75361 1 2 2/14/2013 15:56 4 5 6 7 8 9 10 11 12 13 14 17 35 Co-financing USD (million) Sub-category Click to sort Pakistan Bid document Estimated Cost in USD Tranche # Click to sort IBRD Financing Share IBRD/IDA Financing Procurement Ref. # Natural Gas Efficiency Project submission Selection Method Unit Cost in USD Type-Category Bank Review USD (million) SSGC DRAFT Procurement Plan (million) # Units SSGC # Lots As of date in file name Click to sort Completion Scroll right for graphic representations Click to sort. (Columns may In sorting meny use choise on top (Sort A to Z) be hidden) APP T1 High-efficiency Consumer Appliances 4 WB0079 G 1 - - 100% ICB Prior 27-Feb-12 02-Nov-12 CP T1 Deep Well Ground Bed 1 WB0015 G 70 - - 100% ICB Post 31-Mar-11 2-Dec-11 CP T1 Magnesium Anodes 1 WB0010 G 550 - - 100% NCB Post 31-Mar-11 21-Nov-11 Power Sources CP T1 1 WB0036 G 12 - - 100% ICB Post 14-Apr-11 16-Dec-11 Solar CP T1 CP Survey Equipment 1 WB0033 G 15 - - 100% ICB Post 29-Apr-11 31-Dec-11 CP T1 Battery Backup System 1 WB0028 G 33 - - 100% ICB Post 15-May-11 17-Jan-12 CP T1 CP Remote Monitoring 1 WB0034 G 70 - - 100% ICB Post 15-May-11 16-Jan-12 CP T1 Road Restoration (Cathodic Protection) 1 WB0039 W 65 - - 0% ICB Post 15-May-11 16-Jan-12 CP T1 Pipe Recoating Installation 1 WB0038 W 65 - - 0% NCB Post 15-May-11 16-Jan-12 CP T1 Pipe coating Material 1 WB0023 G 65 - - 100% ICB Post 30-May-11 5-Feb-12 Bulk Meters -TBSs METER T1 6 WB0022 G 78 - - 100% ICB Post 14-Apr-11 19-Dec-11 AAT-140- (12), T60 (20), T-35(50), T-18 (50) METER T1 Testing Laboratory 1 WB0041 G 1 - - 100% ICB Post 1-May-11 05-Jan-12 Turbine meters METER T1 2 WB0020 G 54 - - 100% ICB Post 15-May-11 19-Jan-12 (230M) & (60M) Ultrasonic Meters METER T1 1 WB0021 G 2,500 - - 100% ICB Post 15-May-11 19-Jan-12 2000 cft./hr. & 800 cft./hr. METER T1 Filter Assembly 1 WB0026 G 12 - - 100% ICB Post 15-May-11 17-Jan-12 Gas Chronomatographs METER T1 1 WB0027 G 5 - - 100% ICB Post 15-May-11 17-Jan-12 Portable GC & GC up to C12 Analyzers Provers METER T1 Large workshop prover, Medium field prover, Small field 3 WB0025 G 10 - - 100% ICB Post 15-May-11 17-Jan-12 prover METER T1 Sonic Nozzle Prover and Test Bench 2 WB0037 G 9 - - 100% ICB Post 15-May-11 16-Jan-12 METER T1 Video Monitoring/Surveillance/Data Acquisition 2 WB0035 G 504 - - 100% ICB Post 15-May-11 16-Jan-12 Service Connection Equipment OVER T1 ML Cocks, Service Valves, Service Tees, Regulators / 4 WB0007 G 1 - - 100% ICB Prior 15-May-11 19-Jan-12 Swivels, Die Tools Overhead Leak Detection Work OVER T1 1 WB0031 W 1 - - 0% NCB Post 15-May-11 18-Jan-12 Outsourcing Component GI Pipe OVER T1 1 WB0005 G 68,405 - - 100% NCB Post 30-May-11 16-Jan-12 BS 1387 Medium Grade 1/2" diameter PRESS T1 Automatic Pressure Management Equipment 1 WB0001 G 100 - - 100% ICB Post 19-Feb-11 25-Oct-11 PRESS T1 Turbine Meters / Regulators / Recorders - Pressure 3 WB0002 G 100 - - 100% ICB Post 15-Apr-11 21-Dec-11 Gauges PRESS T1 Pressure Recorder 100 Btr, Pressure Gauges (0-50, 0-100) 2 WB0018 G 77 - - 100% NCB Post 15-Apr-11 5-Nov-11 Digital, Pressure Gauges (0-50, 0-100), Master & Slave TA T1 Appliance Pilot Project Consultant 1 TA 1 - - 100% ICB Post 1-Apr-11 22-Jul-13 TA T1 Training & Capacity Building ? WB0043 T 1 - - 100% ICB Post 1-Apr-11 06-Dec-11 TA T1 Technical Audit 1 WB0040 TA 1 - - 100% ICB Post 1-Apr-11 18-Nov-11 TA T1 Owner's Engineer 1 TA 1 - - 100% ICB Prior 1-Jun-11 30-Jun-16 TA T1 Customer Satisfaction Survey 1 TA 1 - - 100% NCB Post 2-Jun-11 18-Feb-12 TA T1 Equipment to Gas Training Institute (Goods) ? G 1 - - 100% ICB Post 7-Jun-11 29-Mar-12 TA T1 Lender's Engineer 1 TA 1 - - 100% ICB Prior 1-Jul-11 30-Jun-16 UNDER T1 Electro Fusion, Butt Fusion Machines w/access. 4 WB0009 G 50 - - 100% ICB Post 26-Mar-11 1-Dec-11 UNDER T1 Fittings 5 WB0061 G 1 - - 100% ICB Post 30-Mar-11 04-Dec-11 UNDER T1 Underground Leak Rectification Material ? WB0030 G 1 - - 100% ICB Post 30-Mar-11 03-Dec-11 UNDER T1 MS Pipe 6 WB0004 G 327,308 - - 100% ICB Post 30-Mar-11 01-Dec-11 UNDER T1 Construction Work 1 WB0024 W 1 - - 30% NCB Prior 1-Apr-11 8-Dec-11 Air Compressors UNDER T1 1 WB0013 G 10 - - 100% ICB Post 1-Apr-11 6-Dec-11 100 PSI. Vehicles / Transport UNDER T1 Pick-up 4x2 - Large / Plain Truck / Crane Mounted Truck / 7 WB0016 G 70 - - 100% NCB Post 1-Apr-11 3-Dec-11 Hi-Roof / Jeeps / Pickups -Small / Motorcycles Welding Plant UNDER T1 1 WB0011 G 15 - - 100% NCB Post 15-Apr-11 6-Dec-11 400 AMP UNDER T1 Vehicle Mounted Leak Survey Equipment ? WB0019 G 3 - - 100% ICB Post 1-May-11 9-Dec-11 De-Watering Pumps UNDER T1 1 WB0014 G 10 - - 100% NCB Post 15-May-11 5-Jan-12 4 x4 Suction & Delivery. UNDER T1 Electric Generators 1 WB0012 G 50 - - 100% NCB Post 30-May-11 3-Feb-12 Under Ground Leak Rectification/Replacement Ditching, UNDER T1 1 WB0032 W 1 - - 30% ICB Post 30-May-11 02-Feb-12 Backfiling, PE Road Reinstatement Pipe (PE-100) UNDER T1 5 WB0003 G 1,468,833 - - 100% ICB Prior 30-May-11 31-Jan-12 250mm / 180mm / 125mm / 63mm / 40mm / 20mm APP T2 High-efficiency Consumer Appliances 4 WB0129 G 1 - - 100% ICB Prior 27-Feb-13 03-Nov-13 CP T2 Battery Backup System 1 WB0071 G 50 - - 100% ICB Post 1-May-12 05-Jan-13 Power Sources CP T2 1 WB0072 G 24 - - 100% ICB Post 1-May-12 05-Jan-13 Solar CP T2 CP Survey Equipment 1 WB0075 G 10 - - 100% ICB Post 1-May-12 04-Jan-13 CP T2 Pipe coating Material 1 WB0051 G 90 - - 100% ICB Post 1-May-12 04-Jan-13 CP T2 CP Remote Monitoring 1 WB0074 G 120 - - 100% ICB Post 1-May-12 02-Jan-13 CP T2 Deep Well Ground Bed 1 WB0055 G 90 - - 100% ICB Post 1-May-12 02-Jan-13 CP T2 Pipe Recoating Installation 1 WB0076 W 90 - - 0% ICB Post 1-May-12 02-Jan-13 CP T2 Magnesium Anodes 1 WB0052 G 900 - - 100% NCB Post 