Document of The World Bank Report No: ICR00002866 IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-81870) ON A LOAN IN THE AMOUNT OF US$450 MILLION TO THE STATE OF MINAS GERAIS FOR A THIRD MINAS GERAIS DEVELOPMENT PARTNERSHIP DEVELOPMENT POLICY LOAN July 20, 2014 Governance Global Practice Brazil Country Management Unit Latin America and the Caribbean CURRENCY EQUIVALENTS (Exchange Rate Effective April 25, 2014) Currency Unit = Brazilian Reais R$ 1.00 = US$ 0.45 US$ 1.00 = R$ 2.23 FISCAL YEAR January 1- December 31 ABBREVIATIONS AND ACRONYMS AFD Agence Française de Développement CDM Clean Development Mechanism CEMIG State Energy Company (Companhia Energética de Minas Gerais) CPS Country Partnership Strategy DPL Development Policy Loan GoMG Government of Minas Gerais IEF State Institute for Forestry (Instituto Estadual de Florestas) IGD-M Index of Decentralized Municipal Management (Índice de Gestão Descentralizada Municipal) M&E Monitoring and Evaluation PDO Program Development Objective PPA Multi-Year Plan (Plano Plurianual) PROEB Evaluation Program of Public Basic Education Network (Programa de Avaliação da Rede Pública de Educação Básica) RBM Results-Based Management RI Results Indicator RMBH Metropolitan Region of Belo Horizonte (Região Metropolitana de Belo Horizonte) SEPLAG Secretariat of Planning and Management (Secretaria Estadual de Planejamento e Gestão) SIAFI/MG Integrated Financial Management System (Sistema Integrado de Administração Financeira) Vice President: Jorge Familiar Country Director: Deborah L. Wetzel Senior Practice Director Mario Marcel Cullel Practice Manager: Arturo Herrera Task Team Leader: Roland Clarke ICR Team Leader: Fanny Weiner ICR Primary Author: Chris Parel i BRAZIL Third Minas Gerais Development Partnership Development Policy Loan CONTENTS Data Sheet A. Basic Information B. Key Dates C. Ratings Summary D. Sector and Theme Codes E. Bank Staff F. Results Framework Analysis G. Ratings of Program Performance in ISRs H. Restructuring Table of Contents 1. Program Context, Development Objectives and Design ............................................ 1 2. Key Factors Affecting Implementation and Outcomes .............................................. 8 3. Assessment of Outcomes .......................................................................................... 10 4. Assessment of Risk to Development Outcome ......................................................... 17 5. Assessment of Bank and Borrower Performance ..................................................... 18 6. Lessons Learned........................................................................................................ 20 7. Comments on Issues Raised by Borrower/Implementing Agencies/Partners........... 21 Annex 1. Bank Lending and Implementation Support/Supervision Processes............. 22 Annex 2. Beneficiary Survey Results ........................................................................... 23 Annex 3. Stakeholder Workshop Report and Results................................................... 23 Annex 4. Summary of Borrower's ICR and/or Comments on Draft ICR ..................... 24 Annex 5. Comments of Cofinanciers and Other Partners/Stakeholders ....................... 25 Annex 6. Citizen Engagement in Policy Priorization: The Estado em Rede experience ....................................................................................................................................... 26 Annex 7. Forest Plantation Policy: Limitations to State intervention .......................... 32 MAP .............................................................................................................................. 36 ii A. Basic Information Third Minas Gerais Country: Brazil Program Name: Development Partnership DPL Program ID: P121590 L/C/TF Number(s): IBRD-81870 ICR Date: 04/24/2014 ICR Type: Core ICR THE STATE OF Lending Instrument: DPL Borrower: MINAS GERAIS BRAZIL Original Total US$ 450.00M Disbursed Amount: US$ 450.00M Commitment: Revised Amount: US$ 450.00M Implementing Agencies: State Secretariat of Planning and Management (Secretaria Estadual do Planejamento e Gestão - SEPLAG Cofinanciers and Other External Partners: Agence Française de Développement B. Key Dates Revised / Actual Process Date Process Original Date Date(s) Concept Review: 08/04/2011 Effectiveness: 12/13/2012 12/10/2012 Appraisal: 03/29/2012 Restructuring(s): Approval: 07/26/2012 Mid-term Review: Closing: 01/31/2014 01/31/2014 C. Ratings Summary C.1 Performance Rating by ICR Outcomes: Satisfactory Risk to Development Outcome: Low or Negligible Bank Performance: Satisfactory Borrower Performance: Highly Satisfactory C.2 Detailed Ratings of Bank and Borrower Performance (by ICR) Bank Ratings Borrower Ratings Quality at Entry: Moderately Satisfactory Government: Highly Satisfactory Implementing Quality of Supervision: Satisfactory Highly Satisfactory Agency/Agencies: Overall Bank Overall Borrower Satisfactory Highly Satisfactory Performance: Performance: iii C.3 Quality at Entry and Implementation Performance Indicators Implementation QAG Assessments Indicators Rating: Performance (if any) Potential Problem Program Quality at Entry No None at any time (Yes/No): (QEA): Problem Program at any Quality of No None time (Yes/No): Supervision (QSA): DO rating before Highly Satisfactory Closing/Inactive status: D. Sector and Theme Codes Original Actual Sector Code (as % of total Bank financing) General education sector 15 15 General energy sector 10 10 General industry and trade sector 10 10 Other social services 15 15 Sub-national government administration 50 50 Theme Code (as % of total Bank financing) Education for all 10 10 Environmental policies and institutions 20 20 Managing for development results 20 20 Public expenditure, financial management and 30 30 procurement Social safety nets 20 20 E. Bank Staff Positions At ICR At Approval Vice President: Jorge Familiar Hasan A. Tuluy Country Director: Deborah L. Wetzel Deborah L. Wetzel Practice Manager: Arturo Herrera Gutierrez Arturo Herrera Gutierrez Program Team Leader: Roland N. Clarke Roland N. Clarke ICR Team Leader: Fanny Weiner ICR Primary Author: Chris Parel iv F. Results Framework Analysis Program Development Objectives (from Project Appraisal Document) Assist the Government of Minas Gerais to deepen its innovative management model and strengthen its budget management and sectoral policy management in the areas of social inclusion, environmental management and metropolitan governance. Revised Program Development Objectives (if any, as approved by original approving authority) N/A (a) PDO Indicator(s) Formally Actual Value Original Target Revised Achieved at Indicator Baseline Value Values (from Target Completion or approval documents) Values Target Years Indicator 1: Share of Strategic Projects with an execution rate above 85% Value (quantitative or 61.00% 63.00% 88.77% Qualitative) Date achieved 06/25/2012 01/31/2014 12/30/2013 Comments Overachieved (incl. % achievement) Percentage of budget items with contracts greater than the annual budget Indicator 2: allocation Value (quantitative or 16.12% 8.06% 1.45% Qualitative) Date achieved 06/25/2012 01/31/2014 12/29/2013 Comments (incl. % Overachieved achievement) Percentage share of government programs and projects for which Indicator 3: screening and evaluation procedures are operational (value amount as share of total PPA) Value (quantitative or 0.79% 9.12% 6.24% Qualitative) Date achieved 06/25/2012 01/31/2014 12/29/2013 Underachieved. A pilot application of the screening and evaluation procedures to priority on-going programs indicated that the methodology Comments was unsuited for these and the methodology changed to evaluate (incl. % achievement) Investment Projects with values above R$10 million. 