E4537 Republic Of Yemen Presidency of the Council of Ministers Social Fund for Development Environmental and Social Management Framework (ESMF) April 2014 Social Fund for Development Phase IV (Additional Financing 2) Table of Contents Acronyms ................................................................................................................................3 Executive Summary ..................................................................................................................4 1.Introduction ......................................................................................................... 15 2.Objectives, Scope and Application of the ESMF ...................................................................... 15 3.World Bank Safeguard Policies and their applicability .............................................. 16 4.Detailed Project Description .................................................................................. 18 5.Legal, Policy and Administrative Framework ........................................................... 24 6.Institutional and implementation arrangements ..................................................... 28 7.Description of Baseline Environmental and Socioeconomic Conditions ...................... 28 8.Analysis of Alternatives ......................................................................................... 32 9.Potential Environmental and Social Impacts ............................................................ 33 10.Objectives of the ESMF .......................................................................................... 34 11.SFD Subproject Cycle and Methodology for using the ESMF ...................................... 35 12.Basic elements of the ESMF ................................................................................... 37 12.1.Environmental Screening and Classification of Subprojects ................ 37 12.2.Environmental Screening and Registration process using Classification Lists ................. 37 12.3.Environmental and Social Responsiveness Criteria at Proposal stage .................. 38 12.4.Checklist of expected Environmental & Social impacts to be addressed at Design stage... 38 12.5.Environmental and Social Self-monitoring, Reporting and Periodic Inspection ...............38 12.6.Environmental and Ssocial Auditing and Reporting .................. 39 12.7.Environmental and Social Education, Training and Awareness: .................. 39 13.SFD Complaints Handling Mechanism (CHM) .......................................................... 41 14.Environmental Monitoring Plan (EMP) .................................................................... 42 15.Environmental Mitigation Measures ....................................................................... 42 16.Sub-projects Monitoring and Evaluation ................................................................. 43 Annex (1) Examples of Negative Environmental Impacts that may be associated with Subprojs…...44 Annex (2) Environmental and Social Responsiveness Criteria at Proposal Stage ........................... 47 Annex (3)Checklist of Expected Env and Social Impacts to be Addressed at Design Stage……………..75 Annex (4) Environmental Monitoring Plan Matrix ................................................................... 105 Annex (5) Environmental and Social Management Plan Matrix................................................. 108 Annex (6) Check list for Environmental Monitoring Indicators for Sample Subprojects ………..…. 121 Annex (7) Form for Voluntarily Donated Land/Compensated Land and Water Rights ................. 123 Annex (8) Environmental Screening Form (A) of Likely Env/Soc Impacts of Subprojects ............. 126 Annex (9) Environmental Screening Form (B) For Specific Subproject EMP ................................ 130 Annex (10) SFD’s interventions in the field of Cultural Heritage ............................................... 132 Annex (11) Summary of Stakeholder Consultations..……………………………………………………………………138 Acronyms AP Approved Sub-project BAS Bid Analysis System BM Branch Manager BQ Bill of Quantities CLTS Community-Led Total Sanitation CT Completion and Takeover CLDP Community and Local Development Program ECO Environmental Coordinator ESMF Environmental and Social Management Framework ESR Environmental and Social Responsiveness EMP Environmental Management Plan EPA Environment Protection Authority IDA International Development Association IP Implementation Party LIWP Labor Intensive Works Program MA Ministry of Agriculture and Irrigation MDG Millennium Development Goals MENA Middle East and North Africa Region MIS Management Information System MSWF Ministry of Social Welfare O&M Operation and Maintenance PAC Projects' Approval Committee PO Project Officer PRA Participatory Rural Appraisal PU Procurement Unit SC Supervising Consultant SA Sponsoring Agency SFD Social Fund for Development SMED Small and Micro Enterprises Development Program SWMP Solid Waste Management Plan TA Tender Announcement TD Tender Document TCBU Training and Capacity Building Unit TO Technical Officer UH Unit Head UI Under Implementation WEU Water and Environment Unit WB World Bank Executive Summary Preamble 1. This Environmental and Social Management Framework (ESMF) is prepared for the Social Fund for Development (SFD) IV Projects: SFD IV and SFD IV Additional Financing 1 (AF 1)—under implementation; and the proposed SFD IV Additional Financing 2 (AF 2). The ESMF replaces the SFD January 2010 Environmental Management Plan (EMP). Introduction 2. Yemen, one of the poorest countries in the Middle East and North Africa (MENA) region, faces daunting challenges in an uncertain global and regional environment. Living conditions for much of Yemen’s population remain difficult. Yemen is also facing rapid population growth, lack of clear alternatives to the oil economy, limited institutional capacity and outreach of the State, rapidly-depleting water reserves, poor infrastructure, and acute gender inequality issues. According to the World Food Program, food insecurity affected approximately 45 percent of the population in 2012, with almost half of children under five in the country – two million children - chronically malnourished and one million acutely malnourished. Given the country’s high dependence on staple food imports, the reduction in oil prices has led to economic hardships and a surge in the food crisis and poverty, especially for the majority of the population residing in rural areas. Political crises have meant that the limited resources for human development and poverty alleviation are further constrained. Most major countries and international organizations have expressed continuing support, and in many cases significantly greater support, for the economic development of Yemen. 3. Reducing poverty in Yemen requires, among others, village-level infrastructure improvements and greater access to social services delivered through diversified, localized approaches that address the needs of marginalized rural areas where indicators are farthest from the targets laid out in the Millennium Development Goals (MDGs). Poverty is pervasive in rural areas, where much of the population resides. The dispersion of the population and the difficult topography pose a serious challenge to delivering social services: Yemen has around 35,000 official villages (with approximately 136,000 human settlements), many with less than 100 households, which makes the provision and maintenance of social services very expensive. Project Description 4. The Social Fund for Development IV (SFD IV) project is expected to have important environmental and social impacts and benefits. SFD IV has been a major contributor to Yemen’s efforts to progress towards the MDGs and support key elements of Yemen’s current Poverty Reduction Strategy Paper. This includes: better human capital by expanding basic education, closing the gender gap in basic and secondary education, and improving access to health care; ensured environmental sustainability including policies for and investment in water sustainability and soil conservation; and improved governance through encouraging better budgeting and expenditure controls, as well as high fiduciary standards. After the successful completion of the previous SFD projects, SFD IV and SFD IV Additional Financing 1 (AF 1) are now under implementation. In addition, SFD IV AF 2 is now under preparation. Below is a description of the SFD IV projects. Page 4 of 139 I. The Social Fund for Development Phase IV Project (SFD IV) was financed by a World Bank IDA Grant during 2010, with the project development objectives to: (i) improve access to basic services; (ii) enhance economic opportunities; and (iii) reduce the vulnerability of the poor. This Project is currently under implementation. The SFD IV has the following four components, consisting of four operational Programs: (i) Community and Local Development (CLD) program; (ii) Small and Micro Enterprises Development (SMED) program; (iii) Capacity-Building (CB) program; and (iv) Labor-Intensive Works (LIW) program. Component 1: Community and Local Development (CLD) program. The objective of this component is to improve access to basic social services. Under this program, SFD will continue to implement community-based subprojects in various sectors, while building the capacity of local authorities and engaging selected districts in implementing development projects. Specifically, this component will do this through: • Provision of Sub-grants for the carrying out, by communities and local authorities, of Subprojects consisting of infrastructure and other services in various sectors, including: education, health, special needs groups, water and sanitation, cultural heritage, agriculture, and rural roads. • Carrying out, through the provision of goods, training and consultants’ services, activities to develop SFD’s annual operational plans as well as the capacity of selected local authorities and communities in participatory planning and management of development activities. Component 2: Small and Micro Enterprises Development (SMED) Program. The objective of this component is to support the overall SMED program of SFD which is: (i) strengthening and building capacity of local microfinance providers; and (ii) actively promoting entry into the market by creating an enabling environment and by encouraging the establishment of new financial service providers managed on a private sector basis by international investors with strong technical partners. This component will be supported through: • provision of Sub-grants to Eligible Intermediaries to build up the institutional capacity of such Eligible Intermediaries to deliver financial and business development services; and • carrying out, through the provision of goods, training and consultants’ services, a program to further support the institutional capacity of micro finance institutions and to create an enabling environment for small and micro enterprises development, including through the establishment of a credit bureau, the development of consumer protection legislation and associated regulations, and the development of financial literacy training programs. Component 3: Capacity-Building Program. A third set of activities will support the other three programs through a focus on capacity-building of local entities, including local and central government bodies, NGOs, and communities. The component will also support the strengthening of SFD’s own institutional capacity, to include for example monitoring and evaluation, management, and transparency. This component will be supported through: • carrying out, through the provision of Sub-grants, goods, training and consultants’ services, Subprojects to develop or enhance the capacity of selected governmental organizations, local authorities, community-based organizations, non-governmental organizations, private sector groups and individuals in the areas related to SFD activities. Page 5 of 139 • carrying out, through the provision of goods, training, consultants’ services, and operating costs, a program to strengthen the institutional capacity including the project management capacity of SFD. Component 4: Labor-Intensive Works (LIW). The objective of this component is to provide a cash-for-work safety net to target households to bridge their consumption gap during shocks and stagnation of agricultural seasons, while increasing the productive assets of communities and households. It will also aim to raise awareness among the targeted communities about the dangers of malnutrition and damages of Qat, and build the capacity and enhance the skills of the targeted communities to cope with future shocks. This component will be supported through: • provision of Sub-grants to targeted communities for the carrying out of labor- intensive works Subprojects in: irrigation, water harvesting, agricultural terraces rehabilitation, agricultural land improvement, maintenance and improvement of village access earth roads, the improvement of drinking water sources, watershed management and other fields based on the priority needs of each community. • carrying out, through the provision of goods, training and consultants’ services, activities to develop the SFD’s annual operational plans as well as the capacity of select local authorities and communities in participatory planning and management of development activities. II. SFD IV Additional Financing 1 (AF 1): Based on SFD achievements on during previous phases, World Bank obtained additional financing Grant for SFD IV (AF 1), which was approved in June 2013 to finance additional activities directed to youth under the Labor- Intensive Works Program Component (LIW) of the SFD IV project. The AF 1 is scaling up the SFD IV’s LIW Program, with the aim of providing income opportunities and work experience to young people and women in the provision of health and education services. The AF 1 included the following two new subcomponents: to (i) support LIW targeted to unemployed youth; and (ii) introduce cash-for-work opportunities for youth and women in the delivery of social services. SFD IV AF1 is currently under implementation. III. SFD IV Additional Financing 2 (AF 2): Based on the continued success of SFD IV, the World Bank is now seeking to obtain a second additional financing Grant as SFD IV (AF 2), to help meet the financing gap under the SFD IV’s largest component, the Community and Local Development Program Component (CLDP).The Project Development Objectives of the SFD IV AF 2 will be the same as the original SFD IV project, which are to: (i) improve access to basic services; (ii) enhance economic opportunities; and (iii) reduce the vulnerability of the poor. Implementation Arrangements 5. The Project will be implemented by the Social Fund for Development (SFD) which has a solid track-record of promoting development in areas as identified in the above projects. SFD was established in 1997 as an autonomous State organization under the Council of Ministers. The Prime Minister is the Chairman of its Board of Directors. Since its establishment, SFD has become one of Yemen’s main development actors, with support from the Government and the donor community. SFD plays a vital role in improving living standards in rural areas by providing funds to needy communities so that access to social services can improve. SFD follows a demand-driven approach and thereby promotes its activities among the target communities and motivates them to apply for priority services. Its involvement has included areas such as education, health, water and sanitation, agriculture, Page 6 of 139 village access roads (rural feeder roads), micro and small enterprise (MSE) development, social protection and workfare programs. 6. SFD has expanded and diversified its operations over the last 16 years, maintaining high standards in implementation and earning a strong reputation with communities and other stakeholders. The subprojects will continue to be implemented through SFD’s branch offices and supervised by main implementation units. SFD has proven capacity to implement World Bank safeguard policies as it has gained significant experience through implementing the previous phases. SFD has well established procedures for environmental/social screening and classifying subprojects; monitoring to ensure that mitigation measures as outlined in the ESMP, are implemented; and reporting on compliance with safeguard policies. 7. The Water and Environment Unit (WEU) of SFD will be responsible for the monitoring and evaluation of the ESMF with support from the Training and Capacity Building Unit (TCBU) of SFD in the social aspects whenever needed. Objectives of the Environmental and Social Management Framework (ESMF) 8. The purpose of the ESMF is to ensure that environmental and social management is integrated into the development cycle of individual subprojects. The SFD IV projects will be implemented as a community-led effort, where communities will be empowered to enable them in identifying their available resources and priority needs. Since exact sub-projects are not determined at the onset of project and will be decided during project implementation based on demand and consultations with the concerned communities, the instrument of the Bank Operational Policy OP 4.01 on Environmental Assessment is determined as ESMF. 9. The ESMF is intended to serve as a practical tool to guide identification and mitigation of potential environmental and social impacts of proposed investments and as a platform for consultations with stakeholders and potential project beneficiaries. The ESMF has been prepared in compliance with the Bank’s OP 4.01 and relevant Yemeni policies on environmental assessment. The ESMF identifies the policy triggers for the project, the screening criteria of sub-projects, the environmental and social impacts for the likely sub- projects and the mitigation measures to mitigate the identified risks, assessment of the institutional capacity of the implementing agency and measures for capacity-filling gaps, and an estimate of the budget needed for the implementation of the ESMF. Application of ESMF 11. The first Environmental Management Plan (EMP) for SFD was prepared in 2004, and the EMP was then updated during 2010. While SFD has been undertaking independent annual environmental audits, it was decided to improve the EMP report further by integrating lessons learned, and to replace it with an Environmental and Social Management Framework (ESMF). Due to the demand driven nature of the SFD’s programs, specific types, designs and locations of sub projects are not know in advance, until implementation. Therefore the ESMF is the appropriate document which sets out guidelines and procedures for assessing potential environmental and social impacts of subprojects. These procedures and guidelines will help the implementing agencies in screening subprojects’ eligibility; determining their environmental and social impacts; identifying appropriate mitigation measures to be incorporated into the sub-project; and specifying institutional responsibilities for implementing preventive, mitigation and compensation measures, and monitoring and evaluation. Page 7 of 139 World Bank Safeguard Policies 12. The SFD IV and AF 1 projects that are under implementation, and the proposed AF 2 project—are all classified as environmental Category B according to the Bank’s OP 4.01. The projects are expected to have significant positive environmental and social impacts, with relatively minor and localized negative impacts. The ESMF has been developed to ensure environmental and social due diligence for subprojects. The Bank safeguard policies on Environmental Assessment (OP 4.01) and Physical Cultural Resources (OP 4.11) are triggered by the SFD projects. Safeguard Policy Policy Justification triggered 1 OP 4.01: Yes The policy is triggered due to the small-scale physical Environmental interventions that would be financed under SFD projects in Assessment several sectors including education, health, rural roads, agriculture and rural development. The project is not expected to result in significant, negative or irreversible impacts. Due to the nature of interventions, some subprojects could result in adverse environmental impacts which are expected to be site-specific and temporary in nature. The ESMF includes methodology to apply an environmental and social screening process that will guide in determining the potential environmental and social impacts of subprojects and in the application of appropriate mitigation measures. Site-specific EMP will be prepared during implementation and before construction as required for the subprojects. 2 OP 4.04: Natural No The policy is not triggered. The project activities will not Habitats cause conversion or degradation of natural habitats or critical natural habitats as defined by the policy. 3 OP 4.09: Pest No The policy is not triggered. Management 4 OP 4.11: Physical Yes The policy is triggered due to the positive efforts envisaged Cultural Resources under the SFD projects towards cultural heritage sites, and will be covered within the scope of the ESMF, which includes a separate annex on cultural heritage aspects. 5 OP 4.12: No The policy is not triggered. The small scale nature of Involuntary infrastructure works combined with a community Resettlement participatory approach makes it possible land to be obtained as needed through voluntary land donation. Any subprojects which involve involuntary taking of land will not be eligible for funding under the SFD projects. Therefore the Bank Policy on Involuntary Resettlement OP 4.12 will not be applicable. Guidelines for safeguards screening, voluntary land donation and a negative project list are included in the Operational Manual. 6 OP 4.20: Indigenous No The policy is not triggered as indigenous people as defined People in the policy are not present in project areas. 7 OP 4.36: Forestry No The policy is not triggered as project will not be implemented in any forested areas. 8 OP 4.37: Safety of No The policy is not triggered as SFD projects under IDA Dams financing will not include construction of dams as defined Page 8 of 139 in the policy. 9 OP 7.50: Projects on No The policy is not triggered as SFD projects will not International undertake any activities in the catchment areas of Waterways international waterways and shared aquifers. 10 OP 7.60: Projects in No The policy is not triggered as SFD project activities will not Disputed Areas be implemented in any disputed areas. Consultations and Disclosure of the ESMF 13. As part of the SFD IV and SFD IV AF 1 projects, consultations have been an ongoing process with key stakeholders and other beneficiaries. However, the project design including the environmental/social aspects were shared and consulted with key stakeholders during consultations that were held on April 9, 2014. Annex (11) contains a summary of stakeholder consultations where points and concerns of stakeholders were documented. The annex contains also a list of names of participants. The Final draft of the ESMF has been reviewed and cleared by the World Bank and disclosed on the website of SFD on April 15, 2014. The ESMF was submitted to the Bank’s Infoshop for disclosure on April 15, 2014. Potential Environmental and Social Impacts 14. The SFD IV projects are expected to result in significant social benefits and positive environmental impacts. Potential negative environmental impacts anticipated for SFD IV projects are minor and of temporary nature during the construction/rehabilitation of small- scale interventions including dust, noise, waste generation, disruption to traffic and movement, health and safety; and would be mitigated by implementing appropriate mitigation measures as identified in the ESMF. Annex (1) shows expected impacts for samples of subprojects during construction and operation, the proposed mitigation measures, the party/entity responsible for follow up and frequency of visits/testing. 15. SFD has been progressively building on and integrating lessons learned in its follow on projects, including enhancing the project’s longer-term environmental rehabilitation impact. For public works programs, greater consideration is given to agricultural lands and terraces that can be rehabilitated for the benefit of poorer households. The LIW includes the rehabilitation of community assets in the fields of soil protection, agricultural terraces rehabilitation, maintenance and improvement of local feeder roads, streets pavement and other types of labor-intensive work based on the demand and priority needs of each community. In addition to the LIW program’s regular menu, subprojects more suitable for youth and urban and semi-urban areas will be added, such as planting trees, paving cobblestone streets, cleaning shorelines, and especially rebuilding damaged public spaces. Cash will be provided to help mitigate the impact of increased food prices through temporary work opportunities using a well-tested community targeting mechanism, as well as to support rehabilitation of basic community assets. The CLDP will continue delivering poverty-targeted improvements in community infrastructure while building local-level capacity and creating employment. Subprojects will be targeted to poor communities and priorities defined by them including: school construction/rehabilitation; water and sanitation; health; rural feeder roads; agriculture and rural development and cultural heritage. 16. SFD is familiar with the provisions of the Bank’ safeguards policies, including the implementation and monitoring of EMPs and related instruments due to the experience gained from the implementation of previous SFD phases with the Bank. Page 9 of 139 In addition, the participatory techniques and the governance mechanisms incorporated in the SFD’s Operational Manual will ensure transparency of processes and reduce opportunities for elite capture. Environmental and Social Auditing and Reporting 17. Annually, SFD recruits an environmental consultant to conduct an independent environmental and social compliance and performance audit. The audit report will then be reviewed within the SFD environment unit and then presented to SFD management. Based on the findings of this report, the SFD Managing Director (MD) will forward an “Annual Environmental Report” to the World Bank. In addition to SFD’s independent annual audit, compliance of the projects with the ESMF will be included in the project specific progress reports that are submitted to the Bank. Cost of ESMF Implementation 18. The cost of implementation of ESMF is estimated at US$500,000 (to be included in the cost of contracts). With regards to training, SFD conducts five levels of training, and the cost associated is US$680,200, through 2020. The five levels of training includes: SFD staff level, related government staff level, consultant level, contractor level, and SA level. The amount allocated also includes awareness related activities. SFD staff training will include all POs and BMs and the projects' approval committee (PAC) members. Government ministries and authorities related to SFD's activities and their branch offices at the governorate and district levels will receive training on the ESMF. With the development of subprojects, consultants will be trained in groups and this training will continue throughout the project period (2015-2020). In the same way, contractors, and SA will be trained in groups as soon as enough number of subprojects becomes ready for physical implementation. Table under section 12.7 of the main report shows the SFD budget allocation for education, training and awareness. SFD Subproject Cycle Methodology using the ESMF 19. Summary: When an initial request is received, it is first registered in the SFD Management Information System (MIS). Together with other requests, the request is verified in the field where a Participatory Rural Appraisal (PRA) team goes down to the community to facilitate in identifying priorities. If the request is the first priority, then it entered the annual plan. After the approval of the annual plan, the subprojects are assigned to Project Officers (PO). The PO hires a qualified consultant to go down to the community to prepare the proposal which will include a preliminary design and a cost estimate. The PO along with the qualified consultant will screen the proposed proposal against environmental and social impacts during the process of preparation of the proposal (reference Annexes 8 and 9). The PO/consultant classifies the environmental category of the proposed activity based on the results of screening. At this stage, they will decide if the subproject/proposal will need a separate EMP, and will also confirm aspects of requirement for land. If voluntary land donation is needed, it will be ensured that subproject is not site-specific and is free of squatters and encroachers. The PO/consultant will verify with each person on who is willing to donate their land (reference Annexes 4-7 will be used to prepare subproject specific EMP). The proposal is submitted to the Branch Manager/Unit Head (BM/UH) who reviews the proposal and either approves it and returns it to the PO to go ahead with the detailed design or returns it with comments. Page 10 of 139 If the proposal is approved, the PO hires a qualified consultant to prepare the detailed design and tender documents. The consultant should visit the community and see the location of the proposed subproject and gather all the data needed for preparing the design. The design and tender documents are then submitted to the BM/UH for review and approval. If the subproject was developed at the branch, then, the BM will either approve the subproject and submit it to the related UH or return it back to the PO with comments. Whether the subproject was developed in the branch or in the HQ, the related UH will review it and, if satisfied, submit it to the Projects' Approval Committee (PAC) or return it back to the BM with comments. The PAC reviews the subproject and either approves it or return it back to the UH with comments. If approved by the PAC, the subproject is returned to the PO to start preparing for implementation. At this stage the financing agreement (FA) is signed with the sponsoring agency (SA), and the tender is prepared for announcement. The PO and the Technical Officer (TO) work together to select the work and supply items needed for the subproject from a system called bid analysis system (BAS) and they come out with the final BQ that will be handed to the bidders. The tender is announced, offers received, evaluated, and the tender is awarded to the most responsive and lowest cost. The PO hires a qualified consultant for supervising the project, and a technician is assigned to work as a resident technician. The contract is signed and the work starts and continues till completion and final hand over. According to the subproject cycle followed in the SFD (Figure 1, Page 12), the critical points where environmental and social issues will need to be addressed are: ➢ At the proposal stage where a draft design and cost estimate are prepared. Here the responsiveness of the proposal to the environmental and social issues is confirmed. ➢ The detail design stage, where environmental and social impacts will need to be identified and mitigation measures are designed and incorporated in the subproject documents including the Bill of Quantities (BQ), to ensure they are priced and thus become an obligation of the implementing and supervising parties. The environmental and social self monitoring plan is prepared at this stage. ➢ The implementation stage, where the role of the supervising consultant with regards to the ESMF will be stated clearly in the TOR. The TOR will also require the follow up and reporting on the progress of implementing the mitigation measures. ➢ The operation stage, where the environmental and social self monitoring plan is implemented and periodically inspected. Basic elements of the ESMF (see details in pages below) a. Environmental screening and classification of sub-projects b. Environmental screening and registration process using classification lists c. Environmental and social responsiveness criteria at proposal stage d. Checklist of expected environmental and social impacts to be addressed in the design stage e. Environmental and social self monitoring, reporting and periodic inspection f. Environmental and social auditing and reporting g. Environmental and social education, training and awareness Page 11 of 139 Figure 1: SFD Subproject Cycle Request Completion & Takeover OP Screening Under Proposal Implementation No BM/UH PO+SC +IP+SA YES PO TA Design &TD PO+TO+PU No AP BM/UH YES YES HQ Subprojects No UH PAC YES No Page 12 of 139 (a) Environmental screening and classification of subprojects: The procedure followed by SFD for undertaking environmental screening and classification of subprojects is in line with the Bank’s OP 4.01 on Environmental Assessment. SFD undertakes environmental screening of the subproject proposals and classifies subprojects into Class A, B, and C, comparable to the Bank’s classification of environmental category A, B and C of projects/subprojects. The classification is based on the significance of impacts which depend on the type, location, sensitivity, and scale of the subproject and the nature and magnitude of its potential environmental impacts. Accordingly, List C subprojects are those which are known to have no adverse environmental impacts and accordingly will not require any environmental assessment or follow-up. List B subprojects are those that are likely to have limited adverse environmental impacts that are temporary and/or site specific and can be reduced/avoided/mitigated with the implementation of appropriate mitigation measures, and these subprojects would require a scoping to be undertaken and a limited EIA/EMP is prepared as needed; and List A subprojects are those with significant adverse environmental impacts for which an independent full EIA will need to be prepared. However, List A subprojects will be excluded from IDA funding. During the screening process if SFD comes across any of such List A subprojects (World Bank’s environmental category A), they will be excluded from IDA funding. (b) Environmental screening and registration process using classification lists: During the preparation of the proposal the project officer (PO) will enter the proposal data into SFD’s Management Information System (MIS), including the environmental classification (C or B). When the proposal reaches the SFD Branch Manager/Unit Head (BM/UH) the proposal will be reviewed and classification will be confirmed. (c) Environmental and social responsiveness criteria at proposal stage: This is done by using the formats prepared for each type of intervention of class B subprojects. The format includes decisive questions to examine the responsiveness of the proposal to the environmental and social issues. The answers to the questions are either "Yes" or "No". If the answer to any of the questions is "No", then the proposal is dropped or location is changed to ensure full responsiveness to environmental and social issues. Annex (2) gives the environmental and social responsiveness criteria for SFD interventions at Proposal Stage. (d) Checklist of expected environmental and social impacts to be addressed in the design stage: The ESMF developed checklist of expected environmental and social impacts that will be addressed in the design stage. This is an important stage as it will pave the way for the implementation and operation stages. All the expected environmental and social impacts will be identified at this stage and the mitigation measures will be designed and incorporated in the subproject design and tender documents, particularly, in the BQ so that it becomes obligatory. The checklist contains questions about the expected environmental and social mitigation measures to be included in the project documents for each type of intervention and the answer will be "Yes" or "No". If the answer is "No", then the consultant/PO will need to justify this in the design report, and also include the completed checklist as an annex to the design report. Annex (3) gives the checklist of the environmental and social issues that will need to be addressed at the Design Stage for SFD interventions. Page 13 of 139 (e) Environmental and social self-monitoring, reporting and periodic inspection: The commencement of physical works is preceded by the following two preparation steps: ➢ Signing of the Financing Agreement (FA): The PO will prepare a FA which will state the role and commitments of SFD and the sponsoring agency (SA). All documents for land donation, compensation, water rights, system of operating and maintaining the subproject after completion are to be attached to the FA. Annex (7) contains the formats for land donation, land compensation and water rights. ➢ Preparing the BQ for Tender Announcement (TA) via MIS: The final BQ and the TA are prepared via the MIS. The PO and technical officer (TO) together select the BQ items from a system called bid analysis system (BAS) and then proceed with the TA. If the consultant omits, for example, the addition of PPE or the temporary toilets or the tippy tap, the missing items will be added into the final BQ, and hence the POs and TOs will be trained in the ESMF to ensure that this step is undertaken accurately. ✓ Construction Phase: The PO prepares the TOR for the supervision consultancy service and selects the consultant from the consultants' data base. The existing TOR for supervising subprojects will be modified to incorporate the role of the supervising team in implementing the ESMF, and in monitoring and reporting the progress of implementing the mitigation measures. The PO will review the periodic reports and will follow-up periodically to ensure that environmental mitigation measures are being implemented.The representative of the SA will also report to the PO on the implementation of mitigation measures. ✓ Operation Phase: The party assigned for implementing the self monitoring plan, prepared in the design phase, would be required to prepare and present to the PO, periodic self-monitoring reports as stipulated in the self-monitoring plan. The Environmental Coordinator (ECO) within SFD’s Water and Environment Unit (WEU) will review the environmental self monitoring reports, and will periodically inspect subprojects for environmental compliance and performance. (f) Environmental and social auditing and reporting: Annually an environmental consultant will be recruited to conduct an environmental and social compliance and performance audit. The consultant is given a list of all SFD's subprojects, and he/she will select randomly the subprojects to be audited, which should include all SFD's sectors and programs, in different stages of subproject cycle including design, under implementation, and completed stages. The audit will include both a deskaudit/review and a field audit. Consequently, an audit report will be prepared by the consultant, reviewed by the ECO and then presented to SFD management. The executive summary of the audit report will be forwarded to the donors while the detailed report will be distributed to all SFD's branches for remedies, follow up and learning lessons towards current and future interventions. (g) Environmental and social education, training and awareness: Five levels of training on the ESMF will be conducted: SFD staff level, related government staff level, consultants’ level, contractors’ level, and SAs level. SFD staff training will include Pos, BMs and UHs. Government ministries and authorities related to SFD's activities and their branch offices at the governorate and district levels will receive training on the ESMF. With the development of subprojects, consultants will be trained in groups and this training will continue throughout the project period. In the same way, contractors, and SA will be trained in groups as soon as enough number of subprojects becomes ready for physical implementation. Page 14 of 139 1. Introduction 1. Yemen, one of the poorest countries in the MENA region, faces daunting challenges in an uncertain global and regional environment. Living conditions for much of Yemen’s population remain difficult. Yemen is also facing rapid population growth, lack of clear alternatives to the oil economy, limited institutional capacity and outreach of the State, rapidly- depleting water reserves, poor infrastructure, and acute gender inequality issues. According to the World Food Program, food insecurity affected approximately 45 percent of the population in 2012, with almost half of children under five in the country – two million children - chronically malnourished and one million acutely malnourished. Given the country’s high dependence on staple food imports, the reduction in oil prices has led to economic hardships and a surge in the food crisis and poverty, especially for the majority of the population residing in rural areas. Political crises have meant that the limited resources for human development and poverty alleviation are further constrained. Most major countries and international organizations have expressed continuing support, and in many cases significantly greater support, for the economic development of Yemen. 