World Bank Group – Bosnia and Herzegovina Partnership: Country Program Snapshot April 2015 Bosnia and Herzegovina Country Program Snapshot RECENT ECONOMIC AND same period in 2013. Long-term bank credit to SECTORAL DEVELOPMENTS private enterprises was in positive growth rates through the whole year except in November, and in Growth and Real Sector Performance December, the growth rate was 1.2 percent year-on- year. The index of industrial production was mostly The economy appears to be on a path of gradual negative during 2014 and decreased by 1.7 percent recovery after the flood-related slowdown in compared to 2013. 2014. Better high-frequency indicators in the third and fourth quarter led to a shift in estimates for Figure 1. Proxy Data for Investments: Growth of Imports of Capital Goods, LT Credit to Enterprises GDP in 2014 to a stagnation of 0.4 percent from a 100 100 contraction of 0.7 percent. The May floods are Imports of capital goods (ytd) estimated to have cost Bosnia and Herzegovina 80 Imports of capital goods (y/y) 80 (BiH) around 15 percent of GDP in loss of output 60 LT Claims on Private Companies 60 and damages, with almost no segment of the 40 (y/y change) 40 economy left unharmed. Agriculture and energy 20 20 were the main sectors hit hard by the floods, with both output and productive capacity strongly 0 0 affected. The agriculture sector, which represents -20 -20 about 6 percent of GDP but 19 percent of overall -40 -40 employment, remains in a state of transition, with a -60 -60 majority of very small farms and a growing number 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 of larger commercial farms. This fall in agricultural 2011 2012 2013 2014 output reduced economic growth in the second and third quarter of 2014 and as a result, agricultural On a positive note, BiH is drawing closer to the value added contracted by nearly 11 percent, while European Union (EU). The BiH presidency electricity value added declined by 8.3 percent adopted a written commitment on EU-required during the same period. Still, some sectors did grow reforms on January 29, 2015. The statement was faster following the floods. Transport and storage made in line with the requirements of the UK- had a positive contribution to economic growth in German initiative on the EU’s new approach to the third quarter and consequently, transport and BiH. The text of the commitment, which storage value added increased by 7.5 percent and the consolidates input provided by political party wholesale/retail sector by 5.1 percent. leaders, is consistent with the requirements set out in the Conclusions of the EU Foreign Affairs The slow progress on economic reforms has Council of December 15, 2014. If the commitment kept the unemployment rate unchanged. The is endorsed by the BiH parliament, the Council will Labor Force Survey figures suggest that the decide on the entry into force of the Stabilization unemployment rate was 27.5 percent in 2014, and Association Agreement (SAA) for BiH. unchanged from 2013. Imported deflationary pressure is still strong, and hence after positive External Performance annual inflation in October and November, prices fell at an annual rate of 0.4 percent in December The current account deficit (CAD) widened in 2014. Lower food, clothing, and fuel prices made 2014. The CAD is estimated to have widened to 9.7 the biggest contribution. percent of GDP in 2014 from 5.4 percent in 2013, as imports rose more than exports. Exports were Consumption appears to have improved, as negatively affected by the floods, rising just 3.6 imports of consumer goods in 2014 grew by 7.6 percent in 2014. On the other hand, the upward percent compared to the same period in 2013, while import trend continued in the first few months of bank credit to households increased by 5.7 percent 2015, although the decline in oil prices on the world growth (year-on-year) in December. Investments market mitigated the growth of imports to some also appear to have improved, as imports of capital extent. Imports increased by 6.8 percent. Although goods in 2014 grew by 19.8 percent compared to the balance of payments data are available only for the 2 Bosnia and Herzegovina Country Program Snapshot first three quarters of 2014, worsening conditions election led to a delay in the adoption of a budget by are evident on almost all of the CAD’s main items, the state-level institutions and the Federation of BiH except on net income, which slightly improved. Still, (FBiH). the improving net income was not sufficient to make more significant change, and the trade deficit In BiH, public expenditures continue to be increased (8.2 percent). Net foreign direct concentrated on current spending, including investment (FDI) inflow continued in 2014, public wages, pensions, and social transfers. growing at around 17 percent in the first three Still, it is clear that fiscal consolidation will need to quarters (year-on-year). In the third quarter, FDI be temporarily on hold in order to absorb the shock financed 23 percent of the CAD; however, this was caused by the floods. Fiscal consolidation in BiH still insufficient to make a significant contribution to began in 2011, dictated by a lack of financing and the economic growth pattern. temporary fiscal rules, and it reduced the deficit to 2.0 percent in 2013 from 5.5 in 2009 (figure 2). The main contributors to financing the CAD are FDIs, other investments (the assets and Figure 2. Growth and General Government Fiscal liabilities of residents), and external borrowing, Balance including from the International Monetary Fund 8.0 (IMF). Even though a surge in exports supported a 6.0 2015=forecast; 2014=estimate modest recovery of the trade deficit in 2013, the impact of the May 2014 floods began to reverse this 4.0 trend in the third quarter of 2014, creating pressure 2.0 for the trade deficit to widen. The currency board remains stable, and international reserves are at a 0.0 comfortable level (5.3 months of imports.) In -2.0 December, the euro-linked convertible mark (BAM) -4.0 registered an annual appreciation relative to the currencies of its main trading partners, Serbia and -6.0 General Government Fiscal Balance (percent of GDP) Croatia. Given the limited share of dollar- -8.0 Real GDP Growth denominated external debt (about 16 percent), the 2007 2008 2009 2010 2011 2012 2013 2014 2015 appreciation of the dollar against the euro is likely to have only a modest additional impact on the balance In 2014, government spending remained overly of payments. concentrated in non-growth-enhancing areas. The weak economy notwithstanding, the indirect Fiscal Performance taxation authority (ITA) declared 2014 to be the most successful since its establishment. The gross Even before the floods, BiH was facing collection of indirect tax revenues in BiH increased significant fiscal challenges exacerbated by by 6.1 percent in 2014, and 69.9 percent of the declining revenues. Lower tax revenue and higher indirect revenues were collected from the value spending needs are anticipated as a result of the added tax (VAT). This progress was mainly due to slowdown in economic activity and the flood- expanded cooperation between the four tax agencies related construction. Significant falls in both direct on the exchange of taxpayer information. The and indirect tax revenues are likely, although authorities also harmonized the excises on different donations from citizens, firms, and international tobacco products that have been levied in recent financial institutions (IFIs) may slightly moderate years. In addition, the Republika Srpska (RS), one of the decline in revenues. the two entities of BiH, increased social security contributions by three percent to pay for solidarity BiH started the year without a budget. A fond intended for flood damage reconstruction, decision on temporary financing was adopted for contributing to higher revenues. the first quarter of 2015, and it is expected that BiH will adopt a budget at the end of this time period. Still, the fiscal deficit is estimated to have Delays in the formation of a government at the increased by 2.1 percent of GDP in 2014 due to entity and state levels after the October 2014 general faster growth in expenditures than revenues. 3 Bosnia and Herzegovina Country Program Snapshot Expenditures are estimated to have increased as a end-2013. Both public sector deposits (4.4 percent, share of GDP in BiH partially due to post-flood year-on-year) and private sector deposits (9.4 reconstruction spending. As the final figure on the percent, year-on-year) are growing. consolidated budget for BiH for 2014 is not yet available (it is expected in mid-2015), the estimated In the second half of September 2014, Standard increase in the fiscal deficit will most likely be & Poor’s affirmed a sovereign credit rating of slightly revised to take into account some positive “B with stable outlook” to BiH. This rating surges in revenues. In the next six months, the indicates the country’s creditworthiness, though collection of direct taxes and social contributions is BiH needs to continue to work on building its expected to remain low in the areas that were institutions and promoting economic development. affected by flooding, as it will take some time for the economy to recover. On the other hand, Private Sector Development expenditures are expected to increase as recovery and reconstruction continue to take place. Over the BiH is one of the most difficult places to do medium term, better control of wages and public business in Europe despite a well-educated sector hiring, pension reform, and a revision of labor force and proximity to the EU. Fragility in veteran benefits, as well as the containment of the Europe and domestic challenges are responsible for public wage bill, will be required if BiH is going to an economy that has been stagnating since 2008. For live within a sustainable fiscal envelope. the fifth year in a row, the rate of credit growth is in the low single digits, or near zero on a real basis after Financial Sector deducting the inflation rate. Private sector credit growth remains weak but started to pick up toward The banking sector has remained stable, but end-2014, with credit to the private sector estimated banks have seen nonperforming loans rise. The at 3.2 percent of GDP for 2014 compared to 2.3 share of nonperforming loans (NPLs) in percent of GDP in 2013. Micro, small, and medium- commercial banks’ portfolios amounted to 16.1 sized enterprises (MSMEs) were particularly hit by percent of the total loans at the end of September the insufficient amount of available working capital, 2014, up from 15.5 at the end of June 2014. The medium-term investment financing, and liquidity banks’ profitability has deteriorated due to high post-2008–09. The devastating floods of May and provisioning for the high share of NPLs and in part August 2014, with damages and losses estimated at due to the fragile economic environment. Capital 15 percent of the GDP, placed additional stress on adequacy remained at 17 percent at the end of businesses and the banking sector. Regulators September 2014, above the prescribed limit of 12 adopted measures to help mitigate the likely impact percent. Stress tests show an adequate level of on the financial sector and on access to finance for capitalization; Tier 1 capital as a share of risk- the enterprises hit by the floods; however, weighted assets remained above 15 percent in the authorities reported that only about 1 percent of last quarter of 2013 and in the third quarter of 2014, total loans had been restructured by October 2014. but if the situation deteriorates, additional capital In addition, BiH is now facing increased pressure to could be needed by some banks. upgrade policies and systems so that its goods (and services) can enter international markets, especially Total credits and deposits are recording the EU. positive growth. In December 2014, total credit was 2.8 percent, but the rate of growth was The business reform agenda remains crucial to decelerating compared to the 2.9 percent at end- BiH’s future economic development and the 2013. In December 2014, 1.5 percent of credit creation of private sector jobs, and the growth came from the private sector and 1.4 percent governments in BiH have initiated a program of from the public sector, but public sector credit grew measures to support this reform. Though an fastest (12.9 percent). This is largely because the important step forward, the momentum of these entity governments use domestic securities to fund reforms needs to continue, ensuring private sector their deficits, with banks as the main investors. Total growth and competitiveness. The domestic market deposits increased by 8.5 percent, which is is small, and neighboring countries are now part of somewhat higher compared to the 6.9 percent at the EU or its accession process. The continued 4 Bosnia and Herzegovina Country Program Snapshot underperformance of the BiH economy only Investment Climate and Institutional Strengthening reinforces the necessity of creating jobs—private Single-Donor Trust Fund (US$5 million). This aims sector–driven jobs—and of providing a level playing to reduce the costs and risks of doing business by field for BiH’s businesses to thrive. BiH continues improving inspection services (their internal to present itself as one the least favorable places in organization and efficiency, and the information and which to do business; its 2015 Doing Business rank data exchange system between institutions in BiH) places it firmly at 107th, the lowest in the region. and by promoting capacity building within Improving the competitiveness of the country’s institutions. economy, regaining export competitiveness, and continuing implementation of business As competitiveness and jobs remain in focus for environment reforms are recognized as critical to the foreseeable future, the Bank is ready to BiH’s future economic development. The respond by opening a dialogue on the further unfavorable environment is further exacerbated by changes needed in the medium term. Increasing the layered and overlapping administrative opportunities for trade and improving the jurisdictions and bureaucracies that are stifling competitiveness of BiH’s economy are paramount exports and growth. Investment in BiH, foreign and to enabling job creation and driving the economy domestic, needs further stimulus to realize its forward. BiH is a small, open economy located on potential and create competitive markets. the border to the EU, and though it has maintained macroeconomic stability with low deficits and The World Bank has responded to these moderate debt levels, its economic growth challenges by providing assistance to enhance prospects are linked to its performance in the access to finance for small and medium-sized regional and global marketplace. As most enterprises (SMEs) in BiH and a Business employment in BiH is public sector generated, with Environment Development Policy Loan (DPL). almost 50 percent of the GDP servicing the public The World Bank is providing funds (a financial sector, private sector growth remains weak, intermediary loan of US$70 million) to enhance underdeveloped, and vulnerable to competition. access to finance for SMEs in BiH, and an additional US$120 million. Following the devastating floods, BiH needs to regain export competitiveness to the Bank enhanced the flexibility for find new sources of growth. As a small middle- reprogramming the loans under this project in line income economy, BiH’s greatest potential is in with the entity banking authorities’ decisions and trade: trade with the EU, in the region, and included agribusinesses as eligible SMEs. The internationally. BiH does have a lot of advantages— Bank’s new DPL, approved by the Board of its geographic location, natural resources, fairly Executive Directors on October 3, 2014, supports good infrastructure, well-educated (if not adequately BiH’s business environment reforms and includes skilled) workforce, light manufacturing, agriculture, areas such as reducing the time and cost for and wholesale/retail continue to be the main drivers registering a business, streamlining procedures for of growth. Therefore, in order to draw higher obtaining construction permits, and facilitating investments, the governments could embark on a trade across borders. These policies target series of medium-term reforms aimed at improving improving BiH’s competitiveness, helping to the investment climate (business regulation, facilitate the country’s dialogue with the EU on inspections, and land management, including accession, and promoting economic growth. It is construction permits and property rights) and expected that governments in BiH will address the advancing the competitiveness of specific value ratification of the DPL well in advance of the chains where BiH has a competitive advantage, such effectiveness date deadline currently set for July 13, as agribusiness. The World Bank is willing to 2015. support the governments in tackling these reforms in the medium term in order to unlock the potential Responding to constraints in the transparency of unproductive assets and enable the development and accountability needed to align inspections of a more agile and resilient private sector to EU requirements, the World Bank and the Swedish International Development Cooperation Poverty and Social Protection Agency (SIDA) have set up an Improving 5 Bosnia and Herzegovina Country Program Snapshot Despite the lack of recent data, there are extending job-brokerage services to over 10,000 indications that the progress in poverty active job seekers from among hard-to-employ reduction experienced up to 2007 has been categories (disabled, long-term unemployed, etc.). stalled by the 2008 crisis followed by a sluggish Furthermore, policy dialogue contributed to the recovery. Poverty in 2007 was estimated at 14 adoption of a new law on social protection in RS percent of the population according to the World aimed at improving the targeting of social benefits Bank’s poverty methodology.1 Preliminary estimates in this entity. Finally, ongoing technical assistance from the most recent 2011 Extended Household on options to improve poverty targeting criteria for Budget Survey suggest that the incidence of poverty social assistance programs will be incorporated into remained largely unchanged during 2007–11, due to new social assistance legislation that will be the crisis-induced economic contraction, continued introduced in FBiH during 2014–15. Social economic weakness in the EU, and the deteriorating assistance targeting in RS is also expected to benefit labor market situation. Overall employment in the from the incorporation of additional poverty economy fell by 9 percent between 2008 and 2012, indicators. with over half of the net job losses in the industrial sector. Net wages recorded no growth in real terms The main performance indicators of the social between 2008 and 2013. The recovery of 2013 was assistance system in BiH are poor by the interrupted by the floods in 2014, and rural areas, standards of middle-income countries in with much higher poverty incidence, continue to Europe. Targeting accuracy is low, while the struggle with the aftermath of the floods that leakage of resources to the richest 20 percent of the damaged agricultural infrastructure. population is significant. According to the estimates published in a recent study,2 in 2011, the members Spending on social protection schemes in BiH of the poorest quintile received only 18 percent of is high by international standards. Public non-contributory cash benefits, whereas the richest spending on pensions is high (at 10.2 percent of the quintile received about 20 percent. Only a small GDP) even by regional standards, driven by early proportion of the poor receive social benefits— retirement and privileged pension schemes, while about 1.4 percent of the population—whereas 17 spending on active labor market programs is low, percent are at risk of poverty. Even within that resulting in limited opportunities for employment population, only about one-quarter in the poorest support for disadvantaged groups in the labor quintile receive some form of social benefits, and market. BiH spends close to 3.5 percent of its GDP their poverty reduction impact is negligible. A 2010 (2011) on noninsurance-based cash transfers, which World Bank Poverty Report 3 found that if these makes the country one of the highest spenders in transfers were to be eliminated, the poverty the Europe and Central Asia (ECA) region. About headcount would increase by only 1.2 percent. In 80 percent of this spending continues to be allocated contrast, the poverty impact of pensions is much to categorical benefits for persons with non-war- higher; without these transfers, poverty would related disabilities, civilian victims of war, and war increase to 25.8 percent of the population. veterans, which are disproportionately benefiting individuals in the richest quintile of the population Health Development in terms of targeting, while the outreach to disadvantaged groups, such as those with disabilities In recent years, the family medicine model has or lacking minimum resources, is quite limited. been the single largest reform implemented by the entity governments. In FBiH, more than 75 The World Bank’s Social Safety Net and percent of service users expressed satisfaction with Employment Support Project has been effective the approach of the family medicine teams. Medical in extending job brokerage for vulnerable job doctors and nurses are being regularly trained for seekers. The project achieved the objective of 1 The World Bank’s poverty methodology relies on the Living Does Not” (Sarajevo and Maastricht: Institute for Better and Standards Measurement Study (LSMS) poverty line of KM 205 Humane Inclusion (IBHI) and Maastricht University, 2013). per month per capita. 3 World Bank, “Protecting the Poor during the Global Crisis: 2 IBHI and Maastricht University, “Non-contributory Cash 2009 Bosnia and Herzegovina Poverty Update,” Report 51847 Benefits for Social Protection in BiH: What Works and What (Washington, DC: World Bank, 2010). 