76 percent of these projects were evaluated, showing considerable improvement in that particular area of focus. Indicator 4 : Level of citizen participation in the identification of regional priorities. Five strategic Five strategic priorities priorities identified for each of Value identified for the five additional No additional (quantitative or each of the regions of the state regions identified. Qualitative) regions of the with the participation state - North and of civil society. v Rio Doce - with the participation of civil society Date achieved 06/25/2012 01/31/2014 12/29/2013 Underachieved. The participatory model developed was launched in two pilot regions, however, due to the lack of capacity and training of civil society in these regions, participation was very passive. The Government thus decided to not expand the model to all ten regions as the pilot regions Comments did not achieve the results initially expected. Nevertheless, the Regional (incl. % achievement) Committees comprised of Government representatives with some civil society participation, eventually played a bigger role than initially expected in integrating civil society in the planning process and were kept in all ten regions. Percentage share of Municipalities receiving co-financing from the State Indicator 5 : for the delivery of social services Value (quantitative or 25.00 70.00 100.00 Qualitative) Date achieved 06/25/2012 01/31/2014 12/31/2013 Comments Overachieved (incl. % achievement) Number of municipalities with IGD-M below 0.55 (register validation and Indicator 6 : quality) Value (quantitative or 90 municipalities 45 municipalities 11 municipalities Qualitative) Date achieved 06/25/2012 01/31/2014 12/31/2013 Comments Overachieved (incl. % achievement) Backlog of education personnel records modification (informativos de Indicator 7 : alteração) to be included in SISAP-MG Value 91,917 178 remaining to be (quantitative or modifications to 18,383 included Qualitative) be included Date achieved 06/25/2012 01/31/2014 12/31/2013 Comments Overachieved (incl. % achievement) Share of students reaching adequate learning levels or higher on the Indicator 8 : annual PROEB exam Portuguese: 5th Portuguese: 5th year - Portuguese: 5th year year - 42.1%; 9th 46.5%; 9th year - – 45.9%; 9th year – year - 33.7%; 36.3%; 12th year - 40.5%; 12th year – Value 12th year - 29.7% 37.5% 36.3%% (quantitative or Math: 5th year - Math: 5th year - Math: 5th year – Qualitative) 57%; 9th year - 61.5%; 9th year - 59.7%; 9th year – 21.2%; 12th year 25.8%; 12th year - 22.9%; 12th year – - 3.7% 5.5% 3.85%. Date achieved 06/25/2012 01/31/2014 12/31/2013 Comments Underachieved. The targets were excessively ambitious, in the short vi (incl. % achievement) term, given the teacher’s strike in 2011, and because previous reforms had already raised the level of education to among the best in the country. Share of irregular business undertakings monitored after being identified Indicator 9 : through the Special Inspection Operations to ensure mitigation measures are implemented Value (quantitative or 0.00 100.00 100.00 Qualitative) Date achieved 06/25/2012 01/31/2014 12/30/2013 Comments Achieved. Out of the four irregular business undertakings identified (incl. % achievement) through the Special Inspection Operations all of them were monitored. Indicator 10 : Hectares of forest plantation to serve as raw input for charcoal production Value (quantitative or 94.325 hectares 108.474 hectares 62.227 hectares Qualitative) Date achieved 06/25/2012 01/31/2014 12/30/2013 Underachieved. The new phase of the Kyoto Protocol made Brazil ineligible for CDM payments removed all incentives from the Comments Government program (for unforeseeable reasons external to the (incl. % achievement) Government), although initial indications are that the target would have been met if the CDM had continued. Holding of regular meetings of the Territorial Management Commission Indicator 11 : (CGT) of the RMBH Value 19 meetings held in At least one every 60 (quantitative or 0 2013, one every 2 days Qualitative) weeks Date achieved 06/25/2012 01/31/2014 12/31/2013 Comments Overachieved (incl. % achievement) Average time, in days for the analysis of requests of prior approval for Indicator 12 : land parceling in RMBH. Value (quantitative or 27.52 days 23 days 10.45 days Qualitative) Date achieved 06/25/2012 01/31/2014 12/31/2013 Comments Overachieved (incl. % achievement) G. Ratings of Program Performance in ISRs Actual Date ISR No. DO IP Disbursements Archived (US$ millions) 1 11/12/2012 Satisfactory Satisfactory 0.00 2 03/20/2013 Highly Satisfactory Highly Satisfactory 448.88 3 12/09/2013 Highly Satisfactory Highly Satisfactory 448.88 H. Restructuring (if any): Not Applicable vii 1. Program Context, Development Objectives and Design 1.1 Context at Appraisal 1. Minas Gerais is often referred to as a microcosm of Brazil. Its income level is close to Brazil’s national average (ranked 10th out of 27 states in 2012), it has a very poor Northeastern region not different from the semi-arid northeastern sertão, and is home to a dynamic industrial area. Minas Gerais also has Brazil’s second largest population (19.5 million, representing 10 percent of Brazil’s total) and the economy is the third largest after São Paulo and Rio de Janeiro, and about the size of Peru. Between 2003 and 2012 Minas Gerais grew at an average rate of 4.5 percent, slightly above Brazil’s 4.4 percent. Nonetheless, the State’s economy remains vulnerable to the country and the world’s growth dynamics. 2. From 2003 Minas Gerais has had an unparalleled record of public sector reform and sustained engagement with the Bank. The administration elected in 2003 inherited a bankrupt state with large levels of debt, poor management and no investment. Consequently, the Government launched the results based management reform program, “Choque de Gestão” (Management Shock). It also addressed the dire fiscal situation by imposing fiscal discipline and constraining expenditures while rigorously defining priority programs. Within the new management framework secretaries were held accountable for meeting agreed performance indicators. In the ensuing decade the government successfully dealt with State’s indebtedness and fiscal constraints while improving public service delivery and significantly reducing poverty. 3. The Bank has supported the Government of Minas since 2006 through the “Minas Gerais Partnership Series”. The first operation under the partnership series was the 2006, US$170 million Minas Gerais Partnership for Development DPL (P088543). 1 It was followed by the 2008 Minas Gerais Partnership II SWAp (P101324), a US$976 million multi-sectoral project that was supplemented in 2010 by an Additional Financing (P119215) of US$461 million. The series was followed by this current operation in 2012. The Bank also played an important technical assistance role collaborating frequently in the fine-tuning of the Choque de Gestão and on sector programs. Minas Gerais Partnership for Minas Gerais Partnership II Third Minas Gerais Development DPL (2006) SWAp (2008) + Additional Development Partnership DPL Financing (2010) (2012) • Choque de Gestão - • Estado para Resultados - State • Estado em Rede - Management Shock (2003- for Results (2007-2010) - Management for 2006) - stressing fiscal stressing efficiency and results Citizenship (2011-2014) - balance stressing citizen participation 4. The Choque de Gestão was based upon priority programs and performance indicators to manage them. As the system evolved these targets were negotiated with sector secretariats that became accountable for delivering program results. By the time of 1 Owing to its compliance with the Federal Government’s (Fiscal Reform Law) debt limit rules, 2006 was the first year the State was allowed to borrow. 1 the SWAp, reforms had entered into a second phase - the Estado para Resultados (State for Results). In this phase, indicators were negotiated at the departmental level, with rewards and penalties linked to the achievement of goals. A special unit was established in the Secretariat of Planning (SEPLAG) to coordinate the elaboration of annual programs and monitor, evaluate and report results. By 2012, the Government strategy had evolved to a focus on citizen participation, called Estado em Rede (Management for Citizenship) with the aim of consolidating previous phases, increasing efficiency and building a permanent constituency through citizen participation while ensuring the model’s sustainability, through devolution of performance management to individual secretariats. It was organized across eleven thematic networks representing eleven key challenges to be overcome. 5. The Choque de Gestão and its subsequent phases have grown to impact every facet of State economic and administrative management. All Partnership Series operations provided cross-sectorial support to public sector management and the results based framework. Minas Gerais’ success, starting with the Choque de Gestão, was critical in managing the State’s economic recovery as well as improving service delivery. In effect, it transformed Minas from a bankrupt and poorly managed under-performer to a fiscally responsible state, featuring an innovative management model. It is considered to be a ‘gold standard’ of public sector management in Brazil and worldwide. 6. From 2004 to 2008 Minas Gerais consolidated the fiscal adjustment efforts initiated in 2003, significantly improving revenue and operating balances, increasing investments and reducing debt (see Table 1). Not only was it able to borrow after 2006 but by 2008 the State was in a much stronger position to withstand the deep global and domestic recession and fiscal challenges resulting from significant drops in state revenues and federal transfers. Table 1: Financial Results 2004-2011 (R$ billion—2011 constant values) Parameter 2004 2008 2011 Revenues 33.2 50.1 55.3 Expenses 28.6 39.8 45.7 Gross Operating Balance 2.5 6.4 4.7 -% of NCR 15.2 21.6 12.6 Net Current Revenue (NCR) 16.7 29.2 37.3 Primary Balance 2.3 3.7 2.7 -% of NCR 13.8 12.7 7.3 Non-Financial Investment/NCR 9.5 15.0 8.9 Debt/NCR 224.5 175.4 181.8 Source: Third Minas Gerais Partnership DPL PD, p. 14 7. The rate of extreme poverty in the State was reduced from 7.8 percent in 2003 to 3.3 percent in 2011. As part of a continuous effort to further reduce this rate, the Federal Government launched large programs to confront extreme poverty and to empower states to do likewise. Minas Gerais has incorporated poverty mitigation through the creation of the Programa Travessia, to identify the poorest communities and rationalize social protection program support across secretariats. The State also had strengthened the statewide social assistance services and supported a new social safety net funding program (Piso Mineiro de Assistência Social) complementing federal and municipal efforts. 2 8. At time of preparation of the operation, the Government of Minas Gerais (GoMG) had an appropriate fiscal framework, including its expenditure program and its fiscal relations with the Federal Government. Nevertheless, care was required in managing investment owing to projected growth of expenditure exceeding growth of revenue over the medium term and the downside risk that, despite major efforts, revenue might fall short of expectations. Of particular concern on the expenditure side was the medium term increase in the wage bill driven by teachers and public security. 9. The Bank’s debt sustainability diagnostic concluded that under any plausible set of external conditions the debt and fiscal dynamics were sustainable and consistent with the Federal Government’s Fiscal Responsibility Law (Lei de Responsabilidade Fiscal – LRF). However, diagnosis of the amortization profile confirmed a spike in 2035 amortization owing to debt owed to the State Energy Company (Companhia Energética de Minas Gerais S.A - CEMIG). Indexed to the IGP-DI price index (Índice Geral de Preços Disponibilidade Interna), the CEMIG debt was also the most expensive owed by the State and posed a potential future threat to sustainability. Rationale for Bank Involvement 10. Consolidation of Reforms and creating fiscal space. The DPL offered the opportunity to support the consolidation of important reforms addressed in previous Partnership Series loans. The consolidation required fiscal space for investment to further strengthen the reforms; at the same time, the GoMG made the decision to anticipate future debt payment to avoid unfavorable financing conditions of the existing CEMIG debt, which could have affected the State’s fiscal situation in the future. 11. Leveraging the State’s successful results-based management model as an example for other states. The aim of this operation was to maintain the support for the reforms being carried out by the GoMG, and to develop solutions to enhance public sector performance and service delivery issues which can be used by other states and countries. Since 2006, the Bank has been committed to supporting the evolution of this innovative results based management model. Through its Partnership Series, the World Bank had become a major stakeholder in successfully implementing the Choque de Gestão. The success of the public sector reforms in Minas Gerais proved to be an important model with continuing and useful demonstration effects for Brazilian states and other countries confronting similar development problems. 12. Building upon the CPS. The DPL aligned well with the Brazil Country Partnership Strategy (CPS) for 2012-2015 2. The DPL policy measures addressed four CPS pillars: (i) increasing the efficiency of public and private sector investments; (ii) improving the quality of public services for low income households; (iii) promoting regional economic development; and (iv) improving sustainable natural resource management and climate resilience. 3 2 Country Partnership Strategy 2012-2015 (Report No. 63731-BR) discussed by the Executive Directors on November 1, 2011. 3 Although not mentioned in the PD, the DPL was also well-aligned with the Middle Income Countries Strategy, which emphasized knowledge services, financial services, flexibility and sub-national focus. 3 13. Strengthening long run financial sustainability. The GoMG recognized that the terms of payment of the CEMIG debt presented a threat to future fiscal sustainability and had negotiated a refinancing arrangement including a cash discount of 35 percent on the current debt face value, if this were to be repaid immediately. This arrangement required resources of about US$2 billion, but would reduce the debt face value as well as decrease the real cost of service, thus increasing fiscal space for investment or providing an additional margin to deal with any external shocks. 14. Leveraging external finance. The initial request from the State to the Bank was for a loan of about US$ 2 billion. While the Bank could not supply this volume of resources on its own, it worked with the State to develop alternative innovative financing solutions. During the preparation of the loan operation, the Bank Treasury provided advice and guidance on the possible structure of a refinancing operation, and explored various options including guarantees of private sector loans. The solution developed in the end involved a parallel financing operation with the Agence Française de Développement (AFD) and Credit Suisse to refinance the CEMIG debt. AFD provided a €300 million loan based on a program closely coordinated with the World Bank operation, while Credit Suisse lent US$1.3 billion. The refinancing package was one of the first times since the institution of the Fiscal Responsibility Law that a subnational government in Brazil was able to borrow from an external private sector lender without the guarantee of a multilateral or bilateral development agency. In this sense it was an important innovation facilitated by the World Bank operation, and represented a return to market financing for the State of Minas Gerais, providing an example for other well managed and reforming states in Brazil. 1.2 Original Program Development Objectives (PDO) and Key Indicators (as approved) 15. The PDO was to assist the Government of Minas Gerais to deepen its innovative management model and strengthen its budget management and sectoral policy management in the areas of social inclusion, environmental management and metropolitan governance. Table 2: Policy Area Objectives and Key Outcome Indicators Policy Areas and Objectives Key Outcome Indicators Policy Area 1: Strengthening Public Sector and Budgetary Management Increased robustness and • Increased share of strategic programs with execution rate above sustainability of RBM Model 85% (target 63%) • 50% reduction in the number of budget items with contract Increased predictability and commitments above annual budget allocation control of budget execution • Evaluation procedures extended from 0.79% to 9.12% of Government programs • Five additional “Notebooks of regional priorities” published, Increased citizen participation in identifying regional priorities for additional five regions of the State identification of regional priorities produced through formal consultation procedures Policy Area 2. Promoting Social Inclusion Reduce poverty in the most • Percentage share of municipalities receiving co-financing from the disadvantaged areas so as to State for the delivery of social services (Social Assistance Floor of reduce exclusion and regional Minas Gerais program) increased from 25% to 70% inequalities • Reduction of 50% in number of municipalities with IGD-M score below 0.55 Strengthen the management of • Increase the share of students reaching adequate learning levels or 4 quality of education higher on the annual PROEB exam—Portuguese and math • 80% Reduction in the backlog of education personal records modifications to be included in Personal Records