Project name: Dhaka Water Supply & Sanitation Project Loan: 4506-BD Procurement Plan Version: 2015-1 Status: Approved Date of Last Change of Status: 25/06/2015 Category Works: Activities ShowHide Description Reference # Rehabilitation and Up gradation of DWSSP-3-NCB-O-W-8A Abdullapur, Shajadpur and Shutivola Khal Contract under execution Post Review Rehabilitation and Up gradation of Digun DWSSP-5-NCB-O-W8(F) Khal. Contract under execution Post Review Rehabilitation and Up gradation of Baunia DWSSP-9-NCB-O-W-8G1 Khal. Contract under execution Post Review Rehabilitation and Up gradation of DWSSP-10-NCB-O-W-8I Mohakhali Khal. Contract under execution Post Review Rehabilitation and Up gradation of Jerani DWSSP-13-NCB-O-W-8L/01 Khal (CH 1 + 685 Km to 2 + 085 Km). Contract under execution Post Review Rehabilitation and Up gradation of Jerani DWSSP-14-NCB-O-W-8L/02 Khal (CH 2 + 085 Km to 4 + 890 Km). Contract under execution Post Review Rehabilitation and Up gradation of Khilgaon- DWSSP-16-NCB-O-W-8N Bashabo Khal up stream. Contract under execution Post Review Rehabilitation and Up gradation of DWSSP-17-NCB-O-W-8P Abdullahpur Branch Khal. Contract under execution Post Review Water Supply and Sanitation for Low income DWSSP-19-NCB-O-W11(01) communities at Moller Bosti near Mirpur under DWSSP. Contract under execution Post Review Refurbishment of Fakirapul Office (Zone-1 & DWSSP-21-NCB-O-W-14(B)-01 6) building & office compound under DWSSP. Contract under execution Post Review Refurbishment of Lalbab-Chadnighat zonal DWSSP-22-NCB-O-W-14(B)-02 office (Zone-2) & Dhaka Water Works Under Contract under execution DWSSP. Post Review Rehabilitation and Up-gradation of DWSSP-25-NCB-O-W-8(A2) Shajadpur khal remaining portion. Ch 0300 + Contract under execution 0600. Post Review Rehabilitation and Up-gradation of DWSSP-26-NCB-O-W-8(A3) Shajadpur khal remaining portion. Ch 0600 + 0900. Contract under execution Post Review Rehabilitation and Up-gradation of DWSSP-27-NCB-O-W-8(A4) Shajadpur khal remaining portion.Ch 0900 + Contract under execution 1200. Post Review Rehabilitation and Up-gradation of DWSSP-28-NCB-O-W-8(A5) Abdullahpur remaining portion. Contract under execution Post Review Rehabilitation and up-gradation of Sutivola DWSSP-29-NCB-O-W-8(A6) khal remaining portion Ch. 3+080 km to Contract under execution 3+680 km. Post Review Rehabilitation and Up-gradation of DWSSP-31-NCB-O-W-8(H/01) Kallyanpur khal. Ch 1+ 0965 km to Ch 2+165 Contract under execution km. Post Review Rehabilitation and Up-gradation of DWSSP-32-NCB-O-W-8(H/02) Kallyanpur khal. Ch 2+ 165 km to Ch 2+395 km. Contract under execution Post Review Rehabilitation and Up-gradation of DWSSP-33-NCB-O-W-8(H/03) Kallyanpur khal. Ch 2+ 325 km to Ch 2+505 Contract under execution km. Post Review Rehabilitation and Up-gradation of DWSSP-34-NCB-O-W-8(H/04) Kallyanpur khal. Ch 2+ 655 km to Ch 2+955 Contract under execution km. Post Review Construction of water line facility in low DWSSP-35-NCB-O-W-11(04) income community (LIC) at Kulsi slum area near matikata road under DWSSP Contract under execution Post Review Rehabilitation and Up-gradation of DWSSP-90-NCB-O-W8(Q2) Segunbagicha khal under Dhaka Water Supply and Sanitation Project (DWSSP). Contract under execution Package No. W8(q2) Post Review Rehabilitation and Up-gradation of DWSSP-91-NCB-O-W8(Q3) Segunbagicha khal under Dhaka Water Supply and Sanitation Project (DWSSP). Contract under execution Package No. W8(q3) Post Review Rehabilitation and Up-gradation of DWSSP-93-NCB-O-W8(Q4) Segunbagicha khal under Dhaka Water Supply and Sanitation Project (DWSSP). Contract under execution Package No. W8(q4) Post Review Rehabilitation and Up-gradation of DWSSP-94-NCB-O-W8(Q5) Segunbagicha khal under Dhaka Water Supply and Sanitation Project (DWSSP). Contract under execution Package No. W8(q5) Post Review Rehabilitation and Up-gradation of DWSSP-96-NCB-O-W8(Q1) Segunbagicha khal under Dhaka Water Supply and Sanitation Project (DWSSP). Contract under execution Package No. W8(q1) Post Review Cleaning of Drainage Canals of Baunia khal DWSSP-97-NCB-O-W16(A) under Dhaka Water Supply and Sanitation Project (DWSSP). Package No. W16(a) Contract under execution Post Review Cleaning of Drainage Canals of Mohakhali DWSSP-98-NCB-O-W-16(D) Khal under DWSSP Project, Package No. W- 16(d) Contract under execution Post Review Cleaning of Drainage Canals of Zerani khal DWSSP-99-NCB-O-W16(B) under Dhaka Water Supply and Sanitation Project (DWSSP). Package No. W16(b) Contract under execution Post Review Cleaning of Drainage Canals of Zerani khal DWSSP-100-NCB-O-W16(C) under Dhaka Water Supply and Sanitation Project (DWSSP). Package No. W16(c) Contract under execution Post Review Renovation & Equipping of Zonal Office DWSSP-101-NCB-O-W14/A(3) (Zone-5) under Dhaka Water Supply and Sanitation Project (DWSSP). Package No. Contract under execution W14/a(3) Post Review Renovation & Equipping of Zonal Office DWSSP-102-NCB-O-W14/A(2) (Zone-4) under Dhaka Water Supply and Sanitation Project (DWSSP). Package No. Contract under execution W14/a(2) Post Review Renovation & Equipping of Zonal Office DWSSP-103-NCB-O-W14/A(1) (Zone-3) under Dhaka Water Supply and Sanitation Project (DWSSP). Package No. Contract under execution W14/a(1) Post Review Rehabilitation and up-gradation of Shajadpur DWSSP-105-NCB-O-W8(A7) Khal Under DWSSP Project Package- W8(a7) Contract under execution Post Review Rehabilitation and Up gradation of DWSSP-113-NCB-O-W8(A10) Shahjahanpur Khal under DWSSP. Package No W8(a10) Contract under execution Post Review Water Supply Facilities for Low income DWSSP-114-NCB-O-W11(03) communities at Kallyanpur Slum near Bangla Collage under DWSSP. Contract under execution Post Review Construction of Water Line Facilities for Low DWSSP-115-NCB-O-W11(09) income communities (LIC) at city colony Slum MODS Zone -4 under Dhaka Water Supply and sanitation project (DWSSP) Contract under execution Post Review Rehabilitation and Up-gradation of DWSSP-116-NCB-O-W8(A8) Shajadpur khal remaining portion ch 1+560km to 1 +1680km. Contract under execution Post Review Rehabilitation and Up-gradation of DWSSP-117-NCB-O-W8(A9) Shajadpur khal remaining portion ch 1+680KM TO 1+800KM Contract under execution Post Review Rehabilitation and Up gradation of Khilgaon- DWSSP-122-NCB-O-W8(B) Bashabo Khal up stream.- Package - W8(b) Contract under execution Post Review Rehabilitation and Up gradation of DWSSP-123-NCB-O-W8(M) shahjanpur khal Pack: W8 (M) Contract under execution Post Review Rehabilitation and up gradation of Jerani DWSSP-124-NCB-O-W8(J-01) Khal (CH 0+885 Km to 1 + 290 Km). Package W8(J-01) Contract under execution Post Review Construction of water line facilities in low DWSSP-129-NCB-O-W11(05) income community at Baguntila Slum Area at Mirpur Under DWSSP Contract under execution Post Review Construction Water Supply Facilities for Low DWSSP-130-NCB-O-W 11.02 Income Community at Duari Para Slump Contract under execution Construction Water Supply Facilities for Low Income Community at Duari Para Slump Post Review Rehabilitation and Up gradation of Jerani DWSSP-138-NCB-O-W8(J)/02 Khal (CH 1 + 290 Km to 1+685 Km). Contract under execution Post Review Rehabilitation and Up-gradation of DWSSP-143-NCB-O-W8(A1) Shajadpur khal remaining portion. Ch 0000 + 0300. Contract under execution Post Review Procurement of 1 car on hire and rental DWSSP-144-NCB-O-W-17 basis for the executive engineer-4 of DWSSP, Dhaka WASA Contract under execution Post Review Refurbishment of training Center, DWSSP-145-NCB-O-W-14(D) Construction of lift lobby and supply and installation of lift under DWSSP Contract under execution Post Review Sinking and Commissioning of DWSSP-153-NCB-O-W11(07) 450mm*200mm dia 3 Nos (1 New & 2 Replacement) DTW at any places of Dhaka city including all related works and supplying all necessary materials. Package No. Evaluation under execution W11(07) Post Review Sinking and Commissioning of DWSSP-154-NCB-O-W-11(08) 450mm*200mm dia 3 Nos (1 New & 2 Replacement) DTW at any places of Dhaka city including all related works and supplying all necessary materials. Package No. Evaluation under execution W11(08) Post Review Sinking and Commissioning of DWSSP-155-NCB-O-W-11(06) 450mm*200mm dia 3 Nos (1 New & 2 Replacement) DTW at any places of Dhaka city including all related works and supplying all necessary materials. Package No. Evaluation under execution W11(06) Post Review Sinking and Commissioning of DWSSP-156-NCB-O-W-11(10) 450mm*200mm dia 3 Nos (1 New & 2 Replacement) DTW at any places of Dhaka city including all related works and supplying all necessary materials. Package No. Ongoing Activity W11(10) Post Review Sinking and Commissioning of DWSSP-157-NCB-O-W-11(11) 450mm*200mm dia 3 Nos (1 New & 2 Replacement) DTW at any places of Dhaka city including all related works and supplying all necessary materials. Package No. Ongoing Activity W11(11) Post Review Sinking and Commissioning of DWSSP-158-NCB-O-W-11(12) 450mm*200mm dia 3 Nos (1 New & 2 Replacement) DTW at any places of Dhaka city including all related works and supplying all necessary materials. Package No. Ongoing Activity W11(12) Post Review Sinking and Commissioning of DWSSP-159-NCB-O-W-11(13) 450mm*200mm dia 3 Nos (1 New & 2 Replacement) DTW at any places of Dhaka city including all related works and supplying all necessary materials. Package No. Ongoing Activity W11(13) Post Review Topographical survey and preparation of DWSSP-165-CP-O-NS-34 land schedule for acquisition of land for the construction of Dhaka north (Uttara) sewage Expected treatment plant (STP) Post Review Topographical survey and preparation of DWSSP-166-CP-O-NS-35 land schedule for acquisition of land for the construction of Dhaka west (Mirpur) sewage Expected treatment plant (STP) Post Review Topographical survey and preparation of DWSSP-167-CP-O-NS-36 land schedule for acquisition of land for the construction of Rayerbazar (Kamrangichor) sewage treatment plant (STP) Expected Post Review Construction of Storm Water Pumping DWSSP-1-LPI2-O-W-6 Station at Rampura. Contract Completed Prior Review Construction of Storm Water Pumping DWSSP-2-LPI2-O-W-7 Station at Kamlapur. Contract under execution Prior Review Category Goods: Activities ShowHide Description Reference # Description Reference # Procurement of Storm Water Drain cleaning DWSSP-37-NCB-B-G-3A(LOT 3A2) Equipmentn-Tractor ( 3 Nos) Contract under execution Post Review Storm water drain Cleaning equipment- DWSSP-38-NCB-B-G-3A2 (Tractor). Contract under execution Post Review Storm water drain Cleaning