6 Bosnia and Herzegovina Country Program Snapshot the family medicine specialization. RS has also been from 7.1 percent in 2000 and 9.4 percent in 2006), a upgrading the clinical skills of its family medicine level similar to that in the EU15 countries but higher teams; it has completed a retraining program of its than in many neighboring countries. existing family medicine doctors, and family medicine specializations are now regularly provided. In this new phase, the health sector will focus It is also focusing on enhancing the role played by on the need to: nurses as a vital component of the primary health i) further strengthen primary care services care delivery system. Patients are now registered toward prevention and early diagnostics and with family medicine teams, and about 95 percent of the treatment of noncommunicable diseases; the population has access to basic primary health care coverage through social insurance and through ii) expand secondary ambulatory specialized dedicated public (direct subsidized) programs. services to introduce high-resolution ambulatory diagnostic and treatment Picture 1. The introduction of the “family schemes; medicine” model supports the development of a sustainable primary health care network iii) rationalize inpatient services, including clear differentiation between general hospital “secondary” services and “true tertiary care” high-complexity hospitals, and between long- term care facilities/units for medical and rehabilitation-palliative services and expanded social long-term care on the one hand, and hospital services on the other; iv) expand the incentives/payment system to improve the performance at all levels of the health system; v) strengthen the Heath Technology Assessment (HTA) and quality control mechanisms. Nevertheless, the needs that BiH’s entity-level health systems must address have changed as a Environmental Sustainability consequence of the demographic and epidemiologic transition in the country. The The World Bank portfolio in BiH includes a disease burden in BiH has shifted to a majority of number of projects that contribute to the chronic and noncommunicable conditions. environmentally sustainable development and Cardiovascular diseases, for example, are the leading use of natural resources. The portfolio has a cause of death, and cancer is the second most strong drive toward the reduction of pollution and frequent cause. Given this change in the health emissions, improving management and the use of profile of the BiH population (including co- natural resources and ensuring environmental morbidities) and the new available technologies, it is sustainability through greener project rare for patients to be able to have all of their implementation and cleaner production. medical problems treated in one health facility. This pattern of co-morbidities makes coordination For example, the Second Solid Waste between primary care and hospital care more Management Project will help establish new important than ever before. Health sector reform in sanitary landfills and municipal waste BiH therefore needs to implement a new phase, with management regions that are improving a focus on increasing access to new technologies, environmental management and the sustainability of enhancing quality, and improving efficiency to previously common single-municipality dumpsites. control the growing trend of rising health Works on two new regions financed under the expenditures. Total health expenditures are now project are expected to start in 2015 with the aim of estimated to be about 10.9 percent of GDP (rising introducing improved waste management and 7 Bosnia and Herzegovina Country Program Snapshot disposal. Municipal wastewater is one of the key both fuel consumption for heating and emissions pollutants in BiH, and the World Bank is financing into the air, which will have a particularly positive the construction or reconstruction of nine impact in larger urban areas during winter periods. wastewater treatment facilities through three different projects: the Sarajevo Wastewater Project, the Agriculture Development Neretva and Trebisnjica Management Project, and the Water Quality Protection Project. In 2015, all of the nine Agriculture’s share in BiH’s economy treatment plants are expected to be operational, decreased from 15.1 percent in 1999 to 8.4 while in a number of cities and regions, these percent in 2012. While this figure points to a treatment plants have also called for cooperation continued shrinking of the agricultural GDP relative with other donors and IFIs on improving the to the overall economy, the rate of the decline has sewage networks. It is important to note that prior been reduced dramatically over the past few years. to the interventions under these projects, only 5–6 The decline of agriculture’s share of the economy percent of total municipal wastewater in the country has been particularly noticeable since the onset of was treated before being released into rivers, which the financial crisis that has affected the region, further downstream are used for water supply, though agricultural output has remained relatively irrigation, and recreation. With the nine treatment steady compared to other sectors. The floods of plants starting operation in the upcoming year, it is May 2014 are estimated to have contributed to a loss estimated that the percentage of treated wastewater of roughly US$130.00 million to the agriculture will increase to at least 30 percent, including sector. treatment of wastewater from two of the largest settlements in BiH: Sarajevo and Mostar. Favorable climate conditions and relatively low prices give the agriculture sector in BiH some The Bank supports sustainable forest and comparative advantages. The agricultural season landscape management through the ongoing in BiH begins earlier than in most EU countries, Global Environment Facility (GEF) project. shipping costs are relatively low, and land and labor Integrated river basin management approaches in prices are favorable compared to the Mediterranean line with the EU Directive will be addressed for the EU countries. Neretva, Trebisnjica, and Drina rivers. It is of particular importance to note that a Framework for With about 20 percent of all those employed in River Basin Management was recently adopted for BiH working in agriculture, the sector remains the Neretva and Trebisnjica river basin between BiH important for employment and as a and Croatia, which was financed and facilitated socioeconomic buffer, despite a decline in the through the GEF grant. The same grant has also working-age population in rural areas. While the financed a management plan for the Hutovo Blato value of the agro-food sector has been shrinking as Nature Park, ensuring the sustainable use of a a share of GDP and BiH’s agro-food trade deficit protected area for tourism development. Through has been growing, both have lost momentum over support to a SME credit line, each of the applicant the past few years. enterprises underwent impact screening, and a condition for the loan was the successful Changing consumer preferences have identification and mitigation of associated contributed to the development of new market environmental impacts, leading to cleaner segments that BiH’s domestic producers have production. SMEs involved in this credit line vary been unable to capture. Both exports and imports from fully automated cleaner production to of agro-food products have risen, but the rate of sustainable natural resource use for exports or even exports has grown faster than the rate of imports, state-of–the-art recycling facilities. with a ratio of some 4:1 in food imports to exports today, while 10 years ago this ratio was roughly Through the Energy Efficiency Project, 15:1.4 improved energy efficiency will lead to a decrease in 4 FAOSTAT Data from 1996 to 2011. Food trade excluding fish. 8 Bosnia and Herzegovina Country Program Snapshot BiH’s agriculture sector faces a broad range of Public spending in BiH’s agriculture sector is constraints in input and output markets. Farms relatively low, and funds are not attuned to the are for the most part small and fragmented, and challenges the sector faces. On average, supply chains remain weak. Consequently, farmers agriculture spending is roughly 6–8 percent of total in BiH pay more for their inputs and receive less for public spending in developed countries and 3–5 their outputs relative to their peers in neighboring percent in developing countries; in BiH, agricultural markets. Low output prices are a result of market spending amounts to only 2–3 percent of total failures such as weak bargaining power, a lack of public spending. In addition, around 60 percent of post-harvest facilities for storage and packaging, these relatively modest resources go toward direct fragmented supply chains, costly logistics, and the payments that often provide little incentive for limited access to affordable finance. High input farmers to modernize and become more efficient. In prices result largely from a reliance on a few addition, the policy on direct payments lacks dominant input traders in combination with highly continuity and longer-term targeting, thus regulated import markets. This situation dampens undermining any business planning that farmers productivity as well as competitiveness, as the may do in response to the subsidy policy and also limited access to modern inputs makes it more the ability of policy makers to effectively gauge the difficult for farmers to export their produce and effects of the policy. Experience from other participate in modern supply chains. countries shows that investment in public goods— such as research and extension services, market Institutional constraints also prevent BiH’s infrastructure, and natural resource management— agro-food sector from reaching its full potential. yields much higher returns than do subsidies, BiH has access to EU markets through preferential especially direct production subsidies. A substantial trade agreements, yet a broad range of products increase in resources for agricultural administration remain banned from these markets due to the at all levels will be needed to build capacities in line absence of EU-compliant food safety institutions with EU requirements. and a regulatory framework. A state-level Food Safety Agency (FSA), an Agency for Plant and Picture 2. The agro-food sector has good growth Phytosanitary Health (APPH), and a State potential due to growing demand and a number of Veterinary Office (SVO) have been established and comparative advantages. regulations developed; however, an agreement on the precise roles and responsibilities of the various actors, the link to entity inspection services, and various other laws and regulations have yet to be finally agreed on or adopted and then implemented across the country. These institutional arrangements and the effective implementation of legislation at each administrative level became increasingly urgent after the accession of Croatia into the EU in July 2013, at which time producers and traders from BiH were no longer able to access this important market. While some efforts are being made to improve the situation, such as the recent adoption of a hygiene package and an informal agreement on residue Climate change is expected to have an testing between the SVO, FSA, and APPH, a lack of increasingly intense impact on agriculture in clear reporting lines remains between entity and BiH, and the current institutional set-up is not state institutions, which hampers the effectiveness prepared to support the sector in adapting to these of the food safety system. Border inspections are changes. While some irrigation infrastructure was uneven, with quite adequate facilities at the airport part of the former agro-kombinats (the state-owned level though these are poorly equipped for sampling enterprises [SOEs]), these systems have suffered and testing or quarantines, especially in relation to from significant dilapidation. Although some of the phytosanitary inspections. drainage/irrigation canal systems are over 100 years old and need rebuilding, they nevertheless play the 9 Bosnia and Herzegovina Country Program Snapshot dual role of providing excess water drainage in Transport fall/winter and being used as a water supply for irrigation in the dry summer months. Other systems, Last year’s flooding caused significant damage especially on former kombinats, are fairly modern, to the transport infrastructure, with costs pressurized underground pipe systems with estimated at about BAM 464 million. Damages to hydrants to which farmers connect irrigation the magistral and regional/local roads were equipment. The more modern systems have been estimated at BAM 110 million and BAM 254 deteriorating mainly since the war and since their million, respectively, while costs to the railway privatization over the past 20 years. In addition, infrastructure were estimated at BAM 98 million. their layout often makes them ineffective in Damages to airports were relatively lower at BAM delivering water to the numerous small parcels of 0.5 million. land held by private farmers. Finally, the operational responsibility of existing irrigation schemes remains The BiH road network totals approximately unclear, and closer user participation in their 22,615 kilometers. The density of the entire BiH management as well as discussions about their road network is broadly comparable to that of its expansion are needed. The vulnerability of the immediate neighbors. As for network condition, the sector has been well demonstrated over the past few World Economic Forum’s Global Competiveness Report years, as production has been affected by alternating (GCR) showed improvements in road quality in BiH droughts and, most recently, devastating floods as a between 2012 and 2014, when the country’s ranking consequence of persistent heavy rains that also on road quality improved from 134th out of 144 affected mountainous areas, with extensive damage countries to 104th out 148 countries. However, the to transport infrastructure from landslides. The rural May floods have adversely affected the condition of development strategies that the entities have the network, and further improvements in road recently developed need to take a comprehensive quality remain necessary. The condition of look at the vulnerabilities in the sector and introduce structures (bridges and tunnels) in the network is measures to mitigate the impacts of high variability particularly poor due to the extended period of in rainfall. neglect after the hostilities, insufficient funds for maintenance, a continued lack of enforcement of The World Bank supports the agriculture sector axle-load limits, and a significant increase in traffic in BiH through the Agriculture and Rural volumes. Development Project (ARDP) and an Irrigation Development Project (IDP). The ARDP is part of The Bank began supporting the rehabilitation a series of projects developed in the region to of BiH’s magistral and regional roads through support the countries in their quest for EU the Road Infrastructure and Safety Project in accession. ARDP supports the institutions and 2008. The project, which closed in June 2012, had systems necessary for developing the traceability of built on the results of the earlier Road Management and food and foodstuffs and for establishing transparent Safety Project (RMSP), which closed in June 2007. The EU-aligned agricultural payment systems, including implementation of the RMSP led the European all the registers, databases, legislation, and Investment Bank (EIB) and the European Bank for regulations that are needed. The IDP project is Reconstruction and Development (EBRD) to financing the rehabilitation of irrigation contribute significant parallel financing to the infrastructure in both BiH entities in some of the US$220 million program to clear the maintenance most productive agricultural areas of the country. backlog on the road network (excluding the The project primarily finances works but also structures), out of which the Bank project provided provides support to the formation of water user US$25 million. associations where appropriate and develops the institutional set-up to ensure adequate operations, The railway network in BiH extends for some maintenance, and funding of the systems in a 1,017 kilometers, 92 percent of which is single sustainable manner. track. Despite the rehabilitation efforts, the overall condition of the railway network in BiH needs further improvement. The 2013–14 GCR ranks BiH 55th out of 121 countries on the quality of rail 10 Bosnia and Herzegovina Country Program Snapshot infrastructure. Operational speeds are low due to the thermo and hydropower plants have been existence of temporary speed restrictions; poor rehabilitated since 1996 through four power tunnel, track, and track-alignment conditions; and projects financed by the World Bank, in cooperation the inadequate functioning of inter-entity crossings. with the EU, EBRD, EIB, the U.S. Agency for Train operating speeds are limited to a range of International Development (USAID), and the between 30 and 70 kilometers per hour on around German Development Bank (KfW). At all three 80 of the railway lines along the future European power supply companies (Elektroprivredas), transport corridor (Vc). The length of crossing efficiency has significantly improved, technical sidings in stations restricts train length (550 meters) losses have been reduced, and the billing and and train weight (1,500 tons) on the network. There collection system has been enhanced. These is ongoing support from IFIs to improve improvements have helped the companies become infrastructure, including track, structure, and profitable, even while keeping consumer tariffs signaling systems. relatively low. Power companies have also increased their investment in renewable energy projects to In the prewar period, navigation on the Sava some extent. Today, BiH is one of the few countries River, BiH’s most important river, was possible in the region with excess generation and export almost 250 days per year, excluding the summer potential. Significant improvements have been months. Current navigation conditions along the made to unlock the market potential by enacting Sava River are difficult, as it has a strongly energy and renewable energy laws and necessary fluctuating discharge that results in wide variations regulation in both entities. At the same time, the in water levels and depths during the year. Heavy impact of the floods in 2014 was significant, with sedimentation in certain areas, together with a lack damages and losses registered on generation of maintenance of the riverbed, has led to a facilities, transmission and distribution networks, reduction in the width and depth of the fairway coalmines, and oil terminals. (navigable channel). The result is a large drop in traffic volumes carried via the river. The The aging coal-fired power generation plants unfavorable conditions now reduce the number of are expected to become a challenge in the navigable days to fewer than 200 in some places, and coming years, and the transmission and even fewer in certain other locations. distribution systems also require further investment in order to improve their reliability and expand The rehabilitation of the Sava River is interconnections with neighboring countries. particularly important for BiH, where the Without the replacement of obsolete thermal power improved navigability of the river would enhance plants or the construction of new base power the operational performance and safety of generation and renewable energy facilities in the commercial vessels, thereby contributing to the medium term, the country may lose its competitive improved utilization of the river ports and broader position in the regional electricity market. The economic development in the hinterland. As the fragmented energy market is linked to three energy rehabilitation would also be beneficial to Croatia utilities, and the lack of a coordinated approach to and Serbia, the World Bank, together with the the country’s energy strategy is preventing greater European Delegation and the International Sava progress on unlocking the potential of this sector River Basin Commission (ISRBC), has facilitated and opening it to private sector participation. ongoing collaboration between BiH, Croatia, and Serbia toward the realization of a more The environmental performance of the coal- environmentally friendly mode of transportation. fired power plants has improved through investments supported by the World Bank and Energy development partners. An air emission control system installed at Kakanj thermal power plant was The destruction of BiH’s power grid not only the first of its kind in the Western Balkans and has left BiH citizens without a power supply, it also significantly improved air quality in the area. The disconnected the Southeast Europe power grid Bank is also financing improvements in the safety of from the rest of Western Europe. Hundreds of water storage dams in partnership with EIB. To kilometers of power lines, transmission stations, and improve corporate governance and financial and 11 Bosnia and Herzegovina Country Program Snapshot management controls, an enterprise-wide, network- a focus on the health and education sectors, in order based financial management information system has to maximize both energy savings and the been installed at one public power utility company demonstration impact of the investments. The (EPHZHB), while similar systems are being piloted World Bank is also starting a Western Balkans at the other two power utilities (EPBH and EPRS). Investment Facility–funded study on biomass-based heating; the study will identify viable investment Picture 3. The basic sources of primary energy in options and policy measures to increase the use of BiH are coal and hydropower, which cover over 62 biomass for heating in the Western Balkan region, percent of the total consumption of primary energy. including BiH. The renewable energy sector is still characterized by insufficient private sector activity and few concrete opportunities, for example, medium-size and large hydro power development concessions. The major power assets in the country are all state owned. Although the renewable energy legal framework, with support from the International Finance Corporation (IFC) and other stakeholders, has significantly improved in recent years with the adoption of renewable energy laws in both entities, changes to the law on concessions facilitating the financing of renewable Energy end-use in BiH remains inefficient, energy projects, and the adoption of a number of indicating a large potential for reducing the bylaws, the limited incentives for renewable energy burden of energy expenses in both the public projects in both entities are a significant impediment and private sectors. The buildings sector (private, to full renewable energy sector development. As a public, and residential) accounts for one-third of result, there is inadequate construction of new total fuel consumption. Buildings are generally renewable energy projects, which are focused at the poorly insulated, incurring heat losses of more than moment mostly on small hydropower plants 30 percent. In addition, since the gas distribution (SHPPs), resulting in limited opportunity for network is not fully connected, the majority of economic growth, exports, and job creation. household heating requirements are met by the inefficient use of firewood and electricity. As a Forestry result, about 65 percent of the total electricity consumed in 2009 went to the residential and public Forest resources in BiH are among the richest buildings sector. Therefore, investment in the in Europe in terms of their extent and variety energy efficiency of the building sector would help relative to the size of the country, covering to reduce energy intensity, the consumption of almost 50 percent of the land area. The war imported oil and gas to the extent that it is used for between 1992 and 1995 caused heavy damage to the space heating, and BiH’s carbon intensity. natural resources—the direct damage to forests and associated sectors is estimated at US$2 billion. A Improving energy efficiency in BiH, however, is minimum of 200,000 hectares became contaminated facing several challenges, including the lack of by landmines, which resulted in the overexploitation a clear regulatory and policy framework. The of some rural areas and the abandonment of others. Government has recognized this issue, as energy Subsequent to the conflict, unsustainable land-use efficiency is getting increasing attention at both the practices and habitat change were common, due to state and entity levels, and efforts have been made poverty, inadequate land-use planning, the limited to develop legal and policy frameworks for energy- capacity of local institutions, and a lack of awareness efficiency implementation. On March 13, 2014, the of conservation issues. Moreover, forest resources World Bank approved an International are inaccessible due to the low road density, which Development Association (IDA)-funded public limits their potential contribution to local and buildings energy-efficiency investment project, with national economic development. 