1-May-12 17-Dec-12 CP T2 Road Restoration (Cathodic Protection) 1 WB0084 W 90 - - 0% ICB Post 15-May-12 17-Jan-13 Bulk Meters -TBSs METER T2 6 WB0088 G 77 - - 100% ICB Post 15-May-12 17-Jan-13 AAT-140- (12), T60 (20), T-35(50), T-18 (50) Turbine meters METER T2 2 WB0069 G 54 - - 100% ICB Post 15-May-12 16-Jan-13 (230M) & (60M) Ultrasonic Meters METER T2 2 WB0070 G 2,500 - - 100% ICB Post 15-May-12 16-Jan-13 2000 cft./hr. & 800 cft./hr. METER T2 Video Monitoring/Surveillance/Data Acquisition 2 WB0077 G 504 - - 100% ICB Post 15-May-12 16-Jan-13 METER T2 Filter Assembly 1 WB0073 G 12 - - 100% NCB Post 15-May-12 03-Jan-13 1 2 2/14/2013 15:56 4 5 6 7 8 9 10 11 12 13 14 17 35 Co-financing USD (million) Sub-category Click to sort Pakistan Bid document Estimated Cost in USD Tranche # Click to sort IBRD Financing Share IBRD/IDA Financing Procurement Ref. # Natural Gas Efficiency Project submission Selection Method Unit Cost in USD Type-Category Bank Review USD (million) SSGC DRAFT Procurement Plan (million) # Units SSGC # Lots As of date in file name Click to sort Completion Scroll right for graphic representations Click to sort. (Columns may In sorting meny use choise on top (Sort A to Z) be hidden) Service Connection Equipment OVER T2 4 WB0062 G 1 - - 100% ICB Prior 15-May-12 19-Jan-13 Service ML Cocks, Leak Overhead Work Tees, Regulators / Valves, Service Detection OVER T2 1 WB0082aW 1 - - 0% NCB Post 15-May-12 02-Jan-13 Outsourcing GI Pipe Component OVER T2 1 WB0058 G 86,400 - - 100% NCB Post 15-May-12 26-Dec-12 BS 1387 Medium Grade 1/2" diameter PRESS T2 Automatic Pressure Management Equipment 1 WB0050 G 150 - - 100% ICB Post 15-May-12 20-Jan-13 Turbine Meters / Regulators / Recorders - Pressure PRESS T2 3 WB0085 G 150 - - 100% ICB Prior 30-May-12 01-Feb-13 Management Gauges PRESS T2 2 WB0059 G 77 - - 100% NCB Post 30-May-12 18-Jan-13 Pressure Recorder 100 Btr, Pressure Gauges (0-50, 0-100) TA T2 Training & Capacity Building ? WB0093 T 1 - - 100% ICB Post 30-May-12 03-Feb-13 TA T2 Technical Audit 1 WB0087 TA 1 - - 100% ICB Post 30-May-12 01-Feb-13 TA T2 Customer Satisfaction Survey 1 TA 1 - - 100% NCB Post 1-Jun-12 24-Feb-13 UNDER T2 Electro Fusion, Butt Fusion Machines w/access. 4 WB0092 G 20 - - 100% ICB Post 1-Jun-12 6-Feb-13 Fittings UNDER T2 Transition Fittings, Stopple Fittings, Electro Fusion Fittings, 5 WB0111 G 1 - - 100% ICB Post 1-Jun-12 05-Feb-13 Poly Pigs, GI & Weld Fittings , Valves with gaskits UNDER T2 Electric Generators 1 WB0091 G 30 - - 100% NCB Post 1-Jun-12 5-Feb-13 Air Compressors UNDER T2 1 WB0067 G 10 - - 100% ICB Post 1-Jun-12 04-Feb-13 100 PSI. Construction Work Ditching, pipe laying, testing, commissioning, shifting of UNDER T2 1 WB0083 W 1 - - 30% NCB Prior 1-Jun-12 03-Feb-13 services & meters, backfilling, permissions and road restoration De-Watering Pumps UNDER T2 1 WB0068 G 10 - - 100% NCB Post 1-Jun-12 20-Jan-13 4 x4 Suction & Delivery. Welding Plant UNDER T2 1 WB0065 G 15 - - 100% ICB Post 15-Jun-12 19-Feb-13 400 AMP Vehicles / Transport UNDER T2 Pick-up 4x2 - Large / Plain Truck / Crane Mounted Truck / 7 WB0080 G 70 - - 100% NCB Post 15-Jun-12 17-Feb-13 Hi-Roof / Jeeps / Pickups -Small / Motorcycles Under Ground Leak Rectification/Replacement Ditching, UNDER T2 1 WB0086 W 1 - - 30% ICB Post 15-Jun-12 17-Feb-13 Backfiling, Road Reinstatement PE Pipe (PE-100) UNDER T2 5 WB0056 G 1,795,400 - - 100% ICB Prior 15-Jun-12 16-Feb-13 250mm / 180mm / 125mm / 63mm / 40mm / 20mm MS Pipe UNDER T2 6 WB0057 G 406,020 - - 100% ICB Post 15-Jun-12 08-Feb-13 API5L Grade "B" 3/4" / 1" / 2" / 4" / 6" / 8" dia meter. UNDER T2 Vehicle Mounted Leak Survey Equipment ? WB0064 G 3 - - 100% NCB Post 15-Jun-12 03-Feb-13 UNDER T2 Underground Leak Rectification Material ? WB0090 G 1 - - 100% ICB Post 15-Jun-12 02-Feb-13 APP T3 High-efficiency Consumer Appliances 4 WB0179 G 1 - - 100% ICB Prior 27-Feb-14 03-Nov-14 CP T3 Battery Backup System 1 WB0121 G 65 - - 100% ICB Post 1-May-13 05-Jan-14 Power Sources CP T3 1 WB0122 G 36 - - 100% ICB Post 1-May-13 05-Jan-14 Solar CP T3 CP Survey Equipment 1 WB0225 G 5 - - 100% ICB Post 1-May-13 04-Jan-14 CP T3 Pipe coating Material 1 WB0101 G 115 - - 100% ICB Post 1-May-13 04-Jan-14 CP T3 CP Remote Monitoring 1 WB0124 G 150 - - 100% ICB Post 1-May-13 02-Jan-14 CP T3 Deep Well Ground Bed 1 WB0105 G 80 - - 100% ICB Post 1-May-13 02-Jan-14 CP T3 Pipe Recoating Installation 1 WB0126 W 115 - - 0% ICB Post 1-May-13 02-Jan-14 CP T3 Magnesium Anodes 1 WB0102 G 1,200 - - 100% NCB Post 1-May-13 17-Dec-13 CP T3 Road Restoration (Cathodic Protection) 1 WB0134 W 115 - - 0% ICB Post 15-May-13 17-Jan-14 Bulk Meters -TBSs METER T3 6 WB0138 G 77 - - 100% ICB Post 15-May-13 17-Jan-14 AAT-140- (12), T60 (20), T-35(50), T-18 (50) Turbine meters METER T3 2 WB0119 G 54 - - 100% ICB Post 15-May-13 16-Jan-14 (230M) & (60M) Ultrasonic Meters METER T3 2 WB0120 G 2,500 - - 100% ICB Post 15-May-13 16-Jan-14 2000 cft./hr. & 800 cft./hr. METER T3 Video Monitoring/Surveillance/Data Acquisition 2 WB0127 G 504 - - 100% ICB Post 15-May-13 16-Jan-14 METER T3 Filter Assembly 1 WB0123 G 12 - - 100% NCB Post 15-May-13 03-Jan-14 Service Connection Equipment OVER T3 ML Cocks, Service Valves, Service Tees, Regulators / 4 WB0112 G 1 - - 100% ICB Prior 15-May-13 19-Jan-14 Swivels, Die Tools 1 2 2/14/2013 15:56 4 5 6 7 8 9 10 11 12 13 14 17 35 Co-financing USD (million) Sub-category Click to sort Pakistan Bid document Estimated Cost in USD Tranche # Click to sort IBRD Financing Share IBRD/IDA Financing Procurement Ref. # Natural Gas Efficiency Project submission Selection Method Unit Cost in USD Type-Category Bank Review USD (million) SSGC DRAFT Procurement Plan (million) # Units SSGC # Lots As of date