Hebei Irrigated Agriculture Intensification III Project Procurement Plan for 2007 Hebei Provincial Agriculture Development Office Goods and Civil Works for Hebei Province Unit: RMBY 1,000' Procurument Method Quantity of Contracts Cost USD RMB ICB 0.00 0.00 NCB 37 10581.94 81480.91 Shopping 180 7979.26 61440.30 Total 217 18561.20 142921.20 1 Hebei Province Civil Works Unit: RMBY 1,000' Procurument Method Quantity of Contract Cost USD RMB ICB NCB 23 3396 26151.44 Shopping 145 5869 45189.44 Total j 168 9265.05 71340.87 3 Hebei Province Goods Unit: RMBY 1,000' Procurument Method Quantity of Contract Cost ICB USD RMB ICB NCB 14.00 7185.65 55329.47 Shopping 35.00 2110.50 16250.86 Total 49.00 9296.15 71580.33 2 Goods Procurement Plan for 2007 IAIL III Project of Hebei Province number mode f procument prior or estimated cost cost of expected date actual date expected date actual date expected date actual date ete of ate nwnber contract eof Signing t o o g nLumber conntract No f t contents of purchase Sub-project category hop posteno of issuing of issuing of opening of opening of Signing o ng executing executing shoitemsstenNCBRMBntra (0pp0 revie RMB USD Yyuan bid (y,m) bid (y,m) bid(y,m) bid (y,m) contrat (y, m) contract contract ('00) ('00)(VrnM (V.MnL ICB 14 55329.47 7185.64 HBOOO I H7001 I 351 sets of transformers watersaving irrigation prior 3702.16 480.80 May,2007 June,2007 Aug,2007 Sept,2007 -200701 HBOOOIH7002 2 accessories watersaving irrigation posterio 1282.24 166.52 May,2007 June,2007 Aug,2007 Sept,2007 HBOOOIH7003 1 776.542 km of agri-power line watersaving irrigation I/ prior 3257.79 423.09 May,2007 June,2007 Aug,2007 Sept,2007 -200702 _____ ____ HBOOOIH7004 2 accessories watersaving irnigation 4 - prior 2269.98 294.80 May,2007 June,2007 Aug,2007 Sept,2007 -200703 HBOOOIH7005 556.2 km of polypropylene pipes and watersaving irigation 4 prior 7881.40 1023.56 May,2007 June,2007 Aug,2007 Sept,2007 rittings *200704 HBOOOIH7006 I 173.7km of PVC pipes watersaving irrigation 4/ prior 2007.40 260.70 May,2007 June,2007 Aug,2007 Sept,2007 HBOOOIH7007 2 841.646km of PVC pipes watersaving inrigation 4 prior 10515.46 1365.64 May,2007 Jime,2007 Aug,2007 Sept,2007 *200705 HBOOOIH7008 1 464.188km of PVC pipes watersaving irrigation / 4 prior 8076.48 1048.89 May,2007 June,2007 Aug,2007 Sept,2007 HBOOOIH7009 2 145.9 km of PE watersaving irrigation / 4 prior 2112.44 274.34 May,2007 June,2007 Aug,2007 Sept,2007 HBOOOIH7010 - 40950 water-outlets, 500 kg of bonding watersaving irrigation p - rior 3598.52 467.34 May,2007 June,2007 Aug,2007 Sept2007 200706 glueMa207Jn207Ag20 et07 HBOOOIH701 1 2 50bonding glue watersaving inrigation 4 prior 3839.23 498.60 May,2007 June,2007 Aug,2007 Sept,2007 t~ p Lci JC p t 1 6&-t e/Sc £ <( ' Kv f- C' C 4 mode of procurement cost of actual date expected actual date nubrprior or estimated cost cotatexpected date actual date expected date actual date expected date date of of gnme cotrcNof e cotnso itemase Subprjec ctgiry shop potro cnrc f issuing of issuing of opening of opening ofSinngoSigning execating executing gfitmsICB NCB RM S contat (000)evewRM U000 Yya bid (yin) bid (y.m) bid(y,m) bid (yin) conirat (yin (,) contract contract -200707 HBOOOtH7012 1 657 pumps watersaving irrigation ___ Vprior 3704.30 481.08 May,2007 June,2007 Aug,2007 Sept,2007 -200708 HBOOOIH7013 1 401 pumps watersaving irTigation ___ . _ *1075.66 139.70 __ May,2007 June,2007 Aug.2007 Sept.2007 -200709 HB0001H7014 1 526 km of hoses watersaving irrigation Vprior 2006.40 260.57 __ May,2007 June,2007 Aug.2007 Sept,2007 )ping _______ 35 16250.86 2110.50I )1H7015 HBOOOIH7015 1 70 sets of quipment for drip irrigation watersaving irrigation V posterion 344.00 44.68 May,2007 June,2007 Aug.2007 Sept.2007 IIH701 HBOO I H706 I 40instrmentsagri-standadization & 529 66 171 HBOH71 42itumnsorganizational construction posterio 529 66 May,2007 June,2007 Aug.2007 Sept,2007 *1H7017 HB0001H7017 I 47sets of office equipment organizational development & pseit550 20 a,07Jn,07Ag20 et20 supportpotro550 720Ma,07Jn,07Ag20 p,07 IH701 HBOOIH708 1 1 faring vhicls, I aterng veicleagri-standadization & 570 36 1H08 HOOHO8 1 1 amn eils aeigvhceorganizational construction posterio 6.0 36 May,20071____ June,2007 Aug.2007 Sept.2007 I1H7019 HBOOO1IH7019 1 302 .sprayers, 2 sets of sifting agri-standadization & V .325.57 42.28 _____equipment organizational construction posteriol_____ ________ May,2007 June,2007 IAug.2007 Sept.2007 IH00 HOOH00 I Imto cesre o aceg watersaving inrigation postenio 523.6 600June,2007 June,2007 July,2007 Aug.2007 10H7001 HBIQAOOH7001 1 85800 saplings for Qian'an agri-bio enviromnment construction & mnanagem, V posteriot 343.20 44.57 April,2007 May,2007 May,2007 June, 2007 '0H7002 HBRQOOH7002. 