Procurement of Goods (Equipment) and Consultancy Procurement of goods (equipment) and selection of non-construction consultancy will be conducted under full responsibility for procedural compliance and integrity by the Procurement Services Unit (ULP) (Secretariat of IAARD Working Group). While the selection of construction consultancy (design & supervision) will be conducted under full responsibility for procedural compliance and integrity by each Satker Working Group. Procurement of Works (Building Construction) Procurement of building construction will be conducted under full responsibility for procedural compliance and integrity by working group of SATKER. Each SATKER will conduct procurement of one package of W1 building contruction works. 86 THE SUISTAINABLE MANAGEMENT OF AGRICULTURAL RESEARCH AND TECHNOLOGY DISSEMINATION (SMARTD) PROCUREMENT PLAN FOR WORKS Schedule Preparat- Submission of WB No Invitation Submissi Submission WB No Contract Contract Completion Estimated Proc. Bank's ion of Bidding Objection for Bid on of of Bid Objection Signing Period No. Name of Package Quantity Cost Method Review Bidding Documents to (10 days) (Advertis Bids (21 Evaluation (10 days) (USD '000) Documents WB ement) days for Report to NCB) WB W Construction of New Buildings and Renovation 1 BB Biogen - Indonesian Center for Agricultural 1 package 950.00 NCB Prior Biotechnology and Genetic Resource Research and Development (ICABIOGRD), Bogor, West Java Planned 15/01/13 22/01/13 4/02/13 11/02/13 11/03/13 25/03/13 8/04/13 15/04/13 240 calendar 10/12/13 days a. Construction of Plant Genetic Bank - ICABIOGRD 950.00 Revised Actual 2 Balittri - Indonesian Spice and Industrial Crops 1 package 643.50 NCB Post Research Institute (ISICRI), Bogor, West Java Planned 15/01/13 N/A N/A 29/01/13 27/02/13 N/A N/A 20/03/13 240 calendar 15/11/13 days a. Construction of Integrated Laboratory - ISICRI 643.50 Revised Actual 3 Balittas - Indonesian Tobacco and Fiber Crops 1 package 820.65 NCB Post Research Institute (ITOFCRI), Malang, East Java Planned 15/01/13 N/A N/A 11/02/13 11/03/13 N/A 8/04/13 15/04/13 240 calendar 10/12/13 days a. Construction of Integrated laboratory ITOFCRI 820.65 Revised Actual 4 Jambi Assessment Institute for Agricultural 1 package 1,039.33 NCB Post Technology (AIAT), Jambi Planned 15/01/13 N/A N/A 11/02/13 11/03/13 N/A 8/04/13 15/04/13 240 calendar 10/12/13 Construction of Office Buildings and Infrastructure - days a. 1,039.33 Jambi AIAT Revised Actual 5 BB Pascapanen - Indonesian Center for Agricultural 1 package 534.48 NCB Post Post Harvest Research and Development (ICAPOSTRD), Bogor, West Java Planned 15/01/14 N/A N/A 29/01/14 27/02/14 N/A N/A 20/03/14 240 calendar 15/11/14 Construction of Food Nano Laboratory - days a. 534.48 ICAPOSTRD Revised Actual 6 Balittra - Indonesian Swampland Agriculture 1 package 498.96 NCB Post Research Institute (ISARI), Banjar Baru, South Kalimantan Planned 15/01/14 N/A N/A 29/01/14 27/02/14 N/A N/A 20/03/14 240 calendar 15/11/14 Construction of Integrated Laboratory (Hidrology, days a. 498.96 Gis, Telematry, Remote Sensing) - ISARI Revised Actual 7 Balitka - Indonesian Coconut and Palmae Research 1 package 922.73 NCB Post Institute (ICOPRI), Menado, North Sulawesi a. Construction of Integrated Laboratory - ICOPRI 606.98 Planned 15/01/14 N/A N/A 29/01/14 27/02/14 N/A N/A 20/03/14 240 calendar 15/11/14 days 86 Schedule Preparat- Submission of WB No Invitation Submissi Submission WB No Contract Contract Completion Estimated Proc. Bank's ion of Bidding Objection for Bid on of of