in file name Click to sort Completion Scroll right for graphic representations Click to sort. (Columns may In sorting meny use choise on top (Sort A to Z) be hidden) Overhead Leak Detection Work OVER T3 1 WB0131 W 1 - - 0% NCB Post 15-May-13 18-Jan-14 Outsourcing Component GI Pipe OVER T3 1 WB0108 G 86,400 - - 100% NCB Post 15-May-13 26-Dec-13 BS 1387 Medium Grade 1/2" diameter PRESS T3 Automatic Pressure Management Equipment 1 WB0078 G 150 - - 100% ICB Post 15-May-13 18-Jan-14 Turbine Meters / Regulators / Recorders - Pressure PRESS T3 3 WB0135 G 150 - - 100% ICB Prior 30-May-13 01-Feb-14 Management Gauges PRESS T3 2 WB0109 G 76 - - 100% NCB Post 30-May-13 18-Jan-14 Pressure Recorder 100 Btr, Pressure Gauges (0-50, 0-100) TA T3 Technical Audit 1 WB0137 TA 1 - - 100% ICB Post 30-May-13 01-Feb-14 TA T3 Training & Capacity Building ? WB0130b T 1 - - 100% ICB Post 30-May-13 31-Jan-14 TA T3 Customer Satisfaction Survey 1 TA 1 - - 100% NCB Post 2-Jun-13 04-Mar-14 UNDER T3 Electro Fusion, Butt Fusion Machines w/access. 4 WB0066 G 10 - - 100% ICB Post 1-Jun-13 05-Feb-14 Fittings UNDER T3 Transition Fittings, Stopple Fittings, Electro Fusion Fittings, 5 WB0161 G 1 - - 100% ICB Post 1-Jun-13 05-Feb-14 Poly Pigs, GI & Weld Fittings , Valves with gaskits UNDER T3 Electric Generators 1 WB0141 G 20 - - 100% NCB Post 1-Jun-13 5-Feb-14 Air Compressors UNDER T3 1 WB0117 G 10 - - 100% ICB Post 1-Jun-13 04-Feb-14 100 PSI. Construction Work UNDER T3 1 WB0133 W 1 - - 30% NCB Prior 1-Jun-13 03-Feb-14 laying, testing, commissioning, shifting of Ditching, pipe Pumps De-Watering UNDER T3 1 WB0118 G 10 - - 100% NCB Post 1-Jun-13 20-Jan-14 4 x4 Suction Vehicles & Delivery. / Transport UNDER T3 6 WB0130 G 49 - - 100% NCB Post 15-Jun-13 17-Feb-14 4x2 - Large Pick-upGround Under Leak/ Plain Truck / Truck / Crane Mounted Ditching, Rectification/Replacement UNDER T3 1 WB0136 W 1 - - 30% ICB Post 15-Jun-13 17-Feb-14 Backfiling, PE Road Reinstatement Pipe (PE-100) UNDER T3 5 WB0106 G 1,795,400 - - 100% ICB Prior 15-Jun-13 16-Feb-14 250mm MS Pipe / 180mm / 125mm / 63mm / 40mm / 20mm UNDER T3 6 WB0107 G 415,402 - - 100% ICB Post 15-Jun-13 08-Feb-14 API5L Grade "B" 3/4" / 1" / 2" / 4" / 6" / 8" dia meter. UNDER T3 Underground Leak Rectification Material ? WB0140 G 1 - - 100% ICB Post 15-Jun-13 02-Feb-14 APP T4 High-efficiency Consumer Appliances 4 WB0229 G 1 - - 100% ICB Prior 27-Feb-15 03-Nov-15 CP T4 Battery Backup System 1 WB0171 G 52 - - 100% ICB Post 1-May-14 05-Jan-15 Power Sources CP T4 1 WB0172 G 24 - - 100% ICB Post 1-May-14 05-Jan-15 Solar CP T4 Pipe coating Material 1 WB0151 G 90 - - 100% ICB Post 1-May-14 04-Jan-15 CP T4 CP Remote Monitoring 1 WB0174 G 130 - - 100% ICB Post 1-May-14 02-Jan-15 CP T4 Deep Well Ground Bed 1 WB0155 G 80 - - 100% ICB Post 1-May-14 02-Jan-15 CP T4 Pipe Recoating Installation 1 WB0176 W 90 - - 0% NCB