1 60000 saplings for Renqiu agri-bio enviromnent construction & manager V posterioi 336.00 43.64 Feb.2007 March,2007 ____March,2007 April, 2007 0H7001 HBZHOOH7001 1 37000 saplings for Zunhua agri-bio environment construction & managem V posterioi 266.00 34.55 Feb,2007 March,2007 March,2007 April,2007 OH700 HBZOOH702 1 2500km ofprot-speies or Znhua agri-s.tandadization & I64 0H02HZOH02 1 20 mo it-pce o uhaorganzafional constumction I Iposterior 50 6.9June,2007 _____June,2007 July,2007 Aug.2007 31H7001 HBXJOOH7001 I 100000 saplings for Xinji agri-bio environmnent construction & managef V posterio 600.00 7.2March,2007 April,2007 April,2007 My20 )H702 HBJOO7002 1 820 k of rotospeies or Xnji agri-standadization &974 )H02 HXOH 2 1 820k fpnoseisfrXni organiztiona constumction Vposterior 750 9.0June,2007 June,2007 July,2007 Aug.2007 )H7002 HBJZOOH7002 1 69960 saplings for Jizhou V90.87 1H02 HJOH02 1 690spig o ihuagri-bio environment construction & manag n posterior 699.67 9.7March,2007 April,2007 _____April,2007 ____May,20071 ~]H7001 HBCZWQH7001 1 60000 saplings for Wuqiao agri-bio environment construction & managen V posterio 300.00 38.96 March,2007 April,'2007 April,2007 May,2007 3H7001 HBCZDGH7001 1 .125152 saplings for Dongguans agfi-bio envirownment constiruction & mnanage V posteeio 750.91 97.52 March,2007 April,20071 April,2007 May,2007 M17001 HBCZBTH7001 1 153200 saplings for Botou agri-bio environmnent construction & managei V posterio 391.00 50.78 Feb,2007 IMarch,2007 ____March,2007 May,2007 CH7001 HBCZCXH7001 1 75000 saplings for Cangxian agri-bio environment construction & manager V posterio 750.00 97.40 March,2007 April,2007 April,2007 May,2007 'H7001 HBTSYTH7001 1 79200 saplings for Yutian agri-bio environment construction & mnanagei V posterio 259.00 33.64 __ March,2007 April,2007 April,2007 May,2007 'H7001 HBTSLTH7001 1 63000 saplings for Leting agri-bio environment construction & managei V posterio4251.8 32.70 1 March,2007 April,2007 April,2007 May,2007 'H7002 HBTSLTH7002 1 62000 saplings for Leting agiboevrVetcntuto aae potro 277 32.17 Jn,07Jn,07Jl,07Ag20 701HHTH01 1 680spigfoTaceg agri-bio environmnent construction & managem posterior 247.78 789 June,2007 _____June,2007 _____JuIy,2007 Aug.2007 ____ H70HBSC70 I 700spigfoTaceg agri-bio environment construction & managei posteriorl608.08 9.8 June,2007 IJune,2007 IJuly,2007 lAug.2007 H01HHJH01 1 400spigfoJiginagri-bio environment construction & managem posterior 745.7 416June,2007 June,2007 July,2007 Aug.2007 H02HHJH02 1 770spigfoJiginagri-bio environment construction & managem__ posterior 340. 72.94 _____ June,2007 June,2007 July,2007 Aug.2007 ____ 11702 HHSJX700 1 7700saplngsfor ingian . 2.9 csofactual date exetd oftaldt mode of procurement c f ac*x date exp,ected date actual date expected date date of of pror or estimated coo cot expected date ofue Siing rig number coHuStract No ofutem contents of purchase Sub-project category & NCB s posterior 58 4of issuing ofiuing of opening of opening of Signing contrat executn executing ppH7001 rBLFvYH7ew1 RB USD bid (f,o) bid (m) bidbi rm) bid (ycm) contrat (yhm) y contract contract (1000) (000) - ________ ____v.jm J L ZQH7001 HBHSZQH7001 1 72605 saplings for Zaoqiang agri-bio environment construction & manage posterior 5.40 754. June,2007 June,2007 July,2007 Aug,2007 YZQH7002 HBHSZQH7002 - 72605 saplings for Zaonqiang agri-bw envionent construction M managen V poserior 8062.4 75-4 M h,200 April,2007 Dec,2007 IYH7001 HBLFGYH700 1 120000saplings for ng'ang agri-bio environment construction & managen V posterior 600 77.92 June,2007 June,2007 July,2007 AUg,2007 ACH7001 HBLFACH7001 1 70000 saplinga for Ani 54.55207Jne207Jly20 agri-bio environment construction & manage posteriorI42007 J=:e,2077 July,2007 Aug,2007 ZfQH7001 HBLFYQH7001 1 60000 saplings for Yongqing gnbio environent constrction & managestio 48 62,34 June,2007 June,2007 July,2007 AUg,2007 23.38Jne07Jn,07uI,07A ,20 VAH7001 HBLFWAH7001 1 40000 saplings for Wenoan agri-bio enviromnent construction & managem posterio 180 5.19 June,2007 JuLne,2007 July,2007 Aug,2007 VJH7001 HBSJWJH700 1 1 92520 saplings for Wuji -boevr1etcntuto amr oter7416 96.12 June,2007 Junse,2007 July,2007 Aug,2007 _ZH701 _HS ___700 __62400_sap_i_p_for_Ji __hou agr-bio environment construction & managem posterior 468 67 June,2007 June,2007 JuIy,2007 Aug,2007 ;DH7001 HBSJZDH7001 1 2 sets of seed processing equiPment agi-itenionenicnsrcton40ang5.19 Jusne,2007 June,2007 July,2007 Aug,2007 aw-bioenvirnmposteriorct 40 m__e__ I DH7002 H1BSJZDH7002 1 45000 saplings for Zhengding agri-bio environment construction & managen psteriorl 49.68 June,2007 June,2007 July,2007 Aug,2007 6 Wuji Civil Works Procurement Plan for 2007 IAIL III Project the mode of purchase rior or estimated cost date of date of date of date of bidding numb contract Contents of P_ost_o issumg opening signing executing No. er of No. purchase CB shoppi prosteiewor RMB USD bid bid contract contract remark items ng 1,000 1,000 (y,m) (y,m) (y,m) (y,m) to llushi 140 wells, HBSJZWJB HBSJWJT build 363 wellheads, June- ID-W- 1 250 m2 of drying yard,V posterior 308.53 40.07 April,200 May,2007 May,2007 Nov.,2007 Qiji Town 200701 701 50 m2 of service 7 ,'f37L VVJ _PnferI ID-W- 1 HBSJWJT 48 km of gravel road V posterior 2400 311.69 April,200 May,2007 June,2007 Town _ _ _ 7002 __ _ _ _ _ _ _ _~May,2007 Town____ __ _ HBSJZWJB HBSJWJT to build 8 km of gravel ID000 1 7003 road, and 65 wellheads V posterior 420.15 54.56 April,200 May,2007 May,2007 June,2007 Guozhuang 200703 703 ra, n 5wiled7~ uzun BBSJZWJB HBSJWJT 10950 protectors of 0-W- 1 7004 water outlet J posterior 219 28.44 NCB 1 2400 311.69 shopping 3 947.68 123.08 total 4 3347.68 434.76 Zhengding Civil Works Procurement Plan for 2007 IAIL III Project the date of date of the mode of purchase prior or estimated cost date of date of signing executing bidding No. nu ef contract No. Conten o posterior issuing bid opening bid remark ro ucaeshoPP review RMB USDcotat onrt items ICB NCB *n 1,000 1,000 (y,m) (y,m) (y,M) (y,m) SJZZDBID-W- I HBSJZDT70 15.6 km of gravel road posterior 936 121.56 April, 2007 April, 2007 April, 2007 April, 2007 Nanlou 01 200701 HIBSJZDT70 2 02 24.4 km of gravel road - posterior 1464 190.13 April, 2007 April, 2007 April, 2007 May,2007 Quyangqiao _ _ _ _ _ _ _ _ _ _ _ _ __ __ 0 2 - _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ 1 03 to flush 230 wells - posterior 379.5 49.29 April, 2007 April, 2007 July,2007 July,2007 NQuyangqiao SJZZDBID-W- HBSJZDT70 to install 140 kmn of Nn 200702 2 04 PVC conduit v posterior 545.21 70.81 Sept,2007 Sept,2007 Sept,2007 2007.1 Nanlou, 200702__04 PVC __ _ __ _ __ conduit _ __ _ __ __ _ __ _ ___I_ _ Quyangqiao XHBSJZDT70 to build wellheads and -Nanlou 3 H 7 tovs aI posterior 136.2 17.69 Sept,2007 Sept,2007 Sept,2007 2007.1 anu, 05 covers Quyangqiao SJZZDBID-W- I HBSJZDT70 5 n00m2 of seed 200703 H 706 multiplication drying I/ posterior 60 7.79 May,2007 May,2007 June,2007 June,2007 Quyangqiao _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ yard SJZZDBID-W- HBSJZDT70 11620 protectors of Nanlou, 200704 I 07 water-outlet, 508 V posterior 184.78 24.00 April, 2007 April, 2007 July,2007 July,2007 Quyangqiao wellheads with covers NCB 2 2400 311.69 shopping 5 1305.69 169.57 total 7 3705.69 481.26 Xinji Civil Works Procurement Plan for 2007 IAIL III Project the mode of purchase p estimated cost date of date of bidding numbe contract Contents of prior or date of date of signing executing No. r of No. purchase ICBptevie RMB USD issin b oen i contract contract items shopping 1,000 1,000 (y,m) (y,m remark 5 bridges with span HBXJOOT7 of 4 m, to build 289 1 001 wellheads and switch J posterior 540. 2 70. 2 April,2007 May,2007 June,2007 June,2007 huts, install 115.8 km Tiangongying, HBXJBID- of conduit Tianjiazhuang W-200701 HBXJOOT7 11 km of gravel road J posterior 478.5 62. 1 Aug,2007 Aug,2007 Sept,2007 Sept,2007 002 Tianjiazhuang HBJO77993 water outlet 3 HBX003T7 pools, 289 sets of /J posterior 369. 9 48. 0 April,2007 May,2007 June,2007 June,2007 Tiangongying, p pressure pools Tianjiazhuang 19 km of barium HBXJBID- HBXJOOT7 cindered road, 10 km W-200702 004 of waste oilstone prior 1181.0 153.4 April,2007 May,2007 June,200 June,2007Tiangongying, road Tianjiazhuang NCB 1 1181.0 153.4 shopping 3 1388.6 180.3 total 4 2569.60 333.7 Note:The county is new and it has never done NCB Jinzhou Civil Works Procurement Plan for 2007 IAILIE Project the mode of purchase prior or estimated cost date of date of Sgi ecutin bidding No. number contract No. Contents of purchase ICB NCB shoppin posterior RMB USD issuing bid opening bid sgnng executing remark _ _ _ _ _ _ of items __ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _review 1,000 1,000 (y,m) (y,m) _ _ _ _ _ HBSJJZT700 9.63 km of brick-paved Donglizhua 1 1 road posterior 1042.22 135.35 April,2007 April,2007 April,2007 May,2007 ng IHBSJJZT700 20.3 km of cindered Zhaowei 2 2 road posterior 939.78 122.05 April,2007 April,2007 April,2007 May,2007 Town SJZJZBID-W- HBSJJZT700 16.5 km of cindered Donglizhua 200701 3 3 road posterior 763.15 99.11 Aug,2007 Aug,2007 Sept,2007 Sept,2007 ng build 458 wellheads, SJZJZBID-W- HBSJJZT700 26 pumping huts, and 5 Donglizhua 200702 1 4 sign boards posterior 424.71 55.16 Aug,2007 Aug,2007 Sept,2007 Sept,2007 ng SJZJZBID-W- HBSJJZT700 3.47 km of brick-paved Zhaowei 200703 1 5 road posterior 375.54 48.77 Aug,2007 Aug,2007 Sept,2007 Sept,2007 Town SJZJZBID-W- HBSJJZT700 Donglizhua 200704 1 6 to install conduit posterior 436.5 56.69 Aug,2007 Aug,2007 Sept,2007 Sept,2007 ng SJZJZBID-W- HBSJJZT700 9996 protectors of j posterior Donglizhua 200705 1 7 water outlet 199. 92 25.96 Aug,2007 Aug,2007 Sept,2007 Sept,2007 ng NCB 3 2745.15 356.51 shopping 4 1436.67 16. 58 6 total 7 1 1____ 4181.82 543.09 _ 1 1 1 the red words are to flush 100 wells. Zunhua Civil Works Procurement Plan for 2007 IAILIIH Project the mode of purchase prior or estimated cost | date of date of date of date of bidding No. mt Contents of purchase Ierevior Rissuing bid opening bid signing executing remark bidngN. bl No. ICB NCB shopping review RMB 1,uuu USD 1,000 y)(ymcotat onrt I HBzHooT700 to rebuild 4 wells and flush 42 wells posterior 120 15.58 2007.3.15 2007.3.30 2007.4.15 2007.4.25 HBZHOOT700 2 bridges, 5 culverts, 217 water pits and HBZHBID- 2 2 40 sqm of building for farm-tech V posterior 499.6 64.88 2007.3.15 2007.3.30 2007.4.15 2007.4.25 Xisanli W-200701 service center Town 3 HBZHOOT7007 km of gravel road posterior 315 40.91 2007.3.15 2007.3.30 2007.4.15 2007.4.25 1 HBZHOOT700 install 32 km of conduit V posterior 352 45.71 2007.3.15 2007.3.30 2007.4.15 2007.4.25 HBZHBID- Dongjiuzhai W-200702 2 HBZHGOT70 3.95 kmt of gravel road, 24 pumping posterior 403.5 52.40 2007.3.15 2007.3.30 2007.4.15 2007.4.25 Town 5 huts, and build 2 bridges.___ __ _ _ _ ___ _ _ _ _ _ -HBZHOOT700- 3 6 wells washing V posterior 92 11.95 2007.3.15 2007.3.30 2007.4.15 2007.4.25 1 HBZHooT700 to rebuild 2 wells, flush 7 wells I posterior 162 21.04 2007.3.15 2007.3.30 2007.4.15 2007.4.25 7 2 pumping huts, 2 reservoirs, 10.6 km HBZHBID- HBZHOOT700 of gravel road, 38 km of underground Ping'ancheng W-200703 2 8 conduit, 50 sqm of building for farun- V posterior 585. 3 76.01 2007.3.15 2007.3.30 2007.4.15 2007.4.25 Town tech service center 3 HBZHOOT700 o install 2 transformers posterior 136 17.66 2007.3.15 2007.3.30 2007.4.15 2007.4.25 9 NCB 0 shopping 9 2665. 4 346. 16 total 9 2665. 40 346.16 Yutian Civil Works Procurement Plan for 2007 IAILIII Project numbe mode of purchase prior or estimated cost date of date of date of date of bidding No. r of contract No. Contents of purchase posterior UN U issuing bid opening bid signing executing remark items ICB NCB shopping review I Ran I fit (y,m) (y,m) contract contract 5 bridges with span over 10 m, 44 bridges with span less than 4 m; , Chenjiapu 1 HBTSYTT7001 culverts with diameter of 60- V posterior 688 89. 