THE WORLD BANK MONTHLY OPERATIONAL SUMMARY Contents User’s Guide ...................................................................................................................................................................... 3 The Global Environment Facility (GEF) .................................................................................................................... 4 New Projects Added In This Issue ............................................................................................................................. 5 Projects Deleted In This Issue………………………………………….…………………………………………………………….6 Africa ................................................................................................................................................................................. 11 East Asia And Pacific ................................................................................................................................................... 75 Europe And Central Asia ........................................................................................................................................... 94 Latin America and The Caribbean........................................................................................................................ 110 Middle East And North Africa................................................................................................................................ 126 South Asia ..................................................................................................................................................................... 136 Guarantee Operations .............................................................................................................................................. 158 Sector Categorizations Agriculture, Fishing, and Forestry Education Energy and Mining Finance Health and Other Social Services Industry and Trade Information and Communications Public Administration, Law, and Justice Transportation Water, Sanitation, and Flood Protection July 2018 Monthly Operational Summary PAGE 2 LIST OF ACRONYMS AUSAID Australian Agency for International IDB Inter-American Development Bank Development IFAD International Fund for Agricultural ADB Asian Development Bank Development ADF African Development Fund IsDB Islamic Development Bank AfDB African Development Bank JBIC Japan Bank for International Cooperation APL Adaptable Program Loan ITF Interim Trust Fund BADEA Banque Arabe de Développement KfW Kreditanstalt für Wiederaufbau Économique en Afrique (Germany) BOAD Banque Ouest Africaine LIL Learning and Innovation Loan de Développement NCB National Competitive Bidding CDB Caribbean Development Bank NGO Nongovernmental Organization CFD Caisse Française de Développement NORAD Norwegian Agency for Development CIDA Canadian International Development Cooperation Agency OECF Overseas Economic Cooperation Fund DANIDA Danish International Development Agency (Japan) DFID Department for International OPEC Organization of Petroleum Exporting Development (UK) Countries EBRD European Bank for Reconstruction PAD Project Appraisal Document and Development PCD Project Concept Document EDF European Development Fund PCF Prototype Carbon Fund EIB European Investment Bank PCN Project Concept Note EU European Union PHRD Policy and Human Resources FAC Fonds d’Aide et de Coopération (France) Development (Japan) FAO Food and Agricultural Organization PID Project Identification (Number) of the United Nations PPF Project Preparation Facility FAO/CP FAO Cooperative Program QCBS Quality and Cost-Based Selection (with the World Bank) FINNIDA Finland International Development SDC Swiss Agency for Development Agency Cooperation GEF Global Environment Facility SIDA Swedish International Development GTZ Deutsche Gesellschaft für Technische Authority Zusammenarbeit UNDP United Nations Development Program IAPSO Inter-Agency Procurement Service Office UNFPA United Nations Population Fund IBRD International Bank for Reconstruction UNICEF United Nations Children’s Fund and Development USAID United States Agency for International ICB International Competitive Bidding Development IDA International Development Association WHO World Health Organization PAGE 3 Monthly Operational Summary July 2018 GUIDE TO THE WORLD BANK MONTHLY OPERATIONAL SUMMARY The World Bank Monthly Operational Summary (MOS) reports on the status of projects in the World During NEGOTIATIONS, discussions are held with Bank’s pipeline from the time the operation is identi- the client government, and the agreements reached are fied to the signing of the Loan, Credit, or Grant Agree- written into the loan documents. Upon completion of ment. It is a detailed accounting of the projects in- negotiations, the project is presented to the Bank’s cluded in the country lending programs that are ac- Board of Executive Directors for approval. After ap- tively being prepared for implementation. The lending proval, the financing agreement is signed. programs reflect the Bank’s strategy for each member country as set out in the Country Partnership Frame- Project IMPLEMENTATION normally starts within work (CPF) presented to the Board of Executive Direc- a few months after the project financing agreement is tors of the World Bank. On average, it takes about 13 signed. Countries, through their implementing agen- months for the Bank to process a project from concept cies, have full responsibility for executing World Bank- to approval. After a financing agreement is signed or a financed projects, including procuring goods and project is dropped from the program, the project entry works and hiring consultants. Contractors and suppli- is deleted from this summary. Each issue of the sum- ers, therefore, should contact appropriate officials of mary contains a list of projects reported for the first the implementing agency to express their interest in time and the list of projects deleted from the current specific projects and obtain information on what goods issue. Familiarity with the Bank’s project cycle, sum- and services will be needed and when and how to sub- marized in the following paragraphs, can help potential mit bids and proposals. bidders identify business opportunities with Bank bor- rowers. Each entry in the MOS indicates at what point Consultants are often used during project implementa- the operation is in the project cycle. tion to provide technical assistance and other project implementation support. Consultants in particular should contact the responsible implementing agency Project Cycle early in the project preparation period to express their interest. Contracts for consulting services, as well as During IDENTIFICATION, the client government some for goods and works, may also be procured prior and the Bank identify a specific operation as being to loan/credit/grant approval. This is known as ad- likely to support the country’s development strategy vance contracting. and the Bank’s CPF. The information contained in the MOS is intended to During PREPARATION, the client government iden- enable companies to assess their interest in supplying tifies and discusses the technical and institutional al- Bank-financed projects. Further information should be ternatives for achieving the objectives of a project. requested from the country’s project implementing Preparation usually requires feasibility studies fol- agency. The likelihood of a timely response is greater if lowed by more detailed studies of the alternatives that the queries are brief and to the point. When possible, promise to yield the most satisfactory results. An envi- travel to the country; direct contact with relevant ronmental assessment is usually carried out during this agency officials is recommended. phase. (See below for more information on environ- mental assessment.) In the preparation stage of the Firms should contact the World Bank only if they are project cycle, clients often supplement their own efforts unable to obtain a response to their queries from the by hiring consultants to carry out a major part of the implementing agency. General information about busi- work. Contractors and suppliers of equipment and ness opportunities under Bank loans, credits, and goods need to start making contacts with country offi- grants may be obtained from the World Bank’s Pro- cials during this stage. curement Policy and Services Group’s website at http://www.worldbank.org/en/projects-opera- During APPRAISAL, the Bank conducts a compre- tions/products-and-services/procurement-projects- hensive review of all aspects of the project (technical, programs and (click on “Browse Contract Awards and institutional, economic, and financial), laying the foun- Notices by Country� in the Related Links at the bottom dation for implementing the project and evaluating it of the webpage). when completed. Project appraisal is conducted by Bank staff and may be supplemented by individual ex- Business opportunities under World Bank-financed perts. The preparation of the Project Appraisal Docu- appear twice a month in UN Development Business ment concludes this stage. and are available via the internet at July 2018 Monthly Operational Summary PAGE 4 https://www.devbusiness.com/. . The website also in- cludes invitations to bid and submit proposals, notices Category FI: Involves investment of Bank funds of contract awards, and General Procurement Notices. through a financial intermediary, in subprojects that have adverse environmental impacts. An environmen- Environmental Categories tal framework may be required. The type, timing, and scope of environmental analysis Category U: No category given. to be performed by Bank clients are confirmed when a given project is identified. Projects are assigned one of The World Bank has three basic lending instruments: the following categories, depending on the nature, (ii) Investment Project Finance which provides finan- magnitude, and sensitivity of environmental issues: cial support for goods, works and services for a pre-de- fined specific project; (ii) Development Policy Finance Category A: The project may have adverse and signif- (DPF) which supports countries’ policy and institu- icant environmental impacts. Full environmental as- tional reforms in a sector or the economy as a whole sessment is normally required. and provides quick-disbursing budget support; and (iii) Program-for-Results (PforR) which finances parts of a Category B: The project may have specific environ- larger government program, with disbursements mental issues. Partial environmental assessment is linked to results or performance indicators. DPF and normally required. PforR operations are not included in the MOS because these instruments are not designed to provide procure- Category C: Likely to have minimal or no adverse en- ment opportunities since the funds are disbursed di- vironmental impacts. Beyond screening, no further EA rectly to government accounts. action is required. A typical summary entry looks like this: The Global Environment Facility (GEF) In addition to projects financed by the World Bank, the benefits in the focal areas of climate change, biodiver- World Bank Monthly Operational Summary reports sity, international waters, land degradation chemicals, on projects financed by the Global Environment Facil- sustainable forest management (SFM)/REDD+, and ity (GEF). under the Least Developed Countries Fund (LDCF) and the Special Climate Change Fund—adaptation to cli- The GEF was established in 1991 by a Resolution of the mate change. The GEF consists of an Assembly of 183 World Bank Executive Directors as a pilot program to participating countries, a Council, a Secretariat a Scien- assist in the protection of the global environment and tific and Technical Advisory Panel, and 18 Implement- to promote environmentally sound and sustainable ing Agencies – ADB, AfDB, BOAD, CAF, CI, DBSA, economic development. The GEF operates as a mecha- EBRD, FAO, FECO, FUNBIO, IADB, IFAD, IUCN, nism for providing new and additional grant and con- UNDP, UNEP, UNIDO, WBG, and WWF. cessional funding to meet the agreed incremental costs of measures to achieve agreed global environmental PAGE 5 Monthly Operational Summary July 2018 As one of the Implementing Agencies of the GEF, the For additional information on the GEF, contact the World Bank assists its member countries conserve and GEF secretariat or visit its website: www.thegef.org/gef sustainably use their biological diversity, reduce their The GEF Secretariat emissions of greenhouse gases and adapt to climate 1818 H St. NW change, manage shared water bodies and reduce their Washington DC 20433, USA emissions of ozone-depleting substances by accessing Tel: (1-202) 473-0508 GEF resources to cover the incremental costs of addi- Fax: (1-202) 522-3240, 522-3245 tional actions on these global issues. E-mail: Secretariat@TheGEF.org To be eligible for GEF co-financing, projects must be consistent with at least one of the GEF's 'Operational Programs' and meet the GEF project eligibility criteria. New Projects Added In This Issue Africa Region Africa Transport & Digital Development: Lome-Ouagadougou-Niamey Regional Corridors Benin Agriculture: AGRICULTURE COMPETITVENESS AND DIVERSIFICATION PROJECT Ethiopia Education: Additional Financing to GEQIP-E for Refugees Integration Lesotho Health, Nutrition & Population: Additional Financing for Lesotho Performance Enhancement Project Mozambique Health, Nutrition & Population: Mozambique Primary Health Care Strengthening Additional Financing Senegal Social, Urban, Rural and Resilience Global Practice: SN:Casamance Development Pole Project AF East Asia And Pacific Region Cambodia Social, Urban, Rural and Resilience Global Practice: Cambodia Secondary Cities Development Project July 2018 New Projects Added In This Issue PAGE 6 China Transport & Digital Development: Chuzhou-Nanjing Intercity Railway PPP Project Pacific Islands Poverty and Equity: Statistical Innovation and Capacity Building in Pacific Islands Vietnam Social, Urban, Rural and Resilience Global Practice: Vietnam - Dynamic Cities Integrated Development Project Europe And Central Asia Region Tajikistan Finance, Competitiveness and Innovation: Inclusive Economic Development Project Energy & Extractives: Tajikistan Power Sector Financial Recovery Uzbekistan Finance, Competitiveness and Innovation: Uzbekistan Institutional Capacity Building Technical Assistance Project Social, Urban, Rural and Resilience Global Practice: Support to Inclusive, Accountable Community Development through Uz- bekistan's Obod Qishloq (Prosperous Villages) National Program Latin America And Caribbean Region Paraguay Agriculture: Paraguay - Project for Climate and Economic Resilience of Small Farmers - PROCER Middle East And North Africa Region Tunisia Energy & Extractives: Energy Sector Performance Improvement Project West Bank and Gaza Education: Improving Early Childhood Development in the West Bank and Gaza PAGE 7 Monthly Operational Summary July 2018 South Asia Region Afghanistan Governance: Afghanistan: Fiscal Stability Facility India Agriculture: State of Maharashtra's Agribusiness and Rural Transformation Project Health, Nutrition & Population: Moving Towards Elimination of TB Project Transport & Digital Development: Meghalaya Integrated Transport Project Pakistan Finance, Competitiveness and Innovation: Punjab Agriculture Finance and Agribusiness Development Sri Lanka Transport & Digital Development: Sri Lanka Logistics Project July 2018 New Projects Added In This Issue PAGE 8 Projects Deleted from This Issue Africa Region Africa: Ruzizi Regional Hydropower Project Burundi: Burundi Landscape Restoration and Resilience Project(Cr. D2760-BI) Burundi: Burundi Early Grade Learning Project(Cr. D3200-BI) Congo, Democratic Republic of: DRC Power Sector and Utility Development Project Eastern Africa: Great Lakes Regional Integrated Agriculture Development Project(Cr. D1810-BI) Ethiopia: Ethiopia Economic Opportunities Program(Cr. 62920-ET, Cr. D3460-ET) Ghana: Pwalugu Multipurpose Project Guinea: Guinea Health Service and Capacity Strengthening Project(Cr. 62300-GN, Cr. D3040-GN) Guinea-Bissau: Guinea-Bissau Strengthening Maternal and Child Health Service Delivery(Cr. D3280-GW) Liberia: Getting to Best in Education Malawi: Digital Malawi Program Phase I: Malawi Digital Foundations Project(Cr. 60500-MW) Rwanda: Strengthening Social Protection Project Additional Financing Sierra Leone: Enabling Local Service Delivery in Sierra Leone Zambia: Electricity Service Access Project(Cr. 61060-ZM) East Asia And Pacific Region Cambodia: Cambodia Higher Education Improvement Project(Cr. 62210-KH) China: Jiangxi Integrated Rural and Urban Water Supply and Wastewater Management Project( Ln. 88490-CN) PAGE 9 Monthly Operational Summary July 2018 Indonesia: National Road Preservation Program Indonesia: Indonesia - Supporting Primary Health Care Reform( Ln. 88730-ID) Lao People's Democratic Republic: Lao National Road 13 Improvement and Maintenance(Cr. 62260-LA) Vietnam: Vietnam Scaling up Urban Upgrading Project(Cr. 60560-VN, Cr. 60550-VN) Vietnam: Dynamic City Integrated Development Project - Thai Nguyen(Cr. 62970-VN) Europe And Central Asia Region Kosovo: Kosovo Digital Economy (KODE)(Cr. 62850-XK) Kyrgyz Republic: Capacity Building in Public Financial Management 2 Montenegro: Montenegro Second Energy Efficiency Project( Ln. 88700-ME) Russian Federation: Innovative Dev-t of Preschool Educ. of Rep. of Sakha (Yakutia) Project Russian Federation: Improvement of Urban Transport Sys (GEF) Latin America And Caribbean Region Argentina: Capital Market, Infrastructure Bond Liquidity Facility Argentina: AR Housing Finance Development Argentina: Argentina Infrastructure Guarantee Facility for Private Financial Market Funding Argentina: Northwestern Road Development Corridor Project( Ln. 88100-AR) Brazil: Salvador Social Multi-Sector Service Delivery Project( Ln. 88180-BR) St Maarten: Sint Maarten Emergency Recovery Project I Middle East And North Africa Region Djibouti: Djibouti Support for Women and Youth Entrepreneurship(Cr. 62590-DJ) July 2018 New Projects Added In This Issue PAGE 10 West Bank and Gaza: Social Protection Enhancement Project South Asia Region Bangladesh: National Strategy for Development of Statistics Implementation Support(Cr. 61930-BD) India: Strengthening Public Financial Management in Rajasthan( Ln. 88550-IN) India: Shimla Water Supply and Sewerage Project Sri Lanka: Colombo Urban Transport Efficiency Project PAGE 11 Monthly Operational Summary July 2018 Africa Angola Agriculture Angola: Commercial Agriculture Development Project: The proposed Project Development Objective is to increase productivity and market access for selected beneficiaries in the project areas. Approval completed on 29 May 2018. Environ- mental Assessment Category B. Project: P159052. US$130.0/100.0 (IBRD/GFRC). Consultants will be required. Ministry of Agriculture. Energy & Extractives Angola Support to Electricity Sector: The Project Development Objective is to improve the operational performance of the utility and increase access in selected areas. Identification completed on 6 February 2018. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population Angola Health System Performance Strengthening Project (HSPSP): The Project Development Objective (PDO) is to increase the utilization and the quality of health care services in target provinces and municipalities. Approval completed on 29 March 2018. Environmental Assessment Category B. Project: P160948. US$110.0 (IBRD). Consultants will be required. Ministry of Health. Social Protection & Labor AO-Local development Project - AF: The LDP Development Objectives are: (a) to improve access of poor households to basic services and economic opportunities, and (b) to enhance local institutional capacities among Angola's municipalities. Approval completed on 25 July 2017. Environmental Assessment Category B. Project: P160105. US$70.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Water Additional Financing - Second Water Institutional Development Project: The Project Development Objective is to strengthen the institutional capacity of selected water sector agencies and increase water service coverage in target cities. Ap- proval completed on 21 June 2018. Environmental Assessment Category B. Project: P167201. US$150.0 (IBRD). Consulting services to be determined. Ministry of Energy and Water. Luanda Bita Water Supply Project Guarantee: Objective to be Determined. The Project Development Objective is to improve access to potable water service in selected areas of Luanda. The Project is to be supported through an IBRD guarantee currently estimated at US$150m, tentatively complemented by a MIGA guarantee. Identification completed on 30 March 2017. Environmental Assessment Category B. US$ 285.0 (GUAR). Consulting services to be determined. Implementing agency(ies) to be determined. Luanda Bita Water Supply Guarantee (GU-P163610) &: The Project Development Objective (PDO) is to improve ac- cess to potable water service in selected areas of Luanda by mobilizing commercial financing for the Government of Angola. Identification completed on 31 March 2017. Environmental Assessment Category B. US$ 285.0 (GUAR). Consulting services July 2018 Africa PAGE 12 to be determined. Implementing agency(ies) to be determined. Benin Agriculture Agricultural Productivity and Diversification Additional Financing: The PDO of the AF is to improve productivity and competitiveness for selected value chains (rice, fish farming, pineapple and cashew) and promote small scale animal hus- bandry in the Recipient’s territory. Approval completed on 14 April 2017. Environmental Assessment Category B. Project: P160029. US$ 45.0 (IDA Credit). No consultants are required. Ministry of Finance. (N) AGRICULTURE COMPETITVENESS AND DIVERSIFICATION PROJECT: The objective of the project is to pro- mote export of high value crops and market access for producers and agribusiness Small and Medium Enterprises (SME) through increased private investments in selected value chains in project areas. Identification completed on 13 July 2018. US$ 160.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Education Benin Global Partnership for Education Project Phase 3: The Project Development Objectives (PDO) are to: (i) im- prove the quality of teaching and learning in basic education with an emphasis on early grades of primary school; and (ii) strengthen equity and retention in basic education, particularly in the most deprived districts. Concept completed on 28 June 2018. Environmental Assessment Category B. Project: P167432. US$ 17.0 (FTIE). Consultants will be required. Ministry of Preschool and Primary Education. Environment & Natural Resources Benin: Gazetted Forests Management Project: Increase the sector contribution to the national economy, and improve access to sources of income from sustainable forest management for selected communities in target zones. Concept completed on 25 June 2018. Environmental Assessment Category B. Project: P167678. US$ 20.0 (IDA Grant). Consulting services to be determined. Ministry of Environment and Sustainable Development. Health, Nutrition & Population Early Years Nutrition and Child Development Project: The development objective is to increase the coverage and utilization of early nutrition and child development interventions in selected areas in the Recipient’s territory Concept com- pleted on 23 March 2018. Environmental Assessment Category C. Project: P166211. US$ 32.0 (IDA Grant). Consulting services to be determined. Permanent Secretariat of the national Food and Nutrition Council (SP CAN). Macroeconomics, Trade and Investment Benin Second Fiscal Reform and Growth PBG: The program development objectives of this PBG are to: a) support macroeconomic stability by strengthening fiscal management; b) promote economic growth by increasing agricultural produc- tivity and competitiveness and strengthening the power sector’s financial viability and production capacity; and c) improve education and health service delivery and strengthen social protection. Concept completed on 23 April 2018. Project: P167278. US$ 180.0 (GUID). Consulting services to be determined. Imple- menting agency(ies) to be determined. Social Protection & Labor Benin Decentralized Community Driven Services Project - Addl Financing: To improve access to decentralized basic social services and to mainstream the CDD approach for such services. Approval completed on 27 February 2014. Envi- PAGE 13 Monthly Operational Summary July 2018 ronmental Assessment Category B. US$ 30.0 (IDA Credit). Consultants will be required. Secretariat for Decentralized Com- munity Driven Services Tel: (229) 9003-3601, E-mail: sepsdcc@yahoo.fr, Contact: Mr. Germain Ouin Ouro Community and Local Government Basic Social Services Project: The development objective of the project is to improve access to decentralized basic social services and social safety nets, and to strengthen the social protection system. Approval completed on 6 July 2018. Environmental Assessment Category B. Project: P163560. US$ 40.0 (IDA Grant). Con- sultants will be required. Ministry of Decentralization and Local Government. Social, Urban, Rural and Resilience Global Practice (R) Benin - Urban Resilience and Stormwater Management Project: The proposed Project Development Objective is to reduce flood risks in selected areas of Cotonou and strengthen urban resilience planning and capacity at the city level. Concept completed on 25 July 2018. Environmental Assessment Category A. Project: P167359. US$ 50.0/50.0 (IDA Credit/IDA Grant). Consultants will be required. Ministère du Cadre de Vie. Transport & Digital Development Benin Digital Solutions for Sustainable Development: To improve access to affordable broadband in rural communi- ties and leverage e-services to improve supply-chain efficiency and access to markets. Concept completed on 7 November 2017. Environmental Assessment Category B. Project: P162599. US$ 30.0/27.0 (IDA Credit/FRDE). Consultants will be re- quired. Ministère de l'Economie Numérique et de la Poste. Burkina Faso Agriculture Integrated Agriculture Development Project: The objective of the project is to increase agricultural productivity and market access for producers and agribusiness Small and Medium Enterprises (SMEs) in selected value chains in project areas. Identification completed on 27 June 2018. US$150.0/50.0 (IBRD/IDA Credit). Consulting services to be determined. Imple- menting agency(ies) to be determined. Sustainable Agricultural Intensification for Food and Nutrition Security Project: To increase agricultural produc- tivity and promote nutrition-sensitive agro-sylvo-pastoral value chains with potential to create jobs for sustainable food and nutrition security in targeted rural areas in Burkina Faso Identification completed on 12 May 2017. US$ 24.0 (GAFS). Con- sulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives Burkina Faso AF to Electricity Sector Support Project: The project development objectives are to: (i) increase access to electricity, (ii) improve the reliability of electricity supply, and (iii) improve the efficient use of energy in targeted areas. Approval completed on 8 June 2017. Environmental Assessment Category B. Project: P160344. US$ 80.0 (IDA Credit). Con- sultants will be required. Implementing agency(ies) to be determined. Sustainable Mineral Development Support Project: To enhance economic integration and governance in the manage- ment of the mineral sector Identification completed on 28 June 2018. US$ 30.0 (IDA Grant). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Burkina Faso Electricity Access Project: The objective of the proposed project is to expand access to reliable electricity services in rural areas. Identification completed on 5 February 2018. US$ 50.0 (IDA Credit). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation Burkina Faso - Bagre Growth Pole Project Additional Financing: To increase private investment, employment gen- eration and agricultural production in the Project Area. July 2018 Africa PAGE 14 The assumption is that increased economic activity will be a result of both improved infrastructure for irrigation contributing to more successful agriculture (financed mainly under the original project) and increased private investments in the Bagre region incentivized by rehabilitated feeder roads, access to electricity and water supply, and increased opportunities for SMEs and targeted investment promotion activities. All of the above are covered by project activities. A further assumption is that increased economic activity in the Bagre region will lead to increased job creation in the area and that the labor intensity of the supported agribusiness activities is relatively high. Approval completed on 29 March 2018. Environmental Assessment Category A. Project: P161234. US$ 50.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be deter- mined. Governance Burkina Faso Local Government Support Project AF: The development objective of the project is to strengthen the national capacity for decentralization, the institutional capacities of communes in all Regions and to increase citizen partici- pation in local governance. Approval completed on 4 August 2017. Environmental Assessment Category B. Project: P162742. US$ 60.0 (IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Health, Nutrition & Population Health Services Reinforcement Project: The Project Development Objective (PDO) is to increase the quality and utili- zation of health services with a particular focus on maternal, child and adolescent health, nutrition and disease surveillance Approval completed on 6 July 2018. Environmental Assessment Category B. Project: P164696. US$ 80.0/20.0 (IDA Grant/GFF). Consultants will be required. Ministry of Health. Poverty and Equity Statistical Capacity Development Project: Strengthening National Statistical Capacity to Produce and Disseminate Quality Products and Enhancing Economic Analysis for Evidence-based Policy Making Identification completed on 29 June 2018. US$ 30.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Social Protection & Labor Additional Financing for Social Safety Net Project: The PDO is to increase access of poor and vulnerable households to safety nets and to lay the foundations for an adaptive safety net system in Burkina Faso. Approval completed on 7 December 2016. Environmental Assessment Category C. Project: P160371. US$ 6.0 (AFRH). Consultants will be required. Ministry of Economics and Finances. Burkina Faso - Refugees and Host Communities Project: The Project Development Objective is increase access of poor households in refugee and host communities to earnings and human capital building opportunities Identification com- pleted on 27 December 2017. Environmental Assessment Category B. US$ 4.0/6.0 (IDA Credit/IDA Grant). Consulting ser- vices to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice (R) Strengthening Climate Resilience in Burkina Faso: The Project Development Objective is to improve the country’s hydro-meteorological, climate and early warning services, and improve access to such services by targeted sectors and com- munities. Appraisal completed on 13 July 2018. Environmental Assessment Category B. Project: P164078. US$ 8.5 (IDA Grant). Consultants will be required. Conseil National de Secours d'Urgence et de Réhabilitation (CONASUR); Secrétariat Permanent des Projets du Secteur Transport, c/o Ministère des transports, de la mobilité; Direction Générale des Ressources en eaux (DGRE); Ministry of Transport; Ministère de l’agriculture et de l’aménagement hydraulique; Direction Générale de la Protection Civile (DGPC). Water PAGE 15 Monthly Operational Summary July 2018 Urban Water Sector Project - Additional Financing: The overall objective of the project is to increase access to sus- tainable water and sanitation services in selected urban areas. This will contribute to achievement of the water and sanitation MDGs. The project will achieve the objective through: (a) facilitating access to services through programs for constructing social water service connections, public standpipes, and on-site sanitation facilities; and (b) consolidating the achievements of the urban water supply sub-sector reforms and strengthening capacities to deliver and manage services. The project will help to provide clean water to 527,000 additional people and to provide improved sanitation services to 246,000 additional people." Approval completed on 12 January 2015. Environmental Assessment Category B. Project: P149556. US$ 80.0 (IDA Grant). Consultants will be required. Office National de l'Eau et de l'Assainissement (ONEA) Tel: (226) 5043-1900. Burkina Faso Water Supply and Sanitation Program: The Program Development Objective (PDO) is to improve access to water supply and sanitation services in targeted areas Approval completed on 26 June 2018. Environmental Assessment Category B. Project: P164345. US$ 250.0/50.0 (IDA Credit/IDA Grant). No consultants are required. Ministry of Water and Sanitation (Ministère de l’Eau et l’Assainissement); National Offi ce for Urban Water Supply and Sanitation (Office national de l’eau et de l’assainisseme. Burundi Agriculture Agro-Pastoral Productivity and Markets Development - AF: The Project Development Objective is to increase small producers' productivity and market access for Targeted Commodities in the Project Area. Approval completed on 15 December 2016. Environmental Assessment Category B. US$ 25.0 (IDA Grant). Consulting ser- vices to be determined. Ministry of Finance, Budget and Privatization; Ministry of Agriculture and Livestock. Education Burundi Youth Skills and Employment Project: To develop skills and improve employment outcomes of beneficiary youths Identification completed on 16 June 2017. Environmental Assessment Category C. US$ 30.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives Burundi Electrification Scale up Project: Increase energy access through grid expansion and off-grid electrification Identification completed on 13 October 2017. US$ 100.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Burundi Solar Energy Guarantees Project: The development objective is to increase renewable energy power supply in Burundi Identification completed on 1 March 2018. Environmental Assessment Category B. US$ 1.5 (GUID). Consulting ser- vices to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population Burundi Health System Support-Additional Financing: To increase the use of quality Reproductive, Maternal, Neo- natal, Child and Adolescent Health services, and, in the event of an Eligible Crisis or Emergency, to provide immediate and effective response to said Eligible Crisis or Emergency. Identification completed on 5 March 2018. Environmental Assessment Category B. US$ 13.0 (GAVI). Consulting services to be determined. Implementing agency(ies) to be determined. Investing in Early Years in Burundi (NKURIZA): Increase the coverage of community based nutrition interventions among women of reproductive age and children under two and the coverage of family planning services in project areas Con- cept completed on 9 June 2018. Environmental Assessment Category B. Project: P165253. US$ 30.0 (IDA Grant). Consultants will be required. Ministry of Public Health and Fight against AIDS; Second Vice Presidency (SUN Secretariat). Social, Urban, Rural and Resilience Global Practice July 2018 Africa PAGE 16 GLR-SOP: Burundi Refugee and Host Community Development Response Project: to improve access to liveli- hoods and socio-economic infrastructure for displaced people and host communities in the targeted areas. Identification com- pleted on 2 June 2017. US$ 25.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be deter- mined. Transport & Digital Development AF1 - Burundi Infrastructure Resilience Emergency Project: The Project’s objective is to enhance the climate resili- ence of key transport and drainage infrastructure in Greater Bujumbura while strengthening the country’s capac ity to manage and prevent natural disasters. Identification completed on 19 June 2018. Environmental Assessment Category B. US$ 15.0 (IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Digital Burundi / Burundi Numerique: The development objective is to promote economic opportunities and financial inclusion through enhanced digital connectivity, financial services and enhanced data collection Identification completed on 17 July 2017. Environmental Assessment Category B. US$ 3.0/30.0 (IDA Credit/IDA Grant). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Cabo Verde Governance STATE OWNED ENTERPRISES RELATED FISCAL MANAGEMENT PROJECT: The Project Development Objective is to strengthen SOE related fiscal management. Approval completed on 4 June 2018. Environmental Assessment Category C. Project: P160796. US$ 20.0 (IDA Credit). Consultants will be required. Unidade de Acompanhanmento do Sector Empre- sarial do Estado (UASE). Social Protection & Labor Social Inclusion Project: To support Government efforts in building a robust social protection system that promotes social and productive inclusion, by (i) building effective delivery systems for outreach, targeting and program management; and (ii) supporting the expansion of the Rendimento Social de Inclusão Program (cash transfer program). Concept completed on 8 April 2018. Environmental Assessment Category C. Project: P165267. US$ 10.0 (IDA Credit). Consultants will be required. Ministerio da Familia e Inclusao Social - Ministry of Family and Social Inclusion. Transport & Digital Development First Additional Financing to the Cabo Verde Transport Sector Reform Project: The objective of the project is to support the Recipient's efforts to improve efficiency and management of its national road assets and lay the groundwork for transport sector State Owned Enterprise reform. Approval completed on 15 June 2017. Environmental Assessment Category B. Project: P161248. US$ 27.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Cameroon Agriculture North Cameroon Agriculture and Water Smart Landscapes Project: to improve irrigation services and sustain cli- mate resilient agricultural productivity in the Benue River Valley Concept completed on 5 March 2018. Environmental As- sessment Category A. Project: P166072. US$ 200.0 (IDA Credit). Consulting services to be determined. MEADEN. Education CAMEROON Education Reform Support Project: The Project Development Objective is to improve equitable access to quality basic education, with a focus on selected disadvantaged areas PAGE 17 Monthly Operational Summary July 2018 Approval completed on 1 May 2018. Environmental Assessment Category B. Project: P160926. US$ 100.0/30.0 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Basic Education. Skills Development for Growth Project: The objective of the project is to increase the supply of quality and market relevant skills in priority sectors and to improve the governance and management of skills development system. Concept com- pleted on 21 December 2017. Environmental Assessment Category B. Project: P164117. US$ 50.0 (IDA Credit). Consultants will be required. MINEFOP. Energy & Extractives Hydropower Development on the Sanaga River Technical Assistance Project: The Project development objective is to improve the Recipient's institutional capacity for a sustainable development of hydroelectric resources on the Sanaga River Basin. Approval completed on 11 May 2017. Environmental Assessment Category A. Project: P157733. US$ 26.3 (IDA Credit). Consultants will be required. Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE). Mining Sector Capacity Building Add: The PDO is to improve (i) the efficiency and transparency of mining sector man- agement and (ii) the frameworks for sustainable mining development. Approval completed on 31 March 2017. Environmental Assessment Category B. Project: P160917. US$ 26.9 (IDA Credit). No consultants are required. Ministry of Economy, Planning, and Regional Development. (R) Cameroon Nachtigal Hydropower Project: Objective to be Determined. Approval completed on 19 July 2018. En- vironmental Assessment Category A. Project: P157734. US$ 300.0/150.0/280.0 (GUAR/ZBIL/ZMUL). Consulting services to be determined. Implementing agency(ies) to be determined. CM- Rural Electricity Access Project for Underserved Regions: The Project Development Objective is to increase electricity access in Northern Regions of Cameroon. Concept completed on 20 November 2017. Environmental Assessment Category B. Project: P163881. US$ 150.0 (IDA Credit). Consultants will be required. Rural Electrification Agency. Governance CAMEROON - Strengthening Public Sector Effectiveness and Statistical Capacity Project: The project develop- ment objective is to improve the effectiveness of public spending in selected sectors and strengthen the statistics system for evidence-based decision making. Approval completed on 20 November 2017. Environmental Assessment Category C. Project: P151155. US$ 31.0 (IDA Credit). Consulting services to be determined. Ministry of Economy Planning and Regional Develop- ment. Social Protection & Labor Social Safety Nets for Crisis Response: The project development objective (PDO) is to support the establishment of a basic national safety net system including piloting targeted cash transfers and public works programs for the poorest and most vulnerable people in participating areas within the Recipient's territory. Approval completed on 1 May 2018. Environmental Assessment Category B. Project: P164830. US$ 30.0/30.0 (IDA Credit/IDA Grant). Consultants will be required. MINEPAT. Social, Urban, Rural and Resilience Global Practice Cameroon: Inclusive and Resilient Cities Development Project: The proposed Development Objective is to improve urban management and access to infrastructure in selected urban areas, particularly for poor neighborhoods, and increase resilience to natural hazards and other eligible crises. Approval completed on 22 August 2017. Environmental Assessment Category B. Project: P156210. US$ 160.0 (IDA Credit). Consultants will be required. Republic of Cameroon, Contact: Jean Jacques YEPMOU, Director; Ministry of Urban Development and Housing (MINDUH), Contact: Mme Anne-Marie Essono, Engineer. Transport & Digital Development Douala Urban Mobility Project: The Project Development Objective is to improve urban mobility and accessibility along selected corridors in Douala. Identification completed on 26 June 2018. Environmental Assessment Category A. US$ 200.0 July 2018 Africa PAGE 18 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Cameroon - ICT Sector Reform Project: The Development Objective is to further ICT sector's reforms in order to increase the reach and usage of ICT services in the Republic of Cameroon. Concept completed on 16 January 2017. Environmental Assessment Category C. Project: P161219. US$ 40.0 (IDA Credit). Consultants will be required. Ministry of Posts and Tele- communications. Central African Republic Agriculture CAR-Agriculture Recovery and Agribusiness Development Support Project (ARADSP): Increase agriculture productivity of small scale farmers and promote micro, small and medium agribusiness enterprises in the project area, and provide immediate and effective response in the event of an Eligible Crisis or Emergency Identification completed on 16 Oc- tober 2017. Environmental Assessment Category B. US$ 25.0 (IDA Grant). Consulting services to be determined. Implement- ing agency(ies) to be determined. Energy & Extractives CAR Emergency Electricity Access Project: The PDO is to increase electricity supply and access in Central African Re- public. Identification completed on 2 August 2017. Environmental Assessment Category B. US$ 65.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Governance Emergency Public Services Response Project: The project development objective is to re-establish an operational gov- ernment payroll and related financial management systems. Approval completed on 19 May 2015. Environmental Assessment Category C. Project: P154304. US$ 10.0 (IDA Grant). Consultants will be required. Ministry of Finance and Budget/ CS REF, Contact: Remy Yakoro, Minister of Finance. Social, Urban, Rural and Resilience Global Practice CAR: LONDO AF: To provide temporary employment to vulnerable people throughout the entire territory of the country. Identification completed on 21 May 2018. Environmental Assessment Category B. US$ 30.0 (IDA Grant). No consultants are required. Implementing agency(ies) to be determined. Chad Agriculture Emergency Food and Livestock Crisis Response AF: The project development objective is to improve the availability of and access to food and livestock productive capacity for targeted beneficiaries affected by the conflict in the Central African Republic on the Recipient's territory. Approval completed on 29 September 2017. Environmental Assessment Category B. Project: P163258. US$ 16.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Education Chad Education Sector Reform Project Phase-2 Additional Financing: The Project Development Objective is to improve teaching and learning conditions in primary schools nationwide and upper secondary schools in selected areas. Ap- proval completed on 23 June 2017. Environmental Assessment Category B. Project: P163740. US$ 50.0 (IDA Grant). Con- sulting services to be determined. Implementing agency(ies) to be determined. PAGE 19 Monthly Operational Summary July 2018 Energy & Extractives Chad Energy Sector Recovery and Access Expansion Project: To ensure recovery of foundational principles of a well- functioning energy sector while supporting energy access expansion in both urban and rural areas. Identification completed on 2 April 2018. US$ 30.0/2.1 (IDA Credit/PHRD). Consulting services to be determined. Implementing agency(ies) to be determined. Governance TD-Public Financial Mgmt CB AF: The additional financing will scale up some existing activities (technical assistance to the computerization of the public financial management system) while supporting new ones (implementation of the organic finance law, debt management). Approval completed on 12 May 2014. Environmental Assessment Category C. US$ 10.2 (IDA Grant). No consultants are required. Ministry of Economy and Finance Tel: (235-22) 520-452, E-mail: pamfip@intnet.td, Contact: Chandanie Wijayawardene, Director General. Chad Domestic Resource Mobilization and Management: To improve performance, processes, and transparency in key government entities for revenue mobilization. Approval completed on 6 July 2018. Environmental Assessment Category C. Project: P164529. US$ 35.0 (IDA Grant). No consultants are required. Ministère des Finances. Social Protection & Labor Chad - Refugees and Host Communities Support Project: The Project Development Objectives are to improve access of refugees and host communities to basic services, livelihoods, and safety nets, and strengthen country systems to manage refugees. Negotiations authorized on 28 June 2018. Environmental Assessment Category B. Project: P164748. US$ 60.0 (IDA Grant). Consulting services to be determined. Cellule Filets Sociaux; CNARR. Social, Urban, Rural and Resilience Global Practice Chad Hydrological and Meteorological Services Modernization Project: The proposed Project Development Ob- jective (PDO) is to improve the country’s hydro-meteorological, early warning and response systems and services in targeted areas. Identification completed on 24 July 2017. Environmental Assessment Category B. US$ 8.2/22.0 (IDA Grant/GCF). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development (R) Chad Rural Mobility and Connectivity Project: The Project Development Objective (PDO) is to improve and sustain road access to markets in the project area, and in the event of an eligible crisis or emergency, to provide immediate and effective response to it. Concept completed on 26 July 2018. Environmental Assessment Category B. Project: P164747. US$ 30.0 (IDA Credit). Consultants will be required. Ministère des Infrastructures et du Désenclavement. Comoros Energy & Extractives COMOROS SOLAR ENERGY DEVELOPMENT PROJECT: To add solar PV and energy storage facilities to the Como- rian power generation mix. Identification completed on 6 December 2016. Environmental Assessment Category B. US$ 20.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation Comoros Financial Sector Development Project: To contribute to financial inclusion through the development of the national payment system and to promote financial stability. Identification completed on 3 May 2018. US$ 10.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. July 2018 Africa PAGE 20 Integrated Development and Competitiveness Project: Improving the enabling environment for private sector growth and enhancing the competitiveness of selected value chains in agriculture, tourism, and transport services sectors. Concept completed on 9 February 2018. Environmental Assessment Category B. Project: P164584. US$ 25.0 (IDA Credit). Consulting services to be determined. Ministry of Finance and Budget. Governance Economic Governance Technical Assistance - AF: 1. Comoros' three islands form one of the smallest African countries. With an estimated 760,000 inhabitants, spread among three islands, the country remains mired in poverty. Gross Domestic Product (GDP) per capita is estimated at US$785 and, based on 2004 estimates, about 45 percent of the population lived below the poverty line, an incidence that has probably increased since then . Poverty incidence varies considerably across regions and is typically higher in rural areas and on the island of Anjouan. The primary sector of the economy (mainly subsistence agriculture, a few cash crops, and fisheries) and retail services dominate the economy, representing about one-half and one- fifth of the country's GDP, respectively. Cash crops comprise mainly three high-value export crops-vanilla, cloves and ylang- ylang -and constitute most of the export earnings in goods, equivalent to a mere 4 percent of GDP. The third largest sector is government services, representing about 10 percent of GDP. Despite the potential in tourism, the country has failed so far to tap into the growing role of this sector in the region. With longstanding outmigration, the country benefits from large and growing remittances-at close to 20 percent of GDP-from the Comorian diaspora, mainly in France. The diaspora also repre- sents the main source of visitors from abroad. 2. Confirming a new commitment to reform, the Union of the Comoros adopted a Poverty Reduction Strategy Paper (PRSP) for the period 2010-2014, which was endorsed by partners, including the World Bank.5 The strategy has the following core objectives: (i) stabilize the economy and lay the groundwork for strong and equita- ble growth; (ii) strengthen key sectors by focusing on institution-building and ensuring a broader role for the private sector; (iii) strengthen governance and social cohesion; (iv) improve the health status of the general public; (iv) promote education and vocational training with the aim of developing human capital; and (v) promote environmental sustainability and civilian security. 3. In support of its PRSP, the government has finalized a comprehensive Public Financial Management strategy for the coming decade (2010-19) and adopted a detailed Action Plan for 2010-12. The proposed strategy is organized around four pillars6: (i) modernizing the legislative and regulatory framework and strengthening institutional capacity; (ii) rationalizing budget preparation; (iii) strengthening budget execution; and (iv) increasing transparency through improved internal and external controls. The action plan (the first in a series of rolling triennial plans) provides a detailed, sequenced and budgeted list of actions mapped to specific lead institutions within the administration. Its implementation relies on two committees that include Union and island representatives: The CREF (which acts as a secretariat of the Comité Budgétaire) that is responsible for the implementation as well as monitoring and evaluation of the national PFM reform strategy, and the HASC that is in charge of leading the civil service reform, including management of personnel rosters, new recruitments into the civil service and implementation of the organic frameworks. 4. Notwithstanding this new dynamism for PFM reforms, important chal- lenges remain. The 2007 Public Expenditure and Financial Assessment (PEFA) review rated Comoros at the lowest possible score, on 22 out of 28 key indicators. This evaluation emphasized weaknesses at all levels of public financial management (from formal institutions and procedures to actual implementation and processes), and puts Comoros squarely in the 'lower performance league' of African countries. 5. Major weaknesses contribute to reduce the Government's efficiency in terms of budget preparation, execution, and reporting. Despite recent improvements and efforts to enhance cooperation via the Comité Budgétaire, budget preparation remains nonparticipatory with consultations between Union and Islands fragmentary and unstructured. As a result, the budget is established mainly on the basis of economic and financial constraints, and is largely disconnected from policy priorities. With revenues barely covering wages and recurrent expenditures, there is limited scope for using the budget as a tool for resource allocations. In addition, the budgetary nomenclature is still based on administrative classifications and does not permit establishing a direct link between the budget (preparation and monitoring) and the gov- ernment's policy priorities or tracking priority expenditures through the budget cycle. With respect to execution, the legal and procedural framework is outdated and moreover poorly understood even by those in charge of the administrative phase of execution (credit managers). As a result normal procedures are often circumvented through a proliferation of exceptional procedures and significant gaps appear between budgeted and actual amounts. Thus the informational and authorization functions of the budget are severely undermined. At the Treasury level, serious structural weaknesses were again compounded during the reconciliation period, which saw a breakdown in communication and systems across levels of Government. As a result key public accounts documents are simply never produced. 6. PFM information systems and financial control mecha- nisms are generally rudimentary and obsolete, and lack an integrated financial management information system. Except for the recently implemented ASYCUDA++ for customs operations, the only systems in place are software applications for wage bill calculation and external debt management. 7. Comoros' civil service absorbs an inordinate share of the Government's resources, while delivering poor quality services to the population. During the period of decentralization, most central admin- istrative structures were simply duplicated in each autonomous island (without regard for administrative efficiency or financial PAGE 21 Monthly Operational Summary July 2018 sustainability). Correspondingly the civil service roster increased from less than 6,000 in 1999 to some 12,000 in 2008, with a concomitant rise of wage and salaries expenditures from 6.2 to 9 percent of Gross Domestic Product (GDP), a loss of insti- tutional memory and a dilution of already scare human resources. Moreover, the often discretionary nature of these appoint- ments has weakened the significance of positions and job descriptions within each public institution. 8. The government has taken steps to improve the effectiveness of public administration and gradually reduce the wage bill, but much remains to be done. The HASC has supervised the establishment of a unified computerized civil service roster (for the Union and Islands) and contracted the development of an integrated civil service and wage management software. It has also carried out a vast review of the existing organizational structures of each administration (cadres organiques) an updated version of which has been adopted by Parliament in 2010 and will be gradually implemented. Nevertheless, there are numerous remaining chal- lenges. For example, the civil service roster will only become a useful management tool once a physical census of all civil servants has been completed to clean up and validate the data. Also, much work is needed to develop feasible strategies for implementing the new organizational structures over time and with due consideration for social consequences. 9. In January 31 2011, the Bank approved a grant in the amount of SDR 1.2 million (USD 1.8 million equivalent) to support the country's PFM and civil service reform programs. The original project development objectives are (i) to increase the efficiency, account- ability and transparency of public financial management and (ii) to improve the management of civil service human resources and wages. The disbursement percentage as of December 18, 2012 is about 67%. 10. A midterm performance review was conducted in March 2012 and followed by s supervision mission in October 2012. Overall, progress towards achieving the PDOs and implementation progress of the activities were found satisfactory. However, the team noted a financing gap of about $1.5 million to implement the remaining activities of the project, including the PFM information system and the implementa- tion of the recommendations of the HR assessments and reviews (physical census of the civil servants, wages paid by checks, organic frameworks). In addition, the policy dialogue with the Ministry of Finance highlighted the weak macroeconomic man- agement capacities which undermine the country's ability to formulate expenditure policy decisions based on sound assump- tions and data. To address this challenge, the authorities have requested the Bank's support to conduct economic management studies to inform budget preparation processes and sectoral analysis. 12. The purpose of the additional financing is to support the implementation of those activities. More specifically, the additional activities are following: (i) Acquire and roll out a sys- tem covering budget preparation, budget execution, and accounting and reporting; (ii) design and build the required network (LAN and WAN) so that the module could be used by the Treasury services throughout the territory (iii) support the imple- mentation of the HR assessments and reviews (physical census of the civil servants, wages paid by checks, organic frameworks) (iv) economic management studies to inform budget preparation processes and sectoral analysis. 13. Moreover, the original date closing date is set for December 31, 2013. According to the IT master plan, the acquisition and roll out of the budget and accounting system would take up to 18 months. Therefore an extension of the closing date of the parent project is proposed until December 31, 2015. 14. No other changes are proposed to the project's development objectives as the additional activities fit within the originally conceived objectives. Approval completed on 12 November 2013. Environmental Assessment Category C. US$ 3.5 (IDA Credit). Consultants will be required. Economic and Governance Project (ABGE) Tel: (263) 773-9900, E-mail: moinacharani@yahoo.fr, Contact: Moinafatima Charani, Coordinator, ABGE. Health, Nutrition & Population Health and Nutrition Systems Support for Quality Services: Improve access to quality maternal and child health and nutrition services in selected geographical areas of the country Concept completed on 24 April 2018. Environmental Assess- ment Category B. Project: P166013. US$ 10.0 (IDA Credit). No consultants are required. Ministry Of Health, Solidarity, Social Protection And Gender Promotion. Congo, Democratic Republic of Agriculture Famine Risk Reduction and Nutrition Improvement Project: To increase agriculture productivity and improve mar- ket access of small farmers and small and medium size agribusinesses in selected regions. Concept completed on 14 July 2017. Environmental Assessment Category B. Project: P162517. US$ 200.0 (IDA Grant). Consulting services to be determined. PARRSA PIU. Education Democratic Republic of Congo - Skills for Employment & Productivity Project: The project development objective July 2018 Africa PAGE 22 would be to increase access to skills training programs and the employability of those being trained and strengthen systems for job placement in priority economic sectors with a focus on the vulnerable and women. Concept completed on 13 February 2018. Environmental Assessment Category C. Project: P165090. US$ 100.0 (IDA Credit). Consultants will be required. Min- istry of Labor, Employment and Social Welfare. Energy & Extractives DRC Growth with Governance in the Mineral Sector - PROMINES II: To enhance government capacity to manage the extractive sector, and to increase its contribution to local economic development. This implies increased geological knowledge, targeted capacity building and institutional reforms, and the promotion of local participation in mining value chains. Concept completed on 9 January 2018. Environmental Assessment Category B. Project: P166110. US$ 120.0 (IDA Grant). Consulting services to be determined. PIU PROMINES (Ministry of Mines of DRC). Environment & Natural Resources Mai Ndombe REDD+ Integrated Investment Project (GEF Additional Financing): The project development ob- jective is to test new approaches to improve community livelihoods and forested landscape management, and to reduce green- house gas emissions from deforestation and forest degradation in selected areas in the Recipient's territory. Identification completed on 27 September 2016. Environmental Assessment Category B. US$ 6.2 (GEFU). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation DRC- SME Development and Growth Project: The project development objective is to support the growth of Micro, Small and Medium-sized Enterprises (MSMEs) and increase employment and entrepreneurship opportunities for youth and women in select areas. Approval completed on 6 July 2018. Environmental Assessment Category B. Project: P160806. US$ 100.0 (IDA Credit). Consulting services to be determined. Ministry of SME. Governance Public Financial Management and Accountability Project Additional Financing: The project development objec- tive (PDO) is to improve domestic revenue mobilization, public expenditure management, and accountability, at central level and in selected provinces. Approval completed on 15 February 2017. Environmental Assessment Category C. Project: P159160. US$ 50.0 (IDA Grant). Consultants will be required. COREF. Governance II: This is additional financing for the ongoing GCEP operation P104041, as per the recommendation of the MTR, conducted in November 2010, and as per the detailed request from the Minister of Finance, received in January 2011. Additional financing will fund activities in a 4th provinces (Kasai Occidental) additional activity on supporting procurement reform additional activity on public service identification process additional cost for IT investments due to price increases and expansion of the initially planned activities Approval completed on 9 May 2013. Environmental Assessment Category C. Pro- ject: P126115. US$ 67.0 (IDA Grant). No consultants are required. Ministry of Interior Tel: (243-99) 290-5743, E-mail: prcgrdc@gmail.com, Contact: Popaul Kizungu Chihiza, Project Coordinator. Public Sector Reform and Rejuvenation Project - AF: The project development objective is to strengthen and rejuve- nate the civil service in selected ministries at the central and provincial levels. Approval completed on 16 May 2017. Environ- mental Assessment Category C. Project: P160612. US$ 45.0 (IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Health, Nutrition & Population DRC Health System Strengthening Additional Financing: The proposed project development objective is to improve utilization and quality of maternal and child health services in targeted areas within the Recipient's Territory. Approval com- pleted on 31 March 2017. Environmental Assessment Category B. Project: P157864. US$ 120.0/40.0/3.5 (IDA Credit/GFF/SPTF). No consultants are required. Alain Iyeti; Ministry of Finance. PAGE 23 Monthly Operational Summary July 2018 Health System Strengthening for Better Maternal and Child Health Results AF2: The proposed project develop- ment objective is to improve utilization and quality of maternal and child health services in targeted areas within the Recipi- ent's Territory. Approval completed on 2 March 2018. Environmental Assessment Category B. Project: P166004. US$ 10.0 (FSHN). No consultants are required. Ministry of Health; Democratic Republic of Congo; Ministry Of Finances. AF-DRC Human Development Systems Strengthening: The proposed project development objective is to strengthen select management systems for education and health services in targeted geographic areas in the Recipient's territory. Ap- proval completed on 29 March 2016. Environmental Assessment Category C. Project: P156421. US$ 30.0/10.0/1.1 (IDA Grant/GFF/PHRD). Consultants will be required. Ministry of Finance, Contact: Henri Yav Mulang, Minister. Macroeconomics, Trade and Investment DRC Domestic Resource Mobilization Program: The Program Development Objective is to increase the mobilization of domestic revenues, including taxes, levies, fees, and customs duties. The Program aims to support the Government's efforts not only to curb the sharp decline in public revenue that have occurred since the fall in world commodity prices in 2015, but also to raise them to levels achieved by benchmark countries and compatible to the country’s development ambitions. To this end, the Program specifically supports the policy and administrative reforms, actions and activities included in the SPPFR Pillar 2 aimed at improving the equity and the economic and technical efficiency of the DRC tax system. Identification com- pleted on 18 July 2017. Environmental Assessment Category A. US$ 100.0 (IDA Credit). Consulting services to be determined. Ministry of Finance. Social Protection & Labor Productive Inclusion Project: The project development objective is to establish the core building blocks of a safety net system and improve the access of poor households to productive safety nets interventions. Approval completed on 28 June 2018. Environmental Assessment Category B. Project: P163962. US$ 200.0 (IDA Credit). Consultants will be required. Social Fund of the Democratic Republic of Congo; Ministry of Social Affairs. Social, Urban, Rural and Resilience Global Practice Kinshasa Urban Development and Resilience Project: To improve the living conditions and socio economic opportu- nities for the residents of targeted poor and vulnerable neighborhoods through selected investments and to strengthen the urban planning and management capacity of the City-Province of Kinshasa. Concept completed on 8 December 2017. Environmental Assessment Category B. Project: P161602. US$ 150.0 (IDA Credit). Consultants will be required. Kinshasa Provincial Ministry of Plan, Budget and Infrastructure. DRC - Urban Development Project Additional Financing: To improve access to basic services and infrastructure and strengthen urban and municipal management of the targeted cities. Approval completed on 4 May 2017. Environmental As- sessment Category B. Project: P157114. US$ 90.0 (IDA Credit). Consultants will be required. Ministry of Finance; Project Im- plementation Unit. DRC - Gender Based Violence Prevention and Response Project: The objectives of the Project are to increase in targeted Health Zones: (i) the participation in Gender-Based Violence (GBV) prevention programs; (ii) the utilization of multi- sectoral response services for survivors of GBV; and (iii) in the event of an Eligible Crisis or Emergency, to provide immediate and effective response to said Eligible Crisis or Emergency. Negotiations authorized on 10 May 2018. Environmental Assess- ment Category B. Project: P166763. US$ 100.0 (IDA Grant). Consultants will be required. Fonds Social Democratic Republic of Congo. Transport & Digital Development Second High Priority Roads Reopening and Maintenance Project: The Project Development Objective is to re-es- tablish lasting earth and paved road access between provincial capitals, districts and territories, in the project impact area and to improve the road sector institutional organization Concept completed on 29 June 2017. Environmental Assessment Cate- gory A. Project: P161877. US$ 300.0 (IDA Grant). Consultants will be required. Cellule Infrastructures. July 2018 Africa PAGE 24 Water DRC Urban Water Supply Project Additional Financing and Restructuring: The revised PDO is to increase access to sustainable water services in selected urban areas, and to improve the operational performances and viability of the Project Implementing Entity. Approval completed on 25 February 2016. Environmental Assessment Category B. US$ 166.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Congo, Republic of Environment & Natural Resources (R) Northern Congo Agroforestry Project: To strengthen climate smart agriculture and conservation practices in Com- munity Development Zones in the departments of Sangha and Likouala. Concept completed on 26 July 2018. Environmental Assessment Category B. Project: P166189. US$ 16.0 (CIF). No consultants are required. Ministry of Agriculture, Livestock and Fisheries; Ministry of Forest Economy. Health, Nutrition & Population Health System Strengthening Project: The project development objective is to increase utilization and quality of mater- nal and child health services in targeted areas. Identification completed on 13 June 2018. US$ 20.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Poverty and Equity Additional Financing - RoC - Statistics Capacity Building Project: The objectives of the project are to: (i) strengthen the NSS in the production and dissemination of quality statistics relevant for policies and decision making; and, (ii) promote the demand for statistical information. Approval completed on 5 April 2018. Environmental Assessment Category C. Project: P162345. US$25.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Social Protection & Labor LISUNGI Safety Nets System Project II: "Strengthen the social safety nets system and its programs aimed at improving both access to health and education services and productivity among poor and vulnerable households in participating areas." Identification completed on 9 January 2018. Environmental Assessment Category C. US$ 12.0/10.0 (IDA Credit/IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Lisungi Safety Nets System Project Additional Financing: "Strengthen the social safety nets system and its programs aimed at improving both access to health and education services and productivity among poor and vulnerable households in participating areas." Approval completed on 30 March 2017. Environmental Assessment Category C. Project: P161154. US$ 10.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Transport & Digital Development Central African Backbone SOP3 Republic of Congo Additional Financing: The development objective of the pro- posed project is consistent with the PDO for the CAB Program: to contribute to increase geographical reach and usage of regional broadband network services and reduce their prices, in the Republic of Congo. Approval completed on 30 March 2017. Environmental Assessment Category B. Project: P160292. US$ 5.0 (IDA Credit). Consultants will be required. Ministry of Posts and Telecommunications in Charge of ICT. PAGE 25 Monthly Operational Summary July 2018 Cote d'Ivoire Agriculture Cashew Value Chain Competitiveness Project: The objective of the Project is to increase cashew productivity, quality and added value, benefiting smallholder farmers and the cashew processing industry in the Republic of Côte d’Ivoire. Approval completed on 10 April 2018. Environmental Assessment Category A. Project: P158810. US$200.0 (IBRD). Consulting services to be determined. Ministry of Mines and Industry. Education Cote d'Ivoire Higher Education Development Support Project: The Project Development Objective (PDO) is to es- tablish quality standards and foster short-term professional programs in Côte d’Ivoire’s tertiary education. Concept comp leted on 9 March 2018. Environmental Assessment Category B. Project: P160642. US$ 100.0 (IDA Credit). Consultants will be required. Ministry of Higher Education and Scientific Research. Youth Employment and Skills Development - Additional Financing: The proposed Project Development Objective (PDO) is to improve access to temporary employment and skills development opportunities for young men and women in Cote d'Ivoire' s territory. Approval completed on 26 March 2015. Environmental Assessment Category B. Project: P151844. US$ 50.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Cote d'Ivoire: Education Service Delivery Enhancement Project: The Project Development Objective is to increase access to pre-school and improve learning outcomes in beneficiary primary schools in participating regions Approval com- pleted on 4 June 2018. Environmental Assessment Category B. Project: P163218. US$ 23.4 (EFAS). Consultants will be re- quired. Ministry of National Education and Technical and Vocational Education and Training. Energy & Extractives (R) Cote d'Ivoire: CI-ENERGIES Guarantee Project: Objective to be Determined. Approval completed on 29 June 2018. Environmental Assessment Category B. Project: P164145. US$ 280.