PROCUREMENT PLAN Project information: Colombia Multipurpose Cadaster Project Region Project P162594 Project Implementation agency: 1. “DNP" means Departamento Nacional de Planeacion , the Borrower's National Planning Department created by Law 19 of 1958 and regulated by Decree 2996 of 1968. 2. "ANT" means Agencia Nacional de Tierras, the Borrower's National Land Agency, created by Law Decree 2363 of 2015 3. "SNR" means Superintendencia de Notariado y Registro, the Borrower's Superintendent of Notaries and Registries, created by Law Decree 3346 of 1959 and regulated by Decree 1298 of 1962. 4. "IGAC" means lnstituto Geografico Agustin Codazzi, the Geographic Institute Agustin Codazzi created by Law 14 of 1983 and regulated by Decree 283 8 of 1991. Date of the Procurement Plan: 02/07/2019 Period covered by this Procurement Plan: 02/07/2019 – 08/06/2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the documents previously approved with the Bank will be used. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is not applicable; Works: Is not applicable PROCUREMENT Colombia : Multipurpose Cadaster Project PLAN General Information Country: Colombia Bank’s Approval Date of the Original Procurement Plan: 2019-11-26 2020-10-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162594 GPN Date: 2019-09-10 Project Name: Multipurpose Cadaster Project Loan / Credit No: IBRD / 89370 Executing Agency(ies): National Land Agency WORKS Bid Evaluation Activity Reference No. / Procurement Estimated Actual Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Contract Description Component Review Type Method Document Amount Amount Document / Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Completion Type (US$) (US$) Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-ANT-166540-NC-DIR / Implementation and Solicitud de Single Stage - One Logistica formulación POSPR IBRD / 89370 Maintenance of the Posterior Open - National 13,581.00 0.00 Cancelado 2020-08-04 2020-09-29 2021-03-28 cotizaciones Envelope - Proveer servicios logísticos Multipurpose Cadastre ICT Development and CO-ANT-190920-NC-RFQ / Strengthening of the Solicitud de Single Stage - One Adquisición de los servicios IBRD / 89370 Posterior Limited 360,937.00 0.00 En ejecución 2020-09-05 2020-10-07 2020-10-31 2020-12-31 National Spatial Data cotizaciones Envelope de nube pública (Azure). Infrastructure ICT Development and CO-ANT-177691-NC-RFB / Strengthening of the Solicitud de Single Stage - One IBRD / 89370 Posterior Open - National 246,824.00 0.00 Cancelado 2020-08-14 2020-08-20 2020-09-17 2020-09-24 2020-10-29 2022-01-30 Fábrica de Software National Spatial Data ofertas Envelope Infrastructure CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-ANT-166493-CS-QCBS / Servicio de Fábrica de ICT Development and Software - Gestionar el Strengthening of the Selección basada proceso de construcción de IBRD / 89370 Posterior Open - National 258,065.00 0.00 Cancelado 2020-05-08 2020-05-18 2020-06-05 2020-06-19 2020-07-06 2020-08-05 2020-09-02 2020-12-31 National Spatial Data en calidad y costo software encaminado a la Infrastructure actualización del sistema de información. Page 1 CO-ANT-166491-CS-QCBS / Firma Consultora - Revisar y ajustar el modelo de atención (nacional y Selección basada IBRD / 89370 Institutional Strengthening Posterior Open - National 293,976.00 0.00 Cancelado 2020-06-30 2020-07-14 2020-07-21 2020-07-25 2020-07-31 2020-08-14 2020-10-06 2021-03-05 territorial) de la ANT para en calidad y costo el desarrollo de los procesos de ordenamiento social de la propiedad. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-ANT-145491-CS-INDV / Apoyo a la ANT en la planificación, seguimiento y monitoreo de la ejecución del IBRD / 89370 Project Management Posterior Individual Limited 54,194.00 44,315.86 Rescindido 2019-11-29 2019-12-06 2019-12-06 2019-12-11 2019-12-20 2020-01-13 2020-01-13 2020-02-05 2020-12-30 préstamo (Especialista en planificación, seguimiento y monitoreo) CO-ANT-145497-CS-INDV / Apoyo a la ANT en las actividades financieras IBRD / 89370 Project Management Posterior Individual Limited 58,065.00 41,235.86 Rescindido 2019-11-29 2019-12-06 2019-12-06 2019-12-11 2019-12-20 2020-01-13 2020-01-13 2020-02-05 2020-12-30 necesarias para la ejecución del préstamo (Especialista financiero). CO-ANT-145496-CS-INDV / Apoyo a la ANT en las actividades de adquisiciones IBRD / 89370 Project Management Posterior Individual Limited 58,065.00 47,481.28 Rescindido 2019-12-09 2019-12-09 2019-12-12 2019-12-11 2020-01-09 2020-01-13 2020-01-21 2020-02-05 2020-12-31 necesarias para la ejecución del préstamo (Especialista en adquisiciones). CO-ANT-166131-CS-INDV / Implementation and Especialista en Salvaguardas IBRD / 89370 Maintenance of the Posterior Individual Limited 18,290.00 12,379.29 Firmado 2020-04-03 2020-04-03 2020-04-07 2020-04-17 2020-04-13 2020-05-07 2020-04-21 2020-06-01 2020-12-18 Ambientales Multipurpose Cadastre CO-ANT-166423-CS-CDS / Especialista en Planificación, IBRD / 89370 Project Management Posterior Individual Limited 43,806.00 32,748.10 Firmado 2020-04-02 2019-12-06 2020-04-02 2019-12-11 2020-04-02 2020-01-13 2020-04-02 2020-03-31 2020-12-30 Seguimiento y Monitoreo ICT Development and CO-ANT-166494-CS-INDV / Strengthening of the Analista de Requerimientos IBRD / 89370 Posterior Individual Open 15,742.00 8,036.57 Firmado 2020-04-06 2020-05-12 2020-04-27 2020-07-07 2020-04-29 2020-07-09 2020-05-05 2020-07-24 2020-12-18 National Spatial Data y Pruebas 1 Infrastructure ICT Development and CO-ANT-166497-CS-INDV / Strengthening of the Analista de Requerimientos IBRD / 89370 Posterior Individual Open 15,742.00 8,036.57 Firmado 2020-04-06 2020-05-12 2020-04-27 2020-07-09 2020-04-29 2020-07-14 2020-05-05 2020-07-24 2020-12-18 National Spatial Data y Pruebas 2 Infrastructure ICT Development and CO-ANT-166498-CS-INDV / Strengthening of the Analista de Requerimientos IBRD / 89370 Posterior Individual Open 15,742.00 8,036.57 Firmado 2020-04-06 2020-05-12 2020-04-27 2020-07-07 2020-04-29 2020-07-14 2020-05-05 2020-07-24 2020-12-18 National Spatial Data y Pruebas 3 Infrastructure ICT Development and CO-ANT-166499-CS-INDV / Strengthening of the IBRD / 89370 Posterior Individual Open 16,935.00 8,284.69 Firmado 2020-05-05 2020-05-12 2020-05-26 2020-07-24 2020-05-28 2020-08-14 