PE Cusco Transport Improvement Project (P132505) Procurement Plan Country: Peru Region: LATIN AMERICA AND CARIBBEAN Approval Date: 28-Feb-2014 General Procurement Notice published on: 14Oct-2014 July 9, 2010 PROCUREMENT Peru : Cusco Transport Improvement Project PLAN General Information Country: Peru Banks Approval Date of the Original Procurement Plan: 2017-09-19 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-10-04 Project ID: P132505 GPN Date: Project Name: Cusco Transport Improvement Project Loan / Credit No: IBRD / 83390 Executing Agency(ies): Proyecto Especial Regional Plan COPESCO WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Integral Improvement of the Via Expresa PE-COPESCO-27789-CW-RFB Avenue of Cusco Provincial Single Stage - One Pending / Construcción de la Vía Expresa- IBRD / 83390 Prior Request for Bids Open - International Y 105,149,551.00 0.00 2016-12-25 2017-07-11 2017-09-13 2016-12-25 2017-10-25 2017-11-09 2017-12-15 2019-03-10 Municipality (US$143 million, of Envelope Implementation cusco. which US$ 112.7 mill ion is Bank-financed) GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-COPESCO-26816-NC-RFB / Component 3: Institutional Habilitación de Sistemas Strengthening and Monitoring Request for Single Stage - One Pending Informático (Instalación de IBRD / 83390 and Evaluation (US$ 4.6 million, Post Open - National 15,600.00 0.00 2017-09-30 2017-10-25 2017-12-24 Quotations Envelope Implementation Servidor, puntos de red y of which US$4.3 million is Bank- conexiones a internet) financed) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Improvement of PE-COPESCO-25622-CS-CQS / Mobility in Cusco Provincial Consultant Estudio de circulación y Pending IBRD / 83390 Municipality (US3.6 million, of Post Qualification Open - National 22,969.00 0.00 2017-08-28 2017-09-12 2017-10-11 2017-10-16 2017-11-16 2017-12-31 Modelación en el Centro Implementation which US.3.0 million is Bank- Selection Histórico fina nced) PE-COPESCO-25625-CS-QCBS Component 2: Improvement of / Estudio de modelación y Mobility in Cusco Provincial Quality And Cost- Pending movilidad motorizada y estudio IBRD / 83390 Municipality (US3.6 million, of Post Open - National 245,291.00 0.00 2017-08-28 2017-09-11 2017-10-05 2017-10-15 2017-10-30 2017-11-09 2017-11-19 2017-12-31 Based Selection Implementation origen/destino en la ciudad del which US.3.0 million is Bank- cusco fina nced) PE-COPESCO-26877-CS-QCBS Component 2: Improvement of / Estudio de Modelación y Mobility in Cusco Provincial Quality And Cost- Pending Movilidad Motorizada y estudio IBRD / 83390 Municipality (US3.6 million, of Post Open - National 245,291.00 0.00 2017-07-31 2017-08-21 2017-10-04 2017-11-01 2017-12-01 2018-01-05 2018-02-09 2019-02-09 Based Selection Implementation origen/Destino en la ciudad del which US.3.0 million is Bank- cusco fina nced) Component 4: Project PE-COPESCO-26932-CS-QCBS management (US$ 1.4 million). Quality And Cost- Pending / Implementación del plan de IBRD / 83390 Post Open - International 435,582.00 0.00 2017-09-04 2017-09-25 2017-11-08 2017-12-06 2018-01-05 2018-02-09 2018-03-16 2019-03-16 This amount is financed by local Based Selection Implementation comunicación y difusión counterpart contributions PE-COPESCO-26921-CS-QCBS Component 2: Improvement of / DISEÑO DE UN BARRIO Mobility in Cusco Provincial Quality And Cost- Pending PILOTO CON CONEXIÓN CON IBRD / 83390 Municipality (US3.6 million, of Post