Bid Objection Signing Period No. Name of Package Quantity Cost Method Review Bidding Documents to (10 days) (Advertis Bids (21 Evaluation (10 days) (USD '000) Documents WB ement) days for Report to NCB) WB 15/01/14 N/A N/A 29/01/14 27/02/14 N/A N/A 20/03/14 240 calendar 15/11/14 b. Construction of Research Station - ICOPRI 315.75 days - Kayuwatu Research Station 279.00 Revised - Kima Atas Research Station 36.75 Actual 8 Balitsa - Indonesian Vegetables Research Institute 1 package 1,522.50 NCB Post (IVEGRI), Lembang, Bandung - West Java a. Construction of Subang Research Station - 767.00 240 calendar IVEGRI Planned 15/01/14 N/A N/A 12/02/14 13/03/14 N/A 11/04/14 18/04/14 7/12/14 days b. Construction of IVEGRI Laboratories 755.49 - Laboratory of Vegetable Breeding and Seed 146.25 Production - Hydroponic Vegetable Laboratory 80.80 - Pest and Disease Laboratory 36.62 Revised - Quality Testing Laboratory 66.83 - Fertilizer Testing Laboratory 25.00 - Research Disemitation 400.00 Actual 9 Center for Seed Production of Tropical Fruits, 1 package 1,683.40 NCB Post Subang - West Java Planned 15/01/14 N/A N/A 12/02/14 13/03/14 N/A 11/04/14 18/04/14 240 calendar 7/12/14 Construction of Office Buildings and Infrastructure - days a. 1,683.40 Center for Seed Production of Tropical Fruits Revised Actual 10 Balittas - Indonesian Tobacco and Fiber Crops 1 package 908.65 NCB Post Research Institute (ITOFCRI), Malang, East Java b. Construction of Research Station - ITOFCRI 908.65 Planned 15/01/14 N/A N/A 12/02/14 13/03/14 N/A 11/04/14 18/04/14 240 calendar 7/12/14 - Asembagus Research Station 143.80 days - Muktiharjo Research Station 288.25 Revised - Pasirian Research Station 85.25 - Sumberrejo Research Station 156.00 Actual - Karang Ploso Research Station 235.35 11 Balingtan - Indonesian Agricultural Environment 1 package 572.27 NCB Post Research Institute (IAERI), Pati, Central Java Planned 15/01/14 N/A N/A 29/01/14 27/02/14 N/A N/A 20/03/14 240 calendar 15/11/14 days a. Construction of Jakenan Research Station - IAERI 572.27 Revised Actual 12 North Sulawesi Assessment Institute for Agricultural 1 package 2,370.40 NCB Post Technology (AIAT) Planned 15/01/14 N/A N/A 12/02/14 13/03/14 N/A 11/04/14 18/04/14 240 calendar 7/12/14 Construction of Office Buildings and Infrastructure - days a. 2,370.40 North Sulawesi AIAT Revised Actual 13 South Sulawesi Assessment Institute for 1 package 2,126.50 NCB Post Agricultural Technology (AIAT) Construction of Research Station - South Sulawesi Planned 15/01/14 N/A N/A 12/02/14 13/03/14 N/A 11/04/14 18/04/14 240 calendar 7/12/14 a. 2,126.50 AIAT days - Gowa Research Station 1,496.50 Revised - Jeneponto Research Station 630.00 Actual 87 Schedule Preparat- Submission of WB No Invitation Submissi Submission WB No Contract Contract Completion Estimated Proc. Bank's ion of Bidding Objection for Bid on of of Bid Objection Signing Period No. Name of Package Quantity Cost Method Review Bidding Documents to (10 days) (Advertis Bids (21 Evaluation (10 days) (USD '000) Documents WB ement) days for Report to NCB) WB 14 West Papua Assessment Institute for Agricultural 1 package 2,281.30 NCB Post Technology (AIAT) Planned 15/01/14 N/A N/A 12/02/14 13/03/14 N/A 11/04/14 18/04/14 240 calendar 7/12/14 Construction of Office Building, Housing, and days a. 2,281.30 Research Station - West Papua AIAT Revised Actual TOTAL CONTRUCTION AND INFRASTRUCTURE 16,874.66 88 PROCURMENT PLAN FOR GOODS No Equipment group/Satker Quantity Estimated Proc. Bank's Schedule Cost Method Review Submission (USD '000) Preparation