2020-06-09 2020-08-14 2020-12-18 Desarrollador Senior 1 National Spatial Data Infrastructure ICT Development and CO-ANT-166502-CS-INDV / Strengthening of the IBRD / 89370 Posterior Individual Open 16,935.00 8,284.69 Firmado 2020-05-05 2020-05-12 2020-05-26 2020-07-24 2020-05-28 2020-08-14 2020-06-09 2020-08-14 2020-12-18 Desarrollador Senior 2 National Spatial Data Infrastructure Page 2 ICT Development and CO-ANT-166503-CS-INDV / Strengthening of the IBRD / 89370 Posterior Individual Open 16,935.00 6,008.29 Firmado 2020-05-05 2020-05-12 2020-05-26 2020-08-13 2020-05-28 2020-08-27 2020-06-09 2020-09-17 2020-12-18 Desarrollador Senior 3 National Spatial Data Infrastructure ICT Development and CO-ANT-166517-CS-INDV / Strengthening of the Profesional Bases de Datos IBRD / 89370 Posterior Individual Open 19,355.00 9,881.03 Firmado 2020-04-06 2020-05-12 2020-04-27 2020-07-09 2020-04-29 2020-07-09 2020-05-11 2020-07-24 2020-12-18 National Spatial Data Senior 2 Infrastructure Implementation and CO-ANT-166834-CS-INDV / IBRD / 89370 Maintenance of the Posterior Individual Limited 14,219.00 0.00 Cancelado 2020-04-08 2020-06-11 2020-04-13 2020-06-12 2020-04-16 2020-05-05 2020-12-18 Gestor Territorial 1 Multipurpose Cadastre CO-ANT-166835-CS-INDV / Implementation and Temático Social Transversal IBRD / 89370 Maintenance of the Posterior Individual Limited 11,768.00 4,277.54 Firmado 2020-04-08 2020-06-11 2020-04-14 2020-06-12 2020-04-17 2020-09-11 2020-05-05 2020-09-23 2020-12-18 2 Multipurpose Cadastre CO-ANT-145510-CS-INDV / Implementation and Especialista en Salvaguardas IBRD / 89370 Maintenance of the Posterior Individual Limited 18,290.00 0.00 Cancelado 2019-12-20 2020-03-31 2020-01-20 2020-01-31 2020-02-16 2020-12-30 Sociales Multipurpose Cadastre CO-ANT-145508-CS-INDV / Apoyo a la ANT en la coordinación de gestión operativa de la ejecución del IBRD / 89370 Project Management Posterior Individual Limited 61,935.00 0.00 Cancelado 2019-11-29 2019-12-06 2019-12-20 2020-01-13 2020-12-30 préstamo (Coordinador de gestión operativa de proyecto- ANT). CO-ANT-145501-CS-INDV / Apoyo a la ANT en la gestión de operaciones IBRD / 89370 Project Management Posterior Individual Limited 15,242.00 0.00 Cancelado 2019-12-16 2020-01-17 2020-01-31 2020-02-16 2020-12-30 monetarias de la ejecución del préstamo (Profesional de tesorería). CO-ANT-145500-CS-INDV / Apoyo a la ANT en la gestión contable de la IBRD / 89370 Project Management Posterior Individual Limited 15,242.00 0.00 Cancelado 2019-12-16 2020-01-17 2020-01-31 2020-02-16 2020-12-30 ejecución del préstamo (Profesional contable). CO-ANT-166531-CS-INDV / Especialista de Adquisiciones IBRD / 89370 Project Management Posterior Individual Direct 44,694.00 34,762.03 Firmado 2020-04-08 2020-04-14 2020-04-14 2020-04-21 2020-04-16 2020-04-22 2020-04-20 2020-05-07 2020-12-30 - Bertha Lucía Cordero Otero CO-ANT-174190-CS-CDS / Selección directa Especialista Financiero - IBRD / 89370 Project Management Posterior Direct 32,941.00 26,475.68 Firmado 2020-05-20 2020-05-20 2020-05-22 2020-05-21 2020-05-27 2020-06-01 2020-12-30 de consultores Germán Jiménez Implementation and CO-ANT-174397-CS-INDV / IBRD / 89370 