Open - National 150,000.00 0.00 2017-07-02 2017-07-23 2017-09-05 2017-10-03 2017-11-02 2017-12-07 2018-01-11 2019-01-11 Based Selection Implementation SISTEMAS DE CABLE PARA which US.3.0 million is Bank- ACCESOS fina nced) Component 2: Improvement of PE-COPESCO-26883-CS-QCBS Mobility in Cusco Provincial Quality And Cost- Pending / Consultoría Capacidad de IBRD / 83390 Municipality (US3.6 million, of Post Open - National 270,000.00 0.00 2018-07-07 2018-07-28 2018-09-10 2018-10-08 2018-11-07 2018-12-12 2019-01-16 2020-01-16 Based Selection Implementation Gestión de Vías Urbanas which US.3.0 million is Bank- fina nced) Component 2: Improvement of PE-COPESCO-27193-CS-CQS / Mobility in Cusco Provincial Consultant Pending Acciones de Promoción y IBRD / 83390 Municipality (US3.6 million, of Post Qualification Open - National 60,000.00 0.00 2018-07-02 2018-07-16 2018-08-10 2018-09-22 2018-10-17 2018-11-11 2019-02-09 Implementation Difusion which US.3.0 million is Bank- Selection fina nced) Component 2: Improvement of PE-COPESCO-26894-CS-CQS / Mobility in Cusco Provincial Consultant Estudio de Circulación y Pending IBRD / 83390 Municipality (US3.6 million, of Post Qualification Open - National 22,969.00 0.00 2017-02-21 2017-03-14 2017-04-27 2017-05-27 2017-07-01 2017-12-28 Modelación en el Centro Implementation which US.3.0 million is Bank- Selection Histórico fina nced) Component 2: Improvement of PE-COPESCO-26878-CS-CQS / Mobility in Cusco Provincial Consultant Pending Soporte de Comunicación I, del IBRD / 83390 Municipality (US3.6 million, of Post Qualification Open - National 47,145.00 0.00 2017-11-21 2017-12-12 2018-01-25 2018-02-24 2018-03-31 2018-09-27 Implementation componente 2 which US.3.0 million is Bank- Selection fina nced) Page 1 Component 1: Integral PE-COPESCO-26926-CS-QCBS Improvement of the Via Expresa / Elaboaracion del Expediente Avenue of Cusco Provincial Quality And Cost- Pending IBRD / 83390 Prior Open - International 1,439,504.00 0.00 2015-08-21 2015-09-11 2015-10-25 2015-11-22 2015-12-22 2016-01-26 2016-03-01 2017-03-01 tecnico (diseño) de la Via Municipality (US$143 million, of Based Selection Implementation Expresa CUSCO which US$ 112.7 mill ion is Bank-financed) Component 1: Integral Improvement of the Via Expresa PE-COPESCO-26909-CS-QCBS Avenue of Cusco Provincial Quality And Cost- Pending / Supervision del Expediente IBRD / 83390 Prior Open - International 474,417.00 0.00 2015-08-21 2015-09-11 2015-10-25 2015-11-22 2015-12-22 2016-01-26 2016-03-01 2017-03-01 Municipality (US$143 million, of Based Selection Implementation tecnico de la Via Expresa Cusco which US$ 112.7 mill ion is Bank-financed) Component 1: Integral Improvement of the Via Expresa PE-COPESCO-26895-CS-QCBS Avenue of Cusco Provincial Quality And Cost- Pending / Supervision de Obra avenida de IBRD / 83390 Prior Open - International 4,468,856.00 0.00 2017-01-30 2017-02-20 2017-04-05 2017-05-03 2017-06-02 2017-07-07 2017-08-11 2018-08-11 Municipality (US$143 million, of Based Selection Implementation la Via Expresa Cusco which US$ 112.7 mill ion is Bank-financed) Component 2: Improvement of PE-COPESCO-26896-CS-QCBS Mobility in Cusco Provincial Quality And Cost- Pending / Plan de fomento del uso de la IBRD / 83390 Municipality (US3.6 million, of Post Open - National 100,000.00 0.00 2017-07-10 2017-07-31 2017-09-13 2017-10-11 2017-11-10 2017-12-15 2018-01-19 2019-01-19 Based Selection Implementation bicicleta y otros