2. Reducing poverty in Yemen requires, among others, village-level infrastructure improvements and greater access to social services delivered through diversified, localized approaches that address the needs of marginalized rural areas where indicators are farthest from the targets laid out in the Millennium Development Goals (MDGs). Poverty is pervasive in rural areas, where much of the population resides. The dispersion of the population and the difficult topography pose a serious challenge to delivering social services: Yemen has around 35,000 official villages (with approximately 136,000 human settlements), many with less than 100 households, which makes the provision and maintenance of social services very expensive. 2. Objectives, Scope and Application of the ESMF 3. The World Bank has been a leading partner in the SFD since its inception and as requested by the Government of Yemen, the Bank is continuing to play a leadership role in organizing support for the fourth phase of the Social Fund for Development. The Bank will bring its global, regional, and country experiences regarding social funds and microfinance to the fourth phase. SFD IV is a major contributor to Yemen’s efforts to make progress towards the MDGs and supports the following key elements: better human capital by expanding basic education, closing the gender gap in basic and secondary education, and improving access to health care; ensured environmental sustainability including policies for and investment in water sustainability and soil conservation; and improved governance through encouraging better budgeting and expenditure controls, as well as high fiduciary standards. 4. After the successful completion of the previous SFD phases, the SFD IV project is now under implementation, which has 4 components consisting of four operational Programs which will be implemented by the SFD:(i) Community and Local Development (CLD) program; (ii) Small and Micro Enterprises Development (SMED) program; (iii) Capacity-Building (CB) program; and (iv) Labor-Intensive Works (LIW) program. 5. While the SFD IV is still under implementation, the Bank obtained additional financing towards the Labor-Intensive Works (LIW) Program, which is now under implementation. The AF1 scaled up the Labor-Intensive Works (LIW) Program (Component 4 of SFD IV) with two Page 15 of 139 new subcomponents to: (i) support LIW targeted to unemployed youth; and (ii) introduce cash-for-work opportunities for youth and women in the delivery of social services. Currently, it is proposed that additional funds will be obtained by the Bank to fund a financing gap for the Community and Local Development Program (CLDP) (Component 1 of SFD IV). Objectives of the ESMF 6. The purpose of the ESMF is to ensure that environmental and social management is integrated into the development cycle of individual subprojects. The SFD IV projects will be implemented as a community-led effort, where communities will be empowered to enable them in identifying their available resources and priority needs. Since exact sub-projects are not determined at the onset of project and will be decided during project implementation based on demand and consultations with the concerned communities, the instrument of the Bank Operational Policy OP 4.01 on Environmental Assessment is determined as ESMF. 7. The ESMF is intended to serve as a practical tool to guide identification and mitigation of potential environmental and social impacts of proposed investments and as a platform for consultations with stakeholders and potential project beneficiaries. The ESMF has been prepared in compliance with the Bank’s OP 4.01 and relevant Yemeni policies on environmental assessment. The ESMF identifies the policy triggers for the project, the screening criteria of sub-projects, the environmental and social impacts for the likely sub- projects and the mitigation measures to mitigate the identified risks, assessment of the institutional capacity of the implementing agency and measures for capacity-filling gaps, and an estimate of the budget needed for the implementation of the ESMF. Application of ESMF 8. The first Environmental Management Plan (EMP) for SFD was prepared in 2004, and the EMP was then updated during 2010. While SFD has been undertaking independent annual environmental audits, it was decided to improve the EMP report further by integrating lessons learned, and to replace it with an Environmental and Social Management Framework (ESMF). Due to the demand driven nature of the SFD’s programs, specific types, designs and locations of sub projects are not know in advance, until implementation. Therefore the ESMF is the appropriate document which sets out guidelines and procedures for assessing potential environmental and social impacts of sub projects. These procedures and guidelines will help the implementing agencies in screening subprojects’ eligibility; determining their environmental and social impacts; identifying appropriate mitigation measures to be incorporated into the sub-project; and specifying institutional responsibilities for implementing preventive, mitigation and compensation measures, and monitoring and evaluation. 3. World Bank Safeguard Policies and their Applicability 9. The SFD IV and AF 1 projects that are under implementation, and the proposed AF 2 project—are all classified as environmental Category B according to the Bank’s OP 4.01. The projects are expected to have significant positive environmental and social impacts, with relatively minor and localized negative impacts. The ESMF has been developed to ensure environmental and social due diligence for subprojects. The Bank safeguard policies on Environmental Assessment (OP 4.01) and Physical Cultural Resources (OP 4.11) are triggered by the SFD projects. Page 16 of 139 Safeguard Policy Policy Justification triggered 1 OP 4.01: Yes The policy is triggered due to the small-scale physical Environmental interventions that would be financed under SFD projects in Assessment several sectors including education, health, rural roads, agriculture and rural development. The project is not expected to result in significant, negative or irreversible impacts. Due to the nature of interventions, some subprojects could result in adverse environmental impacts which are expected to be site-specific and temporary in nature. The ESMF includes methodology to apply an environmental and social screening process that will guide in determining the potential environmental and social impacts of subprojects and in the application of appropriate mitigation measures. Site-specific EMP will be prepared during implementation and before construction as required for the subprojects. 2 OP 4.04: Natural No The policy is not triggered. The project activities will not Habitats cause conversion or degradation of natural habitats or critical natural habitats as defined by the policy. 3 OP 4.09: Pest No The policy is not triggered. Management 4 OP 4.11: Physical Yes The policy is triggered due to the positive efforts envisaged Cultural Resources under the SFD projects towards cultural heritage sites, and will be covered within the scope of the ESMF, which includes a separate annex on cultural heritage aspects. 5 OP 4.12: No The policy is not triggered. The small scale nature of Involuntary infrastructure works combined with a community Resettlement participatory approach makes it possible land to be obtained as needed through voluntary land donation. Any subprojects which involve involuntary taking of land will not be eligible for funding under the SFD projects. Therefore the Bank Policy on Involuntary Resettlement OP 4.12 will not be applicable. Guidelines for safeguards screening, voluntary land donation and a negative project list are included in the Operational Manual. 6 OP 4.20: Indigenous No The policy is not triggered as indigenous people as defined People in the policy are not present in project areas. 7 OP 4.36: Forestry No The policy is not triggered as project will not be implemented in any forested areas. . 8 OP 4.37: Safety of No The policy is not triggered as SFD IV projects under IDA Dams financing will not include construction of dams as defined in the policy. 9 OP 7.50: Projects on No The policy is not triggered as the project will not undertake International any activities in the catchment areas of international Waterways waterways and shared aquifers. 10 OP 7.60: Projects in No The policy is not triggered as project activities will not be Disputed Areas implemented in any disputed areas. Page 17 of 139 4. Detailed Project Description 10. The SFD Programs are implemented across the country and therefore has a national coverage. The SFD Programs include contribution from 12 donors, including IDA funds from the World Bank. After the successful completion of the previous SFD projects, SFD IV and SFD IV Additional Financing 1 (AF 1) are now under implementation. In addition, SFD IV AF 2 is now under preparation. Below is a description of the SFD IV projects. I. The Social Fund for Development Phase IV Project (SFD IV) (US$60 million) was financed by a World Bank IDA Grant during 2010, with the project development objectives to: (i) improve access to basic services; (ii) enhance economic opportunities; and (iii) reduce the vulnerability of the poor. This Project is currently under implementation. The SFD IV has the following four components, consisting of four operational Programs: (i) Community and Local Development (CLD) program; (ii) Small and Micro Enterprises Development (SMED) program; (iii) Capacity-Building (CB) program; and (iv) Labor- Intensive Works (LIW) program. 11. Objective: This program aims to enhance the productivity of poor households by ensuring that the public works interventions contribute to improving local productive capacities and livelihood opportunities (i.e., community and household asset creation). 12. Component 1: Community and Local Development (CLD) program. The objective of this component is to improve access to basic social services. Under this program, SFD will continue to implement community-based subprojects in various sectors, while building the capacity of local authorities and engaging selected districts in implementing development projects. Specifically, this component will do this through: • Provision of Sub-grants for the carrying out, by communities and local authorities, of Subprojects consisting of infrastructure and other services in various sectors, including: education, health, special needs groups, water and sanitation, cultural heritage, agriculture, and rural roads. • Carrying out, through the provision of goods, training and consultants’ services, activities to develop SFD’s annual operational plans as well as the capacity of select ed local authorities and communities in participatory planning and management of development activities. 13. While the basic principles of targeting resources to the poorest communities in Yemen, participatory planning, and community based development will continue to underpin the CLD, some changes are being introduced in the approach for community development activities, as well as inclusion of a line of activity which supports the capacity-building of local authorities in the management of local development activities. • Modified approach to community development. In addition to the existing demand- driven nature of community investments, whereby SFD responds to project requests from a community, in Phase IV, community investments will also respond to national sector plans and priorities, such as the education sector’s master plan for schools or the water sector’s national planning framework, or the national strategy of the health sector. In this variation, which is being termed the “MDG Gap Approach,” the standards, criteria, and subproject cycle will remain identical to the existing guidelines except for Page 18 of 139 the initial “application” stage, which will be guided by an analysis of national norms and/or data evidencing severe gaps in services. Elements of this approach have been applied in the Integrated Interventions and Special Programs elements of Phase III. This combination of modalities is intended to enhance SFD’s contribution towards the achievement of the MDGs at the national level. • Local development approach. As part of its commitment to support the decentralization strategy of Yemen, SFD will directly support local development through building capacity of a number of local authorities. Some major features of this new activity are: (i) SFD has signed a MOU with the Ministry of Local Administration regarding the delivery of its Empowerment and Local Development Program (ELD), which is the first stage of its support to local authorities. (ii) SFD will upfront formally agree on the 3- stage local development program with relevant national Government partners as a recognized process to certify or accredit local authorities as capable of managing resources for participatory local development. (iii) Since SFD cannot support all 333 local authorities simultaneously, it proposes to focus on approximately 80 districts with its first ELD stage of support. (iv) These ELD districts will be selected through objective, transparent selection criteria that would also consider geographical spread and ownership at the Governorate level. (v) SFD will sign agreements with each Governorate regarding the local development support it will be providing to districts. This will include Governorate commitments to sustained staffing of the selected districts. 14. Component 2: Small and Micro Enterprises Development (SMED) Program. The objective of this component is to support the overall SMED program of SFD which is: (i) strengthening and building capacity of local microfinance providers; and (ii) actively promoting entry into the market by creating an enabling environment and by encouraging the establishment of new financial service providers managed on a private sector basis by international investors with strong technical partners. This component will be supported through: • provision of Sub-grants to Eligible Intermediaries to build up the institutional capacity of such Eligible Intermediaries to deliver financial and business development services; and • carrying out, through the provision of goods, training and consultants’ services, a program to further support the institutional capacity of micro finance institutions and to create an enabling environment for small and micro enterprises development, including through the establishment of a credit bureau, the development of consumer protection legislation and associated regulations, and the development of financial literacy training programs. 15. Given competing demands on IDA resources, it was agreed that IDA funds would be limited to technical assistance, capacity-building and business development services, while non-IDA sources would be used to finance loan funds to MFIs or banks. 16. During Phase IV SMED will continue to support with loan funds (mobilized from financiers other than IDA) and technical assistance the existing micro finance providers through an ongoing process of merger and consolidation. It will support the two microfinance programs in Aden and Abyan to merge in order to become a strong regional player in the Page 19 of 139 South, and it will assist the largest microfinance provider – the NMF, which has a national coverage – to transform into a microfinance bank. Furthermore SMED will actively support at least one international microfinance provider (BRAC) to set up operations in Yemen and one private local financial institution to set up a microfinance bank. With experienced seasoned players entering the microfinance market, it is hoped that the microfinance sector will experience a boost in growth. 17. SMED will continue its work on the enabling environment, focusing on passage of relevant legislation/regulation for the establishment of a credit bureau as well as for consumer protection (including truth in lending). SMED will also continue supporting SMEPS via provision of sub-grants for operational support and business development services albeit on a decreasing basis and based on SMEPS achieving an agreed upon set of performance targets. Finally, SMED will undertake a feasibility study addressing options regarding its own sustainability and legal status. This study will inter alia analyze the option of transforming SMED into an independent apex agency (wholesale lending). 18. Component 3: Capacity-Building Program. A third set of activities will support the other three programs through a focus on capacity-building of local entities, including local and central government bodies, NGOs, and communities. The component will also support the strengthening of SFD’s own institutional capacity, to include for example monitoring and evaluation, management, and transparency. This component will be supported through: • carrying out, through the provision of Sub-grants, goods, training and consultants’ services, Subprojects to develop or enhance the capacity of selected governmental organizations, local authorities, community-based organizations, non-governmental organizations, private sector groups and individuals in the areas related to SFD activities. • carrying out, through the provision of goods, training, consultants’ services, and operating costs, a program to strengthen the institutional capacity including the project management capacity of SFD. 19. The first set of activities listed above will be carried out by the Training and Organizational Support Unit (TOSU) which promotes effective identification, preparation, and implementation of SFD’s diversified portfolio through training and enhancing skills of its various partners – communities, CBOs, NGOs, government agencies, private sector agencies (consultants, contracts) and local authorities. TOSU will mainstream skills accumulation across institutions involved in the poverty alleviation and good governance agenda of Yemen. TOSU will continue its work on the development and implementation of training programs, development of manuals, qualification of consultants and trainers, and documentation of lessons learned from the field. 20. The second set of activities will be carried out by different departments within SFD itself, including the Monitoring and Evaluation Department, the sector departments, and the branch offices. These activities will include: regular management activities, the M&E program, strengthening of the SFD MIS, and field supervision by branch offices. 21. Component 4: Labor-Intensive Works (LIW) Program. The objective of this component is to provide a cash-for-work safety net to target households to bridge their consumption gap during shocks and stagnation of agricultural seasons, while increasing the productive assets of communities and households. It will also aim to raise awareness among Page 20 of 139 the targeted communities about the dangers of malnutrition and damages of Qat, and build the capacity and enhance the skills of the targeted communities to cope with future shocks. This component will be supported through: • provision of Sub-grants to targeted communities for the carrying out of labor-intensive works Subprojects in: irrigation, water harvesting, agricultural terraces rehabilitation, agricultural land improvement, maintenance and improvement of village access earth roads, the improvement of water sources, watershed management and other fields based on the priority needs of each community. • carrying out, through the provision of goods, training and consultants’ services, activities to develop the SFD’s annual operational plans as well as the capacity of select local authorities and communities in participatory planning and management of development activities. 22. SFD has been implementing a labor-intensive cash-for-works program since 2008 that targets households most affected by the recent food crisis. The LIW program is an important component of Yemen’s Social Protection Strategy. In the fourth phase, SFD will reflect on lessons learned from the first round of implementation of workfare programs to (i) scale-up coverage to roughly 300,000 individuals annually in the 45-50 poorest districts of Yemen; (ii) re-orient the program to have a simplified targeting process and target chronically vulnerable households; (iii) begin supporting interventions in communities for periods of 3-5 years rather than just one year; and (iv) support interventions implemented in each area that complement each other and have a focus on enhancing long-term productivity. The LIW program will also aim to be responsive to various shocks that affect communities. There will be greater consideration of agricultural lands and terraces that can be rehabilitated for the benefit of poorer households, and there will also be a greater emphasis on projects that might maximize female labor force participation. II. SFD IV Additional Financing 1 (AF 1) (US$25 million): Based on SFD achievements on during previous phases, World Bank obtained additional financing Grant for SFD IV (AF 1), which was approved in June 2013 to finance additional activities directed to youth under the Labor-Intensive Works Program Component (LIW) of the SFD IV project. The AF 1 is scaling up the SFD IV’s LIW Program, with the aim of providing income opportunities and work experience to young people and women in the provision of health and education services. The AF 1 included the following two new subcomponents: to (i) support LIW targeted to unemployed youth; and (ii) introduce cash-for-work opportunities for youth and women in the delivery of social services. SFD IV AF1 is currently under implementation. ✓ LIW for Youth (US$5 million): The main objective of this subcomponent is to reduce the vulnerability of unemployed youth through youth-targeted labor-intensive works. The subcomponent will finance subprojects that provide income opportunities and work experience to participating youth, while at the same time improving public infrastructure. 23. The program will create approximately 420,000 person-days of employment for unemployed youth in the 18-30 year old age bracket in urban and semi-urban areas. The level of compensation will be set low to ensure that the program attracts unemployed youth from poor households. Some 7,000 youth are expected to participate with up to 60 days employment each. Page 21 of 139 Subprojects will be selected on the basis of high labor-intensity and potential impact, primarily targeting semi-urban poverty pockets in towns with high unemployment. In addition to the LIW program’s regular menu, subprojects more suitable for youth and urban and semi-urban areas will be added, such as planting trees, paving cobblestone streets, cleaning shorelines, and especially rebuilding damaged public spaces. 24. Management and coordination arrangements for subproject implementation will follow the procedures already tested and used for the LIW program, with implementation through SFD Branch Offices in close coordination with local authorities. Subcomponent 1 LIW for Youth will finance: • subproject costs in the targeted communities for carrying out labor-intensive public works; • the development of annual operational plans; • capacity building of the selected local authorities and communities in participatory planning and management of development activities; • the provision of goods, training, consultancy services and operating costs for management, monitoring and evaluation activities. ✓ Cash-for-Work for Social Services (US$20 million): The objectives of this subcomponent are: (i) to reduce the vulnerability of unemployed youth and women through providing employment opportunities, and (ii) to improve access to basic social services in poor communities. In coordination with relevant national programs, this subcomponent will finance education and nutrition services at the community level, with a particular focus on promoting demand for these services. 25. (i) Education, literacy and numeracy Approximately 750,000 person days of employment in teaching will be created for up to 3,000 unemployed young women and men who have completed at least secondary education. Successful applicants will receive training and regular supervision in delivering the following services: teachers to fill teacher gaps in regular schools (pupils 6-14 years old); non-formal accelerated programs for children who have not enrolled or have dropped out of school, to help them re-integrate into the formal system; and adult literacy classes, including life skills. 26. The beneficiary communities for these education services will be approximately 30 percent in urban areas and 70 percent in rural areas, selected on the basis of poverty and education indicators. The program expects to provide education and literacy benefits for approximately 26,000 children and 9,000 adults (70 percent women) in targeted communities. 27. In implementing the subprojects, the SFD will use the tested procedures, guidelines, manuals and training content developed since 2004 for its Girls Education Program, taking an integrated community-based approach to addressing key constraints in the targeted communities, and will coordinate closely with the MOE and local government formal, community and adult education systems. 28. (ii) Nutrition Approximately 460,000 person days of employment will be created for women Community Health Volunteers (CHVs) who will be trained and will receive monthly incentives in Page 22 of 139 delivering a package of community-based nutrition services for children under 5 years old (U5) and pregnant and lactating women. This package includes: (a) enrolment and initial malnutrition screening; (b) quarterly or bi-annual malnutrition screening where MOPHP outreach services are not available; (c) facilitating transport to health facilities for treatment; (d) monthly nutrition education to mothers of U5 children; (e) nutrition education for pregnant women; (f) breastfeeding promotion; and (g) community level nutrition and health education. 29. The services are targeted to Hodeida Governorate, based on its high malnutrition rate and its readiness to provide nutrition interventions through the public health facilities. The program will take a phased approach to covering the whole governorate, and expects to directly benefit approximately 75,000 acutely malnourished children, representing 15 percent of the estimated 493,644 children in the governorate, as well as providing nutrition education to 20,000 pregnant and lactating women. 30. SFD will be responsible for managing and implementing the demand side community- level interventions, in close coordination with MOPHP which is responsible for the operation and equipment of health facilities and outreach teams. For implementation of the nutrition intervention, MOPHP will be supported by the Bank’s Health and Population Project (P094755), which will supply nutrition kits, and the on-going treatment and supplementary feeding programs of UNICEF and WFP. 31. Subcomponent 2 Cash-for-Work for Social Services will finance: • subproject costs in targeted communities to carry out cash-for-work for social services; • information, public awareness and recruitment campaigns; • testing of applicants and training of the youth and women recruited; • equipment and materials (textbooks and learning materials, supplies); • education and health supervisors (consultants); • the development of annual operational plans; • capacity building of selected local authorities and communities in participatory planning and management of development activities; • management and monitoring and evaluation activities through the provision of goods, training, consultancy services and operating costs. III. SFD IV Additional Financing 2 (AF 2) (US$50 million): Based on the continued success of SFD IV, the World Bank is now seeking to obtain a second additional financing Grant as SFD IV (AF 2), to help meet the financing gap under the SFD IV’s largest component, theCommunity and Local Development Program Component (CLDP). The Project Development Objectives of the SFD IV AF 2will be the same as the original SFD IV project, which are to: (i) improve access to basic services; (ii) enhance economic opportunities; and (iii) reduce the vulnerability of the poor. 32. The proposed AF 2 grant would help finance the costs associated with continuing activities under SFD’s established and successful CLDP over the remainder of the project period, delivering poverty-targeted improvements in community infrastructure and building local-level capacity, while also creating employment. The expected outcomes, based on performance of the program to date, include: increased school enrolments, especially of girls; improved access to water; increased agricultural productivity and incomes; access to improved Page 23 of 139 public health services; reduced travelling time through rural road improvements; and strengthened institutional capacity at community and local government levels. 33. The CLDP activities to be financed through the AF2 would support the national transition process and proposed decentralization by helping to strengthen capacity at community and local government levels, as well as improving access of the poor to basic services. The component’s activities include a wide range of infrastructure subprojects, targeted to poor communities and responding to priorities defined by the community: school construction and rehabilitation; water and sanitation; health; rural feeder roads; agriculture and rural development. Demand from communities remains strong and SFD has a large pipeline of approved subprojects waiting funding. The CLDP has a strong momentum and is exceeding many of its targets. Follow up studies have found that the great majority (87 percent in the latest annual survey) of CLDP infrastructure continues to be utilized, while impact evaluations (the latest in 2010) have found substantial impacts of CLDP operations, including increases in school enrolments, especially of girls, improved access to water, and reduced travel time through rural road improvements. Impact evaluations also found satisfactory poverty targeting of CLDP interventions. 5. Legal, Policy and Administrative Framework National environmental legislation: Environment Protection Law 34. In 1995, Parliament enacted a comprehensive Environment Protection Law (Law No.26 of 1995), consisting of five chapters and 95 articles.The law’s objectives are to protect the environment, to combat pollution, and to protect naturalresources, society, human health, and living beings from activities that damage theenvironment. In addition, the law is designed to protect the national environment fromactivities practiced beyond the national boundaries and to implement internationalcommitments ratified by the Republic of Yemen in relation to environmental protection,control of pollution, conservation of natural resources, and the protection of such globally important environmental elements as the ozone layer and climatic changes.To avoid future adverse environmental effects, the law stipulates the incorporation ofenvironmental considerations in economic development plans at all levels and stages ofplanning for all sectors. It also, imposes the performance of environmental assessment for allprojects proposed by government, public, private, and cooperative agencies, and foreigncompanies. No licenses are to be issued for projects that degrade the environment. There isas yet no regulatory framework to support the implementation of the EnvironmentProtection Law and the provision of undertaking environmental assessment for projects isnot enforced. 