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Environment & Natural Resources Forest Investment Program: The Development Objective is to conserve and increase the forest stock and improve access to sources of income from sustainable forest management for selected communities in target zones Approval completed on 26 January 2018. Environmental Assessment Category B. Project: P162789. US$ 15.0 (CIF). Consultants will be required. Minis- try of Environment, Sanitation and Sustainable Development. Governance CI Governance and Institu Dev Addit Fin: The project development objective (PDO) is to achieve enhanced transparency and efficiency in the management of public finances and improved governance and efficiency in the cocoa sector. Approval completed on 9 June 2014. Environmental Assessment Category B. Project: P147016. US$ 5.0 (IDA Credit). Consultants will be required. Ministry of Planning and International Cooperation Tel: (967-1) 250-118, E-mail: ashater@mpic.gov.ye, Contact: Abdullah Al Shatter, Deputy Minister for Projects Programming. Health, Nutrition & Population (R) Strategic Purchasing and Alignment of Resources & Knowledge in Health Project (SPARK): The PrPDO is to reduce Maternal Mortality by one-half and Infant Mortality by one-third over the next decade Concept completed on 20 July 2018. Environmental Assessment Category B. Project: P167959. US$ 100.0/25.0 (IDA Credit/GFF). Consulting services to be determined. Ministere de la Sante et de l'Hygiene Publique (MSHP). July 2018 Africa PAGE 26 Social, Urban, Rural and Resilience Global Practice Infrastructure Renewal and Urban Management Project Additional Financing: The objective of the project is to improve access to basic infrastructure in targeted urban and rural areas, and, in the event of an Eligible Crisis or Emergency, to provide immediate and effective response to said Eligible Crisis or Emergency. Approval completed on 2 August 2016. Environmental Assessment Category A. Project: P156253. US$ 60.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Transport & Digital Development Abidjan Rapid Mass Transit System Project: The Project Development Objective is to Enhance urban mobility in Abid- jan through the development of Rapid mass transit system on the Yopougon - Bingerville corridor and its feeder lines Identi- fication completed on 24 May 2018. US$ 200.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. GREATER ABIDJAN PORT - CITY INTEGRATION PROJECT: The Project Development Objective (PDO) is to support the improvement of urban management, logistics efficiency, port accessibility, and urban mobility in the Greater Abidjan Area (GAA) and to provide immediate and effective response to eligible crisis or emergency. Approval completed on 29 June 2018. Environmental Assessment Category A. Project: P159697. US$ 315.0 (IDA Credit). Consulting services to be determined. PRICI (PCU). CI: Cote d'Ivoire E-Agriculture Project: The Project Development Objective is to increase access to digital services and leverage digital platforms to improve farm productivity and access to markets. Approval completed on 25 May 2018. Environ- mental Assessment Category B. Project: P160418. US$ 70.0 (IDA Credit). Consultants will be required. Ministry of Digital Economy and Post. Equatorial Guinea Education Equatorial Guinea Basic Education Project: to improve quality of basic education and to strengthen institutional ca- pacity. Concept completed on 19 June 2018. Environmental Assessment Category B. Project: P163543. US$50.0 (IBRD). Con- sultants will be required. Ministry of Education, Higher Education, and Sports. Eswatini Energy & Extractives Network Strengthening and Renewables Integration Project: To increase access to electricity services in peri urban and rural areas of Swaziland. Identification completed on 16 November 2017. US$25.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Governance IMPROVING PUBLIC SECTOR PERFORMANCE PROJECT: The project development objective is to improve public sector performance in selected ministries, departments and agencies through the strengthening of human and public resources management and use of data. Approval completed on 12 January 2017. Environmental Assessment Category C. Project: P152528. US$25.0 (IBRD). Consulting services to be determined. Ministry of Finance, Contact: Bheki Bhembe, Principal Sec- retary; Prime Minister's Office, Contact: Mbuso C. Dlamini, Secretary to Cabinet. PAGE 27 Monthly Operational Summary July 2018 Trade & Competitiveness Swaziland Private Sector Competitiveness: The development objective is: to support an improved investment climate and strengthen competitiveness of firms, especially in the agribusiness and tourism sectors. Approval completed on 30 November 2015. Environmental Assessment Category B. Project: P151433. US$25.0 (IBRD). Con- sulting services to be determined. Ministry of Economic Planning and Development. Water Swaziland Water Access Project: To improve access to water and sanitation services in Swaziland Identification com- pleted on 15 January 2018. US$ 25.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Ethiopia Education (N) Additional Financing to GEQIP-E for Refugees Integration: The Program Development Objective (PDO) is to improve internal efficiency, equitable access, and quality in general education (O-Class to Grade 12) Identification completed on 27 July 2018. Environmental Assessment Category B. US$ 60.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Energy & Extractives Renewable Energy Guarantees Project: Objective to be Determined. Appraisal completed on 24 May 2017. Environ- mental Assessment Category B. Project: P162607. US$ 200.0/800.0 (GUID/ZPCO). Consulting services to be determined. Implementing agency(ies) to be determined. Environment & Natural Resources (R) Ethiopia Resilient Landscapes and Livelihoods Project: To improve climate resilience, land productivity and carbon storage, and increase access to diversified livelihood activities in selected rural watersheds. Approval completed on 30 July 2018. Environmental Assessment Category B. Project: P163383. US$ 100.0/19.0 (IDA Credit/FSCO). Consultants will be required. Ministry of Agriculture and Livestock Resource. Finance, Competitiveness and Innovation Ethiopia Competitiveness and Job Creation Project-Additional Financing: The Project Development Objective (PDO) is to contribute to job creation by attracting investments and improving competitiveness of enterprises in the targeted industrial parks and their linked domestic enterprises. Approval completed on 25 June 2018. Environmental Assessment Category A. Project: P164429. US$ 175.0 (IDA Credit). Consulting services to be determined. Industrial Parks Development Corporation. Health, Nutrition & Population Ethiopia Health MDGs P4R Additional Financing: Objective to be Determined. Approval completed on 9 May 2017. Environmental Assessment Category B. US$ 150.0/20.0/60.0 (IDA Credit/FSHD/GFF). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Social Protection & Labor PRODUCTIVE SAFETY NET PROJECT (PSNP 4) ADDITIONAL FINANCING: The Project Development Objective July 2018 Africa PAGE 28 is: increase access to effective safety net and disaster risk management systems, and complementary livelihood and nutrition services for food-insecure households in the Recipient’s rural areas. Approval completed on 30 June 2016. Environmental Assessment Category B. Project: P158770. US$ 100.0/300.0/12.0/36.0/25.0/122.0/75.0/19.0/17.0/12.0 (IDA Credit/AID/AUSL/BMZ/CIDA/DFID/ECEU/JPPG/NEDA/SIDA). Consulting services to be determined. Implementing agency(ies) to be determined. Productive Safety Net 4 Project Additional Financing: The Project Development Objective is: increase access to effec- tive safety net and disaster risk management systems, and complementary livelihood and nutrition services for food-insecure households in the Recipient’s rural areas. Approval completed on 2 May 2017. Environmental Assessment Category B. Project: P163350. US$ 8.1 (IDA Credit). No consultants are required. Implementing agency(ies) to be determined. Transport & Digital Development Connecting Ethiopia: Support to the Fifth Road Sector Development Program (RSDPV): The proposed Project Development Objective is to provide support to the Fifth Road Sector Development Program to improve transport connectivity to selected regional capitals and agriculturally productive areas. Identification completed on 1 August 2016. Environmental Assessment Category A. US$ 375.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Water One WaSH - Consolidated WaSH Account Project (One WaSH -CWA): To achieve increased and sustained coverage of safely managed water supply and sanitation in selected rural and urban areas Concept completed on 26 June 2018. Envi- ronmental Assessment Category B. Project: P167794. US$ 300.0 (IDA Credit). Consultants will be required. Ministry of Water, Irrigation and Electricity; Ministry of Education; Ministry of Health. Gabon Environment & Natural Resources Forest sector revitalization in Gabon: The project development objective is to reinvigorate wood mobilization in Gabon in a sound social and environmental manner, while testing new approaches to involve communities in forest management. Identification completed on 8 May 2017. Environmental Assessment Category B. US$30.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development eGabon Additional Financing: Objective to be Determined. Identification completed on 20 September 2017. Environ- mental Assessment Category B. US$15.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Additional Financing CAB4: The development objective of the project is consistent with the PDO for the CAB Program: To contribute to increase geographical reach and usage of regional broadband network services and reduce their prices in the territory of the Republic of Gabon. Approval completed on 29 June 2016. Environmental Assessment Category B. Project: P158299. US$23.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Gambia, The Education Results for Education Achievement and Development Project (READ): To increase access to basic education, im- prove quality of teaching and learning in lower basic schools, and strengthen education systems. Approval completed on 14 September 2016. Environmental Assessment Category B. Project: P160282. US$ 7.5/1.0 (IDA Grant/ELP). No consultants are PAGE 29 Monthly Operational Summary July 2018 required. Implementing agency(ies) to be determined. Governance Gambia State Owned Enterprise Reform Project: The Project Development Objective is to strengthen fiscal risk man- agement of the SOEs for better service delivery, by strengthening the Government’s oversight and restructuring of the selecte d SOEs. Identification completed on 11 January 2018. Environmental Assessment Category C. US$ 10.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population AF Maternal and Child Nutrition and Health Results Project: A. Proposed Development Objective The development objective of the project is to increase the utilization of community nutrition and primary maternal and child health services in selected regions in the Recipient’s territory. Approval completed on 9 January 2017. Environmental Assess- ment Category B. Project: P159693. US$ 3.2/4.3 (IDA Credit/IDA Grant). No consultants are required. Implementing agency(ies) to be determined. Social Protection & Labor The Gambia Social Safety Net Project: To strengthen the social assistance system of the Gambia to smooth consumption and build awareness of human capital and productive investments among the extreme poor. *The strengthening of the social assistance system will be achieved through: the implementation of a pilot cash transfer pro- gram; aligned delivery system enhancements; a basic policy coordination mechanism. Concept completed on 30 June 2018. Environmental Assessment Category C. Project: P167260. US$ 11.0 (IDA Grant). Consultants will be required. National Nu- trition Agency. Ghana Agriculture Ghana Commercial Agriculture Project Additional Financing: The objective of the Project is to improve agricultural productivity and production of both smallholder and nucleus farms in selected project intervention areas of the Recipient’s territory. Approval completed on 31 May 2018. Environmental Assessment Category A. Project: P162525. US$ 50.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Education Ghana Basic Education Reform: Improve the quality of basic education in Ghana. Identification completed on 27 Sep- tember 2017. Environmental Assessment Category C. US$ 45.0 (IDA Credit). Consulting services to be determined. Imple- menting agency(ies) to be determined. Secondary Education Improvement Project Additional Financing: The Project Development Objective is to increase access to senior secondary education in underserved districts and improve quality in low-performing senior high schools in Ghana. Approval completed on 28 June 2017. Environmental Assessment Category B. Project: P163628. US$ 40.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives (R) Ghana Energy Sector Transformation Initiative Project: The Project development objectives is to: strengthen the capacity of the energy sector to implement sector reforms, and improve energy sector planning and coordination in Ghana July 2018 Africa PAGE 30 Approval completed on 13 July 2018. Environmental Assessment Category C. Project: P163984. US$ 20.0 (IDA Credit). Con- sultants will be required. Ministry of Energy. Additional Financing for Ghana Oil and Gas Capacity Building Project: The project objective is to (i) improve public management and regulatory capacity while enhancing transparency; and (ii) strengthen local technical skills in Ghana's emerging oil and gas sector. Approval completed on 27 June 2014. Environmental Assessment Category C. Project: P148224. US$ 19.8 (IDA Credit). Consultants will be required. Ghana: Artisanal and Small-Scale Mining Formalization: Create enabling conditions for the orderly, safe, sustainable, and environmentally sound development of artisanal and small-scale mining in Ghana. Identification completed on 25 June 2018. US$ 30.0/10.0/7.8 (IDA Credit/CIF/GEFU). Consulting services to be determined. Implementing agency(ies) to be de- termined. Environment & Natural Resources Dedicated Grant Mechanism for Local Communities Project: The PDO is to strengthen knowledge and practices of targeted local communities in the Select Regions of the Member Country in REDD+processes and sustainable forest manage- ment. Approval completed on 26 April 2017. Environmental Assessment Category B. Project: P145316. US$ 5.5 (CSCF). Con- sultants will be required. KASA; National Steering Committee; Solidaridad. Finance, Competitiveness and Innovation (R) Tourism Development Project: The project development objective is to improve the performance of tourism in tar- geted destinations in Ghana Approval completed on 13 July 2018. Environmental Assessment Category B. Project: P164211. US$ 40.0 (IDA Credit). Consultants will be required. Ministry of Tourism, Arts and Culture. (R) Ghana Financial Sector Development Project: The objective of the project is to promote financial sector soundness and access to financial services by individuals. Negotiations authorized on 23 July 2018. Environmental Assessment Category C. Project: P161787. US$ 30.0 (IDA Credit). Consultants will be required. Ministry of Finance. Ghana Economic Transformation Program: The Program Development Objective is to promote sustainable private investments, productive jobs and firm growth in non-resource based sectors. Concept completed on 29 June 2018. Project: P166539. US$ 100.0 (IDA Credit). No consultants are required. Ghana Investment Promotion Center; Ministry of Trade and Industry; Ministry of Business Development. Governance Ghana Public Sector Reform for Results Project: To improve access, quality and accountability of delivery of adminis- trative services provided by selected Ministries, Departments and Agencies (MDAs). Concept completed on 26 January 2018. Environmental Assessment Category C. Project: P164665. US$ 30.0 (IDA Credit). Consulting services to be determined. Office of the Senior Minister. Poverty and Equity Ghana Statistical Capacity Enhancement Program-for-Results Project: To enhance the capacity of the national sta- tistical system to produce and disseminate relevant and timely statistical data Identification completed on 10 January 2018. US$ 25.0 (IDA Credit). Consulting services to be determined. Ghana Statistical Service. Social Protection & Labor AF Ghana Social Opportunities Project: The Project Development Objectives (PDO) of this Additional Financing is to improve targeting of social protection programs and provide income support to poor households through LEAP grants and LIPW infrastructure in targeted districts. Approval completed on 27 May 2014. Environmental Assessment Category B. Pro- ject: P146923. US$ 50.0 (IDA Credit). Consultants will be required. Ministry of Gender, Children and Social Protection, Con- tact: Abdullah Al Shatter, Deputy Minister for Projects Programming; Ministry of Local Government and Rural Development Tel: (233-302) 818-1782, E-mail: kofibedu@yahoo.com, Contact: Robert Austin, National Coordinator. PAGE 31 Monthly Operational Summary July 2018 Promoting access to new and better jobs: The Development Objective is to promote access to new and better jobs. Con- cept completed on 22 June 2018. Environmental Assessment Category C. Project: P166996. US$ 100.0 (IDA Credit). Consult- ing services to be determined. Ministry of Employment and Labor Relations; Ministry of Education. Ghana Productive Safety Net Project: To support the Government in consolidating Ghana’s safety net system and in- creasing access to productive opportunities for extremely poor households. Concept completed on 10 April 2018. Environ- mental Assessment Category B. Project: P164603. US$ 60.0/14.0 (IDA Credit/DFID). Consulting services to be determined. Ministry of Local Government and Rural Development; Ministry of Gender, Children and Social Protection. Social, Urban, Rural and Resilience Global Practice (R) Ghana Secondary Cities Support Program: to improve urban management and basic urban services in participating municipal assemblies Appraisal completed on 16 July 2018. Environmental Assessment Category B. Project: P164451. US$ 100.0 (IDA Credit). No consultants are required. Ministry of Local Government and Rural Development. Greater Accra Clean, Resilient and Inclusive Development Project: The objective of the project is to improve flood and solid waste management, and provision of public services to targeted communities with Odaw Basin of Greater Accra Region. Identification completed on 7 June 2017. Environmental Assessment Category A. US$ 100.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Land Administration Phase 2 Additional Financing: To consolidate and strengthen land administration and manage- ment systems for efficient and transparent land services delivery Identification completed on 23 March 2018. Environmental Assessment Category B. US$ 35.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Transport & Digital Development Ghana Transport Sector Project - Additional Fin: Objective to be Determined. Approval completed on 4 November 2014. Environmental Assessment Category A. Project: P149444. US$ 25.0 (IDA Credit). Consulting services to be determined. Ministry of Roads and Highways and Ministry of Transport Tel: (233-302) 661-575, E-mail: duaquaye@yahoo.com, Contact: Dr. D. D. Darku Transport Sector Improvement Project: The Project Development Objectives are to: (i) reduce travel time on selected parts of the classified road network in Northern Ghana, (ii) promote road safety, and (iii) strengthen the institutional manage- ment of the transport sector. Approval completed on 6 June 2017. Environmental Assessment Category B. Project: P151026. US$ 150.0 (IDA Credit). Consultants will be required. Ministry of Finance, Contact: Major M.S. Tara (Rtd), Chief Director; Ministry of Transport, Contact: Twumasi Ankrah-Selby, Chief Director; Ministry of Roads and Highways, Contact: Godwin J. Brocke, Ag. Chief Director. Water AF Sustainable Rural Water and Sanitation Project: The projects development objective is to expand access to, and ensure sustainability of water and sanitation services in rural and small town communities in six regions over the next 6 years. Approval completed on 28 June 2017. Environmental Assessment Category B. Project: P163846. US$ 45.7 (IDA Credit). Con- sulting services to be determined. Implementing agency(ies) to be determined. Guinea Agriculture Guinea Agribusiness Development Project: 23.The Project development objectives are to improve competitiveness of selected value-chains of selected value chains and create economic opportunities for women and youth in project intervention areas. Concept completed on 14 June 2018. Environmental Assessment Category A. Project: P164184. US$175.0 (IBRD). Con- sultants will be required. Ministere de l'Agriculture. July 2018 Africa PAGE 32 Education Guinea Education Project for Results in Early Childhood and Basic Education: The Development Objective is to improve access to and the quality of early childhood and basic education and to strengthen the capacity of the education system to deliver better results. Identification completed on 7 June 2018. US$ 50.0 (IDA Credit). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Guinea Education Program for Results: The Development Objective is to improve service delivery in primary and sec- ondary education and to strengthen the Government's capacity to manage resources efficiently for better education results. Identification completed on 18 October 2017. Environmental Assessment Category B. US$ 40.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives Power Sector Recovery Project - Additional Financing: The Project Development Objective (PDO) is to improve the technical and commercial performance of the national power utility. Approval completed on 16 March 2018. Environmental Assessment Category B. Project: P160771. US$ 25.0 (IDA Credit). No consultants are required. Implementing agency(ies) to be determined. Governance Economic Governance Technical Assistance & Capacity Building - Additional Financing: The project develop- ment objective (PDO) is to modernize public financial and human resource management and enhance statistical capacity in Guinea. Approval completed on 9 June 2017. Environmental Assessment Category C. Project: P157662. US$ 15.0 (IDA Grant). Consulting services to be determined. Ministry of Economy and Finance. Social, Urban, Rural and Resilience Global Practice Guinea Support to Local Governance Project: The development objective of the Project is to improve local government capacity and performance in managing their public financial resources, delivering basic services and contributing to local conflict prevention. Identification completed on 27 June 2018. US$ 40.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Guinea Rural Mobility and Connectivity Project: The Project Development Objective (PDO) is to improve and sustain rural road connectivity to markets and social services Concept completed on 8 February 2018. Environmental Assessment Category B. Project: P164543. US$ 40.0/40.0 (IDA Credit/IDA Grant). No consultants are required. Ministère de l'Agriculture. Guinea-Bissau Education (R) Guinea Bissau: The Quality Education for All Project: The Project Development Objective is to improve the teach- ing and learning environment in grades 1-4 in targeted schools in Guinea-Bissau. Approval completed on 31 July 2018. Envi- ronmental Assessment Category C. Project: P160678. US$ 10.7/4.3 (IDA Grant/FTIE). Consultants will be required. The Min- istry of Education, Higher Education, Youth, Culture and Sports. Energy & Extractives Emergency Electricity and Water Rehabilitation Project - Additional Financing: This Additional Financing of $2.1m will aim to (i) cover any cost over-run on the 5 MW of thermal power plus fuel oil reservoir planned under the EEWRP with a budget of $6m, and/or (ii) cover any needed scale up of TA for reform/transformation of utility EAGB into a well- managed commercial entity, which has a budget of $1.5m under EEWRP. Both of these components were constrained due to PAGE 33 Monthly Operational Summary July 2018 limited IDA CRW funds under emergency operation. Bids for 5 MW thermal power are expected in February 2011, by which time it will become clear to what extent there is a shortage of funds for this component. Approval completed on 17 May 2011. Environmental Assessment Category B. Project: P125374. US$ 2.2 (IDA Grant). Consultants will be required. Ministry of Economy, Planning, and Regional Integration Tel: (245) 320-7286, E-mail: hembalo@hotmail.com, Contact: Luis Alberto Gomes, Coordinator. Social Protection & Labor Rural Community-Driven Development Project Add Fin: Objective to be Determined. Approval completed on 7 Feb- ruary 2014. Environmental Assessment Category B. Project: P146746. US$ 15.0 (IDA Grant). Consulting services to be deter- mined. Project Coordination Unit Tel: 245955219738, E-mail: alfamajal@gmail.com, Contact: João S. Handem Jr., Project Coordinator. Guinea Bissau: Safety Nets and Basic Services Project: The Project Development Objective is to provide poor com- munities and households with greater access to basic service infrastructure and social safety nets. Approval completed on 18 May 2018. Environmental Assessment Category B. Project: P163901. US$ 15.0 (IDA Grant). No consultants are required. Pro- ject Coordination Unit (PCU). Transport & Digital Development Guinea-Bissau - Rural Transport Project: The development objective is to improve, in selected areas, the rural popula- tion's physical access to markets and essential services. Concept completed on 15 March 2017. Environmental Assessment Category B. Project: P161923. US$ 15.0 (IDA Credit). Consultants will be required. Project Management Unit located at Min- istry of Public Works; Project Coordination Unit of Rural Community-Driven Development Project. Water Emergency Water and Electricity Services - Additional Financing: The objective of the Project is to: (a) restore and increase the access of the population of the Recipient's capital city of Bissau to safe water and improve the quality of water services; (b) improve the reliability of electricity supply to the population of Bissau; and (c) improve the performance of EAGB. Approval completed on 30 May 2017. Environmental Assessment Category B. Project: P161630. US$ 18.0/7.0 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Economic and Regional Integration; PHIMP. Kenya Energy & Extractives Additional Financing: Kenya Electricity Expansion Project: The project has two development objectives: (a) increase the capacity, efficiency, and quality of electricity supply; and (b) expand access to electricity in urban, peri-urban, and rural areas Approval completed on 15 June 2016. Environmental Assessment Category A. Project: P153179. US$ 68.0/3.0 (IDA Credit/GPBA). Consultants will be required. Implementing agency(ies) to be determined. Kenya Electricity System Improvement Project: To increase the access, capacity and reliability of the transmission and distribution system in Kenya. Concept completed on 26 February 2018. Environmental Assessment Category A. Project: P166646. US$ 370.0 (IDA Credit). Consultants will be required. The Kenya Power and Lighting Company Limited (KPLC); Kenya Electricity Transmission Company Limited (KETRACO); Ministry of Energy and Petroleum. KenGen Guarantee Program: Objective to be Determined. Approval completed on 26 April 2018. Environmental Assess- ment Category C. Project: P162422. US$ 180.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. July 2018 Africa PAGE 34 Environment & Natural Resources Kenya Marine Fisheries and Socio-Economic Development Project (KEMFSED): The Project Development Ob- jective is to improve management and increase value-addition of priority fisheries and aquaculture, and to strengthen access to livelihoods for coastal communities in Kenya. Concept completed on 16 October 2017. Environmental Assessment Category B. Project: P163980. US$ 100.0 (IDA Credit). Consultants will be required. Ministry of Agriculture and Irrigation. Finance, Competitiveness and Innovation Kenya Affordable Housing Finance Project: The development objective is to expand access to affordable housing fi- nance and help build an enabling environment for private investment in affordable housing delivery. Concept completed on 11 April 2018. Environmental Assessment Category F. Project: P165034. US$250.0 (IBRD). Consulting services to be deter- mined. Kenya Mortgage Refinance Company. Kenya Industry and Entrepreneurship: Increase innovation and productivity in select private sector firms Approval completed on 15 June 2018. Environmental Assessment Category B. Project: P161317. US$ 50.0 (IDA Credit). Consultants will be required. Ministry of Industry, Trade and Cooperatives. Kenya Infrastructure Finance Public Private Partnership Additional Financing Project: The overall objective of this project is to increase private investment in the Kenya infrastructure market across sectors and to sustain this participation over an extended period of time. Approval completed on 5 July 2017. Environmental Assessment Category A. Project: P162182. US$ 50.0 (IDA Credit). Consultants will be required. Ministry of Finance. Long-term Finance for PPP/ Nairobi-Nakuru Toll Road Guarantee: Crowd in long term local currency financing into PPP Infrastructure projects Concept completed on 8 February 2018. Project: P165545. US$ 80.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Social Protection & Labor Additional Financing for Cash Transfers for Orphans and Vulnerable Children: To increase social safety net ac- cess for extremely poor OVC households and to build the capacity of the government to more effectively deliver the National Safety Net Program. Approval completed on 31 October 2013. Environmental Assessment Category C. Project: P146161. US$ 10.0/56.4 (IDA Credit/DFID). Consultants will be required. Ministry of Labor, Social Security and Services Tel: NA, E-mail: mwasiajiwf@yahoo.com, Contact: Winnie Mwasiaji, Social Protection Secretariat Coordinator. (R) Kenya Social and Economic Inclusion Project: To strengthen delivery systems for enhanced access to social and economic inclusion services and shock-responsive safety nets to poor and vulnerable households. Appraisal completed on 18 July 2018. Environmental Assessment Category B. Project: P164654. US$ 250.0/93.0 (IDA Credit/FSCO). Consultants will be required. Ministry of Labor and Social Protection. Social, Urban, Rural and Resilience Global Practice Kenya Informal Settlements Improvement Projects - Additional financing: To improve living conditions in infor- mal settlements in selected urban centers in selected counties in Kenya. Approval completed on 8 June 2015. Environmental Assessment Category B. Project: P144966. US$ 8.3 (SPTF). Consulting services to be determined. Implementing agency(ies) to be determined. Kenya Informal Settlements Improvement Project 2: To enhance tenure security and access to basic services in infor- mal settlements in Kenya. Identification completed on 20 June 2018. US$ 150.0 (IDA Credit). Consulting services to be de- termined. Implementing agency(ies) to be determined. Kenya Development Response to Displacement Impacts Project Additional Financing: Project Development Ob- jective (from Project Appraisal Document) The Project Development Objective is to improve access to basic social services, expand economic opportunities, and enhance environmental management for communities hosting refugees in the target areas in the Recipient's territory. PAGE 35 Monthly Operational Summary July 2018 Identification completed on 21 November 2017. Environmental Assessment Category B. US$ 8.2 (MSC1). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Kenya Digital Transport Solutions Project: The project's development objective is to enhance the delivery of services and information available to Kenyans in the transport sector through digital solutions. Concept completed on 25 June 2018. Environmental Assessment Category B. Project: P164086. US$200.0 (IBRD). Consultants will be required. Kenya ICT Au- thority; National Transport Safety Authority (NTSA); Ministry of Transport, Infrastructure Housing, and Urban Development. Mass Rapid Transit Development Project: To improve transport mobility, accessibility, and safety along selected section of the Northern Corridor road (A104) in the Nairobi metropolitan area (NMA) and to enhance urban transport planning ca- pacity in the NMA and selected secondary cities in Kenya. Concept completed on 5 December 2017. Environmental Assess- ment Category A. Project: P159891. US$ 250.0 (IDA Credit). Consultants will be required. Ministry of Transport, Infrastruc- ture, Housing and Urban Development; Kenya Railways Corporation (KRC); Kenya National Highways Authority (KeNHA); Nairobi Metropolitan Area Transport Authority (NAMATA). Northeastern Transport Improvement Project: The proposed project development objectives are to improve the move- ment of goods and people along Isiolo-Wajir-Mandera part of the Mombasa-Garissa- Wajir- Mandera- Mogadishu road corri- dor and to enhance connectivity between Kenya and Somalia and Ethiopia. Concept completed on 19 October 2016. Envi- ronmental Assessment Category B. Project: P161305. US$ 500.0 (IDA Credit). Consultants will be required. Kenya National Highways Authority (KeNHA); Ministry of Transport, Infrastructure, Housing and Urban Development; ICT Authority. Kenya Transparency and Infrastructure Project Additional Financing 2: The RCIP Program, the CIP 1,2,3 Projects and following CIP Projects have two overarching development objectives (i) to contribute to lower prices for international capacity and extend the geographic reach of broadband networks (the "connectivity development objective") and (ii) contrib- ute to improved Government efficiency and transparency through egovernment applications (the "transparency development objective"). Approval completed on 26 March 2014. Environmental Assessment Category B. Project: P149019. US$ 30.0 (IDA Credit). Consulting services to be determined. ICT Authority Tel: (254-20) 208-9061, E-mail: vkyalo@ict.go.ke, Contact: Mr. Victor Kyalo, vkyalo@ict.go.ke. Aviation Modernization Project: Improve security and service provision at Jomo Kenyatta International Airport to meet international standards and enhance public oversight capabilities for the aviation sector in Kenya. Concept completed on 17 November 2016. Environmental Assessment Category B. Project: P156971. US$200.0/85.0 (IBRD/IDA Credit). Consultants will be required. Kenya Civil Aviation Authority; Kenya Airports Authority. Water Addl Financing - Kenya Water Security and Climate Resilience Project: The PDOs of KWSCRP-1 are to (a) increase availability and productivity of irrigation water for project beneficiaries and (b) enhance the institutional framework and strengthen capacity for water security and climate resilience in certain areas of the country. Within the PDO, ‘capacity for water security and climate resiliency’ primarily includes improved water services, flood protec- tion, and analytical capacity to understand and manage hydrological variability. Approval completed on 26 June 2015. Envi- ronmental Assessment Category A. Project: P151660. US$ 58.0/3.5 (IDA Credit/KWBP). Consultants will be required. Imple- menting agency(ies) to be determined. Lesotho Agriculture Lesotho Smallholder Agriculture Development Project Additional Financing: Increase in marketed output among project beneficiaries in Lesotho’s smallholder agriculture sector and, to improve the Recipient’s capacity to respond promptly and effectively to an Eligible Crisis or Emergency. Approval completed on 29 September 2017. Environmental Assessment July 2018 Africa PAGE 36 Category B. Project: P162397. US$ 10.0 (IDA Credit). No consultants are required. Implementing agency(ies) to be deter- mined. Lesotho Smallholder Agriculture Development Project Phase 2: The development objectives of the project are to: (i) improve reliability and efficiency of the irrigation and drainage services in selected areas of Lesotho; (ii) strengthen access to markets by project beneficiaries in the horticulture and livestock subsectors of the country; and (iii) in the event of an Eligible Crisis or Emergency, provide immediate and effective response. Identification completed on 12 September 2017. En- vironmental Assessment Category A. US$ 10.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives Lesotho Electricity Sector Development: The Project Development Objective is to scale up renewable energy-based off- grid electrification in rural and peri-urban areas of Lesotho. Identification completed on 20 February 2018. Environmental Assessment Category B. US$ 10.0/12.9 (IDA Credit/CIF). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population (N) Additional Financing for Lesotho Performance Enhancement Project: The overall project development objec- tive is to: (i) increase utilization and improve the quality of primary health services in selected districts in Lesotho with a particular focus on maternal and child health, TB and HIV; (ii) improve contract management of select PPPs; and (iii) in the event of an Eligible Crisis or Emergency, to provide immediate and effective response to said Eligible Crisis or Emergency. Identification completed on 24 July 2018. Environmental Assessment Category B. US$ 8.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Other Second Private Sector Competitiveness & Economic Diversification - AF: To improve the business environment for firms, strengthen select government institutions, and further diversify the economy. Approval completed on 24 March 2017. Environmental Assessment Category B. Project: P160964. US$ 13.4 (IDA Credit). Consultants will be required. Ministry of Finance. Social Protection & Labor Livelihoods Project: The objective of the project is to promote income generating opportunities for disadvantaged youth in Lesotho. Concept completed on 1 March 2018. Environmental Assessment Category C. Project: P164981. US$ 15.0 (IDA Credit). Consultants will be required. Ministry of Social Development. Additional Financing to Social Assistance project - CRW funds: The objective of the Project is to support the GoL in improving the efficiency, equity and shock responsive function of selected Social Assistance programs and, in the event of an Eligible Crisis or Emergency, to provide immediate and effective response to said Eligible Crisis or Emergency. Approval com- pleted on 6 December 2016. Environmental Assessment Category C. Project: P160934. Consultants will be required. Ministry of Social Development; Ministry of Finance; Ministry of Finance. Water Lesotho WSIP2 AF LHWP Ph2 Hydropower: To support the Kingdom of Lesotho in: (i) developing and sustaining an environmentally sound, socially responsible, and financially viable framework for the MDWSP, (ii) increasing the quantity of safe, bulk water supplied to Teyateyaneng, (iii) strengthening institutions and related instruments in the water sector; and (iv) advancing strategic infrastructure investments. Approval completed on 20 June 2014. Environmental Assessment Category A. US$ 9.1/6.4 (IDA Credit/IDA Grant). Consultants will be required. Lesotho Highlands Development Authority Tel: (266- 22) 311-281, E-mail: lhwp@lhda.org.ls, Contact: .. Lowlands Water Development Project: The Proposed Development Objectives are to: (i) increase potable bulk water availability in four priority water zones; (ii) improve access to reliable water supply and sanitation services in each of the PAGE 37 Monthly Operational Summary July 2018 priority water zones; (iii) strengthen institutional capacity to manage the LLWSS; and (iv) enable the government of Lesotho to respond promptly and effectively to any eligible emergency. Concept completed on 27 November 2017. Environmental Assessment Category A. Project: P160672. US$ 78.0/50.0/99.0 (IDA Credit/ECDF/EUIB). Consultants will be required. Low- lands Unit. Liberia Agriculture Smallholder agriculture Transformation and Agribusiness Revitalization Project (STAR-P): The proposed de- velopment objective is to increase agricultural productivity and promote commercialization of smallholder farmers through productive linkage between the farmers and the private agribusiness firms in selected value chains. The project will aim at small holder commercialization and facilitating private sector investment in agribusiness by fostering productive business linkages between smallholder farmers and selected agribusiness firms with capacity strengthened by pri- vate business service providers. Agribusiness firms and SME groups will be selected on the basis of their innovative plans and experience working with organized farmers’ groups or cooperatives. The project will aim at supporting a few commodity value - chains with significant potential for enhancing competitiveness and creating jobs. Concept completed on 29 June 2017. Envi- ronmental Assessment Category B. Project: P160945. US$ 25.0 (IDA Credit). Consultants will be required. Ministry of Agri- culture. Education Secondary Education Teaching for Results: Improve access and quality of secondary education in math, science, and vocational skills Identification completed on 27 September 2017. Environmental Assessment Category C. US$ 25.0 (IDA Credit). Consulting services to be determined. Liberia Ministry of Education. Health, Nutrition & Population Liberia Health Systems Strengthening Project - Additional Financing: The new proposed PDO is to improve the quality of primary and secondary health care services, with a focus on maternal, neonatal and child health. Approval completed on 23 February 2017. Environmental Assessment Category B. Project: P162477. US$ 16.0 (GFF). Consultants will be required. Implementing agency(ies) to be determined. Poverty and Equity Liberia Statistical Capacity Strengthening Project: The project development objective is to strengthen the capacity of LISGIS to improve the quality and accessibility of statistics. Concept completed on 21 December 2017. Environmental Assess- ment Category C. Project: P164713. US$ 5.0 (IDA Grant). Consulting services to be determined. Liberia institute of Statistics and Geo-Information Systems (LISGIS). Transport & Digital Development Liberia South Eastern Corridor Road Asset Management Guarantee Project: The Project Development Objectives (PDOs) are to support the Recipient's effort to reduce motorized vehicles' travel time along the selected sections of South Eastern Ganta-Zwedru-Harper corridor and to improve institutional arrangements and capacity in the road sector. Identifi- cation completed on 26 October 2017. US$ 29.0/48.0 (IDA Credit/GUID). Consulting services to be determined. Implement- ing agency(ies) to be determined. Second Additional Financing to Liberia Road Asset Management Project: The objective of the project is to support the Recipient's efforts to reduce transport costs along the road corridor from Monrovia to the Guinea border and to maintain the road in good condition over a 10-year period. Approval completed on 8 May 2017. Environmental Assessment Category B. Project: P161939. US$ 28.0 (IDA Credit). Consultants will be required. Ministry Of Finance; Infrastructure Implementation July 2018 Africa PAGE 38 Unit. Southeastern Corridor Road Asset Management Project: 16.The Project Development Objectives (PDOs) are to sup- port the Recipient’s effort to reduce transport costs along the South Eastern Ganta -Zwedru corridor and to improve institu- tional arrangements and capacity in the road sector. Concept completed on 22 December 2014. Environmental Assessment Category B. Project: P149279. US$ 29.0/48.0 (IDA Credit/GUID). Consulting services to be determined. Infrastructure Im- plementation Unit (IIU). Water Monrovia Urban Sanitation Infrastructure Project: 11.The project development objective (PDO) is to increase access to improved sanitation facilities and reduce the pollution from wastewater in select areas in Monrovia. Concept completed on 7 February 2018. Environmental Assessment Category B. Project: P165877. US$ 20.0 (IDA Credit). Consultants will be re- quired. Liberia Water and Sewer Corporation. Madagascar Agriculture Madagascar Agriculture Growth and Land Management - Additional Financing: The proposed development ob- jective is to improve rural land tenure security and access to markets of targeted farming households in selected agricultural value chains in the Project Areas, and to provide immediate and effective response to an Eligible Crisis or Emergency. Identification completed on 26 February 2018. Environmental Assessment Category B. US$ 42.0 (IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Energy & Extractives Madagascar Electricity Sector Operations and Governance Improvement Project - AF to ESOGIP:

The Pro- ject Development Objective is to improve the operational performance of the national electricity utility (JIRAMA) and improve the reliability of electricity supply in the project area and, in the event of an eligible crisis or emergency, to provide immediate and effective response to said eligible crisis or emergency. Approval completed on 14 June 2018. Environmental Assessment Category B. Project: P164318. US$ 40.0 (IDA Credit). Consulting services to be determined. JIRAMA; Ministry of Energy and Hydrocarbons. MG - Scaling Solar Guarantee Project: The project development objective is to increase solar electricity generation ca- pacity and diversify electricity generation resources in Madagascar. Identification completed on 27 February 2018. US$ 2.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation (R) Madagascar Integrated Growth Poles and Corridor SOP-2: The development objective is to contribute to the sustainable growth of the tourism and agribusiness sectors by enhancing access to enabling infrastructure and services in the Target Regions of Madagascar. PIC 2.1 (SOP1) has supported economic recovery by improving the investment climate, increasing investor confidence, invest- ing in key infrastructure and restoring economic governance, to lay the foundation for inclusive growth and shared prosperity in the target regions. Negotiations authorized on 24 July 2018. Environmental Assessment Category B. Project: P164536. US$ 70.0 (IDA Credit). Consultants will be required. PIC National Project Secretariat. PAGE 39 Monthly Operational Summary July 2018 Health, Nutrition & Population AF-Emergency Support Critical Education Health and Nutrition Services: The Project Development Objective (PDO) is to preserve critical education, health and nutrition service delivery in targeted vulnerable areas in the recipient’s territory. Approval completed on 27 February 2014. Environmental Assessment Category B. Project: P148749. US$ 9.8/0.2 (IDA Credit/IDA Grant). Consultants will be required. Social Protection & Labor AF Social Safety Net Drought Response: The project development objective (PDO) is to support the government in increasing the access of extremely poor households to safety net services and in laying the foundations for a social protection system. Approval completed on 10 November 2016. Environmental Assessment Category B. Project: P160554. US$ 15.0 (IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Transport & Digital Development Madagascar Transport Connectivity SOP1: The Project Development Objective is to enhance transport connectivity in selected areas in support of economic growth and livelihood of communities and to provide immediate response to an eligible crisis or emergency as needed. The Program objective of the Series of Projects (SOP) is the same as the PDO of this Project. Concept completed on 25 April 2018. Environmental Assessment Category A. Project: P166526. US$ 80.0 (IDA Credit). Con- sultants will be required. Autorité Routière de Madagascar; Ministère des Transports et de la Météorologie; Ministère des Travaux Publics. Malawi Education Equity with Quality and Learning at Secondary (EQUALS): The overall PDO for the proposed EQUALS Multiphase Program is: To improve student learning at the secondary level and to increase access to secondary education. The PDO for the proposed Phase 1 of the EQUALS Project is: To improve the quality of mathematics and science instruction and increase access to secondary education in Community Day Secondary Schools (CDSSs). Concept completed on 15 March 2018. Environmental Assessment Category B. Project: P164223. US$ 75.0 (IDA Credit). Consulting services to be determined. Ministry of Education, Science and Technology. Energy & Extractives Malawi - Electricity Access Project: The development objective of the project is to increase electricity access to house- holds, businesses, and public facilities. Concept completed on 14 May 2018. Environmental Assessment Category B. Project: P164331. US$ 150.0 (IDA Credit). Consultants will be required. Electricity Supply Corporation of Malawi, Ltd.. Mpatamanga Hydropower Project: The objective is to increase hydropower generation capacity through a public private partnership in Malawi. Concept completed on 8 June 2018. Environmental Assessment Category A. Project: P165704. US$ 200.0/150.0 (IDA Credit/GUID). Consultants will be required. Ministry of Natural Resources Energy & Mining. Health, Nutrition & Population Additional Financing to Nutrition and HIV/AIDS Project: To increase coverage of selected nutrition, HIV and AIDS services and strengthen disease outbreak preparedness in project areas. Approval completed on 23 June 2016. Environmental Assessment Category B. Project: P156129. US$ 22.6 (IDA Credit). No consultants are required. Implementing agency(ies) to be determined. Investing in Early Years for Growth and Productivity in Malawi: The project development objective is to increase July 2018 Africa PAGE 40 utilization of key interventions that enhance child development in children from conception to 59 months in project areas. Concept completed on 21 December 2017. Environmental Assessment Category B. Project: P164771. US$ 50.0/10.0 (IDA Grant/GFF). Consulting services to be determined. Ministry of Gender, Children, Disability and Social Welfare; Ministry of Health. Social Protection & Labor Second AF for Strengthening Safety Nets Systems Project MASAF IV: The Project Development Objective is to im- prove resilience among poor households and to strengthen Malawi’s social safety net delivery systems and coordination across programs. Approval completed on 8 November 2016. Environmental Assessment Category B. Project: P160519. US$ 22.3/47.7 (IDA Credit/IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Additional Financing Strengthening Safety Nets Systems Proj. (MASAFIV): The Project Development Objective of the proposed project is to strengthen Malawi’s social safety net delivery systems and coordination across programs. Approval completed on 26 March 2015. Environmental Assessment Category B. Project: P148617. US$ 6.8/68.2 (IDA Credit/IDA Grant). Consulting services to be determined. Local Development Fund - Technical Support Team (LDF-TST). Trade & Competitiveness Business Enabling Environment Project: BUSINESS ENABLING ENVIRONMENT PROJECT Identification completed on 23 May 2013. Environmental Assessment Category C. US$ 5.2 (AFRF). Consulting services to be determined. Implement- ing agency(ies) to be determined. Water Malawi Resilient Productive Landscapes Project: Increase adoption of resilience-enhancing natural resource manage- ment practices to sustain and protect energy security and boost productivity and livelihoods in targeted priority landscapes Identification completed on 8 June 2018. US$ 100.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Mali Agriculture Mali Drylands Development Project: To improve agricultural productivity and strengthen resilience of rural households living in the targeted dryland areas Approval completed on 5 July 2018. Environmental Assessment Category B. Project: P164052. US$ 30.0/30.0 (IDA Credit/IDA Grant). Consulting services to be determined. Ministry of Agriculture. Education Mali Secondary Education Support Project: The Project Development Objective is to improve the access to secondary education, put in place systems which govern its quality, and enhance the capacity of the Ministry of Education for better education service delivery. Concept completed on 3 May 2018. Environmental Assessment Category B. Project: P164032. US$ 20.0/30.0 (IDA Credit/IDA Grant). Consulting services to be determined. Mohomodou Taifour. Energy & Extractives Mali Electricity Sector Improvement Project (MESIP): The Program Development Objective (PDO) is to improve EDM-S.A. operational performances; expand electricity access in selected areas; Concept completed on 4 April 2018. Envi- ronmental Assessment Category B. Project: P166796. US$ 48.0 (IDA Credit). Consultants will be required. Energie du Mali - S.A. Mali Rural Electrification Hybrid System Project - GPOBA: The Mali Rural Electrification Hybrid System Project (US$25 million – IDA; US$ 15.5 million - Climate Investment Funds) prepared under the Scaling Up Renewable Energy Pro- gram in Low Income Countries (SREP) aims i) to increase the share of renewable energy generation in rural electricity supply PAGE 41 Monthly Operational Summary July 2018 and ii) to contribute to increased access to modern energy services in rural areas. The proposed GPOBA component (US$ 5 million) will support the objectives of the Program by partially subsidizing the investment cost of mini-grids’ densification/ex- tension, SHSs and internal wiring to make access to clean energy affordable to low income households in rural, isolated areas. Promoting OBA approaches in the rural electrification program is important for unlocking additional US$1.6 million of private sources of funding for rural energy development, maximizing the benefits of renewable energy generation (hybridization of mini-grids with solar energy under IDA project) through increased access, enhancing the performance of private operators while making off-grid connections affordable to the poor. The grant will be managed by AMADER and implemented by se- lected private operators. Approval completed on 11 December 2013. Environmental Assessment Category B. US$ 5.0 (GPBA). Consulting services to be determined. Implementing agency(ies) to be determined. FCS RE Segou Solaire Mali Project: The Project Development Objective is to promote the introduction of grid-connect ed renewable energy in Mali through an IPP Approval completed on 8 June 2017. US$ 8.2/6.2 (AFDB/GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Banda Gas to Power Guarantee: The Gas To Power Project will use natural gas discovered offshore of Mauritania for a power station to be built near Nouakchott. The power will be sold to SOMELEC in Mauritania, SENELEC in Senegal and EDM in Mali using the existing OMVS regional grid. A PRG is required to guarantee gas payments to the producer Tullow Oil esti- mated at $104m. Government of Mali needs to provide a counter-guarantee to cover the proportion of the energy that will be exported to EDM estimated at $17m (equivalent to IDA allocation of $4.25m given 1:4 leverage for IDA PRGs). Approval completed on 29 May 2014. Environmental Assessment Category A. Project: P145664. US$ 32.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Governance Mali Fiscal Decentralization for Better Service Delivery: The project will contribute to strengthening fiscal manage- ment in local governments for better service delivery. Concept completed on 1 May 2018. Environmental Assessment Category C. Project: P164561. US$ 65.0 (IDA Grant). No consultants are required. Ministry of Finance. Health, Nutrition & Population Mali - Accelerating Progress Towards Universal Health Coverage: The objective of the project is to improve the utilization of quality RMNCAH and nutritional services, especially among the poorest households, in targeted areas. Concept completed on 11 May 2018. Environmental Assessment Category B. Project: P165534. US$ 50.0 (IDA Credit). No consultants are required. Ministère de la Santé. Social Protection & Labor Safety Nets Project (Jigisemejiri): The objectives of the project are to increase access to targeted cash transfers for poor and vulnerable households and build an adaptive national safety net system in Recipient's territory . Approval completed on 5 July 2018. Environmental Assessment Category C. Project: P165064. US$ 52.0/2.4 (IDA Grant/AFRH). No consultants are required. Unite Technique de Gestion des filets sociaux au Mali - JigisemeJiri. Social, Urban, Rural and Resilience Global Practice Additional Financing - Mali Reconstruction and Economic Recovery Project: The objective of the proposed project is to rehabilitate basic infrastructure and restore productive activities of communities impacted by the crisis in Mali. Identifi- cation completed on 12 April 2018. Environmental Assessment Category B. US$ 9.5/2.2 (IDA Grant/GFRC). Consultants will be required. Implementing agency(ies) to be determined. Mali Hydrological and Meteorological Services Modernization Project: The proposed Project Development Objec- tive (PDO) is to improve the country’s hydro-meteorological, early warning and response systems and services in targeted areas. Concept completed on 31 March 2017. Environmental Assessment Category B. Project: P161406. US$ 8.3/22.8 (IDA Grant/GCF). Consultants will be required. Ministry of Security and Civil Protection (MSPC) - Directorate-General for Civil Protection (DGPC). July 2018 Africa PAGE 42 Mauritania Education Mauritania Education Support Project: To improve quality of teaching and education services in selected regions. Identification completed on 20 June 2017. Environmental Assessment Category B. US$ 25.0/11.8 (IDA Credit/EFAF). Con- sulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives MR-Banda Gas to Power Guarantee: The gas to power project will use natural gas discovered offshore for a power station to be built near Nouackchott. The power will be sold to SOMELEC in Mauritania, Senelec in Senegal and EDM in Mali using the existing OMVS regional grid Approval completed on 29 May 2014. Environmental Assessment Category A. Project: P107940. US$ 130.0 (GUID). Consultants will be required. Ministry of Energy Tel: (222-46) 431-537, E-mail: kane@acces.mr, kane@hydraulique.gov.mr, Contact: Mamadou Amadou Kane, Directeur General de l'Electricite. Finance, Competitiveness and Innovation Nouadhibou Eco-Seafood Cluster Project AF: The objective of the proposed project is to support the development of a seafood cluster that promotes sustainable management of fisheries and creates value for communities in Nouadhibou and to improve the business environment for boosting competition and inclusiveness of the Mauritanian private sector. Identification completed on 27 June 2017. Environmental Assessment Category B. US$ 8.0 (IDA Grant). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Governance (R) Mauritania Public Sector Governance Project Additional Financing: The revised Project Development Objec- tive (PDO) is to enhance transparency and improve the mobilization, allocation and management of public resources Approval completed on 12 July 2018. Environmental Assessment Category C. Project: P165501. US$ 14.5 (IDA Credit). Consultants will be required. Ministry of Economy and Finance. Social Protection & Labor Mauritania Youth Employment Project: The Project Development Objective is to promote the employability of vulner- able youth in Mauritania. Identification completed on 20 December 2016. US$ 25.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Water Mauritania Rural Water Supply and Sanitation: Increasing Access to Water and Sanitation in Mauritania rural areas and small towns Identification completed on 4 April 2018. US$ 30.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Mozambique Agriculture Smallholder Irrigated Agriculture and Market Access Project- IRRIGA 1: The proposed Project Development Ob- jective (PDO) is to improve smallholder agriculture productivity and market access in the project areas developed with irriga- tion and provide immediate and effective response to an eligible crisis or emergency. PAGE 43 Monthly Operational Summary July 2018 The Program objective of the Series of Projects (SOP) is to increase farmers' productivity and improve rural livelihoods through increased access to irrigation and markets. Approval completed on 29 June 2018. Environmental Assessment Category B. Project: P164431. US$ 55.0 (IDA Grant). Consultants will be required. Ministry Of Agriculture and Food Security. Education MZ- AF to Education Sector Support Project: The objective is to assist the Government to: (a) pilot various types of community-based ECD interventions; (b) include provision of nutrition services for pregnant mothers and young children; and (c) create an ECD unit within the Ministry of Education. Approval completed on 1 May 2012. Environmental Assessment Category B. Project: P124729. US$ 40.0 (IDA Credit). Consulting services to be determined. Government of Mozambique Tel: (258-21) 480-700, Contact: HE Said Baragoita, Minister. Science and Technology Project: Increase access and improve quality in selected priority disciplines across participating technical and higher education institutions, promote quality assurance and collaborative applied research and innovation in the sector. Identification completed on 20 March 2018. US$ 50.0 (IDA Credit). Consulting services to be determined. Imple- menting agency(ies) to be determined. Additional Financing for the Education Sector Support Project: The original PDO is to improve access to and, quality and equity of education. No changes to the PDO are proposed in the restructuring. Approval completed on 2 June 2017. Environmental Assessment Category B. Project: P160959. US$ 59.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Additional Financing for Mozambique Higher Education Science and Technology Project: The objectives of the Project are to: (a) increase the number and raise the quality of graduates at the undergraduate and graduate levels; (b) strengthen the national research capacities to produce research outputs of relevance to the Recipient’s strategic economic sectors; and (c) strengthen the institutional framework for TVET. Approval completed on 28 April 2015. Environmental As- sessment Category B. Project: P146602. US$ 45.0 (IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Energy & Extractives Mining and Gas Technical Assistance Additional Financing: The proposed project development objective is to strengthen the capacity and governance systems of key institutions to manage the mining and hydrocarbon sectors in Mozam- bique. Approval completed on 1 November 2017. Environmental Assessment Category B. Project: P161683. US$ 28.0/1.0 (IDA Grant/FSCO). Consultants will be required. Implementing agency(ies) to be determined. Temane Regional Electricity Project: The Project Development Objectives are to increase electricity generation capacity with private sector participation and to enhance transmission capacity for domestic and regional market. Identification com- pleted on 20 June 2016. Environmental Assessment Category A. US$ 300.0/30.0/80.0 (IDA Grant/FSCO/GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Mozambique Ligthing and Grid Access Project (Moz-LIGA): The Project Development Objective is to increase access to electricity for households and enterprises in Mozambique. Concept completed on 16 March 2018. Environmental Assess- ment Category B. Project: P165453. US$ 80.0/70.0 (IDA Grant/ESMP). Consulting services to be determined. Fundo de En- ergia (FUNAE); Electricidade de Moçambique (EdM). Environment & Natural Resources (R) Mozambique Conservation Areas for Biodiversity and Development - Phase 2: To improve management of target conservation area landscapes and enhance the living conditions of communities in and around these conservation areas. Negotiations authorized on 17 July 2018. Environmental Assessment Category B. Project: P166802. US$ 45.0 (IDA Grant). Consulting services to be determined. Fundo Nacional de Desenvolvimento Sustentavel. Finance, Competitiveness and Innovation Mozambique: Financial Inclusion and Stability Project: To promote financial inclusion and financial stability in July 2018 Africa PAGE 44 Mozambique. Concept completed on 18 May 2018. Environmental Assessment Category C. Project: P166107. US$ 40.0 (IDA Grant). Consultants will be required. Ministry of Economy and Finance; Deposit Guarantee Fund; Bank of Mozambique. Health, Nutrition & Population (N) Mozambique Primary Health Care Strengthening Additional Financing: The Program Development Objective is to improve the utilization and quality of reproductive, maternal, child and adolescent health and nutrition services, partic- ularly in underserved areas. Identification completed on 19 July 2018. Environmental Assessment Category B. US$ 57.1/33.1 (DFTD/PFED). Consultants will be required. Implementing agency(ies) to be determined. Social Protection & Labor Social Protection Project - Additional Financing: The objective of the project is to provide temporary income support to extremely poor households and to put in place the building blocks of a social safety net system. Approval completed on 10 March 2017. Environmental Assessment Category B. Consultants will be required. National Institute of Social Action. (R) Development and Jobs for the Next Generation: The PDO is to improve access to social services, employment and earnings opportunities for targeted youth. Concept completed on 20 July 2018. Environmental Assessment Category C. Pro- ject: P166100. US$ 80.0 (IDA Grant). Consultants will be required. INEP; Ministerio da Juventude e Desportos. Social, Urban, Rural and Resilience Global Practice Mozambique National Urban Development and Decentralization Project: Objective to be Determined. Concept completed on 8 December 2017. Environmental Assessment Category B. Project: P163989. US$ 100.0 (IDA Credit). Consult- ing services to be determined. Implementing agency(ies) to be determined. Mozambique Land Administration Project (Terra Segura): The Project Development Objective is to regularize land rights in selected priority districts and to modernize land administration services. Concept completed on 23 November 2017. Environmental Assessment Category B. Project: P164551. US$ 100.0 (IDA Grant). Consultants will be required. Ministry of Land, Environment and Rural Development. Mozambique Disaster Risk Management and Resilience Program: The Program Development Objective is to strengthen the capacity of the Government of Mozambique to prepare for and respond to disasters and increase the resilience of key public infrastructure in risk-prone areas. Concept completed on 7 June 2018. Environmental Assessment Category B. Project: P166437. US$ 80.0/8.0 (IDA Grant/GFDR). Consultants will be required. National Institute for Disaster Management (INGC). Additional Financing for the Emergency Resilient Recovery Project: The Project Development Objective is to re- store the functionality of critical infrastructure in a resilient manner in the disaster-affected provinces; and to improve the Government of Mozambique’s capacity to respond promptly and effectively to an eligible crisis or emergency. Approval completed on 13 January 2017. Environmental Assessment Category B. Project: P161559. Consultants will be re- quired. Implementing agency(ies) to be determined. Cities and Climate Change PPCR AF: The proposed Additional Financing (AF) is one of the pilot investments expected to be financed by the Pilot Project for Climate Resilience (PPCR). These pilots aim at to reduce current and future weather induced impacts on poor population and on Mozambique's fragile economy. This specific pilot will support green infrastruc- ture investments in the City of Beira aiming at protecting existing natural drainages courses to increase the city resilience to floods. Approval completed on 23 October 2014. Environmental Assessment Category B. US$ 6.5/9.3 (CSCC/CSCF). Consult- ing services to be determined. Administration for Water Supply and Sanitation Infrastructure (AIAS). Transport & Digital Development MZ-Additional Financing for Roads and Bridges Management and Maintenance Program - Ph-2 (AF3): The project development objective of this phase of the APL is to improve access of the population to all-season roads through PAGE 45 Monthly Operational Summary July 2018 maintenance, rehabilitation and upgrading of the classified road network. Approval completed on 31 March 2015. Environ- mental Assessment Category B. Project: P150956. US$ 73.6 (IDA Credit). No consultants are required. ROAD FUND (Fundo de Estradas), Contact: Cecilio Granchane, Chairman; National Road Administration (ANE), Contact: Atanasio Mugunhe, Di- rector General. Integrated Feeder Road Development Project: The Project Development Objective is to enhance road access in selected rural areas in support of livelihoods of local communities and to provide immediate response to an eligible crisis or emergency as needed. Approval completed on 8 May 2018. Environmental Assessment Category B. Project: P158231. US$ 150.0 (IDA Grant). Consultants will be required. Road Fund; National Roads Administration (Administração Nacional de Estradas, ANE). Water Mozambique Urban Sanitation and Drainage Project: To increase access to sanitation services in selected cities and increase national capacity to plan and implement sanitation investments in Mozambique. Concept completed on 28 Septem- ber 2017. Environmental Assessment Category A. Project: P161777. US$ 135.0 (IDA Grant). Consultants will be required. Na- tional Directorate of Water Supply and Sanitation (DNAAS); Water and Sanitation Infrastructure Management Agency (AIAS). Niger Agriculture NIGER - AGRICULTURAL AND LIVESTOCK TRANSFORMATION PROJECT: The Development Objective (PDO) is “to increase productivity and commercialization for selected agriculture and livestock value chains and strengthen the coun- try’s capacity to respond to eligible crisis or emergency�. Concept completed on 7 May 2018. Environmental Assessment Cat- egory B. Project: P164509. US$ 100.0 (IDA Credit). Consultants will be required. Ministry of Agriculture and Livestock. Additional Financing for the Niger Community Action Phase 3: The PDO under the AF was slightly revised to strengthen the Recipient’s local development planning and implementation capacities, to support the targeted population in improving agriculture productivity, and to respond promptly and effectively to an eligible crisis or emergency. Approval com- pleted on 29 June 2017. Environmental Assessment Category B. Project: P163144. US$ 20.8/2.3 (IDA Grant/PHRD). No consultants are required. Implementing agency(ies) to be determined. Education Niger Skills Development for Growth Project Additional Financing: The project development objective is to improve the effectiveness of formal technical and vocational training, short term skills development and apprenticeship programs in priority sectors. Approval completed on 10 April 2018. Environmental Assessment Category B. Project: P163467. US$ 50.0 (IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Energy & Extractives Additional Financing Electricity Access Expansion Project: The Project Development Objective (PDO) is to increase access to electricity. Negotiations authorized on 26 June 2018. Environmental Assessment Category B. Project: P164090. US$ 56.0/14.0/22.0/70.0 (IDA Credit/IDA Grant/ECEU/EUIB). No consultants are required. Implementing agency(ies) to be de- termined. Environment & Natural Resources Additional Financing for Niger CAPCR: The project development objective (PDO) is to improve the resilience of the populations and of production systems to climate change and variability in targeted Communes. Identification completed on 16 November 2017. Environmental Assessment Category B. US$ 9.6 (CRLD). No consultants are required. Implementing agency(ies) to be determined. July 2018 Africa PAGE 46 Governance Mining Governance Project: Improved Management and Transparency of Extractive Revenues Identification completed on 8 June 2017. US$ 30.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Other Niger: Smart Villages for rural growth and digital inclusion: The project aims at improving digital inclusion in rural areas, in order to bring transformative services based on digital technologies for selected social and economic sectors. Identi- fication completed on 15 May 2018. Environmental Assessment Category B. US$ 35.