Page 1 South Sudan HIV/AIDS Commission Procurement Plan 2009-10-11 Goods 3,173,600.00 Services 10,036,000.00 Non-Consultant Services 1,684,000.00 TOTAL 14,893,600.00 Page 2 Country: Government of Southern Sudan (GoSS) Grant No. : TF091518 Project ID No.: P106927 South Sudan HIV/AIDS Project: Southern Sudan Multi Donor Trust Fund HIV-AIDS (SSMA) Project Implementing Agency: South Sudan HIV/AIDS Commission Component 1: Institutional & Capacity Building for SSAC A. Procurement Plan (Revised) for GOODS :Jan 2010-May 2011 Package # Lot # Description Qty Funds (US$) Plan/Actual Proc Method Prior or Post Review Planned vs Actual Prep & Submission by PIA No-objection Date On-line UNDB Gateway Nat Press Bid Invitation Date Bid Closing- Opening Submission Bid Eval Rpt No-objection Date Contract Amount in US$ Date Contract Award Date Contract Signature Opening of LC Arrival of Goods Inspection Final Acceptance Post Plan 15-Jul-09 N/A 22-Jul-09 22-Jul-09 31-Aug-09 7-Sep-09 N/A 240,000 14-Sep-09 21-Sep-09 N/A 20-Nov-09 20-Dec-09 Prior Actual 14-Jun-09 14-Jul-09 31-Jul-09 31-Jul-09 31-Aug-09 16-Oct-09 23-Nov-09 240,000 29-Sep-09 3-Dec-09 Post Plan 20-Sep-09 N/A 27-Sep-09 27-Sep-09 6-Nov-09 13-Nov-09 N/A 398,400 20-Nov-09 27-Nov-09 N/A 26-Jan-10 25-Feb-10 Post Actual 9-Oct-09 2-Nov-10 24-Nov-09 N/A 398,400 25-Nov-09 8-Dec-09 Post Plan 1-Jun-09 11-Jun-09 18-Jun-09 18-Jun-09 18-Jul-09 20-Aug-09 30-Aug-09 444,000 6-Sep-09 13-Sep-09 N/A 12-Nov-09 12-Dec-09 Prior Actual 10-Jun-09 17-Jun-09 23-Jun-09 23-Jun-09 23-Jul-09 17-Sep-09 29-Sep-09 499,703 4-Nov-09 SSAC/G/09/06 (RE- ADVERTISED) Prior Plan 7-Dec-09 N/A 8-Dec-09 11-Dec-09 23-Jan-10 2-Feb-10 12-Feb-10 820,000 28-Feb-10 14-Mar-10 28-Mar-10 27-May-10 10-Jun-10 prior Actual 8-Dec-09 14-Dec-09 14-Dec-09 26-Jan-10 5-Feb-10 Post Plan 7-Dec-09 N/A N/A 9-Dec-09 19-Dec-09 29-Dec-09 N/A 140,000 10-Jan-10 17-Jan-10 19-Jan-10 6-Feb-10 20-Feb-10 Post Actual 8-Dec-09 N/A N/A 9-Dec-09 22-Dec-09 6-Jan-10 N/A 134,800 7-Jan-10 8-Jan-10 Post Plan 7-Dec-09 N/A N/A 9-Dec-09 19-Dec-09 29-Dec-09 N/A 80,000 10-Jan-10 17-Jan-10 19-Jan-10 6-Feb-10 20-Feb-10 Post Actual 8-Dec-09 N/A N/A 9-Dec-09 22-Dec-09 6-Jan-10 N/A 75,800 7-Jan-10 8-Jan-10 Prior Plan 7-Dec-09 N/A N/A 9-Dec-09 19-Dec-09 29-Dec-09 N/A 170,000 10-Jan-10 17-Jan-10 19-Jan-10 2-Jan-10 16-Jan-10 Post Actual 7-Dec-09 N/A N/A 9-Dec-09 22-Dec-09 6-Jan-10 N/A 164,700 7-Jan-10 8-Jan-10 Office Equipment 134,500 Post Plan 3-Dec-09 N/A N/A 9-Dec-09 8-Jan-10 18-Jan-10 N/A 134,500 19-Jan-10 22-Jan-10 24-Jan-10 20-Feb-10 28-Feb-09 1 LaptopComputer/Notebooks @ $2500 22 55,000 Post Actual 10-Dec-09 N/A N/A 11-Dec-09 12-Jan-10 13-Jan-10 N/A 129,900.00 18-Jan-10 22-Jan-10 2 Portable Printers @ $750 4 3,000 3 Scanners @ $500 10 5,000 4 Desktop Computers + UPS @ $1500 25 37,500 5 Photocopiers @ $2500 11 27,500 6 External Hard Drive @ $500 3 1,500 