Maintenance of the Posterior Individual Limited 14,344.00 5,482.45 Firmado 2020-05-21 2020-06-11 2020-05-24 2020-06-12 2020-05-26 2020-09-11 2020-06-01 2020-09-18 2020-12-18 Temático Jurídico Multipurpose Cadastre CO-ANT-174404-CS-INDV / Implementation and Temático Ordenamiento IBRD / 89370 Maintenance of the Posterior Individual Limited 13,933.00 4,559.33 Firmado 2020-05-21 2020-06-11 2020-05-24 2020-06-12 2020-05-26 2020-09-25 2020-06-01 2020-10-02 2020-12-18 Territorial Multipurpose Cadastre CO-ANT-166532-CS-INDV / Especialista Financiero - IBRD / 89370 Project Management Posterior Individual Direct 38,387.00 0.00 Cancelado 2020-04-08 2020-04-14 2020-04-14 2020-04-22 2020-04-16 2020-04-22 2020-04-20 2020-12-30 Mario de Milleri Bonilla CO-ANT-166535-CS-INDV / Implementation and Temático Catastral 1 - Juan IBRD / 89370 Maintenance of the Posterior Individual Direct 14,258.00 12,349.95 Firmado 2020-06-09 2020-06-09 2020-06-10 2020-06-10 2020-06-10 2020-06-10 2020-06-12 2020-06-19 2020-12-18 Carlos Fajardo Multipurpose Cadastre Page 3 CO-ANT-145503-CS-INDV / Apoyo a la ANT en la Implementation and coordinación técnica de la IBRD / 89370 Maintenance of the Posterior Individual Limited 38,387.00 0.00 Cancelado 2020-06-30 2020-07-07 2020-07-21 2020-08-14 2021-08-01 ejecución del préstamo Multipurpose Cadastre (Coordinador técnico del proyecto-ANT). CO-ANT-181975-CS-INDV / Coordinador de Gestión IBRD / 89370 Project Management Posterior Individual Direct 27,353.00 20,060.67 Firmado 2020-07-31 2020-07-24 2020-08-02 2020-07-21 2020-08-03 2020-07-22 2020-08-25 2020-08-04 2020-12-30 Operativa - Karen Godoy CO-ANT-181974-CS-INDV / Implementation and Coordinador Técnico del IBRD / 89370 Maintenance of the Posterior Individual Direct 28,765.00 21,155.17 Firmado 2020-07-31 2020-07-24 2020-08-02 2020-07-21 2020-08-03 2020-07-21 2020-08-25 2020-08-05 2020-12-30 Proyecto - Juan Rodrigo Multipurpose Cadastre Higuera CO-ANT-145510-CS-INDV-2 Implementation and / Consultor Salvaguardas IBRD / 89370 Maintenance of the Posterior Individual Limited 12,353.00 5,884.82 Firmado 2020-07-31 2020-07-24 2020-08-31 2020-07-28 2020-09-11 2020-07-30 2020-09-27 2020-09-16 2020-12-30 Sociales Multipurpose Cadastre CO-ANT-177460-CS-INDV / Profesional Senior de Implementation and contratos de uso de la IBRD / 89370 Maintenance of the Posterior Individual Limited 14,824.00 0.00 En ejecución 2020-07-31 2020-09-29 2020-08-05 2020-08-07 2020-08-28 2021-02-14 Dirección de Acceso a Multipurpose Cadastre Tierras CO-ANT-177458-CS-INDV / Implementation and Profesional Senior de la IBRD / 89370 Maintenance of the Posterior Individual Limited 14,824.00 0.00 Cancelado 2020-07-31 2020-08-05 2020-08-07 2020-08-28 2021-02-14 Dirección de Gestión Jurídica Multipurpose Cadastre de Tierras CO-ANT-177457-CS-INDV / Implementation and Profesional Senior de la IBRD / 89370 Maintenance of the Posterior Individual Limited 14,824.00 0.00 En ejecución 2020-07-31 2020-09-29 2020-08-05 2020-08-07 2020-08-28 2021-01-26 Dirección de Acceso a Multipurpose Cadastre Tierras CO-ANT-145499-CS-INDV / IBRD / 89370 Project Management Posterior Individual Limited 12,135.00 0.00 En ejecución 