Summarized Procurement Plan Table 3.1. Main Works, Goods, and Non-Consulting Services to be Procured Estimated Domestic Prior or Ref. Amount in Procurement Contract Description Preference Post No. US$, Method (yes/no) Review thousands OSS upgrade IT equipment 1 (including OSS software and 300 NCB No Post Investors Tracking System) Direct 2 FM software configuration 15 No Prior Contracting 3 Vehicles for PCU and IC 500 NCB No Prior 4 Vehicles for API-Mali 180 Shopping No Post Furniture and computer 5 40 Shopping No Post equipment for PCU Rehabilitation of 300 km of 6 rural roads (100km in Sikasso, 7,500 NCB No Prior 200 in Yanfolila) Rehabilitation of three collection facilities (Sikasso) 7 600 NCB No Post and construction of three collection facilities (Yanfolila) Construction of a conditioning 8 1,000 NCB No and exports facility Prior 9 API-Mali website 70 Shopping No Post Table 3.2. Main Consulting Assignments of the Project Review by Estimated Selection Ref. No. Contract Description Bank Amount Method (Prior/Post) in US$ Component 1: Support Agribusiness Diversification through Mango Processing and Investment Promotion 1 TA support to mango nursery QCBS Post 150 Technical training to rural assemblers and TA 2 support to IFM (rural assemblers/brokers) and IC Prior 250 statistical database/geolocation Selection and supervision of cooperatives, traders, 3 and millers with connections to support contracting QCBS Prior 490 and implementation Support for credit records, warranties, and sources of 4 QCBS Prior 250 funding for orchards and cooperatives Support supply exporters/millers, cooperatives 5 OHADA assistance and legal assistance contract QCBS Prior 200 production partnerships Support to exporters and millers on food safety, 6 QCBS Post 200 certification, and compliance (EU) Comparative studies of trade facilitation and export 7 QCBS Post 150 routes and recommendations Advisory support to exporters and millers on logistics 8 IC Post 50 flows and contracting (trucks, port, airports ) #1 1 Review by Estimated Selection Ref. No. Contract Description Bank Amount Method (Prior/Post) in US$ Advisory support to exporters and millers on logistics 9 IC Post 50 flows and contracting (trucks, port, airports ) #2 Advisory support to exporters and millers on logistics 10 IC Post 50 flows and contracting (trucks, port, airports ) #3 Advisory support to exporters and millers on logistics 11 IC Post 50 flows and contracting (trucks, port, airports ) #4 12 Staff 1 API-Mali IC Prior 170 13 Staff 2 API-Mali IC Prior 170 14 Staff 3 API-Mali IC Prior 170 15 Staff 4 API-Mali IC Prior 170 16 Staff 5 API-Mali IC Prior 170 Component 2: Improve Access to Mango Production Areas Consultant for technical studies and specifications of 17 300 km of rural roads and preparation of bid SSS Prior 500 documents and supervision of works 18 External technical audit of roads quality QCBS Post 150 Consultant for technical studies for the construction and rehabilitation of six collections facilities, 19 QC Post 35 preparation of bid documents, and supervision of works Consultant for technical studies and specifications for 20 QC Prior 90 the construction of conditioning and exports facility Component 3: Foster Animal Feed Production Trainings program for productive alliances 21 QBS Prior 540 consultants – BDS (training of trainers) Trainings program for productive alliances 22 QBS Prior 540 consultants – Extension (training of trainers) 23 TA for pre-investments activities QBS Prior 1,100 Consultant for technical studies for equipment and 24 infrastructure of all subprojects and supervision of QC Prior 320 works Component 4: Strengthen Institutional and Implementation Capacities 25 Procurement assistant IC Prior 150 26 Principal accountant IC Prior 180 27 Assistant accountant IC Prior 125 28 Project director IC Prior 230 29 Project assistant IC Post 40 30 Infrastructure specialist IC Prior 165 31 Financing specialist IC Prior 165 32 Value chains specialist IC Prior 165 33 Update of operations manual IC Prior 20 34 Institutional contractor QBS Prior 1,850 35 External auditor QCBS Prior 40 36 Assistant en suivi et evaluation IC Prior 125 ICB = International Competitive Bidding LIB = Limited International Bidding NCB = National Competitive Bidding Direct Contracting Shopping 2 CQS = Selection Based on Consultants’ Qualifications FBS = Selection under a Fixed Budget