which US.3.0 million is Bank- fina nced) Component 1: Integral Improvement of the Via Expresa PE-COPESCO-27173-CS-QCBS Avenue of Cusco Provincial Quality And Cost- Pending IBRD / 83390 Post Open - International 218,934.00 0.00 2015-12-20 2016-01-10 2016-02-23 2016-03-22 2016-04-21 2016-05-26 2016-06-30 2017-06-30 / Estudio de Impacto Ambiental Municipality (US$143 million, of Based Selection Implementation which US$ 112.7 mill ion is Bank-financed) Component 2: Improvement of PE-COPESCO-26897-CS-QCBS Mobility in Cusco Provincial Quality And Cost- Pending / Asistencia técnica en IBRD / 83390 Municipality (US3.6 million, of Post Open - International 474,494.00 0.00 2017-07-31 2017-08-21 2017-10-04 2017-11-01 2017-12-01 2018-01-05 2018-02-09 2019-02-09 Based Selection Implementation cooperación which US.3.0 million is Bank- fina nced) Component 2: Improvement of PE-COPESCO-26904-CS-QCBS Mobility in Cusco Provincial / Consultoría para la elaboración Quality And Cost- Pending IBRD / 83390 Municipality (US3.6 million, of Post Open - International 376,235.00 0.00 2017-12-04 2017-12-25 2018-02-07 2018-03-07 2018-04-06 2018-05-11 2018-06-15 2019-06-15 de Estudios de Pre inversión Based Selection Implementation which US.3.0 million is Bank- para el Centro Histórico fina nced) Component 2: Improvement of PE-COPESCO-26892-CS-QCBS Mobility in Cusco Provincial Quality And Cost- Pending / Estudios para el Intercambiador IBRD / 83390 Municipality (US3.6 million, of Post Open - International 310,000.00 0.00 2017-12-04 2017-12-25 2018-02-07 2018-03-07 2018-04-06 2018-05-11 2018-06-15 2019-06-15 Based Selection Implementation vial which US.3.0 million is Bank- fina nced) Component 2: Improvement of PE-COPESCO-26893-CS-QCBS Mobility in Cusco Provincial Quality And Cost- Pending / Estudios para el Sistema IBRD / 83390 Municipality (US3.6 million, of Post Open - International 355,000.00 0.00 2017-12-04 2017-12-25 2018-02-07 2018-03-07 2018-04-06 2018-05-11 2018-06-15 2019-06-15 Based Selection Implementation Integrado de Transporte which US.3.0 million is Bank- fina nced) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4: Project PE-COPESCO-26884-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Prior Open 186,621.00 0.00 2015-07-06 2015-08-24 2015-09-14 2015-10-19 2016-04-16 / Oficial de legal This amount is financed by local Selection Implementation counterpart contributions Component 2: Improvement of PE-COPESCO-26908-CS-INDV Mobility in Cusco Provincial Individual Consultant Pending / Asistente en Plan de Movilidad IBRD / 83390 Municipality (US3.6 million, of Post Limited 8,694.00 0.00 2017-01-16 2017-01-21 2017-02-11 2017-03-18 2017-09-14 Selection Implementation (2) which US.3.0 million is Bank- fina nced) Component 2: Improvement of PE-COPESCO-26898-CS-INDV Mobility in Cusco Provincial Individual Consultant Pending / ASISTENTE EN REDES IBRD / 83390 Municipality (US3.6 million, of Post Open 8,666.00 0.00 2017-07-03 2017-08-21 2017-09-11 2017-10-16 2018-04-14 Selection Implementation PEATONALES which US.3.0 million is Bank- fina nced) Component 4: Project PE-COPESCO-26920-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Post Open 46,276.00 0.00 2017-01-16 2017-03-06 2017-03-27 2017-05-01 2017-10-28 / Auxiliar de contrataciones 1 This amount is financed by local Selection Implementation counterpart contributions Component 4: Project PE-COPESCO-27182-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Post Limited 46,276.00 0.00 2017-01-16 2017-01-21 2017-02-11 2017-03-18 2017-09-14 / Auxiliar de contrataciones 2 This amount is financed by local Selection Implementation counterpart contributions Component 2: Improvement of Mobility in Cusco Provincial PE-COPESCO-26825-CS-INDV Individual Consultant Pending IBRD / 83390 Municipality (US3.6 million, of Post Open 38,228.00 0.00 2017-01-16 2017-03-06 2017-03-27 2017-05-01 2017-10-28 / Asistente de quejas y reclamos Selection Implementation which US.3.0 million is Bank- fina nced) Component 4: Project PE-COPESCO-26924-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Prior Open 21,176.00 0.00 2016-01-18 2016-03-07 2016-03-28 2016-05-02 2016-10-29 / Oficial de adquisiciones UGP This amount is financed by local Selection Implementation counterpart contributions Component 4: Project PE-COPESCO-27171-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Prior Open 21,176.00 0.00 2015-12-03 2016-01-21 2016-02-11 2016-03-17 2018-12-31 / Oficial financiero This amount is financed by local Selection Implementation counterpart contributions Component 4: Project PE-COPESCO-27188-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Prior Limited 134,086.00 0.00 2016-11-30 2016-12-05 2016-12-26 2017-01-30 2017-07-29 / especialista en Presupuesto This amount is financed by local Selection Implementation counterpart contributions Page 2 Component 2: Improvement of Mobility in Cusco Provincial PE-COPESCO-26930-CS-INDV Individual Consultant Pending IBRD / 83390 Municipality (US3.6 million, of Post Limited 93,103.00 0.00 2017-07-03 2017-07-08 2017-07-29 2017-09-02 2018-03-01 / Asesor técnico Selection Implementation which US.3.0 million is Bank- fina nced) Component 2: Improvement of PE-COPESCO-26922-CS-INDV Mobility in Cusco Provincial / Especialista en espacios Individual Consultant Pending IBRD / 83390 Municipality (US3.6 million, of Post Limited 7,776.00 0.00 2017-07-03 2017-07-08 2017-07-29 2017-09-02 2018-03-01 públicos 3 - especialista en Selection Implementation which US.3.0 million is Bank- proyectos estratégicos fina nced) Component 2: Improvement of PE-COPESCO-27175-CS-INDV Mobility in Cusco Provincial Individual Consultant Pending / Asistente en espacios públicos IBRD / 83390 Municipality (US3.6 million, of Post Direct 6,128.00 0.00 2017-08-14 2017-08-24 2017-09-03 2017-09-16 2018-01-14 Selection Implementation 1 - asistente en barrios which US.3.0 million is Bank- fina nced) Component 4: Project PE-COPESCO-26928-CS-INDV management (US$ 1.4 million). Individual Consultant Pending / Especialista en coordinación y IBRD / 83390 Post Open 3,888.00 0.00 2017-07-03 2017-08-21 2017-09-11 2017-10-16 2018-04-14 This amount is financed by local Selection Implementation comunicación social counterpart contributions Component 2: Improvement of Mobility in Cusco Provincial PE-COPESCO-26929-CS-INDV Individual Consultant Pending IBRD / 83390 Municipality (US3.6 million, of Post Limited 86,000.00 0.00 2017-11-06 2017-11-11 2017-12-02 2018-01-06 2018-07-05 / ASESOR DE PROYECTOS Selection Implementation which US.3.0 million is Bank- fina nced) Component 2: Improvement of Mobility in Cusco Provincial PE-COPESCO-27157-CS-INDV Individual Consultant Pending IBRD / 83390 Municipality (US3.6 million, of Post Open 14,000.00 0.00 2017-10-09 2017-11-07 2017-11-12 2017-12-04 2018-11-29 / ASISTENTE ADMINISTRATIVO Selection Implementation which US.3.0 million is Bank- fina nced) Component 