congestion costs on the 11 Principal Corridors (sections 4.3-4.7) and secondly an extension of the calculation to cover the complete GCMA (section 4.8) Moreover, a zonal based distribution of congestion cost is conducted by applying an engineering judgment based on available information. Finally, this chapter presents a reflection of the calculation method in view of the data used. 4.2 Methods to Measure Direct Economic Costs of Congestion 4.2.1 Definition of congestion To the traveler, congestion comprises motionless or slowly moving lines of vehicles on a freeway or urban street, a lane closure because of road construction or an accident, or some sort of traffic backup. The transportation professional, on the other hand, thinks of congestion in terms of flow rates, capacities, volumes, speeds, and delay. Congestion occurs when the road capacity does not meet traffic demand at an adequate speed, traffic controls are improperly used, or there is an incident on the road such as an accident or disabled vehicle. Congestion can occur during any time of the day and along any type of roadway. Congestion can take various forms, such as recurring or nonrecurring, and can be located across a network or at isolated points. Recurring congestion exists when the traffic volume on roadway exceeds its capacity at a particular location during a predictable and repeated time of day. Nonrecurring congestion is caused by random or unpredictable events that temporarily increase, demand, or reduce capacity on a roadway. Such events include accidents, disabled vehicles, road construction, and inclement weather. Cairo Traffic Congestion Study. Final report 115 4.2.2 How to measure congestion? Measuring congestion is a necessary step in order to deliver better congestion outcomes. However, congestion should not be described using a single metric for policy purposes. Such an approach is sure to obscure either the quantitative aspects of congestion or its relative and qualitative aspects. These two aspects can not be disassociated and progress in managing congestion should be based on sets of indicators that capture both of these aspects. Good indicators can be based on a wide network of roadway sensors but simple indicators based on less elaborate monitoring can sometimes adequately guide policy. What is important is to select metrics that are relevant to both road managers (e.g. speed and flow, queue length and duration, etc.) and road users (e.g. predictability of travel times, system reliability, etc). Congestion has an impact on both the speed of travel and on the reliability of travel conditions. It is the latter that may be of greatest concern to individuals and businesses. Thus congestion management policies should keep track of travel reliability indicators. These may capture the variance in travel times or, alternatively, communicate the amount of time buffers road users have to include in their travel plans to make their trips “on timeâ€?. Insofar as these reliability indicators give an understanding of the quality of travel conditions, they are important to policymakers seeking to address the qualitative aspects of congestion. The manner in which congestion is measured has a fundamental impact on the manner in which congestion is defined and managed. Measures of congestion based alternately on speed, access, user costs, delay, reliability, etc. will give rise to different problem statements regarding congestion and will motivate sometimes radically different policy interventions. There is no “simpleâ€? measure of congestion that is good for all purposes and all situations. The rating of a specific roadway segment’s performance as translated by hourly vehicle counts against rated capacity will mean little to a user even if they travel over that link every day. Conversely, knowing the amount of time one must plan for to get from one suburb to another at peak hours in order to arrive before 09:30 will not necessarily help an engineer better time traffic signals in the central business district. There are not necessarily “betterâ€? indicators of congestion than others, but there may exist a better fit between those indicators selected and specific outcomes desired. In this respect, it is important not to simply use a specific congestion indicator because it is available (others might be as well), but because it allows one to measure progress towards a specific goal (e.g. link performance, system operation, user experience, etc…). Based on an analysis of the commonly used performance measure(s) that reflects congestion levels on roads (see literature review Annex 9) it is concluded that both travel speed characteristics (differences between peak and off-peak) as well as the number of 116 vehicles divided by the capacity (V/C11) are suitable for this study to calculate direct economic costs of congestion. 4.2.3 Economic Costs Elements and Calculation Method Based on the literature review (see Annex 9) the following direct cost elements are commonly used to calculate the direct costs of traffic congestion: ï‚· Costs of travel time delay imposes to users (passengers as well as freight ) ï‚· Costs of travel time unreliability in passenger transportation ï‚· Cost of excess fuel consumption in vehicular transportation (Diesel and Gasoline) ï‚· The associated cost of CO2 emissions due to excess fuel consumption The method used to estimate cost of time delay and the cost of excess fuel consumption is primarily based on the methodology developed by the Texas Transportation Institute12.This methodology focuses on the calculation of delay costs and the costs of excess fuel consumption. The remaining cost items, namely the costs of travel time unreliability and associated costs of CO2 emissions due to excess fuel consumption are estimated using other sources. These sources represent research on monetizing travel time uncertainty and the valuation of external costs of transport and are listed in the sections 4.4 and 4.6 in which the calculation of these costs is described. It is noted that the detailed methodology used for the calculation of each direct cost item, including formulas used, is presented in Annex 10. The main report presents the main steps in the calculation, and focuses on the results. 4.3 Costs of Travel Time Delay The methodology is outlined as follows and is performed on individual roadway segments. The three aforementioned peak period times (morning, afternoon, and evening) were used as the time for the beginning of congestion. Most of the basic performance measures are developed as part of calculating travel delay (the amount of extra time spent traveling due to congestion). An overview of the process is followed by more detailed descriptions of the individual steps. Travel delay calculations are performed in two steps: recurring (or usual) delay and secondly nonrecurring delay (due to crashes, vehicle breakdowns, etc.). Recurring delay estimates are developed using a process designed to identify peak period congestion due to 1) differences in peak and off-peak speeds and 2) traffic volume and useable capacity. 11 Congestion occurs if the number of vehicles is close to the capacity, the ratio of 0.77 V/C as provided in the Highway Capacity Manual is often used as a threshold. 12 (http://mobility.tamu.edu/ums/report/Annex_a.pdf Cairo Traffic Congestion Study. Final report 117 Delay caused by stochastic events is included in the non recurring delay estimate. Generally, these events can be categorized as one of the eleven sources of unreliability: ï‚· Traffic Incidents ï‚· Work Zones ï‚· Weather ï‚· Fluctuation in Demand ï‚· Special Events ï‚· Traffic Control Devices ï‚· Inadequate Base Capacity ï‚· Vehicle breakdown ï‚· Random Pedestrian Crossing ï‚· Random Minibus Stops ï‚· Security Checks Given the available information from the Floating Car Survey (see Chapter 2) only estimates of nonrecurring travel delay from incidents, security checks, vehicle breakdowns, random minibus stops, and finally random pedestrian crossings have been taking into account in this assignment. 4.3.1 Estimation of Delay from Recurrent Traffic Congestion In order to estimate delay from recurrent traffic congestion, determining the congestion threshold is essential. In order to determine the congestion threshold two different approaches have been applied as follows: ï‚· Approach 1: Applying Principal Corridors Collective Assessment for corridors’ speed plot ï‚· Approach 2: Applying V/C based on traffic counts and useable road capacity Approach 1: Applying Principal Corridors Collective Assessment for corridors’ speed plot The consultant uses the speed indices plots (see Chapter 2 and Annex 4) to determine the corridors’ level of service and thus the congestion level. The hours that the speed indices show the average speed below 0.6 is considered as congested hours. Travel delay from recurrent traffic congestion is estimated by equations relating vehicle traffic volume per lane and traffic speed. The calculation proceeds through the following simplified steps based on the method proposed by Texas Transportation Institute (TTI Method): 1. Estimate the daily volume of vehicles per lane corresponding to the congested peak hours 2. Calculate daily vehicle kilometers traveled (DVKT) for each roadway section as the average daily traffic (ADT) of a section of roadway multiplied by the length of that section of roadway 3. Calculate peak period volume 4. Determine average freeway speeds during the peak period based on data collected from travel time and speed surveys in corridors 118 5. Estimate travel delay. The difference between the amount of time it takes to travel the peak-period vehicle-Kilometers at the average speed and at free-flow speeds is termed delay. 6. Calculate daily recurring vehicle-hour delay The amount of delay incurred in the peak period is the difference between the time to travel at the average speed and the travel time at the free-flow speed, multiplied by the distance traveled in the peak period. The daily vehicle-kilometers of travel (DVKT) is the average daily traffic (ADT) of a section of roadway multiplied by the length (in kilometers) of that section of roadway. This allows the daily volume of all urban facilities to be presented in terms that can be utilized in cost calculations. The DVKT was estimated for the freeways and principal arterial streets located in each urbanized study area. Approach 2: Applying V/C based on traffic counts and useable road capacity By this approach the consultant applied the following multistep method to identify congested peak hours and segments for the corridors: 1. Divide each corridor into segments based on the useable segment’s capacity 2. Calculate V/C for each segment during peak hours 3. Identify congested segments when V/C >0.77. The FHWA model used 0.77 V/C ratio as threshold markers for traffic congestion. In fact, in 1991, the FHWA completed additional research in the area of quantifying congestion. The focus of this work was on recurring congestion on urban area freeways and the development of a congestion indicator combining both the duration and extent of congestion in a single measure (Cottrell, 1991), (Texas Transportation Institute, 1992), and (Epps et al. 1993). The only impact of congestion considered in this work was recurring congestion-induced delay expressed in terms of both its duration and physical extent by a newly developed indicator called the lane-mile duration index. Given description above, the consultant applied the following steps to estimate the delay from recurrent congestion: 1. Calculate capacity based on number of lanes, an adjustment factor for lane width, lateral clearance, the presence of trucks, and type of terrain, and a value of 2,200 vehicles per lane per hour for the basic lane capacity assuming a roadway design speed of at least 60 Km per hour (kph) 2. Calculate volume-to-capacity ratio (V/C) for each hour of a typical day based on new counts 3. Determine which hours of the day are to be classified as congested. A V/C ratio of 0.77 was used to indicate the onset of congested travel conditions (boundary between LOS C and LOS D). 4. Calculate total annual congested vehicle Kms of travel (DVKT) based on AADT, roadway section length, and percentage of daily traffic experiencing congested conditions, which is the sum of the percentages of traffic occurring during those hours of the day with a V/C ratio greater than or equal to 0.77. Cairo Traffic Congestion Study. Final report 119 5. Estimate Travel Delay: The difference between the amount of time it takes to travel the peak-period vehicle-Kilometers at the average speed and at free-flow speeds is termed delay. 6. Calculate daily recurring vehicle-hour delay by the following formula: 4.3.2 Estimation of Delay from Nonrecurring Traffic Congestion Another type of delay encountered by travelers is the delay that results from incidents, Security Checks, Vehicle Breakdowns, Random Minibus Stops, and finally Random Pedestrian Crossings. Incident delay is related to the frequency of crashes or vehicle breakdowns, how easily those incidents are removed from the traffic lanes and shoulders and the “normalâ€? amount of recurring congestion. The basic procedure used to estimate incident delay in this study is to multiply the recurring delay by a ratio. The process used to develop the delay factor ratio is a detailed examination of the freeway characteristics and volumes. In addition, a methodology developed by the Texas Transportation Institute is used to model the effect of incidents based on the design characteristics and estimated volume patterns. The road incident delay factor is calculated based on TTI method. The process used to develop the delay factor ratio is a detailed examination of the road characteristics and volumes. The consultant uses daily traffic influencing events in the car floating survey to estimate the incident delay factor. Incident delay occurs in different ways on streets than freeways. While there are driveways that can be used to remove incidents, the crash rate is higher and the recurring delay is lower on streets. Arterial street designs are more consistent from city to city than freeway designs. For the purpose of this study, the road incident delay factor for arterial streets is estimated between 110 to 160 percent of arterial street recurring delay depending on: ï‚· No. of accidents ï‚· Security checks ï‚· Vehicle breakdowns ï‚· Random Microbus stops ï‚· Random pedestrian crossings Based on engineering judgment most of the corridors are allocated the value of 1.1 as the incident delay ratio. For corridor 1 with the following nonrecurring events, the value of 1.3 is considered as the incident delay ratio. Average Accidents 0.2 Daily Security Checks 4.5 Frequency Vehicle Breakdowns 7.4 Qualitative Random Microbus Stops High Observation Random Pedestrian Crossings Medium 120 For corridor 3 with the following nonrecurring events, the value of 1.6 is considered as the incident delay ratio Average Accidents 2 Daily Security Checks 5 Frequency Vehicle Breakdowns 17 Qualitative Random Microbus Stops High Observation Random Pedestrian Crossings Medium For corridor 4 with the following nonrecurring events, the value of 1.2 is considered as the incident delay ratio Average Accidents 0.3 Daily Security Checks 1.4 Frequency Vehicle Breakdowns 1.4 Qualitative Random Microbus Stops High observation Random Pedestrian Crossings High Inputs and assumptions It should be noted that estimating recurrent as well as nonrecurring delay costs needs update data for the value of time, and vehicle occupancy factor. The vehicle occupancy factor for diverse vehicular modes is assumed as follows: Passenger Transportation: Table 4.1: Vehicle occupancy factor for diverse vehicular modes (passenger) Passenger Pickup Motorcycle Taxi Microbus Minibus Bus car 1.5 1.3 1.0 2.5 13 21 49 Freight Transportation: Table 4.2: Truck Load capacity (Ton) Light Truck Medium Truck Large Truck 5 9 15 Source: The strategic Development Master Plan Study for Sustainable Development of the Greater Cairo region in the Arab Republic of Egypt March 2008 In order to monetize the delays to costs, the following value of time classified for passenger car users, taxi users, and transit riders have been applied. The value of time for motorcyclists is assumed to be equal to that for transit riders. Cairo Traffic Congestion Study. Final report 121 Table 4.3: Value of time for diverse transport user classes (adjusted for 2010) Passenger car users (LE/hr) Taxi users (LE/hr) Transit riders (LE/hr) Freight transporters (LE/ton) 13,8 5,4 3.5 4.2 Sources: For passenger transport: Transportation Master Plan and Feasibility Study of Urban Transport Projects in Greater Cairo Region in the Arab Republic of Egypt, November 2002 For freight transport: Developing Harmonized European Approaches for Transport Costing and Project Assessment (HEATCO), May 2006 Working Days Cost calculations were based on 250 working days per year. 4.3.3 Total Delay Cost for 11 Corridors The annual recurring and nonrecurring cost for the 11 corridors amount to 2.6 billion LE using approach 1 (speed plots) and 2.4 billion LE using approach 2(V/C ratios). The share of recurrent delay costs is estimated to be approximately 40% leaving 60% for the non-recurrent delay (valid for both approaches). The estimation is based on the TTI methodology in which ratios have been determined on recurrent and non-recurrent delays. The information in the Floating Car Survey on the level of incidents in the corridors is used in this estimation; it is noted that the duration of the incidents is not known. Nevertheless, the non-recurrent delays are a substantial part of the delay costs, indicating that avoiding vehicle breakdowns and incidents provides substantial benefits. Further information and a series of detailed analyses on delay costs for individual corridors can be found in Annex 11. 4.4 Costs of Travel Time Unreliability Basically, average travel time between two destinations includes both expected and unexpected delays. It is assumed that network users accommodate expected delays into their travel time through, say, the inclusion of buffer time. However, it is more difficult and costly to incorporate the unpredictable the unexpected delays that lead to variation from planned or anticipated travel time. The terms unreliability and congestion are often used synonymously. However, a congested network does not necessarily have to be unreliable. Unreliability refers to unanticipated delays, and therefore a congested network is not necessarily unreliable because journey time along a congested road can be fairly predictable. However, congestion increases the likelihood of unreliability: as traffic levels increase the time delays due to slight perturbations tend to increase more than proportionality. 122 4.4.1 Observed Travel Time Unreliability A wide variety of temporal indicators (e.g. STD, COV, 95th Percentile, Buffer time index) can be used to provide a range of perspectives of the reliability issue. The consultant applied the Coefficient of Variation of Travel time (COV) in observed travel speeds from multiple floating car runs in the corridors as the travel time reliability measure. This approach is chosen since it directly uses the outcomes of the Floating Car Survey. On average 16 runs were recorded for each direction of each route for each peak period through the FC survey. Variations in trips' length caused some alterations. As such, the undertaken reliability analysis is based on the estimated coefficients of variation of the corridors average speeds (Figures 3.12) The shown variability in traffic speeds is likely to encapsulate both day to day variability in traffic volumes as well as within-day variability due to situational differences (such as the random stop of a microbus) and personal differences (such as drivers’ experiences and responsiveness). The coefficient of variation of travel times is defined as standard deviation divided by mean travel time: STDi COVi  Ti Where: i: corridor number STD: The standard deviation of travel time T: The mean travel time STDv  standard deviation of speeds L STDT  standard deviation of travel times  STDv 4.4.2 Cost of Unreliability for 11 Corridors In general, reliability is highly valued by travelers and commercial vehicle operators reflecting the fact that a reliable transport network is a net benefit for society and that an unreliable network represents a net cost to society. A lot of work has been carried out in among others the Netherlands to monetize unreliability of travel time. Based on the research’s outcomes (OECD 2010) and the local conditions, the consultant assumed the following rates for monetizing travel time unreliability: Passenger cars and motorcycle: 1.0 minute travel time variation is equivalent to 0.9 minute travel time Public Transport including taxi: 1.0 minute travel time variation is equivalent to 1.1 minute in vehicle travel time It should be noted that reliability perception is a controversial issue and may range from 0.9 to 2.5 in different countries (Senna 1991; Copley et al 2002). Also, due to lack of Cairo Traffic Congestion Study. Final report 123 reliable source for economic valuation of buffer time index, the consultant uses the standard deviation of travel time derived from COV in economic analyses. In order to estimate the accurate value of reliability, a SP survey seems to be essential. Given the aforementioned values, the consultant estimates monetary value of travel time unreliability for the 11 corridors as well as for all road users. The freight users have been excluded since no rates for monetizing travel time unreliability are available. The total unreliability associated cost for the 11 corridors is estimated approximately 1.7 billion LE. The level of unreliability costs is close to the delay costs, which is mainly caused by the assumed ratio of minutes travel time variation equivalent to minutes travel time. Further information and a series of detailed analyses on unreliability associated costs for individual corridors can be found in Annex 11. 4.4.3 Unreliability in freight transport Given the lack of sufficient information on annual cargo shipment volume and type in the Cairo region, the consultant is incapable to estimate the cost of unreliability in freight transportation. However, a rough estimation based on the annual tonnage of cargo transported in the region could be made to give a clue on impacts of unreliability on freight transport cost. The consultant applies the criterion of Willingness To Pay (WTP) which is derived from cargo transport companies in Nigeria. The case study has been done by Ogwude in (1990-1993) and reported in National Cooperative Highway Research Program (NCHRP 431). The Nigerian firms were willing to pay for 1.6 and 0.6 Naira per ton of consumer and capital goods respectively to reduce the standard deviation of travel time by an hour. Given the aforementioned value and inflation rate in the country, the consultant estimate the Willingness to Pay for Egypt approximately 0.70 LE and 0.26 LE per ton of consumer and capital goods respectively to reduce the standard deviation of travel time by an hour. Thus, the total unreliability cost for freight transportation is estimated around 13.5 Million LE per year. 4.5 Cost of Excess Fuel Consumption The average fuel economy calculation is used to estimate the fuel consumption of the vehicles running in the congested condition. The formula used is derived from the TTI methodology, a metric conversion has been applied to the equation since it is originally formulated based on non metric units (Miles per Gallon). In order to estimate excess fuel consumption due to traffic congestion the following steps are applied: ï‚· Calculate average speed ï‚· Calculate average fuel efficiency 124 ï‚· Calculate total excess fuel (liters) used as a result of recurring and nonrecurring delay, based on the mix of traffic and fuel used (diesel and gasoline) The total annual gasoline consumption for the 11 corridors due to congestion is estimated around 608 million liters (2.4 million liters per morning and evening peak hours – approach 1) and 552 million liters (2.2 million liters per morning and evening peak hours – approach 2). Similarly, the total annual diesel consumption for the 11 corridors due to congestion is estimated around 102 million liters (410 thousands liter per morning and evening peak hours) by using approach 1 and 81 million liters (326 thousand liters per morning and evening peak hours) by using approach 2. Based on an interview with a petroleum company in Cairo, the following tariffs have been applied to estimate the total excess Gasoline and Diesel costs in Cairo: ï‚· Gasoline (grade 80): 0.90 LE ï‚· Gasoline (grade 90): 1.75 LE ï‚· Gasoline (grade 92): 1.85 LE ï‚· Gasoline (grade 95): 2.75 LE ï‚· Diesel: 1.10 LE Furthermore, it should be noted that a fuel subsidy has been assumed being 2.2 LE/Ltr for gasoline, and 1.1 LE/Ltr for Diesel according to GTZ Transport Policy Advisory reported in International Fuel Prices (2009). Both the costs for the users of excess fuel and the costs for the Government (subsidy provided) have been calculated: Table 4.4: Excess fuel cost in the Greater Cairo because of traffic congestion Approach 1 Approach 2 Excess fuel cost Excess Fuel Excess total Excess fuel cost Excess Fuel Excess total imposed to Subsidy Fuel Cost imposed to Subsidy Fuel Cost transport users transport users 1.20 1.46 2.85 1.08 1.30 2.38 The total excess fuel costs for the 11 corridors are estimated to be 2.85 billion LE using approach 1 (speed plots) and 2.38 billion LE using approach 2(V/C ratios). The share of the costs to the user is 45% and the costs for the Government represent 55% of the total amount. Further information and a series of detailed analyses on excess fuel consumption and costs for individual corridors can be found in Annex 11. 4.6 Associated Cost of CO2 Emissions due to Excess Fuel Consumption This section outlines the method of estimating emissions from vehicular activity using available data from car floating survey. Cairo Traffic Congestion Study. Final report 125 A number of studies, in developed and developing countries, apportioning the sources of air pollution put the transport sector atop – both from direct exhaust and indirect road dust. Increasing fuel consumption on the road mean emissions increase, air quality will only get worse. The following figure provides the framework for the emissions from road traffic. The fuel intake is one of the elements determining the level of emissions. Given the following standard emission rates for diverse vehicular modes, the CO2 emission caused by excess fuel consumption due to congestion is estimated per year. 126 Table 4.5: The emission rate for diverse vehicular modes Emission rate CO2 Vehicular Mode kg/L Cars (diesel and gasoline) 2,40 Motorcycle 2,42 Taxi 2,40 Bus 2,41 BRT 2,24 Source: Guttikunda, S., 2008, Simple Interactive Models for Better Air Quality, Vehicular Air Pollution Information System VAPIS. www.sim-air.org Likewise other cost components, the consultant applied both approaches to estimate emission weight and consequent cost for the region. The total CO2 emission weight is estimated 1.7 million ton per annum for the 11 corridors using approach 1 (speed plots).The emission cost for each corridor is estimated by converting emission weights to costs. The consultant applied the conversion factor 57 (LE/Ton) based on the World Bank estimation. The total emission costs due to traffic congestion for the 11 corridors is estimated approximately 97 million LE per annum. When applying approach 2 (V/C ratios), the total CO2 emission weight is estimated 1.5 million ton per annum for 11 corridors and the emission cost due to traffic congestion is estimated approximately 86 million LE per annum. Further information and a series of detailed analyses on emission costs for 11 corridors can be found in Annex 11. 4.7 Total Direct Costs of Traffic Congestion for 11 Corridors Summarizing the aforementioned traffic congestion cost components, the total direct traffic congestion cost for the 11 corridors is estimated as follows by: Table 4.6: Direct cost components of traffic congestion (approach 1) Excess fuel Delay cost Unreliability cost Excess fuel cost Emission Cost Total cost subsidy 2.625.668.148 1.712.392.281 1.207.697.012 1.451.004.736 97.299.441 7.094.061.618 Table 4.7: Direct cost components of traffic congestion (approach 2) Excess fuel Delay cost Unreliability cost Excess fuel cost Emission Cost Total cost subsidy 2.375.181.344 1.712.392.281 1.084.507.106 1.305.544.977 86.813.921 6.564.439.628 The data that has been used for all calculations is presented in Annex 12. Cairo Traffic Congestion Study. Final report 127 Figure 4.1 and 4.2 illustrates the total direct economic cost of traffic congestion for 11 corridors given the approach 1 and 2. The main cause of difference between results of these two approaches is the applied method to determine the congested part of the corridors. Due to lack of sufficient information on legal and illegal onsite parking status on the corridors, police checks, random pedestrian crossings and microbus stops, the actual corridor’s capacity in approach 2 might be overestimated and thus results in lower traffic congestion cost compared to approach 1. This is especially the case for corridors 2, and 10 which is the estimated length of congested segments in approach 2 is shorter than that in approach 1. 1,40 Billions 1,20 1,00 0,80 LE 0,60 0,40 0,20 0,00 r1 r2 r3 r4 r5 r6 r7 r8 r9 0 1 r1 r1 o o o o o o o o o rid rid rid rid rid rid rid rid rid o o rid rid or or or or or or or or or or or C C C C C C C C C C C Figure 4.1 Total annual direct cost due to traffic congestion in 11 corridors (approach 1) 1,40 Billions 1,20 1,00 0,80 LE 0,60 0,40 0,20 0,00 0 11 Co r 1 r2 Co r 3 r4 Co r 5 r6 7 8 9 r1 or or Co or o do o do o do or do rid rid rid rid rid rid rid rri rri rri rri or or or or or or or C C C C C C C Figure 4.2 Total annual direct cost due to traffic congestion in 11 corridors (approach 2) The figure shows that transportation in corridor 1 (26th of July/15th of May Travel Corridor) and corridor 3 (Ring Road Southern segment) faces the highest excess cost due to traffic congestion in Cairo compared to other corridors. For corridor 3, total excess cost 128 exceeds 1.28 billion LE annually. This amount decreases for corridor 1 and approximately reaches to 1.1 billion LE per annum. 4.8 Sensitivity analysis As indicated before, in the 2nd approach the congestion threshold is determined by using the V/C index. The road capacity in the GCMA is affected by onsite parking. In the lack of a comprehensive parking inventory analysis the consultant assumed that one lane of the corridors is occupied during peak hours by legally and/or illegally parked vehicles. By restricting onsite parking to 50% of corridors’ length (instead of no restriction), the congestion level in the corridors decreases accordingly. In this case the total traffic congestion cost can be reduced down to 20%. In other words, an onsite parking inventory analysis on the GCMA network seems to be essential and would lead to more precise estimation of congestion cost in the region. The second sensitivity analysis was performed based on the value of time for all road users (passenger car users, taxi users, transit users, and freight transporters). The analysis demonstrates that ± 1 LB change in the VoT results in approximately ± 8% alteration in the total congestion cost. The third sensitivity analysis focused on fuel economy formulation. The consultant used the original fuel efficiency formula calibrated in 80th decade base on the US car fleet composition. In other words, the average fuel consumption is estimated around 10 litres/100 km (24 MPG) in the city based on speed of 60 Km/hr. The actual fuel consumption in Cairo depends on the fleet composition and the age of the fleet. This information is not yet available. In absence of fleet data, a sensitivity analysis has been conducted. The analysis results show that 20% reduction in fuel efficiency (12 liters/ 100 km), increases the excess fuel cost, the excess emission cost, and the total congestion cost around 25 %, 25% , and 10% respectively. 4.9 Total Direct Cost of Traffic Congestion for GCMA The 11 corridors have been selected to represent the vast majority of traffic congestion locations in GCMA and have been done together with traffic police representatives. Clearly, the direct congestion costs of the entire GCMA will be higher compared to the amount calculated for the 11 corridors. In order to estimate congestion cost for the entire GCMA, crucial information is needed to be able to calculate vehicle capacity ratios. The calculation of V/C ratios can only be done through assigning the total traffic to the total network. The following information is needed: ï‚· Transit route(s) between OD pairs ï‚· Taxi and shared taxi (microbus) route(s) between OD pairs ï‚· Freight transportation routes between OD pairs ï‚· Actual peak hour capacity of the routes ï‚· Free flow speed, peak hour speed, and average speed of in the entire network Cairo Traffic Congestion Study. Final report 129 ï‚· The standard deviation of travel time in the route(s) This listed information is not available, and therefore it is not possible to assign traffic to the network using transport modeling software. The consultant used an alternative method to extend the direct economic cost of traffic congestion from 11 corridors to the GCMA and provide a framework for further research on the issue. The applied methodology can be outlined as a two step procedure as follows: The consultant developed a Traffic Model in Emme3 based on the trip generation and distribution tables and the 11 major corridors attributes and alignments. By running this model we came out with traffic volumes in Greater Cairo distributed only on the 11 major corridors. Therefore, to calculate the percentage of the traffic in Greater Cairo carried by the 11 major corridors, we compared the actual traffic counts results to the Emme Traffic volumes on these corridors. The method used is as follows: ï‚· Summing up the traffic counts results on the 11 corridors in each direction and the total Emme traffic volume in one direction; ï‚· Dividing the total traffic count in each direction by the total Emme traffic volume in one direction; ï‚· Taking the average of the ratios in both directions. This procedure was applied on the PM and AM traffic counts and the ratios turned out to be: 50.4% (AM) and 50.9% (PM). The average of these ratios has been used to extrapolate the congestion cost of the 11 corridors to the entire GCMA. The results are shown in the following tables: Table 4.8: Direct cost components of traffic congestion for the entire GCMA (approach 1) Excess fuel Delay cost Unreliability cost Excess fuel cost Emission Cost Total cost subsidy 5.251.336.295 3.424.784.562 2.415.394.024 2.902.009.472 194.598.882 14.188.123.236 Table 4.9: Direct cost components of traffic congestion for the entire GCMA (approach 2) Excess fuel Delay cost Unreliability cost Excess fuel cost Emission Cost Total cost subsidy 4.750.362.688 3.424.784.562 2.169.014.212 2.611.089.953 173.627.841 13.128.879.256 130 Fuel Subsidy 20,5% Excess Fuel cost users 17,0% Emission Cost 1,4% Reliability cost 24,1% Delay cost 37,0% Figure 4.3 Distribution of total annual direct cost due to traffic congestion in GCMA (approach 1) Excess fuel subsidy 19,9% Excess fuel cos users 16,5% Emission Cost 1,3% Unreliability cost 26,1% delay cost 36,2% Figure 4.4 Distribution of total annual direct cost due to traffic congestion in GCMA (approach 2) Based on the estimated figures the following conclusions are drawn: ï‚· The total annual direct congestion costs for GCMA is in the range from 13 to 14 billion LE. This range is based on two approaches used: actual speed flow characteristics and calculated vehicle capacity ratios. The latter approach show higher values. ï‚· The main contributor to the total direct cost is the delay costs (36%), which consist of recurrent and non-recurrent congestion costs. The non-recurrent delay costs represent approximately more than half of the total delay costs. ï‚· The unreliability costs also represent a major part of total congestion costs (25%); though these costs are not as high as the total delay costs. ï‚· The total share of the costs for excess fuel is 37% of total costs, of which half is paid by users (retail price of fuel) and the other half is additional costs to the Government (fuel subsidies). Cairo Traffic Congestion Study. Final report 131 ï‚· The emission cost, which only consists of CO2 emissions, is modest with a share of less than 1% of total costs. An additional analysis has been carried comparing the traffic counts (2010 figures) and the Emme assigned traffic in Tables 4.10, 4.11 4.12, and 4.13 summarize a comparison between traffic counts and EMME assignment results. 