4 May,2007 May,2007 May,2007 June,2007 Town 100cm; I sluice with discharge of HBTSYTBID- 1-3m3/s, and 120 pumping huts; W-200701 2 HBTSYT7002 3 bridges with span over 10 m, 40 posterior May,2007 June,2007 Guojiaqiao 2 _HTSTT00 culverts with dia over 1 00cm. I poei 293_ May,2007 May,2007 May,2007 June,2007 Township 3 HBTSYTT7003 3 bridges with span of 10-4 m I posterior 12 1. 6 May,2007 May,2007 May,2007 June,2007 ailngqliao 4 1HBTSYTT7004 9 bridges with span of 10-4 m V posterior 35 4. 5 May,2007 May,2007 May,2007 June,2007 Daan Town 1 HBTSYTT7005 to flush 99 wells I/ posterior 149 19. 4 June,2007 June,2007 June,2007 July,2007 Laitingqiao HBTSYTBID- -IITw W-200702 2 HBTSYTT7006 to flush 47 wells V posterior 71 9. 2 June,2007 June,2007 June,2007 July,2007 Daan Town 3 HBTS7007 to flush 75 wells V posterior 112 14. 5 June,2007 June,2007 June,2007 July,2007 (henjiapu I HBTSYTT7008 to install 5 km of agri-power line V posterior 169 21. 9 July,2007 July,2007 July,2007 Aug,2007 Daan Town HBTSYTBID- and 16 transformers W-200703 2 HBTSYTT7009 to install 19 km of agri-power line I posterior 185 24. 0 July,2007 July,2007 July,2007 Aug,2007 Chenjiapu and 10 transformners uy "3 'Town 3 km of gravel road (width > 1 HBTSYTT701o 6m),and 20 km of gravel road I posterior 590 76. 6 April,2007 April,2007 April,2007 May,2007 Daan Town HBTSYTBID- (width <6m) W-200704 2 HBTSYTT7011 7 km of gravel road, width <6 m IV posterior 175 22. 7 April,2007 April,2007 April,2007 May,2007 aItingqiao 3 HBTsm7012 3 km of gravel road, width <6 m V posterior 75 9. 7 April,2007 April,2007 April,2007 May,2007 Chenjiapu HBTSYTBID- I HBTSYTT7013 to install water-saving conduit V posterior 180 23. 4 Sept,2007 Sept,2007 Oct,2007 Oct,2007 Daan Town W-200705 2 HBTSYTT7014 to install water-saving conduit =- posterior 144 18. 7 Sept,2007 Sept,2007 Oct,2007 Oct,2007 caitingqiao HBTSYTBID 1 HBTS75 60 M2 of the building for farm-tech W-200706 - HBTsm7o 15 service center posterior 34 4. 4 May,2007 May,2007 May,2007 June,2007 Da'an Town total 15 2912 378.2 Luannan Civil Works Procurement Plan for 2007 IAILi Project date of date of the mode of purchase prior or estimated cost date of date of date executing )idding No. number contract No. Contents of purchase posterior issuing bid opening bid con t coremark of items ICB NCB shopping review 1,00 U,SD contract contrac I 0 ridgs wih spn ofPachigang HBTSLNT700 10 bridges with span of Town,Qingtuoying *TSLNBID- 1 3.4 m, 33 culverts with dia Town,Chenghuang 200701 of 100cm V posterior 471.5 61.23 March,2007 March,2007 March,2007 April,2007 Town,Bencheng Town Pachigang HBTSLNT700 Town,Qingtuoying TSLNBID- 2 to rebuild 80 wells and Town,Chenghuang 200702 flush 115 wells. V posterior 772.5 100.32 March,2007 March,2007 March,2007 April,2007 Town,Bencheng Town to install 36.3 km of TSLNBID- I HBTSLNT700 380V power line and 8 3 '00703 transformers V posterior 749.8 97.38 March,2007 March,2007 March,2007 April,2007 Pachigang,Qingtuoying HBTSLNT700 to install 14.7 km of 380 'SLNBID-W- I 4 V low-voltage power line '04 and 3 A transformers V posterior 302.7 39.31 Aug,2007 Aug,2007 Aug,2007 Sept,2007 Chenghuang, Bencheng SLNBID-W- I HBTSLNT700 12.8 km of gravel road 05 o with width of 5 m V posterior 563 73.12 March,2007 March,2007 March,2007 April,2007 Pachigang,Qingtuoying SLNBID-W- I HBTSLNT700 12.56 km of gravel road 06 6 with width of 5 m V posterior 556.8 72.31 Aug,2007 Aug,2007 Aug,2007 Sept,2007 Chenghuang,Bencheng SLNBID-W- 1 HBTSLNT700 to install139 km of low- Pachigang,Qingtuoying, D7 7 pressure conduit V posterior 486.5 63.18 Aug,2007 Aug,2007 Aug,2007 Sept,2007 Chenghuang,Bencheng iLNBID-W- I HBTSLNT700 16650 M2 of buildings for Qingtuoying,Chengzhua 8 8 farming facilities V posterior 170 22.08 Aug,2007 Aug,2007 Aug,2007 Sept,2007 ng NCB 2 - 1522.3 197.70 ;hopping 6 2550.5 331.231 total 8 4072.8 528.94 Qian'an Civil Works Procurement Plan for 2007 IAILiI Project the mode of purchase prior or estimated cost date of date of uate OT bidding No. number contract No. Contents of purchase posterior RMB issuing bid opening bid dat (y,) executing remark ofiesICB NCB shpigUSD (y,) (,m) contract (y,m) contract oitmshpig review i,o 1,000 Y) '-t m 1 HBQAOOT7001 to rebuild 29 wells, repair 30 wells r 538 69.9 March,2007 April,2007 April,2007 April,2007 Kouzhuang HBQAOOT7001 2 HBQAOOT7002 to rebuild 12 wells, repair 22 wells V posterior 237 30.8 March,2007 April,2007 April,2007 April,2007 Xiaguanying to rebuild 29 pumping huts and V posterior I HBQAOOT7003 repair 30 pumping huts - 176.5 22.9 April,2007 May,2007 May,2007 May,2007 Kouzhuang to rebuild 15 pumping huts, repair posterior Xiaguanying HBQAOOT7002 2 HBQAOOT7004 43 pumping huts 160 20.78 April,2007 May,2007 May,2007 May,2007 Town to install 6.2 km of agri-power I/ posterior Kouzhuang 1 HBQAOOT7005 line, 12 transformers 604 78.44 Sept,2007 Oct,2007 Oct,2007 Oct,2007 township to install 4.3 km of agri-power line V posterior Xiaguanying HBQAOOT7003 2 HBQAOOT7006 and 5 transformners 286 37.1 Sept,2007 Oct,2007 Oct,2007 Oct,2007 Town 20 km of gravel road with width Voterior Kouzhuang HBQAOOT7004 I HBQAOOT7007 over 6 m pos 1300 168.8 April,2007 April,2007 April,2007 May,2007 township 20 km of gravel road with width posterior HBQAOOT7005 2 HBQAOOT7008 over 6 m 1100 142.9 June,2007 Junc,2007 June,2007 July,2007 Xiaguanying to install 50 km of low-pressure I HBQAOOT7009 conduit V posterior 150 19.5 Sept,2007 Oct,2007 Oct,2007 Oct,2007 Kouzhuang to install 36 km of low-pressure HBQAOOT7006 2 HBQAOOT7010 conduit V posterior 108 14.03 Sept,2007 Oct,2007 Oct,2007 Oct,2007 Xiaguanying I HBQAOOT7011 to plant trees of 31 ha. V posterior 102.3 13.3 March,2007 April,2007 April,2007 April,2007 Kouzhuang -IBQAOOT7007 2 HBQAOOT7012 to plant trees of 21 ha. V posterior 69.3 9.0 March,2007 April,2007 April,2007 April,2007 Xiaguanying NCB 2 2400 311.69 shopping 10 - 2431.1 315.73 total 12 4831.1 627.42 _ _ Leting Civil Works Procurement Plan for 2007 IAILiE Project the mode of purchase prior or estimated cost date of date of date of date of biofn No. ub cotatCnetofprhs posterior RMB issuing bid opening bid sgig ecung remarks bidding No. numbe conotrat Contents of purchase ICB NCB shopping review 1,ooo USD 1,000 (y,m) (y,m) contract contract _ _ _ _ _ _ _ _ _ _ _ _ _ item s v m to repair 5 bridges (10-4 m) and 3 bridges 1 HBTSLTT7001 (less than 4 m) for production,35 culverts (60-lOOcm);2 culverts (less than 60 cm) V . posterior 624. 6 81. 1 March,2007 April,2007 April,2007 May,2007 Jianggezhuang HBTSLTBID-T7001 2 HBTSLTT7002 1 bridge for production (over 10 m),50 V culverts (60- 1 00cm) posterior 415. 6 54. 0 March,2007 April,2007 April,2007 May,2007 Panggezhuang 3 HBTSLTT7003 7 bridges (less than 4 m)for 3 production,27 culverts (60-100 cm) V posterior 525. 0 68. 2 March,2007 April,2007 April,2007 May,2007 Guhe 1 HBTSLTT7004 to flush 110 wells - posterior 273. 9 35. 6 March,2007 April,2007 April,2007 May,2007 Jianggezhuang HBTSLTBID-T7002 2 HBTSLTT7005 to flush 200 wells posterior 400. 0 51. 9 March,2007 April,2007 April,2007 May,2007 Panggezhuang 3 HBTSLTT7006 to flush 50 wells V posterior 250. 0 32. 5 March,2007 April,2007 April,2007 May,2007 Guhe 1 HBTSLTT7007 to install 8 km of power line I/ - posterior 24. 0 3. 1 March,2007 April,2007 April,2007 May,2007 Guhe HBTSLTBID-T7003 2 HBTSLTT7008 to install 10 km of power line posterior 30. 0 3. 9 March,2007 April,2007 April,2007 May,2007 Panggezhuang HBTSLTBID-T7004 1 HBTSLTT7009 2.5 km of gravel road I/ posterior 150. 0 19. 5 March,2007 April,2007 April,2007 May,2007 Guhe 1 HBTSLTT7010 to install 20 km of conduit I/ posterior 72. 0 9. 4 March,2007 April,2007 April,2007 May,2007 Jianggezhuang HBTSLTBID-T7005 2 HBTSLTT7011 to install 40 km of conduit V posterior 144. 0 18. 7 March,2007 April,2007 April,2007 May,2007 Panggezhuang 3 HBTSLTT7012 to install 51.7 km of conduit I/ posterior 189. 9 24. 7 March,2007 April,2007 April,2007 May,2007 Guhe (observation center);50 M2 of building for 1 HBTSLTT7013 farm-tech service; 14500 M2 of buildings for farming facilities I/ posterior 407. 5 52. 9 March,2007 April,2007 April,2007 May,2007 ianggezhuang (observation center);50 M2 of building for 2 HBTSLTT7014 farm-tech service; 14420 M2 of buildings HBTSLTBID-T7006 for farming facilities V posterior 410. 5 53. 3 March,2007 April,2007 April,2007 May,2007 Panggezhuang 6 sluices (discharge less than Im3/s); 3 equeducts,60 M2 of buildings for 3 HBTSLTT015 pumping irrigation station;48M2of building for farm-tech service center;8360 M2 for farming facilities V posterior 419. 0 54. 4 March,2007 April,2007 April,2007 May,2007 Guhe total 15 _ _ _ _ _ _4336. 0 542.0 ICI_I_I Wuqiao Civil Works Procurement Plan for 2007 IAILHI Project date of date of the mode of purchase prior or estimated cost date of date of date executing bidding No. number contract No. Contents of purchase posterior issuing bid opening bid signing executing remarks of items ICB NCB shopping review RMB 1,000 USD 1,000 (y,m) (y,m) (y,n) (y,m) HBCZWQT7 April26,200 Caowa,Tiechen I 001 11 bridges; 7 culverts V posterior 714 92.73 April10,2007 April25,2007 7 April30,2007 g,Goudianpu 3 pumping stations HBCZWQT7 with area of 150M2,6 April26,200 Caowa,Tiechen 2 002 pumping huts __ posterior 314.66 40.86 April10,2007 April26,2007 7 April30,2007 g,Goudianpu HBCZWQBI HBCZWQT7 to harden road of 3.2 April28,200 D-W-200701 3 003 km V posterior 480 62.34 AprillO,2007 April27,2007 7 April30,2007 Liangji Town HBCZWQT7 Caowa,Tiechen 4 004 to harden road 4.25 km V posterior 714.5 92.79 AuglO,2007 Aug28,2007 Aug26,2007 Aug3O,2007 g,Goudianpu to rebuild 52 wells, HBCZWQT7 install conduit of 70 April29,200 Caowa,Tiechen 5 005 km, flush 3 wells; i posterior 558 72.47 AprillO,2007 April29,2007 7 April30,2007 g,Goudianpu HBCZWQT7 210 m of concrete April29,200 Caowa,Tiechen 6 006 intake pipe V posterior 50 6.49 April10,2007 April29,2007 7 April30,2007 g,Goudianpu total 6 -- 2831.16 367.68 = = = == Dongguang Civil Works Procurement Plan for 2007 IAIL III Project the prior or date of date of date of date of the contract Contents of mode of purchase pro r estimated cost daeodtef dtef dtef bidding No. number con purchase posterior issuing bid opening bid signing executing remarks ofNo. purchase ICB NCB shopping review RMB 1,000 USD 1,000 (y,m) (y,m) contract contract HBZG BZG 6 sluices, 194 M2 of Dongguang,Li 0BCZDCT - HBZDG b uilding for pumping posterior 384.4 49.92 Aug,2007 Aug,2007 Sept,2007 Oct,2007 anzhen,Dngmi station ngsi HBCZDGT HBCZDG Dongguang,Li 7002 2 T7002 33 culverts I posterior 785 101.95 Aug,2007 Aug,2007 Sept,2007 Oct,2007 anzhen -_ ,Dengmingsi HBCZDGT HBCZDG to rebuild 56 wells, Lianzhen 7003 H Z1 T7003 repair 45 wells I/ posterior 189.6 24.62 Aug,2007 Aug,2007 Sept,2007 Oct,2007 Town,Dengmi 703I03 ear45wlsngsi Town HBCZDGT HBCZDG 40 M2 of township I posterior 20 2.60 Aug,2007 Aug,2007 Sept,2007 Oct,2007 Dengiingsi 7004 T7004 service center Town HBCZDGT I HBCZDG 3000 M2 for fanning V posterior 100 12.99 Aug,2007 Aug,2007 Sept,2007 Oct,2007 Dongguang 7005 T7005 facilities Town - B HCZDG to harden 5 km road V posterior 597. 21 77.56 Aug,2007 Aug,2007 Sept,2007 Oct,2007 Dengmignsi HBCZDGT T7006 Town 7006 2 TBCZDG to harden 4 km of I posterior 480. 