12 Bosnia and Herzegovina Country Program Snapshot project will provide an important foundation for About 2 million people (54 percent of BiH’s future development and investment in BiH’s rich population) live in rural areas and rely on forest forest sector. and mountain ecosystems as an important source of subsistence, employment, energy, and Public Financial Management recreation. The forestry sector currently contributes 2–2.5 percent of GDP; however, with BiH has made good progress on establishing the proper investments in infrastructure and modern public financial management (PFM) improvements in the competitiveness of the wood institutions and systems. Within the entities, processing and manufacturing industries, this sector primarily in FBiH, the consolidation of data for all has the potential to contribute a much larger general government levels—governments, cantons, proportion to the economy. Furthermore, since BiH local self-governance units, and extra-budgetary has a lower rural population density (43 persons per funds (EBFs)—is complex, and data are generally square kilometer) than any of the Balkan countries, not used to inform policy decisions. Only there is less pressure on the natural resource base, countrywide budget execution at an aggregate level and the sound management of its “production is consolidated by the Central Bank of BiH using landscape” values (forest and grassland government finance statistics (GFS), while management) can provide income for local people consolidated budget plans and medium-term while also maximizing environmental services. frameworks are approximated for illustrative purposes for the Global Framework adopted by the The World Bank has been continuously Fiscal Council and for the Economic and Fiscal involved in the natural resources/environment Programs submitted to the European Commission. sector since 1998. From 1998 to 2003, a Forestry Further progress is needed to ensure that budget Project financed by IDA, the EU, and the Italian and discipline is uniform and consistent across the entire Norwegian governments focused on the recovery system of public resource management and to and protection of forest ecosystems. A follow-up counter inadequate compliance with procurement project, the Forest Development and Conservation Project law and internal controls, poor internal audit (FDCP), supported the implementation of reforms capacity, weak governance in SOEs, and widespread in forest organization and management. The State corruption. Forest Inventory (SFI), the single largest project activity, is fully completed, with 100 percent of the Credible and comprehensive medium-term country’s forests surveyed. Initial findings show that macro-fiscal strategies are lacking at all levels. forests and growing stock have increased and that The process of preparing the budget and public forests are in a much better condition than is investment program is not well integrated with the generally recognized. medium-term macroeconomic outlook and overall/sectoral strategic documents (which, in On January 15, 2014, the Bank approved a new many cases, are missing or not properly costed). GEF project called the Sustainable Forest and Landscape Management Project (SFLMP). The Despite some recent technical improvements, focus is on climate change mitigation, land the budget planning system at all levels degradation, and sustainable forest management. primarily reflects legal expenditure obligations The SFLMP is a five-year project aimed at building within the available budget envelope, rather than the capacity of forest sector stakeholders and the strategic targeting of resource allocation toward demonstrating new approaches for sustainable social and economic development objectives. forest and land management through the integrated Furthermore, despite some steps toward program management of vulnerable forest, scrub, and pasture budgeting, BiH does not use results-based landscapes. Through a menu of project budgeting in the budget planning process. Budget interventions, including planning and monitoring, planning is largely based on (mostly short-term) forest certification support, forest management measures agreed annually with the IMF under the information system enhancement, afforestation, fire Stand-By Arrangement (SBA). The share of current management techniques and planning, and the expenditure remains high in all budgets, with an development of a forest road master plan, the 13 Bosnia and Herzegovina Country Program Snapshot especially high wage bill and large general governance units (but not EBFs) have been government sector employment. Parliaments are integrated into one STA since January 2013. not sufficiently involved in the budget planning processes, and they generally lack the capacity for a Substance over form. At all four levels of thorough budget analysis. government, transactions are processed automatically through STAs at each level. What is BiH has made some progress in government not monitored regularly, however, is the substance budget transparency as measured by the 20125 and nature of these transactions. The Supreme Open Budget Index Assessment (OBI). BiH’s Audit Institution (SAI) reports raise certain OBI shows that the Government does disclose questions on the substance of some transactions and some information on the central government’s the methods followed in processing them. At lower budget and financial activities during the course of government levels (cantons in FBiH and local self- the budget year. The 2012 OBI for BiH provides governance units in both entities), more substantial useful recommendations (to publish a citizen’s issues with the substance of recordings are likely, as budget and mid-year review) in order to increase different methodologies for some transactions are budget transparency and oversight.6 used. All this hampers the ability to accurately consolidate fiscal data. Public procurement remains weak, despite a common Public Procurement Law (PPL) based SAIs are independent from the legislature and on international best practices. The law is the executive. The three SAIs of BiH have applicable across the state and two entities, but achieved good results in a complex environment compliance has been weak. Progress has been made and with limited resources. Since 2000, the three on establishing important institutions such as the SAIs have gradually improved their audit capacity Public Procurement Agency (PPA) and the and enhanced their audit coverage. They have Procurement Review Body (PRB). Under the SBA, played a key role in strengthening the responsibility, a new law on public procurement was adopted in transparency, and efficiency of financial May 2014. management in all of BiH. All three SAIs have formally adopted the International Organisation of The budget execution process has been steadily Supreme Audit Institutions (INTOSAI) standards. strengthened. All four Ministries of Finance have In the context of budget scrutiny, however, despite introduced a Single Treasury Account (STA), but recent improvements, better follow-up on external though the systems are in place, they need to be audit findings and recommendations is missing. further strengthened. Payment arrears are Furthermore, the coverage/quality of performance problematic because comprehensive, good-quality audits performed by the SAIs is not comprehensive. data on arrears are not available yet (excluding BiH institutions), and treasury systems were just starting A number of important improvements in public to monitor payment due dates as of end-2013. The finance have been implemented in recent years, treasury systems of both entities do not include all and some steps have also been taken to enhance social funds and in FBiH, do not include all local coordination. The development with the most self-governance units. Generally, social fund impact was the adoption of the Law on the Fiscal management and fiscal sustainability constitute a Council, though further challenges remain in terms growing risk for the overall solidity of the PFM of implementing it. Other results achieved relate to system. EBFs, cantons, and local self-governance the steps taken to harmonize budget calendars. All units are not integrated into the FBiH government four levels of government use the modified accrual STA and in fact, not all local self-governance units basis 7 for accounting, under which revenues are in FBiH have treasury systems, making arrears recognized as they become available and monitoring difficult. However, in RS, all local self- measurable, while expenditures are recognized when 5 Bosnia-Herzegovina’s OBI 2012 score of 50 has increased 7 Except RS, which has been using the full accrual basis since from its score of 44 on the OBI 2010. January 1, 2013. 6http//internationalbudget.org/wp- content/uploads/OBI2012-BosniaHerzegovinaCS- English.pdf. 14 Bosnia and Herzegovina Country Program Snapshot the liability is incurred. There may be concerns that The Bank’s current strategy focuses on not all government levels within the entities use competitiveness, environmentally sustainable comparable recording. Among the four 8 main growth, and social inclusion. With BiH now set government levels in BiH, the charts of account are on joining the EU, supporting the EU integration generally detailed but not harmonized. BiH, FBiH, process has also become an important theme of the and RS institutions are developing internal audit World Bank’s engagement in that country. Expected capabilities, while District Brcko has no Internal outcomes of the current CPS (2012–15) include: Audit function. The Public Expenditure and continued macroeconomic stability, improved Financial Accountability (PEFA) report for BiH was business environment and investment climate, finalized in May 2014, and it included four enhanced competitiveness in key sectors, assessments in one report. The diagnostic is serving strengthened infrastructure and basic services, a as a starting point in shaping PFM dialogue between more effective distribution of social benefits and donors and BiH authorities and as a baseline for any employment services for vulnerable job seekers, future updates. sustainable development of infrastructure, reduced pollution of rivers (Neretva, Bosna, and Miljacka), THE WORLD BANK PROGRAM IN and improved management of wastewater. BOSNIA AND HERZEGOVINA The World Bank currently supports 13 BiH joined the World Bank and the IDA in 1996, operations in BiH. The total value of these with membership retroactive to 1993. Over the projects, which are in various stages of past 18 years since the end of the conflict, the World implementation, is US$595.6 million. Areas of Bank has approved 71 projects in the total amount support include business environment, agriculture, of roughly US$1.88 billion (IDA credits, US$1.53 social safety and employment, wastewater and solid billion; IDA grants, US$25 million; GEF grants, waste management, private sector development, US$23.9 million; and International Bank for energy efficiency, environment protection, flood Reconstruction and Development [IBRD] loans, management, and flood emergency recovery. US$295 million). Analytical and Advisory (AAA) Program. The World Bank engaged early and extensively Ongoing and planned analytic and knowledge in the postwar reconstruction of BiH. During the services will provide an important diagnostic period of intensive post-conflict reconstruction foundation for policy making and for preparing the (1996–2002), the World Bank supported repairs to upcoming Country Partnership Framework in over 20,000 public apartment units and about 2,000 alignment with the Bank goals of eliminating private houses. Hundreds of kilometers of power extreme poverty and enhancing shared prosperity. and water lines, transmission stations, and thermo The Western Balkans Poverty Assessment will provide an and hydropower plants were rehabilitated. Roughly understanding of poverty, inequality, and exclusion 2,300 kilometers of roads, 41 bridges, three tunnels, indicators. The Regional Activation and Smart Safety and Sarajevo’s International Airport were rebuilt. Nets programmatic analytical work will provide Eighty-two primary schools were reconstructed, and technical support for labor force participation and 24 medical facilities equipped. New trees were social safety net reforms through a combination of planted on 550 hectares of land, and 210 kilometers analytical/knowledge products, just-in-time advice, of forest roads were reconstructed. About 200,000 and intensive policy dialogue. The Western Balkans jobs were created or sustained under the two Jobs Challenges will identify the main labor market microfinance projects. A 2004 review carried out by incentives, determine policy priorities, and discuss the Independent Operations Evaluation policies to improve labor market outcomes. Department (OED) found that the role played by Through the Western Balkans Regional Research and the World Bank in BiH’s reconstruction program Development Strategy for Innovation technical assistance, was an example of “the Bank at its best.” the Bank will help Western Balkan countries, including BiH, to identify funding instruments for the implementation of their research and 8 BiH, FBiH, RS, and District Brcko institutions. 15 Bosnia and Herzegovina Country Program Snapshot development action plans. The Western Balkans agribusiness, infrastructure, and efforts to Financial Sector Outlook will continue to provide a manage climate change. IFC is also focusing its semi-annual analysis of the key vulnerabilities of the efforts in BiH to support private sector participation financial sectors in the region and recommend in infrastructure development in roads, health, and actions to address them. Finally, the new regional renewable energy. “Deep Dive: Turn down the Heat” will feature the Western Balkans and help develop country-specific Recent investment projects in BiH include: assessments and recommendations to support BiH to better prepare itself for extreme climate and  €4 million loan to MF Banka to support the possible future natural hazards. bank’s lending to micro and small enterprises in Bosnia and Herzegovina (Smaller companies Systematic Country Diagnostics (SCD). The are critical to Bosnia and Herzegovina’s Bank team is currently conducting an SCD exercise economic development, and adequate financing in BiH to identify key challenges and opportunities is crucial to their growth.) for the country with regard to the goals of reducing  €24 million in financing to Sisecam Soda poverty and promoting shared prosperity. The SCD Lukavac, a soda ash producer, including €7.5 will be completed in the second quarter of 2015 and million from the IFC-Canada Climate Change will provide an analytical underpinning for the new Program, to enhance competitiveness and Country Partnership Framework for BiH for the cleaner production next four years.  US$20 million Global Trade Finance Program (GTFP) line to Sberbank THE INTERNATIONAL FINANCE  €8 million loan to Bekto Precisa, a local CORPORATION supplier of plastic and metal products for the automotive and electrical industries, to expand BiH became a shareholder and member of IFC and become more competitive (The investment in 1996. Since then, IFC’s investment in the country will allow the company to handle larger orders has totaled US$382.1 million, including US$23.1 and facilitate the partial refinancing and million mobilized from World Bank partners, in 46 restructuring of its existing debt.) projects across a variety of sectors. IFC is focusing  €15 million to Sisecam Soda Lukavac to its investment services on foreign and domestic enhance its competitiveness investments in the real sector and infrastructure,  US$4 million GTFP line to Raiffeisen Bank with a particular focus on climate solutions and renewable energy and financial markets. IFC has  US$8.9 million loan to the Economic Credit also invested in the health sector, municipal Institution (EKI) microcredit foundation, to infrastructure, agribusiness, construction, and enable it to continue serving its microfinance general manufacturing. clients in rural areas  US$5.6 million in financing to Mi Bospo, IFC’s committed investment portfolio in BiH as including a local currency guarantee of January 1, 2015 was US$116.2 million. So far in  US$6.4 million to BH Heart Center to FY15, IFC has invested US$5.3 million in BiH. IFC support the first privately owned and managed works with private sector clients, the Government, health care facility in BiH and civil society to bring the benefit of global  US$29.5 million to CIMOS B to support a expertise to the country through its advisory services Slovenian car part production company in and investment projects. IFC advisory services aim developing new production capacities in four to improve the investment climate, the performance cities of BiH of private sector companies, and access to finance,  US$14.2 million to Nova Banka to support a and also to attract private sector participation in the credit line and straight equity, as well as to AS, development of infrastructure projects. one of the more successful domestically owned commercial banks Priorities in BiH include improvements in the  US$3.8 million to EKI to support its investment climate, manufacturing, transformation from not-for-profit status to a 16 Bosnia and Herzegovina Country Program Snapshot commercially oriented, regulated, non-deposit- 1. Improve the existing regulatory framework to taking financial organization enable SHPP sponsors to develop and  US$32 million to Sisecam, the largest Turkish construct feasible SHPPs; producer of glass, soda ash, and related 2. Work with SHPP sponsors to improve their chemicals, which has purchased an 80 percent SHPP designs and business plans; shareholding in Sisecam Soda Lukavac (SSL) through a privatization transaction (The project 3. Work with selected financial institutions in BiH helped the company to preserve 783 out of 792 to improve their internal capacities and jobs and created opportunities for expansion knowledge on SHPP and project financing. and new jobs.) (Supported by the Ministry of Finance of Austria) IFC has also invested in the following BiH banks and companies: UniCredit Bank, Sarajevo Brewery, BiH Public Private Partnership Road (598047) Bosnalijek, and Akova. The objective of this project is to assist the Government of FBiH with structuring and Recent advisory projects in BiH include: implementing a successful tender process for the selection of a private concessionaire that will BiH Investment Climate Project (587227) upgrade, operate, and maintain the motorway The project goal is to increase the competitiveness section between Karuse and Poprikuse. Successful of BiH by assisting selected governments at all four implementation of the project will improve access levels in the country to achieve investment climate to road infrastructure for Bosnian and foreign reforms. The project will provide critical regulatory drivers, facilitate trade and tourism in the region, and investment policy tools to help BiH in its EU and reduce