equipment- DWSSP-39-NCB-B-G-3A1 (Dump Truck). Contract under execution Post Review Storm water drain Cleaning equipment- DWSSP-40-NCB-B-G-3B Jetting and Suction machine. Contract under execution Post Review Storm water drain Cleaning equipment-Light DWSSP-41-NCB-B-G-3C(LOT-3C1) maintenance. Contract under execution Post Review Double Cabin Pick-up 2000- 2200 cc. DWSSP-44-NCB-B-G-4 Contract under execution Post Review Vehicle 4WD 2200-2700 cc (Jeep). DWSSP-45-NCB-B-G-5 Contract under execution Post Review Vehicle 4WD 2200-2700 cc (Jeep). DWSSP-46-NCB-B-G-5A Contract under execution Post Review Motor Cycle 125 cc. DWSSP-47-NCB-B-G-6 Contract under execution Post Review Survey Equipment. DWSSP-48-NCB-B-G-7 Contract under execution Post Review Supply and Installation of Desktop Computer DWSSP-49-NCB-B-G-08/01 for DWSSP, Dhaka Wasa Contract under execution Post Review Laboratory Equipment, fixtures and spares, DWSSP-51-NCB-B-G-10A etc. Contract under execution Laboratory Equipment, fixtures and spares, etc. Post Review Total Organic Carbon Analyzer (Laboratory DWSSP-52-NCB-B-G-10B Equipment). Contract under execution Post Review DeltaTox II test system etc. (Laboratory DWSSP-53-NCB-B-G-10C Equipment). Contract under execution Post Review Supply, installation and commissioning of Air DWSSP-55-NCB-B-G-12 Cooling System for the PMU office of DWSSP Contract under execution (Re-bidding). Post Review Procurement of furniture for DWSSP. DWSSP-56-NCB-B-G-13 Contract under execution Post Review Supply and installation of IPS for DWSSP. DWSSP-57-NCB-B-G-14 Contract under execution Post Review Furniture for PMU of DWSSP. DWSSP-59-NCB-B-G-16 Contract under execution Post Review Supply and installation of Automatic Rain DWSSP-60-NCB-B-G-17A Gauge. Contract under execution Post Review Storm water drain Cleaning equipment DWSSP-109-NCB-B-G-3A LOT-3A2 vehicles-(Mini Excavator). Package No.- 3A under DWSSP Contract under execution Post Review Procurement of 4WD Single Cabin Pickup for DWSSP-110-NCB-B-G 2/1 DWASA, DWSSP Package No.G 2/1 Contract under execution Post Review Office Equipment including Photocopier. DWSSP-111-NCB-B-G-06 Package No. G-06 under DWSSP Contract under execution Post Review Procurement of One Micro & One Motor DWSSP-131-NCB-B-G-18A Cyclefor Micro Biology and Chemical Division Contract under execution Post Review Storm water drain Cleaning equipment-Light DWSSP-135-NCB-B-G-3C(3C2) maintenance. Contract under execution Post Review Supply of computer, printer,scanners, ups & DWSSP-136-NCB-B-G-1A relevant accessories Supply of computer, printer,scanners, ups & relevant accessories Contract under execution Post Review Chemical for Laboratory DWSSP-161-NCB-B-G-10D Ongoing Activity Post Review procurement of logistics for existing PMU DWSSP-163-NCB-B-G-20A and other offices. Expected Post Review Supply of Desktop Computers and UPS. DWSSP-168-NCB-B-W-15(A) Package W-15(a) Evaluation under execution Prior Review Supply of Microsoft & database license with DWSSP-169-NCB-B-W-15(B) migration tools and services. Package W- 15(b) Evaluation under execution Prior Review WAN/ Internet connectivity support and DWSSP-172-NCB-B-W-15(E) services. Package W-15(e) Expected Prior Review Supplying fitting & fixtures of tyre for the DWSSP-127-CP-B- jeep no Dhaka Metro Gha-13-2538 & Gha 13- 2540 Under Dwssp Contract under execution Post Review Supply of Tyre and Tube for Jeep-No. Dhaka DWSSP-137-CP-B- Metro - Cha-13-2539 under DWSSP Contract under execution Post Review Production of Vedio Documentary on WASA DWSSP-139-CP-B- Turn Around Program under DWSSP Contract under execution Post Review Procurement of Hand GPS and Laptop DWSSP-152-CP-B-G-17B computer. Contract under execution Post Review Supply of motorcycle (1 Nos) DWSSP-162-CP-B-G-18B Expected Post Review Supply and installation of core networking DWSSP-170-LPI-B-W-15(C) infrastructure along with video conferencing systems (active part). Package W-15(c) Supply and installation of core networking infrastructure along with video conferencing systems (active part). Package W-15(c) Ongoing Activity Prior Review Supply and installation of core services and DWSSP-171-LPI-B-W-15(D) storage systems (active part). Package W- 15(d) Ongoing Activity Prior Review Category Consultants - Firms: Activities ShowHide Description Reference # Preparation of Sewerage Master Plan for DWSSP-66-SBCC-CF-S-1 Dhaka City and identification of Priority Investments and engineering preparation (DD and BD) of priority works. Contract under execution Post Review Updating the Storm Water Drainage Master DWSSP-67-SBCC-CF-S-3 Plan for Dhaka. Contract under execution Prior Review Technical assistance environmental analysis DWSSP-84-SBCC-CF-S-30 & GIS mapping (Water quality monitoring of Contract under execution the rivers). Post Review Consultancy services for Engineering Design DWSSP-92-SBCC-CF-S-24 and Preparation of Tender Document for Construction of Sewage Collection and Treatment Infrastructure at Uttra & Mirpur Contract under execution area of Dhaka City. Prior Review Consultancy Services for Technical assistance DWSSP-149-SBCC-CF-S-17A to the PMU, DWSSP of DWASA (Package DS- Contract under execution 17A) Post Review Consultancy services for water supply and DWSSP-150-SBCC-CF-S-8 sanitation services to low