4: Project PE-COPESCO-26912-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Post Limited 13,793.00 0.00 2017-07-03 2017-07-08 2017-07-29 2017-09-02 2018-03-01 / Procurador - PRODER This amount is financed by local Selection Implementation counterpart contributions Component 2: Improvement of Mobility in Cusco Provincial PE-COPESCO-26918-CS-INDV Individual Consultant Pending IBRD / 83390 Municipality (US3.6 million, of Post Limited 29,790.00 0.00 2015-12-15 2015-12-20 2016-01-10 2016-02-14 2016-08-12 / Asistente Administrativo Selection Implementation which US.3.0 million is Bank- fina nced) Component 2: Improvement of Mobility in Cusco Provincial PE-COPESCO-26879-CS-INDV Individual Consultant Pending IBRD / 83390 Municipality (US3.6 million, of Post Limited 32,549.00 0.00 2016-02-17 2016-02-22 2016-03-14 2016-04-18 2016-10-15 / Administrador Técnico Selection Implementation which US.3.0 million is Bank- fina nced) Component 2: Improvement of Mobility in Cusco Provincial PE-COPESCO-26899-CS-INDV Individual Consultant Pending IBRD / 83390 Municipality (US3.6 million, of Post Limited 29,480.00 0.00 2016-02-17 2016-02-22 2016-03-14 2016-04-18 2016-10-15 / Especialista de GIS Selection Implementation which US.3.0 million is Bank- fina nced) Component 2: Improvement of PE-COPESCO-26890-CS-INDV Mobility in Cusco Provincial Individual Consultant Pending / Especialista en Planes de IBRD / 83390 Municipality (US3.6 million, of Post Limited 13,930.00 0.00 2016-02-17 2016-02-22 2016-03-14 2016-04-18 2016-10-15 Selection Implementation Movilidad (1) which US.3.0 million is Bank- fina nced) Component 2: Improvement of PE-COPESCO-27185-CS-INDV Mobility in Cusco Provincial Individual Consultant Pending / Especialista en Planes de IBRD / 83390 Municipality (US3.6 million, of Post Open 19,806.00 0.00 2016-02-17 2016-03-12 2016-03-17 2016-04-01 2016-05-31 Selection Implementation Movilidad - movilidad Urbana which US.3.0 million is Bank- fina nced) Component 2: Improvement of PE-COPESCO-27195-CS-INDV Mobility in Cusco Provincial / Asistente en espacios públicos Individual Consultant Pending IBRD / 83390 Municipality (US3.6 million, of Post Limited 6,128.00 0.00 2016-02-17 2016-02-22 2016-03-14 2016-04-18 2016-10-15 1 - asistente en en redes Selection Implementation which US.3.0 million is Bank- peatonales fina nced) Component 2: Improvement of PE-COPESCO-26888-CS-INDV Mobility in Cusco Provincial Individual Consultant Pending / Especialista en Espacios IBRD / 83390 Municipality (US3.6 million, of Post Limited 3,971.00 0.00 2016-02-17 2016-03-02 2016-03-22 2016-04-26 2017-04-26 Selection Implementation Públicos which US.3.0 million is Bank- fina nced) Component 2: Improvement of PE-COPESCO-26880-CS-INDV Mobility in Cusco Provincial Individual Consultant Pending / Especialista en Espacios IBRD / 83390 Municipality (US3.6 million, of Post Limited 11,775.00 0.00 2016-02-17 2016-02-22 2016-03-14 2016-04-18 2016-10-15 Selection Implementation Públicos (3) which US.3.0 million is Bank- fina nced) Component 4: Project PE-COPESCO-26907-CS-INDV management (US$ 1.4 million). Individual Consultant Pending / Asistente de Coordinación y IBRD / 83390 Post Open 4,922.00 0.00 2016-02-17 2016-04-06 2016-04-27 2016-06-01 2016-11-28 This amount is financed by local Selection Implementation Comunicación counterpart contributions Component 4: Project PE-COPESCO-26925-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Prior