35. The law also details provisions on the protection of land and water resources, and the use of pesticides. Mainly, the law prescribes controls on the digging of wells, raising water harvesting levels, soil erosion, desertification and pollution, and urban and industrial expansion on agricultural lands. The articles on the use of pesticides stipulate the control measures over importation, handling, storage, registration, analysis and disposal of expired stocks as per the international standards of FAO, WHO, and the Arab Organization for Industrial Development (AOID). Page 24 of 139 36. The law also broadened the role of the Environment Protection Council (established in1990) to include planning, licensing, monitoring, and auditing functions and to develop the procedures for defining, adopting, and monitoring environmental standards. The Law also outlines the role of line ministries and other technical authorities in the protection of air, water, and soil. 37. The Environment Protection Law provides the national, legal mandate for the application of the Bank’s Safeguard Policies that are relevant to the SFD projects. Cooperatives Societies and Unions Law (Law No. 39 of 1998) 38. Law 39 of 1998 concerning Cooperative Societies and Unions, which is the organizational and legal reference for all cooperatives and cooperative unions in the Republic of Yemen.This law is seen of relevance to the ACAP since it addresses community mobilization interms of collective actions that would lead to better community involvement in the design, implementation and operation and maintenance of the coping measures and the income generation activities. 39. Law no. 39 of 1998 grants a relevant Ministry and its departments and branches in the governorates the right to supervise and assure compliance with relevant laws, and provide advice and technical assistance to the cooperatives to plan their activities as well as to attend their General Assembly meetings. It defines five specific types of cooperatives. Any other type of cooperative, such as Agricultural Cooperative Union (ACU) and its branches in thecountry can be created according to the provision of Article 142, which states that it is lawful to establish other cooperative societies, according to provision of this Law, in other services. More specifically, Article 142 stipulates that a decree of establishment under appropriate lineMinistry shall be developed and forwarded to the Ministry of Social Affairs and Labour for approval and issuance. Pesticides Law 40. The Pesticides Law was decreed in 1999 (Law No. 25 of 1999) and includes seven chapters and 36 articles. Executive regulations for enforcement are to be issued by resolution of the Minister of Agriculture. A registration guide and executive regulations were prepared to facilitate enforcement. Penalties for violations are stated. 41. The law's objectives are to regulate the handling, registration, and inspection of pesticides and to avoid the poisonous effects on humans, and animals, the environment, and economically beneficial insects. The competent authority for enforcing the law is the General Authority of Plant Protection of the Ministry of Agriculture and Irrigation, and the authority is to coordinate its work with the Environmental Protection Authority. 42. The Pesticides Law provides the national, legal basis for the application of the Bank’s PestManagement Safeguard Policy in SFD interventions. International and regional environmental legislation: 43. The Yemeni Government has ratified multilateral environmental agreements on agro- biodiversity and natural resources, oceans and seas, hazardous materials and chemicals, atmosphere and air pollution, and health and workers safety. The following list provides the multilateral agreements relevant to the project activities: Page 25 of 139 44. Yemen is party to a number of international environmental agreements, the most important of which are: • The Convention on Biodiversity (CBD) singed on 1/12/2005 • The Convention on the Conservation of Migratory Species (CMS); starting on the 1st of December, 2006; Yemen is party No.100 • The Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES). Signed at Washington, D.C., on 3 March 1973 and amended at Bonn, on 22 June 1979 • The United Nations Framework Convention on Climate Change (UNFCCC) Kyoto Protocol • The United Nations Convention on Combating Desertification (UNCCD) • Environmental Modification • Hazardous Wastes • World Cultural & Natural Heritage, Paris 1982 • Civil Responsibility for Damage from Oil Pollution, Paris 1979 • Convention on Wetlands of International Importance Especially as Waterfowl Habitat 1971 • Law of the Sea • Ozone Layer Protection. On December 19, 1994, the United Nations General Assembly proclaimed 16 September the International Day for the Preservation of the Ozone Layer, commemorating the date in 1987, on which the Montreal Protocol on Substances that deplete the Ozone Layer was signed • Yemen has also signed Stockholm Convention on Persistent Organic Pollutants (Signed: 12/05/2001; Ratified: 01/09/2004), which is a global treaty to protect human health and the environment from chemicals that remain intact in the environment for long periods, become widely distributed geographically and accumulate in the fatty tissue of humans and wildlife. Administrative Framework: 45. As a governmental institution, SFD follows the national environmental law through applying its ESMF and maintaining good coordination with Environment Protection Authority (EPA). The Water and Environment Unit (WEU) and the Training and Capacity Building Unit (TCBU), in the headquarters, are assigned to be the two focal points for the environmental and social issues respectively. The main tasks of the WEU and the TCBU in the field of environment and social issues are summarized below: • Formulation of environmental and social policies and ensuring the mainstreaming of such policies into SFD’s activities in implementing the SFD IV and related projects; • Monitoring the implementation of SFD’s Environmental and Social Management Framework into the subprojects of the SFD IV and related projects; • Formulation of environmental and social training programs and monitoring their implementation; • Conduct environmental and social auditing to ensure application of the ESMF; • Participate in the Projects' Committee to ensure the mainstreaming of environmental and social policies and guidelines; • Coordinate with the EPA and MSWF; • Preparing studies/manuals to promote environmental and social best practices and compile annual progress reports on the best practices. Page 26 of 139 World Bank Safeguard Policies: 46. The World Bank safeguard policies are designed to help ensure that projects proposed for Bank financing are environmentally and socially sound and sustainable, and thus improve decision-making. These operational policies include: ➢ OP 4.01 Environmental Assessment ➢ OP 4.04 Natural Habitats ➢ OP 4.09 Pest Management ➢ OP 4.11 Physical Cultural Resources ➢ OP 4.12 Involuntary Resettlement ➢ OP 4.10 Indigenous People ➢ OP 4.36 Forests ➢ OP 4.37 Safety of Dams ➢ OP 7.50 Projects on International Waterways ➢ OP 7.60 Projects in Disputed Areas 47. In preparing this ESMF, all categories of subprojects were screened against the Bank safeguard policies and it was determined that the following two policies are triggered by SFD project: OP 4.01 on Environmental Assessment and OP 4.11 on Physical Cultural Resources. For further details on World Bank safeguard policies, please refer www.worldbank.org. Environmental Assessment (OP 4.01) 48. For projects financed by the Bank, environmental screening is conducted and according to the environmental impacts expected from the project or subproject, an environmental category A, B, C, or FI, is assigned, with a decreasing order of environmental impact severity. The instruments for this policy vary from a strategic environmental assessment, environmental and social management framework, environmental and social impact assessment, environmental audit, depending on project specific circumstances. This project has been classified as environmental category “B” since the environmental impacts are expected to be minimal, during the construction phase, and can be mitigated via an environmental management plan. Subprojects of environmental category A in nature will be screened out and will not be eligible for funding under this project. Physical Cultural Resources (OP 4.11) 49. The policy is triggered due to the positive efforts envisaged under the AF II towards cultural heritage sites, and will be covered within the scope of the ESMF. Project will implement activities relating to the preservation and conservation of cultural assets and cultural heritage sites in Yemen, in compliance with the “Preservation of the Historic Cities and Sites Law No. 16” (endorsed by Cabinet on August 13, 2013), for protecting Yemen’s cultural heritage. SFD has a separate Cultural Heritage unit. For more details, please refer to Annex 10. Other World Bank Safeguard Policies: 50. The Project does not trigger any other Bank safeguard policies. OP 4.12 on Involuntary Resettlement is not triggered. The small scale nature of infrastructure works combined with a community participatory approach makes it possible for the CLDP to obtain land needed through voluntary land donation. Subprojects which involve involuntary taking of land will not be eligible for funding under. Guidelines for safeguards screening, voluntary land donation and negative project list will be developed and included in the Operational Manual. Page 27 of 139 Public Consultations and Disclosure Policy 51. The World Bank requires that stakeholder consultations be undertaken during planning, implementation and operation phases of the project. These consultations were carried out on April 9, 2014. Annex (11) includes a summary of the stakeholder consultations where points and concerns of stakeholders were documented, as well as names of participants. The executive summary of the ESMF has been translated into Arabic and the ESMF including the Arabic executive summary have been disclosed in-country (at the SFD premises and on their website) on April 15, 2014, and the documents were submitted to the Bank’s Infoshop for disclosure on April 15, 2014. 6. Institutional and Implementation Arrangements 52. The SFD is uniquely placed to deliver safety net and development programs during this politically uncertain and challenging period. Its ability to respond flexibly and produce innovative multi-sectoral solutions is based on its operational autonomy, decentralized structure with strong Branch Offices, its focus on strong local-level partnerships, and transparent procedures with emphasis on monitoring and evaluation and good information systems. The SFD’s Board is chaired by the Prime Minister with members representing the line ministries, private sector, labor union and non-governmental organizations (NGOs). Through diversified programs, SFD is responding to many pressing immediate and medium-term needs of the population. The government of Yemen, which has been financing over 10 percent of the SFD’s budget since 2004, is fully committed to the SFD IV, AF 1 and AF 2 projects. SFD has expanded and diversified its operations over the last 16 years, maintaining high standards in implementation and earning a strong reputation with communities and other stakeholders. 53. With the recently announcement of Socotra as a new governorate, Yemen has 22 governorates. The city of Sana’a (the capital) has a special administrative status comparable to a governorate. Each governorate is divided into districts (Mudiriyah). Citizens of each district elect one representative to the national parliament. While there is no official central government administrative structure below the district, there are several additional administrative sub-divisions: sub-districts (Uzlah/Markez), villages, and hamlets (Mahalla). 54. Every ministry in the central government has a branch office at the governorate level and some have offices at the district level. For subprojects that need commitment for operation and maintenance such as teachers and books for schools and physicians, nurses and medicines for health facilities, SFD signs financing agreements with the executive offices at the district level. For subprojects that can be operated and maintained by the local communities, SFD signs the financing agreement with an active and community trusted NGO. In case an active and community trusted NGO is not available, then SFD helps the community to elect a committee, and the financial agreement is signed with the head of the committee. 7. Description of Baseline Environmental and Socioeconomic Conditions 55. Yemen is located in Southwest Asia at the southern tip of the Arabian Peninsula between Oman and Saudi Arabia. It is situated at the entrance to the Bab-el- Mandeb Strait, which links the Red Sea to the Indian Ocean (via the Gulf of Aden) and is one of the most active and strategic shipping lanes in the world. Yemen has an area of 527,970 Page 28 of 139 square kilometres (203,850 sq mi), including the islands of Perim at the southern end of the Red Sea and Socotra at the entrance to the Gulf of Aden. Yemen's land boundaries total 1,746 kilometres (1,085 mi). Yemen borders Saudi Arabia to the north (1,458 km or 906 mi) and Oman to the northeast (288 km or 179 mi). 56. Temperatures are generally very high in Yemen, particularly in the coastal regions. Rainfall is limited, with variations based on elevation. The highlands enjoy a temperate, rainy summer with an average high temperature of 21 °C (69.8 °F) and a cool, moderately dry winter with temperatures occasionally dipping below 0 °C (32.0 °F). The climate of the Tihamah (western coastal plain) is tropical; temperatures occasionally exceed 54 °C (129.2 °F), and the humidity ranges from 50 to 70 percent. Rainfall, which comes in irregular heavy torrents, averages 130 millimetres (5.12 in) annually. In Aden the average temperature is 25 °C (77.0 °F) in January and 32 °C (89.6 °F) in June, but with highs often exceeding 37 °C (98.6 °F). Average annual rainfall is 127 millimetres (5 in). The highest mountainous areas of southern Yemen receive from 520 to 760 mm (20.5 to 29.9 in) of rain a year. Some areas of the western highlands, most notably Ibb and Taiz, receive from about 1,000–1,500 millimetres (39.4–59.1 in) of rain each year. The capital, Sana'a, receives around 300 mm (11.8 in) a year, it is not uncommon for the northern and eastern sections of the country to receive no rain for five years or more. The Wadi Hadramaut in the eastern part of Yemen is arid and hot, and the humidity ranges from 35 percent in June to 64 percent in January. Yemen is dry in the east and humid in the west. 57. Yemen's main environmental problems have long been scarcity of water, soil erosion, and desertification. Water pollution is a problem due to contamination from the oil industry, untreated sewage, and seawater intrusion. The nation has 4.1 cubic kilometers of renewable water resources with 92% used for farming activity and 1% for industrial purposes. Environmental problem in Yemen are caused by three fundamental factors: (i) Population growth, (ii) poverty and (ii) institutional weaknesses. These factors are discussed further below. Page 29 of 139 Population and Growth 58. A total of 24 million Yemeni inhabitants make use of Yemen's resource base, over half of them are younger than 14 years. At the current growth rate of about 3.5 percent, the population is expected to double every 20 years. The factors that account for this high rate of growth include improved health standards and a high fertility rate, the latter possibly linked to low female education and employment. Between 1970 and 1997, the percentage of urban population rose from 13 to 25 percent. In the capital city Sanaa (2 million) the population growth rate is more than 10 percent per year, reflecting an in migration rate of about 7 percent per year and an annual natural increase of over 3 percent. The other cities in Yemen with populations over 100,000 are Aden, Hodeida, and Taiz, all of which are growing by about 7 to 8 percent. The failure of the centrally planned system in South Yemen during the late 1980s caused migration to the cities of the north. Urbanization was further accelerated by the return of about 900,000 Yemeni workers and their families after the Gulf War which caused a proliferation of unplanned settlements and accompanying environmental degradation in cities such as Sana'a, Hodeida, and Mukalla. The inability of Yemen's municipalities to provide the necessary land, services, and facilities to accommodate urban growth poses significant threats to health, natural resources, and urban productivity. The fertility rate in Yemen (7.5) compares unfavorably to that in other countries: 5 (Algeria), 4.3 (Morocco), 3.5 (Tunisia), 4.2 (Egypt), 6.2 (Iran), and 5.3 (Jordan). The factors which contribute to this high rate are: (i) 74 percent of the female population is illiterate (compared to 47 percent for men), and (ii) only 13 percent of the women are in the labor force. In Morocco and Lebanon, 20 and 27 percent of the women, respectively, are in the labor force. Page 30 of 139 Poverty and Environment 59. A key issue confronting Yemen is poverty, and the linkage with environmental degradation, and resources depletion - occurring in both rural and urban areas. In rural areas, high levels of poverty often have led to environmental degradation. Households are living at levels well below subsistence levels and use soils, forest, and other resources at rates that exceed sustainable limits for recovery or renewal. The poor have no other option than to adopt short-term survival strategies which do not incorporate longer term resource management considerations. If the poor have no alternatives, they will continue to use land and water resources in ways that will threaten their future productivity. The conditions that exacerbate these trends include: unclear land and water rights, the use of modem technology (e.g., water pumps) without adequate knowledge of its impact on natural resources, and population pressure. Yemen's urban areas also illustrate the mutually reinforcing effects of poverty and environmental degradation. Foremost among the environmental concerns of the urban poor arc health problems resulting from substandard living conditions that do not shield them from human excreta and other wastes and natural hazards. In most cities, it is not only the impact of urban environmental deterioration on the poor that is a concern. Poverty is itself a major factor in urban environmental degradation as the rural poor migrate to the cities in search of income- producing opportunities. The poor lack the financialresources to compete for serviced land and adequate housing in safe locations. In Sana'a the poor have no access to safe water. As a result, the poor are often forced to occupy illegal settlements on hazard prone or environmentally sensitive land. In many instances, the location of low-income populations on these lands has resulted in health hazards, injuries, property damage and loss of natural resources. Institutional Weaknesses 60. The institutional capacity in Yemen to enforce environmental regulations, and ensure compliance with national and international laws, lags behind what is anticipated by legislators. In particular, the existing capacity to implement international treaty obligations is missing (as in CITES reporting, toxic dumping reporting, port facilities that comply withMARPOL requirements).There are gaps in management. Some areas of environmental concern are notaddressed at all. For example, there is no agency designated to coastal zone management. There is no Department in the Ministry of Tourism to deal with Eco-tourism. There is no central authority to dealwith oil spills. Although spills within the confinement of harbors are under responsibility of the portauthorities, there is no budget allocated to control oil pollution.The system is characterized by the centralization of the management of naturalresources at the national level, under the responsibility of the line ministries. The provision of many environmental services, such as urban water supply, wastewater collection and disposal, and solid waste management is also centralized at the national level. Also among the many agencies with natural resource management responsibilities at the national level, there is fragmentation and a lack of coordination. For example, at least four ministries and a number of government agencies share responsibility for water management but do not coordinate their operations. This leads to overlap and duplication of functions. In addition, competing sectoral interests undermine the establishment of overall objectives and formulation of policies and strategies for resource management. 61. Natural forests in mountainous areas have been destroyed by agricultural clearing and livestock overgrazing. As of 2001, 5 mammal species and 13 bird species are listed as threatened. Endangered species include the northern bald ibis, the South Arabian leopard, slender-billed curlew, and two species of turtle (green sea and hawksbill). Queen of Sheba's gazelle and the Saudi Gazelle have become extinct in the wild. Page 31 of 139 62. The flora in Yemen comprises of sparse vegetation near the coast and dense vegetation as the land proceeds towards higher land. The chief of the trees that grow in Yemen are the date palms, Judas tree and acacias. The land is blessed with an abundance of fruits as well. Some of them are euphorbia, grapes, spurge and custard apple. The land of Yemen is plentiful in herbs too. Two of the most famous ones are balsam and basil. The fauna of the land forms a rich and diverse list of gazelles, baboons and leopards. Another unique species of fauna is the mountain hare. The avian fauna too forms a pretty inventory consisting of hornbills, vultures, honey suckers, hawks, parrots, ravens, bustards and weaver finches. 63. Most Yemenis are engaged in agriculture and herding. Yemen produces grain, fruits, vegetables, qat (a stimulant-containing shrub), coffee, cotton, and livestock (sheep, goats, cattle, and camels) but is dependent on imports for most of its essential needs. Terraced agriculture, dating from ancient times, is still practiced. The climate is arid, and only a fraction of the land is arable. There is fishing, food processing, salt mining, and small-scale manufacturing, including cotton textiles, leather goods, handicrafts, and aluminum products. The country produces and refines petroleum, and oil export revenues have boosted the economy since the late 1980s, but oil reserves are now being depleted. Imported oil is also processed into petroleum products for export. Other exports include coffee and processed fish. Foodstuffs, live animals, machinery, and chemicals are imported. 64. Yemen is characterized by high food insecurity and malnutrition with rates of child malnutrition and maternal mortality being amongst the highest in the world. The country faces multi-dimensional challenges: High population growth (>3%) associated with gender inequalities; high prevalence of poverty (35%) with a large rural/urban divide; high illiteracy (21.1% and 57.2% among adult male and female respectively); poor access to social infrastructure; conflicts in several parts of the country (Saadah in the north, Abyan and Lahej in the south); increased influx of refugees; recurrent droughts and floods, in addition to increasing aridity due to climate change, as well as increasing agricultural and urban water needs. Furthermore, substantial food price rises over the past two years have led to an augmented number of Yemenis affected by food insecurity and poverty, given that 96% of the populationare net-buyers, making them particularly vulnerable to food price fluctuations1. 65. Land ownership varies between self owned, rent, or tenant. In renting system, the farmer pay the owner a fixed and agreed amount (cash/products) per year, while in the tenanting system, the farmer should allocate an agreed fraction of the land products (usually 1/3-1/2) to the landlord. 8. Analysis of Alternatives 66. A business-as-usual scenario implies maintaining the status quo of impoverished communities of the selected project sites and doing very little about it, maintaining the current poverty and livelihoods situation, and continued exploitation of the natural resources in a non- sustainable manner and compromising its biodiversity, in addition being posed to negative potential impacts on their current livelihoods due to climate change. This option would wrongfully imply that there is no urgent need for improved management targeted by the SFD projects or for improving sustainable livelihoods in the area, that there is no urgent need to 1 International Food Policy Research Institute (IFPRI 2010) Page 32 of 139 introduce activities that would improve access to basic services, enhance economic opportunities, and reduce the vulnerability of the poor. 67. Should SFD IV move to support full-scale decentralization of services vs. gradual bottom-up capacity-building of local authorities? This was a key question considered by SFD and its partners during the “visioning” process for SFD IV. Based on consultations with a variety of local partners, on-the-ground experience with local authorities in different parts of the country, and a review of international experience of social funds and their contributions to decentralization strategies, SFD took the decision to adopt a gradual, step-by-step capacity building approach to supporting local authorities, including through grants for small projects for local authorities who have demonstrated their ability to manage and account for resources. Most districts are found to have weak management capacity. This will be addressed by the national Government through public sector management-related investments, to be complemented by SFD investments in capacity-building of local authorities in aspects where SFD has a comparative advantage (e.g., participatory planning, learning-by-doing management of investment projects). 68. Without the project, the following environmental and social impacts would be expected: continued unsustainable natural resource exploitation, continued high levels of poverty and unemployment, continued deterioration in natural assets/or reliance on governmental aid: natural resources will be put under additional stress and those that directly or indirectly exploit natural resources will either proactively change livelihoods to compensate or be forced to change because the resource base will no longer support the relevant livelihood. On the other hand- project sub projects being proposed- this option indicates that all defined potential adverse impact sources during the construction, implementation and operation phases will not occur. Also local governance capacity will remain weak in area of management and hence rely on central level which will hinder move to full-scale decentralization of services delivery. 69. Nevertheless, adverse potential environmental impacts identified for SFD projects are very limited as compared to the positive social and environmental impacts anticipated from the project. On account of the reasons listed above, a no-project alternative should not be considered. 9. Potential Environmental and Social Impacts 70. The SFD IV projects are expected to result in significant social benefits and positive environmental impacts, as has been witnessed in the previous SFD phases. Potential negative environmental impacts anticipated for SFD IV projects are minor and of temporary nature during the construction/rehabilitation of small-scale interventions including dust, noise, waste generation, disruption to traffic and movement, health and safety; and would be mitigated by implementing appropriate mitigation measures as identified in the ESMF. 71. SFD has been progressively building on and integrating lessons learned in its follow up of projects, including enhancing the project’s longer-term environmental rehabilitation impact. For public works programs, greater consideration is given to agricultural lands and terraces that can be rehabilitated for the benefit of poorer households. The LIW includes the rehabilitation of community assets in the fields of soil protection, agricultural terraces Page 33 of 139 rehabilitation, maintenance and improvement of local feeder roads, streets pavement and other types of labor-intensive work based on the demand and priority needs of each community. In addition to the LIW program’s regular menu, subprojects more suitable for youth and urban and semi-urban areas will be added, such as planting trees, paving cobblestone streets, cleaning shorelines, and especially rebuilding damaged public spaces. Cash will be provided to help mitigate the impact of increased food prices through temporary work opportunities using a well-tested community targeting mechanism, as well as to support rehabilitation of basic community assets. The CLDP will continue delivering poverty-targeted improvements in community infrastructure while building local-level capacity and creating employment. Subprojects will be targeted to poor communities and priorities defined by them including: school construction/rehabilitation; water and sanitation; health; rural roads; agriculture and rural development and cultural heritage. 72. SFD is familiar with the provisions of the Bank’ safeguards policies, including th e implementation and monitoring of ESMF and related instruments due to the experience gained from the implementation of previous SFD phases with the Bank. 73. In addition, the participatory techniques and the governance mechanisms incorporated in the SFD’s Operational Manual will ensure transparency of processes and reduce opportunities for elite capture. 10. Objectives of the ESMF 74. Environment & Social Management Framework (ESMF) has been prepared to set out the environmental and social assessment procedures required by SFD and its partners to assess the environmental and social consequences of SFD interventions. Following are the objectives of ESMF: • Prevent execution of interventions with significant individual or cumulative negative environmental and social impacts; • Minimize potential individual and cumulative negative impacts by incorporating mitigations at the design stage and implementing mitigations at the implementation stage of the interventions; • Enhance the positive impacts of interventions; •Protect environmentally sensitive areas from additional disturbance from human interventions. The procedures in the ESMF were designed to: • Facilitate SFD and Sponsoring Agencies (SA) to adopt intervention specific structured environmental assessment formats; •Enable SFD and SAs to monitor the implementation of ESMF on the basis of intervention specific structured environmental assessment formats. Page 34 of 139 11. SFD Subproject Cycle and Methodology for using the ESMF Figure 1 below shows the subproject cycle. Request Completion & Takeover PO Screening Under Proposal Implementation No BM/UH PO+SC +IP+SA YES PO TA Design &TD PO+TO+PU No AP BM/UH YES YES HQ Subprojects No UH PAC YES No Figure 1: SFD's Subproject Cycle Page 35 of 139 75. In Summary: When an initial request is received, it is first registered in the SFD Management Information System (MIS). Together with other requests, the request is verified in the field where a Participatory Rural Appraisal (PRA) team goes down to the community to facilitate in identifying priorities. If the request is a first priority, then it is entered in the annual plan. After the approval of the annual plan, the subprojects are assigned to Project Officers (PO). The PO hires a qualified consultant to go down to the community to prepare the proposal which will include a preliminary design and a cost estimate. The PO along with the qualified consultant will screen the proposed proposal against environmental and social impacts during the process of preparation of the proposal (reference Annexes 8 and 9). The PO/consultant classifies the environmental category of the proposed activity based on the results of screening. At this stage, they will decide if the subproject/proposal will need a separate EMP, and will also confirm aspects of requirement for land (reference Annexes 4-7 will be used to prepare subproject specific EMP). If voluntary land donation is needed, it will be ensured that subproject is not site-specific and is free of squatters and encroachers. The PO/consultant will verify with each person on who is willing to donate their land. The proposal is submitted to the Branch Manager/Unit Head (BM/UH) who reviews the proposal and either approves it and returns it to the PO to go ahead with the detailed design or returns it with comments. If the proposal is approved, the PO hires a qualified consultant to prepare the detailed design and tender documents. The consultant should visit the community and see the location of the proposed subproject and gather all the data needed for preparing the design. The design and tender documents are then submitted to the BM/UH for review and approval. If the subproject was developed at the branch, then, the BM will either approve the subproject and submit it to the related UH or return it back to the PO with comments. Whether the subproject was developed in the branch or in the HQ, the related UH will review it and, if satisfied, submit it to the Projects' Approval Committee (PAC) or return it back to the BM with comments. The PAC reviews the subproject and either approves it or return it back to the UH with comments. If approved by the PAC, the subproject is returned to the PO to start preparing for implementation. At this stage the financing agreement (FA) is signed with the sponsoring agency (SA), and the tender is prepared for announcement. The PO and the Technical Officer (TO) work together to select the work and supply items needed for the subproject from a system called bid analysis system (BAS) and they come out with the final BQ that will be handed to the bidders. The tender is announced, offers received, evaluated, and the tender is awarded to the most responsive and lowest cost. The PO hires a qualified consultant for supervising the project, and a technician is assigned to work as a resident technician. The contract is signed and the work starts and continues till completion and final hand over. 76. In Detail: According to the subproject cycle followed in the SFD (Figure 1) the critical points where environmental and social issues will need to be addressed are: Page 36 of 139 ➢ At the proposal stage where a draft design and cost estimate are prepared. Here the responsiveness of the proposal to the environmental and social issues is confirmed. ➢ The detail design stage, where environmental and social impacts will need to be identified and mitigation measures are designed and incorporated in the subproject documents including the Bill of Quantities (BQ), to ensure they are priced and thus become an obligation of the implementing and supervising parties. The environmental and social self monitoring plan is prepared at this stage. ➢ The implementation stage, where the role of the supervising consultant with regards to the ESMF will be stated clearly in the TOR. The TOR will also require the follow up and reporting on the progress of implementing the mitigation measures. ➢ The operation stage, where the environmental and social self monitoring plan is implemented and periodically inspected. 12. Basic elements of the ESMF (1) Environmental screening and classification of sub-projects (2) Environmental screening and registration process using classification lists (3) Environmental and social responsiveness criteria at proposal stage (4) Checklist of expected environmental & social impacts to be addressed at design stage (5) Environmental and social self monitoring, reporting and periodic inspection (6) Environmental and social auditing and reporting (7) Environmental and social education, training and awareness 12.1. Environmental screening and classification of subprojects 77. The procedure followed by SFD for undertaking environmental screening and classification of subprojects is in line with the Bank’s OP 4.01 on Environmental Assessment. SFD undertakes environmental screening of the subproject proposals and classifies subprojects into Class A, B, and C, comparable to the Bank’s classification of environmental category A, B and C of projects/subprojects. The classification is based on the significance of impact to depend on the type, location, sensitivity, and scale of the project and the nature and magnitude of its potential environmental impacts. Accordingly, List C subprojects are those which are known to have no adverse environmental impacts and accordingly will not require any environmental assessment or follow-up; List B subprojects are those that are likely to have limited adverse environmental impacts that are temporary and/or site specific and can be reduced/avoided/mitigated with the implementation of appropriate mitigation measures, and these subprojects would require a scoping to be undertaken and a limited EIA/EMP is prepared as needed; and List A subprojects are those with significant adverse environmental impacts for which an independent full EIA will need to be prepared. However, List A subprojects will be excluded from IDA funding. During the screening process if SFD comes across any of such List A subprojects (World Bank’s environmental category A), they will be excluded from IDA funding. 12.2. Environmental screening and registration process using classification lists 78. During the preparation of the proposal the project officer (PO) will enter the proposal data into SFD’s Management Information System (MIS), including the environmental Page 37 of 139 classification (C or B). When the proposal reaches the SFD Branch Manager/Unit Head (BM/UH) the proposal will be reviewed and classification will be confirmed. 12.3. Environmental and social responsiveness criteria at the proposal stage 79. This is done by using the formats prepared for each type of intervention of class B. The format includes decisive questions to examine the responsiveness of the proposal to the environmental and social issues. The answers to the questions are either "Yes" or "No". If the answer to any of the questions is "No", then the proposal is dropped or the location is changed to ensure full responsiveness to environmental and social issues. Annex (2) contains the tables of the environmental and social responsive criteria for all SFD's subprojects. 12.4. Checklist of expected environmental and social impacts to be addressed at the design stage 80. The ESMF developed checklist of expected environmental and social impacts that will be addressed in the design stage. This is an important stage as it will pave the way for the implementation and operation stages. All the expected environmental and social impacts will be identified at this stage and the mitigation measures will be designed and incorporated in the subproject design and tender documents, particularly, in the BENSUREQ so that it becomes obligatory. The checklist contains questions about the expected environmental and social mitigation measures to be included in the project documents for each type of intervention and the answer will be "Yes" or "No". If the answer is "No", then the consultant/PO will need to justify this in the design report, and also include the completed checklist as an annex to the design report. Annex (3) shows the check list of the environmental and social issues that need to be addressed in the design phase for most of SFD's intervention. 12.5. Environmental and social self-monitoring, reporting and periodic inspection 81. The commencement of physical works is preceded by following two preparation steps: ➢ Signing of the Financing Agreement (FA): The PO will prepare a FA which will state the role and commitments of SFD and the sponsoring agency (SA). All documents for land donation, compensation, water rights, and the operation and maintenance system after completion are to be attached to the FA. Annex (3) contains the format for land donation, compensation and water rights. For the operation and maintenance system, it will depend on the type and level of project; therefore it should be prepared for each subproject by the SA, approved by SFD, signed by the SA and attached to the FA. ➢ Preparing the BQ for Tender Announcement (TA) via MIS: The final BQ and the TA are prepared via the MIS. The PO and technical officer (TO) together select the BQ items from a system called bid analysis system (BAS) and then proceed with the TA. If the consultant omits, for example, the addition of PPE or the temporary toilets or the Page 38 of 139 tippy tap, the missing items will be added into the final BQ, and hence the POs and TOs will be trained in the ESMF to ensure that this step is undertaken accurately. ✓ Construction Phase: The PO prepares the TOR for the supervision consultancy service and selects the consultant from the consultants' data base. The existing TOR for supervising subprojects will be modified to incorporate the role of the supervising team in implementing the ESMF, and in monitoring and reporting the progress of implementing the mitigation measures. The PO will review the periodic reports and will follow-up periodically to ensure that environmental mitigation measures are being implemented.The representative of the SA will also report to the PO on the implementation of mitigation measures. ✓ Operation Phase: The party assigned for implementing the self monitoring plan, prepared in the design phase would be required to prepare and present to the PO, periodic self-monitoring reports as stipulated in the self-monitoring plan. The Environmental Coordinator (ECO) within SFD’s Water and Environment Unit (WEU) will review the environmental self monitoring reports, and will periodically inspect subprojects for environmental compliance and performance. 12.6. Environmental and social auditing and reporting 82. Annually an environmental consultant will be recruited to conduct an environmental and social compliance and performance audit. The consultant is given a list of all SFD's subprojects, and he/she will select randomly the subprojects to be audited, which should include all SFD's sectors and programs, in different stages of subproject cycle including design, under implementation, and completed stages. The audit will include both a deskaudit/review and a field audit. Consequently, an audit report will be prepared by the consultant, reviewed by the ECO and then presented to SFD management. The executive summary of the audit report will be forwarded to the donors while the detailed report will be distributed to all SFD's branches for learning lessons towards current and future interventions. 12.7. Environmental and social education, training and awareness 83. Five levels of training on the ESMF will be conducted: SFD staff level, related government staff level, consultant level, contractor level, and SA level. SFD staff training will include all POs and BMs and the projects' approval committee (PAC) members. Government ministries and authorities related to SFD's activities and their branch offices at the governorate and district levels will receive training on the ESMF. With the development of subprojects, consultants will be trained in groups and this training will continue throughout the project period (2015-2020). In the same way, contractors, and SA will be trained in groups as soon as enough number of subprojects becomes ready for physical implementation. Table below shows the SFD budget allocation for education, training and awareness. Page 39 of 139 Training and Awareness Budget for SFD Operations 2015 2016 2017 2018 2019 2020 Unit No. of No. of Total Item Cost No. of Amount Trainee Amount No. of Amount Trainee Amount No. of Amount No. of Amount $ Trainees $ s $ Trainees $ s $ Trainees $ Trainees $ Remarks Training SFD's 149Pos+9BM+7U Branch Hs=210 Mangers , Unit Heads and POs 100 210 21,000 210 21,000 210 21,000 210 21,000 210 21,000 210 21,000 126,000 7Persons*21gove Training rnorates+20perso Government ns from Staff ministries and 100 167 ,16700 167 ,16700 167 ,16700 167 16,700 167 16,700 167 16,700 100,200 authorities 20 consultants *9 Training branches=180 Consultants 100 180 18,000 180 18,000 180 18,000 180 18,000 180 18,000 180 18,000 108,000 yearly 20 persons from Training each branch sponsoring yearly=180 agencies 100 180 18,000 180 18,000 180 18,000 180 18,000 180 18,000 180 18,000 108,000 persons/year 20 Contractors from each Training local branch contractors yearly=180 100 180 18,000 180 18,000 180 18,000 180 18,000 180 18,000 180 18,000 108,000 contractors/year Introducing targeted communities to Awareness the project and Activities delivering messaged on 40,000 20,000 20,000 20,000 20,000 30,000 130,000 good practices Total 680,200 Page 40 of 139 13. SFD Complaints Handling Mechanism (CHM) 84. As part of an ongoing move to improve its accountability, SFD is developing a CHM for managing, responding to and monitoring complaints within its Programs. The accumulated experience in SFD to respond and interact with all partners and beneficiaries enables it to improve and adopt an efficient CHM, focusing on institutionalizing the experience in dealing with complaints and mainstream it in the system context including MIS. Objectives of CHM: ➢ Improve accountability to SFD partners and beneficiaries ➢ Increase the level of beneficiaries satisfaction with the delivery of services and enhance the beneficiaries /SFD relationship ➢ Provide an efficient, fair and accessible mechanisms for resolving beneficiaries/partners complaints ➢ guide SFD staff in handling complaints ➢ Allow to rectify mistakes, alert to problems, and help to continuously learn and improve ➢ Allow the beneficiaries to express their concerns relating to the voluntary land donation process Principles of CHM: • Protect beneficiaries /partners rights to comment and complain • Neutrality and equity while handling complaints • Timing: short cycle, quick response to the critical complaints • Transparency: Partners will be aware of the procedures; understand its purpose, have sufficient information on how to access it and understand how it works • Confidentiality: Create an environment in which people are more likely to raise concerns, complain or stand in witness. Confidentiality assures that any information given is restricted to a limited number of people and that it is not disseminated wider, therefore offering an element of protection and security to the complainant • Accessibility: The CHM will be easily accessed by as many people as possible within any stakeholder in the place where projects are being implemented • Mutual responsibility between SFD and complainants to insure fair, accurate, and responsible behavior Mechanism of Handling Complaints • Receiving complaints: Complaints are received by branch managers, unit heads, project officers, and consultants, directly, or by fax, mail, or through some complaint boxes in some SFD programs. • Dealing with complaints : SFD staff deal with complaints as follows: ➢ Investigation: Depending on the subject of complaint investigation may be limited to office investigation through the related documents and interview of related individuals to get full answer to the complaint or may include, in addition to office investigation, field visits to check the validity of the complaint. Page 41 of 139 ➢ Response: If the result of the investigation proved that the complaint is valid, action is taken to settle the complaint. If the investigation indicates that the complaint is fake then the complainant is informed officially. ➢ Settlement through Court: In some cases of contractors' complaints, the complainant isn't satisfied with the settlement. In such case arbitration is applied as mentioned in the signed contract. After the arbitration if the contractor is still not satisfied he may decide to go to court. Recording, Monitoring and Reporting Complaints • Complaints will be recorded in to MIS. • The system will have a reporting function enables SFD senior management to monitor the type of complaints received, the procedures followed and from where the complaint originates. • Reports will be easy to generate regularly. • Complainants will be able to follow and monitor their complaints through the CHM, and with a glance they can detect the stage of processing the complaint, at which department, and whether any actions are needed to be taken from their side. 14. Environmental Monitoring Plan (EMP) 85. Environmental monitoring is an integral part of an EMP, which outlines the specific information to be collected to ensure the environmental quality at different stages of project implementation. The parameters and their frequency of monitoring should be provided along with cost of monitoring plan and institutional arrangements for conducting monitoring. Reporting formats should be provided along with a clear arrangement for reporting and taking corrective action. Annex (4) outlines variables for monitoring of an example of sub-project. Environmental monitoring plan includes indictors to be measured thought out the stages of the subproject including the baseline indicators measurements in order to track the impacts of the subproject. Annex (6) shows the environmental impacts, the monitoring indicator and the monitoring frequency. Monitoring costs are included within the budgets for the project components at 10% of subproject cost, and will be budgeted in the goods and services contracts related to the activities when more detail is available. The site specific EMP will be translated into action on the ground. Contract documents will be incorporated with clauses directly linked to the implementation of mitigation measures. 15. Environmental Mitigation Measures 86. By design, the project is expected to have far greater environmental benefits than adverse environmental impacts. The potential adverse environmental impacts from the project are likely to be small and limited. Spatial and temporal distribution of impacts that would result from the project activities, as well as the sub-projects requires the attention especially during screening. However, it is recognized that such impacts can accrue into larger impacts if they are not identified early during the planning cycle, and their mitigation measures integrated into the project planning and implementation. The following table provides direct and significant potential impacts due to project actions. As the actual site of intervention and scope of interventions are not known, it is not possible to provide specific impact level category although preliminary identification based on likelihood has been done. Given the fact that minimum impact sub-projects are eligible and the level of available fund, such impacts could Page 42 of 139 be mitigated using sensible site selection criteria, good construction practices in harmony with the local culture and diligent management practices in the operational phase. 87. Annex (5) identifies some of the possible environmental impacts that could arise in each selected sample of sub-projects, proposed mitigation aspects and measures, monitoring indicators and monitoring methods and monitoring responsibilities and frequencies. As mitigation measures must be taken into account the project design and costs, some aspects of the EMP do not need a separate budget allocation. However, it is imperative that activities’ costs reflect the incremental effort necessary to fully implement the EMP. 16. Sub-projects Monitoring and Evaluation 88. Environmental monitoring needs to be carried out during all phases including operation and maintenance of sub-projects in order to measure the success of the mitigation measures implemented. Monitoring provides opportunities: ➢ To alert SFD and provide timely information about the success or otherwise of the screening process, to enable changes to be made to the system, if required; and ➢ To determine whether the mitigation measures set out the sub-projects have been successful. 89. Subproject design must include a monitoring framework, together with indicators. The responsibilities for monitoring and evaluation of the mitigation measures adopted under the sub-projects would be assigned as follows: The WEU will be responsible for the implementation of the monitoring framework and reporting of feedback throughout the life of the subproject, specifically: ➢ Monitoring of the environmental and social assessment work to be carried out; ➢ Monitoring of environmental issues and the supervision of any works during the implementation process ➢ Monitoring of environmental issues during operations and maintenance of any infrastructure and facilities when handed over to communities after implementation; ➢ Submission of monitoring reports to the SFD for review. ➢ The report will include inter alia progress towards achieving the overall project objectives and specific objectives of the sub-projects using indicators identified by the community with support of WEU technical staff. The reporting may be as appropriate on monthly, quarterly and annually basis. Page 43 of 139 ANNEX (1) Examples of Negative Environmental Impacts that may be associated with Sub-projects2 Potential Environmental and Potential Environmental and Best Management Practices and Best Management Practices and Sub-project Type Social Negative Impacts Social Negative Impacts Mitigation Measures Mitigation Measures During Project Construction During Project Operation Water Supply and ▪Mismanagement of ▪Monitoring of water ▪Disruption to biodiversity ▪Quality; operation, and Networks Construction and demolition/ ▪Regional water use plans (changes to fauna, flora, Maintenance plan Rehabilitation waste ▪Proper drainage near wells and and aquatic life) ▪Avoid harmful effects to ▪Disruption to biodiversity pumping stations ▪Increased air pollutant biodiversity during operation Rural Road, and (changes to fauna, flora, and ▪Erosion control during emissions ▪Monitoring of water Irrigation Canals aquatic life) construction ▪Foul odors ▪Regional water use plans ▪Cut down of trees or ▪Construction during dry season ▪Changes in soil(erosion/ ▪Erosion control during destruction of green areas ▪Include odor-control technology fertility/salinity/pollution) operation ▪Increased air pollutant in design ▪Gas emissions ▪Include odor-control technology emissions ▪Provide appropriate sized bins to ▪Change in local climate in operation ▪Foul odors collect construction waste and ▪Accidents may occur ▪Use protective clothing and ▪Effluents to public water arrange for periodic pickup and leading to fire or personal masks for workers as systems disposal injury appropriate. ▪Alteration of current alignment ▪Restrict activities to areas where ▪Train workers on health care of streams biodiversity is not adversely waste segregation and ▪Obstruction of irrigation affected occupational safety measures intakes ▪Avoid cutting trees and ▪Obstruction of flood water destruction of green areas, and if course necessary ,re-vegetation should ▪Alteration of surface water be arranged and included in the quality or quantity project ▪Interference with existing ▪Control construction by fencing drainage networks Site and spraying water over ▪Alteration of direction/quality of working area to control dust groundwater emissions ▪Changes in soil(erosion/ ▪Consider project siting during the fertility/salinity/pollution) design phase ▪Gas emissions ▪Collect liquid effluents during ▪Dust pollution Construction and avoid disposal ▪Change in local climate of untreated effluents into public ▪Accidents may occur leading water systems to fire or personal injury ▪Careful design and appropriate 2 The table provides a summary of some of the negative environmental impacts that maybe associated with the sub-projects different components though it is not intended to provide an exhaustive list of all types of the sub-projects, their impacts, and their mitigation measures that shall be funded by the Project, rather, the table highlights the typical impacts that can be expected in the types of sub-projects that shall be financed by the Project. Page 44 of 139 Selection of irrigation systems ▪Use protective clothing and masks for workers as appropriate. ▪Train workers on health care waste segregation and occupational safety measures Waste ▪None perceived ▪None ▪The garbage streams contain ▪Avoiding contamination of Management All types of household and Close by water bodies through other wastes, some of which random waste dumping. are hazardous. ▪Sound selection and siting of ▪Collection vehicles are not dumping areas, studies are Covered during transport crucial for this type of project leads to littering. ▪Train workers on waste ▪Collection workers usually management and occupational have no special training or safety measures protection for handling these ▪Use protective clothing and wastes masks for workers as ▪Human scavengers at appropriate dumping area maybe ▪Vehicles must be covered sorting through the waste. during transport. ▪Waste accumulating in ▪Waste generated should be dumping areas may burn collected frequently and storage spontaneously or by prohibited in streets. individuals resulting in air ▪Waste accumulated in dumping quality degradation from areas should be covered to smoke and dust. avoid scavenging and ▪Contamination of ground spontaneous burning water resources is of concern at dumping areas. HealthCare ▪Mismanagement of demolition ▪Adequate sanitation and disposal ▪Indoor air pollution ▪Control sources of indoor Related /rehabilitation waste System for waste ▪Infectious waste may be Pollution at source. ▪Disruption to biodiversity ▪Avoid cutting trees and disposed of in mixed form ▪Provide for appropriate indoor (changes to fauna, flora, and destruction of green areas, and if with municipal waste ventilation either naturally by aquatic life) necessary, re-vegetation should ▪Incinerators, if used, may using larger windows or ▪Cut down of trees or be arranged and included in the not be properly sited, mechanically by using air destruction of green areas project operated or maintained circulation fans and vents ▪Changes in soil(erosion/ ▪Restrict noisy activities to certain leading to air pollution and ▪Use different bags for Page 45 of 139 fertility/salinity/pollution) Hours during the day to avoid Hazardous working Municipal waste (black bags) ▪Dust pollution disturbance Conditions. And infectious waste (red bags). ▪Accidents may occur leading ▪Control construction by fencing ▪Accidents may occur ▪Get approval on incinerator to fire or personal injury site and spraying water over leading to fire or personal location before installation. ▪Transportation and traffic working area to control dust injury ▪Maintain incinerator circulation emissions ▪Disruption/congestion of periodically. ▪Increase traffic hazards to ▪Provide appropriate sized bins to transportation and traffic ▪Use protective clothing and motorists and pedestrians collect construction waste and circulation masks for workers as ▪Introduction of new diseases arrange for periodic pickup and ▪Increase traffic hazards to appropriate. ▪Excessive exposure to existing disposal motorists and pedestrians ▪Train workers on health care diseases ▪Consider project siting during the ▪Introduction of new diseases waste segregation and ▪Attraction of pests and rodents design phase ▪Excessive exposure to Occupational safety measures ▪Generation of excess solid ▪Restrict activities to areas where existing diseases ▪Consultation with affected wastes and litter biodiversity is not adversely ▪Attraction of pests and communities ▪Transport, storage or disposal affected rodents ▪Employ local citizens in sub- of regulated hazardous wastes ▪Use protective clothing and ▪Generation of excess solid project area in sub-project ▪Reduced aesthetic values/ masks for workers as wastes and litter operation visual pollution appropriate. ▪Transport, storage or ▪Education in proper sanitation ▪Risk of impact on historical, ▪Train workers on health care disposal of regulated and health practices archaeological, touristic, waste segregation and hazardous wastes ▪Avoidance of stagnant waters religious, or protected areas occupational safety measures ▪Reduced aesthetic values/ ▪Careful management of and sites ▪Education in proper sanitation Visual pollution pesticides ▪Risk of impact on recreational And health practices ▪Risk of impact on historical, ▪Integrated pest management activities ▪Careful management of archaeological, touristic, or programs ▪Increased noise levels/noise pesticides protected areas and sites ▪Provide glowing traffic signs pollution ▪Integrated pest management ▪Risk of impact on and build artificial humps near programs recreational activities construction area ▪Provide glowing traffic signs and build artificial humps near construction area ▪Strict avoidance of construction near archeological, historical, or religious areas. If any potential Artifacts are discovered during construction, work will be temporarily halted in this area ▪Restrict noisy activities to certain hours during the day to avoid disturbance Page 46 of 139 Annex (2) Environmental and Social Responsiveness Criteria at Proposal Stage Building New Terraces i. Establishing new terraces in an area will affect its landscape, therefore, the relation between existing historical, cultural, and sensitive environmental sites with the new terraces shall be checked. ii. New Terraces will not increase erosion to the surrounding environment. iii. Fertilizers are used for improving soil and increase the quantity and quality of products, but they may cause contamination to water sources downstream the terraces. Therefore, new terraces should not part of a catchment area of rainwater harvesting cisterns used for domestic use. Mitigation to be taken is to divert the final outlet of the terraces outside the catchment area. iv. Terraces are one of the tools for rainwater harvesting; they receive water from direct rain and intercept runoff. Part of this water is consumed by the plant and the other part penetrates down the ground to the shallow aquifer. Hence, introducing new terraces will certainly create water rights conflict, which shall be checked. v. The slope of the terrain shall not be steeper than 1:1, as steeper slopes will increase the cost per hectare retained. vi. Normally there should be no land ownership problem because the lands here are either small water courses (locally called Rahag) or privately owned but not used because of steep slope and very low or zero soil depth. Even if privately owned, owners are in favor of having terraces they can cultivate. Nevertheless, the community should solve any land ownership problem that may arise in future phases of implementation. Proposal Title Proposal Location ESR Criteria for Building New Terraces at Confirmation the Proposal Stage Write Yes or No The proposed site is at a distance of at least10Mfrom the nearest historical, cultural or sensitive environmental site Slope is not more than 1:1 The terraces will not be part of a catchment area for an existing rainwater harvesting cistern for domestic use The terraces will not cause any water right conflicts The community is willing to solve any land ownership problem If answer to any of the above stated questions is 'NO' then the PO should amend the proposal to achieve compliance or develop new alternative, or drop the project. If the answer is 'Yes' then incorporate this information in the project proposal Page 47 of 139 Rehabilitating Terraces i. Existing, but, deteriorated terraces are part of the historic culture of the site, therefore, no threat of distorting the landscape and existing cultural monuments ii. New Terraces will not increase erosion to the surrounding environment iii. After being abandoned for years, land owners downstream the deteriorated terraces became accustom to receive certain amount of runoff. Rehabilitating the terraces will disturb the quantity of the runoff they used to receive, hence, the water right conflict have to be checked iii. Normally there should be no land ownership problem because the lands here are either small water courses (locally called Rahag) or privately owned but not used because of steep slope and very low or zero soil depth. Even if privately owned, owners are in favor of having terraces they can cultivate. Nevertheless, the community should solve any land ownership problem that may arise in future phases of implementation. iv. Fertilizers are used for improving soil and increase the quantity and quality of products, but they may cause contamination to water sources downstream the terraces. Therefore, new terraces should not be part of a catchment area of rainwater harvesting cisterns for domestic use. Mitigation to be taken is to divert the final outlet of the terraces outside the catchment area. Proposal Title Proposal Location Confirmation ESR Criteria for Rehabilitating New Terraces at the Write Yes or Proposal Stage No The terraces will not cause any water right conflict The community is willing to solve any land ownership problem The terraces will not be part of a catchment area for an existing rainwater harvesting cistern for domestic use If answer to any of the above stated questions is 'NO' then the PO should amend the proposal to achieve compliance or develop new alternative, or drop the project. If the answer is 'Yes' then incorporate this information in the project proposal Page 48 of 139 Check Dams i. Check dams normally do not cause environmental impacts. It is suggested that wherever possible use local material to avoid the transportation of material and ensure that the structure design ensures the safety of people in case of break down. ii. It should not have any negative social impact through its location or ownership of land. iii. Water rights should be considered for the downstream users before constructing the dam. iv. It should not result in any significant ecological impacts. Proposal Title Proposal Location Confirmation ESR Criteria for Check Dams at the Proposal Stage Write Yes or No There is no land acquisition problem There is no water rights problem There are no significant ecological impacts If answer to any of the above stated questions is 'NO' then the PO should amend the proposal to achieve compliance or develop new alternative, or drop the project. If the answer is 'Yes' then incorporate this information in the project proposal Page 49 of 139 Flood Protections i. Flood protections are structures for protecting agricultural lands or wadi banks from erosion. ii. In Yemen, most of the erosion occurs to the agricultural lands and wadi banks are the results of deteriorated upstream watershed. Hence, interventions in protecting lands downstream a deteriorated watershed may not solve the problem while improving the watershed management will reduce the erosion downstream the watershed and if needed, protection work will be minimal, hence, economical and sustainable. iii. In case flood protection structures have been approved, then low cost techniques using local materials and gabions shall be adopted without jeopardizing the function of the structure. iv. The interventions may include check dams, rehabilitating terraces, and rainwater harvesting cisterns. Hence, land may be an issue for such structures, therefore, the community should solve any land ownership problem in a fairly way and if needed compensate the land owners in cash/kind. Proposal Title Proposal Location ESR Criteria for Flood Protections at the Proposal Confirmation Stage Write Yes or No The proposal will lead to reduction in erosion of downstream properties Protected land will not be used for cultivating Qat The community is willing to solve any land ownership problem and compensate owners fairly in cash/kind If answer to any of the above stated questions is 'NO' then the PO should amend the proposal to achieve compliance or develop new alternative, or drop the proposal. If the answer is 'Yes' then incorporate this information in the project proposal. Page 50 of 139 Groundwater Recharging i. Groundwater recharging structures are structures that receive storm water and allow it to infiltrate to the ground. Such structures may include leaching pits and trenches, recharging wells and basins, water weirs, etc. ii. Land may be needed to build groundwater structures hence, the community shall provide the land needed and compensate the owners fairly in cash/kind. iii. At low areas where flooding is a problem, groundwater recharging structures will play two roles, eliminating the flood problem and recharging groundwater. iv. All recharging structures need periodic maintenance including removal of accumulated silt, monitoring and controlling contamination sources, etc. Proposal Title Proposal Location ESR Criteria for Groundwater Recharging Confirmation at the Proposal Stage Write Yes or No The recharging structure/s will not cause large displacement of population. Upstream catchment area is free from open disposal of wastewater, garbage dumping site, or open defecation areas. The recharging structure/s do not inundate large cultivable land, orchards, and culturally, religious and environmentally important site The proposed recharging structure/s is/are not less than 100 M far from the nearest cultural monument or environmentally sensitive site. The community is willing to solve any land ownership problem and compensate owners fairly in cash/kind No water right conflict problem If answer to any of the above questions is 'NO' then the PO should amend the proposal to achieve full responsiveness to environmental and social issues or develop new alternative, or drop the proposal. If the answer is 'Yes' then incorporate this information in the project proposal. Page 51 of 139 Open Catchment Rainwater Harvesting Covered cisterns for Domestic Use i. The locations of open catchment rainwater harvesting cisterns for domestic use are carefully selected to avoid contamination sources from wastewater disposal, open defection, dumping sites and agriculture lands. ii. The storage capacity depends on rainfall pattern, runoff coefficient, catchment area and consumption. iii. All SFD's interventions in this field are covered, in order to comply with the national water coverage definition in rural areas, therefore, the threats of algae growth, and mosquitoes breeding are eliminated. iv. Women and girls are responsible for fetching water, therefore, their opinion on the proposal and the location of the cistern must be respected, v. Depending on the site, taking water from the cistern could be via pulley-rope-bucket, or hand pumps or taps. vi. Site selection should ensure the use of the cistern by all community groups including the vulnerable and marginalized groups. vii. Silt and floating material trap basin is normally built before the inlet of the cistern, and if not emptied, cleaned and maintained periodically it becomes a good environment for mosquitoes breeding. Proposal Title Proposal Location ESR Criteria for Open Catchment Rainwater Confirmation Harvesting Covered Cisterns for Domestic Use at the Write Yes or No Proposal Stage Women and girls were consulted on the proposal and its location and their feedback and comments were reflected in the proposal report The site is far by at least 100m from latrines, dumping site and agriculture lands The site is far by at least 10m from the nearest historical, cultural, religious or environmentally sensitive site The site is far by at least 10 m from the nearest wadi course The catchment area is free from open defecation, open wastewater disposal, dumping sites or agricultural lands The location of the cistern serves all community including the vulnerable and marginalized groups The community agreed to provide the land and compensate the owners fairly in kind/cash. If answer to any of the above questions is NO, then the PO and the SA shall search for another location, or the proposal shall be dropped. If all answers are YES then incorporate this information in the project proposal. Page 52 of 139 Open Catchment Rainwater Harvesting Uncovered Cisterns for Agriculture and Livestock i. The storage capacity depends on rainfall pattern, runoff coefficient, catchment area and consumption. ii. The cisterns in this case are normally open, hence, mitigations for minimizing mosquitoes breeding and Bilharzia spreading shall be considered. iii. Depending on the site, taking water from the cistern could be via pulley-rope- bucket, hand pumps or taps. iv. Site selection should ensure the use of the cistern by all community groups including the vulnerable and marginalized groups. v. Silt and floating material trap basin is normally built before the inlet of the cistern, and if not emptied, cleaned and maintained periodically it becomes a good environment for mosquitoes breeding and source of bad odor. Proposal Title Proposal Location ESR Criteria for Open Catchment Rainwater Confirmation Harvesting Uncovered Cisterns for Agriculture and Write Yes or No Livestock at the Proposal Stage The site is far by at least 10m from the nearest historical, cultural, religious or environmentally sensitive site The site is far by at least 10 m from the nearest wadi course The catchment area is enough to fill the cistern The catchment area is free from open defecation, open wastewater disposal, dumping sites The location of the cistern serves all community including the vulnerable and marginalized groups Recommendations for mitigating mosquitoes breeding and Belharzia spreading were considered in the proposal The community agreed to provide the land and compensate the owners fairly in kind/cash If answer to any of the above questions is NO, then the PO and the community shall search for another location, or the proposal shall be dropped. If all answers are YES then incorporate this information in the project proposal. Page 53 of 139 Rooftop Rainwater Harvesting i. Rooftop rainwater harvesting cisterns are normally owned by the house owner; therefore, ownership