LCS = Least-Cost Selection QBS = Quality-Based Selection QCBS = Quality- and Cost-Based Selection SSS = Single-Source Selection IC = Individual Consultant 3 PROCUREMENT Mali : Mali Support to Agroindustrial Competitiveness Project PLAN General Information Country: Mali Bank’s Approval Date of the Original Procurement Plan: 2017-10-02 2019-12-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151449 GPN Date: 2018-03-19 Project Name: Mali Support to Agroindustrial Competitiveness Project Loan / Credit No: IDA / 59190 Executing Agency(ies): National Committee for Agricultural Research WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CW-REF-72 / Travaux de Component 1: Expand Single Stage - One En attente réhabilitation /construction IDA / 59190 Mango Processing and A posteriori Appel d'offres Open - National 850,000.00 0.00 2018-02-07 2018-02-10 2018-03-12 2018-03-22 2018-04-11 2018-08-09 Envelope d'exécution de Tubaniso Investment Opportunities Component 2: Improve CW-REF-1 / Réhabilitation Single Stage - One En cours IDA / 59190 Access to Mango Production A posteriori Appel d'offres Open - National 7,500,000.00 0.00 2017-12-20 2017-12-23 2018-01-22 2018-02-22 2018-06-22 de 300km de routes rurales Envelope d'exécution Areas CW-REF-3 / Construction et installation d'unités de Component 3: Foster Animal Single Stage - One En attente IDA / 59190 A posteriori Appel d'offres Open - National 350,000.00 0.00 2017-09-12 2017-09-17 2017-10-17 2017-10-24 2017-11-10 2018-03-10 conditionnement et Feed Production Envelope d'exécution d'exportation CW-REF-71 / Travaux Component 4: Strengthen Single Stage - One En attente d'aménagement des locaux IDA / 59190 A posteriori Demande de prix Open - National 144,000.00 0.00 2018-02-18 2018-03-17 2018-04-01 Project Implementation Envelope d'exécution du siège du PACAM CW-REF-69 / Travaux de construction de 50 étables et Component 3: Foster Animal Single Stage - One En cours IDA / 59190 A posteriori Appel d'offres Open - National 682,000.00 0.00 2019-01-24 2019-02-08 2019-03-22 2019-04-21 2019-05-26 2019-12-22 magasins dans le cadre du Feed Production Envelope d'exécution projet LAHAM CW-REF-70 / Travaux de 50 forages positifs/ château Component 3: Foster Animal Single Stage - One En cours IDA / 59190 A posteriori Appel d'offres Open - National 850,000.00 0.00 2019-01-24 2019-02-08 2019-03-22 2019-04-21 2019-05-26 2019-12-22 d'eau et pompage solaire Feed Production Envelope d'exécution pour LAHAM. GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GO-REF-5 / Acquisition de Component 4: Strengthen Single Stage - One En cours mobilier et matériel IDA / 59190 A posteriori Demande de prix Open - National 40,000.00 0.00 2017-07-17 2017-09-09 2017-10-09 Project Implementation Envelope d'exécution informatique pour l'UPC GO-REF-11 / Achat Component 3: Foster Animal Single Stage - One En attente IDA / 59190 A posteriori Demande de prix Open - National 100,000.00 0.00 2017-07-15 2017-09-09 2017-11-08 d'équipement individuels Feed Production Envelope d'exécution GO-REF-8 / Achat de Passation de produits success appat pour Component 3: Foster Animal IDA / 59190 A posteriori marché de gré à Direct 418,000.00 555,002.16 Achevé 2017-06-21 2017-07-05 2017-07-29 2017-08-02 le compte de l'Interprofession Feed Production gré de la filière mangue du Mali Page 1 GO-REF-7 / Achat de produits Invader B-Lok et Passation de M3 fruit Fly Bait station Component 3: Foster Animal IDA / 59190 A posteriori marché de gré à Direct 648,000.00 704,635.10 Achevé 2017-06-26 2017-07-01 2017-08-21 2017-10-05 pour le compte de Feed Production gré l'Interprofession de la filière mangue du Mali GO-REF-9 / Equipement en Component 4: Strengthen Single Stage - One En attente mobiliers de bureaux du IDA / 59190 A posteriori Demande de prix Open - National 97,000.00 0.00 2018-02-18 2018-03-22 2018-04-06 Project Implementation Envelope d'exécution siège du PACAM GO-REF-16 / Achat de produits vinaigre, croissange Component 1: Expand Passation de En attente organique pour le compte de IDA / 59190 Mango Processing and A posteriori marché de gré à Direct 102,000.00 0.00 2018-02-13 2018-02-18 2018-03-07 2018-04-06 d'exécution l'Interprofession de la filière Investment Opportunities gré mangie du Mali GO-REF-17 / Acquisition en matériels d'entretien et Component 2: Improve Single Stage - One En attente dispositions IDA / 59190 Access