System of Minas Gerais (SIAP-MG) Policy Area 3: Increasing Environmental Sustainability Strengthen the quality of • 100% of irregular business undertakings monitored after being environmental management identified through a Special Inspection Operation to ensure mitigation measures are implemented. • At least 108,474 hectares of new forest plantations for charcoal production are established Policy Area 4: Developing a Metropolitan Governance Framework Strengthen governance of the • Regular meetings (at least one every 60 days) of Territorial Metropolitan Region of Belo Management Commission (CGT) for Belo Horizonte Metropolitan Horizonte (RMBH) improving Area are held coordination of state and • Reduce the average time from 27.5 to 23 days for the analysis of municipal public policies. requests of prior approval for land parceling in RMBH. 1.3 Revised PDO and Key Indicators, and Reasons/Justification N/A 1.4 Original Policy Areas Supported by the Program 11. This operation comprised four Policy Areas: (i) Strengthening Public Sector and Budget Management; (ii) Promoting Social Inclusion; (iii) Increasing Environmental Sustainability; and (iv) Developing a Metropolitan Governance Framework. In addition, it included a cross cutting theme of improved fiscal sustainability and increased fiscal space through leveraging external financing for the refinancing of the CEMIG debt. Policy Area 1: Strengthening Public Sector and Budget Management 12. The Government’s objective under this policy area was to deepen its innovative management model, strengthen its budget management and promote greater citizen participation in the definition of regional priorities. While previous reform phases had a strong “center of government” bias, being highly dependent on the roles of the Secretariats of Finance and Planning, the leading role exerted from the center of government on the implementation of sector policies began to be seen as counterproductive in the long run. Moreover, a key weakness of the model was the fact that it could easily be dismantled from the center by a future administration, for instance with the setting of easier targets or loosening of controls. 13. To increase the robustness and sustainability of the Results-based Management Model, the GoMG shifted responsibilities to line secretariats. Under this phase of the reform supported by this DPL, the public management systems were moved away from a model where power was centralized in the “State for Results Unit” (Unidade Estado para Resultados) and the Planning and Finance Secretariats, to one where authority is embedded in line secretariats’ operation units, thereby enhancing ownership of service delivery teams. This was achieved by establishing 22 Strategic Management and Innovation Units (AGEI’s) within line secretariats transferring the monitoring of sector policies, definition of targets and responses to problems to line secretariats. 5 14. At the same time, the State took an important step in improving predictability and control of budget execution to ensure that investment projects were cost effective and sustainable in the medium term. This required, inter alia, assuring that: (i) projects were adequately reviewed and included reasonable assumptions; (ii) data on contractual commitments were available to avoid unforeseen payments requiring short term budget adjustments; and (iii) budgeted funds were used for their intended purpose. The introduction of new procedures for budget execution planning and evaluation of investments consequently was supported under the DPL. A major policy reform and advance was the migration to a new integrated financial system, which improved the level of data exchange within the system and facilitated the introduction of the new accounting regulations. 15. In order to enhance budget allocation efficiency, a methodology for screening and evaluation of investment projects was developed and formally launched in 2011. The first step in mainstreaming the system was supported in this DPL. The policy reform ensured that all projects exceeding roughly US$2 million co-financed through voluntary transfers from the Federal Government were subjected to rigorous prior review, in order to ensure that they could be implemented as planned and would not result in an undue use of State resources (both financial and administrative) for implementation. 16. Finally, the budget reform included the State’s pilot for expanding citizen participation. The reform contemplated empowering citizens, especially in poorer regions, to participate in the selection of development priorities. As part of the Estado em Rede program, it was intended to increase understanding of and support for results-based management while refining priorities and upgrading implementation by involving local governments and civil society in priority settings. Policy Area 2: Promoting Social Inclusion 17. The GoMG has been very successful in its efforts to eradicate extreme poverty, reducing the incidence from 8 percent in 2005 to 3 percent in 2009. Nevertheless, about 6 percent of the rural population was living in extreme poverty in 2009 and there was a large variance in extreme poverty rates across the 853 municipalities. Once the Government’s Choque de Gestão results-based management model was firmly in place, the State increasingly focused on reducing poverty and regional inequities. This was intended to be achieved through programs focusing resources in the most deprived areas. 18. The first policy action included a co-financing structure to support the provision of social services at the municipal level. To that end, the Social Safety Net Piso Mineiro de Assistência Social was established. The Piso Mineiro increased resource transfers to poor municipalities through state co-financing of services and benefits which complemented federal and municipal funding. The calculation of the transfer was based on the number of registered families in the Federal Government’s Single Registry of Beneficiaries, the CadÚnico, which currently constitutes a keystone of several social programs in the country. 19. A second policy reform was directed at collecting data on and increasing knowledge of the conditions in the poor municipalities, identifying causes, effects and instruments to mitigate poverty. This was implemented through the “Door-to- Door” program Programa Travessia, which supports the municipalities with the 6 preparation of poverty or “Deprivation Maps”. These maps show key vulnerabilities, identifying poor families yet to be included in the CadÚnico, and provide support in the definition of social programs to address the municipality’s key social needs. 20. A third intervention focused on improving management in public schools throughout the State by adopting merit-based selection for regional school superintendents and directors. While not explicitly targeting poorer municipalities, it supported social inclusion because wealthier students tend to opt out of the public school system in favor of private schools. Hence, the public schools serve virtually all of the State’s poor and near-poor student population. Policy Area 3: Increasing Environmental Sustainability 21. Minas Gerais is among Brazil’s largest states, with enormous natural resources and important biomes. Owing to the workload and difficulties of coordination involved in issuing environmental licenses, there was insufficient follow-up on inspection and mitigation. Hence, the State reformed the organization, roles and responsibilities of its environmental agencies to integrate environmental management functions in the administration so that regulatory and oversight actions occurred in a more systematic and coordinated manner. 