Documents & Reports

Chittagong Strategic Urban Transport Master Plan : Corridor Improvements Pre-Feasibility Study (English)

Abstract

This pre-feasibility study report is the sixth deliverable under the Chittagong Urban Transport Master Plan project conducted for the World Bank coordinated by the Chittagong Development Authority. This study presents a corridor improvement project which... See More +

Details

  • Sakaki, Shigeyuki;
  • 2018/11/19 22:46:03
  • 135050
  • 1
  • 1
  • Bangladesh
  • South Asia
  • 2019/03/04 22:42:09
  • Disclosed
  • Chittagong Strategic Urban Transport Master Plan : Corridor Improvements Pre-Feasibility Study
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation