Support to the National Urban Transit Program Project (P117947) PROCUREMENT PLAN I. General 1. Bank’s approval Date of the procurement Plan 2. Date of General Procurement Notice (Revised): May 05, 2016 3. Period covered by this procurement plan: Until Sep 30, 2018 July 9, 2010 PROCUREMENT Colombia : Support to the National Urban Transit Program Project PLAN General Information Country: Colombia Banks Approval Date of the Original Procurement Plan: 2017-06-20 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-12-29 Project ID: P117947 GPN Date: Project Name: Support to the National Urban Transit Program Project Loan / Credit No: IBRD / 80830 Executing Agency(ies): Ministry of Transport, Metroplus S.A., Metrolinea S.A., Integrated Transport System of Valledupar SIVA S.A.S, Strategic Public Transport System of Sincelejo METROSABANAS S.A.S, Strategic Public Transport System of Neiva TRANSFEDERAL S.A.S WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component C - Strategic Public LPI 01 DE 2014 / CONSTRUCCI Transit Systems N DEL PROYECTO Component B - Integrated Mass Single Stage - One METROPLUS EN EL MUNICIPIO IBRD / 80830 Prior Request for Bids Open - International N 30,000,000.00 23,979,522.14 Signed 2015-01-20 2015-04-20 2015-05-20 2015-04-07 2015-05-20 2015-05-15 2015-05-20 Transit System Envelope DE ITAGUI - QUEBRADA DO A Component A - Implementing MAR A Capacity Building LPI 001-2015 / Solicitud de no objecion a Informe de Evaluacion Component C - Strategic Public y recomendacion de Transit Systems Adjudicacion correspondiente a Component B - Integrated Mass Single Stage - One IBRD / 80830 Prior Request for Bids Open - International N 0.00 7,116,252.51 Signed 2015-08-06 2015-09-02 la LPI 001-2015 Construccion del Transit System Envelope Portal del municipio de Giron del Component A - Implementing Sistema Integrado de Transporte Capacity Building Masivo Metrolinea Informe de evaluacion Clle 44 SIVA / Solicitud de no objecion a Informe de evaluacion para Component C - Strategic Public contratar la construccion de la Transit Systems Malla Vial, Espacio Publico y Component B - Integrated Mass Single Stage - One IBRD / 80830 Prior Request for Bids Open - International N 0.00 4,407,087.30 Signed 2015-10-05 2016-01-27 Obras Complementarias de la Transit System Envelope Avenida Calle 44 y su conexion Component A - Implementing con la Carrera 4 del Sistema Capacity Building Estrategico de Transporte de Valledupar SIVA. CO-METROLINEA-18996-CW- Component B - Integrated Mass Request for Single Stage - One Pending RFQ / Adecuación rampa puente IBRD / 80830 Post Open - National 166,666.67 0.00 2019-05-27 2019-08-08 2019-12-06 Transit System Quotations Envelope Implementation cenfer POP-BIRF8083-CO-LPN001- 2017 / obra fase IV- Construccion, rehabilitacion de vias, renovacion de andenes y Component C - Strategic Public Single Stage - One Under obras complementarias - FASE IBRD / 80830 Post Request for Bids Open - National 4,824,457.00 0.00 2017-07-24 2017-07-26 2017-07-28 2017-09-11 2017-10-02 2017-10-23 2018-11-17 Transit Systems Envelope Implementation IV, en el marco de la implementacion del sistema estrategico de transporte publico de la ciudad de Neiva. CO-METROLINEA-18986-CW- Component B - Integrated Mass Request for Single Stage - One Pending IBRD / 80830 Post Open - National 3,063,333.33 0.00 2019-05-03 2019-05-27 2019-06-27 2019-07-11 2019-07-26 2019-11-25 RFP / Rutas alimentadoras Norte Transit System Proposals Envelope Implementation CO-METROLINEA-18994-CW- Component B - Integrated Mass Request for Single Stage - One Under RFP / Construcción Portal del IBRD / 80830 Post Open - National 11,769,571.96 0.00 2017-06-27 2017-08-08 2017-07-04 2017-08-08 2017-08-18 2017-09-18 2017-09-14 2017-10-19 2017-09-29 2019-05-22 Transit System Proposals Envelope Implementation Norte LPN-001-2017 / CONSTRUCCIÓN Y Component C - Strategic Public Single Stage - One Pending REHABILITACIÓN DE VIAS IBRD / 80830 