and sustainability are very high. ii. SFD's policy insists on the community to identify the vulnerable families and help them to build their cisterns. iii. To comply with the national standards, the cisterns are normally covered and water is taken from the cistern via bucket and rope or tap if the level allows. iv. Traditional techniques are use for building the cisterns. v. To improve the quality of stored water, first flush tool is installed to force the first quantity of storm water outside the cistern, then, clean water is allowed to enter the cistern. Coarse filter can be installed at the inlet as well. i. No land ownership problem here because the intervention is at the household level, hence every house owner will allocate a suitable land near the house to build his own cistern. Proposal Title Proposal Location ESR Criteria for Rooftop Rainwater Harvesting Cisterns Confirmation at the Proposal Stage Write Yes or No Women and girls were consulted on the proposal and its locations and their feedback and comments were reflected in the proposal report The community agreed to identify vulnerable families and help them build their own cisterns The whole community is aware of SFD's policy and agreed to go for rooftop rainwater harvesting If answer to any of the above questions is NO, then the PO and the community shall search for another option, or the proposal shall be dropped. If all answers are YES then incorporate this information in the project proposal. Page 54 of 139 Water Channel i. Water channels divert water from upstream main water source, and distribute water to the downstream farmers along the alignment. Diversion and distribution of water is a serious issue among the farmers community. Intensive consultations are conducted with the farmer communities for the selection of point and source of diversion, alignment of the channel, water distribution system along the channel, construction design and cost, etc. ii. The good practice is to have the alignment of the water channel in publicly owned passages. Though, loosing property is not expected, but objections from farmers may arise in some sections hence the community should agree to solve such problems whenever arise. iii. In many cases the quantity of water for irrigation is very limited; therefore, the end of the channel and the limits of the agricultural lands that will be included in the proposal must be discussed and agreed with the community. Encouraging the farmers outside the limits to attend the discussions will help in eliminating this impact in the future. iv. The alignment of water channel will avoid, minimize and/or mitigate the potential negative impacts on natural vegetation. Proposal Title Proposal Location Confirmation ESR Criteria for Water Channel at the Proposal Stage Write Yes or No No water right conflicts exist as a result of the proposal The preliminary alignment of the channel has been discussed and the community agreed to solve any obstacles arise from farmers The boundaries of the agricultural lands that will be served by the proposal have been agreed with all the farmers The alignment of water channel will avoid, minimize and/or mitigate the potential negative impacts on natural vegetation The community agreed to provide the land required and compensate the owners fairly in kind/cash If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If all answers are in 'Yes' then incorporate this information in the project proposal. Page 55 of 139 Water Saving Irrigation Systems i. Intervention may include water distribution network and on field irrigation system which should be of a water saving system such as drip irrigation. ii. The good practice is to have the alignment of the water distribution network in publicly owned passages. Though, loosing property is not expected, but objections from farmers may arise in some sections, hence the community should agree to solve such problems whenever arise. iii. In many cases the quantity of water for irrigation is very limited therefore the end of the network and the boundary of the agricultural lands that will be included in the subproject must be discussed and agreed with the community. Encouraging the farmers outside the identified boundary to attend the discussions will help in eliminating this impact in the future. iv. Operation and maintenance is an issue here, hence, their requirements in terms of labors, and expenses should be discussed and agreed with the community. v. The two components, the network and on field irrigation systems are connected to each other, if the farmers don't accept the on field irrigation system the network will not be implemented. Therefore, the type of on farm irrigation system must be discussed and agreed with the farmers. vi. Water right conflict may arise at the water source and at distribution points; hence, need to be checked at the proposal stage. Proposal Title Proposal Location ESR Criteria for Water Saving Irrigation System at Confirmation the Proposal Stage Write Yes or No The preliminary alignment of the distribution network has been discussed and the community agreed to solve any obstacles arise from farmers. The boundaries of the agricultural lands that will benefit from the proposal have been agreed with all the farmers. Farmers were introduced and accepted the proposed technique for the on farm irrigation system. No water right conflicts will exist at the water source and at distribution points as a result of the proposal O&M requirements have been discussed with the community and the community agreed to develop a proposal for this issue If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If all answers are in 'Yes' then incorporate this information in the project proposal. Page 56 of 139 Introducing New Plants Species i. Introducing new plants species that can tolerate harsh environment can help rural communities to cope with climate change. However, social, economical, climatic, and environmental issues have to be studied carefully. ii. New plant species introduced will not disturb the local ecosystem. iii. Community participation is crucial, and the community should know the advantages and disadvantages of the new species and all its requirements. Proposal Title Proposal Location Confirmation ESR Criteria for Introducing New Plants Species at the Proposal Stage Write Yes or No New species have been identified according to the local social, economical, climatic, and environmental conditions. New plant species introduced will not disturb the local ecosystem. The community has been introduced to the new species and accepted them. If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If all answers are in 'Yes' then incorporate this information in the project proposal. Page 57 of 139 Improving Existing Rural Feeder Roads i. Improvement work may include retaining walls, drainage ditches, and very little widening at critical sections. Pavement is also introduced at steep slopes to protect the road surface from erosion. ii. Water rights could be an issue, therefore, at the proposal stage the affected community members shall be identified and informed that their water rights will be documented and kept without change as a result of implementing the proposal. iii. As a result of improving the road, the speed of the vehicles may increase therefore, speed breakers and signs at critical sections shall be introduced. Proposal Name Proposal Location ESR Criteria for Improving Existing Rural Feeder Road at the Confirmation Proposal Stage Write Yes or No Affected community members have been identified and informed that their water rights will be documented and kept with no change. The community is introduced to the threats of increasing vehicles' speed as a result of improving the road, and the measures to mitigate them. If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If all answers are in 'Yes' then incorporate this information in the project proposal. Page 58 of 139 House Gardens i. Open areas near houses can be utilized for planting lettuce, chili, onion, coriander, garlic, etc. to provide households with basic food needs. ii. Selecting the needed type of plant will depend on the household, however, the proposal should provide guidance on how to maintain the plant, Proposal Title Proposal Location ESR Criteria for House Gardens at the Proposal Confirmation Stage Write Yes or No The community has been introduced to the house garden plants suitable to their environment. The proposal has been introduced to all community groups including vulnerable and marginalized. If answer to any of the above questions is 'NO' then the PO shall drop the proposal. If all answers are in 'Yes' then incorporate this information in the project proposal. Page 59 of 139 Biogas Units i. Biogas units are an environmentally friendly product. It does two functions; (a) Supply clean energy at the household level, and (b) generate bio-fertilizer (slurry) as a bye product. Biogas unit operation is relatively complex as compared to other SFD's interventions. If the unit is operated under prescribed manual then it normally do not cause environmental impacts. ii. Public or shared biogas plants are not common in Yemen, but individual units can be accepted. Therefore, eligibility criteria for having individual biogas unit shall be developed and introduced to the community; and the project will only support individual biogas units. iii. The community shall be introduced to the technology, and expected dangers associated with its use, the safety measures, and its O&M. iv. Households fulfilling the eligibility criteria should be given equal chance. Proposal Title Proposal Location Confirmation ESR Criteria for Biogas Units at the Proposal Stage Write Yes or No There is no threat of contaminating water sources as a result of accumulated bio-fertilizer The community is aware of the eligibility criteria The community has been introduced to the expected dangers associated with the biogas units, and the safety measures to be taken The community has been introduced to their advantages and disadvantages and accepted the technology If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If all answers are 'Yes' then incorporate this information in the project proposal. Page 60 of 139 Establishing/Rehabilitating Grazing Lands i. Interventions in this field may include building/rehabilitating terraces not more than 1.0 M high, cutting and leveling soil, seeding and seedlings, open catchment rainwater harvesting cisterns for irrigation and livestock, community mobilization and capacity building. ii. Interventions on establishing/rehabilitating grazing lands will not involve significant alteration of natural vegetation. iii. The community shall be introduced to the characteristics of grazing lands, then, the community will identify the location of the land and shall agree on using it equally by all community groups including vulnerable, and marginalized groups. iv. The community shall agree to provide the land and compensate owners fairly in kind/cash. v. Management of grazing land will include agreed schedule of grazing, therefore, the community shall agree to develop the schedule of grazing and the arrangements for its enforcement. Proposal Title Proposal Location ESR Criteria for Establishing/Rehabilitating Confirmation Grazing Lands at the Proposal Stage Write Yes or No The community was introduced to the characteristics of grazing lands, and has indentified a suitable location Interventions on establishing/rehabilitating grazing lands will not involve significant alteration of natural vegetation The community agreed to give equal rights to use the grazing land for all groups including vulnerable and marginalized groups The community agreed to provide the required land and compensate the owners fairly in kind/cash The community has agreed to develop the schedule for grazing and the arrangements for its enforcement. If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If all answers are 'Yes' then incorporate this information in the project proposal. Page 61 of 139 Replacement of Qat i. Interventions here will include the provision of new cash crops seedlings that will depend on many factors including climate, economical, environmental and social factors. ii. Equity should be ensured, therefore, all the community must be introduced to the proposal and every household is given equal chance to have the new cash crops seedlings depending on the available land and water sources. iii. Most of the farmers will not accept to remove completely the Qat tree and replace it with the new cash crop because they are afraid of losing almost a monthly revenue, while the new cash crop will take years to start giving revenues which will be once or twice a year in the best conditions. Therefore, the proposal should be to encourage the farmers to plant the new cash crop beside the Qat tree and let them figure out the benefits of the new cash crop and decide to remove the Qat tree completely in the future i.e. removal of Qat should not be a prerequisite for providing the cash crop seedlings. Proposal Title Proposal Location Confirmation ESR Criteria for Replacing Qat at the Proposal Stage Write Yes or No The crop water requirement of the new cash crop is less than that of Qat All households are given equal chance to get the seedlings of the new cash crops The community clearly knew that completely removing the Qat tree is not a prerequisite for receiving the cash crop seedlings The proposal is accepted by local community If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If all answers are 'Yes' then incorporate this information in the project proposal. Page 62 of 139 Seeds storage i. Intervention here will include new buildings that may include hangars, and management building. The impacts of these new buildings on the surrounding landscape must be considered. ii. Management buildings will have wastewater disposal at operation phase, therefore, the possibility of contaminating existing water sources must be considered and mitigated. Proposal Title Proposal Location ESR Criteria for Seeds Storage at the Proposal Confirmation Stage Write Yes or No The proposed site is at least 100 M far from historical, cultural, or environmental sensitive sites The proposed site is at least 100 M far from the nearest water source The community agreed to provide the land and compensate the owners fairly in kind/cash The sponsoring agency is welling to operate and maintain the buildings If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. Sponsoring agency is advised to locate new site that qualifies the criteria. If all answers are 'Yes' then incorporate this information in the project proposal. Page 63 of 139 Post Harvesting Facilities i. Interventions here may include the introduction of harvesting machines, wooden boxes for drying coffee beans, and packaging of agriculture products. ii. Grain harvesting machine is associated with dust and smoke emissions, therefore, the location of installing and operating such machine shall be far from residential buildings and historical and cultural monuments. iii. Arrangement of operating and maintaining post harvest facilities is very important to ensure their sustainability in providing the service. iv. All households shall be given equal chance to access post harvesting facilities. Proposal Title Proposal Location ESR Criteria for Post Harvesting Facilities at Confirmation the Proposal Stage Write Yes or No Harvesting machine is at least 100 M from residential buildings, historical and cultural monuments Community has agreed to operate and maintain the post harvesting facilities All household will be given equal access to post harvesting facilities The community agreed to provide the land needed and compensate the owners fairly in kind/cash If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If answer is 'Yes' then incorporate this information in the project proposal Page 64 of 139 Improving Rural Markets i. Rural areas have their local markets, but they are in bad condition, they lack shades, public toilets, and garbage collection and disposal system. ii. Improvement may include establishing public toilets; hence, the method of wastewater disposal shall be selected carefully to avoid contaminating existing water sources. iii. Establishing garbage collection and disposal will require a dumping site which shall be discussed and agreed with the SA. iv. Sustainability will need an operation and maintenance system which will require payment for the service to get revenues to cover the cost of O&M. Proposal Title Proposal Location Confirmation ESR Criteria for Improving Rural Markets at the Proposal Stage Write Yes or No The proposed site of the public toilet is at least 100 M far from the nearest water source The dumping site for garbage disposal is selected and agreed with the SA The SA has agreed to provide the land for all the intervention's components and compensate the owners fairly in cash/ kind The SA was introduced to the importance of the O&M and agreed to develop a system for O&M If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If answer is 'Yes' then incorporate this information in the project proposal Page 65 of 139 Constructing Sewerage Network (Wastewater Treatment Plant Not Included) i. From SFD's previous experience, operation and maintenance of newly established sewerage systems is one of the strong challenges for the sustainability of these systems. Due to social and religious reasons local people will accept to work and come into direct contact with water, but they will refuse to work in sanitation where direct contact with wastewater is possible, i.e. it's so difficult to find people for operating these systems. Hence, such interventions are limited to extensions of existing sewerage networks in urban areas where Local Water Supply and Sanitation Corporations (LWSC) are active. ii. LWSC in some cities doesn't maintain the already existing sewers, and this can be detected by opening few manholes and looking at the accumulated debris on the benching and standing wastewater which are signs for frequent blockages due to lack of preventive maintenance. In such case, adding new sewers will cause more burden on LWSC, hence should be avoided. iii. These systems are new to the country, hence the plumbing of some houses are not prepared to connect to a sewerage network. They lack ventilation columns, siphons, and inspection champers' covers. The lack of these components will cause frequent blockages in the new sewerage network and increase the corrosion of concrete work. Hence, all houses shall be checked for the availability of these components. iv. Boundaries of targeted area shall be agreed with the SA and local community members to avoid any obstacles during implementation and the need to add variation orders. v. The alignment of all sewers shall be in public roads and passages. When a short cut through private land is found technically and economically feasible, then it should be discussed with the SA and land owner. The short cut should not be considered acceptable unless both the SA and the land owner agreed to settle this down at the design stage. vi. The targeted community is expected to pay for the service after completion; therefore, a survey shall be conducted for randomly selected houses to measure the willingness to pay for service. At least 75% of the surveyed houses are willing to pay for the service. Proposal Title Proposal Location Confirmation ESR Criteria for Sewerage Network at the Proposal Stage Write Yes or No The Local Water Supply and Sanitation Corporation is active in the area and conducts preventive maintenance for the existing sewers Plumbing of all houses within boundaries of targeted area are accepted, therefore, houses are ready to be connected to sewerage network The boundaries of targeted area are identified and agreed with the SA All sewers are in roads and passages, and short cuts through private lands have been discussed with the SA and the land owner and both agreed to settle the issue at the design stage 75% or more of the surveyed houses are willing to pay for the service If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If answer is 'Yes' then incorporate this information in the project proposal Page 66 of 139 Building and Furnishing Kindergarten i. The location should be safe for the kids. It should be far from main roads, heavy traffic, and noise sources such as workshops, markets, and mills. ii. Land will be needed, therefore, the SA should provide the land and compensate the land owner fairly in cash/kind iii. Operation and maintenance of the building after completion is usually a problem, and kids will suffer from the shortcomings of the O&M particularly the WASH facilities. Hence, this issue should be discussed carefully with all stakeholders including the SA, and the community. They should know at this stage that they will develop at the design stage a system for O&M that will cover all issues including financial and administration issues, and they will bear the whole responsibility for its enforcement. iv. The location should have good drainage (i.e. should not be low to cause water stagnation during rainy seasons), and should be far from water courses and rock falls. Proposal Title Proposal Location ESR Criteria for Building and Furnishing Kindergarten or School Confirmation at the Proposal Stage Write Yes or No The location is far from main roads, heavy traffic, and noise sources such as workshops, markets and mills SA agreed to compensate the land owner fairly in cash/kind O&M of the building after completion, particularly WASH facilities has been discussed with the SA who agreed to develop a system for OM at the design phase The location has good runoff drainage, and far from water courses and rock falls If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If answer is 'Yes' then incorporate this information in the project proposal Page 67 of 139 Building and Furnishing School i. The location should be safe for the students. It should be far from main roads, heavy traffic, and noise sources such as workshops, markets, and mills. ii. No family will allow a boy/girl to go to school while there is no water at home. The PO/Consultant should check that the community has access to improved water according to the national water coverage definition "The availability of 30l/c/d of improved quality water within a fetching time not more than 30 minutes roundtrip throughout the year". Improved water could be a protected spring, covered and protected rainwater harvesting cistern, or protected well. iii. Land will be needed, therefore, the SA should provide the land and compensate the land owner fairly in cash/kind iv. Operation and maintenance of the building after completion is usually a problem, and kids will suffer from the shortcomings of the O&M particularly the WASH facilities. Hence, this issue should be discussed carefully with all stakeholders including the SA, and the community. They should know at this stage that they will develop at the design stage a system for O&M that will cover all issues including financial and administration issues, and they will bear the whole responsibility for its enforcement. v. The location should have good drainage (i.e. should not be low to cause water stagnation during rainy seasons), and should be far from water courses and rock falls. Proposal Title Proposal Location ESR Criteria for Building and Furnishing Kindergarten or School Confirmation at the Proposal Stage Write Yes or No The location is far from main roads, heavy traffic, and noise sources such as workshops, markets and mills The community has access to improved water according to the national water coverage definition SA agreed to compensate the land owner fairly in cash/kind O&M of the building after completion, particularly WASH facilities has been discussed with the SA who agreed to develop a system for OM at the design phase The location has good runoff drainage, and far from water courses and rock falls If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If answer is 'Yes' then incorporate this information in the project proposal Page 68 of 139 Building and Furnishing Health Education Center i. The location should be far from heavy traffic, and noise sources such as workshops, markets, and mills. ii. Land will be needed, therefore, the SA should provide the land and compensate the land owner fairly in cash/kind iii. Operation and maintenance of the building after completion is usually a problem, and students and staff will suffer from the shortcomings of the O&M particularly the WASH facilities. Hence, this issue should be discussed carefully with all stakeholders including the SA, and the community. They should know at this stage that they will develop at the design stage a system for O&M that will cover all issues including financial and administration issues, and they will bear the whole responsibility for its enforcement. iv. The location should have good drainage (i.e. should not be low to cause water stagnation during rainy seasons), and should be far from water courses and rock falls. Proposal Title Proposal Location ESR Criteria for Building and Furnishing Health Education Center Confirmation at the Proposal Stage Write Yes or No The location is far from main roads, heavy traffic, and noise sources such as workshops, markets and mills SA agreed to compensate the land owner fairly in cash/kind O&M of the building after completion, particularly WASH facilities has been discussed with the SA who agreed to develop a system for OM at the design phase The location has good runoff drainage, and is far from water courses and rock falls If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If answer is 'Yes' then incorporate this information in the project proposal Page 69 of 139 Pavement of Squares, Roads and Passages i. Pavement generally seals the ground surface, and reduces rainwater infiltration and consequently reduces groundwater recharge. To compensate for this, components for recharging groundwater such as leaching pits, recharging wells... etc, shall be added and considered a compulsory component of the intervention. ii. Garbage accumulation and spread out is expected to become a problem at operation phase, hence, the arrangement for collecting and transporting garbage shall be discussed and agreed with the SA. iii. As a result of pavement, the speed of vehicles is expected to increase hence the community should be aware of this impact and the measures to mitigate it. iv. The final level of pavement should not cause any trouble to the entrance of houses, and any change in pavement level from the existing level for the favor of improvement shall be discussed and agreed with the related house owner. v. In some sub-urban areas where agriculture exists side by side with urban settlements, water rights could be an issue. Therefore, the directions of runoff drainage shall be documented and agreed with the SA and the agriculture land owners and should be kept without any alteration. Proposal Title Proposal Location ESR Criteria for Paving Squares, Roads, and Passages at the Confirmation Proposal Stage Write Yes or No Components for compensating groundwater recharge are added to the proposal SA agreed to provide a system for collecting and transporting garbage after completion The SA and the community are introduced to the expected increase of vehicle speed as a result of pavement and the mitigation measures to reduce that impact The final level of pavement is not causing any trouble to the houses' entrances, and all alterations for the favor of improvement have been discussed and agreed with the houses' owners Water rights have been documented and agreed with the agriculture land owners If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If answer is 'Yes' then incorporate this information in the project proposal Page 70 of 139 Rehabilitation of Cultural Heritage Monuments i. Every cultural heritage monument has its unique architectural and structural style and construction techniques. Hence, rehabilitation should be based on these techniques using same materials and same final finish by highly qualified people in cultural heritage rehabilitation. ii. After rehabilitation, the no. of visitors is expected to increase and this may cause nuisance to the neighbors after the years of smooth and quite life of abandoning the monument. Though some neighbors may see the visitors as a source of improving business, others my see them as nuisance particularly those leaving very near to the monument. This issue shall be discusses and agreed with the SA and the community. iii. After completion and commissioning, garbage will accumulate and a system for garbage collection and transportation will be needed to keep the monument clean and tidy for the visitors. This shall be discussed and agreed with the SA. iv. The proposal may include the addition/modification of toilets for the visitors, hence, the outlets shall connected to the existing sewerage system or wastewater shall be disposed appropriately to avoid contamination to water sources Proposal Title Proposal Location ESR Criteria for Rehabilitating Cultural Heritage Monument Confirmation Passages at the Proposal Stage Write Yes or No The proposal recognizes the cultural sensitivity and will use the same materials and final finish and techniques use in the original monument The SA and the neighboring households are introduced to the impacts of visitors coming to the monument after commissioning and the mitigations to reduce those impacts The SA is aware of the need to a garbage collection and transporting system at commissioning phase and agreed to provide the system and maintain it Wastewater from rest rooms will be collected and disposed safely without causing environment pollution If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If answer is 'Yes' then incorporate this information in the project proposal Page 71 of 139 Cash for Work – Building New Latrines i. Cash for work program is targeting the most vulnerable households and pay them for the work they do in rehabilitating/building services such as terraces, rainwater harvesting, rural feeder roads...etc. However, there are very poor communities in the West coastal strip where they don't have any asset and don't even own the land they live on with their huts. In such case supporting the community in having appropriate latrines could be the only activity for cash for work. ii. Such subsidy will not change behavior hence; cash for work activity should be preceded by awareness campaign to create demands for latrines. iii. To win the appreciation of latrines' users and encourage their use frequently, latrines should fulfill at least the minimum standards. Siphons to prevent odors and rodents, ventilation pipes, and tight inspection chamber covers shall be provided and installed. Ventilation pipe should be extended to at least 0.2m above the roof of the latrine. iv. The work is implemented by the house' owner, hence training on the job in plumbing and all civil work will be necessary. v. It was found in previous similar interventions that community started to experience more mosquito breeding directly after commissioning the latrines. The reason was leaving the squat hole and water containers open. Hence, the proposal should include awareness to the community on the importance of keeping the squat hole and water containers closed. vi. To augment the impact, the proposal should include also the introduction of the tippy tap and help the families to have their own hand washing tool. vii. Some of cash for work Pos focus on selecting only the poor families for this intervention hence they may ignore a better-off family without appropriate latrine. The exclusion of better-off families will not solve the sanitation problem because even if one house is left without appropriate sanitation is enough to keep the disease burden within the community. Therefore in this activity, cash for work program should focus in two objectives, pumping cash to the poor families, and achieving total sanitation. Proposal Title Proposal Location Confirmation ESR Criteria for Building New Latrines at the Proposal Stage Write Yes or No Hygiene awareness will be conducted to create demand for latrines before starting cash for work activities The minimum requirements for appropriate latrines such as siphons, ventilation pipes, and tight inspection chamber covers are included The arrangement for training on the job in plumbing and civil work have considered in the proposal Awareness campaign on the importance of keeping the squat hole and water containers closed is included in the proposal Introducing tippy tap is included in the proposal All houses are included in the intervention even the better-off If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If answer is 'Yes' then incorporate this information in the project proposal Page 72 of 139 Building Groundwater Based Water Supply System i. Sustainability of groundwater as a single water source for this investment is a threat hence; the proposal should include pumping tests to measure the discharge of the well and the water quality. ii. To compensate for the water extraction, a component for recharging groundwater shall be included in the proposal. Such component could be of surface spreading type such as flooding, ditches and furrows, and recharge basins or of sub-surface type such as injection wells, recharge pits, recharge trenches or a combination of both techniques. iii. Sanitation problem may exacerbate as a result of water consumption increase and consequently increase of wastewater disposal. Hence, a sanitation component should be included in the proposal. In most of the cases in rural areas, sanitation component will be in the form of conducting hygiene campaign using Community-Led Total Sanitation (CLTS) approach with water saving awareness. As a result the community comes out with collective activities to solve the sanitation problem without any subsidy. iv. Willingness and affordability to pay for the service is measured through conducting socio-economic survey for randomly selected households. The community is willing and can afford to pay for the service when more than 75% of the surveyed families have the water bill less than 5% of their income. v. The proposal should contain a component for training the selected management staff on the O&M of the system. The management staff will be divided into two groups, the first group will be trained on administration and management and the second group on mechanical and technical aspects. Proposal Title Proposal Location ESR Criteria for Building Groundwater Based Water Supply Confirmation System at the Proposal Stage Write Yes or No Pumping test has been conducted for 72hrs, and water quality tests have been conducted and all the results confirmed the well is successful Components for compensating groundwater extraction have been included in the proposal Sanitation component in the form of CLTS and water saving awareness in included in the proposal Socio-economic survey has been conducted and confirmed that more than 75% of the surveyed families can afford and are willing to pay for the service Training the selected management staff on the O&M is included in the proposal If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If answer is 'Yes' then incorporate this information in the project proposal Page 73 of 139 Building Spring Based Gravity Water Supply System i. These systems depend on collecting water from springs to supply communities with clean drinking water by gravity. ii. The water production of the springs will dictate the capacity of the collection tank, hence; accurate measurement of the springs' water production in both dry and wet seasons should be conducted and the proposal shall be prepared accordingly. iii. Sanitation problem may exacerbate as a result of water consumption increase and consequently increase of wastewater disposal. Hence, a sanitation component should be included in the proposal. In most of the cases in rural areas, sanitation component will be in the form of conducting hygiene campaign using Community-Led Total Sanitation (CLTS) approach with water saving awareness. As a result the community comes out with collective activities to solve the sanitation problem without any subsidy. iv. Though the O&M costs are less than groundwater based systems (because they work by gravity without pumps), the community should develop a system for O&M including the water tariff. Proposal Title Proposal Location ESR Criteria for Building Groundwater Based Water Supply Confirmation System at the Proposal Stage Write Yes or No Measurement of springs' water production at dry and wet seasons has been taken and found feasible for the proposal Water quality tests have been conducted and