road accident rates. The first phase of accession process, reduce the administrative burden the project has been completed, which included on businesses, and attract FDI. In this respect, technical, legal, and financial due diligence. The agribusiness will be a key sectoral focus of the project is now awaiting the formation of a new project. (Supported by the Government of Sweden FBiH Government in early 2015 before further and the Ministry of Finance of Austria) steps are taken toward the public-private partnership (PPP) transaction phase. (Supported by Microfinance Bosnia (569807) three donor partners: Austria, Norway, and The overall objective of the project is to further Switzerland) develop the microfinance sector in BiH by improving the conditions for microfinance Europe and Central Asia Corporate Governance institutions (MFIs) to conduct their business on a Project (586209) sustainable basis under post-crisis conditions. The project’s overall goal is to improve the current Specifically, the project aims to maintain a state of corporate governance and the delivery of microfinance portfolio in the country at a corporate governance services, building on sustainable level of US$350 million while driving corporate governance project activities previously down the level of nonperforming microfinance undertaken by IFC in ECA. Through the project, loans from 8.2 to 4.0 percent. These development IFC aims to leave a sustainable legacy for the impact indicators are expected to be achieved by delivery of corporate governance company 2016. (Supported by the Swiss State Secretariat for improvement programs, training, and services by Economic Affairs [SECO]) local institutions in selected countries. IFC also expects such partner institutions to raise sales Renewable Energy BiH (575567) revenue from the delivery of corporate governance The overall goal of the project in BiH is to create a services. IFC also aims, through its firm-level work comprehensive framework to support the in the ECA region, to improve the performance of development and implementation of small companies and their ability to raise financing hydropower plants (SHPPs). This goal will be through recommended improvements to their achieved through the systematic implementation of corporate governance practices. (Supported with the three individual objectives: majority of funds by SECO and the Austrian Development Bank [OeEB]) 17 Bosnia and Herzegovina Country Program Snapshot AS Group Resource Efficiency Advisory South East Europe Regional Tax (595107) The Resource Efficiency Advisory (REF) is part of The project goal is to improve transparency and a five-year ECA Cleaner Production Program. The legal/regulatory certainty in tax procedures for program is designed to enable a wider uptake of international and domestic investors through the cleaner production (CP) improvements across the alignment of standards and simplified processes. region and will help to deliver on IFC’s global The secondary goal is to improve overall mandate on climate change. CP assessments will be compliance and contribute to an improved delivered to multiple clients operating across ECA investment environment. The program will countries. The program will operate under the contribute and benefit from ongoing Tax umbrella of the ECA regional CP program (ID Transparency and Transfer Pricing product 568088) and will closely cooperate with the Cleaner development to quantify the link between Production Lending Facility (ID 28163) and Global international tax process alignment and investor Cleaner Production Advisory Facility (ID 568587). decision making. (Supported by SECO) The IFC ECA Resource Efficiency Program has signed an Engagement Letter with AS Group for the South East Europe Regional Trade Logistics provision of Resource Efficiency advisory services Project (572687) (REF) to the AS Group owned companies The Western Balkans Trade Logistics Project aims to “Napredak” and “Vispak” in order to reduce reduce regulatory and administrative bottlenecks to production costs by improving the efficiency of the cross-border trade in the region through more utilization of its resources. Resource Efficiency streamlined export, import, and transit procedures; Scoping reports for Vispak and Napredak were closer and more harmonized interagency delivered in late 2014. Reports show substantial cooperation in country and between countries; and opportunity for savings. wider use of electronic systems for data exchange, risk based controls, and trade logistics–related Western Balkans Investment Climate and payments. The objective of the project is to improve Agribusiness Competitiveness Project the competitiveness of the private sector in the (P600476) region through more efficient access to regional and This project was approved in FY15 and is expected global markets. The activities implemented by the to extend to FY20. The main objective is to increase project are to result in US$10 million in private the competitiveness of the Western Balkans sector savings. The project is being implemented by countries and targeted value chains therein by IFC in partnership with the EU and delivered in addressing regulatory bottlenecks along the value close cooperation with the Central European Free chains, increasing investment in the sector, and Trade Agreement (CEFTA). facilitating market access. The project is in the pre- implementation stage. 18 Bosnia and Herzegovina Country Program Snapshot MAP OF BOSNIA AND HERZEGOVINA 19 Bosnia and Herzegovina Country Program Snapshot WORLD BANK PROJECT BRIEFS 20 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: FLOODS EMERGENCY RECOVERY PROJECT Key Dates: Approved: June 30, 2014 Effective: September 15, 2014 Closing: December 31, 2018 Financing from all cofinanciers, million US Dollars: Financier Financing IDA Credit 100.0 Total Project Cost 100.0 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IDA Credit 100.0 7.6 92.4 *as of March 2015 Note: Disbursements may differ from financing due to exchange rate fluctuations. The Project Development Objective of the Floods Emergency Recovery Project for Bosnia and Herzegovina (BiH) is to meet critical needs and restore the functionality of infrastructure essential for public services and economic recovery in the areas affected by the massive flooding in May 2014. There are three components to the project. The first component will allow the entity-level governments and Brcko District to purchase or refinance emergency recovery goods, including food, fuel, hygienic items, agriculture goods, construction materials, and other emergency needs. The second component will finance the rehabilitation of key regional and local public infrastructure. This component will finance the rehabilitation or reconstruction of high-priority, public service delivery infrastructure in the worst-affected areas, including the rehabilitation of regional roads and railways and flood protection, as well as local infrastructure such as rural roads, water and sanitation, schools, hospitals, etc. Finally, the third component will finance the project management costs and provide technical assistance and capacity building to help ensure future improved disaster resilience. Expected results: The project will provide assistance to the population in affected areas to restore their lives to the pre-flood level by providing emergency goods, including agriculture goods to help restore agriculture and income-generating activities and construction materials to help rehabilitate the housing stock in the worst affected areas. The project will also recover priority public service infrastructure facilities to pre-flood conditions. Progress thus far: Implementation is under way in both entities and in the Brcko District. During the initial months of implementation, the focus was on refinancing eligible emergency goods (primarily agriculture goods and construction materials) and preparing the design and project documentation for regional and local infrastructure rehabilitation subprojects that will be initiated in the 2015 construction season. Key Partners: The Bank team is working closely with the Ministry of Finance and Treasury of BiH, Ministry of Finance in the Federation BiH (FBiH), the Ministry of Finance in the Republika Srpska (RS), and the Brcko District Government. Key Development Partner: The European Commission (EC) and the United Nations Development Programme (UNDP). 21 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: AGRICULTURE AND RURAL DEVELOPMENT PROJECT Key Dates: Approved: June 19, 2007 Effective: February 26, 2008 Closing: June 30, 2015 Financing in million US Dollars:* Financier Financing IDA Credit 21.0 SIDA TF 070858 6.2 Total Project Cost 27.2 World Bank Disbursements, million US Dollars*: Total Disbursed Undisbursed IDA Credit 21.0 16.6 4.6 *as of February 2015 Note: Disbursements may differ from financing due to exchange rate fluctuations. The agriculture sector is a relatively small but important part of the BiH economy. Agriculture’s share in BiH’s economy has fallen by nearly half from 15.1 percent in 1999 to 8.4 percent in 2012, while the services sector has grown to 66.8 percent and industry represents 24.8 percent of the economy. Institutional constraints across the various governmental levels and bodies mandated to provide services prevent BiH’s agro-food sector from reaching its full potential. BiH has some comparative advantages in agriculture, especially for niche products due to its close proximity to the European Union (EU), moderate continental climate, and fairly rich and cultivable soils, as well as clean and abundant natural water resources, natural upland pastures, and the ready availability of labor. In spite of the important role the vertically integrated agrokombinats used to play in primary production, there is a long tradition of small-scale farming and organic production in the country. Despite access to the EU market through preferential trade agreements, BiH is not reaping the full benefits of this favorable treatment due to the absence of EU-compliant food safety institutions and an EU-compliant regulatory framework. The Project Development Objective is to assist BiH in strengthening the capacity of its state- and entity-level institutions to deliver more efficient and effective agricultural services and support programs and to make a substan tial contribution to an acceleration of BiH’s eligibility to access support under the EU Instrument for Pre-Accession Assistance for Rural Development (IPARD). A project restructuring was conducted in response to: (i) changes in country priorities in the pre-EU accession context; (ii) implementation issues identified as part of the Bank’s implementation support activities; and (iii) damage rehabilitation needs pertaining to rural infrastructure and assets following the severe floods that hit the country during the 2010–11 winter season. Results achieved: To date, substantial efforts have gone toward strengthening the state-level agencies for veterinary services, plant health and phytosanitary services, and food safety. In parallel, inspection services have been strengthened and information systems are under development for the deployment of an eventual Agricultural Information System. Substantial progress has been made in the implementation of a farm and client register and a livestock identification and registration system, as well as the identification and rehabilitation of reference laboratories for the handling of plant material and food safety. The country has now conducted four consecutive years of potato pest monitoring, including modifications to the survey in line with the EU’s Food and Veterinary Office (FVO) recommendations that will allow for exports of potatoes to the EU. Similarly, a residue-testing strategy is under implementation in consultation with the FVO, where Bank financing is supporting laboratory equipment and accreditation for a laboratory network for the select testing domestically of some residues. Finally, the distribution of flood rehabilitation grants and the rehabilitation of rural infrastructure is under way to assist farmers and rural populations in the areas that were most affected during the 2010/2011 floods. Key Partners: The Bank team is working closely with the Ministry of Foreign Trade and Economic Relations, Ministry of Agriculture, Water Management and Forestry in FBiH, Ministry of Agriculture, Forestry and Water Resources in RS, Food Safety of BiH, Plant Health Administration, State Veterinary Office of BiH, and Inspection Services in both entities. Key Development Partners: Swedish International Development Cooperation Agency (SIDA), European Commission (EC), U.S. Agency for International Development (USAID), and International Finance Corporation (IFC). 22 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: NERETVA AND TREBISNJICA MANAGEMENT PROJECT Key Dates: Approved: May 29, 2008 Effective: March 6, 2009 Closing: June 30, 2015 Financing from all cofinanciers, million US Dollars: Financier Financing Global Environment. Facility 8.00 Recipients (Bosnia and Herzegovina and Croatia) 8.45 Bilateral Agencies 3.92 EC 2.00 Total Project Cost 23.27 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed Global Env. Facility (BiH) 6.00 5.37 0.63 Global Env. Facility (HR) 2.00 1.60 0.40 *as of January 2015 Note: Disbursements may differ from financing due to exchange rate fluctuations. BiH and Croatia have identified the need for improved water resources management and biodiversity conservation as key environmental issues in their National Environmental Action Plans. The water resources of the Neretva and Trebisnjica river basins (NTRB), and the ecosystems dependent on them, play an important part in the economies of both countries and the livelihoods of over 430,000 people living in the area. Taken together, these two rivers comprise most of the Adriatic watershed of BiH and Croatia, and both are crucial to energy production, recreation, fisheries, drinking water, and irrigation. They carry the (generally untreated) wastewater of the municipalities and many industries into the basins. The approach to improving the water resources management and biodiversity of the NTRB called for a joint effort of the two countries, resulting in the regional transboundary project, the “Neretva and Trebisnjica Manage ment Project (NTMP),” supported by the Global Environment Facility (GEF) through a US$8 million grant, out of which US$6 million has been granted to BiH and US$2 million to Croatia. In addition, the EC provided a US$2 million IPA grant for the rehabilitation and construction of sewerage in Ljubuski, BiH. The Croatia GEF grant closed on December 31, 2014, and the BiH grant will close on June 30, 2015. The project aims to provide a mechanism for promoting efficient and equitable water allocation among the users of the NTRB at the transboundary level and for enhancing the basin ecosystem and biodiversity through improved water resources management, including: (i) improved transboundary water resource management; (ii) enhanced management and use of wetland ecosystems and biodiversity; (iii) high-priority investments for water pollution and two industrial sector investments; and iv) public participation and management of project implementation. Key Results Achieved/Expected: BiH and Croatia have been cooperating effectively and regularly holding joint bilateral meetings. Rehabilitation of the wastewater treatment plant in Trebinje and Ljubuski was completed, as was the EC-financed sewerage system in Ljubuski. The new advanced treatment plant in Bileca could become a best practice showcase for municipal wastewater treatment. The newly constructed wastewater treatment plant in Konjic will start its trial work as soon as the EIB- financed sewerage system is connected to it. The wastewater treatment plant of the visitors’ center of Nature Park Hutovo Blato in BiH and the construction works for the reception center and 6-kilometer long hike and bike trail at the Bacina Lakes in Croatia have also been completed. The preparation of the River Basin Management Plan for Croatia, FBiH, and RS and the Framework for Neretva and Trebisnjica River Basin Management have been completed and adopted. The Minimal Environmental Flow study and the Optimization of Hydropower Plants Work study have also been completed. The construction of the water-efficient irrigation pilot in Glog in the Croatian Delta has unfortunately been dropped due to the inability to obtain a construction permit in time. As a replacement, the water monitoring system has been strengthened by online monitoring of water quantity and quality data, including ground waters (salinity, flows, etc.). By the end of the project, the following results will be achieved: reduction of nutrients and other pollution from municipal sources in the selected municipalities in the basin; improved maintenance of environmental flows; and improved ecosystem health and biodiversity in the basin. Key Partners: The Ministry of Agriculture, Water Management and Forestry in FBiH, and the Ministry of Agriculture, Forestry and Water Management in RS, under the coordination of the Ministry of Foreign Trade and Economic Relations of BiH; the five participating municipalities in BiH; and in Croatia, the Ministry of Agriculture through Croatian Waters (HV). Key donors: The EC and the Governments of Spain and the Netherlands. 23 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: SARAJEVO WASTEWATER PROJECT Key Dates: Approved: December 22, 2009 Effective: July 15, 2010 Closing: November 30, 2015 Financing in million US Dollars:* Financier Financing IBRD Loan 35.0 Government of Bosnia and Herzegovina 2.0 EU IPA Grant Fund 13.0 Total Project Cost 51.0 World Bank Disbursements, million US Dollars*: Total Disbursed Undisbursed IBRD Loan 35.0 10.87 15.47 *as of March 2015 Note: Disbursements may differ from financing due to exchange rate fluctuations at the time of disbursement. Service delivery problems in BiH are prevalent due to the lingering after-effects of the conflict that left vast portions of the basic infrastructure destroyed or severely damaged. A case that vividly illustrates the problem is wastewater collection and treatment in the city of Sarajevo. A Wastewater Treatment Plant (WWTP) was built close to the confluence of the Miljacka and Bosna Rivers in the early 1980s on the occasion of the 1984 Winter Olympics. Construction of the plant was supported by the World Bank – financed Sarajevo Water Supply and Sewerage Project (Loan 1263-YU), which closed in December 1982. However, the plant was extensively damaged in the spring of 1992 at the outset of the conflict, during which time the sewer network was also destroyed in various places. Since the end of the conflict in 1995, the WWTP has been largely out of commission, with only minimal conservation works carried out to prevent further deterioration. As a result, virtually all of the city’s wastewater is discharged into the Miljacka and Bosna Rivers without any treatment, causing severe pollution of the rivers and impacting the communities downstream. The Project Development Objective is to improve the living conditions of populations in the areas covered by the Sarajevo Water and Wastewater Company and in downstream riverside communities by: (i) reducing the population’s exposure to and reliance on highly polluted water from the Miljacka and Bosna Rivers; and (ii) improving the efficiency of the wastewater collection network in the Sarajevo Canton. As of August 2011, the first civil works contracts had been signed for the rehabilitation of priority sewage networks in the city. The Design Supply and Install of WWTP contract was signed in January 2014. Preparing the designs and obtaining the necessary construction permit were completed and rehabilitation works started. Results achieved: The rehabilitation work of a total of 17.24 kilometers of the city’s sewage network has been completed, which exceeded the project target of 16 kilometers. The work also included separating storm water drainage connections from the sewage network, thereby reducing the grit and sediment that undermine the treatment plant. 32,000 sewer connections are benefiting from the rehabilitation works. Delivery of high-powered sewage network cleaning and maintenance vehicles took place in November 2011. Since commissioning the new vehicles, the number of sewer blockages in the network has been reduced by 20 percent on an annual basis. Rehabilitation works on the WWTP are progressing. Key Partners: The Bank team is working closely with the BiH Ministry of Foreign Trade and Economic Relations, Sarajevo Cantonal and Municipal Institutions, as well as with “VIK,” the Sarajevo Water Utility. Key Development Partners: Close coordination has been established with the EC (which is providing project cofinancing in the amount of €13.0 million). 