22. One of the State’s critical environmental challenges is deforestation to produce charcoal, the energy source for many of the State’s 62 pig iron mills. Minas Gerais produces 60 percent of Brazil’s iron and steel and most of the charcoal has come from illegal deforestation of the Cerrado biome. The State approved legislation requiring that by 2018 at least 95 percent of charcoal consumed should originate from managed plantations in order to encourage forest plantation within the State’s territory. A key Government objective was to create incentives and conditions for planned forestation and to define the financial and technical mechanisms to promote tree plantations under strict environmental sustainability parameters for all sizes on rural landholdings. In addition, it intended to lay out the process to develop a programmatic Clean Development Mechanism (CDM) under the Kyoto Protocol, with the aim to increase attractiveness of the plantations and provide key initial resources to the farmers (See also Annex 7). Policy Area 4: Developing a Metropolitan Governance Framework 23. The development and eventual implementation of an urban master plan is part of a long process that was, at the time of the loan preparation, unique in Brazil and in Latin America. In 2004 an amendment to the State Constitution was approved, allowing for the creation of metropolitan regions to improve planning and development. Additional legislation passed between 2006 and 2009 introduced institutional arrangements for governing the Metropolitan Region of Belo Horizonte (RMBH). The RMBH has about 5.5 million inhabitants, making it the third largest metropolitan area in the country after São Paulo and Rio de Janeiro, and is an industrial powerhouse. The objective was to promote effective policy coordination among different state and municipal government stakeholders that are coordinated in the Consultative Council of Metropolitan Development (Conselho Deliberativo de Desenvolvimento) in the RMBH, and which is entrusted with the preparation and adoption of the Integrated Development Master Plan. This strategic plan presented guidelines and proposals on public policies and 7 investments that guide regional development. The Plan was focused on urban areas where poverty and social vulnerability are concentrated through a combination of structural investments and coordinated measures of social development, environmental quality, generation of jobs, and delivery of local public services. Fiscal sustainability and external financing 24. The Bank team worked very closely with the Agence Française de Développement (AFD), which prepared a parallel financing of €300 million to support the reduction of social and regional inequalities in the State of Minas Gerais. The AFD operation also had a budget support format and was based on the GoMG’s strategy to broaden the coverage of basic infrastructure and housing in the poorest regions of the State. The AFD operation supported the refinancing of the State’s debt with CEMIG. Although AFD’s mandate does not include the support for broad reforms of public administration, the agency recognized the advances made by the GoMG with the support of the World Bank and the importance of the current reform program. As a result, the approval of the AFD operation was conditional on the approval of the World Bank operation. In addition to the €300 million loan with 20 year maturity from AFD, Credit Suisse, chosen in a competitive process with other private banks, provided US$1.3 billion with 15 year maturity and 5 year grace period to refinance the CEMIG debt. 1.5 Revised Policy Areas N/A 1.6 Other significant changes N/A 2. Key Factors Affecting Implementation and Outcomes 2.1 Program Performance 25. All required policy actions were satisfied in a timely manner, with no delays in effectiveness or disbursement. The Prior Actions have significantly advanced the State’s development agenda and have resulted in significant impact, as described below. While some of the indicators, specifically the ones on citizen participation and commercial tree planting have been missed, many outcomes were achieved and valuable lessons were learned. Indeed the State responded pro-actively to the missed indicators and used them as an opportunity to learn and adapt policy interventions. 2.2 Major Factors Affecting Implementation 26. Government commitment. Minas Gerais was and continues to be fully committed to the continuous reforms carried out since the Choque de Gestão. The Prior Actions and Results Indicators came from the State’s development agenda; hence the strong ownership and the fact that the operation was deeply embedded into the Government program strongly facilitated the implementation. Perhaps the most important evidence of commitment was the fact that the Government had been progressing systematically in its reform agenda, and thus had a long track record of implementation of reforms. 8 27. Political and Institutional Risk. In the particular case of the implementation of the citizen participation model, the risk identified during preparation materialized and resulted in the non-expansion of the participatory model to all regions of the State. Despite strong political support, the implementation process and the necessary adjustments that the model seemed to require could not be achieved within the time of the implementation, but require a longer time period. However, valuable lessons learned for the design of citizen participation were obtained and the Government continues adjusting its approach on how to better involve citizens (See Annex 6). 28. Operation design. This DPL was anchored in the Government’s current phase of the reform (Estado em Rede) and based on progress initiated by previous Partnership Series operations. The four DPL policy areas were highly relevant and well reflected in the PDO, and aligned with the Government’s development agenda and the Bank’s CPS. The choice of a DPL was appropriate as disbursement to the treasury single account relieved fiscal pressure. Support of selected policy areas furthermore allowed the consolidation of previous reform efforts. 2.3 Monitoring and Evaluation (M&E) Design, Implementation and Utilization 29. Design. The choice of a DPL covering multiple sectors and supporting various priority policy areas of the GoMG not only reflected the Government’s commitment, but also backed inter-governmental coordination and the consolidation of previous multi-sector approaches. However, the original design of the results framework was weak and was not able to capture all of the progress made with the supported policy reforms (see Section 3.2). 30. Implementation. The Secretariat of Planning and Management (Secretaria do Planejamento e Gestão - SEPLAG) had overall responsibility for M&E, reporting progress and coordinating actions with other involved secretariats. As in the case of the other Partnership Series operations, the management of M&E and liaison with the Bank was carried out by the unit (Gestão Estratégica dos Recursos e Ações do Estado - GERAES) that focuses on day-to-day implementation of the Government’s strategic program. SEPLAG led the actions under Policy Area 1; the Secretariats of Social Development (Secretaria de Estado de Trabalho e Desenvolvimento Social - SEDESE) and Education (Secretaria Estadual de Educação - SEE) were jointly responsible for implementation of reforms under Policy Area 2. Policy Area 3 was the responsibility of the State Secretariat for Environment and Sustainable Development (Secretaria de Estado de Meio Ambiente e Desenvolvimento Sustentável - SEMAD) and the State Institute for Forest (Instituto Estadual Florestal - IEF). Finally, the Secretariat for Metropolitan Governance (Secretaria de Gestão Metropolitana - SEGEM) and the Development Agency of the Metropolitan Region of Belo Horizonte (Agência de Desenvolvimento da Região Metropolitana de Belo Horizonte - ARMBH) were responsible for Policy Area 4. As in previous Partnership Series operations, the monitoring of Results Indicators was carried out satisfactorily by the client, and collaboration and communication with the Bank continued to be very good. Consequently, the Bank was aware that some 2013 indicators were at risk (owing to design and not M&E problems) and the State provided detailed explanations. One of the particular strengths of monitoring and evaluation (and indeed overall implementation) was the high degree of coordination across secretariats through SEPLAG, which is also evidence of the efficacy of the management model adopted over the past decade. 9 31. M&E Systems. Finally, this DPL and its M&E design significantly supported the strengthening of the State’s already well-articulated M&E framework, i.e. through the adoption of the SIAFI/MG budget model, and the prior review of investment projects. 