Submission of WB No Invitation of Bids (45 Submission of WB No Bidding for Bid Contract Contract of Bidding Objection days for ICB Bid Evaluation Objection Completion Documents to (Advertise Signing Period Documents (10 days) and 21 days Report to WB (10 days) WB ment) for NCB) GA 2013 Planned 15-Jan-13 21-Jan-13 01-Feb-13 05-Feb-13 5-Mar-13 18-Mar-13 01-Apr-13 08-Apr-13 180 calendar 08/Oct/13 Laboratory equipment for 1 days 1 3,777.78 ICB Prior satker Revised Actual GB 2014 Planned 15 Jan 2014 20-Jan-14 31-Jan-14 07-Feb-14 07-Mar-14 21-Mar-14 03-Apr-14 10-Apr-14 180 calendar 07-Oct-14 Laboratory equipment for days 1 6,999.65 ICB Prior 13 satker Revised Actual Planned 15 Jan 2014 20-Jan-14 31-Jan-14 07-Feb-14 11-Apr-14 01-May-14 14-May-14 21-May-14 180 calendar 18-Nov-14 2 ICB days Machinery for 8 satker 2,004.96 Prior Revised Actual Planned 15 Jan 2014 20-Jan-14 31-Jan-14 07-Feb-14 07-Mar-14 21-Mar-14 03-Apr-14 10-Apr-14 180 calendar 07-Oct-14 3 NCB Vehicles/Tractor for 8 days 957.93 Prior satker Revised Actual Planned 15 Jan 2014 20-Jan-14 31-Jan-14 07-Feb-14 07-Mar-14 21-Mar-14 03-Apr-14 10-Apr-14 180 calendar 07-Oct-14 Office equipment for 12 days 4 944.64 NCB Prior Revised satker Actual Planned 15 Jan 2014 N/A N/A 24-Jan-14 21-Feb-14 N/A N/A 14-Mar-14 180 calendar 12-Sep-14 Data processing/IT and days 5 dissemination equipment 496.21 NCB Post Revised for 4 satker Actual GRAND TOTAL GOODS 15,181.16 89 THE SUISTAINABLE MANAGEMENT OF AGRICULTURAL RESEARCH AND TECHNOLOGY DISSEMINATION PROCUREMENT PLAN FOR SELECTION OF CONSULTANTS I. LOAN No. Name of Package Quantities Estimated Proc. Bank's Review Schedule (Man Cost Method Submission WB No Expression Sub. Of EOI/ Shortlist/ Bank No Submisison Tech. WB No Final WB No Contract Contract Period Complet- Month) (USD '000) of Term of Objection* of Interest CVs (14 selected objection of Evaluation Objection Eval/Negoti Objection to Signing ion Reference (10 days) (EOI) days) candidate (10 days) Proposals ation/ Draft draft (TOR)/Cost (Required (and RFP (30 days) Contract contract* Est. to WB for firms, for firms) recommend ed for individuals) CF Firm Consultants 12 calendar Firm Consultancy Services Planned 12/10/2012 22/10/2012 23/10/2012 05/11/2012 1411/2012 24/12/2012 24/12/2012 02/01/2013 12/01/2013 18/01/2013 28/01/2013 31/01/2013 31/01/2014 months 1 (requiring international 12 173.33 QCBS Prior Revised expertise) to Support HRD Actual Total Firm Consultants 12 173.33 IC Individual Consultants Individual Consultant (requiring 17 calender Planned 24/09/2012 03/10/2012 08/10/2012 22/10/2012 25/10/2012 03/11/2012 N/A N/A N/A 05/11/2012 15/11/2012 17/11/2012 17/04/2014 international expertise) for months 1 17 245.55 ICS Prior (Full) Project Implementation (Team Revised Leader) Actual Planned 12/02/2013 22/02/2013 05/03/2013 22/03/2013 27/03/2013 7/04/13 N/A N/A N/A 09/04/2013 N/A 11/04/2013 2 calendar months 11/06/2013 Prior* (only draft Revised Individual Consultant (requiring TOR and CV of 2 international expertise) for 8 115.55 ICS recommended Economist/Financial Actual candidate) Planned 12/02/2013 22/02/2013 05/03/2013 22/03/2013 27/03/2013 7/04/13 N/A N/A N/A 09/04/2013 N/A 11/04/2013 6 calendar months 11/10/2013 Prior* (only draft Individual Consultant (requiring Revised TOR and CV of 3 international expertise)for 6 86.67 ICS recommended Laboratory Development candidate) Actual Planned 12/02/2013 22/02/2013 05/03/2013 22/03/2013 27/03/2013 7/04/13 N/A N/A N/A 09/04/2013 N/A 11/04/2013 5 calendar months 11/09/2013 Prior* (only draft Revised