to Mango Production A posteriori Demande de prix Open - National 42,589.00 0.00 2019-03-20 2019-04-29 2019-07-28 Envelope d'exécution d'accompagnement pour la Areas pérennisation des pistes GO-REF-18 / Acquisition Component 2: Improve d'Equipements : Bac de Single Stage - One En attente IDA / 59190 Access to Mango Production A posteriori Demande de prix Open - National 59,625.00 0.00 2019-02-22 2019-03-27 2019-04-26 lavage, cageots de récolte et Envelope d'exécution Areas autres... GO-REF-19 / Achat équipements et Component 4: Strengthen Single Stage - One En attente IDA / 59190 A posteriori Demande de prix Open - National 51,107.00 0.00 2019-01-16 2019-02-25 2019-12-22 consommables du bureau Project Implementation Envelope d'exécution pour l'UCP NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NC-REF 1 / Impression du Component 1: Expand Single Stage - One En attente matériel de promotion de IDA / 59190 Mango Processing and A posteriori Demande de prix Open - National 8,520.00 0.00 2017-12-25 2018-02-19 2018-08-18 Envelope d'exécution l'API Mali Investment Opportunities NC-REF-2 / Fourniture et Component 4: Strengthen Single Stage - One En attente édition des bulletins IDA / 59190 A posteriori Demande de prix Open - National 17,036.00 0.00 2019-02-24 2019-04-14 2019-10-11 Project Implementation Envelope d'exécution d'informations trimestriels CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-REF-1 / Recrutement Component 1: Expand Sélection fondée d'un Assistant Technique En attente IDA / 59190 Mango Processing and A posteriori sur la qualité et Open - National 150,000.00 0.00 2017-07-10 2017-07-20 2017-08-13 2017-09-12 2017-09-19 2017-10-03 2017-10-20 2018-01-18 pour les pépiniéristes de d'exécution Investment Opportunities le coût mangues CS-REF-5 / Assistance aux exportateurs/transformateurs, Sélection fondée Component 3: Foster Animal En attente coopératives de type OHADA IDA / 59190 A posteriori sur la qualité et Open - National 200,000.00 0.00 2017-08-30 2017-09-13 2017-09-27 2017-10-04 2017-10-11 2017-10-25 2017-11-11 2018-01-10 Feed Production d'exécution et l'assistance juridique pour le coût la production contractuelle Page 2 CS-REF-6 / Récrutement d'un cabinet pour l'appui aux exportateurs et aux Sélection fondée Component 3: Foster Animal En attente transformateurs en matière IDA / 59190 A posteriori sur la qualité et Open - National 200,000.00 0.00 2017-08-28 2017-09-11 2017-09-25 2017-10-05 2017-10-12 2017-10-26 2017-11-12 2018-01-11 Feed Production d'exécution de sécurité alimentaire, de le coût certification et de conformité (UE) CS-REF-7 / Etudes comparatives de la Sélection fondée Component 3: Foster Animal En attente facilitation du commerce et IDA / 59190 A posteriori sur la qualité et Open - National 150,000.00 0.00 2017-07-20 2017-08-03 2017-08-20 2017-08-30 2017-09-09 2017-09-23 2017-10-15 2018-01-13 Feed Production d'exécution des voies d'exportation et le coût des recommandations CS-REF-12 / Cabinet en charge du recrutement des Sélection fondée Component 1: Expand cadres de l’Agence pour la sur les En cours IDA / 59190 Mango Processing and A posteriori Open - National 35,000.00 0.00 2017-07-05 2017-07-19 2017-08-12 2017-08-22 2017-09-16 2018-09-16 Promotion des qualifications des d'exécution Investment Opportunities Investissements au Mali consultants (API). Component 2: Improve Sélection fondée CS-REF-22 / Audit externe En cours IDA / 59190 Access to Mango Production A posteriori sur la qualité et Open - National 150,000.00 0.00 2018-03-05 2018-03-19 2018-04-02 2018-04-09 2018-04-16 2018-04-30 2018-05-22 2018-09-19 de la qualité des routes d'exécution Areas le coût CS-REF-24 / Etudes Sélection fondée techniques pour la Component 3: Foster Animal sur les En attente construction de l'installation IDA / 59190 A posteriori Open - National 90,000.00 0.00 2017-09-12 2017-09-26 2017-10-10 2017-10-17 2017-11-03 2018-01-02 Feed Production qualifications des d'exécution d'unités de conditionnement consultants et d'exportation CS-REF-42 / Recrutement Sélection fondée Component 1: Expand d’un bureau pour la sur les En attente IDA / 59190 Mango Processing and A posteriori Open - National 12,000.00 0.00 2017-06-23 2017-07-03 2017-07-27 2017-08-06 2017-08-23 2017-09-22 traduction des documents de qualifications des d'exécution Investment Opportunities l'API Anglais-Français consultants CS-REF-46 / Contrôle