7 Wireless Network Printer @ $5000 1 5,000 Office Furniture 133,700 Sh Post Plan 7-Dec-09 N/A N/A 4-Jan-10 25-Jan-10 4-Feb-10 18-Feb-10 133,700 25-Feb-10 28-Feb-10 N/A 15-Mar-10 29-Mar-10 1 (i) File Cabinets 4 Drawers @ $750 12 9,000 Actual 2 (ii) Executive Tables @ $1500 12 18,000 3 (iii) Executive Chairs @ $700 12 8,400 4 (iv) Book Shelves Medium Sizes @ $1000 24 24,000 5 (v) Visitor’s Chairs @ $500 24 12,000 6 (vi) Office Table @ $1000 12 12,000 7 (vii) Conference Table with 12 Chairs each 1 3,500 8 (viii) Secretarial Table @ $7000 6 42,000 9 (ix) Secretarial Chair @ $300 6 1,800 10 (x) Office Chairs @ $250 12 3,000 VSAT 350,000 DC Prior Plan 15-Dec-09 25-Dec-09 N/A N/A N/A 15-Jan-10 29-Jan-10 350,000 5-Feb-10 8-Feb-10 N/A 9-Apr-10 23-Apr-10 10 350,000 Actual Audio Visual Equipment 6,000 Sh Post Plan 4-Dec-09 N/A N/A 11-Dec-09 18-Dec-09 21-Dec-09 N/A 6,000 28-Dec-09 31-Dec-09 N/A 14-Jan-10 21-Jan-10 (i) TV set 1 500 Actual (ii) DVD set 1 3,000 SSAC/G/2010/1 1 Assorted General Office Supplies & Consumables 155,000.00 Sh Post Plan 6-Jan-10 N/A N/A 5-Jan-10 26-Jan-10 5-Feb-10 N/A 100,000.00 8-Feb-10 15-Feb-10 N/A N/A N/A Actual SSAC/G/2010/2 Accounting Software 100,000.00 NCB Post Plan 7-Jan-10 17-Jan-10 N/A N/A N/A 7-Feb-10 21-Feb-10 155,000.00 28-Feb-10 3-Mar-10 N/A 2-May-10 16-May-10 Actual SSAC/G/2010/3 Other Office Equipment 2,000.00 Sh Post Plan 6-Jan-10 16-Jan-10 N/A N/A N/A 6-Feb-10 20-Feb-10 2,000.00 27-Feb-10 2-Mar-10 N/A 1-May-10 15-May-10 1 Manual Binding Machine 1 1,000.00 Atual 2 Paper Shredder 1 500.00 3 Digital Sender 1 500.00 N/A Airtime for Official Communication N/A 31,000.00 Sh Post Plan 7-Jan-10 17-Jan-10 N/A N/A N/A 7-Feb-10 21-Feb-10 31,000.00 28-Feb-10 3-Mar-10 N/A 2-May-10 16-May-10 Actual Total 3,173,600 30-Jun-11 6 398,400 ICB NCB 10 NCB Contract Implementation Contract Finalization NCB Sh Sh Sh Bid Evaluation Draft Bid Documents, including specs and quantities, Draft SPN Bidding Period Supply and Erect Complete Set of Prefab in Four (4) State offices (CE, WE, EE and Jonglei) Basic Data 4 240,000 SSAC/G/09/01 1,2,-4 NCB SSAC/G/09/05 1 Supply and Erect Complete Set of Prefab in six (6) State Offices (Warrap, LS, UNS, WBG, NBG and Unity) SSAC/G/09/02 Supply of Electric Power Generator 50 kVA 1,2,-6 SSAC/RFQ/09/1 820,000 2 (iii) LCD projector 2 80,000 30 1 Supply of Motor Vehicles Pick-up Double Cabin Wagon (2 Units) Supply of Motorcycles (30 Units) 444,000 16 SSAC/RFQ/09/02 SSAC/G/09/07 1 Supply and Installation of VSAT for SSAC State Offices to be procured through UNOPS 3 SSAC/RFQ/09/03 140,000 1 170,000 2,500 Supply of Motor Vehicles Hardtop Station Wagon (16 Units) Supply of Motor Vehicles Standard Station Wagon (2 Units) 2 3 Page 3 KEY ICB - International Competitive Bidding Sh - Shopping Pr - Pre/Prior NCB - National Competitive Bidding DC - Direct Contracting Approved By: Name: Ezekiel Okwach Position: Procurement Specialist Sign_______________________________Date_______________ Page 4 Procurement Plan-Consultants Contract Type Description* Selection Method L/S or Time-Based Estimated Amount in US$ Prior/ Post Review Plan vs. Actual Prep & Submission by Ex Ag No-objection Date On-line UNDB Gateway Nat Press Lead-time before shortlist Submission Date No-objection Date Invitation Date Submission/ Opening Date Submission Evaluation Report (T) No- objection Evaluation Report (T) Opening Fin Prop Prep Eval Report (T) (F) Negotiations (N) Submission Date No-objection Date Contract Amount in US$ Contract Award Contract Signature Mobilization Adv Payment Draft Report Final Report Final Cost SFB L/s 1,800,000.00 Prior Plan 26-Nov-09 22-Dec-09 9-Feb-10 14days 26-Feb-10 2-Mar-10 4-Mar-10 2-Apr-10 6-Apr-10 12-Apr-10 N/A N/A 15-Apr-10 16-Apr-10 20-Apr-10 1,800,000 23-Apr-10 26-Mar-10 30-Apr-10 30-May-11 15-Jun-11 1,800,000.00 Actual SFB L/s 1,800,000.00 Prior Plan 26-Nov-09 22-Dec-09 9-Feb-10 14days 26-Feb-10 2-Mar-10 4-Mar-10 2-Apr-10 6-Apr-10 12-Apr-10 N/A N/A 15-Apr-10 16-Apr-10 20-Apr-10 1,800,000 23-Apr-10 26-Mar-10 30-Apr-10 30-May-11 15-Jun-11 1,800,000.00 Actual SFB L/s 1,800,000.00 Prior Plan 26-Nov-09 22-Dec-09 9-Feb-10 14days 26-Feb-10 2-Mar-10 4-Mar-10 2-Apr-10 6-Apr-10 12-Apr-10 N/A N/A 15-Apr-10 16-Apr-10 20-Apr-10 1,800,000 23-Apr-10 26-Mar-10 30-Apr-10 30-May-11 15-Jun-11 1,800,000.00 Actual SFB L/s 1,800,000.00 Prior Plan 26-Nov-09 22-Dec-09 9-Feb-10 14days 26-Feb-10 2-Mar-10 4-Mar-10 2-Apr-10 6-Apr-10 12-Apr-10 N/A N/A 15-Apr-10 16-Apr-10 20-Apr-10 1,800,000 23-Apr-10 26-Mar-10 30-Apr-10 30-May-11 15-Jun-11 1,800,000.00 Actual SFB L/s 1,800,000.00 Prior Plan 26-Nov-09 22-Dec-09 9-Feb-10 14days 26-Feb-10 2-Mar-10 4-Mar-10 2-Apr-10 6-Apr-10 12-Apr-10 N/A N/A 15-Apr-10 16-Apr-10 20-Apr-10 1,800,000 23-Apr-10 26-Mar-10 30-Apr-10 30-May-11 15-Jun-11 1,800,000.00 Actual L/S 250,000.00 Post Plan 5-Jan-10 15-Jan-10 25-Jan-10 10days 8-Feb-10 18-Feb-10 25-Feb-10 N/A N/A N/A N/A N/A 10-Apr-10 20-Apr-10 30-Apr-10 250,000.00 5-May-10 19-May-10 2-Jun-10 17-Jul-10 1-Aug-10 Actual CQS L/S 30,000.00 Post Plan 7-Dec-09 N/A 15-Dec-09 14 Days 29-Dec-09 N/A 12-Jan-10 N/A N/A N/A N/A N/A 25-Feb-10 N/A N/A 30,000.00 11-Mar-10 25-Mar-10 8-Apr-10 23-May-10 7-Jun-10 Actual IC L/S 240,000.00 Prior Plan N/A N/A 14-Dec-09 14 Days 28-Dec-09 N/A N/A N/A N/A N/A N/A N/A 11-Jan-10 21-Jan-10 31-Jan-10 240,000.00 25-Jan-10 8-Feb-10 22-Feb-10 8-Apr-10 23-Apr-10 Actual N/A N/A N/A N/A N/A N/A 27-Jul-09 10-Aug-09 17-Sep-09 2-Oct-09 N/A N/A 12/04/2009 IC L/S 240,000.00 Prior Plan N/A N/A 1-Jun-09 14 Days 15-Jun-09 N/A N/A N/A N/A N/A N/A N/A 29-Jun-09 9-Jul-09 19-Jul-09 240,000.00 13-Jul-09 27-Jul-09 10-Aug-09 24-Sep-09 9-Oct-09 Actual N/A N/A N/A N/A N/A N/A 28-Jul-09 5-Aug-09 17-Sep-09 5-Oct-09 N/A