Post 1-May-14 02-Jan-15 CP T4 Magnesium Anodes 1 WB0152 G 950 - - 100% NCB Post 1-May-14 17-Dec-14 CP T4 Road Restoration (Cathodic Protection) 1 WB0184 W 90 - - 0% NCB Post 15-May-14 17-Jan-15 Turbine meters METER T4 2 WB0169 G 54 - - 100% ICB Post 15-May-14 16-Jan-15 (230M) & (60M) Ultrasonic Meters METER T4 2 WB0170 G 2,500 - - 100% ICB Post 15-May-14 16-Jan-15 2000 cft./hr. & 800 cft./hr. METER T4 Video Monitoring/Surveillance/Data Acquisition 2 WB0177 G 504 - - 100% ICB Post 15-May-14 16-Jan-15 METER T4 Filter Assembly 1 WB0173 G 12 - - 100% NCB Post 15-May-14 03-Jan-15 Service Connection Equipment OVER T4 ML Cocks, Service Valves, Service Tees, Regulators / 4 WB0162 G 1 - - 100% ICB Prior 15-May-14 19-Jan-15 Swivels, Die Tools OVER T4 Overhead Leak Detection Work 1 WB0181 W 1 - - 0% NCB Post 15-May-14 02-Jan-15 OVER T4 GI Pipe 1 WB0158 G 86,400 - - 100% NCB Post 15-May-14 26-Dec-14 TA T4 Technical Audit 1 WB0187 TA 1 - - 100% ICB Post 30-May-14 01-Feb-15 TA T4 Training & Capacity Building ? WB0180b T 1 - - 100% ICB Post 30-May-14 31-Jan-15 TA T4 Customer Satisfaction Survey 1 TA 1 - - 100% NCB Post 3-Jun-14 12-Mar-15 Fittings UNDER T4 Transition Fittings, Stopple Fittings, Electro Fusion Fittings, 5 WB0006 G 1 - - 100% ICB Post 1-Jun-14 5-Feb-15 Poly Pigs, GI & Weld Fittings , Valves with gaskits Construction Work Ditching, pipe laying, testing, commissioning, shifting of UNDER T4 1 WB0183 W 1 - - 30% NCB Prior 1-Jun-14 03-Feb-15 services & meters, backfilling, permissions and road restoration Under Ground Leak Rectification/Replacement Ditching, UNDER T4 1 WB0186 W 1 - - 30% ICB Post 15-Jun-14 17-Feb-15 Backfiling, Road Reinstatement PE Pipe (PE-100) UNDER T4 5 WB0156 G 1,871,348 - - 100% ICB Prior 15-Jun-14 16-Feb-15 250mm / 180mm / 125mm / 63mm / 40mm / 20mm MS Pipe UNDER T4 6 WB0157 G 415,402 - - 100% ICB Post 15-Jun-14 08-Feb-15 API5L Grade "B" 3/4" / 1" / 2" / 4" / 6" / 8" dia meter. UNDER T4 Underground Leak Rectification Material ? WB0189 G 1 - - 100% ICB Post 15-Jun-14 02-Feb-15 CP T5 Battery Backup System 1 WB0221 G 50 - - 100% ICB Post 1-May-15 05-Jan-16 Power Sources CP T5 1 WB0222 G 24 - - 100% ICB Post 1-May-15 05-Jan-16 Solar CP T5 Pipe coating Material 1 WB0201 G 90 - - 100% ICB Post 1-May-15 04-Jan-16 CP T5 CP Remote Monitoring 1 WB0224 G 130 - - 100% ICB Post 1-May-15 02-Jan-16 CP T5 Deep Well Ground Bed 1 WB0205 G 82 - - 100% ICB Post 1-May-15 02-Jan-16 CP T5 Pipe Recoating Installation 1 WB0226 W 90 - - 0% NCB Post 1-May-15 02-Jan-16 CP T5 Magnesium Anodes 1 WB0202 G 900 - - 100% NCB Post 1-May-15 17-Dec-15 CP T5 Road Restoration (Cathodic Protection) 1 WB0235 W 90 - - 0% NCB Post 15-May-15 17-Jan-16 Turbine meters METER T5 2 WB0219 G 54 - - 100% ICB Post 15-May-15 16-Jan-16 (230M) & (60M) Ultrasonic Meters METER T5 2 WB0220 G 2,500 - - 100% ICB Post 15-May-15 16-Jan-16 