et Component 2: Improve Sélection fondée surveillance des travaux de IDA / 59190 Access to Mango Production A posteriori sur la qualité et Open - National 250,000.00 331,772.47 Achevé 2017-06-18 2017-06-25 2017-07-19 2017-07-29 2017-08-08 2017-08-22 2017-09-13 2018-03-12 300 km de piste PACAM Areas le coût CS-REF-47 / Recrutement d'un bureau en charge de Sélection fondée l'inventaire, le suivi dans la Component 3: Foster Animal sur les En attente distribution, le contrôle dans IDA / 59190 A posteriori Open - National 40,000.00 0.00 2017-07-07 2017-07-21 2017-08-04 2017-08-11 2017-08-28 2017-10-27 Feed Production qualifications des d'exécution l'utilisation et l'évaluation consultants des produits achetés et des methodes d'application CS-REF-23 / Etudes techniques, DAO de Sélection fondée construction et réhabilitation Component 2: Improve sur les En attente de six centres de collecte à IDA / 59190 Access to Mango Production A posteriori Open - National 35,000.00 0.00 2017-07-03 2017-07-17 2017-07-31 2017-08-07 2017-08-24 2017-10-23 qualifications des d'exécution Sikassso (3 réhabilitations) Areas consultants et Yanfolila (3 constructions) et supervision des travaux CS-REF-25 / Formation Sélection fondée (formation des formateurs) Component 3: Foster Animal Open - En attente IDA / 59190 A posteriori sur la qualité et 540,000.00 0.00 2018-01-23 2018-02-13 2018-03-13 2018-03-23 2018-04-02 2018-05-07 2018-05-31 2018-06-30 pour consultants en matière Feed Production International d'exécution le coût d'alliances productives - BDS CS-REF-26 / Formation (formation des formateurs) Sélection fondée Component 3: Foster Animal En attente pour consultants en matière IDA / 59190 A posteriori sur la qualité et Open - National 540,000.00 0.00 2018-01-15 2018-02-05 2018-03-05 2018-03-15 2018-03-25 2018-04-29 2018-06-03 2018-06-18 Feed Production d'exécution d'alliances productives - le coût Vulgarisation Page 3 CS-REF-27 / Assistance Component 1: Expand Sélection fondée Open - En attente Technique pour les activités IDA / 59190 Mango Processing and A priori sur la qualité et 1,100,000.00 0.00 2018-01-30 2018-02-20 2018-03-16 2018-03-26 2018-04-05 2018-05-10 2018-06-03 2019-06-03 International d'exécution de pré-investissement Investment Opportunities le coût CS-REF-28 / Etudes techniques sur le matériel et Sélection fondée Component 3: Foster Animal En attente l'infrastructure de tous les IDA / 59190 A posteriori sur la qualité et Open - National 320,000.00 0.00 2017-12-20 2018-01-10 2018-02-07 2018-02-22 2018-03-04 2018-04-08 2018-05-02 2018-06-01 Feed Production d'exécution sous-projets et supervision le coût des travaux CS-REF-40 / Récrutement Sélection fondée d'un Auditeur externe du Component 4: Strengthen En cours IDA / 59190 A posteriori sur la qualité et Open - National 40,000.00 28,241.75 2017-09-12 2017-09-26 2017-10-10 2017-10-17 2017-10-24 2017-11-07 2017-11-29 2018-11-29 PACAM pour les exercices Project Implementation d'exécution le coût 2017, 2018 et 2019 CS-REF-43 / Recrutement Sélection fondée d’un bureau pour Component 4: Strengthen sur les En cours IDA / 59190 A posteriori Open - National 20,000.00 0.00 2017-12-21 2018-01-11 2018-02-24 2018-03-26 2018-04-30 2018-06-29 l'élaboration du manuel de Project Implementation qualifications des d'exécution procédure du PACAM consultants CS-REF-66 / Etude et Sélection fondée contrôle de 50 Component 3: Foster Animal sur les En attente IDA / 59190 A posteriori Open - National 154,000.00 0.00 2017-12-20 2018-01-03 2018-01-17 2018-01-24 2018-02-10 2018-03-27 étables/magasin/forages/systè Feed Production qualifications des d'exécution me solaire du projet LAHAM consultants CS-REF-72 / Recrutement Sélection fondée bureau pour étude du flux Component 3: Foster Animal sur les En attente IDA / 59190 A posteriori Open - National 43,000.00 0.00 2018-01-24 2018-02-14 2018-03-30 2018-04-29 2018-06-03 2018-11-30 de transport des mangues Feed Production qualifications des d'exécution pour PACAM consultants CS-REF-81 / Etude et Component 1: Expand Sélection fondée En attente contrôle des travaux de IDA / 59190 Mango Processing and A posteriori sur la qualité et Open - National 85,000.00 0.00 2018-01-10 2018-01-24 2018-02-10 2018-02-17 2018-02-27 2018-03-11 2018-03-28 2018-05-12 d'exécution réhabilitation de Tubaniso Investment Opportunities le coût CS-REF-73 / Etude du Sélection fondée