24 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: ENHANCING SMALL AND MEDIUM ENTERPRISES ACCESS TO FINANCE PROJECT Key Dates: Original IBRD loan approved: December 15, 2009 Effective: August 16, 2010 Additional financing IBRD loan approved: May 17, 2012 Effective: April 18, 2013 Closing: July 31, 2016 Financing from all cofinanciers, million US Dollars: Financier Financing IBRD Loan 190.0 Total Project Cost 190.0 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IBRD Loan 190.0 134.12 49.16 *as of March 2015 Note: Disbursements may differ from financing due to exchange rate fluctuations. The development and growth of small and medium-sized enterprises (SMEs) are critical for the development of BiH. Following the global financial crisis that began in 2008, access to finance for SMEs became even more difficult as banks limited their risk exposure. Under this worrying backdrop, the World Bank in 2009 provided funds (US$70 million) via the Enhancing Access to Finance for Small and Medium Enterprises Project to ensure continued access to finance for SMEs. This support proved critical for many SMEs throughout the country, as many of them had found themselves totally cut off from credit markets. The situation began to improve in 2011, but the persistent difficulties in the Eurozone continued to negatively impact access to finance for SMEs. The deterioration in economic activity in one of BiH’s key trading partners further depressed local prospects and tightened the credit enviro nment for local firms. Realizing the situation, the World Bank quickly mobilized an additional US$120 million in 2012 to enable the banks to continue extending credit to SMEs in an environment of constrained funding and growth (estimated at close to 1 percent for 2013). Following the devastating floods of May 2014, the World Bank supported FBiH in developing a targeted and time-bound emergency support loan program for SMEs in flood-affected areas using the revolving funds under the project. Additionally, the World Bank enhanced the flexibility for reprogramming the loans under this project in line with the entity banking authorities’ decisions and included agribusinesses as eligible SMEs under the project. The Project Development Objective is to enhance access to finance for SMEs in BiH in the context of the global financial crisis and the generally constrained conditions for SMEs. The primary beneficiaries of the project are SMEs with growth and export potential that would benefit from improved access to finance. The project will also help the banking sector in BiH to withstand the global economic downturn that has triggered financing difficulties for the enterprise sector. Results achieved:  By the end of 2014, a total of 142 SMEs had received loans under the Additional Financing project, while as many as 112 companies (as of July 2012) had been supported via the original SME project to help ease the impact of the economic downturn and contribute to the recovery.  The loans continue to be geographically well distributed, covering all 10 cantons in FBiH and over 20 municipalities in RS, and support a wide range of sectors, including food production and processing, wood processing and furniture manufacture, metal fabrication, and livestock food production.  It is estimated that 4,000 jobs were saved and 1,120 new jobs created between August 2010 and March 2013, during the implementation of the original project when the figures were last reviewed. Key Partners: The project was designed in close cooperation with the BiH, FBiH, and RS Ministries of Finance and the BiH Central Bank. The Central Bank provided statistical data and analysis on demand throughout the project preparation period. The BiH Em ployers’ Association and the Foreign Trade Chamber were consulted in the project. Key Development Partners: The Bank is coordinating its work on this project with other donors in BiH such as the European Bank for Reconstruction and Development (EBRD), Swedish SIDA, EU Delegation, and USAID. 25 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: SECOND SOLID WASTE MANAGEMENT PROJECT Key Dates: Approved: November 25, 2008 Effective: October 23, 2009 Closing: February 28, 2016 Financing from all cofinanciers, million US Dollars: Financier Financing IBRD Loan 25.0 IDA Credit 15.0 Government of Bosnia and Herzegovina 3.5 EU IPA Grant Fund 12.8 Total Project Cost 56.3 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IBRD Loan 25.0 6.84 9.25 IDA Credit 15.0 5.06 4.23 *as of March 2015 Cancelled, million US Dollars*: IBRD Loan 2.88 IDA Credit 0.30 * Cancellation based upon Republika Srpska request Note: Disbursements may differ from financing due to exchange rate fluctuations. Since the end of the war, BiH has made tremendous progress in improving its solid waste management (SWM) system. Only a few years ago, there were no functioning regional sanitary landfills and almost all waste was discarded in unofficial sites such as wild dumps, roadsides, small village dumps, rivers, and mines, which posed a direct risk to public health. During implementation of the first Solid Waste Management Project (SWMP- 1), which closed in 2010, several municipalities had set up and jointly operated regional sanitary landfills, and an increasing amount of waste was being managed in compliance with high EU standards. Nevertheless, numerous illegal dump sites can still be found in many municipalities, and their cleanup and closure remain a high priority that will require setting up functioning sanitary landfills to provide a viable alternative for disposal. At the same time, advanced regional landfills will start moving to the next level of integrated SWM by introducing advanced separation and recycling facilities and improving the financial viability of their services. The Second Solid Waste Management Project (SWMP-2) will support both: new regions that will establish an additional six sanitary landfills by the end of 2014 and the rehabilitation of existing landfills. The Project Development Objectives are to: (i) improve public health and quality of life by reducing exposure to pollutants and disease vectors from solid waste; (ii) improve municipal institutional capacity by establishing up-to-date technical and financial solutions for SWM; (iii) enhance environmental policy by improving the scope and depth of SWM strategies and facilitating recycling and waste-reduction programs nationwide; and (iv) improve local governance by enhancing cooperation between municipalities. Results achieved and to be achieved under project:  Six regional sanitary landfills are operational in Sarajevo, Mostar, Zenica, Tuzla, Bijeljina, and Banja Luka; end-target is eight regional sanitary landfills to be operational.  13 inter-municipal councils have been established.  Regular monitoring is performed at six operational sanitary landfills (in Sarajevo, Zenica, Tuzla, Banja Luka, Bijeljina, and Prijedor); target is nine.  40 percent out of a targeted 60 percent of regional solid waste utilities are complying with national environmental standards, while four utilities (Sarajevo, Tuzla, Zenica, and Mostar) have recycling and/or gas capturing facilities; target is six.  Six utilities have implemented cost-recovery plans out of a targeted seven.  Implementation of leachate treatment is in progress in all completed landfills.  1.05 million people have been provided with access to regular solid waste collection under the project.  300 wild dumps closed (25 percent of estimated exiting dumps).  Share of collected solid waste disposed in regional sanitary landfills has increased;  Regular environmental monitoring has improved, as 50 percent of solid waste utilities monitor compliance with national standards. Key Partners: The (i) Ministry for Environment and Tourism (FMET) in FBiH; (ii) the Ministry of Physical Planning, Construction, and Ecology (MPPCE) in RS; and (iii) FBiH and RS solid waste utilities. Key Development Partners: The EU and the Government of Sweden (SIDA) are cofinancing this project. 26 BOSNIA AND HERZEGOVINA: HEALTH SECTOR ENHANCEMENT PROJECT Bosnia and Herzegovina Country Program Snapshot Key Dates: Original IDA Credit (U$ 17 million) approved: March 31, 2005 Effective: April 3, 2006 Additional Financing IDA Credit (US$ 10 million) Approved: March 22, 2011 Effective: December 27, 2011 Closing: December 31, 2014 Financing from all cofinanciers, million US Dollars: Financier Financing IDA Credit 27.0 Entity Government’s 8.9 Council of Europe 14.0 Total Project Cost 39.9 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IDA Credit 27.0 26.9 0.1 *as of February 2015. Note: Disbursements may differ from financing due to exchange rate fluctuations at the time of disbursement. While BiH experiences some communicable disease challenges (such as the need to increase vaccination rates for measles and diphtheria/pertussis/tetanus [DPT]), the BiH epidemiological profile is largely dominated by noncommunicable diseases (NCDs) such as heart disease, diabetes, and cancer, with some indicators (i.e., ischemic heart disease) estimated to be the highest in the South East Europe region. Road accidents, injuries, and suicides are also at high levels. With a rapidly aging population, the burden of NCDs will continue to increase. The historic organization and financing of the health system in BiH, which was based on a fragmented primary health care (PHC) system and an increasing bias toward curative services, is not oriented to meet the challenge of the ongoing and increasing NCD epidemic. The Project Development Objective (PDO) is to (i) expand and enhance the family medicine (FM) model of PHC; (ii) build management capacity in the sector; and (iii) strengthen the policy-making process through the development and implementation of a system for monitoring and evaluating sector performance. Results achieved: The project successfully achieved the three PDOs. Regarding the restructuring and strengthening of PHC, the FM model has been the single largest reform implemented by the Government in the health sector. Coverage by FM teams increased from 5 to 80 percent (national average). In FBiH, more than 75 percent of service users expressed their satisfaction with the approach of FM teams in a recent survey. Medical doctors and nurses are being regularly trained for FM specialization. RS has also been upgrading the clinical skills of its FM teams. The retraining program of its existing FM doctors was completed, FM specializations are now regularly provided, and training is focusing on enhancing the role played by nurses as a vital component of the PHC delivery system. An IT system and software application to support business process of FM team and health record are being used across the country. In FBiH, the project financed LAN and IT equipment for all the PHC facilities (440) and financed software application for eight cantons. Similar progress was achieved in the areas of building management capacity, enhancing the policy-making process, and monitoring and evaluating health sector performance. Health Management Centers (HMC) are fully functional in both entities. From a total of 45 staff having managerial skill in 2004, the HMC succeeded in training 608 staff by project closing. Since 2010, managerial skills are mandatory for managers at all levels. In the area of policy making, several rulebooks were developed to standardize the management of facilities; indicators for health services and health outcomes; training for FM teams, and specialization in FM. In addition, in FBiH, the project supported a process to reach agreement across cantons on a standardized set of indicators and on a methodology for the monitoring and evaluation of the sector. The methodology was adopted across the 10 cantons and data are being shared at the entity level. Lastly, the project supported the implementation of health surveys at the national level using a similar methodology for both entities. Progress toward achieving the PDOs is reflected in the achievement of the project outcomes. 4 out of 5 PDO indicators were achieved (PDO 1 was surpassed, PDOs 3, 4, and 5 were fully met), and one PDO indicator (PDO 2) was partially achieved. PDO 1. Coverage of the population through FM teams reached a national average of 70 percent. From about 5 percent of the population in 2004 (FBiH: 130,659, RS: 86,270), the coverage reached about 58 percent at the time of the end of the original credit (2010), with FBiH: 1,586,000 (69.0 percent), RS: 1,193,230 (95.5 percent) (80.2 percent national level), surpassing the goal by the end of the project (September 2014). PDO2. 260 FM teams and Health Centers in the RS meeting rigorous accreditation standards. From not having in place any accreditation process in 2004, the project reached 60 FM teams accredited by 2010. During the accredited process, some teams changed working roles and by the end of the project, 200 active teams were accredited. This is 23 percent below the goal, and thus this PDO is considered partially achieved. PDO3. Systemic implementation of selected preventive services in at least two major FBiH cantons. FBiH: implemented results-based payments (based on performance of preventive services) in four cantons. Pilots completed. New report system and software adopted. PDO 4. HMCs operational with an annual budget and regular work plan. FBiH: The HMC was developed as a unit within the Federation PH institute; RS: The HMC is fully operational. PDO 5. The RS Primary Health Care Strategy and the FBiH Primary Health Care Strategy operational plan are updated. FBiH: Operation Plan for 2014 has been updated and adopted. RS: The RS Primary Health Care Strategy was updated and is being implemented though it has not been formally approved by Parliament. Key Partners: Ministries of Health in FBiH and RS are leading efforts, supported by various donors and agencies, notably the EU, World Health Organization (WHO), and the World Bank. The project is cofinanced by the Council of Europe Development Bank (CEB), which contributes a significant percentage of total project costs (32 percent) toward the financing of civil works and equipment. In addition, the EU is financing a number of complementary activities designed in close collaboration with the Bank in the areas of: (i) public health; (ii) accreditation and quality assurance; (iii) pharmaceuticals; (iv) hospital provider payment mechanisms; (v) hospital modernization; and (vi) the functional review of health institutions. Agencies such as the Canadian International Development Agency (CIDA) and the Swiss Agency for Development and Cooperation (SDC) have provided considerable support and recently approved a trust fund to finance a project to reduce Health Risk Factors for Noncommunicable Diseases. 27 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: WATER QUALITY PROTECTION PROJECT Key Dates: Approved: June 7, 2005 Effective: November 18, 2005 Closing: August 31, 2015 Financing from all cofinanciers, million US Dollars: Financier Financing Government of Bosnia and Herzegovina 6.19 Global Environment Facility 8.90 Global Environment-Associated IDA Fund 4.00 Government of Spain 1.18 EU IPA Grant Fund 8.57 Government of Sweden Grant Fund 3.50 Total Project Cost 32.34 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed Global Environment Facility 8.90 8.60 0.30 *as of March 2015 Note: Disbursements may differ from financing due to exchange rate fluctuations. The Water Quality Protection Project focuses on the Neretva and Bosna Rivers. The Neretva River originates in BiH and flows through Croatia before entering into the Adriatic Sea, and has a strong impact on the water quality of the Bay of Mali Ston. It is an important source of hydropower, drinking water, and irrigation, but also a source of pollutants for the Adriatic and Mediterranean. The Neretva Delta is a Mediterranean wetland of international importance and is designated as a Ramsar Wetlands site. The Bosna River Basin covers the largest and most developed area of BiH. The Bosna River also originates in BiH and is about 260 kilometers long—BiH’s most developed and industrialized regions are found along this river. Wastewater from communities and industrial facilities—the concentrated polluters—discharges directly into the river, most of it without any treatment, and is the major source of pollutants in the Danube. The Project Development Objective is to further strengthen the capacity of local utilities and to reduce pollution from municipal sources into the Neretva and Bosna Rivers. The global objective is to reduce municipal pollution and nutrients in the Adriatic Sea and the Danube Basin. Results achieved:  Water Information System (WIS) installed in the water agencies in both entities.  Rehabilitation of the Trnovo, Odzak, and Zivinice Wastewater Treatment Plants (WWTPs) has been completed and plants are fully operational. Construction of the Mostar WWTP is under way.  8 percent of municipal wastewater is now treated and discharged according to new BiH water environment standards.  Three key studies have been completed: (i) a Wastewater Improvement Plan for Reducing River Pollution, (ii) Biological Monitoring of Rivers, Lakes, and Reservoirs, and (iii) a feasibility study on the low-cost, natural treatment of wastewater.  Improved cooperation of BiH with institutions in Croatia, Montenegro, and Serbia, leading to an agreement on most aspects of the Wastewater Improvement Plan requiring cross-border cooperation. Key Partners: The FBiH Ministry of Agriculture, Water Management and Forestry. Key Development Partners: The EU and the Governments of Spain and Sweden are cofinancing this project. 28 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: SOCIAL SAFETY NETS AND EMPLOYMENT SUPPORT PROJECT Key Dates: Approved: February 25, 2010 Effective: October 7, 2010 Closing: October 31, 2015 Financing from all cofinanciers, million US Dollars: Financier Financing IDA Credit 15.0 Government of Bosnia and Herzegovina 7.0 Total Project Cost 22.0 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IDA Credit 15.00 14.0 0.5* *as of March 2015 ** US$ 0.5 million of the credit was cancelled Note: Disbursements may differ from financing due to exchange rate fluctuations. The Social Safety Net and Employment Support Project (SSNESP) aims to improve the efficiency of social spending, quality of social services, and efficiency of active labor market programs. It supports ongoing reform in the social protection sector in the country through technical assistance on improving the targeting methodology in social assistance and strengthening the institutional capacity to implement the targeting of social benefits. The Project Development Objectives are to: (i) support noncontributory cash transfers in reaching the eligible poor and disabled; (ii) improve the efficiency and transparency of benefits administration; and (iii) support job brokerage services for those active job seekers who become ineligible to receive cash transfers or who are vulnerable (e.g., poor, disabled but able to work, hard-to-serve, demobilized soldiers, etc.). Results achieved: The project has provided technical assistance on improving targeting methodologies for noncontributory cash benefits. Different targeting options were considered and analized in both entities. Proxy Means Testing is the proposed model for the new social protection legislation that has been drafted in FBiH and for the amendments to the social protection legislation that is planned for 2015–16 in RS. A total of 40 social welfare centers were rehabilitated (35 in FBiH and five in RS). The upgrading of the SOTAC management information system used by the social welfare centers was finalized in FBiH and is currently under way in RS. The upgrade of management information systems used for veteran benefits is under way in both entities. Strong progress was made in delivering job-brokerage services to the most vulnerable active job seekers. About 10,833 unemployed persons have received job brokerage support under the project (7,146 in FBiH and 3,687 in RS). Outcomes in terms of employment status after service provision are positive. In FBiH, 64 percent of beneficiaries were employed six months after the employment services contract had expired, while 55 percent were employed 12 and even 18 months after the contract had expired. 44 percent of beneficiaries in FBiH are women. In RS, 54 percent remained employed both six and 12 months after the end of the contract for training, self-employment, and employment with employers. 52 percent of beneficiaries in RS are women. Key Partners: The World Bank team is working closely with the FBH Ministry of Labor and Social Policy; the RS Ministry of Health and Social Welfare; the RS Ministry of Labor and Veteran-Disability Protection; and the Public Employment Funds in the two entities. Key Development Partners: Close coordination has been established with the EC and the United Nations Children’s Fund (UNICEF). 