Post Request for Bids Open - National 1,063,793.00 0.00 2017-08-15 2017-08-15 2017-09-15 2017-09-29 2017-10-30 2018-02-27 Transit Systems Envelope Implementation NUEVAS: Diagonal 10 entre Calle 6a y Carrera 45 LPN-002-2017 / CONSTRUCCIÓN Y REHABILITACION DEL Component C - Strategic Public Single Stage - One Pending ESPACIO PUBLICO: Av la Popa IBRD / 80830 Post Request for Bids Open - National 2,309,316.00 0.00 2017-08-30 2017-08-30 2017-09-29 2017-10-16 2017-11-03 2018-11-02 Transit Systems Envelope Implementation entre Glorieta Batallon y Diagonal 16 Gobernación (Gobernación - María mulata) LPN-003-2017 / CONSTRUCCIÓN Y REHABILITACION DEL Component C - Strategic Public Single Stage - One Pending IBRD / 80830 Post Request for Bids Open - National 2,532,831.00 0.00 2017-09-08 2017-09-08 2017-10-09 2017-10-23 2017-11-23 2018-07-23 ESPACIO PUBLICO: Avenida Transit Systems Envelope Implementation Simon Bolivar entre La Ceiba y Las Piloneras LPI-01-2015 / Construcción del proyecto Metroplús y obras Component B - Integrated Mass Single Stage - One Pending IBRD / 80830 Post Request for Bids Open - International 8,518,332.00 0.00 2015-10-30 2015-10-30 2015-11-19 2016-01-29 2016-04-26 2017-10-01 complementarias en el municipio Transit System Envelope Implementation de Envigado LPN-02-2017 / Construcción de las estaciones requeridas para la Component B - Integrated Mass Single Stage - One Pending operación del sistema Metroplús IBRD / 80830 Post Request for Bids Open - National 4,158,949.00 0.00 2017-10-16 2017-10-21 2017-12-02 2018-01-01 2018-02-05 2019-02-05 Transit System Envelope Implementation en la Pretroncal del municipio de Envigado LIP-01-2014 / Construcción del proyecto Metroplús en el Component B - Integrated Mass Single Stage - One Pending IBRD / 80830 Prior Request for Bids Open - International 21,131,754.00 0.00 2014-10-15 2014-11-23 2015-01-04 2015-02-23 2015-05-15 2017-09-28 municipio de Itagüí - Quebrada Transit System Envelope Implementation Doña María POP-BIRF8083-CO-LPN002- 2017 / Obra fase v - Rehabilitacion de vias, renovacion de andenes y obras Component C - Strategic Public Single Stage - One Under complementarias - FASE V, en IBRD / 80830 Post Request for Bids Open - National 5,331,113.00 0.00 2017-08-04 2017-08-04 2017-08-04 2017-09-18 2017-10-09 2017-10-27 2018-11-21 Transit Systems Envelope Implementation el marco de la implementacion del sistema estrategico de transporte publico de la ciudad de Neiva. Page 1 CO-METROLINEA-18990-CW- Component B - Integrated Mass Single Stage - One Under RFP / Construcción Portal de IBRD / 80830 Post Request for Bids Open - National 12,716,463.00 0.00 2017-08-18 2017-09-01 2017-08-22 2017-09-01 2017-09-19 2017-10-11 2017-09-29 2017-11-15 2017-10-27 2019-04-26 Transit System Envelope Implementation Piedecuesta POP-BIRF8083-CO-LPN003- 2017 / Construcción, rehabilitación de vías, renovación de andenes, y obras Component C - Strategic Public Single Stage - One Under complementarias - Fase VI, en el IBRD / 80830 Post Request for Bids Open - National 3,232,533.00 0.00 2017-12-05 2017-12-06 2017-12-07 2018-01-09 2018-01-29 2018-02-15 2018-12-19 Transit Systems Envelope Implementation marco de la implementación del Sistema Estratégico de Trasporte Público - SETP - de la ciudad de Neiva BIRF-LPN-002-2017 / RECONST. DE VÍAS Y ANDENES DE LA CLL UNIVERSIDAD DE SUCRE (SEDE PUERTA ROJA), PERTENECIENTE A LA RUTA Component C - Strategic Public Single Stage - One Pending IBRD / 80830 Post Request for Bids Open - National 1,919,418.58 0.00 2018-02-22 2018-02-23 2018-03-25 2018-04-08 2018-04-27 2019-04-22 CABRERO DEL SETP DE Transit Systems Envelope Implementation PASAJEROS DE LA CIUDAD DE SINCELEJO Y RENOV. DE REDES DE ACUED. Y ALCANT. SANITARIO Y CONST. DE ALCANTARILLADO PLUVIAL BIRF-CP-001-2017 / CONSTRUCCIÓN DEL PARADERO CON ESPACIO PÚBLICO (PEP) LA BASTILLA, Component C - Strategic Public Request for Single Stage - One Pending PERTENECIENTE AL SISTEMA IBRD / 