N/A 20-Oct-09 22-Oct-09 14-Nov-09 18-Nov-09 23-Nov-09 3-Dec-09 22-Dec-09 22-Nov-10 IC L/S 96,000.00 Post Plan N/A N/A 4-Jan-10 14 Days 18-Jan-10 N/A N/A N/A N/A N/A N/A N/A 1-Feb-10 N/A N/A 96,000.00 15-Feb-10 1-Mar-10 15-Mar-10 29-Apr-10 14-May-10 Actual IC L/S 80,000.00 Post Plan N/A N/A 15-Jan-09 14 Days 29-Jan-09 N/A N/A N/A N/A N/A N/A N/A 12-Feb-09 N/A N/A 80,000.00 26-Feb-09 12-Mar-09 26-Mar-09 10-May-09 25-May-09 Actual Hire of Graphic Artist IC L/S 20,000.00 Post Plan N/A N/A N/A 7days 14-Jan-10 N/A 16-Jan-10 29-Jan-10 N/A N/A N/A N/A 3-Feb-10 N/A N/A 20,000.00 5-Feb-10 10-Feb-10 18-Feb-10 5-Mar-10 12-May-10 Hire of Drivers (4) IC L/S 80,000.00 Post Plan N/A N/A N/A 7days 14-Jan-10 N/A 16-Jan-10 29-Jan-10 N/A N/A N/A N/A 3-Feb-10 N/A N/A 80,000.00 5-Feb-10 10-Feb-10 18-Feb-10 5-Mar-10 12-May-10 Actual Total Cost 10,036,000.00 Plan 10,036,000.00 Actual LEGEND QCBS - Quality and Cost Selection Based SFB - Selection under Fixed Budget CQS - Consultant’s Qualification Selection Based QBS - Quality Based Selection LCS - Least Cost Selection SSS - Single Source Selection Pr - Prior CP - Commercial Practice Ps - Post L/S - Lampsum Procurement of Lead Agency from among the NGOs in SS for Implementation of Programs at Upper Nile/Jonglei Cluster Procurement of Lead Agency from among the NGOs in SS for Implementation of Programs at Warrap/Unity Cluster Procurement of Lead Agency from among the NGOs in SS for Implementation of Programs at Lake/Western Equatoria cluster CQS Hire of Consultants to develop policy framework documents (HCT Training curriculum, HIV/AIDS Maintreamimg Guide, Coordinating guidelines Operational Plan, OVC, Nutritional Guide, IEC materials, Mgt and Governance Systems and Human Rights Act) Procurement of Lead Agency from among the NGOs in SS for Implementation of Programs at Western Bhar/Northern Bhar Ghazal Cluster Hire of Project Procurement Specialist/Consultant Procurement of Lead Agency from among the NGOs in SS for Implementation of Programs at Central/Eastern Equatoria Cluster Consultancy to Develop SSAC Website Hire of Administrative Assistant Hire of M & E Specialist for 6months Hire of Project Financial Management Specialist/Consultant Country: Government of Southern Sudan (GoSS) Implementing Agency: Southern Sudan HIV/AIDS Commission (SSAC) Grant No.: TF 091518 Preparation Request for Proposals Component I: Institutional and Capacity Building of Southern Sudan HIV/AIDS Commission (SSAC) Project/Program: Southern Sudan MDTF HIV/AIDS (SSMA) Project B. Updated Procurement Plan for Consultancy Services for the Period Jan 2010-June 2011 Request for EOI (where required) Contract Implementation Contract Finalization Technical (T) & Financial (F) and Negotions (N) Draft Contract Short List Consultant Proposals 531540PROP0P101REMENT0PLAN1FINAL111.xls 9 of 5 02/24/2010 2:01 AM Page 5 