132 Cairo Traffic Congestion Study. Final report 133 134 Cairo Traffic Congestion Study. Final report 135 136 Table 4.10: Comparison Traffic Counts and Emme Assigned Traffic (vehicles/hour) (AM) Traffic Count Traffic Count EMME Each No Road name Direction 2 Direction 1 (v/h) direction (v/h) Ring Road / Between El Khosoos & Cairo-Alex P1 3299 3212 8879 Agr.Rd Gesr El-Suez/between Ring Road and Ainshams P2 5708 2766 5169 Str. Suez Desert Road / Between KM 4.5 and Ring P3 3051 1890 8988 Road P4 Ring Road / Carfour Al Maadi 6969 6716 7543 P5 Ring Road / Above Cairo-Alex Desert Road 3418 2981 6502 P6 26th July / Between Railway and Ring Road 4389 2398 7587 P7 Al-Ahram Street / Electricity Station 2242 2813 5584 P8 Middle of Abbas Bridge 1512 2022 7800 P9 6 October Bridge between Zamalk and Agozah 7400 7154 9685 P10 Ahmed Helmy Str./ Before Abo Wafya Bridge 651 497 3749 Ramses St. between Ghmara and Ahmed Said P11 4244 4964 St. (One Way to Abasia) Lotifi Al Said St. between Abasia and Ghamrah P12 4093 4648 (One Way to Ramses Square) Salah Salem Str./Between Elfangary and P13 3873 3600 4575 Abbasey Cornish El-Nil /Between 15th May & El-Sahel P14 2535 4016 5982 Bridge Gamal Abd El-Naser (El-Nile St.)/Kornish al P15 4058 3000 8020 Agouza 57.4 43.1 99.7 Cairo Traffic Congestion Study. Final report 137 Table 4.11: Comparison Traffic Counts and Emme Assigned Traffic (ratio count/model) (AM) No Road name Direction 1 Direction 2 Ring Road / Between El Khosoos & Cairo-Alex P1 Agr.Rd 0,37 0,36 Gesr El-Suez/between Ring Road and Ainshams P2 Str. 1,10 0,54 Suez Desert Road / Between KM 4.5 and Ring P3 Road 0,34 0,21 P4 Ring Road / Carfour Al Maadi 0,92 0,89 P5 Ring Road / Above Cairo-Alex Desert Road 0,53 0,46 P6 26th July / Between Railway and Ring Road 0,58 0,32 P7 Al-Ahram Street / Electricity Station 0,40 0,50 P8 Middle of Abbas Bridge 0,19 0,26 P9 6 October Bridge between Zamalk and Agozah 0,76 0,74 P10 Ahmed Helmy Str./ Before Abo Wafya Bridge 0,17 0,13 Ramses St. between Ghmara and Ahmed Said P11 St. (One Way to Abasia) 0,85 Lotifi Al Said St. between Abasia and Ghamrah P12 (One Way to Ramses Square) 0,88 Salah Salem Str./Between Elfangary and P13 Abbasey 0,85 0,79 Cornish El-Nil /Between 15th May & El-Sahel P14 Bridge 0,42 0,67 Gamal Abd El-Naser (El-Nile St.)/Kornish al P15 Agouza 0,51 0,37 138 Table 4.12: Comparison Traffic Counts and Emme Assigned Traffic (vehicles/hour) (PM) Traffic Count Traffic Count EMME Each No Road name Direction 2 Direction 1 (v/h) direction (v/h) Ring Road / Between El Khosoos & Cairo-Alex P1 2968 2985 8879 Agr.Rd Gesr El-Suez/between Ring Road and Ainshams P2 5532 2821 5169 Str. Suez Desert Road / Between KM 4.5 and Ring P3 3996 2009 8988 Road P4 Ring Road / Carfour Al Maadi 7821 9605 7543 P5 Ring Road / Above Cairo-Alex Desert Road 2765 2958 6502 P6 26th July / Between Railway and Ring Road 3323 2499 7587 P7 Al-Ahram Street / Electricity Station 3267 2318 5584 P8 Middle of Abbas Bridge 1765 2464 7800 P9 6 October Bridge between Zamalk and Agozah 5695 3197 9685 P10 Ahmed Helmy Str./ Before Abo Wafya Bridge 606 726 3749 Ramses St. between Ghmara and Ahmed Said P11 4448 4964 St. (One Way to Abasia) Lotifi Al Said St. between Abasia and Ghamrah P12 4111 4648 (One Way to Ramses Square) Salah Salem Str./Between Elfangary and P13 3773 5454 4575 Abbasey Cornish El-Nil /Between 15th May & El-Sahel P14 3460 3249 5982 Bridge Gamal Abd El-Naser (El-Nile St.)/Kornish al P15 3513 4192 8020 Agouza 57.043 44.447 99.675 Based on the traffic counts, the total number of vehicles in peak hours in the eleven corridors is estimated around 605.000 PCU per morning and evening peak hours. Similarly, the total number of vehicles in peak hours in the entire GCMA is approximated to 1.210.000 PCU per morning and evening peak hours. Given the figures above, the total direct cost of traffic congestion for the entire GCMA is estimated as follows: Cairo Traffic Congestion Study. Final report 139 Table 4.13: Comparison Traffic Counts and Emme Assigned Traffic (ratio count/model) (PM) No Road name Direction 1 Direction 2 Ring Road / Between El Khosoos & Cairo-Alex P1 Agr.Rd 0,33 0,34 Gesr El-Suez/between Ring Road and Ainshams P2 Str. 1,07 0,55 Suez Desert Road / Between KM 4.5 and Ring P3 Road 0,44 0,22 P4 Ring Road / Carfour Al Maadi 1,04 1,27 P5 Ring Road / Above Cairo-Alex Desert Road 0,43 0,45 P6 26th July / Between Railway and Ring Road 0,44 0,33 P7 Al-Ahram Street / Electricity Station 0,59 0,42 P8 Middle of Abbas Bridge 0,23 0,32 P9 6 October Bridge between Zamalk and Agozah 0,59 0,33 P10 Ahmed Helmy Str./ Before Abo Wafya Bridge 0,16 0,19 Ramses St. between Ghmara and Ahmed Said P11 St. (One Way to Abasia) 0,90 Lotifi Al Said St. between Abasia and Ghamrah P12 (One Way to Ramses Square) 0,88 Salah Salem Str./Between Elfangary and P13 Abbasey 0,82 1,19 Cornish El-Nil /Between 15th May & El-Sahel P14 Bridge 0,58 0,54 Gamal Abd El-Naser (El-Nile St.)/Kornish al P15 Agouza 0,44 0,52 As the results show, there is a major difference between traffic counts and the Emme model in most of the count stations. It is recommended to further analyse these differences before using the present model for transport planning purposes. 4.10 Breakdown of Traffic Congestion costs Tables 4.14 and 4.15 outline congestion costs breakdown for the entire GCMA for the flowing vehicular modes: ï‚· Passenger cars ï‚· Transit (incl. Taxi, Microbus, Minibus, Bus) ï‚· Freight transport As the results show, the share of passenger cars in traffic congestion costs is the highest (56%). Public transport also contributes significantly in traffic congestion costs (41%). The share of freight transportation is the lowest (7 %). 140 Table 4.8:Breakdown of traffic congestion costs for the entire GCMA (Approach 1) GCMA Excess Fuel cost users Reliability cost Delay cost Emission Cost Fuel Subsidy Total cost Passenger Car 1.554.736.357 1.532.168.985 2.827.446.364 124.543.284 1.900.233.325 7.939.128.316 Vehicular Transit 711.745.492 1.857.479.502 2.251.811.697 56.433.676 852.863.972 5.730.334.339 mode Freight 148.912.175 27.061.318 156.030.239 13.621.922 148.912.175 494.537.828 Table 4.9:Breakdown of traffic congestion costs for the entire GCMA (Approach 2): GCMA Excess Fuel cost users Reliability cost Delay cost Emission Cost Fuel Subsidy Total cost Passenger Car 1.412.431.994 1.532.168.985 2.559.609.174 111.121.818 1.726.305.771 7.341.637.743 Vehicular Transit 637.997.790 1.857.479.502 2.043.672.258 50.352.074 766.199.755 5.355.701.378 mode Freight 118.584.427 27.061.318 131.491.781 12.153.949 118.584.427 407.875.903 Cairo Traffic Congestion Study. Final report 141 4.11 Zonal Based Direct Economic Cost of Traffic Congestion In this section the distribution of congestion cost to traffic zones is dealt with. In order to determine direct economic cost in a disaggregate level for each zone of GCMA; the consultant considers the following factors for each zone: ï‚· Geographic size ï‚· Local road types ï‚· Traffic network types ï‚· Number of available lanes in the traffic network ï‚· Land use Figure 4.5 illustrates local road types in GCMA. Local road types are divided into 3 classes: ï‚· Dual Carriage Road ï‚· Main Paved Road ï‚· Secondary Paved Road 142 Figure 4.5 Local road types in GCMA As is shown, most of the local roads in the suburban area belong to dual carriage road class with one lane available capacity in each direction. Excluding interzonal trips that are normally made via local network, it is not expected that main traffic between zones use such local roads. Figure 4.6 illustrates traffic network types in the entire GCMA. The network consists of 5 road types as follows: ï‚· Inter- Urban Primary Highway ï‚· Regional Primary Highway Cairo Traffic Congestion Study. Final report 143 ï‚· Urban Expressway ï‚· Urban Primary Street ï‚· Other Figure 4.6 Traffic Network types in GCMA Table 4.16 outlines GCMA zones existing network types: 144 Table 4.10: GCMA zones network types Zone InterUrban Regional Urban Urban Local Primary Highway Primary Highway Expressway Primary Street South Giza Helwan 10th of Ramadan 6th of October Giza Imbaba Markaz Maadi Khaleefa Dokki CBD Shoubra Nasr City Ain Shams Masr Al Gadida Salam City Shoubra El Khima Qanater Qalioub Figure 4.7 illustrates the number of lanes in the main corridors of the region. Cairo Traffic Congestion Study. Final report 145 Figure 4.7 Number of Lanes in Main corridors of GCMA As it is shown in the most of regions, especially suburbs, local roads having one lane in each direction are predominant. Although the ring road contains 4 lanes, the number of lanes in other main corridors is commonly limited to 3, or even 2. 146 Figure 4.8 illustrates the land use as well as network classes in the entire GCMA. Agriculture is the predominant land use in the most of the region especially in the suburbs. Figure 4.8 Land use and Network classes in the GCMA Table 4.17 outlines the land use of GCMA zones. Cairo Traffic Congestion Study. Final report 147 Table 4.11: Predominant Land Use of GCMA Zone Agriculture Urbanized South Giza Helwan Giza Imbaba Markaz Maadi Khaleefa Dokki CBD Shoubra Nasr City Ain Shams Masr Al Gadida Salam City Shoubra El Khima Qanater Qalioub In order to calculate the share of each traffic zone of total direct economic of traffic congestion the aforementioned information are used by the consultant. The following factors are used to determine the share of each traffic zone from congestion: ï‚· Number of originated and attracted trips from the adjusted OD matrix from JICA for 2010 as proxy for traffic flow ï‚· Network type(s) as proxy for design road capacity and free flow speed ï‚· Number of trips per lane-kilometer as proxy for actual road capacity and average speed ï‚· Land Use as proxy for level of congestion ï‚· The Network length The congestion costs in the eleven corridors cover the following zones: Salam City, Nasr City, Khaleefa, Giza, Dokki, CBD, Masr El Gadida, Shoubra, Shoubra El Khima, Part of Imbaba Markaz and Ain Shams. The share of each aforementioned zone based on the trip production/attraction, the network type and the network capacity are approximated (table 4.18). Table 4.12: Traffic congestion cost in traffic zones in the GCMA District Share of Congestion (%) Congestion cost Congestion cost Million Million LE(approach 1) LE (approach 2) Ain Shams 3.4 237.9 220.1 CBD 5.8 410.5 379.8 Dokki 8.3 592.0 547.8 Giza 14.7 1,043.4 965.5 Khaleefa 7.5 530.1 490.5 Masr El Gadid 19.0 1,345.3 1,244.8 148 Nasr City 23.6 1,675.8 1,550.7 East side Imbaba Markaz 6.2 443.1 410.0 Salam City 3.8 270.3 250.1 Shoubra 5.5 389.5 360.5 Shoubra El Khima 2.2 156.0 144.3 Total 100.0 7,094.1 6,564.4 Similarly, the method is applied for suburban areas. Table 4.19 summarizes the congestion costs for traffic zones located in the suburbs. Table 4.13: Traffic congestion cost in suburban traffic zones in the GCMA District Share of Congestion (%) Congestion cost Million Congestion cost Million LE(approach 1) LE (approach 2) th 10 of Ramadan 6.3 445.6 412.3 th 6 of October 8.5 600.0 555.2 Helwan 3.0 213.0 197.1 Imbaba Markaz 13.2 934.1 864.4 Maadi 13.5 957.7 886.2 Qalioub 22.8 1617.1 1496.4 Qanater 24.5 1737.8 1608.0 South Giza 8.3 588.7 544.8 Total 100.0 7,094.1 6,564.4 4.12 Reflection of the Applied Methodology The calculation method applied, which to a large degree is based on the TTI method, has provided a sound basis for the direct congestion costs for GCMA within the available data and information. The method has been extended using two different approaches, which provide comparable results for the overall direct costs. The method is replicable and justifiable, though the calculation method can be enhanced in future to yield more accurate results. The following issues could be elaborated: Fuel efficiency calculation The fuel efficiency calculation based on a linear regression model which has been developed for the US in line with American car standards and existing fuel octane in US. Thus, the formulation needs to be adjusted for the Cairo region based on fleet ages, composition, vehicle motor standards and efficiency, and widely used fuel octane. Reliability indicator The consultant uses the standard deviation and thus coefficient of variation (COV) as the measure for travel time reliability. For a more accurate measure, the buffer index could be chosen as well, because it relates to the reliability of an individual vehicle trip. The travel rates used in this calculation can be derived from average speed readings and the length of a route. This measure will help determining the impact of congestion on one vehicle traveling on a segment of roadway during a specific time period. Cairo Traffic Congestion Study. Final report 149 The buffer index represents the reliability of travel rates associated with single vehicles. This measure may be beneficial to the public because it tells them how congestion will affect them as individuals. For example a buffer index of 40% means that a traveler should budget an additional 8 minute buffer for a 20 minute average peak travel time to ensure on time arrival “mostâ€? of the time (where “mostâ€? is defined as 95% of the time). However, it should be noted that in practice the buffer time varies across the users because of each user’s individual experiences with variability and because of each user’s individual requirement for arriving at the destination on time. To summarize, the consultant believes buffer time related indicators such as the Buffer Time Index and Planning Time Index are appropriate monitors to describe and communicate travel time reliability to planners as well as users. Other more simple measures such as travel time percentiles, median travel times and the standard deviation of travel time may also serve as appropriate indicators, but they should be used with caution, as relevant characteristics of the travel time distributions could be easily overlooked. For instance, using the standard deviation of travel time as a utility component in route choice may results in biased outcomes. To estimate the unreliability associated cost for the entire network, using the standard deviation of travel time seems to be accurate enough since the indicator does not need to express traveler’s behavior facing travel time unreliability. In other words, applying a buffer time indicator (e.g. the buffer time index) is essential when transport planners particularly deal with the way in which travelers make their decision (mode choice, route choice, and departure time choice). Monetizing unreliability When unreliability is measured as the standard deviation of travel time, data for the valuation of the standard deviation should be obtained through a stated preference survey by including a representation of the variance and the mean travel time as attributes. Thus, a utility function is specified that includes the mean journey duration as well as the standard deviation of the journey duration. Parameters for both variables are estimated usually on the stated preference data. The ratio of coefficient for the standard deviation to the coefficient for the mean travel time can be calculated. This gives the disutility of a minute standard deviation of travel time in terms of minutes of mean travel time. A monetary value for unreliability can be derived by combining this with a value of time. Given the lack of stated preference survey, the consultant used quantitative results on value of reliability in passenger transport from European studies carried out in recent years. Regarding the potential differences in trip patterns, peak hours, commuting trips between EU countries and Egypt, estimation of unreliability associated costs would be more precise if a SP survey performed in the region to derive a monetary value of 1 minute standard deviation of travel time in the Cairo Region. 150 Coverage of the entire GCMA The methodology that was applied to estimate the direct economic cost of traffic congestion is based on several assumptions that impact accuracy. Therefore, the consultant believes in order to gain an accurate estimation of traffic congestion cost in the GCMA, a complete and detailed transport network is needed, socio economic information is needed, an effective transport model in a commonly used transport software should be developed, and finally Stated Preference survey to derive reliability perception need to be carried out. The systematic procedure that the consultant recommends to obtain more accurate results consists of the following steps: ï‚· Trip generation is estimated based on existing land use. Thus, a comprehensive socio- economic data are required. ï‚· The detailed transport, as well as transit networks should be designed in ARC GIS based software (e.g. Map Info) and then linked to commercial softwares such as Emme, TransCad, or Visum. ï‚· Design as well as actual transport and transit network specifications including, speed, length, number of lanes, types of right of way, on site parking places, bus and micro bus stops, signal setting at intersection, etc are determined and implemented into the model. ï‚· Travel time functions (e.g. adapted BPR function) should be allocated to the network depending on road type. For the links suffering from incidental delays, BPR functions should be adjusted accordingly. ï‚· TTI or FHWA recurrent as well as nonrecurring delay functions, reliability indicators, the fuel efficiency function, and the air emission function are applied to the model to estimate delay costs, unreliability costs, excess fuel cost, excess fuel subsidy, and emission cost. ï‚· The four steps of the classical urban transportation planning system model consisting: Trip generation, Trip Distribution, Mode Choice, Route Assignment are done by running commercial packages such as Emme, TransCad, or Visum. ï‚· Given outputs, several sensitivity analyses are carried out in order to test the accuracy of the model. ï‚· The most accurate outputs are chosen as the reliable result. Cairo Traffic Congestion Study. Final report 151 5 Conclusions and some recommendations for Phase II This study demonstrates that traffic congestion is a serious problem in the Cairo metropolitan area with substantial adverse effects on personal travel time, vehicle operating costs, air quality, fuel cost and subsidy, and also reliability. The consultant showed that without investments in urban transportation in the Greater Cairo, it is expected that the total annual direct congestion costs for the GCMA is estimated in the range of 13 to 14 billion LE. The highest shares of the total direct cost are those of the travel time delay cost (36%), consisting of recurrent and non-recurrent congestion costs, and excess fuel cost (37%), of which half is paid by users (retail price of fuel) and the other half is additional costs to the Government (fuel subsidies); followed by unreliability cost (25%); and finally, the CO2 emissions cost has a fairly small share of less than 2% of total costs. the CO2 emissions cost 2% unreliability cost 25% travel time delay cost 36% excess fuel cost 37% Given, the first phase study result in terms of significance of economic costs of traffic congestion in the region, the second phase should involve prioritizing and recommending a package of traffic management and investment measures for congestion reduction. 152 The findings of the Phase 1 of the study will undoubtedly be utilized in Phase 2. Further to the analyses that were completed to this point, the capacity constraints of the transport network in Greater Cairo may be identified, in order to input such data in the demand and congestion cost model required in Task 3 of Phase 2. In terms of additional data needed for Phase 2, available forecasts and plans shall be sought to help identify the requested possible scenarios based on income growth, urbanization, travel patterns (Task 3, Phase 2). The Consultant also needs to know of investment plans that are currently in place regarding city road network, public transport system, metro system, rail system, etc. (Task 4, Phase 2). The Consultant may also benefit from the additional data that would be collected to refine and confirm some of the results of Phase 1. For instance, the collection of a more complete set of vehicle registration data, particularly in terms of vehicle age and composition, would help refine the calculated estimate for CO2 emissions due to traffic congestion. Additionally, the generalization of congestion costs that were calculated for the surveyed corridors to cover the entire study area would be assessed. Cairo Traffic Congestion Study. Final report 153 Annex 1: References 1. Annual Urban Mobility Report, 2009, Texas Transportation Institute, Texas, USA. 2. ADONIS (1999), Best Practice to Promote Cycling and Walking and How to Substitute Short Car Trips by Cycling and Walking, European Union (www.europa.eu); at http://cordis.europa.eu/transport/src/adonisrep.htm. 3. Anne Vernez Moudon (2001-2007), Targeting Pedestrian Infrastructure Improvements, Washington State DOT, WA-RD 519.1 (www.wsdot.wa.gov); at www.wsdot.wa.gov/Research/Reports/500/519.1.htm. 4. Austroads (2009), Estimating the Social Costs of Crashes: Methodological Challenges, Draft working paper, Sydney, Australia. 5. Austroads (2009), Methodological Challenges in the Valuation of Environmental Externalities in Australia, Draft working paper, Sydney, Australia. 6. Bayer-Oglesby L, Schindler C, Hazenkamp-von Arx ME, Braun-Fahrlander C, Keidel D, et al (2006). Living near main streets and respiratory symptoms in adults: the swiss cohort study on air pollution and lung disease in adults. Am J Epidemiol 2006;164:1190-1198. 7. Bell ML, Ebisu K, Belanger K. (2007) Ambient air pollution and low birth weight in Connecticut and Massachusetts. Environmental Health Perspective;115(7):1118-1125. 8. Bilbao-Ubillos, J., (2008). The costs of urban congestion: Estimation of welfare losses arising from congestion on cross-town link roads. Transportation research Part A. pp.1098-1108 9. Brook RD, Brook JR, Rajagopalan S. (2003) Air pollution: the “heartâ€? of the problem. Curr Hypertens Rep;5:32-39. 10. Burnett RT, Stieb D, Brook JR, Cakmak S, Dales R, Vincent R, et al. (2004), Associations between short-term changes in nitrogen dioxide and mortality in Canadian cities. Arch Environ Health 2004;59:228-236. 11. COMPETE (2007), COMPETE Final Report: Analysis of the Contribution of Transport Policies to the Competitiveness of the EU Economy and Comparison with the United States, ISI Fraunhofer Institute Systems and Innovation Research, Karlsruhe 12. Cost-Effective Performance Measures for Travel Time Delay, Variation, and Reliability, 2008, National Cooperative Highway Research Program NCHRP, Report 618. 13. Dales R, Burnett RT, Smith-Doiron M, Stieb DM, Brook JR. (2004), Air pollution and sudden infant death syndrome. Pediatrics;113:628-631. 14. Dan Burden (2003), Level of Quality (LOQ) Guidelines, Walkable Communities (www.walkable.org/library.htm); at www.tjpdc.org/transportation/walkability.asp. 15. Dan Nabors, et al. (2007), Pedestrian Road Safety Audit Guidelines and Prompt Lists, Pedestrian and Bicycle Information Center (www.pedbikeinfo.org), Federal 154 Highway Administration Office of Safety; at http://drusilla.hsrc.unc.edu/cms/downloads/PedRSA.reduced.pdf 16. De Rosa M, Zarrilli S, Paesano L, Carbone U, Boggia B, Petretta M, et al. (2003) Traffic pollutants affect fertility in men. Human Reproduction;18:1055-1061. 17. Developing Harmonized European Approaches for Transport Costing and Project Assessment (HEATCO) , May 2006 18. ECMT, 1998 European Conference of Ministers of Transport, Efficient transport in Europe, Policies for internalisation of external costs Paris : ECMT, 1998 19. Finkelstein MM, Jerrett M, Sears MR. (2005) Environmental inequality and circulatory disease mortality gradients. J Epidemiol Community Health;59:481- 487. 20. FDOT (2002), Quality/Level of Service Handbook, Florida Department of Transportation (www.dot.state.fl.us); at www.dot.state.fl.us/Planning/systems/sm/los/los_sw2.htm 21. Fung KY, Luginaah I, Gorey KM, Webster G.(2005) Air pollution and daily hospital admissions for cardiovascular diseases in Windsor, Ontario. Canadian Journal of Public Health;96:29-33. 22. Gauderman WJ, Vora H, McConnell R, Berhane K, Gilliland F, Thomas D, et al. (2007) Effect of exposure to traffic on lung development from 10 to 18 years of age: a cohort study. Lancet 2007;369(9561):571-577. 23. Guidebook for Assessing the Social and Economic Effects of Transportation Projects Transportation Research Board — National Research Council 2001 24. Guo J, Kauppinen T, Kyyronen P, Heikkila P, Lindbohm M, Pukkala E. (2004) Risk of esophageal, ovarian, testicular, kidney and bladder cancers and leukemia among Finnish workers exposed to diesel or gasoline engine exhaust. Int J Cancer 2004;111:286-292.’ 25. Guria J, Jones W, Leung J, Mara K. Alcohol in New Zealand road trauma.2003, Applied Health Economy and Health Policy.Vol.2 pp.183–190 26. Harkey, et al (1998), The Bicycle Compatibility Index: A Level of Service Concept, FHWA, FHWA-RD-98-072 (www.fhwa.dot.gov); at http://safety.fhwa.dot.gov/tools/docs/bci.pdf 27. Health Canada, http://www.tbs-sct.gc.ca/dpr-rmr/2007-2008/inst/shc/shc02- eng.asp 28. Hoffmann B, Moebus S, Stang A, Beck E, Dragano N, Mohlenkamp S, et al (2006). Residence close to high traffic and prevalence of coronary heart disease. Eur Heart J;27:2696-2702. 29. Improving Reliability on Surface Transport Networks, Organization for Economic Co-Operation and Development OCED, International Transportation Forum, 2010 30. INFRAS/IWW, (2004). External Costs of Transport: up-date study (October 2004 Summary), Zurich/Karlsruhe. 31. Interactions between Transportation Capacity, Economic Systems, and Land Use, 2008, Economic Development Research Group, Inc. 32. J.M. Clark and B.J. Hutton (1991), The Appraisal of Community Severance, Report #135, Transport Research Laboratory (www.trl.co.uk). 33. Jerrett M, Burnett RT, Ma R, Pope III CA, Krewski D, Newbold KB, et al (2005). Spatial analysis of air pollution and mortality in Los Angeles. Epidemiology;16:727- 736. 34. Koushki, P., L. Cohn and A. Felimban, 1990. Traffic-generated noise pollution in Riyadh: Its magnitude and perceived health hazards. Research Report No. AT 9- 31, KACST, 1990, Saudi Arabia. Cairo Traffic Congestion Study. Final report 155 35. Land Transport New Zealand (2006) Economic Evaluation Manual (EEM) - volume 1 (www.landtransport.govt.nz); at www.landtransport.govt.nz/funding/manuals.html 36. Lanki T, Pekkanen J, Aalto P, Elosua R, Berglind N, D’Ippoliti D, et al. (2006) Associations of traffic related air pollutants with hospitalization for first acute myocardial infarction: the HEAPSS study. Occup Environ Med ;63:844-851. 37. Land Transport New Zealand (2006), Transportation and noise: land use planning options for a quieter New Zealand, Land Transport NZ Research Report No. 299, Wellington. 38. Managing Urban Traffic Congestion, European Conference of Ministers of Transport (Ecmt) OCED, 2007. 39. Mehra, C., 1986. Very high noise levels in Indian cities. Arab News, Sunday, November 9 1986. 40. McConnell R, Berhane K, Yao L, Jerrett M, Lurmann F, Gilliland F, et al. Traffic, susceptibility, and childhood asthma. Environ Health Perspective 2006;114:766-772. 41. Miller KA, Siscovick DS, Sheppard L, Shepherd K, Sullivan JH, Anderson GL, et al. Long-term exposure to air pollution and incidence of cardiovascular events in women. NEJM 2007;356(5):447-458 42. Miller, T and Guria, J (1991), The Value of Statistical Life In New Zealand, Ministry of Transport, Wellington. 43. Morgenstern V, Zutavern A, Cyrys J, Brockow I, Gehring U, Koletzko S, et al. (2007) Respiratory health and individual estimated exposure to traffic-related air pollutants in a cohort of young children. Occup Environ Med 2007;64: 8-16. 44. Mutairi, N., F. Al-Rukaibi and P. Koushki, 2009, Measurements and Model Calibration of Urban Traffic Noise Pollution, American Journal of Environmental Sciences 5 (5): 613-617, 45. NHI (1996), Pedestrian and Bicyclist Safety and Accommodation; Participants Handbook, National Highway Institute Course No. 38061, FHWA (www.fhwa.dot.gov). 46. Nie J, Beyea J, Bonner MR, Han D, Vena JE, Rogerson P, et al. 2007. Exposure to traffic emissions throughout life and risk of breast cancer : the Western New York Exposures and Breast Cancer (WEB) study. Cancer Causes Control; 18 :947- 955. 47. Oyana TJ, Rivers PA.(2005) Geographic variations of childhood asthma hospitalization and outpatients visits and proximity to ambient pollution sources at a US-Canada border crossing. Int J Health Geography;4:14 48. Peters A, Dockery DW, Muller JE, Mittleman MA (2001). Increased particulate air pollution and the triggering of myocardial infarction. Circulation;103:2810- 2815. 49. Richard Dowling, et al. (2008), Multimodal Level Of Service Analysis For Urban Streets, NCHRP Report 616, Transportation Research Board (www.trb.org); at http://trb.org/news/blurb_detail.asp?id=9470; User Guide at http://onlinepubs.trb.org/onlinepubs/nchrp/nchrp_w128.pdf. 50. Ryan PH, LeMasters G, Biagini J, Bernstein D, Grinshpun SA, Shukla R, et al.(2005) Is it traffic type,volume, or distance? Wheezing in infants living near truck and bus traffic. J Allergy Clin Immunol;116:279-284. 156 51. Pattenden S, Hoek G, Braun-Fahrlander C, Forastiere F, Kosheleva A, Neuberger M, et al.(2006) NO2 and children’s respiratory symptoms in the PATY study. Occup Environ Med 2006;63:828-835 52. Person-Kirk, D. and S. Sabir, 1989. The Assessment and prediction of road traffic noise in developing countries. Proceeding of the 11th International Road Federation World Meeting, Korea. 53. Pearson RL, Wachtel H, Ebi KL.(2000) Distance-weighted traffic density in proximity to a home is a risk factor for leukemia and other childhood cancers. Journal Air Waste Management Association;50:175-180. 54. Sarnat JA, Holguin F. Asthma and air quality (2007). Current Opinion in Pulmonary Medicine 2007;13:63-66. 55. Sathis, T.C., 1981. Community noise levels in Patras, Greece. J. Acoust. Soc. Am., 69: 468-477. http://www.ncbi.nlm.nih.gov/pubmed/7462470 56. Schrank, D., and T. Lomax, 2009, Annual Urban Mobility Report, Texas Transportation Institute, UTCM, Texas, USA. 57. Stefan Grudemo, Pernilla Ivehammar and Jessica Sandström (2002), Calculation Model For Encroachment Costs Of Infrastructure Investments, Swedish National Road and Transport Research Institute (www.vti.se); at www.vti.se/nordic/3- 03mapp/pdf/page27.pdf 58. Stieb DM, Judek S, Burnett RT.(2002) Meta-analysis of time-series studies of air pollution and mortality: effects of gases and particles and the influence of cause of death, age, and season. Journal Air Waste Management Association;52:470- 484. 59. Susan Handy (2003), “Amenity and Severance,â€? Handbook of Transport and the Environment, Elsevier (www.elsevier.com), pp. 117-140. 60. The Cost of Congestion to the Economy of the Portland Region, 2005, Economic Development Research Group, Inc. 61. Todd Litman (1994), “Bicycling and Transportation Demand Management,â€? Transportation Research Record 1441, TRB (www.trb.org), pp. 134-140; now titled, Quantifying the Benefits of Non-Motorized Transport for Achieving TDM Objectives; at www.vtpi.org/nmt-tdm.pdf. 62. Toronto Public Health. Air Pollution Burden of Illness from Traffic in Toronto, Problems and Solutions, Nov 2007. Toronto, Canada 63. Transportation Cost and Benefit Analysis II – Congestion Costs, Victoria Transport Policy Institute 2010 64. Travel Time Reliability, Making It There on Time , All the Time, US Department of Transportation, Federal Highway Administration FHWA. http://www.fhwa.dot.gov/ 65. Villeneuve PJ, Chen L, Stieb D, Rowe BH. (2006) Associations between outdoor air pollution and emergency department visits for stroke in Edmonton, Canada. Eur J Epidemiol;21:689-700. 66. Vineis P, Hoek G, Krzyzanowski M, Vigna-Taglianti F, Veglia F, Airoldi L, et al. (2006). Air pollution and risk of lung cancer in a prospective study in Europe. Int J Cancer 2006;119:169-174. 67. VTPI (2005), Transport Elasticities: How Prices and other Factors Affect Travel Behaviour, On-line TDM Encyclopedia, Victoria Transport Policy Institute, www.vtpi.org/tdm/tdm11.htm Cairo Traffic Congestion Study. Final report 157 68. Pedestrian and Bicycle Information Center (www.bicyclinginfo.org), NHTSA, and USDOT. 69. UK. Department for Environment Food and Rural Affairs. http://www. Defra.gov.uk 70. Watkiss, 2005, The Social Cost of Carbon (SCC) Review : Methodological Approaches for Using SCC Estimates in Policy Assessment, Final Report November London : UK Defra, 2005 71. Weisbrod, G., Vary, D., and Trezy, G. 2003, Measuring the Economic Costs of Urban Traffic Congestion to Business, Transportation Research Record, #1839 72. Weisbrod, G., 2007, Models to Predict the Economic Development Impact of Transportation Projects: Historical Experience and New Applications, Annals of Regional Science 73. Yavuz Duvarcia; Shoshi Mizokami, 2009, A suppressed demand analysis method of the transportation disadvantaged in policy making, Transportation Planning and Technology, Volume 32, Issue 2 April 2009 , pages 187 - 214 74. Zax, J.S. 1991, “Compensation for Commutes in Labor and Housing Markets.â€? Journal of Urban Economics, v.30, pp. 192-207 158 Annex 2: Glossary Symbol Unit Explanation The total traffic volume during a given time period, ranging from 2 to 364 ADT Vehicles per day consecutive days, divided by the number of days in that time period, C Pc/hr Road capacity COV - Coefficient of variation of travel time DC LE/year The annual recurring and nonrecurring delay cost Vehicle km per The average daily traffic (ADT) of a section of roadway multiplied by the length DVKT day of that section of roadway L Km Corridor length ï?