2000 cft./hr. & 800 cft./hr. METER T5 Video Monitoring/Surveillance/Data Acquisition 2 WB0227 G 504 - - 100% ICB Post 15-May-15 16-Jan-16 METER T5 Filter Assembly 1 WB0223 G 12 - - 100% NCB Post 15-May-15 03-Jan-16 Service Connection Equipment OVER T5 ML Cocks, Service Valves, Service Tees, Regulators / 4 WB0212 G 1 - - 100% ICB Prior 15-May-15 19-Jan-16 Swivels, Die Tools 1 2 2/14/2013 15:56 4 5 6 7 8 9 10 11 12 13 14 17 35 Co-financing USD (million) Sub-category Click to sort Pakistan Bid document Estimated Cost in USD Tranche # Click to sort IBRD Financing Share IBRD/IDA Financing Procurement Ref. # Natural Gas Efficiency Project submission Selection Method Unit Cost in USD Type-Category Bank Review USD (million) SSGC DRAFT Procurement Plan (million) # Units SSGC # Lots As of date in file name Click to sort Completion Scroll right for graphic representations Click to sort. (Columns may In sorting meny use choise on top (Sort A to Z) be hidden) Overhead Leak Detection Work OVER T5 1 WB0232 W 1 - - 0% NCB Post 15-May-15 02-Jan-16 Outsourcing Component GI Pipe OVER T5 1 WB0208 G 86,400 - - 100% NCB Post 15-May-15 26-Dec-15 BS 1387 Medium Grade 1/2" diameter TA T5 Technical Audit 1 WB0237b TA 1 - - 100% ICB Post 30-May-15 01-Feb-16 1 2 2/14/2013 15:56 4 5 6 7 8 9 10 11 12 13 14 17 35 Co-financing USD (million) Sub-category Click to sort Pakistan Bid document Estimated Cost in USD Tranche # Click to sort IBRD Financing Share IBRD/IDA Financing Procurement Ref. # Natural Gas Efficiency Project submission Selection Method Unit Cost in USD Type-Category Bank Review USD (million) SSGC DRAFT Procurement Plan (million) # Units SSGC # Lots As of date in file name Click to sort Completion Scroll right for graphic representations Click to sort. (Columns may In sorting meny use choise on top (Sort A to Z) be hidden) TA T5 Training & Capacity Building ? WB0231 T 1 - - 100% ICB Post 30-May-15 31-Jan-16 TA T5 Customer Satisfaction Survey 1 TA 1 - - 100% NCB Post 4-Jun-15 19-Mar-16 Fittings UNDER T5 Transition Fittings, Stopple Fittings, Electro Fusion Fittings, 5 WB0211 G 1 - - 100% ICB Post 1-Jun-15 05-Feb-16 Poly Pigs, GI & Weld Fittings , Valves with gaskits Construction Work UNDER T5 1 WB0234 W 1 - - 30% NCB Prior 1-Jun-15 03-Feb-16 Ditching, Leak testing, pipe laying, Under Ground commissioning, shifting Rectification/Replacement of Ditching, UNDER T5 1 WB0237 W 1 - - 30% ICB Post 15-Jun-15 17-Feb-16 Backfiling, PE Road Reinstatement Pipe (PE-100) UNDER T5 5 WB0206 G 1,871,348 - - 100% ICB Prior 15-Jun-15 16-Feb-16 250mm MS Pipe/ 180mm / 125mm / 63mm / 40mm / 20mm UNDER T5 6 WB0207 G 415,402 - - 100% ICB Post 15-Jun-15 08-Feb-16 API5L Grade "B" 3/4" / 1" / 2" / 4" / 6" / 8" dia meter. UNDER T5 Underground Leak Rectification Material ? WB0240 G 1 - - 100% ICB Post 15-Jun-15 02-Feb-16 TOTAL WB SSGC 0.00 0.00 0.00