Component 1: Expand système orchestration sur les En attente IDA / 59190 Mango Processing and A posteriori Open - National 85,000.00 0.00 2018-01-18 2018-02-08 2018-03-24 2018-04-23 2018-05-28 2018-11-24 filières/modernisation pisteurs qualifications des d'exécution Investment Opportunities pour PACAM consultants CS-REF-64-1 / Recrutement d'une firme pour la Component 1: Expand Sélection fondée Open - En cours réalisation du schéma IDA / 59190 Mango Processing and A posteriori sur la qualité et 170,000.00 0.00 2018-10-29 2018-11-19 2019-01-02 2019-01-30 2019-03-01 2019-04-05 2019-05-10 2019-07-09 International d'exécution directeur opérationnel de Investment Opportunities le coût Toubaniso CS-REF-93 / Recrutement d'un Cabinet pour l'appui Sélection fondée Component 1: Expand aux cinq familles de l'IFM sur les En attente IDA / 59190 Mango Processing and A posteriori Open - National 51,107.00 0.00 2019-01-14 2019-02-04 2019-03-11 2019-04-01 2019-04-29 2020-04-23 en matière de sécurité qualifications des d'exécution Investment Opportunities alimentaire, certification et consultants qualité CS-REF-65 / Recrutement d'une firme pour la Component 1: Expand Sélection fondée réalisation d'un audit IDA / 59190 Mango Processing and A priori sur la qualité et Open - National 18,000.00 0.00 Annulé 2017-10-12 2017-10-26 2017-11-05 2017-11-20 2017-11-23 2017-12-08 2017-12-23 2018-01-22 environnemental et social de Investment Opportunities le coût tubaniso CS-REF-39-1 / Recrutement Sélection fondée Component 3: Foster Animal Open - En cours d'un Contracteur IDA / 59190 A priori sur la qualité et 1,850,000.00 0.00 2019-03-12 2019-04-02 2019-05-21 2019-06-18 2019-07-18 2019-08-22 2019-09-26 2022-07-12 Feed Production International d'exécution Institutionnel le coût CS-REF-39 / Récrutement Sélection fondée Component 3: Foster Animal Open - d'un contracteur IDA / 59190 A priori sur la qualité et 1,850,000.00 0.00 Annulé 2017-10-31 2017-11-14 2017-11-29 2017-12-09 2017-12-14 2017-12-29 2018-01-24 2019-01-24 Feed Production International Institutionnel le coût INDIVIDUAL CONSULTANTS Page 4 Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-REF-8 / Appui consultatif aux exportateurs et aux transformateurs sur Component 3: Foster Animal En attente les flux logistiques et la IDA / 59190 A posteriori Individuel Open 50,000.00 0.00 2017-08-24 2017-09-21 2017-09-28 2017-10-15 2017-12-14 Feed Production d'exécution passation des marchés (camions, ports, aéroports) n°1 CS-REF-9 / Appui consultatif aux exportateurs et aux transformateurs sur Component 1: Expand En attente les flux logistiques et la IDA / 59190 Mango Processing and A posteriori Individuel Open 50,000.00 0.00 2017-07-24 2017-08-27 2017-09-06 2017-09-23 2017-12-22 d'exécution passation des marchés Investment Opportunities (camions, ports, aéroports) n°2 CS-REF-10 / Appui consultatif aux exportateurs et aux transformateurs sur Component 1: Expand En attente les flux logistiques et la IDA / 59190 Mango Processing and A posteriori Individuel Open 50,000.00 0.00 2017-06-22 2017-07-26 2017-08-05 2017-08-22 2017-11-20 d'exécution passation des marchés Investment Opportunities (camions, ports, aéroports) n°3 CS-REF-11 / Appui consultatif aux exportateurs et aux transformateurs sur Component 1: Expand En attente les flux logistiques et la IDA / 59190 Mango Processing and A posteriori Individuel Open 50,000.00 0.00 2017-07-12 2017-08-09 2017-08-16 2017-08-26 2017-10-25 d'exécution passation des marchés Investment Opportunities (camions, ports, aéroports) n°4 CS-REF-48 / Récrutement d'un expert en Component 1: Expand communication pour aider à En cours IDA / 59190 Mango Processing and A posteriori Individuel Open 34,072.00 0.00 2017-07-27 2017-08-24 2017-08-31 2017-09-17 2018-03-16 la préparation du forum d'exécution Investment Opportunities Investir au Mali pour le compte de l'API CS-REF-49 / Récrutement d'un expert en évenementiel Component 1: Expand En attente pour aider à la préparation IDA / 59190 Mango Processing and A posteriori Individuel Open 34,072.00 0.00 2017-07-05 2017-08-02 2017-08-09 2017-08-23 2018-02-19 d'exécution du forum Investir au Mali Investment Opportunities pour le compte de l'API CS-REF-52 / Récrutement d'un expert chargé des Component 1: Expand réseaux sociaux pour aider à En attente IDA / 59190 Mango Processing and A posteriori Individuel Open 34,072.00 0.00 2017-06-29 