Request for EOI Package No. Description* Qty Proc. Method Estimated Amount in US$ Prior/ Post Review Plan vs. Actual Prep & Submissio n by PIA WB No- objection Date On-line UNDB Gateway Nat Press Bid Invitation Date Bid Closing/ Opening Date Submission of Eval Rpt WB No- objection to Eval Rpt Contarct Amount US$ Contract Award Date Contract Sign Date Opening of LC Service Delivery Date Completion Certificate Date Post Plan 4-Jan-10 N/A N/A 4-Feb-10 18-Feb-10 22-Feb-10 N/A 50,000.00 2-Mar-10 5-Mar-10 8-Mar-10 1-Apr-10 6-Apr-10 Actual L/Sum DC 80,000.00 Post Plan 25-Jan-10 N/A N/A 4-Feb-10 18-Feb-10 22-Feb-10 N/A 80,000.00 2-Mar-10 5-Mar-10 8-Mar-10 1-Apr-10 6-Apr-10 Actual L/Sum S 125,000.00 Post Plan 1-Mar-10 N/A N/A 10-Mar-10 17-Mar-10 18-Mar-10 N/A 125,000.00 21-Mar-10 4-Jun-10 8-Mar-10 1-Apr-10 6-Apr-10 Actual 4 Maintenance of Motor Vehicles, Plant & Equipment L/Sum Preq thro NCB 85,000.00 Post Plan 1-Feb-10 N/A N/A 4-Feb-10 18-Feb-10 22-Feb-10 N/A 85,000.00 2-Mar-10 5-Mar-10 8-Mar-10 1-Apr-10 6-Apr-10 Actual 5 Insurance of Motor Vehicles & Motor Cycles L/Sum NCB 150,000.00 Post Plan 15-Feb-10 N/A N/A 15-Feb-10 22-Feb-10 24-Feb-10 N/A 150,000.00 8-Mar-10 5-Mar-10 8-Mar-10 1-Apr-10 6-Apr-10 Actual 6 Tender Advert ICB & NCB AWNA DC 54,000.00 Prior Plan 4-Jan-10 N/A N/A 8-Jan-10 18-Feb-10 22-Feb-10 N/A 54,000.00 2-Mar-10 5-Mar-10 8-Mar-10 1-Apr-10 6-Apr-10 Actual 7 World Aids Day in ten SSAC States L/Sum DC 60,000.00 Prior Plan N/A N/A 4-Nov-10 N/A 60,000.00 10-Nov-10 1-Dec-10 Actual 8 HIV/AIDS Indicator Survey L/Sum DC 800,000.00 Prior Plan N/A N/A 29-Jan-10 18-Feb-10 22-Feb-10 N/A 800,000.00 2-Mar-10 5-Mar-10 8-Mar-10 1-Apr-10 6-Apr-10 Actual 9 Staff Training L/Sum DC 80,000.00 Prior Plan N/A N/A 7-Apr-10 18-Feb-10 22-Feb-10 N/A 80,000.00 2-Mar-10 5-Mar-10 8-Mar-10 1-Apr-10 6-Apr-10 Actual 10 M & E Program Roll-out L/Sum S 200,000.00 Prior Plan N/A N/A 4-Feb-10 18-Feb-10 22-Feb-10 N/A 200,000.00 2-Mar-10 5-Mar-10 8-Mar-10 1-Apr-10 6-Apr-10 Actual Total Cost 1,684,000.00 Plan Post Plan 1,684,000.00 Actual Post Actual LEGEND: S = Shopping NCB = National competitive Bidding DC = Direct Conracting AWNA = As and When Need Arises NOTES: Most of the services will be procured based on approved requests from the Implementing units Contarct implemenation Bid Evaluation Contact Finalization C. Updated Procurement Plan for Non-Consultant Services (Revised) Preparation Request for Proposals Bidding period Grant No.: TF 091518 1 L/Sum 2 3 Hire of Venue for Leader Workshops TV & Radio Spots and Informercials Country: Government of Southern Sudan (GoSS) Implementing Agency: Southern Sudan HIV/AIDS Commission (SSAC) Project/Program: Southern Sudan MDTF HIV/AIDS (SSMA) Project Component I: Institutional and Capacity Building of Southern Sudan HIV/AIDS Commission (SSAC) 50,000.00 S Printing Works for Policy Guidelines