80830 Post Open - National 234,696.00 0.00 2017-09-01 2017-11-16 2018-05-05 Transit Systems Quotations Envelope Implementation ESTRATEGICO DE TRANSPORTE PUBLICO DE PASAJEROS DE LA CIUDAD DE SINCELEJO BIRF-LPN-003-2017 / Reposición de placas en los Component C - Strategic Public Single Stage - One Pending IBRD / 80830 Post Request for Bids Open - National 1,157,000.00 0.00 2018-02-28 2018-03-01 2018-03-31 2018-04-14 2018-05-03 2018-10-30 corredores del SETP De La Transit Systems Envelope Implementation Ciudad De Sincelejo BIRF-LPN-001-2017 / CONSTRUCCIÓN DEL PARQUE CON PUNTO DE PARADA LOS LIBERTADORES (PEP), Component C - Strategic Public Single Stage - One Pending PERTENECIENTE AL SISTEMA IBRD / 80830 Post Request for Bids Open - National 714,631.95 0.00 2017-09-04 2017-09-05 2017-10-05 2017-10-19 2017-11-07 2018-07-05 Transit Systems Envelope Implementation ESTRATEGICO DE TRANSPORTE PÚBLICO DE PASAJEROS DE LA CIUDAD DE SINCELEJO. BIRF-LPN-002-2016 / Construcción de Vías en pavimento rígido, andenes en concreto estampado y adoquín Component C - Strategic Public Single Stage - One Pending correspondientes a las Vías y IBRD / 80830 Post Request for Bids Open - National 5,051,041.26 0.00 2016-08-01 2016-08-22 2016-08-29 2016-09-28 2016-10-19 2017-04-10 Transit Systems Envelope Implementation Andenes del Anillo Exclusivo, corredores Semipeatonales y los corredores Peatonales del SETP Sincelejo - Centro Amable GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual contratacion directa normas Icontec / Pr stamo BIRF 8083- Component C - Strategic Public CO: Proyecto de Apoyo al Transit Systems Programa Nacional de Transporte Component B - Integrated Mass IBRD / 80830 Prior Direct Selection Direct N 0.00 30,397.03 Canceled Urbano (PAPNTU). Solicitud de Transit System no objecion a contratacion Component A - Implementing directa para compra de Normas Capacity Building Tecnicas, a cargo de la UMUS BIRF-LPI-BIE-001-2016 / Suministro e instalación de la Component C - Strategic Public Single Stage - One IBRD / 80830 Prior Request for Bids Open - International 3,566,206.86 2,528,421.97 Signed 2016-09-08 2017-12-21 2016-10-05 2016-12-05 2016-12-05 2016-12-21 2017-12-22 2016-12-30 2016-12-30 2017-12-27 central e intersecciones del Transit Systems Envelope Sistema Semaforico centralizado NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CD Contratacion Capacitacion Component C - Strategic Public NIIF Camara / No objecion a Transit Systems contratacion de la Camara de Component B - Integrated Mass Comercio de Bogota para IBRD / 80830 Prior Direct Selection Direct N 0.00 21,856.77 Terminated 2015-04-16 Transit System capacitacion en NIIF para Component A - Implementing contadores de los entes Capacity Building gestores. CO-MINTRANSPORTE-19716- NC-DIR / ASISTENCIA TÉCNICA Y ASESORÍA A LA UNIDAD DE MOVILIDAD URBANA SOSTENIBLE UMUS DEL Component A - Implementing MINISTERIO DE TRANSPORTE IBRD / 80830 Post Direct Selection Direct 3,333.00 3,375.80 Signed 2017-07-04 2017-07-04 2017-08-01 2017-07-26 2017-12-31 Capacity Building EN EL MANEJO, ACTUALIZACIÓN Y MANTENIMIENTO DEL SOFTWARE HELISA GW Y BIABLE. Page 2 CO-MINTRANSPORTE-19715- NC-RFQ / SUMINISTRO DE TIQUETES AEREOS EN RUTAS NACIONALES E Component A - Implementing Request for Single Stage - One Pending IBRD / 80830 Post Limited 33,333.00 0.00 2017-03-06 2017-05-04 2017-12-31 INTERNACIONALES PARA LA Capacity Building Quotations Envelope Implementation UNIDAD DE MOVILIDAD URBANA SOSTENIBLE UMUS CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UMUS-112-SBCC / Component C - Strategic Public ASISTENCIA INTEGRAL A LAS Transit Systems ENTIDADES INVOLUCRADAS Component B - Integrated Mass Quality And Cost- IBRD / 80830 Prior Open - International N 2,000,000.00 1,407,151.00 Signed 2015-09-11 2015-09-17 2015-10-19 2015-10-26 2015-10-30 2017-02-15 2015-11-03 2016-10-20 2016-11-02 EN LA IMPLEMENTACION DE Transit System Based Selection LA PRIMERA LINEA DE METRO Component