found water suitable for human use Sanitation component in the form of CLTS and water saving awareness in included in the proposal The SA was introduced to the importance of O&M and agreed to develop a proposal for that purpose If answer to any of the above questions is 'NO' then the project will be dropped at the proposal stage. If answer is 'Yes' then incorporate this information in the project proposal Page 74 of 139 Annex (3) Checklist of Expected Environmental and Social Impacts to be Addressed at the Design Stage After approving the proposal, the project inters the stage of detail design and tender documents which include the bill of quantities. This stage is very important for it will pave the road for the implementation and operation stages. All the expected environmental and social impacts shall be identified at this stage and the mitigation measures shall be designed and incorporated in the subproject design and tender documents, particularly, the bill of quantities so that they are priced and become the obligation of the implementing and supervising parties. From the previous experience, it was noticed that local contractors don't give any attention to the general and specific conditions of contract which includes some safeguards, but, they focus only on the BQ. Hence, the environmental and social safeguards shall be inserted in the BQ. There are two measures needed to be taken in every subproject that requires civil work for its implementation: i. Whether implemented by commercial or community contracting, the laborers will need temporary toilets and handwashing tools such as Tippy Tap. Therefore, this should be included in the design and tender documents particularly the Bill of Quantities (BQ) to ensure they become the obligation of the implementing party and the supervision consultant. Such measure is not only for the benefit of the laborers and supervision staff, but, in addition, a message to local communities how to build and erect low cost and simple toilets and handwashing tools in their own homes using local materials. The only exceptions are the rooftop rainwater harvesting, and home gardens where the intervention is at the house level, here in these two cases, temporary toilets will not be needed assuming that every house has a toilet. ii. PPE are normally mentioned in the General Conditions of the Contract which states that the contractor is responsible for providing personal protection equipment to his labors and enforce their use. However, most contractors don't read the General Conditions of the Contract, but focus only on the Bill of Quantities; therefore, they have to be inserted in the Bill of Quantities in order to become the obligation of the implementer and the supervisor. In addition to the above two measures, every subproject will have additional specific measures to be taken. The checklist formats for every type of subproject are mentioned in the following pages. The consultant shall confirm the points mentioned in the checklist by writing "Yes" or "No", and if the confirmation is "No", he should justify it in the design report where a section should be prepared for safeguards. The checklist format shall be annexed to the design report so that the BM/UH can review it. Page 75 of 139 Building New Terraces i. Scope of work or the boundaries of intervention is one of the technical and social issues that need to be identified and agreed with the community otherwise the subproject will reach the point of community's dissatisfaction, even if the disbursed amounts exceeded the original budget. ii. Establishing new terraces will need agricultural soil to be brought from nearby sources. The borrowing location shall be identified and agreed with the community and the mitigations for avoiding the location to become a low point for water stagnation and nuisance to the community shall be included in the Bill of Quantities. iii. New terraces will need also stones for building the retaining walls. Large quantities of stones will be needed hence; the locations for extracting the stones shall be carefully selected to avoid disturbing the stability of slopes and soil. iv. Introducing new terraces will result in intercepting some of the runoff water that was previously flowing into the downstream agricultural lands. Hence the water rights problem shall be studied carefully and discussed with the owners of the downstream lands. Mitigation measures to minimize this impact shall be presented to the downstream land owners and agreed upon and included in the bill of quantities. v. Arrangement for the sustainability of the terraces needs to be developed, discussed and agreed with the community. vi. At the design stage, the areas for borrowed agriculture soil shall be identified. Hence, the community shall agree to compensate the owners fairly either in kind or in cash. Project Name Project Location Check List of the E&S Issues To Be Addressed for Building New Confirmation Terraces at the Design Stage Write Yes or NO Scope of work has been indentified and agreed with the community Temporary toilets have been added to the bill of quantities Hand washing tool such as Tippy Tap has been added to the bill of quantities PPE have been added to the bill of quantities Stability of slopes will not be affected by extracting stones for building the retaining walls The mitigation measures for minimizing the negative impacts in the location of borrowing the soil have been designed, discussed and agreed with the community and included in the Bill of Quantities The owners of the land from which the agriculture soil will be borrowed have been identified and the community agreed to compensate them fairly in kind/cash The extent of the expected water right problem is figured out and the downstream people are aware and agreed to cope with it If any of the answers is "No", then the reasons must be stated in the design report. Page 76 of 139 Rehabilitating Terraces i. Scope of work is one of the technical and social issues that need to be identified and agreed with the community otherwise the project will end up with community's dissatisfaction even if the disbursed amounts exceeded the original budget. ii. Rehabilitating terraces will need agricultural soil to be brought from nearby sources. The borrowing location shall be identified and agreed with the community and the mitigations for avoiding the location to become a low point for water stagnation and nuisance to the community shall be designed and incorporated in the BQ. iii. Rehabilitating terraces will need also stones for building the retaining walls. Large quantities of stones will be needed; hence, the locations for extracting the stones shall be carefully selected to avoid disturbing the stability of slopes and soil. iv. Introducing new terraces will result in intercepting some of the runoff water that was previously flowing into the downstream agricultural lands. Hence the water rights problem shall be studied carefully and discussed with the owners of the downstream lands. Mitigation measures to minimize this impact shall be presented to the downstream land owners and agreed upon and included in the bill of quantities. Project Name Project Location Confirmation Checklist of the E&S Issues to be Addressed for Rehabilitating Terraces at the Design Stage Write Yes or NO Scope of work has been indentified and agreed with the community Temporary toilets have been added to the bill of quantities Hand washing tool such as Tippy Tap has been added to the bill of quantities PPE have been added to the bill of quantities The contributions have been discussed and agreed with the community The mitigation measures for minimizing the negative impacts in the location of borrowed soil have been designed, discussed and agreed with the community and included in the Bill of Quantities Stability of slopes will not be affected by extracting stones for building the retaining walls The owners of the land from which the agricultural soil will be borrowed have been identified and the community agreed to compensate them fairly either in kind or cash The extent of the expected water right problem is figured out and the downstream people are aware and agreed to cope with it If any of the answers is "No", then the reasons must be stated in the design report. Page 77 of 139 Check Dams i. Water rights shall be studied discussed and agreed with the owners of the lands downstream the check dam. ii. The arrangement for cleaning the accumulated silt and debris shall be developed, and agreed with the community. iii. Check dams shall not result in any significant ecological impacts. Project Title Location of the project Confirmation Checklist of E&S Issues to be Addressed for Check Dams at the Design Stage Write Yes or No Water rights have been studied, discussed and agreed with the owners of the downstream lands The arrangement for cleaning the accumulated silt and debris have been developed, discussed and agreed with the community It is confirmed that check dams will not result in any significant ecological impacts If any of the answers is "No", then the reasons must be stated in the design report. Page 78 of 139 Flood Protection i. The design of the targeted location, if not covering the whole affected area, which is normally the case, shall be part of a holistic approach for protecting all the affected area. ii. Scope of work is one of the technical and social issues that need to be identified and agreed with the community otherwise the project will reach the point of community's dissatisfaction, even if the disbursed amounts exceeded the original budget. iii. The location for dumping construction wastes shall be indentified and agreed with the community and the mitigations measures to minimize the distortion of the landscape of the dumping location shall be included in the bill of qualities. iv. The design of the flood protection structures, if implemented, will not increase the erosion to the other side of the wadi or to the lands downstream the targeted area. Project Title Project Location E&S Issues to be Addressed for Flood Protection at the Confirmation design Stage Write Yes or No The design of the targeted location is part of a holistic approach for protecting all the affected area Scope of work has been indentified and agreed with the community Temporary toilets have been added to the bill of quantities Hand washing tool such as Tippy Tap has been added to the bill of quantities PPE have been added to the bill of quantities The contributions have been discussed and agreed with the community The mitigation measures for minimizing the negative impacts in the location of dumping construction waste materials have been designed, discussed and agreed with the community and included in the Bill of Quantities The design of the flood protection structures will not increase the erosion to the other side of the wadi or to the lands downstream the targeted area. In case of answer "No" to any of the above points, it should be justified in the design report. Page 79 of 139 Groundwater Recharging Structures i. The location for dumping construction wastes shall be indentified and agreed with the community and the mitigations measures to minimize the distortion of the landscape of the dumping location shall be included in the bill of qualities. ii. Guidelines and arrangements for operation and maintenance of the recharging structures shall be developed, discussed and agreed with the sponsoring agency. iii. Safety measures are considered in the selection and design of groundwater recharging techniques. Such measures may include fencing, sings, etc. iv. A plan for measuring the impacts of the project shall be developed and the party for its implementation has been identified and the party has agreed to do so. The plan will include the locations of measuring groundwater levels, frequency of measurements, requirements and the budget. Project Title Project Location E&S Issues to be Addressed for Groundwater Recharging Confirmation at the design Stage Write Yes or No Temporary toilets and Tippy Taps have been added to the BQ PPE have been added to the bill of quantities The contributions have been discussed and agreed with the community Life safety measures have been considered in the selection and design of groundwater recharging structures. The mitigation measures for minimizing the negative impacts in the location of dumping construction waste materials have been designed, discussed and agreed with the SA and included in the BQ Guidelines and arrangements for operation and maintenance of the recharging structures shall be developed, discussed and agreed with the sponsoring agency. The plan for measuring the impacts of the project has been developed and the party for its implementation has been identified and the party agreed to do so. In case of answer "No" to any of the above points, it should be justified in the design report. Page 80 of 139 Open Catchment Covered Rainwater Harvesting Cisterns for Domestic Use i. Women and girls in rural areas are responsible for fetching water, therefore, the design should respond to their needs, hence, they have to be consulted on the whole design of the cistern including the storage capacity, the level of the roof, the steps needed to ascend and descend it, and the method of lifting water and its location. ii. The components for improving the stored water quality shall be included in the design. These components should include the cover, the silt and floats trap, and the tool for taking water pulley-rope-bucket, hand pump, or taps if the level allows. iii. Wherever possible, the location of the silt and floats basin trap should be at higher level to allow emptying it via cleaning pipe and cap. iv. In some cases the design consultant may chose corrugated sheets for covering the cistern because of their low cost, but this may cause the distortion of the landscape in the area. Therefore, the cover should have nearly the same appearance of the buildings' roofs in the area. v. Rainwater harvesting technique is traditional in most of the country; therefore, there is no threat of operation and maintenance. However, due to the water scarcity, rainwater harvesting may be implemented in areas where it's not a tradition and people will have no idea about their O&M. In such cases, guidelines and arrangement for O&M shall be developed, and the community should be trained. vi. The location for dumping construction wastes shall be indentified and agreed with the SA and the mitigation measures to minimize the distortion of the landscape of the dumping location shall be designed and included in the bill of qualities. Project name Project Location E&S Issues to be Addressed for Open Catchment Rainwater Confirmation Harvesting Covered Cistern at the design Stage Write Yes or No Women and girls have been consulted on the design and their feedback and comments have been reflected in the design Components for improving water quality such as settling basin, fetching tool, and cover have been included in the design and BQ The location of the settling basin is at a higher level and the emptying and cleaning pipe has been included in the design and bill of quantities The design and material of the cover ensure the harmony in the area's landscape The arrangement for O&M is developed, discussed and agreed with the SA Temporary toilets and tippy taps have been included in the bill of quantities PPE has been inserted in the bill of quantities The location for dumping construction wastes has been indentified and agreed with the SA and the mitigation measures to minimize the distortion of the landscape have been designed and included in the BQ In case of answer "No" to any of the above points, it should be justified in the design Page 81 of 139 report. Page 82 of 139 Open Catchment Rainwater Harvesting Uncovered Cisterns for Agriculture and Livestock i. Wherever possible, the location of the silt and floats basin trap should be at higher level to allow emptying it via cleaning pipe and cap. ii. Rainwater harvesting technique is traditional in most of the country, hence, no threat of operation and maintenance. However, due to the water scarcity, rainwater harvesting may be implemented in areas where it's not a tradition and people will have no idea about their O&M. In such cases, guidelines and arrangement for O&M shall be developed, and the community should be trained. iii. The location for dumping construction wastes shall be indentified and agreed with the SA and the mitigation measures to minimize the distortion of the landscape of the dumping location shall be designed and included in the bill of qualities. iv. Open cisterns at elevation below 1500 M above sea level (ASL) may become an environment for mosquito breeding. Bilharzias spreading are also a threat in open cisterns. Therefore, mitigation measures such as agitation via boating, growing special fish that eats larvae and fencing to prevent swimming shall be developed and included in the design and bill of quantities. Project name Project Location Checklist of E&S Issues to be Addressed for Open Catchment Confirmation Rainwater Harvesting Uncovered Cistern for Agriculture and Write Yes or Livestock at design stage No Mitigation measures for combating mosquitoes and Bilharzias have been included in the design and BQ. The location of the settling basin is at a higher level and the emptying and cleaning pipe has been included in the design and bill of quantities The arrangement for O&M is developed, discussed and agreed with the SA Temporary toilets and tippy taps have been included in the bill of quantities PPE has been inserted in the bill of quantities The location for dumping construction wastes has been indentified and agreed with the SA and the mitigation measures to minimize the distortion of the landscape of the dumping location have been designed and included in the bill of qualities Site selection ensures the use of the cistern by all community groups including the vulnerable and marginalized groups. In case of answer "No" to any of the above points, it should be justified in the design report Page 83 of 139 Rooftop rainwater harvesting i. Women and girls in rural areas are responsible for fetching water, therefore, the design should respond to their needs, hence, they have to be consulted on the whole design of the cistern including the storage capacity, the level of the roof, the steps needed to ascend and descend it, and the method of lifting water and its location. ii. To comply with the national standards, the cisterns are normally covered and water is taken from the cistern via bucket and rope or tap if level allows. iii. Traditional techniques and material are use for building the cisterns. iv. To improve the quality of stored water, first flush tool is installed to force the first quantity of storm water, which normally carry with it dust, and birds' and rodents' droppings, outside the cistern, then clean water is allowed to enter the cistern. v. Coarse filter can be installed at the inlet as well. vi. In some cases the design consultant may chose corrugated sheets for covering the cistern because of their low cost, but this may cause the distortion of the landscape in the area. Therefore, the cover should have nearly the same appearance of the buildings' roofs in the area. vii. Rainwater harvesting technique is traditional in most of the country; therefore, there is no threat of operation and maintenance. However, due to the water scarcity, rainwater harvesting may be implemented in areas where it's not a tradition and people will have no idea about their O&M. In such cases, guidelines and arrangement for O&M shall be developed, and the community should be trained. Project name project location Checklist of E&S Issues to be Addressed for Rooftop Rainwater Confirmation Harvesting Cisterns at Design Stage Write Yes or No Women and girls have been consulted on the design and their feedback and comments have been reflected First flush tool and coarse filter at the inlet have been included in the design and BQ The design and material of the covers ensure the harmony in the area's landscape The arrangement for O&M is developed, discussed and agreed with the community All households including poor, vulnerable and marginalized are included in the project. In case of answer "No" to any of the above points, it should be justified in the design report Page 84 of 139 Water Channel i. The alignment of the water channel is known at this stage and the SA identified all property loss along the path of the channel- if any –and confirmed its commitment to compensate the owners fairly in kind/cash. ii. Water channels, if not properly constructed, cause upstream and downstream soil erosions. During construction special care needs to be taken to avoid all the reasons of community disturbances attached to falling of debris, alternate route for existing channel, and blasting - if involved. iii. During operations leakages from water channels lead to landslides that may cause physical damage and human loss in the downstream communities. Due to this reason technical measures are taken to ensure water tightness of the channel. iv. The mitigations needed to overcome the water rights conflicts at the water source and the distribution points shall be designed and included in the BQ. v. The location of dumping construction wastes should be identified with the community, and the mitigations to reduce the distortion to the landscape of the dumping location should be designed and included in the BQ. Project Title Project Location Checklist of E&S Issues to be Addressed for Water Channels Confirmation at Design Stage Write Yes or No There is a consensus in the community on channel design, route, water distribution, and cost Technical measures were taken to prevent landslides The community agreed to provide the land required and compensate the owners fairly in kind/cash Temporary toilets and tippy taps have been included in the bill of quantities Mitigation measures to eliminate the water right problem at the water source and at distribution points have been designed and included in the BQ The location for dumping construction wastes has been indentified and agreed with the SA and the mitigation measures to minimize the distortion of the landscape of the dumping location have been designed and included in the BQ In case of answer "No" to any of the above points, it should be justified in the design report Page 85 of 139 Water Saving Irrigation Systems i. The alignment, the limits of the water distribution network and the external boundaries of the lands that will be irrigated are clearly identified, discussed and agreed with all farmers. ii. Water rights conflicts at the water source and the distribution points are settled at this stage. Measures to eliminate the water rights conflicts have been designed and included in the BQ. iii. Operation and maintenance schedule and budget have been developed, discussed and agreed with the SA. iv. On farm irrigation systems have been developed and agreed with the farmers and training plan in incorporated in the design of the project. Project Title Project Location Checklist of E&S Issues to be Addressed for Water Saving Confirmation Irrigation Systems at Design Stage Write Yes or No The alignment, the limits of the water distribution network and the external boundaries of the lands that will be irrigated are clearly identified, discussed and agreed with all farmers. Measures to eliminate the water rights conflicts have been designed and included in the BQ. Temporary toilets and tippy taps have been included in the bill of quantities Operation and maintenance schedule and budget have been developed, discussed and agreed with the SA. On farm irrigation systems have been developed and agreed with the farmers and training plan is in incorporated in the design of the project In case of answer "No" to any of the above points, it should be justified in the design report Page 86 of 139 Introducing New Plants Species i. The new species have been selected and proved to be suitable to the community's environment. The community is aware of their benefits and their requirements. ii. New plant species introduced will not disturb the local ecosystem. iii. Lands where the new species will be planted are indentified and agreed with the farmers. iv. Monitoring and evaluation schedule and budget are developed and incorporated in the design. v. Dissemination plan and budget were developed and incorporated in the design report. Project Title Project Location Checklist of E&S Issues to be Addressed In Introducing New Confirmation Plants Species at Design Stage Write Yes or No The new species have been selected and proved to be suitable to the community's environment. The community is aware of their benefits and their requirements. Lands where the new species will be planted are indentified and agreed with the farmers. Confirm that the new plant species introduced will not disturb the local ecosystem Monitoring and evaluation schedule and budget are developed and incorporated in the design Dissemination plan and budget were developed and incorporated in the design report. In case of answer "No" to any of the above points, it should be justified in the design report Page 87 of 139 Improving Existing Rural Feeder Roads i. All improvement items needed to ensure the road safety such as retaining walls, drainage ditches, stone pavement are incorporated in the design and BQ. ii. Communities are consulted on the expected danger of increasing vehicles' speed as a result of improving the road, and mitigation measures that can be adopted to reduce the impact. iii. Mitigation measures agreed with the communities to reduce the impacts of increasing vehicles' speed as a result of improving the road should be incorporated in the design and BQ. iv. At this stage the documentation of water rights should be agreed with the related community members and the drainage ditches and culverts are designed accordingly. I.e. the drainage system of the improved road should keep the water rights as they were before road improvement. Project Name Project Location Checklist of E&S Issues to be Addressed in Improving Rural Confirmation Feeder Road at design stage Write Yes or No All work items for insuring the road safety such as retaining walls, drainage ditches, culverts and stone pavement, have been included in the design and BQ Communities have been consulted on the expected danger of increasing vehicles' speed as a result of improving the road, and on the mitigation measures that can be adopted. Mitigation measures to reduce the impacts if increasing vehicles speed have been designed and incorporated in the design and BQ. Water rights are documented and reflected into the design and BQ. Temporary toilets and tippy taps have been included in the bill of quantities In case of answer "No" to any of the above points, it should be justified in the design report Page 88 of 139 Back Yard gardens i. At this stage targeted households, available land area, and quantity of water available for irrigation should be identified. ii. Type of plants, the quantities of each species, and their inputs and requirements have been discussed and agreed with the households. iii. Training, monitoring and follow up plan has been developed and budgeted. iv. Baseline data about nutrition and household expenses on food have been collected for future comparison. Project Name Project Location Checklist of E&S Issues to be Addressed in Houses' Gardens at Confirmation design stage Write Yes or No All vulnerable households are included in the subproject Types of plants, their quantities, their inputs and requirements have been discussed and agreed with the community Training, monitoring and follow up plan has been developed and budgeted Baseline data about nutrition, and household expenses on food have been collected In case of answer "No" to any of the above points, it should be justified in the design report Page 89 of 139 Biogas Units i. At this stage no. of biogas units and their locations should be known based on the eligibility criteria and households complying with the criteria including the vulnerable. ii. Seepage from biogas well can cause groundwater contamination. Seepage control measures are incorporated in the design to mitigate this impact. iii. H2S generation can cause serious environmental impacts in the form of community health. This issue is normally mitigated by fixing a suction fan in the kitchen. Fan will suck the gas and disperse it in the air. iv. O&M guidelines and safety precautions shall be developed. v. Training of local community, monitoring and evaluation plans have been developed and budgeted. vi. Baseline data of family expenses on existing energy sources for cooking such as wood and natural gas for randomly selected families should be collected. These data will be compared with the post data after completing and operating the biogas units. Project Name Project Location Checklist of E&S Issues to be Addressed in Biogas Units at Design Confirmation Stage Write Yes or No O&M guidelines have been developed Training, monitoring and evaluation plans have been developed and budgeted Baseline data of family expenses on existing energy sources for cooking have been collected for randomly selected families. All safety measures have been incorporated in the design and BQ. In case of answer "No" to any of the above points, it should be justified in the design report Page 90 of 139 Establishing/Rehabilitating Grazing Lands i. The grazing lands and their owners have been identified and the community confirms its commitment to compensate them fairly in kind/cash. ii. The design of all the components of the grazing land and their costs have been developed, discussed and agreed with the community. iii. Interventions on establishing/rehabilitating grazing lands will not involve significant alteration of natural vegetation iv. The schedule for grazing and the arrangements for its enforcement were developed by the community and are ready to be approved and signed by selected community members. Project name Project Location Checklist of E&S Issues to be Addressed in Confirmation Establishing/Rehabilitating Grazing Lands at Design Stage Write Yes or No The grazing lands and their owners have been identified and the community confirms its commitment to compensate them fairly in kind/cash. The design of all the components of the grazing land and their costs have been developed, discussed and agreed with the community. The schedule for grazing and the arrangements for its enforcement were developed by the community and are ready to be approved and signed by selected community members. In case of answer "No" to any of the above points, it should be justified in the design report Page 91 of 139 Replacement of Qat i. At this stage, the new cash crops to replace Qat will be selected, discussed, and agreed with the community. ii. The areas for planting the new cash crops will be agreed; hence, the quantities of the seeds/seedlings can be identified. iv. The community is introduced to the requirements of the new cash crops and agreed to fulfill them. Project Name Project Location Checklist of E&S Issues to be Addressed in Replacement of Qat at Confirmation Design Stage Write Yes or No The new cash crops have been selected, discussed and agreed with the community The areas for planting the new cash crops are agreed with the community, and quantities of seeds/seedlings are calculated accordingly. The community is aware of the new cash crops requirements and agreed to fulfill them. In case of answer "No" to any of the above points, it should be justified in the design report Page 92 of 139 Seeds Storage i. The landscape of the area was considered in the design of the buildings and in the selection of their materials and their outlook. ii. The location for dumping construction waste materials has been identified and the mitigation measures to eliminate the distortion to its landscape have been designed and incorporated in the BQ. iii. The community confirmed its obligation to compensate land owners in kind/cash. iv. To ensure sustainability of service provision, the arrangement for O&M and the service tariff should be developed, discussed and agreed with the community. Project Name Project Location Checklist of E&S Issues to be Addressed in Seeds Storage at Confirmation Design Stage Write Yes or No The landscape of the area was considered in the design of the buildings and in the selection of their materials and their outlook. The location for dumping construction waste materials has been identified and the mitigation measures to eliminate the distortion to its landscape have been designed and incorporated in the BQ. The community confirmed its obligation to compensate land owners in kind/cash. Temporary toilets and tippy taps have been incorporated in the BQ PPE have been incorporated in the BQ In case of answer "No" to any of the above points, it should be justified in the design report Page 93 of 139 Post Harvesting Facilities i. To ensure the sustainability of post harvesting service provision, the arrangement of operating and maintaining the post harvest facilities should be developed, discussed and agreed with the community. ii. The type, and size of the harvesting machines have been selected and their installation locations have been agreed with the community. Project Name Project Location Checklist of E&S Issues to be Addressed in Post Harvesting Confirmation Facilities at Design Stage Write Yes or No The arrangement of operating and maintaining the post harvest facilities is developed, discussed and agreed with the community. The type, and size of the harvesting machines have been selected and their installation locations have been agreed with the community In case of answer "No" to any of the above points, it should be justified in the design report Page 94 of 139 Improving Rural Markets i. The locations of all the interventions' components and the areas needed for each component have been indentified and agreed with the SA. ii. The location of the garbage dumping site has been selected and agreed with the SA. The site should satisfy the following criteria(distance is from the edge of the site): a. Distance to the nearest water course is not less than 60m, b. Distance to the nearest residential building or public facility (school or health facility) is not less than 400m, c. Distance to the nearest cultural heritage monument, or environmentally sensitive site is not less than 100m, d. Distance to the nearest operational well is not less than 1.0km, e. The static water level is not less than 100m from the bottom of the design level of the dumping site. iii. The SA has developed the system for operating and maintaining the market, and was reviewed and found satisfactory. Project name project location Checklist of E&S Issues to be Addressed in Improving Rural Confirmation Markets at the Design Stage Write Yes or No The area of lands needed for all the subproject components have been identified and the SA confirmed its obligation to provide the land and compensate the owners fairly in kind/cash The dumping site for garbage satisfies all the environmental criteria The SA has developed the O&M system and seen satisfactory Temporary toilets and tippy taps have been incorporated in the BQ PPE have been incorporated in the BQ In case of answer "No" to any of the above points, it should be justified in the design report Page 95 of 139 Constructing Sewerage Network (Wastewater Treatment Plant Not Included) i. The boundaries of the targeted area have been agreed with the SA, and the local community members. ii. Houses lacking siphons, ventilation columns, and tight covers for inspection chambers have been identified and agreed to be equipped with these components by the house owners before the announcement of the tender. iii. All outlets from all houses within the agreed boundary are considered in the design. Houses with very deep outlets (in case of basements) that can't be connected to the designed network are indentified and owners are recommended to keep the existing leaching pits they have. iv. The alignments of all sewers are in public roads and passages and all short cuts through private lands have been discussed and settled by the SA and land owners. v. The location for dumping construction wastes has been identified and stated in the BQ vi. Fixing damaged services as a result of excavations is included in the BQ vii. Safety measures for pedestrians and traffic during open trenches, such as closing the trench with poles and ropes, pedestrians' bridges at convenient locations, signals and signs have been considered and included in the BQ. Project name project location Checklist of E&S Issues to be Addressed in Constructing Sewerage Confirmation Networks at the Design Stage Write Yes or