29 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: IRRIGATION DEVELOPMENT PROJECT Key Dates: Approved: May 3, 2012 Effective: March 29, 2013 Closing: December 31, 2017 Financing from all co-financiers, million US Dollars: Financier Financing IDA Credit 40.0 Government of Bosnia and Herzegovina 7.0 Total Project Cost 47.0 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IDA Credit 40.0 8.55 28.25 *as of February 2015 Note: Disbursements may differ from financing due to exchange rate fluctuations. The agriculture sector is and will remain economically important for BiH and is an integral part of the rural economy, providing important sources of employment for rural inhabitants and having significant backward and forward linkages to the rest of the economy. According to official statistics, the primary agriculture sector still accounts for approximately 9 percent of GDP and employs more than one-fifth of the total labor force. Crop yields and potential options for growing high-value crops and double cropping are restricted without irrigation, primarily due to prolonged dry spells during the summer season. Typical yield losses are estimated to be in the order of 30 –40 percent in the southwest, while in the northern areas along the Sava river plain, typical yield losses amount to 20–30 percent, with less in the central and mountain areas. In addition, in many of the plains and valleys, productivity also regularly suffers from waterlogging and inundation. Thus, drainage is as important as irrigation. The Irrigation Development Project aims to improve the performance of the irrigation systems and the irrigation institutions to support agricultural producers in the project areas. The Project Development Objective would be achieved through: (i) rehabilitating irrigation and drainage infrastructure, including construction, reconstruction, upgrading, and modernization, on existing agricultural land; (ii) introducing new technologies in irrigated agriculture; and (iii) promoting institutional development, strengthening water resources management institutions, and introducing a participatory approach to water management. The project would support better water resources planning and management for the sustainable use of the water resources in irrigation and drainage, mitigation of the impact of droughts and floods, and in general preparation of more suitable adaptation strategies that can also cope with climate change. Expected results: The project will support better water resource planning and management for the sustainable use of water resources in irrigation and drainage and the mitigation of the impact of droughts and floods, and in general help prepare more suitable adaptation strategies to also cope with climate change. Progress thus far: Progress toward reaching the Project Development Objective has been satisfactory. Works have been completed in three subproject sites (two sites in RS and one in FBiH), worth around US$8 million, or 20 percent of total project costs. In parallel, for these sites, agreements are under way with municipalities and Water User Associations (WUAs) to modernize the water-monitoring systems and to train farmers on improved irrigation practices. In parallel, works are ongoing on the remaining subprojects from the first batch (in Siroki Brijeg and Gorazde). The second batch of irrigation schemes has been selected in RS and the design and supporting studies are under way. In FBiH, the preselected subprojects for the second batch were affected by the May 2014 floods, and therefore their participation in the project activities is still pending, awaiting the final decision of municipal authorities. Key Partners: The Bank team is working closely with the Ministry of Foreign Trade and Economic Relations, Ministry of Agriculture, Water Management and Forestry in FBiH, Ministry of Agriculture, Forestry and Water Resources in RS. Key Development Partner: EC. 30 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: REAL ESTATE REGISTRATION PROJECT Key Dates: Approved: October 25, 2012 Effective: September 23, 2013 Closing: July 31, 2018 Financing in million US Dollars:* Financier Financing IDA Credit 34.1 Total Project Cost 34.1 World Bank Disbursements, million US Dollars*: Total Disbursed Undisbursed IDA Credit 34.1 7.60 24.98 *as of February 2015 Note: Disbursements may differ from financing due to exchange rate fluctuations. The project aims to support the development of a sustainable real estate registration system with harmonized land register and cadastre records in the urban areas of BiH. The Real Estate Registration Project (RERP) and its predecessor, the Land Registration Project (2007–12), are part of a programmatic approach toward supporting a well-functioning land administration system in BiH by 2016. The RERP will support this goal with a focus on the scaling-up of cadastre activities and on the sustainability of land registration and cadastre institutions. The beneficiaries of the project will be (i) the public, which can own, lease, and use real estate under the protection of the legal registration of rights, (ii) the business community, which can invest more, relying on the secure access to real estate and improved access to credit, (iii) the government institutions and municipalities that can make use of the online access to accurate spatial information to increase their revenues and inform their decision making, and (iv) real estate registration institutions that will gain from more sustainable operations and staff policies. Society overall will benefit from improved land governance supported by the up-to-date and accessible spatial information on real estate and on their transactions, which will increase accountability and informed decision and policy making concerning land, real estate, and natural resources. Results achieved: Project implementation is progressing well, with many activities under way. In RS, the Real Estate Cadastre establishment is ongoing in 62 Cadastre Municipalities (CMs), while work has been completed in six CMs. The Vulnerability Mapping (VM) has been conducted in 112 CMs. Geodetic and computer equipment has been purchased for harmonization teams, 160 commissions have been contracted, and technical specifications for vectorization and cadastral database creation have been finalized. Tender for the development of a new coordinate system is under way. In FBiH, harmonization is ongoing and vulnerability mapping has been conducted in seven CMs, and the reports produced. FBiH Geodetic Administration has started public awareness activities. The RS Geodetic Administration has finalized tender documentation for the development of the new coordinate system and also finalized the purchase of two offices, while the purchase of the remaining offices is under way. FBiH has initiated office renovation activities. Key Partners: The Bank team is working closely with the Administration for Geodetic and Real-Property Affairs of the Federation of BiH; Administration for Geodetic and Property Affairs of the Republika Srpska; and the entity-level ministries of justice. Key Development Partners: SIDA, EC, and the Government of Norway. 31 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: SUSTAINABLE FOREST AND LANDSCAPE MANAGEMENT PROJECT Key Dates: Approved: January 15, 2014 Effective: June 9, 2014 Closing: May 31, 2019 (expected) Financing in million US Dollars:* Financier Financing Global Environment Facility 5.58 Total Project Cost 5.58 World Bank Disbursements, million US Dollars*: Total Disbursed Undisbursed Global Environment 5.58 0.00 5.58 Facility *as of February 2015 Note: Disbursements may differ from financing due to exchange rate fluctuations. Relative to the size of the country, the forest resources of BiH are among the richest in Europe in terms of their extent and variety. BiH has a total forest area of 3.2 million hectares, covering some 62 percent of the total land area, making it the most forested country in Europe. The rural population (estimated to be 2 million) considers the forests to be an important source of employment, energy (wood fuel for heating, largely from forest residues), and recreation. As BiH is a mountainous country, forests also have important watershed protection values, especially for the middle and lower Danube. Some 17 percent of the forest areas are classified as low, degraded forests, while an additional 6 percent of the forest estate is classified as underutilized pasture land or bare landscapes. Improved forest management would allow BiH to take advantage of timber production values, providing income for local people while also protecting environmental values associated with watershed protection. Potential climate change hazards such as fires and pests threaten vulnerable forest lands and the economic opportunities they otherwise might provide; sustainable management reduces their vulnerability. The Project Development Objective is to build the capacity of forest sector stakeholders and demonstrate approaches for sustainable forest and land management through the integrated management of vulnerable forest, scrub, and pasture landscapes. The Project addresses key issues through support to: i) enhanced planning and monitoring for sustainable management; and, ii) the demonstration and replication of sustainable management techniques in vulnerable areas. Expected results: Procurement planning and tendering procedures are well advanced, with a view to addressing high-priority issues that were seasonally constrained in 2014. These include investments in equipment for firefighting for the summer fire season, as well as the commencement of forest seedling nursery operations in anticipation of an autumn afforestation program on degraded and vulnerable lands on the national forest estate. Ongoing efforts in both ministries will support forest monitoring and certification efforts that improve access to continental export markets. A total of 3,000 hectares of land are being directly addressed over the project lifetime, of which 600 will be in the first calendar year. Cooperation with the Food and Agriculture Organization (FAO) prior to effectiveness has involved training in information systems suitable for carbon monitoring on the forest estate. Key Partners: The Bank is working closely with: the Ministry of Agriculture, Water Management, and Forestry in FBiH; and the Ministry of Agriculture, Forestry and Water Management in RS. 32 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: ENERGY EFFICIENCY PROJECT (BEEP) Key Dates: Approved: March 13, 2014 Effective: not yet effective; Financing Agreement signed October 29, 2014 Closing: June 30, 2018 Financing in million US Dollars*: Financier Financing IDA Credit 32.00 Total Project Cost 32.00 World Bank Disbursements, million US Dollars*: Total Disbursed Undisbursed IDA Credit 32.00 - 32.00 *as of March 2015 Note: Disbursements may differ from financing due to exchange rate fluctuations. The Project Development Objective of the Energy Efficiency Project for Bosnia and Herzegovina is to demonstrate the benefits of energy-efficiency improvements in public sector buildings and support the development of scalable energy- efficiency financing models. The project has three components. The first component, energy-efficiency investments in public facilities, will support energy- efficiency investments (subprojects) in schools, hospitals, and clinic centers. This component will finance energy-efficiency upgrades as well as related technical consultancy services (for example, energy audits, technical and social monitoring and evaluation, technical designs, supervision, and subproject commissioning). The second component, support for the development of scalable financing mechanisms and capacity building, will support the development of sustainable energy- efficiency financing mechanisms in the public sector, strengthen implementation capacity, and help to increase public awareness on energy efficiency. The third component, project management, will ensure effective project management by the project implementing units (PIUs) through financing additional experts, training PIU staff, and covering incremental operating costs. Key Partners: Ministry of Physical Planning of FBiH and Ministry of Physical Planning, Civil Engineering and Environment of RS. Key Development Partners: The World Bank is cooperating with the USAID, which is preparing detailed energy audits for several buildings likely to be included in the BEEP; the FBH PIU is also cooperating with the Swedish and Swiss Embassies for additional support for subproject preparation activities. 33 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: DRINA FLOOD PROTECTION PROJECT Key Dates: Approved: May 16, 2014 Effective: not yet effective Closing: December 31, 2019 Financing from all cofinanciers, million US Dollars: Financier Financing IBRD + IDA 24.00 Borrower 4.27 Total Project Cost 28.27 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IBRD + IDA 100.0 - 100.0 *as of March 2015 Note: Disbursements may differ from financing due to exchange rate fluctuations. The objective of the Drina Flood Protection Project for BiH is to provide increased protection from flood events to agricultural and commercial interests and communities in the project areas. There are two components to the project. The first component is flood protection works and support for the Bijeljina area. This component will fund civil engineering works and related investments in flood protection in the Bijeljina area, in the downstream flat plains near the confluence with the Sava River. This includes resources for the Agriculture Project Coordination Unit (APCU) at the RS Ministry of Agriculture, Forestry and Water Management (MoAFW), including staff for procurement and financial management (FM), as well as technical assistance as may be required for the supervision of works and contract management and the provision of administrative and coordination support to the RS Waters Institution in Bijeljina, which will support the project at the technical level. The second component is flood protection works and support for the Gorazde area. This component will fund civil engineering works and related investments in flood protection in four clusters of works in the Bosnia Podrinje Canton (around Gorazde), in the Middle Drina. This includes resources for the Project Implementation Unit (PIU) at the FBiH Ministry of Agriculture, Water Management and Forestry (MoAWF), including staff for procurement and FM, as well as technical assistance as may be required for the supervision of works and contract management and the provision of administrative and coordination support to the Sava River Watershed Agency in Sarajevo, by which the project is technically supported. Expected results: i. avoided damages of agriculture production on land likely to suffer frequent floods; ii. avoided damages of assets (private houses, apartment houses, industrial facilities, roads, electricity, schools, kindergartens, health facilities, and other public buildings); iii. avoided losses of business due to uninterrupted production, provision of services, interrupted communications, traffic disruption, etc.; iv. avoided human health costs due to reduction of the pollution in the water supply systems, reduced water borne diseases, and reduced risks of human life losses; v. increased recreation benefits, including tourism development; vi. indirect economic development effects. Key Partners: The Bank team is working closely with the Ministry of Finance and Treasury of BiH, RS Ministry of Agriculture, Forestry and Water Management, and FBiH Ministry of Agriculture, Water Management and Forestry. 34 Bosnia and Herzegovina Country Program Snapshot IFC PROJECT BRIEFS 35 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: MF Bank Key Dates: Approved: Signed: September 2014 IFC financing (million € million): Financier Financing Fiscal Year IFC 4.00 2015 Total Project Cost 4.00 The International Finance Corporation (IFC), a member of the World Bank Group, is lending to MF Banka to support the bank’s lending to micro and small enterprises in Bosnia and Herzegovina. The investment in MF Banka, a new IFC client, would help scale up the bank’s lending capacity to underserved micro and small enterprises (“MSEs”) in BiH. Located in Republika Srpska, MF Banka is an ideal partner for IFC’s microfinance strategy in Central and Eastern Europe, which seeks to create and support commercially viable financial institutions able to attract enough capital to diversify and expand their MSE products. MF Banka is the only dedicated MSE market player in BiH with a banking license and therefore seeks long-term funding to sustain dynamic growth and offer new products to targeted customers. With a successful MSE lending track record, the bank has a well-defined development strategy and strong capacity to use IFC’s funds to shore up finance for underserved segments of the economy. IFC’s expected role and additionality:  Longer-term resources for MSE lending: This project would provide long-term funding, now limited from other commercial sources, thus opening up financing channels with additional longer-term resources to underserved MSEs in the BiH economy.  Building a long-term relationship with Mikrofin group: Through this project, IFC would build a long-term partnership with a major MSE bank in BiH, reinforcing the bank’s focus to serve more customers, expand its outreach in rural and low-income areas, and promote sustainable best practices in the MSE sector. The development impact of the project is expected to include:  Increased access to funding for underserved MSEs in a fragile and conflict-affected state (FCS);  Demonstration effect by reengaging in the BiH microfinance sector and building confidence in the financial sector; and  Job creation, contributing to economic growth and poverty reduction. 36 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: BEKTO PRECISA Key Dates: Approved: June 2013 Signed: June 2013 IFC financing (million € million): Financier Financing Fiscal Year IFC 8.00 2013 Total Project Cost 12.00 The IFC, a member of the World Bank Group, is lending to a Bekto Precisa to support the local manufacturing sector, create jobs, and generate exports. An IFC loan of €8 million will enable Bekto Precisa, a local supplier of plastic and metal products for the automotive and electrical industries, to expand and become more competitive. The investment will allow the company to handle larger orders and facilitate the partial refinancing and restructuring of its existing debt. Bekto Precisa’s operations are based in Gorazde, 100 kilometers east of Sarajevo, where it employs more than 350 people. The export-oriented company offers production solutions covering design, engineering, precision tool-making, and molding. IFC’s expected role and additionality:  Long-term Financing: The proposed long-term IFC financing will help Bekto Precisa to grow/modernize by (i) funding its capital expenditure program to improve its competitiveness by broadening its products’ dimensions; and (ii) restructuring its debt through extending the maturity that is not readily available in the market at favorable rates to enhance the company’s financial flexibility.  Corporate Governance Advice: IFC is expected to accelerate the company’s transformation from a family-owned business to a more institutionalized firm.  Global Sector Expertise and Knowledge: IFC will share its global sector expertise and knowledge to help improve the company’s lean manufacturing programs and fine-tune its long-term strategic vision to grow beyond its traditional customer base.  Standard Setting: IFC will help the company improve its environmental and social practices to exceed local regulatory requirement and be a pioneer in the country. The development impact of the Project is expected to include:  On top of the company’s existing labor force, Bekto Precisa is expected to create additional direct skilled jobs in a country where the official unemployment rate is around 45 percent.  Moreover, the multiplier effect is estimated at three times for indirect jobs in small and medium-sized enterprises (SMEs) focused on factory and machine maintenance and small mechanical workshops located mainly in Gorazde, a small remote mountain town, supporting local micro, small, and medium-sized enterprises (MSMEs).  The increased sales and production capacity of the company as well as export-oriented production and sales will boost the hard currency flow to BiH, with a certain positive impact on the country’s current account deficit and tax revenues.  Finally, given that Bekto Precisa mainly sources its main processing material and services domestically, which corresponds to more than 50 percent of total annual expenses of the company, the project will have a direct positive local supply chain impact. 37 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: SISECAM, SODASO LUKAVAC Key Dates: Approved: June 2013 Signed: June 2013 IFC financing (million € million): Financier Financing Fiscal Year IFC 18.00 2013 Canada Climate Change 5.60 Program Total Project Cost 23.60 IFC, a member of the World Bank Group, with the support of the Government of Canada, is helping Turkey’s Sisecam Group enhance competitiveness and cleaner production in its BiH subsidiary, Sisecam Soda Lukavac (SSL), a soda ash producer. IFC will provide €24 million in financing to Sisecam Soda Lukavac, including €7.5 million from the IFC-Canada Climate Change Program (CCCP). The loan will help the company improve resource and energy efficiency. In 2007, IFC provided a €24 million loan to Sisecam to help finance the acquisition of Soda Lukavac, then a loss-making state- owned enterprise. In 2010, IFC provided another €15 million loan to Sisecam’s subsidiary in BiH. Sisecam has been an IFC client for over 35 years with multiple investments, first in Turkey and then abroad, as IFC helped finance the group’s expansion into Bulgaria, Russia, the Balkans, and other countries in Europe and Central Asia. Canada’s contribution was instrumental, helping to make the financing package viable. IFC’s expected role and additionality:  Longer tenor: IFC will provide long-term financing not readily available in the current environment in BiH. IFC funds will be in the form of a senior loan.  Environmental and social support: IFC has worked with the client during previous projects and is continuing its efforts to improve its (i) waste management, and (ii) clean production  Blended finance: CCCP funding to partially finance investment in energy-efficiency equipment The development impact of the project is expected to include:  Local enhanced supply chain: An increase in the production capacity will result in an increased demand for raw materials from local brine and limestone mines (which sell more than half of their output to SSL) and local subcontractors (transportation and catering services), thereby supporting significant employment in the local supply chain.  Employment preservation: Had it not been privatized, the plant would have been shut down, adding to unemployment in BiH. SSL is one of the largest employers in the Tuzla area (around 550 people) in a country where the official unemployment rate is 45 percent.  Demonstration effect: IFC’s investment in SSL continues to have a strong demonstration effect, as SSL has become an example of a successful privatization and foreign direct investment (FDI) in BiH, an IDA country. This is a South- South investment that will also (i) strengthen economic ties between Turkey and BiH; and (ii) send an encouraging signal to other foreign investors in the region. The continued success of SSL will increase investor appetite for state assets in BiH. 38 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: RENEWABLE ENERGY SMALL HYDRO POWER PLANTS PROJECT (SHPP) Key dates: Start Date: October 01, 2010 Effective: August 30, 2013 End date: June 30, 2016 Total Budget: US$1,426,840.00 Donor: Austrian Ministry of Finance (BMF) The project in BiH aims to facilitate at least US$120 million of investment into small hydropower plant (SHPP) construction (out of which US$15 million would be provided by IFC) to support construction of 40 SHPPs, with a total installed capacity of 80 megawatts (MW) that could directly avoid 500,000 tons/year of greenhouse gas (GHG) emissions (the estimation is based on a reduction in coal-fired electricity production). The Project Development Objectives: The overall goal of the project in BiH is to create a comprehensive framework to support the development and implementation of SHPP projects. This goal will be achieved through the systematic implementation of three individual objectives:  Improve the existing regulatory framework to enable SHPP sponsors to develop and construct feasible SHPPs  Work with SHPP sponsors to improve their SHPP designs and business plans  Work with selected financial institutions (FIs) in BiH to improve their internal capacities and knowledge on SHPPs and project financing Results Achieved:  Regulatory improvements in both entities led to the adoption of the Renewable Energy Law in RS and the Renewable Energy Law in FBiH.  