income communities in Dhaka city Contract under execution Prior Review Consultancy services for DD & BD to DWSSP-148-SBPF-CF-S-26 established a modern training center for Evaluation under execution Dhaka WASA. Package S-26 Post Review RAP preparation and implementation for DWSSP-151-SBPF-CF-S-20A rampura & kamlapur pumping station and drainage canals under DWSSP Contract under execution RAP preparation and implementation for rampura & kamlapur pumping station and drainage canals under DWSSP Post Review Inundation mapping and Rainfall monitoring. DWSSP-79-SSF-CF-S-21 Contract under execution Post Review Monitoring and & Evaluation framework ans DWSSP-126-SSF-CF-S-17C1 prepare a periodic reporting on this franework Contract under execution Post Review Preparation of storm water management DWSSP-164-SSF-CF-S-33 database Expected Post Review Category Consultants - Individuals: Activities ShowHide Description Reference # Assistance from a local Procurement DWSSP-71-IC-CI-S-10 Specialist. Contract under execution Post Review TA for operational / internal financial Audit DWSSP-73-IC-CI-S-13 (Five years). Contract under execution Post Review Consultancy for Interior Design of 3(three) DWSSP-81-IC-CI-S-25 Zonal office. Contract under execution Post Review Consultant's Service for Supervision of Storm DWSSP-128-IC-CI-S-32 Water Pumping Stations and Drainages Canals. Package DS-3 (Phase-ii) Contract under execution Post Review Financial Management Specialist DWSSP-140-IC-CI-S-14 Contract under execution Post Review Financial Management Specialist DWSSP-141-IC-CI-S-14 Contract under execution Post Review Financial Management Specialist DWSSP-142-IC-CI-S-14 Contract under execution Post Review Resettlement Consultanat DWSSP-146-IC-CI-S-01 Resettlement Consultanat Contract Completed Post Review Resettlement Consultanat DWSSP-147-IC-CI-S-01/1 Contract Completed Post Review New Activities Modified Activities Canceled Activities Activities without Modification Province/State E/A Amount in u$s No Objection Documents Dhaka Est. 1,777,246.46 05/10/09 Actual 1,762,684.00 05/10/09 Dhaka Est. 641,025.64 21/12/10 Actual 640,988.59 21/12/10 Dhaka Est. 916,191.48 10/06/10 Actual 779,638.86 10/06/10 Dhaka Est. 1,042,307.69 07/04/11 Actual 914,535.88 07/04/11 Dhaka Est. 812,820.51 09/08/11 Actual 689,050.27 09/08/11 Dhaka Est. 710,256.41 09/08/11 Actual 665,368.00 09/08/11 Dhaka Est. 974,358.97 27/09/13 Actual 910,878.00 27/09/13 Dhaka Est. 225,641.03 27/09/13 Actual 171,750.00 27/09/13 Dhaka Est. 1,025,641.03 27/04/14 Actual 53,059.00 27/04/14 Dhaka Est. 275,641.03 29/01/14 Actual 238,457.00 29/01/14 Dhaka Est. 275,641.03 N/A Actual 238,457.28 N/A Dhaka Est. 710,256.41 N/A Actual 555,977.31 N/A Dhaka Est. 767,948.72 17/07/14 Actual 698,217.00 17/07/14 Dhaka Est. 793,589.74 04/05/14 Actual 650,062.00 04/05/14 Dhaka Est. 1,012,820.51 30/01/14 Actual 800,858.00 30/01/14 Dhaka Est. 71,794.87 30/11/14 Actual 46,470.00 30/11/14 Dhaka Est. 256,410.26 23/05/14 Actual 188,770.83 23/05/14 Dhaka Est. 263,049.10 23/05/14 Actual 236,546.67 26/08/14 Dhaka Est. 256,410.26 28/08/14 Actual 239,711.00 28/08/14 Dhaka Est. 256,410.26 31/08/14 Actual 236,580.64 31/08/14 Dhaka Est. 143,589.74 23/06/14 Actual 53,506.00 23/06/14 Dhaka Est. 183,239.86 N/A Actual 181,457.09 N/A Dhaka Est. 263,769.66 N/A Actual 263,230.77 N/A Dhaka Est. 356,794.34 N/A Actual 301,742.44 N/A Dhaka Est. 374,142.72 N/A Actual 372,953.46 N/A Dhaka Est. 179,991.24 N/A Actual 179,675.37 N/A Dhaka Est. 38,813.45 N/A Actual 38,450.64 29/12/14 Dhaka Est. 37,395.50 N/A Actual 37,357.96 01/01/15 Dhaka Est. 25,435.67 N/A Actual 25,123.41 30/12/14 Dhaka Est. 41,080.29 N/A Actual 40,523.08 01/01/15 Dhaka Est. 317,666.81 N/A Actual 205,082.84 18/01/15 Dhaka Est. 339,896.03 N/A Actual 241,186.18 N/A Dhaka Est. 290,951.18 N/A Actual N/A Dhaka Est. 317,509.68 18/12/14 Actual 315,703.96 18/12/14 Dhaka Est. 619,230.77 21/12/14 Actual 301,742.00 21/12/14 Dhaka Est. 1,025,641.03 24/06/14 Actual 37,569.00 24/06/14 Dhaka Est. 25,992.07 N/A Actual 24,935.60 N/A Dhaka Est. 715,384.62 21/12/14 Actual 316,165.00 21/12/14 Dhaka Est. 715,384.62 15/12/14 Actual 315,805.00 15/12/14 Dhaka Est. 2,128,797.03 11/10/09 Actual 1,943,570.54 11/10/09 Dhaka Est. 619,350.18 25/07/13 Actual 457,346.00 25/07/13 Dhaka Est. 684,797.55 09/08/11 Actual 702,656.28 09/08/11 Dhaka Est. 27,148.88 N/A Actual 19,724.00 13/06/14 Dhaka Est. 384,615.38 16/04/14 Dhaka Actual 60,984.00 16/04/14 Dhaka Est. 710,189.00 03/04/11 Actual 727,954.19 03/04/11 Dhaka Est. 704,167.87 N/A Actual 631,145.13 N/A Dhaka Est. 9,846.15 N/A Actual 9,845.38 N/A Dhaka Est. 127,885.60 N/A Actual 126,559.20 N/A Dhaka Est. 382,872.34 N/A Actual N/A Dhaka Est. 382,872.34 N/A Actual N/A Dhaka Est. 382,872.34 N/A Actual N/A Dhaka Est. 382,872.34 N/A Actual N/A Dhaka Est. 382,872.34 N/A Actual N/A Dhaka Est. 382,872.34 N/A Actual N/A Dhaka Est. 382,872.34 N/A Actual N/A Dhaka Est. 5,128.21 N/A Actual Dhaka Est. 6,400.00 N/A Actual Dhaka Est. 6,400.00 N/A Actual Dhaka Est. 18,461,538.46 18/04/10 Actual 14,928,380.00 18/04/10 Dhaka Est. 14,410,256.41 18/04/10 Actual 11,657,428.76 18/04/10 Province/State E/A Amount in u$s No Objection Documents Province/State E/A Amount in u$s No Objection Documents Dhaka Est. 185,897.44 06/02/14 Actual 78,846.00 06/02/14 Dhaka Est. 84,615.38 