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Poverty and Equity Quality Data for Decision Making: To improve the quality, availability and use of macroeconomic and sector statistics. Approval completed on 6 July 2018. Environmental Assessment Category C. Project: P165062. US$ 20.0 (IDA Grant). Con- sulting services to be determined. Institut National de la Statsitique. Social Protection & Labor Niger Adaptive Safety Net Project 2: The PDO is to improve the capacity of the Niger adaptive safety net system to re- spond to shocks and to provide access to poor and vulnerable people to multiyear safety nets with accompanying measures. Concept completed on 26 June 2018. Environmental Assessment Category B. Project: P166602. US$ 40.0/40.0 (IDA Credit/IDA Grant). No consultants are required. Cellule Filets Sociaux. Youth Employment and Productive Inclusion Project: The objective of the project is to expand income-generating activities for youths in selected poor areas in Niger. Approval completed on 14 June 2018. Environmental Assessment Cate- gory C. Project: P163157. US$ 30.0 (IDA Grant). Consulting services to be determined. Ministry of Employment, Work and Social Protection. Social, Urban, Rural and Resilience Global Practice Niger Refugees and Host Communities Support Project: The project development objective is to improve access to basic services and economic opportunities for refugees and host communities in select areas. Negotiations authorized on 28 June 2018. Environmental Assessment Category B. Project: P164563. US$ 40.0/40.0 (IDA Credit/IDA Grant). Consultants will be required. Cabinet du Premier Ministre; Projet de Gestion des Risques de Catastrophes et de Développement Urbain; Executive Secretariat for the SDS Sahel Niger (SE/SDS Sahel-Niger). Transport & Digital Development Rural Mobility and Connectivity Project: The project development objective is to improve road access of farming com- munities to markets and essential services in selected areas. Concept completed on 27 December 2017. Environmental As- sessment Category B. Project: P164498. US$ 50.0 (IDA Credit). Consultants will be required. Ministry of Equipment. Water Urban Water and Sanitation Project - AF: To increase access to sustainable water supply services and to improved san- itation services in some urban areas in the recipient's territory. Approval completed on 30 June 2016. Environmental Assessment Category B. Project: P159240. US$ 10.0/60.0 (IDA Credit/IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. PAGE 47 Monthly Operational Summary July 2018 Nigeria Agriculture Second Additional Financing to Third National Fadama Development Proj: The new PDO will be: to increase the incomes for users of rural lands and water resources in a sustainable manner, and to contribute to restoration of the livelihoods of conflict affected households in the selected area in the North East of the Recipient’s territory Approval completed on 7 June 2016. Environmental Assessment Category B. Project: P158535. US$ 50.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Livestock Productivity and Resilience Support Project: The Project Development Objectives (PDO) is to improve productivity, resilience and market access of selected livestock value chains, and to strengthen institutional capacity in service delivery. Concept completed on 18 July 2017. Environmental Assessment Category B. Project: P160865. US$ 200.0 (IDA Credit). Consultants will be required. Federal Ministry of Agriculture and Rural Development. Ogun State Nigeria:Agricultural Production and Industrialization PforR: To support the agriculture production and industrialization program of the Ogun State government by improving the business environment, stimulating agriculture, enhancing skills and strengthening governance Identification completed on 23 May 2017. Environmental Assessment Cate- gory B. US$ 350.0 (IDA Credit). Consulting services to be determined. Ministry of Budget and Planning. Education Innovation Development and Effectiveness in the Acquisition of Skills (IDEAS): To enhance the quality and rele- vance of skills development in Nigeria. Concept completed on 28 June 2018. Environmental Assessment Category B. Project: P166239. US$ 200.0 (IDA Credit). Consultants will be required. Federal Ministry of Education. Nigeria: AF - State Education Program Investment Project: The project development objective is to strengthen the educational system by supporting: (a) need-based teacher deployment; (b) school-level management and accountability; and (c) measurement of student learning in the Participating States. Approval completed on 7 June 2016. Environmental Assess- ment Category B. Project: P157890. US$ 100.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Energy & Extractives Nigeria Electricity and Gas Improvement Project Additional Financing: Additional financing to the Nigeria Elec- tricity and gas improvement project to cover additional PRGs for Gas supply to government owned power plants, in particular the Sapele, Olorunsogo and Alaoji plants held by the NIGER DELTA POWER HOLDING COMPANY. The NDPHC is scheduled to commission power generation units in three of the NIPP plants at Sapele, Olorunsogo and Alaoji. The units to be commis- sioned will have a combined initial generation capacity of 575 MW. The 3 plants will have a final generation capacity of 1,974 MW upon completion. These plants urgently require executed Gas Sales Supply Agreements (GSAs) with prospective gas sup- pliers and IOCs who have emphasized the need for a payment guarantees to enter into long term supply agreements for the fuel deliveries. In accordance with World Bank PRG guidelines, the Federal Ministry of Finance on behalf of the Federal Gov- ernment of Nigeria is required to nominate parties with whom the World Bank Gan enter into negotiations on PRGs. Therefore, I am writing to request that the World Bank extends the coverage of NEGIP to include NDPHC's NIPP plants and to nominate the NDPHC as a party with whom the World Bank can enter into formal negotiations on the potential provision of PRGs for the individual projects. Approval completed on 19 June 2012. Environmental Assessment Category B. Project: P126190. US$ 200.0 (GUID). Consulting services to be determined. Power Holding Company of Nigeria Tel: (234-9) 413-6684, E-mail: ma- ganiyu@nepapmu.org, Contact: Mansuru A. Ganiyu, Project Manager. NG-Electricity Transmission Project: The project development objective is to increase the transfer capacity of the trans- mission network in Nigeria. Approval completed on 15 February 2018. Environmental Assessment Category B. Project: P146330. US$ 486.0 (IDA Credit). Consulting services to be determined. Transmission Company of Nigeria, Contact: Mr. Mack Kast, Managing Director/CEO. Nigeria Electricity Distribution Improvement Project: The Project Development Objective is to improve the technical July 2018 Africa PAGE 48 and financial performance of the electricity distribution sector in Nigeria Identification completed on 9 January 2018. Envi- ronmental Assessment Category B. US$ 500.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Power Sector Recovery Performance Based Operation: Objective to be Determined. Negotiations authorized on 29 March 2018. Environmental Assessment Category C. Project: P164001. US$ 1000.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Nigeria Electrification Project: The development objective is to increase access to electricity services for households, pub- lic educational institutions, and underserved micro, small and medium enterprises. Approval completed on 27 June 2018. Environmental Assessment Category B. Project: P161885. US$ 350.0 (IDA Credit). Consultants will be required. Rural Elec- trification Agency. Environment & Natural Resources Nigeria Erosion and Watershed Management Project (NEWMAP) - Additional Financing: To reduce vulnerabil- ity to soil erosion in targeted sub-watersheds. Approval completed on 27 June 2018. Environmental Assessment Category A. Project: P164082. US$ 400.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation (R) Nigeria Affordable Housing Project: To increase access to mortgage finance for targeted underserved households. Concept completed on 11 July 2018. Environmental Assessment Category F. Project: P165296. US$ 150.0 (IDA Credit). Con- sulting services to be determined. Family Homes Fund. Governance (R) States Fiscal Transparency, Accountability and Sustainability PforR: To improve systems for collection and management of public funds, enhance fiscal performance, and improve service delivery of States in Nigeria Approval com- pleted on 27 June 2018. Environmental Assessment Category C. Project: P162009. US$ 750.0 (IDA Credit). Consulting ser- vices to be determined. Implementing agency(ies) to be determined. Fiscal Governance and Institutions Project: The project development objective (PDO) is to improve the credibility of public finance and national statistics. Approval completed on 27 June 2018. Environmental Assessment Category C. Project: P163540. US$ 125.0 (IDA Credit). Consulting services to be determined. Federal Ministry of Finance. Health, Nutrition & Population Nigeria- Accelerating Nutrition Results: To increase utilization of quality, cost-effective nutrition services for pregnant and lactating women, adolescent girls and children under five years of age in select areas of the Recipient's territory. Approval completed on 27 June 2018. Environmental Assessment Category B. Project: P162069. US$ 225.0/7.0 (IDA Credit/GFF). Consultants will be required. Federal Ministry of Health. BASIC HEALTHCARE PROVISION FUND PROJECT (HUWE PROJECT): The project development objective (PDO) is to establish accreditation, verification and payment mechanisms for the operationalization of the Basic Health Care Provi- sion Fund in participating states. Negotiations authorized on 22 June 2018. Environmental Assessment Category B. Project: P163969. US$ 20.0 (GFF). Consultants will be required. Federal Ministry of Health. Nigeria Polio Eradication Support Project Additional Financing: To assist the Recipient, as part of a global polio eradication effort, to achieve and sustain at least 80 percent coverage with oral polio vaccine immunization in every state in the Recipient’s territory, and improve national routine immunization coverage. Approval completed on 27 June 2018. Envi- ronmental Assessment Category B. Project: P165247. US$ 150.0 (IDA Credit). Consultants will be required. National Primary Health Care Development Agency. Additional Financing NG-Polio Eradication Support Project: To assist the Recipient, as part of a global polio eradi- cation effort, to achieve and sustain at least 80% coverage with oral polio vaccine immunization in every state in the Recipient's PAGE 49 Monthly Operational Summary July 2018 territory, and sustain national routine immunization coverage. Approval completed on 7 June 2016. Environmental Assess- ment Category B. US$ 125.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Nigeria Cutting U5MR in Half in a Decade MPA: The PDO of this Multi-Phased Approach (MPA) is to cut under five mortality rate in half in a decade. Concept completed on 27 June 2018. Environmental Assessment Category B. Project: P167156. US$ 1000.0 (IDA Credit). No consultants are required. Federal Ministry of Health. Additional Financing Nigeria State Health Investment Project: To increase the delivery and use of high impact ma- ternal and child health interventions and improve quality of care available to the people of Nasarawa, Ondo and all the states in the North East. Approval completed on 7 June 2016. Environmental Assessment Category B. US$ 125.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Social Protection & Labor Community and Social Development AF-2: The new PDO is to increase access by the poor people, and particularly by the internally displaced and vulnerable people in the North East of Nigeria, to improved social and natural resource infrastruc- ture services in a sustainable manner throughout Nigeria. Approval completed on 7 June 2016. Environmental Assessment Category B. Project: P157898. US$ 75.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be deter- mined. Nigeria Youth Employment and Social Support AF: The project development objective is to increase access of the poor and vulnerable, using improved social safety net systems, to youth employment opportunities in all Participating States and to provide Targeted Cash Transfers to the poor, vulnerable and internally displaced people (IDPs) in the North East States. Approval completed on 7 June 2016. Environmental Assessment Category B. Project: P157899. US$ 100.0 (IDA Credit). Con- sultants will be required. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Nigeria For Women Project: To support improved livelihoods for benefiting women in targeted areas of Nigeria. Approval completed on 27 June 2018. Environmental Assessment Category B. Project: P161364. US$ 100.0 (IDA Credit). Consultants will be required. Federal Ministry of Women Affairs and Social Development. Transport & Digital Development Nigeria Green Belt Corridors Development Program: The proposed Program Development Objective (PDO)of the Nigeria green belt corridors development program is to improve transport and trade connectivity and facilitate market inte- gration along Nigeria’s key economic corridors. This is a multi-sectoral complex and long-term undertaking that requires adopting a multiphase programmatic instru- ment/approach (MPA). The Government of Nigeria (GON) has requested financing for the improvement of critical road in- frastructure and logistics services along the economic corridors spread in the gateway states, south eastern region, north west- ern region and River Nile corridor. The request includes 23 road projects with a total length of about 2,400km. The investment requirement for the urban renewal is anticipated to be high. Private investment is required to operationalize the SEZs and establish commodity exchange centers. Therefore, the proposed program will be implemented in phases. This MPA will support an integrated approach to economic corridor development with a focus on: i) upgrading priority transport corridors at the national and sub-national levels; ii) improving logistics infrastructure and services; and iii) creating an enabling environment for private investment. Phase 1 will focus on improving priority transport corridors at the national and sub-national levels, whilst developing the interventions that will support the economic transformation by addressing key regulatory gaps along the economic corridors. July 2018 Africa PAGE 50 Phases 2 and 3 will expand the support for spatial transformation and regional economic integration through the development of economic development corridors and other complementary interventions with multi-sectoral interventions at national and sub-national levels. Identification completed on 13 September 2016. Environmental Assessment Category A. US$ 400.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Nigeria Rural Access and Agricultural Marketing Project: The objective of the proposed Nigeria Rural Access and Agricultural Marketing (RAAMP) is to improve rural access and agricultural marketing in selected participating states, whilst enhancing sustainability of the rural and state road network. 13.This operation is the successor of the Second Rural Access and Mobility Project (RAMP 2-P095003) designed to enhance the impact of the rural access initiative in improving agricultural productivity and value chain, as well as income and compet- itiveness of small family farmers. The focus on connecting rural communities to local agricultural markets - roadside agro- logistics hubs – to support the ongoing agricultural transformation initiative makes RAAMP unique from its predecessors. RAAMP will facilitate the provision of services that will enhance agricultural productivity, help build rural agricultural value chains, and help producers market agricultural products competitively. RAAMP will build on its successor, RAMP 2, by incor- porating agricultural marketing/agro-logistics services. The project also proposes adopting an innovative output-based ap- proach to help the states function as full-fledged implementing entities capable of implementing development partners’ sup- port. Concept completed on 30 June 2017. Environmental Assessment Category B. Project: P163353. US$ 180.0/236.0 (IDA Credit/FRDE). Consultants will be required. Federal Ministry of Agriculture and Rural Development. (R) Nigeria Digital Identification for Development Project: The Development Objective of the project is to increase the number of persons in Nigeria who have government-recognized proof of unique identity that enables them to access services. Concept completed on 24 July 2018. Environmental Assessment Category B. Project: P167183. US$ 115.0/215.0/100.0 (IDA Credit/EUIB/FRDE). No consultants are required. National Iden- tity Management Commission. Rwanda Agriculture (R) Sustainable Agricultural Intensification and Food Security Project: To increase agricultural productivity, mar- ket access, and food security of the targeted beneficiaries in the project areas. Negotiations authorized on 31 July 2018. En- vironmental Assessment Category B. Project: P164520. US$ 26.3 (GAFS). No consultants are required. Rwanda Agriculture and Animal Resources Board (RAB). Transformation of Agriculture Sector Program Phase 3 PforR Additional Financing: Objective to be Determined. Approval completed on 28 February 2017. Environmental Assessment Category B. US$ 46.0/10.0 (IDA Credit/RWAG). Con- sulting services to be determined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation Rwanda Affordable Housing Finance Project: To expand access to affordable housing finance by improving availability of long-term wholesale finance Concept completed on 5 April 2018. Environmental Assessment Category F. Project: P165649. US$ 150.0 (IDA Credit). No consultants are required. Development Bank of Rwanda. Social, Urban, Rural and Resilience Global Practice Rwanda Urban Development Phase II: To improve access to basic infrastructure and urban management in participating urban areas of Rwanda Identification completed on 2 August 2017. US$ 90.0 (IDA Credit). Consulting services to be deter- mined. Implementing agency(ies) to be determined. PAGE 51 Monthly Operational Summary July 2018 Rwanda Displaced Persons Development Response Project: To improve access to basic services and economic op- portunities, and support environmental management for refugees and host communities in the target areas in Rwanda. Iden- tification completed on 8 September 2017. Environmental Assessment Category B. US$ 26.8/19.2 (IDA Credit/IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Sao Tome and Principe Education STP Quality Education for All - AF: The Development Objective of the proposed operation is to improve the system of in- service teacher training and to strengthen the management of human resources in the education sector in São Tomé and Prín- cipe. Approval completed on 27 June 2014. Environmental Assessment Category C. Project: P150828. US$ 3.5 (IDA Grant). Consultants will be required. AFAP, Contact: Jorge Bom Jesus, Minister. Finance, Competitiveness and Innovation Sao Tome and Principe: Institutional Capacity Building Project: To contribute to improved capacity of public insti- tutions to: i) supervise the banking system; ii) promote access to finance; iii) manage public finances; and, iv) produce national statistics. Approval completed on 18 May 2018. Environmental Assessment Category C. Project: P162129. US$ 12.0 (IDA Grant). Consultants will be required. Central Bank. Social Protection & Labor Social Protection and Skills Development Project: The DO is to: (i) increase income and productivity of poor house- holds in STP through supporting their access to regular cash transfers; and (ii) expand access to market relevant and inclusive training programs in key growth sectors. Concept completed on 20 June 2018. Environmental Assessment Category C. Pro- ject: P163088. US$ 10.0 (IDA Grant). Consultants will be required. Ministry of Labor and Social Affairs; Ministry of Education, Science, Culture and Communication. Transport & Digital Development Sao Tome e Principe Transport Sector Development and Coastal Protection Project: The proposed PDOs is to reduce road users’ cost and increase transport and urban infrastructure resilience to coastal erosion and rise of sea level Con- cept completed on 20 June 2018. Environmental Assessment Category B. Project: P161842. US$ 25.0/15.0/15.0 (IDA Grant/EUIB/NETH). No consultants are required. INAE (instituto Nacional das Estradas). Senegal Education Senegal Investing in the Early years for Human Development in Senegal: Improve access to quality ECD services for those most in need, in targeted regions. Concept completed on 6 March 2018. Environmental Assessment Category B. Project: P161332. US$ 75.0 (IDA Credit). Consultants will be required. Ministry of Governance and Protection of the Child. Senegal-Quality Improvement and Equity of Basic Education - AF: The project development objective is to improve learning outcomes for early grades, increase access to the science and mathematics tracks of secondary schools, and to improve equity in access to basic education. Approval completed on 31 May 2018. Environmental Assessment Category B. Project: P163575. US$ 60.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. July 2018 Africa PAGE 52 Energy & Extractives Senegal Sector Financial Recovery and Sustainability Program for Results: Objective to be Determined. The Sen- egal Modern Energy Services Program for Results will explore innovative approaches to capitalize on the results based nature of the PforR to improve the quality of electricity supply and access to modern electricity services in both urban and rural areas. The Senegal Modern Energy Services Program for Results will explore innovative approaches to capitalize on the results based nature of the PforR to improve the quality of electricity supply and access to modern electricity services in both urban and rural areas. The Senegal Modern Energy Services Program for Results will explore innovative approaches to capitalize on the results based nature of the PforR to improve the quality of electricity supply and access to modern electricity services in both urban and rural areas. The Senegal Modern Energy Services Program for Results will explore innovative approaches to capitalize on the results and nature of the PforR to improve the quality of electricity supply and access to modern electricity services in both urban and rural areas. The Senegal Modern Energy Services Program for Results will explore innovative approaches to capitalize on the results based nature of the PforR to improve the quality of electricity supply and access to modern electricity services in both urban and rural areas. The Senegal Modern Energy Services Program for Results will explore innovative approaches to capitalize on the results based nature of the PforR to improve the quality of electricity supply and access to modern electricity services in both urban and rural areas. The Senegal Modern Energy Services Program for Results will explore innovative approaches to capitalize on the results based nature of the PforR to improve the quality of electricity supply and access to modern electricity services in both urban and rural areas. Identification completed on 14 March 2016. Environmental Assessment Category U. US$ 100.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Senegal Solar Energy Development through IPPs Project: In the spirit of 'Scaling up Solar' initiative developed by IFC, the Project will support Solar Energy Development in Senegal through IPPs selected competitively and transparently on the basis of the lowest price per kWh. In order to attract interest from major international developers, minimize transaction costs and uncertainties with regard to contract negotiations and finance mobilization, the bidding package will include draft legal agreements (PPAs, and concession agreements) as well as a financing package (term sheet of loans, risk mitigation in- struments including proposed Bank guarantee). Identification completed on 8 December 2014. Environmental Assessment Category B. Project: P153826. US$ 35.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be deter- mined. Governance Public Financial Management Strengthening Technical Assistance Project: To enhance budget credibility, trans- parency and accountability mechanisms in the use and management of central Government financial resources. The project aims to support the modernization of the Public Financial Management system and the implementation of a Public Sector performance based system in Senegal. It includes five components: (1) Strengthening Fiscal Policies and Planning; (2) Improving Budget Execution and Reporting Processes; (3) Strengthening the Capacity of External Audit and Legislative Oversight; (4) Project Management; and (5) Sup- porting the Implementation of a Public Sector Performance-Based Management and Results Monitoring System. Approval completed on 31 July 2014. Environmental Assessment Category C. Project: P146859. US$ 30.0 (IDA Credit). Consultants will be required. PFM Reform Secretary Tel: (221) 821-4587, E-mail: ctdiopmef@yahoo.fr, Contact: Cheikh Tidiane Diop, Co- ordinator. Health, Nutrition & Population Investing in Maternal and Child Health: The Project Development Objective is to increase utilization and improve the quality in priority regions with a particular focus on reproductive, maternal, adolescent and child health and nutrition services. Concept completed on 31 May 2018. Environmental Assessment Category B. Project: P162042. US$ 30.0/10.0 (IDA Credit/GFF). Consultants will be required. Ministry of Health and Social Action. Social Protection & Labor Senegal Youth Employability: The project development objective is to improve the employability of youth in selected PAGE 53 Monthly Operational Summary July 2018 urban areas. Identification completed on 13 June 2018. US$ 57.0 (IDA Credit). Consulting services to be determined. Imple- menting agency(ies) to be determined. Social Safety Net: The objectives of the Project are to: (a) support the establishment of building blocks for the social safety net system; and (b) increase the access of poor and vulnerable households to targeted and adaptive cash transfers programs. Approval completed on 24 August 2016. Environmental Assessment Category C. Project: P156160. US$ 11.1 (AFRH). Consult- ants will be required. Implementing agency(ies) to be determined. Senegal - Additional Financing to the Social Safety Net Project: The development objective is to improve the effec- tiveness of traditional apprenticeships and youth employment services and to improve access to skills and productive oppor- tunities for targeted youth. Concept completed on 3 October 2017. Environmental Assessment Category C. Project: P162354. US$ 27.0 (IDA Credit). Consulting services to be determined. Prime Minister's Office. Social, Urban, Rural and Resilience Global Practice Senegal - Saint-Louis Emergency Recovery and Resilience Project: The Project Development Objective (PDO) is to reduce the vulnerability of populations to coastal hazards along the Langue de Barbarie and strengthen urban and coastal resilience planning of the city of Saint-Louis. Approval completed on 7 June 2018. Environmental Assessment Category A. Project: P166538. US$ 30.0 (IDA Credit). Consultants will be required. Municipal Development Agency (Agence de développe- ment municipal - ADM). Senegal Municipal Solid Waste Management Project: The development objective of the project is to strengthen the governance of solid waste management in Senegal and improve solid waste management services in selected Senegalese cities. Concept completed on 25 July 2017. Environmental Assessment Category A. Project: P161477. US$ 50.0/35.0/58.0/7.0 (IDA Credit/EUIB/GSPN/ZPCO). Consultants will be required. Unite de Coordination et de Gestion (UCG). Municipal and Agglomerations Support Program: 19.The proposed Project Development Objective is to support the Government of Senegal in: (a) setting up financial mechanisms and institutional structures to implement its decentralization policy; and (b) strengthening the capacity of selected urban local governments for effective, accountable and inclusive service delivery. Approval completed on 30 January 2018. Environmental Assessment Category U. Project: P157097. US$ 110.0/90.0 (IDA Credit/FRDE). Consulting services to be determined. Municipal Development Agency; GOVERNMENT OF SENEGAL. (N) SN:Casamance Development Pole Project AF: The Project Development Objectives (PDO) are to: (i) enhance the agricultural productivity of youth and female farmers for selected crops; and (ii) improve transport linkages in isolated rural communities in targeted areas of the Casamance region. Identification completed on 24 July 2018. Environmental Assess- ment Category B. US$ 20.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Additional Financing - Stormwater Management and Climate Change Adaptation Project: To improve flood prevention management in peri-urban areas of Dakar and to promote city sustainability management practices, including climate resilience, in two selected urban areas Approval completed on 27 May 2015. Environmental Assessment Category A. Project: P152150. US$ 35.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Water Senegal Rural Water Supply and Sanitation Project: The project's development objective is to increase access to im- proved water and sanitation services in selected rural areas and strengthen capacity for water resources management. Ap- proval completed on 22 June 2018. Environmental Assessment Category B. Project: P164262. US$ 130.0 (IDA Credit). Con- sultants will be required. Direction de l'Hydraulique (DH); Office des Forages Ruraux (OFOR); Direction de Gestion et de Planification des Ressources en Eau (DGPRE); Project Implementation Unit (PIU); Direction de l'Assainissement (DA); Office National de l'Assainissement du Sénégal (ONAS). Senegal Urban Water and Sanitation Project - Additional Financing: The proposed Project Development Objective (PDO) is to improve access to water and sanitation services in selected urban areas in a financially sustainable manner. Approval completed on 6 July 2017. Environmental Assessment Category B. Project: P162537. US$ 30.0 (IDA Credit). Con- sulting services to be determined. Implementing agency(ies) to be determined. July 2018 Africa PAGE 54 Sierra Leone Education (R) Sierra Leone Skills Development Project: The Project Development objective (PDO) is to increase access to de- mand-led skills training and build the foundations for a demand-led skills development system in Sierra Leone. B. Key Results Progress towards meeting the PDO would be measured through the following key outcome indicators: a)Increased number of people (disaggregated by gender) having successfully completed demand-led skills development train- ing programs b)Foundations for a demand-led skills development system developed through: (i) the establishment and operationalization of a skills information system; and (ii) the pilot accreditation of TVET training program with industries' participation. Negotiations authorized on 20 July 2018. Environmental Assessment Category C. Project: P163723. US$ 20.0 (IDA Credit). Consultants will be required. Ministry of Finance. Additional Financing of the Revitalizing Education Development in Sierra Leone Project: The Project Develop- ment Objective is to improve the learning environment in targeted schools and establish systems for monitoring of education interventions and outcomes. To do this, the Project will finance elements of the ESP that deliver intermediate results while simultaneously addressing critical issues in the system to build the foundation for better management and efficiency within the sector. Approval completed on 20 June 2017. Environmental Assessment Category B. Project: P163161. US$ 10.0 (IDA Credit). Con- sulting services to be determined. Implementing agency(ies) to be determined. Sierra Leone Higher Education Development Program: The proposed higher education program aims to strengthen the capacity of the higher education system to deliver better quality, to increase access and enhance governance and financing in higher education. Identification completed on 19 January 2018. US$ 10.0 (IDA Credit). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Focusing Resources on Equity and Excellence of Education Project (FREE Education Project): The project de- velopment objective is to increase access to quality education in Sierra Leone Identification completed on 7 June 2018. US$ 10.0/13.4 (IDA Credit/PFED). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives SL_Bumbuna II Hydropower Project: The project development objective is to provide affordable clean energy and mo- bilize private and development finance Identification completed on 5 April 2018. US$ 120.0/80.0 (IDA Credit/GUID). Con- sulting services to be determined. Implementing agency(ies) to be determined. Sierra Leone Energy Sector Utility Reform Project Additional Financing: The Project Development Objective is to improve the operational performance of the national electricity distribution utility. Identification completed on 18 April 2018. Environmental Assessment Category B. US$ 30.0 (IDA Credit). No consultants are required. Implementing agency(ies) to be determined. SL _ Bumbuna II Hydropower Project: The project development objective is to provide affordable renewable energy by mobilizing private and development finance Identification completed on 7 December 2017. Environmental Assessment Cate- gory A. US$ 120.0/80.0 (IDA Credit/GUID). Consulting services to be determined. Implementing agency(ies) to be deter- mined. PAGE 55 Monthly Operational Summary July 2018 Finance, Competitiveness and Innovation Sierra Leone Expanding Financial Inclusion: The objective of the project is to increase efficiency in financial services delivery and financial inclusion through modernizing the financial infrastructure. Identification completed on 8 January 2018. Environmental Assessment Category B. US$ 10.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Sierra Leone Agro-Processing Competitiveness Project: To improve business environment in agribusiness sector and increase productivity of targeted agro-processing firms in Sierra Leone. Approval completed on 9 July 2018. Environmental Assessment Category B. Project: P160295. US$ 10.0 (IDA Credit). Consultants will be required. Ministry of Trade and Indus- try. Sierra Leone Sustainable Tourism Development Project: To contribute to sustainable tourism development in Sierra Leone. Concept completed on 26 January 2018. Environmental Assessment Category B. Project: P164212. US$ 10.0/0.8 (IDA Credit/KWBP). Consultants will be required. Ministry of Tourism & Cultural Affairs. Governance Public Financial Management Improvement and Consolidation -Additional Financing Project: The modified project development objective reads as follows: to improve the public financial management system and accountability in the use of government finances. Approval completed on 7 June 2017. Environmental Assessment Category C. Project: P162667. US$ 10.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Poverty and Equity Improving Statistics in Sierra Leone: To improve the statistical production of Statistics Sierra Leone and enhance the dissemination of statistical data. Concept completed on 1 February 2018. Environmental Assessment Category B. Project: P164714. US$ 6.0 (IDA Grant). Consultants will be required. Statistics Sierra Leone. Social Protection & Labor Social Safety Nets Additional Financing: The project development objective is to establish the key building blocks for a basic national safety net system and to provide income support to extremely poor households in Sierra Leone. Approval com- pleted on 6 August 2015. Environmental Assessment Category C. Project: P154454. US$ 10.0/4.3 (IDA Grant/ERR). Consult- ants will be required. Implementing agency(ies) to be determined. Transport & Digital Development Freetown Integrated Urban Transport Project: The Project Development Objective (PDO) is to improve mobility and road safety in a pilot area and enhance institutional capacity to plan and manage urban transport in the city of Freetown. Concept completed on 10 April 2018. Environmental Assessment Category B. Project: P164353. US$ 20.0 (IDA Credit). Con- sultants will be required. Ministry of Transport and Aviation. Somalia Energy & Extractives Somali Electricity Access Project: The Project Objective is to expand access to electricity in targeted rural and peri urban communities in Somalia, including Somaliland Concept completed on 5 May 2018. Environmental Assessment Category B. Project: P165497. US$ 5.5 (SOMP). Consultants will be required. Ministry of Finance, Somaliland; Ministry of Energy and Water Resources, FGS; Ministry of Energy and Minerals, Somaliland. July 2018 Africa PAGE 56 Finance, Competitiveness and Innovation Somalia Capacity Enhancement, Livelihoods and Entrepreneurship, through Digital Uplift Program (SCALED-UP): The development objective of the proposed program is to improve financial and digital access to support entrepreneurship, jobs and livelihoods, particularly for women and youth. Identification completed on 9 July 2018. US$ 20.0/10.0 (IDA Grant/SOMP). Consulting services to be determined. Implementing agency(ies) to be determined. Governance (R) Domestic Revenue Mobilization and Public Financial Management Capacity Strengthening Project: To strengthen systems of domestic revenue mobilization, expenditure control and accountability in the Federal Government, Puntland State of Somalia, and Somaliland. Negotiations authorized on 29 July 2018. Environmental Assessment Category C. Project: P166206. US$ 20.0/10.0 (IDA Grant/SOMP). Consultants will be required. Ministry of Finance, Puntland; Ministry of Finance of Somaliland Hargeisa; Ministry of Finance Federal Government. Recurrent Cost & Reform Financing Project - Additional Financing: To support the Federal Government and Fed- eral Member States and eligible interim and emerging Federal Member States to strengthen resource management systems, the inter-governmental fiscal framework, and service delivery systems in health and education. Identification completed on 29 May 2018. Environmental Assessment Category C. US$ 60.0/2.0 (IDA Grant/SOMP). Consultants will be required. Im- plementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Somali Urban Investment Planning: To provide (i) an assessment of the feasibility of, and preliminary plans for, selected urban investment and institutional strengthening activities in southern Somalia, Puntland and Somaliland, and (ii) enhanced project preparation and implementation capacity of participating agencies. Approval completed on 4 February 2016. Environmental Assessment Category B. Project: P150374. US$ 6.0 (SOMP). Con- sultants will be required. Ministry of Finance, Contact: H.E. Mohamed Adan Ibrahim, Minister; Ministry of Finance, Contact: Zamzam Abdi Adan, Minister; Hargeisa Municipality, Contact: Abdurahman Mohamud Aided, Mayor; Mogadishu Municipal- ity, Contact: Yusuf Hussein Jim'ale, Mayor; Garowe Municipality, Contact: Hassan Mohamed Isse, Mayor; Hargeisa Water Agency, Contact: Ibrahim Siyad Yonis, Manager. Somali Urban Investment Planning Project Additional Financing: To provide (I) an assessment of feasibility of, and preliminary plans for, selected urban investment and institutional strengthening activities in targeted cities; and (ii) enhanced project preparation and implementation capacity of participating agencies. Identification completed on 25 April 2018. Envi- ronmental Assessment Category B. US$ 3.0 (SOMP). Consultants will be required. Implementing agency(ies) to be deter- mined. Transport & Digital Development Additional Financing: ICT Sector Support in Somalia (Phase 2): Objective to be Determined. Approval completed on 15 November 2017. Environmental Assessment Category C. US$ 14.0/2.0 (SOMP/SPBF). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Water Somali - Water for Agro-pastoral Productivity and Resilience: Develop water and agricultural services for improving productivity and livelihood resilience among agro-pastoralist communities in dryland areas of Somalia. Identification com- pleted on 6 June 2018. Environmental Assessment Category B. US$ 10.0/30.0 (IDA Credit/IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. PAGE 57 Monthly Operational Summary July 2018 South Africa Energy & Extractives Technical Assistance Project for the Development Carbon Capture and Storage in the Republic of South Af- rica: The Project Development Objective (PDO) is to assess the feasibility of, and build expert capacity for, carbon capture and storage in South Africa. Approval completed on 22 March 2017. Environmental Assessment Category A. Project: P149521. US$ 23.0 (CARB). Consultants will be required. South African National Energy Development Institute (SANEDI). South Sudan Agriculture South Sudan Agriculture Development and Food Security Project: The development objective of the proposed pro- ject is to increase crop production and productivity in selected areas and to lay the foundation for more sustainable approaches to deliver agriculture services and inputs Identification completed on 20 December 2011. Environmental Assessment Category B. US$ 50.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives South Sudan Energy Sector Technical Assistance Project: The project development objective (PDO) is to strengthen the capacity of the Recipient for improved energy sector planning and management supporting access enhancement. Negoti- ations authorized on 17 November 2014. Environmental Assessment Category B. Project: P145581. US$ 15.0 (IDA Credit). Consultants will be required. Ministry of Electricity, Dams, Irrigation and Water Resources, Contact: H.E Jemma Nunu Kumba, Minister. Governance Institutional Development and Capacity Building Project: To improve selected government systems and capabilities with respect to human resource management and public financial management in target ministries and agencies. Negotiations authorized on 22 October 2014. Environmental Assessment Category C. Project: P143975. US$ 20.0 (IDA Credit). Consultants will be required. Ministry of Labour, Public Service and HRD, Contact: Juma Yoane Kedi, Undersecretary, Public Service; Ministry of Finance and Economic Planning, Contact: Wani Buyu, Undersecretary; Ministry of Finance and Economic Plan- ning, Contact: Maxwell Lobokha, Director, Planning; Ministry of Public Service and Human Resource Development, Contact: Lily Manyiel, Ag. Director for Policy. Health, Nutrition & Population South Sudan Health Services Support Project: The Project Development Objective is to increase the utilization and quality of an essential package of health services in Upper Nile and Jonglei Identification completed on 19 September 2017. Environmental Assessment Category B. US$ 40.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. South Sudan Health Rapid Results AF: The additional financing to Rapid Results Health Project will ensure continuity of high impact primary health care services in Upper Nile and Jonglei States of South Sudan. The project development objec- tives (PDOs) are: (i) to improve the delivery of high impact primary health care services in Recipient's states of Jonglei and Upper Nile; and (ii) to strengthen coordination and monitoring and evaluation capacities of the Ministry of Health. The addi- tional financing will provide support to the two original components: i) Component 1 will support Delivery of high impact Primary Health Care services; ii) Component 2 will strengthen capacity of MOH at the national level. The project will also support performance based contracting, exact details of the amounts to be financed from the HRITF (possibly for amounts upto US$15 million) are still being discussed. Approval completed on 13 March 2014. Environmental Assessment Category B. Project: P146413. US$ 10.0/25.0 (IDA Credit/IDA Grant). Consulting services to be determined. July 2018 Africa PAGE 58 South Sudan Health Rapid Results Project AF: The proposed revised PDO is to: i) improve delivery of high impact primary health care services, including pharmaceuticals in Upper Nile and Jonglei states; and iii) to strengthen coordination and M&E implementation capacities of the MOH. Approval completed on 27 June 2016. Environmental Assessment Category B. Project: P156917. US$ 40.0 (IDA Grant). Consultants will be required. Ministry of Finance and Economic Planning, Contact: Moses Moses Mabior Deu, Director of Aid Co-ordination. Social Protection & Labor Safety Net and Skills Development Project Additional Financing: Objective to be Determined. Identification com- pleted on 8 February 2017. Environmental Assessment Category B. US$ 40.0 (IDA Credit). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Local Governance and Service Delivery Project: To improve local governance and service delivery in participating counties in South Sudan. Identification completed on 9 June 2016. Environmental Assessment Category B. US$ 65.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Sudan Education Sudan Basic Education Development Project: The proposed Project Development Objective (PDO) is to improve read- ing proficiency of pupils in early grades and improve progression to the upper grades of primary education in disadvantaged schools, and to strengthen the education management systems. Identification completed on 8 March 2018. Environmental Assessment Category B. US$ 59.0 (FTIE). Consulting services to be determined. Implementing agency(ies) to be determined. Environment & Natural Resources Sudan Sustainable Natural Resources Management Project (SSNRMP) Additional Financing (Phase 2): The Project Development Objective (PDO) and Global Environment Objective is “to increase the adoption of sustainable land and water management practices in targeted landscapes�. Negotiations authorized on 30 May 2018. Environmental Assessment Category B. Project: P161304. US$ 5.5 (GEFU). Consultants will be required. Ministry of Environment, Natural Resources Management and Physical Development; Ministry of Environment, Natural Resources and Physical Development (MoENRPD). Tanzania Education Tanzania Secondary Education Quality Improvement Program: To enhance equitable access to and improve learn- ing environments in government secondary schools with a focus on mathematics and science. Negotiations authorized on 7 February 2018. Environmental Assessment Category B. Project: P163439. US$ 300.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Higher Education for Economic Transformation Project: To increase enrolment in and improve the quality and labor market relevance of degree programs in priority disciplines in select public universities and improve the management of the higher education system. Identification completed on 6 December 2017. Environmental Assessment Category B. US$ 300.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. PAGE 59 Monthly Operational Summary July 2018 Energy & Extractives Tanzania Utility Strengthening Project (TUSP): The project development objective of the Tanzania Utility Strengthen- ing Project (TUSP) is to expand electricity access, improve supply services and enhance operational performance of the utility. The project has five components: a-) distribution grid densification program, including grid extension, rehabilitation and me- tering; b-) electricity transmission strengthening (selected priority investment in extension and rehabilitation of transmission infrastructure); c-) distribution control center upgrade in Dar es Salaam; d-) strengthening utility operations and revenue management through upgrading the MIS, GIS, advanced metering and billing systems; and e-) technical assistance & capacity building. Identification completed on 21 November 2017. US$ 400.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. TZ Sustainable Management of Mineral Resources: To strengthen the Governments capacity to manage the mineral sector to improve the socioeconomic impacts of large and small-scale mining for Tanzania and Tanzanians and enhance private local and foreign investment. Approval completed on 7 May 2015. Environmental Assessment Category B. Project: P151124. US$ 45.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation Tanzania Financial Inclusion Project: The Project Development Objective (PDO) is to expand responsible access to fi- nance for MSMEs and improve capacity for regulators, financial institutions and enterprises. The operation will have a gender focus to address the specific inclusion and access constraints faced by women in Tanzania. Negotiations authorized on 21 May 2018. Environmental Assessment Category F. Project: P161355. US$ 150.0 (IDA Credit). Consultants will be required. BANK OF TANZANIA. Industrial Competitiveness for Jobs: To improve and promote the investment climate and support industrial growth through facilitating increased domestic value addition Identification completed on 8 June 2016. US$ 100.0 (IDA Credit). Consulting services to be determined. Ministry of Industry, Trade and Investments. Housing Finance Project: The revised PDO is as follows: To facilitate the development of the housing finance market through the provision of medium and long-term liquidity to lenders. Approval completed on 24 February 2015. Environmental Assessment Category B. US$ 60.0 (IDA Credit). Consultants will be required. Bank Of Tanzania, Contact: Albert Mkenda, Program Manager (PIU). Governance Tanzania Public Service Modernization Project: Objective to be Determined. Identification completed on 31 August 2017. Environmental Assessment Category C. US$ 150.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population Investing in the Early Years: Improve coverage and quality of the early childhood development services for the first 1,000 days in selected regions. Concept completed on 28 November 2017. Environmental Assessment Category B. Project: P164758. US$ 200.0 (IDA Credit). Consulting services to be determined. President’s Office Regional Administration and Local Govern- ment; Ministry of Health, Community Development, Gender, Elderly and Children. Infrastructure, PPP's & Guarantees Tanzania Public-Private Partnership Project: The development objective of the TSPF is sustainable private financing of sub-sovereign public services. Concept completed on 21 March 2018. Environmental Assessment Category B. Project: P159192. US$ 10.0 (TZPP). Consultants will be required. PPP Node, President's Office Regional Administration and Local Government, GoT. July 2018 Africa PAGE 60 Poverty and Equity Tanzania Statistics Project: The project development objective is to strengthen the governance and capacity of the Na- tional Statistical System to produce, use and disseminate quality statistics, and to fill data gaps. Concept completed on 9 June 2018. Environmental Assessment Category B. Project: P167066. US$ 50.0 (IDA Credit). Consulting services to be determined. Tanzania National Bureau of Statistics. Development Support for Tanzania Statistics: To strengthen the capacity of the national statistical bureau to collect, process, and disseminate data and statistics on living standards, labor markets, and agriculture. Negotiations authorized on 14 September 2017. Environmental Assessment Category C. Project: P159954. US$ 8.6 (EUDF). Consultants will be required. National Bureau of Statistics. Social Protection & Labor Tanzania Productive Social Safety Net Project II: Support the government to further enhance the national productive safety net delivery system in order to improve access to income-earning opportunities and socio-economic services for extreme poor households. Concept completed on 12 February 2018. Environmental Assessment Category B. Project: P165648. US$ 300.0/3.4/0.9/49.5/9.1/64.0 (IDA Credit/AID/BMGF/DFID/GIRR/SIDA). Consultants will be required. Tanzania Social Acion Fund. TZ-PSSN Additional Financing: The Project Development Objective of APL Phase 1 is to create a comprehensive, efficient, well-targeted productive social safety net system for the poor and vulnerable section of the Tanzanian population. Approval completed on 16 June 2016. Environmental Assessment Category B. Project: P151838. US$ 200.0 (IDA Credit). No consult- ants are required. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Zanzibar Urban Services Project Additional Financing: Improve access to urban services and conserve physical cul- tural heritage in Zanzibar. Approval completed on 13 June 2016. Environmental Assessment Category A. Project: P155392. US$ 55.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Land Tenure Improvement Project: To strengthen the land administration system and increase tenure security in both urban and rural areas. Concept completed on 1 February 2018. Environmental Assessment Category B. Project: P164906. US$ 75.0 (IDA Credit). Consultants will be required. Ministry of Lands, Housing and Human Settlements Development. TSCP Second Additional Financing: To improve the quality of and access to basic urban services in Participating LGAs. Approval completed on 27 February 2017. Environmental Assessment Category B. Project: P159489. US$ 130.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Dar es Salaam Flood Risk Management Project: The objective of the Project is to improve urban services and institu- tional capacity in the Dar es Salaam Metropolitan Area and to facilitate potential emergency response. Identification com- pleted on 30 June 2017. Environmental Assessment Category B. US$ 20.0 (TURP). Consulting services to be determined. Implementing agency(ies) to be determined. Tanzania Strategic Cities Project AF: To improve the quality of and access to basic urban services in Participating LGAs. Approval completed on 29 May 2014. Environmental Assessment Category B. Project: P148974. US$ 50.0 (IDA Credit). Con- sultants will be required. Prime Minister's Office - Regional Administration and Local Government Tel: (255-26) 232- 1908/2848, E-mail: NA, Contact: Chandanie Wijayawardene, Director General. Boosting Inclusive Growth for Zanzibar: Integrated Development Project: The development objective of the pro- ject is to improve the livability and economic potential of Zanzibar in targeted areas, with enhanced service delivery, mobility, cultural heritage revitalization, and urban management. Concept completed on 8 May 2018. Environmental Assessment Cat- egory B. Project: P165128. US$ 100.0 (IDA Credit). Consultants will be required. Ministry of Finance and Planning. PAGE 61 Monthly Operational Summary July 2018 Trade & Competitiveness Private Sector Competitiveness Project Additional Financing: Objective to be Determined. Approval completed on 27 December 2013. Environmental Assessment Category C. US$ 60.2 (IDA Credit). Consulting services to be determined. United Republic of Tanzania, Contact: Chandanie Wijayawardene, Director General. Transport & Digital Development Tanzania Roads to Inclusion and Socioeconomic Opportunities (RISE) Program: To improve road connectivity in support of livelihoods of rural population, both male and female, in selected rural areas, and build capacity in the sustainable management of rural roads Concept completed on 18 April 2018. Environmental Assessment Category A. Project: P164920. US$ 300.0 (IDA Credit). No consultants are required. Tanzania Rural and Urban Roads Agency (TARURA); Tanzania National Roads Agency (TANROADS). Digital Tanzania Program Phase I: Digital Foundations Project: To increase access to affordable, high quality inter- net services for government, businesses and citizens and to improve the government's capacity to deliver digital public services. Concept completed on 8 November 2017. Environmental Assessment Category B. Project: P160766. US$ 140.0 (IDA Credit). Consulting services to be determined. President's Office - Public Service Management; Ministry of Works, Transport and Com- munication (Communication Sector). Tanzania Development Corridors Transport Project: The PDO is to improve transport connectivity in selected devel- opment corridors and institutional capacity for enhanced management of efficient, resilient, and safe road and airport transport systems. Concept completed on 16 April 2018. Environmental Assessment Category A. Project: P165660. US$ 550.0 (IDA Credit). Consulting services to be determined. Tanzania National Roads Agency (TANROADS). Water Sustainable Rural Water Supply and Sanitation Program: Objective to be Determined. Approval completed on 26 June 2018. Environmental Assessment Category B. Project: P163732. US$ 350.0/65.0 (IDA Credit/DFID). Consulting services to be determined. Implementing agency(ies) to be determined. Tanzania Water Sector Support Project - Additional Financing: The Additional finance will contribute to the coun- try's water sector development program (WSDP) acheieve its first phase target of providing access to the originally planned beneficiaries of 10 villages per local Government Administration (LGAs). This target was down sized during restructuring of the project due to shortage of funding. Given the increased attention given to the Rural water supply in governments recent initiative of Big Result Now (BRN), the AF will be a timely response to assist government achieve its objective. It will also be uninterrupted continuation of the Bank support during the transition from phase I to Phase II of the program. The AF will finance RWS schemes and completion works in urban component while at the same time provide program management as- sistance to Government's effort to streamline the new BRN initiative with the WSDP arrangement. It is expected that devel- opment partners such as the DFID will join the initiative. It is also envisaged that preparation of the follow on project to support the second phase of government's WSDP will be initiated in parallel to implementation of the Additional financing. Approval completed on 16 June 2014. Environmental Assessment Category A. Project: P146700. US$ 44.9/13.0/15.0 (IDA Credit/DFID/KFW). Consultants will be required. Ministry of Water Tel: (255-22) 245-1530, E-mail: b.psmw@mowi.go.tz, Contact: EgR. Bashir J. Mrindoko, Permanent Secretary. Togo Agriculture PASA Additional Financing: The objectives of the Project are to (i) rehabilitate and reinforce productive capacities among targeted beneficiaries across Selected Value Chains, and (ii) foster an enabling environment for the development of the agri- cultural sector, in the Recipient's territory. July 2018 Africa PAGE 62 Project Beneficiaries (within all five administrative regions of Togo) 1) 60,000 crop farmers 2) 13,000 animal herders 3) 1,600 fish producers 4) 500 fish merchants 5) 650,000 households raising poultry and/or small ruminants will benefit from dedicated animal vaccination campaigns PDO Level Results Indicators 1) Farm output subject to project supported post-harvest value-adding schemes (rice,corn); 2) Increase of crop (coffee, cocoa) and continental fisheries output, and of livestock population (small ruminants, poultry) among project beneficiaries; 3) Rates of PNIASA financial execution (for PASA, PADAT and WAAPP altogether) and; 4) Number of direct beneficiaries. Approval completed on 14 April 2017. Environmental Assessment Category B. Project: P159637. US$ 20.0 (IDA Credit). No consultants are required. Implementing agency(ies) to be determined. Health, Nutrition & Population Togo Health System Performance Strengthening Project: To improve utilization and quality of reproductive, mater- nal, neonatal, and child health services in selected regions. Concept completed on 8 December 2017. Environmental Assess- ment Category B. Project: P164886. US$ 25.0 (IDA Grant). Consultants will be required. Ministère de la Santé et de la Protec- tion sociale. Poverty and Equity Togo: Data for a fact based society: To improve the quality of welfare and macro-economic statistics and to strengthen the institutional, financial and human infrastructure needed to sustain improved data production. Concept completed on 3 February 2018. Environmental Assessment Category C. Project: P166135. US$ 10.0 (IDA Grant). Consultants will be required. INSEED. Social Protection & Labor Community Development and Safety Nets Project Additional Financing: The proposed Project Development Ob- jective is to provide poor communities with greater access to basic socio-economic infrastructures and social safety nets. Ap- proval completed on 7 March 2014. Environmental Assessment Category B. Project: P146598. US$ 12.1 (IDA Credit). Con- sultants will be required. Technical Secretariat of the Community Development and Safety Nets Project Tel: (228) 220-7597, E-mail: pdctogo@yahoo.fr, Contact: Yawavi Agboka-Abalo, Coordonatrice du Secretariat Technique. Social, Urban, Rural and Resilience Global Practice Emergency Infrastructure Rehabilitation & Energy Project - Additional Financing: The objectives are to: (a) in- crease access to infrastructure and urban services in Lome; and (b) support the Government's efforts to demonstrate concrete improvements in the lives of its citizens, a critical step for sustaining social and political stability in the country. Approval completed on 4 June 2013. Environmental Assessment Category B. US$ 14.0 (IDA Grant). Consultants will be required. Agence deExecution des Travaux Urbains (AGETUR) Tel: (229) 313-645, E-mail: agetur@intnet.bj, Contact: Yuba Raj Pandey, Vice Chairman. (R) Togo - Infrastructure and Urban Development Project: The project development objective (PDO) is to improve access to urban infrastructure and basic services in selected cities and strengthen the institutional capacity of participating PAGE 63 Monthly Operational Summary July 2018 cities in urban planning and management. Approval completed on 17 July 2018. Environmental Assessment Category B. Project: P161772. US$ 30.0 (IDA Credit). Consultants will be required. Ministry of Urban Development and Housing (Ministre de l’Urbanisme, de l’Habitat et du Cadre de Vie). Uganda Education Uganda Secondary Education Expansion Project: The project development objective is to enhance equitable access to lower secondary education. This will be achieved by focusing on underserved areas and populations, including refugees and hosting communities, and girls. Identification completed on 9 January 2018. Environmental Assessment Category B. US$ 118.8/31.3 (IDA Credit/IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives Uganda Electricity Access Scale-up Project (EASP): The Project Development Objective is to scale-up access to elec- tricity in Uganda. Identification completed on 2 February 2018. Environmental Assessment Category B. US$ 300.0 (IDA Credit). Consulting services to be determined. Rural Electrification Agency (REA). IDA Guarantee for Renewable Energy Development Program: The project will provide for amongst others counter- part risk guarantee to cover the payment risk from Uganda Electricity Transmission Company Approval completed on 18 March 2014. Environmental Assessment Category B. Project: P133318. US$ 160.0 (GUID). Consultants will be required. Min- istry of Energy and Mineral Development Tel: (256-41) 434-9342, E-mail: info@energy.go.ug, Contact: Hon. Irene Muloni, Minister. Finance, Competitiveness and Innovation Second Competitive and Enterprise Development Project: The development objective of the proposed Competitive- ness and Enterprise Development Project 2 is to improve business environment and boost job creation in select sectors by strengthening institutions of land administration/management and boosting SME competitiveness. This will be based on sup- porting the GoU in fostering innovation, enhancing competitiveness of the light manufacturing sector by developing effective industrial infrastructure with linkages to small and medium-enterprises through targeted interventions, implementing the land administration reform, strengthening links between agriculture and manufacturing, and generating investments Identi- fication completed on 18 October 2017. US$ 150.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Governance Narrowing the Governance Implementation Gap in Uganda (NGIGU): Objective to be Determined. Identification completed on 17 October 2016. Environmental Assessment Category C. Project: P161981. US$ 100.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population Additional Financing Uganda Reproductive Maternal and Child Health Services Improvement Project: The Project Development Objectives (PDOs) are to: (a) improve utilization of essential health services with a focus on reproductive, maternal, newborn, child and adolescent health services in target districts; and (b) scale up birth and death registration ser- vices Negotiations authorized on 19 April 2018. Environmental Assessment Category B. Project: P163691. US$ 25.0 (AFC2). No consultants are required. Implementing agency(ies) to be determined. Macroeconomics, Trade and Investment Uganda Intergovernmental Fiscal Transfers Program: Objective to be Determined. Approval completed on 27 June 2017. Environmental Assessment Category B. Project: P160250. US$ 200.0 (IDA Grant). Consulting services to be determined. July 2018 Africa PAGE 64 Ministry of finance, Planning, and Economic Development. Other UAP Testing July Release - July29, 2017: Development Objective Identification completed on 29 July 2017. Environ- mental Assessment Category A. Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Kampala Institutional and Infrastructure Development Project 3: To enhance mobility within the Greater Kampala Metropolitan Area (GKMA) and economic productivity of Kampala City. Identification completed on 9 April 2018. US$ 200.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Development Response to Displacement Impacts Project: The Project Development Objective (PDO) is to improve access to basic social services, expand economic opportunities, and enhance environmental management for communities hosting refugees in the target areas of Djibouti, Ethiopia and Uganda. The proposed regional project will embed the essential features of ensuring citizen participation and engagement in identifying and prioritizing developmental needs, including socio-economic infrastructure and livelihood opportunities to improve self- reliance of refugee hosting communities; improving social cohesion between refugees and refugee hosting communities; in- creasing citizen voice and role in development decision making; and eliciting greater demand for social accountability. The operational approach will be Community Driven Development (CDD) and will involve: (i) building and capacitating grassroots institutions; (ii) ensuring the voice of all communities is heard in decision making; (iii) strengthening decentralized govern- ment administrative functions; and (iv) investing in public service delivery and social mobilization to enhance social cohesion among beneficiary communities. Identification completed on 2 August 2017. Environmental Assessment Category B. US$ 87.5/62.5 (IDA Credit/IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. UG - Strengthening Social Risk Management and Gender-Based Violence Prevention and Response Project: The Project Development Objectives are to increase: (i) participation in Gender-Based Violence (GBV) prevention programs; and (ii) utilization of multi-sectoral response services for survivors of GBV in targeted districts. Approval completed on 20 June 2017. Environmental Assessment Category B. Project: P160447. US$ 40.0 (IDA Credit). Consultants will be required. Ministry of Gender, Labour and Social Development. Uganda Support to Municipal Infrastructure Development Program - Additional Financing: Objective to be Determined. Approval completed on 15 May 2018. Environmental Assessment Category B. Project: P163515. US$ 360.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Water Uganda irrigation development and climate resilience project: To provide irrigation and drainage services, and de- velop institutional capacity for irrigated agriculture production in the project areas. Concept completed on 1 May 2018. Envi- ronmental Assessment Category A. Project: P163836. US$ 195.0 (IDA Credit). Consultants will be required. Ministry of Water and Environment. Zambia Agriculture Zambia agricultural growth clusters for rural jobs and diversified economic development: to promote agricul- tural diversification and agricultural market opportunities in rural Zambia Identification completed on 29 June 2018. US$ 100.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Zambia Integrated Forest Landscape Project (GEF): To improve landscape management and increase environmental and economic benefits for targeted rural communities in the Eastern Province and to improve the Recipient’s capacity to re- PAGE 65 Monthly Operational Summary July 2018 spond promptly and effectively to an Eligible Crisis or Emergency. Approval completed on 4 May 2017. Environmental As- sessment Category B. Project: P157521. US$ 8.1 (GEFU). Consultants will be required. Ministry of National Development Plan- ning (MoNDP). Energy & Extractives Zambia Power Sector Financial Recovery Guarantee Project: The Project development objective (PDO) is to enhance Zambia power sector financial and operational viability. Identification completed on 24 April 2018. US$ 300.0 (GUID). Con- sulting services to be determined. Implementing agency(ies) to be determined. Second Scaling Solar Guarantee: To increase solar electricity generation capacity and diversify electricity generation re- sources in Zambia. Approval completed on 20 December 2017. Environmental Assessment Category B. Consulting services to be determined. Implementing agency(ies) to be determined. ZM-Guarantee for Scaling Solar (Round 2): To increase solar electricity generation capacity and diversify electricity generation resources in Zambia. Identification completed on 3 October 2017. Environmental Assessment Category B. US$ 15.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Environment & Natural Resources Additional Financing for Zambia Strengthening Climate Resilience (PPCR Phase II): The development objective of the project is to strengthen Zambia's institutional framework for climate resilience and improve the adaptive capacity of vulnerable communities in the Barotse sub-basin. The project involves three components: 1. Strategic National Program Support, aiming to strengthen the national institutional and financial framework for climate resilience, by (a) providing institutional support to the national climate change program; and (b) strengthening climate infor- mation. 2. Support to Participatory Adaptation, through strengthening of the adaptive capacity of vulnerable rural communities in the Barotse sub-basin. 