00 62.34 Aug,2007 Aug,2007 Sept,2007 Oct,2007 Yuqiao Town T7007 road NCB 1 785.00 101. 95 shopping 6 1771. 21 230. 03 total 7 2556.21 331.98 Botou Civil Works Procurement Plan for 2007 IAILUI Project mode of purchase or estimated cost date of date of date of bdigN.the number of Cnetofprior ordate of issuing baeo signg remarktin biiding No. items contract No. purchase ICB NCB shopping rosterior RMB 1,000 USD bid (y,m) op(yin) contract contract remarks rciw1,000 m .I) 3niL...... to repair 17 wells, |Jiaohe HBCZBTT7001 HBCZBTT7001 build 14 pumping I/ posterior 410 53.25 May,2007 May,2007 May,2007 May,2007 Town huts to repair 18 wells, Yiorzi HBCZBTT7002 HBCZBTT7002 build 10 pumping ci posterior 410 53.25 May,2007 May,2007 May,2007 May,2007 Town, huts to bild newYingzi HBCZBTT7003 HBCZBTT7003 to bid-t c6 newts | posterior 564 73.25 May,2007 May,2007 May,2007 May,2007 hbcz20070 1 Jiaohe HBCZBTT7004 HBCZBTT7004 to install 45 km of I posterior 90 11.9 June,00 J e J low-pressure conduit V otro 0 1.9 Jn,07 Jn,07 Jn,07 Jn,07 Yingzi Jiaohe 97 MI building for Town, HBCZBTT7005 HBCZBIT7005 farm-tech service I/ posterior 58 7.53 June,2007 June,2007 June,2007 June,2007 Yingzi center Tw HBCZBTT7006 HBCZBTT7006 ecology construction V/ posterior 100 12.99 June,2007 June,2007 June,2007 June,2007 Ynz in rural area Town 'ibcz2007O2 HBCZBTT7007 HBCZBTr7007 to bulV i fhr posterior 1085 140.91 June,2007 June,2007 Tow207 Juc207 Yngz road Tw NCB 1 1085 140.91 shopping 6 1632 211.95 total 7 2717 352.86 Cangxian Civil Works Procurement Plan for 2007 IAILIII Project mode of purchase prior or estimated cost d o date of date of eute ol bidding No. the number contract Contents of purchase -p ostrior date of pssuingoopening bid signing remarkecutisg rmk of items No. conRBbi y,)tract IR NCB shopping review USD 1,000 bd(m) (y,m) contract (y,m) con 001 HBCZCX to build 60 culverts, 19 pumping Town, T7001 huts V posterior 712 92.47 April,2007 May,2007 May.2007 May,2007 Wulongtang HBCZCX Dulin Town, 002 249 culverts, 2 bridges and 25 Dachucun T7002 pumping huts V posterior 652 84.68 April,2007 May,2007 May,2007 May,2007 Town, 003 HBCZCX Xueguantun T7003 5.03 km of brick-paved road V posterior 503 65.32 April,2007 May,2007 May,2007 May,2007 Town HBCZCXWulongtang 004 HBZXTown, Dulin HBCZCXT7 T7004 6.4 km of brick-paved road V posterior 700 90.91 April,2007 May,2007 May,2007 May,2007 Town 005 HBCZCX Dachucun T7005 7.05 km of brick-paved road - posterior 705 91.56 April,2007 May,2007 May,2007 May,2007 Town Xueguantun, 006 HBCZCX Wulongtang, T7006 Dulin,Dachuc to flush 41 wells V posterior 410 53.25 April,2007 May,2007 May,2007 May,2007 un Towns Xueguantun, 007 HBCZCX Wulongtang, 07 T7007 Dulin,Dachuc install 75.9 km of conduit V posterior 75.9 9.86 April,2007 May,2007 May,2007 May,2007 un Towns total 7' 3757.9 488.04 _ 1 1 Renqiu Civil Works Procurement Plan for 2007 IAILJI Project th ubrmode of purchase Iprior or estimated cost date of date of d.ate. of date of bidding No. th number contract No. Contents of purchase posterior issuing bid opening bid signing executing of iemsICB NCB shopincontract contract IC C hpi review RMB 1,000 USD 1,000 (m) y,) (y,m) (y,m)reak 3 bridges with the span <4 HBCZRQ- HBQO70m, 1 bridge with the span BID-W- 1 HBRQ T7 10-4 m;3 bridges with span I posterior 475 61. 69 Apnrl,2007 May,2007 May,2007 June,2007 Liangzhao, Yongfeng,Lugongbao 200701 >lOm; I irrigation pumping station. HBCZRQ-15 culverts with dia. < BID-W- 1 HBRQOOT7 00 -00cm, 2 culvert with V/ posterior 206 26. 75 April,2007 May,2007 May,2007 June,2007 Lugongbao,Yongfeng, Yilunbao 200702 2 60 dt of I m dia. over 100cm. HBCZRQ-HBQ T707k ofbikpvdra BID-W- 1 HBRQOOT700 7 ikm wof b k pad ro a m posterior 730 94. 81 April,2007 May,2007 May,2007 June,2007 Lugongbao 200703 3wt it fm' HBCZRQ- HBRQOOT700 73 mstall I lun V Yilunbao,Liangzhao,Lugongbao, BID-W- 1 4 brick-paved road with I/ posterior 671 87. 14 Aug,2007 Aug,2007 Sept,2007 Sept,2007 Yogfn 200704 width of 4 m HBCZRQ- HBRQOOT700 rebuild 19 wells, repair 74 Yilunbao,Liangzhao,Lugongbao,Yongfen BID-W- 1 5 wells ./ posterior 725 94. 16 April,2007 May,2007 May,2007 June,2007 200705 ____ HBCZRQ- HBRQOOT700o Yilunbao,Liangzhao,Lugongbao,Yongfeni BID-W- 1 to install 31.3 power line .1 posterior 149 19. 35 April,2007 May,2007 May.2007 June,2007 2007066 NCB shopping 6 2956 383.90 total 6 2956 383.90 Jingxian Civil Works Procurement Plan for 2007 IAILI Project mode of estimated cost date of biddingNo. nube contract Contents of purchase prior or date of date of signing date of executing No. purchase shposteriowRM contract contract (y,m) ofiesIBNBping 1,000 USD 1,000 bid (y,m) (y,m (,)remark 4 bridges less than HBHSJXT 4 m;291 culverts of March,20 Beiliuzhi,Wangton HBHSJXBID-W-200701 1 7001 50 cm V posterior 429.20 55.74 07 March,2007 April,2007 April - Dec,2007 g,Duqiao HBHSJXT To rebuild 142 March,20 Beiliuzhi,Wangton HBHSJXBID-W-200702 1 7002 wells __ posterior 480.39 62.39 07 March,2007 April,2007 April - Dec,2007 g Duqiao HBHSJXT 9.5 kmn of hard March,20 Beiliuzhi, HBHSJXBID-W-200703 1 7003 (gravel) road V posterior 760.00 98.70 07 March,2007 April,2007 April - Dec,2007 Wangtong HBHSJXT to harden 45 km of March,20 HBHSJXBID-W-200704 1 7004 brick-paved road V/ posterior 465.00 60.39 07 March,2007 April,2007 April - Dec,2007 Duqiao 6.5 km of seeping preventing canel, 61.3 km of seeping HBHSJXT prevention March,20 Beiliuzhi,Wangton HBHSJXBID-W-200705 1 7005 construction V +v posterior 637.47 82.79 07 March,2007 April,2007 April - Dec,2007 g,Duqiao 80200 M2 of HBHSJXT building for farming March,20 HBHSJXBID-W-200706 1 7006 facilities V posterior 120.3 15.62 07 March,2007 April,2007 April - Dec,2007 Wangtong HBHSJXT 3 ponds March,20 HBHSJXBID-W-200707 1 7007 v/ posterior 412 53.51 07 March,2007 April,2007 April - Dec,2007 Wangtong NCB 1 760.00 98.70 shopping 6 - = 2544.36 330.44 _ _ _ total 7 3304.36 429.14 1 1 __ Zaoqiang Civil Works Procurement Plan for 2007 IAILIl Project the number contract Contents of mode of purchase prior or estimated cost date of issuing bid date of opening signing executing bidding No of items No. purchase ICB NCB shoppin posterior bid (y,m) contract contract remarks ofies N. prhs C C F review RMB 1,000 USD 1,000 (ymbd(y) cotat onrt HBHSZQBID- HBHSZQT7 Zaoqiang,Wangc W-200701 1 oo0 to build 7 bridges V posterior 760 98. 