The Law on Concessions, with a few essential articles drafted by the IFC team, has been adopted by the National Assembly of RS.  The Renewable Energy Action Plan (REAP), the decree on incentives for electricity generation from renewable energy sources, and the methodology for determining levies for incentives have been adopted by the Government of FBiH. Development of both documents was supported by the IFC team.  The following reviews of technical design documents were finalized:  Three SHPPs owned by the Marvel Company  Three SHPPs developed by Most International  Renewable energy training to two FIs, UniCredit Bank Mostar and UniCredit Bank Banjaluka, has been delivered.  IFC’s direct and indirect work in BiH’s renewable energy sector has led to the commissioning of a total of 53 renewable energy plants since the program began, generating annually an additional 98,283 megawatt hours (MWh) of clean energy. Key Partners: Ministry of Energy, Mining and Industry of FBiH, Ministry of Energy, Mining and Industry of RS, and privately owned HPP Marvel. Key Development Partners: Austrian Ministry of Finance (BMF). 39 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: BOSNIA PUBLIC-PRIVATE PARTNERSHIPS ROAD Key dates: Start Date: June 01, 2013 Effective: August 30, 2013 End date: December 31, 2014 Total Budget: US$600,000 Donor: Austrian Ministry of Finance (BMF) IFC will provide transaction advisory support to the Government of FBiH through the Public Company of Motorways Federation of BiH to assist with the implementation of a road project under a public-private partnership (PPP) scheme. This will include the upgrading, operation, and maintenance of a section of the Corridor Vc motorway between Karuse and Poprikuse in FBiH. The project is a critical enabler of the Government’s objective of improving the road network in the country. IFC will conduct its mandate in two phases. In phase one, IFC will carry out technical, commercial, legal, and regulatory due diligence for the project and will present the proposed transaction structure to the FBiH Government. As part of phase two and following the approval of the proposed transaction structure by the Government, IFC will assist the latter with implementing an open and transparent competitive bid to select a private developer for the project. The Project Development Objectives: The objective of this project is to assist the Government of FBiH with structuring and implementing a successful tender process for the selection of a private concessionaire that will upgrade, operate, and maintain the motorway section between Karuse and Poprikuse. Successful implementation of the project will improve access to road infrastructure for Bosnian and foreign drivers and facilitate trade and tourism in the region. The program is supported by three donor partners: Austria, Norway, and Switzerland. Results Achieved:  Signed mandate with Motorways of FBiH for a 40-kilometer section on the Corridor Vc.  Legal, technical, and financial due diligence has been completed. Recent client deliverables include: recommended transaction structure and summary term sheet and risk allocation matrix  Awaiting feedback from the Government before committing to the next tender phase. Key Partners: Motorways of Federation of BiH. Key Development Partners: Austrian Ministry of Finance (BMF). 40 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: MICROFINANCE BOSNIA AND HERZEGOVINA Key dates: Phase I start Date: September 01, 2010 Phase II started: June 01, 2013 End date: June 30, 2016 Total Budget: US$1,142,857.00 Donor: Swiss State Secretariat for Economic Affairs (SECO) The project works to address the microfinance crisis that originated with sector over-liquidity in 2008. Principally, the project aims to strengthen the delivery of responsible and quality microfinance services in BiH. The focus of the project is to help create policies for a better environment ensuring more efficient and effective microfinance operations; cooperation with the SMART Campaign, which measures the level of adherence to the internationally recognized principles of consumer protection; and addressing the issue of over-indebtedness of microfinance clients. To this end, the project works at mainstreaming the debt counselling, developed during Phase I of the project, to local municipalities and free legal aid offices. This work establishes a solid exit strategy and strengthens the capacity of local institutions in providing services to the population on this issue. During this time, the Debt Advice Centre “UPlusu,” also established during Phase I of the project, serves as a resource center for debt counseling. The Project Development Objectives: The overall objective of the project is to further the development of the microfinance sector in BiH by improving the conditions for microfinance institutions (MFIs) to conduct their business on a sustainable basis under post-crisis conditions. Specifically, the project aims to maintain a microfinance portfolio in the country at a sustainable level of US$350 million while driving down the level of nonperforming microfinance loans from 8.2 to 4.0 percent. These development impact indicators are expected to be achieved by 2016. Results Achieved:  Altogether, 19 municipalities have already received training in debt counseling, launching free debt advice services in the local communities, and nine more have signed up for training in the first quarter of 2015, resulting in 81 debt restructuring cases resolved in the period July–December 2014 alone, out of 163 clients counseled.  Three BiH microcredit organizations (MCOs) have received the SMART Campaign’s certification for treating clients responsibly, among the first six such MFIs in the world to receive this rigorous certification in 2014. The same three MCOs applied for recertification in 2015, demonstrating continued understanding of the benefits that SMART certification brings in terms of responsible financing, and the process is gaining credibility with clients and MCOs. No legislative changes have been made in the sector, but there has been a notable decrease in multiple borrowing by microfinance clients, as evidenced by IFC’s annual over-indebtedness study.  In terms of policy reforms, together with EBRD, KfW, and the European Fund for South Eastern Europe (EFSE), a joint policy-level approach related to the necessary microfinance sector reforms has been agreed. The first microfinance transformation, one of the project goals, has been accomplished in FBiH. Key Partners: U Plusu, a nonprofit debt counseling service provider, Central Bank BiH, FBiH Banking Agency, RS Banking Agency, Ministry of Finance and Treasury BiH, Ministries of Finance FBiH and RS; EFSE, EBRD, and KFW. EFSE provides financing for debt counseling. Key Development Partners: Swiss State Secretariat for Economic Affairs (SECO). 41 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: INVESTMENT CLIMATE PROJECT Key dates: Start Date: November 03, 2011 Effective: August 30, 2013 End date: December 31, 2014 Total Budget: US$2,944,360.00 Donor: Swedish International Development Cooperation Agency (SIDA); Austrian Ministry of Finance (BMF) The project proposes programmatic assistance on the national, entity, cantonal, and municipal levels of government. The proposed project will provide critical regulatory, agribusiness, and investment policy tools to help BiH in its EU accession process, reduce the administrative burden to businesses, assist governments in attracting FDI and increasing exports, and assist in enabling a single economic space. The Project Development Objectives: The project goal is to increase the competitiveness of BiH by assisting selected governments at all four levels in the country to achieve investment climate reforms. The proposed project will provide critical regulatory and investment policy tools to help BiH in its EU accession process, reduce the administrative burden to businesses, and attract FDI. In this respect, agribusiness will be a key sectoral focus of the project. The project is well on track with implementation, with project targets being met or exceeded six months before project close. Results Achieved: Regulatory simplification work on the local, cantonal, entity, and national levels has led to direct and verified private sector savings for businesses in the amount of US$6.49 million, and US$106 million in savings in indirect costs (waiting and processing time for companies). This is a result of streamlining the process for licenses, permits, approvals, etc., reducing the processing time and fees, and eliminating information requirements and unnecessary documents in many cases. The project has also resulted in over US$30 million in new investments/reinvestments in BiH facilitated by project partners. Furthermore, a regulatory impact assessment has been introduced as a mandatory regulatory quality control mechanism in FBiH. This is the first time this kind of regulatory governance system was introduced in FBiH, aiming to improve the quality of regulations. In addition, several significant legal acts have recently been adopted: Law on Registration of Business and Law on Offenses in FBiH, Law on Spatial Planning and Construction in RS, Law on Construction in Zenica-Doboj Canton, Law on Construction in Tuzla Canton, and secondary legislation on provisions related to food information for consumers at the national level. In cooperation with the RS and FBiH Ministries of Agriculture, the Governments of RS and FBiH adopted strategies for increasing competitiveness and FDIs in three value chains (fruits, vegetables, and diary). Finally, transparency has been improved by creating online electronic registers at the national, entity, cantonal, and local levels (a total of 14 registers created), with online information about requirements for licenses, permits, costs, documents, and forms. Such information did not exist before in online format for each of the government levels. Key Partners: Council of Ministers BiH, Government of FBiH, Government of RS, Governments of Zenica Doboj, Tuzla and Una-Sana Canton, Municipalities of Teslic, Zivinice, Vitez, Bosanska Krupa, Srebrenik, Tuzla, Ilidza, Zenica, Visoko, Prnjavor, Cazin. Key Development Partners: SIDA, BMF. 42 Bosnia and Herzegovina Country Program Snapshot REGIONAL PROJECT - ECA CORPORATE GOVERNANCE PROJECT BOSNIA AND HERZEGOVINA Key dates: Start Date: May 01, 2012 Effective: August 30, 2013 End date: December 31, 2015 Total Budget: US$4,480,091 Donor: Swiss State Secretariat for Economic Affairs (SECO), Austrian Development Bank (OeEB) IFC will provide demand-driven corporate governance advisory services based on its established delivery methodology. Specifically, the project will: 1. Build on the capacity of certain partner institutions in selected countries in Europe and Central Asia (ECA) to deliver corporate governance services in their markets. The project will provide training/capacity building to partner institutions, based on IFC’s corporate governance methodology and according to their needs and capacity. Such training is expected to include the training of trainers and lead to the development of sustainable training institutions. 2. Provide corporate governance advisory services to targeted companies with the aim of helping them improve their business performance and reach new investment and/or financing. 3. Provide advice to local regulators and other relevant stakeholders on the corporate governance framework. The Project Development Objectives:  The project’s overall goal is to improve the current state of corporate governance and the delivery of corporate governance services, building on corporate governance project activities previously undertaken by IFC in ECA. Through the project, IFC aims to leave a sustainable legacy for the delivery of corporate governance training and services by local institutions in selected countries. IFC also expects such partner institutions to raise sales revenue from the delivery of corporate governance services. IFC also aims, through its firm-level work in the ECA region, to improve the performance of companies, as well as their ability to raise financing, through recommended improvements to their corporate governance practices. Results Achieved: Two local consultancies have been receiving intensive training in corporate governance and have started providing advisory services to companies (eight in-company engagements to date) based on acquired knowledge. The BiH Institute of Directors has been established with project support and is continuously receiving capacity-building support. Three comprehensive corporate governance assessments were conducted in BiH, including one for IFC investment client, Bekto Precisa. Comments on the FBiH Company Law have been provided as part of the Regulatory Impact Assessment process. One regional research and conference on board diversity organized, additional training activities for women on boards conducted. Support provided to the FBiH Chamber of Commerce to improve the competencies of board members in the state-owned enterprises. Key Partners: Advantis Broker Banja Luka, SEE Business Solutions Sarajevo, BiH Institute of Directors, Bekto Precisa Gorazde, Tri Best Banja Luka, R&S doo Sarajevo, Sarajevo Stock Exchange, FBiH Chamber of Commerce, Banja Luka Stock Exchange, Women Entrepreneurs Association “ONE.” Key Development Partners: SECO, Austrian Development Bank (OeEB). 43 Bosnia and Herzegovina Country Program Snapshot REGIONAL PROJECT - BOSNIA AND HERZEGOVINA SEE REGIONAL TAX Key dates: Start Date: October 16, 2012 Effective: August 30, 2013 End date: August 31, 2015 Total Budget: US$2,598,745 Donor: Swiss State Secretariat for Economic Affairs (SECO) The project/program will work to simplify tax administration procedures to reduce tax compliance costs, particularly for SMEs, and improve the legal framework and efficiency of international taxation procedures, with a focus on Transfer Pricing (TP) and Double Taxation Treaties (DTT). Specifically, the project will start by focusing on Albania, where it will provide advisory services to the Ministry of Finance. The Project Development Objectives:  The project goal is to improve transparency and legal/regulatory certainty in tax procedures for international and domestic investors through the alignment of standards (TP and DTT) and simplified processes. The secondary goal is to improve overall compliance and contribute to an improved investment environment. The program will contribute and benefit from ongoing Tax Transparency and TP product development to quantify the link between international tax process alignment and investor decision making. The project has two objectives that will be achieved by the end of the project. Results Achieved: The respective ministries of finance (national and entities) and tax administration have been receiving intensive training on key aspects of the legal framework for TP and DTT, covering topics such as permanent establishment, beneficial ownership, residencies, taxation of interests and dividends, and intra-group services. Both the FBiH Corporate Income Tax Law and the RS Law on Amendments and Changes to the Corporate Income Tax Law drafts are currently in their respective parliamentary approval processes. Key Partners: BiH Ministry of Finance and Treasury, FBiH Ministry of Finance, Ministry of Finance of RS, Tax Administration of Federation of BiH, Tax Administration of RS. Key Development Partners: SECO. 44 Bosnia and Herzegovina Country Program Snapshot REGIONAL PROJECT - TRADE LOGISTICS WESTERN BALKANS BOSNIA AND HERZEGOVINA Key dates: Start Date: September 01, 2011 Effective: August 30, 2013 End date: June 30, 2014 Total Budget: US$2,152,061 Donor: European Union The Western Balkans Trade Logistics Project aims to reduce the regulatory and administrative bottlenecks to cross-border trade in the region through more streamlined export, import, and transit procedures; closer and more harmonized inter-agency cooperation in-country and between countries; and wider use of electronic systems for data exchange, risk-based controls, and trade logistics–related payments. The objective of the project is to improve the competitiveness of the private sector in the region through more efficient access to regional and global markets. The activities implemented by the project are to result in US$10 million in private sector savings. The project is implemented by IFC in partnership with the EU and is being delivered in close cooperation with the Central European Free Trade Agreement (CEFTA). Project Development Objectives: (i) Reduction in the number of documents and days needed for goods to be exported and imported; and (ii) Streamlined procedures for the flow of cargo by road, air, and river. Results Achieved:  The project has succeeded in increasing the working hours of the federal inspectors at the three most frequented border crossing points (BCPs) with Croatia (BC Izačić, BC Orašje, and BC Šamac-Domaljevac) in order to align them with the working hours of customs. About 70 percent of the entire trade volume for FBiH is conducted through these three border points. This alignment shortens the total lead time for the clearance of goods, resulting in savings for the private sector. According to data obtained from the agencies for 2013, this reform has shortened the lead time throughout the year for clearing goods by the phytosanitary agencies by a monthly average of 10.56 percent since January 2013.  The project assessed the procedures of cargo flow at two ports on the river Sava. It also identified the absence of a customs post at the Brcko port, which was provided for in the legislative framework. The implementation of this post will be followed up on. The Council of Ministers adopted a decree on July 17, 2013, requiring the Indirect Tax Administration (ITA) to deliver a report about the establishment of a Customs Unit within the Port of Brcko within 30 days. However, the ITA turned down the establishment of a Customs Unit within the Port of Brcko.  The project performed a review of the fees currently imposed by entity inspectorates and has made recommendations for reductions in both the number and amount. The project participated in the organization of a joint meeting of two entity inspectorates, which resulted in the signing of a Protocol about the harmonization of fees and procedures between these two inspectorates. The outcome of these initiatives was to lower the fees for the Quality Certificate at the border that is submitted by the Federal Directorate for Inspection Affairs FBiH by an average of 39.83 percent in direct costs.  The project hosted the first Risk Management Methodologies workshop, which was designed as an introductory workshop in sanitary and phytosanitary (SPS) agencies in charge of regulating the import and export in/out of BiH. The goal was to discuss the perspectives of facilitating processes/procedures involved in trade and the need for practical opportunities to particularly improve risk-based SPS border controls. As an outcome of this event, the team has received open interest from the Veterinary Office of BiH for the implementation of work assistance. The practical work with the Veterinary Office of BiH has been completed, providing the SOP, Concept Note, and Annual Sampling Plan papers based on Risk Management (RM) Methodology. Completed the final practical training for the veterinary border inspectors. Implementation of the RM was in place at the start of 2015. Key Partners: BiH Ministry of Foreign Trade and Economic Relations, Indirect Tax Administration, FBiH and RS Inspectorates. Key Development Partners: EU, Austria Foreign Investment Advisory Services. 45 Bosnia and Herzegovina Country Program Snapshot RECENTLY CLOSED WORLD BANK PROJECTS 46 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: FOREST AND MOUNTAIN PROTECTED AREAS PROJECT Key Dates: Approved: May 29, 2008 Effective: April 16, 2009 Closing: October 30, 2013 Financing in million US Dollars:* Financier Financing Global Environment Facility 3.40 Total Project Cost 3.40 World Bank Disbursements, million US Dollars*: Total Disbursed Undisbursed Global Environment 3.40 3.40 0.00 Facility *as of February 2014 BiH covers three globally significant ecosystems and several smaller-scale globally important sites. It is estimated that BiH has the highest proportion of threatened plant species of any European country, and yet by the mid-2000s, it had only 0.55 percent of land set aside as protected areas—the lowest level in Europe. Protected areas were generally underfunded, relying heavily on resource extraction for revenues. Additionally, staff working in protected areas had little or no experience in applied management approaches for ecosystems-based management and new management fields, such as sustainable tourism and participatory conservation. Broad consensus on expanding the protected area network existed in both entities, to protect key biodiversity and cultural assets and to provide new income opportunities for local residents. The Project Development Objective was to strengthen the institutional and technical capacity for sustainable protected area management and expand the BiH network of forest and mountain protected areas. The Project addressed key issues through support to: i) protected area development, including planning, monitoring, and building facilities; ii) enhanced capacity and support for biodiversity conservation; and iii) local initiatives in biodiversity conservation. Results achieved: In FBiH, protected area management plans have been completed and adopted for the Una National Park and Blidinje Nature Park. In RS, all management plans and related protected area baseline ecological assessments for the national parks and forest reserves have been finalized. Numerous small works and rehabilitation efforts have been realized in all the protected areas, including tourist viewing centers, bicycle paths, and research and office accommodations. A capacity to address critical firefighting threats has been built. Overall, protected areas now make up about 2.6 percent of the land area, compared with only 0.55 percent at the time of Board approval. Key Partners: The Bank team worked closely with: the BiH Ministry of Foreign Trade and Economic Relations, the Ministry of Tourism and Environment in FBiH; and the Ministry of Spatial Planning, Civil Engineering and Ecology in RS. They are also collaborating with the Ministries of Agriculture, Water Management, and Forestry in both entities along with cantonal and municipal institutions. 