3. Pilot Participatory Adaptation, through the funding of actual participatory adaptation investments in the Barotse sub-basin, including (a) community adaptation sub-grants; (b) establishment and operation of an adaptation contingency fund; and (c) rehabilitation and strengthened management of traditional canals. Approval completed on 18 June 2018. Environmental As- sessment Category B. Project: P165442. US$ 14.6 (CIF). Consulting services to be determined. Ministry of Finance; Ministry of National Development Planning. (R) Transforming landscapes for resilience and development in Zambia: To improve natural resource manage- ment in the northern region of Zambia to support sustainable livelihoods, and in the event of an eligible crisis or emergency, to provide immediate and effective response to the eligible crisis or emergency. Concept completed on 30 July 2018. Environ- mental Assessment Category B. Project: P164764. US$ 75.0 (IDA Credit). Consultants will be required. Luapula Provincial Administrative office. Zimbabwe Health, Nutrition & Population Zimbabwe Health Sector Development Support Project III - AF: The Project Development Objective (PDO) is to increase coverage of key maternal and child health interventions in targeted rural and urban districts consistent with the Re- cipient's ongoing health initiatives. Approval completed on 17 July 2017. Environmental Assessment Category B. Project: P163976. US$ 5.0 (GFF). Consultants will be required. Implementing agency(ies) to be determined. Zimbabwe Health Sector Development Support Project AF II: The Project Development Objective (PDO) is to in- crease coverage of key maternal and child health interventions in targeted rural and urban districts consistent with the Recip- ient's ongoing health initiatives. Approval completed on 23 December 2015. Environmental Assessment Category B. Project: July 2018 Africa PAGE 66 P156879. US$ 10.0 (HRBF). Consultants will be required. Implementing agency(ies) to be determined. Regional Agriculture Agricultural Productivity Program for Southern Africa - Angola & Lesotho: To increase the availability of improved agricultural technologies in participating countries in the Southern Africa Development Community (SADC) region. Concept completed on 27 May 2018. Environmental Assessment Category B. Project: P164486. US$25.0/20.0/5.0 (IBRD/IDA Credit/IDA Grant). Consulting services to be determined. Angola Ministry of Agriculture; Lesotho Ministry of Agriculture and Food Security. WAAPP -2A - Support to Groundnut Value Chain in Senegal: The development objective of WAAPP-2A is to scale- up the generation, dissemination and adoption of improved technologies in the participating countries’ priority agricultural commodity areas. Approval completed on 17 May 2016. Environmental Assessment Category B. Project: P158265. US$ 20.0 (IDA Credit). No consultants are required. Implementing agency(ies) to be determined. Association for Strengthening Agricultural Research in East and Central Africa Multi-Donor Trust Fund: This is a request for Additional Financing to support the existing ASARECA MDTF (P112600, TF071104). A Multi-Donor Trust Fund (MDTF) was established at the World Bank in 2008 to support a program of integrated agricultural research for devel- opment, as described in ASARECA's 5-year OP (2008/09-2013/14). The MDTF is intended to facilitate donor interaction, coordination and harmonization (including harmonization of procedures and formats to be applied by ASARECA), which is essential to effectively and efficiently assist the further institutional development of ASARECA. The project has been under implementation for the past 3.5 years and implementation progress has been satisfactory. Original donor pledges were ex- pected to reach $55 million and this target has been met. New contributions totaling $4 million will be used to scale up the results of existing sub-projects within the remaining timeframe of the grant (19 months). No new activities are planned. Iden- tification completed on 21 May 2012. Environmental Assessment Category B. US$ 5.6 (CDP4). Consulting services to be de- termined. Association for Strengthening Agricultural Research in Eastern and Central Africa (ASARECA), Contact: Seyfu Ketema, Executive Director. AFCC2/RI-Regional Pastoral Livelihoods Resilience: To enhance livelihood resilience of pastoral and agro-pastoral communities in cross-border drought prone areas of selected countries and improve the capacity of the selected countries’ governments to respond promptly and effectively to an eligible crisis or emergency. Approval completed on 21 October 2014. Environmental Assessment Category B. Project: P150006. US$ 75.0 (IDA Credit). Consultants will be required. Ministry of Finance (Federal Democratic Republic of Ethiopia) Tel: (251-9) 2771-8854, E-mail: faberra@mofed.gov.et, Contact: Fisseha Aberra, Director. Eastern and Central Africa Agriculture Transformation Project: The development objective is to enhance regional collaboration to improve productivity, climate resilience, and competitiveness of selected agricultural commodity value chains and increase smallholder farmer access to the regional market for food commodities and products Concept completed on 4 April 2018. Environmental Assessment Category B. Project: P162416. US$ 312.0 (IDA Credit). Consulting services to be de- termined. Uganda: Ministry of Agriculture, Animal Industry and Fisheries; Kenya: Ministry of Agriculture, Livestock and Fish- eries; DRC: Ministry of Agriculture; Burundi: Ministry of Agriculture and Livestock; RoC: Ministry of Scientific Research and Technological Innovation. Additional Financing for West Africa Agricultural Productivity Program (WAAPP- 1C): To generate and accel- erate the adoption of improved technologies in the participating countries' top agricultural commodity priority areas that are aligned with the sub-region's top agricultural commodity priorities, as outlined in the ECOWAP. Approval completed on 3 February 2017. Environmental Assessment Category B. Project: P158983. US$ 53.0 (IDA Credit). No consultants are required. Ministere de l’Economie et de Finances/ Caisse Autonome d’Amortissement; Ministere de l’Economie et des Finances; Minis- tere du Plan du Niger; Ministre de l’Economie et des Finances. Strengthening Agricultural Higher Education in Africa: To strengthen linkages between selected African universities and regional agricultural sector needs for developing required human resources to accelerate agri-food systems transformation in Africa Concept completed on 23 January 2018. Environmental Assessment Category B. Project: P164702. US$ 90.0/10.0 PAGE 67 Monthly Operational Summary July 2018 (IDA Credit/IDA Grant). Consulting services to be determined. Ministry of Education (Malawi); Ministry of Education (Ghana); RUFORUM; Ministry of Education (Cote d'Ivoire); Ministry of Education (Cameroon). Forum for Agricultural Research in Africa MDTF - Additional Financing: This is a request for an extension of and additional financing for the ongoing Forum for Agricultural Research in Africa (FARA) Multi-Donor Trust Fund (MDTF) (P1126840/TF071192). It is currently financed by the Canadian International Development Agency (CIDA), UK's Department for International Development (DfID); the European Commission (EC); and The Netherlands, and managed by the Agricul- ture, Rural Development and Irrigation unit (AFTA2). FARA has been operating on a 10-year Strategic Plan (2007-2016) de- veloped to add value to the support provided by the sub-regional organizations (SROs) to strengthen African National Agri- cultural Research Systems (NARS). The strategy was designed to be implemented in 2 five year phases with corresponding Medium Term Operational Plans (MTOPs) which detail implementation of the strategy. Due to delays in obtaining donor funding under the original MDTF, the Strategic Plan period was adjusted to cover the period 2009-2018. The FARA MDTF was established at the World Bank in 2009 to support the first phase of the strategic plan, MTOP I (2009-2013). It has been under implementation for the past three and a half years and implementation has been satisfactory. It is scheduled to close on December 31, 2013. Several of the MDTF participating donors are in favor of and have recommended a 5-year extension of the MDTF (in line with the Bank's revised guidelines on extension of closing dates, April 2013) to support a smooth transition to FARA's second MTOP (2014-2018). The associated proposed Additional Financing would support implementation of MTOP II. Initial confirmed funding to launch implementation has already been secured from one donor. Approval completed on 13 December 2013. Environmental Assessment Category B. US$ 20.0 (CDP4). Consulting services to be determined. Forum for Agricultural Research in Africa (FARA) Tel: (233-302) 772-823, E-mail: yakinbamijo@fara-africa.org, Contact: Dr. Yemi Akinbamijo, Executive Director. Association for Strengthening Agricultural Research in East and Central Africa Multi Donor Trust Fund: This is a request for an extension of and additional financing for the ongoing Association for Strengthening Agricultural Research in Eastern and Central Africa (ASARECA) Multi-Donor Trust Fund (MDTF) (P112600/TF071104). It is currently financed by the Canadian International Development Agency (CIDA), UK's Department for International Development (DfID); the Euro- pean Commission (EC); and United States Agency for International Development (USAID), and managed by the Agriculture, Rural Development and Irrigation unit (AFTAI). ASARECA, a sub-regional not-for-profit association has been operating based on a 10 year Strategic Plan (2008-2018) developed to support the sustainable competitiveness of Eastern and Central Africa agricultural research systems through support to prioritized areas of research for development. The strategy was designed to be implemented in 2 five year phases with corresponding Medium Term Operational Plans (MTOPs) which detail implemen- tation of the strategy. The ASARECA MDTF was established at the World Bank in 2008 to support the first phase of the stra- tegic plan, OPI (2008-2013). It has been under implementation for the past 4 and a half years and implementation has been satisfactory. It is scheduled to close on December 31, 2013. Donor support has been very strong for the OPI. Original donor pledges totaled $55 million. This target was not only met, but exceeded following an additional contribution of $5.6 million in the second half of 2012. Total contributions to date have passed $60 million. A number of the MDTF participating donors are in favor of and have recommended a 5 year extension of the MDTF to support a smooth transition to ASARECA' second MTOP (OPII) (2014-2018). The associated proposed Additional Financing would support implementation of OPII. Initial confirmed funding to launch implementation has already been secured from two donors. Identification completed on 23 July 2013. Environmental Assessment Category B. US$ 30.0 (CDP4). Consulting services to be determined. Implementing agency(ies) to be determined. Education Africa Higher Education Centers of Excellence for Development Impact: To improve the quality, quantity and de- velopment impact of postgraduate education in selected universities in Africa through regional specialization and collabora- tion. Concept completed on 17 January 2018. Environmental Assessment Category B. Project: P164546. US$ 272.0/12.0 (IDA Credit/IDA Grant). No consultants are required. Economic Community of West African States. East Africa Skills for Transformation and Regional Integration Project (EASTRIP): To increase the access and improve the quality of TVET programs in selected Regional TVET Centers of Excellence and to support regional integration Appraisal completed on 28 June 2018. Environmental Assessment Category B. Project: P163399. US$ 210.0/10.0 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Education; Inter-University Council of East Africa; Ministry of Education, Science and Technology; Ministry of Education, Science and Technology. Africa Higher Education Centers of Excellence Project Add. Fin.: The Project Development Objective is to support July 2018 Africa PAGE 68 the Recipients to promote regional specialization among participating universities in areas that address regional challenges by strengthening the capacities of these universities to deliver quality training and applied research. Approval completed on 10 September 2015. Environmental Assessment Category B. Project: P153111. US$ 15.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Africa Regional Scholarship and Innovation Fund for Applied Sciences, Engineering and Technology: To strengthen the institutional capacity for quality and sustainable doctoral training, research and innovation in transformative technologies in sub-Saharan Africa. Approval completed on 5 July 2018. Environmental Assessment Category C. Project: P165581. US$ 15.0/9.0 (IDA Grant/SPTF). Consultants will be required. International Centre of Insect Physiology and Ecol- ogy. Energy & Extractives WAPP-APL4 (Phase 1): Côte d'Ivoire Liberia Sierra Leone and Guinea Regional Interconnector- Additional Financing: The revised PDOs for the WAPP CLSG Power Interconnection are to: (a) reduce the cost of electricity supply at the utility level for Liberia and Sierra Leone and (b) increase the amount of electricity traded among all the participating countries. The Development Objective of the WAPP TA is to increase the technical integration of the WAPP network. Approval completed on 17 November 2017. Environmental Assessment Category A. Project: P163033. US$ 82.2/40.2/4.6 (IDA Credit/IDA Grant/KFW). Consultants will be required. Implementing agency(ies) to be determined. North Core/Dorsale Nord Regional Power Interconnector Project: The Project Development Objective is to (i) to reduce the cost of and increase the electricity supply at utility level, and (ii) to increase electricity trade between Nigeria, Niger, Benin and Burkina Faso. Concept completed on 5 December 2017. Environmental Assessment Category B. Project: P162933. US$ 280.7/184.8/119.7/16.1/34.1 (IDA Credit/IDA Grant/AFDB/ECEU/GFRC). Consultants will be required. WAPP Secre- tariat. (R) Zambia-Tanzania Interconnector: The Development Objective for the Series of Projects is to establish cross-border transmission capacity between the Southern African Power Pool and the Eastern Africa Power Pool to enable regional power trade. The Project Development Objective (PDO) is to increase power transmission and distribution capacity in northern regions of Zambia enabling regional interconnection with Tanzania. Concept completed on 17 July 2018. Environmental Assessment Category A. Project: P166099. US$ 210.0 (IDA Credit). Consulting services to be determined. ZESCO. Additional Financing for SAPP AREP Program - MDTF: Objective to be Determined. Identification completed on 6 March 2017. Environmental Assessment Category A. US$ 8.5 (FSAF). Consulting services to be determined. Implementing agency(ies) to be determined. (R) Guinea – Mali Interconnection Project: The Project Development Objectives are to: (i) increase electricity supply to the Eastern part of Guinea; (ii) enable electricity trade between Guinea and Mali; and (iii) increase Guinea’s electricity export capability towards other West African Power Pool countries. Approval completed on 13 July 2018. Environmental Assessment Category A. Project: P166042. US$ 84.0/58.4/44.2/13.5/47.4/86.8/33.1 (IDA Credit/AFDB/EBID/ECEU/EUIB/ISDB/WADB). Consulting services to be determined. EDG; EDM. Regional Off Grid Electrification Project: To enhance shared capacity, knowledge and to jointly increase electricity access to households, businesses and communities using modern off-grid electrification technologies in project countries. The project will focus on a selected set of country-specific initiatives that are crucial to meeting the regional strategic goals. Concept completed on 11 April 2017. Environmental Assessment Category F. Project: P160708. US$ 140.0/10.0 (IDA Credit/IDA Grant). Consultants will be required. ECOWAS Centre for Renewable Energy and Energy Efficiency (ECREEE). CAR-DRC Cross-border Electrification Project: The proposed SOP aims to increase Electricity access in Central Africa Power Pool targeted countries through regional power trade. PAGE 69 Monthly Operational Summary July 2018 The project development objective is to (i) increase power transfer across DRC and CAR, and (ii) strengthen the Capacity of the Central Africa Power Pool General Secretariat (CAPP - SG) for regional power trade. Identification completed on 6 Feb- ruary 2018. Environmental Assessment Category B. US$ 110.0/140.0 (IDA Credit/IDA Grant). Consulting services to be de- termined. Implementing agency(ies) to be determined. Ruzizi Regional Hydropower Project - Guarantee: The Ruzizi III hydropower project, 147MW is sponsored by the Energy Commission of the Great Lakes Countries (DRC, Rwanda and Burundi),in short “EGL�, and includes the construction of the dam, tunnel, power station and the transmission line to a switchyard. The project will be developed in the form of a public-private partnership supported by donors including the World Bank, AfDB, and DBSA. The World Bank would provide a Partial Risk Guarantee to support private sector investors to develop the Ruzizi hydropower project. Identification completed on 15 October 2013. Environmental Assessment Category B. US$ 60.0 (GUID). Consulting services to be determined. Imple- menting agency(ies) to be determined. ECOWAS-Regional Electricity Access Project (Phase 1): The Programmatic Development Objective is to increase ac- cess to reliable energy services in targeted areas and to enable cross-border electrification between the recipient countries. The Project Development Objective for the proposed Phase 1 operation is to increase access to reliable energy services in The Gambia, Guinea-Bissau, and Mali and to enable cross-border electrification between those countries. Concept completed on 11 March 2018. Environmental Assessment Category B. Project: P164044. US$ 255.0/8.0 (IDA Credit/IDA Grant). Consultants will be required. Energie du Mali (EDM SA); National Water and Electricity Company (NA- WEC); Electricidade e Agua da Guiné - Bissau (EAGB). Mozambique - Malawi Regional Interconnector Project: The project development objective is to implement the Mozambique-Malawi transmission interconnection and to expand Malawi and Mozambique’s ability to engage in bilateral and regional power trade in the Southern African Power Pool. Concept completed on 13 February 2018. Environmental Assess- ment Category A. Project: P164354. US$ 17.0/42.0/40.0/33.0 (IDA Credit/IDA Grant/GGER/NORW). Consultants will be required. Electricidade de Mocambique; Electricity Supply Corporation of Malawi, Ltd. Solar Development in Sub-Saharan Africa - Phase 1 (Sahel): The Series of Projects' development objective (PDO) is to promote the deployment of competitively-procured Regional Solar Parks in West Africa and enable the dispatch of variable solar energy. SOP #1 project specific PDO is to strengthen the regional technical capacity for preparation of large–scale solar parks and integration of solar electricity into the grids Approval completed on 6 July 2018. Environmental Assessment Category A. Project: P162580. US$ 21.0 (IDA Grant). Con- sultants will be required. West African Power Pool (WAPP). Environment & Natural Resources (R) Lake Victoria Environmental Management Project Phase Three: The Project Development Objective (PDO) is to strengthen planning, coordination and monitoring of environmental pollution in Lake basin and reduce sediment loads in selected hotspot areas. Identification completed on 2 October 2017. Environmental Assessment Category B. US$ 195.0/38.0/8.0 (IDA Credit/IDA Grant/GEFU). Consulting services to be determined. Implementing agency(ies) to be determined. WARFP Fisheries Phase 2 GEF in Cape Verde, Gambia, Guinea-Bissau, Senegal: Improve the management of selected fisheries and increase the net value of catch in targeted landing sites. Identification completed on 12 October 2017. US$ 7.3 (GEFU). Consulting services to be determined. Implementing agency(ies) to be determined. Lake Tanganyika Environmental Management Project: To contribute to the establishment of sustainable integrated watershed and fisheries management in the Lake Tanganyika Basin, while strengthening regional and national institutional framework and capacity to manage natural resources. Identification completed on 4 January 2018. Environmental Assess- ment Category B. US$ 135.0/40.0/10.0 (IDA Credit/IDA Grant/GFIA). Consulting services to be determined. Implementing agency(ies) to be determined. July 2018 Africa PAGE 70 West Africa Regional Fisheries Program Phase 2 in Liberia and Sierra Leone: To improve the management of selected fisheries, increase the post-harvest value of catch in targeted landing sites and improve the enabling environment for aquaculture development. Concept completed on 8 March 2018. Environmental Assessment Category B. Project: P162343. US$ 75.0 (IDA Credit). Consultants will be required. Ministry of Agriculture; Ministry of Fisheries and Marine Resources (MFMR); Sub-Regional Fisheries Commission (SRFC); Committee of Fisheries for the West Central of the Gulf of Guinea (FCWC); Liberia Maritime Authority. AFFC2/RI-Lake Victoria Environmental Management Project APL-1 AF: The objectives of the Project are to con- tribute to: (i) the improvement of the collaborative management of the trans-boundary natural resources of the LVB among the Partner States; and (ii) the improvement of environmental management of targeted pollution hotspots and selected de- graded sub-catchments for the benefit of communities who depend on the natural resources of LVB. Approval completed on 26 May 2015. Environmental Assessment Category A. Project: P153466. US$ 20.0/2.0 (IDA Credit/IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. (R) West Africa Regional Fisheries Program Phase 2 in Cabo Verde, The Gambia, Guinea Bissau and Senegal: Increased sharing of fisheries information by project countries, improved regulation of access to priority fisheries and improve secure access to priority fisheries by small scale fishers and increase the post-harvest value of catch. Concept completed on 21 July 2018. Environmental Assessment Category B. Project: P161906. US$ 73.0 (IDA Credit). Consulting services to be deter- mined. Commission Sous Régionale des Pêches; Ministry of Economy and Employment; Ministry of Environment, Climate Change and Natural Resources; Ministry of Fisheries; Ministry of Fisheries and Maritime Economy. Investments towards Resilient Management of GCLME: To strengthen the resilience of targeted communities and areas in coastal Western Africa. Approval completed on 9 April 2018. US$ 20.3 (GEFU). Consultants will be required. Sao Tome and Principe - Ministry of Infrastructures, Natural Resources and Environment; Mauritania - Ministry of Environment and Sustainable Development; Benin - Ministry of Environment and Sustainable Development; Togo - Ministry of Environ- ment and Forest Resources (MEFR) (Directorate of Environment); Cote d'Ivoire - Ministry of Salubrity, Environment and Sustainable Development; Senegal - Ministry of Environment and Sustainable Development (Directorate of Environment (DECC)); Cote d'Ivoire - Ministry of Economy and Finances; West Africa Economic and Monetary Union; International Union for Conservation of Nature. West Africa Regional Fisheries Program Phase 1 in Cote d'Ivoire: The development objective of this first phase of the West Africa Regional Fisheries Program in Cote d'Ivoire is to strengthen governance and management of targeted fisheries and improve handling of landed catch at selected sites. Identification completed on 26 March 2018. US$ 30.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation Strengthening the Capacity of Regional Financial Institutions in the CEMAC Region: The Project Development Objective (PDO) is to strengthen the capacity of selected CEMAC regional financial institutions to implement their mandates in the areas of financial stability, inclusion and integrity. Approval completed on 4 May 2018. Environmental Assessment Category C. Project: P161368. US$ 25.0/10.0 (IDA Credit/IDA Grant). Consultants will be required. Commission Bancaire de l'Afrique Centrale - COBAC; Groupe d' Action contre le Blanchiment d' Argent en Afrique Centrale (GABAC). Dakar-Bamako Regional Trade Facilitation and Competitiveness Program: Reduce the trade and transport time and cost of carrying goods along the Dakar-Bamako corridor through the efficient management of port, road freight transport, transit, customs and trade procedures and related infrastructure. Identification completed on 20 June 2018. US$ 60.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. EAC Financial Sector Development and Regionalization Project I: AF: To establish the foundation for financial sector integration among EAC Partner States. For the purposes of this additional financing the "foundation of financial sector integration refers to formulating a regional approach to financial inclusion, furthering legal and regulatory harmonization and building institutional capacity to manage the increasingly integrated financial sector in the EAC. Approval completed on 30 September 2016. Environmental Assessment Category C. Project: P160770. US$ 10.5 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. PAGE 71 Monthly Operational Summary July 2018 Africa Region - Improved Investment Climate within the Organization for the Harmonization of Business Laws in Africa (OHADA) AF: To strengthen OHADA’s institutional capacity and sustainability to support, in its member countries, selected aspects of investmentclimate reforms. The reason for the change is to include sustainability of the organization as a result of Project activities. The assumption is that strengthened OHADA institutions with additional capacity to elaborate, adopt and disseminate a new generation of investment climate reform regulations, enforce contracts, and provide fee based services to the private sector will contribute to improved investment climate in OHADA member countries and make the organization more sustainable. The assumption is also that the elaboration of norms, provision of tools and training will contribute to improved corporate financial reporting. Approval completed on 8 June 2018. Environmental Assessment Category C. Project: P164728. US$ 15.0 (IDA Grant). Consultants will be required. Organization for the harmonization of Business Law in Africa. Governance (R) Support for Capacity Development of the AUC and Other African Union Organs: The Project Development Objective (PDO) is to strengthen AUC’s capacity to facilitate regional integration results and transformation through enhanced institutional efficiency. Approval completed on 31 July 2018. Environmental Assessment Category C. Project: P166316. US$ 15.0 (IDA Grant). Consultants will be required. African Union Commission. Regional Public Sector Capacity Building: The project development objective (PDO) is to strengthen, through regional cooperative networks and public goods, the capacity of select schools and institutes of public administration (SIPAs) to build public sector leadership and management capacity. Concept completed on 1 October 2017. Environmental Assessment Cate- gory C. Project: P160923. US$ 30.0 (IDA Grant). Consultants will be required. New Partnership for Africa’s Development Planning and Coordinating Agency. Health, Nutrition & Population AFCC2/RI-3A EA PH Laboratory Networking Project Additional Financing: To establish a network of efficient, high quality, accessible public health laboratories for the diagnosis and surveillance of tuberculosis and other communicable diseases. Approval completed on 7 July 2015. Environmental Assessment Category B. US$ 50.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Enhancing Central Africa Regional Disease Surveillance Systems: The project development objectives are: (i) to strengthen national and regional cross-sectoral capacity for collaborative disease surveillance and epidemic preparedness in ECCAS Region; and (ii) in the event of an eligible crisis or emergency, to provide immediate and effective response to said eligible crisis or emergency. Identification completed on 25 June 2018. Environmental Assessment Category B. US$60.0/220.0 (IBRD/IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Regional Disease Surveillance Systems Enhancement (REDISSE) Phase III: The PDOs are : (i) to strengthen na- tional and regional cross-sectoral capacity for collaborative disease surveillance and epidemic preparedness in West Africa; and (ii) in the event of an Eligible Emergency, to provide immediate and effective response to said Eligible Emergency. Ap- proval completed on 7 May 2018. Environmental Assessment Category B. Project: P161163. US$ 50.0/70.0 (IDA Credit/IDA Grant). Consultants will be required. Mauritania - Ministry of Livestock; Benin - CNLS-TP, Présidence de la République du Bénin; Mali - Ministry of Health; Niger - Ministry of Health. Africa Centers for Disease Prevention and Control Regional Investment Financing Program: The project devel- opment objective is to support the Africa CDC to effectively deliver on its mandate of preventing, detecting and responding to health threats by establishing the institutional and regulatory framework and public health assets at the continental, sub- regional and national levels for the benefit of Africa Union member states and their citizens. Identification completed on 27 June 2018. Consulting services to be determined. Implementing agency(ies) to be determined. SWEDD Additional Financing for Benin: The development objective is to increase women and adolescent girls’ empow- erment and their access to quality reproductive, child and maternal health services in selected areas of the participating coun- tries, including the Recipients' territory, and to improve regional knowledge generation and sharing as well as regional capacity and coordination. Identification completed on 4 May 2018. Environmental Assessment Category C. US$ 15.0/15.0 (IDA July 2018 Africa PAGE 72 Credit/IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Macroeconomics, Trade and Investment CEMAC Technical Assistance on Regional Economic and Trade Integration: 15.The Project Development Objective (PDO) is to develop the institutional capacity of the CEMAC Commission to set, implement and monitor policies aimed at strengthening the business environment, facilitating trade, and improving macroeconomic and fiscal management across the region. Identification completed on 14 February 2017. Environmental Assessment Category C. US$ 30.0 (IDA Grant). Con- sulting services to be determined. Implementing agency(ies) to be determined. Nacala Corridor Regional Trade Project: 33.The development objective of this project is to reduce transport, trade and logistics costs along the Nacala Corridor. Identification completed on 17 August 2017. Environmental Assessment Category A. US$ 108.0/75.0 (IDA Credit/IDA Grant). Consulting services to be determined. Implementing agency(ies) to be deter- mined. AFCC2/RI-EAC Accelerated Regional Integration: A.Proposed Development Objectives38.The development objective of the proposed project is to accelerate regional trade integration by reducing costs and barriers for farmers and small scale traders in the EAC. The objective will be achieved through reforming trade policies and procedures, improving facilities and systems, leveraging digital platforms, and enhancing the capacity of select trade regulation agencies. 39.Project beneficiaries will primarily be Farmers; Cross-border traders, especially women; Services providers in selected sec- tors (ICT, transport, professional) as well as consumers and users of such services ; and National and regional policy institu- tions tasked to implement and monitor policy reforms to deepen regional integration in the EAC. Concept completed on 29 May 2017. Environmental Assessment Category B. Project: P154227. US$ 60.0 (IDA Credit). Consulting services to be deter- mined. East African Community. AFCC2/RI-Great Lakes Trade Facilitation - SOP2: The development objective is to enhance the capacity for commerce and improve processes and conditions for cross-border trade at targeted border locations in the GLR The "Capacity for commerce in the context of this project is defined as the capacity of core trade infrastructure, such as border markets, border facilities, and ports, to handle an increased flow of goods, services, and people, and the capacity of government agencies at the border to provide high quality and efficient services. Service providers include those individuals who directly support the immediate cross-border trade value chains, including, among others, market vendors in border markets, trans- porters, and government agents. The assumption is that improving the adequacy of trade infrastructure, simplifying and im- proving border processing procedures (including standards for treatment), and enhancing the knowledge and capacity of trad- ers and border officials would lead to reduced trade costs (be they material and immaterial, the latter related to harassment and waste of time) that the target-groups have to bear each time they cross the border. Taken together, and in the absence of any other factors of influence that are not under the control of the project (such as conflict, disaster, major political and/or economic crisis), these project outcomes would help increase the volume of goods traded through the respective border posts/crossing points and improve the livelihoods of those involved in the cross-border value chains in the sub-region. Concept completed on 30 September 2016. Environmental Assessment Category B. Project: P155329. US$ 37.0/23.0 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Industry, Trade and Investment. Other (R) Additional Financing for the Comoros program of the 4th Phase of the Regional Communications Infra- structure Program: The development objectives of this project, in line with the overall RCIP program, are to support the Recipient’s efforts to lower prices for international capacity and extend the geographic reach of broadband networks. Negoti- ations authorized on 11 July 2018. Environmental Assessment Category B. Project: P166737. US$ 10.0 (IDA Grant). Consult- ants will be required. RCIP-4 4th Phase of the Regional Communications Infrastructure Program. Social Protection & Labor Additional Financing to Eastern Recovery Project: The project development objective is to improve access to liveli- hoods and socio-economic infrastructure in vulnerable communities in the eastern provinces of DRC. Approval completed on PAGE 73 Monthly Operational Summary July 2018 11 December 2015. Environmental Assessment Category B. Project: P157303. US$ 34.0/16.0 (IDA Credit/IDA Grant). Con- sultants will be required. Implementing agency(ies) to be determined. West Africa Unique Identification for Regional Integration and Inclusion (WURI) Program: The Program De- velopment Objective (Pr.DO) is to increase the number of persons in participating countries who have government-recognized proof of unique identity that facilitates access to services. The Project Development Objective (PDO) for Phase 1 of the Project is to increase the number of persons in Côte d’Ivoire and Guinea who have government-recognized proof of unique identity that facilitates access to services. Approval completed on 5 June 2018. Environmental Assessment Category B. Project: P161329. US$ 92.3/29.9 (IDA Credit/IDA Grant). Consultants will be required. Office of the Prime Minister (Primature); ECOWAS Commission; Organisation National de l'Identification (ONI). Social, Urban, Rural and Resilience Global Practice Regional Lake Chad Recovery and Development Project: The development objective is to improve economic oppor- tunities, access to basic services and better connectivity for communities in targeted participating provinces of the Lake Chad region in Cameroon, Chad, Niger and Nigeria. Identification completed on 12 September 2016. Environmental Assessment Category B. US$ 60.0/40.0 (IDA Credit/IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Great Lakes Region Displaced Persons and Border Communities Project Additional Financing: to (i) improve access to livelihoods and socio-economic infrastructure for displaced people and host communities in target areas of the ter- ritory of the Republic of Zambia, and (ii) support regional learning on development responses to forced displacement. Ap- proval completed on 25 July 2017. Environmental Assessment Category B. Project: P163895. Consulting services to be deter- mined. Implementing agency(ies) to be determined. West Africa Regional Hydro Meteorological Services Modernization Program Phase I: The proposed Project Development Objective (PDO) is to strengthen regional hydro-meteorological services for improved early warning, disaster response and safety nets systems, and agricultural services in targeted areas in the participating countries. Identification com- pleted on 28 February 2018. Environmental Assessment Category B. US$ 79.2/67.8 (IDA Grant/GCF). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Lake Tanganyika Transport Program - SOP1 Tanzania Phase: The program development objective for the Lake Tan- ganyika Transport Program has been identified as the following: to facilitate the sustainable movement of goods and people to and across Lake Tanganyika, whilst strengthening the institutional framework for navigation and maritime safety. Concept completed on 12 March 2018. Environmental Assessment Category A. Project: P165113. US$ 200.0/3.0 (IDA Credit/IDA Grant). No consultants are required. TANROADS; Tanzania Port Authority; Central Corridor Transit Transport Facilitation Agency; East Africa Community. Burkina Faso - West Africa Regional Communications Infrastructure Project - Additional Financing: The de- velopment objective of WARCIP is to increase the geographical reach of broadband networks and reduce costs of communica- tions services in West Africa. For APL1B, the Project's development objectives are to contribute to increasing the geographical reach of broadband networks and to reducing the costs of communications services in each of the territories of The Gambia, Guinea and Burkina Faso. Approval completed on 25 April 2018. Environmental Assessment Category B. Project: P161836. US$ 20.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Regional Connectivity and Transformation Program: The program aims to deepen reforms for connectivity and to extend the benefits of connectivity to people regionally using enabling ICT applications. Identification completed on 15 No- vember 2017. US$ 75.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Lake Tanganyika Transport Program - SOP2 - Burundi: The project development objective has been identified as the July 2018 Africa PAGE 74 following: to facilitate the sustainable movement of goods and people to and across Lake Tanganyika, whilst strengthening the institutional framework for navigation and maritime safety. Concept completed on 12 March 2018. Environmental Assess- ment Category A. Project: P165119. US$ 50.0/2.0 (IDA Credit/IDA Grant). Consultants will be required. Autorité Maritime Portuaire et Ferroviaire; Office des Routes; Lake Tanganyika Authority. (N) Lome-Ouagadougou-Niamey Regional Corridors: To improve regional connectivity and enhance economic op- portunities along the Lome-Ouagadougou-Niamey road corridors Identification completed on 30 July 2018. US$ 210.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Lake Victoria Transport Program - Phase 3 Tanzania: The PDO is to facilitate the sustainable movement of goods and people across Lake Victoria, whilst strengthening the institutional framework for navigation and maritime safety Concept completed on 18 January 2018. Environmental Assessment Category A. Project: P160955. US$ 200.0/5.0 (IDA Credit/IDA Grant). Consultants will be required. TANROADS; TANZANIA PORTS AUTHORITY; Lake Victoria Basin Commission. Water Economic growth and water security in the Sahel through improved groundwater governance: The Project Development Objective (PDO) is to improve the knowledge on groundwater potential in the Sahel and to strengthen ground- water governance arrangements at local, national, and regional levels. Concept completed on 25 October 2017. Environmental Assessment Category B. Project: P163252. US$ 13.6 (GEFU). No consultants are required. Sahara and Sahel Observatory (OSS); CILSS Interstate Committee for Drought Control in the Sahel. Support to sustainable water resource management and navigation development in the Congo river basin: The Project Development objective is to strengthen the capacity of CICOS to improve the water resource management in the Congo river basin, and to improve of the navigability of the Kinshasa-Brazzaville-Bangui waterway. Concept completed on 20 June 2018. Environmental Assessment Category A. Project: P164880. US$ 30.0/75.0 (IDA Credit/IDA Grant). No consultants are required. Commission internationale du bassin Congo-Sangha-Oubangui (CICOS). Nile Cooperation for Results Project (NCORE) - Additional Financing 2: The development objective for the pro- posed project is to facilitate cooperative water resource management and development in the Nile Basin. Approval completed on 27 April 2017. Environmental Assessment Category B. Project: P162304. US$ 8.5 (CIWA). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Zambezi River Basin Development Project Additional Financing: The Project Development Objective is to advance preparation of the Batoka Gorge Hy-dro-Electric Scheme and strengthen cooperative development within the Zambezi River Basin. Identification completed on 12 June 2018. Environmental Assessment Category A. US$ 2.8 (CIWA). Consultants will be required. Implementing agency(ies) to be determined. Building Climate Resilience in the Niger Basin - Project 1: The program Phase 1 development objective is to strengthen NBA’s capacity for integrated, transboundary water resources management. Concept completed on 24 January 2018. Environmental Assessment Category A. Project: P161262. US$ 45.0/25.0 (IDA Credit/IDA Grant). Consultants will be required. Niger Basin Authority; Ministry of Agriculture and Livestock. NEL TRANSBOUNDARY RIVER BASIN MANAGEMENT AND DEVELOPMENT PROJECT: The project activities will strengthen (i) regional cooperation and integration, (ii) water resources management, (iii) water resources development, and (iv) stakeholder engagement and coordination. They will improve river basin planning, advance investment projects to pipeline status through feasibility type studies and packaging of prepared investments, and strengthen stakeholder participa- tion in investment planning as well as strategic communication. The NEL region will be broadly covered, in addition to targeted activities in the Mara, Kagera and Sio-Malaba-Malakisi sub-basins. Identification completed on 13 June 2013. Environmental Assessment Category B. US$ 13.0 (CIWA). Consulting services to be determined. Implementing agency(ies) to be determined. PAGE 75 Monthly Operational Summary July 2018 East Asia And Pacific Cambodia Agriculture Cambodia Agricultural Sector Diversification Project: The Proposed Project Development Objective (PDO) is to en- hance productivity and market access of smallholder farmers and agribusinesses in selected geographical areas in Cambodia. Concept completed on 8 November 2017. Environmental Assessment Category B. Project: P163264. US$ 90.0 (IDA Credit). Consultants will be required. Ministry Of Agriculture, Forestry And Fisheries (MAFF). Environment & Natural Resources Cambodia Integrated Landscape and Natural Resources Management Project: To improve natural resources man- agement and related value addition in selected landscapes. Concept completed on 9 April 2018. Environmental Assessment Category B. Project: P165344. US$ 60.0 (IDA Credit). Con- sulting services to be determined. Ministry of Agriculture, Forestry and Fisheries; Ministry of Environment (Cambodia). Health, Nutrition & Population Additional Financing for Health Equity and Quality Improvement Project (H-EQIP): To improve access to quality health services for the targeted population groups with protection against impoverishment due to the cost of health services in the Kingdom of Cambodia and to provide immediate and effective response in case of an eligible crisis or emergency Nego- tiations authorized on 27 June 2018. Environmental Assessment Category B. Project: P167351. US$ 6.0 (KHFS). Consultants will be required. Ministry of Health; Ministry of Health. Cambodia Nutrition Project: To improve utilization and quality of basic maternal and child health and nutrition services in targeted areas of Cambodia. Concept completed on 14 February 2018. Environmental Assessment Category B. Project: P162675. US$ 15.0/5.0/10.0/5.0 (IDA Credit/FSHN/GFF/KHFS). Consultants will be required. Ministry of Health. Social, Urban, Rural and Resilience Global Practice (N) Cambodia Secondary Cities Development Project: The project development objectives are to improve access to urban infrastructure in the project cities and to improve integrated urban planning capacity. Identification completed on 23 July 2018. US$ 60.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Road Asset Management Project II Additional Financing: The PDO is to improve the condition, safety and climate resilience of selected national road corridors in Cambodia and to provide immediate and effective response in case of an Eli- gible Crisis or Emergency. Approval completed on 21 June 2018. Environmental Assessment Category B. Project: P165249. US$ 110.0 (IDA Credit). Consultants will be required. Ministry of Public Works and Transport. July 2018 East Asia And Pacific PAGE 76 China Agriculture China Food Safety Improvement Project: The project development objective is to improve food safety management at the national and subnational levels and reduce food safety risks in selected value chains. Identification completed on 8 No- vember 2016. US$300.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Hubei Safe, Sustainable, Smart Agriculture Product Quality Project: Indicative PDO: Improve agriculture product quality and safety through sustainable and climate smart interventions. Identification completed on 9 July 2018. US$100.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Guangxi Poverty Reduction Program for Results: The program development objective is to enhance the impact and efficiency of the Guangxi Consolidated Poverty Reduction Program (CPRP) in the Targeted Counties. Approval completed on 22 June 2018. Environmental Assessment Category B. US$400.0 (IBRD). No consultants are required. Guangxi Poverty Al- leviation Office. Henan Poverty Reduction Project: Objective to be Determined. Identification completed on 20 February 2017. Environ- mental Assessment Category B. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives China Distributed Renewable Energy Scale Up Project: This project aims to support the scale-up of distributed re- newable energy in China, thereby reducing greenhouse gas emissions. Concept completed on 21 May 2017. Environmental Assessment Category C. Project: P162299. US$ 7.3 (GEFU). Consultants will be required. National Energy Administration. Improving Renewable Energy Efficiency to Promote Clean Energy Development in China: The project develop- ment objective is to improve utilization and reduce curtailment of renewable energy in selected regions/provinces in China. Identification completed on 20 December 2017. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Environment & Natural Resources China HCFC Phaseout Project Stage II: The project development objective is to reduce HCFC production and consump- tion, as well as to avoid and reduce the use of high global warming controlled substances in the consumption sector and the emissions of greenhouse gases from the production sector. Negotiations authorized on 12 April 2018. Environmental Assess- ment Category B. Project: P156397. US$ 141.5 (MPIN). Consultants will be required. People's Republic of China; Ministry of Ecology and Environment, Foreign Economic Cooperation Office. Zhejiang Qiandao Lake and Xin'an River Basin Water Resources and Ecological Environment Protection Project: To strengthen integrated pollution and watershed management and increase access to improved water supply in selected landscapes in support of Zhejiang's program for the protection of Qiandao Lake and Xin’an River Basin. Approval completed on 6 June 2018. Environmental Assessment Category B. Project: P159870. US$150.0 (IBRD). No consultants are required. Zhejiang Provincial Construction Department. (R) Climate Smart Management of Grassland Ecosystems: To pilot climate smart and participatory grassland man- agement practices and an evidence-based PES scheme at selected sites. Concept completed on 30 July 2018. Environmental Assessment Category B. Project: P166853. US$ 3.8 (GEFU). Consultants will be required. Ministry of Agriculture and Rural Affairs. Forest Development in the Yangtze River Economic Belt PforR: Objective to be Determined. To improve the imple- mentation of the Forest Action Plans in selected provinces To improve the implementation of the Forest Action Plans in selected provinces To improve the implementation of the Forest Action Plans in selected provinces To improve the imple- mentation of the Forest Action Plans in selected provinces To improve the implementation of the Forest Action Plans in PAGE 77 Monthly Operational Summary July 2018 selected provinces To improve the implementation of the Forest Action Plans in selected provinces To improve the implemen- tation of the Forest Action Plans in selected provinces Identification completed on 31 May 2017. Environmental Assessment Category C. US$150.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. China Partnership for Market Readiness: The Project Development Objective is to enable China to design a national carbon emissions trading scheme. Identification completed on 22 April 2018. Environmental Assessment Category C. US$ 2.0 (PMR). Consultants will be required. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation Yangtze River Economic Belt Industrial Transformation: Objective to be Determined. The development objective of the project is to support the government's plan to make Yangtze River Economic Belt (YREB) a lead i n g a nd model region in innovation driven development, industrial transformation, regional coordination and win-win cooperation by improving innovation capacity , optimizing industrial structure, and strengthening the regions role in driving national development. The development objective of the project is to support the government's plan to make Yangtze River Economic Belt (YR EB) a leading and model region in innovation driven development, industrial transformation , regional coordination and win-win cooperation by improving in novation capacity, optimizing industrial structure, and strengthening the regions role in driving national development. The development objective of the project is to support the government's plan to make Yangtze River Economic Belt (YREB) a leading and model region in innovation driven development, industrial transformation, regional coordination and win-win cooperation by improving innovation capacity, optimizing industrial structure, and strengthening the regions role in driving national development. The development objective of the project is to support the government's plan to make Yangtze River Economic Belt (YREB) a leading and mod el region in innovation driven development, industrial transformation, regional coordination and win-win cooperation by improving innovation capacity, optimizing industrial structure, and strengthening the regions role in driving national development. The development objective of the project is to support the government's plan to make Yangtze River Economic Bel t (YREB) a leading and model region in innovation driven development, industrial transformation, regional coordination and win-win cooperation by improving in novation capacity, optimizing industrial structure, and strengthening the regions role in driving national development. The development objec- tive of the project is to support the government's plan to make Yangtze River Economic Belt (YRE B) a leading and model region in innovation driven development, industrial transformation, regional coordination and win-win cooperation by im- proving innovation capacity, optimizing industrial structure, and strengthening the regions role i n driving national develop- ment. The development objective of the project is to support the government's plan to make Yangtze River Economic Belt (YREB) a leading and model region in innovation driven development, industrial transformation, regional coordination and win-win cooperation by improving innovation capacity, optimizing industrial structure, and strengthening the regions role in driving national development. Identification completed on 30 August 2017. Environmental Assessment Category B. US$400.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Social Protection & Labor Guizhou Aged Care System Development Program: The PDO is to improve the coverage, quality, equity and efficiency of the aged care system in Guizhou province through strengthened service delivery, public management and public financing. Identification completed on 15 February 2017. Environmental Assessment Category C. US$350.0/124.0 (IBRD/FRDE). Con- sulting services to be determined. Guizhou Provincial Department of Civil Affairs. Anhui Aged Care System Demonstration Project: The project development objective (PDO) is to support the govern- ment of Anhui province in developing and managing a diversified, three-tiered aged care service delivery system for the elderly, particularly those with limited functional ability. Approval completed on 19 June 2018. Environmental Assessment Category B. Project: P154716. US$118.0 (IBRD). Consultants will be required. Anhui Provincial Department of Civil Affairs; People's Republic of China. Social, Urban, Rural and Resilience Global Practice China: Greening Fuzhou High Tech Zone Demonstration Project: To contribute to balanced spatial development in the Yangtze River Belt Concept completed on 24 April 2018. Environmental Assessment Category B. Project: P158079. US$200.0 (IBRD). Consulting services to be determined. Fuzhou High-Tech Industrial Development Zone. July 2018 East Asia And Pacific PAGE 78 Shanghai New Urbanization Financing and Innovation Project: The project development objective is to provide sus- tainable long-term financing to green infrastructure in selected small towns in the Shanghai metropolitan area and Yangtze river delta region. Concept completed on 6 November 2017. Environmental Assessment Category F. Project: P158124. US$350.0 (IBRD). Consultants will be required. Shanghai Municipal Investment (Group) Corporation. Chongqing New Urbanization Pilot and Demonstration Project: The project development objective is to improve the use of public space and increase pedestrian mobility in selected districts of Chongqing’s Central City. Appraisal completed o n 6 July 2018. Environmental Assessment Category A. Project: P158142. US$100.0 (IBRD). Consultants will be required. Chongqing PMO. Gansu Silk Road Revitalization Project: The project development objective is to improve local economy and living con- ditions in selected communities in Gansu Province. The project will contribute to the implementation of the Master Plan for the Gansu Golden Section of Silk Road Economic Belt, the 13th Five-Year Plan of Gansu Province, and the Chinese Civilization Inheritance and Innovation Master Plan. The project is anchored within Gansu Poverty Alleviation through Tourism Program, which aims at improving urban and rural settle- ments, infrastructure, environment sustainability, and provide microcredit support to poor households. Building on the suc- cess of completed and ongoing infrastructure development and cultural conservation in the province, the project will finance incremental improvements needed to connect lower income groups to benefit from major public investments. The project introduces an integrated approach of using local endowments as an economic driver for sustainable local economic develop- ment. The project invests in selected locations where lower-income groups living in decaying historic areas could benefit from, and contribute to, the Silk Road economic growth. Concept completed on 19 June 2017. Environmental Assessment Category A. Project: P158215. US$250.0 (IBRD). Consultants will be required. Department of Culture. Shaanxi Sustainable Towns Development Project: The proposed project development objective is to foster regional town cluster development, reduce flood risk, and improve urban access and services in selected towns in southern Shaanxi Province. Concept completed on 18 December 2017. Environmental Assessment Category B. Project: P162623. US$150.0 (IBRD). Consultants will be required. Foreign Debt Management Office, Shaanxi Provincial Development and Reform Com- mission. Transport & Digital Development Shaanxi Xi'an City Intelligent Public Transport Project: 15.The PDO is to improve public transport efficiency and reliability in Xi'an Municipality. 16.Achievement of the PDO will be measured by the following indicators: Concept completed on 28 December 2016. Environ- mental Assessment Category B. Project: P157787. US$150.0 (IBRD). Consulting services to be determined . Xi’an Urban Infra- structure Investment and Development Co.. Xinjiang Yining Urban Transport and Environment Project: To improve transport mobility and accessibility to se- lected areas of Yining Municipality in a safe, sustainable and inclusive manner. Appraisal completed on 26 November 2017. Environmental Assessment Category B. Project: P159253. US$100.0 (IBRD). Consultants will be required. Yining Municipal Government. China: Hubei Xiangyang New Urbanization Demonstration Project: The proposed PDO is to promote the balanced and sustainable growth of the city of Xiangyang through integrated urban transport and urban developments, with a focus on the Panggong and Dongjin areas. Identification completed on 26 February 2017. US$150.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Qianxinan Rural Transport Program for Results: Objective to be Determined. Identification completed on 23 Decem- ber 2015. Environmental Assessment Category B. Project: P158545. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. China: GEF Efficient and Green Freight Transport Project: The development objective of the project is to improve the efficiency of China's freight transport sector and contribute to the reduction of carbon emissions. Concept completed on PAGE 79 Monthly Operational Summary July 2018 20 June 2017. Environmental Assessment Category B. Project: P159883. US$ 8.3 (GEFU). Consultants will be required. Min- istry of Transport. China: Hubei Inland Waterway Improvement Project: The Project Development Objective (PDO) is to improve inland waterway transport capacity and reliability along the Han River in support of low carbon development. Approval completed on 18 May 2018. Environmental Assessment Category A. Project: P158717. US$150.0 (IBRD). Consultants will be required. Hubei Provincial Transportation Department (HPTD); People's Republic of China. Anhui Rural Road Improvement and Upgrading PforR: Objective to be Determined. Negotiations authorized on 2 April 2018. Environmental Assessment Category B. Project: P158733. US$200.0 (IBRD). Consulting services to be deter- mined. Implementing agency(ies) to be determined. China PPP Promotion and Demonstration Project: The PDO is to improve the PPP implementation practices in China. The project will support the establishment of Project Development Facility in selected provinces to finance project and trans- action development, and help implementing agencies to take well-prepared projects to the market. The project is designed to help implementing agencies to develop best-practice PPP projects, thereby attracting reputable private sector partners and get value-for-money from PPP transactions. The project will finance a series of TA to help MOF/PPP Center improve and refine the PPP policy and regulatory framework, develop standard guidelines for PPP transactions in various, and develop and deliver a nation-wide capacity development and training program. The project will also provide implementation support TA to par- ticipating provinces and the PPP Center. Identification completed on 9 February 2016. Environmental Assessment Category A. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. (N) Chuzhou-Nanjing Intercity Railway PPP Project: The proposed project development objective is to improve con- nectivity between new districts of Chuzhou Municipality and Nanjing Municipality and to demonstrate an innovative public- private partnership in China. Identification completed on 16 July 2018. US$150.0 (IBRD). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Water Hezhou Urban Water Infrastructure and Environment Improvement Project: The objectives of the Project are to improve flood risk management and reduce discharge of water pollutants in Hezhou Municipality。 Approval completed on 13 June 2018. Environmental Assessment Category A. Project: P158622. US$150.0 (IBRD). Consultants will be required. Hezhou Project Management Office. China: Liaoning Safe and Sustainable Urban Water Supply Project: The project development objectives are to im- prove water quality and operational efficiency of selected water supply utilities in the project areas. Approval completed on 6 June 2018. Environmental Assessment Category B. Project: P158713. US$250.0 (IBRD). Consultants will be required. Liao- ning Urban Construction and Renewal Project Management Company Limited (LUCRPMC); PEOPLE'S REPUBLIC OF CHINA. Public-private Partnership Project for Water Supply and Sanitation in Sichuan Province: To be determined. Identification completed on 25 June 2018. US$100.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Henan Zhoukou Longhu Wetland Protection and Management Project: The proposed Project Development Objec- tive (PDO) is to improve the management of, and remove water pollution from Longhu Wetland. Concept completed on 2 February 2018. Environmental Assessment Category A. Project: P164279. US$200.0 (IBRD). Consulting services to be deter- mined. Huaiyang County Government. Indonesia Education Improving Efficiency and Effectiveness in Education Expenditure: To improve learning conditions for students in the first nine years of formal education in selected districts by strengthening governance and management practices in the July 2018 East Asia And Pacific PAGE 80 education sector. Identification completed on 23 February 2017. Environmental Assessment Category C. US$300.0 (IBRD). Consulting services to be determined. Ministry of Education and Culture. Energy & Extractives Indonesia Geothermal Resource Risk Mitigation Project (GREM): The proposed development objective is to scale up investment in geothermal energy development and reduce greenhouse gas emissions in Indonesia. Concept completed on 9 March 2018. Environmental Assessment Category F. Project: P166071. US$325.0/185.0 (IBRD/GCF). Consulting services to be determined. PT Sarana Multi Infrastruktur (Persero). Environment & Natural Resources Improvement of Solid Waste Management to Support Regional and Metropolitan Cities: The Project Develop- ment Objective (PDO) is to improve solid waste management services for urban populations in selected cities across Indonesia. Negotiations authorized on 4 May 2018. Environmental Assessment Category A. Project: P157245. US$100.0/102.0 (IBRD/ZBIL). Consultants will be required. Ministry of Environment and Forestry; Ministry of Public Works and Housing. ID: Strengthening of Social Forestry in Indonesia: The Project Development Objectives (PDO) are to improve com- munity management of forest in select priority areas and to conserve biodiversity of global significance. Identification com- pleted on 23 February 2018. US$ 14.3 (GEFU). Consulting services to be determined. Implementing agency(ies) to be deter- mined. Indonesia: HCFC Phase-out in the PU Foam Sector: Additional Financing for Stage 2: The Project Development Objective is to reduce the consumption of HCFC-141b in the foam sector in Indonesia in order to contribute to the government's effort to comply with Indonesia's HCFC phase-out obligations under the Montreal Protocol. Approval completed on 22 De- cember 2017. Environmental Assessment Category B. Project: P161588. US$ 4.3 (MPIN). Consultants will be required. Imple- menting agency(ies) to be determined. ID: Sustainable Landscape Program in Jambi: The program’s proposed development objective is to reduce land -based greenhouse gas emissions and promote sustainable land-use in the selected provinces of Indonesia. Concept completed on 5 April 2018. Environmental Assessment Category B. Project: P166672. US$ 13.5 (BIOA). Consultants will be required. Ministry of Environment and Forestry. Forest and Land Fire Prevention and Management: To improve the prevention and suppression of forest and land fires in targeted project areas Identification completed on 21 June 2016. US$200.0 (IBRD). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation Indonesia Infrastructure Finance Facility - Additional Financing: To strengthen the financial capacity of IIF to in- crease the access to private sector financing for infrastructure in Indonesia Approval completed on 24 March 2017. Environ- mental Assessment Category F. Project: P154779. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Integrated Infrastructure Development for National Tourism Strategic Areas (Indonesia Tourism Develop- ment Project): The Development Objective is to improve the quality of, and access to, tourism-relevant basic infrastructure and services, strengthen local economy linkages to tourism, and attract private investment in selected tourism destinations in Indonesia. Approval completed on 30 May 2018. Environmental Assessment Category A. Project: P157599. US$300.0/2.1 (IBRD/IDIS). Consultants will be required. Regional Infrastructure Development Agency, Ministry of Public Works and Hous- ing; Directorate General Highways, Ministry of Public Works and Housing; Directorate General Human Settlements, Ministry of Public Works and Housing; Deputy Tourism Destination Development, Ministry of Tourism; Deputy for Investment Pro- motion, Indonesia Investment Coordinating Board (BKPM); Deputy for Investment Climate Development, Indonesia Invest- ment Coordinating Board (BKPM); Deputy Institutional Development and Tourism Industry, Ministry of Tourism; National Development Planning Agency (BAPPENAS); Deputy Investment Planning, Indonesia Investment Coordinating Board (BKPM). PAGE 81 Monthly Operational Summary July 2018 Governance Human Resource Development for Bureaucratic Reform Project: The Development Objective of the proposed pro- ject is to strengthen civil service talent management, professionalism, and skills investment in view of achieving key national development priorities Identification completed on 21 November 2016. Environmental Assessment Category C. US$150.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Social Protection & Labor Indonesia Skills Development Project: To support the Government of Indonesia in reforming its technical vocational education and training system and employment services to better align skills to employers' demand. Identification completed on 14 January 2018. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Investing in Nutrition and Early Years: To increase simultaneous utilization of nutrition interventions by 1,000-day households in priority districts. Approval completed on 21 June 2018. Environmental Assessment Category B. Project: P164686. US$400.0/20.0 (IBRD/GFF). No consultants are required. Secretariat of the Vice President; Ministry of Finance; Ministry of Home Affairs; Ministry of Health; Ministry of Education and Culture; Ministry of Social Affairs; National Statistical Agency; National Development Planning Agency; Ministry of Villages, Disadvantaged Areas and Transmigration; Coordinat- ing Ministry for Human Development and Cultural Affairs. National Urban Development Project (NUDP): The PDO is to strengthen the capacity of participating urban local gov- ernments to carry out integrated planning, prioritize capital investments and improve fiscal management. Concept completed on 9 November 2017. Environmental Assessment Category B. Project: P163896. US$49.6 (IBRD). No consultants are re- quired. Ministry of Public Works and Housing. ID-TF ADDITIONAL FINANCING PNPM GENERASI PROGRAM: The new PDO is to empower local communities in poor, rural sub-districts in the project provinces to increase utilization of health and education services. Approval completed on 23 June 2014. Environmental Assessment Category B. Project: P147658. US$ 121.8 (IDPN). Consultants will be required. Director Generasl for Village Community Empowerment Tel: 6221-7990419, E-mail: ppkpmd@yahoo.com, Contact: Nata Ira- wan, SH, MSi, Directorate of Traditional and Community Social and Cultural. (R) Program to Accelerate Agrarian Reform (One Map Project): The Project Development Objective is to establish clarity on actual land rights and land use at the village level in the target areas. Approval completed on 18 July 2018. Environmental Assessment Category A. Project: P160661. US$200.0 (IBRD). Consult- ants will be required. Geospatial Information Agency; Badan Informasi Geospasial (BIG); Ministry of Agrarian Affairs and Spatial Planning / National Land Agency (ATR/BPN). Institutional Strengthening for Improved Village Service Delivery: Strengthen villages’ ability to deliver effective investments Concept completed on 26 April 2018. Environmental Assessment Category B. Project: P165543. US$350.0 (IBRD). No consultants are required. Ministry of Finance; Ministry of Home Affairs; BAPPENAS (Minister of Planning and National Development); Ministry of Villages. Water National Urban Water Supply Project: The project development objective is to provide access to improved water sources for the population and strengthen the operational performance of water service providers in selected urban areas. Approval completed on 6 June 2018. Environmental Assessment Category B. Project: P156125. US$100.0 (IBRD). Consultants will be required. Directorate General of Human Settlements - Ministry of Public Works, Contact: Andreas Suhono, Mr.; Republic of Indonesia, Contact: Robert Pakpahan, Director General of Budget Financing and Risk Management. National Urban Waste Water Management Program: The Project Development Objective (PDO) is to increase capac- ity of national and local governments for wastewater management and increase access to safely managed sanitation to the July 2018 East Asia And Pacific PAGE 82 population living in selected cities in Indonesia. Concept completed on 24 December 2017. Environmental Assessment Cate- gory A. Project: P158310. US$200.0 (IBRD). Consulting services to be determined. Ministry of Public Works, Directorate General of Human Settlement. Dam Operational Improvement and Safety Project Phase 2: The new Project Development Objective is proposed to increase the safety and functionality of dams in selected locations and strengthen the operation and management capacity for dam safety. Approval completed on 27 February 2017. Environmental Assessment Category B. Project: P161514. US$125.0/125.0 (IBRD/AIIB). Consultants will be required. Ministry of Public Works and Housing; Ministry of Finance. The National Rural Water Supply and Sanitation Project (PAMSIMAS AF): To increase the number of under-served rural and peri-urban populations accessing sustainable water supply and sanitation services Approval completed on 8 January 2016. Environmental Assessment Category B. Project: P154780. US$300.0 (IBRD). Consultants will be required. Ministry of Public Works and Housing, Contact: Andreas Suhono, Director General of Human Settlements; Ministry of Public Works and Housing, Contact: Andreas Suhono, Director General of Human Settlements. Strategic Irrigation Modernization and Urgent Rehabilitation Project: The Project Development Objective is to improve irrigation services and strengthen accountability of irrigation schemes management in selected areas. Approval com- pleted on 21 June 2018. Environmental Assessment Category B. Project: P157585. US$250.0/250.0 (IBRD/AIIB). Consult- ants will be required. Ministry of Public Works and Housing. Kiribati Environment & Natural Resources Pacific Islands Regional Oceanscape Program - Kiribati: The PDO is to strengthen the shared management of selected Pacific Island oceanic and coastal fisheries and the critical habitats upon which they depend. Identification completed on 12 October 2017. US$ 15.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Kiribati Outer Islands Transport Infrastructure Investment Project: To improve domestic connectivity through investments targeted in either new, or the rehabilitation or upgrading of existing infrastructure assets. Identification com- pleted on 18 October 2017. US$ 21.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Kiribati Aviation Investment Project Additional Financing: The project development objective is to improve opera- tional safety and oversight of international air transport and associated infrastructure. Approval completed on 9 March 2016. Environmental Assessment Category B. Project: P153381. US$ 7.1/5.4 (IDA Grant/PRIF). Consultants will be required. Min- istry of Communication, Transport, & Tourism Development Tel: 686-26-004, E-mail: tmwemwenikeaki@gmail.com, Con- tact: Terieta Mwemwenikeaki, Secretary. Water South Tarawa Water Supply Project: The proposed PDO is to increase access and quality of water supply services, and to improve the operational performance of the water supply services provider in South Tarawa. Concept completed on 8 March 2018. Environmental Assessment Category B. Project: P162938. US$ 15.0/15.0/28.0 (IDA Grant/ASDB/GCF). Consulting services to be determined. Ministry of Infrastructure and Sustainable Energy. Lao People's Democratic Republic Energy & Extractives Laos - Vietnam Interconnector Project: To increase the export of renewable energy from Laos to Vietnam in a financially and environmentally sustainable way. Concept completed on 5 July 2018. Environmental Assessment Category B. Project: PAGE 83 Monthly Operational Summary July 2018 P164500. US$ 25.0 (IDA Credit). No consultants are required. Ministry of Energy and Mines; Electricite du Laos. Governance Lao PDR Public Finance Management Modernization Project: The project development objective (PDO) is to im- prove budget execution, cash management, and reliability and completeness of Government’s annual financial statements. Identification completed on 11 May 2018. Environmental Assessment Category C. US$ 20.