¡ - Road incident delay factor ND - The number of cases of material injuries O passengers Vehicle occupancy factor P - The Number of cases of personal injuries PHF - The peak hour factor T Hr The mean travel time STD Hr The standard deviation of travel time UD LE The average unitary value of material damage UP LE The average unitary value of personal damage V Pc/hr Traffic flow rate Vf Km/hr Free flow speed Vp Km/hr Average speed during peak hours VHD Vehicle hour The vehicle hour delay VOT LE/hr Value of time Cairo Traffic Congestion Study. Final report 159 Annex 3: Overview of Existing Data 160 (A): The total number of vehicles (by type)  Table A3.1: No. of licensed vehicles by type of vehicles & governorate up to Dec 2008 Public Customs Commercial & Bus Private Governorate Bury's cars Taxi Carvan sector Plates Temporary School Travel Tourism Private Public Cars Cairo  954  10264  5765 12167 4133 4452  7320 11826 6669 71370 579 973374 Alexandria*  85  2496  0 1215 600 4116  233 2942 1109 18062 46 270502 Giza  379  714  0 797 1210 8831  1197 4809 803 32015 395 363651 Port Said  12  244  236 335 14 187  48 255 97 9480 3 44541 Suez  7  907  4527 241 10 514  2 395 60 3375 0 26913 Ismailia  2  478  0 342 42 91  4 401 177 5002 4 28200 Damietta  24  990  7 339 41 129  0 186 189 4825 0 30269 Sharkia  7  561  0 350 115 1401  212 2312 1297 14470 11 64664 Dakahlia  22  1989  0 847 219 1155  95 446 425 15133 1 65956 Behera  1  1262  0 313 46 443  4 573 551 15491 0 24437 Gharbia  11  4907  0 656 76 445  12 361 2478 13469 3 52418 Menuofia  5  568  0 289 42 743  4 381 740 13379 0 31644 KafrElSheikh  5  1342  0 205 5 123  11 52 226 6282 0 16969 Kalyoubia  56  1195  0 168 220 1508  22 1160 218 16999 0 39018 Foyoum  4  336  0 73 11 338  8 132 220 10625 0 17627 Beniâ€?Suef  3  163  0 65 15 150  7 167 251 7411 0 20658 Menia  9  223  0 158 73 170  8 263 226 5250 0 21843 Asyout  43  780  0 149 46 102  5 241 192 10873 0 33614 Suhag  4  477  0 186 91 71  4 92 122 11396 0 22501 Qena  18  286  0 53 9 71  9 246 152 8938 0 14290 Aswan  1  370  86 55 2 44  396 396 67 8825 2 11243 Matrouh  1  152  11760 33 9 11  18 34 43 4477 0 4635 Red Sea  27  374  1044 167 32 137  2515 386 200 2271 61 12293 Elâ€?Wadi El Gidid  4  95  0 8 0 16  25 21 34 808 0 2309 North Sinai  1  59  17 15 3 33  0 24 8 1989 0 3062 South Sinai  1  64  5500 12 5 95  1295 307 44 1395 8 4644 Cairo Traffic Congestion Study. Final report 161 Luxor  3  60  0 27 0 29  1647 40 0 2683 0 5548 Total 1689 31356 28942 19265 7069 25405 15101 28452 16598 316293 1113 2206823 * Including Alexandria Port                  Governorate Governorate Government Political Authority Motorcycle Tractor Truck Lorries Total         Cairo  6184  12617  4026 154520 490 10067  118203 306107 Alexandria*  1221  2415  â€? 19681 304 8131  61999 93751 Giza  3361  7870  â€? 100235 634 3958  75710 191768 Portâ€?Said  616  514  â€? 14038 25 1127  6092 22412 Suez  598  418  â€? 15903 53 963  6162 24097 Ismailia  914  732  â€? 13776 440 560  13835 30257 Damietta  1332  421  â€? 43128 339 1684  18205 65109 Sharkia  3078  1592  â€? 67133 3223 4056  59959 139041 Dakahlia  1417  1087  â€? 53786 1949 7005  59886 125130 Behera  3173  1836  â€? 28038 4248 7055  53367 97717 Gharbia  2719  6704  â€? 61264 4669 12900  42444 130700 Menuofia  836  2625  â€? 79505 994 2033  25824 111817 Kafrâ€?ElSheikh  996  2811  â€? 13871 815 1264  21721 41478 Kalyoubia  1013  708  â€? 67702 131 1525  25255 96334 Fayoum  1087  2214  â€? 61223 1339 1980  15185 83028 Beniâ€?Suef  655  1636  â€? 42575 181 406  20226 65679 Menia  1695  2669  â€? 27836 878 988  27531 61597 Asyout  1238  2232  â€? 19724 783 1462  29749 55188 Suhag  862  1435  â€? 23762 637 1183  25100 52979 Qena  697  1334  â€? 38600 265 761  15346 57003 Aswan  1020  1281  â€? 11533 161 238  11432 25665 Matrouh  746  427  â€? 1783 23 271  8875 12125 Red Sea  539  486  â€? 4987 10 839  9181 16042 Elâ€?Wadi Elâ€?Gidid  757  1004  â€? 9913 118 168  2257 14217 162 North Sinai  1576  530  â€? 1754 274 192  7009 10335 South Sinai  513  425  â€? 2782 2 91  4816 8629 Luxur  692  320  â€? 16729 79 25  2480 20325 Total 38535 58343 4026 995781 23064 70932 767849 1958530         * Including Alexandria Port    Source: Central Agency for Public Mobilization and Statistics (CAPMAS) Cairo Traffic Congestion Study. Final report 163 B) Public transport Demand, Capacity, Fleet Composition And Age Fuel economy as an element in direct economic congestion costs will be estimated based on information on the public transport fleet composition and age. Furthermore, determining the public transportation demand and capacity allows estimating the number of passengers who might suffer from traffic congestion and the consequent delay. The tables below outline the public transport demand, capacity, fleet composition and age in GCMA in 2007-2008. Public transport demand is estimated according to “The Strategic Urban Development Master Plan Study For A Sustainable Development Of The Greater Cairo Region In The Arab Republic Of Egypt Final Report (Volume 4).â€? Public transport capacity is based on the number of cars owned by public transportation companies and authorities distributed by transportation means. Table A3.2: Public Transport Daily Trip Generation Growth Ratio Sector Zone name 2007 2012 2017 2022 2027 2027/2007 6th of October NUC 216,409 390,614 560,358 868,892 1,059,497 4.90 Imbaba Markaz 1,224,960 1,540,847 1,680,565 1,755,701 1,772,260 1.45 Doqi 1,113,289 1,197,862 1,175,722 1,121,626 1,077,006 0.97 Giza 1,538,098 1,694,914 1,684,672 1,642,330 1,617,088 1.05 South Giza 377,277 416,811 415,157 395,258 381,68 1.01 Helwan 675,426 741,484 718,017 686,875 668,821 0.99 Maadi 767,843 887,596 936,307 963,995 975,325 1.27 Khaleefa 703,441 732,048 705,051 658,327 619,705 0.88 CBD 583,372 573,342 522,053 454,552 404,122 0.69 Shobra 807,168 832,971 789,732 720,484 664,455 0.82 Masr El Gedeeda 1,263,771 1,274,377 1,183,954 1,104,493 1,022,950 0.81 Nasr City and New 997,651 1,172,625 1,286,118 1,623,031 1,801,254 1.81 Cairo Ain Shams 798,533 879,825 894,459 881,605 856 1.07 Salam City 628,054 645,219 593,245 523,024 468,512 0.75 Shobra El Kheima 858,262 932,533 926,293 909,425 875,359 1.02 Qalyob 699,653 766,281 771,089 772,34 754,438 1.08 Qanater 999,283 1,209,728 1,308,409 1,458,439 1,539,546 1.54 th 10 of Ramadan 122,841 198,592 251,867 328,684 393,14 3.20 NUC Total 14,375,331 16,087,669 16,403,068 16,869,081 16,951,158 1.18 Source: The Strategic Urban Development Master Plan Study For A Sustainable Development Of The Greater Cairo Region In The Arab Republic Of Egypt Final Report (Volume 4) 164 Table A3.3: Public Transport Daily Trip OD Unit 1,000 trips 2007 6th October Imbaba Doqi Giza S.Giza CBD Others Total 6th october 84 21 19 34 8 3 44 216 Imbaba 21 617 282 132 2 37 130 1,224 Doqi 17 261 383 197 5 45 201 1,113 Giza 35 138 196 824 66 36 240 1,538 S. Giza 8 3 4 67 246 3 44 377 CBD 3 38 44 34 3 61 396 583 Others 45 144 181 247 45 395 8,261 9,321 Total 216 1,225 1,113 1,538 377 583 9,321 14,375 2012 6th October Imbaba Doqi Giza S.Giza CBD Others Total 6th October 185 37 29 51 12 4 69 390 Imbaba 37 799 344 158 4 41 155 1,54 Doqi 26 321 390 207 5 42 203 1,197 Giza 53 165 205 916 69 35 248 1,694 S.Giza 12 4 4 71 274 2 46 416 CBD 4 42 41 33 3 58 389 573 Others 70 170 181 254 47 388 9,158 10,273 Total 390 1,541 1,198 1,695 416 573 10,272 16,087 2017 6th October Imbaba Doqi Giza S.Giza CBD Others Total 6th October 298 51 36 64 15 4 89 560 Imbaba 52 896 358 164 4 40 162 1,68 Doqi 32 337 371 200 4 37 190 1,175 Giza 65 172 198 916 66 31 233 1,684 S.Giza 15 4 4 68 274 2 45 415 CBD 4 41 36 30 2 51 355 522 Others 89 175 167 238 46 352 9,286 10,356 Total 559 1,679 1,173 1,684 414 520 10,363 16,395 2027 6th October Imbaba Doqi Giza S.Giza CBD Others Total 6th October 667 84 51 94 21 6 133 1,059 Imbaba 85 970 349 165 4 33 163 1,772 Doqi 46 329 321 181 3 27 165 1,077 Giza 95 171 180 881 57 23 207 1,617 S.Giza 21 4 3 60 250 1 39 381 CBD 6 34 26 22 1 37 274 404 Others 134 174 141 210 40 272 9,655 10,629 Total 1,057 1,769 1,074 1,615 380 402 10,639 16,94 Source: The Strategic Urban Development Master Plan Study For A Sustainable Development Of The Greater Cairo Region In The Arab Republic Of Egypt Final Report (Volume 4) Cairo Traffic Congestion Study. Final report 165 Table A3.4: Public transport Capacity in Cairo Working And Valid Units And Governorates /Technical Valid Units In Expected To Be Accident Destruction And Total Capacity Under Repairing Total Case Stores Repaired Scrap No. Of Seats No. Of Units Bus 112145 3167 0 1176 269 208 4820 Tram 4484 59 0 32 0 0 91 Heliopolis Subway 5450 109 2 25 0 8 144 Subway 50589 231 0 0 0 0 231 River Bus 2100 15 0 20 0 0 35 Total 174768 3581 2 1253 269 216 5321 *Public Bus Includes Public Transportation Authority And Cairo Bus **Unit Contains Three Wagons  Source: CAPMAS Table A3.5: Public transport Capacity in Alexandria Working And Valid Units And Transportation Means Valid Units In Expected To Be Accident Destruction And Total Capacity Under Repairing Total Stores Repaired Scrap   No. Of Seats No. Of Units Bus 13183 351 0 111 0 0 462 City Tram 2880 80 0 39 0 0 119 Tram El Ramel 2784 29 0 13 0 0 42 Total 18847 460 0 163 0 0 623 Source: CAPMAS 166 Table A3.6: Public transport Capacity in Inside Cities  Governorates /Technical Valid & Working Units And Total Capacity Valid Units In Expected To Be Accident Destruction Under Repair Total Case Stores Repaired And Scrap No. Of Seats  No. Of Units  Greater Cairo 112145 3167 0 1176 269 208 4820 Alexandria 13183 351 0 111 0 0 462 Suez 536 18 0 3 0 7 28 6-Oct 368 14 0 1 4 2 21 Damietta 29 1 0 0 0 0 1 Dakahlia 341 12 0 0 0 0 12 Kalyoubia 1858 60 0 3 0 1 64 Kafr El Sheikh 1053 40 0 0 0 0 40 Gharbia 4846 163 12 122 32 0 329 Menoufia 3460 116 0 0 0 0 116 Behera 1296 51 0 2 0 0 53 Ismailia 1212 42 0 1 7 0 50 Giza 1108 41 2 7 0 2 52 Beni Suef 125 3 0 0 0 0 3 Fayoum 116 4 0 0 0 0 4 Menia 73 3 0 1 0 0 4 Asyout 1962 72 0 0 0 8 80 Suhag 234 9 0 1 0 0 10 ASWAN 58 2 0 0 0 0 2 Cairo Traffic Congestion Study. Final report 167 Elwadi El Gidid 33 1 0 0 0 0 1 Total 144036 4170 14 1428 312 228 6152 Source: CAPMAS 168   Table A3.7: Public transport Capacity in Outside Cities Valid & Working Units And Total Valid Units Under Expected To Be Accident Destruction And Regions/Technical Case Capacity Total In Stores Repairing Repaired Scrap No. Of Seats No. Of Units East Delta 31230 641 0 37 102 0 780 West And Central Delta 36251 733 0 85 15 29 862 Upper Egypt 24539 513 0 92 20 2 627 Rail / Sub-Master 273691 3921 27 24 0 0 3972 Total 365711 5808 27 238 137 31 6241 *West and Central Delta, including the EU **Rail unit is a vehicle    Source: CAPMAS Table A3.8: Public transport Capacity the Cairo – 6th of October Transport Corridor System Capacity per Car Congestion Rate Transport Capacity by Headway in Minutes (pax./way/hour) (PAX/Car) 1 3 5 10 15 Bus Ordinary 60 100 3,600 1,200 720 360 240 Large 100 100 6,000 2,000 1,200 600 400 Bi-Articulated 270 100 16,200 5,400 3,240 1,620 1,080 LRT 75 120 18,000 6,000 3,600 1,800 1,200 MonoRail 100 120 - 12,000 7,200 3,600 2,400 MRT 140 150 - 16,800 10,080 5,040 3,360 140 150 - 22,400 13,440 6,720 4,480 Source: The Strategic Urban Development Master Plan Study For A Sustainable Development Of The Greater Cairo Region In The Arab Republic Of Egypt JICA 2009 Update-Final report Vol.4 Cairo Traffic Congestion Study. Final report 169 Table A3.9: Fleet age and composition in Cairo Brands/ Age Groups <1 -1 -3 -5 -7 9 Total Nasr 0 0 0 27 180 3079 3286 Mercedes 0 16 447 149 0 474 1086 Daewoo 0 25 25 0 0 0 50 Kstor 0 0 85 40 0 0 125 Thomas 0 0 0 18 101 58 177 Other 0 0 0 96 0 0 96 Total 0 41 557 330 281 3611 4820 Source: CAPMAS   Table A3.10: Fleet age and composition in Alexandria Brands/ Age Groups <1 -1 -3 -5 -7 9 Total Nasr 15 0 20 59 76 67 237 Mercedes 0 50 0 0 0 0 50 Afico 0 0 0 15 0 0 15 Daewoo 0 30 0 0 0 0 30 Kstor 20 0 0 0 21 0 41 Other 0 0 40 10 23 16 89 Total 35 80 60 84 120 83 462 Source: CAPMAS   170 Table A3.11: Fleet age and composition Inside Cities Brands/ Age Groups <1 -1 -3 -5 -7 -9 Total Nasr 15 5 46 99 256 3190 3611 Mercedes 0 68 447 155 5 475 1150 Nissan 0 0 0 0 0 8 8 Daihatsu 0 0 3 2 0 28 33 G.M 0 0 0 0 0 3 3 Isuzu 12 3 4 55 59 32 165 Bedford 0 0 0 0 0 3 3 Chevrolet 0 10 8 46 8 39 111 Afico 0 3 3 22 0 77 105 Daewoo 0 55 25 0 0 0 80 Kstor 20 0 85 40 23 0 168 Thomas 0 0 0 18 101 58 177 Other 10 30 99 190 49 160 538 Total 57 174 720 627 501 4073 6152 Source: CAPMAS   Cairo Traffic Congestion Study. Final report 171 Table A3.12: Fleet age and composition Outside Cities Brands/ Age Groups <1 -1 -3 -5 -7 9 Total Nasr 0 0 0 0 65 20 85 Mercedes 30 0 0 0 0 6 36 Scania 0 0 0 1 44 479 524 Renault 0 23 29 4 77 249 382 Afico 17 0 13 22 0 24 76 Man 0 0 0 0 52 61 113 Njublan 0 10 9 10 15 33 77 Daewoo 72 195 231 58 0 0 556 Kstor 0 0 0 0 53 137 190 Other 20 71 70 58 10 1 230 Total 139 299 352 153 316 1010 2269 Source: CAPMAS 172 Table A3.13: Distribution of Bus and Microbus Following both Public and Private Licenses (2005) Type of License and Subordination to the Different Governorates (2005) Type of license Total Governorates Public Private Tourism Schools Trips B.S P.S B.S P.S B.S P.S B.S P.S B.S P.S B.S P.S Cairo 5843 0 4541 5280 0 3072 0 2296 0 3685 10384 14333 Alexandria 906 0 554 2608 0 166 0 379 0 1496 1460 4649 Port Said 68 0 47 156 0 26 0 8 0 34 115 224 Suez 86 0 174 429 0 2 0 4 0 202 260 637 Damietta 47 0 66 105 0 0 0 27 0 42 113 174 Dakahlia 281 0 31 272 0 67 0 78 0 556 312 973 Sharkia 594 0 17 1859 0 27 0 35 0 1381 611 3302 Kalyoubia 247 0 206 431 0 22 0 200 0 1891 453 2544 Kafr El Sheikh 197 0 0 39 0 4 0 4 0 38 197 85 Gharbia 412 0 60 287 0 60 0 25 0 286 472 658 Menoufia 347 0 35 287 0 4 0 17 0 404 382 712 Behera 278 0 47 325 0 1 0 15 0 162 325 503 Ismailia 176 0 145 397 0 3 0 36 0 84 321 520 Giza 696 0 44 2302 0 727 0 755 0 2500 740 6284 Beni Suef 69 0 12 138 0 15 0 15 0 100 81 268 Fayoum 81 0 0 91 0 0 0 3 0 85 81 179 Menia 191 0 51 176 0 0 0 15 0 71 242 262 Asyout 89 0 80 211 0 10 0 32 0 70 169 323 Suhag 64 0 8 99 0 0 0 45 0 35 72 179 Qena 100 0 0 203 0 9 0 6 0 37 100 255 Aswan 52 0 74 228 0 124 0 0 0 19 126 371 Luxor 0 0 16 29 0 687 0 0 0 13 16 729 Cairo Traffic Congestion Study. Final report 173 Red Sea 76 0 8 225 0 945 0 4 0 27 84 1201 El Wadi El Gidid 32 0 12 8 0 15 0 0 0 0 44 23 Matrouh 32 0 0 28 0 4 0 4 0 9 32 45 North Sina 14 0 7 29 0 2 0 1 0 21 21 53 South Sina 22 0 2 152 0 257 0 0 0 59 24 468 Total 11000 0 6237 16394 0 6249 0 4004 0 13307 17237 39954 Source: CAPMAS 174 C) Accident data Obtaining accident data including fatality rates, and injury rates will be essential for estimating direct and indirect economic costs of traffic congestion in Cairo. The following tables outline the number of accidents and injuries by the region and the accident type in GCMA in 2007-2008:   Table A3.14: Public transport accident in Cairo Accident Without Injuries Accident With Injuries No. Of Injuries Transport Means Type/ Accident Type Passenger Passenger No. Of No. Of Clashes Fire Infantry Violation To Quarrels Other Clashes Fire Infantry Violation To Quarrels Other Injured Dead Regulations Regulations Bus 1049 50 0 0 13 286 434 0 0 0 0 0 415 43 Tram 15 1 8 0 0 0 9 0 0 0 0 0 6 3 Heliopolis Subway 28 4 0 0 1 0 3 0 0 0 0 0 2 1 Subway 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 1092 55 8 0 14 286 446 0 0 0 0 0 423 47 Source: CAPMAS   Cairo Traffic Congestion Study. Final report 175 Table A3.15: Public transport accident in Alexandria Accident Without Injuries Accident With Injuries No. Of Injuries Transport Means Type/ Accident Type Passenger Passenger No Of No. Of Clashes Fire Infantry Violation To Quarrels Other Clashes Fire Infantry Violation To Quarrels Other Injured Dead Regulations Regulations Bus 518 15 0 0 37 151 29 0 0 0 0 0 42 1 City Tram 270 0 0 0 0 0 10 0 0 0 2 0 11 1 Tram El Ramel 33 0 0 0 0 0 48 0 0 0 0 0 45 3 Total 821 15 0 0 37 151 87 0 0 0 2 0 98 5 Source: CAPMAS Table A3.16: Public transport accident in Inside Cities Accident Without Injuries Accident With Injuries No. Of Injuries Accident Type Passenger Passenger \.Gov No. Of No. Of Clashes Fire Infantry Violation To Quarrels Other Clashes Fire Infantry Violation To Quarrels Other Injured Dead Regulations Regulations Greater Cairo 1049 50 0 0 13 286 434 0 0 0 0 0 415 43 Alexandria 518 15 0 0 37 151 29 0 0 0 0 0 42 1 Suez 1 0 0 0 0 0 1 0 1 0 0 0 8 5 Kafr El Sheikh 0 0 0 0 0 0 2 0 0 0 0 0 2 0 Gharbia 0 0 0 0 0 0 2 0 0 0 0 0 1 1 Menoufia 8 0 0 0 0 0 3 0 0 0 0 0 32 0 176 Behera 0 0 0 0 0 1 0 0 0 0 0 1 0 1 Total 1576 65 0 0 50 438 471 0 1 0 0 1 500 51 Source: CAPMAS Table A3.17: Public transport accident in Outside Cities Accident Without Injuries Accident With Injuries No. Of Injuries Passenger Passenger No. Accident Type No Of Clashes Fire Infantry Violation To Quarrels Other Clashes Fire Infantry Violation To Quarrels Other Of Injured Regulations Regulations Dead East Delta 0 1 0 0 0 0 62 0 3 0 0 0 93 24 West and Central Delta 59 4 1 0 0 0 43 0 2 0 0 0 96 24 Upper Egypt 5 9 2 0 0 2 12 0 4 0 0 2 47 13 Rail / sub-master 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 64 14 3 0 0 2 117 0 9 0 0 2 236 61 *West and Central Delta, including the EU            Source: CAPMAS Cairo Traffic Congestion Study. Final report 177 Table A3.18: Accident Seriousness Rate (Dead or Injured / Accident) by A.R.E Governorates (2008) Dead or Number of Governorate Dead Injured Total Injured/Accident accidents Rate Cairo 1587 737 1888 2625 1,7 Alexandria 438 179 801 980 2,2 Port Said 302 51 399 450 1,5 Suez 263 157 577 734 2,8 Damietta 470 156 585 741 1,6 Dakahlia 1564 445 2167 2612 1,7 Sharkia 1376 236 1067 1303 0,9 Kalyoubia 320 108 531 639 2 Kafr El Sheikh 453 189 1015 1204 2,7 Gharbia 716 372 1421 1793 2,5 Menoufia 680 179 789 968 1,4 Behera 408 245 872 1117 2,7 Ismailia 1100 214 1393 1607 1,5 Giza 1151 275 2360 2635 2,3 Beni Suef 682 241 1163 1404 2,1 Fayoum 355 100 609 709 2 Menia 269 316 1255 1571 5,8 Asyout 221 156 835 991 4,5 Suhag 193 112 468 580 3 Qena 649 221 1080 1301 2 Aswan 401 164 896 1060 2,6 Red Sea 807 152 1142 1294 1,6 El Wadi El Gidid 248 42 427 469 1,9 Matrouh 679 176 1325 1501 2,2 North Sinai 276 55 307 362 1,3 South Sinai 613 126 1043 1169 1,9 Grand Total 20938 6603 35718 42321 2,1 Highways 4717 1199 9303 10502 2,2 Source: CAPMAS 178   Table A3.19: The Most Vehicles Causing Accidents on Highways by Type (2008) Item No. of Accidents The Percentage of Importance % Lorry 1844 39,1 Private Car 1797 38,1 Taxi 561 11,9 Bus 288 6,1 Motor Cycle 78 1,6 Others 151 3,2 Total 4717 100 Source: CAPMAS Table A3.20: Percentage Distribution of Accidents Causes on Highways (2008) Accidents Cause No. Percentage % Human Cause 3302 70 Car Technical Status 1038 22 Road Status 94 2 Others 283 6 Total 4717 100 Source: CAPMAS   Table A3.21: Car Accidents by Causes (2008) Item No. Percentage % Tire Explosion 4020 19,2 Car Defects 293 1,4 Wrong Subway Exit 314 1,5 Sudden Stop 607 2,9 Weather Statues 712 3,4 Car Coup 1717 8,2 Wheel Imbalance 2073 9,9 Driver Unconsciousness 2303 11 Wrong Exceed 2554 12,2 Vehicles collision 2554 12,2 Increased Speed 3016 14,4 Others 775 3,7 Total 20938 100 Source: CAPMAS D) Unit vehicle operation costs: Cairo Traffic Congestion Study. Final report 179 The unit vehicle operating cost (VOC) by vehicle type was estimated based on an analysis of actual performance data collected from different transport operators, as well as automobile dealers. Estimation of VOC considered the following components: ï‚· Representative vehicle ï‚· Vehicle characteristics ï‚· Vehicle prices ï‚· Tire prices ï‚· Fuel and lubricants ï‚· Maintenance costs ï‚· Bus crew cost ï‚· Depreciation ï‚· Insurance costs   180   The table below summarizes Estimated Unit Vehicle Operating Cost (VOC) based on “the strategic urban development master plan study for a sustainable development of the greater Cairo region in the Arab republic of Egyptâ€? update in 2009:   Table A3.22: Estimated Unit Vehicle Operating Cost Vehicle Passenger Shared Medium Heavy Pick-up Bus Articulated Bus Minibus Light Truck Type Car taxi Truck Truck Fuel cost  196.88  263.86  229.10  597.96  1195.92  217.80  396.00  495.00  594.00  Distance related VOC LE /  Lubricant cost  31.35  78.38  62.70  78.38  156.75  62.70  125.40  156.75  156.75  Tire cost  23.40  33.00  20.57  122.73  163.64  57.12  43.62  90.00  276.92  000 KM  Maintenance Spare Parts Costs  56.38  20.70  35.98  37.33  366.83  24.16  90.43  85.53  68.77  Depreciation cost  97.14  75.37  35.00  355.37  3686.32  153.31  658.31  518.90  385.12  Sâ€?Total  405.14  471.31  383.35  1191.76  4569.45  515.08  1313.75  1346.18  1481.57  Overhead cost  0.00  70.70  30.67  238.35  913.89  103.02  459.81  471.16  518.55  Total  405.14  542.00  414.02  1430.12  5483.34  618.09  1773.56  1817.35  2000.12  Crew cost  0.00  4.98  7.03  8.28  11.58  6.63  8.28  8.28  11.58  Maintenance labor cost  1.09  1.02  1.09  1.38  1.82  0.74  2.01  3.27  3.63  Time related VOC LE/hour  Insurance cost  0.09  0.05  0.18  0.18  1.34  0.07  0.70  1.07  0.88  Depreciation cost  1.26  0.41  0.71  0.63  6.16  0.27  3.54  3.35  2.70  Sâ€?Total  2.44  6.45  9.01  10.46  20.90  7.71  14.53  15.97  18.79  Overhead cost  0.00  0.97  0.72  2.09  4.18  1.54  5.09  5.59  6.58  Total  2.44  7.42  9.73  12.56  25.08  9.25  19.62  21.56  25.36  Annual Hours  800  4500  1200  4800  4800  4800  1300  1500  2250  Annual KM  40000  105000  60000  76000  76000  67500  50000  75000  125000  Conversion to km base  48.79  318.08  194.60  793.14  1583.78  657.52  510.09  431.24  456.55  Cairo Traffic Congestion Study. Final report 181   E) Fuel cost Information about the market price of fuel and lubricants was obtained by interviewing gasoline stations and some car dealers. Based on an interview with a petroleum company in Cairo, the factors in the table below were incorporated when converting the market prices to economic prices. For gasoline, there is no sales tax or subsidy. However, there is some subsidy for diesel. (Source: The Strategic Urban Development Master Plan Study for a Sustainable Development of the Greater Cairo Region in the Arab Republic of Egypt- Update 2009). The table below outlines quantity, value and type of fuel used in operation in 2007-08 in GCMA. 182 Table A3.23: Quantity, Value and Type of Fuel Used in Operation in Cairo - Value by 1000 2007/2008 Solar Gasoline Natural Gas Electricity Oilers Transportation Means /Fuel Type Monetary  Quantity By  Monetary  Quantity By  Monetary  Quantity By  Monetary  Quantity By Monetary  Quantity By  Value  1000 Liters  Value   1000 Liters  Value  1000 M3  Value  1000 Kw  Value  1000 Kl  Bus  90625  109955  435  335  1569  3359  0  0  18569  2725  Tram  0  0  0  0  0  0  1159  1423  217  22  Heliopolis Subway  0  0  0  0  0  0  1692  8591  129  15  Subway  0  0  0  0  0  0  35113  390150  223  37  River Bus  324  406  0  0  0  0  0  0  102  10  Total 90949 110361 435 335 1569 3359 37964 400164 19240 2809 Source: CAPMAS Table A3.24: Quantity, Value and Type of Fuel Used in Operation in Alexandria - Value by 1000 L.E 2007/2008 Solar Gasoline Natural Gas Electricity Oilers Transportation Means /Fuel Type Quantity  Quantity  Monetary  Quantity By  Monetary  Monetary  Monetary  Quantity By  Quantity  By 1000  By 1000  Monetary Value  Value  1000 Liters  Value  Value  Value  1000 Liters  By 1000 Kg  Liters  M3  Bus  14026  15993  0  0  0  0  0  0  1720  215  City Tram  0  0  0  0  0  0  2978  12561  15  3  Tram El Ramel  0  0  0  0  0  0  3594  15901  319  33  Total 14026 15993 0 0 0 0 6572 28462 2054 251 * Greases Are Supplied With Oilers,  Source: CAPMAS                 Cairo Traffic Congestion Study. Final report 183   Table A3.25: Quantity, Value and Type of Fuel Used in Operation in Inside Cities- Value by 1000 2007/2008 Solar Gasoline Natural Gas Oilers* Governorates/Fuel Type Monetary  Quantity By  Monetary  Quantity By  Monetary  Quantity By  Monetary  Quantity By  Value  1000 Liters  Value  1000 Liters  Value  1000 M3  Value  1000 Kg  Greater Cairo  90625  109955  435  335  1569  3359  18569  2725  Alexandria  14026  15993  0  0  0  0  1720  215  Suez  232  292  0  0  0  0  29  4  6â€?okt  117  144  0  0  0  0  16  2  Damietta  40  50  0  0  0  0  56  9  Dakahlia  215  199  0  0  0  0  45  7  Kalyoubia  844  823  0  0  0  0  293  24  Kafr El Sheikh  354  390  3  3  0  0  92  13  Gharbia  2404  2750  23  23  0  0  504  62  Menoufia  2346  2844  0  0  1  2  369  53  Behera  528  587  3  3  0  0  114  17  Ismailia  1117  1110  0  0  0  0  131  17  Giza  559  583  0  0  0  0  146  19  Beni Suef  31  41  3  3  0  0  4  0  Fayoum  23  27  0  0  0  0  7  1  Menia  19  19  0  0  0  0  5  1  Asyout  560  534  0  0  0  0  95  11  Suhag  52  60  2  2  0  0  24  3  ASWAN  36  32  0  0  0  0  15  1  Elwadi El Gidid  9  11  0  0  0  0  2  0  Total 114137 136444 469 369 1570 3361 22236 3184 *Greases Are Supplied With Oilers In Some Sources            184 Source: CAPMAS   Table A3.26: Quantity, Value and Type of Fuel Used in Operation in Outside Cities -Revenues by 1000 L.E. 2007/2008 Solar Gasoline Natural Gas Oilers Regions /Fuel Type Monetary  Quantity By  Monetary  Quantity By  Quantity By  Quantity By  Regions  Regions  value  1000 Liters  value  1000 Liters  1000 M3  1000 Kg  East Delta  25585  23259  140  104  0  0  4231  445  West and Central Delta  23239  28217  102  78  0  0  3234  464  Upper Egypt  18632  22824  96  96  0  0  2995  399  Total 67456 74300 338 278 0 0 10460 1308 Source: CAPMAS   Unit Fuel costs in Egypt (2008â€? Reuters):   Gasoline Regular 95:    1.75 LE / Liter  Diesel        1.00 LE / Liter    Cairo Traffic Congestion Study. Final report 185 F) Household income and Value of Time Between June and July 2007, a household opinion poll survey was carried out in the Cairo Master Plan (phase 1) to clarify the public perceptions of urban planning. The survey results provided useful information about households (HH), including their income. According to the survey, average household income in the study area of the Master Plan phase was estimated at 1,134 LE / HH / Month or 13,590 LE / HH / Year (USD 2,470 / HH / Year) in 2007. The number of workers per household was estimated at 1.09 in 2007, so that the income per worker is estimated at 1,037 LE / month or 12,440 LE / Year (USD 2,260 / Year). Figure below shows the household income distribution. The table below outlines the average household income by Household Income Group: Table A3.27: The average household income by Household Income Group (2007)  Monthly household Average Household Group Share (%) Income Group Income Low Income Less than 420 LE 18.1 291 Middle Income 1670 LE> I > 420 LE 64.6 877 High Income Above 1670 LE 17.2 2985 Total/ Average 100.0 1134 The table below outlines socioeconomic framework in the study area: 186 Table A3.28: Socio-Economic Framework in the Study Area Indicator Unit 2006 2007 2012 2017 2027 Population 1000 16,101 16,464 18,411 20,369 24,192 No. of Household 1000 4,007 4,097 4,582 5,069 6,021 Household size Person/household 4.02 4.02 4.02 4.02 4.02 Age Structure % 28.7 29.0 29.9 31.0 32.1 Labor force 1000 4,613 4,777 5,506 6,316 7,761 Unemployment % 7 6 6 5 5 Primary 1000 260 266 306 349 427 No. of Secondary 1000 1,667 1,741 2,014 2,311 2,824 Workers Tertiary 1000 2,384 2,467 2,876 3,223 4,126 Total 1000 4,310 4,475 5,196 5,982 7,378 Household Income LE/HH 1,072 1,134 1,488 1,886 2,911 No. of Workers in the Worker/HH 1.08 1.09 1.13 1.18 1.23 Household Worker’s income LE/worker 997 1,038 1,312 1,598 2,376 Source: The Strategic Urban Development Master Plan Study For A Sustainable Development Of The Greater Cairo Region In The Arab Republic Of Egypt JICA 2009 Update-Final report Vol.4 The average monthly income per worker was estimated as shown in Table A3.29. The assumption that the number of working days was 22 days per month and the working time of 8 hours per day resulted in the estimated number of working hours being 176 hours per month. The predicted hourly average income per worker from 2007 up to 2027 was estimated, as shown in Table A3.29. Table A3.29: Average Monthly Income and Hourly Income per Worker Year Unit 2006 2007 2012 2017 2027 Low and Middle Income LE/month 746 982 1,245 1,921 Household Household income High and Middle Households LE/month 1,322 1,529 1,863 2,769 High Income Household LE/month 2,985 3,916 4,964 7,664 Workers in household Worker/household 1.09 1.09 1.09 1.09 Low and Middle Income LE/month 687 901 1,142 1,763 Household Worker’s income High and Middle Households LE/month 1,038 1,312 1,598 2,376 High Income Household LE/month 2,739 3,593 4,554 7,031 Working hours per month Hour/month 176 176 176 176 Low and Middle Income LE/month 3.90 5.12 6.49 10.02 Household Hourly worker’s income High and Middle Households LE/month 6.89 7.45 9.08 13.50 High Income Household LE/month 15.56 20.41 25.88 39.95 Source: The Strategic Urban Development Master Plan Study For A Sustainable Development Of The Greater Cairo Region In The Arab Republic Of Egypt JICA 2009 Update-Final report Vol.4 Cairo Traffic Congestion Study. Final report 187 The hourly time values for transport users were estimated based on the hourly workers income. In this estimation, the following assumptions were adopted: • Public transport users comprise middle and low income groups; • Car users comprise the high income group; and • Taxi and shared taxi users, including air conditioned bus users, comprise high and middle income groups.  The estimated hourly time value for transport users was predicted for 2007 up to 2027, as shown in the following table: Table A3.30: Estimated Hourly Time Value for Transport Users from 2007 to 2027 Year Unit 2007 2012 2017 2027 Public Transport LE/Hour/Person 2.95 3.86 4.90 7.56 Users Car Users LE/Hour/Person 11.75 15.41 19.54 30.16 Taxi and Shared LE/Hour/Person 5.20 5.63 6.86 10.19 Taxi Users Source: The Strategic Urban Development Master Plan Study For A Sustainable Development Of The Greater Cairo Region In The Arab Republic Of Egypt JICA 2009 Update-Final report Vol.4   G) Vehicle ownership Vehicle ownership by household income is tabulated from the Household Interview Survey (HIS) database (2000). Then they have been updated for 2007 given the following adjustments: ï‚· The increase in the number of cars ï‚· Population growth ï‚· HH income indicator growth   Table A3.31: Monthly Income Indicator and Car Ownership per household (2007) Monthly Income Indicator Car Ownership per household < 200 0.09 201-300 0.22 301-400 0.50 401-500 0.92 501-1000 1.15 Source: The Strategic Urban Development Master Plan Study For A Sustainable Development Of The Greater Cairo Region In The Arab Republic Of Egypt JICA 2009 Update-Final report Vol.4   188 H) Percentage of daily traffic in the peak hour Given Annex 3.4 of “Public Private Partnership Program for Cairo Urban Toll Expressway Network Developmentâ€? which contains the necessary base data and information, drawings, calculations and other information produced during the course of the Study, the percentage of daily traffic in peak hour in 26 corridors has been derived as follows: Cairo Traffic Congestion Study. Final report 189 Table A3.32: Percentage of 16 hour traffic volume in the peak hour (2005) Peak hour factor Site Direction (ADT %) Qalyobeya  8,83%  Warraq Bridge  Giza  10,04%  Cairo  8,17%  Rodh Elâ€?Farag Bridge  Giza  11,56%  Cairo  9,61%  Imbaba Bridge  Giza  10,30%  Cairo  9,06%  15th of May Bridge  Giza  9,61%  Cairo  9,24%  6th of October Bridge  Giza  8,49%  Cairo  10,19%  Galaa Bridge  Giza  10,45%  Cairo  10,23%  Gamah Bridge  Giza  9,95%  Cairo  8,31%  Giza Bridge  Giza  7,94%  Cairo  10,33%  Moneeb Bridge  Giza  10,31%  Cairo  11,20%  Marazeeq Bridge  Giza  8,08%  Lebanon Sq.  9,75%  26th of July Corridor  6th of October City  8,99%  Suez  9,90%  Suez Desert Road  Cairo  9,85%  Alexandria  9,04%  Alex. Agriculture Road  Cairo  8,38%  Ismailia  9,47%  Ismailia Agriculture Road  Cairo  9,26%  Ismailia  9,84%  Ismailia Desert Road  Cairo  8,20%  Cairo Airport  9,95%  Autostrade  Helwan  11,13%  Cairo Airport  8,69%  Nasr Road  Helwan  8,47%  Ismailia  7,73%  Gesr Elâ€?suez St.  CBD  9,97%  Orooba St.  11,22%  Abo Bakr Elâ€?Sedeeq St.  Tagneed Sq.  9,86%  Mataria Sq.  8,02%  Kablat St.  Ismailia Canal  8,00%  Ramsis Sq.  7,91%  Lotfy Elâ€?Sayed St.      Qalyob  10,34%  Ahmed Helmy St.  CBD  11,30%  Abbassia Sq.  8,19%  Ramsis St.  Ramsis Sq.  10,89%  Cairo Airport  8,25%  Salah salem Road  Giza Sq.  8,28%  Haram st.  9,26%  Tereat Elâ€?Zomor Road  Ring Road  9,36%  Imbaba  8,03%  Sudan St.  Haram St.  7,77%  Source: The JICA study of 2005 (Cairo Urban Toll Expressway Network Development)  190 Table A3.33: Peak Hour Traffic Volumes on Main Bridges and Arterial Roads (2005) Peak Hour Traffic Peak Hour Direction Site No. Site Name Volume (O’clock) Dir 1:To Dir 2: To: Dir 1 Dir 2 Dir 1 Dir 2 1  Warraq Br.  Qaliobeya  Giza  2,192  2,125  18:00  8:00  Rodh Elâ€?Farag  2  Cairo  Giza  3,604  4,572  10:00  20:00  Br.  3  Imbaba Br.  Cairo  Giza  817  1,347  8:00  2:00  4  15th of May Br.  Cairo  Giza  4,300  6,862  12:00  12:00  Bridges  th 6  of October.  5  Cairo  Giza  13,400 9,747  8:00  11:00  Br.  6  Galaa Br.  Cairo  Giza  2,962  2,803  9:00  13:00  7  Gamah Br.  Cairo  Giza  3,357  3,800  8:00  9:00  8  Giza Br.  Cairo  Giza  3,259  3,433  15:00  17:00  9  Moneeb Br.  Cairo  Giza  4,516  6,222  12:00  9:00  10  Marazeeq Br.  Cairo  Giza  704  502  7:00  16:00  th 6   Lebanon  11  26th of July Cdr  3,176  4,204  10:00  16:00  October  Sq.  12  Suez Desert Rd  Suez  Cairo  1,692  1,851  8:00  15:00  Arterials  13  Alex. Agr. Rd  Alexandria  Cairo  3,975  3,780  16:00  7:00  14  Ismailia Agr. Rd  Ismailia  Cairo  1,290  1,255  16:00  20:00  Ismailia Desert  15  Ismailia  Cairo  3,832  3,328  9:00  13:00  Rd  16  Autostrade  Cairo Ap.  Helwan  1,443  2,018  8:00  18:00  17  Nasr Rd  Cairo Ap.  Helwan  8,050  6,529  8:00  12:00  18  Gesr El Suez st.  Ismailia  CBD  2,619  3,346  15:00  15:00  Suez Desert  19  Suez  Cairo  2,258  2,151  20:00  21:00  Road  Abo Bakr Elâ€? Tagneed  20  Orooba s.  2,753  2,458  12:00  18:00  Sedeeq st.  Sq.  Mataria  Ismailia  21  Kablat st.  980  828  11:00  17:00  Sq.  Canal  Lotfy Elâ€? Sayed  Expressway Routes  22  Ramsis Sq.    4,078    10:00    st.  Cairo  23  Autostrade  Hewan  2,354  3,122  16:00  15:00  Airport  Ahmed Helmey  24  Qalyob  CBD  1,624  2,223  13:00  8:00  St.  Abbassia  25  Ramsis st.  Ramsis Sq.  3,067  4,668  12:00  8:00  Sq.  Saleh Salem  Cairo  26  Giza Sq.  3,719  3,804  16:00  10:00  Road  Airport  Tereat Elâ€?  27  Haram st.  Ring Rd.  2,298  1,701  20:00  21:00  Zomor Rd.  28  Sudan St.  Imbaba  Haram st.  1,281  1,514  16:00  9:00  Cairo Traffic Congestion Study. Final report 191 Peak Hour Factor, Directional Factor and K-Factor Based on the aforementioned survey summaries, different factors describing the characteristics of traffic flow could be estimated. These factors include Peak Hour Factor (PHF), Directional factor (D) and percentage of peak hour volume as related to the daily traffic volume as shown in Table A3.34. The peak hour factor (PHF) varies from 0.72 to 0.93 with an average of 0.84 for the Nile bridges compared with 0.81, 0.97 and 0.87 for major arterials, respectively. As for the new sites on the expressway corridors, PHF varies from 0.82 to 0.95 with 0.88 as an average. This implies that in some locations, the variation of traffic volumes within the peak hour can not be neglected. If the whole set of the count stations is considered, PHF reaches 0.86 as overall average within the study area. The average value of distributional factor (D) accounts form 0.65, 0.62 and 0.67 for bridges, arterials and new sites, respectively with an overall average of 0.65. This indicates the traffic volume is not evenly balanced between the two directions of travel. Similarly, the value of design traffic volume divided by daily traffic volume (K) is estimated. It can be observed that K-factor, which is estimated by dividing the peak hour volume by the observed/estimated daily traffic for each count station, varies from 6.1% to 10.3% with an average of 8.4% for Nile bridges compared with 6.6%, 8.4% and 7.8% for major arterials, respectively. As for the count stations located on the expressway corridors (new sites), the K-factor ranges from 6% to 12% with 8% as an average. A value of 8.1% for K-factor can be considered as an overall average for the study area. 192 Table A3.34: Characteristics of Observed Traffic Volume at Different Count Stations in 2005  Site No. Site Name PHF D K 1  Warraq Br.  0.72  0.59  9.2%  2  Rodh Elâ€?Farag Br.  0.87  0.71  7.4%  3  Imbaba Br.  0.86  0.72  8.9%  4  15th of May Br.  0.78  0.60  10.3%  Bridges  5  6th of October. Br.  0.78  0.67  8.2%  6  Galaa Br.  0.88  0.60  8.4%  7  Gamah Br.  0.82  0.67  8.2%  8  Giza Br.  0.93  0.61  6.1%  9  Moneeb Br.  0.85  0.68  8.6%  10  Marazeeq Br.  0.89  0.63  8.4%  Average of Nile Bridges  0.84  0.65  8.4%  11  26th of July Cdr  0.84  0.65  8.2%  12  Suez Desert Rd  0.90  0.57  8.4%  Arterials  13  Alex. Agr. Rd  0.93  0.61  6.6%  14  Ismailia Agr. Rd  0.80  0.57  8.4%  15  Ismailia Desert Rd  0.81  0.61  8.1%  16  Autostrade  0.88  0.70  8.2%  17  Nasr Rd  0.97  0.60  6.8%  Average of major arterials  0.87  0.62  7.8%  18  Gesr El Suez st.  0.87  0.56  8.6%  19  Suez Desert Road  0.87  0.67  6.4%  Abo Bakr Elâ€? Sedeeq  20  0.88  0.60  8.8%  st.  