No The boundaries of the targeted area are indentified and agreed with the SA and the design was prepared accordingly Houses within the boundary lacking siphons, ventilation columns and tight inspection chambers covers have been identified agree to be equipment by the house owners before tender announcement The owners of outlets that will not be connected to the network due to very low invert levels are informed to keep disposing their wastewater into their existing leaching pits All sewers are in roads and passages, and short cuts through private lands have been settled by the SA and land owners Safety measures for pedestrians and traffic during open trenches, such as closing the trench with poles and ropes, pedestrians' bridges at convenient locations, signals and signs have been considered and included in the BQ. Temporary toilets are included in the BQ PPE are included in the BQ The location for dumping construction wastes has been identified by the SA and stated in the BQ In case of answer "No" to any of the above points, it should be justified in the design report Page 96 of 139 Building and Furnishing Kindergarten i. The SA has confirmed its obligations to compensate the land owners fairly in cash/kind ii. The system for O&M has been developed by the SA and has been checked and found acceptable. The system is signed by the SA and is ready to be annexed to the financial agreement. iii. If the building will not be connected to the water network, then rooftop rainwater harvesting tank shall be designed based on the rainfall pattern and the roof area of the building. iv. The location for dumping construction wastes has been identified and agreed with the SA and the mitigation measures to minimize the distortion of the landscape of the dumping location are designed and incorporated in the bill of qualities. Project name project location Checklist of E&S Issues to be Addressed in Building and Confirmation Furnishing Kindergarten at the Design Stage Write Yes or No SA confirmed its obligations to compensate the land owners fairly in cash/kind and to prepare the formats of land voluntarily donated and land compensated according to annex 1. The system for O&M developed by the SA was found reasonable and has been signed by the SA, and become ready to be annexed to the financial agreement The capacity of the rooftop rainwater harvesting tank was calculated based on the rainfall pattern and the roof area of the building Temporary toilets and tippy taps are included in the BQ PPE are included in the BQ The location for dumping construction wastes has been identified by the SA and stated in the BQ In case of answer "No" to any of the above points, it should be justified in the design report Page 97 of 139 Building and Furnishing School i. The SA has confirmed its obligations to compensate the land owners fairly in cash/kind ii. The system for O&M has been developed by the SA and has been checked and found acceptable. The system is signed by the SA and is ready to be annexed to the financial agreement. iii. If the building will not be connected to the water network, then rooftop rainwater harvesting tank shall be designed based on the rainfall pattern and the roof area of the building. iv. The location for dumping construction wastes has been indentified and agreed with the SA and the mitigation measures to minimize the distortion of the landscape of the dumping location are designed and incorporated in the bill of qualities. Project name project location Checklist of E&S Issues to be Addressed in Building and Confirmation Furnishing School at the Design Stage Write Yes or No SA confirmed its obligations to compensate the land owners fairly in cash/kind and to prepare the formats of land voluntarily donated and land compensated according to annex 1. The system for O&M developed by the SA was found reasonable and has been signed by the SA, and become ready to be annexed to the financial agreement The capacity of the rooftop rainwater harvesting tank was calculated based on the rainfall pattern and the roof area of the building Temporary toilets and tippy taps are included in the BQ PPE are included in the BQ The location for dumping construction wastes has been identified by the SA and stated in the BQ In case of answer "No" to any of the above points, it should be justified in the design report Page 98 of 139 Building and Furnishing Health Education Center i. The SA has confirmed its obligation to compensate the land owners fairly in cash/kind and agreed to prepare the formats for land voluntarily donated and compensated according to annex 1. ii. The system for O&M has been developed by the SA and has been checked and found acceptable. The system is signed by the SA and is ready to be annexed to the financial agreement. iii. If the building will not be connected to the water network, then rooftop rainwater harvesting tank shall be designed based on the rainfall pattern and the roof area of the building. iv. The location for dumping construction wastes has been indentified and agreed with the SA and the mitigation measures to minimize the distortion of the landscape of the dumping location are designed and incorporated in the bill of qualities. Project name project location Checklist of E&S Issues to be Addressed in Building and Confirmation Furnishing Health Education Center at the Design Stage Write Yes or No SA confirmed its obligations to compensate the land owners fairly in cash/kind and to prepare the formats of land voluntarily donated and land compensated according to annex 1. The system for O&M developed by the SA was found reasonable and has been signed by the SA, and become ready to be annexed to the financial agreement The capacity of the rooftop rainwater harvesting tank was calculated based on the rainfall pattern and the roof area of the building Temporary toilets and tippy taps are included in the BQ PPE are included in the BQ The location for dumping construction wastes has been identified by the SA and stated in the BQ In case of answer "No" to any of the above points, it should be justified in the design report Page 99 of 139 Pavement of Squares, Roads and Passages i. Locations for the components of groundwater recharging to compensate for sealing the ground surface has been identified and agreed with the SA. ii. The SA has confirmed its obligation to compensate the land owners fairly in cash/kind and agreed to prepare the formats for land voluntarily donated and compensated according to annex 1. iii. The SA has developed and signed a system for collecting and transporting solid waste at the commissioning phase which will be annexed to the financing agreement. iv. The expected threat of increased vehicles' speed after pavement has been discussed with the SA and affected families and the mitigation measures have been designed and incorporated in the BQ. v. The final design pavement levels have been discussed and agreed with the SA and the changes in levels compared with the original existing levels have been discussed and agreed with the related house owners. vi. Water rights have been documented and agreed with the agricultural land owners, and have been incorporated in the design and BQ. vii. The location for dumping construction wastes has been indentified and agreed with the SA and the mitigation measures to minimize the distortion of the landscape of the dumping location are designed and incorporated in the bill of qualities. Project name project location Checklist of E&S Issues to be Addressed in Pavement of Squares, Confirmation Roads, and Passages at the Design Stage Write Yes or No Locations for the components of groundwater recharging to compensate for sealing the ground surface has been identified and agreed with the SA. The SA has confirmed its obligation to compensate the land owners fairly in cash/kind and agreed to prepare the formats for land voluntarily donated and compensated according to annex 1. The S A has developed and signed a system for collecting and transporting solid waste at the commissioning phase which will be annexed to the financing agreement. The expected threat of increased vehicles' speed after pavement has been discussed with the SA and affected families and the mitigation measures have been designed and incorporated in the BQ. The final design pavement levels have been discussed and agreed with the SA and the changes in levels compared with the original existing levels have been discussed and agreed with the related house owners. Water rights have been documented and agreed with the agricultural land owners, and have been incorporated in the design and BQ. The location for dumping construction wastes has been indentified and agreed with the SA and the mitigation measures to minimize the distortion of the landscape of the dumping location are designed and incorporated in the BQ. In case of answer "No" to any of the above points, it should be justified in the design report Page 100 of 139 Rehabilitation of Cultural Heritage Monuments i. Rehabilitation work has been designed based on the architectural and structural style and construction techniques of the monument and the same materials will be used and the same final finish will be ensured. ii. The impacts of having visitors to the monument have been discussed with the SA and the vicinity neighbors, and mitigations to reduce these impacts have been designed and incorporated into the BQ. iii. The SA has developed and signed a system for collecting and transporting solid waste at the commissioning phase which will be annexed to the financing agreement. iv. The disposal method of wastewater from the monument has been designed to ensure avoiding pollution to the environment and water sources. v. The location for dumping construction wastes has been identified by the SA and stated in the BQ Project name project location Checklist of E&S Issues to be Addressed in Rehabilitating Cultural Confirmation Heritage Monument at the Design Stage Write Yes or No Rehabilitation work has been designed based on the architectural and structural style and construction techniques of the monument and the same materials will be used and the same final finish is ensured. The impacts of having visitors to the monument have been discussed with the SA and the vicinity neighbors, and mitigations to reduce these impacts have been designed and incorporated into the BQ. The SA has developed and signed a system for collecting and transporting solid waste at the commissioning phase which will be annexed to the financing agreement. The disposal method of wastewater from the monument has been designed to ensure avoiding pollution to the environment and water sources. Temporary toilets and tippy taps are included in the BQ PPE are included in the BQ The location for dumping construction wastes has been identified by the SA and stated in the BQ In case of answer "No" to any of the above points, it should be justified in the design report Page 101 of 139 Cash for Work – Building New Latrines i. Arrangement to conduct hygiene campaigns to create demands for latrines before the start of cash for work activities has been ensured. ii. All components needed for latrines to comply with the minimum standards have been incorporated in the BQ. Siphons to prevent odors and rodents, ventilation pipes, and tight inspection chamber covers shall be provided and installed. Ventilation pipe should be extended to at least 0.2m above the latrine's roof. iii. On job training for house owners in plumbing and civil work have been arranged. iv. Awareness of the community on the importance of keeping the squat hole and water containers closed has been considered and incorporated in the projects' activities. v. Introducing tippy taps and training the community on erecting them have been incorporated into the project's activities. vi. To ensure total sanitation and elimination of diseases burdens, all houses are included in the project. vii. The location for dumping construction wastes has been identified by the SA and stated in the BQ Project name project location Checklist of E&S Issues to be Addressed in Building New Latrines Confirmation at the Design Stage Write Yes or No Arrangement to conduct hygiene campaigns to create demands for latrines before the start of cash for work activities has been ensured. Siphons, ventilation pipes up to 0.2m above the roof, and tight inspection chamber covers have been considered for all latrines and incorporated in the BQ On job training for house owners in plumbing and civil work have been incorporated in the projects' activities. Awareness of the community on the importance of keeping the squat hole and water containers closed has been considered and incorporated in the project's activities. Introducing tippy taps and training the community on erecting them have been incorporated into the project's activities. All houses are included in the intervention even the better-off The location for dumping construction wastes has been identified by the SA and stated in the BQ In case of answer "No" to any of the above points, it should be justified in the design report Page 102 of 139 Building Groundwater Based Water Supply System i. Pumping test and water quality tests have been conducted and all confirm the suitability of the well for human use and for the investment in the subproject. ii. The components for recharging groundwater have been designed and incorporated in the BQ. There locations have been identified and agreed with the SA. iii. The SA has developed and singed a system for O&M and it's ready to be attached to the financing agreement. iv. Hygiene awareness campaigns using CLTS and water saving campaigns have been considered and incorporated in the subproject's activities. v. Training the selected management staff have been considered and incorporated in the subproject's activities. vi. The location for dumping construction wastes has been identified by the SA and stated in the BQ Project name project location Checklist of E&S Issues to be Addressed in Building Groundwater Confirmation Based Water Supply System at the Design Stage Write Yes or No Pumping test and water quality tests have been conducted and all confirm the suitability of the well for human use and for the investment in the subproject. The components for recharging groundwater have been designed and incorporated in the BQ. There locations have been identified and agreed with the SA. Hygiene awareness campaigns using CLTS and water saving campaigns have been considered and incorporated in the subproject's activities. The SA has developed and singed a system for O&M and it's ready to be attached to the financing agreement. Training the selected management staff on O&M have been considered and incorporated in the subproject's activities. Temporary toilets and tippy taps are included in the BQ PPE are included in the BQ The location for dumping construction wastes has been identified by the SA and stated in the BQ In case of answer "No" to any of the above points, it should be justified in the design report Page 103 of 139 Building Spring Based Gravity Water Supply System i. The spring's water production has been measured in dry and wet seasons and the storage tank has been designed accordingly. ii. Hygiene awareness campaigns using CLTS and water saving campaigns have been considered and incorporated in the subproject's activities. iii. The SA has developed and singed a system for O&M and it's ready to be attached to the financing agreement. iv. The location for dumping construction wastes has been identified by the SA and stated in the BQ Project name project location Checklist of E&S Issues to be Addressed in Building Spring Based Confirmation Gravity Water Supply System at the Design Stage Write Yes or No The spring's water production has been measured in dry and wet seasons and the storage tank has been designed accordingly. Hygiene awareness campaigns using CLTS and water saving campaigns have been considered and incorporated in the subproject's activities. The SA has developed and singed a system for O&M and it's ready to be attached to the financing agreement. The location for dumping construction wastes has been identified by the SA and stated in the BQ In case of answer "No" to any of the above points, it should be justified in the design report Page 104 of 139 ANNEX 4 Environmental Monitoring Plan Matrix Mitigation Mitigation Measures Monitoring Indicators Monitoring Implementi Monitorin Monitoring Aspects Methods ng Agency g Agency Frequency Reduce Construction Phase: Complaints from local • Monitoring • Contracto SFD/WEU Daily/Weekl emissions, • Covering waste disposal trucks with tarpaulins community and occupants devices to ensure r during y dust, and • Ensuring that ambient air quality limits are not Dust deposition on compliance of construction suppression exceeded: vehicles and machinery should comply with vegetation and rocks noise and of noise emission standards. Loud noise can be heard emissions • Construction activity noise levels will be maintained from a distance • Field below limits. Change in natural habitats observations • Personnel and workers operating on site will be within ecolodge • Interaction equipped with hearing and breathing protection gear. surroundings with local community: use Operation Phase: indigenous • Adopting composting practices to reduce the amount knowledge to • WEU of solid waste produced and reduces the need for waste understand impact during Monthly collection vehicles. on wildlife operation phase Occupational Construction Phase: Complaints from laborers, • Construction • Contracto SFD/WEU Monthly Health and • Compliance with General rules and regulations on occupants, and local site inspection r during Safety Occupational Health and Safety. community • Review of construction • Provision of protective gear for workers including incidents records helmets, boots, gloves, masks, and earplugs. Number of • Provision of first aid kit at work sites and necessary incidents/accidents information on rescue during emergency. Adoption level of OHS • Prohibiting admission of children, guests, or dependents of legal employees or underage workers to construction site. • Provision of appropriate training and emergency response procedures. Operation Phase: • Provision of fire extinguishers and first-aid kits in • WEU SFD/WEU Monthly the camp sites. during • An operational manual will also be developed for the operation building facilities management. phase Page 105 of 139 Solid Waste Construction Phase: Complaints from local • Construction • Contracto EPA Weekly Management • Construction waste will be stored and disposed of in community and occupants site inspection r during an environmentally safe manner. construction construction • A suitable location will be designated for the safe Improper disposal of waste • phase storage of construction waste onsite. The designated products WEU during location should be void of vegetation, natural habitats, operation and distant from depressions or surface drainage. phase • Use of natural materials where possible • Onsite waste shall be covered with tarpaulin to prevent dust clouds from forming. • Waste will be carted away from the onsite storage location to a location identified by for filling purposes. Operation Phase: • Spaces should be designated for on-site separation Monthly for paper, glass, aluminium, steel and plastics. during • Adopting a garbage prevention strategy: recycle for operational reuse or recycled back into the environment through phase biodegradation where possible • Final disposal of waste through landfills should be remote from population and properly designed in accordance with global and national specifications. Sewage Waste Operation Phase: Construction specifications • Review of WEU SFD/WEU Quarterly Management • Adopting composting strategy of solid sewage waste and infrastructure design tender and and use compost for greenery. contractor bid • Use of composting toilets not flush toilets. Improper disposal of waste documents • Recommended use of biological treatment products • site inspection technologies of sewage waste that does not involve land • Water and soil disposal. Soil and water quality quality • Recommended use of biological systems to purify measurements reflecting monitoring wastewater. And biological control for vectors Contamination of nearby • Recommended use of pit latrines during the areas from sewage waste construction stage of ecotourism structures and in the products. remote camping areas. Pit latrines should not be located in runoff areas, in depression, or near water resources. Soil Construction Phase: Indication of rill or inter-rill • Field • SFD/WEU Weekly protection • Soil removed through excavation should be used as erosion observations Contractor during and Page 106 of 139 prevention of back filling or immediately removed from the project. Soil compaction and • Complaints construction construction compaction • Any excavated soil remaining temporarily on site exfoliation of rocks during from local phase and should be placed in proper location and covered using construction or operation community periodically tarpaulin. Disruption of vegetation and during • Construction should be avoided during periods of wildlife project anticipated rainfall to prevent any soil erosion. operation Operation Phase: • Use of existing paths for transportation and avoiding the creation of new routes that would disrupt vegetation, wildlife and compact soils. • Limit the use of vehicles in the region to reduce soil • WEU compaction and ecosystem disruption. during • Reduce dependency on vehicles for services operation phase Spreading of Operation Phase: Presence of Mosquito • Field • Contracto SFD/WEU Periodically Malaria, • Measures to minimize pollution (on-site water larvae observations r during during diarrhoea quality monitoring, ensure proper design of the Amoeba + E-Coli • Complaints construction project Bilharzias discharge of stagnant water, etc.) Snails from local stage operation • Using biological control, mesquite treated nets community • Regular monitoring of species • Health records • Use a warning system with environmental • Water quality monitoring indicators monitoring • Measures to treat waste using biological, chemical Change of water quality and physical filters, prioritize water re-use • Apply best environmental practice to avoid and diseases. • Proper feeding practices Habitat • Construction away from sensitive habitats Complaints from • Field • Contracto SFD/WEU Periodically degradation • Waste management strategy applied community, local operators, observations r during from various • Tender document will have to include provisions for NGOs, and tourist. • Incident • WEU project activities site specific EMP. Poor water quality / reports construction visibility observed in • Violations and vegetation areas operation Observed damage to Flora and Fauna Page 107 of 139 ANNEX 5 Environmental and Social Management Plan Matrix Means of Time Cost Institutional supervision) insurance and Frame Estimate Requirements compliance Responsibility or Monitoring Sub-Projects Potential Environmental (including Proposed Mitigation Measures (including Schedul Measures Impacts enforcement/ e coordination) Building New Air Quality and Noise Air Quality and Noise SFD/ SFD with SDF and WEU Quarterl Will be Terraces Construction Construction WEU/as beneficiaries CBOs y estimate Construction may impact air Use dust control measures onsite, appropriate oversees during quality and generate noise. such as water spraying for dust construction and design monitor the This results mainly from suppression; operation activities excavation, site grading, Regulate site access; design and and conducts visual vehicle loading and Cover lorries transporting friable supervision inspection with the unloading, and other construction materials and spoil; consultant‘ assistance of a construction-related activities. Prohibit open air burning; s reports to representative of Operation Maintain machinery in good ensure the local Potential impacts on ambient working conditions to minimize safeguards community air quality would result from emissions; and Contracts and PCU compliance odors and gaseous emissions Provide adequate protective wear coordinator ensures generated by stagnant water– for workers, and equipment must , that contractors water may increase humidity be maintained regularly to avoid undertaking implement - Exposure to or production any emissions; field visits environmental cracks, humidity exfoliation Pre-treat gases emitted or further management may happen due to high Operation investigatio plans/regulations humidity in the area Conserve energy use to reduce ns as and that - Odor due to increase relative fuel combustion; contractors perform necessary. humidity Control emissions from continuous - Deterioration of terraces wastewater treatment The World inspection and walls my lead to erosion or facility/good discharge system Bank will monitoring of areas flash flood Mitigation to the first factor could also its own of potential - distributing the stability of be addressed by frequent monitoring pollution and/or Page 108 of 139 slopes and soils due to large inspection to the terraces to ensure uses with the quantities used in building construction and apply the the project potential to result in terraces required maintenance. Regular is soil contamination; - interruption of some runoff inception and examinations for compliant water mentioned impacts and address Complaints from Soil Quality and them through maintenance with its local community Surface/Ground water replacement of materials spoiled. environmen Pattern/contamination Minimizing entrance of heavy t and social Review of tender Construction machines to reduce vibration safeguards and bid documents Impacts on soil quality may impact. .For handling and by SDF result from the following occupational health applying construction activities: restrict protection regulation for Change in composition, occupational health filtration. measurements is critical and a Operation separate EA is required to part of Contamination of soils and EMP-including all operational groundwater with chemicals stages form handling, washing, used in farming and classification, freezing, backing chemicals and oil spills from up to loading and distribution to equipment. consumption Spills and leaks at liquid Soil Quality and impoundment areas for fuels, Surface/Ground water solvents, waste and from pattern/contamination infrastructure equipments, Construction may infiltrate through soil Apply, inspect and maintain pores, under gravitational temporary/permanent erosion and forces, and contaminate sediment control measures (e.g. ground water aquifers; silt fences, rapid growth Discharge into surface waters, vegetation, erosion control or alteration of surface water matting) to exposed areas; quality, including but not Restrict movement of vehicles to limited to temperature, designated tracks; dissolved oxygen, turbidity, Operation solids Maintain periodically vehicles Waste water and equipment to prevent leaks; Potential generation of waste Maintain records and procedures Page 109 of 139 water resulting for the project for equipment maintenance, activities and/ or sub-projects handling and storage of liquid during both construction and fuels and chemicals; lab regular operation. testing for ground and surface -contamination of water, soil workers and agricultural products with insecticides and herbicides Waste Water Biological Resources- Flora Encourage drying mechanisms to & Fauna avoid stagnant water Removal or disturbance of Use of bio-treatment to prevent natural vegetation, A loss or chemical contamination disturbance to a unique, rare Apply IPMP to avoid negative or threatened plant impact of pesticides and community, A reduction in herbicides if required, apply the numbers or restriction in biological control for pests. 2 the range of any unique, rare Biological Resources- Flora & or threatened species of plants Fauna such as bushes, A Applying environmental deterioration of existing operational standards within the wildlife habitat, Introduction legal, policy and management of any factors (light, fencing, framework of the project to noise, human presence and/or minimize the negative impact on domestic animals) which the environment using the could hinder the normal comparative advantage of the activities of wildlife different project counterparts. Compliance with SFD IV area is critical for the conservation of biodiversity Coordination with relevant stakeholders is very important, Proper selection of sites as to avoid damaging natural habitat. Tender document will have to include provisions for site 2 Integrated Pest Management Plan as per World Bank operational manual at http://web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTARD/EXTPESTMGMT/0 Page 110 of 139 specific EMP. Open Catchment Air Quality and Noise Air Quality and Noise Villages CBOs SDF/WEU and Monthl Will be Covered Rainwater Construction Construction with support from Villages CBOs y estimate Harvesting Cisterns Construction may impact air Use dust control measures onsite, Governorate lined with support from during quality and generate noise. such as water spraying for dust Units in addition to Governorate lined design for Domestic Use This results mainly from suppression; SDF/ WEU PO and Units excavation, site grading, Regulate site access; ECO conducting vehicle loading and Cover lorries transporting friable visual inspection unloading, and other construction materials and spoil; with the assistance construction-related activities. Prohibit open air burning; of a representative Operation Maintain machinery and vehicles of the local Potential impacts on ambient in good working conditions to community air quality would result from minimize emissions; and Contracts and ECO odors and gaseous emissions Provide adequate protective wear ensures that generated by a for workers contractors Boilers/Kitchen/Air Vehicles, and equipment used implement Compressors Wastewater must be maintained regularly to environmental treatment (undesirable avoid any emissions; management odors), Vehicles and Pre-treat gases emitted by boilers plans/regulations motorized engines, and Boats and generators; and that Soil Quality and Ground Operation Technical officials water contamination -Assess the ecology of disease with CBOs perform Construction carriers in the watershed continuous Impacts on soil quality may - Employ suitable prevention and inspection and result from the following mitigation measures, including monitoring of areas construction activities: Site education of local people of potential clearance, site grading, and construction workers, e.g.: pollution and/or excavation, infrastructure, and Ensure all construction sites, uses with the oil leaks from borrow pits and quarries are potential to result in vehicles/equipment. properly drained soil contamination; Operation -Finish and manage reservoir Review of tender Contamination of soils and margins for proper drainage and bid documents groundwater with plastic -Vary the reservoir water level by SDF&WEU generated decaying chemicals Proper design and operation of may result from chemicals dam spillways and gates (timing used in water purification and ,and volume of discharges) Page 111 of 139 from equipments. Spills and •-Monitor disease and public leaks at liquid impoundment health indicators, areas for fuels, solvents, during and after construction, and waste and from infrastructure take corrective measures (e.g. pipelines pumps and buckets, education, medical) as needed may infiltrate through soil -Conserve energy use to reduce pores, under gravitational fuel combustion; forces, and contaminate Control emissions from groundwater aquifers; wastewater treatment facility; Waste waster -Conserve energy use to reduce Potential generation of waste fuel combustion; water resulting for the project Control emissions from activities and/ or sub-projects wastewater treatment facility; during both construction and operation such as stagnant water Biological Resources- Flora Waste Water & Fauna Treatment of stagnant water after Construction & Operation to avoid biological contamination Removal or disturbance of Biological Resources- Flora & natural vegetation, A loss or Fauna disturbance to a unique, rare Applying environmental or threatened plant operational standards within the community, A reduction in legal, policy and management the numbers or restriction in framework of the project to the range of any unique, rare minimize the negative impact on or threatened species of plants the environment using the such as indigenous herbs, A comparative advantage of the deterioration of existing different project counterparts. wildlife habitat, Introduction Proper selection of sites as to of any factors (light, fencing, avoid damaging natural habitat. noise, human presence and/or Tender document will have to domestic animals) which include provisions for site could hinder the normal specific EMP. activities of wildlife Page 112 of 139 Rooftop rainwater If small workshops are Proper selection of sites as to All technical SDF/WEU and Weekly/ Will be harvesting required to be constructed to avoid damaging natural habitat. stakeholder are Villages CBOs Monthl estimate produce water harvesting Ecotourism criteria mentioned involved in with support from y during materials, the potential impact above to be applied inspection of Governorate lined design to minor than the cases Tender document will have to quality assurance units mentioned above but at least include provisions for site with village CBO impact on soil and water specific EMP. Good practice in waste , due small design constructions and construction waste, expected leakage can be damage building during operation Flood Protection Alteration or damaging Avoiding damaging natural All technical Villages CBOs Monthl Will be natural habitat during habitat during constructions or stakeholder are with support from y estimate construction, contamination minimize it (proper site selection, involved in Governorate lined during may occur from construction use environmentally friendly inspection of Units in addition design infrastructure and materials, materials, prepare materials off- quality assurance to SDF/WEU run-off surface water site, etc.) with village CBO obstacles and divert to cause Tender document will have to and overall other flooding hazards include provisions for site supervision of specific EMP. SDF/WEU Good practice in design Improving Rural Potential impact is expected Good practice associated with District/town/villag District/town/villa As Will be Markets during construction and quality assurance and regular site e councils with ge councils with required estimate operation on air, soil and inspection support from CBOs support from during water from associated Apply specific site ESMP and SDF and WEU CBOs and SDF design activities such as traffic, solid and WEU waste, however, the size will be smaller but minor smaller impact could be accumulated and increase impact on air, water, soil and natural habitat Water Saving Plastic installation and dioxin Using materials made from All technical CBOs with As Will be Irrigation Systems made material could source of friendly environmental materials stakeholder are support of required estimate contamination for water and and good practice involved in government lined during soil and thus public health Apply specific site ESMP inspection of department and design Page 113 of 139 quality assurance SDF/WEU and WEU with village CBO Stone Pavement Air Quality and Noise Air Quality and Noise SFD/ WEU SFD with SFD and WEU Quarterl Will be Construction Construction to monitor beneficiaries CBOs y estimate Construction may impact air Use dust control measures onsite, the design oversees d during quality and generate noise. such as water spraying for dust and construction and design This results mainly from suppression; supervision operation activities excavation, site grading, Regulate site access; consultant‘ and conducts visual vehicle loading and Cover lorries transporting s reports to inspection with the unloading, and other construction materials; ensure assistance of a construction-related activities. Prohibit open air burning; safeguards representative of Operation Maintain machinery in good compliance the local Potential impacts on ambient working conditions to minimize . Undertake community. air quality would result from emissions; and field visits PCU coordinator odors and gaseous emissions Provide adequate protective wear or further ensures that generated by stagnant water – for workers investigatio contractors water may increase humidity equipment must be maintained ns as implement - Exposure to or production regularly to avoid any