2017-08-17 2017-08-27 2017-09-21 2018-03-20 la préparation du forum d'exécution Investment Opportunities Investir au Mali pour le compte de l'API CS-REF-53 / Récrutement d'un coordinateur technique Component 1: Expand En attente pour aider à la préparation IDA / 59190 Mango Processing and A posteriori Individuel Open 34,072.00 0.00 2017-06-30 2017-07-28 2017-08-04 2017-08-21 2018-02-17 d'exécution du forum Investir au Mali Investment Opportunities pour le compte de l'API CS-REF-54 / Récrutement d'un expert en comptabilité Component 1: Expand finance pour aider à la En attente IDA / 59190 Mango Processing and A posteriori Individuel Open 34,072.00 0.00 2017-07-05 2017-08-08 2017-08-15 2017-08-29 2017-09-05 préparation du forum d'exécution Investment Opportunities Investir au Mali pour le compte de l'API Page 5 CS-REF-55 / Récrutement d'un expert pour former les Component 3: Foster Animal En attente formateurs pour l'application IDA / 59190 A posteriori Individuel Open 102,215.00 0.00 2017-07-10 2017-08-07 2017-08-14 2017-08-31 2017-09-30 Feed Production d'exécution des produits de lutte contre la mouche de fruit CS-REF-56 / Récrutement Component 4: Strengthen En attente d'un consultant pour l'appui IDA / 59190 A posteriori Individuel Open 51,107.00 0.00 2017-06-29 2017-08-02 2017-08-09 2017-08-29 2018-08-29 Project Implementation d'exécution au démarage du projet CS-REF-57 / Récrutement Component 4: Strengthen En attente d'un consultant en appui à IDA / 59190 A posteriori Individuel Open 20,442.00 0.00 2017-07-06 2017-08-24 2017-09-03 2017-09-28 2017-11-27 Project Implementation d'exécution la passation des marchés CS-REF-58 / Récrutement Component 1: Expand d'un spécialiste en TIC, En attente IDA / 59190 Mango Processing and A posteriori Individuel Open 102,215.00 0.00 2017-07-05 2017-08-13 2017-08-23 2017-09-17 2018-09-17 communication et d'exécution Investment Opportunities evenementiel CS-REF-59 / Récrutement d'un économiste international Component 3: Foster Animal En attente IDA / 59190 A posteriori Individuel Open 42,590.00 0.00 2017-06-22 2017-07-20 2017-07-27 2017-08-10 2017-09-04 pour la chaine de valeur Feed Production d'exécution mondiale CS-REF-60 / Récrutement Component 3: Foster Animal En attente d'un économiste national de IDA / 59190 A posteriori Individuel Open 8,518.00 0.00 2017-07-02 2017-08-05 2017-08-20 2017-09-13 2017-10-28 Feed Production d'exécution terrain CS-REF-61 / Récrutement d'un assistant de recherche Component 3: Foster Animal En attente IDA / 59190 A posteriori Individuel Open 8,518.00 0.00 2017-07-03 2017-08-06 2017-08-16 2017-09-10 2017-10-25 developpement chaines de Feed Production d'exécution valeur CS-REF-62 / Recrutement d'une firme pour la sélection Component 1: Expand Sélection de En cours des investisseurs dans la IDA / 59190 Mango Processing and A posteriori consultants par Direct 200,000.00 0.00 2017-10-06 2017-10-10 2017-11-01 2018-01-30 d'exécution zone office du Niger (PDAIC- Investment Opportunities entente directe ZON) CS-REF-63 / Recrutement Component 1: Expand Sélection de d'une firme pour la En cours IDA / 59190 Mango Processing and A posteriori consultants par Direct 170,400.00 0.00 2017-10-10 2017-10-18 2017-11-05 2018-02-03 réalisation du plan d'affaires d'exécution Investment Opportunities entente directe de tubaniso CS-REF-64 / Recrutement d'une firme pour la Component 1: Expand Sélection de En cours réalisation du schéma IDA / 59190 Mango Processing and A posteriori consultants par Direct 170,000.00 0.00 2017-10-10 2017-10-18 2017-11-07 2018-02-05 d'exécution directeur opérationnel de Investment Opportunities entente directe tubaniso CS-REF-29 / Récrutement Component 4: Strengthen En attente d'un assistant en passation IDA / 59190 A posteriori Individuel Open 150,000.00 0.00 2017-06-22 2017-07-20 2017-07-27 2017-08-10 2017-08-13 Project Implementation d'exécution des marchés CS-REF-31 / Récrutement Component 4: Strengthen IDA / 59190 A posteriori Individuel Open 125,000.00 120,377.64 Signé 2017-06-28 2017-08-12 2017-09-02 2017-09-16 2018-09-16 d'un comptable adjoint Project Implementation CS-REF-32 / Récrutement Component 4: Strengthen IDA / 59190 A posteriori Individuel Open 230,000.00 193,672.50 Signé 2017-06-23 2017-07-21 2017-07-28 2017-08-14 2018-08-14 d'un directeur technique Project Implementation CS-REF-34 / Récrutement Component 4: Strengthen IDA / 59190 A