Expressway Routes  21  Kablat st. 0.88 0.60 6.9%  22  Lotfy Elâ€? Sayed st.  0.95  1.00  7.0%  23  Autostrade  0.92  0.58  12.3%  24  Ahmed Helmey St.  0.86  0.77  7.9%  25  Ramsis st.  0.94  0.69  8.4%  26  Saleh Salem Road  0.82  0.66  6.4%  27  Tereat Elâ€? Zomor Rd.  0.84  0.66  8.1%  28  Sudan St.  0.91  0.59  6.7%  Average of Expressway Corridors  0.88  0.67  8.0%  Overall average  0.86  0.65  8.1%  Source: The JICA study of 2005 (Cairo Urban Toll Expressway Network Development)  Cairo Traffic Congestion Study. Final report 193 I) Passenger Car Unit Vehicle demand/capacity is expressed in terms of passenger car units (PCU). Given the strategic urban development master plan study for sustainable development of the greater Cairo region in the Arab republic of Egypt (March 2008), the following PCUs have been derived: Table A3.35: Passenger Car Units (PCU) Vehicle Type Motorcycle Light Vehicle(1) Small Truck(2) Medium Truck(3) PCU 0.33 1.00 2.00 2.50 Vehicle Type Large Truck(4) Micro Bus(5) Mini Bus Standard Bus PCU 3.00 1.50 2.00 2.50 Note:     (1) : Light Vehicle: Car, Pickâ€?up, Taxi, Van  (2) : Small Truck: Two Axles Truck  (3) : Medium Truck: Three Axles  (4) : Large Truck: More than Three Axles   (5) : Micro Bus: Shared Taxi    J) Vehicle Occupancy Factor Based on the strategic urban development master plan study for sustainable development of the greater Cairo region in the Arab republic of Egypt (March 2008), the following Vehicle Occupancy Factors have been derived: Table A3.36: Vehicle Occupancy Factors (Passengers/Vehicle) Trip Purpose Car Occupancy Taxi Occupancy Homebased Work 1.5 2.0 Homebased Education 2.4 3.0 Homebased others 2.1 2.5 Non homebased 1.7 2.0   K) Origin Destination Matrix Origin-Destination matrices have been derived from the results of the study of “Public Private Partnership Program for Cairo Urban Toll Expressway Network Developmentâ€? OD matrices are classified into the following categories: ï‚· Passenger Car ï‚· Taxi ï‚· Bus ï‚· Truck ï‚· All Vehicle These OD matrices are presented in Tables B-1 through B-10 in Annex B. 194 Annex 4: Principal Corridors Collective and Individual Assessment, Estimation Procedures [separate pfd file] Cairo Traffic Congestion Study. Final report 195                 ANNEX 4    1. Principal Corridors Collective Assessment  a) Average Speed Plots  b) Speed Indices Plots  c) Coefficients of Variation Plots    2. Principal Corridors Individual Assessment  a) Space â€? Time Plots   b)  Field Photos    3. Estimation Procedures  a) Route Average Speed Estimation Procedure  b) Route Free flow Speed Estimation Procedure  Annex 4  Section 1:  Principal Corridors Collective Assessment    1. Principal Corridors Collective Assessment  a) Average Speed Plots  AM Direction 1 70.000 Route 1 60.000 Route 2 50.000 40.000 Route 3 30.000 Route 4 20.000 Route 5 10.000 Route 6 0.000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM   AM Direction 1 70.000 Route 7 60.000 50.000 Route 8 40.000 Route 9 30.000 20.000 Route 10 10.000 Route 11 0.000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM   1â€?[1]  Annex 4  Section 1:  Principal Corridors Collective Assessment    Average Speed Plots (Continued)  AM Direction 2 70.000 Route 1 60.000 Route 2 50.000 40.000 Route 3 30.000 Route 4 20.000 Route 5 10.000 Route 6 0.000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM   AM Direction 2 70.000 Route 7 60.000 50.000 Route 8 40.000 Route 9 30.000 20.000 Route 10 10.000 Route 11 0.000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM   1â€?[2]  Annex 4  Section 1:  Principal Corridors Collective Assessment    Average Speed Plots (Continued)  PM Direction 1 70.000 Route 1 60.000 Route 2 50.000 Route 3 40.000 30.000 Route 4 20.000 Route 5 10.000 Route 6 0.000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM   PM Direction 1 70.000 Route 7 60.000 50.000 Route 8 40.000 Route 9 30.000 20.000 Route 10 10.000 Route 11 0.000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM   1â€?[3]  Annex 4  Section 1:  Principal Corridors Collective Assessment    Average Speed Plots (Continued)  PM Direction 2 70.000 Route 1 60.000 Route 2 50.000 40.000 Route 3 30.000 Route 4 20.000 Route 5 10.000 Route 6 0.000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM   PM Direction 2 70.000 Route 7 60.000 50.000 Route 8 40.000 Route 9 30.000 20.000 Route 10 10.000 Route 11 0.000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM   1â€?[4]  Annex 4  Section 1:  Principal Corridors Collective Assessment    b) Speed Indices Plots AM Direction 1 0.9000 Route 1 0.8000 0.7000 Route 2 0.6000 Route 3 0.5000 0.4000 Route 4 0.3000 Route 5 0.2000 0.1000 Route 6 0.0000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM   AM Direction 1 0.9000 0.8000 Route 7 0.7000 Route 8 0.6000 0.5000 Route 9 0.4000 0.3000 Route 10 0.2000 0.1000 Route 11 0.0000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM   1â€?[5]  Annex 4  Section 1:  Principal Corridors Collective Assessment    Speed Indices Plots (Continued)  AM Direction 2 0.9000 0.8000 Route 1 0.7000 Route 2 0.6000 Route 3 0.5000 0.4000 Route 4 0.3000 Route 5 0.2000 0.1000 Route 6 0.0000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM   AM Direction 2 0.9000 0.8000 Route 7 0.7000 Route 8 0.6000 0.5000 Route 9 0.4000 0.3000 Route 10 0.2000 0.1000 Route 11 0.0000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM   1â€?[6]  Annex 4  Section 1:  Principal Corridors Collective Assessment    Speed Indices Plots (Continued)  PM Direction 1 0.9000 Route 1 0.8000 0.7000 Route 2 0.6000 Route 3 0.5000 0.4000 Route 4 0.3000 Route 5 0.2000 0.1000 Route 6 0.0000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM    PM Direction 1 0.9000 0.8000 Route 7 0.7000 Route 8 0.6000 0.5000 Route 9 0.4000 0.3000 Route 10 0.2000 0.1000 Route 11 0.0000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM   1â€?[7]  Annex 4  Section 1:  Principal Corridors Collective Assessment    Speed Indices Plots (Continued)  PM Direction 2 0.9000 0.8000 Route 1 0.7000 Route 2 0.6000 Route 3 0.5000 0.4000 Route 4 0.3000 Route 5 0.2000 0.1000 Route 6 0.0000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM    PM Direction 2 0.9000 0.8000 Route 7 0.7000 Route 8 0.6000 0.5000 Route 9 0.4000 0.3000 Route 10 0.2000 0.1000 Route 11 0.0000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM   1â€?[8]  Annex 4  Section 1:  Principal Corridors Collective Assessment    Comments and Observations  On the speed indices of Route 1, 4 (Direction 1) and Route 2, 6 (Direction 2):    The end of the morning peak, dominated by work and school trips, overlaps with the midday   period,  which  is  characterized  by  trips  for  shopping,  banking,  and  governmental  services.  This overlap results in the congestion levels increasing towards the midday.  Congestion on Route 1 (Direction 2):   The  26th  of  July  corridor  is  a  major  corridor  that  links  Cairo/Giza  to  6th  of  October  city  and  Cairo/Alex  Desert  Road.  Many  large  scale  businesses  as  well  as  a  huge  industrial  zone  is  located  on  this  side  of  the  Corridor  inducing  high  directional  peak  hour  traffic  volume  for  direction 2 during the early AM peak and direction 1 during the PM peak.  Congestion witnessed after the PM peak period:  The  end  of  the  evening  peak,  dominated  by  work  trips,  overlaps  with  night  time  which  is  characterized  by  trips  for  socialization,  shopping,  entertainment…etc.    This  overlap  results  in congestion levels increasing towards the end of the evening peak period.    1â€?[9]  Annex 4  Section 1:  Principal Corridors Collective Assessment    c) Coefficients of Variation Plots  AM Direction 1 1.200 1.100 Route 1 1.000 0.900 Route 2 0.800 0.700 Route 3 0.600 0.500 Route 4 0.400 0.300 Route 5 0.200 0.100 Route 6 0.000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM   AM Direction 1 1.200 1.100 Route 7 1.000 0.900 Route 8 0.800 0.700 0.600 Route 9 0.500 0.400 Route 10 0.300 0.200 0.100 Route 11 0.000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM   1â€?[10]  Annex 4  Section 1:  Principal Corridors Collective Assessment    Coefficients of Variation Plots (Continued)  AM Direction 2 1.200 1.100 Route 1 1.000 0.900 Route 2 0.800 0.700 Route 3 0.600 0.500 Route 4 0.400 0.300 Route 5 0.200 0.100 Route 6 0.000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM   AM Direction 2 1.200 1.100 Route 7 1.000 0.900 Route 8 0.800 0.700 0.600 Route 9 0.500 0.400 Route 10 0.300 0.200 0.100 Route 11 0.000 7â€?8 AM 8â€?9 AM 9â€?10 AM 10â€?11 AM   1â€?[11]  Annex 4  Section 1:  Principal Corridors Collective Assessment    Coefficients of Variation Plots (Continued)  PM Direction 1 1.200 1.100 Route 1 1.000 0.900 Route 2 0.800 0.700 Route 3 0.600 0.500 Route 4 0.400 0.300 Route 5 0.200 0.100 Route 6 0.000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM   PM Direction 1 1.200 1.100 Route 7 1.000 0.900 Route 8 0.800 0.700 0.600 Route 9 0.500 0.400 Route 10 0.300 0.200 Route 11 0.100 0.000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM   1â€?[12]  Annex 4  Section 1:  Principal Corridors Collective Assessment    Coefficients of Variation Plots (Continued)  PM Direction 2 1.200 1.100 Route 1 1.000 0.900 Route 2 0.800 0.700 Route 3 0.600 0.500 Route 4 0.400 0.300 Route 5 0.200 0.100 Route 6 0.000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM   PM Direction 2 1.200 1.100 Route 7 1.000 0.900 Route 8 0.800 0.700 0.600 Route 9 0.500 0.400 Route 10 0.300 0.200 0.100 Route 11 0.000 3â€?4 PM 4â€?5 PM 5â€?6 PM 6â€?7 PM   1â€?[13]  Annex 4  Section 2:  Principal Corridors Individual Assessment  2. Principal Corridors Individual Assessment  a) Spaceâ€?Time Plots  ¾ The survey during the morning peak period started at 7:00 AM and ended  at 11:00 AM  ¾ The survey during the evening peak period started at 3:00 PM and ended  at 7:00 PM  Route 1â€? AM Direction 1 25.0 Mon(24)â€?1A Mon(24)â€?1B Mon(24)â€?2A Mon(24)â€?2B 20.0 DISTANCE TRAVELED (KM) Mon(24)â€?3A Tues(25)â€?1A Tues(25)â€?1B Tues(25)â€?2A 15.0 Tues(25)â€?2B Tues(25)â€?3A Tues(25)â€?3B Mon(31)â€?1A 10.0 Mon(31)â€?1B Mon(31)â€?2A Mon(31)â€?2B Mon(31)â€?3A 5.0 Mon(31)â€?3B Tues(01)â€?1A Tues(01)â€?1B Tues(01)â€?2A 0.0 Tues(01)â€?2B Tues(01)â€?3A 15 30 45 60 75 90 0 105 120 135 150 165 180 195 210 225 240 Tues(01)â€?3B Lebanon Square TIME (MINUTES) Zamalek East   Route 1â€? AM Direction 2 25 Mon(24)â€?1A Mon(24)â€?1B Mon(24)â€?2A DISTANCE TRAVELED (KM) 20 Mon(24)â€?2B Mon(24)â€?3B Tues(25)â€?1A 15 Tues(25)â€?1B Tues(25)â€?2A Tues(25)â€?2B Tues(25)â€?3B 10 Mon(31)â€?1A Mon(31)â€?1B Mon(31)â€?2A 5 Mon(31)â€?2B Mon(31)â€?3B Tues(01)â€?1A Tues(01)â€?1B 0 Tues(01)â€?2A Tues(01)â€?2B 0 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 10 20 30 40 50 60 70 80 90 Tues(01)â€?3B Lebanon Square Zamalek East TIME (MINUTES)   2â€?[1]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 1â€? PM Direction 1 25.0 Mon(24)â€?1A Mon(24)â€?1B Mon(24)â€?2A 20.0 Mon(24)â€?2B DISTANCE TRAVELED (KM) Mon(24)â€?3B Tues(25)â€?1A Tues(25)â€?1B 15.0 Tues(25)â€?2A Tues(25)â€?2B Tues(25)â€?3A Mon(31)â€?1A 10.0 Mon(31)â€?1B Mon(31)â€?2A Mon(31)â€?2B Mon(31)â€?3A 5.0 Mon(31)â€?3B Tues(01)â€?1A Tues(01)â€?1B Tues(01)â€?2A 0.0 Tues(01)â€?2B Tues(01)â€?3A 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 Tues(01)â€?3B Lebanon Square TIME (MINUTES) Zamalek East   Route 1â€? PM Direction 2 25 Mon(24)â€?1A Mon(24)â€?1B Mon(24)â€?2A 20 Mon(24)â€?2B DISTANCE TRAVELED (KM) Mon(24)â€?3B Tues(25)â€?1A Tues(25)â€?1B 15 Tues(25)â€?2A Tues(25)â€?2B Tues(25)â€?3A Tues(25)â€?3B 10 Mon(31)â€?1A Mon(31)â€?1B Mon(31)â€?2A Mon(31)â€?2B 5 Mon(31)â€?3B Tues(01)â€?1A Tues(01)â€?1B 0 Tues(01)â€?2A Tues(01)â€?2B 0 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 10 20 30 40 50 60 70 80 90 Tues(01)â€?3B Lebanon Square TIME (MINUTES) Zamalek East 2â€?[2]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 2â€? AM Direction 1 60.0 Mon(24)â€?1A DISTANCE TRAVELED (KM) 50.0 Mon(24)â€?1B Mon(24)â€?2A Mon(24)â€?2B 40.0 Tues(25)â€?1A Tues(25)â€?1B 30.0 Tues(25)â€?2A Tues(25)â€?3A Mon(31)â€?1A 20.0 Mon(31)â€?1B Mon(31)â€?2A 10.0 Mon(31)â€?3A Tues(01)â€?1A Tues(01)â€?1B 0.0 Tues(01)â€?2A 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 0 Tues(01)â€?3A El Khosous I/C 26th of July I/C TIME (MINUTES)   Route 2â€? AM Direction 2 70 Mon(24)â€?1A Mon(24)â€?1B 60 DISTANCE TRAVELED (KM) Mon(24)â€?2A Mon(24)â€?2B 50 Tues(25)â€?1A Tues(25)â€?1B 40 Tues(25)â€?2A Tues(25)â€?2B 30 Mon(31)â€?1A Mon(31)â€?1B 20 Mon(31)â€?2A Mon(31)â€?2B 10 Tues(01)â€?1A Tues(01)â€?1B 0 Tues(01)â€?2A 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 0 10 20 30 40 50 60 70 80 90 Tues(01)â€?2B El Khosous I/C TIME (MINUTES) 26th of July I/C 2â€?[3]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 2â€? PM Direction 1 70.0 Mon(24)â€?1A DISTANCE TRAVELED (KM) 60.0 Mon(24)â€?1B Mon(24)â€?2A 50.0 Tues(25)â€?1A Tues(25)â€?1B 40.0 Tues(25)â€?2A 30.0 Mon(31)â€?1A Mon(31)â€?1B 20.0 Mon(31)â€?2A Mon(31)â€?3A 10.0 Tues(01)â€?1A Tues(01)â€?1B 0.0 Tues(01)â€?2A 10 20 30 40 50 60 70 80 90 0 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 Tues(01)â€?3A El Khosous I/C TIME (MINUTES) 26th of July I/C   Route 2â€? PM Direction 2 60 Mon(24)â€?1A DISTANCE TRAVELED (KM) 50 Mon(24)â€?1B Mon(24)â€?2B 40 Tues(25)â€?1A Tues(25)â€?1B 30 Tues(25)â€?2A Mon(31)â€?1A 20 Mon(31)â€?1B Mon(31)â€?2A 10 Mon(31)â€?2B Tues(01)â€?1A 0 Tues(01)â€?1B Tues(01)â€?2A 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 Tues(01)â€?2B El Khosous I/C TIME (MINUTES) 26th of July I/C 2â€?[4]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 3â€? AM Direction 1 50.0 Mon(24)â€?1A 45.0 Mon(24)â€?1B DISTANCE TRAVELED (KM) 40.0 Mon(24)â€?2A Mon(24)â€?2B 35.0 Tues(25)â€?1A Tues(25)â€?1B 30.0 Tues(25)â€?2A 25.0 Tues(25)â€?2B Mon(31)â€?1A 20.0 Mon(31)â€?1B 15.0 Mon(31)â€?2A Mon(31)â€?2B 10.0 Mon(31)â€?3A Tues(01)â€?1A 5.0 Tues(01)â€?1B 0.0 Tues(01)â€?2A Tues(01)â€?2B 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 Tues(01)â€?3A Saqr Qorishâ€?Autostrad I/C TIME (MINUTES) Al Maryouteya   Route 3â€? AM Direction 2 60 Mon(24)â€?1A 50 Mon(24)â€?1B DISTANCE TRAVELED (KM) Mon(24)â€?2A Mon(24)â€?2B 40 Mon(24)â€?3B Tues(25)â€?1A Tues(25)â€?1B 30 Tues(25)â€?2A Tues(25)â€?2B Mon(31)â€?1A 20 Mon(31)â€?1B Mon(31)â€?2A Mon(31)â€?2B 10 Mon(31)â€?3B Tues(01)â€?1A Tues(01)â€?1B Tues(01)â€?2A 0 Tues(01)â€?2B 105 120 135 150 165 180 195 210 225 240 0 15 30 45 60 75 90 Saqr Qorishâ€?Autostrad I/C Al Maryouteya TIME (MINUTES)   2â€?[5]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 3â€? PM Direction 1 60.0 Mon(24)â€?1A DISTANCE TRAVELED (KM) 50.0 Mon(24)â€?1B Mon(24)â€?2A Mon(24)â€?2B 40.0 Tues(25)â€?1A Tues(25)â€?1B 30.0 Tues(25)â€?2A Tues(25)â€?2B Mon(31)â€?1A 20.0 Mon(31)â€?1B Mon(31)â€?2A 10.0 Mon(31)â€?2B Tues(01)â€?1A Tues(01)â€?1B 0.0 Tues(01)â€?2A 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 Tues(01)â€?2B Saqr Qorishâ€?Autostrad I/C Al Maryouteya TIME (MINUTES)   Route 3â€? PM Direction 2 50 45 Mon(24)â€?1A Mon(24)â€?1B 40 DISTANCE TRAVELED (KM) Mon(24)â€?2A 35 Mon(24)â€?2B Tues(25)â€?1A 30 Tues(25)â€?1B Tues(25)â€?2A 25 Tues(25)â€?2B 20 Mon(31)â€?1A Mon(31)â€?1B 15 Mon(31)â€?2A 10 Mon(31)â€?2B Tues(01)â€?1A 5 Tues(01)â€?1B Tues(01)â€?2A 0 Tues(01)â€?2B 0 105 120 135 150 165 180 195 210 225 240 15 30 45 60 75 90 Saqr Qorishâ€?Autostrad I/C Al Maryouteya TIME (MINUTES)   2â€?[6]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 4â€? AM Direction 1 30.0 Mon(24)â€?1A Mon(24)â€?1B DISTANCE TRAVELED (KM) 25.0 Mon(24)â€?2A Mon(24)â€?2B Mon(24)â€?3A 20.0 Tues(25)â€?1A Tues(25)â€?1B 15.0 Tues(25)â€?2A Tues(25)â€?2B 10.0 Mon(31)â€?1A Mon(31)â€?1B Mon(31)â€?2A 5.0 Mon(31)â€?2B Tues(01)â€?1A 0.0 Tues(01)â€?1B Tues(01)â€?2A 105 120 135 150 165 180 195 210 225 240 0 15 30 45 60 75 90 Tues(01)â€?2B Tues(01)â€?3A Roud Elâ€?Farag Bridge TIME (MINUTES) Elâ€?Rouda Bridge   Route 4â€? AM Direction 2 30 Mon(24)â€?1A Mon(24)â€?1B 25 Mon(24)â€?2A DISTANCE TRAVELED (KM) Mon(24)â€?2B Tues(25)â€?1A 20 Tues(25)â€?1B Tues(25)â€?2A 15 Tues(25)â€?2B Mon(31)â€?1A Mon(31)â€?1B 10 Mon(31)â€?2A Mon(31)â€?2B 5 Mon(31)â€?3B Tues(01)â€?1A Tues(01)â€?1B 0 Tues(01)â€?2A Tues(01)â€?2B 15 30 45 60 75 90 0 105 120 135 150 165 180 195 210 225 240 Roud Elâ€?Farag Bridge TIME (MINUTES) Elâ€?Rouda Bridge   2â€?[7]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 4â€? PM Direction 1 30.0 Mon(24)â€?1A DISTANCE TRAVELED (KM) Mon(24)â€?1B 25.0 Mon(24)â€?2A Tues(25)â€?1A 20.0 Tues(25)â€?1B Tues(25)â€?2A 15.0 Tues(25)â€?2B Tues(25)â€?3A 10.0 Mon(31)â€?1A Mon(31)â€?1B 5.0 Mon(31)â€?2A Tues(01)â€?1A 0.0 Tues(01)â€?1B Tues(01)â€?2A 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 Tues(01)â€?2B Roud Elâ€?Farag Bridge TIME (MINUTES) Elâ€?Rouda Bridge   Route 4â€? PM Direction 2 30 Mon(24)â€?1A Mon(24)â€?1B 25 DISTANCE TRAVELED (KM) Mon(24)â€?2A Mon(24)â€?2B 20 Tues(25)â€?1A Tues(25)â€?1B Tues(25)â€?2A 15 Tues(25)â€?2B Mon(31)â€?1A 10 Mon(31)â€?1B Mon(31)â€?2A 5 Mon(31)â€?2B Tues(01)â€?1A Tues(01)â€?1B 0 Tues(01)â€?2A 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 Tues(01)â€?2B Roud Elâ€?Farag Bridge TIME (MINUTES) Elâ€?Rouda Bridge   2â€?[8]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 5â€? AM Direction 1 20.0 Mon(24)â€?1A 18.0 Mon(24)â€?1B Mon(24)â€?2A DISTANCE TRAVELED (KM) 16.0 Mon(24)â€?2B Mon(24)â€?3A 14.0 Tues(25)â€?1A 12.0 Tues(25)â€?1B Tues(25)â€?2A 10.0 Tues(25)â€?2B Tues(25)â€?3A 8.0 Mon(31)â€?1A 6.0 Mon(31)â€?1B Mon(31)â€?2A 4.0 Mon(31)â€?2B Mon(31)â€?3A 2.0 Tues(01)â€?1A 0.0 Tues(01)â€?1B Tues(01)â€?2A 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 Tues(01)â€?2B Tues(01)â€?3A 6th October Bridge TIME (MINUTES) Elâ€?Nasagoon Elâ€?Sharqeyon â€? Al Haram St   Route 5â€? AM Direction 2 20 Mon(24)â€?1A 18 Mon(24)â€?1B Mon(24)â€?2A DISTANCE TRAVELED (KM) 16 Mon(24)â€?2B Mon(24)â€?3A 14 Tues(25)â€?1A Tues(25)â€?1B 12 Tues(25)â€?2A Tues(25)â€?2B 10 Tues(25)â€?3A 8 Tues(25)â€?3B Mon(31)â€?1A 6 Mon(31)â€?1B Mon(31)â€?2A 4 Mon(31)â€?2B Mon(31)â€?3A 2 Tues(01)â€?1A Tues(01)â€?1B 0 Tues(01)â€?2A Tues(01)â€?2B 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 0 Tues(01)â€?3B 6th October Bridge TIME (MINUTES) Elâ€?Nasagoon Elâ€?Sharqeyon â€? Al Haram St   2â€?[9]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 5â€? PM Direction 1 25.0 Mon(24)â€?1A Mon(24)â€?1B Mon(24)â€?2A DISTANCE TRAVELED (KM) 20.0 Mon(24)â€?2B Tues(25)â€?1A Tues(25)â€?1B 15.0 Tues(25)â€?2A Tues(25)â€?2B Tues(25)â€?3A 10.0 Mon(31)â€?1A Mon(31)â€?1B Mon(31)â€?2A Mon(31)â€?2B 5.0 Mon(31)â€?3A Tues(01)â€?1A Tues(01)â€?1B 0.0 Tues(01)â€?2A 105 120 135 150 165 180 195 210 225 240 0 15 30 45 60 75 90 Tues(01)â€?2B Tues(01)â€?3A 6th October Bridge TIME (MINUTES) Elâ€?Nasagoon Elâ€?Sharqeyon â€? Al Haram St   Route 5â€? PM Direction 2 25 Mon(24)â€?1A Mon(24)â€?1B Mon(24)â€?2A 20 DISTANCE TRAVELED (KM) Mon(24)â€?2B Tues(25)â€?1A Tues(25)â€?1B 15 Tues(25)â€?2A Tues(25)â€?2B Mon(31)â€?1A Mon(31)â€?1B 10 Mon(31)â€?2A Mon(31)â€?2B Mon(31)â€?3A 5 Tues(01)â€?1A Tues(01)â€?1B Tues(01)â€?2A 0 Tues(01)â€?2B Tues(01)â€?3A 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 Tues(01)â€?3B 6th October Bridge TIME (MINUTES) Elâ€?Nasagoon Elâ€?Sharqeyon â€? Al Haram St   2â€?[10]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 6â€? AM Direction 1 30.0 Mon(24)â€?1A Mon(24)â€?1B 25.0 DISTANCE TRAVELED (KM) Mon(24)â€?2A Mon(24)â€?2B Tues(25)â€?1A 20.0 Tues(25)â€?1B Tues(25)â€?2A 15.0 Tues(25)â€?2B Mon(31)â€?1A Mon(31)â€?1B 10.0 Mon(31)â€?2A Mon(31)â€?2B Mon(31)â€?3A 5.0 Tues(01)â€?1A Tues(01)â€?1B Tues(01)â€?2A 0.0 Tues(01)â€?2B 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 Tues(01)â€?3A Enpi (Abbas Alâ€?Akkad Int) Abbaseya Bridge TIME (MINUTES)   Route 6â€? AM Direction 2 30.0 Mon(24)â€?1B Mon(24)â€?2B 25.0 Tues(25)â€?1A Tues(25)â€?1B DISTANCE TRAVELED (KM) 20.0 Tues(25)â€?2A Tues(25)â€?2B Mon(31)â€?1A 15.0 Mon(31)â€?1B Mon(31)â€?2A Mon(31)â€?2B 10.0 Mon(31)â€?3A Tues(01)â€?1A Tues(01)â€?1B 5.0 Tues(01)â€?2A Tues(01)â€?2B Tues(01)â€?3A 0.0 Tues(01)â€?3B 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 Enpi (Abbas Alâ€?Akkad Int) Abbaseya Bridge TIME (MINUTES)   2â€?[11]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 6â€? PM Direction 1 30.0 Mon(24)â€?1A DISTANCE TRAVELED (KM) Mon(24)â€?1B 25.0 Tues(25)â€?1A Tues(25)â€?1B 20.0 Tues(25)â€?2A Tues(25)â€?2B 15.0 Mon(31)â€?1A 10.0 Mon(31)â€?1B Mon(31)â€?2A 5.0 Tues(01)â€?1A Tues(01)â€?1B 0.0 Tues(01)â€?2A Tues(01)â€?2B 0 105 120 135 150 165 180 195 210 225 240 15 30 45 60 75 90 Tues(01)â€?3A Enpi (Abbas Alâ€?Akkad Int) TIME (MINUTES) Abbaseya Bridge   Route 6â€? PM Direction 2 30 Mon(24)â€?1A DISTANCE TRAVELED (KM) Mon(24)â€?1B 25 Tues(25)â€?1A 20 Tues(25)â€?1B Tues(25)â€?2A 15 Tues(25)â€?2B Mon(31)â€?1A 10 Mon(31)â€?1B Mon(31)â€?2B 5 Tues(01)â€?1A Tues(01)â€?2A 0 Tues(01)â€?2B 105 120 135 150 165 180 195 210 225 240 0 15 30 45 60 75 90 Tues(01)â€?3B Enpi (Abbas Alâ€?Akkad Int) TIME (MINUTES) Abbaseya Bridge   2â€?[12]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 7â€? AM Direction 1 25.0 Mon(24)â€?1A Mon(24)â€?1B DISTANCE TRAVELED (KM) Mon(24)â€?2B 20.0 Tues(25)â€?1A Tues(25)â€?1B 15.0 Tues(25)â€?2B Tues(25)â€?3B Mon(31)â€?1A 10.0 Mon(31)â€?1B Mon(31)â€?2A Mon(31)â€?2B 5.0 Mon(31)â€?3B Tues(01)â€?1A Tues(01)â€?1B 0.0 Tues(01)â€?2A Tues(01)â€?2B 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 0 Tues(01)â€?3B Nadi Elâ€?Sekka TIME (MINUTES) Elâ€?Qalaa   Route 7â€? AM Direction 2 25 Mon(24)â€?1A Mon(24)â€?1B DISTANCE TRAVELED (KM) 20 Mon(24)â€?2B Tues(25)â€?1A Tues(25)â€?1B 15 Tues(25)â€?2B Tues(25)â€?3B Mon(31)â€?1A 10 Mon(31)â€?1B Mon(31)â€?2B Mon(31)â€?3B 5 Tues(01)â€?1A Tues(01)â€?1B Tues(01)â€?2A 0 Tues(01)â€?2B 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 0 Tues(01)â€?3B Nadi Elâ€?Sekka TIME (MINUTES) Elâ€?Qalaa   2â€?[13]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 7â€? PM Direction 1 25.0 Mon(24)â€?1A Mon(24)â€?1B DISTANCE TRAVELED (KM) 20.0 Mon(24)â€?2A Mon(24)â€?2B Tues(25)â€?1A 15.0 Tues(25)â€?1B Tues(25)â€?2A Tues(25)â€?2B 10.0 Mon(31)â€?1A Mon(31)â€?1B Mon(31)â€?2A 5.0 Mon(31)â€?2B Tues(01)â€?1A 0.0 Tues(01)â€?1B Tues(01)â€?2A 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 0 10 20 30 40 50 60 70 80 90 Tues(01)â€?2B Nadi Elâ€?Sekka TIME (MINUTES) Elâ€?Qalaa   Route 7â€? PM Direction 2 25 Mon(24)â€?1A Mon(24)â€?1B DISTANCE TRAVELED (KM) 20 Mon(24)â€?2B Tues(25)â€?1A Tues(25)â€?1B 15 Tues(25)â€?2A Tues(25)â€?2B 10 Tues(25)â€?3B Mon(31)â€?1A Mon(31)â€?1B 5 Mon(31)â€?2B Tues(01)â€?1A 0 Tues(01)â€?1B Tues(01)â€?2B 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 0 10 20 30 40 50 60 70 80 90 Tues(01)â€?3B Nadi Elâ€?Sekka TIME (MINUTES) Elâ€?Qalaa   2â€?[14]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 8â€? AM Direction 1 30.0 Mon(24)â€?1A Mon(24)â€?1B Mon(24)â€?2A 25.0 Mon(24)â€?2B DISTANCE TRAVELED (KM) Mon(24)â€?3A Mon(24)â€?3B 20.0 Tues(25)â€?1A Tues(25)â€?1B Tues(25)â€?2A Tues(25)â€?2B 15.0 Tues(25)â€?3B Mon(31)â€?1A Mon(31)â€?1B Mon(31)â€?2A 10.0 Mon(31)â€?2B Mon(31)â€?3A Mon(31)â€?3B 5.0 Tues(01)â€?1A Tues(01)â€?1B Tues(01)â€?2A Tues(01)â€?2B 0.0 Tues(01)â€?3A Tues(01)â€?3B 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 0 Eltayaran Int Ramsis Square TIME (MINUTES) Linear (Ramsis Square)   Route 8â€? AM Direction 2 30 Mon(24)â€?1A Mon(24)â€?1B Mon(24)â€?2A 25 Mon(24)â€?2B Mon(24)â€?3B DISTANCE TRAVELED (KM) Tues(25)â€?1A 20 Tues(25)â€?1B Tues(25)â€?2A Tues(25)â€?2B 15 Tues(25)â€?3B Mon(31)â€?1A Mon(31)â€?1B Mon(31)â€?2A 10 Mon(31)â€?2B Mon(31)â€?3A Mon(31)â€?3B 5 Tues(01)â€?1A Tues(01)â€?1B Tues(01)â€?2A 0 Tues(01)â€?2B Tues(01)â€?3A 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 0 Tues(01)â€?3B Eltayaran Int TIME (MINUTES) Ramsis Square   2â€?[15]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 8â€? PM Direction 1 30.0 Mon(24)â€?1A Mon(24)â€?2A DISTANCE TRAVELED (KM) 25.0 Mon(24)â€?2B Tues(25)â€?1A 20.0 Tues(25)â€?1B Tues(25)â€?2A Mon(31)â€?1A 15.0 Mon(31)â€?1B Mon(31)â€?2A 10.0 Mon(31)â€?2B Mon(31)â€?3A 5.0 Tues(01)â€?1A Tues(01)â€?1B 0.0 Tues(01)â€?2A Tues(01)â€?2B 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 Tues(01)â€?3A Eltayaran Int TIME (MINUTES) Ramsis Square   Route 8â€? PM Direction 2 30 Mon(24)â€?1A Mon(24)â€?1B 25 DISTANCE TRAVELED (KM) Mon(24)â€?2A Mon(24)â€?2B 20 Mon(24)â€?3B Tues(25)â€?1A Tues(25)â€?1B 15 Tues(25)â€?2B Mon(31)â€?1A 10 Mon(31)â€?1B Mon(31)â€?2A 5 Mon(31)â€?2B Tues(01)â€?1A Tues(01)â€?1B 0 Tues(01)â€?2A 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 0 Tues(01)â€?2B Eltayaran Int TIME (MINUTES) Ramsis Square   2â€?[16]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 9â€? AM Direction 1 30.0 Mon(24)â€?1A Mon(24)â€?1B Mon(24)â€?2A 25.0 DISTANCE TRAVELED (KM) Mon(24)â€?2B Mon(24)â€?3A Tues(25)â€?1A 20.0 Tues(25)â€?1B Tues(25)â€?2A Tues(25)â€?2B 15.0 Tues(25)â€?3A Tues(25)â€?3B Mon(31)â€?1A 10.0 Mon(31)â€?1B Mon(31)â€?2A Mon(31)â€?2B 5.0 Mon(31)â€?3A Tues(01)â€?1A 0.0 Tues(01)â€?1B Tues(01)â€?2A 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 0 Tues(01)â€?2B Tues(01)â€?3A Haikesteb Bridge TIME (MINUTES) Elâ€?Shams Club   Route 9â€? AM Direction 2 25 Mon(24)â€?1A Mon(24)â€?1B Mon(24)â€?2A DISTANCE TRAVELED (KM) 20 Mon(24)â€?2B Mon(24)â€?3B Tues(25)â€?1A 15 Tues(25)â€?1B Tues(25)â€?2A Tues(25)â€?2B Tues(25)â€?3B 10 Mon(31)â€?1A Mon(31)â€?1B Mon(31)â€?2A 5 Mon(31)â€?2B Mon(31)â€?3B Tues(01)â€?1A 0 Tues(01)â€?1B Tues(01)â€?2A 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 0 10 20 30 40 50 60 70 80 90 Tues(01)â€?2B Tues(01)â€?3B Haikesteb Bridge TIME (MINUTES) Elâ€?Shams Club   2â€?[17]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 9â€? PM Direction 1 30.0 Mon(24)â€?1A DISTANCE TRAVELED (KM) 25.0 Mon(24)â€?1B Mon(24)â€?2A 20.0 Mon(24)â€?2B Tues(25)â€?1A 15.0 Tues(25)â€?1B Tues(25)â€?2A 10.0 Mon(31)â€?1A Mon(31)â€?1B 5.0 Mon(31)â€?2A Mon(31)â€?2B 0.0 Tues(01)â€?1A Tues(01)â€?2A 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 Haikesteb Bridge Elâ€?Shams Club TIME (MINUTES)   Route 9â€? PM Direction 2 30 Mon(24)â€?1A 25 DISTANCE TRAVELED (KM) Mon(24)â€?1B Mon(24)â€?2B 20 Tues(25)â€?1A Tues(25)â€?1B 15 Mon(31)â€?1A Mon(31)â€?1B 10 Mon(31)â€?2B Mon(31)â€?3B 5 Tues(01)â€?1A Tues(01)â€?1B 0 Tues(01)â€?2B 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 0 10 20 30 40 50 60 70 80 90 Haikesteb Bridge Elâ€?Shams Club TIME (MINUTES)   2â€?[18]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 10â€? AM Direction 1 30.0 DISTANCE TRAVELED (KM) Mon(24)â€?1A 25.0 Mon(24)â€?1B Mon(24)â€?2A 20.0 Mon(24)â€?2B Tues(25)â€?1A Tues(25)â€?1B 15.0 Tues(25)â€?2A Tues(25)â€?2B 10.0 Mon(31)â€?1A Mon(31)â€?1B 5.0 Mon(31)â€?2A Mon(31)â€?2B 0.0 Tues(01)â€?1A Tues(01)â€?1B 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 Tues(01)â€?2B Aboud Bridge Ramsis Square TIME (MINUTES)   Route 10â€? AM Direction 2 30 Mon(24)â€?1A Mon(24)â€?1B DISTANCE TRAVELED (KM) 25 Mon(24)â€?2B 20 Tues(25)â€?1A Tues(25)â€?1B 15 Tues(25)â€?2B Mon(31)â€?1A 10 Mon(31)â€?1B Mon(31)â€?2B 5 Tues(01)â€?1A Tues(01)â€?1B 0 Tues(01)â€?2B 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 Aboud Bridge TIME (MINUTES) Ramsis Square   2â€?[19]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 10â€? PM Direction 1 30.0 Mon(24)â€?1A 25.0 Mon(24)â€?1B DISTANCE TRAVELED (KM) Mon(24)â€?2B Tues(25)â€?1A 20.0 Tues(25)â€?1B Tues(25)â€?2A 15.0 Tues(25)â€?2B Mon(31)â€?1A 10.0 Mon(31)â€?1B Mon(31)â€?2A 5.0 Mon(31)â€?2B Tues(01)â€?1A Tues(01)â€?1B 0.0 Tues(01)â€?2B 0 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 10 20 30 40 50 60 70 80 90 Aboud Bridge Ramsis Square TIME (MINUTES)   Route 10â€? PM Direction 2 30 Mon(24)â€?1A Mon(24)â€?1B 25 DISTANCE TRAVELED (KM) Mon(24)â€?2B 20 Tues(25)â€?1A Tues(25)â€?1B 15 Tues(25)â€?2B Mon(31)â€?1A 10 Mon(31)â€?1B Mon(31)â€?2B 5 Tues(01)â€?1A Tues(01)â€?1B 0 Tues(01)â€?2B 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 0 Aboud Bridge TIME (MINUTES) Ramsis Square   2â€?[20]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 11â€? AM Direction 1 25.0 Mon(24)â€?1A Mon(24)â€?1B 20.0 Mon(24)â€?2A DISTANCE TRAVELED (KM) Mon(24)â€?2B Mon(24)â€?3B Tues(25)â€?1A Tues(25)â€?1B 15.0 Tues(25)â€?2A Tues(25)â€?2B Tues(25)â€?3B Mon(31)â€?1A 10.0 Mon(31)â€?1B Mon(31)â€?2A Mon(31)â€?2B Mon(31)â€?3A Mon(31)â€?3B 5.0 Tues(01)â€?1A Tues(01)â€?1B Tues(01)â€?2A Tues(01)â€?2B 0.0 Tues(01)â€?3A Tues(01)â€?3B 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 0 Ring Road Int Elâ€?Autostrad Bridge TIME (MINUTES)   Route 11â€? AM Direction 2 30 Mon(24)â€?1A Mon(24)â€?1B Mon(24)â€?2A DISTANCE TRAVELED (KM) 25 Mon(24)â€?2B Mon(24)â€?3B Tues(25)â€?1A 20 Tues(25)â€?1B Tues(25)â€?2A 15 Tues(25)â€?2B Tues(25)â€?3B Mon(31)â€?1A 10 Mon(31)â€?1B Mon(31)â€?2A Mon(31)â€?2B 5 Mon(31)â€?3A Mon(31)â€?3B Tues(01)â€?1A 0 Tues(01)â€?1B Tues(01)â€?2A 105 120 135 150 165 180 195 210 225 240 0 15 30 45 60 75 90 Tues(01)â€?2B Tues(01)â€?3B Ring Road Int TIME (MINUTES) Elâ€?Autostrad Bridge   2â€?[21]  Annex 4  Section 2:  Principal Corridors Individual Assessment  Route 11â€? PM Direction 1 30.0 Mon(24)â€?1A Mon(24)â€?2A 25.0 DISTANCE TRAVELED (KM) Tues(25)â€?1A Tues(25)â€?1B Tues(25)â€?2A 20.0 Tues(25)â€?2B Tues(25)â€?3A Tues(25)â€?3B 15.0 Mon(31)â€?1A Mon(31)â€?1B Mon(31)â€?2A 10.0 Mon(31)â€?2B Mon(31)â€?3A Mon(31)â€?3B 5.0 Tues(01)â€?1A Tues(01)â€?1B Tues(01)â€?2A 0.0 Tues(01)â€?2B 0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 Tues(01)â€?3A Tues(01)â€?3B Ring Road Int TIME (MINUTES) Elâ€?Autostrad Bridge   Route 11â€? PM Direction 2 30 Mon(24)â€?1A Mon(24)â€?1B Mon(24)â€?2A 25 DISTANCE TRAVELED (KM) Mon(24)â€?2B Mon(24)â€?3B Tues(25)â€?1A 20 Tues(25)â€?1B Tues(25)â€?2A Tues(25)â€?2B 15 Tues(25)â€?3B Mon(31)â€?1A Mon(31)â€?1B 10 Mon(31)â€?2A Mon(31)â€?2B Mon(31)â€?3A 5 Mon(31)â€?3B Tues(01)â€?1A Tues(01)â€?1B Tues(01)â€?2A 0 Tues(01)â€?2B Tues(01)â€?3A 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 0 Tues(01)â€?3B Ring Road Int TIME (MINUTES) Elâ€?Autostrad Bridge   2â€?[22]  Annex 4  Section 2:  Principal Corridors Individual Assessment    b) Field Photos    2 lanes   1   amalek Exit Elâ€?Z 4 Lanes Random Microbus  Stop  2    4    3    Fig. 1: Route 1, Location 1 â€? Satellite Photo by Google    4 3     Fig. 2: Route 1, Location 1 – Photo by Traffic Control Center    1 2 3 2 Lanes       Fig. 3: Route 1, Location 2 (Direction 2: Aboâ€?ElFeda) â€? Satellite Photo by Google      2â€?[23]    Annex 4  Section 2:  Principal Corridors Individual Assessment    Random Microbus  Stop 3  3 L   anes 2 3 Lanes    1   2 Lanes  2 Lanes       Fig. 4: Route 1, Location 2 (Direction 1: Sphinx Square till Kornish Elâ€?Agouza) â€? Satellite Photo by  Google    Opening  Through Traffic       Fig. 5: Route 1, Location 3 (Direction 2: Exit of El Tarsana Club) â€? Satellite Photo by Google    2 L   anes    1 2   3       Fig. 6: Route 1, Location 3 (Direction 2: El Sudan Street) â€? Satellite Photo by Google    2â€?[24]    Annex 4  Section 2:  Principal Corridors Individual Assessment    2 3     Fig. 7: Route 1, Location 3 (Direction 2: El Sudan Street) â€? Photo by Traffic Control Center    2 Lanes 4 Lanes   2 Lanes   2 Lanes     Fig. 8: Route 1, Location 3 (Direction 1: Ring Road Interchange) â€? Satellite Photo by Google    3 1 2      Fig. 9: Route 3, Location 2 (Both Directions: Autostrad interchange) â€? Satellite Photo by Google  2â€?[25]    Annex 4  Section 2:  Principal Corridors Individual Assessment    Microbus stop  Security Check       Fig. 10: Route 3, Location 3 (Direction 2) â€? Satellite Photo by Google       Å To Alexandria   3 Lanes   1 lane  2 Lanes   2 Lanes   Microbus stop   2 Lanes   Å To Elâ€?Wahat  ÃŽ To Elâ€?Ahram  2 Lanes        Fig. 11: Route 3, Location 6 (Direction 2: Elâ€?Sahrawy Interchange) â€? Satellite Photo by Google    2â€?[26]    Annex 4  Section 2:  Principal Corridors Individual Assessment        Fig. 12: Route 5, Location 1 (Direction 2: Near Imbaba Bridge) â€? Satellite Photo by Google        Fig. 13: Route 5, Location 2 (Both directions: Elâ€?Kit Kat square) â€? Satellite Photo by Google  2â€?[27]    Annex 4  Section 2:  Principal Corridors Individual Assessment    3 Lanes   4 Lanes   Elâ€?Agouza Exit       Fig. 14: Route 5, Location 3 (Direction 1: October 6th bridge â€? Agouza Exit) â€? Satellite Photo by  Google    4 Lanes   3 lanes        Fig. 15: Route 5, Location 4 (Direction 2: Before Giza security municipality) â€? Satellite Photo by  Google    2â€?[28]    Annex 4  Section 2:  Principal Corridors Individual Assessment    Elâ€?Giza Bridge   2 Lanes   4 Lanes       Fig. 16: Route 5, Location 5 (Direction 1: Before Elâ€?Giza Bridge) â€? Satellite Photo by Google     230 m   m     m  130  m   S Elâ€?   alam Mosque      Fig. 17: Route 6, Location 2 (Both directions: Elâ€?Salam Mosque) â€? Satellite Photo by Google  2â€?[29]    Annex 4  Section 2:  Principal Corridors Individual Assessment    Bus Stop           Fig. 18: Route 6, Location 3 (Direction 1: Rabaa Elâ€?Adaweya Intersection) â€? Satellite Photo by  Google        Fig. 19: Route 6, Location 4 (Direction 1: Elâ€?Rahman Elâ€?Raheem Mosque) â€? Satellite Photo by  Google    2â€?[30]    Annex 4  Section 2:  Principal Corridors Individual Assessment        Fig. 20: Route 6, Location 5 (Direction 1: Elâ€?Rahman Elâ€?Raheem Mosque) â€? Satellite Photo by  Google  2â€?[31]    Annex 4  Section 2:  Principal Corridors Individual Assessment    5 Lanes     2 Lanes        zhar Tunnel   Elâ€?A     Fig. 21: Route 6, Location 6 (Direction 1: Elâ€?Azhar Tunnel) â€? Satellite Photo by Google    4     Fig. 22: Route 7, Location 1 (Directions 1 & 2: From Ahmed Fakhry Str. To Abbas Elâ€?Akkad Str.) â€?  Satellite Photo by Google  2â€?[32]    Annex 4  Section 2:  Principal Corridors Individual Assessment    2  1  Onâ€?Street  Parking          Fig. 23: Route 7, Location 1 (Directions 1 & 2: Fom Ahmed Fakhry Str. To Abbas Elâ€?Akkad Str) â€?  Photo by Traffic Control Center     4 Lanes   6 Lanes         Fig. 24: Route 7, Location 2 (Direction 2: Prior to Youssif Abbas Intersection) â€? Satellite Photo by  Google        Fig. 25: Route 7, Location 2 (Direction 2: Prior to Youssif Abbas Intersection) â€? Photo by Traffic  Control Center  2â€?[33]    Annex 4  Section 2:  Principal Corridors Individual Assessment       3 Lanes   4 Lanes         Fig. 26: Route 7, Location 4 (Direction 2: Elâ€?Deweyqa entrance) â€? Satellite Photo by Google        Fig. 27: Route 7, Location 4 (Direction 2: Elâ€?Deweyqa entrance) â€? Photo by Traffic Control Center    Direction (2)   4 Lanes   2 Lanes        Fig. 28: Route 8, Location 1 (Directions 1 & 2: Elâ€?Galaa Bridge) â€? Satellite Photo by Google  2â€?[34]    Annex 4  Section 2:  Principal Corridors Individual Assessment      anes   2 L 2 Lanes    2 Lanes        Fig. 29: Route 8, Location 4 (Direction 1: Elâ€?Orouba Entrance to 6th October Bridge) â€? Satellite  Photo by Google    2 Lanes   2 Lanes     2 Lanes        Fig. 30: Route 8, Location 5 (Direction 1: Ghamra Bridge entrance) â€? Satellite Photo by Google  2â€?[35]    Annex 4  Section 2:  Principal Corridors Individual Assessment    Section 1      Section 2     To Ramsis Street         Fig. 31: Route 8, Location 6 (Direction 1: Ramsis Exit – Tahrir Entrance) â€? Satellite Photo by Google     Section 1     3 Lanes    2 Lanes   Elâ€?Tahrir Entrance    3 Lanes        Fig. 32: Route 8, Location 6 (Direction 1: Ramsis Exit – Tahrir Entrance) â€? Satellite Photo by Google  2â€?[36]    Annex 4  Section 2:  Principal Corridors Individual Assessment        Fig. 33: Route 9, Location 1 (Direction 2: At Mawqaf Elâ€?Asher) â€? Satellite Photo by Google      Fig. 34: Route 9, Location 2 (Direction 1: Under the Hikesteb Bridge) â€? Satellite Photo by Google        Fig. 35: Route 9, Location 2 (Direction 1: Under the Hikesteb Bridge) â€? Photo by Traffic Control  Center    2â€?