A - Implementing DE BOGOT PLMB Capacity Building ACEPTACION MINUTA- CARRILES SBCC 59 / Elaborar lineamientos tecnico-operativos, Component C - Strategic Public normativos, de seguridad, Transit Systems informacion y cultura ciudadana Component B - Integrated Mass Quality And Cost- para la formulacion, IBRD / 80830 Prior Open - International N 174,000.00 119,753.09 Signed 2015-09-02 2015-09-11 Transit System Based Selection implementacion, operacion y Component A - Implementing mantenimiento de carriles Capacity Building preferenciales en los sistemas de transporte urbano en Colombia Acta de Negociacion y Minuta de Contrato / Acta de Negociaci Component C - Strategic Public n y Minuta de Contrato para Transit Systems contratar la Consultor a para la Consultant Component B - Integrated Mass estructuraci n, dise o y divulgaci IBRD / 80830 Prior Qualification Open - International N 0.00 42,161.44 Signed 2015-09-10 2015-09-23 Transit System n de una Gu a Pr ctica de pol Selection Component A - Implementing ticas de Cambio Clim tico para el Capacity Building Transporte Urbano a cargo de la UMUS. Proceso No. 062 / Determinar la viabilidad t cnica, operativa, Component C - Strategic Public normativa, empresarial y Transit Systems socioecon mica para la prestaci Component B - Integrated Mass Quality And Cost- n del servicio p blico de IBRD / 80830 Prior Open - International N 260,000.00 257,049.26 Terminated 2015-10-15 2015-10-23 Transit System Based Selection pasajeros mediante el uso de Component A - Implementing motocarros y triciclos, a partir de Capacity Building la caracterizaci n del servicio, la de sus prestadores y usuar Component C - Strategic Public Auditoria del PNTU para 2014 / Transit Systems No objecion Contratacion de Component B - Integrated Mass Quality And Cost- IBRD / 80830 Prior Open - International N 0.00 28,188.29 Signed 2015-07-10 2015-05-05 Auditoria del PNTU para el ano Transit System Based Selection 2014 Component A - Implementing Capacity Building Component C - Strategic Public Adquisicion tiquetes Aereos / Transit Systems Acta de Negociacion y Minuta de Component B - Integrated Mass Quality And Cost- IBRD / 80830 Prior Open - International N 0.00 46,731.25 Signed 2015-07-10 2015-05-14 contrato para Adquisicion Transit System Based Selection tiquetes Aereos Component A - Implementing Capacity Building Acta de Negociaci n de Contrato Itagui / Nota de no objecion a Component C - Strategic Public Acta de Negociacion de Contrato Transit Systems de la interventoria para el Component B - Integrated Mass Quality And Cost- IBRD / 80830 Prior Open - International N 0.00 1,286,450.10 Signed 2015-08-03 2015-07-28 CONSTRUCCION DEL Transit System Based Selection PROYECTO METROPLUS EN Component A - Implementing EL MUNICIPIO DE ITAGUI - Capacity Building QUEBRADA DO A MARIA SEP No. 01 de 2015 / Solicitud de no objeci n a Acta de Component C - Strategic Public Negociaci n y Minuta de Contrato Transit Systems de la Interventor a Component B - Integrated Mass Quality And Cost- Under IBRD / 80830 Prior Open - International N 0.00 979,296.06 2016-04-06 correspondiente a la Construcci Transit System Based Selection Implementation n del Proyecto METROPL S y Component A - Implementing Obras Complementarias - Tramo Capacity Building 2 en el Municipio de Envigado. No Obj Acta Neg y Min Portal Giron / Prestamo BIRF 8083-CO. Component C - Strategic Public Proyecto de Apoyo al programa Transit Systems Nacional de Transporte Urbano. Component B - Integrated Mass Quality And Cost- Solicitud de no objecion a Acta IBRD / 80830 Prior Open - International N 0.00 560,181.14 Signed 2016-01-30 2016-04-08 Transit System Based Selection de Negociacion y Minuta de Component A - Implementing Contrato la interventoria de la Capacity Building construccion del Portal de Giron del SITM de Metrolinea. CONTR DE CONSUL SEP-001- 2015 SIVA S.A.S / Solicitud de Component C - Strategic Public no objeci n a Acta de Negociaci