06/02/14 Actual 7,885.00 06/02/14 Dhaka Est. 206,997.90 N/A Actual 171,794.87 N/A Dhaka Est. 512,820.51 21/06/11 Actual 362,910.00 21/06/11 Dhaka Est. 67,948.72 N/A Actual 35,541.00 N/A Dhaka Est. 175,825.64 14/12/08 Actual 157,230.77 14/12/08 Dhaka Est. 128,205.13 15/12/08 Actual 136,692.31 15/12/08 Dhaka Est. 61,794.87 15/12/08 Actual 136,692.00 15/12/08 Dhaka Est. 50,000.00 29/03/10 Actual 46,097.00 29/03/10 Dhaka Est. 5,615.38 15/02/10 Actual 5,625.64 15/02/10 Dhaka Est. 6,392.00 N/A Actual 6,392.27 N/A Dhaka Est. 207,692.31 06/07/11 Dhaka Actual 150,626.00 06/07/11 Dhaka Est. 64,102.56 06/07/11 Actual 5,985.00 06/07/11 Dhaka Est. 51,282.05 06/07/11 Actual 32,051.28 06/07/11 Dhaka Est. 12,820.51 05/07/10 Actual 12,673.59 05/07/10 Dhaka Est. 17,589.74 04/05/09 Actual 15,116.31 04/05/09 Dhaka Est. 728.21 04/06/09 Actual 634.62 04/06/09 Dhaka Est. 6,994.87 16/09/12 Actual 5,269.00 16/09/12 Dhaka Est. 20,512.82 25/12/13 Actual 20,152.31 20/01/14 Dhaka Est. 276,923.07 13/07/11 Actual 185,769.23 14/12/11 Dhaka Est. 261,538.46 15/11/09 Actual 250,000.00 29/12/09 Dhaka Est. 8,717.95 10/11/08 Actual 5,743.59 06/10/09 Dhaka Est. 54,823.70 10/03/14 Actual 46,731.00 10/03/14 Dhaka Est. 67,948.72 N/A Actual 34,643.00 N/A Dhaka Est. 15,346.00 13/09/09 Dhaka Est. 15,346.00 13/09/09 Actual 12,182.19 13/09/09 Dhaka Est. 87,179.49 N/A Actual N/A Dhaka Est. 57,692.31 N/A Actual Dhaka Est. 597,435.90 05/02/15 Actual 15/02/15 Dhaka Est. 1,474,358.97 05/02/15 Actual 15/02/15 Dhaka Est. 1,025,641.03 15/02/15 Actual Dhaka Est. 2,561.92 12/04/12 Actual 2,557.69 12/04/12 Dhaka Est. 1,316.00 03/08/11 Actual 1,314.10 03/08/11 Dhaka Est. 5,128.00 06/02/13 Actual 5,121.79 06/02/13 Dhaka Est. 1,923.07 N/A Actual 1,916.41 N/A Dhaka Est. 2,564.10 N/A Actual Dhaka Est. 2,832,051.28 15/02/15 Dhaka Est. 2,832,051.28 15/02/15 Actual 15/03/15 Dhaka Est. 2,438,461.54 15/02/15 Actual 15/03/15 Province/State E/A Amount in u$s Request for Proposal (RFP) and Short List Dhaka Est. 1,558,974.36 03/04/12 Actual 287,906.00 03/04/12 Dhaka Est. 884,615.38 28/06/10 Actual 738,116.65 28/06/10 Dhaka Est. 110,000.00 05/05/14 Actual 124,615.00 05/05/14 Dhaka Est. 1,669,539.20 15/05/14 Actual 1,669,539.20 15/05/14 Dhaka Est. 726,375.00 12/12/10 Actual 12/12/10 Dhaka Est. 205,128.20 05/04/09 Actual 75,801.28 05/04/09 Dhaka Est. 200,000.00 15/12/14 Actual 15/12/14 Dhaka Est. 90,157.18 22/01/12 Dhaka Actual 16,583.33 22/01/12 Dhaka Est. 20,000.00 28/08/12 Actual 22,323.00 28/08/12 Dhaka Est. 252,564.10 15/02/15 Actual 2,525,641.00 28/05/15 Dhaka Est. 141,025.64 01/05/15 Actual Province/State E/A Amount in u$s No Objection to the TOR P.P. - Executing Agency: 2015-1-DWASA - DWASA Method: IC (Selection of Individual Consultants) Dhaka Est. 70,000.00 03/06/12 Actual 1,949.00 03/06/12 Dhaka Est. 30,769.23 27/02/11 Actual 7,436.00 27/02/11 Dhaka Est. 50,000.00 17/11/14 Actual 21,794.87 17/11/14 Dhaka Est. 50,000.00 02/02/15 Actual 125,991.00 02/02/15 Dhaka Est. 18,244.00 22/12/08 Actual 18,243.78 22/12/08 Dhaka Est. 16,738.00 28/08/10 Actual 17,629.44 28/08/10 Dhaka Est. 11,957.00 18/11/14 Actual 11,956.92 18/11/14 Dhaka Est. 20,256.00 22/12/08 Dhaka Est. 20,256.00 22/12/08 Actual 20,243.08 22/12/08 Dhaka Est. 20,256.00 22/05/10 Actual 20,000.00 22/05/10 Publication / Invitation Bid Opening Evaluation of Bids P.P. - Executing Agency: 2015-1-DWASA - DWASA Method: NCB (National Competitive Bidding) 08/10/09 08/12/09 13/12/09 08/10/09 08/12/09 13/12/09 29/12/10 17/01/11 01/02/11 29/12/10 17/01/11 01/02/11 22/07/10 08/09/10 18/10/10 25/07/10 08/09/10 18/10/10 25/08/11 13/10/11 16/10/11 25/08/11 13/10/11 16/10/11 05/09/11 13/10/11 01/11/11 05/09/11 13/10/11 01/11/11 05/09/11 18/10/11 18/10/11 05/09/11 18/10/11 18/10/11 11/11/13 04/12/13 07/01/14 11/11/13 04/12/13 07/01/14 08/11/20 08/11/20 08/11/20 18/05/15 18/05/15 18/05/15 05/05/14 25/05/14 26/06/14 05/05/14 25/05/14 26/06/14 04/02/14 05/03/14 06/03/14 04/02/14 05/03/14 06/03/14 19/02/14 05/03/14 05/03/14 19/02/14 05/03/14 05/03/14 10/02/14 09/03/14 27/03/14 01/05/14 26/05/14 23/06/14 03/08/14 20/08/14 03/09/14 03/08/14 20/08/14 03/09/14 05/05/14 02/06/14 19/06/14 05/05/14 02/06/14 19/06/14 11/02/14 10/03/14 19/03/14 11/02/14 10/03/14 19/03/14 30/11/14 30/11/14 30/11/14 30/11/14 30/11/14 30/11/14 23/05/14 28/05/14 16/06/14 23/05/14 28/05/14 16/06/14 23/05/14 28/05/14 16/06/14 31/08/14 31/08/14 09/11/14 31/08/14 01/10/14 09/11/14 31/08/14 01/10/14 09/11/14 03/09/14 13/10/14 10/11/14 03/09/14 13/10/14 10/11/14 30/06/14 23/07/14 28/08/14 30/06/14 23/07/14 28/08/14 24/12/15 24/12/15 24/12/15 01/01/15 20/01/15 01/02/15 24/12/14 11/01/15 26/01/15 01/01/15 21/01/15 05/02/15 24/12/14 11/01/15 26/01/15 22/01/15 09/02/15 16/02/15 24/12/14 11/01/15 26/01/15 01/01/15 26/01/15 15/02/15 24/12/15 24/12/15 24/12/15 01/01/15 19/01/15 01/02/15 05/01/15 19/01/15 03/02/15 25/01/15 26/01/15 11/02/15 05/01/15 19/01/15 03/02/15 01/01/15 26/01/15 18/02/15 05/01/15 19/01/15 03/02/15 12/01/15 26/01/15 22/02/15 05/01/15 19/01/15 03/02/15 12/01/15 21/01/15 04/02/15 30/12/14 20/01/15 04/02/15 19/01/15 18/02/15 08/03/15 30/12/14 20/01/15 04/02/15 19/01/15 17/02/15 02/03/15 30/12/14 20/01/15 04/02/15 19/01/15 16/02/15 11/05/15 24/12/14 11/01/15 26/01/15 29/12/14 12/01/15 01/02/15 28/12/14 15/01/15 22/01/15 28/12/14 15/01/15 22/01/15 17/07/14 23/07/14 03/09/14 