[37]    Annex 4  Section 2:  Principal Corridors Individual Assessment       Railway Level Crossing    Uâ€?Turn   2 Lanes   4 Lanes     Fig. 36: Route 9, Location 3 (Directions 1 & 2: Abdel Aziz Fahmy intersection) â€? Satellite Photo by  Google    â€?Nour   Elâ€?Sheikh Abo El   anadi   Elâ€?K      Fig. 37: Route 9, Location 4 (Directions 1&2: Elâ€?Qobba Intersection) â€? Satellite Photo by Google  2â€?[38]    Annex 4  Section 2:  Principal Corridors Individual Assessment        Fig. 38: Route 9, Location 4 (Directions 1&2: Elâ€?Qobba Intersection) â€? Photo by Traffic Control  Center     Elâ€?Kanadi     our     heikh Abo Elâ€?N Elâ€?S      Fig. 39: Route 9, Location 4 (Direction 2: Upstream of Elâ€?Qobba Intersection) â€? Photo by Traffic  Control Center    2â€?[39]    Annex 4  Section 2:  Principal Corridors Individual Assessment    4 Lanes   Pedestrian Crossover   3 lanes          Fig. 40: Route 10, Location 4 (Direction 1: Near October 6thâ€?Ghamra Exit) â€? Satellite Photo by  Google    Queuing   Random Stop          Fig. 41: Route 10, Location 4 (Direction 1: In front of Ramsis Light Rail Station) â€? Photo by Traffic  Control Center    2â€?[40]    Annex 4  Section 2:  Principal Corridors Individual Assessment      urn    Uâ€?T â€?Galaa and  Traffic from El Ramsis Str.      Fig. 42: Route 10, Location 5 (Direction 1: Beginning of Shoubra tunnel) â€? Satellite Photo by Google    5 Lanes   Uâ€?Turn   3 Lanes         Fig. 43: Route 10, Location 5 (Direction 2) â€? Satellite Photo by Google    2â€?[41]    Annex 4  Section 2:  Principal Corridors Individual Assessment    410 m          Fig. 44: Route 10, Location 6 (Direction 2) â€? Satellite Photo by Google  2â€?[42]    Annex 4  Section 3:  Estimation Procedures    3. Estimation Procedures  a) Route Average Speed Estimation Procedure  Estimation Procedure  • Problem  Statement:  To  calculate  the  average  speed  and  the  coefficient  of  variation  (of  speeds)  per  hour  per  peak  period  per  direction  per  route  given  floatingâ€?car  data  for  4  days  for  2  peak  periods consisting of 5 minute intervals of distance measurements.  • To  ‘solve’  the  problem  we  first  had  to  determine  an  appropriate  aggregation  procedure  for  the  data.   We  can  treat  the  4  dates  as  a  sample  space  for  each  hour.   Essentially,  this  means  that  each  5  minute  interval  of  distance  measurement  for  each  hour  is  given  an  equal  weight  regardless of the date/day that it occurs on.  This is the chosen method.  • An  alternative  method  would  give  each  day  the  same  weight  (the  average  is  computed  for  each  day and then the average is taken across all 4 days).   However, this method has the shortcoming  that  given  a  particular  route  during  a  particular  hour  in  a  particular  direction  on  a  particular  dateâ€? let’s say (Route 1 6PM Direction 2)â€? we find that Monday 31â€?05â€?2010 has only one distance  recorded during that hour.  Yet, if this procedure were used Monday  31â€?05â€?2010 would be given  an equal weight as other days which have many recorded distances during that hour.  Therefore,  we rejected this method.  • Still  another  method  would  treat  each  day  (Monday  or  Tuesday)  as  a  sample  space  and  average  the  average  speed  for  Monday  and  Tuesday.    This  method  would  treat  Monday  as  having  a  particular  pattern  of  traffic  and  Tuesday  as  having  a  separate  pattern  of  traffic.    This  method  would  be  more  ideal  if  the  traffic  patterns  on  Monday  and  Tuesday  varied  significantly.   However,  since  the  average  has  been  requested  over  all  4  days  and  there  seems  to  be  similarity  (see  the  average  speed  per  day  per  car)  between  Monday  and  Tuesday  patterns  we  did  not  use  this procedure.    • Explicit formulation of the solution:  o   If  , , … ,   are  all  the  recorded  marginal  distances  for  a  particular  hour  irrespective  of  the  date  or  car  (over  all  4  days  and  both  cars),  and  , , … ,   are  the  corresponding  times  then  an  estimation  for  average  speed  during  that  hour  is  given by Eq. 1:      μ 1     o Because  of  the  sampling  in  uniform  intervals  of  time  (5  mins.)    for  1 , .  Therefore, Eq. 1 can be written in the following form:     Ì‚ 2   i.e.  as  an  average  of  speeds.    This  facilitates  the  calculation  of  the  coefficient  of  variation,  where  the  standard  deviation  is  taken  from  the  sample  data    .    The  reason  we  mention  this  is  because  Eq.  1  and  Eq.  2  produce  different  results  in  the  calculation of the standard deviation and mean when  .  3â€?[1]    Annex 4  Section 3:  Estimation Procedures    o Then the coefficient of variation can be written:    Ì‚ where    is the unbiased estimator of the variance of the speeds  .    o In  the  ideal  situation  we  would  want  to  have  a  maximum  amount  of  sample  data  distributed  equally  in  both  distance  and  time  domains  since  the  traffic  depends  on  attributes  of  the  road  network  as  well  as  time  of  day.    Due  to  experimental  constraints  the  traffic  is  considered  to  assume  a  possible  different  state  for  each  trip depending on the incidence of floating cars along the route.   Matlab Function  • Finally,  the  average  speeds  for  the  11  routes  can  be  found  in  the  excel  file  “Speeds  per  hour.xlsxâ€?.  A specially tailored Matlab function was designed to handle the irregularly formatted  and large amount of data.  • The  Matlab  function  serves  as  an  input/output  mechanism  which  takes  as  input  the  floating  car  data (recorded marginal distances) for each hour per peak period per direction on all the routes.   This  input  is  irregular  in  the  sense  that  the  distance  data  occurs  in  trip  ‘clusters.’   Furthermore  the  data  entered  into  Excel  begins  each  trip  with  a  marginal  distance  of  zero.    Therefore,  the  function  has  two  main  purposes:  1)  To  remove  all  nonâ€?numerical  data;  2)  To  remove  all  zeros  at  the beginning of each trip so as to exclude them from the average.  The first task can be handled  by  a  builtâ€?in  Matlab  function;  the  second  must  use  an  algorithm.    After  these  two  tasks  have  been  preformed  the  calculation  of  average  distances  (Eq.  1)  and  coefficients  of  variation  is  trivial.  The output is sent back to Excel.        3â€?[2]    Annex 4  Section 3:  Estimation Procedures    b) Route Free Flow Speed Estimation Procedure  The following section describes a procedure for estimating free flow speeds using speed limit, length  of  route  section,  number  of  intersections  along  each  section,  as  well  as  assumed  acceleration  and  deceleration rates.  Principles  • The  free  flow  speed  along  a  corridor  is  the  speed  experienced  by  motorists  under  uncongested  conditions (at near zero flow and density conditions).  • The  free  flow  speed  along  freeway  sections  is  close  to  the  posted  speed  limit.  Along  arterial  corridors  with  controlled/uncontrolled  intersections,  the  free  flow  speed  includes  delay  effects  at intersections, and accordingly we can’t use the posted speed limit directly.  • In  Cairo,  the  free  flow  speed  during  peak  periods  is  perhaps  different  from  the  free  flow  speed  measured  during  late  night  hours  when  traffic  flow/density  is  low.  This  is  due  to  poor  user  compliance  of  traffic  rules  and  inadequate  enforcement  of  intersection  control  (both  factors  causing  near  zero  delays  at  intersections),  and  due  to the traffic/security checkpoints  at  random  locations  along  expressways  and  arterials  (which  cause  extra  delays  typical  only  of  late  night  hours). Accordingly, the free flow speed cannot be “measuredâ€? adequately at late night hours.  • The  free  flow  speed  can  be  estimated  using  simulation  or  analytical  methods.  We  opt  for  the  latter.    Assumptions  • Along limitedâ€?access freeway sections, motorists travel at the posted speed limit under free flow  conditions.  • Along  arterials,  motorists  come  to  a  full  stop  at  each  signalized  and  unsignalized  intersection  under  free  flow  conditions,  but  they  do  not  experience  waiting  delays.  This  represents  an  approximation  of  the  average  delays  at  intersections  in  real  life,  where  motorists  under  uncongested  conditions may stop  at some  intersections and wait briefly but pass through others  without stopping.   • Further delays are experienced at intersections with Uâ€?turns.  • At  each  arterial  section,  the  vehicle  accelerates  from  zero  speed  at  the  start  of  the  section,  reaches  speed  limit,  cruises  at  that  speed,  then  decelerates  to  a  speed  of  zero  at  the  end  of  the  section.    Estimation procedure for arterials  • Suppose you have a corridor with multiple sections, each having a length Si and speed limit Vi.  • Total  corridor  travel  time  under  freeâ€?flow  conditions  =  T  =  (S1/V1  +  S2/V2  +  …….)  +  “lost  timeâ€?  at  intersections + additional delays due to Uâ€?turns  • Lost time at the start of section 1 = V1 / 2a  o Where a is the acceleration rate  o This  time  represents  the  difference  between  the  time  to  travel  the  accelerating  distance  at  V1  and  the  time  to  accelerate  from  0  to  V1  over  the  same  distance;  the  kinematic equations assuming uniform acceleration are used.  • Lost time at the end of section 1 = V1 / 2d  o Where d is the deceleration rate.  • Lost time at the start of section 2 = V2 / 2a  3â€?[3]    Annex 4  Section 3:  Estimation Procedures    • Lost time at the end of section 2 = V2 / 2d  • Additional delay at an intersection with a Uâ€?turn = a fixed value of say 2 minutes.  • Free Flow Speed = (S1 + S2 + S3 + ….) / T  • The speed index is then the average speed (from the first part) divided by the free flow speed.      Matlab function    • As before, a pair of Matlab functions is used to expedite the calculations. The first function takes  as  input  the  data  on  section  class,  speed  limit,  and  section  length.  It  then  performs  the  calculations described above.  • The  second  function  takes  the  resulting  free  flow  speed  estimates  calculates  the  speed  index,  organizes the data into a table, and outputs to excel the results.          3â€?[4]    Annex 5: Origin Destination Matrices 2005 and 2012 [separate pdf file] 196                 ANNEX 5    Originâ€?Destination Matrices:   Daily vehicle trips in the years 2005 and 2012 according to “Public Private  Partnership Program for Cairo Urban Toll Expressway Network  Developmentâ€? Study by JICA  Annex 5   Table B.1: OD matrix passenger car 2005  OD Matrix for passenger cars 2005            6th of   Imbaba  Masr El   Shoubra El   10th of      October   Markaz  Dokki  Giza  South Giza  Helwan  Maadi  Khaleefa  CBD  Shoubra  Gadida  Nasr City  Ain Shams  Salam City  Khima  Qalioub  Qanater  Ramadan  6th of October  1.997  215  472  1.165  95  52  159  176  273  89  113  97  37  24  51  24  13  1  Imbaba Markaz  215  25.703  20.607  14.533  1.010  1.108  3.010  3.902  10.840  4.570  4.812  3.541  2498  2.396  4.100  4.419  2.275  79  Dokki  472  20.607  56.498  33.626  4.085  4.108  10.184  13.241  28.546  14.431  14.476  9.966  6425  4.631  10.026  5.778  4.071  213  Giza  1.165  14.534  33.626  62.560  8.111  4.709  12.187  14.519  20.364  7.449  9.115  7.131  3485  2.214  4.079  2.052  1.367  92  South Giza  95  1.010  4.085  8.111  14.311  4.065  2.008  1.914  2.693  826  1.137  948  359  232  471  185  113  8  Helwan  52  1.108  4.109  4.709  4.065  47.937  11.498  4.429  7.010  2.419  4.698  4.921  1678  1.092  1.054  371  543  47  Maadi  159  3.010  10.184  12.187  2.008  11.498  29.649  11.266  14.986  4.493  8.276  7.756  2861  1.853  2.042  967  1.166  100  Khaleefa  176  3.902  13.241  14.519  1.914  4.430  11.267  12.891  14.073  5.875  10.179  8.849  3992  2.681  2.894  941  1.089  66  CBD  273  10.840  28.546  20.364  2.692  7.010  14.987  14.074  22.782  19.785  21.510  16.202  10.857  7133  10.950  4.087  3.843  136  Shoubra  89  4.570  14.431  7.449  826  2.419  4.493  5.875  19.784  20.025  16.783  10.192  7564  4.590  9.413  3.827  3.055  132  Masr El Gadida  113  4.813  14.476  9.115  1.137  4.698  8.276  10.179  21.510  16.783  42.147  28.467  20.079  11.945  10.185  4042  6.132  493  Nasr City  97  3.541  9.966  7.131  948  4.921  7.756  8.849  16.201  10.192  28.467  43.828  14.485  12.729  6829  3.550  6.447  2.110  Ain Shams  37  2.498  6.425  3.485  359  1.677  2.861  3.992  10.857  7.564  20.079  14.485  17.001  9.024  5.976  3.116  4.876  285  Salam City  24  2.396  4.631  2.214  232  1.092  1.854  2.681  7.133  4.590  11.945  12.729  9.024  14.778  5568  4.611  8.131  413  Shoubra El Khima  51  4.100  10.026  4.079  471  1.054  2.042  2.894  10.950  9.413  10.185  6.829  5976  5.568  17.967  6.682  6.094  191  Qalioub  24  4.420  5.778  2.052  185  371  967  941  4.088  3.827  4.041  3.550  3116  4.611  6.683  22.155  5030  126  Qanater  13  2.275  4.071  1.367  113  543  1.166  1.088  3.843  3.055  6.130  6.447  4876  8.132  6.094  5.029  29.805  470  10th of ramadan  1  79  213  92  8  47  100  66  136  132  493  2.110  285  413  191  126  470    Total  5.053  109.621  241.385  208.758  42.570  101.739  124.464  112.977  216.069  135.518  214.586  188.048  114.598  94.046  104.573  71.962  84.520  4.962    [1] Annex 5 Table B.2: OD matrix for passenger car 2012  OD Matrix for passenger cars 2012                                    Imbab Shoubra  6th of  a   South   Masr El   Nasr  Ain  Salam  Qanat 10th of     Dokki  Giza  Helwan  Maadi  Khaleefa  CBD  Shoubra  El   Qalioub   October  Marka Giza  Gadida  City  Shams  City  er  Ramadan  Khima  z  6th of October  21.212  4.151  6.386  17.483  1.247  1.108  1.608  2.618  5.114  1.330  1.473  982  684  471  1.011  729  443  13  61.75 14.07 Imbaba Markaz  4.151  27.722  16.718  1.157  1.719  3.401  4.965  4.676  7.061  5.779  2071  1.348  2.828  2.947  911  153  9  9  27.72 34.76 Dokki  6.386  72.910  39.307  4.154  7.029  12.516  16.028  15.790  21.293  16.778  7707  5.419  10.552  6.329  4.550  565  2  8  16.71 27.46 Giza  17.483  39.307  89.254  9.994  5.993  12.787  17.479  9.312  12.722  10.639  4262  3.080  5.716  3.420  2.244  395  7  6  28.08 South Giza  1.247  1.157  4.154  9.994  4.329  2.126  2.349  3.847  1.086  1.810  1.557  505  354  627  336  218  40  5  Helwan  1.108  1.719  7.029  5.993  4.328  67.824  14.456  5.107  8.988  2.818  5.692  4.309  1769  1.251  1.951  1.137  843  149  18.35 Maadi  1.608  3.401  12.516  12.787  2.126  14.456  42.105  13.824  5.685  11.615  9.549  3119  2.323  3.281  2.039  1.550  298  1  18.64 Khaleefa  2.618  4.965  16.028  17.478  2.349  5.107  13.824  18.924  8.251  15.043  14.521  4520  3.358  4.356  2.004  1.683  272  5  14.07 29.36 CBD  5.115  34.767  27.467  3.847  8.987  18.350  18.646  23.506  27.709  26.643  12.364  9.218  13.500  6.671  5.871  392  9  7  23.50 Shoubra  1.330  4.675  15.790  9.312  1.086  2.818  5.685  8.251  32.165  21.444  15.730  8877  5.271  11.757  5.950  4.393  388  6  27.70 10.06 Masr El Gadida  1.473  7.060  21.294  12.721  1.810  5.692  11.615  15.043  21.444  69.267  56.592  28.393  19.671  14.616  6566  1.375  9  0  26.64 103.99 Nasr City  982  5.780  16.778  10.639  1.557  4.309  9.549  14.521  15.728  56.591  22.444  21.402  11.419  5.475  9.103  7.641  4  6  12.36 Ain Shams  684  2.071  7.707  4.262  505  1.769  3.119  4.520  8.877  28.393  22.444  22.215  12.189  8.080  3.635  5.947  1.595  4  Salam City  471  1.347  5.419  3.080  354  1.251  2.323  3.358  9.218  5.271  19.671  21.402  12.189  24.876  5886  4.033  8.484  1.397  Shoubra  El  13.50 1.011  2.828  10.552  5.716  627  1.951  3.281  4.356  11.757  14.616  11.419  8.080  5.886  19.080  9.462  6.629  493  Khima  0  Qalioub  729  2.947  6.329  3.420  336  1.137  2.039  2.004  6.671  5.950  6.566  5.476  3635  4.033  9.462  31.891  5.430  178  57.53 Qanater  443  911  4.550  2.243  218  843  1.551  1.683  5.871  4.393  10.058  9.103  5947  8.485  6.629  5.431  715  7  10th of ramadan  13  153  565  395  40  149  298  272  392  388  1.375  7.641  1595  1.397  493  178  715  17.276  163.4 309.80 288.26 63.82 136.47 160.63 286.5 178.42 332.39 344.56 126.6 Total  68.064  153.948  150.376  130.032  131.244  98.233  33.335  42  3  9  0  1  3  00  7  9  0  11  [2] Annex 5 Table B.3: OD matrix for Taxi 2005  OD Matrix for Taxi 2005                                      6th of  Imbaba   Masr El   Shoubra  10th of     October  Markaz  Dokki  Giza  South Giza Helwan Maadi Khaleefa CBD Shoubra Gadida  Nasr City Ain Shams Salam City El Khima Qalioub Qanater ramadan 6th of October  698  48  89  285  14  5  25  19  23  7  6  5  3  1  9  2  1  0  Imbaba Markaz  48  10.859  6.109  4.617  184  175  627  887  2.431  1.124  990  618  576  570  1.257  1.233  519  12  Dokki  89  6.109  17.917  8.903  812  723  2.137  2.948  5.725  3.528  2.749  1.554  1403  987  2.760  1.254  800  27  Giza  285  4.617  8.903  20.110  2.363  981  3.075  3.724  3.962  1.805  1.706  1.167  755  455  1.106  377  240  11  South Giza  14  184  812  2.363  5.547  1.094  402  321  345  117  113  88  47  26  82  16  10  0  Helwan  5  175  723  981  1.094  16.976  3.188  938  1.102  458  836  947  335  209  222  32  65  7  Maadi  25  627  2.138  3.075  402  3.188  9.412  2.965  2.823  928  1.733  1.586  606  353  464  113  164  10  Khaleefa  19  887  2.948  3.724  321  938  2.965  3.792  2.868  1.302  2.204  1.711  896  551  755  104  161  9  CBD  23  2.432  5.726  3.962  345  1.102  2.823  2.868  5.876  4.673  3.948  2.367  2.268  1.424  2.938  691  662  14  Shoubra  7  1.124  3.528  1.805  117  458  928  1.302  4.673  6.793  4.431  2.166  2147  1.157  3.099  887  636  21  Masr El Gadida  6  990  2.749  1.706  113  836  1.733  2.204  3.949  4.431  11.066  6.092  5.784  3.190  2.946  751  1.327  106  Nasr City  5  618  1.554  1.167  88  947  1.586  1.711  2.367  2.166  6.092  10.516  3.584  3.182  1.708  622  1.418  455  Ain Shams  3  576  1.403  755  47  335  606  896  2.268  2.147  5.784  3.584  6.142  2.867  1.930  758  1.316  70  Salam City  1  570  987  455  26  209  353  551  1.424  1.157  3.190  3.182  2.867  5.398  1.762  1.308  2.580  105  Shoubra El Khima  9  1.257  2.760  1.106  82  222  464  755  2.938  3.099  2.946  1.708  1930  1.762  7.630  2.240  1.971  53  Qalioub  2  1.233  1.254  377  16  32  113  104  691  887  751  622  758  1.308  2.240  8.194  1.400  29  Qanater  1  519  800  240  10  65  164  161  662  636  1.327  1.418  1316  2.580  1.971  1.400  11.458  152  10th of ramadan  0  12  27  11  0  7  10  9  14  21  106  455  70  105  53  29  152  6.905  Total  1.240  32.837  60.427  55.642  11.581  28.293  30.611  26.155  44.141  35.279  49.978  39.786  31.487  26.125  32.932  20.011  24.880  7.986              [3] Annex 5     Table B.4: OD matrix for Taxi 2012  OD Matrix for Taxi 2012                                    6th of   Imbaba   Masr El  Shoubra El  10th of     October  Markaz  Dokki  Giza  South Giza Helwan Maadi Khaleefa CBD Shoubra Gadida  Nasr City Ain Shams Salam City Khima Qalioub Qanater ramadan 6th of October  5.448  929  1.172  4.073  272  192  274  428  721  216  204  118  96  65  172  102  51  0  Imbaba Markaz  929  22.743  7.642  4.771  193  283  618  1.060  2.976  979  1.413  948  377  217  677  740  135  34  Dokki  1.172  7.642  22.939  9.956  762  1.293  2.507  3.443  6.940  3.589  4.128  2.626  1606  1.088  2.681  1.289  844  138  Giza  4.073  4.773  9.956  28.197  2.812  1.151  2.904  4.157  5.195  2.001  2.210  1.548  838  592  1.417  638  378  121  South Giza  272  193  762  2.812  9.568  1.064  364  402  536  153  216  159  64  47  109  34  25  6  Helwan  192  283  1.293  1.149  1.064 22.619 3.750 945 1.387 461 910  595 295 198 417 143 110 37 Maadi  274  618  2.507  2.903  364 3.750 12.950 3.450 3.371 1.124 2.307  1.650 582 411 731 291 206 58 Khaleefa  428  1.060  3.444  4.157  402 945 3.450 5.684 3.823 1.794 3.190  2.649 897 639 1.082 279 256 63 CBD  721  2.976  6.940  5.195  536  1.387  3.371  3.824  7.952  5.311  4.960  3.718  2.431  1.801  3.328  1.181  1.047  77  Shoubra  216  979  3.589  2.001  153  461  1.124  1.794  5.311  10.502  5.268  3.163  2.272  1.217  3.536  1.377  983  90  Masr El Gadida  204  1.413  4.128  2.210  216  910  2.307  3.191  4.960  5.268  18.066  11.770  7.731  5.118  3.988  1.260  2.331  387  Nasr City  118  949  2.628  1.548  158 595 1.650 2.649 3.718 3.163 11.769  26.046 5.148 5.012 2.722 868 1.899 2.089 Ain Shams  96  377  1.606  838  64 295 582 897 2.431 2.272 7.731  5.148 7.529 3.575 2.407 829 1.551 574 Salam City  65  217  1.088  592  47 198 411 639 1.801 1.217 5.118  5.012 3.575 8.514 1.626 991 2.435 442 Shoubra El Khima  172  677  2.681  1.417  109  417  731  1.082  3.328  3.536  3.988  2.722  2.407  1.626  12.093  2.929  1.948  150  Qalioub  102  740  1.289  638  34  143  291  279  1.181  1.377  1.260  868  829  991  2.929  11.219  1.460  40  Qanater  51  135  844  378  24  110  205  256  1.047  983  2.331  1.899  1.551  2.435  1.948  1.460  19.898  187  10th of ramadan  0  34  138  121  6 37 58 63 77 90 387  2.089 574 442 150 40 187 16.926 Total  14.533  46.738  74.646  72.956  16.784 35.850 37.547 34.243 56.755 44.036 75.456  72.728 38.802 33.988 42.013 25.670 35.744 21.419   [4] Annex 5 Table B.5: OD matrix for Bus 2005  OD  Matrix  for  Bus                                      2005  6th  of  Imbaba   South  Masr  El  Nasr  Ain  Salam  Shoubra  10th of    Dokki  Giza  Helwan  Maadi  Khaleefa  CBD  Shoubra  Qalioub  Qanater  October  Markaz  Giza Gadida  City Shams City El Khima ramadan  6th of October  87  2  5  24  0  0  0  0  0  0  0  0  0  0  0  0  0  0  Imbaba Markaz  2  1.276  581  479  10  5  43  55  141  80  58  32  38  40  120  95  39  0  Dokki  5  581  1.552  853  48  36  148  177  246  278  153  58  98  69  293  94  51  1  2.13 Giza  24  479  853  218  61  275  269  180  147  98  51  56  33  104  22  13  1  1  South Giza  0  10  48  218  646  105  18  15  9  2  2  1  1  0  5  0  0  0  Helwan  0  5  36  61  105  2.137  327  52  38  24  36  67  22  14  17  0  3  0  Maadi  0  43  148  275  18  327  1.018  234  135  54  116  116  43  22  35  0  5  0  Khaleefa  0  55  177  269  15  52  234  218  55  70  110  74  54  29  51  0  6  0  CBD  0  141  246  180  9  38  135  55  17  238  106  36  121  68  232  25  37  0  Shoubra  0  80  278  147  2  24  54  70  238  660  365  141  197  97  345  51  48  1  Masr El Gadida  0  58  153  98  2  36  116  110  106  365  854  400  556  278  298  35  96  9  Nasr City  0  32  58  51  1  67  116  74  36  141  400  786  289  255  161  35  119  50  Ain Shams  0  38  98  56  1  22  43  54  121  197  556  289  689  302  216  49  114  6  Salam City  0  40  69  33  0  14  22  29  68  97  278  255  302  618  203  109  250  9  Shoubra El Khima  0  120  293  104  5  17  35  51  232  345  298  161  216  203  1.090  237  205  6  Qalioub  0  95  94  22  0  0  0  0  29  51  35  35  49  109  237  874  118  1  Qanater  0  39  51  13  0  3  5  6  37  48  96  119  114  250  205  118  1.269  21  10th of ramadan  0  0  1  1  0  0  0  0  0  1  9  50  6  9  6  1  21  803  5.01 1.68 Total  118  3.094  4.741  1.080  2.944  2.589  1.469  2.798  3.570  2.671  2.851  2.396  3.618  1.745  2.394  908  5  8              [5] Annex 5   Table B.6: OD matrix for Bus 2012  OD Matrix                                       for Bus 2012  Imbaba  Masr El   Shoubra   10th of     6th of October  Dokki  Giza  South Giza  Helwan  Maadi  Khaleefa  CBD  Shoubra  Nasr City  Ain Shams  Salam City  Qalioub  Qanater   Markaz  Gadida  El Khima  ramadan  6th of October  2.049  59  84  392  18  10  15  19  28  11  10  3  4  3  12  4  2  0  Imbaba Markaz  59  2.478  619  373  10  15  31  51  138  50  82  39  15  9  40  52  3  0  Dokki  84  619  1.908  847  42  85  167  197  291  241  237  98  113  63  227  85  50  5  Giza  392  373  847  2.791  228  59  202  274  217  131  94  45  59  32  116  37  21  5  South Giza  18  10  42  228  1.049  80  14  16  15  3  3  1  0  0  5  1  1  0  Helwan  10  15  85  59  80  2.513  346  44  56  18  35  17  13  9  32  5  3  1  Maadi  15  31  167  202  14  346  1.291  253  156  54  128  73  26  17  62  11  8  0  Khaleefa  19  51  197  274  16  44  253  358  66  73  145  113  37  25  71  8  13  0  CBD  28  138  291  217  15  56  156  66  67  262  101  45  114  80  233  52  51  0  Shoubra  11  50  241  131  3  18  54  73  262  992  362  181  170  72  326  78  62  3  Masr El Gadida  10  82  237  94  3  35  128  145  101  362  1.331  748  676  426  336  60  138  18  Nasr City  3  39  98  45  1  17  73  113  45  181  748  2.194  369  350  207  33  113  143  Ain Shams  4  15  113  49  0  13  26  37  114  170  676  369  794  327  227  48  114  47  Salam City  3  9  63  32  0  9  17  25  80  72  426  350  327  900  139  67  203  30  Shoubra El Khima  12  40  227  116  5  32  62  71  233  326  336  207  227  139  1.564  284  164  8  Qalioub  4  52  85  37  1  5  11  8  52  78  60  33  48  67  284  1.186  105  0  Qanater  2  3  50  21  1  3  8  13  51  62  138  113  114  203  164  105  2.116  10  10th of ramadan  0  0  5  5  0  1  0  0  0  3  18  143  47  30  8  0  10  1.695  Total  2.723  4.064  5.359  5.913  1.486  3.341  2.854  1.763  1.972  3.089  4.930  4.772  3.153  2.752  4.053  2.116  3.177  1.965    [6] Annex 5 Table B.7: OD matrix for Truck 2005  OD Matrix   for Truck 2005              Imbaba  6th  of    South  Masr El  Shoubra   10th of      October  Markaz  Dokki  Giza   Giza  Helwan  Maadi  Khaleefa  CBD  Shoubra   Gadida  Nasr City  Ain Shams  Salam City  El Khima  Qalioub  Qanater  ramadan  6th of   October  0  753  634  620  102  178  193  524  1.849  559  314  559  152  349  246  68  94  0  Imbaba   Markaz  753  655  1.561  1.121  145  136  194  366  1.427  445  79  131  237  543  67  87  368  438  Dokki  634  1.561  2.740  2.896  426  692  501  1.262  3.216  659  507  447  81  148  498  185  256  277  Giza  620  1.121  2.896  5.827  834  606  1.124  2.120  2.643  290  883  1.289  55  147  601  319  325  308  South Giza  102  145  426  834  626  942  237  500  318  10  330  890  0  8  116  81  110  166  Helwan  178  136  692  606  942  2.166  2.198  928  2.140  256  924  1.893  438  521  204  122  230  574  Maadi  193  194  501  1.124  237  2.198  2.752  1.690  1.267  231  1.303  1.617  262  334  133  63  202  246  Khaleefa  524  366  1.262  2.120  500  928  1.690  2.369  3.487  750  1.688  1.366  889  437  93  100  329  270  CBD  1.849  1.427  3.216  2.643  318  2.140  1.267  3.487  12.431  3.088  4.299  1.816  1.303  851  1.038  1.132  548  546  Shoubra  559  445  659  290  10  256  231  750  3.088  677  1.564  1.010  243  707  649  370  561  498  Masr El Gadida  314  79  507  883  330  924  1.303  1.688  4.299  1.564  2.489  2.124  613  926  567  394  484  717  Nasr City  559  131  447  1.289  890  1.893  1.617  1.366  1.816  1.010  2.124  2.651  952  584  819  418  600  390  Ain Shams  152  237  81  55  0  438  262  889  1.303  243  613  952  292  554  117  0  91  467  Salam City  349  543  148  147  8  521  334  437  851  707  926  584  554  941  123  318  177  557  Shoubra  El  Khima  246  67  498  601  116  204  133  93  1.038  649  567  819  117  123  549  79  193  148  Qalioub  68  87  185  319  81  122  63  100  1.132  370  394  418  0  318  79  331  345  251  Qanater  94  368  256  325  110  230  202  329  548  561  484  600  91  177  193  345  539  198  10th of ramadan  0  438  277  308  166  574  246  270  546  498  717  390  467  557  148  251  198  87  16.98 Total  7.194  8.753  6  22.008  5.841  15.148  14.547  19.168  43.399  12.567  20.205  19.556  6.746  8.225  6.240  4.663  5.650  6.138    [7] Annex 5 Table B.8: OD matrix for Truck 2012  OD Matrix for Truck 2012            6th of  Imbaba  Masr El   Shoubra  10th      October   Markaz  Dokki  Giza  South Giza  Helwan  Maadi  Khaleefa  CBD  Shoubra  Gadida  Nasr City  Ain Shams  Salam City   El Khima  Qalioub  Qanater   of ramadan  6th of October  1.116  2.370  2.722  1.538  84 163 170 451 1.590 465 322 687  344 287 434 1.133 95 1.433 Imbaba Markaz  2.370  425  3.346  1.850  120 145 138 267 1.381 369 69 75  211 432 47 44 292 679 Dokki  2.722  3.346  3.865  3.330  279 458 332 858 2.623 1.551 792 214  215 385 1.524 116 208 568 Giza  1.538  1.850  3.330  5.301  565 596 745 1.738 1.697 333 941 1.251 29 86 372 198 315 370 South Giza  84  120  279  565  428 1.916 343 557 342 6 290 425  2 7 73 50 82 182 Helwan  163  145  458  596  1.916 1.949 3.341 1.275 1.367 167 840 854  254 326 255 79 280 753 Maadi  170  138  332  745  343  3.341  3.051  1.282  851  151  786  1.100  177  210  78  40  226  295  Khaleefa  451  267  858  1.738  557 1.275 1.282 1.633 3.436 507 2.727  932  574 294 48 63 280 316 CBD  1.590  1.381  2.623  1.697  342  1.367  851  3.436  11.727  2.408  3.084  1.012  1.111  621  668  856  458  1.549  Shoubra  465  369  1.551  333  6  167  151  507  2.408  670  1.214  431  164  756  409  492  681  946  Masr El Gadida  322  69  792  941  290  840  786  2.727  3.084  1.214  2.481  1.817  955  503  469  1.010  923  1.359  Nasr City  687  75  214  1.251  425  854  1.100  932  1.012  431  1.817  4.266  698  2.503  501  1.484  873  2.045  Ain Shams  344  211  215  39  2  254  177  574  1.138  164  955  698  186  372  73  364  257  940  Salam City  287  432  385  86  7  326  210  294  621  756  503  2.503  372  644  487  201  171  1.050  Shoubra El Khima  434  47  1.524  372  73  255  78  48  668  409  469  501  73  487  697  143  621  2.435  Qalioub  1.133  44  116  198  50  79  40  63  856  492  1.010  1.484  364  201  143  189  1.085  2.163  Qanater  95  292  208  315  82  280  226  280  458  681  923  873  257  171  621  1.085  1.836  810  10th of ramadan  1.433  679  568  370  182  753  295  316  1.549  946  1.359  2.045  940  1.050  2.435  2.163  810  186  Total  15.404  12.260  23.386  21.265  5.751  15.018  13.316  17.238  36.808  11.720  20.582  21.168  6.926  9.335  9.334  9.710  9.493  18.079    [8] Annex 5 Table B.9: OD matrix for all vehicles 2005  OD Matrix for all   vehicles 2005  6th   Imbaba   Masr   Shoubra  10      of October  Markaz  Dokki  Giza  South Giza Helwan Maadi Khaleefa CBD Shoubra El Gadida  Nasr City Ain Shams Salam City El Khima Qalioub Qanater Ramadan 6th of October  2.782  1.018  1.200  2.094  211  235  377  719  2.145  655  433  661  192  374  306  94  108  1  Imbaba Markaz  1.018  38.493  28.858  20.750  1.349  1.424  3.874  5.210  14.839  6.219  5.939  4.322  3349  3.549  5.544  5.834  3.201  529  Dokki  1.200  28.858  78.707  46.278  5.371  5.559  12.970  17.628  37.733  18.896  17.885  12.025  8007  5.835  13.577  7311  5.178  518  Giza  2.094  20.751  46.278  90.628  11.526  6.357  16.661  20.632  27.149  9.691  11.802  9.638  4351  2.849  5.890  2.770  1.945  412  South Giza  211  1.349  5.371  11.526  21.130  6.206  2.665  2.750  3.365  955  1.582  1.927  407  266  674  282  233  174  Helwan  235  1.424  5.560  6.357  6.206  69.216  17.211  6.347  10.290  3.157  6.494  7.828  2473  1.836  1.497  525  841  628  Maadi  377  3.874  12.971  16.661  2.665  17.211  42.831  16.155  19.211  5.706  11.428  11.075  3772  2.562  2.674  1.143  1.537  356  Khaleefa  719  5.210  17.628  20.632  2.750 6.348 16.156 19.270 20.483 7.997 14.181  12.000 5831 3.698 3.793 1.145 1.585 345 CBD  2.145  14.840  37.734  27.149  3.364 10.290 19.212 20.484 41.106 27.784 29.863  20.421 14.549 9476 15.158 5935 5.090 696 Shoubra  655  6.219  18.896  9.691  955 3.157 5.706 7.997 27.783 28.155 23.143  13.509 10.151 6551 13.506 5135 4.300 652 Masr El Gadida  433  5.940  17.885  11.802  1.582 6.494 11.428 14.181 29.864 23.143 56.556  37.083 27.032 16.339 13.996 5222 8.039 1.325 Nasr City  661  4.322  12.025  9.638  1.927 7.828 11.075 12.000 20.420 13.509 37.083  57.781 19.310 16.750 9517 4.625 8.584 3.005 Ain Shams  192  3.349  8.007  4.351  407 2.472 3.772 5.831 14.549 10.151 27.032  19.310 24.124 12.747 8239 3.923 6.397 828 Salam City  374  3.549  5.835  2.849  266 1.836 2.563 3.698 9.476 6.551 16.339  16.750 12.747 21.735 7656 6346 11.138 1.084 Shoubra El Khima  306  5.544  13.577  5.890  674 1.497 2.674 3.793 15.158 13.506 13.996  9.517 8239 7.656 27.236 9238 8.463 398 Qalioub  94  5.835  7.311  2.770  282 525 1.143 1.145 5.940 5.135 5.221  4.625 3923 6.346 9.239 31.554 6.893 407 Qanater  108  3.201  5.178  1.945  233 841 1.537 1.584 5.090 4.300 8.037  8.584 6397 11.139 8463 6.892 43.071 841 10th of ramadan  1  529  518  412  174 628 356 345 696 652 1.325  3.005 828 1.084 398 407 841 7.795 Total  13.605  154.305  323.539  291.423  61.072 148.124 172.211 159.769 305.297 186.162 288.339  250.061 155.682 130.792 147.363 98.381 117.444 19.994   [9] Annex 5 Table B.10: OD matrix for all vehicles 2012  6th of  Imbaba  South  Masr El  Shoubra  10th of       October   Markaz  Dokki  Giza  Giza Helwan Maadi Khaleefa CBD Shoubra Gadida  Nasr City Ain Shams Salam City El Khima Qalioub Qanater ramadan 6th of   October  29.825  7.509  10.364  23.486  1.621 1.473 2.067 3.516 7.453 2.022 2.009  1.790 1128 826 1.629 1.968 591 1.446 Imbaba   Markaz  7.509  87.405  39.329  23.712  1.480  2.162  4.188  6.343  18.574  6.074  8.625  6.841  2674  2.006  3.592  3.783  1.341  866  Dokki  10.364  39.329  101.622  53.440  5.237 8.865 15.522 20.526 44.622 21.171 26.450  19.716 9641 6.955 14.984 7.819 5.652 1.276 Giza  23.486  23.713  53.440  125.543  13.599 7.799 16.638 23.648 34.575 11.777 15.967  13.483 5188 3.790 7.621 4.293 2.958 891 South Giza  1.621  1.480  5.237  13.599  39.130 7.389 2.847 3.324 4.740 1.248 2.319  2.142 571 408 814 421 326 228 Helwan  1.473  2.162  8.865  7.797  7.388 94.905 21.893 7.371 11.798 3.464 7.477  5.775 2331 1.784 2.655 1.364 1.236 940 Maadi  2.067  4.188  15.522  16.637  2.847  21.893  59.397  18.809  22.729  7.014  14.836  12.372  3904  2.961  4.152  2.381  1.990  651  Khaleefa  3.516  6.343  20.527  23.647  3.324  7.371  18.809  26.599  25.970  10.625  21.105  18.215  6028  4.316  5.557  2.354  2.232  651  CBD  7.454  18.574  44.621  34.576  4.740 11.797 22.728 25.972 49.113 31.487 35.854  31.418 16.020 11.720 17.729 8760 7.427 2.018 Shoubra  2.022  6.073  21.171  11.777  1.248 3.464 7.014 10.625 31.487 44.329 28.288  19.505 11.483 7316 16.028 7.897 6.119 1.427 Masr El   Gadida  2.009  8.624  26.451  15.966  2.319  7.477  14.836  21.106  35.854  28.288  91.145  70.927  37.755  25.718  19.409  8896  13.452  3.139  Nasr City  1.790  6.843  19.718  13.483  2.141 5.775 12.372 18.215 31.419 19.503 70.925  136.502 28.659 29.267 14.849 7.860 11.988 11.918 Ain Shams  1.128  2.674  9.641  5.188  571 2.331 3.904 6.028 16.047 11.483 37.755  28.659 30.724 16.463 10.787 4.876 7.869 3.156 Salam City  826  2.005  6.955  3.790  408 1.784 2.961 4.316 11.720 7.316 25.718  29.267 16.463 34.934 8138 5.292 11.293 2.919 Shoubra   El Khima  1.629  3.592  14.984  7.621  814 2.655 4.152 5.557 17.729 16.028 19.409  14.849 10.787 8.138 33.434 12.818 9.362 3.086 Qalioub  1.968  3.783  7.819  4.293  421 1.364 2.381 2.354 8.760 7.897 8.896  7.861 4876 5.292 12.818 44.485 8.080 2.381 Qanater  591  1.341  5.652  2.957  325  1.236  1.990  2.232  7.427  6.119  13.450  11.988  7869  11.294  9.362  8.081  81.387  1.722  10th of   ramadan  1.446  866  1.276  891  228 940 651 651 2.018 1.427 3.139  11.918 3156 2.919 3.086 2.381 1.722 36.083 Total  100.724  226.504  413.194  388.403  87.841  190.680  214.350  207.192  382.035  237.272  433.367  443.228  199.257  176.107  186.644  135.729  175.025  74.798    [10] Annex 6: Non-classified Vehicle Counts [separate pdf file] Cairo Traffic Congestion Study. Final report 197                 ANNEX 6    Nonâ€?Classified Vehicle Counts  Annex 6   Survey Summary Sheet for Non-Classified Vehicle Counts Date: Tuesday 6 July, 2010 Counted By: Amr Mamdoh Point No: P1 Name of Ring Road / Between El Khosoos & Cairoâ€?Alex Agr.Rd  Street: Direction: To East Cairo (Cairo-Ismailia Desert Road) Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 929 929 7.00 - 8.00 3,632 3,716 0.977 7:15 - 7:30 900 7:30 - 7:45 895 7:45 - 8:00 908 8:00 - 8:15 881 881 8.00 - 9.00 3,374 3,524 0.957 8:15 - 8:30 878 8:30 - 8:45 844 8:45 - 9:00 771 9:00 - 9:15 822 858 9.00 - 10.00 3,276 3,432 0.955 9:15 - 9:30 818 9:30 - 9:45 778 9:45 - 10;00 858 10:00 - 10:15 761 772 10.00 - 11.00 2,915 3,088 0.944 10.15 - 10.30 772 10.30 - 10.45 703 10.45 - 11.00 679 3.00 - 3.15 649 816 3.00 - 4.00 2,930 3,264 0.898 3.15 - 3.30 706 3.30 - 3.45 759 3.45 - 4.00 816 4.00 - 4.15 872 872 4.00 - 5.00 3,289 3,488 0.943 4.15 - 4.30 837 4.30 - 4.45 823 4.45 - 5.00 757 5.00 - 5.15 761 761 5.00 - 6.00 2,940 3,044 0.966 5.15 - 5.30 751 5.30 - 5.45 750 5.45 - 6.00 678 6.00 - 6.15 701 701 6.00 - 700 2,714 2,804 0.968 6.15 - 6.30 674 6.30 - 6.45 675 6.45 - 7.00 664 [1] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Tuesday 6 July, 2010 Counted By: Mohamed Imam Point No: P1 Name of Ring Road / Between El Khosoos & Cairoâ€?Alex Agr.Rd  Street: Direction: To West of Cairo (Cairo-Alx Desert Road) Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 915 915 7.00 - 8.00 3,473 3,660 0.949 7:15 - 7:30 905 7:30 - 7:45 817 7:45 - 8:00 836 8:00 - 8:15 848 881 8.00 - 9.00 3,393 3,524 0.963 8:15 - 8:30 833 8:30 - 8:45 831 8:45 - 9:00 881 9:00 - 9:15 825 896 9.00 - 10.00 3,242 3,584 0.905 9:15 - 9:30 736 9:30 - 9:45 896 9:45 - 10;00 785 10:00 - 10:15 724 724 10.00 - 11.00 2,741 2,896 0.946 10.15 - 10.30 679 10.30 - 10.45 683 10.45 - 11.00 655 3.00 - 3.15 704 925 3.00 - 4.00 3,412 3,700 0.922 3.15 - 3.30 862 3.30 - 3.45 925 3.45 - 4.00 921 4.00 - 4.15 883 883 4.00 - 5.00 2,890 3,532 0.818 4.15 - 4.30 680 4.30 - 4.45 673 4.45 - 5.00 654 5.00 - 5.15 670 714 5.00 - 6.00 2,727 2,856 0.955 5.15 - 5.30 664 5.30 - 5.45 714 5.45 - 6.00 679 6.00 - 6.15 701 762 6.00 - 700 2,909 3,048 0.954 6.15 - 6.30 734 6.30 - 6.45 712 6.45 - 7.00 762 [2] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Monday 5 July, 2010 Counted By: Amr Samir Point No: P2 Name of Gesr Elâ€?Suez/between Ring Road and Ainshams Str.  