Transit Systems n y Minuta de Contrato para Component B - Integrated Mass Quality And Cost- IBRD / 80830 Prior Open - International N 0.00 183,976.04 Signed 2016-01-30 2016-02-01 contratar la interventor a de la Transit System Based Selection construcci n de la Obra Calle 44 Component A - Implementing del Sistema Estrat gico de Capacity Building Transporte de Valledupar SIVA. Licitacion Publica CECAR 2 etapa / Solicitud de no objecion a Component C - Strategic Public documento de avaluacion de Transit Systems propuestas de la Licitacion Pu Component B - Integrated Mass Quality And Cost- blica correspondiente a la IBRD / 80830 Prior Open - International N 0.00 2,668,232.74 Signed 2015-07-10 2015-08-04 Transit System Based Selection Construccion CECAR Etapa 2 Component A - Implementing del Sistema Estrategico de Capacity Building Transporte Publico Metrosabanas Page 3 CO-METROLINEA-18992-CS- Component B - Integrated Mass Quality And Cost- Under QCBS / Interventoría Portal del IBRD / 80830 Post Open - National 932,679.67 844,886.58 2017-06-23 2017-06-28 2017-06-30 2017-07-07 2017-07-25 2017-08-04 2017-08-23 2017-09-08 2017-09-01 2017-10-05 2017-09-15 2017-11-07 2017-09-29 2019-04-28 Transit System Based Selection Implementation Norte CO-METROLINEA-18974-CS- Component B - Integrated Mass Quality And Cost- Under QCBS / Interventoría Portal de IBRD / 80830 Post Open - National 828,392.16 0.00 2017-06-23 2017-06-28 2017-06-30 2017-07-07 2017-07-25 2017-08-09 2017-08-23 2017-09-13 2017-09-02 2017-11-17 2017-09-15 2017-12-04 2017-09-29 2019-04-28 Transit System Based Selection Implementation Piedecuesta CO-METROLINEA-18976-CS- Component B - Integrated Mass Quality And Cost- Pending QCBS / Interventoría rutas IBRD / 80830 Post Open - National 214,433.33 0.00 2019-04-08 2019-04-15 2019-05-02 2019-05-07 2019-06-18 2019-07-02 2019-07-15 2019-12-24 Transit System Based Selection Implementation alimentadoras Norte CO-METROLINEA-18973-CS- Consultant Component B - Integrated Mass Pending CQS / Interventoría adecuación IBRD / 80830 Post Qualification Open - National 11,666.67 0.00 2019-04-08 2019-04-15 2019-05-03 2019-06-07 2019-06-18 2019-07-02 2019-07-15 2019-11-24 Transit System Implementation rampa puente cenfer Selection PC-BIRF8083-CO-CONS-002- 2017 / Interventoria, tecnica, administrativa, financiera y ambiental al contrato de obra publica Construccion, Component C - Strategic Public Quality And Cost- Under IBRD / 80830 Post Open - International 434,201.00 0.00 2017-07-12 2017-07-12 2017-07-14 2017-07-18 2017-08-08 2017-08-14 2017-09-07 2017-09-18 2017-09-26 2017-10-06 2018-11-30 rehabilitacion de vias, renovacion Transit Systems Based Selection Implementation de andenes y obras complementarias - FASE IV, en el marco de la implementacion del SETP de Neiva. PC-BIRF8083-CO-CONS-003- 2017 / Interventoria, tecnica, administrativa, financiera y ambiental al contrato de obra Component C - Strategic Public Quality And Cost- Under publica Rehabilitacion de vias, IBRD / 80830 Post Open - International 426,489.00 0.00 2017-07-17 2017-07-19 2017-07-17 2017-08-10 2017-08-11 2017-09-11 2017-09-21 2017-09-29 2017-10-12 2018-12-06 Transit Systems Based Selection Implementation renovacion de andenes y obras complementarias - FASE V, en el marco de la implementacion del SETP de Neiva SBCC-001-2014 / Interventoría para el seguimiento administrativo, técnico, financiero, ambiental, contable, y Component B - Integrated Mass Quality And Cost- Pending IBRD / 80830 Prior Open - International 1,494,887.00 0.00 2014-11-11 2014-11-11 2015-02-16 2015-03-25 2015-04-30 2015-07-23 2015-07-28 2017-09-28 jurídico para la construcción del Transit System Based Selection Implementation proyecto Metroplús en el municipio de Itagüí - quebrada Doña María SBCC-01-2015 / Interventoría para el seguimiento administrativo, técnico, financiero, ambiental, contable, y Component B - Integrated Mass Quality And Cost- Pending IBRD / 80830 Prior Open - International 1,056,334.00 0.00 2015-02-17 2015-03-10 2015-04-23 2015-11-11 2015-12-15 2016-03-23 2016-04-26 2018-01-01 jurídico para la construcción del Transit System Based Selection Implementation proyecto Metroplús y obras complementarias en el municipio de Envigado. SBCC-001-2016 / Interventoría para el seguimiento técnico, legal y financiero, de la Component B - Integrated Mass Quality And Cost- Pending construcción del proyecto IBRD / 80830 Post Open - National 1,140,366.00 0.00 2016-06-02 2016-06-23 2016-08-06 2016-09-03 2017-03-07 2017-03-29 2017-05-25 2018-07-26 Transit System Based Selection Implementation Metroplús en el sur del Valle de Aburrá Fase 1 y obras complementarias' SBCC-002-20171 / Interventoría para la construcción de las estaciones del Tramo 3 y el Component B - Integrated Mass Quality And Cost- Pending Tramo 4 Fase I, requeridas para IBRD / 80830 Post Open - National 659,001.00 0.00 2017-09-15 2017-10-06 2017-11-19 2017-12-17 2018-01-16 2018-02-20 2018-03-27 2019-07-29 Transit System Based Selection Implementation la operación del sistema Metroplús en la Pretroncal del municipio de Itagüí SBCC-002-2017 / Interventoría para la construcción de las estaciones requeridas para la Component B - Integrated Mass Quality And Cost- Pending IBRD / 80830 Post Open - National 418,133.00 0.00 2017-09-15 2017-10-06 2017-11-19 2017-12-17 2018-01-16 2018-02-20 2018-03-27 2019-07-26 operación del sistema Metroplús Transit System Based Selection Implementation en la Pretroncal del municipio de Envigado SBCC-001-2018 / Interventoría para la construcción de las estaciones requeridas para la Component B - Integrated Mass Quality And Cost- Pending operación del sistema Metroplús IBRD / 80830 Post Open - National 162,424.00 0.00 2018-01-02 2018-01-23 2018-03-08 2018-04-05 2018-05-05 2018-06-09 2018-07-14 2019-11-14 Transit System Based Selection Implementation en la Pretroncal Sur del municipio de Medellín Pretroncal Sur Medellín BIRF-8083-CO-CON-004-MS / INTERVENTORÍA TÉCNICA, ADMINISTRATIVA, FINANCIERA Y SOCIOAMBIENTAL AL CONTRATO ESTATAL BIRF-LPN- 002-2017, CUYO OBJETO ES Component C - Strategic Public Quality And Cost- Pending IBRD / 80830 Post Open - National 293,000.00 0.00 2018-01-31 2018-02-01 2018-02-16 2018-03-18 2018-04-01 2018-04-21 2018-04-27 2019-05-22 LA "RECONSTRUCCION DE Transit Systems Based Selection Implementation VIAS Y ANDENES DE LA CALLE UNIVERSIDAD DE SUCRE (SEDE PUERTA ROJA), PERTENECIENTE A LA RUTA CABRERO DEL SETP BIRF-8083-CO-CON-003-MS / Interventoria al Suministro e Component C - Strategic Public Quality And Cost- Pending instalación de la central e IBRD / 80830 Post Open - National 273,812.32 0.00 2016-08-02 2016-08-23 2016-10-05 2016-11-03 2016-12-07 2016-12-27 2016-12-28 2017-12-27 Transit Systems Based Selection Implementation intersecciones del Sistema Semaforico centralizado BIRF-8083-CO-CON-002-MS / Interventoría Técnica, Administrativa, Financiera y ambiental a la Construcción de Vías en pavimento rígido, Component C - Strategic Public Quality And Cost- Pending IBRD / 80830 Post Open - National 302,044.35 0.00 2016-07-20 2016-08-10 2016-08-26 2016-09-25 2016-10-09 2016-10-23 2016-10-30 2018-04-29 andenes en concreto estampado Transit Systems Based Selection Implementation y adoquín correspondientes a las Vías y Andenes del Anillo Exclusivo, corredores Semipeatonales Centro Amable Page 4 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component C - Strategic Public UMUS-157-SSF-CF-001-2016 / Transit Systems Asesor a puesta en marcha Component B - Integrated Mass IBRD / 80830 Prior Direct Selection Direct N 608,273.00 663,160.59 Signed 2016-09-20 sistemaTranscaribe de Transit System Cartagena Component A - Implementing Capacity Building Contratacion Consultor Espc Component C - Strategic Public Adquisicion / Solicitud de no Transit Systems objecion a contratos de Component B - Integrated Mass IBRD / 80830 Prior Direct Selection Direct N 0.00 41,663.31 