17/07/14 23/07/14 03/09/14 22/03/15 08/04/15 16/04/15 22/03/15 08/04/15 16/04/15 23/12/14 13/01/15 15/01/15 23/12/14 13/01/15 15/01/15 29/12/14 14/01/15 27/01/15 29/12/14 14/01/15 27/01/15 22/11/09 08/12/09 14/01/10 22/11/09 08/12/09 14/01/10 06/11/13 04/12/13 02/01/14 06/11/13 04/12/13 02/01/14 21/08/11 03/10/11 03/11/11 21/08/11 03/10/11 17/11/11 17/07/14 23/07/14 17/09/14 17/07/14 23/07/14 17/09/14 05/05/14 03/06/14 25/06/14 05/05/14 03/06/14 25/06/14 11/05/11 23/06/11 16/08/11 11/05/11 23/06/11 16/08/11 12/02/14 11/03/15 27/03/15 12/02/14 11/03/15 27/03/15 13/08/14 01/09/14 04/09/14 13/08/14 01/09/14 04/09/14 21/05/14 03/06/14 09/07/14 21/05/14 03/06/14 09/07/14 18/03/15 16/04/15 10/05/15 18/03/15 16/04/15 18/03/15 16/04/15 10/05/15 18/03/15 16/04/15 18/03/15 16/04/15 10/05/15 18/03/15 16/04/15 17/05/15 15/06/15 30/06/15 17/05/15 17/05/15 16/06/15 30/06/15 17/05/15 17/05/15 17/06/15 30/06/15 17/05/15 17/05/15 18/06/15 30/06/15 17/05/15 Method: SH (Shopping) 15/06/15 01/07/15 01/07/15 15/06/15 01/07/15 01/07/15 15/06/15 01/07/15 01/07/15 Method: ICB2 (Two Stage International Competitive Bidding) 25/04/10 19/07/10 30/08/11 25/04/10 19/07/10 30/08/11 25/04/10 19/07/10 30/08/11 25/04/10 19/07/10 30/08/11 Publication / Invitation Bid Opening Evaluation of Bids Publication / Invitation Bid Opening Evaluation of Bids P.P. - Executing Agency: 2015-1-DWASA - DWASA Method: NCB (National Competitive Bidding) 16/02/14 04/03/14 12/03/14 16/02/14 04/03/14 12/03/14 06/02/14 12/03/14 27/03/14 06/02/14 12/03/14 27/03/14 04/06/14 02/07/14 18/07/14 04/06/14 02/07/14 18/07/14 13/07/11 12/09/11 19/10/11 13/07/11 12/09/11 19/10/11 13/07/11 30/08/12 08/11/12 13/07/11 30/08/12 08/11/12 20/01/09 05/03/09 05/04/09 20/01/09 05/03/09 05/04/09 12/01/09 17/02/09 05/04/09 12/01/09 17/02/09 05/04/09 12/01/09 05/03/09 05/04/09 12/01/09 05/03/09 05/04/09 25/04/10 18/05/10 26/05/10 25/04/10 18/05/10 26/05/10 15/02/10 15/03/10 22/03/10 15/02/10 15/03/10 22/03/10 11/02/13 04/03/13 19/03/13 11/02/13 04/03/13 19/03/13 05/09/11 13/10/11 18/12/11 05/09/11 13/10/11 18/12/11 13/11/11 21/12/11 28/12/11 13/11/11 21/12/11 28/12/11 13/11/11 21/12/11 22/12/11 13/11/11 21/12/11 22/12/11 14/07/10 14/10/10 28/10/10 14/07/10 14/10/10 28/10/10 04/05/09 26/05/09 02/06/09 04/05/09 26/05/09 02/06/09 04/06/09 08/06/09 09/06/09 04/06/09 08/06/09 09/06/09 16/09/12 16/09/12 24/09/12 16/09/12 16/09/12 24/09/12 07/01/14 12/02/14 24/02/14 23/01/14 17/02/14 02/03/14 11/08/11 23/08/11 11/09/11 19/02/12 05/04/12 17/05/12 17/12/09 21/01/10 10/02/10 21/01/10 24/02/10 15/03/10 26/11/08 05/03/09 26/03/09 07/10/09 14/10/09 15/11/09 31/03/14 09/04/14 14/05/14 31/03/14 09/04/14 14/05/14 13/07/11 30/08/12 08/11/12 13/07/11 30/08/12 08/11/12 05/10/09 02/11/09 15/11/09 05/10/09 02/11/09 15/11/09 05/10/09 02/11/09 15/11/09 10/06/15 24/06/15 04/07/15 10/06/15 01/01/15 15/01/15 15/02/15 15/02/15 15/03/15 05/04/15 23/02/15 25/03/15 10/06/15 15/02/15 15/03/15 05/04/15 23/02/15 25/03/15 10/06/15 20/02/15 22/03/15 15/04/15 Method: SH (Shopping) 23/04/12 30/04/12 16/05/12 23/04/12 30/04/12 16/05/12 09/09/11 13/10/11 05/11/11 09/09/11 13/10/11 05/11/11 26/02/13 19/03/13 02/04/13 26/02/13 19/03/13 02/04/13 25/06/14 29/06/14 29/06/14 25/06/14 29/06/14 29/06/14 01/07/15 15/07/15 29/07/15 Method: ICB (International Competitive Bidding) 20/02/15 22/03/15 30/04/15 20/02/15 22/03/15 30/04/15 25/03/15 14/05/15 16/02/15 30/03/15 30/04/15 25/03/15 15/05/15 No Objection to RFP and Short List Invitation for RFP Bid Opening P.P. - Executing Agency: 2 Method: QCBS (Quality an 04/04/12 09/04/12 10/04/12 04/04/12 09/04/12 10/04/12 19/07/10 24/08/10 29/08/10 19/07/10 24/08/10 29/08/10 14/05/14 19/05/14 09/11/14 14/05/14 19/05/14 09/11/14 04/06/14 10/06/14 22/07/14 04/06/14 10/06/14 22/07/14 26/01/11 06/02/11 20/03/11 26/01/11 06/02/11 20/03/11 07/09/09 20/10/09 10/03/10 07/09/09 20/10/09 10/03/10 Method: FBS (Selection 24/12/14 18/02/15 01/04/15 24/12/14 18/02/15 01/04/15 N/A 26/01/12 23/02/12 N/A 26/01/12 23/02/12 Method: SSS (Selection ba 03/10/12 08/01/13 09/01/13 03/10/12 08/01/13 09/01/13 15/02/15 15/02/15 15/02/15 28/05/15 28/05/15 28/05/15 N/A 10/05/15 01/06/15 Contract Signature Date Total days of Process End Date of Activity ncy: 2015-1-DWASA - DWASA on of Individual Consultants) 22/08/12 13/09/12 22/08/12 02/09/12 02/07/15 02/09/12 08/02/15 08/03/15 08/02/15 31/03/15 31/01/16 31/03/15 25/10/09 25/10/10 25/10/09 02/12/10 19/05/11 02/12/10 25/02/15 25/12/15 25/02/15 25/10/09 24/04/11 25/10/09 24/04/11 25/10/09 24/04/11 07/11/10 06/05/12 07/11/10 06/05/12 No Objection to Evaluation Report Contract Signature Date y: 2015-1-DWASA - DWASA onal Competitive Bidding) 17/01/10 18/03/10 17/01/10 18/03/10 02/02/11 03/02/11 02/02/11 03/02/11 21/10/10 22/11/10 18/10/10 22/11/10 26/10/11 11/12/11 26/10/11 11/12/11 27/11/11 15/12/11 27/11/11 15/12/11 18/11/11 08/12/11 18/11/11 08/12/11 19/03/14 17/04/14 19/03/14 17/04/14 08/11/20 08/11/20 18/05/15 18/05/15 16/07/14 24/07/14 16/07/14 24/07/14 11/05/14 11/08/14 11/05/14 11/08/14 30/04/14 11/05/14 30/04/14 15/07/14 N/A 15/05/14 N/A 12/08/14 24/09/14 20/10/14 24/09/14 20/10/14 26/07/14 12/08/14 26/07/14 12/08/14 18/06/14 15/07/14 18/06/14 15/07/14 30/11/14 30/11/14 30/11/14 30/11/14 30/06/14 10/12/14 30/06/14 10/12/14 30/06/14 10/12/14 20/11/14 10/12/14 25/11/14 