Street: Direction: To Cairo Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 1,203 1,583 7.00 - 8.00 5,442 6,332 0.859 7:15 - 7:30 1,240 7:30 - 7:45 1,416 7:45 - 8:00 1,583 8:00 - 8:15 1,576 1,576 8.00 - 9.00 5,971 6,304 0.947 8:15 - 8:30 1,484 8:30 - 8:45 1,417 8:45 - 9:00 1,494 9:00 - 9:15 1,492 1,492 9.00 - 10.00 5,791 5,968 0.970 9:15 - 9:30 1,458 9:30 - 9:45 1,425 9:45 - 10;00 1,416 10:00 - 10:15 1,392 1,605 10.00 - 11.00 5,627 6,420 0.876 10.15 - 10.30 1,605 10.30 - 10.45 1,308 10.45 - 11.00 1,322 3.00 - 3.15 1,563 1,563 3.00 - 4.00 5,320 6,252 0.851 3.15 - 3.30 1,264 3.30 - 3.45 1,306 3.45 - 4.00 1,187 4.00 - 4.15 1,189 1,727 4.00 - 5.00 5,656 6,908 0.819 4.15 - 4.30 1,257 4.30 - 4.45 1,483 4.45 - 5.00 1,727 5.00 - 5.15 1,662 1,662 5.00 - 6.00 5,882 6,648 0.885 5.15 - 5.30 1,400 5.30 - 5.45 1,448 5.45 - 6.00 1,372 6.00 - 6.15 1,339 1,349 6.00 - 700 5,268 5,396 0.976 6.15 - 6.30 1,259 6.30 - 6.45 1,321 6.45 - 7.00 1,349 [3] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Monday 5 July, 2010 Counted By: Moataz Ahmed Point No: P2 Name of Gesr Elâ€?Suez/between Ring Road and Ainshams Str.  Street: Direction: To Ismalia Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 685 685 7.00 - 8.00 2,565 2,740 0.936 7:15 - 7:30 590 7:30 - 7:45 605 7:45 - 8:00 685 8:00 - 8:15 600 800 8.00 - 9.00 2,595 3,200 0.811 8:15 - 8:30 595 8:30 - 8:45 600 8:45 - 9:00 800 9:00 - 9:15 730 780 9.00 - 10.00 2,915 3,120 0.934 9:15 - 9:30 780 9:30 - 9:45 745 9:45 - 10;00 660 10:00 - 10:15 800 800 10.00 - 11.00 2,990 3,200 0.934 10.15 - 10.30 680 10.30 - 10.45 745 10.45 - 11.00 765 3.00 - 3.15 724 724 3.00 - 4.00 2,616 2,896 0.903 3.15 - 3.30 658 3.30 - 3.45 607 3.45 - 4.00 627 4.00 - 4.15 691 749 4.00 - 5.00 2,656 2,996 0.887 4.15 - 4.30 624 4.30 - 4.45 592 4.45 - 5.00 749 5.00 - 5.15 680 756 5.00 - 6.00 2,868 3,024 0.948 5.15 - 5.30 723 5.30 - 5.45 756 5.45 - 6.00 709 6.00 - 6.15 835 843 6.00 - 700 3,144 3,372 0.932 6.15 - 6.30 701 6.30 - 6.45 765 6.45 - 7.00 843 [4] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Wed. 7 July, 2010 Counted By: Amr Samir Point No: P4 Name of Ring Road / Carfour Al Maadi  Street: Direction: To New Cairo Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 1,889 1,911 7.00 - 8.00 7,487 7,644 0.979 7:15 - 7:30 1,911 7:30 - 7:45 1,799 7:45 - 8:00 1,888 8:00 - 8:15 1,711 2,391 8.00 - 9.00 7,731 9,564 0.808 8:15 - 8:30 2,009 8:30 - 8:45 2,391 8:45 - 9:00 1,620 9:00 - 9:15 1,759 1,759 9.00 - 10.00 6,605 7,036 0.939 9:15 - 9:30 1,699 9:30 - 9:45 1,676 9:45 - 10;00 1,471 10:00 - 10:15 1,677 1,677 10.00 - 11.00 6,052 6,708 0.902 10.15 - 10.30 1,559 10.30 - 10.45 1,326 10.45 - 11.00 1,490 3.00 - 3.15 1,668 1,993 3.00 - 4.00 7,529 7,972 0.944 3.15 - 3.30 1,915 3.30 - 3.45 1,953 3.45 - 4.00 1,993 4.00 - 4.15 1,702 2,013 4.00 - 5.00 7,527 8,052 0.935 4.15 - 4.30 1,801 4.30 - 4.45 2,013 4.45 - 5.00 2,011 5.00 - 5.15 2,117 2,237 5.00 - 6.00 8,504 8,948 0.950 5.15 - 5.30 2,105 5.30 - 5.45 2,045 5.45 - 6.00 2,237 6.00 - 6.15 2,156 2,156 6.00 - 700 7,725 8,624 0.896 6.15 - 6.30 1,900 6.30 - 6.45 1,856 6.45 - 7.00 1,813 [5] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Wed. 7 July, 2010 Counted By: Motaz Ahmed Point No: P4 Name of Ring Road / Carfour Al Maadi  Street: Direction: To Al Maadi Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 1,765 2,235 7.00 - 8.00 7,239 8,940 0.810 7:15 - 7:30 2,235 7:30 - 7:45 1,336 7:45 - 8:00 1,903 8:00 - 8:15 1,007 2,127 8.00 - 9.00 6,149 8,508 0.723 8:15 - 8:30 1,405 8:30 - 8:45 1,610 8:45 - 9:00 2,127 9:00 - 9:15 1,368 1,950 9.00 - 10.00 6,953 7,800 0.891 9:15 - 9:30 1,733 9:30 - 9:45 1,950 9:45 - 10;00 1,902 10:00 - 10:15 1,652 1,771 10.00 - 11.00 6,524 7,084 0.921 10.15 - 10.30 1,771 10.30 - 10.45 1,537 10.45 - 11.00 1,564 3.00 - 3.15 2,371 2,651 3.00 - 4.00 9,134 10,604 0.861 3.15 - 3.30 2,195 3.30 - 3.45 2,651 3.45 - 4.00 1,917 4.00 - 4.15 2,307 2,707 4.00 - 5.00 9,651 10,828 0.891 4.15 - 4.30 2,433 4.30 - 4.45 2,707 4.45 - 5.00 2,204 5.00 - 5.15 2,644 2,890 5.00 - 6.00 9,758 11,560 0.844 5.15 - 5.30 2,444 5.30 - 5.45 1,780 5.45 - 6.00 2,890 6.00 - 6.15 2,180 2,945 6.00 - 700 9,875 11,780 0.838 6.15 - 6.30 2,190 6.30 - 6.45 2,560 6.45 - 7.00 2,945 [6] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Wed. 7 July, 2010 Counted By: Amr Mamdoh Point No: P5 Name of Ring Road / Above Cairoâ€?Alex Desert Road  Street: Direction: To Al Moniab and New Cairo Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 913 913 7.00 - 8.00 3,560 3,652 0.975 7:15 - 7:30 906 7:30 - 7:45 893 7:45 - 8:00 848 8:00 - 8:15 890 890 8.00 - 9.00 3,388 3,560 0.952 8:15 - 8:30 841 8:30 - 8:45 815 8:45 - 9:00 842 9:00 - 9:15 785 851 9.00 - 10.00 3,234 3,404 0.950 9:15 - 9:30 777 9:30 - 9:45 821 9:45 - 10;00 851 10:00 - 10:15 871 911 10.00 - 11.00 3,488 3,644 0.957 10.15 - 10.30 843 10.30 - 10.45 911 10.45 - 11.00 863 3.00 - 3.15 849 849 3.00 - 4.00 3,239 3,396 0.954 3.15 - 3.30 845 3.30 - 3.45 794 3.45 - 4.00 751 4.00 - 4.15 760 760 4.00 - 5.00 2,935 3,040 0.965 4.15 - 4.30 731 4.30 - 4.45 712 4.45 - 5.00 732 5.00 - 5.15 684 687 5.00 - 6.00 2,659 2,748 0.968 5.15 - 5.30 687 5.30 - 5.45 649 5.45 - 6.00 639 6.00 - 6.15 623 623 6.00 - 700 2,227 2,492 0.894 6.15 - 6.30 578 6.30 - 6.45 553 6.45 - 7.00 473 [7] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Wed. 7 July, 2010 Counted By: Mohamed Imam Point No: P5 Name of Ring Road / Above Cairoâ€?Alex Desert Road  Street: Direction: To Cairo-Alx Agricultural Road Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 828 828 7.00 - 8.00 3,049 3,312 0.921 7:15 - 7:30 757 7:30 - 7:45 724 7:45 - 8:00 740 8:00 - 8:15 746 791 8.00 - 9.00 2,980 3,164 0.942 8:15 - 8:30 746 8:30 - 8:45 791 8:45 - 9:00 697 9:00 - 9:15 811 811 9.00 - 10.00 3,052 3,244 0.941 9:15 - 9:30 801 9:30 - 9:45 701 9:45 - 10;00 739 10:00 - 10:15 710 752 10.00 - 11.00 2,844 3,008 0.945 10.15 - 10.30 752 10.30 - 10.45 712 10.45 - 11.00 670 3.00 - 3.15 780 784 3.00 - 4.00 3,009 3,136 0.960 3.15 - 3.30 784 3.30 - 3.45 732 3.45 - 4.00 713 4.00 - 4.15 753 757 4.00 - 5.00 2,947 3,028 0.973 4.15 - 4.30 757 4.30 - 4.45 685 4.45 - 5.00 752 5.00 - 5.15 685 738 5.00 - 6.00 2,886 2,952 0.978 5.15 - 5.30 728 5.30 - 5.45 738 5.45 - 6.00 735 6.00 - 6.15 715 789 6.00 - 700 2,989 3,156 0.947 6.15 - 6.30 789 6.30 - 6.45 766 6.45 - 7.00 719 [8] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Tuseday 6 July, 2010 Counted By: Mohamed Shaban Point No: P6 Name of 26th July / Between Railway and Ring Road  Street: Direction: To Cairo Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 604 1,148 7.00 - 8.00 3,506 4,592 0.764 7:15 - 7:30 615 7:30 - 7:45 1,148 7:45 - 8:00 1,139 8:00 - 8:15 1,120 1,215 8.00 - 9.00 4,693 4,860 0.966 8:15 - 8:30 1,177 8:30 - 8:45 1,181 8:45 - 9:00 1,215 9:00 - 9:15 1,137 1,186 9.00 - 10.00 4,639 4,744 0.978 9:15 - 9:30 1,182 9:30 - 9:45 1,186 9:45 - 10;00 1,134 10:00 - 10:15 1,139 1,205 10.00 - 11.00 4,716 4,820 0.978 10.15 - 10.30 1,184 10.30 - 10.45 1,205 10.45 - 11.00 1,188 3.00 - 3.15 981 1,008 3.00 - 4.00 3,632 4,032 0.901 3.15 - 3.30 1,008 3.30 - 3.45 866 3.45 - 4.00 777 4.00 - 4.15 796 906 4.00 - 5.00 3,368 3,624 0.929 4.15 - 4.30 838 4.30 - 4.45 828 4.45 - 5.00 906 5.00 - 5.15 863 863 5.00 - 6.00 3,225 3,452 0.934 5.15 - 5.30 830 5.30 - 5.45 780 5.45 - 6.00 752 6.00 - 6.15 780 791 6.00 - 700 3,067 3,164 0.969 6.15 - 6.30 791 6.30 - 6.45 777 6.45 - 7.00 719 [9] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Tuseday 6 July, 2010 Counted By: Yasian Mohamed Point No: P6 Name of 26th July / Between Railway and Ring Road  Street: Direction: To 6 October City Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 567 605 7.00 - 8.00 2,256 2,420 0.932 7:15 - 7:30 530 7:30 - 7:45 554 7:45 - 8:00 605 8:00 - 8:15 605 630 8.00 - 9.00 2,284 2,520 0.906 8:15 - 8:30 630 8:30 - 8:45 551 8:45 - 9:00 498 9:00 - 9:15 595 750 9.00 - 10.00 2,416 3,000 0.805 9:15 - 9:30 467 9:30 - 9:45 604 9:45 - 10;00 750 10:00 - 10:15 574 727 10.00 - 11.00 2,634 2,908 0.906 10.15 - 10.30 627 10.30 - 10.45 727 10.45 - 11.00 706 3.00 - 3.15 770 770 3.00 - 4.00 2,589 3,080 0.841 3.15 - 3.30 554 3.30 - 3.45 570 3.45 - 4.00 695 4.00 - 4.15 593 593 4.00 - 5.00 2,267 2,372 0.956 4.15 - 4.30 549 4.30 - 4.45 572 4.45 - 5.00 553 5.00 - 5.15 546 766 5.00 - 6.00 2,671 3,064 0.872 5.15 - 5.30 766 5.30 - 5.45 677 5.45 - 6.00 682 6.00 - 6.15 613 636 6.00 - 700 2,470 2,544 0.971 6.15 - 6.30 586 6.30 - 6.45 635 6.45 - 7.00 636 [10] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Monday 5 July, 2010 Counted By: Mohamed Shaban Point No: P7 Name of Alâ€?Ahram Street / Electricity Station  Street: Direction: To Pyramids Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 569 588 7.00 - 8.00 2,098 2,352 0.892 7:15 - 7:30 475 7:30 - 7:45 466 7:45 - 8:00 588 8:00 - 8:15 546 569 8.00 - 9.00 2,254 2,276 0.990 8:15 - 8:30 569 8:30 - 8:45 564 8:45 - 9:00 575 9:00 - 9:15 598 628 9.00 - 10.00 2,434 2,512 0.969 9:15 - 9:30 622 9:30 - 9:45 586 9:45 - 10;00 628 10:00 - 10:15 547 564 10.00 - 11.00 2,181 2,256 0.967 10.15 - 10.30 564 10.30 - 10.45 525 10.45 - 11.00 545 3.00 - 3.15 901 901 3.00 - 4.00 3,407 3,604 0.945 3.15 - 3.30 890 3.30 - 3.45 866 3.45 - 4.00 750 4.00 - 4.15 802 826 4.00 - 5.00 3,172 3,304 0.960 4.15 - 4.30 764 4.30 - 4.45 826 4.45 - 5.00 780 5.00 - 5.15 859 859 5.00 - 6.00 3,303 3,436 0.961 5.15 - 5.30 854 5.30 - 5.45 784 5.45 - 6.00 806 6.00 - 6.15 710 845 6.00 - 700 3,187 3,380 0.943 6.15 - 6.30 802 6.30 - 6.45 845 6.45 - 7.00 830 [11] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Monday 5 July, 2010 Counted By: Yasian Mohamed Point No: P7 Name of Alâ€?Ahram Street / Electricity Station  Street: Direction: To Giza Square Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 483 739 7.00 - 8.00 2,622 2,956 0.887 7:15 - 7:30 739 7:30 - 7:45 705 7:45 - 8:00 695 8:00 - 8:15 805 829 8.00 - 9.00 3,191 3,316 0.962 8:15 - 8:30 746 8:30 - 8:45 811 8:45 - 9:00 829 9:00 - 9:15 694 830 9.00 - 10.00 2,994 3,320 0.902 9:15 - 9:30 830 9:30 - 9:45 800 9:45 - 10;00 670 10:00 - 10:15 592 675 10.00 - 11.00 2,445 2,700 0.906 10.15 - 10.30 598 10.30 - 10.45 580 10.45 - 11.00 675 3.00 - 3.15 718 737 3.00 - 4.00 2,602 2,948 0.883 3.15 - 3.30 737 3.30 - 3.45 608 3.45 - 4.00 539 4.00 - 4.15 624 647 4.00 - 5.00 2,518 2,588 0.973 4.15 - 4.30 612 4.30 - 4.45 647 4.45 - 5.00 635 5.00 - 5.15 450 600 5.00 - 6.00 2,090 2,400 0.871 5.15 - 5.30 500 5.30 - 5.45 540 5.45 - 6.00 600 6.00 - 6.15 540 540 6.00 - 700 2,060 2,160 0.954 6.15 - 6.30 520 6.30 - 6.45 495 6.45 - 7.00 505 [12] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Monday 5 July, 2010 Counted By: Mohamed Nagi Point No: P8 Name of Middle of Abbas Bridge  Street: Direction: To Al Tahiri Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 200 413 7.00 - 8.00 1,163 1,652 0.704 7:15 - 7:30 214 7:30 - 7:45 336 7:45 - 8:00 413 8:00 - 8:15 550 550 8.00 - 9.00 1,813 2,200 0.824 8:15 - 8:30 432 8:30 - 8:45 470 8:45 - 9:00 361 9:00 - 9:15 427 427 9.00 - 10.00 1,546 1,708 0.905 9:15 - 9:30 395 9:30 - 9:45 380 9:45 - 10;00 344 10:00 - 10:15 350 437 10.00 - 11.00 1,527 1,748 0.874 10.15 - 10.30 413 10.30 - 10.45 437 10.45 - 11.00 327 3.00 - 3.15 365 437 3.00 - 4.00 1,574 1,748 0.900 3.15 - 3.30 437 3.30 - 3.45 410 3.45 - 4.00 362 4.00 - 4.15 436 436 4.00 - 5.00 1,666 1,744 0.955 4.15 - 4.30 407 4.30 - 4.45 420 4.45 - 5.00 403 5.00 - 5.15 409 484 5.00 - 6.00 1,789 1,936 0.924 5.15 - 5.30 440 5.30 - 5.45 484 5.45 - 6.00 456 6.00 - 6.15 543 543 6.00 - 700 2,030 2,172 0.935 6.15 - 6.30 478 6.30 - 6.45 477 6.45 - 7.00 532 [13] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Monday 5 July, 2010 Counted By: Osama Atiah Point No: P8 Name of Middle of Abbas Bridge  Street: Direction: To Giza Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 243 419 7.00 - 8.00 1,276 1,676 0.761 7:15 - 7:30 286 7:30 - 7:45 328 7:45 - 8:00 419 8:00 - 8:15 489 630 8.00 - 9.00 2,220 2,520 0.881 8:15 - 8:30 516 8:30 - 8:45 585 8:45 - 9:00 630 9:00 - 9:15 672 672 9.00 - 10.00 2,437 2,688 0.907 9:15 - 9:30 631 9:30 - 9:45 608 9:45 - 10;00 526 10:00 - 10:15 529 559 10.00 - 11.00 2,154 2,236 0.963 10.15 - 10.30 529 10.30 - 10.45 559 10.45 - 11.00 537 3.00 - 3.15 612 719 3.00 - 4.00 2,604 2,876 0.905 3.15 - 3.30 719 3.30 - 3.45 656 3.45 - 4.00 617 4.00 - 4.15 610 610 4.00 - 5.00 2,414 2,440 0.989 4.15 - 4.30 592 4.30 - 4.45 609 4.45 - 5.00 603 5.00 - 5.15 526 621 5.00 - 6.00 2,316 2,484 0.932 5.15 - 5.30 593 5.30 - 5.45 621 5.45 - 6.00 576 6.00 - 6.15 613 692 6.00 - 700 2,521 2,768 0.911 6.15 - 6.30 656 6.30 - 6.45 560 6.45 - 7.00 692 [14] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Wed. 7 July, 2010 Counted By: Osama Atiah Point No: P9 Name of 6 October Bridge between Zamalk and Agozah  Street: Direction: To Al Mohandisain and Al Doki Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 1,100 2,071 7.00 - 8.00 6,391 8,284 0.771 7:15 - 7:30 1,340 7:30 - 7:45 1,880 7:45 - 8:00 2,071 8:00 - 8:15 2,200 2,995 8.00 - 9.00 9,380 11,980 0.783 8:15 - 8:30 2,380 8:30 - 8:45 2,995 8:45 - 9:00 1,805 9:00 - 9:15 2,140 2,140 9.00 - 10.00 8,129 8,560 0.950 9:15 - 9:30 2,094 9:30 - 9:45 1,955 9:45 - 10;00 1,940 10:00 - 10:15 1,560 1,700 10.00 - 11.00 5,700 6,800 0.838 10.15 - 10.30 1,700 10.30 - 10.45 1,180 10.45 - 11.00 1,260 3.00 - 3.15 1,180 1,342 3.00 - 4.00 4,885 5,368 0.910 3.15 - 3.30 1,073 3.30 - 3.45 1,342 3.45 - 4.00 1,290 4.00 - 4.15 1,398 1,412 4.00 - 5.00 5,256 5,648 0.931 4.15 - 4.30 1,412 4.30 - 4.45 1,323 4.45 - 5.00 1,123 5.00 - 5.15 1,415 1,415 5.00 - 6.00 5,182 5,660 0.916 5.15 - 5.30 1,242 5.30 - 5.45 1,193 5.45 - 6.00 1,332 6.00 - 6.15 1,938 2,100 6.00 - 700 7,458 8,400 0.888 6.15 - 6.30 1,780 6.30 - 6.45 2,100 6.45 - 7.00 1,640 [15] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Wed. 7 July, 2010 Counted By: Mohamed Nagi Point No: P9 Name of 6 October Bridge between Zamalk and Agozah  Street: Direction: To Cairo-Alx Agricultural Road Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 1,261 2,371 7.00 - 8.00 7,147 9,484 0.754 7:15 - 7:30 1,316 7:30 - 7:45 2,371 7:45 - 8:00 2,199 8:00 - 8:15 2,006 2,156 8.00 - 9.00 7,352 8,624 0.853 8:15 - 8:30 2,156 8:30 - 8:45 1,547 8:45 - 9:00 1,643 9:00 - 9:15 2,002 2,002 9.00 - 10.00 6,512 8,008 0.813 9:15 - 9:30 1,756 9:30 - 9:45 1,277 9:45 - 10;00 1,477 10:00 - 10:15 2,077 2,230 10.00 - 11.00 7,605 8,920 0.853 10.15 - 10.30 2,230 10.30 - 10.45 1,300 10.45 - 11.00 1,998 3.00 - 3.15 762 911 3.00 - 4.00 3,247 3,644 0.891 3.15 - 3.30 832 3.30 - 3.45 911 3.45 - 4.00 742 4.00 - 4.15 653 715 4.00 - 5.00 2,566 2,860 0.897 4.15 - 4.30 715 4.30 - 4.45 506 4.45 - 5.00 692 5.00 - 5.15 514 742 5.00 - 6.00 2,424 2,968 0.817 5.15 - 5.30 603 5.30 - 5.45 565 5.45 - 6.00 742 6.00 - 6.15 962 1,322 6.00 - 700 4,549 5,288 0.860 6.15 - 6.30 1,050 6.30 - 6.45 1,215 6.45 - 7.00 1,322 [16] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Monday 5 July, 2010 Counted By: Amr Mamdoh Point No: P10 Name of Ahmed Helmy Str./ Before Abo Wafya Bridge  Street: Direction: One to Shobra Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 162 209 7.00 - 8.00 721 836 0.862 7:15 - 7:30 175 7:30 - 7:45 175 7:45 - 8:00 209 8:00 - 8:15 233 240 8.00 - 9.00 909 960 0.947 8:15 - 8:30 240 8:30 - 8:45 224 8:45 - 9:00 212 9:00 - 9:15 171 171 9.00 - 10.00 577 684 0.844 9:15 - 9:30 153 9:30 - 9:45 131 9:45 - 10;00 122 10:00 - 10:15 108 108 10.00 - 11.00 395 432 0.914 10.15 - 10.30 107 10.30 - 10.45 99 10.45 - 11.00 81 3.00 - 3.15 157 171 3.00 - 4.00 635 684 0.928 3.15 - 3.30 142 3.30 - 3.45 165 3.45 - 4.00 171 4.00 - 4.15 148 157 4.00 - 5.00 619 628 0.986 4.15 - 4.30 157 4.30 - 4.45 157 4.45 - 5.00 157 5.00 - 5.15 149 152 5.00 - 6.00 594 608 0.977 5.15 - 5.30 149 5.30 - 5.45 152 5.45 - 6.00 144 6.00 - 6.15 153 153 6.00 - 700 574 612 0.938 6.15 - 6.30 152 6.30 - 6.45 143 6.45 - 7.00 126 [17] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Monday 5 July, 2010 Counted By: Mohamed Imam Point No: P10 Name of Ahmed Helmy Str./ Before Abo Wafya Bridge  Street: Direction: Two to Ramses Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 127 158 7.00 - 8.00 554 632 0.877 7:15 - 7:30 141 7:30 - 7:45 128 7:45 - 8:00 158 8:00 - 8:15 168 168 8.00 - 9.00 596 672 0.887 8:15 - 8:30 163 8:30 - 8:45 127 8:45 - 9:00 138 9:00 - 9:15 121 129 9.00 - 10.00 496 516 0.961 9:15 - 9:30 123 9:30 - 9:45 129 9:45 - 10;00 123 10:00 - 10:15 93 93 10.00 - 11.00 342 372 0.919 10.15 - 10.30 82 10.30 - 10.45 83 10.45 - 11.00 84 3.00 - 3.15 217 217 3.00 - 4.00 814 868 0.938 3.15 - 3.30 209 3.30 - 3.45 199 3.45 - 4.00 189 4.00 - 4.15 179 191 4.00 - 5.00 731 764 0.957 4.15 - 4.30 178 4.30 - 4.45 183 4.45 - 5.00 191 5.00 - 5.15 178 181 5.00 - 6.00 712 724 0.983 5.15 - 5.30 176 5.30 - 5.45 177 5.45 - 6.00 181 6.00 - 6.15 187 187 6.00 - 700 646 748 0.864 6.15 - 6.30 166 6.30 - 6.45 165 6.45 - 7.00 128 [18] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Monday 5 July, 2010 Counted By: Magady Mubark Point No: P11 Name of Ramses St. between Ghmara and Ahmed Said St. (One Way to Abasia)  Street: Direction: To Abasiah Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 761 980 7.00 - 8.00 3,553 3,920 0.906 7:15 - 7:30 877 7:30 - 7:45 935 7:45 - 8:00 980 8:00 - 8:15 1,075 1,130 8.00 - 9.00 4,396 4,520 0.973 8:15 - 8:30 1,095 8:30 - 8:45 1,096 8:45 - 9:00 1,130 9:00 - 9:15 1,250 1,250 9.00 - 10.00 4,585 5,000 0.917 9:15 - 9:30 1,080 9:30 - 9:45 1,155 9:45 - 10;00 1,100 10:00 - 10:15 1,120 1,135 10.00 - 11.00 4,360 4,540 0.960 10.15 - 10.30 1,110 10.30 - 10.45 995 10.45 - 11.00 1,135 3.00 - 3.15 1,260 1,260 3.00 - 4.00 4,615 5,040 0.916 3.15 - 3.30 1,160 3.30 - 3.45 1,100 3.45 - 4.00 1,095 4.00 - 4.15 1,230 1,230 4.00 - 5.00 4,350 4,920 0.884 4.15 - 4.30 1,070 4.30 - 4.45 1,100 4.45 - 5.00 950 5.00 - 5.15 1,030 1,240 5.00 - 6.00 4,390 4,960 0.885 5.15 - 5.30 1,240 5.30 - 5.45 1,000 5.45 - 6.00 1,120 6.00 - 6.15 1,100 1,130 6.00 - 700 4,435 4,520 0.981 6.15 - 6.30 1,130 6.30 - 6.45 1,125 6.45 - 7.00 1,080 [19] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Monday 5 July, 2010 Counted By: Mohamed Al Imam Point No: P12 Name of Lotifi Al Said St. between Abasia and Ghamrah (One Way to Ramses Square)  Street: Direction: To Ramses Square Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 598 1,049 7.00 - 8.00 3,544 4,196 0.845 7:15 - 7:30 900 7:30 - 7:45 997 7:45 - 8:00 1,049 8:00 - 8:15 1,249 1,289 8.00 - 9.00 4,604 5,156 0.893 8:15 - 8:30 1,289 8:30 - 8:45 1,033 8:45 - 9:00 1,033 9:00 - 9:15 882 1,035 9.00 - 10.00 3,593 4,140 0.868 9:15 - 9:30 1,035 9:30 - 9:45 872 9:45 - 10;00 804 10:00 - 10:15 1,205 1,348 10.00 - 11.00 4,631 5,392 0.859 10.15 - 10.30 1,084 10.30 - 10.45 994 10.45 - 11.00 1,348 3.00 - 3.15 1,329 1,329 3.00 - 4.00 4,419 5,316 0.831 3.15 - 3.30 946 3.30 - 3.45 1,197 3.45 - 4.00 947 4.00 - 4.15 804 1,183 4.00 - 5.00 3,926 4,732 0.830 4.15 - 4.30 1,061 4.30 - 4.45 1,183 4.45 - 5.00 878 5.00 - 5.15 1,020 1,082 5.00 - 6.00 3,946 4,328 0.912 5.15 - 5.30 825 5.30 - 5.45 1,082 5.45 - 6.00 1,019 6.00 - 6.15 1,040 1,143 6.00 - 700 4,151 4,572 0.908 6.15 - 6.30 1,059 6.30 - 6.45 1,143 6.45 - 7.00 909 [20] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Tuesday 6 July, 2010 Counted By: Mohasn El Imam Point No: P14 Name of Cornish Elâ€?Nil /Between 15th May & Elâ€?Sahel Bridge  Street: Direction: To Shobra Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 406 449 7.00 - 8.00 1,699 1,796 0.946 7:15 - 7:30 425 7:30 - 7:45 419 7:45 - 8:00 449 8:00 - 8:15 619 619 8.00 - 9.00 2,389 2,476 0.965 8:15 - 8:30 599 8:30 - 8:45 565 8:45 - 9:00 606 9:00 - 9:15 717 853 9.00 - 10.00 3,034 3,412 0.889 9:15 - 9:30 853 9:30 - 9:45 818 9:45 - 10;00 646 10:00 - 10:15 636 863 10.00 - 11.00 3,019 3,452 0.875 10.15 - 10.30 743 10.30 - 10.45 777 10.45 - 11.00 863 3.00 - 3.15 703 809 3.00 - 4.00 2,921 3,236 0.903 3.15 - 3.30 699 3.30 - 3.45 710 3.45 - 4.00 809 4.00 - 4.15 721 880 4.00 - 5.00 2,934 3,520 0.834 4.15 - 4.30 670 4.30 - 4.45 880 4.45 - 5.00 663 5.00 - 5.15 862 954 5.00 - 6.00 3,553 3,816 0.931 5.15 - 5.30 815 5.30 - 5.45 954 5.45 - 6.00 922 6.00 - 6.15 905 1,333 6.00 - 700 4,431 5,332 0.831 6.15 - 6.30 1,333 6.30 - 6.45 1,027 6.45 - 7.00 1,166 [21] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Tuesday 6 July, 2010 Counted By: Mohamed El Imam Point No: P14 Name of Cornish Elâ€?Nil /Between 15th May & Elâ€?Sahel Bridge  Street: Direction: To Al Tahrir Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 906 906 7.00 - 8.00 3,346 3,624 0.923 7:15 - 7:30 816 7:30 - 7:45 890 7:45 - 8:00 734 8:00 - 8:15 662 1,347 8.00 - 9.00 4,289 5,388 0.796 8:15 - 8:30 1,113 8:30 - 8:45 1,347 8:45 - 9:00 1,167 9:00 - 9:15 1,205 1,205 9.00 - 10.00 4,473 4,820 0.928 9:15 - 9:30 1,033 9:30 - 9:45 1,031 9:45 - 10;00 1,204 10:00 - 10:15 1,066 1,066 10.00 - 11.00 3,956 4,264 0.928 10.15 - 10.30 1,018 10.30 - 10.45 969 10.45 - 11.00 903 3.00 - 3.15 705 825 3.00 - 4.00 2,881 3,300 0.873 3.15 - 3.30 647 3.30 - 3.45 825 3.45 - 4.00 704 4.00 - 4.15 698 754 4.00 - 5.00 2,849 3,016 0.945 4.15 - 4.30 774 4.30 - 4.45 754 4.45 - 5.00 623 5.00 - 5.15 745 899 5.00 - 6.00 3,158 3,596 0.878 5.15 - 5.30 684 5.30 - 5.45 830 5.45 - 6.00 899 6.00 - 6.15 970 1,069 6.00 - 700 4,106 4,276 0.960 6.15 - 6.30 1,004 6.30 - 6.45 1,063 6.45 - 7.00 1,069 [22] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Tuesday 6 July, 2010 Counted By: Ramadan Ghanam Point No: P15 Name of Gamal Abd Elâ€?Naser (Elâ€?Nile St.)/Kornish al Agouza  Street: Direction: To Giza Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 730 1,348 7.00 - 8.00 3,721 5,392 0.690 7:15 - 7:30 767 7:30 - 7:45 876 7:45 - 8:00 1,348 8:00 - 8:15 1,433 1,455 8.00 - 9.00 5,399 5,820 0.928 8:15 - 8:30 1,436 8:30 - 8:45 1,075 8:45 - 9:00 1,455 9:00 - 9:15 795 1,210 9.00 - 10.00 3,390 4,840 0.700 9:15 - 9:30 785 9:30 - 9:45 600 9:45 - 10;00 1,210 10:00 - 10:15 980 1,050 10.00 - 11.00 3,720 4,200 0.886 10.15 - 10.30 875 10.30 - 10.45 1,050 10.45 - 11.00 815 3.00 - 3.15 805 1,110 3.00 - 4.00 3,945 4,440 0.889 3.15 - 3.30 970 3.30 - 3.45 1,060 3.45 - 4.00 1,110 4.00 - 4.15 1,055 1,055 4.00 - 5.00 3,260 4,220 0.773 4.15 - 4.30 960 4.30 - 4.45 535 4.45 - 5.00 710 5.00 - 5.15 810 825 5.00 - 6.00 3,140 3,300 0.952 5.15 - 5.30 800 5.30 - 5.45 705 5.45 - 6.00 825 6.00 - 6.15 885 1,030 6.00 - 700 3,705 4,120 0.899 6.15 - 6.30 1,030 6.30 - 6.45 880 6.45 - 7.00 910 [23] Annex 6 Survey Summary Sheet for Non-Classified Vehicle Counts Date: Tuesday 6 July, 2010 Counted By: Magdi Mobark Point No: P15 Name of Gamal Abd Elâ€?Naser (Elâ€?Nile St.)/Kornish al Agouza  Street: Direction: To Imbaba Time Volume Highest Time Volume Flow Rate PHF Per 15 Min per 15 min 15 Min Per Hour per Hour per Hour 7:00 - 7.15 425 690 7.00 - 8.00 2,150 2,760 0.779 7:15 - 7:30 445 7:30 - 7:45 590 7:45 - 8:00 690 8:00 - 8:15 730 870 8.00 - 9.00 3,220 3,480 0.925 8:15 - 8:30 750 8:30 - 8:45 870 8:45 - 9:00 870 9:00 - 9:15 920 920 9.00 - 10.00 3,390 3,680 0.921 9:15 - 9:30 910 9:30 - 9:45 660 9:45 - 10;00 900 10:00 - 10:15 790 830 10.00 - 11.00 3,240 3,320 0.976 10.15 - 10.30 810 10.30 - 10.45 810 10.45 - 11.00 830 3.00 - 3.15 910 1,355 3.00 - 4.00 4,506 5,420 0.831 3.15 - 3.30 1,040 3.30 - 3.45 1,355 3.45 - 4.00 1,201 4.00 - 4.15 1,200 1,200 4.00 - 5.00 4,275 4,800 0.891 4.15 - 4.30 1,035 4.30 - 4.45 920 4.45 - 5.00 1,120 5.00 - 5.15 1,090 1,110 5.00 - 6.00 4,250 4,440 0.957 5.15 - 5.30 1,060 5.30 - 5.45 1,110 5.45 - 6.00 990 6.00 - 6.15 940 1,075 6.00 - 700 3,735 4,300 0.869 6.15 - 6.30 830 6.30 - 6.45 1,075 6.45 - 7.00 890 [24] Annex 7: Classified Vehicle Counts [separate pdf file] 198                 ANNEX 7    Classified Vehicle Counts  Annex 7 Survey Summary Sheet for Classified Vehicle Counts Date: Tuesday 6 July 2010 Location No: P3-1 Road Name: Suez Desert Road / Between KM 4.5 and Ring Road Direction: To Cairo Time Private Car Taxi Microbus and Big Bus Small Truck Heavy Truck Total From - To Minibus 7:00 - 7:15 285 2 26 10 12 11 346 7:15 - 7:30 518 1 60 9 38 34 660 7:30 - 7:45 701 3 41 6 36 26 813 7:45 - 8:00 626 7 65 12 37 26 773 7:00 - 8:00 2,130 13 192 37 123 97 2,592 8:00 - 8:15 385 6 25 15 51 16 498 8:15 - 8:30 598 11 50 13 53 24 749 8:30 - 8:45 591 4 118 5 139 22 879 8:45 - 9:00 855 9 137 6 115 20 1,142 8:00 - 9:00 2,429 30 330 39 358 82 3,268 9:00 - 9:15 848 15 109 4 85 20 1,081 9:15 - 9:30 566 20 111 6 80 24 807 9:30 - 9:45 693 21 106 5 108 25 958 9:45 - 10;00 545 23 101 6 91 23 789 9:00 - 10:00 2,652 79 427 21 364 92 3,635 [1] Annex 7 Survey Summary Sheet for Classified Vehicle Counts, P3-1 (continued) 10:00 - 10:15 783 28 48 2 81 33 975 10:15 - 10:30 244 20 66 4 101 34 469 10:30 - 10:45 270 30 113 1 151 43 608 10:45 - 11:00 378 28 93 3 128 28 658 10:00 - 11:00 1,675 106 320 10 461 138 2,710 3:00 - 3:15 810 20 68 9 130 20 1,057 3:15 - 3:30 774 28 58 13 112 34 1,019 3;30-3:45 719 34 75 5 156 34 1,023 3:45-4:00 763 16 80 10 106 31 1,006 3:00 - 4:00 3,066 98 281 37 504 119 4,105 4:00-4:15 757 25 105 7 125 37 1,056 4:15-4:30 760 27 75 9 132 23 1,026 4:30-4:45 766 33 130 11 128 31 1,099 4:45-5:00 654 18 111 24 94 29 930 4:00 - 5:00 2,937 103 421 51 479 120 4,111 5:00-5:15 674 23 151 12 116 28 1,004 5:15-5:30 470 20 113 7 104 31 745 5:30-5:45 675 32 148 10 100 36 1,001 5:45-6:00 594 19 187 13 137 27 977 5:00 - 6:00 2,413 94 599 42 457 122 3,727 6:00-6:15 851 29 176 8 125 24 1,213 6:15-6;30 650 20 166 13 126 40 1,015 6:30-6;45 605 20 179 18 130 30 982 6:45-7:00 465 22 188 12 110 35 832 6:00 - 7:00 2,571 91 709 51 491 129 4,042 [2] Annex 7 Survey Summary Sheet for Classified Vehicle Counts Date: Tuesday 6 July 2010 Location No: P3-2 Road Name: Suez Desert Road / Between KM 4.5 and Ring Road Direction: To Suez Time Microbus and Private Car Taxi Big Bus Small Truck Heavy Truck Total From - To Minibus 7:00 - 7:15 156 4 7 10 177 7:15 - 7:30 219 0 6 28 253 7:30 - 7:45 260 6 10 25 301 7:45 - 8:00 289 8 13 26 336 7:00 - 8:00 924 18 0 36 0 89 1,067 8:00 - 8:15 353 5 150 12 88 24 632 8:15 - 8:30 438 14 76 18 76 22 644 8:30 - 8:45 348 9 82 29 76 33 577 8:45 - 9:00 352 10 83 8 63 20 536 8:00 - 9:00 1,491 38 391 67 303 99 2,389 9:00 - 9:15 351 8 59 8 66 17 509 9:15 - 9:30 384 16 46 7 66 22 541 9:30 - 9:45 400 17 44 6 60 27 554 9:45 - 10;00 375 11 46 9 65 28 534 9:00 - 10:00 1,510 52 195 30 257 94 2,138 [3] Annex 7 Survey Summary Sheet for Classified Vehicle Counts, P3-2 (continued) 10:00 - 10:15 340 20 40 3 86 18 507 10:15 - 10:30 374 15 28 6 75 21 519 10:30 - 10:45 321 17 29 4 73 32 476 10:45 - 11:00 309 19 26 3 76 29 462 10:00 - 11:00 1,344 71 123 16 310 100 1,964 3:00 - 3:15 340 10 32 6 59 35 482 3:15 - 3:30 378 13 52 4 62 34 543 3;30-3:45 357 17 47 9 64 35 529 3:45-4:00 332 28 35 14 60 42 511 3:00 - 4:00 1,407 68 166 33 245 146 2,065 4:00-4:15 424 12 37 6 55 25 559 4:15-4:30 374 10 36 8 57 17 502 4:30-4:45 391 14 38 4 50 23 520 4:45-5:00 362 23 26 8 57 27 503 4:00 - 5:00 1,551 59 137 26 219 92 2,084 5:00-5:15 339 13 30 7 58 21 468 5:15-5:30 329 11 26 4 32 19 421 5:30-5:45 448 18 29 4 51 20 570 5:45-6:00 422 18 28 3 39 27 537 5:00 - 6:00 1,538 60 113 18 180 87 1,996 6:00-6:15 390 16 19 7 37 21 490 6:15-6;30 365 14 23 10 46 29 487 6:30-6;45 360 19 22 4 29 35 469 6:45-7:00 329 21 17 6 43 29 445 6:00 - 7:00 1,444 70 81 27 155 114 1,891 [4] Annex 7 Survey Summary Sheet for Classified Vehicle Counts Date: Wed. 7 July 2010 Location No: P13-1 Road Name: Salah Salem Str./Between Elfangary and Abbasey Direction: To Abasiah Microbus and Time Private Car Taxi Big Bus Small Truck Heavy Truck Total Minibus From - To 7:00 - 7:15 390 55 66 15 15 0 541 7:15 - 7:30 693 79 63 22 17 3 877 7:30 - 7:45 819 125 88 18 15 0 1,065 7:45 - 8:00 695 117 78 22 15 3 930 7:00 - 8:00 2,597 376 295 77 62 6 3,413 8:00 - 8:15 733 169 42 14 21 1 980 8:15 - 8:30 890 143 56 13 17 0 1,119 8:30 - 8:45 874 125 43 13 16 0 1,071 8:45 - 9:00 782 190 52 11 19 2 1,056 8:00 - 9:00 3,279 627 193 51 73 3 4,226 9:00 - 9:15 695 160 51 9 15 2 932 9:15 - 9:30 745 180 59 7 25 2 1,018 9:30 - 9:45 624 120 44 12 13 2 815 9:45 - 10;00 864 202 40 13 5 1 1,125 9:00 - 10:00 2,928 662 194 41 58 7 3,890 [5] Annex 7 Survey Summary Sheet for Classified Vehicle Counts, P13-1 (continued) 10:00 - 10:15 788 232 51 13 7 1 1,092 10:15 - 10:30 790 185 42 16 9 0 1,042 10:30 - 10:45 699 145 36 9 9 0 898 10:45 - 11:00 693 180 35 14 6 1 929 10:00 - 11:00 2,970 742 164 52 31 2 3,961 3:00 - 3:15 943 265 89 33 25 4 1,359 3:15 - 3:30 568 180 102 31 13 0 894 3;30-3:45 634 240 74 24 30 2 1,004 3:45-4:00 556 220 73 53 17 2 921 3:00 - 4:00 2,701 905 338 141 85 8 4,178 4:00-4:15 622 270 83 19 18 2 1,014 4:15-4:30 515 213 70 22 30 2 852 4:30-4:45 606 240 82 20 18 0 966 4:45-5:00 494 234 58 24 10 1 821 4:00 - 5:00 2,237 957 293 85 76 5 3,653 5:00-5:15 415 420 41 11 10 5 902 5:15-5:30 616 225 72 13 7 0 933 5:30-5:45 553 210 51 10 11 3 838 5:45-6:00 581 300 70 18 12 1 982 5:00 - 6:00 2,165 1,155 234 52 40 9 3,655 6:00-6:15 537 230 61 13 11 3 855 6:15-6;30 672 250 70 18 16 3 1,029 6:30-6;45 589 220 49 16 11 4 889 6:45-7:00 549 200 53 17 10 4 833 6:00 - 7:00 2,347 900 233 64 48 14 3,606 [6] Annex 7 Survey Summary Sheet for Classified Vehicle Counts Date: Wed. 7 July 2010 Location No: P13-2 Road Name: Salah Salem Str./Between Elfangary and Abbasey To Cairo Direction: Airport Time Private Car Taxi Microbus and Big Bus Small Truck Heavy Truck Total From - To Minibus 7:00 - 7:15 359 37 60 30 13 5 504 7:15 - 7:30 450 86 98 28 27 3 692 7:30 - 7:45 430 123 82 31 20 5 691 7:45 - 8:00 395 123 104 36 27 0 685 7:00 - 8:00 1,634 369 344 125 87 13 2,572 8:00 - 8:15 443 144 69 19 16 0 691 8:15 - 8:30 520 160 47 28 21 6 782 8:30 - 8:45 615 200 34 16 18 2 885 8:45 - 9:00 580 175 31 14 14 1 815 8:00 - 9:00 2,158 679 181 77 69 9 3,173 9:00 - 9:15 600 216 21 19 14 3 873 9:15 - 9:30 500 220 18 16 19 6 779 9:30 - 9:45 715 314 33 10 26 8 1,106 9:45 - 10;00 700 281 38 15 20 18 1,072 9:00 - 10:00 2,515 1,031 110 60 79 35 3,830 [7] Annex 7 Survey Summary Sheet for Classified Vehicle Counts, P13-2 (continued) 10:00 - 10:15 685 377 38 17 24 15 1,156 10:15 - 10:30 595 415 25 16 42 15 1,108 10:30 - 10:45 800 475 21 5 28 13 1,342 10:45 - 11:00 775 378 24 9 27 5 1,218 10:00 - 11:00 2,855 1,645 108 47 121 48 4,824 3:00 - 3:15 960 192 52 8 19 6 1,237 3:15 - 3:30 1,000 226 63 13 16 4 1,322 3;30-3:45 970 358 50 22 24 3 1,427 3:45-4:00 950 346 59 17 18 4 1,394 3:00 - 4:00 3,880 1,122 224 60 77 17 5,380 4:00-4:15 1,010 292 52 19 19 3 1,395 4:15-4:30 1,000 327 49 20 15 5 1,416 4:30-4:45 950 317 38 14 13 7 1,339 4:45-5:00 975 242 59 15 18 3 1,312 4:00 - 5:00 3,935 1,178 198 68 65 18 5,462 5:00-5:15 1,075 226 54 12 18 2 1,387 5:15-5:30 980 285 49 28 28 7 1,377 5:30-5:45 940 248 57 9 21 5 1,280 5:45-6:00 1,010 304 37 11 14 14 1,390 5:00 - 6:00 4,005 1,063 197 60 81 28 5,434 6:00-6:15 970 362 44 9 11 6 1,402 6:15-6;30 850 428 28 12 10 5 1,333 6:30-6;45 900 450 34 11 17 3 1,415 6:45-7:00 950 403 16 13 9 0 1,391 6:00 - 7:00 3,670 1,643 122 45 47 14 5,541   [8] Annex 8: June 6 Workshop: List of Participants, th Invitation, Objectives and Program [separate pdf file] Cairo Traffic Congestion Study. Final report 199                 ANNEX 8    June 6th Workshop: List of Participants, Invitation, Objectives and Program    Annex 8   List of Participants of the June 6th Workshop  Name  Position  Affiliation  Dr. Rashad Elmitiny  professor of highway and  Cairo University  traffic engineering  Dr. Layla Radwan  professor of highway and  Cairo University  traffic engineering  Dr. Moustafa Sabry  professor of transport and  Ain Shams University  traffic engineering  Dr. Hatem Abdelâ€?Lateef  professor of transport and  Ain Shams University  traffic engineering  Dr. Ahmed Alâ€?Hakeem  professor of transport and  Alâ€?Azhar University  traffic engineering  Eng. Khaled Alâ€?Manhawy  Senior consultant  ACE Consulting Engineers   (Moharramâ€?Bakhoum)  Dr. Hamed Mubarak  Senior consultant  Independent  Dr. Nabil Sehsah  Senior consultant  Independent  Eng. Fifi Mohamed  Head of Road Department  Transport Directorate, Cairo  Governorate  Brigadier Safwat Kamel  Head of the Research and  Cairo Traffic Administration,  Planning Unit  Ministry of Interior  Dr. Essam Sharaf*  professor of highway and  Cairo University  traffic engineering  Dr. Hoda Talaat*  assistant professor and  Nile University  director of ITS program  Eng. Hossam Badrawy*  Assistant to Dr. Essam    Sharaf  Eng. Toka Muhammad*  research assistant  Nile University  Dr. Amer Shalaby*  Associate professor   University of Toronto  * Study team member    [1] ‫‪Annex 8‬‬ ‫دعـــوة‬ ‫االستاذ الدكتور ‪................. /‬‬ ‫بعد التحية‪........‬‬ ‫نتشرÙ? بدعوتكم إلى ورشة العمل اإلستشارية بعنوان "أسباب اإلزدحام المروري Ù?ÙŠ القاھرة الكبرى"‬ ‫وذلك ضمن Ù?عاليات الدراسة الحالية تحت عنوان " دراسة اإلزدحام المروري Ù?ÙŠ إقليم القاھرة الكبرى"‬ ‫والتى تھدÙ? إلى تقييم الوضع الحالي والتكلÙ?Ø© اإلقتصادية لھذا اإلزدحام‪.‬‬ ‫وسوÙ? تقام ورشة العمل يوم األحد المواÙ?Ù‚ ‪ 2010-6-6‬Ù?Ù‰ تمام الساعة التاسعة صباحا Ù‹ ‪ ،‬وتجدون مرÙ?قا ً‬ ‫مع ھذه الدعوة ملخصا Ù‹ حول أھداÙ? ومنھجية وبرنامج الورشة‪ ،‬باإلضاÙ?Ø© إلى مكان إنعقادھا‪.‬‬ ‫وحيث أن مشاركتكم Ù?ÙŠ ھذه الورشة ومساھمتكم Ù?ÙŠ أعمالھا لھا أھمية خاصة ‪ ،‬Ù?إننا نأمل قبولكم لھذه‬ ‫الدعوة ونأمل مشاركتكم Ù?Ù‰ ھذه الورشة ‪ ،‬وسوÙ? يتم تاكيد الحضور مع سيادتكم تليÙ?ونيا Ù‹ من خالل أحد‬ ‫مساعدى االستاذ الدكتور ‪ /‬عصام شرÙ? بصÙ?ته الخبير الوطنى Ù?Ù‰ ھذه الدراسة وايضا Ù‹ المضيÙ? لھذه‬ ‫الورشة Ù?Ù‰ مكتبه باالكاديمية العربية للعلوم والتكنولوجيا والنقل البحرى بشيراتون‪.‬‬ ‫وتÙ?ضلوا بقبول Ù?ائق التحية‪.......‬‬ ‫‪  Title ‬‬ ‫‪  Signature ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫]‪[2‬‬ ‫‪Annex 8‬‬ ‫ورشة عمل إستشارية‬ ‫لمناقشة‬ ‫أسباب اإلزدحام المروري Ù?ÙŠ القاھرة الكبرى‬ ‫‪ 6‬يونيو ‪2010‬‬ ‫الخلÙ?ية واألھداÙ? ‪:‬‬ ‫يتبنى البنك الدولي دراسة حالية تحت عنوان " دراسة اإلزدحام المروري Ù?ÙŠ إقليم القاھرة الكبرى"‬ ‫والتى تھدÙ? إلى تقييم الوضع الحالي والتكلÙ?Ø© اإلقتصادية لھذا اإلزدحام ‪ ،‬وضمن Ù?عاليات ھذا المشروع‬ ‫سيتم تنظيم ورشة عمل إستشارية نسعى من خاللھا إلى تحديد األسباب الرئيسية لإلزدحام المرورى Ù?ي‬ ‫إقليم القاھرة الكبرى‪.‬‬ ‫برنامج الورشة‬ ‫‪  9:15 – 9:00‬‬ ‫ترحيب من قبل د‪ .‬عصام شرÙ? وتعارÙ? المشاركين‬ ‫‪  9:30 – 9:15‬‬ ‫خلÙ?ية وأھداÙ? ورشة العمل‪ -‬د‪.