Individual Consultant (requiring TOR and CV of 4 international expertise)for 5 72.22 ICS recommended Research Station Development candidate) Actual Planned 12/02/2013 22/02/2013 05/03/2013 22/03/2013 27/03/2013 7/04/13 N/A N/A N/A 09/04/2013 N/A 11/04/2013 5 calendar months 11/09/2013 Prior* (only draft Revised Individual Consultant (requiring TOR and CV of 5 international expertise)for Seed 6 86.67 ICS recommended Production Quality Control Actual candidate) Planned 12/02/2013 22/02/2013 05/03/2013 22/03/2013 27/03/2013 7/04/13 N/A N/A N/A 09/04/2013 N/A 11/04/2013 2 calendar months 11/06/2013 Individual Consultant (requiring Prior* (only draft Revised international expertise) for TOR and CV of 6 2 28.89 ICS Institutional Assessment recommended Framework candidate) Actual Prior* (only draft Planned 24/05/2013 29/05/2013 07/06/2013 21/06/2013 25/06/2013 5/07/13 N/A N/A N/A 07/07/2013 N/A 09/07/2013 2 calendar months 09/09/2013 Individual Consultant (requiring TOR and CV of Revised 7 international expertise) for 2 28.89 ICS recommended Business Plan candidate) 96 Prior* (only draft Individual Consultant (requiring TOR and CV of 7 international expertise) for 2 28.89 ICS recommended Business Plan candidate) Actual Planned 22/03/2013 27/03/2013 05/04/2013 19/04/2013 23/04/2013 3/05/13 N/A N/A N/A 05/05/2013 N/A 07/05/2013 2 calendar months 07/07/2013 Individual Consultant (requiring Prior*(only draft international expertise) for TOR and CV of Revised 8 2 28.89 ICS Priority Setting, Planning and recommended Programming Design candidate) Actual Planned 24/05/2013 29/05/2013 07/06/2013 21/06/2013 25/06/2013 5/07/13 N/A N/A N/A 07/07/2013 N/A 09/07/2013 2 calendar months 09/09/2013 Prior* (only draft Individual Consultant (requiring TOR and CV of Revised 9 international expertise) for 2 28.89 ICS recommended Technology Commercialization candidate) Actual Planned 24/05/2013 29/05/2013 07/06/2013 21/06/2013 25/06/2013 5/07/13 N/A N/A N/A 07/07/2013 N/A 09/07/2013 2 calendar months 09/09/2013 Prior* (only draft Individual Consultant (requiring TOR and CV of Revised 10 international expertise) for 2 28.89 ICS recommended Technology Dissemination candidate) Actual Planned 24/09/2012 03/10/2012 08/10/2012 22/10/2012 25/10/2012 03/11/2012 N/A N/A N/A 05/11/2012 N/A 07/11/2012 9 calendar months 07/08/2013 Individual Consultant (requiring Prior* (only draft international expertise) for TOR and CV of Revised 11 9 130.00 ICS International Research recommended Collaboration candidate) Actual Total Individual Consultants 881.09 CC Consultant for Construction 1 BB Biogen - Indonesian Center for 105.55 Agricultural Biotechnology and Genetic Resource Research and Development (ICABIOGRD) Laboratory a Designing of Construction 1 package 63.33 CQS Prior Planned 21/09/2012 30/09/2012 01/10/2012 15/10/2012 19/10/2012 30/10/2012 29/11/2012 N/A N/A 01/12/2012 04/12/2012 04/12/2012 45 calender days 17/01/3013 Building Plant Genetic Bank Revised Actual b Supervisory of Construction 1 package 42.22 CQS Prior Planned 01/02/2013 11/01/2013 13/02/2013 25/02/2013 27/02/2013 08/03/2013 09/04/2013 N/A N/A 10/04/2013 12/04/2013 15/04/2013 240 calendar days 24/12/2013 Building Plant Genetic Bank from construction awarded Revised Actual 2 BB Pascapanen - Indonesian Center for 59.38 Agricultural Post Harvest Research and Development (ICAPOSTRD) Laboratory a Designing of Construction 1 package 35.63 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Building Food Nano Laboratory Revised Actual b Supervisory Of Construction 1 package 23.75 CQS Post