2.4 Expected Next Phase/Follow-up Operation (if any) 32. This operation, in conjunction with the Minas Gerais SWAp, created a rich venue for continued collaboration in the Partnership Series. This longstanding relationship between the State of Minas Gerais and the Bank is likely to continue in the future, as it is an important factor in the continuous consolidation of the State’s reform process. The State has already expressed interest in a follow up operation to support the development of the Belo Horizonte Metropolitan Area. 3. Assessment of Outcomes 3.1 Relevance of Objectives, Design and Implementation 33. The operation was developed based on the State’s development agenda and was aligned with the Brazil Country Partnership Strategy. The DPL policy measures address four CPS pillars: (i) increasing the efficiency of public and private sector investments; (ii) improving the quality of public services for low income households; (iii) promoting regional economic development; and (iv) improving sustainable natural resource management and climate resilience. The design and objectives were and remain highly relevant for Brazil and for Minas Gerais. This operation was the third in the Minas Gerais Partnership Series and has supported the continuation and consolidation of the Government reform program. 34. The Results Indicators were generally relevant. Nevertheless, some of the Results Indicators could have benefitted from narrower and more operational definitions given the long chain of causality between public sector reforms and sector specific service delivery. For example, on Prior Action 7, while over the medium to long term it would be reasonable to expect improved management has a direct impact on educational outcomes, it would be difficult to attribute the achievement (or non-achievement) of the results indicator to an improved selection process of school managers in the short time frame of the project. The result indicator for Prior Action 10, the number of times the Conselho Deliberativo de Desenvolvimento held meetings, should be considered an intermediate result (i.e. the policy is actively being implemented) but cannot measure the final desired outcome, which would include better social and economic development indicators for the RMBH in future years. Furthermore, as one of the rationales of the operation – even though not specifically mentioned in the PDO – was to re-finance the debt with CEMIG and to improve the State’s debt sustainability, the project design would have benefitted from an indicator reflecting this. 3.2 Achievement of Program Development Objectives 35. The PDO was to assist the Government of Minas Gerais to deepen its innovative management model and strengthen budget management and sector policy management in the areas of social inclusion, environmental management and metropolitan governance. Policy Area 1 supported the deepening of the innovative management model and 10 strengthened budget management, while the other Policy Areas supported the respective sector policies. The results achieved under each Policy Area are described below. Policy Area 1 – Strengthening public sector and budgetary management 36. This policy area aimed at strengthening the RBM organizational structure, systems and processes. Hence the first Prior Action decentralized RBM functions by establishing 22 Strategic Management & Innovation Units in the line secretariats. This decentralization of monitoring in turn promoted further institutionalization of strategic management and built capacity throughout the administrative apparatus and ultimately improved execution capacity. In line with this, the linked Results Indicator (RI), as targeted (improvements in the execution rates of priority projects -above an 85 percent rating), was overachieved, reaching 88.8 percent of priority projects relative to a baseline of 61 percent. 37. The second and third Prior Actions targeted the introduction of systemic and process reforms through upgrading the SIAFI/MG integrated budget model and completing rigorous prior-reviews of larger investment projects. The introduction of SIAFI/MG allows for monitoring of commitments relative to the planned budget, direct action with the line ministries to ensure compatibility between commitments and budgetary planning, and expansion of the budgetary management for new contracts before the procurement processes. Ultimately, the new procurement portal can block purchase requests that have estimated values beyond the budgetary credit available. Overall, this system improved the predictability and control of budget execution, which was reflected in a decrease in the percentage of budget items with contracts greater than the annual budget allocations from 16.12 percent to 14.5 percent, exceeding the original target of 8.45 percent. 38. The rigorous prior-reviews of investment projects required the previous evaluation of costs and impacts for projects with values above R$5 million. In 2012, 18 convênios were evaluated, and in 2013 the value was raised by decree to R$10 million, changing the focus of the evaluation portfolio to Investment Projects and Associated Projects. An entire methodology for evaluation of the projects was developed and this process is now systematized and institutionalized. The Results Indicator that targeted increasing the (value) share of projects for which screening and evaluation had been performed was underachieved. Approximately 6.2 percent of the total PPA projects were evaluated relative to a target of 9.12 percent. However, 76 percent of the Investment Projects with values above R$10 million were evaluated, showing considerable improvement in that particular area of focus. Moreover the methodology of prior-review is now well established in the State. 39. The final Prior Action targeted broader civil society participation in identifying priorities, particularly with a regional focus. The participatory model developed was launched in two pilot regions where regional meetings and forums were established, facilitated and closely monitored. However, due to the lack of capacity and training of civil society in these regions, the participation was very passive (see Annex 6). The Government then decided not to expand the model to all ten regions as the pilot regions did not achieve the results initially expected. Nevertheless, the Regional Committees comprised of Government representatives with some civil society participation, eventually played a bigger role than initially expected in integrating civil society in the planning 11 process and were kept in all ten regions. Furthermore, the State undertook an evaluation of the program’s results and reasons for the unexpected outcomes and showed great effort in trying to understand why the participatory model did not work as expected and how to improve it (see Annex 6 for a summary of the Government’s evaluation). 40. Citizen participation is also embedded through local consultations as part of the federal government’s Multi-Year Plan (Plano Plurianual-PPA). The fact that the participatory model did not reach the results expected is somewhat mitigated by the fact that the federal government’s PPA process requires local consultations in devising annual budgets and the State, through its RBM system and deconcentration, continues to identify and vet priorities. Furthermore, the Regional Committees still maintain an element of citizen participation, even though not as formal and structured as initially planned with the Regional Forums. 41. Overall, Policy Area 1 achieved two of the three Results Indicators and the actual outcomes achieved far exceed the results represented by the indicators. The GoMG went to great lengths into the decentralization of the management model, the institutionalization of better budgetary controls, and increase in citizen participation. While not all of the reforms achieved the expected level of success, as was the case for the citizen participation, this resulted in important lessons learned and opportunities to improve future efforts in this area. Indeed the process of learning by doing or “feeling the stones to cross the river” has been one of the hallmarks of the Minas reform process, whereby successful experiments are adopted and less successful ones are adapted or dropped. Policy Area 2 - Promoting Social Inclusion 42. In Policy Area 2, the main objective was broadly to strengthen management of social protection and education services, and increase their supply for the poor through increase in resources — diagnostics, funding and service delivery. It was recognized that a major challenge was the uneven management capacity across municipalities, which undermined the implementation of social inclusion programs at the municipal level. To strengthen and improve the coordination amongst the various government-level programs for income transfer, productive inclusion and provision of public services, the GoMG took measures for co-financing of social services provided by the municipalities and improvement in the identification of poor families entitled to receive assistance from federal, state and municipal social programs. The Piso Mineiro provided supplementary flexible resources needed by municipalities to finance services and benefits to the most vulnerable and at risk local populations in municipalities based upon the number of poor families registered in the CadÚnico. 