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population Health and Nutrition Services Access Project: To improve access to quality health and nutrition services while ensuring financial protection, in targeted areas of Lao PDR. Identification completed on 8 November 2017. US$ 15.0/10.0/5.0 (IDA Credit/GFF/IDFH). Consulting services to be determined. Implementing agency(ies) to be determined. Lao PDR Civil Registration and Vital Statistics Project: To establish a functional electronic civil management infor- mation system and improve the coverage of civil registration of vital events particularly births and deaths in Lao PDR Identi- fication completed on 7 May 2018. Environmental Assessment Category B. US$ 5.0/25.0 (IDA Credit/EDCF). Consulting services to be determined. Implementing agency(ies) to be determined. Social Protection & Labor Laos Reducing Rural Poverty and Malnutrition Project: To increase the utilization of nutrition services and improve key nutrition behaviors that are known to reduce childhood stunting in poor, rural areas. Concept completed on 1 February 2018. Environmental Assessment Category C. Project: P162565. US$ 25.0 (IDA Credit). Consultants will be required. Depart- ment of Cooperation and Planning, Ministry of Agriculture and Forestry. Water Additional Financing for Mekong Integrated Water Resources Management (Lao PDR): The Project Develop- ment Objective is to improve water resource and fisheries management in selected areas of the Lower Mekong Basin. Approval completed on 6 July 2017. Environmental Assessment Category B. Project: P159447. US$ 25.0 (IDA Credit). Consultants will be required. Mekong River Commission; Ministry of Finance, Lao PDR; Ministry of Natural Resources and Environment. Water Supply and Sanitation Project: To provide access to improved water supply, sanitation and hygiene services in selected areas, and strengthen capacity of select institutions to improve service delivery. Concept completed on 7 May 2018. Environmental Assessment Category B. Project: P164901. US$ 25.0 (IDA Credit). Consultants will be required. Ministry of Health. Marshall Islands Governance Project to Strengthen budget execution and financial reporting systems: The objective of the project is to improve the completeness, reliability and timeliness of Government’s annual financial statements, and the availability of reliable soci- oeconomic statistics. Approval completed on 30 May 2018. Environmental Assessment Category B. Project: P163131. US$ 9.0 (IDA Grant). Consultants will be required. Ministry of Finance. Health, Nutrition & Population RMI Early Childhood Development and Nutrition Project: The proposed project development objective is to increase coverage and utilization of essential reproductive, maternal, and child health and nutrition, and early childhood development services. Concept completed on 29 June 2018. Project: P166800. US$ 12.0 (IDA Grant). No consultants are required. Division of International Development Assistance (DIDA). July 2018 East Asia And Pacific PAGE 84 Social, Urban, Rural and Resilience Global Practice ADDITIONAL FINANCING FOR THE PACIFIC RESILIENCE PROJECT UNDER THE PACIFIC RESILIENCE PROGRAM: To strengthen the financial protection of the Republic of Marshall Islands. Identification completed on 30 April 2018. Environmental Assessment Category B. US$ 2.5 (IDA Grant). No consultants are required. Implementing agency(ies) to be determined. Transport & Digital Development The Republic of the Marshall Islands Maritime Investment Project: Facilitate maritime access and safety in the Republic of the Marshall Islands by improving marine infrastructure and assets, and strengthening institutional arrange- ments. Concept completed on 15 February 2018. Environmental Assessment Category B. Project: P161382. US$ 25.8 (IDA Grant). Consultants will be required. Ministry of Transport and Communications. Micronesia, Federated States of Energy & Extractives SUSTAINABLE ENERGY DEVELOPMENT AND ACCESS PROJECT: The Project Development Objectives is to im- prove PUC's operational performance, expand access to electricity, and increase the share of renewable energy in the Recipi- ent’s Territory. Concept completed on 2 March 2018. Environmental Assessment Category B. Project: P165183. US$ 30.0 (IDA Grant). Consulting services to be determined. Pohnpei Utility Corporation (PUC); Chuuk Public Utility Corporation (CPUC). Governance Project for Strengthening Public Financial Management: The objective of the project is to improve tax administration and the completeness, reliability and timeliness of financial reports of the National and State Governments. Approval com- pleted on 30 May 2018. Environmental Assessment Category B. Project: P161969. US$ 11.0 (IDA Grant). Consultants will be required. Department of Finance and Administration. Transport & Digital Development P2: Palau-FSM Connectivity Project: AF Kosrae Connectivity: The development objective of the Project is to reduce the cost and increase the availability of information and communication technology services in the Recipient's territory. Aproval completed on 31 May 2017. Environmental Assessment Category B. Project: P161363. US$ 1.6 (IDA Grant). Consult- ing services to be determined. Implementing agency(ies) to be determined. Federated States of Micronesia Maritime Investment Project: Facilitate maritime access and safety in the Federated States of Micronesia by improving marine infrastructure and assets, and strengthening institutional arrangements. Concept completed on 12 February 2018. Environmental Assessment Category B. Project: P163922. US$ 29.4 (IDA Grant). Consult- ants will be required. Department of Transportation, Communication & Infrastructure. Mongolia Agriculture (R) National Livestock and Agriculture Commercialization Program Support: To improve efficiency and effec- tiveness of selected Government programs for enhancing livestock and crop productivity and commercialization Concept com- pleted on 18 July 2018. Environmental Assessment Category B. Project: P165945. US$ 50.0 (IDA Credit). No consultants are required. Ministry of Food Agriculture and Light Industry, Government of Mongolia. PAGE 85 Monthly Operational Summary July 2018 Energy & Extractives Additional Financing to Ulaanbaatar Clean Air Project: The development objective (PDO) is to enable consumers in areas to access heating appliances producing less particulate matter emissions and to further develop selected medium-term particulate matter abatement measures in Ulaanbaatar in coordination with development partners. Identification completed on 9 May 2018. Environmental Assessment Category B. US$ 12.0 (IDA Credit). Consulting services to be determined. Imple- menting agency(ies) to be determined. Myanmar Agriculture Myanmar National Food and Agriculture Systems Project: The Project Development Objective (PDO) is to, “increase productivity of select high value commodities, enhance agricultural diversification and competitiveness, and diet diversity in selected agro-ecological zones of Myanmar�. This will be achieved through the provision of key public goods and services that will facilitate and further enhance the engagement of (and with) the private sector. Concept completed on 29 June 2018. Environmental Assessment Category B. Project: P164448. US$ 100.0 (IDA Credit). Consulting services to be determined. Min- istry of Agriculture, Livestock, and Irrigation. Education Decentralizing Funding to Schools Project: The proposed objective of the Additional Financing is to improve inclusive- ness of school funding management and enhance support to teachers professional development while increasing transition rates of poor and at-risk students. Negotiations authorized on 8 June 2017. Environmental Assessment Category B. Project: P157231. US$ 54.0 (MMSP). No consultants are required. Implementing agency(ies) to be determined. Inclusive Access and Quality Education project: Objective to be Determined. Concept completed on 18 September 2017. Environmental Assessment Category B. Project: P163389. US$ 100.0/70.0/10.0 (IDA Credit/EFAF/EUDF). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives Power System Energy Efficiency Improvement Project: The development objective of the proposed project is to in- crease capacity and efficiency of generation and transmission system in the project area. Concept completed on 10 November 2017. Environmental Assessment Category B. Project: P162151. US$ 160.0 (IDA Credit). Consultants will be required. Electric Power Generation Enterprise; Ministry of Electricity and Energy. Health, Nutrition & Population Investing in Nutrition for Growth and Development in Myanmar: To increase the coverage of nutrition interventions proven to improve the nutritional status of women and children in the first 1,000 days of life, in the selected high burden States / Regions of Myanmar. Concept completed on 12 November 2017. Environmental Assessment Category B. Project: P164129. US$ 100.0 (IDA Credit). No consultants are required. Department of Social Welfare; Ministry of Health and Sports. Additional Financing: Essential Health Services Access Project: In support of the Myanmar National Health Plan 2017-2021, increase access to a basic essential package of health services of acceptable quality focusing on health and nutri- tional outcomes of women and children, while increasing financial protection. Negotiations authorized on 29 September 2017. Environmental Assessment Category B. Project: P160208. US$ 100.0/10.0 (IDA Credit/GFF). Consulting services to be de- termined. Implementing agency(ies) to be determined. Macroeconomics, Trade and Investment Myanmar Private Sector Growth and Competitiveness: To promote private sector growth and competitiveness July 2018 East Asia And Pacific PAGE 86 through: (i) upgrading the enabling environment for investment; (ii) facilitating cross-border trade; and (iii) strengthening the internal capability of SMEs. Identification completed on 31 January 2018. Environmental Assessment Category C. US$ 100.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice National Community Driven Development Project: The development objective is to enable poor rural communities to benefit from improved access to and use of basic infrastructure and services through a people-centered approach and to en- hance the Recipient's capacity to respond promptly and effectively to an eligible crisis or emergency. Approval completed on 30 June 2015. Environmental Assessment Category B. Project: P153113. US$ 400.0/22.5 (IDA Credit/ITAL). Consulting ser- vices to be determined. Implementing agency(ies) to be determined. Enhancing Community Driven Development Project: The development objective is to enable poor rural communities to benefit from improved access to and use of basic infrastructure and services through a people-centered approach. Appraisal completed on 30 January 2018. Environmental Assessment Category B. Project: P162647. US$ 25.0 (JSDF). Consulting ser- vices to be determined. Department of Rural Development, Ministry of Agriculture, Livestock and Irrigation. Myanmar National Community Driven Development Project: The development objective is to enable poor rural com- munities to benefit from improved access to and use of basic infrastructure and services through a people-centered approach and to enhance the government’s capacity to respond promptly and effectively to an eligible crisis or emergency. Approval completed on 27 June 2018. Environmental Assessment Category B. Project: P166734. US$ 3.0 (MMSP). No consultants are required. Ministry of Agriculture, Livestock and Irrigation. Papua New Guinea Agriculture PNG Agriculture Commercialization and Diversification Project: To increase the productivity and access to markets of target smallholder farmers and small and medium enterprises (SMEs) for selected agricultural value-chains, in selected economic corridors. Concept completed on 5 June 2018. Environmental Assessment Category B. Project: P166222. US$ 40.0 (IDA Credit). Consultants will be required. Department of Agriculture and Livestock. Energy & Extractives Energy utility performance and reliability improvement project: To improve the operational performance of the national electricity utility (PNG Power Limited) and improve the reliability of electricity supply in the project area Identifica- tion completed on 8 July 2018. US$40.0/15.0/15.0 (IBRD/IDA Credit/IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population Improving Access to and Value from Health Services in PNG: To improve performance of essential health services and deliver better value-for-money from public spending on health Identification completed on 3 April 2018. US$ 30.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Urban Youth Employment Project II: The project’s development objectives are to provide vulnerable urban youth (both males and females) in targeted urban centers with work experience, skills and income to enable them to contribute to local development and facilitate their transition to the labor market. Identification completed on 31 January 2018. Environmental Assessment Category B. US$ 30.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be deter- mined. PAGE 87 Monthly Operational Summary July 2018 Transport & Digital Development Papua New Guinea Resilient Transport Project: To enhance climate resilience of priority road infrastructure and strengthen the road transport institutional framework, while maximizing their positive impacts on other economic sectors. Concept completed on 28 June 2018. Environmental Assessment Category B. Project: P166991. US$50.0/19.8 (IBRD/PNGS). Consultants will be required. Department of Work and Implementation. Philippines Agriculture Philippine Rural Development Project Additional Financing: The PRDP aims to increase rural incomes and enhance farm and fishery productivity in the targeted areas. Approval completed on 11 January 2018. Environmental Assessment Cat- egory B. Project: P161944. US$170.0 (IBRD). Consultants will be required. Secretary Emmanuel F. Piñol. Mindanao Inclusive Agriculture Development Project: The objective of the proposed project would be to increase incomes for poor rural households, enhance the competitiveness of farmers and their integration in agricultural value-chains in targeted areas in Mindanao. Identification completed on 14 March 2017. Environmental Assessment Category B. US$100.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Education Teacher effectiveness and competencies enhancement project: Support better teaching and learning in early grades in Mindanao Identification completed on 8 November 2017. Environmental Assessment Category C. US$100.0 (IBRD). Con- sulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives FINANCING MECHANISM FOR DISTRIBUTED SOLAR POWER IN THE PHILIPPINES: The proposed project aims at catalyzing investment in distributed renewable energy in the Philippines. Identification completed on 14 July 2017. US$ 18.2 (PHFS). Consulting services to be determined. Implementing agency(ies) to be determined. Environment & Natural Resources Philippines Stage II HCFC Phase-out: The project development objective is to contribute to the Philippines’ efforts to meet the 2020 HCFC consumption phase-out obligations of the Montreal Protocol and the initial requirements of the Kigali Amendment. Concept completed on 7 March 2018. Environmental Assessment Category B. Project: P165341. US$ 2.8 (MPIN). Consultants will be required. Environmental Management Bureau. GEF Integrated Water Quality Management Project: To introduce integrated and innovative pollution management interventions to reduce land-based pollution affecting Manila Bay Identification completed on 17 November 2011. Environ- mental Assessment Category A. US$ 7.4 (GEFU). Consultants will be required. Department of Environment and Natural Re- sources Tel: (63-2) 929-6626/27/28/29, E-mail: tehanna08@gmail.com, tehanna17@yahoo.com, Contact: Analiza Teh, Un- dersecretary. Finance, Competitiveness and Innovation Philippines Customs Modernization Project: The Project Development Objective is to improve the efficiency, effective- ness and transparency of the Bureau of Customs. Concept completed on 19 September 2017. Environmental Assessment Cat- egory B. Project: P163428. US$150.0 (IBRD). Consultants will be required. Bureau of Customs. Governance Harnessing technology to improve government services: The project development objective is to improve access, July 2018 East Asia And Pacific PAGE 88 efficiency and the quality of delivery of selected government administrative services. Identification completed on 28 June 2017. US$50.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Multi Donor Facility - PH Mindanao Reconstruction & Development: To improve social and economic recovery in targeted conflict-affected communities of Mindanao through activities which promote confidence-building, peace and de- mand-driven governance. Approval completed on 22 December 2015. Environmental Assessment Category B. Project: P157966. US$ 7.0 (PHMF). Consultants will be required. Mindanao Land Foundation, Contact: Damaso Vertido, Executive Director; Bangsamoro Development Agency, Contact: Mohammad Shuaib Yacob, Executive Director; Community and Family Services International Tel: (63-2) 556-1618, E-mail: smuncy@cfsi.ph, Contact: Steve Muncy, Executive Director; International Labour Organization, Contact: Hideki Kagohashi, Enterprise Development Specialist. Multi Donor Facility - PH Mindanao Reconstruction & Development: To improve social and economic recovery in targeted conflict-affected communities of Mindanao through activities which promote confidence-building, peace and de- mand-driven governance. Approval completed on 4 August 2014. Environmental Assessment Category B. Project: P147008. US$ 6.6 (PHMF). Consultants will be required. Mindanao Land Foundation, Inc. Tel: (63-64) 278-3077, E-mail: minland- cmo@minland.ph, Contact: Damaso Vertido, Executive Director; International Labour Organization Tel: (63-2) 580-9900, E- mail: johnsonl@ilo.org, Contact: Mr. Lawrence Jeff Johnson, Director; Community and Family Services International Tel: (63-91) 7812-8523, E-mail: vhernandez@cfsi.ph, Contact: Vladimir Hernandez, Director, Philippine Programs. Transport & Digital Development Metro Manila BRT Line 1 Project: The Project Development Objective (PDO) is to improve the efficiency, effectiveness and safety of the public transport system along the Project Corridor in Metro Manila in an environmentally sustainable man- ner. Approval completed on 16 March 2017. Environmental Assessment Category A. Project: P132401. US$40.7/23.9 (IBRD/CCTF). Consultants will be required. Republic of the Philippines, Contact: Stella Laureano, Director, IFG, Department of Finance; Department of Transportation, Contact: Tom Orbos, Under Secretary, Department of Transport and Communica- tions. Samoa Agriculture Samoa Agriculture & Fisheries Productivity and Marketing Project (SAFPROM): To increase the productivity and access to markets of targeted beneficiaries in selected crops and livestock value-chains and to improve management of targeted fisheries. Concept completed on 3 April 2018. Environmental Assessment Category B. Project: P165873. US$ 21.0 (IDA Grant). Consultants will be required. Ministry of Agriculture & Fisheriers. Health, Nutrition & Population Samoa Health System Strengthening Program: The Program Development Objective (PDO) is to improve the quality and capacity of the service delivery in Samoa for tackling the rising NCDs. Concept completed on 18 April 2018. Project: P164382. US$ 9.3 (IDA Credit). No consultants are required. Ministry of Health. Social, Urban, Rural and Resilience Global Practice SAMOA - PACIFIC RESILIENCE PROJECT UNDER PACIFIC RESILIENCE PROGRAM ADDITIONAL FI- NANCE: To strengthen early warning, resilient investments and financial protection of Samoa. Identification completed on 3 April 2018. Environmental Assessment Category B. US$ 2.5 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development PAGE 89 Monthly Operational Summary July 2018 Samoa Aviation Investment Project Additional Financing: The project development objective is to improve opera- tional safety and oversight of international air transport and associated infrastructure. Approval completed on 3 June 2016. Environmental Assessment Category B. Project: P157241. US$ 16.6 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. (R) Samoa Climate Resilient Transport Project: Improve the climate resilience of Samoa’s road network and in the event of an Eligible Crisis or Emergency, to provide an immediate response to the Eligible Crisis or Emergency. Negotiations authorized on 11 July 2018. Environmental Assessment Category B. Project: P165782. US$ 35.8 (IDA Grant). Consultants will be required. Land Transport Authority. Enhanced Road Access Project Additional Financing: To restore key road sector assets damaged by extreme weather events and enhance the climate resilience of critical roads and bridges in Samoa. Approval completed on 31 May 2018. Envi- ronmental Assessment Category B. Project: P165943. US$ 3.4 (PRAB). Consultants will be required. Land Transport Author- ity. Solomon Islands Energy & Extractives GEF Electricity Access and Renewable Energy Expansion Project: The project development objective is to increase access to grid-supplied electricity and increase renewable energy generation in Solomon Islands. Approval completed on 5 July 2018. US$ 1.0 (GEFU). Consultants will be required. Solomon Islands Electricity Authority (Solomon Power). Tina River Hydropower Development Project: The project development objective (PDO) is to increase the share of renewable energy through hydropower in Solomon Islands. Approval completed on 20 June 2017. Environmental Assessment Category A. Project: P161319. US$ 23.4/10.3/15.0/30.0/31.6/86.0/11.7/10.4 (IDA Credit/IDA Grant/ADFA/ASDB/EDCF/GCF/PRAB/ZPCI). Consultants will be required. Solomon Islands Ministry of Mines, Energy and Rural Electrification; Solomon Islands Electricity Authority; Project Company to be established. Electricity Access and Renewable Energy Expansion Project: The project development objective is to increase access to grid-supplied electricity and increase renewable energy generation in Solomon Islands. Approval completed on 5 July 2018. Environmental Assessment Category B. Project: P162902. US$ 5.6/4.8/7.1/1.6 (IDA Credit/IDA Grant/CSCF/DOCK). Con- sultants will be required. Solomon Islands Electricity Authority (Solomon Power). Social, Urban, Rural and Resilience Global Practice Rapid Employment Project Additional Financing: The proposed new PDO is: to assist targeted vulnerable urban pop- ulations in the Recipient’s territory to (i) increase their incomes through the provision of short term employment; (ii) improve their knowledge, experience and basic employment skills that are valued in the workplace and society; and (iii) improve their access to services and markets through repaired, more climate resilient roads and access infrastructure. Approval completed on 18 November 2016. Environmental Assessment Category B. Project: P160738. US$ 1.9 (IDA Grant). Consulting services to be determined. Ministry of Finance and Treasury; HONIARA CITY COUNCIL; Ministry of Infrastructure Development. Solomon Islands Rapid Employment Project Additional Financing: The proposed new PDO is: to assist targeted vulnerable urban populations in the Recipient’s territory to (i) increase their incomes through the provision of short term employment; (ii) improve their knowledge, experience and basic employment skills that are valued in the workplace and soci- ety; and (iii) improve their access to services and markets through repaired, more climate resilient roads and access infrastruc- ture. Approval completed on 31 July 2015. Environmental Assessment Category B. Project: P152709. US$ 0.5 (IDA Grant). Consulting services to be determined. Honiara City Council Tel: (677) 21-133/4, E-mail: cityclerk@solomon.com.sb, Contact: Charles Kelley, City Clerk; Ministry of Infrastructure Development Tel: (677) 25-783, E-mail: msv24247@gmail.com, Contact: Moses Virivolomo, Permanent Secretary. Transport & Digital Development Solomon Islands Roads and Aviation Project: Improve operational safety and oversight of air transport and associated July 2018 East Asia And Pacific PAGE 90 infrastructure, and strengthen the sustainability and climate resilience of the project roads and airports in the Recipient's territory. Concept completed on 21 June 2018. Environmental Assessment Category B. Project: P166622. US$ 30.5/20.5 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Communication and Aviation; Ministry of Infrastructure Devel- opment. Water Urban Water Supply and Sanitation Sector Project: The proposed PDO is to increase access and quality of water supply and sanitation services in Honiara and selected provincial capitals, and to improve the operational performance of Solomon Water. Concept completed on 11 June 2018. Environmental Assessment Category B. Project: P165872. US$ 15.0/20.0/21.4 (IDA Credit/ASDB/ECDF). Consulting services to be determined. Solomon Islands Water Authority. Thailand Environment & Natural Resources Thailand HCFC Stage II: The project development objective is to contribute to Thailand's efforts to meet the 2020 HCFC consumption phase-out obligations and requirements of the Kigali Amendment of the Montreal Protocol and the agreement between Thailand and the Executive Committee of the Multilateral Fund. Concept completed on 22 February 2018. Environ- mental Assessment Category B. Project: P165235. US$ 7.6 (MPIN). Consultants will be required. Department of Industrial Works. Timor-Leste Education Timor Leste Basic Education Quality Improvement: The development objective is to improve learning facilities in basic education and teaching quality in Grades 1 - 4 (Cycle 1) Identification completed on 23 January 2018. Environmental Assessment Category B. US$ 15.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be deter- mined. Transport & Digital Development Road Climate Resilience Project Second Additional Financing: The project will deliver sustainable climate resilient road infrastructure on the Dili-Ainaro corridor. Approval completed on 27 April 2017. Environmental Assessment Category B. Project: P252338. US$ 35.2 (IDA Credit). Consultants will be required. Ministry of Finance; Ministry of Public Works, Transport, and Communications. Timor Leste Branch Roads Project: The PDO is to upgrade the Aituto-Hatubuilico-Letefoho-Gleno corridor, improving its climate resilience, and strengthen government capacity to manage road assets, and to provide immediate and effective response to an Eligible Crisis or Emergency. Concept completed on 5 July 2018. Environmental Assessment Category B. Pro- ject: P155203. US$ 60.0 (IDA Credit). Consultants will be required. Ministry of Development and Institutional Reform. Tonga Social Protection & Labor Skills and Employment for Tongans: The Project Development Objective is to improve opportunities for secondary school progression and facilitate the transition to jobs in the domestic and overseas labor markets for Tongans. Negotiations authorized on 5 July 2018. Environmental Assessment Category C. Project: P161541. US$ 18.5/2.4 (IDA Grant/PRAB). Con- sultants will be required. Ministry of Internal Affairs; Ministry of Education and Training. PAGE 91 Monthly Operational Summary July 2018 Social, Urban, Rural and Resilience Global Practice (R) Additional Financing for the Pacific Resilience Project under the Pacific Resilience Program: The objective of the Project is to strengthen early warning, resilient investments and financial protection of Tonga. Approval completed on 18 July 2018. Environmental Assessment Category B. Project: P167166. US$ 15.0/2.0 (IDA Grant/GAUL). Consulting services to be determined. Ministry of Finance and National Planning; Ministry of Environment, Energy, Climate Change, Disaster Mgmt, Meteorology, Information and Comms. Transport & Digital Development Tonga e-Government Support Project: The project development objective is to improve the Government’s capacity for digital public service delivery. Concept completed on 3 April 2018. Environmental Assessment Category C. Project: P154943. US$ 4.7/10.0 (IDA Grant/ASDB). Consultants will be required. MEIDECC. Tonga Climate Resilience Transport Project: Improve the resilience of the transport sector in the Recipient’s territory, and in the event of an Eligible Crisis or Emergency, to provide immediate and effective response in such Eligible Crisis or Emergency. Identification completed on 24 August 2016. Environmental Assessment Category B. US$ 28.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Tonga Aviation Investment Project - Additional Financing: The project development objective is to improve opera- tional safety and oversight of international air transport infrastructure. Approval completed on 9 March 2016. Environmental Assessment Category B. Project: P156018. US$ 7.3/0.3 (IDA Grant/PRIF). Consultants will be required. Implementing agency(ies) to be determined. Tuvalu TV: Telecommunications and ICT Development Project: The Project Development Objective is to facilitate improved access to telecommunications and ICT services in Tuvalu. Concept completed on 19 July 2017. Environmental Assessment Category B. Project: P159395. US$ 10.0 (IDA Grant). Consulting services to be determined. Ministry of Communications and Transport, Contact: Falasese Tupau, Assistant Secretary. Tuvalu Aviation Investment Project Additional Financing II: The project development objective is to improve the safety and security of air transport and associated infrastructure. Approval completed on 31 March 2016. Environmental Assessment Category B. Project: P157779. US$ 2.9 (IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Tuvalu Maritime Investment in Climate Resilient Operations: Improve the resilience of Tuvalu’s maritime sector and its capacity to prepare for and respond promptly and effectively to an Eligible Crisis or Emergency in Tuvalu. Concept completed on 25 September 2017. Environmental Assessment Category B. Project: P161540. US$ 20.0/0.2 (IDA Grant/GFDR). Consultants will be required. Ministry of Communications and Transport. Vanuatu Social, Urban, Rural and Resilience Global Practice ADDITIONAL FINANCING FOR THE PACIFIC RESILIENCE PROJECT UNDER THE PACIFIC RESILIENCE PROGRAM: To strengthen the financial protection of Vanuatu. Identification completed on 15 April 2018. Environmental Assessment Category B. US$ 0.9/1.6 (IDA Credit/IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. July 2018 East Asia And Pacific PAGE 92 Transport & Digital Development Vanuatu Aviation Investment Project Additional Financing: The project development objective is to improve opera- tional safety and oversight of international air transport and associated infrastructure in Vanuatu. Approval completed on 10 January 2017. Environmental Assessment Category B. Project: P161454. US$ 9.5/4.6 (IDA Credit/IDA Grant). Consulting services to be determined. Ministry of Finance and Economic Management. Vanuatu Climate Resilient Transport Project: To strengthen the sustainability and climate resilience of the project roads in the Recipient's territory. Identification completed on 16 April 2018. Environmental Assessment Category B. US$ 31.0/31.0 (IDA Credit/IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Vietnam Agriculture National Targeted Programs Support Project: The Project Development Objective is to enhance the socio economic development planning process and push for its operationalization and institutionalization across the National Targeted Pro- gram for New Rural development (NRD) and Sustainable Poverty Reduction (SPR), using planning and monitoring and public financial management systems, as a tool for investment prioritization and financing of local needs. Approval completed on 28 June 2017. Project: P159737. US$ 153.0 (IDA Credit). Consulting services to be determined. Ministry of Agriculture and Rural Development. Education Vietnam National University Development Project: To improve the quality and relevance of advanced teaching and research programs in national priority areas at member universities of the Vietnam National University and to enhance the University’s planning and management capacity. Identification completed on 8 January 2018. US$100.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Support for Autonomous Higher Education Project (SAHEP): The Development Objective of the Project is to im- prove research, teaching, and institutional capacity at selected autonomous universities and strengthen the national higher education management system. Approval completed on 15 May 2017. Environmental Assessment Category B. Project: P156849. US$ 155.0 (IDA Credit). Consulting services to be determined. Vietnam National University of Agriculture; Ministry of Education and Training; Hanoi University of Science and Technology; Industrial University of Ho Chi Minh City; Hanoi National Economics University. Energy & Extractives Vietnam Scaling Up Energy Efficiency Project: The Project Development Objective is to improve energy efficiency in Vietnam's industrial sector through the mobilization of commercial financing. The project will thereby contribute to achieving the government's energy saving and greenhouse gas emission reduction objectives. Concept completed on 31 August 2017. Environmental Assessment Category F. Project: P164938. US$ 11.3 (GCF). Consulting services to be determined. General Di- rectorate of Energy, Ministry of Industry and Trade. Vietnam Second Distribution Efficiency Project: The project development objectives is to improve the quality and reliability of electricity services to final consumers by Vietnam’s Power Corporations. Concept completed on 11 September 2017. Environmental Assessment Category B. Project: P162173. US$350.0 (IBRD). Consultants will be required. Electricity of Vietnam. Vietnam Scaling Up Energy Efficiency Guarantee: The Project Development Objective is to improve energy efficiency in Vietnam’s industrial sector through the mobilization of commercial financing. The project would thereby contribute to achieving the government’s energy efficiency and GHG reduction objectives. Identification completed on 30 November 2017. US$ 11.3 (GCF). Consulting services to be determined. Implementing agency(ies) to be determined. PAGE 93 Monthly Operational Summary July 2018 Environment & Natural Resources Forest Sector Modernization and Coastal Resilience Enhancement Project: The project development objective is to improve coastal forest management in the Project Provinces. Approval completed on 22 June 2017. Environmental Assess- ment Category B. Project: P157127. US$ 150.0 (IDA Credit). Consulting services to be determined. Ministry of Agriculture and Rural Development. GEF Mekong Delta Integrated Climate Resilience and Sustainable Livelihoods Project: The project development objectives (PDO) are to enhance tools for climate-smart planning and improve climate resilience of land and water manage- ment practices in selected provinces of the Mekong Delta in Vietnam. The objectives would be achieved through the provision of capital investments (especially in water management infrastructures), technical assistance (related to agricultural and aq- uaculture livelihoods) and capacity building for farmers in selected Mekong Delta provinces and government institutions at national and sub-national levels. Approval completed on 11 May 2018. Environmental Assessment Category A. Project: P159976. US$ 6.1 (GEFU). Consulting services to be determined. Implementing agency(ies) to be determined. Vietnam HCFC Phaseout Project Stage II: The project development objective is to reduce HCFC consumption in order to assist Vietnam meet its HCFC phase-out obligations under the Montreal Protocol, and to reduce greenhouse gas emissions arising from the replacement of these HCFCs. Negotiations authorized on 4 June 2018. Environmental Assessment Category B. Project: P152232. US$ 14.6 (MPIN). Consultants will be required. State Bank of Vietnam, Contact: Mr. Le Minh Hung, Governor; Ministry of Environment and Natural resources, Contact: Nguyen Thi My Hoang, National Ozone Coordinator. Health, Nutrition & Population Investing and Innovating for Grassroots Service Delivery Reform: The development objective is to improve the quality and efficiency of the grassroots health system in the targeted provinces, with a focus on the management of selected non-communicable disease (NCD) and maternal and child health (MCH) tracer conditions. This will be achieved by (i) enabling the commune-level facilities to take on the management of select non-communicable diseases, (ii) improving the utilization and quality of services already provided at commune level, and (iii) strengthening the capacity of the district to provide appropriate referral and support services.. Concept completed on 21 December 2017. Envi- ronmental Assessment Category B. Project: P161283. US$ 80.0/15.0/5.0/3.0 (IDA Credit/GFF/IDFH/PHGF). Consultants will be required. Ministry of Health. Social, Urban, Rural and Resilience Global Practice Additional Financing for Danang Sustainable City Development Project: The project development objective is to expand access of city residents to improved drainage, wastewater collection and treatment services, the arterial road network, and public transport in selected areas of Da Nang City. Approval completed on 26 May 2017. Environmental Assessment Category B. Project: P159049. US$ 72.5 (IDA Credit). Consultants will be required. Implementing agency(ies) to be deter- mined. Vietnam - Additional Financing for Medium Cities Development Project: The development objective of the project is to increase access to improved urban infrastructure services in selected medium-sized cities in Vietnam. Approval completed on 9 June 2017. Environmental Assessment Category A. Project: P159426. US$ 53.0 (IDA Credit). Consultants will be re- quired. State Bank of Vietnam; Project Management Unit (PMU) in Vinh; Project Management Unit (PMU) in Lao Cai; Project Management Unit (PMU) in Phu Ly. (N) Vietnam - Dynamic Cities Integrated Development Project: To improve access to urban infrastructure and to improve integrated urban planning and management in the project cities. Identification completed on 22 July 2018. US$ 210.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Northern Delta Transport Development Project Additional Financing: The Project's development objective is to enhance the efficiency, environmental sustainability and safety of transport infrastructure and services, through the alleviation of physical and institutional bottlenecks in two major waterway corridors in the Northern Delta Region. Approval completed July 2018 Europe And Central Asia PAGE 94 on 5 May 2017. Environmental Assessment Category A. Project: P158976. US$ 78.7 (IDA Credit). No consultants are required. Project Management Unit for Waterways (PMU-W); Ministry of Transport. Water Vietnam Urban Water Supply and Wastewater Project - Additional Financing: To increase access to sustainable water services and environmental sanitation in selected urban areas in the Project Provinces Approval completed on 26 May 2016. Environmental Assessment Category B. Project: P156678. US$69.0/50.0 (IBRD/IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Mekong Regional Water Security Project: Objective to be Determined. Identification completed on 21 January 2016. Environmental Assessment Category A. US$ 400.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Regional Poverty and Equity (N) Statistical Innovation and Capacity Building in Pacific Islands: To improve the quality, frequency, and timeli- ness of welfare statistics in the Pacific Island Countries (PIC) by fostering new methods in data collection and strengthening the capacity of the regional organization. Identification completed on 19 July 2018. US$ 5.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Pacific Aviation Safety Office Reform Project Additional Financing II: The project development objective is to strengthen the coordination capacity of the Pacific Aviation Safety Office to deliver regional aviation safety and security over- sight, and technical and advisory services to the Pacific Island Countries. Approval completed on 23 May 2018. Environmental Assessment Category C. Project: P164468. US$ 3.6 (IDA Grant). Consultants will be required. Pacific Aviation Safety Office. Sustainability of Aviation in the Pacific Island Countries: To improve the sustainability of key regional aviation in- frastructure in Pacific Island Countries. Identification completed on 17 January 2018. Environmental Assessment Category C. US$ 21.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Europe And Central Asia Albania Energy & Extractives Second Additional Financing for Energy Community of South East Europe APL Program APL 5 for Albania Dam Safety: The development objectives of the project are to: (i) contribute to safeguarding the major hydroelectric dams of Albania; and (ii) improve their operational efficiency and enhance the stability of power supply for the regional electricity market. The proposed project supports the development of the Energy Community in accordance with the objectives of the Energy Community of South Eastern Europe (ECSEE) APL. PAGE 95 Monthly Operational Summary July 2018 The key objectives of the ECSEE Program are to: (a) Create a stable regulatory and market framework to attract investment in gas networks and power systems so that all states in the region have access to the stable and continuous energy supply, essen- tial for economic development and social stability; (b) Establish integrated regional markets in South East Europe, closely linked to the internal energy market of the European Union, and complying with the rules applicable within the European Union; (c) Enhance the energy security of South East Europe and the European Union by providing incentives to connect the Balkans to Caspian and North African gas reserves; and (d) Improve the environmental situation in relation to energy in the region. Approval completed on 25 May 2018. Environmental Assessment Category B. Project: P166469. US$14.9/7.6 (IBRD/EBRD). Consultants will be required. Albanian Power Corporation (KESH). Environment & Natural Resources Environmental Services Project: The Project Development Objective (PDO) is to support sustainable land management practices and increase communities’ monetary and non-monetary benefits in targeted Project areas which are mainly in ero- sion prone rural upland areas. This PDO is to be achieved through the support of alternative livelihoods and provision of environmental services and through sustainable utilization of wood and pasture products in the long term. The Project will particularly focus on enhancing the financial, economic, and institutional sustainability of land use and natural resources management, and will help build capac- ities of Albania farmers, community organizations and government institutions to efficiently use EU funding. Approval com- pleted on 8 July 2014. Environmental Assessment Category B. US$ 10.6 (FSCO). Consultants will be required. Ministry of Environment, Contact: Ardiana Sokoli, Director. Social Protection & Labor Additional Financing Social Assistance Modernization project: The project would support the Albania's implemen- tation of reforms to improve the equity and efficiency of its social assistance programs. Approval completed on 4 May 2018. Environmental Assessment Category C. Project: P162079. US$11.0 (IBRD). No consultants are required. Implementing agency(ies) to be determined. Transport & Digital Development Regional and Local Roads Connectivity: The Project Development Objectives are to improve access to selected agricul- tural and tourism centers, and to strengthen their municipalities’ capacity to manage their road assets. Approval completed on 25 April 2018. Environmental Assessment Category B. Project: P163239. US$50.0 (IBRD). No consultants are required. Albania Development Fund. Water Albania Water Resources and Irrigation Project Additional Financing: The Revised Project Development Objective (PDO) is to: (i) establish the strategic framework to manage water resources at the national level and at the level of the Drin- Buna and Semani River basins; and (ii) improve irrigation service delivery in Selected Irrigation Systems. Approval completed on 22 February 2018. Environmental Assessment Category B. Project: P162786. US$27.2 (IBRD). Consultants will be re- quired. Implementing agency(ies) to be determined. Armenia Education (R) EU4Innovation STEM Project: The proposed development objective is to increase the capacity of the NIE to formulate and manage key policies affecting education quality. Concept completed on 26 July 2018. Environmental Assessment Cate- gory B. Project: P167561. US$ 5.1 (EUDF). Consultants will be required. Ministry of Education and Science. July 2018 Europe And Central Asia PAGE 96 Energy & Extractives Utility Scale Solar Power Project: Objective to be Determined. Appraisal completed on 16 November 2017. Environmen- tal Assessment Category B. Project: P155662. US$ 4.0 (GUAR). Consulting services to be determined. Implementing agency(ies) to be determined. Water Additional Financing Irrigation System Enhancement Project: The PDO is (i) to reduce the amount of energy used and to improve the irrigation conveyance efficiency in targeted irrigation schemes; and (ii) to improve the availability and reliability of important sector data and information for decision makers and other stakeholders. Approval completed on 14 November 2017. Environmental Assessment Category B. Project: P161538. US$2.0 (IBRD). Consultants will be required. Wa- ter Sector Projects Implementation Unit State Agency; State Committee of the Water Economy. Azerbaijan Social, Urban, Rural and Resilience Global Practice Additional Financing to IDP Living Standards and Livelihoods Project: The objective of the Project is to improve living conditions and increase the economic self-reliance of targeted internally displaced persons. Approval completed on 17 June 2016. Environmental Assessment Category B. Project: P155110. US$66.7 (IBRD). Consultants will be required. Imple- menting agency(ies) to be determined. Second Rural Investment Project Additional Financing: The Project Development Objective is to improve access to and use of community-driven rural infrastructure and expand economic activities for rural households. This would be achieved through: (i) the provision of grants to finance eligible demand-driven micro-projects in rural infrastructure; (ii) the provision of training and consultants’ services to support micro-project development by enhancing the capacity of engaged local stake- holders in all aspects of micro-project program development; (iii) building opportunities for rural employment and livelihood support services through the provision of training and consultants’ services to carry out pilot livelihood support services i n six communities; and, (iv) supporting project management capacity at the Project Management Unit and its Regional Operations Offices for the purposes of effective management, implementation and monitoring and evaluation of Project activities. Ap- proval completed on 9 July 2014. Environmental Assessment Category B. Project: P147861. US$50.0 (IBRD). Consultants will be required. AZRIP PMU in State Agency on Agricultural Credit Tel: /Fax: (994-12) 493-4813, E-mail: subhan@azrip.org, Contact: Soubhan Asgerov, Project Director. National Solid Waste Management Project: To enhance the availability and quality of waste management services in selected regions in Azerbaijan. Concept completed on 22 June 2018. Environmental Assessment Category A. Project: P167007. US$117.0 (IBRD). Consultants will be required. Ministry of Economy. Azerbaijan Third Rural Investment Project: Using Technology for Development: Improve access to quality rural infrastructure and livelihoods opportunities for target rural communities. Negotiations authorized on 2 February 2018. Envi- ronmental Assessment Category B. Project: P159962. US$100.0 (IBRD). Consultants will be required. State Service on Agri- cultural Projects and Credits, Ministry of Agriculture. Transport & Digital Development Azerbaijan Highway 3 Additional Financing: “To contribute to a more efficient and safer Baku-Shamakhi and Yeni- kend-Shorsulu roads and higher quality road services as part of the general network upgrading to motorway standard, and to improve the management of the nascent motorway network.� Approval comp leted on 28 March 2016. Environmental Assess- ment Category A. Project: P156377. US$140.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. PAGE 97 Monthly Operational Summary July 2018 Belarus Education Belarus Tertiary Education Project: The DO is to modernize Belarus' tertiary education sector with an emphasis on qual- ity and labor market relevance of degrees. Identification completed on 18 June 2018. US$50.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives Sustainable Energy Scale-Up Project: The Project Development Objective is to scale up renewable biomass utilization and efficient energy use in space heating of multi-apartment buildings in selected urban localities in Belarus. Concept com- pleted on 22 March 2018. Environmental Assessment Category B. Project: P165651. US$100.0/100.0 (IBRD/EUIB). Consult- ants will be required. Energy Efficiency Department, State Committee for Standardization. Environment & Natural Resources Belarus Forestry Development Project - Additional Financing: The Project Development Objective is to enhance silvicultural management and reforestation and afforestation, increase the use of felling residues and improve the public good contribution from forests in targeted forest areas. Approval completed on 12 March 2018. Environmental Assessment Cate- gory B. Project: P165121. US$14.4 (IBRD). Consulting services to be determined. Ministry of Forestry; BellesExport. Water Utility Efficiency and Quality Improvement Project: The Project Development Objective (PDO) is to improve the ac- cess, quality and efficiency of water and wastewater services, and strengthen regional solid waste management . Concept com- pleted on 11 June 2018. Environmental Assessment Category A. Project: P164260. US$70.0 (IBRD). No consultants are re- quired. Ministry of Housing and Utilities. Bosnia and Herzegovina Energy & Extractives Additional Financing for the Bosnia and Herzegovina Energy Efficiency Project: The project development objec- tive is to improve energy efficiency in public buildings, and to support the development and implementation of scalable energy efficiency financing models Identification completed on 17 March 2018. Environmental Assessment Category B. US$32.2 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation BiH Business Environment Strengthening Project (BESP): The Project Development Objective is to enhance com- petitiveness and strengthen the environment in which enterprises operate. Identification completed on 30 June 2016. US$60.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Second Solid Waste Management Project Additional Financing - EC IPA: The objective is to improve the availabil- ity, quality, environmental soundness, and financial viability of solid waste management services in participating utilities/re- gions. Approval completed on 18 December 2012. Environmental Assessment Category B. US$ 6.0 (F7U4). Consulting ser- vices to be determined. FBiH Ministry of Environment and Tourism Tel: (387-33) 726-374, E-mail: sswmp@fmoit.gov.ba, Contact: Mr. Anto Covic, Team Leader; RS Ministry of Spatial Planning Tel: (387-51) 339-504, E-mail: s.cvijic@mgr.vla- dars.net, swmp2@mgr.vladars.net, Contact: Mr. Sveto Cvijic, Team Leader. July 2018 Europe And Central Asia PAGE 98 Bulgaria Finance, Competitiveness and Innovation Bulgaria - Deposit Insurance Contingency Financing Project: The Project Development Objective is to strengthen the financial safety net system of Bulgaria by enabling contingent financing to the Bulgarian Deposit Insurance Fund (BDIF), in order for it to meet its deposit insurance and bank resolution obligations. Identification completed on 9 July 2018. Con- sulting services to be determined. Implementing agency(ies) to be determined. Croatia Governance Transforming Justice Services in Croatia: To improve access and efficiency of selected justice services in targeted justice institutions in Croatia. Identification completed on 9 May 2018. US$20.0 (IBRD). Consulting services to be determined. Im- plementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Integrated Land Administration System - Additional Financing: The objective of the proposed Project is to modern- ize the land administration and management system to improve the efficiency, transparency and cost effectiveness of govern- ment services. Negotiations authorized on 18 March 2018. Environmental Assessment Category B. Project: P166324. US$24.1 (IBRD). Consultants will be required. Ministry of Justice; State Geodetic Authority. Transport & Digital Development Modernization and Restructuring of the Road Sector: Objective to be Determined. Approval completed on 28 April 2017. Environmental Assessment Category B. US$23.3/265.0/370.7/424.3 (IBRD/EBRD/GUAR/ZPCO). Consulting services to be determined. Implementing agency(ies) to be determined. Georgia Health, Nutrition & Population Georgia Health System Reform Project: The project development objective is to establish a nationwide medical record system. Identification completed on 18 October 2017. Environmental Assessment Category C. US$5.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Second Regional Development Project Additional Financing: The Project Development Objective is to improve in- frastructure services and institutional capacity to support increased contribution of tourism in the local economy of the Imereti Region. Approval completed on 4 April 2016. Environmental Assessment Category B. Project: P157465. US$9.0 (IBRD). Con- sultants will be required. Implementing agency(ies) to be determined. Transport & Digital Development East West Highway Corridor Improvement Project Additional Financing: The proposed PDOs are to: (i) reduce road user costs along the East-West Highway Corridor section upgraded under the project; and (ii) strengthen the capacity of the Roads Department and the Ministry of Economy and Sustainable Development to respectively manage the road network and provide an enabling environment to improve logistics services. PAGE 99 Monthly Operational Summary July 2018 Approval completed on 8 November 2017. Environmental Assessment Category A. Project: P160152. US$20.0/90.0 (IBRD/EUIB). Consultants will be required. Roads Department of the Ministry of Regional Development and Infrastructure (RDMRDI). Kazakhstan Center West Regional Development Corridor: The Project Development Objectives are to improve the transport con- nectivity within the regions along the Kazakhstan Center West Corridor and strengthen the capacity of selected agencies for the effective implementation of the corridor development, and road asset preservation policies. Approval completed on 9 June 2016. Environmental Assessment Category A. Project: P153497. US$977.9 (IBRD). Consulting services to be determined. Com- mittee for Roads, Contact: Satjan Ablaliev, Deputy Chairman; Ministry of Finance, Contact: Mr. Ruslan Beketayev, Vice Min- ister; JSC KazAvtoZhol, Contact: Ermek Kizatov, Chairman. Kosovo Agriculture Kosovo Agriculture and Rural Development Project - Third Additional Financing: The development objective of the project is to improve productivity of and access to markets by project beneficiaries in the horticulture and livestock sub- sectors of Kosovo and strengthen the institutional capacity of the Ministry of Agriculture, Forestry and Rural Development. Approval completed on 28 April 2017. Environmental Assessment Category B. Project: P158710. US$ 22.0 (IDA Credit). Con- sultants will be required. Ministry of Finance; Ministry of Agriculture, Forestry and Rural Development. Energy & Extractives Kosovo Energy Efficiency and Renewable Energy Additional Financing: The project development objectives are to: (i) reduce energy consumption and fossil fuel use in public buildings through energy efficiency and renewable energy invest- ments; and (ii) enhance the policy and regulatory environment for renewable energy and energy efficiency. Identification com- pleted on 10 May 2018. Environmental Assessment Category B. US$ 12.0 (EUDF). Consultants will be required. Implementing agency(ies) to be determined. Kosovo Power Project: IDA partial risk guarantee in support of a private sector independent power producer and lignite mining company, to be selected under the Lignite Power TA Project (P097635). Identification completed on 19 May 2010. Environmental Assessment Category A. Project: P118287. US$ 40.0/725.0/725.0 (GUID/ZBIL/ZEXP). No consultants are required. Ministry of Economic Development Tel: (381-38) 2002-1505, E-mail: agron.dida@ks-gov.net, Contact: Mr. Besim Beqaj, Minister. Environment & Natural Resources Environmentally and Socially Sustainable Development Project: Objective to be Determined. Identification com- pleted on 27 June 2014. Environmental Assessment Category A. US$ 30.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation Kosovo Financial Sector Strengthening Project: The objectives of the Project are to (i) enhance financial intermedia- tion; and (ii) strengthen financial sector infrastructure. Concept completed on 17 April 2018. Environmental Assessment Cat- egory F. Project: P165147. US$ 25.0 (IDA Credit). Consultants will be required. Kosovo Credit Guarantee Fund; Central Bank of Kosovo. Social, Urban, Rural and Resilience Global Practice Kosovo Youth Entrepreneurship and Inclusion: Improve the social and economic inclusion of 4,000 disadvantaged July 2018 Europe And Central Asia PAGE 100 youth, aged 15-29, through entrepreneurship opportunities and youth engagement in local development activities. Identifica- tion completed on 4 December 2017. US$ 15.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Real Estate & Geospatial Infrastructure Project: The Project Development Objective is to contribute to an increase in the availability, transparency and efficiency of land administration and geospatial data and services. Identification completed on 20 July 2017. Environmental Assessment Category B. US$ 16.5 (IDA Credit). Consulting services to be determined. Imple- menting agency(ies) to be determined. Kyrgyz Republic Governance Revenue Administration Modernization Project: To improve revenue collection, tax compliance and taxpayer services in the Kyrgyz Republic. Identification completed on 31 May 2017. US$ 25.0 (IDA Credit). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Health, Nutrition & Population Kyrgyz Health Program for Results: The Project Development Objective is to contribute to improving health service quality and health system efficiency in the Kyrgyz Republic. Identification completed on 31 May 2018. US$ 10.0/10.0/12.0/22.3 (IDA Credit/IDA Grant/MSC1/MSC2). Consulting services to be determined. Ministry of Health. Social, Urban, Rural and Resilience Global Practice Enhancing Resilience in Kyrgyzstan Project: The Project Development Objective is to support the Recipient to strengthen its capacity to respond to disasters, provide safer and improved learning environment for children, and reduce adverse financial impacts of natural hazards on the Recipient's budget and population. Approval completed on 25 May 2018. Environmental Assessment Category B. Project: P162635. US$ 10.0/10.0 (IDA Credit/IDA Grant). Consultants will be re- quired. Ministry of Emergency Situations. CASA1000 Community Support Project - Kyrgyz Republic: To engage communities in the development of social and economic infrastructure in order to enhance services, livelihoods and inclusion in target villages near the CASA1000 Trans- mission Line. Approval completed on 10 April 2018. Environmental Assessment Category B. Project: P163592. US$ 5.0/5.0/1.0 (IDA Credit/IDA Grant/CASA). Consulting services to be determined. Community Development and Investment Agency. Water National Water Resource Management Project - Phase 2 Additional Financing: The project development objective of the NWRMP-1 is to improve water resources management capability and irrigation service delivery for the benefit of water users. Identification completed on 21 February 2018. Environmental Assessment Category B. US$ 5.1 (F7VP). Consultants will be required. Implementing agency(ies) to be determined. Sustainable Rural Water Supply and Sanitation Development Project – Additional Financing: The project de- velopment objectives (PDO) are to assist the Kyrgyz Republic to (i) improve access to and quality of water supply and sanitation services in the Participating Rural Communities; and (ii) strengthen capacity of the Recipient's institutions in the water supply and sanitation sector. Approval completed on 22 June 2017. Environmental Assessment Category B. Project: P162840. US$ 19.8/16.2 (IDA Credit/IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. PAGE 101 Monthly Operational Summary July 2018 Macedonia, former Yugoslav Republic of Agriculture Agriculture Modernization Project: Improve sector competitiveness and strengthen public institutions in agriculture in Macedonia Identification completed on 21 June 2018. US$20.0/20.0 (IBRD/ECEU). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives Macedonia Energy Efficiency Fund for Public Buildings: The project would develop and capitalize a revolving fund to finance energy efficiency improvements in public buildings. The fund would directly support the Government's National Program for Energy Efficiency in Public Buildings and meet its energy savings targets for the building sector as committed under the Energy Community Treaty. Identification completed on 19 March 2014. Environmental Assessment Category B. US$20.0/10.0 (IBRD/ECSE). Consulting services to be determined. Ministry of Economy Tel: (389-2) 309-3489, E-mail: ne- riman.dzeladini@economy.gov.mk. Social Protection & Labor Macedonia Social Services Improvement Project: To expand access to and improve the quality of social services, in- cluding preschool services, for vulnerable groups. Negotiations authorized on 21 June 2018. Environmental Assessment Cat- egory B. Project: P162246. US$33.4 (IBRD). Consultants will be required. Ministry of Labor and Social Policy. Moldova Agriculture Moldova Agriculture Competitiveness Project 2nd Additional Financing: The Project Development Objective is to enhance the competitiveness of the agro-food sector by supporting the modernization of the food safety management system, facilitating market access for farmers, and mainstreaming agro-environmental and sustainable land management practices. Approval completed on 7 July 2016. Environmental Assessment Category B. Project: P157765. US$ 10.0 (IDA Credit). Con- sultants will be required. Implementing agency(ies) to be determined. Moldova Agriculture Competitiveness Project Additional Financing: The Project Development Objective is to en- hance the competitiveness of the agro-food sector by supporting the modernization of the food safety management system, facilitating market access for farmers, and mainstreaming agro-environmental and sustainable land management practices. Approval completed on 19 May 2015. Environmental Assessment Category B. Project: P154238. US$ 12.0 (IDA Credit). No consultants are required. Implementing agency(ies) to be determined. Education Higher Education Project: Improve the alignment between labor supply and demand by strengthening the quality and relevance of higher education Identification completed on 12 June 2018. US$ 30.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Moldova Education Reform Additional Financing: The Project Development Objective is to improve learning condi- tions in targeted schools and strengthen the Recipient's education monitoring systems, while promoting efficiency reforms in the education sector. Approval completed on 16 February 2018. Environmental Assessment Category B. Project: P156657. US$ 10.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Energy & Extractives (R) Moldova Transparent Power Market Project: The Development Objective of the Project is to improve the security July 2018 Europe And Central Asia PAGE 102 and reliability of the electricity transmission system through interconnections with Romania, and therefore, enable the crea- tion of a transparent and competitive electric power market in Moldova and its integration into the regional electric power market. Identification completed on 18 July 2016. Environmental Assessment Category A. US$ 70.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Environment & Natural Resources Climate Adaptation Project: The Project Development Objective (PDO) is to enhance the adoption of climate-smart prac- tices in agriculture, forestry and pasture management in targeted landscapes and strengthen national disaster management systems. Approval completed on 9 June 2017. US$ 2.0 (GEFU). Consultants will be required. Ministry of Environment; Min- istry of Agriculture and Food Industry; Ministry of Internal Affairs. Climate Adaptation Project: The Project Development Objective (PDO) is to enhance the adoption of climate-smart prac- tices in agriculture, forestry and pasture management in targeted landscapes and strengthen national disaster management systems. Approval completed on 9 June 2017. Environmental Assessment Category B. Project: P155968. US$12.4/12.8 (IBRD/IDA Credit). Consultants will be required. Ministry of Environment; Ministry of Agriculture and Food Industry; Min- istry of Internal Affairs. Social, Urban, Rural and Resilience Global Practice Disaster and Climate Risk Management Project Additional Financing: The Project development objective (PDO) is to strengthen the State Hydro meteorological Service's ability to forecast severe weather and improve Moldova's capacity to prepare for and respond to natural disasters. Approval completed on 19 May 2015. Environmental Assessment Category B. Project: P148125. US$ 2.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Land Registration and Property Valuation Project: To improve the quality and transparency of the land administration and property valuation systems. Negotiations authorized on 9 July 2018. Environmental Assessment Category B. Project: P161238. US$ 35.0 (IDA Credit). Consultants will be required. Public Service Agency, Department of Cadastre. Montenegro Agriculture Additional Financing to MIDAS: The new objectives of the Project are: (i) to improve delivery of government assistance for sustainable agriculture and rural development in a manner consistent with the EU's pre-accession requirements; (ii) to increase the experience of Montenegrin authorities in administering rural development grants in accordance with EU-IPARD core rules, and (iii) to support a selected number of agricultural holdings and food establishments in upgrading towards EU standards. Approval completed on 9 September 2016. Environmental Assessment Category B. Project: P159115. US$3.3 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Romania Environment & Natural Resources Integrated Nutrient Pollution Control Project - Additional Financing: The development objective of the project is to support the Government of Romania towards meeting EU Nitrate Directive requirements at a national scale. Approval com- pleted on 28 March 2016. Environmental Assessment Category B. Project: P155594. US$52.4 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice (R) Strengthening Disaster Risk Management Project: The objective of the Project is to enhance the resilience of critical disaster and emergency response infrastructure and to strengthen the Borrower’s institutional capacities in disaster PAGE 103 Monthly Operational Summary July 2018 risk reduction and climate change adaptation. Approval completed on 24 July 2018. Environmental Assessment Category B. Project: P166302. US$60.5 (IBRD). Consultants will be required. Ministry of Internal Affairs - Department of Emergency Situations and General Inspectorate for Emerg. Justice Quarter and Esplanada District Development Project: The Project Development Objective is to support the Government of Romania and City of Bucharest in developing an integrated urban redevelopment model for central Bucharest through development of a multi-use urban development plan anchored by a new Justice complex. Concept completed on 1 February 2018. Environmental Assessment Category B. Project: P157654. US$150.0 (IBRD). Consulting services to be deter- mined. Ministry of Justice. Strengthening Resilience of Police Facilities in Romania: The objective of the Project is to enhance the resilience of police facilities critical for disaster and emergency response and to strengthen the Borrower’s institutional capacities in disas- ter risk reduction and climate change adaptation. Identification completed on 29 June 2018. US$58.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Strengthening Resilience of Gendarmerie Facilities in Romania: The objective of the Project is to enhance the resil- ience of gendarmerie facilities critical for disaster and emergency response and to str engthen the Borrower’s institutional capacities in disaster risk reduction and climate change adaptation. Identification completed on 29 June 2018. US$46.5 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Building Romania’s Institutional Capacity and Knowledge for Motorway Construction: To support preparation of the Ploiesti-Brasov Motorway Project in order to strengthen the capabilities of Romania’s institutions to implement and finance major road projects. Appraisal completed on 4 May 2018. Environmental Assessment Category A. Project: P165989. US$43.3 (IBRD). Consultants will be required. Ministry of Transport. Russian Federation Education Enhancing Workforce Skills for Regional Development: The project development objectives (PDO) are to increase the relevance of the skills of technical and vocational education and training graduates to the needs of the labor market in selected pilot regions and to expand best practices to other selected dissemination regions in the Russian Federation. This will be achieved through developing, pilot testing and disseminating modern models of efficient training of skilled workers and technicians in the regional vocational education systems to support the social and economic development of the regions of the Russian Federation. Negotiations authorized on 27 June 2014. Environmental Assessment Category B. Project: P144167. US$330.0 (IBRD). Consultants will be required. Ministry of Education and Science Tel: (7-495) 629-2425, E-mail: klimov- aa@mon.gov.ru, Contact: Alexander Klimov, Deputy Minister. Finance, Competitiveness and Innovation Microfinance Development Project: The objectives of the project are to: (i) develop a proper legal, regulatory, and su- pervisory framework to enable safe and sound growth of the microfinance and credit cooperative sectors; and (ii) develop the industry's capacity to meet sectoral regulations and institutional standards. Approval completed on 31 January 2013. Envi- ronmental Assessment Category C. Project: P095554. US$20.0 (IBRD). No consultants are required. Ministry of Finance Tel: (7-495) 648-3541, E-mail: p0530_ka@minfin.ru, Contact: Alexey Savatyugin, Deputy Minister. Serbia Agriculture Serbia: Commercial Agriculture Project (CAP): To strengthen commercial agriculture through productive partnerships July 2018 Europe And Central Asia PAGE 104 in selected project areas Identification completed on 19 June 2018. US$50.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Governance Tax Administration Modernization Project: To improve efficiency of tax collection and lower the compliance burden for taxpayers. Concept completed on 17 November 2017. Environmental Assessment Category B. Project: P163673. US$50.0 (IBRD). No consultants are required. Serbian Tax Administration. (R) Enabling Digital Governance in Serbia: To improve access, quality, and efficiency of selected administrative e-Gov- ernment services. Concept completed on 1 August 2018. Environmental Assessment Category C. Project: P164824. US$50.0 (IBRD). Consulting services to be determined. Office for Information Technologies and Electronic Government. Health, Nutrition & Population Additional Financing for Second Serbia Health Project: The PDO is to contribute to improving the efficiency and quality of the public health system of the Republic of Serbia through the strengthening of: (i) health financing, purchasing, and maintenance systems; and (ii) quality improvement systems and management of selected priority non-communicable diseases. Approval completed on 29 March 2018. Environmental Assessment Category B. Project: P166025. US$31.1 (IBRD). Consultants will be required. Ministry of Health. Transport & Digital Development Corridor X Highway Additional Financing: The Project Development Objective is to increase transport efficiency and improve traffic safety on the three project sections of Corridor X, between Nis and Dimitrovgrad and Grabovnica and Donji Neradovac respectively, and to improve road management and road safety in Serbia. Approval completed on 25 October 2016. Environmental Assessment Category A. Project: P158413. US$38.9 (IBRD). No consultants are required. Ministry of Finance. Tajikistan Agriculture Agriculture Commercialization Project Additional Financing: The project development objective is to increase the commercialization of farm and agribusiness products and to support micro-, small and medium enterprise development in rural areas by providing better access to finance and strengthened capacity of project beneficiaries. Approval completed on 15 December 2017. Environmental Assessment Category B. US$ 15.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Energy & Extractives (N) Tajikistan Power Sector Financial Recovery: The program development objective is to improve the financial via- bility of the power sector. Identification completed on 16 July 2018. US$ 150.0 (IDA Grant). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Environment & Natural Resources Environmental Land Management and Rural Livelihoods - Additional Financing: The overall Project Develop- ment Objective (PDO) and Global Environmental Objective (GEO) is to enable rural people to increase their productive assets in ways that improve natural resource management and resilience to climate change in selected climate vulnerable sites Ap- proval completed on 30 June 2015. Environmental Assessment Category B. Project: P153709. US$ 1.8/2.0 (IDA Grant/CSCF). Consultants will be required. Implementing agency(ies) to be determined. PAGE 105 Monthly Operational Summary July 2018 Finance, Competitiveness and Innovation (N) Inclusive Economic Development Project: The Project Development Objective is to create new economic opportu- nities and generate employment for vulnerable groups, especially, women and youth, while also promoting and preserving the local culture in the GBAO and Khatlon regions. Identification completed on 24 July 2018. US$ 37.