posteriori Individuel Open 40,000.00 13,646.05 Signé 2017-07-03 2017-07-31 2017-08-07 2017-08-24 2018-08-24 d'un assistant du projet Project Implementation CS-REF-35 / Récrutement Component 4: Strengthen d'un spécialiste en IDA / 59190 A posteriori Individuel Open 165,000.00 341,775.00 Signé 2017-06-18 2017-07-16 2017-07-23 2017-08-06 2018-08-06 Project Implementation infrastructure Page 6 CS-REF-36 / Récrutement Component 4: Strengthen d'un spécialiste en IDA / 59190 A posteriori Individuel Open 165,000.00 157,126.20 Signé 2017-06-23 2017-07-21 2017-07-28 2017-08-19 2018-08-19 Project Implementation financement CS-REF-37 / Récrutement Component 4: Strengthen IDA / 59190 A posteriori Individuel Open 165,000.00 159,495.00 Signé 2017-06-29 2017-08-17 2017-08-27 2017-09-18 2018-09-18 d'un spécialiste en filières Project Implementation CS-REF-38 / Mise à jour Component 4: Strengthen En attente IDA / 59190 A posteriori Individuel Open 20,000.00 0.00 2017-08-10 2017-09-07 2017-09-14 2017-10-01 2017-10-31 du manuel opérationnel Project Implementation d'exécution CS-REF-45 / Recrtement d'un spécialiste en études Component 4: Strengthen En cours IDA / 59190 A posteriori Individuel Open 170,000.00 0.00 2017-06-28 2017-07-29 2017-08-08 2017-08-25 2018-08-25 environnementales pour le Project Implementation d'exécution projet CS-REF-68 / Recrutement d'un consultant Component 3: Foster Animal En attente individuel/point focal IDA / 59190 A posteriori Individuel Limited 24,000.00 0.00 2018-01-22 2018-01-27 2018-02-06 2018-02-23 2018-08-22 Feed Production d'exécution embouche commerciale du projet LAHAM CS- REF- 71 / Recrutement Component 4: Strengthen d'un informaticien pour IDA / 59190 A posteriori Individuel Limited 30,000.00 38,409.66 Signé 2017-12-22 2017-12-25 2018-01-04 2018-01-21 2019-01-21 Project Implementation l'UCP PACAM CS-REF-16 / Recrutement Component 1: Expand du chargé de promotion de IDA / 59190 Mango Processing and A posteriori Individuel Open 85,000.00 0.00 Annulé 2017-06-30 2017-07-28 2017-08-04 2017-08-21 2018-08-21 l'élévage Investment Opportunities CS-REF-51 / Récrutement d'un expert en sécurité pour Component 1: Expand aider à la préparation du IDA / 59190 Mango Processing and A posteriori Individuel Open 34,072.00 0.00 Annulé 2017-06-26 2017-07-24 2017-07-31 2017-08-17 2018-02-13 forum Investir au Mali pour Investment Opportunities le compte de l'API CS-REF-50 / Récrutement d'un expert en logistique et Component 1: Expand protocole pour aider à la IDA / 59190 Mango Processing and A posteriori Individuel Open 34,072.00 0.00 Annulé 2017-07-03 2017-07-31 2017-08-07 2017-08-24 2018-02-20 préparation du forum Investment Opportunities Investir au Mali pour le compte de l'API CS-REF-21 / Etude APD, élaboration des dossiers Component 2: Improve Sélection de d'appel d'offre des travaux IDA / 59190 Access to Mango Production A posteriori consultants par Direct 120,000.00 109,110.76 Achevé 2017-02-03 2017-02-23 2017-04-02 2017-06-01 pour 300km de routes Areas entente directe rurales CS-REF-41 / Récrutement Component 4: Strengthen En cours d'un Assistant en suivi et IDA / 59190 A posteriori Individuel Open 41,000.00 0.00 2017-07-20 2017-08-17 2017-08-24 2017-09-07 2017-09-14 Project Implementation d'exécution évaluation CS-REF-67 / Conception du plan, des supports de Component 1: Expand communication et une IDA / 59190 Mango Processing and A posteriori Individuel Limited 54,500.00 60,772.31 Achevé 2017-12-21 2017-12-26 2018-01-05 2018-01-19 2018-03-05 application mobile de Investment Opportunities Tubaniso-Agribusiness et innovation center (TAIC) CS-REF-85 / Recrutement Component 4: Strengthen En attente d'un assistant technique IDA / 59190 A posteriori Individuel Open 35,000.00 0.00 2018-03-19 2018-04-08 2018-04-13 2018-04-18 2018-10-15 Project Implementation d'exécution pour préparation PDAZAM CS-REF-86 / Recrutement d'un consultant pour Component 4: Strengthen En attente IDA / 59190 A posteriori Individuel Open 35,000.00 0.00 2018-03-19 2018-04-12 2018-04-15 2018-04-23 2018-10-20 préparation composante 1 du Project Implementation d'exécution PDAZAM Page 7 CS-REF-87 / Recrutement d'un consultant en appui à Component 4: Strengthen En attente IDA / 59190 A posteriori Individuel Open 30,000.00 0.00 2018-03-19 2018-04-12 2018-04-15 2018-04-23 2018-10-20 la préparation de la Project Implementation d'exécution composante 3 du PDAZAM