Open 191,269.00 0.00 2014-11-03 2014-12-22 2015-01-12 2015-02-16 2015-08-15 / Oficial de Gestión Ambiental - This amount is financed by local Selection Implementation counterpart contributions Component 4: Project PE-COPESCO-26905-CS-INDV management (US$ 1.4 million). Individual Consultant Pending / Oficial de Monitoreo y IBRD / 83390 Prior Open 101,500.00 0.00 2017-07-03 2017-08-21 2017-09-11 2017-10-16 2018-04-14 This amount is financed by local Selection Implementation Supervisión counterpart contributions Component 4: Project PE-COPESCO-27178-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Prior Limited 11,442.00 0.00 2015-09-16 2015-09-21 2015-10-12 2015-11-16 2016-05-14 / Contador This amount is financed by local Selection Implementation counterpart contributions Component 4: Project PE-COPESCO-26910-CS-INDV management (US$ 1.4 million). Individual Consultant Pending / Especialista en IBRD / 83390 Prior Open 140,341.00 0.00 2016-10-31 2016-12-19 2017-01-09 2017-02-13 2017-08-12 This amount is financed by local Selection Implementation Comunicaciones counterpart contributions Page 3 Component 4: Project PE-COPESCO-26881-CS-INDV management (US$ 1.4 million). Individual Consultant Pending / Especialista en Administración IBRD / 83390 Prior Limited 139,827.00 0.00 2016-02-23 2016-02-28 2016-03-20 2016-04-24 2016-10-21 This amount is financed by local Selection Implementation de Contratos counterpart contributions Component 4: Project PE-COPESCO-26885-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Prior Open 128,116.00 0.00 2015-09-28 2015-11-16 2015-12-07 2016-01-11 2016-07-09 / Asistente de Adquisiciones This amount is financed by local Selection Implementation counterpart contributions Component 4: Project PE-COPESCO-26914-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Post Open 141,656.00 0.00 2015-09-16 2015-11-04 2015-11-25 2015-12-30 2016-06-27 / Asistente de Contaduría This amount is financed by local Selection Implementation counterpart contributions Component 4: Project PE-COPESCO-26902-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Prior Open 146,691.00 0.00 2016-02-22 2016-04-11 2016-05-02 2016-06-06 2016-12-03 / Coordinador Técnico METRA This amount is financed by local Selection Implementation counterpart contributions Component 4: Project PE-COPESCO-26919-CS-INDV management (US$ 1.4 million). Individual Consultant Pending / Especialista en Infraestructura IBRD / 83390 Prior Open 149,537.00 0.00 2015-11-23 2016-01-11 2016-02-01 2016-03-07 2016-09-03 This amount is financed by local Selection Implementation METRA counterpart contributions Component 4: Project PE-COPESCO-26901-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Post Limited 127,034.00 0.00 2016-04-14 2016-04-19 2016-05-10 2016-06-14 2016-12-11 / Especialista en SNIP This amount is financed by local Selection Implementation counterpart contributions Component 4: Project PE-COPESCO-26903-CS-INDV management (US$ 1.4 million). Individual Consultant Pending / Asistente de Gestión Social - IBRD / 83390 Post Open 95,947.00 0.00 2015-11-27 2016-01-15 2016-02-05 2016-03-11 2016-09-07 This amount is financed by local Selection Implementation METRA counterpart contributions Component 4: Project PE-COPESCO-26923-CS-INDV management (US$ 1.4 million). Individual Consultant Pending / Asistente de Gestión Ambiental IBRD / 83390 Post Open 94,668.00 0.00 2015-11-27 2016-01-15 2016-02-05 2016-03-11 2016-09-07 