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Social Protection & Labor Social Safety Net Strengthening Project: To achieve national geographic coverage of the Targeted Social Assistance Pro- gram and to ensure integrated delivery of services. Approval completed on 30 January 2018. Environmental Assessment Category C. Project: P165831. US$ 0.9/0.9 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Health and Social Protection; State Agency for Social Protection (SASP). Social, Urban, Rural and Resilience Global Practice CASA-1000 Community Support Project for Tajikistan: The Project Development Objective is to improve access to energy, increase access to social and economic infrastructure services, and strengthen local governance capacity in communi- ties in the project area. Concept completed on 7 November 2017. Environmental Assessment Category B. Project: P165313. US$ 16.0/2.0 (IDA Credit/CASA). Consultants will be required. State Enterprise “Project Management Unit for Energy Sector Projects�; OJSHC Barqi Tojik. Tajikistan Community and Youth Resilience Program: The development objective is to improve access to infrastruc- ture and services and socio-economic inclusion of disadvantaged young men and women in target communities. Identification completed on 29 June 2018. Environmental Assessment Category B. US$ 57.0 (IDA Grant). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Water Additional Financing for Tajikistan PAMP II: The project development objectives for PAMP II are to: (i) provide access to temporary employment to food-insecure people through the rehabilitation of irrigation and drainage infrastructure, (ii) increase yields of selected crops in response to improved irrigation and infrastructure, and (iii) strengthen the capacity of Tajikistan to introduce integrated water resource management. By improving food access and food availability these measures improve the food security of low-income people in the poor rural areas supported by the project. Approval completed on 22 June 2015. Environmental Assessment Category B. Project: P154327. US$ 12.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Tajikistan Second Dushanbe Water Supply Project - Additional Financing: The project development objective is to improve water utility performance and water supply services in selected areas of Dushanbe. Approval completed on 30 June 2015. Environmental Assessment Category B. Project: P154729. US$ 5.5/4.5 (IDA Credit/IDA Grant). Consultants will be re- quired. Implementing agency(ies) to be determined. Dushanbe Water Supply and Wastewater project: The PDOs are to (i) improve the water supply and wastewater ser- vices in selected areas in Dushanbe; and (ii) improve the utility financial management and overall performance. Identification completed on 3 April 2017. US$ 36.0/24.0 (IDA Credit/IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Rural Water Supply and Sanitation Project: The project development objectives (PDO) are to assist the Government of Tajikistan to: (i) strengthen capacity of institutions in the water supply and sanitation sector; and (ii) improve access to water supply and sanitation services in selected regions. Concept completed on 7 December 2017. Environmental Assessment Cat- egory B. Project: P162637. US$ 15.0/10.0 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Energy and Water Resources; State Unitary Entity "Khojagii Manziliyu Kommunali". July 2018 Europe And Central Asia PAGE 106 Turkey Education Re-Engaging At-Risk and Out-of-School Youth: Inclusive Education for All: Strengthening existing services to sup- port out-of-school adolescents to re-enter schooling and increase educational attainment. Concept completed on 1 August 2017. Environmental Assessment Category C. Project: P164181. US$ 32.0 (EUDF). Consulting services to be determined. Min- istry of National Education - Directorate General for Life Long Learning. Energy & Extractives Gas Sector Development Additional Financing: The Project objective is to increase the reliability and stability of gas supply in Turkey by implementing critically needed gas storage and network infrastructure, and support BOTAS in strength- ening its operations as a financially stable and commercially managed corporation. Approval completed on 2 July 2014. En- vironmental Assessment Category A. Project: P133565. US$400.0 (IBRD). Consultants will be required. BOTAS Turkish Pipe- line Company Tel: (90-312) 297-2018, E-mail: mgazi.dulger@botas.gov.tr, Contact: Mr. Mehmet Gazi Dulger, Project Direc- tor. Turkey Energy Efficiency in Public Buildings: The project development objective is to reduce energy use in public buildings and develop, test and scale-up of suitable sustainable financing and institutional mechanisms to support a national program. Concept completed on 7 May 2018. Environmental Assessment Category B. Project: P162762. US$150.0/50.0 (IBRD/CCTF). Consultants will be required. Ministry of Energy and Natural Resources. Social Protection & Labor Strengthening Social Policy in Turkey: The development objective of the proposed project is to support the Government of Turkey to strengthen its social safety net system, to provide the poorest and most vulnerable families in Turkey, including refugee families, the necessary conditions to access social services and benefits, and overcome the social vulnerabilities for which they are affected. At the core of strengthening Turkey’s social safety net system is improving effectiveness of ASDEP, Turkey’s case management model, and bringing it to scale. The case management approach is intended to complement the supply of existing social bene- fits and services by reaching out to eligible families through a personalized support to better identify their needs and tailor the services to address them. The ultimate objective of the intervention is supporting families to ensure they are self-sufficient and capable of accessing available services when necessary, and participate as active members of the society. Identification completed on 23 October 2017. Environmental Assessment Category B. US$100.0/11.7 (IBRD/EUDF). Con- sulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Land Registration and Cadastre Modernization Project - AF: The objective of the Project is to improve the effective- ness and efficiency of the land registry and cadastre services through: (i)renovating and updating cadastre maps to support digital cadastre and land registry information; (ii) making the digital land registry and cadastre information available to public and private entities; (iii) improving customer services in land registry and cadastre offices; (iv) improving human resources in TKGM; and (v) developing policies and capacity to introduce best international practices in property valuation in Turkey. Approval completed on 15 October 2015. Environmental Assessment Category B. Project: P154259. US$90.6 (IBRD). Con- sultants will be required. General Directorate for Land Registry and Cadastre, Contact: Gungor Guzel, Head of Department; Republic of Turkey, Under-secretariat of Treasury, Contact: Gokben Yener, Head of Department for Economic Relations. National Disaster Risk Management Project - Safer Schools: The development objective of the project is to increase the safety of students, teachers and staff in selected schools in high-risk seismic zones in Turkey. Negotiations authorized on 29 June 2018. Environmental Assessment Category B. Project: P157683. US$300.0 (IBRD). Consultants will be required. Ministry of National Education. Sustainable Cities Project 2: The Project Development Objective is to improve the access to targeted municipal services PAGE 107 Monthly Operational Summary July 2018 in participating municipalities and utilities. Approval completed on 12 April 2018. Environmental Assessment Category F. Project: P161915. US$91.5 (IBRD). Consultants will be required. Water GEF Turkey Irrigation Modernization: The objective of the project is to improve irrigation delivery, through rehabilita- tion and modernization of distribution infrastructure in selected schemes, and through strengthening of capacity of WUAs. Identification completed on 24 April 2018. US$ 2.0/398.0 (GEFU/HTWB). Consulting services to be determined. Implement- ing agency(ies) to be determined. GEF Turkey Irrigation Modernization Project: The objective of the project is to improve irrigation delivery, through rehabilitation and modernization of distribution infrastructure in selected schemes, and through strengthening of capacity of WUAs. Negotiations authorized on 29 June 2018. Environmental Assessment Category B. Project: P158418. US$310.0 (IBRD). Consultants will be required. Devlet Su İşleri (DSI). Ukraine Agriculture De-risking Investment in Agriculture Program: The development objective of the proposed Program is to assist the Government in improving the enabling environment to promote private investment in agriculture and agribusiness sectors. Concept completed on 28 June 2018. Project: P166941. US$200.0 (IBRD). No consultants are required. Ministry of Agrarian Policy and Food. Uzbekistan Ferghana Valley Regional Development Project: To increase access to services and expand economic and job opportu- nities, especially for women and youth, within Ferghana Valley Identification completed on 4 December 2017. Environmental Assessment Category B. US$100.0/100.0 (IBRD/IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Uzbekistan Agriculture Modernization and Competitiveness Project: The overarching PDO will be to improve the overall competitiveness of the agricultural sector. The specific Development Objectives will be to promote a sustainable inten- sification of agricultural production, to stimulate a private sector-led diversification in high-value, more job-intensive and less water-intensive productions, to support value addition and job creation in agribusiness. Identification completed on 16 March 2016. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Education Uzbekistan Promoting Early Childhood Development Project: The project development objectives are to increase access to early childhood care and education services, and improve quality of preschool education in project-supported insti- tutions. Concept completed on 16 March 2018. Environmental Assessment Category B. Project: P165737. US$ 50.0/10.0 (IDA Credit/EFAS). No consultants are required. Ministry of Preschool Education. Energy & Extractives Energy Efficiency Facility for Industrial Enterprises, Phase 3: The project objective is to improve energy efficiency in Industrial Enterprises (IEs) by designing and establishing a financing mechanism for energy saving investments. Approval completed on 30 January 2018. Environmental Assessment Category F. Project: P165054. US$200.0 (IBRD). Con- sultants will be required. Ministry of Economy; ASAKA Bank; Hamkorbank; Uzpromstroybank; Invest Finance Bank; Asia Alliance Bank; National Bank of Uzbekistan. July 2018 Europe And Central Asia PAGE 108 Finance, Competitiveness and Innovation (N) Uzbekistan Institutional Capacity Building Technical Assistance Project: The Project Development Objective is to strengthen institutions that will create conditions for: (i) enhancing fiscal discipline, operational performance, transpar- ency and accountability of the public sector and (ii) supporting the transition to market economy through corporate and fi- nancial sector reforms and opening to global markets. Identification completed on 11 July 2018. Environmental Assessment Category C. US$ 30.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population Additional Financing to Health System Improvement Project: The main project plans to equip with modern medical equipment 100 Rayon Medical Unions out of 157 current ones as well as 76 urban policlinics from 155 ones, that are established on the basis of the existing outpatient establishments. Allocation of additional IDA funds in the amount of up to US$63.0 mln will equip the remaining primary health care units which are not covered by the Health-III Project. Approval completed on 7 March 2013. Environmental Assessment Category B. Project: P133187. US$ 93.0 (IDA Credit). Consulting services to be de- termined. Ministry of Health Tel: (998-71) 239-4808, E-mail: office@jpib.uz, Contact: Djamshed Djabriyev, Executive Direc- tor. Social Protection & Labor Uzbekistan: Strengthening the Social Protection System: The Project Development Objective is to improve the social and productive inclusion of the poor and vulnerable people, including those negatively affected by the economic reforms Iden- tification completed on 8 December 2017. Environmental Assessment Category B. US$ 50.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Uzbekistan Medium-Size Cities Integrated Urban and Territorial Development Project: The Project Develop- ment Objective is to support the GoU to enhance livability in targeted medium sized cities in Uzbekistan through selected demonstration investments to improve urban infrastructure, public spaces and access to services. Concept completed on 5 April 2017. Environmental Assessment Category B. Project: P162929. US$100.0 (IBRD). Consultants will be required. State Investments Committee. (N) Support to Inclusive, Accountable Community Development through Uzbekistan's Obod Qishloq (Pros- perous Villages) National Program: To increase access to quality basic infrastructure and services in targeted rural com- munities. Identification completed on 18 July 2018. US$50.0/50.0 (IBRD/IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Digital CASA - Uzbekistan: Digital CASA – Regional Program PDO: The proposed regional program PDO is to increase access to more affordable internet, crowd-in private investment in the ICT sector, and improve participating government’s capacity to deliver digital government services in Central Asia and parts of South Asia, through the development of a regionally integrated digital infrastructure and enabling environment. Digital CASA – Uzbekistan PDO: The proposed country-specific PDO for Uzbekistan is to increase access to more affordable internet, crowd-in private investment in the ICT sector, and improve the government’s capacity to deliver digital government services in Uzbekistan, by contributing to the development of a regionally integrated digital infrastructure and enabling envi- ronment. Concept completed on 12 June 2018. Environmental Assessment Category B. Project: P166615. US$ 100.0 (IDA Credit). Consultants will be required. Ministry of Information Tehnology and Communications. Water Additional Financing for Bukhara and Samarkand Sewerage Project: The proposed PDOs are to reduce wastewater PAGE 109 Monthly Operational Summary July 2018 pollution and improve the performance of utilities responsible for wastewater management in Bukhara and Samarkand. Ap- proval completed on 23 June 2015. Environmental Assessment Category B. Project: P152801. US$ 105.0 (IDA Grant). Con- sultants will be required. Uzkommunkhizmat Tel: (998-712) 354-497, E-mail: waterproject@unitech.uz. Water Services and Institutional Support Program: The Program / Project Development Objective is to: (i) improve coverage, quality and efficiency of water supply and sanitation services in selected project areas; and (ii) strengthen the capac- ity of sector institutions for improved service delivery. Concept completed on 16 March 2018. Environmental Assessment Category B. Project: P162263. US$ 190.0 (IDA Credit). Consultants will be required. Department for Operation of Interre- gional Trunk Main Tuyamuyun – Nukus; Ministry of Housing and Communal Services; Samarkand State Unitary Enterprise Suvokova; Syrdarya State Unitary Enterprise Suvokova. Regional Environment & Natural Resources Climate Adaptation and Mitigation Program for Aral Sea Basin CAMP4ASB Additional Financing:

To en- hance regionally coordinated access to improved climate change knowledge services for key stakeholders (e.g., policy makers, communities, and civil society) in participating Central Asian countries, as well as to increased investments and capacity build- ing that, combined, will address climate challenges common to these countries.

Identification completed on 15 March 2017. Environmental Assessment Category B. US$ 19.0 (GCF). Consulting services to be determined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation Western Balkans Trade and Transport Facilitation: The project aims to support Western Balkan governments to pro- mote deeper economic integration within the region and the EU by assisting with the implementation of measures aiming at (1) facilitating cross-border movement of goods, (2) enhancing transport efficiency and predictability, and (3) enhancing mar- ket access for trade in services and investments. Concept completed on 24 October 2017. Environmental Assessment Category B. Project: P162043. US$90.0 (IBRD). Consultants will be required. Ministry of Trade, Tourism and Telecommunications (Serbia). Social, Urban, Rural and Resilience Global Practice Central Asia Hydrometeorology Modernization Project (CAHMP) Additional Financing: The objective of the Central Asia Hydrometeorology Modernization Project (CAHMP) is to improve the accuracy and timeliness of hydromet ser- vices in Central Asia, with particular focus on Kyrgyz Republic and Republic of Tajikistan. Negotiations authorized on 10 April 2018. Environmental Assessment Category C. Project: P164780. US$ 4.0/7.5 (IDA Credit/IDA Grant). Consultants will be required. Tajikhydromet; Kyrgyzhydromet. Transport & Digital Development Third Phase of the Central Asia Regional Links Program (CARs-3): The project development objective of the pro- posed Third Phase of the Central Asia Regional Links Program (CARs-3 Project) is to increase regional connectivity and sup- port sustainable tourism development in Issyk-Kul Oblast. Negotiations authorized on 25 May 2018. Environmental Assessment Category B. Project: P159220. US$ 27.5/27.5 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Transport and Roads. Fourth Phase of the Central Asia Regional Links Program (CARs-4): The CARs-4 project aims at supporting the country's two poorest oblasts, Khatlon and GBAO, in taking full advantage of their strategic locations at the intersection of trade routes to the People's Republic of China, and the Republic of Afghanistan by (i) increasing regional connectivity and access to markets and opportunities, (ii) improving aviation safety and service delivery, (iii) strengthening transport resilience, and (iii) supporting sustainable tourism development, thereby creating livelihood opportunities for the largely rural popula- tion. July 2018 Latin America And Caribbean PAGE 110 Concept completed on 2 April 2018. Environmental Assessment Category B. Project: P159707. US$ 90.0/90.0 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Transport; Ministry of Finance. Latin America And Caribbean Argentina Agriculture Integrated Risk Management in the Rural Agroindustrial System: The objective of the project is to improve the management of agricultural risks by eligible beneficiaries and selected public institutions. Approval completed on 24 May 2018. Environmental Assessment Category B. Project: P162316. US$150.0 (IBRD). Consult- ing services to be determined. Ministry of Agroindustry. Energy & Extractives Renewable Fund Guarantee: Support the development of renewable energy in Argentina through private sector invest- ments. Approval completed on 15 March 2018. Project: P165085. US$ 250.0 (GUAR). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population Supporting Effective Universal Health Coverage in Argentina: The Development Objective of the proposed Project would be to: (i) increase effective and equitable coverage of key health services provided to the eligible population; and (ii) increase the institutional capacity of the MSN and MSPs to implement mechanisms for an integrated delivery system. Approval completed on 18 May 2018. Environmental Assessment Category B. Project: P163345. US$300.0 (IBRD). Consulting services to be determined. Ministry of Health. AF for AR Provincial Public Health Insurance Development Project: The PDOs are to: (a) increase utilization and quality of key health services for the uninsured target population; and (b) improve institutional management by strengthening the incentives for results in Participating Provinces and among Authorized Providers. Approval completed on 7 July 2015. Environmental Assessment Category C. Project: P154431. US$200.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Other Additional Financing for the Unleashing Productive Innovation Project: The project development objective (PDO) is to expand Argentina’s capacity to generate productive innovation in knowledge-based areas by (i) facilitating the creation of new knowledge-based companies; (ii) developing specialized human capital; (iii) supporting productive research innovation projects and their commercialization in three priority technology areas (biotechnology, nanotechnology, and information and telecommunications); (iv) upgrading research infrastructure in the areas of science, technology and productive innovation; and (v) strengthening the policy framework governing science, technology, and productive innovation. Approval completed on 8 July 2016. Environmental Assessment Category B. Project: P159747. US$45.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Social Protection & Labor (R) Additional Financing Children and Youth Protection Project: The Project Development Objectives are to: (i) expand coverage of the Family Allowances programs; and (ii) improve transparency of social protection programs imple- mented by ANSES. Appraisal completed on 31 July 2018. Environmental Assessment Category C. Project: P167851. US$450.0 PAGE 111 Monthly Operational Summary July 2018 (IBRD). No consultants are required. ANSES - Administracion Nacional de la Seguridad Social; Ministerio de Desarrollo So- cial. Social, Urban, Rural and Resilience Global Practice Metropolitan Buenos Aires Urban Transformation Project Additional Financing: The Project Development Ob- jectives are to improve housing conditions and access to selected basic services and infrastructure in selected disadvantaged neighborhoods in the Buenos Aires Metropolitan Area (AMBA), and strengthen the institutional capacity for urban manage- ment at the metropolitan level. Identification completed on 20 June 2018. Environmental Assessment Category A. US$200.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Transport & Digital Development Metropolitan Areas Urban Transport Project: The overall development objective of the program is to improve the qual- ity and sustainability of urban transport systems in Argentine Metropolitan Areas, through the improvement of sectoral deci- sion making frameworks and by giving priority to public transport modes in the urban transport sector. The project (APL1) development objectives contribute to the overall program development objective by: (i) supporting the design and creation of a multijurisdictional Metropolitan Transport Agency for the Buenos Aires Metropolitan Area (AMBA); (ii) strengthening the institutional capacity of the transport authorities in decision making, planning, priority setting, and resource allocation in urban transport; (iii) improving the quality and performance of urban transport infrastructure and/or services in medium size Metropolitan Areas; and (iv) improving the physical integration and access to public transport networks in the Buenos Aires Metropolitan Area. Approval completed on 27 January 2017. Environmental Assessment Category B. Project: P161393. US$45.0 (IBRD). No consultants are required. Implementing agency(ies) to be determined. Water Plan Belgrano Water Supply and Sanitation Services Development Project: The proposed new Project Develop- ment Objectives are to increase access to water supply and sanitation services and to improve the operational and financial performance of the water supply and sanitation service providers in the project area. Approval completed on 24 March 2017. Environmental Assessment Category A. Project: P162712. US$125.0 (IBRD). Consultants will be required. Ministry of Interior, Public Works and Housing, UCPyPFE. Bolivia Agriculture Additional Finance BO Rural Alliances Project II: The re-written PDO would be: The Objective of the Project is to improve accessibility to markets and climate resilience for small-scale rural producers in the country Approval completed on 13 April 2017. Environmental Assessment Category B. Project: P158532. US$100.0 (IBRD). Consultants will be required. EMPODERAR; EMPODERAR; EMPODERAR; Ministry of Development Planning. BO Community Investment in Rural Areas Project Additional Financing: To improve access to sustainable basic infrastructure and services for the most disadvantaged rural communities selected in some of the poorest municipalities of Bolivia. Approval completed on 4 August 2015. Environmental Assessment Category B. Project: P154854. US$ 60.0 (IDA Credit). No consultants are required. Implementing agency(ies) to be determined. Health, Nutrition & Population Health Service Delivery Network Project: The project development objective (PDO) is to improve access to, and quality of, health service delivery in selected health networks. Approval completed on 14 June 2018. Environmental Assessment Cat- egory B. Project: P164453. US$252.0/48.0 (IBRD/IDA Credit). Consultants will be required. Ministry of Health; Ministry of Health - Agencia de Infraestructura en Salud y Equipamiento Medico (AISEM). Social, Urban, Rural and Resilience Global Practice July 2018 Latin America And Caribbean PAGE 112 Bolivia Urban Resilience: Enhance urban management, improve living conditions in low income areas, and increase re- silience to natural hazards in selected sites of the La Paz and Santa Cruz Metropolitan Areas. Concept completed on 21 June 2018. Environmental Assessment Category B. Project: P165861. US$150.0 (IBRD). Consultants will be required. Ministry of Public Works. Water BO Wastewater Treatment and Reuse: The Project Development Objective is to reduce wastewater pollution and strengthen the capacity of the participating institutions to manage wastewater treatment systems in La Paz and Tarija. Concept completed on 21 February 2018. Environmental Assessment Category A. Project: P162305. US$140.0 (IBRD). Consultants will be required. Ministry of Environment and Water (Ministerio de Medio Ambiente y Agua MMAyA). Rural Water Access Project: The Project Development Objective is to improve access of drinking water supply and clean energy services for low-income populations in rural areas. Negotiations authorized on 13 February 2018. Environmental As- sessment Category B. Project: P161731. US$2.0/48.0 (IBRD/IDA Credit). Consultants will be required. Ministry of Environ- ment and Water (MMAyA) / Vice Ministry (VAPSB) / Program Coordination Unit (UCP). Bolivia - Water and Sanitation in Peri-Urban Areas: The Project Development Objective (PDO) is to improve access to water and sewerage services in participating peri-urban areas and small towns, while mainstreaming climate-resilience in the planning and management of participating water and wastewater utilities. Concept completed on 26 June 2017. Environ- mental Assessment Category B. Project: P162005. US$70.0 (IBRD). Consulting services to be determined. Vice Ministry of Drinking Water and Sanitation. Sustainable Household Irrigation Project: The project development objective is to provide sustainable access to water for irrigation to poor rural households in selected remote areas. Concept completed on 29 June 2018. Environmental Assess- ment Category B. Project: P165365. US$85.0 (IBRD). Consultants will be required. Ministry of Environment and Water. Brazil Agriculture Paraiba Sustainable Rural Development: The objective of the Project is to improve access to water, reduce agro-climatic vulnerability and increase access to markets of Paraiba's rural inhabitants. Approval completed on 20 October 2017. Environ- mental Assessment Category B. Project: P147158. US$50.0 (IBRD). Consultants will be required. Projeto COOPERAR (SEAFDS), Contact: Roberto da Costa Vital, Gestor; State Government of Paraiba, Contact: Tarcio Handel Pessoa, State Sec- retary of Planning, Budget, Management and Finance. Ceara Rural Sustainable Development and Competitiveness Phase II: The Project Development Objective is to im- prove access of water, reduce agro-climatic vulnerability and increase access to markets of Ceara's rural inhabitants. Identifi- cation completed on 23 April 2018. US$100.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives Financial Instruments for Brazil Energy Efficient Cities - FinBRAZEEC: The Project Development Objective is to unlock private financing for urban energy efficiency projects in Brazil by reducing the credit risk and enhancing the technical quality of Efficient Street Lighting subprojects and Industrial Energy Efficiency subprojects. Approval completed on 29 June 2018. Environmental Assessment Category F. Project: P162455. US$200.0/20.0/0.5/195.0/0.5 (IBRD/CCTF/ESMP/GCF/GIF). Consultants will be required. Caixa Economica Federal. Environment & Natural Resources FIP: Brazil Investment Plan: Integrated Landscape Management in the Cerrado Biome Project: To strengthen adoption of environmental conservation and restoration practices, and low-carbon emission agricultural practices in selected PAGE 113 Monthly Operational Summary July 2018 watersheds of Brazil’s Cerrado Biome. Appraisal completed on 8 February 2018. Environmental Assessment Category B. Pro- ject: P164602. US$ 21.0 (CIF). Consultants will be required. Ministry of Agriculture, Livestock, and Food Supply (MAPA); Serviço Nacional de Aprendizagem Rural; Ministry of Environment / Brazilian Forest Service. Social, Urban, Rural and Resilience Global Practice Manaus Urban Resilience: The Development Objective is to enhance urban resilience in the Municipality of Manaus through integrated urbanization with higher density and lower disaster risk. Identification completed on 25 September 2017. US$64.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Fortaleza Sustainable Urban Development Project: The objectives of the Project are to: (a) strengthen the capacity of the Municipality of Fortaleza for land use planning and land-based financing; and (b) enhance urban environment and reha- bilitate public spaces, through interventions in selected areas of the Vertente Maritima Basin and of the Rachel de Queiroz Park. Approval completed on 28 April 2017. Environmental Assessment Category B. Project: P153012. US$73.3 (IBRD). Con- sultants will be required. Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA). Water SABESP PROJECT FOR IMPROVING WATER SERVICE ACCESS AND SECURITY IN THE METROPOLITAN REGION OF SÃO PAULO: The Project Development Objective is to support SABESP to providing secure access to water services to people in low income areas of the Metropolitan Region of São Paulo. Concept completed on 7 June 2018. Environ- mental Assessment Category B. Project: P165695. US$250.0 (IBRD). Consultants will be required. SABESP. Paraiba Improving Water Resources Management and Services Provision: Improvement of water security through an enhanced water resources management in the State, an increase of water supply in the semiarid region and the optimization of the wastewater and water supply systems (WSS) of João Pessoa Metropolitan Region (JPMR). Concept completed on 27 March 2018. Environmental Assessment Category A. Project: P165683. US$138.1 (IBRD). Consultants will be required. CAGEPA - State Water and Sanitation Company; AESA - State Water Resources Management Executive Agency. (R) Ceará Water Security and Governance: The proposed Project's Development Objective (PDO) is to strengthen effi- cient water management and provide access to reliable water supply in selected areas of the State of Ceará. Concept completed on 17 July 2018. Environmental Assessment Category B. Project: P165055. US$139.9 (IBRD). Consultants will be required. Secretariat of Water Resources - SRH; Ceara Water and Sanitation Utility - CAGECE; Ceara Economic Research and Strategy Institute - IPECE. BR AF Teresina Enhancing Municipal Governance and Quality of Life Proj: The objectives of the Project are to (a) improve the financial and environmental management capacity of the Borrower, and (b) improve access to services by the low- income population of the Lagoas do Norte Region. Approval completed on 24 February 2016. Environmental Assessment Category A. US$88.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Chile Health, Nutrition & Population Chile - Public Health Sector Support Project: The objectives of the Project are to: (i) improve the efficiency of the public health care sector; and (ii) improve the quality of Non-Communicable Diseases-related health care services. Approval com- pleted on 8 June 2017. Environmental Assessment Category B. Project: P161018. US$80.0 (IBRD). Consultants will be re- quired. Ministry of Health. Water July 2018 Latin America And Caribbean PAGE 114 CL Integrated Water Resources Management & Infrastructure Development: The Project Development Objective (PDO) is to strengthen the capacity of the Borrower for water resources management and public infrastructure planning and concession. Approval completed on 4 November 2015. Environmental Assessment Category B. Project: P152319. US$40.9 (IBRD). Con- sulting services to be determined. Ministry of Finance, Contact: José Pablo Gomez, Jefe División Finanzas Publicas. Dirección de Presupuestos; Ministry of Public Works, Contact: Sergio Galilea, Undersecretary of Public Works. Colombia Education Additional Financing for Access and Quality in Higher Education Project - PACES: The objective of the project is to improve the quality of tertiary education in participating institutions and to increase the enrollment of students from dis- advantaged socioeconomic backgrounds in quality programs. Approval completed on 29 March 2018. Environmental Assess- ment Category C. Project: P166177. US$160.0 (IBRD). No consultants are required. ICETEX. Energy & Extractives (R) CTF Clean Energy Development Project: Objective to be Determined. Approval completed on 16 July 2018. Envi- ronmental Assessment Category F. Project: P161713. US$ 41.0/41.0 (CCTF/GUAR). Consulting services to be determined. Implementing agency(ies) to be determined. Environment & Natural Resources Sustainable Low-Carbon Development in Orinoquia region Project: To improve enabling conditions for sustainable and low-carbon landscape planning and management in project targeted areas. Approval completed on 16 February 2018. Environmental Assessment Category B. Project: P160680. US$ 20.0 (BIOA). Consulting services to be determined. Ministry of Agriculture and Rural Development (MADR); Ministry of Environment and Sustainable Development (MADS); National Planning Department (DNP); Instituto de Hidrologia, Meteorologia y Estudios Ambientales (IDEAM). Social, Urban, Rural and Resilience Global Practice Colombia Multipurpose Cadaster Project: To strengthen the capacity of selected local governments and national agen- cies to increase access to cadastre and registry services and information. Concept completed on 17 March 2017. Environmental Assessment Category B. Project: P162594. US$100.0 (IBRD). Consultants will be required. Departamento Nacional de Planeacion. Transport & Digital Development Enhancing Waterway Connectivity and Water Service Provision in Colombia’s Plan Pazcifico: The Project De- velopment Objective (PDO) is to improve: (i) waterway transport; and (ii) coverage and quality of water supply and sanitation services, in the Participating Municipalities. Approval completed on 14 December 2017. Environmental Assessment Category B. Project: P156880. US$41.9 (IBRD). Con- sultants will be required. FTSP, represented by its Fiduciary Agent and Trustee FIDUCIARIA LA PREVISORA, S.A. (FI- DUPREVISORA), Contact: Linda Mondragon, Advisor; National Unit for Disaster Risk Management, Contact: Gerardo Jara- millo, Manager. Support to the Bogota Metro Line 1 Section 1 Project - (Series 1): The Series Project Development Objective (S-PDO) is to improve access to jobs and quality transit for public transport users in the area of influence of the Bogota Metro Line 1, Section 1 (PLMB). PAGE 115 Monthly Operational Summary July 2018 The PDO (PDO-1) of the proposed first Project under the series is to improve readiness and start the implementation of the Bogota Metro Line 1, Section 1 (PLMB). Negotiations authorized on 1 June 2018. Environmental Assessment Category A. Project: P165300. US$70.0/500.0/600.0 (IBRD/EUIB/IADB). Consultants will be required. Bogota Metro Company. Dominica Energy & Extractives Dominica Geothermal Risk Mitigation Project: The objective of the proposed Project is to help: a) diversify the domes- tic power generation mix in Dominica by integrating clean, renewable geothermal energy; and b) assess the viability of export- ing geothermal-based electricity to regional islands. Concept completed on 10 May 2017. Environmental Assessment Category A. Project: P162149. US$ 17.2/10.0/2.0/10.0/2.0 (IDA Credit/CCTF/DOCK/FSSP/NZL). Consultants will be required. Dom- inica Geothermal Development Company. Social, Urban, Rural and Resilience Global Practice Additional Financing Dominica Disaster Vulnerability Reduction Project: The objective of the Project is to reduce vulnerability to natural hazards and climate change impacts in Dominica through: (i) investment in resilient infrastructure, and (ii) improved hazard data collection and monitoring systems. Appraisal completed on 15 March 2018. Environmental Assessment Category B. Project: P166540. US$ 31.0 (IDA Credit). Consultants will be required. Ministry of Environment; Ministry of Agriculture. Dominican Republic Agriculture DR Resilient Agriculture and Integrated Water Resources Management: The Project Development Objective is to contribute to improved sustainable landscape management and access to water supply and sanitation services in targeted river basins. Negotiations authorized on 15 March 2018. Environmental Assessment Category B. Project: P163260. US$80.0 (IBRD). Consultants will be required. Ministerio de Economia, Planificacion y Desarrollo; Instituto Nacional de Recursos Hid- raulicos; Ministerio de Agricultura; Instituto Nacional de Aguas Potables y Alcantarillado (INAPA) Tel: 0018097043565, E- mail: estheruear@yahoo.es, Contact: Esther Reyes Echavarria, Directora Nacional Programa INAPA-AECID; Ministerio de Medio Ambiente y Recursos Naturales. Education Additional Financing - Support to the National Education Pact Project: The objective of the Project is to improve the Borrower’s capacity to: (i) recruit and train primary and secondary school teachers, (ii) assess student learning in primary and secondary education, (iii) evaluate the quality of service provided by Public Early Childhood Development Cen- ters, and (iv) enhance the process for decentralizing public school management. Identification completed on 14 June 2018. Environmental Assessment Category C. US$50.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Health, Nutrition & Population Pro-Mejora: Improving the Quality and Efficiency of Health Services in the Dominican Republic: The Project will support the Government of the Dominican Republic in the implementation of the new Health Sector Strategy to improve the efficiency and quality of health services in the primary and specialized levels of care. Concept completed on 5 November 2017. Environmental Assessment Category B. Project: P163031. US$50.0 (IBRD). Consultants will be required. Ministry of Public Health. July 2018 Latin America And Caribbean PAGE 116 Transport & Digital Development Caribbean Regional Communications Infrastructure Prog - Dominican Rep.: The project development objective is to increase access to regional broadband networks and advance the development of ICT-enabled services in the Dominican Republic and in the Caribbean Region. Approval completed on 25 September 2014. Environmental Assessment Category B. Project: P147483. US$30.0 (IBRD). Consultants will be required. INDOTEL Tel: 18293786151, E-mail: jroques@in- dotel.gob.do, Contact: Jorge Roques, Coordinador de Proyectos (Projects Coordinator). Ecuador Environment & Natural Resources Ecuador Forest Investment Program: Reduce GHG emissions from deforestation and forest degradation through the adoption of improved forest management and agricultural production systems in and around selected forest areas of the coastal provinces in Ecuador. Identification completed on 5 June 2018. US$ 20.9 (CSCC). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Social Protection & Labor EC-Improving Nutrition Results: To reduce chronic malnutrition in selected municipalities through improved coordina- tion between Social Protection and Health interventions, and investments in water and sanitation. The project will also support improved monitoring of nutrition indicators at the national, regional and local level. Identification completed on 16 April 2018. US$150.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Additional Financing Quito Metro Line One Project: The proposed Project development objective (PDO) is to improve urban mobility in the city of Quito serving the growing demand for public transport. The Project will reduce travel times, decrease operational costs of the transport service, improve connectivity, security and comfort of the current system and re- duce emissions of pollutants and greenhouse gases. Approval completed on 22 June 2018. Environmental Assessment Cate- gory A. Project: P158756. US$230.0/152.2/250.0 (IBRD/CAFL/IADB). Consulting services to be determined. Implementing agency(ies) to be determined. Water Guayaquil Wastewater Management Project AF: The Project Development Objective (PDO) is to increase access to improved sanitation services and to reduce wastewater pollution in selected areas of the City of Guayaquil. Approval completed on 29 June 2018. Environmental Assessment Category A. Project: P165716. US$233.6 (IBRD). Consultants will be required. EMAPAG-EP. Grenada Governance Grenada Digital Governance for Resilience: To enhance the delivery of selected public services and fortify government resiliency by modernizing Grenada's public sector management systems through digital technologies and institutional reform. Identification completed on 11 May 2018. US$ 15.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. PAGE 117 Monthly Operational Summary July 2018 Guatemala Environment & Natural Resources Forest landscapes and ecosystem services in Guatemala: To strengthen governance of forest management and in- crease access to improved livelihoods for forest-dependent communities in selected areas in Guatemala. As part of a program of three FIP projects, this work will contribute to reducing deforestation and forest degradation as well as increasing the resil- ience of local communities. Concept completed on 13 June 2018. Environmental Assessment Category B. Project: P167131. US$ 10.8/1.4 (CSCC/CSCF). Consultants will be required. Instituto Nacional de Bosques (INAB). Governance Transparency and Efficiency in Tax Administration: The project development objective is to increase levels of com- pliance with tax and customs obligations. Approval completed on 17 January 2017. Environmental Assessment Category C. Project: P153366. US$55.0 (IBRD). Consultants will be required. Superintendencia de Administracion Tributaria, Contact: Ernesto Ramirez Ramirez, PMO; Ministry of Public Finance, Contact: Mynor Argueta, Head, Management and Negotiation of International Cooperatio. Health, Nutrition & Population Crecer Sano: Guatemala Nutrition and Health Project: The Project Development Objective (PDO) is to improve se- lected practices, services and behaviors known to be key determinants of chronic malnutrition (with an emphasis on the first 1,000 days of life) in the intervention areas. Approval completed on 24 March 2017. Environmental Assessment Category B. Project: P159213. US$100.0 (IBRD). Consultants will be required. Social Development Fund/ Ministry of Social Development (MIDES). Social, Urban, Rural and Resilience Global Practice GT: Urban Infrastructure and Violence Prevention: The Project's Development Objective (PDO) is to increase access to basic urban infrastructure and services and mitigate key risk factors of crime and violence in selected communities. Approval completed on 17 January 2017. Environmental Assessment Category B. Project: P143495. US$45.0 (IBRD). Consultants will be required. Mancomunidad Gran Ciudad del Sur Tel: 50255179845, E-mail: thomashl1@hotmail.com, Contact: Thomas Henry, PIU Manager. Guyana Energy & Extractives Guyana O&G Capacity Building Project: The project development objective is to enhance legal and institutional frame- works and strengthen the capacity of key institutions to manage the oil and gas sector in Guyana Concept completed on 26 April 2018. Environmental Assessment Category B. Project: P166730. US$ 20.0 (IDA Credit). Consulting services to be deter- mined. Ministry of Natural Resources. Haiti Agriculture Resilient Productive Landscapes in Haiti: The Project Development Objectives are: (i) to improve the adoption of resil- ience-enhancing agricultural and landscape management practices in selected sub-watersheds; and (ii) to enable the Govern- ment to respond promptly and effectively to an eligible emergency. Approval completed on 1 March 2018. US$ 6.2 (GEFU). Consultants will be required. Ministry of Agriculture, Natural Re- sources and Rural Development (MARNDR); Ministry of Environment. July 2018 Latin America And Caribbean PAGE 118 Relaunching Agriculture: Strengthening Agriculture Public Services II Project - Additional financing: The new proposed PDO is: to (a) reinforce the capacity of the Ministry of Agriculture, Natural Resources and Rural Development to provide or facilitate access to services in the agricultural sector; (b) increase market access to small producers and food security in Selected Areas; (c) improve livelihood in areas affected by Hurricane Matthew and (d) enable the Government to respond promptly and effectively to an eligible emergency. Approval completed on 14 June 2017. Environmental Assessment Category B. Project: P163081. Consultants will be required. Ministry of Agriculture, Natural Resources and Rural Develop- ment; Ministry of Economy and Finance. Energy & Extractives Haiti Modern Energy Services For All: The Project Development Objective is to accelerate private sector-driven, renew- able energy-based off-grid electrification in rural and peri-urban areas of Haiti. Approval completed on 25 October 2017. Environmental Assessment Category F. Project: P154351. US$ 15.7 (CCTF). Consultants will be required. The Republic of Haiti, Contact: Jacques Russeau, Minister MTPTC; MTPTC, Contact: Jacques Russeau, Minister MTPTC. Haiti: Renewable Energy for All: The Project Development Objective is to scale-up renewable energy investments in Haiti in order to expand and improve access to electricity for households, businesses and community services. Approval completed on 25 October 2017. Environmental Assessment Category B. Project: P156719. US$ 19.6 (CSCF). Consultants will be required. MTPTC Energy Cell. Governance Additional Financing to Haiti Statistical Capacity Building Project: The objectives of the project are to (a) assist in the production, analysis, and dissemination of the findings of the Fifth Population and Housing Census and strengthen the human and technological capacities of the IHSI and (b) enhance expenditure management practices and the timeliness and coverage of budgetary and financial information, to contribute to improved budget management and oversight. Approval com- pleted on 31 May 2018. Environmental Assessment Category C. Project: P164093. US$ 15.0 (IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Health, Nutrition & Population Enhancing Health Service Delivery on the Path to Universal Health Coverage in Haiti: Increase the access and use of basic health services and strengthen systems for health service delivery in the Recipient’s territory. Identification com- pleted on 16 May 2018. US$ 40.0/15.0 (IDA Grant/GFF). Consulting services to be determined. Implementing agency(ies) to be determined. Additional Financing for the Improving Maternal and Child Health Through Integrated Social Services Pro- ject: To increase the access and use of maternal and child health services, strengthen cholera control, and improve targeting of social services in the Recipient’s territory, with a particular focus on areas affected by Hurricane Matthew. Approval com- pleted on 14 June 2017. Environmental Assessment Category B. Project: P163313. Consultants will be required. Ministry of Economic and Finance. Social, Urban, Rural and Resilience Global Practice Disaster Risk Management and Reconstruction Additional Financing: The Project Development Objective is to support the Recipient in improving disaster response capacity and enhancing the resiliency of critical transport infrastructure and to support the post-hurricane Matthew emergency recovery. Approval completed on 8 June 2017. Environmental Assess- ment Category B. Project: P163199. Consulting services to be determined. Implementing agency(ies) to be determined. Strengthening DRM and Climate Resilience Project: The proposed Project Development Objective is to strengthen the Government of Haiti’s capacity for disaster preparedness and emergency response and to increase the network of shelters/safe havens in climate risk-prone areas. Identification completed on 28 December 2017. Environmental Assessment Category B. US$ 35.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. PAGE 119 Monthly Operational Summary July 2018 Transport & Digital Development Second Additional Financing Infra & Instit Emergency Recovery: The Revised PDO is to support the Recipient in its sustainable recovery efforts from the effects of the Emergency, through selected interventions aiming to rebuilding key institutions and infrastructure. Approval completed on 10 November 2016. Environmental Assessment Category A. Project: P156049. US$ 2.8 (IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Water Sustainable Rural and Small Town Water Supply and Sanitation Additional Financing: The proposed objectives of the Project are to: (i) increase access to improved water supply and sanitation in targeted rural areas and small towns in zones affected by cholera; (ii) strengthen the Recipient’s water and sanitation service delivery mechanism at the deconcen- trated level; and (iii) improve the Recipient’s capacity to respond promptly and effectively to an Eligible Emergency. Ap proval completed on 14 June 2017. Environmental Assessment Category B. Project: P163194. Consultants will be required. Imple- menting agency(ies) to be determined. Honduras Agriculture Additional Financing for Rural Competitiveness Project (COMRURAL): The revised PDO is (a) to contribute to increased productivity and competitiveness among organized rural small-scale producers through their participation in pro- ductive alliances and (b) to enable the Government to respond promptly and effectively to an eligible emergency. Approval completed on 18 May 2017. Environmental Assessment Category B. Project: P158086. US$ 25.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Social Protection & Labor HN Social Protection and Labor: This project will support the implementation and reform of the national conditional cash transfer program, as well as the broad social protection strategy in the country. It will also support the capacity to design and evaluate employment programs. This project will support the implementation and reform of the national conditional cash transfer program, as well as the broad social protection strategy in the country. It will also support the capacity to design and evaluate employment programs. This project will support the implementation and reform of the national conditional cash transfer program, as well as the broad social protection strategy in the country. It will also support the capacity to design and evaluate employment programs. This project will support the implementation and reform of the national conditional cash transfer program, as well as the broad social protection strategy in the country. It will also support the capacity to design and evaluate employment programs. Identification completed on 28 July 2014. Environmental Assessment Category C. US$ 30.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Land Administration and Information Systems: The development objective of the Project is to improve the land man- agement system and service delivery processes Concept completed on 23 January 2018. Environmental Assessment Category B. Project: P164187. US$ 50.0 (IDA Credit). Consultants will be required. Property Institute. Water Water and Sanitation Sustainability Program in Honduras: The Project Development Objective (PDO) is to support the recipient in increasing and sustaining access to safely managed water and sanitation services in eligible decentralized ser- vice providers in collaboration with sector agencies. Concept completed on 24 July 2017. Environmental Assessment Category B. Project: P163487. US$ 60.0 (IDA Credit). Consulting services to be determined. Unidad Administradora de Proyecto UAP del Ministerio de Finanzas. July 2018 Latin America And Caribbean PAGE 120 Jamaica Agriculture Jamaica Rural Economic Development Initiative II: .To scale-up market access and sales by micro and small-scale agricultural producers, agribusinesses and tourism product and service providers. Concept completed on 28 May 2018. Envi- ronmental Assessment Category B. Project: P166279. US$40.0 (IBRD). Consulting services to be determined. Jamaica Social Investment Fund (JSIF); Ministry of Finance and Public Sector. Mexico Energy for Sustainable Agricultural Development: Promote the adoption of renewable energy and energy efficiency technologies among target beneficiaries. Appraisal completed on 31 January 2018. Environmental Assessment Category B. Project: P164055. US$50.0 (IBRD). Consultants will be required. Secretariat of Energy; Shared Risk Trust (FIRCO). Mexico: Sustainable Productive Landscapes Project: To strengthen sustainable management of productive landscapes and increase economic opportunities for rural producers in priority areas of Mexico Approval completed on 30 March 2018. Environmental Assessment Category B. Project: P159835. US$ 21.9 (GEFU). Con- sultants will be required. Ministry of Environment and Natural Resources (SEMARNAT); Nacional Financiera S.N.C. I.B.D. (NAFIN)/Trustee for the FCC (Climate Change Fund). Education Mexico Higher Education Project: Strengthen the institutional capacity for innovative teaching, collaborative applied research, and internal quality assurance across participating public higher education institutions. Approval completed on 17 March 2017. Environmental Assessment Category B. Project: P160309. US$130.0 (IBRD). Consultants will be required. Sec- retariat of Public Education (Secretaría de Educación Pública). Energy & Extractives Additional Financing for Energy Efficiency in Public Facilities Project (PRESEMEH): The objective is to promote the efficient use of energy in the Borrower’s municipalities and other eligible public facilities by carrying out energy effi ciency investments in selected public sectors and to contribute to strengthening the enabling environment. Approval completed on 30 March 2018. Environmental Assessment Category B. Project: P165585. US$50.0/5.8 (IBRD/GEFU). Consultants will be required. Secretaría de Energía (SENER). Additional Finance for Energy Efficiency in Public Facilities Project (PRESEMEH): The objective of the project is; to promote the efficient use of energy in the Borrower’s municipalities by carrying out energy efficiency investments in selected municipal sectors and contribute to strengthening the enabling environment. Approval completed on 30 March 2018. Environmental Assessment Category B. US$ 5.8 (GEFU). Consulting services to be determined. Secretaría de Energía (SENER). DEVELOPMENT OF CARBON CAPTURE, UTILIZATION AND STORAGE IN MEXICO - PHASE II: The project development objective (PDO) is to implement pilot projects to assess the feasibility of, and build expert capacity for,carbon capture, utilization and storage in Mexico. Concept completed on 22 May 2017. Environmental Assessment Category B. Project: P161311. US$ 16.5 (CARB). Consultants will be required. Secretariat of Energy (SENER). PAGE 121 Monthly Operational Summary July 2018 Social Protection & Labor Additional Financing for Social Protection System Project: The proposed Project Development Objectives are to sup- port the Government’s effort to: (i) increase access of PROSPERA beneficiaries to social and productive programs, and (ii) develop instruments for an integrated social protection system. Approval completed on 29 January 2018. Environmental Assessment Category C. Project: P164152. US$300.0 (IBRD). Consultants will be required. SEDESOL/PROSPERA. Water Water Security and Resilience for the Valley of Mexico (PROSEGHIR): The objectives of the Project are to improve the reliability of the Cutzamala System and strengthen the management of groundwater resources in the Valley of Mexico Negotiations authorized on 31 January 2018. Environmental Assessment Category B. Project: P164389. US$200.0 (IBRD). Consultants will be required. CONAGUA. Nicaragua Agriculture Dry Corridor Climate Resilient Agriculture Project: To strengthen agricultural productivity and climate resilience in selected municipalities of the Dry Corridor of Nicaragua. Negotiations authorized on 24 April 2018. Environmental Assess- ment Category B. Project: P162982. US$ 50.0 (IDA Credit). Consultants will be required. Ministry of Family, Communal, Cooperative, and Associative Economy - MEFCCA. Education Additional Financing - Second Support to the Education Sector Project: The objectives of the Project are to: (a) improve the students' retention rate in Primary Education Schools located in Participating Municipalities; and (b) strengthen MINED’s education management capacity. Approval completed on 22 September 2016. Environmental Assessment Category C. Project: P160057. US$ 5.0 (IDA Credit). Consultants will be required. Ministerio de Educacion; Ministry of Finance and Public Credit (MHCP). Energy & Extractives NI Geothermal Resource Risk Mitigation Project: The development objective of the Geothermal Risk Mitigation Pro- ject is to help confirm resources and speed-up geothermal development in the field by mitigating risks and leveraging funds through a PPP arrangement. The proposed project will initially lead to the construction of a small demonstration power plant that will confirm the operational capability of the geothermal field. By doing so,it will also open up the prospects for the progressive modular expansion of power generation capacity within the field, which is preliminarily estimated at 215 MW . The greater utilization of geothermal power to supply critical base-load needs in Nicaragua will contribute towards lower and more stable electricity costs over time. Concept completed on 8 September 2017. Environmental Assessment Category A. Project: P155197. US$ 45.0 (IDA Credit). Consulting services to be determined. Cerro Colorado Power; Empresa Nicaragüense de Electricidad (ENEL). Environment & Natural Resources Resilient Landscapes Management Project: The Project Development Objective (PDO) is to strengthen the National Protected Areas System and support sustainable land use and restoration practices in selected areas of the Dry Corridor of Nicaragua to foster biodiversity conservation, resilient landscapes, and local livelihoods. Concept completed on 31 July 2017. Environmental Assessment Category B. Project: P160688. US$ 10.3 (GEFU). Consultants will be required. Ministry of Environment and Natural Resources (MARENA); National Forest Development Fund (FONADEFO). July 2018 Latin America And Caribbean PAGE 122 Governance Nicaragua - Increasing Government Effectiveness through Public Sector Modernization: The project aims at increasing government effectiveness by (i) improving the quality of public policies and services through better and more ac- cessible data; and (b) enabling private sector participation in the provision of public infrastructure and services through an improved public investment management framework. This project would contribute to the higher level objective of achieving greater development impact. Identification completed on 18 May 2018. US$ 50.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Additional Financing for Nicaragua Second Land Administration Project: The Project Development Objectives are: (a) to strengthen the property rights of the population in the Project area through improved regularization, titling, and registry services; and (b) to improve Nicaragua's capacity to respond promptly and effectively to an eligible emergency. Ap- proval completed on 14 June 2017. Environmental Assessment Category B. Project: P163246. US$ 18.0 (IDA Credit). Con- sultants will be required. Implementing agency(ies) to be determined. Transport & Digital Development Rural and Urban Access Improvement Project Additional Financing: The objectives of the Project are to: (a) im- prove safe and sustainable access to markets and services in targeted rural and urban areas of the Recipient; and (b) in the event of an Eligible Emergency, provide immediate and effective response to said Eligible Emergency. Approval completed on 15 March 2018. Environmental Assessment Category B. Project: P165467. US$ 35.0 (IDA Credit). Consultants will be required. Ministerio de Transporte e Infraestructura (Ministry of Transport and Infrastructure); Road Maintenance Fund (FOMAV). Paraguay Agriculture (N) Paraguay - Project for Climate and Economic Resilience of Small Farmers - PROCER: To contribute improv- ing access to markets and climate resilience for small farmers and indigenous communities in project areas. Identification completed on 18 July 2018. US$125.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be deter- mined. Peru Environment & Natural Resources Integrated Forest Landscape Management Project in Atalaya, Ucayali: The project objective is to strengthen sus- tainable forest landscape management and use by forest dependent communities and enterprises in the Raimondi, Sepahua and Tahuanía districts of the Atalaya province. Appraisal completed on 12 June 2018. Environmental Assessment Category B. Project: P163023. US$ 6.4/5.8 (CSCC/CSCF). Consultants will be required. Ministry of Environment and Natural Re- sources. Finance, Competitiveness and Innovation Mobilizing Private Long Term Finance for Infrastructure: Support the Government of Peru in leveraging private sector long-term financing for infrastructure under a fiscally sustainable model through the design and provision of partial project based guarantees Identification completed on 15 September 2017. US$ 200.0 (GUAR). Consulting services to be de- termined. Implementing agency(ies) to be determined. PAGE 123 Monthly Operational Summary July 2018 Governance Improving the Performance of Non-Criminal Justice Services: The Project’s development objective is to improve the efficiency, access to justice and transparency in the provision of non-criminal justice services in Peru. Concept completed on 23 February 2018. Environmental Assessment Category B. Project: P162833. US$85.0 (IBRD). Consultants will be required. Ministry of Justice and Human Rights. Health, Nutrition & Population Peru Health Network Transformation: The objectives of this project are to (i) expand the scope and increase the quality of health services in selected areas and (ii) strengthen critical transversal support systems to increase the efficiency and gov- ernance of the health sector. Concept completed on 3 October 2017. Environmental Assessment Category B. Project: P163255. US$125.0 (IBRD). Consultants will be required. Ministry of Health. Social, Urban, Rural and Resilience Global Practice Improving Disaster Risk Management in Peru: Enhancing disaster risk management in Peru through the inclusion of hazard and risk analysis into territorial and sectoral development Identification completed on 11 October 2017. Environmental Assessment Category B. US$70.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. National Urban Cadaster and Municipal Support Project: The project development objective is to establish and / or strengthen urban cadasters in selected municipalities in Peru. Concept completed on 4 December 2017. Environmental As- sessment Category B. Project: P162278. US$100.0 (IBRD). Consultants will be required. Ministry of Housing, Construction and Sanitation. Transport & Digital Development PE: Digital Inclusion Project: 12. The proposed Development Objective is to (i) increase access to broadband services in selected rural areas of the country, and to (ii) improve livelihoods and foster economic development in selected rural areas through a better use of technology. 13. The PDOis consistent with The World Bank twin goals. The recent World Development Report 2016 (WDR16) on Digital Dividends stresses the fact that uneven access to digital technologies, mainly broadband, may exacerbate inequalities within citizens, especially in lower income segments of the population. This project is specifically aimed at bringing rural areas, which represent the lowest income levels in the country, to the digital world by connecting them with reliable and affordable high- speed networks. Concept completed on 13 September 2016. Environmental Assessment Category B. Project: P157355. US$70.0 (IBRD). Con- sulting services to be determined. FITEL (Fondo de Inversion en Telecomunicaciones); FITEL (Fondo de Inversion en Tele- comunicaciones). Water PE AF-Second Optimization of Lima Water & Sewerage: The proposed development objective of this project is to improve efficiency, continuity and reliability of water supply and sanitation services in the Northern Area of Lima. Approval completed on 15 January 2015. Environmental Assessment Category B. US$55.0 (IBRD). Consultants will be required. SEDAPAL Tel: (51-1) 317-3095, E-mail: ysanchez@sedapal.com.pe, Contact: Marco Vargas Medina, General Manager (a.i.). (R) Modernization of Water Supply and Sanitation Services: The proposed Development Objective is to increase access to, and quality of, water and sanitation services in selected areas, and develop the Borrower’s sectoral institutions and participating EPS management capacity to provide efficient water and sanitation services. Approval completed on 26 July 2018. Environmental Assessment Category B. Project: P157043. US$70.0 (IBRD). Consultants will be required. The Technical Organization for the Administration of WSS services (OTASS). July 2018 Latin America And Caribbean PAGE 124 St. Lucia Energy & Extractives Renewable Energy Sector Development Project: The development objective of the Renewable Energy Sector Develop- ment (RESD) Project is to support the Government of Saint Lucia to assess the viability of harnessing indigenous renewable energy resources, in particular geothermal energy. Concept completed on 30 May 2017. Environmental Assessment Category B. Project: P161316. US$ 5.0/9.5/1.9/5.0 (IDA Credit/CCTF/DOCK/FSSP). Consulting services to be determined. Ministry of Infrastructure, Ports, Energy and Labour; Project Coordination Unit. Health, Nutrition & Population (R) Saint Lucia Health System Strengthening Project: The development objective is to improve the accessibility, effi- ciency, and responsiveness of key health services. Negotiations authorized on 26 July 2018. Environmental Assessment Cat- egory B. Project: P166783. US$ 20.0 (IDA Credit). Consultants will be required. Ministry of Health and Wellness, Saint Lucia. Social, Urban, Rural and Resilience Global Practice SLU Disaster Vulnerability Reduction Project (Additional Finance): The Project Development Objective (PDO) is to reduce vulnerability to natural hazards and climate change impacts in Saint Lucia. Approval completed on 23 November 2016. Environmental Assessment Category B. Project: P155324. US$ 1.6/6.5 (IDA Credit/EUDF). Consultants will be required. Ministry of Finance, Economic Growth, Job Creation, External Affairs and Public Service; Ministry of Education, Innovation, Gender Relations and Sustainable Development; Ministry of Infrastructure, Ports, Energy and Labor; Department of Sustain- able Development; Department of Physical Planning. St. Vincent and the Grenadines Health, Nutrition & Population Saint Vincent and the Grenadines Health Project: The development objective is to improve access to and management of select noncommunicable diseases and associated risk factors. Identification completed on 1 March 2018. US$ 10.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Regional Disaster Vulnerability Reduction Project (Additional Finance): The Program aims at measurably reduc- ing vulnerability to natural hazards and climate change impacts in the Eastern Caribbean Sub-region. The objective of the Project in Grenada is to measurably reduce vulnerability to natural hazards and climate change impacts in Grenada and in the Eastern Caribbean Sub-region. The objective of the Project in Saint Vincent and the Grenadines is to measurably reduce vulnerability to natural hazards and climate change impacts in Saint Vincent and the Grenadines and in the Eastern Caribbean Sub-region. The achievement of the Program Development Objectives of the Regional Disaster Vulnerability Reduction Pro- gram (RDVRP) would be measured using the following key indicators: (a) Reduced risk of OECS population to failure of public buildings and infrastructure due to natural hazards or climate change impacts; and (b) Increased capacity of OECS Govern- ments to identify and monitor climate risk and impacts. Approval completed on 9 May 2014. Environmental Assessment Category B. Project: P146768. US$ 35.6/5.0 (IDA Credit/CSCF). Consultants will be required. Ministry of Finance and Eco- nomic Planning - St. Vincent and the Grenadines, Contact:, Public Sector Investment Program Management Unit. Transport & Digital Development Port Modernization Project: Improve efficiency of port operations through modernization of infrastructure and service delivery. Identification completed on 6 March 2018. Environmental Assessment Category A. US$ 30.0/30.0/40.0 (IDA Credit/DFID/LSPB). Consulting services to be determined. Implementing agency(ies) to be determined. PAGE 125 Monthly Operational Summary July 2018 Suriname Finance, Competitiveness and Innovation Facilitating Private Investment and Sector Diversification: The project development objective is to facilitate private investment and strengthen value chains in targeted industries in Suriname. Concept completed on 29 May 2018. Environ- mental Assessment Category B. Project: P166187. US$25.0 (IBRD). Consultants will be required. Ministry of Trade, Industry & Tourism. Social, Urban, Rural and Resilience Global Practice Saramacca Canal System Rehabilitation Project: The Project Development Objective is to reduce flood risk for the people living in the Greater Paramaribo area and improve the operation of the Saramacca Canal System for flood risk man- agement and navigation. Concept completed on 5 June 2018. Environmental Assessment Category B. Project: P165973. US$30.0 (IBRD). Consultants will be required. Ministry of Public Works, Transport and Communication (MoPWTC). Uruguay Agriculture AF- Sustainable Management of Natural Resources and Climate Change: The development objective of the project is to support Uruguay's efforts to promote farmer adoption of climate smart agricultural and livestock practices, and improved natural resource management practices in project areas. Approval completed on 30 November 2017. Environmental Assess- ment Category B. Project: P163444. US$42.0 (IBRD). Consultants will be required. Implementing agency(ies) to be deter- mined. Regional Finance, Competitiveness and Innovation OECS MSME Guarantee Facility Project: The development objective is to facilitate additional financial intermediation for MSMEs by supporting the establishment of a regional partial guarantee corporation. Approval completed on 5 July 2018. Environmental Assessment Category F. Project: P157715. US$2.0/8.0 (IBRD/IDA Credit). Consultants will be required. East- ern Caribbean Partial Credit Guarantee Corporation. Health, Nutrition & Population (R) Sint Maarten Hospital Resiliency & Preparedness Project: Improve the preparedness and capacity of hospital services in Sint Maarten Negotiations authorized on 30 July 2018. Environmental Assessment Category B. Project: P167532. US$ 25.0 (FSSP). Consultants will be required. Sint Maarten Medical Center (SMMC). Social Protection & Labor Emergency Income Support and Training Project: The objective of the Project is to provide temporary income support, improve the employability of affected beneficiaries in targeted sectors, and strengthen the social protection system’s capaci ty for shock-response and protection of the poor. Negotiations authorized on 5 July 2018. Environmental Assessment Category C. Project: P167368. US$ 22.5 (FSSP). Consulting services to be determined. National Recovery Program Bureau. Social, Urban, Rural and Resilience Global Practice Sint Maarten Emergency Debris Management Project: To manage debris from the hurricane and reconstruction ac- tivities to facilitate recovery and reduce risks. Identification completed on 13 April 2018. Environmental Assessment Category July 2018 Middle East And North Africa PAGE 126 A. US$ 18.0 (FSSP). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Sint Maarten Airport Terminal Reconstruction Project: The development objective is to reconstruct the Princess Ju- liana International Airport with increased natural disaster resilience. Identification completed on 20 June 2018. Environ- mental Assessment Category B. US$ 64.0 (FSSP). Consulting services to be determined. Implementing agency(ies) to be de- termined. Middle East And North Africa Djibouti Agriculture DJ- Second Additional Financing for the Rural Community Development and Water Mobilization Project (PRODERMO): The objective of the Project is to increase access of rural communities to water and enhance their capacity to manage water and agro-pastoral resources in the project areas using a participatory approach to community-based devel- opment. Approval completed on 31 May 2016. Environmental Assessment Category B. Project: P157282. US$ 7.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Education Inclusive Quality Education Project: The objective of the Project is to increase equitable access to, and teaching and learning in, pre-primary and basic education Identification completed on 8 January 2018. Environmental Assessment Cate- gory B. US$ 10.0/5.0/10.0/1.0 (IDA Credit/IDA Grant/EFA/UNCF). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population Towards Zero Stunting in Djibouti: The project development objective is to reduce stunting among children under five in Djibouti. Approval completed on 9 July 2018. Environmental Assessment Category B. Project: P164164. US$ 15.0 (IDA Credit). Consultants will be required. Ministry of Health. DJ HRITF Health AF: The HRITF additional financing will support the ongoing Health Improvement Project, which is an RBF operation. Approval completed on 8 April 2015. Environmental Assessment Category B. US$ 7.0 (HRBF). Consulting services to be determined. Implementing agency(ies) to be determined. Other Governance for Private Sector and Finance Development Additional Fin.: To improve the efficiency of business regulation and establish an automated National Payment System. Approval completed on 14 December 2016. Environmental Assessment Category C. Project: P158952. US$ 5.1 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Social Protection & Labor Djibouti Social Safety Net Second Additional Financing: The PDO is to support a social safety net system for (i) im- proved targeting, (ii) improved nutrition practices, and (iii) access to short-term employment for the poor and vulnerable. PAGE 127 Monthly Operational Summary July 2018 Approval completed on 31 May 2016. Environmental Assessment Category B. US$ 4.0 (IDA Credit). Consultants will be re- quired. Implementing agency(ies) to be determined. DJ - Scaling up Safety Nets Project: The Project Development Objectives are to provide targeted cash transfers to poor households and support access to community-level interventions that improve human capital. Concept completed on 25 June 2018. Environmental Assessment Category C. Project: P166220. US$ 16.0 (IDA Grant). Consultants will be required. Agence Djiboutienne de Developpement Social; State Secretariat for Social Affairs. DJ Social Safety Net Project Additional Financing: The project development objectives are to: (a) support the provision of short-term employment opportunities in community-based labor-intensive works for the poor and vulnerable; and (b) sup- port the improvement of nutrition practices among participating households focusing on pre-school children and preg- nant/lactating women. Approval completed on 28 October 2014. Environmental Assessment Category B. Project: P149621. US$ 5.0 (IDA Credit). Consultants will be required. Agence Djiboutienne de Développement Social (ADDS) Tel: (253-21) 358- 655, E-mail: mahdi.mohamed.djama@gmail.com, Contact: Mahdi Mohamed Djama, Director General. Social, Urban, Rural and Resilience Global Practice Djibouti Integrated Slum Upgrading Project: The proposed development objective is to (i) improve living conditions for slum dwellers and (ii) strengthen the capacity of public institutions to implement the national program for slum upgrading. Concept completed on 15 March 2018. Environmental Assessment Category A. Project: P162901. US$ 15.0/5.0 (IDA Credit/IDA Grant). No consultants are required. ARULOS. Egypt, Arab Republic of Agriculture Inclusive Agricultural Development Program in Upper Egypt: Objective to be Determined. Identification completed on 3 December 2015. Environmental Assessment Category A. US$150.0 (IBRD). Consulting services to be determined. Im- plementing agency(ies) to be determined. Finance, Competitiveness and Innovation IMPROVING ECONOMIC OPPORTUNITIES FOR WOMEN AND YOUTH ENTREPRENEURS: Objective to be Determined. Concept completed on 21 March 2017. Environmental Assessment Category F. Project: P162835. US$200.0 (IBRD). Consulting services to be determined. Bedaya Company. Governance Egypt Improving Performance, Accountability and Transparency: Improving monitoring, accountability and trans- parency for enhanced government performance in priority sectors. Identification completed on 29 June 2018. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population Transforming Egypt's Healthcare System Project: The proposed Project Development Objective is to (i) improve the quality of primary and secondary health care services, (ii) enhance demand for health and family planning services, and (iii) support the prevention and control of Hepatitis C. Approval completed on 27 June 2018. Environmental Assessment Category B. Project: P167000. US$530.0 (IBRD). Consultants will be required. Ministry of Health and Population. Social, Urban, Rural and Resilience Global Practice Sinai Peninsula Integrated Development Program: The proposed Program Development Project is to promote peace and stability while creating sustainable economic growth in Sinai Peninsula. Identification completed on 29 June 2018. US$1000.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. July 2018 Middle East And North Africa PAGE 128 Water AF to Sustainable Rural Sanitation Services Program: The Program Development Objective is to strengthen institu- tions and policies for increasing access and improving rural sanitation services in the Governorates of Beheira, Dakahliya, and Sharkiya in the Arab Republic of Egypt. Identification completed on 13 February 2018. Environmental Assessment Category B. US$300.0/250.0 (IBRD/AIIB). Con- sultants will be required. Implementing agency(ies) to be determined. Iraq Agriculture National Agriculture Reform and Competitiveness Program: The proposed project objective is to develop contestable agricultural input markets for machinery, livestock and credit. Concept completed on 18 June 2018. Environmental Assess- ment Category B. Project: P166229. US$300.0 (IBRD). Consulting services to be determined. Ministry of Agriculture. Education Iraq Education Sector Development Project: The project development objective is to restore equitable learning oppor- tunities in pretertiary education. Concept completed on 7 July 2018. Environmental Assessment Category B. Project: P166250. US$400.0 (IBRD). No consultants are required. Ministry of Education; Ministry of Education - Education Project Manage- ment Team (MOED-PMT). Energy & Extractives Iraq Electricity Services Reconstruction and Enhancement Project: To improve the reliability and enhance the op- erational and commercial efficiency of electricity services in the Basra Governorate. Concept completed on 19 October 2017. Environmental Assessment Category B. Project: P162454. US$200.0 (IBRD). Consultants will be required. Ministry of Elec- tricity. Social, Urban, Rural and Resilience Global Practice Emergency Operation for Development Project - Additional Financing: The Project is to support the Republic of Iraq in the reconstruction of damaged infrastructure and the restoration of public services delivery in Targeted Municipal Areas. Approval completed on 31 October 2017. Environmental Assessment Category B. Project: P161515. US$400.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Internally Displaced People Support Project: To support the social and economic integration of IDPs. Identification completed on 17 January 2018. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Water National Decentralized Municipal Water and Wastewater Services: The Project Development Objective (PDO) is to improve and expand water supply and sanitation services in the project areas by strengthening local water utilities to become operationally efficient and financially sustainable. This also includes facilitation of private sector participation in the sector. Identification completed on 8 May 2017. US$150.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. PAGE 129 Monthly Operational Summary July 2018 Jordan Agriculture Jordan Climate Smart Agribusiness Development Project: Proposed DO is to promote climate smart agriculture and agribusiness in Jordan Identification completed on 14 June 2018. Consulting services to be determined. Implementing agency(ies) to be determined. Environment & Natural Resources Jordan Ozone Depleting Substances HCFC Phase-Out (ODS3) Phase 2: The project development objective is to support Jordan in its overall efforts to meet its Montreal Protocol HCFC phase-out obligations, and to strengthen the capacity of responsible government entities to continue to effectively implement and comply with the Montreal Protocol. Approval completed on 21 November 2017. Environmental Assessment Category B. Project: P160103. US$ 2.5 (MPIN). Consulting services to be determined. Ministry of Environment; Ministry of Environment Tel: 962777289112, E-mail: ghazi.odat@MOENV.GOV.JO, Contact: Eng. Ghazi Odat, Head National Ozone Unit. Social Protection & Labor Safety Nets and Youth Employment Support Project: To strengthen social safety nets for poor and vulnerable house- holds and to improve employment support to vulnerable youth Identification completed on 18 May 2018. US$300.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Emergency Services and Social Resilience Project AF: The project development objective is to help Jordanian munic- ipalities and host communities address the immediate service delivery impacts of Syrian refugee inflows and strengthen mu- nicipal capacity to support local economic development. Approval completed on 30 December 2016. Environmental Assess- ment Category B. Project: P161465. US$ 10.8 (MNAF). Consulting services to be determined. Ministry of Planning and Inter- national Cooperation; Ministry of Municipal Affairs. Jordan Urban and Municipal Program for Balanced and Inclusive Growth: The proposed Development Objective is to strengthen institutional capacity to promote more sustainable urban growth in participating urban centers, and improve access to basic services in selected ‘lagging regions’. Concept completed on 22 June 2018. Project: P166577. US$200.0 (IBRD). Consulting services to be determined. Ministry of Planning and International Cooperation. Water Red Sea-Dead Sea Phase 1: - Identification completed on 6 November 2014. Environmental Assessment Category A. US$ 100.0 (GUAR). Consulting services to be determined. Implementing agency(ies) to be determined. Lebanon Agriculture Lebanon Climate Smart Agribusiness Development Project: Proposed DO is to promote climate smart agriculture and agribusiness in Lebanon Identification completed on 14 June 2018. Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives (R) Lebanon Energy Reform and Development Project: Increased availability of gas-fired power generation in Leba- non and reduce technical and non-technical losses on the grid Concept completed on 16 July 2018. Environmental Assessment Category A. Project: P166423. US$400.0 (IBRD). Consulting services to be determined. Ministry of Energy and Water. July 2018 Middle East And North Africa PAGE 130 Environment & Natural Resources Litani River Catchment Comprehensive Environmental Management Project: The proposed Project Development Objective (PDO) is to reduce pollution and improve natural resource management in the Litani River Basin (LRB) for enhanced livelihoods. Concept completed on 9 July 2018. Environmental Assessment Category A. Project: P167818. US$400.0/90.0/10.0 (IBRD/GFF/LSCT). Consulting services to be determined. Council for Development and Reconstruction (CDR). Finance, Competitiveness and Innovation Creating Economic Opportunities - Lebanon National Jobs Program: The Program Development Objective (PDO) is to improve economic opportunities for Targeted Beneficiaries in Lebanon. To achieve this objective an integrated approach is used, leveraging synergies across the Results Areas. Implementation of key policies in Results Area 1 unlocks opportunities for job-creating investments through the demand-side interventions in Results Area 2. These demand-side interventions create economic opportunities for Targeted Beneficiaries of the supply-side inter- ventions in Results Area 3 (and these beneficiaries can contribute to productive investments in Results Area 2). Approval completed on 27 June 2018. Environmental Assessment Category B. Project: P163576. US$329.9/70.1/130.0 (IBRD/CFF/ZPCO). Consulting services to be determined. Implementing agency(ies) to be determined. Governance Strengthening Fiscal Governance: To improve budget realism and transparency, cash management, public debt manage- ment, MoF e-services and the efficiency of public procurement. Concept completed on 19 November 2017. Environmental Assessment Category C. Project: P165324. US$50.0 (IBRD). Consultants will be required. Ministry of Finance. (R) LB Digital Economy Project: Improve access, quality and efficiency of selected e-services and strengthen the founda- tions of the digital economy. Concept completed on 19 July 2018. Environmental Assessment Category C. Project: P167643. US$400.0 (IBRD). Consultants will be required. Office of the Minister of State for Administrative Reform. Social Protection & Labor (R) Social Safety Net System Project: The project development objective is to provide income support and improve access to social services for poor and vulnerable Lebanese and Syrian refugees, increase employment opportunities for the extreme poor Lebanese, and develop the building blocks of Lebanon’s Social Safety Net (SSN) system. Identification completed on 22 March 2018. Environmental Assessment Category B. US$300.0/75.0/100.0 (IBRD/IDA Grant/ZBIL). Consultants will be required. Ministry of Social Affairs. Additional Financing for Emergency National Poverty Targeting Program: The objective of the Project is to expand the coverage and enhance the social assistance package of the National Poverty Targeting Program (NPTP) to Lebanese af- fected by the Syrian crisis and all Lebanese households under the extreme poverty line, as well as to assess the effectiveness of a graduation pilot. Approval completed on 30 June 2016. Environmental Assessment Category C. Project: P158980. US$ 10.0 (LSCT). Consulting services to be determined. Implementing agency(ies) to be determined. Social Promotion And Protection Project: The development objective of SPPP is to increase access to social development services at the community level, improve the coverage and targeting of the National Poverty Targeting Program (NPTP), and build the capacity of the Ministry of Social Affairs (MOSA) at the central and the Social Development Center (SDC) levels. Approval completed on 17 May 2013. Environmental Assessment Category B. Project: P124761. US$30.0 (IBRD). No consult- ants are required. Ministry of Social Affairs, Contact: Bashir Osmat, Advisor to the Minister; Lebanese Republic, Contact: Alain Bifani, Ministry of Finance Director General. Social, Urban, Rural and Resilience Global Practice (R) Lebanon Municipal Investment Program: The proposed Program Development Objective is to address municipal PAGE 131 Monthly Operational Summary July 2018 infrastructure and service delivery deficits in selected cities of Lebanon while laying the foundation for municipalities to mo- bilize private sector finance for municipal services. Concept completed on 16 July 2018. Environmental Assessment Category B. Project: P166580. US$150.0 (IBRD). Consultants will be required. Council for Development and Reconstruction (CDR). Land Administration System Modernization: To improve access to land use and value data, property rights data, and geospatial information through the Land Registry and Cadastre system modernization. Approval completed on 8 June 2018. Environmental Assessment Category B. Project: P159692. US$43.0 (IBRD). Consultants will be required. General Directorate of Land Registration and Cadastre. Transport & Digital Development Northern Lebanon Economic Development Corridor: The proposed Project Development Objective (PDO) is to en- hance local economic development in Northern Lebanon and to expand economic activity between Lebanon and Syria by im- proving connectivity along the corridor. Identification completed on 23 May 2018. Environmental Assessment Category A. US$550.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Greater Beirut Public Transport Project: The Project Development Objective (PDO) is to improve the speed, quality and accessibility of public transport for passengers in Greater Beirut and at the city of Beirut’s northern entrance. Approval co m- pleted on 15 March 2018. Environmental Assessment Category A. Project: P160224. US$225.2/69.8/50.0 (IBRD/CFF/ZPCO). Consultants will be required. Council for Development and Reconstruction. Civil Aviation Reforms and Airport Expansion: To improve the capacity, efficiency, and safety of the air transport sec- tor. Identification completed on 25 May 2018. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Water Additional Financing for the Greater Beirut Water Supply Project: The project development objective is to increase the provision of potable water to the residents in the project area within the Greater Beirut region, including those in the low- income neighborhoods of Southern Beirut, and to strengthen the capacity of the Beirut Mount Lebanon Water Establishment in utility operations. Approval completed on 15 June 2018. Environmental Assessment Category A. Project: P165711. US$90.0 (IBRD). Consultants will be required. Council for Development & Reconstruction. Libya Energy & Extractives Libya: Emergency Electricity Supply Improvement: To improve electricity service delivery in Libya by addressing backlog in maintenance of generation and transmission infrastructure, augmenting natural gas availability, piloting renewable energy development, and strengthening institutional capacity for improved financial performance. Identification completed on 9 July 2018. US$400.0/5.0 (IBRD/GFIA). Consulting services to be determined. Implementing agency(ies) to be deter- mined. Health, Nutrition & Population Libya Emergency Health Project: The Project Development Objective is to support the provision of basic health and nu- trition services in Libya. This will be achieved through strengthening the local health institutions and by filling service availa- bility gaps where there is limited or no public-sector capacity for service provision. Identification completed on 6 June 2018. Environmental Assessment Category B. US$300.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. July 2018 Middle East And North Africa PAGE 132 Morocco Education Morocco Education Support Program: To support the Government of Morocco in strengthening the foundations and the environment for learning in pre-primary and basic education. Identification completed on 24 May 2018. US$300.0 (IBRD). Consulting services to be determined. Ministry of Education. Social, Urban, Rural and Resilience Global Practice Supporting the economic inclusion of youth: The projects proposed development objective (PDO) is to improve access to economic opportunities and increase the active participation of disadvantaged youth in community life in Morocco. Concept completed on 22 February 2017. Environmental Assessment Category B. Project: P151169. US$50.0 (IBRD). Consulting ser- vices to be determined. Ministry of General Affairs and Governance (MAGG). Transport & Digital Development Morocco Urban Transport Program Additional Financing: The Program Development Objective is to strengthen the capacity of urban transport institutions to plan, implement and monitor infrastructure and services, and to improve the level of service of urban transport in targeted corridors in the program area. Identification completed on 19 September 2017. Environmental Assessment Category B. US$50.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Morocco Second Rural Roads Project - AF2: The proposed additional financing is a follow-up to the Second Rural Roads Project approved in May 2006 and to the first additional financing approved in April 2010. It will continue to support the Government's Second National Program of Rural Roads (NPRR2). The proposed additional financing will be used to finance a funding gap for activities appraised as part of the NPRR2, but for which no other financier has been identified. It will allow the Borrower (Caisse pour le Financement Routier) to finalize the last tranche of its borrowing plan for the NPRR2. Approval completed on 9 June 2014. Environmental Assessment Category B. Project: P148003. US$96.6 (IBRD). Consultants will be required. Caisse pour le financement routier, Contact: Ahmed Im- zel, Director. Tunisia Energy & Extractives (N) Energy Sector Performance Improvement Project: Improve the technical, commercial and financial performance of STEG Identification completed on 20 July 2018. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. (R) Tunisia-Italy Power Interconnector - Project Preparation TA: The PDO is to establish the technical, environ- mental, social and financial feasibility, and to help structure the proposed Tunisia-Italy Power Interconnection (“Proposed Projectâ€?). Approval completed on 31 July 2018. Environmental Assessment Category A. Project: P164625. US$ 5.5/0.4/7.0 (ESMP/EUIB/GIF). Consultants will be required. STEG. Finance, Competitiveness and Innovation Tunisia Financing Innovative Start-ups and MSMEs Project: The Project Development Objective is to increase the supply of private financing for innovative start-ups and micro and small and medium enterprises in Tunisia, with a focus on women and youth. Identification completed on 26 June 2018. US$100.0 (IBRD). Consulting services to be determined. Im- plementing agency(ies) to be determined. PAGE 133 Monthly Operational Summary July 2018 Social, Urban, Rural and Resilience Global Practice Tunisia : Urban Development and Local Governance Program - Additional Financing: The objectives of the Pro- gram are to: a) strengthen local governments’ (LGs) performance to deliver municipal infrastructure; and (b) improve access to services in targeted disadvantaged neighborhoods. Approval completed on 15 June 2018. Environmental Assessment Category C. US$130.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Tunisia Economic Development Corridor Project: The PDO is to expand economic activities in selected southern parts of Tunisia by improving regional connectivity and promoting private sector development along the Kasserine-Sidi Bouzid-Sfax corridor. Identification completed on 12 June 2018. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Water Tunisia Sanitation PPP Support Project: The proposed objectives of the Project are to: (i) provide improved sanitation services under the PPP contracts; and (ii) strengthen ONAS’s capacity to manage PPP contracts in delivery of sanitation ser- vices. Concept completed on 16 November 2017. Environmental Assessment Category B. Project: P162957. US$130.0 (IBRD). Consultants will be required. Office National de l'Assainissement (ONAS). Tunisia Irrigated Agriculture Intensification Project: The Project Development Objectives (PDO) are to improve the reliability and efficiency of the irrigation and drainage services and strengthen market linkages for irrigated products in se- lected irrigation schemes. Approval completed on 29 May 2018. Environmental Assessment Category B. Project: P160245. US$140.0 (IBRD). Consultants will be required. Ministry of Agriculture and Water Resources and Fishing (MARHF). Tunisia - Northern Tunis Wastewater Project Additional Financing: The project development objective is to provide an environmentally safe disposal system for the treated wastewater in the North of Tunis, and increase availability for its reuse in the Project Area. Approval completed on 31 August 2016. Environmental Assessment Category A. Project: P154713. US$18.0 (IBRD). No consultants are required. Implementing agency(ies) to be determined. Tunisia Water Sector Reform Project: Objective to be Determined. To improve SONEDE's performance and to support the implementation of the National Water Security Investment Program (NWSIP). To improve SONEDE's performance and to support the implementation of the National Water Security Investment Program (NWSIP). To improve SONEDE's perfor- mance and to support the implementation of the National Water Security Investment Program ( NWSIP). To improve SONEDE's performance and to support the implementation of the National Water Security Investment Program (NWSIP). To improve SONEDE's performance and to support the implementation of the National Water Security Investment Program (NWSIP). To improve SONEDE's performance and to support the implementation of the National Water Security Investment Program ( NWSIP). To improve SONEDE's performance and to support the implementation of the National Water Security Investment Program (NWSIP). To improve SONEDE's performance and to support the implementation of the National Water Security Investment Program (NWSIP). Identification completed on 21 November 2016. Environmental Assessment Category B. US$150.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. West Bank and Gaza Education Education to Work Transition Project Additional Financing: The Education to Work Transition Project seeks to improve education to work transition of young Palestinians attending participating tertiary education institutions (TEIs) by: (i) fostering partnerships between TEIs and employers in order to make TEIs’ study programs more relevant to the needs of the labor market; and (ii) enhancing the capacity of the MOEHE and TEIs to collect, analyze and disseminate data collected through the TEIs’ graduate tracking system to monitor the outcomes of TEIs’ study programs, and to inform education policy July 2018 Middle East And North Africa PAGE 134 formulation and implementation. Approval completed on 2 December 2016. Environmental Assessment Category C. Project: P158951. US$ 5.0 (SPF). No consultants are required. Ministry of Education and Higher Education. (N) Improving Early Childhood Development in the West Bank and Gaza: Improve access and quality of early childhood development in the West Bank and Gaza. Identification completed on 30 July 2018. US$ 9.0 (SPF). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives Gaza Emergency Response for Electricity Network Rehabilitation (AF): The Project objective is to restore and im- prove basic electricity services in Gaza. Approval completed on 30 October 2014. Environmental Assessment Category B. Project: P152411. US$ 15.0 (SPF). Consultants will be required. Palestinian Energy and Natural Resources Authority (PENRA) Tel: 97097222986192, E-mail: chairman@menr.org, Contact: Harry Kuma, Secretary of Finance. Finance, Competitiveness and Innovation (R) Finance for Jobs II Additional Financing: To test the effectiveness of selected financial interventions in incentiviz- ing private sector investment and job creation. Negotiations authorized on 12 July 2018. Environmental Assessment Category B. Project: P167675. US$ 5.0 (SPF). Consultants will be required. Ministry of Finance and Planning; Project Implementing Agency (DAI). Innovative Private Sector Development: To improve economic opportunities for individuals and firms in the West Bank and Gaza. Approval completed on 1 June 2018. Environmental Assessment Category C. Project: P164412. US$ 13.0 (SPF). Consulting services to be determined. Ministry of National Economy through a private sector implementing agency. Governance Public Financial Management Improvement Project: The Project Development Objective (PDO) is to enhance the expenditure controls, financial accountability and procurement management of the Palestinian Authority. Approval completed on 1 June 2018. Environmental Assessment Category C. Project: P162850. US$ 3.0/0.5 (SPF/WBGF). Consulting services to be determined. Ministry of Finance and Planning. Social Protection & Labor (R) Gaza Emergency Cash for Work and Self-Employment Support: To provide target youth in Gaza with short- term income support and increased access to internet-enabled self-employment opportunities Negotiations authorized on 16 July 2018. Environmental Assessment Category C. Project: P167726. US$ 17.0 (SPF). Consultants will be required. NGO De- velopment Center (NDC). Social, Urban, Rural and Resilience Global Practice GZ-Second Municipal Development Project AF: The PDO is "to improve the Recipient's municipal management prac- tices for better municipal transparency and service delivery, and to restore priority municipal services following the conflict in Gaza". Approval completed on 22 March 2016. Environmental Assessment Category B. Project: P155268. US$ 6.9 (PWUD). Consultants will be required. Implementing agency(ies) to be determined. Water Water Security Development Program: 13.The proposed Program Development Objective is increasing access to im- proved quality and efficiency of water supply and wastewater services provision and strengthening the capacity of the selected water sector institutions at the national and local levels PAGE 135 Monthly Operational Summary July 2018 14.The WSDP is aligned with the SDP objective and will support achieving its proposed targets by improving the water security. The WSDP will support Gaza (improving access to improved water and sanitation services) and West Bank (utility manage- ment services and sustainability). The WSDP will also support the national level institutional capacity (Palestinian Water Au- thority (PWA) and Water Sector Regulatory Council (WSRC) to improve business planning and operational performance of the water sector, and, water resource management. The WSDP strongly support the PA’s priority in addressing the Palestinian water crisis, particularly in Gaza, and securing water for the people. The Bank’s comparative advantage will focus on the insti- tutional and economic elements while at the same time supporting investments that improves access to water. Concept com- pleted on 31 March 2017. Environmental Assessment Category A. Project: P158615. US$ 11.9/16.0/15.0 (FRDE/PWUD/SPF). Consulting services to be determined. Palestinian Water Authority. Yemen, Republic of Education Restoring Education and Learning: The proposed project development objective is to restore the delivery of basic edu- cation services in selected areas affected by the conflict. Identification completed on 9 November 2017. US$ 500.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population Yemen Emergency Health and Nutrition Project Second Additional Financing: To contribute to the provision of basic health, essential nutrition, water and sanitation services for the benefit of the population of the Republic of Yemen. Approval completed on 25 August 2017. Environmental Assessment Category B. Project: P164466. US$ 200.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Yemen Emergency Health Sector Support and Reconstruction Project: To support the accessibility and the provi- sion of a minimum integrated package of health and nutrition services to the people of Yemen. Identification completed on 19 March 2018. US$ 200.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Social Protection & Labor Emergency Crisis Response Project Additional Financing: The Project Development Objective is to provide short- term employment and access to selected basic services to the most vulnerable; and preserve existing implementation capacity of two service delivery programs. Approval completed on 17 January 2017. Environmental Assessment Category B. Project: P161806. US$ 250.0 (IDA Grant). No consultants are required. United Nations Development Program. Yemen Emergency Crisis Response Project - Second Additional Financing: The Project Development Objective is to provide short-term employment and access to selected basic services to the most vulnerable; preserve existing implemen- tation capacity of two service delivery programs; and provide emergency cash transfers to the poor and vulnerable in response to the food crisis. Approval completed on 19 May 2017. Environmental Assessment Category B. Project: P163729. US$ 75.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Yemen Emergency Crisis Response Project - Third Additional Financing: The Project Development Objective is to provide short-term employment and access to selected basic services to the most vulnerable; preserve existing implementation capacity of two service delivery programs; and provide emergency cash transfers to the poor and vulnerable in response to the food crisis. Identification completed on 28 June 2017. Environmental Assessment Category B. US$ 400.0 (IDA Grant). Con- sulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development Yemen Transport Rehabilitation and Infrastructure Project: The Project Development Objective is to restore transport connectivity to enable and improve mobility, and delivery and access to emergency relief, social services, markets and jobs. Identification completed on 9 November 2017. Environmental Assessment Category B. Consulting services to be determined. Implementing agency(ies) to be determined. July 2018 South Asia Region PAGE 136 South Asia Afghanistan Agriculture National Horticulture and Livestock Project (NHLP) - Additional Financing: To promote adoption of improved production practices by target farmers, with gradual rollout of farmer-centric agricultural services systems and investment support. Service delivery centered on farmers will promote in practice increased participation of beneficiaries both in defining the type of services required and in the delivery itself. The project would also promote improved ratio of overall costs reaching benefi- ciaries as direct investments. The aim is thus to promote sustainability, effectiveness and efficiency. Approval completed on 29 June 2016. Environmental Assessment Category B. Project: P157997. US$ 90.0 (ARTF). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Second Additional Financing for the Afghanistan Rural Enterprise Development Project: Increased income and sustainable employment opportunities for men and women through supported rural enterprises. Approval completed on 21 November 2017. Environmental Assessment Category B. Project: P163525. US$ 5.0 (ARTF). Consultants will be required. Implementing agency(ies) to be determined. Women's Economic Empowerment Rural Development Project: To increase social and economic empowerment of poor rural women in selected communities. Concept completed on 19 February 2018. Environmental Assessment Category B. Project: P164443. US$ 25.0/75.0 (IDA Grant/ARTF). Consultants will be required. Ministry of Rural Rehabilitation and De- velopment. Education Additional Financing for the Higher Education Development Project: Objective to be Determined. Identification completed on 13 April 2017. Environmental Assessment Category B. US$ 5.0 (ARTF). Consulting services to be determined. Implementing agency(ies) to be determined. (R) EQRA: The Project Development Objectives (PDO) are “to increase equitable access to primary and secondary education, particularly for girls, in selected lagging provinces, and to improve learning conditions in Afghanistanâ€?. Appraisal completed on 16 July 2018. Environmental Assessment Category B. Project: P159378. US$ 100.0/100.0/98.0 (IDA Grant/ARTF/FTIE). Consultants will be required. Ministry of Education. Energy & Extractives Sheberghan Gas to Power Project: The Development Objective is (i) to increase the amount of reliable electricity gener- ated in Afghanistan and (ii) to build a track record for the country in developing and implementing PPP transactions. Identi- fication completed on 22 December 2017. Consulting services to be determined. Implementing agency(ies) to be determined. Kajaki Electrification and Benefit Sharing Support Project: To Provide Access to Electricity to the People in Helmand and Kandahar Province. Identification completed on 11 September 2017. Environmental Assessment Category B. US$ 30.0 (IDA Grant). Consulting services to be determined. Implementing agency(ies) to be determined. Afghanistan Power System Development Project Additional Financing: The development objective of the project is to increase the number of electricity connections for the urban centers of Charikar, Gulbahar and Jabul-es-Seraj and Pul-e- Khumri and to improve the availability of power from Naghlu and Mahipar switchyards. Approval completed on 7 July 2015. PAGE 137 Monthly Operational Summary July 2018 Environmental Assessment Category B. Project: P152975. US$ 15.0 (ARTF). Consultants will be required. Implementing agency(ies) to be determined. Afghanistan: Extractives for Development Project: To assist the GoIRA to implement extractives sector reforms and operationalize mining and gas sector development opportunities Concept completed on 1 December 2016. Environmental Assessment Category B. Project: P159402. US$ 23.0/9.0 (IDA Grant/ARTF). Consulting services to be determined. Ministry of Mines and Petroleum; Ministry of Information and Culture; Afghanistan EITI Secretariat, Ministry of Finance. Mazar-e-Sharif Gas-to-Power Project: Objective to be Determined. Identification completed on 28 October 2015. Envi- ronmental Assessment Category A. Project: P157827. US$ 25.0/45.0 (GUID/ZPCI). Consulting services to be determined. Implementing agency(ies) to be determined. Central Asia South Asia Electricity and Trade Project Addl. Financing: Objective to be Determined. Identification completed on 27 June 2016. Environmental Assessment Category A. Consulting services to be determined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation Financial Sector Rapid Response - Additional Financing: To assist DAB to develop action plans for improved banking supervision and to establish key building blocks of financial sector infrastructure: payment system, movable collateral registry, and public credit registry. Approval completed on 27 October 2016. Environmental Assessment Category C. Project: P160073. US$ 20.0 (IDA Grant). Consultants will be required. Implementing agency(ies) to be determined. Additional Financing to Financial Sector Rapid Response Project: This project is to assist DAB to improve its core function of banking supervision and regulation, and to help improve access to formal banking services by establishing key initial building blocks for further financial sector reform. Over its five-year implementation period, FSSP aims to strengthening DAB's capacity through: (i) strengthening of the off-site supervisory functions of DAB, (ii) strengthening of DAB's accounting and internal audit capabilities, and (iii) establishment of an effective human resource management system, and (iv) develop- ment of an effective information technology system. The project also assists in developing financial sector infrastructure through: (i) establishment of a Public Credit Registry, (ii) establishment of a Collateral Registry, and (iii) supporting the phys- ical development of the Afghanistan Institute of Banking and Finance (AIBF). Approval completed on 26 November 2013. Environmental Assessment Category C. US$ 6.7 (IDA Grant). Consulting services to be determined. Ministry of Finance, E- mail: maqa2005@yahoo.com, Contact: Adris Walli, Aide Coordination Specialist; Da Afghanistan Bank Tel: (93-79) 722-3340, E-mail: zalmei.sherzad@centralbank.gov.af, Contact: Zalmie Sherzad, Project Director. Governance Tackling Afghanistan’s Government HRM and Institutional Reforms: To contribute to the professionalization of the Afghan Civil Service through support to human resource management and institutional reform. Concept completed on 23 April 2018. Environmental Assessment Category C. Project: P166978. US$ 25.0/75.0 (IDA Grant/ARTF). Consultants will be required. Independent Administrative Reform and Civil Service Commission. (N) Afghanistan: Fiscal Stability Facility: Support the reinforcement of the fiscal stability regime in Afghanistan through better expenditure management and financing of eligible recurrent expenditure. Identification completed on 19 July 2018. US$ 300.0 (ARTF). Consulting services to be determined. Implementing agency(ies) to be determined. Second Public Financial Management Reform Project (PFMRP II) - Additional Financing: To further strengthen the efficiency and effectiveness of Afghanistan’s procurement, treasury, and audit systems. Approval completed on 10 Febru- ary 2016. Environmental Assessment Category C. Project: P150632. US$ 41.1 (ARTF). Consulting services to be determined. Implementing agency(ies) to be determined. Health, Nutrition & Population SEHAT Additional Financing: The proposed AF to the SEHAT project (P129663) will finance the delivery of the Basic Package of Health Services (BPHS) and Essential Package of Hospital Services (EPHS) in the 13 provinces currently supported by USAID. As outlined in its 2/2/14 letter, USAID intends to provide an estimated total program contribution to ARTF in the July 2018 South Asia Region PAGE 138 amount of US$ 227.6 million for the 5 year SEHAT program. In addition to supporting BPHS and EPHS (SEHAT component 1), the USAID contribution will support the provision of technical assistance to strengthen the stewardship capacity of MOPH and program management activities, (SEHAT components 2 and 3, respectively). Approval completed on 25 May 2015. Envi- ronmental Assessment Category B. Project: P152122. US$ 248.0 (ARTF). Consulting services to be determined. Implementing agency(ies) to be determined. Social Protection & Labor Afghanistan Placing Labor Abroad, Connecting to Employment Domestically and Addressing the Needs of Youth: To improve economic and social inclusion and to improve human capital through (i) managed labor migration, (ii) improved domestic labor market intermediation services, and (iii) facilitated training and grants for youth initiated develop- ment activities. Identification completed on 3 October 2016. Environmental Assessment Category B. US$ 40.0/10.0 (IDA Grant/ARTF). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Cities Investment Program: The Program Development Objective (PrDO) is to (i) establish a viable and sustainable system for municipal investment planning and finance in Afghanistan; and (ii) improve municipal service provision in participating Provincial Capital Cities (PCCs). The Project Development Objective (PDO) for the first in a Series of Projects (SOP I) is to a pilot municipal investment plan- ning and management performance improvement systems towards strengthening municipal service provision in participating PCCs. Identification completed on 16 June 2016. Environmental Assessment Category B. US$ 25.0/25.0 (IDA Grant/ARTF). Consulting services to be determined. Implementing agency(ies) to be determined. Citizens' Charter Afghanistan Project - Emergency Regional Displacement Response Additional Financing: The Project Development Objective for the Citizens Charter Afghanistan Project is to improve the delivery of core infrastruc- ture, emergency support, and social services to participating communities through strengthened Community Development Councils (CDCs). Approval completed on 13 June 2017. Environmental Assessment Category B. Project: P163468. US$ 85.8/44.3 (IDA Grant/ARTF). Consultants will be required. Implementing agency(ies) to be determined. Afghanistan: Eshteghal Zaiee - Karmondena (EZ-Kar): The proposed Project Development Objective is to improve the economic integration of Afghan returnees, internally displaced people and host communities through investments, incen- tives, and reforms that will improve economic opportunities in participating cities. Concept completed on 4 June 2018. Environmental Assessment Category B. Project: P166127. US$ 150.0/50.0 (IDA Grant/ARTF). Consultants will be required. Ministry of Economy. Afghanistan Land Administration System Project: The Project Development Objective (PDO) is to support the devel- opment of the Afghanistan land administration system and build the capacity of ARAZI to deliver land administration services. Concept completed on 29 January 2018. Environmental Assessment Category B. Project: P164762. US$ 30.0 (IDA Grant). Consultants will be required. AFGHANISTAN INDEPENDENT LAND AUTHORITY-- ARAZI. Third National Solidarity Project: To build, strengthen, and maintain Community Development Councils (CDCs) as ef- fective institutions for local governance and social-economic development. Approval completed on 29 June 2016. Environ- mental Assessment Category B. Project: P159307. US$ 57.3 (ARTF). Consultants will be required. Implementing agency(ies) to be determined. Trade & Competitiveness PAGE 139 Monthly Operational Summary July 2018 ADDITIONAL FINANCING FOR SECOND CUSTOMS REFORM AND TRADE FACILITATION PROJECT: To improve the release of legitimate goods in a fair and efficient manner. Approval completed on 11 June 2015. Environmental Assessment Category B. Project: P155443. US$ 21.5 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Transport & Digital Development Additional financing for Afghanistan Rural Access Project: The PDO is to enable (a) rural communities to benefit from all-season road access to basic services and facilities and (b) an early emergency response in the event of an eligible crisis or emergency. Approval completed on 13 June 2017. Environmental Assessment Category B. US$ 105.0 (ARTF). Consultants will be required. Implementing agency(ies) to be determined. Water Kabul Water Supply Improvement Project: The Project Development Objectives are to improve quality and quantity of water supplied to selected areas in Kabul; and improve the operational performance of Afghanistan Urban Water Supply and Sewerage Corporation (AUWSSC). Identification completed on 28 July 2017. Environmental Assessment Category A. US$ 75.0/25.0 (IDA Grant/ARTF). Consulting services to be determined. Implementing agency(ies) to be determined. AF Additional Financing: Irrigation Restoration and Development: Improve access to irrigation in targeted areas and strengthen capacity for water resources management. Approval completed on 23 May 2016. Environmental Assessment Category A. Project: P152892. US$ 70.0 (ARTF). Consulting services to be determined. Implementing agency(ies) to be deter- mined. Bangladesh Agriculture National Agricultural Technology Project - Additional Financing: The United States Agency for International De- velopment (USAID) has proposed to provide a grant to improve agricultural productivity and farm incomes in the country through research into appropriate technology, increased adoption of low risk-high reward technologies in marginalized areas, and fostering farmers’ links to markets. The project will build on the lessons learned and good practices developed in the World Bank financed Bangladesh National Agricultural Technology Project and the Bangladesh Integrated Agricultural Productivity Project. Approval completed on 4 March 2014. Environmental Assessment Category B. Project: P133251. US$ 23.7 (FSCO). Consultants will be required. Minis- try of Agriculture (MOA), Contact: S.M. Nazmul Islam, Secretary in charge. Climate-Smart Agriculture and Water Management Project: To enhance climate resilience and productivity of irri- gated agriculture in targeted schemes Negotiations authorized on 22 February 2018. Environmental Assessment Category B. Project: P161534. US$ 120.0 (IDA Credit). Consultants will be required. Bangladesh Water Development Board; Department of Agricultural Extension; Department of Fisheries. (R) Livestock and Dairy Development Project: The project development objective is to improve productivity, market access, and resilience of small-holder farmers and agro-entrepreneurs operating in selected livestock value chains in target areas. Negotiations authorized on 15 July 2018. Environmental Assessment Category B. Project: P161246. US$ 500.0 (IDA Credit). Consultants will be required. Department of Livestock Services. Education AF Bangladesh - Primary Education Development Program III: Additional Financing (AF) in the amount of US$400 million to scale up the Bangladesh Third Primary Education Development Program (PEDP3: P150669). In addition, Level 2 Restructuring comprising: (i) modification of the project scope of work; (ii) revision of the results framework to measure the outcomes associated with the revised scope of work; and (iii) extension of the project closing date from December 31, 2015 to December 31, 2017. The Project Development Objective in the proposed AF operation will remain unchanged and will continue July 2018 South Asia Region PAGE 140 to be to: “(i) increase participation and reduce social disparities in primary education, (ii) increase the number of childre n completing primary and improve the quality of the learning environment and measurement of student learning, and (iii) im- prove effectiveness of resource use for primary education.â€? The proposed Additional Financing would help to finance the cost of the scale-up activities and subsequent restructuring of the project to respond effectively to changes in the Bangladesh pri- mary education sector due to ongoing nationalization of the previous "Registered Non-Government Primary Schools" (RNGPS), scale-up and expansion of interventions of the original PEDP3 project in order to implement a further set of reforms by 2017; and join government’s efforts towards achieving universal primary education specifically by improving scaled up efforts targeting the remaining, hardest-to-reach population groups to overcome the barriers to education for those still out of school, while also tackling emerging concerns related to the quality of learning (such as low teacher-student contact hours of instruction in schools). The original project is well performing, and the recent Mid-Term Review (MTR) rates the progress towards development objectives and implementation satisfactory. Approval completed on 16 December 2014. Environmental Assessment Category B. Project: P150669. US$ 400.0 (IDA Credit). Consultants will be required. Directorate of Primary Ed- ucation, Contact: .. Additional Financing: Skills and Training Enhancement Project: The Additional Financing will support the original four components of the Skills and Training Enhancement Project to further contribute towards scaling up ongoing institutional grants to additional public and private institutions to meet the ongoing demand and to fill in the funding gap in the stipend activities. Following are the components under the Additional Financing: Component 1: Improve the Quality and Relevance of Training This component will be implemented through two (2) windows. Window I will support selected additional private institutions offering diploma level programs. These institutions will be chosen on the basis of well-defined eligibility and se- lection criteria. Window II will support selected additional institutions providing short-term vocational and technical training. These institutions will be chosen based on similar eligibility and selection criteria employed under Window I. Component 2 - Pilots in Technical and Vocational Education and Training Developing pilot activities aimed at strengthening the overall tech- nical and vocational educational training system: Supporting Industry Skills Councils (ISC) and the National Skills Develop- ment Council (NSDC) by providing a grant financing and operational cost support to finance establishment of specific offices to about two to four ISCs and NSDC who will guide the overall regulatory and legislative framework for Vocational Education and Training and skills development. Component 3 - Institutional Capacity Development Strengthening the capacity of the Recipient in managing the TVET sector as a whole by way of institutional capacity development of the Directorate of Technical Education (DTE), the Bangladesh Technical Education Board (BTEB) under the Ministry of Education (MoE), and the Bureau of Manpower Employment and Training (BMET) under the Ministry of Expatriate Welfare and Overseas Employment (MOEWOE). (RPL) program. Component 4 - Project Management, Communications, Monitoring and Evaluation Support for project management, monitoring and evaluation of Project progress and outcomes. Approval completed on 26 September 2013. Environmental Assessment Category B. US$ 16.7 (FSSA). Consulting services to be determined. Ministry of Education Tel: (88-02) 911-0664, E-mail: techedu09@gmail.com, Contact: Directorate of Technical Education, Director General. BD Higher Education Quality Enhancement Project - AF: The Higher Education Quality Enhancement Project (HEQEP) was approved in March 2009 and the main objective of the project is to improve the quality and relevance of the teaching and research environment in higher education institution through encouraging both innovation and accountability within universities and by enhancing the technical and institutional capacity of the higher education sector. Additional Fi- nancing has been proposed to fill the funding gap to effectively complete the agreed project activities; expansion of project interventions in order to scale up project impact and development effectiveness is warranted based on the likelihood of achiev- ing project objective and strong project performance. The following components/activities have been proposed with additional financing of US$60.0 million: (i) Component 1: Promoting Academic Innovation; (ii) Component 2: Building Institutional Capacity of Tertiary Education Sector; (iii) Component 3: Raising the Connectivity Capacity in the Higher Education Sector (BdREN & Digital Library); (iv) Component 4: Establishment of Quality Assurance Mechanism; and (v) Component 5: Project Management and Monitoring and Evaluation. Component 1: Promoting Academic Innovation Sub-Component 1.1 - Financing to cover the shortage of funds for the 1st and 2nd rounds AIF . The additional financing will provide funds for the first and second rounds AIF sub-projects which are under implementation. The shortage was created when the Project needed to tem- porarily reallocate the funds to the BdREN activities under Component 3 during the restructuring. Sub-Component1.2 - Third round of AIF The AIF will allocate its resources through three competitive windows: (i) improvement of teaching and learning; (ii) enhancement of research capabilities; and (iii) university-wide innovations which include campus network In order to place additional emphasis on innovation for teaching and learning (Window 1) and research (Window 2), selection criteria will be modified. Established proposal evaluation process will be followed with minor modifications based on the lessons learned from the first and second rounds AIF which will be reflected in a revised AIF Operations Manual. Component 2: Building Institutional Capacity of Tertiary Education Sector This component aims to further strengthen the capacity of UGC, MOE and Higher Education Institutions for the future development of the sector. To this end, the project will support the policy for- mation based on the studied carried out under the original project. Component 3: Raising the Connectivity Capacity of the PAGE 141 Monthly Operational Summary July 2018 Higher Education Sector Sub-component 3.1: Strengthening BdREN connectivity: Basic connectivity through overhead dark fibre would be established by December 2013. To use the full potential of the connectivity campus network would be estab- lished for the remaining 20 public universities. In addition, VC facilities using the BdREN connectivity could be established in the Ministry of Education, ERD, and Planning Commission. Provisions would be made available for add-on software in- cluding cloud-computing and equipment for performance enhancement. Sub-component 3.2: Awareness building and knowledge exchange: Awareness raising and knowledge exchanges on best practice for the ownership, governance and exploi- tation of an NREN for the stakeholders of BdREN. The exchange programs could include: (a) Policy level knowledge exchange among the "South" and "North" countries; (b) academic and technical level knowledge exchange with the neighboring coun- tries in Asia Pacific mainly on grid computing, climate modeling, medical imaging etc. Sub-component 3.3: Capacity building (technical and financial management): Additional staffing and technical training of IT personnel at network and campus level - Local training programs for university IT staff on campus networking in association with international providers to create a national capacity to provide such training. A system of scholarships/fellowship or international placements would be provided for specialist training of IT personnel in campus networking with the aim of building a training team for the country. Sub- component 3.4: Application development to maximize the utilization of BdREN: Additional support would be necessary for ensuring (a) enhancement of digital library access, (b) partnership with regional and continental RENs, and (c) utilization "pump-priming" activities in (1) education, (2) research collaboration, and (c) campus safety. Component 4: Establishment of Quality Assurance Mechanism To build on the momentum generated under the first two rounds of AIF and the recent efforts made in developing a national quality assurance mechanism, the Project would support the following activities with the pro- posed additional financing: (i) establishment of Quality Assurance and Accreditation Council of Bangladesh (QAAC); and (ii) establishment of Institutional Quality Assurance Cells (IQAC). Sub-component 4.1: Establishment Quality Assurance and Ac- creditation Council of Bangladesh The objective of this sub-component is to provide funds for the establishment of Quality Assurance and Accreditation Council of Bangladesh and the development of Regulations, Qualification Framework, and Qual- ity Assurance Manual. Additional funds will be also provided for awareness campaigns and necessary capacity building activ- ities. Sub-component 4.2: Establishment of Institutional Quality Assurance Cells The Fund will finance the establishment and operation of (i) Institutional Quality Assurance Cells (IQACs); (ii) establishment of institutional data collection and analysis mechanism for systematic collecting, processing and dissemination of reliable data concerning higher education quality as- surance as well as graduates' performance in the labor market, (iii) preparation of self-assessment, process facilitation and necessary training, external peer reviewers' visits, and preparation and implementation of Institutional Improvement Plan. Details of the implementation mechanism for this Fund will be laid out in the Operations Manual. Component 5: Project Management and Monitoring and Evaluation The objective of this component is to ensure proper implementation, manage- ment, and monitoring and evaluation of scaled up activities under the project. It would comprise two sub-components, aiming to reach this objective namely: (i) project management; and (ii) monitoring and evaluation. Approval completed on 3 Decem- ber 2013. Environmental Assessment Category B. Project: P145749. US$ 125.0 (IDA Credit). Consulting services to be deter- mined. University Grants Commission of Bangladesh Tel: (88-02) 818-1631, E-mail: chairmanugc@yahoo.com, Contact: Uni- versity Grants Commission, Chairman. Additional Financing Skills and Training Enhancement Project: The project development objective is to strengthen selected public and private training institutions to improve training quality and employability of trainees, including those from disadvantaged socioeconomic backgrounds. Approval completed on 30 October 2015. Environmental Assessment Category B. Project: P155389. US$ 100.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Transforming Secondary Education for Results Operation: Objective to be Determined. Approval completed on 18 December 2017. Environmental Assessment Category B. Project: P160943. US$ 510.0/10.0 (IDA Credit/GFF). Consulting services to be determined. Ministry of Education. (R) Additional Financing for Reaching Out of School Children II: The key project development objective is to im- prove equitable access, retention and completion in quality primary education for out-of-school children in selected under- served areas. Negotiations authorized on 25 July 2018. Environmental Assessment Category B. US$ 4.2/20.8 (IDA Credit/IDA Grant). Consultants will be required. Ministry of Primary and Mass Education (MoPME). Secondary Education Quality and Access Enhancement Project - AF: The Project Development Objective in the proposed AF operation will remain unchanged and will continue to be "to improve the quality of secondary education, system- atically monitor learning outcomes, and to increase access and equity in project upazilas". The four project components will be the same as in the original project. The proposed AF would: (i) support the implementation of the expanded project activi- ties (across more schools and students within SEQAEP upazilas) to deepen the impact of a well-performing project; (ii) allow adequate time for MOE to evaluate and institutionalize successful interventions from the ongoing project under a more har- monized secondary education sector program that GOB is planning to initiate by early 2017; and (iii) initiate replication of July 2018 South Asia Region PAGE 142 successful activities beyond 125 SEQAEP upazilas in a phased manner for a smoother institutionalization of SEQAEP inter- ventions. The AF would also extend the Closing Date of the current SEQAEP project from June 30, 2014 to December 31, 2016 in order to carry out the proposed activities. Approval completed on 3 December 2013. Environmental Assessment Category B. US$ 265.0 (IDA Credit). Consultants will be required. Ministry of Education, E-mail: seqaep@bdcom.net, Contact: Min- istry of Education, Project Director, SEQAEP Project. Energy & Extractives Additional Financing II for Rural Electrification and Renewable Energy Development II: Increase access to clean energy through renewable energy in rural areas. Approval completed on 10 April 2018. Environmental Assessment Category B. Project: P165400. US$ 55.0 (IDA Credit). Consultants will be required. Power Cell; Infrastructure Development Company Limited (IDCOL). RERED II Additional Financing: To increase access to clean energy in rural areas through renewable energy. Approval completed on 19 June 2014. Environmental Assessment Category B. Project: P150001. US$ 48.4/30.0/15.0 (IDA Credit/IDA Grant/GPBA). Consultants will be required. Power Cell, Contact: Mr. Mohammad Hossain, Director General; Infrastructure Development Company Limited Tel: (880-2) 910-2171, E-mail: mmalik@idcol.org, Contact: Mr. Mahmood Malik, Executive Director and CEO. Bangladesh Scaling-up Renewable Energy Project: The Project Development Objective is to increase installed gener- ation capacity of, and mobilize financing for, renewable energy in Bangladesh. Identification completed on 15 September 2016. Environmental Assessment Category B. US$ 156.0/26.4/2.9/58.0 (IDA Credit/CSCC/CSCF/ZBIL). Consulting services to be determined. Infrastructure Development Company Limited (IDCOL); Sustainable and Renewable Energy Development Au- thority (SREDA); Electricity Generation Company of Bangladesh (EGCB). Environment & Natural Resources Bangladesh Sustainable Coastal and Marine Fisheries: The proposed Program Goal is to increase coastal and marine fisheries’ contribution to the economy, poverty reduction, and environmental stability. The proposed PDO is to improve man- agement of coastal and marine fisheries and aquaculture. Negotiations authorized on 22 May 2018. Environmental Assess- ment Category B. Project: P161568. US$ 240.0 (IDA Credit). Consultants will be required. Ministry of Fisheries and Livestock, Department of Fisheries. Clean Air and Sustainable Environment Project - Additional Financing: To improve air quality and safe mobility in Dhaka through the implementation of demonstration initiatives in urban transport and brick making Approval completed on 13 January 2017. Environmental Assessment Category B. Project: P160014. US$ 35.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Sustainable Forests & Livelihoods (SUFAL) Project: To improve collaborative forest management and increase access to alternative income generation activities for forest-dependent people in targeted sites. Concept completed on 3 August 2017. Environmental Assessment Category B. Project: P161996. US$ 175.0 (IDA Credit). Consultants will be required. Bangladesh Forest Department (BFD). Finance, Competitiveness and Innovation Private Sector Development Support Project Additional Financing: Facilitate private investment and job creation and promote compliance with international quality standards, building codes, and good social and environmental practices in economic zones supported by PSDSP. Approval completed on 5 April 2016. Environmental Assessment Category A. Project: P156242. US$ 130.0 (IDA Credit). Consultants will be required. People's Republic of Bangladesh; Economic Relations Division (ERD). Modernization of State-Owned Financial Institutions Project: The proposed project development objective is to con- PAGE 143 Monthly Operational Summary July 2018 tribute to the modernization, transparency and efficiency of state-owned banks. Approval completed on 30 June 2016. Envi- ronmental Assessment Category C. Project: P155363. US$ 150.0 (IDA Credit). Consultants will be required. BFID, Contact: Mr. Md. Eunusur Rahman, Secretary; PEOPLE'S REPUBLIC OF BANGLADESH, Contact: Md. Eunusur Rahman, Secretary. Governance (R) Bangladesh Strengthening PFM Program for Enhanced Service Delivery: The Program Development Objective (PDO) is to improve fiscal forecasting, budget preparation and execution, financial reporting and transparency of the central government. Concept completed on 11 July 2018. Project: P167491. US$ 100.0 (IDA Credit). No consultants are required. Ministry of Finance. Second Additional Financing to Public Procurement Reform Project II: The Project Development Objective (PDO) is to improve performance of the public procurement system progressively in Bangladesh, focusing largely on the target agen- cies. The PDO would be achieved by strengthening the ongoing reform process and moving it further along with the following outputs: (i) enhanced capacity in creating a sustained program to develop skilled procurement professionals, (ii) strengthened management and monitoring of procurement in target agencies, (iii) introduction of e-government procurement in CPTU and the target agencies on a pilot basis, and (iv) creation of greater public awareness of a well functioning public procurement system by engaging civil society, think tanks, beneficiaries, and the private sector. All these actions are key elements in effec- tive implementation of the procurement law/ regulations. Approval completed on 6 June 2016. Environmental Assessment Category C. Project: P158783. US$ 10.0 (IDA Credit). Consulting services to be determined. People's Republic of Bangladesh, Contact: Md. Faruque Hossain, Director General; Economic Relations Division Tel: 88029180675, E-mail: ksazam@gmail.com, Contact: Kazi Shofiqul Azam, Additional Secretary. Health, Nutrition & Population Additional Financing for Health Sector Support Project: The Project Development Objective (PDO) is to strengthen the health, nutrition and population (HNP) sector's core management systems and delivery of essential HNP services with a focus on selected geographical areas. Approval completed on 28 June 2018. Environmental Assessment Category B. Project: P167672. US$ 8.0/42.0 (IDA Credit/IDA Grant). No consultants are required. Ministry of Health and Family Welfare. HSDP Additional Finance: To enable the Government of Bangladesh to strengthen health systems and improve health services, particularly for the poor. Approval completed on 24 June 2016. Environmental Assessment Category B. Project: P151070. US$ 150.0 (IDA Credit). No consultants are required. Ministry of Health and Family Welfare. Social Protection & Labor Safety Net Systems for the Poorest (Additional Financing): The Objective of the Project is to improve the equity, efficiency and transparency of major Safety Net Programs to benefit the poorest households. Approval completed on 15 De- cember 2017. Environmental Assessment Category B. Project: P163677. US$ 245.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Cash Transfer Modernization Project: The Project Development Objective is to improve the transparency and efficiency of selected cash transfer programs for vulnerable populations by modernizing service delivery. Approval completed on 31 Jan- uary 2018. Environmental Assessment Category B. Project: P160819. US$ 300.0 (IDA Credit). Consultants will be required. Department of Social Services. Social, Urban, Rural and Resilience Global Practice Emergency Multi-Sector Rohingya Crisis Response Project: To strengthen the Government of Bangladesh systems to improve access to basic services and build disaster and social resilience of the displaced Rohingya population. Identification completed on 26 May 2018. Environmental Assessment Category B. US$ 165.0 (IDA Grant). Consulting services to be deter- mined. Implementing agency(ies) to be determined. (R) Dhaka City Neighborhood Upgrading Project: To enhance public spaces and improve urban services in selected neighborhoods in Dhaka. Negotiations authorized on 31 July 2018. Environmental Assessment Category B. Project: P165477. US$ 100.5 (IDA Credit). Consultants will be required. Dhaka South City Corporation. July 2018 South Asia Region PAGE 144 Emergency 2007 Cyclone Recovery and Restoration Project-- AF II: The primary rationale for the proposed Addi- tional Financing is for IDA to continue its support to the Government of Bangladesh for improving and strengthening critical disaster prevention infrastructure in the coastal areas of Bangladesh. At the time of Cyclone Sidr, damages were estimated at US$1.2 billion, with significant needs in the further strengthening of coastal embankments as well as the rehabilitation and construction of improved multi-purpose cyclone shelters. The additional financing would be primarily used to: (a) meet the financing gap of about of about US$4.2 million that exist since the inception of the project and also a gap created due to exchange rate between SDRs to USD (about USD 6.2 Million are lost at this stage); and (b) to scale up the construction and rehabilitation of critical infrastructure in particular the disaster shelters in the coastal areas. In addition, part of the proposed credit would be used to carry out necessary repairs/improvement to about ten polders. Approval completed on 30 December 2013. Environmental Assessment Category B. Project: P146500. US$ 140.0 (IDA Credit). Consulting services to be deter- mined. Ministry of Disaster and Relief Tel: (880-18) 1911-7754, E-mail: cms@dmb.gov.bd, Contact: Syed Ashraful Islam, Com- munication Media Specialist. Transport & Digital Development Dhaka Public Transport Improvement Project: The proposed project development objective is to enhance the accessi- bility, efficiency, and safety of transportation in one of the main public transport corridors of Dhaka and improve its connec- tivity with surrounding areas. Concept completed on 17 May 2018. Environmental Assessment Category A. Project: P166435. US$ 475.0 (IDA Credit). Consultants will be required. Roads and Highways Department (RHD); Dhaka North City Corporation (DNCC); Road Transport and Highways Division (RTHD); Bangladesh Police (BP). (R) Operation for Supporting Rural Bridges (SupRB): Objective to be Determined. Negotiations authorized on 16 July 2018. Environmental Assessment Category B. Project: P161928. US$ 425.0 (IDA Credit). Consulting services to be deter- mined. Implementing agency(ies) to be determined. BD: AF for Leveraging ICT for Growth, Employment, Governance Project: The PDO is to (i) catalyze the growth of Bangladesh’s IT/ITES industry for employment creation and export diversification; and(ii)establish basic e-Government foun- dations to support public sector modernization. Approval completed on 24 October 2016. Environmental Assessment Cate- gory C. Project: P159497. US$ 39.0 (IDA Credit). Consulting services to be determined. Bangladesh Computer Council. BD: Integrated Digital Government Project: The development objective is to improve digital integration across GOB agencies, and catalyze digital public services. Appraisal completed on 29 January 2018. Environmental Assessment Category C. Project: P161086. US$ 300.0 (IDA Credit). Consultants will be required. Bangladesh Computer Council. Additional Financing for Second Rural Transport Improvement Project: The proposed Project Development Ob- jective is: To improve rural accessibility in project areas (covering 26 districts) and strengthen institutional capacity for sus- tainable rural road maintenance. Identification completed on 5 January 2018. Environmental Assessment Category A. US$ 100.