10/12/14 25/11/14 10/12/14 23/11/14 18/12/14 23/11/14 18/12/14 16/09/14 14/10/14 16/09/14 14/10/14 N/A 24/12/15 N/A 22/03/15 N/A 28/02/15 N/A 05/02/15 N/A 28/02/15 N/A 22/03/15 N/A 28/02/15 N/A 25/03/15 N/A 24/12/15 N/A 22/03/15 N/A 06/03/15 25/02/15 22/03/15 N/A 06/03/15 22/02/15 25/03/15 N/A 06/03/15 01/03/15 24/03/15 N/A 06/03/15 05/02/15 15/03/15 N/A 10/03/15 09/03/15 31/03/15 N/A 10/03/15 11/05/15 11/05/15 N/A 10/03/15 11/05/15 11/05/15 13/02/15 28/02/15 13/02/15 22/03/15 15/02/15 22/03/15 15/02/15 22/03/15 16/09/14 16/09/14 16/09/14 16/09/14 N/A 14/05/15 N/A 14/05/15 08/02/15 23/03/15 08/02/15 23/03/15 10/02/15 23/03/15 10/02/15 23/03/15 07/02/10 28/04/10 07/02/10 28/04/10 02/01/14 16/01/14 02/01/14 16/01/14 20/11/11 29/11/11 20/11/11 29/11/11 N/A 14/10/14 01/10/14 14/10/14 16/07/14 24/07/14 16/07/14 24/07/14 04/10/11 27/12/11 04/10/11 27/12/11 N/A 27/03/15 N/A 27/03/15 N/A 14/09/14 N/A 14/09/14 N/A 11/08/14 N/A 11/08/14 N/A 10/06/15 N/A N/A 10/06/15 N/A 10/06/15 N/A 25/07/15 N/A 25/07/15 N/A 25/07/15 N/A 25/07/15 SH (Shopping) N/A 15/07/15 N/A 15/07/15 N/A 15/07/15 ternational Competitive Bidding) 07/05/12 21/06/12 07/05/12 21/06/12 07/05/12 21/06/12 03/06/12 21/06/12 No Objection to Evaluation Report Contract Signature Date No Objection to Evaluation Report Contract Signature Date y: 2015-1-DWASA - DWASA onal Competitive Bidding) 12/03/14 10/04/14 12/03/14 10/04/14 06/04/14 09/04/14 06/04/14 09/04/14 N/A 19/08/14 N/A 19/08/14 02/11/11 29/11/11 02/11/11 29/11/11 N/A 15/01/13 N/A 15/01/13 13/05/09 27/05/09 13/05/09 27/05/09 13/05/09 24/05/09 13/05/09 24/05/09 24/05/09 07/06/09 24/05/09 07/06/09 30/05/10 01/06/10 30/05/10 01/06/10 08/04/10 16/05/10 08/04/10 16/05/10 N/A 20/04/13 N/A 20/04/13 10/01/12 06/02/12 10/01/12 06/02/12 22/02/12 20/03/12 22/02/12 20/03/12 22/02/12 14/03/12 22/02/12 14/03/12 19/12/10 07/04/11 19/12/10 07/04/11 04/06/09 29/06/09 04/06/09 29/06/09 11/06/09 11/06/09 11/06/09 11/06/09 25/09/12 07/10/12 25/09/12 07/10/12 27/02/14 15/03/14 03/03/14 31/03/14 12/03/12 12/05/12 05/06/12 05/06/12 10/03/10 10/04/10 17/05/10 16/06/10 21/04/09 10/05/09 06/12/09 06/12/09 14/12/14 19/01/15 14/12/14 19/01/15 N/A 15/01/13 N/A 15/01/13 26/11/09 06/12/09 26/11/09 06/12/09 26/11/09 06/12/09 N/A 30/07/15 N/A 15/03/15 20/04/15 31/05/15 20/04/15 31/05/15 16/05/15 27/06/15 SH (Shopping) 29/05/12 29/05/12 29/05/12 29/05/12 22/11/11 07/12/11 22/11/11 07/12/11 17/04/13 03/05/13 17/04/13 03/05/13 N/A 20/07/14 N/A 20/07/14 N/A 03/09/15 ional Competitive Bidding) 26/05/15 07/07/15 26/05/15 07/07/15 26/05/15 07/07/15 Technical Evaluation No Objection to Technical Evaluation P.P. - Executing Agency: 2015-1-DWASA - DWASA Method: QCBS (Quality and Cost Based Selection) 19/05/12 21/05/12 19/05/12 21/05/12 10/02/11 17/02/11 10/02/11 17/02/11 17/02/15 23/02/15 17/02/15 23/02/15 23/09/14 02/10/14 23/09/14 02/10/14 26/06/11 06/07/11 26/06/11 06/07/11 16/03/10 15/06/10 16/03/10 15/06/10 Method: FBS (Selection under a fixed budget) 11/05/15 N/A 11/05/15 N/A 11/03/12 N/A 11/03/12 N/A Method: SSS (Selection based on a single source) 13/01/13 14/01/13 13/01/13 14/01/13 15/02/15 15/02/15 28/05/15 28/05/15 15/06/15 N/A Comment Add Comment Add Comment Add Comment Update Internal ID (S-32) 11/06/2015 06:17 Add Comment Update Internal ID ( S-14) 04/06/2015 06:23 Add Comment Re-estimation of dates 04/06/2015 06:46 Add Comment Update Internal ID (S-14) 04/06/2015 07:17 Add Comment Update Internal ID ( S-01) 10/06/2015 09:19 Add Comment Re-estimation of dates 10/06/2015 09:12 Add Comment Total days of Process (between Bid Opening and Contract Signature Date) End of Contract (Completed) 100 30/06/12 100 17 03/08/12 17 75 22/05/12 75 59 11/06/13 59 63 15/05/13 63 51 08/06/13 51 134 31/12/15 134 0 08/11/20 0 60 24/10/14 60 159 31/12/15 159 67 15/07/15 132 67 30/08/15 78 61 19/11/15 61 71 31/12/15 71 127 15/10/15 127 0 01/01/15 0 196 10/12/15 196 196 10/12/15 101 70 10/07/15 70 66 08/12/15 66 83 01/01/15 83 0 24/12/15 61 48 28/08/15 15 48 28/08/15 41 48 28/08/15 58 0 24/12/15 62 46 06/06/15 55 46 06/06/15 58 46 06/06/15 57 46 06/06/15 53 49 10/09/15 41 49 10/09/15 83 49 10/09/15 84 48 28/08/15 69 66 22/06/15 66 55 16/12/14 55 36 14/11/15 36 69 31/12/15 69 68 23/09/15 68 141 30/09/10 141 43 16/06/14 43 57 28/05/12 57 83 14/01/15 83 51 30/11/14 51 187 27/06/13 187 16 15/08/15 16 13 15/12/15 13 69 10/08/15 69 55 09/12/15 55 09/12/15 55 09/12/15 40 24/11/15 39 24/11/15 38 24/11/15 37 24/11/15 14 14/08/15 14 14/08/15 14 14/08/15 703 30/12/14 703 30/12/14 703 30/12/14 703 Total days of Process End of Contract (Completed) (between Bid Opening and Contract Signature Date) End of Contract (Completed) 37 05/08/14 37 28 30/09/14 28 48 19/01/15 48 78 09/05/12 78 138 15/05/13 138 83 27/07/09 83 96 24/07/09 96 94 28/06/10 94 14 01/07/10 14 62 15/06/10 62 47 20/06/13 47 116 06/06/12 116 90 15/07/12 90 84 14/07/12 84 175 07/05/11 175 34 29/07/09 34 3 18/06/09 3 21 11/10/12 21 31 31/03/14 42 263 01/08/13 61 79 09/09/10 112 66 12/07/09 53 285 19/04/15 285 138 15/05/13 138 34 06/02/10 34 06/02/10 34 36 30/09/15 59 15/05/15 77 08/09/15 77 08/09/15 97 17/07/15 29 05/06/12 29 55 07/01/12 55 45 03/06/13 45 21 19/09/14 21 50 03/11/15 107 11/11/15 107 11/11/15 99 11/11/15 Final Evaluation and Negotiation No Objection to Contract 23/05/12 24/05/12 23/05/12 24/05/12 