70 May, 2007 May,2007 June,2007 June,2007 hang I irrigation station, Tanglin HBHSZQBID- HBHSZQT7 I sluice and 4 ,Zaoqiang,Wangc W-200702 1 002 culverts V/ posterior 381. 8 49. 58 May, 2007 May, 2007 June, 2007 June,2007 hang Tangirn HIBHSZQBID- HBHSZQT7 Zaoqiang,Wangc W-200703 1 003 to rebuild 52 wells V posterior 234 30. 39 May, 2007 May,2007 June,2007 June,2007 hang HBHSZQBID- HBHSZQT7 W-200704 1 004 50 pumping huts x/ posterior 125 16. 23 May, 2007 May,2007 June,2007 June,2007 Zaoqiang Town, Zaoqiang to install 96.65 km Town,Wangchan of conduit, 1610 g Township, IJBHSZQB ID- H-BHSZQT7 protectors of water Tanglin W-200705 1 005 outlets V posterior 595. 76 77. 37 May, 2007 May, 2007 June,2007 June,2007 Twonship 133 M2 of seed- drying yard, 50 MI Tanglin HBHSZQBID- HBHSZQT7 of observation Township,Wangc W-200706 1 006 station V posterior 40. 25 5. 23 May, 2007 May,2007 June,2007 June,2007 hang Township HBHSZQBID- HBHSZQT7 W-200707 1 007 8 km of gravel road posterior 966. 49 125. 52 March, 2007 March,2007 April,2007 April,2007 Zaoqiang Town NCB 2 1726.49 224.22 shopping 5 1376.81 178.81 total 7 = = = 3103.3 403.031 Jizhou Civil Works Procurement Plan for 2007 IAILIH Project the mode of purchase prior or estimated cost date of date of date of bidding No. number Content of purchase 'posterior issuing bid opening bid co. s executing remarks of items No. ICB NCB s oppi review RMB 1,000 USD 1,000 (y,m) (y,m contract (y,m) 2 bridges (span 10-4 m);20 culverts (dia. 60- 1OOcm);tobuild irrigationstationofl56 MI HBJZoo to rebuild irrigation station of 240 M' 1 T7001 V posterior 263. 00 34. 16 March,2007 March,2007 March,2007 April,2007 HfBJZOO tintl145kfosepnprvtonXuzbuang HIBHSJZBI-D-W-200701 2 T7002 to rnstl 145 ki for seepmg prevention I V posterior 33. 35 4. 33 March,2007 March,2007 March,2007 Oct,2007 Township HBZO5 culvert (dia. 60 -1 00 cm); 2800 Mi of H3JZO0 drying yard for farm-tech service center, I T7003 V posterior 450. 00 58. 44 March,2007 March,2007 March,2007 April,2007 HBJZOOtoisal11kmfrseigpeein HBHSJZBI-D-W-200702 2 H T7004 to stall 13.1 ki for seeping prevention V posterior 30. 13 3. 91 March,2007 March,2007 March,2007 Oct,2007 Weitun Town 4 bridges (span 10-4 m);30 culverts (diameter 60-1 OOcm);50Mi of building for farm-tech service center;324 Miof drying yard of the HBjZoo farm-tech service. I T7005 posterior 353. 60 45. 92 March,2007 March,2007 March,2007 April,2007 2 HJZ006 to flush 10 wells V posterior 30. 00 3. 90 March,2007 March,2007 March,2007 April,2007 HBJZOO toisal6 a o epn rvninXiaozhai HBHSJZBI-D-W-200703 3 T700 to install 67 ki for seepng prevention posterior 154. 10 20. 01 March,2007 March,2007 March,2007 Oct,2007 Township HBJZOO 1kiofbikpvdrawihwdho4m.Xiaozhai HBHSJZBI-D-W-200704 1 T7008 12 ki of bck-paved road with width of 4 i. posterior 1326. 30 172. 25 March,2007 March2007 March,2007 Oct,2007 Township HIBJZOO 182poetn ae fwtrotesthe three HBHSJZBI-D-W-200705 1 T7009 1892 protectig canes of water outlets V posterior 66. 22 8. 60 March,2007 March,2007 March,2007 Oct,2007 towns NCB 1 1326. 30 172. 25 shopping 8 - 1380. 40 179. 27 total 9 2706. 70 351. 521 Hengshui Taocheng District Civil Works Procurement Plan for 2007 IAIL III Project the mode of purchase prior or estimated cost date of date of date of date of bidding No. num contract Content of purchase ICB posterior issuing bid opening bid signing executing township ________ of _____________ ___ ing review RB100 SD,00 (y,m) (y,m) contract (y,m) contract (y,m)______ to build 52culverts,17 sluices, Zhaoquan 1 HBHSTCT 2M2of pumping post, to build 8 May,2007 May,2007 June,2007 June,2007 Town HBHSTCBID- 7001 pumping huts _ posterior 589.02 76.50 W-200701 - 30 culverts of 50 cm 2 IHBHSTCT (diameter), 12 M2 for pumping May,2007 May,2007 June,2007 June,2007 Dengzhuang 7002 post, l3 pumping huts V posterior 173. 15 22. 49 to install 1.2-1 km of I HBHSTCT transmission line; 11 Sept,2007 Sept,2007 Oct,2007 Oct,2007 Town 7003 transformers I posterior 53. 12 6. 90 to install 1.67 km of HBHSTCBID- 2 HBHSTCT transmission line and 14 Sept,2007 Sept,2007 Oct,2007 Oct,2007 Dengzhuang W-200702 7004 transformers V posterior 68. 52 8. 90 to install 1.25 km of 3 HBHSTCT transmission line and 3 Sept,2007 Sept,2007 Oct,2007 Oct,2007 Masen 7005 transformers V posterior 20. 93 2. 72 HBHSTCBID- I HBHSTCT April,2007 April,2007 May,2007 May,2007 Town W-200703 __ 7006 7.5 km of hardened road V posterior 681. 64 88. 52 Town___ ______ HBHSTCBID- I HBHSTCT to install 88.69 kmn of seeping Sept,2007 Oct,2007 Nov,2007 Nov,2007 Zhaoquan 1W200704 1 7007 preventing conduit V posterior 528. 38 68. 62 Town HBHSTCT plant trees of 34.9 ha March,2007 March,2007 March,2007 March,2007 Zhaoquan 1 7008 topate * aV posterior 54. 57 7. 