Signed 2016-02-09 consultores para la UMUS - Transit System Contratacion Especialista de Component A - Implementing Adquisiciones Capacity Building Estudio de Recaudo de Transmetro Bquilla / Proyecto de Component C - Strategic Public Apoyo al Programa Nacional de Transit Systems Transporte Urbano (PAPNTU). Component B - Integrated Mass IBRD / 80830 Prior Direct Selection Direct N 0.00 33,794.25 Signed 2015-10-23 Solicitud de no objeci n para Transit System contratar directamente Estudio Component A - Implementing de Recaudo de Transmetro en Capacity Building Barranquilla, a cargo de la UMUS Acta Neg y Minuta Contrato Recaudo Baq / Solicitud de no Component C - Strategic Public objeci n a Acta de Transit Systems Negociaciones y Minuta de Component B - Integrated Mass IBRD / 80830 Prior Direct Selection Direct N 0.00 36,407.70 Signed 2015-10-23 Contrato para contratar Transit System directamente Estudio de Component A - Implementing Recaudo de Transmetro en Capacity Building Barranquilla, a cargo de la UMUS CO-MINTRANSPORTE-19733- CS-INDV / ASISTENCIA TECNICA AL MINISTERIO DE TRANSPORTE Y A LAS ENTIDADES EJECUTORAS EN LAS LABORES DE ACOMPAÑAMIENTO Y Component A - Implementing Individual Consultant Pending IBRD / 80830 Post Direct 13,371.00 0.00 2016-12-21 2016-12-21 2016-12-21 2017-01-02 2017-07-31 SEGUIMIENTO CONTABLE Capacity Building Selection Implementation FINANCIERO Y ADMINISTRATIVO Y APOYO EN LA GESTION DE DESEMBOLSOS DE LOS PROYECTOS SITM Y SETP DEL PAIS CO-MINTRANSPORTE-19728- CS-INDV / Prestar servicios de asesor jurídico, específicamente a la Coordinación de la Unidad Component A - Implementing Individual Consultant Pending IBRD / 80830 Post Direct 17,652.00 0.00 2017-01-02 2017-01-12 2017-02-02 2017-03-09 2017-09-05 de Movilidad Urbana Sostenible Capacity Building Selection Implementation en las funciones de seguimiento a los proyectos SITM y SETP del país. CO-MINTRANSPORTE-19730- CS-INDV / ASESORAR AL MINISTERIO DE TRANSPORTE Y A LAS ENTIDADES EJECUTORAS EN LAS Component A - Implementing Individual Consultant Pending IBRD / 80830 Post Direct 10,535.00 0.00 2016-12-21 2016-12-21 2016-12-21 2017-01-20 2017-07-31 LABORRES DE APOYO Y Capacity Building Selection Implementation SEGUIMIENTO EN EL TEMA AMBIENTAL DE LOS PROYECTOS SITM Y SETP DEL PAIS CO-MINTRANSPORTE-19732- CS-INDV / Asesorar técnicamente al Ministerio de Component A - Implementing Individual Consultant Pending Transporte y a las Entidades IBRD / 80830 Post Direct 9,889.00 0.00 2016-12-21 2016-12-21 2016-12-21 2017-01-02 2017-07-31 Capacity Building Selection Implementation Ejecutoras en las labores de acompañamiento y seguimiento técnico a las obras. CO-MINTRANSPORTE-19727- CS-INDV / Prestar sus servicios como profesional de adquisiciones en la Unidad de Movilidad Urbana Sostenible del Component A - Implementing Individual Consultant Pending Ministerio de Transporte- en las IBRD / 80830 Post Direct 22,359.00 0.00 2017-01-02 2017-01-12 2017-02-02 2017-03-09 2017-09-05 Capacity Building Selection Implementation labores de revisión, estructuración y acompañamiento a los procesos de selección y contratación, de la UMUS. CO-MINTRANSPORTE-19726- CS-INDV / Asistencia técnica al Ministerio de Transporte y a las Entidades Ejecutoras, en las Component A - Implementing Individual Consultant Pending labores de acompañamiento y IBRD / 80830 Post Direct 13,455.00 0.00 2017-01-02 2017-01-12 2017-02-02 2017-03-09 2017-09-05 Capacity Building Selection Implementation seguimiento contable y financiero de los proyectos SITM y SETP, requeridas para la presentación de los informes financieros. CO-MINTRANSPORTE-19721- CS-INDV / Asistencia técnica para apoyar a la UMUS y a los Entes Gestores de los proyectos Component A - Implementing Individual Consultant SITM y SETP, en las labores de IBRD / 80830 Post Limited 7,950.00 8,051.28 Completed 2017-02-20 2017-02-23 2017-03-01 2017-03-07 2017-03-07 2017-07-31 2017-07-23 Capacity Building Selection