Planned N/A N/A 21/01/2014 03/02/2014 06/02/2014 N/A 07/03/2012 N/A N/A 14/03/2014 N/A 20/03/2014 240 calendar days 15/11/2014 Building Food Nano Laboratory from construction awarded Revised Actual 3 Balittra - Indonesian Swampland 55.44 Agriculture Research Institute (ISARI) Laboratory 97 a Designing of Construction 1 package 33.26 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Integrated Laboratory Revised (Hidrology, Gis, Telematry, Remote Sensing, Biochemistry) Actual b Supervisory of Construction 1 package 22.18 CQS Post Planned N/A N/A 21/01/2014 03/02/2014 06/02/2014 N/A 07/03/2012 N/A N/A 14/03/2014 N/A 20/03/2014 240 calendar days 15/11/2014 Integrated Laboratory from construction (Hidrology, Gis, Telematry, awarded Remote Sensing, Biochemistry) Revised Actual 4 Balittri - Indonesian Spice and Industrial 71.50 Crops Research Institute (ISICRI) Laboratory a Designing of Construction 1 package 42.90 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Integrated Laboratory Revised Actual b Supervisory of Construction 1 package 28.60 CQS Post Planned N/A N/A 21/01/2013 04/02/2013 08/02/2013 N/A 11/03/2013 N/A N/A 15/03/2013 N/A 20/03/2013 240 calendar days 15/11/2013 Integrated Laboratory from construction awarded Revised Actual 5 Balitka - Indonesian Coconut and 102.5 Palmae Research Institute (ICOPRI) Laboratory 67.45 a Designing of Construction 1 package 40.47 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Integrated Laboratory Revised Actual b Supervisory of Construction 1 package 26.98 CQS Post Planned N/A N/A 21/01/2014 03/02/2014 06/02/2014 N/A 07/03/2012 N/A N/A 14/03/2014 N/A 20/03/2014 240 calendar days 15/11/2014 Integrated Laboratory from construction awarded Revised Actual Research Station 35.08 c Designing of Construction 1 package 21.05 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Research Station - ICOPCRI Revised Actual d Supervisory of Construction 1 package 14.03 CQS Post Planned N/A N/A 21/01/2014 03/02/2014 06/02/2014 N/A 07/03/2012 N/A N/A 14/03/2014 N/A 20/03/2014 240 calendar days 15/11/2014 Research Station - ICOPCRI from construction awarded Revised Actual 6 Balitsa - Indonesian Vegetables 169.2 Research Institute (IVEGRI) Laboratory 83.95 a Designing of Construction 1 package 50.37 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 IVEGRI Laboratories Revised Actual b Supervisory of Construction 1 package 33.58 CQS Post Planned N/A N/A 21/01/2014 03/02/2014 06/02/2014 N/A 07/03/2012 N/A N/A 14/03/2014 N/A 20/03/2014 240 calendar days 15/11/2014 IVEGRI Laboratories from construction awarded Revised Actual Subang Research Station 85.22 c Designing of Construction 1 package 51.13 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Subang Research Station Revised Actual 98 d Supervisory of Construction 1 package 34.09 CQS Post Planned N/A N/A 21/01/2014 03/02/2014 06/02/2014 N/A 07/03/2012 N/A N/A 14/03/2014 N/A 20/03/2014 240 calendar days 15/11/2014 Subang Research Station from construction awarded Revised Actual 7 Center for Seed Production of Tropical 187.05 Fruits, Subang - West Java a Designing of Construction 1 package 112.23 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Office Buildings and Infrastructure Revised Actual b Supervisory of Construction 1 package 74.82 CQS Post Planned N/A N/A 21/01/2014 03/02/2014 06/02/2014 N/A 07/03/2012 N/A N/A 14/03/2014 N/A 20/03/2014 240 calendar days 15/11/2014 Office Buildings and from construction Infrastructure awarded Revised Actual 8 Balittas - Indonesian Tobacco and Fiber 173.90 Crops