09 ______Town HBHSTCBID- HBHSTCT . W-200705 _ 7009 to plant trees of 34.4 ha V posterior 53.79 6.99 arch,2007 March,2007 March,2007 March,2007 Dengzhuang HBHSTCT- H T 7010 to plant trees of 8.4 ha V posterior 13.13 1.71 March,2007 March,2007 March,2007 March,2007 Masen total 10 V posterior 2236.26 290.42 Guanyang District Civil Works Procurement Plan for 2007 IAIL III Project the mode of purchase prior or estimated cost date of date of date of date of bidding No. nurmofbe contract No. Content of purchase shoppi posterior issuing bid opening cong excontract r fICB NCB shpipserior RMB USD issuin bid (openingc cntac items n review 1,000 1,000 (y,m) bid (y,m) (yim) (y,m) remarks LFGYT701 I HBLFGYT700 to build gravel road of 15 1500 194.81 Jiuzhou I 1 km posterior 2007-3-1 2007-3-21 2007-3-28 2007-10-1 Twon LFGYT702 I HBLFGYT700 to build hothouse-shed of 2140 277.92 Jiuzhou 2 85600 M2 prior 2007-3-1 2007-3-21 2007-3-28 2007-10-1 Twon I HBLFGYT700 17 culverts of 80 cm dia.; 40 232 30.13 Jiuzhou 3 culverts of 60cm dia. p osterior 232 2007-3-1 2007-3-21 2007-3-28 2007-4-1 Twon HBLFGYT700 to repair 90 wells and J Jiuzhou 2 4 install conduit of 114 km posterior 645 83. 77 2007-3-1 2007-3-21 2007-3-28 2007-4-2 Twon HBLFGYT700 Jiuzhou 3 5 to install 17 transformers I/ posterior 391 50. 78 2007-3-1 2007-3-21 2007-3-28 2007-4-15 Twon 200 M2 of buildings for LFGYT703 Seed-multiplication,3000 M2 of drying yard of seed 4 HBLFGYT700 multiplication farm and 400 357 46. 36 6 M2 of drying yard for farm- tech service; 4OM2of buildings for observation Jiuzhou station posterior 2007-3-1 2007-3-21 2007-3-28 2007-10-1 Twon HBLFGYT700 Jiuzhou 5 7 to plant 120000trees posterior 264 34. 29 2007-3-1 2007-3-21 2007-3-28 2007-11-1 Twon LFGYT704 HBLFGYT700 2280 protection devices of 1 114 14. 81 Jiuzhou 1 8 water outlets posterior 2007-3-1 2007-3-21 2007-3-28 2007-4-1 Twon NCB 2 3640 472.73 shopping 6 2003 260.13 total 8 5643 732.86 Note:The county is new and it has never done NCB Wen'an Civil Works Procurement Plan for 2007 IAIL III Project the mode of purchase prior or estimated cost date of date of date of bidding No r of contract No. Content of purchase posterior USD issuing bid opening bid date of signing executing items ICB NCB ping review RMB 1,000 1,000 (y,m) (y,m) contract (y,m) contract items___ ____ ping.______ (y,m) remark 33 culverts, 40 M2 of building for pest and plant HBLFWAT7disease obxervation post; LFWATO1 I 001 40 M2 of building for M2 prior 743. 8 96.6 March,2007 March,2007 April,2007 Aug, 2007 technical station; 250 M2 of puming irrigation Suqiao station; 4 pumping huts; Town to install 12 km of 10,000- HBLFWAT7 volt power line; 46.5 kmp 002 of 380-V cable and 15 v posterior 209. 5 27.2 March,2007 March,2007 April,2007 Sept,2007 LFWAT02 transformers STuoqwno 2THBLFWAT7 to dig 60 wells and flush 4 2 003 wells d e posterior 92. 0 11.9 March,2007 March,2007 April,2007 Sept, 2007 Suqiao -_ Town NCB I 743.8 96.6 shopping 2 301.5 39.2 total 3.0 -1045.3 135.8 Note:The county is new and it has never done NCB Anci District Civil Works Procurement Plan for 2007 IAIL III Project b N numb contract mode of purchase prior or estimated cost date of date of date of executing bidding No. numb of Ntrc Content of purchase NCB shoppin posterior RMBissuing bid opening bid signing cng er____ o No C NC review RM S ramarconrac ___________ ___1,000 D(y,m) (y,m contract (y,m) Matourown LFACT701 I 15km of hardened road V prior 1350 175.32 April,2007 April,2007 April,2007 May,2007 Qiuzhuang 1 001 Township 29 culverts of 60 - 100 Matou HBLFACT7 cm; 12 culverts less than Town, LFACT702 1 002 60cm; to reapirnl posterior 766. 4 99.53 April,2007 April, 2007 April, 2007 May, 2007 iowng 02 pumping huts; to installQizun 104.5 km of conduit Township 1 HBLFACT7 hothouses-shed of 43200 V posterior 725.8 94.26 April,2007 April,2007 April,2007 May, 2007 Matou 003 sq m 2 HBLFACT7 hothouse-shed 23040 sq I/ posterior 690 89.61 April,2007 April,2007 April,2007 May, 2007 Qiuzhuang 004 m, plant 70,000 trees LFACT703 3 HBLF5CT7 to flush 53 wells V posterior 431 55.97 July, 2007 July, 2007 July, 2007 Sept,2007 Matou , ___ ___ __ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ Q iuzhuang - - .Matou to install 9 km of highMao 4 HBLFACT7 voltage line;5 km of low V posterior 231. 4 30.05 July, 2007 July, 2007 July, 2007 Aug, 2007 Town, 006 voltage line;8 transformers -iTowng I Township LFACT704 1 HBLFACT7 water outlets - V posterior 78. 5 10.19 April, 2007 April, 2007 April, 2007 May, 2007 QiMuzahuang NCB 2 2116.4 274.86 shopping 5 2156.7 280.09 total 7 4273. 1 554. 95 Note:The county is new and it has never done NCB Yongqing Civil Works Procurement Plan for 2007 IAIL III Project the date of date of the mode of purchase prior or estimated cost date of date of date execute of bidding No. contract No. Contents of purchase posterior issuing bid opening bid s posteriorp contract contract items ICB NCB ing review RMB 1,000 USD 1,000 (y,m) (y,m) (y,m) (y.m) 4 km of gravel road wider Daxinge, 1 HBLFYQT7 than 6 m;8 km of gravel Liujie, 001 road with width less than 6 Sanshen LFYQT701 m. _ prior 1320 171. 43 March,2007. March,2007. April,2007 April,2007 gkou Daxinge, HBLFYQT7 36 culverts (dia. <60 cm) Liujie 1 002 w sunlight greenhouse-shed Liujien of 2502 sq m _ _ posterior 171 22. 21 March,2007. March,2007. April,2007 April,2007 gkou Daxinge, HBLFYQT7 Liujie, 003 Sanshen LFYQT702 2 to flush 195 wells _ posterior 97.5 12.66 March,2007. March,2007. April,2007 April,2007 gkou NCB 1 1 1 1320 171.43 1 _ shopping 2 268.5 34.9 total 3 I L I I I 1 1588. 5 206.30 Note:The county is new and it has never done NCB