2020-07-31 2020-09-16 2020-09-01 2020-09-22 2020-10-08 2021-08-21 Profesional Financiero ICT Development and CO-ANT-177456-CS-INDV / Strengthening of the Gestor de proyecto para el IBRD / 89370 Posterior Individual Limited 14,706.00 8,832.59 Firmado 2020-06-29 2020-07-24 2020-07-04 2020-08-03 2020-07-06 2020-09-10 2020-08-03 2020-09-18 2020-12-18 National Spatial Data componente tecnológico Infrastructure CO-ANT-185312-CS-INDV / Apoyar a la ANT, como Gestor Territorial en la formulación de POSPR Implementation and contribuyendo en el análisis IBRD / 89370 Maintenance of the Posterior Individual Limited 8,529.00 3,585.82 Firmado 2020-07-26 2020-07-24 2020-07-27 2020-07-28 2020-08-17 2020-10-01 2020-08-29 2020-10-08 2020-12-18 territorial mediante el Multipurpose Cadastre establecimiento de un diálogo institucional y comunitario en los municipios focalizados ICT Development and CO-ANT-166518-CS-INDV / Strengthening of the Profesional Bases de Datos IBRD / 89370 Posterior Individual Open 19,355.00 0.00 Cancelado 2020-04-06 2020-05-12 2020-04-27 2020-04-29 2020-05-11 2020-12-18 National Spatial Data Senior 1 Infrastructure ICT Development and CO-ANT-166511-CS-INDV / Strengthening of the IBRD / 89370 Posterior Individual Open 13,774.00 0.00 Cancelado 2020-05-05 2020-05-12 2020-05-26 2020-07-21 2020-05-28 2020-06-09 2020-12-18 Desarrollador Junior 1 National Spatial Data Infrastructure ICT Development and CO-ANT-166512-CS-INDV / Strengthening of the IBRD / 89370 Posterior Individual Open 13,774.00 0.00 Cancelado 2020-05-05 2020-05-12 2020-05-26 2020-07-21 2020-05-28 2020-06-02 2020-12-18 Desarrollador Junior 2 National Spatial Data Infrastructure Page 4 ICT Development and CO-ANT-166510-CS-INDV / Strengthening of the IBRD / 89370 Posterior Individual Open 16,935.00 0.00 Cancelado 2020-05-05 2020-05-12 2020-05-26 2020-07-23 2020-05-28 2020-06-09 2020-12-18 Desarrollador Senior 7 National Spatial Data Infrastructure ICT Development and CO-ANT-166509-CS-INDV / Strengthening of the IBRD / 89370 Posterior Individual Open 16,935.00 0.00 Cancelado 2020-05-05 2020-05-12 2020-05-26 2020-07-23 2020-05-28 2020-06-09 2020-12-18 Desarrollador Senior 6 National Spatial Data Infrastructure ICT Development and CO-ANT-166508-CS-INDV / Strengthening of the IBRD / 89370 Posterior Individual Open 16,935.00 0.00 Cancelado 2020-05-05 2020-05-12 2020-05-26 2020-07-23 2020-05-28 2020-06-09 2020-12-18 Desarrollador Senior 5 National Spatial Data Infrastructure ICT Development and CO-ANT-166506-CS-INDV / Strengthening of the IBRD / 89370 Posterior Individual Open 16,935.00 0.00 Cancelado 2020-05-05 2020-05-12 2020-05-26 2020-07-23 2020-05-28 2020-06-09 2020-12-18 Desarrollador Senior 4 National Spatial Data Infrastructure CO-ANT-189894-CS-INDV / Apoyar a la Agencia Nacional de Tierras (ANT) como Especialista de Salvaguardas Ambientales de Implementation and las actividades previstas IBRD / 89370 Maintenance of the Posterior Individual Direct 6,862.75 5,182.45 Firmado 2020-08-24 2020-08-28 2020-08-29 2020-04-17 2020-09-04 2020-09-18 2020-09-09 2020-09-24 2020-12-18 para los componentes y Multipurpose Cadastre subcomponentes del Proyecto denominado “Programa para la adopción e implementación de un Catastro Multipropósit CO-ANT-190917-CS-INDV / ICT Development and Desarrollador Senior - Strengthening of the IBRD / 89370 Posterior Individual Direct 7,941.18 5,422.20 Firmado 2020-08-31 2020-09-02 2020-09-10 2020-09-28 2020-09-10 2020-09-15 2020-09-10 2020-09-25 2020-12-18 Leonard Alfonso Rozo National Spatial Data Hartley Infrastructure ICT Development and CO-ANT-190919-CS-INDV / Strengthening of the Desarrollador Senior - IBRD / 89370 Posterior Individual Direct 7,941.18 0.00 Cancelado 2020-08-31 2020-09-02 2020-09-10 2020-09-10 2020-09-10 2020-12-18 National Spatial Data Wilson Alberto Guasca Rojas Infrastructure CO-ANT-191651-CS-INDV / ICT Development and Profesional Bases de Datos Strengthening of the IBRD / 89370 Posterior Individual Direct 7,942.00 5,402.46 Firmado 2020-09-10 2020-09-07 2020-09-10 2020-09-03 2020-09-15 2020-09-18 2020-09-18 2020-09-25 2020-12-18 Senior - Nelson Ricardo National Spatial Data Restrepo Ramírez Infrastructure CO-ANT-195908-CS-INDV / Profesional Senior de la Implementation and Dirección de Gestión Jurídica IBRD / 89370 Maintenance of the Posterior Individual Direct 14,824.00 4,908.71 Firmado 2020-09-28 2020-09-25 2020-09-29 2020-09-29 2020-09-29 2020-10-01 2020-10-01 2020-10-16 2020-12-18 de Tierras - Miguel Andrés Multipurpose Cadastre Martínez Toro ICT Development and CO-ANT-196375-CS-INDV / Strengthening of the Desarrolladora Senior - Rosa IBRD / 89370 Posterior Individual Direct 5,736.00 0.00 En ejecución 2020-09-30 2020-09-25 2020-09-30 2020-09-25 2020-10-07 2020-10-14 2020-10-12 2020-12-18 National Spatial Data Patricia García Polo Infrastructure ICT Development and CO-ANT-196376-CS-INDV / Strengthening of the Desarrolladora Senior - Elsa IBRD / 89370 Posterior Individual Direct 5,736.00 3,856.24 Firmado 2020-09-30 2020-09-25 2020-09-30 2020-09-25 2020-10-07 2020-10-07 2020-10-12 2020-10-20 2020-12-18 National Spatial Data Viviana López Charry Infrastructure ICT Development and CO-ANT-190918-CS-INDV / Strengthening of the Desarrollador Senior - IBRD / 89370 Posterior Individual Direct 7,941.18 0.00 Cancelado 2020-08-31 2020-09-02 2020-09-10 2020-08-28 2020-09-10 2020-09-10 2020-12-18 National Spatial Data William Javier Barreto Parra Infrastructure Page 5 ICT Development and CO-ANT-198876-CS-INDV / Strengthening of the Desarrollador Senior - John IBRD / 89370 Posterior Individual Direct 3,530.00 0.00 En ejecución 2020-10-13 2020-10-15 2020-10-13 2020-10-16 2020-10-27 2020-11-09 2020-12-18 National Spatial Data Jairo Betancourt Arango Infrastructure CO-ANT-191648-CS-INDV / ICT Development and Profesional Bases de Datos Strengthening of the IBRD / 89370 Posterior Individual Direct 7,942.00 0.00 Cancelado 2020-09-10 2020-09-07 2020-09-10 2020-09-15 2020-09-18 2020-12-18 Senior - John Jairo Moreno National Spatial Data Bohórquez - Infrastructure CO-ANT-201300-CS-INDV / ICT Development and Desarrollador Junior - Strengthening of the Ejecución IBRD / 89370 Posterior Individual Direct 2,871.00 0.00 2020-10-26 2020-10-27 2020-10-30 2020-11-05 2020-12-18 Miguel Antonio Posada National Spatial Data pendiente Osorio Infrastructure Page 6