emissions; necessary. environmental cracks, humidity exfoliation Pre-treat gases emitted The World management may happen due to high Operation Bank will plans/regulations humidity in the area Conserve energy use to reduce also do its and that contractors - Odor due to increase relative fuel combustion; own perform continuous humidity Control emissions from supervision inspection and - Deterioration of stone wastewater treatment to ensure monitoring of areas pavement may lead to facility/good discharge system that the of potential erosion or flash flood Mitigation to the first factor could project is pollution and/or - disturbing the stability of be addressed by frequent compliant uses with the slopes and soils due to large inspection to the terraces with its potential to result in quantities used in building construction and apply the environmen soil contamination; pavements required maintenance. Regular t and social - interruption of some runoff inception and examinations for safeguards Complaints from water mentioned impacts and address local community Soil Quality and them through maintenance Surface/Ground water replacement of materials spoiled. Review of tender pattern/contamination Minimizing entrance of heavy and bid documents Page 114 of 139 Construction machines to reduce vibration by SFD Impacts on soil quality may impact. Applying occupational result from the following health protection regulations and construction activities: measurements is critical for all Change in composition, operational stages form handling, filtration. washing, classification, freezing, Operation backing up to loading and Contamination of soils and distribution to consumption. groundwater with chemicals Soil Quality and Surface/Ground used in construction and water pattern/contamination chemicals and oil spills from Construction equipment. Apply, inspect and maintain Spills and leaks at liquid temporary/permanent erosion and impoundment areas for fuels, sediment control measures (e.g. solvents, waste and from silt fences, rapid growth infrastructure equipments, vegetation, erosion control may infiltrate through soil matting) to exposed areas; pores, under gravitational Restrict movement of vehicles to forces, and contaminate designated tracks ground water aquifers; Operation Discharge into surface waters, Periodically maintain vehicles or alteration of surface water and equipment to prevent leaks; quality, including but not Maintain records and procedures limited to temperature, for equipment maintenance, dissolved oxygen, turbidity, handling and storage of liquid solids fuels and chemicals; lab regular Waste water testing for ground and surface Potential generation of waste workers water resulting from the Waste Water project activities and/ or sub- Encourage drying mechanisms to projects during both avoid stagnant water construction and operation. Use of bio-treatment to prevent Biological Resources- Flora chemical contamination & Fauna Biological Resources- Flora & Removal or disturbance of Fauna natural vegetation, A loss or Applying environmental Page 115 of 139 disturbance to a unique, rare operational standards within the or threatened plant legal, policy and management community, A reduction in framework of the project to the numbers or restriction in minimize the negative impact on the range of any unique, rare the environment using the or threatened species of plants comparative advantage of the such as bushes, A different project counterparts. deterioration of existing Compliance with SFD criteria is wildlife habitat, Introduction critical for the conservation of of any factors (light, fencing, biodiversity. Coordination with noise, human presence and/or relevant stakeholders is very domestic animals) which important. Proper selection of could hinder the normal sites as to avoid damaging natural activities of wildlife habitat. Tender document will have to include provisions for site specific EMP. Basic services Construction Proper selection of sites as to SFD/ WEU All technical SFD/WEU and Weekly/ Will be facilities: -Dispute among beneficiaries avoid dispute among beneficiaries to monitor stakeholders are Villages CBOs Monthl estimate Education, Health, on the on the location. the design involved in with support from y d during etc. location Tender document will have to and inspection of local executive design -Water pollution due to include provisions for site supervision quality assurance offices wastewater disposal of specific EMP. Good practice in consultant‘ with village CBO temporary latrines design s reports to -Spread out of construction -Locate latrines, septic systems ensure waste and soakaways at least 30m from safeguards -Spread out of solid municipal any water body (e.g. stream, compliance waste river, lake, pond) . Undertake Operation -Ensure adequate design, field visits Types of health waste can installation and maintenance of or further include: latrines, holding tanks, septic investigatio -Human tissue and blood; systems and wastewater ns as -Soiled surgical dressings and soakaways. This is especially necessary. swabs; important where the water table is The World -Discarded syringe needles; high or soils have a high clay or Bank will -Other contaminated sharp sand content also do its instruments; -Ensure adequate spacing own Page 116 of 139 - Microbiological cultures and between latrines and supervision potentially infected wastes soakaways to ensure from laboratories; - Tender document for hazardous that the -Excretions; and wastes will have to include project is -Drugs and other provisions for site specific, compliant pharmaceutical products. separate EMP. Determine the with its -Radioactive wastes need to approximate volumes of waste environmen be managed and treated materials by category (e.g. sharps, t and social separately from other body tissues, dressings, safeguards healthcare wastes, and are not pharmaceutical products, non- covered here (will require hazardous healthcare wastes, separate EMP) etc.), and design the management system to deal with each waste -Human feces spread category separately as required around the site - Assess current practices and -Water pollution due to address the priority gaps and wastewater disposal of risks, building on any successful school bathrooms aspects of the current system. All measures and facilities should be planned within an overall strategy for hazardous healthcare waste management. This overall strategy will ensure consistent and efficient methods, and sharing of good practices. - Provide specialized, clearly labeled containers for hazardous healthcare wastes to separate them at source, manage the risks of exposure, and secure the wastes before removal for treatment or storage. - Plan, design, construct and operate a shared treatment facility. Types of facilities include heat treatment Page 117 of 139 disinfection, incineration, chemical & biological treatment. - Until a shared treatment facility is established, employ interim measures to ensure the safe and secure storage of wastes. In some cases, an appropriate interim measure will be to bury the waste in deep (e.g. >2m) trenches in municipal disposal sites, and ensure the trenches are immediately covered with other municipal solid waste. -Implementing the Self Monitoring and Follow up and sewage treatment Implementing the items in the TD related to dealing with municipal solid wastes and the components needed for SWMP Rural Feeder Road Construction -Good practice during SFD/ WEU All technical Villages CBOs Monthl Will be Construction may impact air construction. Proper treatment of to monitor stakeholder are with support from y estimate quality and generate noise. solid waste and other bi product the design involved in local executive during This results mainly from during construction and inspection of offices in addition design excavation, site grading, -Apply suitable design for natural supervision quality assurance to SFD/WEU vehicle loading and water courses and putting consultant‘ with village CBO unloading, and other measures for preserving wildlife s reports to and overall construction-related activities. -Avoiding damaging natural ensure supervision of Solid wastes habitat during constructions or safeguards SFD/WEU Construction wastes minimize it (proper site selection, compliance Historical monuments use environmentally friendly . Undertake Green areas materials, prepare materials off- field visits Sanitary drainage site, etc.) or further Deformation of grades -Avoid creating congested and investigatio Blockage of water canals and unsafe road conditions at ns as drainage course at their intersections, and in villages and necessary. Page 118 of 139 intersection with road. towns The World Alteration or damaging -Good practice in design to avoid Bank will natural habitat during traffic accidents such as Sloping also do its construction, contamination of road Curves own may occur from construction -Include components that reduce supervision infrastructure and materials, traffic accidents such as speed to ensure run-off surface water breakers and speed limits signs that the obstacles and divert to cause -Tender document will have to project is other flooding hazards. A include provisions for site compliant deterioration of existing specific EMP. with its wildlife habitat, Introduction environmen of any factors (light, fencing, t and social noise, human presence and/or safeguards domestic animals) which could hinder the normal activities of wildlife Operation Abrasion of road Increase of traffic accidents Improving Rural Construction Construction District/town/villag District/town/villa As Will be Markets Construction may impact air -Maintain equipment in good e councils with ge councils with required estimate quality and generate noise. working condition to reduce support from CBOs support from during This results mainly from emissions and noise, and SFD and WEU CBOs and SFD design excavation, site grading, -Use dust control measures and WEU vehicle loading and onsite, such as water spraying for unloading, and other dust suppression; construction-related activities. -Good practice associated with Solid wastes quality assurance and regular site Construction wastes inspection Historical monuments -Cover lorries transporting friable Green areas construction materials Sanitary drainage -Maintain a system for collecting Deformation of grades and disposing garbage during Operation construction Solid waste, wastewater from -Collect construction wastes and Page 119 of 139 market latrines may cause soil transport them to the agreed site and water sources pollution -Tendering should include specific site EMP Operation -Enforce the solid waste management system that should have been developed by the SA at the preparation stages -Maintain good operation and maintenance of market latrines Page 120 of 139 ANNEX (6) CHECK LIST FOR ENVIRONMENTAL MONITORING INDICATORS FOR SAMPLE SUB- PROJECTS School Sub-project: Monitoring Environmental Impact MonitoringIndicator Frequency Air Pollution Noise Odors Dust Smoke Annually Pollutants(i.e.CO,NOx.AndSO2) Asbestos Paintcontaininglead WaterPollution ElectricalConductivity BOD–COD Annually E-Coli Nitrates SoilPollution Oil Wastewater Annually SolidWaste Rural Road Sub-project: Environmental Impact MonitoringIndicator MonitoringFrequency AirPollution Increaseintraffic Noise Odors Dust Smoke Annually Pollutants(i.e.CO,NOx.AndSO2) Asbestos Paintcontaininglead VOC DifferentFormsofVisual SolidWaste Pollution ConstructionWaste GreenAreas Annually SewageSystem ArcheologicalSites/Artifacts WaterPollution EC BOD-COD Annually E-Coli Nitrates ReductionorMigrationof Productivityofwatersource WaterSources Annually ObstructionofWater Obstructionofcanalsontheroad Collection Dispersionof naturalcanals Annually Roaderosion Page 121 of 139 Landslide, Erosion and Fallingrocks,soil,anddebrisontheroad StructuralInstability of Changeinroadwidth Annually Slopes PopulationEmigration Census Annually TourismSupport Determination ofincomingtourists Semi-Annually Page 122 of 139 Annex (7) Forms for Voluntary Donation of Land/Compensation Land Owner/Water Rights Form for Voluntary Donation of Land After the PAC approves the subproject, the PO prepares the financing agreement which will be signed by SFD's BM and the SA. If land was voluntarily donated for the subproject, then a form for this purpose shall be prepared and attached to the financing agreement. The form should be signed by the donor and the recipient, and should ensure the following: 1. The ownership of the land and voluntary nature of the donation 2. That the land is appropriate for the intended purpose 3. That the land does not belong to any donor who is below the poverty line or whose holding would be reduced below the minimum size as stipulated to be economically viable (1.0ha) 4. That there are no encumbrances on the land 5. That it does not negatively impact on the livelihood of any vulnerable group, and if so, that community developed mitigation measures are acceptable to the affected group, and 6. That the owner gives up all claims on the land and the title will be transferred to the recipient through the notary public or a registered deed or any other procedure prescribed by the law of the state. Page 123 of 139 Form for Compensating the Land Owner After the PAC approves the subproject, the PO prepares the financing agreement which will be signed by SFD and the SA. This financing agreement should contain the following as annex: "Following the guidelines of the ESMF, the SFD's consultant and the SA have selected the location of -----------------. The boundaries of the location are from North ------------, South -------------, East --------------- ----, and West --------------------. The area of the lands is ------------m2. The SA has met the land owner who brought the documents of the land and they do confirm his ownership of the land with the same boundaries that have been identified by the SA and SFD's consultant. The SA has introduced the land owner to the subproject and its importance to the community, and why his land in particular was selected for the subproject. The land owner without any force from the SA agreed to give the land for a compensation that has been agreed with SA. The land owner hereby confesses that he has given the land to the SA and has received the agreed compensation. With signing this agreement the land owner confirms that he has received the fair compensation and he has no claim with regard to this land. " For the SA The Land Owner Name: Signature Signature Page 124 of 139 Form for Water Rights For any water source which is located in an individual's land and agreement shall be prepared and signed by the individual and the representative of the SA. The agreement should ensure the following: 1. That the person agrees to allow the source of water to be located in his/her land 2. That all persons will have access to the water from the source provided by SFD 3. That no fees or price will be charged from any eligible community member for use of this water. 4. That at no time will supply be restricted to any person Page 125 of 139 Annex (8) Environmental Screening Form A for Checklist of Likely Environmental and Social Impacts of Subprojects Name of the subproject: ………………………………………………………………………………………………………….. Sector and Type of subproject: ………………………………………………………………………………………………… Department implementing subproject: ……………………………………………………………………………………. District where subproject is to be implemented: ……………………………………………………………………… Estimated cost of subproject: …………………………………………………………………………………………………… Screening Checklist Completed By (Name and Title): ……………………………………………………………….. Date: ………………………………………………………………………………………………………………………………………… Proposed Class of subproject (Class A, B or C): …………………………………………………………………………. Name of Approving Authority: …………………………………………………………………………………………………. 1. Brief Description of Subproject Please provide information on the type and scale of subproject (subproject area, area of required land, approximate size of total building floor areas, etc.) ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ 2. The Natural Environment (a) Describe the land formation, topography, vegetation in/adjacent to the subproject area ( e.g. is it a low lying land, water logged, rocky, swamp or wetland, etc.) ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ (b) Estimate and indicate whether vegetation might need to be cleared. ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ (c) Are there any environmentally sensitive areas or threatened species that could be adversely affected by the subproject (specify below)? (i) Intact natural forests Yes ______No______ (ii) Riverine forest Yes ______No______ Page 126 of 139 (iii) Wetlands (lakes/rivers/seasonally inundated areas) Yes ______No______ (iv) If yes, how far are the nearest wetlands (lakes, rivers, seasonally inundated [flooded] areas)? ___________km (v) Habitats of endangered species for which protection is required under Yemeni laws and/or international agreements. Yes ______No ______ (vi) Others (describe)(e.g. cultural sites, burial places, etc.) Yes ______No ______ 3. Fauna and Flora - Will subproject involve the disturbance or modification of existing drainage channels (rivers, canals) or surface water bodies (wetlands, marshes)? Yes ______No ______ - Will the subproject lead to the destruction or damage of terrestrial or aquatic ecosystems or endangered species directly or by induced development? Yes ______No ______ - Will the subproject lead to the disruption/destruction of wildlife through interruption of migratory routes, disturbance of wildlife habitats, and noise-related problems? Yes ______No______ 4. Destruction/Disruption of Land and Vegetation - Will the subproject lead to unplanned use of the infrastructure being developed? Yes ______No ______ - Will the subproject lead to long-term or semi-permanent destruction of soils in cleared areas not suited for agriculture? Yes ______No ______ - Will the subproject lead to the interruption of subsoil and overland drainage patterns (in areas of cuts and fills)? Yes ______No ______ - Will the subproject lead to landslides, slumps, slips and other mass movements in road cuts? Yes ______No ______ - Will the subproject lead to erosion of lands below the roadbed receiving concentrated outflow carried by covered or open drains? Yes ______No ______ - Will the subproject lead to health hazards and interference of plant growth adjacent to roads by dust raised and blown by vehicles? Yes ______No ______ 5. Protected areas - Does subproject occur within/adjacent to any protected areas designated by government (national park, national reserve, world heritage site, etc.) Yes ______No ______ - If subproject is outside of, but close to, any protected area, is it likely to adversely affect the ecology within the protected area (e.g. interference with migration routes of mammals or birds) Yes ______No ______ 6. Geology and Soils - Based upon visual inspection or available literature, are there areas of possible geologic or soil instability (erosion prone, landslide prone, subsidence-prone)? Yes ______No______ - Based upon visual inspection or available literature, are there areas that have risks of large scale increase in soil salinity? Yes ______No ______ 7. Historical, archaeological or cultural heritage site Page 127 of 139 Based on available sources, consultation with local authorities, local knowledge and/or observations, could the subproject alter any historical, archaeological or cultural heritage site or require excavation nearby? Yes ______No ______ 8. Resettlement and/or Land Acquisition - Will the subproject require land acquisition? Yes ______No ______ - If so, will this land acquisition be involuntary? Yes ______No ______ - If so, will this involuntary land acquisition lead to relocation or loss of shelter, loss of assets, or access to assets? Yes ______No ______ - If so, will this involuntary land acquisition lead to loss of income sources or means of livelihood (whether or not affected persons must move to another location)? Yes ______No ______ - Will subproject lead to involuntary restriction of access to legally designated parks and protected areas resulting in adverse impacts on livelihoods of displaced persons? Yes ______No ______ 9. Loss of Household Infrastructure Will subproject result in permanent or temporary loss of household infrastructure (such as granaries, outside toilets and kitchens, etc.)? Yes ______No ______ 10. Noise pollution during Construction and Operations Will operating noise level exceed allowable/ambient noise limits? Yes ______No ______ 11. Solid or Liquid Wastes, including Medical Waste - Will subproject generate large amounts of residual wastes (solid or liquid wastes), including medical waste? Yes ______No ______ - If “Yes”, does subproject include plan for collection & disposal? Yes ______No ______ 12. Pesticides, Insecticides, Herbicides or any other Poisonous or Hazardous Chemicals - Will the subproject require the use of such chemicals? Yes ______No ______ - If, “Yes”, does subproject include plan for safe handling, use & disposal? Yes ______No ______ 13. Water and Soil Contamination - Will subproject require large amounts of raw materials/construction materials? Yes ______No ______ - Will subproject generate large amounts of residual wastes, construction material waste or cause soil erosion? Yes ______No______ - Will subproject result in soil or water contamination (e.g. from oil, grease and fuel from equipment)? Yes ______No ______ - Will subproject lead to contamination of ground and surface water bodies by herbicides for vegetation control and chemicals for dust control? Yes ______No ______ - Will subproject lead to increase in suspended sediments in streams affected by road cut erosion, decline in water quality & increased sedimentation downstream? Yes ______No ______ - Will subproject lead to the destruction of vegetation and soil in the right-of-way; borrow pits, waste dumps, and equipment yards? Yes ______No______ - Will subproject lead to the creation of stagnant water bodies in borrow pits, quarries, etc., encouraging for mosquito breeding and other disease vectors? Yes ______No______ Page 128 of 139 Page 129 of 139 ANNEX (9) Environmental Screening Form (B) For Specific Subproject EMP 1. Projects Name _______________________________________________ 2. Project Type (health care, educational, water, environment, other utilities) 3. Brief description of Project (project's components including assisting services, scope of service, number of beneficiaries, number of workers, etc.) 4. Brief description Project Location (nature of location: rocky or dusty, the previous usage of the location): 5. Description of the surrounding area: for a circle of 50 meters radius from the drainage point, especially locations of environmental sensitivity (utilities, constructions, land usage, water sources3, etc.). 6. Sketch/ Drawing of the of Project 3 Accurate data about water resources such as distance and elevation from the sub-project location and depth of water in case of wells Page 130 of 139 7. Environmental Impacts & Mitigation Measures * (Construction & Operation Phase) Project Parameter Influencing Mitigation Institution Phase Factor Measure Responsible For Execution Design Construction Operation * Example for design phase: Parameter: Water, influencing factor: Disposal of wastewater, mitigating measure: design proper wastewater treatment, Responsibility: Consultant 8. Does the project need monitoring during its operation? (in case there is a probability of polluting water resources, or soil or air) yes No 9. In case the answer is yes, mark the monitoring issues applicable to your project: Monitoring water sources Monitoring the performance of health care waste disposal Monitoring the performance of sanitary drainage system Monitoring the cleanness of the building's yard Monitoring the planting of trees in the building's yard Table for Environmental Monitoring during Project Operation Parameter Indicator Location No. of Intervals Responsibility samples Example: Parameter: Water, Indicator: Nitrate, Location: Albaraka well, No of samples: 4, Interval: one year, Responsibility: YSFD Page 131 of 139 Annex (10) SFD’s interventions in the field of Cultural Heritage Refined Vision for SFD Phase IV Introduction Yemen enjoys a rich, diverse and very much endangered cultural heritage expressed by its unique architecture, cultural landscape, antiquities, traditional handicrafts, music, costume & ritual, dialects, wealth of manuscripts and other aspects all representing a strong expression of deep rooted civilization, national identity as well as a considerable potential economic resource. While employing SFD’s capacity and managerial advantage was a much needed contribution to the national cultural heritage preservation efforts, safeguarding and preserving this heritage was also regarded increasingly by SFD as a possible area for addition to its poverty alleviation efforts from the perspective of the generating temporary and longer term employment as well as from the poverty targeting perspective. SFD’s relation to Cultural Heritage has evolved from no intervention, as cultural heritage was not foreseen as one of SFD’s areas of action upon its establishment to a careful limited intervention by the year 1999, when cultural heritage became officially one of its supported sectors since the start of the second phase. By 2002 SFD became the most important and active partner to the Ministry of Culture as regarded by the World Bank and others. SFD’s operations increased and developed further to become more diverse and achieve wider geographical coverage putting the Social Fund as the first player in this area at the national level. However, the size and nature of threats facing different cultural heritage assets is simply much bigger than to be addressed by SFD’s efforts; it is even beyond Yemen’s resources and capacity if best used for safeguarding its rich, diverse, and patrimony. While poverty, lack of awareness, social, urban and architectural metamorphosis in addition to other factors coalesce with the time caused decay to form an accelerating threat to Yemeni Cultural Heritage assets; concerned agencies experience chronic structural weaknesses at the managerial & technical levels in addition to the lack of adequate legislative bases and financial resources enabling to play an effective role in protecting Yemen’s Cultural Heritage which makes a catastrophic picture for the current situation and less optimistic for the future. As Yemen’s well known genuine architecture represents the most immediate symbol of its rich culture and the strongest expression of its heritage, SFD initially directed its operations to the built heritage as to document and save as many endangered important sites and monuments as possible, and to enhance the conservation status of historic cities, especially those inscribed in the World Heritage. Over time, SFD’s interventions grew and became more diverse by addressing various aspects of tangible and intangible heritage to the extent allowed by its technical and financial capacity. Generally, the implemented interventions were of high technical quality and Page 132 of 139 represented a real and much needed improvement in the conservation status of many endangered aspects of the country’s cultural heritage. Despite the above, a real progress towards improving the legislative, administrative, managerial and technical environment still stands as a fundamental requirement for saving Yemen’s cultural heritage and avoiding a regrettable loss of the important value it bears. Directions of SFD IV relating to Cultural Heritage activities Towards the fourth phase of its operations, SFD still considers the continuation of documenting, rescuing and restoring endangered significant sites and monuments in addition to improving conservation status of Yemeni historic cities as a necessary, realistic and badly needed strategy. This is due to the fact that endangered assets cannot wait for sufficient improvement of the institutional and legislative environment is in place as many of those sites and monuments could collapse, disappear or fall beyond restoration if SFD’s continued interventions do not take place. However, SFD recognizes the importance of expanding and scaling up its interventions in the area of urban conservation by enhancing the national capacity at the central and local levels in protecting historic cities against negative effects of accelerated urbanization on their authentic urban fabric, and architectural traditional styles. This will be given a steadily growing attention throughout the upcoming phase, particularly through the ongoing program “Development of Historic Cities of Yemen” co-financed by SFD. SFD will continue to implement subprojects to document/preserve/conserve endangered cultural heritage sites in Yemen, in compliance with the “Preservation of the Historic Cities and Sites Law No. 16” (endorsed by Cabinet on August 13, 2013), for protecting Yemen’s cultural heritage. For this positive effort to preserve cultural assets, SFD will continue to benefit from qualified national and international expertise to secure quality interventions, trying at the same time to enhance and expand national technical capacity. According to an MOU signed between SFD and the Ministry of Culture, both parties sides will: (i) work with the Ministry of Higher Education to adopt standard conservation as a mandatory subject in the curricula of Architecture and Engineering faculties in public and private universities, and (ii) explore and demonstrate income generation opportunities out of different cultural heritage assets. This will serve both the sustainable preservation and poverty alleviation objectives. With the above in mind, the refined strategic lines through which SFD foresees the delivery of its overall contribution to the national Cultural Heritage preservation efforts will be stated as follows: ➢ Contribution to the conservation of main historic sites especially those inscribed in the World Heritage sites and those of architectural importance; ➢ Expansion of the nation’s technical, professional and managerial capacity at different levels to protect cultural heritage; ➢ Assisting in the establishment of inventories of the country’s cultural heritage assets; ➢ Saving the most threatened most significant sites and monuments (Given the large number and diversity of threatened assets); and ➢ Exploring possibilities and piloting operations to associate Cultural Heritage with development and the use of different Cultural Heritage assets as means of income generation. Page 133 of 139 Quality assurance in SFD Cultural Heritage interventions SFD has a separate Cultural Heritage Unit. Cultural Heritage interventions are generally characterized by being labor intensive in implementation. In its efforts, SFD coordinates with the General Organization for Antiquities and Museums (GOAM) and the General Organization for Preservation of Historic Cities in Yemen (GOPHCY). Furthermore, in its conservation/restoration interventions, SFD used traditional building and restoration techniques and abides with the following international guidelines in the most sensitive monuments of exceptional significance—International Charter for Conservation and Restoration of Monuments and Sites (Venice Charter 1964), World Heritage Convention (Paris Charter 1972), Conservation of Places of Cultural Significance (The Burra Charter, Australian ICOMOS 1981), and the Nara Document on Authenticity (1994). SFD conducts high quality theoretical and practical training course and workshops for young architects, archaeologists and technicians from relevant organization on the principles and techniques of documentation, restoration and conservation of monuments, as well as on the prevailing international guidelines. SFD’s project officers, national consultants and trainees from relevant governmental organizations participated in special training events where they were introduced to the concepts of preservation and to the international relevant charters and practices. Meanwhile, a number of specialized experts4 lead and also provide technical supervision for SFD’s main conservation operations through direct on-site supervision or regular visits that take place on monthly, bi-monthly & semiannual basis. Additionally, the technical quality of SFD’s interventions was positively acknowledged by a World Bank review mission undertaken by a Cultural Heritage expert5. Furthermore, SFD supported projects were recognized as follows: winner of the Aga Khan prestigious architectural award in 2007: (i) Shibam Hadramout conservation project (http://www.akdn.org/akaa_award10.asp#yemen); and (ii) Al Amyriah Mosque project. 4 E. Ronald Lewcock - Professor of Architecture at Georgia Tech. Institute and Cambridge University. Dr. Chris Edens (Archaeologist – former director of the American Institute for Yemeni Studies). Dr. Ala'a Al Habashi, Professor Eves Eagles, Eng. IssamAwwad, Renzo Ravagnan, Abdullah Al Hadrami 5 Marina Djabbarzade (Heritage Management Specialist Sustainable Development Department Europe and Central Asia Region (statements in the Aide memoires 2007,2008,2009) Page 134 of 139 ANNEX (11) Summary of Stakeholder Consultations A consultation workshop was held on Wednesday, 9th April, 2014 attended by related government stakeholders at the central and local levels, and representatives of NGOs, empowerment committees, and local communities. The list of attendees is attached. The workshop was opened with an introduction by the head of water and environment unit, then a speech by SFD's managing director, then the presentations. Three presentations were introduced the first one was for the ESMF (WU), the second for the CRRC (AU) and the thirst was for SFD (M&E U). After the presentation of the ESMF, the discussion was opened and the following are the main points that were discussed: SFD's MD Opening Speech Operation and Maintenance Budget: Some attendees stated that SFD should include in the budget of each subproject an amount for covering the O&M cost. The answer was that O&M is the responsibility of the SA/community. However, SFD should give more attention to this issue at early preparation stages and tone up its mobilization approaches and tools in order to ensure better commitments from its partners in operating and maintaining completed subprojects and consequently improve the sustainability of providing the service. Checklist of Environmental and Social Issues to be Addressed at the Design Phase: To make sure that the subproject is in line with the general plan of the sector in the targeted area, a point should be added to the checklist. Example of groundwater based water system: "the subproject is in line with the MD NWRA- Taiz stating his Points aquifer plan". Climate Resilience Requires Climate Parameters Measurement Equipment: Attendees have put this point stating that climate resilience will not achieve impacts without good early warning climate stations. They were happy to know that the CRRC project will benefit from the 60 early warning climate stations that will be installed by the Climate Information System & PPCR Coordination Project (P132116) in the targeted areas, and rural communities will have good access to the climate data. Page 135 of 139 Excluding Class A Subprojects from the WB Fund: Attendees have put this question, why class A subprojects are excluded from the WB fund? The answer was that WB fund are dedicated to small community level subprojects which are generally of class B. Class A are subprojects associated with very high environmental and social impacts that need special and complicated arrangements for their preparation, design and implementation. Excluding Dams: Attendees showed displeasure of excluding dams from the MD NWRA-Hadramaut WB funds, and asked how SFD is going to support local communities with dams when they are the most viable option to provide the community with water for domestic and agriculture use? The answer was that, there are other donors who still can finance dams, and SFD is planning to evaluate the completed dams and based on the results of this evaluation, the policy of dams will be updated and tone up. Climate Resilience Can Help in WB Local Social Specialist Baslamah Modifying the Agriculture Seasons: Farmers have a traditional agriculture system describe the months of seeding and harvesting based on long experience of rainfall records in memories of famous ancient farmers like Ali Weld Zaid and Homaid Ben Mansur. Having records of rainfall pattern for period not less than 10 years will help in updating the traditional agriculture system to help farmers to cope with the climate change. Page 136 of 139 Page 137 of 139 Page 138 of 139 Page 139 of 139