47 BOSNIA AND HERZEGOVINA: ENERGY COMMUNITY OF SOUTH EAST EUROPE – ECSEE APL3-BIH Key Dates: Approved: June 16, 2006 Effective: April 13, 2007; October 2008 (delay of 27 months) Closing: June 30, 2012 Financing in million US Dollars*: Financier Financing IDA Credit 36.00 Government of Bosnia and Herzegovina 8.64 Co-financers (EBRD, EIB, KfW) 250.00 Total Project Cost 294.64 World Bank Disbursements, million US Dollars*: Total Disbursed Undisbursed IDA Credit 36.00 36.73 1.44 *as of August 2012 Note: Disbursements may differ from financing due to exchange rate fluctuations. The countries of Southeast Europe, including BiH, the EC, bilaterals such as USAID and CIDA, and international financial institutions (IFIs) cooperated to develop a regional energy market—the Energy Community of South East Europe (ECSEE, now called the “Energy Community”)—and integrate it into the internal energy market of the EU. Project Objective: This project facilitated BiH’s participation in the regional energy market through investments to improve dam safety; reduce adverse environmental impacts at thermal power stations; replace aging existing facilities and equipment at hydropower and thermal power stations; and rehabilitate distribution systems. The Project maintained electricity generation in BiH at or above base levels. Environmental compliance improved at Kakanj, Tuzla, Ugljevik, and Gacko thermal power plants. Dam safety measures were recommended at Grabovica, Salakovac, Jablanica, Rama, Trebinje II, Visegrad, and Bocac hydropower plants. A previous project (Power III) started a pilot activity for the implementation of a Financial Management Information System, which has since been scaled up throughout the enterprise by EPHZHB; the other two power utilities (EPBH and EPRS) are also scaling it up. This system would help improve management control, governance, transparency in power trade and accounting, and the commercial integration of the BiH power system with the regional energy market. Results achieved:  Environmental compliance improved at Kakanj, Tuzla, Ugljevik, and Gacko thermal power plants.  Electrostatic Precipitator (ESP) at Kakanj is functioning better than the contracted performance levels and has helped improve air quality in the vicinity as registered by the project-supported environmental monitoring system, which is fully operational.  Wastewater treatment, water cooling system rehabilitation, and ash handling at Ugljevik and Gacko have also helped improve environmental performance, through decreasing the overall environmental impact (emissions) into the environment and through the improved and more rational use of natural resources (primarily water).  Better coal handling in Tuzla indirectly helps improve environmental performance through improved combustion of a more homogeneous coal mix. Key Partners: BiH Ministry of Foreign Trade and Economic Relations; Ministries of Energy of FBiH and RS; EPBH (Elektroprivreda of Bosnia and Herzegovina), EPHZHB (Elektroprivreda of the Croatian Community of Herzeg-Bosnia); and EPRS (Elektroprivreda of Republika Srpska). Key Development Partners: The EU supported power sector reform and restructuring under its technical assistance operations in the region and through its Phase program, in large part cofinanced with EIB, EBRD, and KfW. Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: ROAD INFRASTRUCTURE AND SAFETY PROJECT Key Dates: Approved: December 13, 2007 Effective: September 19, 2008 Closing: June 30, 2012 Financing from all co-financiers, million US Dollars: Financier Financing IDA Credit 25.0 Government of Bosnia and Herzegovina 5.0 Total Project Cost 30.0 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IDA Credit 25.00 24.66 0.25 *as of August 2012 Note: Disbursements may differ from financing due to exchange rate fluctuations at the time of disbursement. Although road traffic in and around the major urban areas in BiH was growing 5 percent per year, the quality of the road network was inadequate, despite a decade of substantial expenditures. Large expenditure needs that reflected a legacy of conflict and neglect were not fully met. Road safety remains a serious social and public health issue in BiH. The state of the road network, driver behavior and limited driver education, poor or nonexistent traffic law enforcement, and significant growth in vehicle ownership and use have increased traffic accidents—there were 436 fatalities and 8,470 injuries in 2004. The 2008 rates declined slightly to 5.3 fatalities per 10,000 vehicles, but the rate is still nearly three times higher than the EU27 average. Hence, road safety was a significant and growing concern that required a comprehensive response. The Project Development Objectives were to reduce user costs on the priority sections of the trunk and regional roads, improve road safety, and modernize road maintenance practices. The Project addressed a range of interconnected sector issues by (i) the financing of main and regional road and bridge rehabilitation; (ii) the financing of technical assistance to implement the recommendations of the 2007 Road Safety Management Capacity Review; and (iii) technical assistance on the introduction of output and performance-based road maintenance contracts on a pilot basis in each entity. Results achieved:  Out of 241 kilometers of roads to be rehabilitated by the project and financed from IDA credit, 121 kilometers were rehabilitated in FBiH and 172 in RS, which has reduced project road-user costs by 11 percent in RS over 2007–12 and by 18 percent in FBiH between 2004 and 2012.  There was significant progress on the development of the institutional framework for road safety, with the approval of entity-level road safety strategies and the establishment of a road safety agency in RS.  Modernization of road maintenance was progressing more slowly, with a pilot-output and performance-based maintenance contract signed in March 2010 in FBiH and in June 2012 in RS. It is still too early to ascertain with accuracy the efficacy of the new maintenance method in FBiH. Key Partners: The (i) Federation Road Directorate and the Republika Srpska Road Directorate; (ii) RS Ministry of Transport and Communications; and (iii) state and entity Ministries of Transport and Communications. Key Development Partners included EBRD and EIB, which provided parallel financing as part of a program of US$210 million of magisterial and regional roads rehabilitation, with the former providing US$75 million and the latter €80 million (US$105 million). The EBRD contributed to the introduction of output- and performance-based maintenance contracts, while the EIB financed preparation and design for rehabilitation work. Government of Norway. 49 Bosnia and Herzegovina Country Program Snapshot BOSNIA AND HERZEGOVINA: LAND REGISTRATION PROJECT Key Dates: Approved: April 27, 2006 Effective: April 13, 2007 Closing: June 30, 2012 Financing in million US Dollars:* Financier Financing IDA Credit 15.87 Government of Bosnia and Herzegovina 2.96 Total Project Cost 18.83 World Bank Disbursements, million US Dollars*: Total Disbursed Undisbursed IDA Credit 15.87 14.19 1.68 *as of August 2012 Note: Disbursements may differ from financing due to exchange rate fluctuations at the time of disbursement. Property registration systems in BiH have been in disarray since World War II, when many of the records and documents relating to property were destroyed. The situation was made worse during the 1992–95 war, when more records were lost and people were displaced, sometimes permanently, and legal records often no longer matched up. The informal development of large areas occurred because of the difficulty in getting permission to build or occupy property. The breakdown in institutional capacity and the deterioration of land and property records make it very difficult to complete basic real estate transactions, develop property, or borrow money based on property as collateral. Property development in urban areas is also restricted because of inadequate urban planning documentation and the uncertainty caused by a real property restitution initiative. The Project Development Objective was to facilitate the orderly development of transparent land markets through the registration of real estate rights and complimentary policies that enable transactions to be made with security and efficiency. The Project has addressed the issue of building effective registration and cadastre systems by (i) improving the transparency, speed, and accuracy of registering property transactions; (ii) improving the efficiency and speed of providing data on property units for clients wishing to register their property rights; and (iii) developing the strategies and draft legislation required for removing the impediments to business development and economic growth that exist in the land administration sector. Results achieved:  New service standards developed and adopted. Registration took many months prior to commencement of the project in 2007, but now there are backlogs in only two courts: Banja Luka and Mostar. In FBiH, booklets explaining the service standards have been distributed to all courts for the public to review or take copies. A customer survey conducted in February 2010 across the country identified an increased quality of services and timeliness, the improved professionalism of staff, and better access to information.  97 percent of property folios digitized in RS and 96 percent in FBiH. 1.9 million hectares of cadastre maps have been digitized, exceeding the project target of 1.4 million hectares.  Over 18,000 cases from the backlog have been resolved since 2007, at a time when new registration requests have increased by almost 100 percent. Improvements were made in service delivery and to the physical infrastructure of 37 offices, and opportunities for corruption have been largely eliminated. Requests can be processed in a matter of minutes.  New legislation covering land registration, spatial planning, cadastre, property taxation, and regularization of informal developments have been drafted and some enacted during the period of the project. Key Partners: At the state level (BiH), the project worked with (i) the Advisory Board, with the participation of each entity and the state government; (ii) the Ministry of Justice at the entity level; (iii) the Geodetic Administration (GA) in RS and municipal and cantonal governments in FBiH; (iv) Ministry of Finance at the state, entity, and cantonal levels; and (v) Ministry of Spatial Planning (at various levels). Key Development Partners: SIDA, Austrian Development Agency (ADA), German Society for International Cooperation (GTZ), USAID, and the EU. 50 Bosnia and Herzegovina Country Program Snapshot MIGA PROJECT BRIEFS 51 Bosnia and Herzegovina Country Program Snapshot Project name Mercator – BH Bosnia and Herzegovina Project ID 10174 Fiscal year 2012 Status Active Guarantee holder Ljubljana (SID Bank, Inc.; Ljubljana) SID – Slovenska Izvozna in Razvojna Banka, d.d. Investor country Slovenia Host country Bosnia and Herzegovina Environmental category FI Sector Services Date SPG disclosed June 09, 2011 Project Board date June 23, 2011 Gross exposure US$43.1 million Project type Non-SIP Strategic priority area IDA (blend) On August 4, 2011, MIGA issued a guarantee of US$43.1 million for reinsurance of the SID Bank, Inc.; Ljubljana coverage to the Mercator retail group (Mercator) in Bosnia and Herzegovina (BiH). MIGA is reinsuring the investment for a period of up to six years against the risks of transfer restriction, expropriation, and war and civil disturbance. MIGA’s support to SID Bank, Inc.; Ljubljana is in accordance with MIGA’s mandate to cooperate with national entities of its member countries, as stated in MIGA’s Convention. By providing facultative reinsurance, MIGA is allowing SID Bank, Inc.; Ljubljana to reduce its net exposure to Mercator and to free up capacity for other investment insurance projects. Mercator is helping to stimulate exports between Balkan countries by carrying goods from the other countries in each of its retail locations. As a result, Mercator is expanding the venue for suppliers to sell not only in their respective countries, but also in neighboring countries where Mercator has an established presence. In addition, Mercator’s further expansion in the Balkans, supported by SID Bank, Inc.; Ljubljana and MIGA, will provide employment and retail training opportunities in these countries. MIGA is also helping to establish best practices with respect to corporate governance as well as environmental and social policies in the host countries. 52 Bosnia and Herzegovina Country Program Snapshot Project name M – BL Bosnia and Herzegovina Project ID 10163 Fiscal year 2012 Status Active Guarantee holder Ljubljana (SID Bank, Inc.; Ljubljana) SID – Slovenska Izvozna in Razvojna Banka, d.d. Investor country Slovenia Host country Bosnia and Herzegovina Environmental category FI Sector Services Date SPG disclosed June 09, 2011 Project Board date June 23, 2011 Gross exposure US$37.7 million Project type Non-SIP Strategic priority area IDA (blend) On August 4, 2011, MIGA issued a guarantee of US$37.7 million for reinsurance of the SID Bank, Inc.; Ljubljana coverage to the Mercator retail group (Mercator) in BiH. MIGA is reinsuring the investment for a period of up to six years against the risks of transfer restriction, expropriation, and war and civil disturbance. MIGA’s support to SID Bank, Inc.; Ljubljana is in accordance with MIGA’s mandate to cooperate with national entities of its member countries, as stated in MIGA’s Convention. By providing facultative reinsurance, MIGA is allowing SID Bank, Inc.; Ljubljana to reduce its net exposure to Mercator and to free up capacity for other investment insurance projects. Mercator is helping to stimulate exports between Balkan countries by carrying goods from the other countries in each of its retail locations. As a result, Mercator is expanding the venue for suppliers to sell not only in their respective countries, but also in neighboring countries where Mercator has an established presence. In addition, Mercator’s further expansion in the Balkans, supported by SID Bank, Inc.; Ljubljana and MIGA, will provide employment and retail training opportunities in these countries. MIGA is also helping to establish best practices with respect to corporate governance as well as environmental and social policies in the host countries. 53 Bosnia and Herzegovina Country Program Snapshot Project name Mercator – BH Bosnia and Herzegovina Project ID 11034 Fiscal year 2012 Status Active Guarantee holder Ljubljana (SID Bank, Inc.; Ljubljana) SID – Slovenska Izvozna in Razvojna Banka, d.d. Investor country Slovenia Host country Bosnia and Herzegovina Environmental category FI Sector Services Date SPG disclosed June 09, 2011 Project Board date June 23, 2011 Gross exposure US$13.9 million Project type Non-SIP On August 4, 2011, MIGA issued a guarantee of US$13.9 million for reinsurance of the SID Bank, Inc.; Ljubljana coverage to the Mercator retail group (Mercator) in BiH. MIGA is reinsuring the investment for a period of up to six years against the risks of transfer restriction, expropriation, and war and civil disturbance. MIGA’s support to SID Bank, Inc.; Ljubljana is in accordance with MIGA’s mandate to cooperate with national entities of its member countries, as stated in MIGA’s Convention. By providing facultative reinsurance, MIGA is allowing SID Bank, Inc.; Ljubljana to reduce its net exposure to Mercator and to free up capacity for other investment insurance projects. Mercator is helping to stimulate exports between Balkan countries by carrying goods from the other countries in each of its retail locations. As a result, Mercator is expanding the venue for suppliers to sell not only in their respective countries, but also in neighboring countries where Mercator has an established presence. In addition, Mercator’s further expansion in the Balkans, supported by SID Bank, Inc.; Ljubljana and MIGA, will provide employment and retail training opportunities in these countries. MIGA is also helping to establish best practices with respect to corporate governance as well as environmental and social policies in the host countries. 54 Bosnia and Herzegovina Country Program Snapshot Project name ProCredit Group Central Bank Mandatory Reserves Coverage Project ID 9188 Fiscal year 2011 Status Active Guarantee holder ProCredit Holding Investor country Germany Host country Bosnia and Herzegovina Environmental category FI Sector Banking Date SPG disclosed October 05, 2010 Project Board date November 23, 2010 Gross exposure US$12.5 million Project type Non-SIP On December 22, 2010, MIGA issued a guarantee of US$12.5 million to ProCredit Holding (PCH), covering its investment in its subsidiary in BiH. The coverage is for a period of up to 10 years against the risk of expropriation of funds for mandatory reserves held by the subsidiary in the central bank of its jurisdiction. This project is part of a master contract that MIGA has issued. PCH is headquartered in Germany and is the parent company of 21 banks (ProCredit group). The ProCredit group is a provider of finance to some 750,000 micro, small, and medium-sized enterprises (MSMEs) in Latin America, Eastern and Central Europe, and Africa. Throughout the world, banks are required to maintain mandatory reserves with the central banks of their respective jurisdictions. The ProCredit group’s capital adequacy ratio (CAR) is calculated according to the German Banking Act. Under this act, at a consolidated level, reserves deposited at the various central banks can attract a risk weighting of 100 or even 150 percent, depending on the country. This risk weighting determines the amount of equity required to maintain a specified CAR in accordance with the German Banking Act. The guarantee issued by MIGA will help PCH obtain capital relief from the CAR requirements. By obtaining MIGA’s insurance against the risk of expropriation of funds, the risk weighting for mandatory reserves held at the central bank can be reduced. A lower risk weighting will allow PCH to free up equity currently tied up for CAR maintenance purposes, thereby allowing these funds to be injected into its subsidiary banks. This in turn will allow PCH’s emerging market subsidiary banks across its network to increase their lending activities. MIGA’s support will help PCH optimize its capital management across its 21 banks, allowing PCH to direct equity to subsidiaries with the greatest need. These banks will be able to offer additional financial services to MSMEs at a time of macroeconomic challenges. Supporting productive small businesses will help stimulate growth, generate employment, and reduce poverty. MIGA’s support for this project is aligned with the World Bank Group’s microfinance strategy, which includes improving the supply of microfinance in large but underserved markets; enhancing deposit capacity by assisting microfinance institutions in savings mobilization; promoting capacity building; creating and shaping markets; and fostering innovation. 55 Bosnia and Herzegovina Country Program Snapshot Project name Raiffeisen Leasing d.o.o. Sarajevo Project ID 7591 Fiscal year 2009 Status Active Guarantee holder Raiffeisen Zentralbank Österreich AG Investor country Austria Host country Bosnia and Herzegovina Environmental category C Sector Leasing Date SPG disclosed April 11, 2008 Project Board date June 12, 2008 Gross exposure US$47.7 million Project type Non-SIP MIGA has issued guarantees of €33.25 to Raiffeisen Zentralbank Österreich AG (RZB) in Austria covering their €35 million shareholder loans to their subsidiary Raiffeisen Leasing d.o.o. Sarajevo (RLBH) in BiH. The loans will fund the RLBH’s leasing portfolio. MIGA’s coverage is for a period of up to six years against the risks of transfer restriction and expropriation of funds. RLBH leases vehicles (including cars, trucks, and trailers), various types of equipment (including processing, packaging, and construction equipment), and industrial and office buildings. Loan proceeds are expected to be used to finance vehicle leases to micro and small-sized enterprises and car leases to individuals. This project is expected to contribute to the development of the financial sector in BiH by improving access to finance, particularly to segments of the economy that are currently underserved. The shareholder loans support RLBH’s ongoing leasing business, thereby contributing toward the continued development and strengthening of the country’s leasing sector. The leasing sector in BiH is still relatively small compared to West European countries. Small and medium-sized enterprises (SMEs) are especially expected to benefit from the development of leasing in the country, as they often do not qualify for bank financing and lack the capital to purchase fixed assets to grow their businesses. SMEs and corporates account for more than 90 percent of RLBH’s leasing volume. MIGA’s support for this investment is aligned with the World Bank Group’s country assistance strategy in BiH for 2008–11 and the country’s development objectives, particularly with regard to improving the environment for private sector–led growth and convergence with Europe. 56 Bosnia and Herzegovina Country Program Snapshot The World Bank Country Office in Bosnia and Herzegovina Fra Anđela Zvizdovića 1/B-17 71 000 Sarajevo, Bosnia and Herzegovina Tel: (387-33) 251 500 Fax: (387-33) 226 945 http://www.worldbank.org.ba 57