43. Related to that, along the period of this operation, there was an increase in the number of municipalities receiving state transfers. In fact, all 853 municipalities of Minas Gerais were granted the Piso Mineiro by 2013, ahead of the 2014 schedule. Also, municipalities of Minas Gerais significantly improved their IGD-M 4 scores. There was a 4 The IGD-M was created to fund the identification and monitoring of the most vulnerable families by municipalities. It measures the quality of municipal management of Bolsa Família Program (PBF) and CadÚnico and, based upon performance, ensures monthly federal transfer of funds to municipalities. To receive the resources of the IGD-M, the municipality must score minimum index of 0.55. 12 reduction of more than 85 percent in the number of municipalities which IGD-M scored less than 0.55. The overall increase in the IGD-M scores for municipalities, and their compliance with federal social safety net guidelines, eventually yielded higher federal transfers to municipalities. Hence, results indicators 5 and 6 were exceeded, and there was supposedly an increased availability of funding from both federal and state level social programs to municipalities in Minas Gerais. 44. The Prior Action regarding the amendment of the Programa Travessia to increase diagnostics studies in poor municipalities had no associated Results Indicator. However, the State has produced more than 140 Social Deprivation Maps based on the UNDP methodology. Accordingly, they portray the multidimensional aspects of poverty that go beyond economic variables and include health, education, living conditions, and provide a fundamental tool for planning and designing adequate government programs to address the needs of the most vulnerable. 45. The Prior Action for the education sector (the introduction of merit based selection of regional officials and school directors) was particularly important. It is linked to the specific objective of strengthening the management and quality of education according to the rationale that ensuring higher standards in the education system management shall improve overall efficiency and thus have a positive impact on students in lower-income neighborhoods and poorer-performing schools. The RIs associated with this Prior Action refer to the expected short-term stronger managerial performance by the recently selected cadre, measured in terms of the increase in education personnel with updated records in the human resource system, and the longer-term impact on the performance of student learning levels. As such, there was a 99,8 percent reduction in the backlog of education personnel records in the Human Resources System (Sistema Eletrônico de Administração de Pessoal do Estado de Minas Gerais – SISAP-MG), i.e. from a backlog of records to be addressed and input of nearly 92,000 the remaining stock was only 178. This represents an overachievement of the original target. 46. The final RI, namely improved PROEB school testing results in Math and Portuguese, however, was not fully met. All three grades tested in Math and Portuguese exceeded the 2011 PROEB test scores. Nonetheless, the baseline was set as 2010 given the timing for preparation of the project. The rigid baseline and challenging targets were not altered and did not compensate for the longest strike of teachers in the State’s history (112 days), from June to September 2011. Yet the impact of the strike undoubtedly affected performance of schools in the next two years. In addition, as previously stated, the period for monitoring and evaluation of the operation, was clearly too short to assess the impact of the managerial reform. While good school directors are known to be an essential input of learning performance this could not measurably affect improvement in test scores in two to three years, especially with such a disruption in teaching activities. 47. This notwithstanding, there are mitigating circumstances pertinent to the evaluation of education performance. A mitigating factor is that Minas Gerais was starting from a high level relative to other states owing to numerous reforms implemented over the past decade. In 2011 the State scored first in Portuguese and Math in percentage of students performing at the recommended level in the 5th and 9th grades of basic education and the 3rd year middle school in math, while ranking 4th in Portuguese. Also in terms of Index for Basic Education Development (Índice de Desenvolvimento da Educação 13 Básica – IDEB) test scores the early and later years of basic education and middle school ranked first, second and third respectively. Hence, the shortfall on the test score indicator is not representative of continuing recent progress in the education sector in Minas Gerais. Policy Area 3 - Increasing environmental sustainability 48. The goal of this policy area was to increase state capacity for managing environmental challenges. On the institutional side, responsibilities and business processes on environmental licensing were integrated to ensure better collaboration and more efficient environmental regulatory system. Through the reorganization of the Secretariat of Environment and Sustainable Development (Secretaria Estadual de Meio Ambiente e Desenvolvimento Sustentável – SEMAD) two new Sub-Secretariats were created: the Sub- Secretaria for Management and Regularization (Subsecretaria de Gestão e Regularização Ambiental Integrada – SGRAI) and the Sub-Secretariat for Control and Inspection (Subsecretaria de Controle e Fiscalização Ambiental Integrada – SUCFIS). Both Sub- Secretariats work through decentralized regional offices, yet with an integrated centralized oversight. As a result of the integration and the use of synergies, work flows and communication were improved, and the Government was able to significantly increase controls of compliance with environmental regulations. 49. Special emphasis was given to the detection of non-compliance with environmental regulations. During 2012 and 2013, “Special Oversight Operations” (Operações Especiais de Fiscalização) including aerial mapping of remote forest areas to detect illegal deforestation, and extensive testing on water quality to reveal clandestine disposal of waste waters found four cases of non-compliance with environmental regulations. All of these irregular business undertakings were then closely monitored to assure improvements of the previous situation and compliance with the regulations. 50. Another action undertaken in this Policy Area was the adoption of measures to encourage forest plantation to supply raw input to State metallurgy industries. The intention was to diminish the harvesting of native forest for charcoal production and to stimulate commercial tree planting carried out by the private sector and entrepreneurs, which had been declining since 2009. While it was intended to increase the hectares of planted forest, the number actually decreased by about 35 percent during the time of the project. The Government action was also linked to Brazil’s participation in the Clean Development Mechanism (CDM) under the Kyoto Protocol, which was expected to finance new tree plantations. 51. However, the new phase of the Protocol unexpectedly declared high-middle income countries, including Brazil, ineligible for the financing scheme. When the CDM payments were discontinued, there was no other mechanism that could have substituted the absence of those payments. Additionally, private sector incentives were further diluted by the recession and a decrease in demand for raw input for charcoal production resulting in a 50 percent decrease of the plantation area for new trees from about 200,000 hectare in 2008 to 100,000 hectare in 2012 The Government could have launched its own incentive program, but due to the decreased demand and a potential time lag for such a program to show results, it would most likely not have been cost effective. It can be assumed that if those two external factors (CDM mechanism and 14 economic conditions) had continued, the commercial tree planting would have increased by up to 50 percent. Annex 7 describes in detail the background and lessons learned, including the proposed policies going forward. 