CS-REF 65-1 / Audit Component 1: Expand En attente environnemental et social de IDA / 59190 Mango Processing and A posteriori Individuel Open 18,000.00 0.00 2018-11-13 2018-11-28 2018-12-03 2018-12-13 2019-01-12 d'exécution Toubaniso Investment Opportunities CS-REF-88 / Recrutement d'un consultant chargé de la Capitalisation des résultats Component 1: Expand En attente engrangés par le PCDA pour IDA / 59190 Mango Processing and A posteriori Individuel Open 17,036.00 0.00 2019-03-11 2019-04-14 2019-04-28 2019-05-15 2020-05-09 d'exécution avancer dans la démarche Investment Opportunities de certification des jeunes plants de manguier CS-REF-95 / Recrutement d'un consultant chargé de l'Etude portant sur l'analyse Component 1: Expand approfondie des avantages et En attente IDA / 59190 Mango Processing and A posteriori Individuel Open 34,072.00 0.00 2019-04-07 2019-05-10 2019-05-17 2019-06-03 2019-10-01 entraves aux expéditions par d'exécution Investment Opportunities voies routière, maritime et aérienne vers l'Europe et le Maghreb. CS-REF-91 / Recrutement d'un consultant chargé de Former les producteurs en techniques d'évaluation de la Component 1: Expand En attente production de la mangue IDA / 59190 Mango Processing and A posteriori Individuel Open 51,107.00 0.00 2019-04-10 2019-05-13 2019-05-20 2019-06-03 2019-09-01 d'exécution dans les vergers géo Investment Opportunities référencés et produire des cartes dynamiques à travers la télédétection CS-REF-92 / Recrutement d'un consultant chargé d'appuyer l'interprofession Component 1: Expand mangue pour la collecte et En attente IDA / 59190 Mango Processing and A posteriori Individuel Open 8,517.00 0.00 2019-04-28 2019-05-26 2019-06-02 2019-06-16 2019-10-14 la diffusion des informations d'exécution Investment Opportunities commerciales par SMS à travers la plateforme "Orange Sènèkèla" CS-REF-96 / Recrutement d'un Consultant chargé de Component 1: Expand faire des études économiques En attente IDA / 59190 Mango Processing and A posteriori Individuel Open 42,589.00 0.00 2019-03-20 2019-04-23 2019-05-07 2019-06-04 2019-09-02 dans le cadre d'un plan d'exécution Investment Opportunities d'appui institutionnel de l'API. CS-REF-97 / Recrutement d'un Consultant Expert en Infrastructure pour le suivi et la supervision des Component 2: Improve En attente travaux ( 300 km de piste, IDA / 59190 Access to Mango Production A posteriori Individuel Open 25,554.00 0.00 2019-01-07 2019-01-23 2019-01-28 2019-02-01 2019-07-31 d'exécution 3 centres de collecte et Areas infrastructures et équipements pour alliances productives). CS-REF-89 / Recrutement d'un consultant chargé de Renforcer la capacité des Component 1: Expand En attente commerçants et IDA / 59190 Mango Processing and A posteriori Individuel Open 8,518.00 0.00 2019-03-27 2019-04-29 2019-05-06 2019-05-20 2019-08-18 d'exécution transformatrices de mangues Investment Opportunities en gestion et conservation de la mangue Page 8 CS-REF-90 / Recrutement d'un consultant chargé de Component 1: Expand Former les pisteurs sur les En attente IDA / 59190 Mango Processing and A posteriori Individuel Open 5,111.00 0.00 2019-03-11 2019-04-13 2019-04-20 2019-05-04 2019-07-03 bonnes pratiques de récolte d'exécution Investment Opportunities et de transport de la mangue. CS-REF-98 / Recrutement Component 4: Strengthen En attente de l'Auditeur interne du IDA / 59190 A posteriori Individuel Direct 128,194.00 0.00 2019-01-24 2019-01-25 2019-01-26 2019-01-27 2022-08-29 Project Implementation d'exécution PACAM CS-REF-100 / Consultant suivi technique (Point focal) Component 3: Foster Animal En attente IDA / 59190 A posteriori Individuel Open 18,038.00 0.00 2019-03-12 2019-03-22 2019-03-26 2019-03-30 2019-09-26 Plateforme d'embouche du Feed Production d'exécution pilote LAHAM CS-REF-99 / Consultant Component 3: Foster Animal En cours Business Plans Projet Pilote IDA / 59190 A posteriori Individuel Open 18,038.00 0.00 2019-03-12 2019-03-22 2019-03-26 2019-03-30 2019-09-26 Feed Production d'exécution LAHAM CS-REF-102 / Consultant suivi et supervision des travaux (300 km de piste, Component 4: Strengthen En attente 6 centres de collecte et IDA / 59190 A posteriori Individuel Limited 25,551.00 0.00 2019-05-11 2019-05-13 2019-05-16 2019-05-20 2019-11-16 Project Implementation d'exécution d'entreposage et infrastructures d'équipements pour alliances productives) Page 9