19/10/11 25/03/12 19/10/11 25/03/12 23/02/15 08/03/15 23/02/15 08/03/15 20/10/14 29/10/14 20/10/14 29/10/14 31/07/11 07/08/11 31/07/11 07/08/11 15/06/10 08/08/10 15/06/10 08/08/10 04/06/15 N/A 04/06/15 N/A 29/04/12 N/A 29/04/12 N/A 17/01/13 20/01/13 17/01/13 20/01/13 15/02/15 15/02/15 28/05/15 28/05/15 22/06/15 01/07/15 Comment Add Comment Update Internal ID ( W8(f)) 07/06/2015 08:56 Add Comment Add Comment Add Comment Add Comment Add Comment Add Comment Add Comment Update Internal ID (W11(01)) 08/06/2015 04:30 Add Comment Re-estimation of dates 20/05/2015 03:33 Add Comment Add Comment Add Comment Re-estimation of dates 08/06/2015 04:11 Add Comment Add Comment Add Comment Add Comment Add Comment Re-estimation of dates 02/06/2015 07:47 Add Comment Add Comment Add Comment Update Internal ID (W-11(04)) 07/06/2015 08:45 Add Comment Re-estimation of dates 04/05/2015 01:28 Add Comment Re-estimation of dates 05/05/2015 01:28 Add Comment Update Internal ID (W8(q4)) 04/05/2015 02:06 Add Comment Re-estimation of dates 05/05/2015 01:30 Add Comment Update Internal ID (W8(q1)) 05/05/2015 01:18 Add Comment Update Internal ID (w16(a)) 11/05/2015 01:34 Add Comment Update Internal ID ( W-16(D)) 07/06/2015 08:47 Add Comment Update Internal ID ( W16(b)) 07/06/2015 09:32 Add Comment Update Internal ID ( W16(c)) 07/06/2015 09:33 Add Comment Update Internal ID ( W14/a(3)) 08/06/2015 04:20 Add Comment Update Internal ID ( W14/a(2)) 08/06/2015 04:21 Add Comment Update Internal ID ( W14/a(1)) 08/06/2015 04:21 Add Comment Update Internal ID (W8(a7)) 12/05/2015 02:16 Add Comment Update Internal ID (W8(A10)) 19/05/2015 03:13 Add Comment Update Internal ID (W11(03)) 08/06/2015 04:26 Add Comment Re-estimation of dates 08/06/2015 04:10 Add Comment Update Internal ID (w8(a8)) 20/05/2015 02:58 Add Comment Update Internal ID (W8(a9)) 20/05/2015 03:50 Add Comment Update Internal ID ( W8(b)) 07/06/2015 08:48 Add Comment Update Internal ID ( W8(M)) 07/06/2015 08:49 Add Comment Update Internal ID ( W8(j-01)) 07/06/2015 08:50 Add Comment Re-estimation of dates 23/06/2015 04:44 Add Comment Update Internal ID (W 11.02) 31/05/2015 04:23 Add Comment Update Internal ID (W8(J)/02) 04/06/2015 03:37 Add Comment Re-estimation of dates 08/06/2015 03:31 Add Comment Update Internal ID (W-17) 08/06/2015 07:34 Add Comment Update Internal ID (W-14(d)) 08/06/2015 08:49 Add Comment Add Comment Update Internal ID (W-11(08)) 14/06/2015 09:08 Add Comment Update Internal ID (W-11(06)) 14/06/2015 09:24 Add Comment Update Internal ID ( W-11(10)) 14/06/2015 09:13 Add Comment Update Internal ID (W-11(11)) 14/06/2015 09:16 Add Comment Update Internal ID (W-11(12)) 14/06/2015 09:21 Add Comment Update Internal ID (W-11(13)) 14/06/2015 09:23 Add Comment Add Comment Update Internal ID ( NS-35) 15/06/2015 04:09 Add Comment Update Internal ID (NS-36) 15/06/2015 04:06 Add Comment Re-estimation of dates 30/04/2015 05:59 Add Comment Update on the Prior Review Status (Prior Review) 30/04/2015 07:21 Add Comment Comment Comment Add Comment Add Comment Re-estimation of dates 02/06/2015 08:19 Add Comment Re-estimation of dates 10/05/2015 04:54 Add Comment Re-estimation of dates 02/06/2015 07:00 Add Comment Re-estimation of dates 05/05/2015 07:16 Add Comment Add Comment Add Comment Add Comment Add Comment Update Internal ID (G-08/01) 08/06/2015 04:52 Add Comment Add Comment Add Comment Add Comment Add Comment Add Comment Add Comment Add Comment Add Comment Update Internal ID (G-3A Lot-3A2) 08/06/2015 05:11 Add Comment Update Internal ID (G 2/1) 08/06/2015 05:16 Add Comment Update Internal ID (G-06) 08/06/2015 04:56 Add Comment Update Internal ID (G-18A) 31/05/2015 04:45 Add Comment Update Internal ID (G-3C(3C2)) 02/06/2015 07:21 Add Comment Update Internal ID ( G-1A) 08/06/2015 07:54 Add Comment Update Internal ID (G-10D) 14/06/2015 09:32 Add Comment Update Internal ID (G-20A) 14/06/2015 09:42 Add Comment Update on the Prior Review Status (Prior Review) 15/06/2015 04:19 Add Comment Update Internal ID (W-15(b)) 15/06/2015 04:22 Add Comment Update Internal ID (W-15(e)) 15/06/2015 04:37 Add Comment Update Internal ID (34/DWSSP) 28/05/2015 04:16 Add Comment Add Comment Add Comment Update Internal ID (G-17B) 14/06/2015 08:44 Add Comment Update Internal ID (G-18B) 14/06/2015 09:36 Add Comment Update Internal ID (W-15(c)) 15/06/2015 04:26 Add Comment Update Internal ID (W-15(d)) 15/06/2015 04:33 Add Comment Total days of Process (between Bid Opening and Contract Contract Signature Date Signature Date) 29/05/12 49 29/05/12 49 15/07/12 686 15/07/12 686 01/04/15 143 01/04/15 143 12/02/15 205 12/02/15 205 16/11/11 241 16/11/11 241 08/09/10 182 08/09/10 182 07/06/15 67 06/05/12 73 06/05/12 73 27/01/13 18 27/01/13 18 15/02/15 0 28/05/15 0 15/07/15 44 End of Contract (Completed) Comment 29/05/15 Add Comment 15/07/13 Update on the Prior Review Status (Prior Review) 08/06/2015 04:42 Add Comment 01/07/15 Add Comment 31/12/15 Update on the Prior Review Status (Prior Review) 30/04/2015 07:44 Add Comment 02/08/15 Add Comment 07/02/11 Update on the Prior Review Status (Prior Review) 14/06/2015 08:04 Add Comment 31/12/15 Add Comment 05/11/13 Update on the Prior Review Status (Post Review) 14/06/2015 08:27 Add Comment 31/12/14 Add Comment 15/02/15 Re-estimation of dates 23/06/2015 05:17 Add Comment 15/08/15 Add Comment