‬عامر شلبي‬ ‫‪  10:45 – 9:30‬‬ ‫الجلسة األولى عن األسباب التشغيلية لإلزدحام المرورى؟‬ ‫‪  11:15 – 10:45‬‬ ‫إستراحة وقھوة ‪ ‬‬ ‫‪  12:30 – 11:15‬‬ ‫الجلسة الثانية عن األسباب اإلستراتيجية لإلزدحام المرورى؟‬ ‫المنھجية ‪:‬‬ ‫سيقوم Ù?ريق عمل الدراسة من خالل ورشة العمل اإلستشارية بإستطالع آراء مجموعة من الخبراء‬ ‫المميزين من خالل خبرتھم العملية واألكاديمية الواسعة لوضع تصور متكامل حول العوامل التي تؤدي‬ ‫إلى اإلزدحام المروري Ù?ÙŠ القاھرة الكبرى ‪ ،‬حيث أن المشاركين Ù?ÙŠ ھذه الورشة يمثلون مجموعات من‬ ‫المعنيين بھذا األمر والسيما األكاديميون واإلستشاريون Ù?ÙŠ مجال النقل والمرور باإلضاÙ?Ø© إلى الجھات‬ ‫المختصة بشئون النقل والمرور‪.‬‬ ‫وستتكون ورشة العمل من جلستين ‪ ،‬تعالج كل منھما عنصراً منÙ?صالً وھما‪:‬‬ ‫‪ .1‬ما Ú¾ÙŠ األسباب التشغيلية لإلزدحام المروري؟ ‪ ‬‬ ‫‪ .2‬ما Ú¾ÙŠ األسباب اإلستراتيجية والطويلة األمد لإلزدحام المروري؟ ‪ ‬‬ ‫وÙ?Ù‰ إطار اإلجابة على السؤالين أعاله ‪ ،‬ستتم إدارة ورشة العمل من خالل " تقنية المجموعة الخاصة"‬ ‫والتي ستتبع الخطوات التالية‪:‬‬ ‫]‪[3‬‬ ‫‪Annex 8‬‬ ‫• تولد األÙ?كار من خالل العصÙ? الذھني الصامت من قبل كل مشارك ‪ ‬‬ ‫• تسجيل األÙ?كار‪ -‬تجميع كل األÙ?كار‪ ،‬وتصنيÙ?ھا‪ ،‬وعرضھا للمشاركين ‪ ‬‬ ‫• مناقشة األÙ?كار‪ -‬مناقشة كل Ù?كرة من قبل كل المشاركين لتوضيحھا وتحديد مدى أھميتھا ‪ ‬‬ ‫• التصويت على األÙ?كار‪ -‬يقوم المشاركون بالتصويت السري على األÙ?كار بھدÙ? وضعھا Ù?ي‬ ‫ترتيب معين ‪ ‬‬ ‫مكان إنعقاد الورشة‬ ‫االكاديمية العربية للعلوم والتكنولوجيا والنقل البحرى‪  .‬‬ ‫مساكن شيراتون ‪ ،‬نھاية شارع المشير احمد إسماعيل – متÙ?رع من صالح سالم ‪ ‬‬ ‫مبنى الدراسات العليا ‪ -‬الدور الثالث ‪ -‬المركز العربى لدراسات النقل‪  .‬‬ ‫‪ ‬‬ ‫]‪[4‬‬ Annex 9: Measuring Congestion, Reliability Costs and Selection of Calculation Method Direct Costs Congestion indicators There are two general approaches for measuring congestion; an operational approach that has had the favour of those responsible for constructing and managing road networks and an economic-based approach that has generally been used to prioritise public expenditures for transport. The former is typically concerned with observable features of roadway performance (speed, flow, density, queue length and duration), whereas the latter has typically focused on extrapolating physical measures into monetary values that can then serve to guide policy through cost-benefit analysis. In the former context, engineers have sought to deliver technically “optimalâ€? roadway performance whereas economists have attempted to determine economically “optimalâ€? levels of congestion. A review of national and regional practice among Working Group countries highlighted that the former approach – measuring physical and technical system performance – seems to be the overwhelmingly dominant approach. Indicators that refer to time, service level or delay typically incorporate some arbitrary definition of the reference travel speed (e.g. free-flow as determined by design, legal operating speeds, or an arbitrary percentage of the free flow travel speed) that make no reference to what users may consider an economically optimal speed. Of course these indicators can be used as inputs to generalised cost calculations to derive economically optimal traffic levels. The use of such economically optimal traffic levels was surveyed as part of this study but most respondents confirmed that physical indicators and link flow maximisation were the main features of congestion measurement used in their experience. Furthermore, it seems that relatively few jurisdictions seem to track or otherwise monitor the variability of traffic performance via reliability indicators. The manner in which these indicators are actually derived can be broken down into three broad approaches; those derived from point-related measurements (vehicle count, flow), temporal/speed indicators extrapolated or derived from the former (link travel time and delay) or spatial indicators (density, queue length, congested lane kilometres, etc). There is some evidence (see box), that point-related measurements of travel time (delay, speed, travel time and Level of Service) dominate the measurement of congestion. There also seems to be mixed views on the accuracy of these indicators, alone, to deliver an accurate understanding of congestion on the roadway network. The following table inventories a broad set of congestion indicators: 200 Table: Congestion Indicators: Inventory Indicator Description Notes 1. Speed Based Indicator Average Traffic Speed Average speed of vehicle trips for Does not adequately capture network congestion effects Peak Hour traffic speed Average speeds of vehicle trips Can serve as a benchmark for during peak hours reliability measures based on actual average or median speeds 2. Temporal/Delay-based indicators Annual Hours Of Delay Hours of extra travel time due to All delay-based indicators depend on congestion a baseline value for calculating the Annual Delay Per Capita Hours of extra travel time divided start of “delayedâ€? travel – when this by area population baseline is free-flow speed, the term Annual Delay Per Road User Annual Delay Per Road User “delayâ€? becomes misleading since it is not at all clear that travellers on the network would ever be able to achieve delay-free speeds at peak hours. Average Commute Travel Time Average commute trip time Estimated Travel Time Estimated travel time on a roadway link (used in conjunction with variable message signs) Congested Time Estimate of how long congested “rush hourâ€? conditions exist Delay per road kilometre Difference between reference travel time and congested travel time per network kilometre Travel Time In Congestion Index Percentage of peak-period vehicle The use of the travel time index and or person travel that occurs under the travel time rate also depend on congested conditions the identification of a baseline value Travel Time Index The ratio of peak period to free-flow for signalling the start of congested travel times, considering both conditions – when this value is based reoccurring and incident delays on free flow speeds, the same (e.g., traffic crashes). reservation as noted for other “delayâ€?- Travel time Rate The ratio of peak period to free-flow type indicators holds travel times, considering only reoccurring delays (normal congestion delays). 3. Spatial Indicators Congested Lane Miles/kms The number of peak-period lane Spatial indicators also depend on miles/kms that have congested threshold values. These may be travel based on the median/average speeds Congested Road Miles/kms Portion of roadway miles/kms that typically achieved or on free-flow are congested during peak periods speeds (see note above). Network Connectivity Index An index that accounts for the This is an indicator of the potential for number of nodes and interchanges congestion to arise, whether or not within a roadway network this potential is realised depends on a number of other factors Cairo Traffic Congestion Study. Final report 201 4. Service level/capacity indicator Roadway Level Of Service (LOS) Intensity of congestion delays on a These indicators have had the favour particular roadway or at an of roadway managers. intersection, rated from A They typically reference the design (uncongested) to F (extremely capacity of a roadway and are congested). typically implicitly used to maximise Roadway Saturation Index Ration of observed flow to design throughput up to the design capacity capacity of roadway of the roadway link in question. 5. Reliability Indicators Buffer time Index See planning time index below These indicators try to capture how Congestion Variability Index An index relating the variability of road users typically make trip travel speeds on the network decisions on congested networks – Planning time index An index that accounts for a time they explicitly take into account the buffer that allows an on-time arrival importance to many users of making for 95% of trips on a network trips “on timeâ€? rather than simply making trips at a high rate of speed. Mean vs. variance travel times Measure of the standard deviation of travel times on a link or on the network for a given period Distribution of travel times: Measure of the difference between Percentile - mean the 80th or 90th percentile of the travel time distribution and the median or 50th percentile 6. Economic cost/efficiency indicators Annual Congestion Costs Hours of extra travel time (generated As noted above, the selection of by travel below reference speed) free-flow speeds when trying to multiplied by a travel time value, plus account for “congestion costsâ€? is the value of additional fuel highly problematic. consumption. This is a monetised congestion cost. Current marginal external The additional external costs (not congestion costs borne by users) of every additional vehicle/use entering the network Total deadweight loss The sum total of the overall losses (costs benefits) incurred for a given level of use/traffic Average deadweight loss per The dead weight loss divided by the vehicle/km number of vehicles/km giving rise to that loss. 7. Other indicators Congestion Burden The exposure of a population to congested road conditions (accounts for availability and use of alternatives) Excess Fuel Consumption Total additional fuel consumption due Again, determining the point of to congestion. reference for “additionalâ€? fuel Excess Fuel Consumption Per Additional fuel consumption divided consumption can be problematic if Capita by area population based on free-flow speeds Source: VTPI(2005) and COMPETE, (2006). 202 Among the multitude of available indicators, one can discern three broad families of primary indicators and performance measurements that could usefully transmit a more accurate picture of congestion and its burden. These primary indicators of congestion could be used to track both system performance as well as to derive the economic impacts of congestion. These indicators relate to system performance in relation to: 1. Travel time (and thus the average speeds experienced on the roadway at peak hours). 2. Travel quality (and primarily to trip reliability and predictability). 3. The exposure of urban peak-hour travellers to roadway congestion (e.g. roadway users travelling on congested roads vs. all urban travellers in peak hours). Travel Time Indicators Of this indicator “familiesâ€?, the first is most developed and most widespread. These measures of system performance can either only reference average speeds or can go one step further and try to relate these average speeds to some benchmark figure – typically free-flow speeds. Free flow speeds are those speeds which drivers self-select on what are commonly considered “emptyâ€? roads – e.g. roads with so few vehicles on them that vehicles do not impede each others progress. These speeds tend to gravitate around the maximum legal speeds posted for each road type although on urban roads these speeds might be less due to stops at intersections. The use of free-flow speeds as a benchmark is understandable since it can be seen as a replicable and readily useable “objectiveâ€? figure. Problems arise, however, when the difference between free flow speeds and experienced speeds are labelled “delayâ€?. Delay is the technically correct term for the difference but is often semantically misconstrued as referring to an attainable target for peak hour travel – e.g. “zero-delayâ€?. It should be noted that, most dynamic cities cannot afford to deliver free-flow speeds at peak hours, nor would they want to live with a road network that could deliver these speeds at peak hours. Discourse based on delay as measured in reference to free-flow travel times can thus be biased towards an unattainable and likely undesirable congestion management goal (e.g. zero delay). In this case, the use of an outcome neutral indicators or indices is preferable. Another way of side-stepping the issue of involuntarily biasing congestion management policies towards the delivery of free-flow travel speeds is to select speeds other than free- flow to serve as the benchmark value. These may be the legally posted speed or some manifestation of “normalâ€? or “expectedâ€? travel speeds on the particular type of road. Such selected benchmarks can more realistically convey the deviation from expected travel speeds but make it difficult to compare different regions. Canada provides one example of how free-flow indicators can be nuanced for policy purposes. The average travel speed for a given road link and for a given representative period may seem to be a natural candidate for such a benchmark – but average speeds can hide the impact of extraordinary non-recurring congestion-causing events. Therefore, it may make more sense to select the median speed as opposed to the mean average speed as a reasonable proxy for use as an “expectedâ€? or “normalâ€? travel time performance benchmark. Cairo Traffic Congestion Study. Final report 203 Travel Quality / Travel Time Variability Indicators By travel quality, we mean principally those elements that contribute to smooth and predictable travel conditions. Travel-time variability and its converse, travel time predictability, are at the heart of this family of indicators. These metrics are important in order to provide system managers, roadway users and policy-makers with a realistic assessment of how well traffic and congestion management policies are delivering consistent and therefore “plan-ableâ€? travel times. Success in delivering such dependable travel conditions is important since these can greatly contribute to reduced traveller stress – even in light of relatively slow average travel speeds. While travel times can vary according to departure time for different vehicles travelling at roughly the same time period on the same road (vehicle-to-vehicle variability), most travel-time variability indicators seek, rather, to capture the change in travel times for vehicles travelling during the same time periods on the same roads but on different days. While habitual roadway users are likely to make a rough heuristic determination as to how much time they should account for in order to make a reasonable percentage of their trips on time based on their past experiences, this is not true for the large minority of those who have not sufficient experience to make such judgements. Research into roadway traffic composition has underscored that up to 20-40% of roadway users during peak hours are not habitual travellers for any given road. Congestion indicators that effectively relate the variability of travel times can allow non- habitual users to make realistic assessments of their travel time requirements (and the “time buffersâ€? necessary to allow for in order to have a good chance of arriving on time) as well as provide more realistic assessments of habitual users’ travel and buffer time requirements. Travel time variability can refer to the difference in travel time between different vehicles undertaking the same trip with the same departure and arrival times, the difference between the same trip undertaken at different departure and arrival times and/or the difference between the same trips undertaken at the same time on different days. In this context, the measure of variability is related to the frequency distribution, and the standard deviation, of the same trips started at the same time, but on different days – that is the day-to-day variation in travel times. The distribution provides insight into what is hidden by average speed data – namely, if the average is composed of more uniform and predictable trips or by highly diverse and unpredictable trips. Indicators of Exposure to Roadway Congestion The final leg of congestion indicator families relates to how roadway congestion impacts total transport system performance. This is an underdeveloped indicator “familyâ€? and would ideally seek to provide a relative measure of how many urban travellers are affected by congestion. As noted earlier, roadway congestion is a still a temporal phenomenon and thus, ideally, policy-makers might seek to understand what percentage of travel takes place in congested conditions. For commuting travel, it seems obvious that the bulk of road travel will take place during the morning and evening peak periods. Less obvious, however, is the importance of peak period travel for other travel purposes. For instance, the United States Federal Highway Administration reports that “most motor carriers work aggressively to schedule and route their truck moves outside of peak 204 periods and around known bottlenecks. Truck volumes typically peak during the midday, especially on urban Interstate highways, and are relatively high in the early morning and at night compared to automobile volumesâ€?. Thus, it might be surmised that truck travel is relatively less exposed than commuter traffic to congested travel conditions. Another form of exposure to congestion relates to the number of travellers caught on congested roads versus the total number of travellers during daily peak periods. This type of indicator would seem to be potentially useful as it could guide policy interventions seeking to improve total transport system performance. Obviously, the policy importance of roadway congestion in a city where 98% of peak hour travel takes place upon the roads is different from that of a city where only 60% of peak hour travel takes place upon the road. For such an indicator to be helpful it must also seek to capture the relative quality of road vs. public transport. This necessarily would have to seek to compare travel times and travel predictability among the different modes – along with some measure of road vs. public transport accessibility to desired destinations. Much travel by public transport (non-separated tramway and bus travel) employs the same congested roads as cars and is therefore exposed to the same congestion as the latter. While elements of such a composite indicator exist within various road and public transport administrations, operational holistic indicators of traffic congestion exposure across modes are still to be developed. This is an area where further innovation and research is required. Commonly used performance measure(s) that reflects congestion levels on roads In this section, a set of commonly used performance measures that reflect congestion levels on roads are briefly explained and their drawbacks are distinguished. Roadway congestion index This index allows for comparison across metropolitan areas by measuring the full range of system performance by focusing on the physical capacity of the roadway in terms of vehicles. The index measures congestion by focusing on daily vehicle miles traveled on both freeway and arterial roads. Drawback(s): None Travel rate index This index computes the “amount of additional time that is required to make a trip because of congested conditions on the roadway.â€? It examines how fast a trip can occur during the peak period by focusing on time rather than speed. It uses both freeway and arterial road travel rates. Drawback(s): Measure can be difficult for public to understand Travel time index This index compares peak period travel and free flow travel while accounting for both recurring and incident conditions. It determines how long it takes to travel during a peak hour and uses both freeway and arterial travel rates. Drawback(s): Requires separation of recurring and incident delay. Measure can be difficult for public to understand Cairo Traffic Congestion Study. Final report 205 Travel delay Travel delay is the extra amount of time spent traveling because of congested conditions. The TTI study divided travel delay into two categories: recurring and incident. Drawback(s): Requires separation of recurring and incident delay Travel rate Travel rate, expressed in minutes per mile, is how quickly a vehicle travels over a certain segment of roadway. It can be used for specific segments of roadway or averaged for an entire facility. Estimates of travel rate can be compared to a target value that represents unacceptable levels of congestion. Remark: Included in many other calculations Delay rate The delay rate is “the rate of time loss for vehicles operating in congested conditions on a roadway segment or during a trip.â€? This quantity can estimate system performance and compare actual and expected performance. Remark: Included in many other calculations Total delay Total delay is the sum of time lost on a segment of roadway for all vehicles. This measure can show how improvements affect a transportation system, such as the effects on the entire transportation system of major improvements on one particular corridor. Drawback(s): None. Relative delay rate The relative delay rate can be used to compare mobility levels on roadways or between different modes of transportation. This measure compares system operations to a standard or target. It can also be used to compare different parts of the transportation system and reflect differences in operation between transit and roadway modes. Drawback(s): Measure may be difficult for public to understand because result is a number with no units. Delay ratio The delay ratio can be used to compare mobility levels on roadways or among different modes of transportation. It identifies the significance of the mobility problem in relation to actual conditions. Drawback(s): Measure may be difficult for public to understand because result is a number with no units. Congested travel This measure concerns the amount and extent of congestion on roadways. Congested travel is a measure of the amount of travel that occurs during congestion in terms of vehicle-miles. Drawback(s): Formula requires length of congested roadway segment Congested roadway This measure concerns the amount and extent of congestion that occurs on roadways. It describes the degree of congestion on the roadway. Drawback(s): Formula requires length of congested roadway segment 206 Accessibility Accessibility is a measure of the time to complete travel objectives at a particular location. Travel objectives are defined as trips to employment, shopping, home, or other destinations of interest. This measure is the sum of objective fulfillment opportunities where travel time is less than or equal to acceptable travel time. This measure can be used with any mode of transportation but is most often used when assessing the quality of transit services. Drawback(s): Requires information on trip objective. Most often used with transit services. Speed reduction index This measure “represents the ratio of the decline in speeds from free flow conditions.â€? It provides a way to compare the amount of congestion on different transportation facilities by using a continuous scale to differentiate between different levels of congestion. The index can be applied to entire routes, entire urban areas, or individual freeway segments for off-peak and peak conditions. Drawback(s): Measure may be difficult for public to understand because result is a number with no units. Result is relative to free flow speed, which is difficult for motorists to comprehend. Congestion severity index This index is “a measure of freeway delay per million miles of travel.â€? This measure estimates congestion using both freeway and arterial road delay and vehicle miles traveled. Drawback(s): None Lane-mile duration index This index is a measure of recurring freeway congestion. This index measures congestion by summing the product of congested lane miles or kms and congestion duration for segments of roadway. Drawback(s): Results would be poor since not all freeway segments in area collect traffic data. Level of service (LOS) LOS differs by facility type and is defined by characteristics such as vehicle density and volume to capacity ratio. Congested conditions often fall into a LOS F range, where demand exceeds capacity of the roadway. Volume to capacity ratios could be compared to LOS to reach conclusions about congested conditions; however, there is no distinction between different levels of congestion once congested conditions are reached. Drawback(s): Is difficult to distinguish between levels of congestion once congested conditions are reached. Queues Queues or traffic back-ups best represent the public’s view of congestion. Queues can be measured using aerial photography, which can often determine performance measures such as LOS and queued volume. Drawback(s): Difficult to estimate queues using available traffic data. Can be measured by use of aerial photography but is costly and site specific. Cairo Traffic Congestion Study. Final report 207 Travel Time Reliability In transport planning, reliability performance is generally expressed by the probability of realizing trips within a certain travel time. As travel times depend on many factors, the travel times in a given network have some randomness arising mainly from interaction between users and available network capacity as well as variations in road capacity due tom external factors. There are numerous indicators used to express the reliability system performance. While the reliability of system performance of public transport is often expressed by the punctuality of arrivals and/ or departures at stops and stations, reliability of system performance in private transport is measured by a wide variety of temporal indicators. Commonly used travel time reliability indictors In this section, a range of suggested indicators are presented, taking into account some considerations regarding the situation for which they can best fit. The Standard deviation In situations where there is a need to look at the variability in travel times around an average value and it is expected that this variability is not much influenced by ( a limited number of) extreme delays, the travel time distribution will be not very much skewed. In these cases, statistical range indicators can be considered useful. The standard deviation of travel times can be used to describe the extent of travel time dispersion. A further consideration to use the standard deviation as a reliability indicator is due to pragmatic reasons and applicability in the cost-benefit analyses. The 95- percentile value To overcome the eventual problem of not giving much specific attention to possible extreme, the 95-percentile value of the distribution can be used or added to the analyses; this indicator is very appropriate to focus on the width of the travel time distribution and can be very useful to analyze the development of high travel time values. However, as long as this indicator is not combined with information on average expected travel times or delays, the indicator does not directly represent reliability. The Buffer time The use of so-called “buffer timeâ€? related indicators is becoming more and more common. The buffer time can be explained as the extra percentage of travel time due to travel time variability on a trip that a traveler may take into account in order to have a high probability of arriving on time. Examples of buffer time related indicators are the Buffer Index and the Planning Time Index, used in the US Federal Highway Administration’s Urban Congestion Reports, aimed at monitoring traffic congestion and travel reliability on a national scale. Buffer Index 208 The buffer index represents the reliability of travel rates associated with single vehicles. This measure may be beneficial to the public because it tells them how congestion will affect them as individuals. The buffer index shows the effect of congestion on the reliability of travel rates along the roadway. The extra percentage of travel time a traveler should allow in order to be on time 95 percent of the time is represented by the buffer index as follows: TT95 - T Buffer Time Index  T Where: TT95: 95th percentile of travel time T: Average travel time Planning Time Index The Planning Time Index represents the extra time most travelers should add to a free flow travel time so as to be fairly confident of arriving at the destination by a certain time. The measure differs from the Buffer Index in that it includes recurring delay as well as nonrecurring delay. For example, a planning time index of 1.60 means that travelers plan for an additional 60% travel time above the free-flow travel time to ensure on time arrival most (95%) of the time. TT95 Planning Time Index  TTfreeflow To summarize, the consultant believes buffer time related indicators such as the Buffer Time Index and Planning Time Index are appropriate monitors to describe and communicate travel time reliability to planners as well as network users. Other more simple measures such as travel time percentiles, median travel times and the standard deviation of travel time may also serve as appropriate indicators, but they should be used with caution, as relevant characteristics of the travel time distributions could be easily overlooked. For instance, using the standard deviation of travel time as a utility component in route choice may results in biased outcomes. Selection of Performance Measures for GCMA To define a measure or measures of performance that reflect congestion levels along specific corridors, two performance measures are selected that focus on : ï‚· travel time delay ï‚· travel time reliability Basically, the data needed to support these measures are available in Smart Traffic Centers (Texas Transportation Institute), therefore allowing most agencies to perform the necessary calculations to validate the measures’ accuracy. Cairo Traffic Congestion Study. Final report 209 Total delay measure Total delay was chosen as a performance measure because it relates to delay and the data needed to calculate this measure are readily available. The travel times can be derived by using speed and the length of a route. This measure will help transportation professionals determine the delay for all vehicles traveling over a segment of roadway during a specific time period and thus to assess the severity of the congestion. Total delay could also allow transportation professionals to estimate how improvements within a transportation system affect a particular corridor or the entire system. Total delay may be useful to traffic managers because it represents delay for all vehicles. Time lost for all vehicles is more important for roads that have higher volumes because higher volumes mean that more travelers are affected by the time lost, which can mean more community money is wasted. A comparison of delay among different segments of roadway is also possible when using total delay. Total delay shows the effect of congestion in terms of the amount of lost travel time. The sum of time lost on a segment of roadway due to congestion for all vehicles is represented by total delay as follows: Total delay (PCU-hr) = [Actual travel time (hr) – Acceptable travel time (hr)] x Traffic Volume (PCU) The Buffer Index as the travel time reliability measure A recent US national Cooperative Highway research Program report concludes that the Buffer Index appears to relate particularly well to the way in which travelers make their decisions (NCHRP 2008). The Buffer Index is useful in the user’s assessment of how much extra time has to be allowed for uncertainty in travel conditions. It hence answers simple questions such as “how much time do I need to allow?â€? “When should I leave?â€? In other words, the buffer index is chosen for the project as a performance measure because it relates to the reliability of an individual vehicle trip, and also is useful to both the public and transportation professionals. The travel rates used in this calculation can be derived from average speed readings and the length of a route. This measure will help transportation professionals determine the impact of congestion on one vehicle traveling on a segment of roadway during a specific time period. The buffer index could also be useful in alerting motorists of the anticipated changes in travel time on particular segments of roadway so trips could be planned accordingly. In addition to the Buffer Time Index, the Planning Time Index represents the total travel time that should be planned when an adequate buffer time is included. In the NCHRP report both these indicators are advised as cost effective measures to monitor travel time variation and reliability. Identification of Congested Locations The goal of road administrators are focused on assessments and management of the road systems in urban areas in ways that maximised the ability of existing infrastructure to handle current and expected future traffic demand and minimised traffic delays and the associated personal, business and resource impacts including personal and productive 210 time lost, fuel wasted and air quality degradation. Identification of existing and potential future congestion locations is the first step toward transport system management. The approach typically involves: ï‚· Measurement of traffic speeds and flows. ï‚· Estimates of maximum achievable speeds and flows during uninterrupted traffic flow conditions (but taking into account speed limits and intersection capacity). ï‚· Assessments of actual speeds and flows in relation to maximum achievable speeds and flows. These are often defined in terms of percent below posted speed (or below off-peak speeds at prevailing flows), roadway volume/capacity ratio, speed-flow charts and intersection levels of service. ï‚· Identification of congested locations throughout the network based on overall Levels of Service (LOS) or another form of categorization. Cairo Traffic Congestion Study. Final report 211 Annex 10: Equations used for Direct Cost Calculation In this section, the formulas that are used to estimate the direct economic costs of traffic congestion in the following themes are presented: ï‚· Travel time delay ï‚· Travel time reliability ï‚· Excess gasoline consumption ï‚· CO2 emission Travel Time Delay In order to estimate delay from recurrent traffic congestion, determining the congestion threshold is essential. In order to determine the congestion threshold two different approaches have been applied as follows: ï‚· Approach 1: Applying Principal Corridors Collective Assessment for corridors’ speed plot ï‚· Approach 2: Applying V/C based on traffic counts and useable road capacity Delay Estimation Causing By Recurrent Congestion Approach 1: Applying Principal Corridors Collective Assessment for corridors’ speed plot The consultant uses the speed indices plots to determine the corridors’ level of service and thus the congestion level. The hours that the speed indices show the average speed below 0.6 is considered as congested hours. Travel delay from recurrent traffic congestion is estimated by equations relating vehicle traffic volume per lane and traffic speed. The calculation proceeds through the following simplified steps based on the method proposed by Texas Transportation Institute (TTI Method): 1. Estimate the daily volume of vehicles per lane corresponding to congested peak hours 2. Calculate Daily Vehicle Kilometer of Travel (DVKT) for each roadway section as the average daily traffic (ADT) of a section of roadway multiplied by the length of that section of roadway. The Daily Vehicle-Kilometers of travel (DVKT) is the average daily traffic (ADT) of a section of roadway multiplied by the length (in Kilometers) of that section of roadway. This allows the daily volume of all urban facilities to be presented in terms that can be utilized in cost calculations. DVKT was estimated for the freeways and principal arterial streets located in each urbanized study area. 3. Determine average freeway speeds based on data collected from travel time and speed surveys in the region. 212 4. Estimate Travel Delay: The difference between the amount of time it takes to travel during the peak-period at the average speed and at free-flow speeds in a the segments is termed delay. 