acompañamiento y seguimiento contable y financiero, requeridas para la presentación de los informes financieros. Page 5 CO-MINTRANSPORTE-19722- CS-INDV / Asesorar al Ministerio de Trans-porte y a los Entes Gestores en asistencia técnica y apoyo para la formulación, Component A - Implementing Individual Consultant Pending IBRD / 80830 Post Direct 16,500.00 0.00 2016-12-21 2016-12-21 2016-12-21 2017-02-10 2017-07-31 ejecución y seguimiento de los Capacity Building Selection Implementation planes de reasentamiento y adquisición predial, ocupantes de espacio público y gestión en obra. CO-MINTRANSPORTE-19729- CS-INDV / Asistencia técnica al Ministerio de Transporte y a las Entidades Ejecutoras en las labores de Seguimiento de Component A - Implementing Individual Consultant Pending IBRD / 80830 Post Direct 14,833.00 0.00 2017-01-02 2017-01-12 2017-02-02 2017-03-09 2017-09-05 política de transporte y de Capacity Building Selection Implementation políticas administración de la demanda para el desarrollo e implementación de los proyectos SITM y SETP del país. CO-MINTRANSPORTE-19723- CS-INDV / Prestar asistencia técnica al Ministerio de Transporte y a las entidades Component A - Implementing Individual Consultant ejecutoras en las labores de IBRD / 80830 Post Direct 12,000.00 12,118.32 Signed 2017-02-17 2017-02-02 2017-02-17 2017-02-20 2017-02-22 2017-02-22 2017-02-22 2017-07-31 Capacity Building Selection seguimiento a los lineamientos de las condiciones de operación de los SITM, SETP, SITP, SITR CO-MINTRANSPORTE-19725- CS-INDV / Asesorar técnicamente al Ministerio de Transporte y a las entidades Component A - Implementing Individual Consultant Pending ejecutoras, para atender labores IBRD / 80830 Post Direct 29,419.00 0.00 2017-01-02 2017-01-12 2017-02-02 2017-03-09 2017-09-05 Capacity Building Selection Implementation de planeación, acompañamiento, estructuración y seguimiento téc- nico a los proyectos a cargo de la Unidad. CO-MINTRANSPORTE-19731- CS-INDV / Apoyar al Ministerio de Transporte y a los Entes Gestores de los proyectos cofinanciados por la Nación, en Component A - Implementing Individual Consultant Pending IBRD / 80830 Post Direct 14,504.00 0.00 2016-12-21 2016-12-21 2016-12-21 2017-01-02 2017-07-31 la implementación de los planes, Capacity Building Selection Implementation programas y medidas que permitan ejecutar los Planes de Manejo Ambiental de las obras de infraestructura. CO-MINTRANSPORTE-19724- CS-INDV / Asesorar técnicamente al Ministerio de Transporte y a las Entidades Component A - Implementing Individual Consultant Pending IBRD / 80830 Post Direct 13,013.00 0.00 2017-01-18 2017-01-28 2017-02-18 2017-03-25 2017-09-21 Ejecutoras en las labores de Capacity Building Selection Implementation acompañamiento y seguimiento técnico de obras y adquisiciones. CO-MINTRANSPORTE-19676- CS-CDS / AUDITORIA EXTERNA Component A - Implementing Under IBRD / 80830 Prior Direct Selection Direct 66,667.00 0.00 2016-06-15 2016-07-27 2016-10-12 2016-10-14 2017-07-14 (FINANCIERA) 2016 y 2017 Capacity Building Implementation VIGENCIAS FUTURAS CO-MINTRANSPORTE-40812- CS-CDS / Auditoría de los estados financieros de propósito especial de los préstamos que financian los Programas de Component A - Implementing Pending Sistemas Estratégicos de IBRD / 80830 Post Direct Selection Direct 108,524.00 0.00 2017-12-21 2017-12-31 2018-02-09 2018-08-31 Capacity Building Implementation Transporte Público (SETPS) y Sistemas Integrados de Transporte Masivo (SITM), ejecutados por el Ministerio de Transporte CO-MINTRANSPORTE-41052- CS-INDV / Prestación de servicios de asesoría técnicamente al Minisiterio de Component A - Implementing Individual Consultant Pending Transporte en temas IBRD / 80830 Post Limited 17,000.00 0.00 2017-12-26 2017-12-31 2018-01-04 2018-01-09 2018-06-30 Capacity Building Selection Implementation relacionados al recaudo electrónico vehicular y sistemas de gestión de flota presentes en los SETP e SITM Page 6