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Water Additional Financing to Chittagong Water Supply Improvement and Sanitation Project: The revised PDO is to increase access to safe water and improve CWASA’s institutional capacity and investment planning for sanitation and drainage in Chittagong City. Approval completed on 23 June 2017. Environmental Assessment Category B. Project: P161566. US$ 47.5 (IDA Credit). No consultants are required. Implementing agency(ies) to be determined. Dhaka Sanitation Improvement Project: The Proposed Project Development Objective (PDO) is to provide improved sanitation services in select areas of Dhaka city. Concept completed on 30 June 2017. Environmental Assessment Category A. Project: P161432. US$ 300.0 (IDA Credit). Consulting services to be determined. Dhaka Water Supply and Sewerage Author- ity. Bangladesh Municipal Water Supply and Sanitation Project: The project development objective (PDO) is to increase access to safe water supply and sanitation services in selected municipalities, and strengthen the municipalities’ institutional capacities for delivering improved water supply and sanitation services. Identification completed on 9 August 2016. Environ- mental Assessment Category B. US$ 100.0/100.0 (IDA Credit/AIIB). Consulting services to be determined. Implementing PAGE 145 Monthly Operational Summary July 2018 agency(ies) to be determined. Bhutan Finance, Competitiveness and Innovation BT Access to Finance: Objective to be Determined. The Project Development Objective (PDO) is to increase access to finance for Micro, Small and Medium Enterprises (MSMEs, or 'Cottage and Small Industries'). The Project Development Objective (PDO) is to increase access to finance for Micro, Small and Medium Enterprises (MSMEs , or ' Cottage and Small Industries'). The Project Development Objective (PD O) is to increase access to finance for Micro, Small and Medium Enter- prises ( MSMEs , or 'Cottage and Small Industries'). The Project Development Objective (PDO) is to increase access to finance for Micro, Small and Medium Enterprises (MSMEs , or ' Cottage and Small Industries'). The Project Development Objective (PDO) is to increase access to finance for Micro, Small and Medium Enterprises (MSMEs, or 'Cottage and Small Industries'). The Project Development Objective (PDO) is to increase access to finance for Micro, Small and Medium Enterprises ( MSMEs, or 'Cottage and Small Industries'). The Project Development Objective (PDO) is to increase access to finance for Micro, Small and Medium Enterprises (MSMEs, or 'Cottage and Small Industries'). Identification completed on 3 August 2017. Environ- mental Assessment Category C. US$ 10.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. India Agriculture Odisha Integrated Irrigation Project for Climate Resilient Agriculture: The Project Development Objective is to enhance climate resilience, improve agricultural productivity, and increase income of farming communities in selected dis- tricts of Odisha. Identification completed on 10 March 2017. Environmental Assessment Category B. US$161.4 (IBRD). Con- sulting services to be determined. Implementing agency(ies) to be determined. AP Integrated Irrigation & Agriculture Transformation Project: The Project Development Objective is to enhance agricultural productivity, profitability and resilience to climate variability in selected tank systems of Andhra Pradesh. 34.The project beneficiaries will include small and marginal farmers, water users associations, farmer producer organizations, and other agro-entrepreneurs. During project preparation, specific target areas will be identified and specific interventions will be designed to benefit women and other vulnerable groups. Concept completed on 3 May 2017. Environmental Assessment Category B. Project: P160463. US$171.8 (IBRD). Consultants will be required. Government of Andhra Pradesh. India Food Processing and Value Addition Project: To enhance the competitiveness of the food supply chain with a focus on micro, small and medium sized enterprises, in selected states in India. Identification completed on 9 May 2018. US$225.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. National Rural Economic Transformation Project ( Additional Financing to National Rural Livelihoods Pro- ject ): To establish efficient and effective institutional platforms of the rural poor to enable them to increase household income through sustainable livelihood enhancements, and improved access to financial and selected public services. Approval com- pleted on 26 April 2018. Environmental Assessment Category B. Project: P166745. US$250.0 (IBRD). No consultants are required. Ministry of Rural Development; Ministry of Rural Development. (N) State of Maharashtra's Agribusiness and Rural Transformation Project: The goal of the project is to enhance the enterprise formation; increase access to markets; and promote climate resilience and resource use efficiency. Identification completed on 1 August 2018. US$210.0/10.0 (IBRD/ZFOU). Consulting services to be determined. Implementing agency(ies) to be determined. July 2018 South Asia Region PAGE 146 Integrated Project for Source Sustainability and climate Resilient Rain-fed Agriculture in Himachal Pra- desh: The project development objective is to improve farm-system resilience and promote source sustainability of springs and streams in selected Gram Panchayat. Identification completed on 24 August 2017. US$80.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Education Strengthening Secondary Education in Focus States: The Program Development Objective for Phase 1 is to improve quality and management of secondary education in focus states in India Identification completed on 13 November 2017. En- vironmental Assessment Category B. US$200.0 (IBRD). Consulting services to be determined. Ministry of Human Resource Development. India: Enhancing Quality Improvement and Teacher Effectiveness Project: Improve quality of learning at through strengthened teacher support and governance systems Identification completed on 24 April 2018. Environmental Assessment Category B. US$250.0 (IBRD). Consulting services to be determined. Ministry of Human Resource and Development. Uttarakhand Workforce Development Project: The Project Development Objectives (PDO) are to improve the quality and relevance of training at priority Industrial Training Institutes (ITIs) and to increase the number of labor-market-relevant workers through short-term training in Uttarakhand. Approval completed on 19 June 2018. Environmental Assessment Cat- egory B. Project: P154525. US$74.0 (IBRD). Consulting services to be determined. Republic of India, Contact: Mr. Bhaskar Dasgupta, Director, MI Division; Government of Uttarakhand, Contact: Alok Kumar, DG (E&T) & JS. Energy & Extractives Prepare:Program to Establish Pilots for Access through Renewable Energy: To demonstrate renewable energy based decentralized models of improving energy access in target states of UP & Bihar. Identification completed on 18 February 2013. Environmental Assessment Category B. Project: P144678. US$ 12.9/15.3 (GEFU/ZPCO). Consulting services to be de- termined. Ministry of New and Renewable Energy, Contact: Tarun Kapoor, Joint Secretary; UPNEDA, Contact: Anamika Singh, Director; BREDA Tel: 0612-2507734, E-mail: breda@breda.in, Contact: Dayanidhi Pradhan, Director. India Energy Efficiency Scale-Up Program Guarantee: The PDO is to enhance EESL’s financial and institutional ca- pacity and to scale up energy savings in residential and public sectors Approval completed on 17 May 2018. Project: P165488. US$220.0/80.0/380.0 (IBRD/GUAR/ZMUL). Consulting services to be determined. Implementing agency(ies) to be determined. India Energy Efficiency Scale-up Program: Objective to be Determined. Approval completed on 17 May 2018. Environ- mental Assessment Category B. Project: P162849. US$220.0/380.0/200.0 (IBRD/ZBIL/ZPCO). Consulting services to be de- termined. Implementing agency(ies) to be determined. (R) Jharkhand Power System Improvement Project: The project development objectives (PDO) are to increase the transmission capacity of electricity network in the state of Jharkhandand strengthen the institutional capacity of state-owned power transmission and distribution utilities. Negotiations authorized on 17 July 2018. Environmental Assessment Category B. Project: P162086. US$310.0 (IBRD). Consultants will be required. Jharkhand Urja Sancharan Nigam Ltd.; Jharkhand Bijli Vitran Nigam Ltd.. Innovation in Solar Power and Hybrid Technologies: The Project Development Objective is to demonstrate large- scale innovative renewable energy technologies in India. Concept completed on 18 November 2016. Environmental Assess- ment Category A. Project: P160379. US$150.0/50.0 (IBRD/CCTF). Consultants will be required. Solar Energy Corporation of India Limited. Environment & Natural Resources PAGE 147 Monthly Operational Summary July 2018 Additional Financing for Financing Energy Efficiency at MSMEs Project: To increase demand for energy efficiency investments in target micro, small and medium enterprise clusters and to build their capacity to access commercial finance. The Project Development Objective supports the global environmental agenda of stabilizing atmospheric concentrations of greenhouse gases (GHG) through an increase in Energy Efficiency investments and resulting energy savings. Approval com- pleted on 4 November 2016. Environmental Assessment Category B. Project: P158033. US$ 5.2 (GEFU). Consultants will be required. Implementing agency(ies) to be determined. Himachal Pradesh: Forests for Prosperity Project: Improved management and community use of forests and alpine pasture at selected sites in Himachal Pradesh. Concept completed on 21 November 2017. Environmental Assessment Category B. Project: P163271. US$50.0 (IBRD). Con- sultants will be required. State of Himachal Pradesh; Himachal Pradesh Forest Department. Enhancing Coastal and Ocean Resource Efficiency Project: To strengthen integrated coastal zone management in selected States and Union Territories Identification completed on 26 June 2018. Environmental Assessment Category B. US$300.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation Agriculture Risk Resilience and Insurance Access Project: The Project Development Objective is to enhance farmer access to and service delivery standards of the crop insurance scheme in select states in India. Concept completed on 24 April 2018. Environmental Assessment Category B. Project: P165923. US$202.3 (IBRD). Consultants will be required. Department of Agriculture, Cooperation & Farmers Welfare. West Bengal Transport and Logistics Improvement Project: Improve the efficiency and environmentally responsible operation of the logistics sector in the targeted area, including through private sector participation. Identification completed on 16 November 2017. Environmental Assessment Category A. US$100.0 (IBRD). Consulting services to be determined. Im- plementing agency(ies) to be determined. Governance Uttarakhand Public Financial Management Strengthening Program: The Program Development Objective (PDO) is "contribute to improve efficiency and accountability in the management of public finances and enhance the effectiveness of revenue administration in Uttarakhand". Concept completed on 16 May 2018. Project: P166923. US$21.2 (IBRD). No con- sultants are required. Finance Department Government of Uttarakhand. Chhattisgarh Public Financial Management and Accountability Project: Contribute to improved efficiency and ac- countability in management of public finances and direct benefit transfer mechanisms in the State of Chhattisgarh Concept completed on 16 May 2018. Project: P166578. US$25.3 (IBRD). No consultants are required. Finance Department, Govern- ment of Chhattisgarh. Health, Nutrition & Population National Nutrition Mission (also known as ICDS Systems Strengthening and Nutrition Improvement Project: Additional Financing): To improve the coverage and quality of ICDS nutrition services to pregnant and lactating women and children under 3 years of age Approval completed on 30 March 2018. Environmental Assessment Category C. Project: P165493. US$200.0 (IBRD). Consulting services to be determined. Ministry of Women and Child Development. Tamil Nadu Health System Reform Project: To improve quality of care and the management of NCDs and injuries, especially for the poor, in Tamil Nadu. Concept completed on 27 April 2018. Environmental Assessment Category B. Project: P166373. US$287.0 (IBRD). Consult- ing services to be determined. Tamil Nadu Health Systems Project. (N) Moving Towards Elimination of TB Project: To improve the coverage and quality of Tuberculosis control interven- tions in the public and private sectors of India Identification completed on 12 July 2018. US$500.0/279.0 (IBRD/GFND). July 2018 South Asia Region PAGE 148 Consulting services to be determined. Implementing agency(ies) to be determined. Andhra Pradesh Health Systems Strengthening Project: To improve the quality of health service delivery in the state of Andhra Pradesh Identification completed on 8 May 2018. US$327.7 (IBRD). Consulting services to be determined. Health, Medical and Family Welfare Department. Social, Urban, Rural and Resilience Global Practice India Urban Reforms Program (AMRUT Plus): Objective to be Determined. Concept completed on 28 September 2017. Environmental Assessment Category U. Project: P164940. US$500.0 (IBRD). Consulting services to be determined. Imple- menting agency(ies) to be determined. Uttarakhand Disaster Recovery Project Additional Financing: To restore housing, rural connectivity and build resil- ience of communities in Uttarakhand and increase the technical capacity of the State entities to respond promptly and effec- tively to an eligible crisis or emergency. Negotiations authorized on 9 February 2018. Environmental Assessment Category B. Project: P164058. US$100.0 (IBRD). Consultants will be required. Government of Uttarakhand; Uttarakhand State Disaster Management Authority, Government of Uttarakhand. India Climate Change Mitigation Action Support: The development objective is to strengthen the readiness of the Gov- ernment of India for the assessment, design, preparation and implementation of new and existing carbon pricing instruments. Concept completed on 27 January 2017. Environmental Assessment Category C. Project: P162119. US$ 5.2 (PMR). No con- sultants are required. Ministry of Environment, Forests, and Climate Change. National Seismic Risk Mitigation Project: The project development objective is to reduce vulnerability of communities and their assets to natural disasters, and increase the capacity of national and state entities to effectively plan for and respond to disasters. Identification completed on 23 September 2016. US$350.0 (IBRD). Consulting services to be determined. Im- plementing agency(ies) to be determined. Amaravati Sustainable Capital City Development Project: To build sustainable urban services and capacity of urban institutions for the development of Amaravati capital city. Concept completed on 8 August 2016. Environmental Assessment Category A. Project: P159808. US$300.0/200.0 (IBRD/AIIB). Consultants will be required. Andhra Pradesh Capital Region Development Authority (APCRDA). India Smart Cities Program: The development objective is to provide access to credit for cities selected under the Smart Cities Mission for their investment programs. Identification completed on 10 November 2015. Environmental Assessment Category F. US$500.0 (IBRD). Consulting services to be determined. State Bank of India. Jharkhand Municipal Development Project: The Project Development Objective (PDO) is to improve urban service delivery and urban management capacity in participating ULBs. Concept completed on 13 July 2016. Environmental Assess- ment Category A. Project: P158502. US$147.0 (IBRD). Consultants will be required. Urban Development and Housing De- partment, Government of Jharkhand. Transport & Digital Development UP CORE ROAD NETWORK DEVELOPMENT PROGRAM: The Project Development Objective is to reduce travel time and improve safety of road users on targeted corridors. Appraisal completed on 2 March 2015. Environmental Assessment Category A. Project: P147864. US$400.0 (IBRD). Consultants will be required. UP-PWD, Contact: Mr. Kishan Singh Atoria, Principal Secretary; UP Police Traffic Directorate, Contact: Mr. Anil Agrawal, ADG Traffic; Transport Commissioner Tel: 91- 522-2613978, E-mail: tc-up@nic.in, Contact: Mr K. Ravinder Naik, Transport Commissioner. (N) Meghalaya Integrated Transport Project: The development objective is to improve transport connectivity and effi- ciency and modernize transport institutions in the state of Meghalaya. Identification completed on 16 July 2018. US$120.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Himachal Pradesh State Roads Transformation Program: To improve the safety, resilience and engineering standard PAGE 149 Monthly Operational Summary July 2018 of the state roads network in Himachal Pradesh, whilst reforming the institutional and financial base for road maintenance and development Identification completed on 16 March 2017. Environmental Assessment Category A. Consulting services to be determined. Implementing agency(ies) to be determined. Green National Highways Corridor Project: Support to Bharatmala Program in development of green and resilient highways Identification completed on 29 June 2018. US$500.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Rajasthan State Highways Development Program II: The PDO is to provide safe, reliable and informed journeys to road users on priority corridors, and strengthen institutional capacity to develop, fund, manage and operate the strategic road network of Rajasthan. Concept completed on 17 October 2017. Environmental Assessment Category B. Project: P157141. US$250.0 (IBRD). Consultants will be required. The State of Rajasthan. Mumbai Urban Transport Project 3: The Project’s Development Objective is to improve the network connectivity, service quality and safety of Mumbai’s suburban railway system with particular attention to female passengers, and better integrate the system with the Mumbai Metropolitan Region Plan both at the network level and through transit oriented development initiatives at specific stations. Concept completed on 19 September 2017. Environmental Assessment Category A. Project: P159782. US$500.0/500.0 (IBRD/AIIB). Consultants will be required. Mumbai Railway Vikas Corporation (MRVC). Additional Financing for PMGSY Rural Roads Project: The objective is to strengthen the systems and processes of the national PMGSY rural roads program for the expansion and maintenance of all-season rural access roads. The result will en- hance the road connectivity to economic opportunities and social services for beneficiary communities in the participating states. Approval completed on 25 May 2018. Environmental Assessment Category A. Project: P165402. US$500.0 (IBRD). Consultants will be required. National Rural Road Development Agency. Assam Inland Water Transport Project: The Project’s Development Objectives are to: (a) improve the passenger and vehicle accessibility across the Brahmaputra and to its islands with ferry System in Assam; and (b) improve the institutional framework and strengthen the capacity of the state institutions, which administer, regulate and provide Inland Water Transport. Concept completed on 29 July 2016. Environmental Assessment Category A. Project: P157929. US$120.0 (IBRD). Consultants will be required. Transport Dept., Govt. of Assam, Dispur, Guwahati (Assam), India. Water Atal Bhujal Yojana (Abhy)-National Groundwater Management Improvement: Objective to be Determined. Ap- proval completed on 5 June 2018. Environmental Assessment Category B. Project: P158119. US$450.0 (IBRD). Consulting services to be determined. The Ministry of Water Resources, River Development and Ganga Rejuvenatio. Dam Rehabilitation & Improvement Project - Additional Financing: To improve the safety and operational perfor- mance of selected existing dams in the territory of the participating states.The PDO will be achieved through rehabilitation and improvement of dams and improvement in central and state-level institutional capacity to sustainably manage dam safety administration and operation and maintenance. Identification completed on 27 March 2018. Environmental Assessment Cat- egory B. US$137.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Assam Integrated River Basin Management Project: The proposed Project Development Objective (PDO) is “to strengthen institutional capacity for water resources planning and management, and to build resilience to flood and erosion risks in selected areas of the Brahmaputra-Barak system in Assam.â€? Concept completed on 5 May 2017. Envi ronmental As- sessment Category A. Project: P158260. US$80.0 (IBRD). Consultants will be required. Mr. Hemant Narzary, Principal Sec- retary, Water Resources, Assam, Government of Assam. West Bengal Major Irrigation and Flood Management Project: The Project Development Objective is to optimize the conjunctive use of surface and ground water for agriculture and reduce flooding in the project area. Identification completed on 22 November 2016. Environmental Assessment Category B. US$145.0/145.0 (IBRD/AIIB). Consulting services to be de- termined. Implementing agency(ies) to be determined. Maldives July 2018 South Asia Region PAGE 150 Environment & Natural Resources Maldives Environmental Management Project Additional Financing: The main aim of the Project is to provide the Republic of Maldives with the capacity to effectively manage environmental risks and threats to fragile coral reefs as well as marine habitats resulting from tourism development, increased solid waste disposal, fisheries and global climate change. Ac- cordingly, this Project has two development objectives. The first Project Development Objective is that a solid waste manage- ment system is established and that inhabitants on targeted islands use solid waste management facilities, reducing the risks of contamination associated with accumulated wastes and sea dumping. The second Project Development Objective is to build human and technical capacity for environmental management so that the environmental dimension is integrated in the plan- ning process using information and expertise developed in the Project. Approval completed on 22 April 2015. Environmental Assessment Category A. Project: P153958. US$ 3.3 (IDA Grant). No consultants are required. Ministry of Environment and Energy Tel: 9603004323, E-mail: memp@environment.gov.mv, Contact: Project Manager, PMU. Social, Urban, Rural and Resilience Global Practice (R) Maldives Urban Development and Resilience Project: To enhance urban services and strengthen resilience in Hulhumale. Concept completed on 19 July 2018. Environmental Assessment Category B. Project: P163957. US$ 7.5/7.5 (IDA Credit/IDA Grant). Consulting services to be determined. Ministry of Housing and Infrastructure; Housing Development Cor- poration. Nepal Agriculture (R) Food and Nutrition Security Enhancement Project: The Project Development Objective (PDO) is to enhance cli- mate resilience, improve agricultural productivity and nutrition practices of targeted smallholder farming communities in selected areas of Nepal. Negotiations authorized on 12 July 2018. Environmental Assessment Category B. Project: P164319. US$ 22.7 (GAFS). Consultants will be required. Ministry of Agriculture, Land Management, and Cooperatives (MoALMC). Education Additional Financing to School Sector Development Program: The Program Development Objective is to improve the quality, equitable access, and efficiency of basic and secondary education in Nepal by supporting the Government's School Sector Development Program. Identification completed on 13 March 2018. Environmental Assessment Category B. US$ 24.2 (EFAS). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives (R) Nepal: Private Sector-Led Mini-Grid Energy Access Project: The Project Development Objective (PDO) is to increase electricity generation capacity from renewable energy mini-grids in selected areas by mobilizing private energy service companies. Appraisal completed on 26 July 2018. Environmental Assessment Category F. Project: P149239. US$ 2.0/5.6 (CSCC/CSCF). Consultants will be required. Alternative Energy Promotion Centre (AEPC). UT1 - Upper Trishuli Hydro Project: The project will develop a partial risk guarantee product to support private sector investment in a 216 MW greenfield run-of-river hydro project for domestic power consumption in Nepal. Concept completed on 26 August 2015. Environmental Assessment Category A. Project: P154109. US$ 100.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation (R) Nepal Sustainable Tourism Value Creation: To establish favorable conditions to enhance the value creation, sus- tainability and inclusiveness of the tourism sector at selected destinations. Concept completed on 19 July 2018. Environmental Assessment Category A. Project: P165130. US$ 80.0 (IDA Credit). Consultants will be required. Ministry of Culture, Tourism PAGE 151 Monthly Operational Summary July 2018 and Civil Aviation. Governance Integrated Public Financial Management Reform Project: Strengthening the effectiveness of selected PFM institu- tions and procurement institutions, systems and procedures at the federal and subnational levels Approval completed on 27 June 2018. Environmental Assessment Category C. Project: P164783. US$ 15.0 (NPPF). Consultants will be required. Ministry of Finance. Health, Nutrition & Population Investing in Early Years: Nepal Grows With Children: The Development Objective of the project is to help children reach their full potential for development. This will be achieved by providing an integrated system of benefits, interventions and social protection services related to health, nutrition and education to support the child and her/his family. Identification completed on 21 May 2018. US$ 50.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Social Protection & Labor Accelerating Inclusive Jobs Growth for Youth in Nepal: To create quality jobs and enhance labor market outcomes for youth. Identification completed on 12 January 2017. Environmental Assessment Category B. US$ 150.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice NP: Additional Financing Earthquake Housing Reconstruction: The Project Development Objective (PDO) is to restore affected houses with multi-hazard resistant core housing units in targeted areas and to enhance the government's ability to improve long-term disaster resilience. Approval completed on 15 December 2017. Environmental Assessment Category B. Project: P163593. US$ 300.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. (R) Nepal Urban Governance and Infrastructure Project: To improve the institutional performance and service de- livery of selected urban local governments in Nepal. Identification completed on 30 March 2017. Environmental Assessment Category A. US$ 150.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development (R) Second Bridges Improvement and Maintenance Program: Objective to be Determined. Negotiations authorized on 24 July 2018. Environmental Assessment Category B. Project: P161929. US$ 133.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Additional finance to Road Sector Development Project: The Project Development Objective is for the residents of beneficiary districts to have all season road access thereby reducing travel time and improving access to economic centers and social services. Approval completed on 25 August 2016. Environmental Assessment Category B. Project: P157607. US$ 5.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Pakistan Agriculture July 2018 South Asia Region PAGE 152 PK: Additional Financing & Restructuring for FATA RLCIP: To improve livelihoods and access to basic service infra- structure in selected Agencies in FATA. Approval completed on 28 March 2017. Environmental Assessment Category B. Pro- ject: P154777. US$ 8.1 (PKNF). Consultants will be required. FATA Secretariat; Islamic Republic of Pakistan. Khyber Pakhthunkhwa Irrigated Agriculture Improvement Project: To enhance water management, productivity and climate resilience of irrigated agriculture in project areas Concept completed on 4 June 2018. Environmental Assessment Category A. Project: P163474. US$ 165.0 (IDA Credit). Consultants will be required. Department of Agriculture, Government of Khyber Pukhthukhwa; Department of Irrigation, Government of Khyber Pukhthunkhwa. Balochistan Livelihoods and Entrepreneurship Project: Promote socio-economic development by improving access to services for rural communities in selected districts of Balochistan. Concept completed on 3 August 2017. Environmental Assessment Category B. Project: P159292. US$ 21.0/14.0/15.0 (IDA Credit/IDA Grant/PKNF). Consultants will be required. Planning and Development Department, Government of Balochistan. Education Assisting Governance and Access in Higher Education for Quality Enhancement: To improve teaching and learn- ing for employable mid-level skills at participating institutions and strengthen research activities in strategic sectors of the economy. Concept completed on 28 June 2018. Environmental Assessment Category C. Project: P161386. US$ 200.0 (IDA Credit). Consulting services to be determined. Higher Education Commission. Pakistan: Khyber Pakhtunkhwa Host Communities and Refugee Human Development Project: The KP Host Communities Human Development project aims to develop the education health and skills of host communities and refugees in the province, to engage constructively in the economy. The project development objective is to offer quality education during the foundational years of basic education, health services and increase the employability of graduates from higher education institutes and enrolled in skills programs. Identification completed on 30 November 2017. US$ 100.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Energy & Extractives Khyber Pakhtunkhwa Hydropower Development Project: Increase installed hydropower capacity and build institu- tional capacity for further hydropower development in Khyber Pakhtunkhwa. Concept completed on 7 November 2017. Envi- ronmental Assessment Category A. Project: P163461. US$ 200.0 (IDA Credit). Consultants will be required. Pakhtunkhwa Energy Development Organization. Additional Financing to PK: Tarbela 4th Extension Hydropower Project: The overall project development objective is to facilitate a sustainable expansion in Pakistan's electricity generation capacity. The Project would also strengthen WAP- DA's capacity to develop the country's hydropower resources. Approval completed on 20 September 2016. Environmental Assessment Category A. Project: P157372. US$390.0/300.0 (IBRD/ZMUL). Consultants will be required. PMU T4HP, WAPDA. Sindh Solar Energy Project: The Development Objective is to increase solar power generation and access to electricity in Sindh Province. Approval completed on 14 June 2018. Environmental Assessment Category B. Project: P159712. US$ 100.0 (IDA Credit). Consultants will be required. Energy Department - Government of Sindh. Environment & Natural Resources Transformation and Revitalization of the Fisheries Sector in Sindh - TRIFISH: The Development Objective is to improve management and increase productivity and consumption of marine and inland fisheries and aquaculture in Sindh province. Identification completed on 12 April 2018. US$ 150.0/10.0/10.0 (IDA Credit/GFRC/PFSH). Consulting services to be determined. Implementing agency(ies) to be determined. Finance, Competitiveness and Innovation Sindh Jobs and Competitiveness Program: Objective to be Determined. Identification completed on 31 October 2017. PAGE 153 Monthly Operational Summary July 2018 Environmental Assessment Category C. Project: P165765. US$200.0 (IBRD). Consulting services to be determined. Imple- menting agency(ies) to be determined. Economic Revitalization of Khyber Pakhtunkhwa and Federally Administered Tribal Areas: To support the Government of Pakistan in creating sustainable employment opportunities, generating private sector investment, and laying the foundations for the future development of selected economic sectors in Khyber Pakhtunkhwa and Federally Administered Tribal Areas. Approval completed on 28 March 2017. Environmental Assessment Category B. Project: P160445. US$ 19.0 (PKNF). Consultants will be required. Economic Affairs Division; Government of Khyber Pakhtunkhwa; FATA Secretariat; Small and Medium Enterprise Development Authority (SMEDA). Integrated Tourism and Enterprise Development in Khyber Pakhtunkhwa: To strengthen institutional capacity, increase private sector participation, and improve destination infrastructure in support of the tourism ecosystem in Khyber Pakhtunkhwa. Concept completed on 25 September 2017. Environmental Assessment Category B. Project: P163562. US$ 55.0 (IDA Credit). Consultants will be required. Galiyat Development Authority; Department of Tourism, Culture, Sports, Archeol- ogy & Youth Affairs. (N) Punjab Agriculture Finance and Agribusiness Development: The development objective is to support agriculture value chains and increase agriculture finance for farmers and agribusinesses in Punjab Identification completed on 30 July 2018. US$ 150.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Governance Khyber Pakhtunkhwa Revenue Mobilization and Public Resource Management: Objective to be Determined. Concept completed on 4 January 2018. Environmental Assessment Category C. Project: P162302. US$ 100.0 (IDA Credit). Consulting services to be determined. Finance Department - Khyber Pakhtunkhwa. Punjab Public Management Reform Program -- Additional Financing: Objective to be Determined. Identification completed on 7 December 2016. Environmental Assessment Category B. US$ 84.2 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Supporting Institutional Interventions for Management of Refugees: To support the design and implementation of policy and institutional arrangements for the inclusive management of Afghan Refugees and undocumented Afghan nationals. Concept completed on 12 April 2018. Environmental Assessment Category B. Project: P165542. US$ 25.0/25.0 (IDA Credit/IDA Grant). Consulting services to be determined. Ministry of States and Frontier Regions. Pakistan Revenue Mobilization Program: Objective to be Determined. Identification completed on 14 November 2017. Environmental Assessment Category C. US$ 285.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Punjab Revenue Mobilization Program: The Program Development Objective is increase Punjab’s own-source revenues by broadening the tax base and strengthening revenue administration. Concept completed on 10 January 2018. Environmen- tal Assessment Category C. Project: P166371. US$ 100.0 (IDA Credit). Consulting services to be determined. Excise, Taxation, and Narcotics Department; Finance Department, Government of Punjab; Punjab Board of Revenue; Punjab Revenue Author- ity. Health, Nutrition & Population Additional Financing for Pakistan National Immunization Support Project: The project development objective is to increase the equitable coverage of services for immunization against vaccine preventable diseases (VPD), including polio- myelitis, for children between 0 and 23 months in Pakistan. Identification completed on 28 May 2018. Environmental As- sessment Category B. US$ 8.1 (GAVI). No consultants are required. Implementing agency(ies) to be determined. Additional Financing to Khyber Pakhtunkhwa: Enhanced Nutrition to Mothers and Children Project: The development objective for the project is to increase the coverage, in Project areas, of interventions that are known to improve the nutritional status of children under two years of age, of pregnant and of lactating women. Approval completed on 22 De- July 2018 South Asia Region PAGE 154 cember 2017. Environmental Assessment Category C. Project: P161703. US$ 14.8 (PPIN). Consultants will be required. Im- plementing agency(ies) to be determined. Pakistan: Balochistan Host Communities and Refugees Human Development Project: The proposed project aims to contribute to improving education, skills and health outcomes of host communities and refugee population in the targeted districts of Balochistan. The project development objective is to: a) enhance provision of health and education services and b) increase the employability of graduates and those enrolled in skills programs. Identification completed on 18 December 2017. US$ 65.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Social Protection & Labor FATA Temporarily Displaced Persons Emergency Recovery Project: The Project Development Objective is to sup- port the early recovery of families affected by the militancy crisis, promote child health, and strengthen emergency response safety net delivery systems in the affected areas of FATA. Approval completed on 21 September 2017. Environmental Assessment Category B. Project: P160941. US$ 114.0 (IDA Credit). Consultants will be required. Economic Affairs Division; National Database & Registration Authority. Pakistan: Khyber Pakhtunkhwa (KP) and Federally Administered Tribal Areas (FATA) Emergency Recovery Project: The objective is to assist the Government of Pakistan/KP/FATA restore social protection through income transfers and cash for work opportunities to the most affected households and vulnerable groups in the areas affected by military oper- ation against militants and floods. Approval completed on 20 January 2011. Environmental Assessment Category C. Project: P121394. US$ 250.0/35.0 (IDA Credit/PKNF). Consulting services to be determined. Provincial Relief Rehabilitation and Set- tlement Authority (PaRRSA) Tel: (92-91) 921-3855, E-mail: shakeelqadir@pdma.gov.pk, Contact: Shakee Qadir Khan, Direc- tor General. Social, Urban, Rural and Resilience Global Practice CASA 1000 Community Support Program: The proposed Project Development Objective is to provide access to electric- ity or other social and economic infrastructure services to communities in the project area in order to strengthen community support for CASA-1000 transmission line. Concept completed on 13 February 2015. Environmental Assessment Category B. Project: P151075. US$ 10.0 (CASA). Consultants will be required. Economic Affairs Division, Contact: Syed Zahid Aziz, Man- aging Director; National Transmission and Dispatch Company (NTDC), Contact: Muhammad Arshad Chaudhry, Managing Director. Karachi Urban Management Project: To enhance institutional performance and management capacity of the Karachi Metropolitan Corporation and District Municipal Corporations; and improve provision of municipal infrastructure in Karachi. Concept completed on 25 May 2018. Environmental Assessment Category A. Project: P161402. US$ 200.0 (IDA Credit). Con- sulting services to be determined. Local Development Department, Government of Sindh; Karachi Metropolitan Corporation. Pakistan Hydromet and DRM Services Project (PHDSP): To strengthen Pakistan’s public sector delivery of reliable and timely hydro-meteorological and disaster risk management services. Approval completed on 25 May 2018. Environmental Assessment Category B. Project: P163924. US$ 188.0 (IDA Credit). Consultants will be required. Pakistan Meteorological De- partment; National Disaster Management Authority. Digital KP: The development objective is to promote inclusion in the digital economy in Khyber Pakhtunkhwa. This will be achieved through investments to expand access to underserved areas, promote digital markets and investment opportunities, and to build the skill base with relevant digital skills for the future of work. Identification completed on 6 April 2018. US$ 80.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Pakistan: KP Cities Project: The Project Development Objective is to improve the viability and effectiveness of urban services provided by participating municipalities. Identification completed on 19 July 2017. US$ 80.0 (IDA Credit). Consulting services to be determined. Implementing agency(ies) to be determined. Transport & Digital Development PAGE 155 Monthly Operational Summary July 2018 Karachi Urban Mobility Project: The Project Development Objective is to improve mobility, accessibility and safety along selected corridors in Karachi. Concept completed on 7 June 2018. Environmental Assessment Category B. Project: P166732. US$400.0 (IBRD). Consultants will be required. Sindh Mass Transit Authority. Khyber Pass Economic Corridor Project: The PDO is to expand economic activity between Pakistan and Afghanistan by improving regional connectivity and promoting private sector development along the Khyber Pass corridor. Approval com- pleted on 14 June 2018. Environmental Assessment Category A. Project: P159577. US$ 460.6 (IDA Credit). Consultants will be required. National Highways Authority (NHA); FATA Secretariat; FATA Development Authority. Water Karachi Water and Sewerage Services Improvement Project (KWSSIP): The Project’s Development objectives are to: (i) raise KWSB’s operational capacity to deliver to all of its customers safe and reliable water service on a sustainable and predictable basis; (ii) restore KWSB’s operations to financial stability; and (iii) establish an enabling environment for fut ure private sector investments in water supply and wastewater treatment. Concept completed on 24 October 2017. Environmental Assessment Category A. Project: P164704. US$160.0/160.0 (IBRD/AIIB). Consulting services to be determined. Karachi Wa- ter and Sewerage Board; Government of Sindh - Planning and Development Department. Sindh Barrages Improvement Project AF: The PDO will be revised to strengthen the Sindh Irrigation Department’s capacity to operate and manage barrages and improve the reliability and safety of Guddu and Sukkur Barrages in the Province of Sindh. Approval completed on 25 May 2018. Environmental Assessment Category A. Project: P162117. US$ 140.0 (IDA Credit). Consulting services to be determined. Sindh Irrigation Department; Irrigation Department, Government of Sindh. Punjab Sanitation and Nutrition Improvement Project (PSNIP): To reduce open defecation in targeted villages in eleven districts of rural Punjab Concept completed on 8 December 2017. Environmental Assessment Category B. Project: P165075. US$ 10.0 (PPIN). Consultants will be required. Public Health Engineering Department. PK Additional Financing for Sindh Water Sector Improvement Phase 1: To improve Ghotki and Fulili canals. Ap- proval completed on 16 December 2014. Environmental Assessment Category A. Project: P131325. US$ 138.0 (IDA Credit). Consulting services to be determined. Sindh Irrigation and Drainage Authority (SIDA) Tel: (92-301) 837-8787, E-mail: zahi- djunejo@hotmail.com, Contact: Junejo Zahid Hussain Sindh Water and Agriculture Climate Resilience Project: The development objective of the project is to transform water management and agriculture production toward more efficiency and climate resilience in Sindh province. Identification completed on 10 July 2018. US$ 350.0/100.0 (IDA Credit/MSC1). Consulting services to be determined. Implementing agency(ies) to be determined. Water Sector Capacity Building and Advisory Services: The project objective is to improve the management and in- vestment planning of water resources in the Indus River Basin. Approval completed on 21 December 2015. Environmental Assessment Category B. Project: P155226. US$ 35.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Sri Lanka Agriculture Agriculture Sector Modernization Project - Additional Financing: The Project Development Objectives (PDO) are to support increasing agriculture productivity, improving market access, and enhancing value addition of smallholder farmers and agribusinesses in the project areas. Identification completed on 14 February 2018. Environmental Assessment Category B. US$ 28.5 (EUDF). Consultants will be required. Implementing agency(ies) to be determined. Education July 2018 South Asia Region PAGE 156 General Education Modernization Project: Enhance quality and strengthen stewardship of the general education sys- tem Approval completed on 26 April 2018. Environmental Assessment Category B. Project: P163714. US$ 100.0 (IDA Credit). Consultants will be required. Ministry of Education. Finance, Competitiveness and Innovation Sri Lanka Sustainable Tourism Development Project: The PDO is to support the creation of conditions for increased private investment and sustained growth in Sri Lanka's tourism sector. Concept completed on 5 June 2018. Environmental Assessment Category A. Project: P167055. US$75.0 (IBRD). Consulting services to be determined. Sri Lanka Tourism Devel- opment Authority. Governance Sri Lanka Public Sector Efficiency Strengthening Project: To contribute to improve transparency and the efficiency of public programs and selected services Concept completed on 1 November 2017. Environmental Assessment Category C. Project: P162949. US$70.0/6.0 (IBRD/ECEU). No consultants are required. Ministry of Finance and Media. Health, Nutrition & Population Sri Lanka: Primary Health Care System Strengthening Project: The project development objective is to increase the utilization and quality of primary health care services, with an emphasis on detection and management of non-communicable diseases in high-risk population groups, in selected areas of the country. Approval completed on 27 June 2018. Environmental Assessment Category C. Project: P163721. US$200.0 (IBRD). Consultants will be required. Ministry of Health, Nutrition and Indigenous Medicine. Macroeconomics, Trade and Investment Sri Lanka Enhancing Fiscal Response Capacity to Natural Disasters: The project development objective is to en- hance the financial and technical capacity of GoSL to increase the resilience of the budget to natural disasters by limiting contingent liabilities, so as to smooth fiscal expenditure and improve access to rapid response financing and disbursements to beneficiaries in response to disasters. Identification completed on 10 April 2018. US$120.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Social, Urban, Rural and Resilience Global Practice Strategic Cities Development Project- Additional Financing: Improve selected urban services and public urban spaces in the Participating City Regions of Sri Lanka. Approval completed on 27 May 2016. Environmental Assessment Cate- gory A. Project: P157427. US$ 55.0 (IDA Credit). Consultants will be required. Implementing agency(ies) to be determined. Climate Resilience Improvement Project Additional Financing: The Project Development Objective (PDO) is to re- duce the vulnerability of exposed people and assets to climate risk and to improve Government’s capacity to respond effec- tively to disasters. Approval completed on 21 March 2016. Environmental Assessment Category B. Project: P157392. US$ 42.0 (IDA Credit). No consultants are required. Ministry of Finance, Contact: R. H. S. Samaratunga, Dr. Climate Resilience Multi-Phase Programmatic Approach: The development objective of the project is to improve Sri Lanka’s physical resilience to extreme climate events and the Government’s capacity to respond to disasters effectively. Iden- tification completed on 26 April 2016. Environmental Assessment Category A. US$161.5/161.5 (IBRD/AIIB). Consulting ser- vices to be determined. Ministry of Finance, Democratic Socialist Republic of Sri Lanka; Ministry of Irrigation and Water Resources Management. Local Development Support Project: The proposed PDO is to strengthen institutional capacity of local authorities and communities to improve service delivery and promote socio-economic opportunities in selected provinces. Concept completed on 21 August 2017. Environmental Assessment Category B. Project: P163305. US$70.0 (IBRD). Consultants will be required. Ministry of Provincial Councils and Local Government. North East Local Services Improvement Project - Additional Financing: The primary development objective of the PAGE 157 Monthly Operational Summary July 2018 project is to improve the delivery of local infrastructure services by local authorities in the Northern and Eastern Provinces of Sri Lanka in an accountable and responsive manner. Approval completed on 26 August 2015. Environmental Assessment Category B. Project: P152623. US$ 20.0 (IDA Credit). No consultants are required. Implementing agency(ies) to be deter- mined. Transport & Digital Development (N) Sri Lanka Logistics Project: The project development objective is to improve connectivity to domestic and interna- tional markets and value creation in supply chains through enhanced logistics. Identification completed on 31 July 2018. US$200.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Water Sri Lanka Water Resources Management Program (WARM-P): The development objective of the project is to (i) strengthen capacity of targeted agencies in Sri Lanka for water resources planning, and (ii) Improve operational efficiency of (high risk) dams. Identification completed on 24 April 2018. Environmental Assessment Category A. US$150.0 (IBRD). Con- sulting services to be determined. Ministry of Mahaweli Development and Environment. LK: AF Dam Safety WRP - Addl Fin.: The Government of Sri Lanka has requested Additional Financing (AF) to: (i) cover cost overruns to complete the original project scope as described in the PAD for P093132; and (ii) scale-up successful project activities and rehabilitate and modernize additional dams, including some dams in the East and North-east of the country that could not be part of the project area under the original project. The main component under the AF will be the original com- ponent 1 - Dam Safety and Operational Efficiency Improvement, that may include some rehabilitation works on linked irriga- tion conveyance systems. Limited activities will be included under the original component 2 - Hydro-meteorological Infor- mation System Improvement and Component 3 - Multi-sectoral Water Resources Planning. Component 4 - Project Manage- ment and Monitoring and Evaluation will continue under the AF. The AF complies with the relevant provisions of OP/13.20 which stipulates that the Bank provides AF when it is satisfied that: (i) implementation of the project, including substantial compliance with legal covenants, is satisfactory; and (ii) the additional financing is economically justified. Approval completed on 5 May 2014. Environmental Assessment Category B. Project: P148595. US$ 83.0 (IDA Credit). Consulting services to be determined. Ministry of Irrigation and Water Resources Management Tel: (94-11) 267-5315, E-mail: pddswrpp@sltnet.lk, Contact: Chandanie Wijayawardene, Director General. July 2018 Guarantee Operations PAGE 158 Guarantee Operations Africa Angola Water, Sanitation and Waste Management Luanda Bita Water Supply Project Guarantee: Objective to be Determined. The Project Development Objective is to improve access to potable water service in selected areas of Luanda. The Project is to be supported through an IBRD guarantee currently estimated at US$150m, tentatively complemented by a MIGA guarantee. Identification completed on 30 March 2017. Environmental Assessment Category B. US$ 285.0 (GUAR). Consulting services to be determined. Implementing agency(ies) to be determined. Benin Benin Second Fiscal Reform and Growth PBG: The program development objectives of this PBG are to: a) support macroeco- nomic stability by strengthening fiscal management; b) promote economic growth by increasing agricultural productivity and competi- tiveness and strengthening the power sector’s financial viability and production capacity; and c) improve education and health service delivery and strengthen social protection. Concept completed on 23 April 2018. Project: P167278. US$ 180.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Burundi Burundi Solar Energy Guarantees Project: The development objective is to increase renewable energy power supply in Burundi Identification completed on 1 March 2018. Environmental Assessment Category B. US$ 1.5 (GUID). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Cameroon Energy and Extractives (R) Cameroon Nachtigal Hydropower Project: Objective to be Determined. Approval completed on 19 July 2018. Environmental Assessment Category A. Project: P157734. US$ 300.0/150.0/280.0 (GUAR/ZBIL/ZMUL). Consulting services to be determined. Im- plementing agency(ies) to be determined. PAGE 159 Monthly Operational Summary July 2018 Cote d'Ivoire Energy and Extractives (R) Cote d'Ivoire: CI-ENERGIES Guarantee Project: Objective to be Determined. Approval completed on 29 June 2018. Envi- ronmental Assessment Category B. Project: P164145. US$ 280.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Ethiopia Energy and Extractives Renewable Energy Guarantees Project: Objective to be Determined. Appraisal completed on 24 May 2017. Environmental As- sessment Category B. Project: P162607. US$ 200.0/800.0 (GUID/ZPCO). Consulting services to be determined. Implementing agency(ies) to be determined. Kenya Energy and Extractives KenGen Guarantee Program: Objective to be Determined. Approval completed on 26 April 2018. Environmental Assessment Cat- egory C. Project: P162422. US$ 180.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Transportation Long-term Finance for PPP/ Nairobi-Nakuru Toll Road Guarantee: Crowd in long term local currency financing into PPP Infrastructure projects Concept completed on 8 February 2018. Project: P165545. US$ 80.0 (GUID). Consulting services to be deter- mined. Implementing agency(ies) to be determined. Liberia Liberia South Eastern Corridor Road Asset Management Guarantee Project: The Project Development Objectives (PDOs) are to support the Recipient's effort to reduce motorized vehicles' travel time along the selected sections of South Eastern Ganta-Zwedru- Harper corridor and to improve institutional arrangements and capacity in the road sector. Identification completed on 26 October 2017. US$ 29.0/48.0 (IDA Credit/GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Madagascar MG - Scaling Solar Guarantee Project: The project development objective is to increase solar electricity generation capacity and diversify electricity generation resources in Madagascar. Identification completed on 27 February 2018. US$ 2.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Mali Energy and Extractives July 2018 Guarantee Operations PAGE 160 Banda Gas to Power Guarantee: The Gas To Power Project will use natural gas discovered offshore of Mauritania for a power station to be built near Nouakchott. The power will be sold to SOMELEC in Mauritania, SENELEC in Senegal and EDM in Mali using the existing OMVS regional grid. A PRG is required to guarantee gas payments to the producer Tullow Oil estimated at $104m. Government of Mali needs to provide a counter-guarantee to cover the proportion of the energy that will be exported to EDM estimated at $17m (equivalent to IDA allocation of $4.25m given 1:4 leverage for IDA PRGs). Approval completed on 29 May 2014. Environmental Assess- ment Category A. Project: P145664. US$ 32.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be deter- mined. Energy and Extractives FCS RE Segou Solaire Mali Project: The Project Development Objective is to promote the introduction of grid-connected renewable energy in Mali through an IPP Approval completed on 8 June 2017. US$ 8.2/6.2 (AFDB/GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Mauritania Energy and Extractives MR-Banda Gas to Power Guarantee: The gas to power project will use natural gas discovered offshore for a power station to be built near Nouackchott. The power will be sold to SOMELEC in Mauritania, Senelec in Senegal and EDM in Mali using the existing OMVS regional grid Approval completed on 29 May 2014. Environmental Assessment Category A. Project: P107940. US$ 130.0 (GUID). Consultants will be required. Ministry of Energy Tel: (222-46) 431-537, E-mail: kane@acces.mr, kane@hydraulique.gov.mr, Contact: Mamadou Amadou Kane, Directeur General de l'Electricite. Nigeria Energy and Extractives Nigeria Electricity and Gas Improvement Project Additional Financing: Additional financing to the Nigeria Electricity and gas improvement project to cover additional PRGs for Gas supply to government owned power plants, in particular the Sapele, Olo- runsogo and Alaoji plants held by the NIGER DELTA POWER HOLDING COMPANY. The NDPHC is scheduled to commission power generation units in three of the NIPP plants at Sapele, Olorunsogo and Alaoji. The units to be commissioned will have a combined initial generation capacity of 575 MW. The 3 plants will have a final generation capacity of 1,974 MW upon completion. These plants urgently require executed Gas Sales Supply Agreements (GSAs) with prospective gas suppliers and IOCs who have emphasized the need for a payment guarantees to enter into long term supply agreements for the fuel deliveries. In accordance with World Bank PRG guidelines, the Federal Ministry of Finance on behalf of the Federal Government of Nigeria is required to nominate parties with whom the World Bank Gan enter into negotiations on PRGs. Therefore, I am writing to request that the World Bank extends the coverage of NEGIP to include NDPHC's NIPP plants and to nominate the NDPHC as a party with whom the World Bank can enter into formal negotiations on the potential provision of PRGs for the individual projects. Approval completed on 19 June 2012. Environmental Assessment Cate- gory B. Project: P126190. US$ 200.0 (GUID). Consulting services to be determined. Power Holding Company of Nigeria Tel: (234-9) 413-6684, E-mail: maganiyu@nepapmu.org, Contact: Mansuru A. Ganiyu, Project Manager. Senegal Energy and Extractives Senegal Solar Energy Development through IPPs Project: In the spirit of 'Scaling up Solar' initiative developed by IFC, the Project will support Solar Energy Development in Senegal through IPPs selected competitively and transparently on the basis of the lowest price per kWh. In order to attract interest from major international developers, minimize transaction costs and uncertainties with regard to contract negotiations and finance mobilization, the bidding package will include draft legal agreements (PPAs, and con- cession agreements) as well as a financing package (term sheet of loans, risk mitigation instruments including proposed Bank guaran- tee…). Identification completed on 8 December 2014. Environmental Assessment Category B. Project: P153826. US$ 35.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. PAGE 161 Monthly Operational Summary July 2018 Sierra Leone SL_Bumbuna II Hydropower Project: The project development objective is to provide affordable clean energy and mobilize pri- vate and development finance Identification completed on 5 April 2018. US$ 120.0/80.0 (IDA Credit/GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Uganda Energy and Extractives IDA Guarantee for Renewable Energy Development Program: The project will provide for amongst others counterpart risk guarantee to cover the payment risk from Uganda Electricity Transmission Company Approval completed on 18 March 2014. Environ- mental Assessment Category B. Project: P133318. US$ 160.0 (GUID). Consultants will be required. Ministry of Energy and Mineral Development Tel: (256-41) 434-9342, E-mail: info@energy.go.ug, Contact: Hon. Irene Muloni, Minister. Zambia ZM-Guarantee for Scaling Solar (Round 2): To increase solar electricity generation capacity and diversify electricity generation resources in Zambia. Identification completed on 3 October 2017. Environmental Assessment Category B. US$ 15.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Zambia Power Sector Financial Recovery Guarantee Project: The Project development objective (PDO) is to enhance Zambia power sector financial and operational viability. Identification completed on 24 April 2018. US$ 300.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. Energy and Extractives Second Scaling Solar Guarantee: To increase solar electricity generation capacity and diversify electricity generation resources in Zambia. Approval completed on 20 December 2017. Environmental Assessment Category B. Consulting services to be determined. Implementing agency(ies) to be determined. Regional Energy and Extractives Ruzizi Regional Hydropower Project - Guarantee: The Ruzizi III hydropower project, 147MW is sponsored by the Energy Com- mission of the Great Lakes Countries (DRC, Rwanda and Burundi),in short “EGLâ€?, and includes the construction of the dam, tunnel, power station and the transmission line to a switchyard. The project will be developed in the form of a public-private partnership sup- ported by donors including the World Bank, AfDB, and DBSA. The World Bank would provide a Partial Risk Guarantee to support private sector investors to develop the Ruzizi hydropower project. Identification completed on 15 October 2013. Environmental Assess- ment Category B. US$ 60.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. July 2018 Guarantee Operations PAGE 162 East Asia And Pacific Vietnam Energy and Extractives Vietnam Scaling Up Energy Efficiency Guarantee: The Project Development Objective is to improve energy efficiency in Vi- etnam’s industrial sector through the mobilization of commercial financing. The project would thereby contribute to achieving the gov- ernment’s energy efficiency and GHG reduction objectives. Identification completed on 30 November 2017. US$ 11.3 (GCF). Consulting services to be determined. Implementing agency(ies) to be determined. Europe And Central Asia Armenia Energy and Extractives Utility Scale Solar Power Project: Objective to be Determined. Appraisal completed on 16 November 2017. Environmental Assess- ment Category B. Project: P155662. US$ 4.0 (GUAR). Consulting services to be determined. Implementing agency(ies) to be determined. Croatia Transportation Modernization and Restructuring of the Road Sector: Objective to be Determined. Approval completed on 28 April 2017. En- vironmental Assessment Category B. US$23.3/265.0/370.7/424.3 (IBRD/EBRD/GUAR/ZPCO). Consulting services to be determined. Implementing agency(ies) to be determined. Kosovo Energy and Extractives Kosovo Power Project: IDA partial risk guarantee in support of a private sector independent power producer and lignite mining company, to be selected under the Lignite Power TA Project (P097635). Identification completed on 19 May 2010. Environmental Assessment Category A. Project: P118287. US$ 40.0/725.0/725.0 (GUID/ZBIL/ZEXP). No consultants are required. Ministry of Eco- nomic Development Tel: (381-38) 2002-1505, E-mail: agron.dida@ks-gov.net, Contact: Mr. Besim Beqaj, Minister. PAGE 163 Monthly Operational Summary July 2018 Latin America And Caribbean Argentina Energy and Extractives Renewable Fund Guarantee: Support the development of renewable energy in Argentina through private sector investments. Ap- proval completed on 15 March 2018. Project: P165085. US$ 250.0 (GUAR). Consulting services to be determined. Implementing agency(ies) to be determined. Colombia Energy and Extractives (R) CTF Clean Energy Development Project: Objective to be Determined. Approval completed on 16 July 2018. Environmental Assessment Category F. Project: P161713. US$ 41.0/41.0 (CCTF/GUAR). Consulting services to be determined. Implementing agency(ies) to be determined. Peru Mobilizing Private Long Term Finance for Infrastructure: Support the Government of Peru in leveraging private sector long- term financing for infrastructure under a fiscally sustainable model through the design and provision of partial project based guarantees Identification completed on 15 September 2017. US$ 200.0 (GUAR). Consulting services to be determined. Implementing agency(ies) to be determined. Middle East And North Africa Jordan Water, Sanitation and Waste Management Red Sea-Dead Sea Phase 1: - Identification completed on 6 November 2014. Environmental Assessment Category A. US$ 100.0 (GUAR). Consulting services to be determined. Implementing agency(ies) to be determined. July 2018 Guarantee Operations PAGE 164 South Asia Afghanistan Sheberghan Gas to Power Project: The Development Objective is (i) to increase the amount of reliable electricity generated in Afghanistan and (ii) to build a track record for the country in developing and implementing PPP transactions. Identification completed on 22 December 2017. Consulting services to be determined. Implementing agency(ies) to be determined. Energy and Extractives Mazar-e-Sharif Gas-to-Power Project: Objective to be Determined. Identification completed on 28 October 2015. Environmental Assessment Category A. Project: P157827. US$ 25.0/45.0 (GUID/ZPCI). Consulting services to be determined. Implementing agency(ies) to be determined. India Energy and Extractives India Energy Efficiency Scale-Up Program Guarantee: The PDO is to enhance EESL’s financial and institutional capacity and to scale up energy savings in residential and public sectors Approval completed on 17 May 2018. Project: P165488. US$220.0/80.0/380.0 (IBRD/GUAR/ZMUL). Consulting services to be de- termined. Implementing agency(ies) to be determined. Nepal Energy and Extractives UT1 - Upper Trishuli Hydro Project: The project will develop a partial risk guarantee product to support private sector investment in a 216 MW greenfield run-of-river hydro project for domestic power consumption in Nepal. Concept completed on 26 August 2015. Environmental Assessment Category A. Project: P154109. US$ 100.0 (GUID). Consulting services to be determined. Implementing agency(ies) to be determined. PAGE 165 Monthly Operational Summary July 2018 Board Annex: Listing of DPFs & PforRs Region Country Project Project Description DecMeeting Total Name Name Definition Amount ECA Macedonia, P149794 Macedonia Fiscal and PFM PBG 70.00 former Yugo- slav Republic of SAS Nepal P154693 Nepal Energy Sector Development Policy Credit 06/07/2018 250.00 LAC St. Lucia P154829 Saint Lucia Disaster Risk Management Development Policy 20.00 Credit with a Catastrophe Deferred Drawdown Option EAP Vietnam P157722 Vietnam Power Sector Reform Development Policy 05/24/2017 170.00 LAC Paraguay P159122 PY Fiscal management and economic resiliance DPL 125.00 EAP Tonga P159263 Tonga Third Inclusive Growth Development Policy Opera- 5.50 tion SAS Nepal P159547 Nepal Fourth Financial Sector Stability Credit DPC4 06/07/2018 100.00 SAS India P159669 Second Programmatic Electricity Distribution Reform DPL 12/11/2017 250.00 for Rajasthan LAC Guatemala P159710 Guatemala DRM Development Policy Loan with CAT DDO II 145.00 EAP Vietnam P160480 Ho Chi Minh City Development Policy Operation 1 09/20/2017 100.00 ECA Western Bal- P160594 Gender Equality in the Western Balkans 50.00 kans AFR Cabo Verde P160628 Cabo Verde Disaster Risk Management Development Policy 8.00 Credit and Loan with Cat DDO EAP Vietnam P160818 Climate Change and Green Growth DPF 2 90.00 ECA Serbia P161184 Serbia Second Public Expenditure and Public Utilities DPL 01/18/2018 200.00 ECA Bosnia and P161190 Bosnia and Herzegovina Fiscal DPL 50.00 Herzegovina SAS Pakistan P161522 Reforms for Accelerating Growth DPC 350.00 AFR Kenya P161562 Disaster Risk Management Development Policy Credit with 04/25/2018 200.00 a Catastrophe Deferred Drawdown Option (Cat DDO) AFR Mali P161619 Second poverty reduction and inclusive growth DPO 04/27/2018 60.00 AFR Guinea P161796 Guinea Second Macroeconomic and Fiscal Management 12/07/2017 60.00 DPO EAP Tuvalu P161867 Tuvalu Fourth Development Policy Operation 03/06/2018 7.50 LAC Haiti P162452 Haiti Fiscal Reform and Economic Growth Grant 30.00 AFR Chad P162548 FISCAL CONSOLIDATION SUPPORT GRANT 11/18/2016 80.00 LAC Colombia P162858 Colombia Fiscal and Growth DPL2 500.00 AFR Chad P163424 Chad First Programmatic Economic Recovery and Resilience 04/13/2018 65.00 Grant SAS Maldives P163939 Maldives- DRM Dev. Policy Financing with Catastrophe De- 10.00 ferred Drawdown Option and Pandemic Emergency Financ- ing Facility SAS Maldives P163966 Maldives First Fiscal Sustainability and Budget Credibility 10.00 Development Policy Financing Operation ECA Kyrgyz Re- P163983 Kyrgyz Republic Economic Governance DPO 12/21/2017 24.00 public AFR Malawi P164122 Malawi Second Agricultural Support and Fiscal Management 05/16/2018 80.00 DPO AFR Uganda P164178 Uganda Domestic Revenue Mobilization DPO 200.00 AFR Gabon P164201 Gabon Second Fiscal Consolidation and Inclusive Growth 200.00 DPF AFR Sao Tome and P164321 STP - 3rd Strengthening Growth and Fiscal Policy DPO 6.00 Principe July 2018 Board Annex DPFs and PforRs PAGE 166 ECA Ukraine P164414 Ukraine Multisector Development Policy Financing 07/12/2018 650.00 MNA West Bank P164427 Development Policy Grant: Fiscal Resilience and Job Crea- 40.00 and Gaza tion II AFR Senegal P164525 Senegal Second Multi-Sectoral Structural Reform DPO 60.00 AFR Gambia, The P164545 Gambia Fiscal Management and State-Owned Enterprise 20.00 Performance First DPO EAP Lao People's P164573 Disaster Risk Management Development Policy Operation 10.00 Democratic with a CAT DDO Republic ECA Serbia P164575 Public Sector Efficiency and Growth DPL 200.00 LAC Brazil P164588 Mato Grosso Fiscal Adjustment DPL 340.00 AFR Tanzania P164655 Tanzania First Growth and Service Delivery DPO 05/11/2018 150.00 MNA Iraq P164676 IRAQ: Third Expenditure Rationalization Energy Eff. and 500.00 SOE Governance SAS Afghanistan P164882 AF Incentive Program DPG 05/08/2018 300.00 AFR Malawi P165056 MALAWI-Disaster Risk Management Development Policy 27.00 Credit with Cat DDO SAS Pakistan P165160 Pakistan DRM DPC with CAT DDO 250.00 LAC St. Vincent P165220 Fiscal Reform and Resilience Development Policy Credit 30.00 and the Gren- adines AFR Cabo Verde P165631 Cabo Verde DPO 20.00 LAC Brazil P165668 Rio de Janeiro Municipality: Restoring Fiscal Sustainability 390.00 DPL EAP Papua New P165717 Papua New Guinea Development Policy Operation 06/26/2018 150.00 Guinea AFR Congo, Re- P165815 Congo Fiscal management, economic and social resilience 200.00 public of DPF OTH World P165926 Demo DPF Program in Ops 3 155.00 EAP Samoa P165928 Second Resilience Development Policy Operation 13.70 AFR Benin P166115 Benin Second Fiscal Reform and Growth DPF 07/09/2018 195.00 AFR Niger P166124 Niger Second DPO Series 110.00 AFR Burkina Faso P166298 Burkina Faso First Development Policy Operation 50.00 AFR Guinea P166322 Guinea First Macroeconomic and Sustainable Growth DPO 40.00 ECA Turkey P166336 DPL Equity and Social Inclusion 400.00 AFR Cote d'Ivoire P166388 CDI Third Fiscal Management, Education, Energy, and Co- 100.00 coa Reforms DPF AFR Madagascar P166425 MG - Second Inclusive and Resilient Growth DPO 05/15/2018 60.00 AFR Rwanda P166458 Second Rwanda Energy Sector Development Policy Opera- 125.00 tion AFR Angola P166564 Angola Macro Stabilization and Inclusive Growth DPO 250.00 AFR Cameroon P166694 Second Fiscal Consolidation and Inclusive Growth DPO 100.00 AFR Togo P166739 Togo Second Fiscal Reform Credit 25.00 AFR Equatorial P166749 EQG First Development Policy Loan 50.00 Guinea AFR Madagascar P166752 Fiscal Sustainability and Energy Development Policy Opera- 40.00 tion SAS Nepal P166788 Nepal DRM DPC with CAT-DDO 100.00 EAP Lao People's P166839 Lao PDR Green Resilient Growth DPO 2 40.00 Democratic Republic LAC St. Lucia P167045 St. Lucia Fiscal DPC 35.00 PAGE 167 Monthly Operational Summary July 2018 SAS Bangladesh P167190 Bangladesh Jobs Programmatic DPC 250.00 SAS India P167246 First Programmatic Water Supply and Sewerage Service De- 25.00 livery Reform Development Policy Loan for Shimla Hima- chal Pradesh EAP Kiribati P167263 Kiribati Fifth Economic Reform Development Policy Opera- 5.00 tion EAP Indonesia P167297 Indonesia Fiscal Reform DPL 3 300.00 LAC Guyana P167320 Second Programmatic Financial and Fiscal Stability Devel- 25.00 opment Policy Credit EAP Tonga P167330 Tonga Second Inclusive Growth Development Policy Opera- 05/08/2018 10.00 tion: Supplemental Financing AFR Mauritania P167348 Mauritania First Competition and Skills DPO 30.00 AFR Liberia P167429 SUPPLEMENTAL DEVELOPMENT POLICY FINANCING 15.00 FOR THE FOURTH POVERTY REDUCTION SUPPORT DE- VELOPMENT POLICY OPERATION (PRSDPO-IV) EAP Mongolia P167485 Second Economic Management Support Operation 40.00 AFR Senegal P167489 Senegal Digital Economy Development Policy Financing 60.00 AFR Mali P167547 Mali Energy and Decentralization DPL 50.00 EAP Philippines P167651 Improving Fiscal Management 300.00 AFR Ghana P167654 Ghana DPO - 1st in Series (FY19) 150.00 LAC Mexico P167674 Mexico Fintech DPL 400.00 LAC Argentina P167889 FIRST INCLUSIVE GROWTH DPF 07/13/2018 500.00 AFR Madagascar P167941 Disaster Risk Management Development Policy Operation 50.00 (DPO) with a Catastrophe Deferred Drawdown Option (CAT DDO) AFR Central Afri- P168035 Consolidation and Economic Recovery Development Pro- 20.00 can Republic gram MNA Jordan P168130 Jordan Second Equitable Growth & Job Creation Program- 1,000.00 matic Development Policy Financing EAP Papua New P168148 Papua New Guinea - Second Economic and Fiscal Resilience 100.00 Guinea DPO SAS Bhutan P168166 STRENGTHENING FISCAL MANAGEMENT AND PRI- 30.00 VATE SECTOR EMPLOYMENT OPPORTUNITIES EAP Myanmar P168182 Disaster Risk Management Development Policy Operation 100.00 with a CAT DDO ECA Uzbekistan P168280 Sustaining Market Reforms in Uzbekistan Development Pol- 500.00 icy Operation AFR Gabon P168333 Gabon Third Fiscal Consolidation and Inclusive Growth DPF 200.00 AFR Equatorial P168334 EQG Second Development Policy Financing 50.00 Guinea AFR Sao Tome and P168335 STP DPO New Series 5.00 Principe AFR Angola P168336 Second Angola Development Policy Operation 200.00 AFR Congo, Re- P168337 Congo Second Fiscal management, economic and social re- 200.00 public of silience DPF LAC Panama P168338 Fourth Programmatic Shared Prosperity Development Pol- 100.00 icy Financing