This amount is financed by local Selection Implementation - METRA counterpart contributions Component 4: Project PE-COPESCO-26916-CS-INDV management (US$ 1.4 million). Individual Consultant Pending / Asistente de Comunicaciones- IBRD / 83390 Post Limited 95,040.00 0.00 2016-12-06 2016-12-11 2017-01-01 2017-02-05 2017-08-04 This amount is financed by local Selection Implementation Difusión counterpart contributions Component 4: Project PE-COPESCO-26886-CS-INDV management (US$ 1.4 million). Individual Consultant Pending IBRD / 83390 Post Open 75,787.00 0.00 2016-09-29 2016-11-17 2016-12-08 2017-01-12 2017-07-11 / Asistente de infraestructura This amount is financed by local Selection Implementation counterpart contributions Component 2: Improvement of Mobility in Cusco Provincial PE-COPESCO-26887-CS-INDV Individual Consultant Pending IBRD / 83390 Municipality (US3.6 million, of Post Limited 6,128.00 0.00 2017-08-07 2017-08-12 2017-09-02 2017-10-07 2018-04-05 / Asistente plan de Movilidad 2 Selection Implementation which US.3.0 million is Bank- fina nced) Component 2: Improvement of PE-COPESCO-26900-CS-INDV Mobility in Cusco Provincial Individual Consultant Pending / Consultoría Calidad Ambiental y IBRD / 83390 Municipality (US3.6 million, of Post Limited 28,276.00 0.00 2016-07-04 2016-07-09 2016-07-30 2016-09-03 2017-03-02 Selection Implementation Balance Energético which US.3.0 million is Bank- fina nced) Component 4: Project PE-COPESCO-26913-CS-INDV management (US$ 1.4 million). Individual Consultant Pending / Asistente Administrativo - IBRD / 83390 Post Limited 72,337.00 0.00 2015-12-15 2015-12-20 2016-01-10 2016-02-14 2016-08-12 This amount is financed by local Selection Implementation PRODER counterpart contributions Component 2: Improvement of PE-COPESCO-27177-CS-INDV Mobility in Cusco Provincial Individual Consultant Pending / ASISTENTE EN ESPACIOS IBRD / 83390 Municipality (US3.6 million, of Post Open 7,443.00 0.00 2017-08-07 2017-09-05 2017-09-10 2017-09-30 2017-12-29 Selection Implementation PUBLICOS which US.3.0 million is Bank- fina nced) Component 3: Institutional PE-COPESCO-27194-CS-INDV Strengthening and Monitoring Individual Consultant Pending / Especialista en Movilidad - IBRD / 83390 and Evaluation (US$ 4.6 million, Post Open 51,840.00 0.00 2016-07-26 2016-08-29 2016-09-03 2016-09-18 2018-09-08 Selection Implementation Especialista en PRODER of which US$4.3 million is Bank- financed) Component 4: Project PE-COPESCO-26917-CS-INDV management (US$ 1.4 million). Individual Consultant Pending / Coordinador de Salvaguardas IBRD / 83390 Prior Open 148,275.00 0.00 2016-06-15 2016-08-03 2016-08-24 2016-09-28 2017-03-27 This amount is financed by local Selection Implementation Ambientales counterpart contributions Component 4: Project PE-COPESCO-26931-CS-INDV management (US$ 1.4 million). Individual Consultant Pending / Asistente de Comunicaciones IBRD / 83390 Post Open 67,264.00 0.00 2016-12-16 2017-02-03 2017-02-24 2017-03-31 2017-09-27 This amount is financed by local Selection Implementation Edicion - METRA counterpart contributions Component 2: Improvement of PE-COPESCO-25643-CS-INDV Mobility in Cusco Provincial Individual Consultant Pending / Consultoría Calidad Ambiental y IBRD / 83390 Municipality (US3.6 million, of Post Open 28,276.00 0.00 2017-08-28 2017-10-01 2017-10-06 2017-10-26 2017-12-25 Selection Implementation balance energético which US.3.0 million is Bank- fina nced) Page 4