5. Calculate daily recurring vehicle-hour delay by using the following formula: Recurring vehicle hour delay Peak Period Congested DVKT Peak Period Congested DVKT   Day Avg. Peak Period Speed Avg. Off Peak Period Speed The amount of delay incurred in the peak period is the difference between the time to travel at the average speed and the travel time at the free-flow speed, multiplied by the distance traveled in the peak period. Approach 2: Applying V/C based on traffic counts and useable road capacity By this approach the consultant applied the following multistep method to identify congested peak hours and segments for the corridors: 1. Divide each corridor into segments based on the useable segment’s capacity 2. Calculate V/C for each segment during peak hours 3. Identify congested segments when V/C >0.77. The FHWA model used 0.77 V/C ratio as the threshold marker for traffic congestion. In fact, in 1991, the FHWA completed additional research in the area of quantifying congestion. The focus of this work was on recurring congestion on urban area freeways and the development of a congestion indicator combining both the duration and extent of congestion in a single measure (Cottrell, 1991), (Texas Transportation Institute, 1992), and (Epps et al. 1993). The only impact of congestion considered in this work was recurring congestion-induced delay expressed in terms of both its duration and physical extent by a newly developed indicator called the lane-mile duration index. Given description above, the consultant applied the following steps to estimate the delay from recurrent congestion: ï‚· Calculate capacity based on number of lanes, an adjustment factor for lane width, lateral clearance, the presence of trucks, and type of terrain, and a value of 2,200 vehicles per lane per hour for the basic lane capacity assuming a roadway design speed of at least 60 Km per hour (kph) ï‚· Calculate volume-to-capacity ratio (V/C) for each hour of a typical day based on new counts ï‚· Determine which hours of the day are to be classified as congested. A V/C ratio of 0.77 was used to indicate the onset of congested travel conditions (boundary between LOS C and LOS D). ï‚· Calculate total annual congested vehicle Kms of travel (DVKT) based on AADT, roadway section length, and percentage of daily traffic experiencing congested conditions, which is the sum of the percentages of traffic occurring during those hours of the day with a V/C ratio greater than or equal to 0.77. ï‚· Estimate Travel Delay: The difference between the amount of time it takes to travel the peak-period vehicle-Kilometers at the average speed and at free-flow speeds is termed delay. ï‚· Calculate daily recurring vehicle-hour delay by the following formula: Recurring vehicle hour delay Peak Period Congested DVKT Peak Period Congested DVKT   Day Avg. Peak Period Speed Avg.Off Peak Speed Cairo Traffic Congestion Study. Final report 213 Delay Estimation due to Nonrecurring Events Another type of delay encountered by travelers is the delay that results from incidents, Security Checks, Vehicle Breakdowns, Random Minibus Stops, and finally Random Pedestrian Crossings. Incident delay is related to the frequency of crashes or vehicle breakdowns, how easily those incidents are removed from the traffic lanes and shoulders and the “normalâ€? amount of recurring congestion. The basic procedure used to estimate incident delay in this study is to multiply the recurring delay by a ratio. The process used to develop the delay factor ratio is a detailed examination of the freeway characteristics and volumes. In addition, a methodology developed by FHWA is used to model the effect of incidents based on the design characteristics and estimated volume patterns. Delay from non-recurring congestion-Summary Version: Calculate vehicle hours of delay due to incidents by the following formula: Daily Non Recurring VHD  Daily Recurring VHD ï‚´ ï?¡ Where: ï?¡: Road incident delay factor Total VHD= Daily Recurring VHD+ Daily Nonrecurring VHD The road incident delay factor is derived from the TTI Urban Mobility Report Methodology. The process used to develop the delay factor ratio is a detailed examination of the road characteristics and volumes. The consultant uses daily traffic influencing events in the car floating survey to estimate the incident delay factor. Incident delay occurs in different ways on streets than freeways. While there are driveways that can be used to remove incidents, the crash rate is higher and the recurring delay is lower on streets. Arterial street designs are more consistent from city to city than freeway designs. For the purpose of this study, the road incident delay factor for arterial streets is ranges between 110 to 160 percent of arterial street recurring delay depending on: ï‚· No. of accidents; ï‚· Security checks; ï‚· Vehicle breakdowns; ï‚· Random Microbus stops; ï‚· Random pedestrian crossings Table A10.1 outlines the road incident delay factor for diverse US states provided by the Texas Transportation Institute and stated in the TTI Urban Mobility Report Methodology. 214 Table A10.1: TTI incident delay factor Based on engineering judgment most of the corridors are allocated the value of 1.1 as the incident delay ratio. For corridor 1 with the following nonrecurring events, the value of 1.3 is considered as the incident delay ratio. Corridor 1 Nonrecurring events: Average Accidents 0.2 Daily Security Checks 4.5 Frequency Vehicle Breakdowns 7.4 Qualitative Random Microbus Stops High Observation Random Pedestrian Crossings Medium Cairo Traffic Congestion Study. Final report 215 For corridor 3 with the following nonrecurring events, the value of 1.6 is considered as the incident delay ratio Corridor 3 Nonrecurring events: Average Accidents 2 Daily Security Checks 5 Frequency Vehicle Breakdowns 17 Qualitative Random Microbus Stops High Observation Random Pedestrian Crossings Medium For corridor 4 with the following nonrecurring events, the value of 1.2 is considered as the incident delay ratio Corridor 4 Nonrecurring events: Average Accidents 0.3 Daily Security Checks 1.4 Frequency Vehicle Breakdowns 1.4 Qualitative Random Microbus Stops High observation Random Pedestrian Crossings High Total delay estimation: The annual recurring and nonrecurring delay costs for passenger car users, motorcyclists, taxi users ,transit users (buses and minibuses), freight transporters, and overall road users have been estimated given recurrent and nonrecurring delays that travelers face as follows: 1 1 DC pc  N pc ï‚´ O pc ï‚´ (1  ï?¡ ) ï‚´ L ï‚´ (  ) ï‚´ VOT pc V p pc V f pc 1 1 DC m  N m ï‚´ Om ï‚´ (1  ï?¡ ) ï‚´ L ï‚´ (  ) ï‚´ VOTm Vpm V f m 1 1 DCtx  N tx ï‚´ Otx ï‚´ (1  ï?¡ ) ï‚´ L ï‚´ (  ) ï‚´ VOTtx V p tx V f tx 1 1 DC pt  N pt ï‚´ O pt ï‚´ (1  ï?¡ ) ï‚´ L ï‚´ (  ) ï‚´ VOT pt V p pt V f pt 1 1 DC fr  N fr ï‚´ O fr ï‚´ (1  ï?¡ ) ï‚´ L ï‚´ (  ) ï‚´ VOT fr V p fr V f fr Where: DC: The annual recurring and nonrecurring delay cost (LE per year) N: Number of vehicle running during peak hours per year O: Vehicle occupancy factor ï?¡: Road incident delay factor L: Congested corridor length (km) Vp: Average speed during peak hours (km/hr) Vf: Free flow speed (km/hr) VOT: Value of time (LE/hr) 216 The indices pc, m, tx, pt, and fr express passenger cars, motorcycles, taxies, public transportation, and freight transportation respectively. A wide variety of temporal indicators (e.g. STD, COV, 95th Percentile, Buffer time index) can be used to provide a range of perspectives of the reliability issue. The consultant applies Coefficient of Variation of Travel time on the routes as the travel time reliability measure. The coefficient of variation of travel times is defined as standard deviation divided by mean travel time: STDi COVi  Ti Where: i: corridor number STD: The standard deviation of travel time T: The mean travel time STDv  standard deviation of speeds L STDT  standard deviation of travel times  STDv Economic Cost of Unreliability In general, reliability is highly valued by travelers and commercial vehicle operators reflecting the fact that a reliable transport network is a net benefit for society and that an unreliable network represents a net cost to society. A lot of work has been carried out in the Netherlands to monetize unreliability of travel time. Based on the research’s outcomes (OECD 2010) and the local conditions, the consultant assumes the following rates for monetizing travel time unreliability: Passenger cars and motorcycle: 1.0 minute travel time variation is equivalent to 0.9 minute travel time Public Transport including taxi: 1.0 minute travel time variation is equivalent to 1.1 minute in vehicle travel time Cairo Traffic Congestion Study. Final report 217 Thus, the annual value of unreliability for passenger car users including driver are estimated as follows: VORipc  0.9 ï‚´ N pc ï‚´ STDi ï‚´ VOT pc Where: i: Route number VOR: Value of unreliability imposed to passenger car users (for both tails, early and late arrivals) Npc: Annual number of passenger car users who suffer from unreliability STDi: The average standard deviation of travel time in route i VOTpc: The Value of time of passenger car users The coefficient of variation of travel time (COV) can not be monetized directly since it is unit less. The consultant monetizes the STD of travel time instead as the proxy for the COV accordingly. Cost of Excess Fuel Consumption In order to estimate excess fuel consumption due to traffic congestion the following steps are applied: ï‚· Calculate average fuel efficiency ï‚· Calculate total excess fuel (liters) used as a result of recurring and nonrecurring delay using the following formulas: The average fuel economy calculation is used to estimate the fuel consumption of the vehicles running in the congested condition. The average fuel economy is formulated as follows: Average Fuel Economy in Congestion  8.8  0.25 (Average peak Period Congested System Speed) It should be noted that a metric conversion has to be applied to the equation above since it is originally formulated based on non metric Units (Miles per Gallon). Adjusting the fuel efficiency formula for Cairo The formula above has been already developed and calibrated for USA between 1985- 1995 . However, the consultant believes it is more or less useable for Cairo as well. By looking at the car composition in US between 1985-1995, and due the fact that GM cars were dominant, the Fuel Efficiency for American cars such as Chevrolet is derived as follows: Brand/Model MPG (City) MPG (HWY) Chevrolet Celebrity (6 cyl) 18 24 Buick Century (6 cyl) 16 23 Cadillac (6 cyl) 16 22 Dodge Lancer (4 cyl) 20 30 Jeep Cherokee (6 cyl) 15 17 Pontiac 6000 (6 cyl) 18 24 Lincoln Continental (6 cyl) 20 26 Chevrolet Blazer (6 cyl) 16 23 218 Chevrolet Camaro (8 cyl) 16 24 Source: www.fueleconomy.gov Given the fleet composition in the Cairo region stated in tables A 3-9 , A3-11, it seems the following car composition and corresponding fuel economy is dominant: Brand Age MPG (City) MPG (HWY) Isuze <5 18 24 Daewoo <5 17 25 Chevrolet <5 18 27 Nissan < 10 19 25 Mercedes < 10 19 25 Peugeot < 20 17 22 Of course for accurate estimation, further information on Brand model, engine type, AC system availability, and so on is required. Based on engineering judgment the consultant believes that the average fleet age at GCR would be from 10 to 12 years (Figure A10-1). Also, the average fuel consumption is estimated around 10 litres/100 km (24 MPG) in the city based on speed of 60 Km/hr which corresponds with the American estimation in 80th decade. It should be noted that the engine size of most passenger cars in the GCR is 1600 cc (Figure A10-2). 2000-2006 Before 1980 21% 26% 1990-2000 1980-1990 28% 25% Figure A10.1Car’s age distribution in Egypt Cairo Traffic Congestion Study. Final report 219 46,700 cars 52,400 cars 55,500 cars 94,500 cars 132,400 cars 100 90 80 70 60 50 40 30 20 10 0 2002 2003 2004 2005 2006 1300cc-1600cc 1000cc-1300cc 4x4, & >2000 cc 1600cc-2000cc < 1000cc > 2000cc 4x4 & < 2000 Figure A10.2Relative distribution of cars’ engine size between 2002-2006 in Egypt Source: AMIC Egypt The fuel that is deemed “wasted due to congestionâ€? is the difference between the amount consumed at peak speeds and free-flow speeds: Annual Fuel Wasted in Congestion  Annual Fuel Consumed in Peak Conditions - Annual Fuel That Would be Consumed in Free Flow Condition DVKT Daily Fuel Wasted (Liter)  ï‚´ Free Flow Travel Speed Free flow speed Peak period system congested speed (  ) Average fuel economy Average fuel economy The formula above is applied for Gasoline cars and Diesel cars separately to derive the amount of excess gasoline consumption (EGW) and excess diesel consumption (EDW) separately. To calculate the Excess gasoline cost, the consultant uses the following formulation: EGC  EGW ï‚´ 1.8 Where: EGC: Annual excess gasoline cost (LE) EGW: Annual excess gasoline wasted (litre) 220 Likewise, to calculate the Excess diesel Cost, the consultant uses the following formulation: EDC  EDW ï‚´ 1.0 Where: EDC: Annual excess diesel cost (LE) EDW: Annual excess diesel wasted (litre) The total excess fuel cost is computed as follows: EFC= EGC+EDC Furthermore, the consultant computes the excess fuel subsidy imposed to the government due to traffic congestion: Gasoline Subsidy: EGS  EGW ï‚´ 2.2 Where: EGS: Annual excess gasoline subsidy (LE) EGW: Annual excess gasoline wasted (litre) Diesel Subsidy: EDS  EDW ï‚´ 1.1 Where: EDS: Annual excess gasoline subsidy (LE) EDW: Annual excess gasoline wasted (litre) The total Fuel subsidy will be calculated as follows: EFS= EGS+ EDS Emission Cost The consultant uses the following standard emission rates for diverse vehicular modes, to calculate the CO2 emission due to congestion in Cairo. As shown, the standard rates below depend on only fuel type as well as the vehicle type and not engine type. For example, 1 liter consumed gasoline or diesel in passenger cars produces 2.40 kg CO2. Table A10.2: The Emission rate for diverse vehicular modes Emission rate CO2 Vehicular Mode kg/L Cars (diesel and gasoline) 2,40 Motorcycle 2,42 Taxi 2,40 Bus 2,41 Cairo Traffic Congestion Study. Final report 221 BRT 2,24 The annual CO2 emission weight (Kg) is estimated as follows: WCO2  GW ï‚´ 2.40  DW ï‚´ 2.41 Where: GW: Annual weight of wasted gasoline (Kg) DW: Annual weight of wasted Diesel (Kg) The annual CO2 emission cost (LE) is formulated as follows: CCO2  WCO2 ï‚´ U C CO 2 Where U C CO : Unit cost of CO2 2 The consultant assumes the unit cost of CO2 as 57 LE per ton. 222 Annex 11: Detailed Direct Economic Cost of Traffic Congestion In this section a series of analyses on direct economic costs of traffic congestion are presented. It consists of delay cost, unreliability cost, fuel cost and finally emission costs for both applied approaches for the 11 corridors in Cairo. Each component is estimated for both directions of the corridors. Then, a comparison between corridors is made. A- Delay Cost In this section total delay costs for each corridor and a comparison between corridors are presented for both approaches 1 and 2. Approach 1: Figures A11.1, A11.2, A11.3, A11.4, A11.5, and A11.6 illustrate the total delay cost for passenger car users, motorcyclists, taxi users, transit riders, freight transporters, and all road users respectively 160.000.000 140.000.000 120.000.000 100.000.000 LE 80.000.000 60.000.000 40.000.000 20.000.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.1 Annual recurring and nonrecurring delay costs for passenger car users Cairo Traffic Congestion Study. Final report 223 1.800.000 1.600.000 1.400.000 1.200.000 1.000.000 LE 800.000 600.000 400.000 200.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.2 Annual recurring and nonrecurring delay costs for motorcyclists 120.000.000 100.000.000 80.000.000 LE 60.000.000 40.000.000 20.000.000 0 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.3 Annual recurring and nonrecurring delay costs for taxi users 224 25.000.000 20.000.000 15.000.000 LE 10.000.000 5.000.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.4 Annual recurring and nonrecurring delay costs for transit users 18.000.000 16.000.000 14.000.000 12.000.000 10.000.000 LE 8.000.000 6.000.000 4.000.000 2.000.000 0 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.5 Annual recurring and nonrecurring delay costs for freight transportation In the aggregate level figure A11.6 illustrates annual recurring and nonrecurring delay costs for all road users (passenger transport). The total delays cost is around 2.6 Billion LE per year for all road users. Cairo Traffic Congestion Study. Final report 225 250.000.000 200.000.000 150.000.000 LE 100.000.000 50.000.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.6 Annual recurring and nonrecurring delay costs for all road users Approach 2: Figures A11.7, A11.8, A11.9, A11.10, A11.11, and A11.12 illustrate the total delay cost for passenger car users, motorcyclists, taxi users, transit riders, freight transporters, and all road users respectively: 160.000.000 140.000.000 120.000.000 100.000.000 LE 80.000.000 60.000.000 40.000.000 20.000.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.7 Annual recurring and nonrecurring delay costs for passenger car users 226 1.800.000 1.600.000 1.400.000 1.200.000 1.000.000 LE 800.000 600.000 400.000 200.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.8 Annual recurring and nonrecurring delay costs for motorcyclists 120.000.000 100.000.000 80.000.000 LE 60.000.000 40.000.000 20.000.000 0 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.9 Annual recurring and nonrecurring delay costs for taxi users Cairo Traffic Congestion Study. Final report 227 25.000.000 20.000.000 15.000.000 LE 10.000.000 5.000.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.10 Annual recurring and nonrecurring delay costs for transit users 18.000.000 16.000.000 14.000.000 12.000.000 10.000.000 LE 8.000.000 6.000.000 4.000.000 2.000.000 0 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.11 Annual recurring and nonrecurring delay costs for freight transportation In the aggregate level figure A11.12 illustrates annual recurring and nonrecurring delay costs for all road users (passenger transport). The total delays cost for all road users is around 2.37 Billion LE per year. 228 250.000.000 200.000.000 150.000.000 LE 100.000.000 50.000.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.12 Annual recurring and nonrecurring delay costs for all road users Results Outline The analysis of annual recurring and nonrecurring delay costs due to traffic congestion in Cairo using 2 approaches yields the following results: ï‚· Passenger car users suffer from the larger amount of delay due to traffic congestion in the 26th of July/15th of May Travel Corridor Particularly (Lebanon Square, Zamalek and Elesaaf) , and the Ring Road (Southern segment - at some major interchanges including the Autostrad, and Maryouteya). In the Ring Road the annual cost of delay reaches roughly 264 Million LE. ï‚· Taxi users suffer from the larger amount of delay cost due to traffic congestion in corridors 26th of July/15th of May Travel Corridor Particularly (Lebanon Square, Zamalek and Elesaaf), Ring Road (Southern segment - at some major interchanges including the Autostrad, and Maryouteya), El Cornich- East/ El Matereya Sq. and Rod El Farag/El-Remaya (Particularly at KitKat Square, Agouza exit , El-Giza tunnel into 2 lanes heading to El-Giza Bridge). In Rod El Farag/El-Remaya corridor the annual cost of delay exceeds 155 Million LE. ï‚· Transit users suffer from the larger amount of delay cost due to traffic congestion in 26th of July/15th of May Travel, Auto Strade/ Giza, and Cairo /Ismailia Qubba Corridors. This is due to larger number of transit demand in this corridor, and larger recurrent and nonrecurrent delays may occur. ï‚· Freight transporters suffer from the larger amount of delay cost due to traffic congestion in the Ring Road (Both Northern and Southern), and Cairo-Ismaillia/El- Qubba,. In the ring Road Northern Segment the annual cost of delay reaches to 23.5 Million LE. B- Unreliability Cost In this section unreliability costs for the corridors and a comparison between them are presented. Cairo Traffic Congestion Study. Final report 229 Figures A11.13, A11.14, A11.15, A11.16, A11.17, A11.18 illustrate the total unreliability costs for passenger car users, motorcyclists, taxi users, transit riders, and all road users respectively. It should be noted that unreliability costs for freight transportation is not included in this study due to lack of enough observation and data. 90.000.000 80.000.000 70.000.000 60.000.000 50.000.000 LE 40.000.000 30.000.000 20.000.000 10.000.000 0 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.13 Annual unreliability associated costs for passenger car users 700.000 600.000 500.000 400.000 LE 300.000 200.000 100.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 Figure A11.14 Annual unreliability associated costs for motorcyclists 230 80.000.000 70.000.000 60.000.000 50.000.000 LE 40.000.000 30.000.000 20.000.000 10.000.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.15 Annual unreliability associated costs for taxi and shared taxi Users 35.000.000 30.000.000 25.000.000 20.000.000 LE 15.000.000 10.000.000 5.000.000 0 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.16 Annual unreliability associated costs for transit Users Cairo Traffic Congestion Study. Final report 231 180.000.000 160.000.000 140.000.000 120.000.000 100.000.000 LE 80.000.000 60.000.000 40.000.000 20.000.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.17 Annual unreliability associated costs for all road users (Excluding freight transporters) Results Outline The analysis of annual recurring and nonrecurring unreliability costs due to traffic congestion in Cairo yields the following hints: ï‚· Passenger car users suffer from the larger unreliability costs due to traffic congestion in the 26th of July/15th of May Travel Corridor, the Ring Road (Southern segment), and the El-Orouba/6th of October Bridge. In corridor (El-Orouba/ 6th of October Bridge) the annual unreliability cost reaches to 122 Million LE. ï‚· Taxi users suffer from the larger unreliability costs due to traffic congestion in the 26th of July/15th of May Travel Corridor, Rod El Farag/El-Remaya, and Cairo- Ismaillia/El-Qubba. In the 26th of July/15th of May Travel Corridor the annual unreliability cost reaches to 125 Million LE. ï‚· Transit users suffer from the larger unreliability costs due to traffic congestion in the 26th of July/15th of May Travel Corridor, Cairo-Suez Desert Road/El-Qalaa, Autostrad/Giza Square, and Cairo-Ismaillia/El-Qubba. In the Cairo-Ismaillia/El- Qubba corridor the annual unreliability cost reaches approximately 51 Million LE. ï‚· In the aggregate level, all road users suffer from the larger amount of unreliability associated costs due to traffic congestion in the 26th of July/15th of May Travel Corridor, Ring Road (Southern segment), El-Orouba/6th of October Bridge, and Cairo-Ismaillia/El-Qubba. In the 26th of July/15th of May Travel Corridor the annual cost of unreliability exceeds 290 Million LE. C- Excess Fuel consumption and Cost In this section excess fuel consumption and cost due to traffic congestion in the Greater Cairo for each corridor and a comparison between corridors are presented. Approach 1: 232 Figures A11.18 and A11.19 illustrate the excess gasoline and diesel consumption for 11 corridors using approach 1: 100 90 80 70 60 50 40 30 Million Liters 20 10 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 Figure A11.18 Annual excess gasoline consumption in the Greater Cairo (1st approach) 30 25 20 15 10 Million Liters 5 0 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 Figure A11.19 Annual excess Diesel consumption in the Greater Cairo (1st approach) Summarizing the above results, traffic congestion wastes 608 Million Liters gasoline and 102 Million Liters Diesel annually in the 11 corridors in Cairo. Given excess fuel consumption, figures A11.20 and A11.21 illustrate the annual excess gasoline and diesel cost in Cairo respectively. Cairo Traffic Congestion Study. Final report 233 400 Millions 350 300 250 LE 200 150 100 50 0 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 Figure A11.20 Annual excess gasoline costs as result of traffic congestion (1 st approach) 60 Millions 50 40 LE 30 20 10 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 Figure A11.21 Annual excess diesel costs as result of traffic congestion (1 st approach) Figure A11.22 illustrates total excess fuel costs per year as result of traffic congestion in Cairo for each corridor separately. 234 400 Millions 350 300 250 LE 200 150 100 50 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 Figure A11.22 Annual total excess fuel costs as result of traffic congestion Summarizing the above results, traffic congestion wastes 2.68 Billion LE annually fuel in the 11 corridors in Cairo (2.46 Billion LE gasoline, 0.22 Billion Diesel). Approach 2: Figures A11.23 and A11.24 illustrate the excess gasoline and diesel consumption for the 11 corridors using approach 2: 100 90 80 70 60 50 40 30 Million Liters 20 10 0 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 Figure A11.23 Annual excess gasoline consumption in the Greater Cairo (2nd approach) Summarizing the above results, traffic congestion wastes 552 Million Liters gasoline and 81 Million Liters Diesel annually in the 11 corridors in Cairo. Cairo Traffic Congestion Study. Final report 235 14 12 10 8 6 4 Million Liters 2 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 Figure A11.24 Annual excess Diesel consumption in the Greater Cairo (2nd approach) Given excess fuel consumption, figures A11.25 and A11.26 illustrate the annual excess gasoline and diesel cost in Cairo respectively. 400 Millions 350 300 250 LE 200 150 100 50 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 236 Figure A11.25 Annual excess gasoline costs as result of traffic congestion (2nd approach) 30 Millions 25 20 LE 15 10 5 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 nd Figure A11.26 Annual excess diesel costs as result of traffic congestion (2 approach) Figure A11.27 illustrates the total excess fuel costs per year as result of traffic congestion in Cairo for each corridor separately. 400 Millions 350 300 250 LE 200 150 100 50 0 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 nd Figure A11.27 Annual total excess fuel costs as result of traffic congestion (2 approach) Summarizing the aforementioned results, traffic congestion wastes around 2.4 Billion LE annually in the 11 corridors in Cairo annually (2.2 Billion LE gasoline cost, 0.2 Billion LE Diesel cost). Cairo Traffic Congestion Study. Final report 237 Results outline The analysis of annual excess fuel costs due to traffic congestion in Cairo yields the following hints: ï‚· The excess gasoline as well as diesel consumption in the Ring Road corridor seems to be the highest (150 Million Liters (southern), and 36 Million Liters (northern) respectively). Thus, the gasoline and diesel cost are approximately estimated 604 and 80 Million LE for both directions of the aforementioned corridor. ï‚· Besides Ring Road, the excess fuel cost is high in the 26th of July/15th of May Travel Corridor. The total excess fuel cost exceeds 332 Million LE per year. ï‚· Comparing excess gasoline and diesel costs, the former is approximately 13 times as higher as the latter. This rate would decrease to 10, if the fuel subsidy was not taken into account. D- Emission Cost In this section excess the emission cost due to traffic congestion in the Greater Cairo for 11 corridors and a comparison between them are presented. Approach 1: Figures A11.28 and A11.29 illustrate the excess gasoline and diesel consumption for the 11 corridors using approach 1: 250.000 200.000 150.000 Ton 100.000 50.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 Figure A11.28 Annual total excess CO2 emission weight due to traffic congestion (approach 1) The total emission weight is estimated 1.7 Million ton per annum for 11 corridors in Cairo.The emission cost for each corridor is estimated by converting emission weights to costs. The consultant applied the conversion factor 57 (LE/Ton) based on the World Bank advice, Figure A11.29, illustrates the emission cost due to congestion for the corridors in Cairo using approach 1: 238 14.000.000 12.000.000 10.000.000 8.000.000 LE 6.000.000 4.000.000 2.000.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.29 Annual excess CO2 emission costs due to traffic congestion (approach 1) The total emission costs due to traffic congestion for the 11 corridors in Cairo is estimated approximately 98 Million LE per annum. Approach 2: Figure A11.30 illustrates CO2 emission weight for excess fuel consumption in Cairo per year by applying approach 2 in 11 corridors: 250.000 200.000 150.000 Ton 100.000 50.000 0 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction 2 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Direction1 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor Corridor 10 11 Figure A11.30 Annual total excess CO2 emission weight due to traffic congestion (approach 2) The total emission weight is estimated 1.52 Million ton per annum for 11 corridors in Cairo.The emission cost for each corridor is estimated by converting emission weights to Cairo Traffic Congestion Study. Final report 239 costs. The consultant applied the conversion factor 57 (LE/Ton) based on the World Bank advice, Figure A 11.31 illustrates the emission cost due to congestion for the corridors in Cairo using approach 2: 14.000.000 12.000.000 10.000.000 8.000.000 LE 6.000.000 4.000.000 2.000.000 0 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor Corridor 1 2 3 4 5 6 7 8 9 10 11 Figure A11.31 Annual excess CO2 emission costs due to traffic congestion (approach 2) Thus, the total emission cost due to traffic congestion for the 11 corridors in Cairo is estimated approximately 86 Million LE per annum. Results outline The analysis of annual excess emission cost due to traffic congestion in Cairo yields the following hints: ï‚· The excess emission weight and consequent cost in the Ring Road Southern Segment Corridor is the highest in the region. The excess emission weight due to traffic congestion in the aforementioned corridor is estimated around 487000 tons per year . The excess emission cost in the Ring Road Southern Segment Corridor is approximately estimated 7.6 Million LE for both directions. ï‚· Alongside the Ring Road Southern segment corridor, 26th of July/15th of May Travel Corridor suffers from higher air pollution. The excess emission weight due to traffic congestion in the aforementioned corridor is estimated around 220000 tons per year . The excess emission cost in the 26th of July/15th of May Travel Corridor is approximately estimated 3.5 Million LE. ï‚· The minimum emission weight is observed in Cario-Alex Agr Road/ El-Qubba Bridge (11 000 tons per year). 240 Annex 12: Overview of Data Used for the Calculation of Direct Cost of Congestion Cairo Traffic Congestion Study. Draft Final report 241 242 INPUT source: Car floating survey 2010 Free flow travel speed (km/hr) Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 80 80 90 90 90 90 60 60 60 60 50 50 60 60 60 60 70 70 60 60 80 80 INPUT source: Car floating survey 2010 Average travel speed (km/hr) Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 31 31 50 50 51 51 25 25 24 24 30 30 27 27 29 29 24 24 25 25 37 37 INPUT source: Car floating survey 2010 Peak hour travel speed (km/hr) Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 25 22 29 36 40 32 22 15 20 23 25 22 22 18 17 21 17 15 19 22 35 31 INPUT source: Car floating survey 2010 Corridor length (Km) Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 20 20 60 60 40 40 22.5 22.5 17.8 17.8 22 22 18 18 22 22 20 20 23.5 23.5 21 21 INPUT Source: Based on manual classified traffic count data on 23/5/2005 JICA Study and applying growth factor Peak period No. of Vehicle (PCU) 2010 Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 41402 52381 41999.82 24822 58445.26 65232.76 23918.58 18545.94 20478 21945 23795.2 30163.2 17991.1 14024.66 44516.4 38188.5 22348.3 44611.6 5769.4 4632.5 28190 29134 INPUT Source: Based on manual classified traffic count data on 23/5/2005 JICA Study and applying growth factor Gasoline User % Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 94.6 87.9 68.4 71.9 88.7 90 87.5 87.5 94.3 98.2 92.8 91.1 91.5 84 95.1 96.7 77.9 74.7 73.4 73.1 91.4 86.2 INPUT Interview with fuel provider companies Fuel cost (LE/LT) Gasoline Diesel cost cost (LE/Lt) (LE/Lt) 1.8 1.1 INPUT Source : Transportation Master Plan and Feasibility Study of Urban Transport Projects in Greater Cairo Region in the Arab Republic of Egypt, November 2002 Value of time (LE/hr, LE.Ton) Passenger transit users Freight cars Taxi users users Transport 13.80 5.45 3.5 4.2 Cairo Traffic Congestion Study. Draft Final report 243 INPUT source The strategic Development Master Plan Study for Sustainable Development of the Greater Cairo region in the Arab Republic of Egypt March 2008 Vehicle occupancy factor Passenger cars Taxi users Motorcycle 1.50 2.50 1.00 For transit riders, the total number of passengers incl. minibuses have been estimated in Row 90 INPUT source: Car floating survey 2010 0.52380952 Coefficient of variation of travel time (AM) Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 0.68 0.81 0.51 0.43 0.42 0.27 0.43 0.47 0.38 0.54 0.46 0.41 0.5 0.44 0.57 0.53 0.45 0.43 0.52 0.54 0.44 0.52 INPUT source: Car floating survey 2010 Coefficient of variation travel time (PM) Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 0.85 0.73 0.56 0.62 0.4 0.58 0.55 0.59 0.47 0.42 0.65 0.58 0.62 0.58 0.67 0.65 0.61 0.67 0.57 0.48 0.48 0.52 INPUT source: Car floating survey 2010 Incident Delay ratio Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 1.3 1.3 1.1 1.1 1.6 1.6 1.2 1.2 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 244 INPUT Source: Based on manual classified traffic count data on 23/5/2005 JICA Study and applying growth factor No. Of Cars and Pickups in peak hours Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 20774 35184 13694 8864 33988 38441 7717 6739 6560 5727 21224 21224 9018 6051 31792 24705 10102 18661 16535 13687 19873 13077 INPUT Source: Based on manual classified traffic count data on 23/5/2005 JICA Study and applying growth factor No. Of Taxies and Share Taxies in peak hours (Each Share Taxi is equivalent to 5 taxies in terms of Capacity) Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 39661 27022 21887 12215 23061 27426 20023 14155 19996 40764 8022 16044 12483 8398 7126 8138 10414 23440 5496 4037 8625 16689 INPUT Source: Based on manual classified traffic count data on 23/5/2005 JICA Study and applying growth factor No. Of Motorcycles in peak hours Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 1239 1657 227 134 554 562 812 598 2446 1716 152 193 106 142 675 687 50 30 31 34 175 183 INPUT Source: Based on manual classified traffic count data on 23/5/2005 JICA Study and applying growth factor No. Of Transit riders in peak hours Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 15767 40997 3719 2634 22100 13145 15572 11191 0 0 33104 33104 29614 50388 29347 25870 27749 36928 9793 3372 10849 43043 INPUT Source: Based on manual classified traffic count data on 23/5/2005 JICA Study and applying growth factor Freight Loads in peak hours (TON) Corridor 1 Corridor 2 Corridor 3 Corridor 4 Corridor 5 Corridor 6 Corridor 7 Corridor 8 Corridor 9 Corridor 10 Corridor 11 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 Direction1 Direction 2 182 1818 32703 16227 15433 14359 1960 1630 2548 698 2851 2851 862 997 1265 362 8692 22900 2760 2077 13400 24276 INPUT Source: Developing Harmonized European Approaches for Transport Costing and Project Assessment (HEATCO) , May 2006 Freight delay factor 4.164 Cairo Traffic Congestion Study. Draft Final report 245