Research Institute (ITOFCRI) Integrated laboratory 72.94 a Designing of Construction 1 package 36.47 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Research Station - ITOFCRI Revised Actual b Supervisory Of Construction 1 package 36.47 CQS Post Planned N/A N/A 21/01/2013 04/02/2013 08/02/2013 N/A 11/03/2013 N/A N/A 15/03/2013 N/A 20/03/2013 240 calendar days 15/11/2013 Research Station - ITOFCRI from construction awarded Revised Actual Research Station 100.96 c Designing of Construction 1 package 60.58 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Research Station - ITOFCRI Revised Actual d Supervisory Of Construction 1 package 40.38 CQS Post Planned N/A N/A 21/01/2014 03/02/2014 06/02/2014 N/A 07/03/2012 N/A N/A 14/03/2014 N/A 20/03/2014 240 calendar days 15/11/2014 Research Station - ITOFCRI from construction awarded Revised Actual 9 Balingtan - Indonesian Agricultural 63.58 Environment Research Institute (IAERI) Research Station 63.58 a Designing Of Construction 1 package 38.15 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Jakenan Research Station - IAERI Revised Actual b Supervisory Of Construction 1 package 25.43 CQS Post Planned N/A N/A 21/01/2014 03/02/2014 06/02/2014 N/A 07/03/2012 N/A N/A 14/03/2014 N/A 20/03/2014 240 calendar days 15/11/2014 Jakenan Research Station - from construction IAERI awarded Revised Actual 10 North Sulawesi Assessment Institute for 263.38 Agricultural Technology (AIAT) a Designing of Construction 1 package 158.03 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Office Buildings and Revised Infrastructure Actual b Supervisory of Construction 1 package 105.35 CQS Post Planned N/A N/A 21/01/2014 03/02/2014 06/02/2014 N/A 07/03/2012 N/A N/A 14/03/2014 N/A 20/03/2014 240 calendar days 15/11/2014 Office Buildings and from construction Infrastructure awarded Revised 99 b Supervisory of Construction 1 package 105.35 CQS Post Office Buildings and Infrastructure Actual 11 South Sulawesi Assessment Institute for 236.28 Agricultural Technology (AIAT) Research Station a Designing of Construction 1 package 141.77 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Gowa and Jeneponto Revised Research Station Actual b Supervisory of Construction 1 package 94.51 CQS Post Planned N/A N/A 21/01/2014 03/02/2014 06/02/2014 N/A 07/03/2012 N/A N/A 14/03/2014 N/A 20/03/2014 240 calendar days 15/11/2014 Gowa and Jeneponto from construction Research Station awarded Revised Actual 12 West Papua Assessment Institute for 253.48 Agricultural Technology (AIAT) a Designing of Construction 1 package 152.09 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Office Building, Housing, and Revised Research Station Actual b Supervisory of Construction 1 package 101.39 CQS Post Planned N/A N/A 21/01/2014 03/02/2014 06/02/2014 N/A 07/03/2012 N/A N/A 14/03/2014 N/A 20/03/2014 240 calendar days 15/11/2014 Office Building, Housing, and from construction Research Station awarded Revised Actual 13 Jambi Assessment Institute for 115.48 Agricultural Technology (AIAT) a Designing of Construction 1 package 69.29 CQS Post Planned N/A N/A 27/09/2012 10/10/2012 12/10/2012 N/A 06/11/2012 N/A N/A 08/11/2012 N/A 09/11/2012 50 calender days 28/12/2012 Office Buildings and Revised Infrastructure Actual b Supervisory of Construction 1 package 46.19 CQS Post Planned N/A N/A 21/01/2013 04/02/2013 08/02/2013 N/A 11/03/2013 N/A N/A 15/03/2013 N/A 20/03/2013 240 calendar days 15/11/2013 Office Buildings and from construction Infrastructure awarded Revised Actual Total Consultants for Construction 1,857 100