52. It should also be underlined that the State undertook several actions to diminish the harvesting of native forest for charcoal production. For example, the State has recently passed laws and regulations requiring 95 percent of raw wood materials to be supplied from cultivated forests. It has eliminated the import of natural forest products from other states to ensure that their forests are not cut to supply local charcoal needs. Each pig iron or steel mill is required to develop annual plans for sustainable supply of wood and charcoal. The State intends to implement these laws including reviewing wood sourcing plans, the use of border crossing point freight inspections and satellites to verify planted areas. These laws are integrated into a broad- reaching, multi-faceted environmental framework that will contribute to ending the harvesting of pristine forests for charcoal. 5 Policy Area 4 - Developing a metropolitan governance framework 53. The key outcome associated with Policy Area 4 was to strengthen governance of the RMBH to enable the coordination of State and Municipal public policies. Accordingly, the respective Prior Action required that the RMBH Metropolitan Authority adopt an integrated regional development master plan. This approach, which was also supported through the Minas Gerais SWAp operation, established the guidelines and orientation on public policies and investments for promoting the development of the region, aiming at improving the quality of life of the RMBH’s population. 54. The state achieved both Results Indicators which targeted more rapid land parceling procedures and regular agency meetings. The RI requiring regular Commission meetings was intended to ensure that a key new metropolitan agency was operational and performing its important intersectoral and intergovernmental coordinating functions. The Commission was supposed to meet every two months and exceeded this target with one meeting every 15 days, suggesting that it was very actively carrying out its functions. The reduction in the average time for the analysis of requests of prior approval for land parceling in the RMBH also overachieved the original target. Previously it would take 27.5 days to obtain the prior approval as compared to the latest record of 10.5 days. These improvements will become increasingly important as the Metropolitan Master Plan is implemented and generate urban investment projects. 5 State laws and regulations include, the Codigo Florestal Mineiro 2013, Plano de Auto Suprimento, Decreto Plano de Prevenção e Combate ao Desmatamento no bioma Mata Atlântica, Lei sobre a Politica de Mudança do Clima, apoio a ABC, Copa Verde, Projeto Certifica Minas-Florestas, Projeto Índice de Atratividade ao Investimento Florestal--and the update of the original plan "Incentivo a Aquisição e Plantio de Florestas de Produção de Base Sustentável"—linked to the Programa Estruturador da SEAPA (Secretariat of Agriculture). 15 3.3 Justification of Overall Outcome Rating Rating: Satisfactory 55. The overall outcome of the PDO was achieved. The outcome of the project is rated satisfactory as the operation’s objectives as expressed by the PDO of deepening Minas Gerais’ innovative management model and strengthening budget management and sector policy management was achieved. As described in the previous section, the State’s reforms of its management model were consolidated, and it is now firmly integrated in the institutional structure of the administration. Sector policy management underwent important regulatory and institutional reforms, with important results achieved in the areas of social inclusion, environmental management and metropolitan governance. Even though the citizen participation model did not fully achieve the outcomes expected, the Government took actions and assessed the shortcomings of the initial model and took initial steps to adapt it. Some result indicators were not fully under the Government’s control, as for example in the case of new forest plantation for charcoal production, which resulted in not all result indicators being fully achieved. However, this shortcoming was less related to State performance than to indicator selection and did not negatively influence the overall outcome of the project. 56. On the contrary, when the Government noticed that some of the policies did not generate the desired results, it took actions to adjust those shortfalls. Assessments were carried out and alternatives were developed to adapt the lagging policies. Even more, the lessons learned from those experiences (i.e. from the citizen pilots and commercial tree planting) were rapidly incorporated into further improvements of sector policies and approaches. This process of adaptation has been a central element of the management reform since it began a decade ago. 3.4 Overarching Themes, Other Outcomes and Impacts (a) Poverty Impacts, Gender Aspects, and Social Development 57. This DPL moved the Partnership Series significantly in the direction of addressing poverty by including a “Promoting Social Inclusion” Policy Area. It addressed poverty through two Prior Actions: (i) implementation of the Piso Mineiro program resulting in transfers to poor municipalities, and (ii) amendment of the Programa Travessia to allow for a more targeted study of impoverished areas. As a result, all of Minas Gerais’ 853 municipalities were granted transfer through the Piso Mineiro, and the number of municipalities with IGD-M below 0.55 was reduced drastically, from 90 to 11. 58. Poverty aspects were addressed through action in the education sector. Poverty issues were also indirectly addressed under the Social Inclusion Policy Area with a Prior Action requiring merit based selection of state regional school superintendents and school directors followed up by Results Indicators requiring improved learning performance and personnel record-keeping. In the long run this is probably one of the most important poverty oriented measures because the poor and near poor students usually attend public 16 schools, and improving the quality of education is one of the most effective mechanisms of increasing the capital of the poor. (b) Institutional Change/Strengthening 59. The Third Partnership Series DPL, as a continuation of the Partnership Series with Minas Gerais, was first and foremost designed to refine, strengthen and build support for the Choque de Gestão model. Policy Area 1 (Strengthening public sector and budgetary management) deepened the management model through the establishment of 22 Strategic Management and Innovation units, adopting the SIAFI/MG integrated budget system, and requiring rigorous prior review of infrastructure projects over R$5 million. Those actions resulted in improved budget planning and execution. The reorganization of the Secretariat of Environment and Sustainable Development under Policy Area 2 resulted in improved work flows and communication, and the Government was able to significantly increase controls of compliance with environmental regulations. Policy Area 3 (Developing a metropolitan governance framework) introduced important institutional changes, which established the guidelines and orientation on public policies and investments for promoting the development of the region and fostered intersectoral and intergovernmental level coordination. (c) Other Unintended Outcomes and Impacts (positive or negative, if any) 60. Further steps to adjust solutions for citizen participation are being undertaken. The major unintended outcome is that the State has undertaken further steps to analyze and develop solutions to address the failure to achieve some Results Indicators and their respective development impact. The difficulties encountered in enrolling local participants in meaningful development agenda discussions once Regional Committees had been established is an example for this. The Government has evaluated and analyzed the issues of how to address non-compliance of the regional committees, how civil society can/should be approached and what it has to offer, and the opportunities and limits of participatory development approaches. Annex 6 provides a summary of the Government’s conclusions, lessons learned and suggested new approaches. 61. Similarly, the State is evaluating why PROEB test score targets were not met. Finally, a paper analyzing the shortfall in tree plantation hectarage has been addressed in a Government Memorandum (see Annex 7 for a summary). While the State had the intention to eliminate the harvest of native forest for charcoal, the implementation mechanisms chosen are being reconsidered. 3.6 Summary of Findings of Beneficiary Survey and/or Stakeholder Workshops N/A 4. Assessment of Risk to Development Outcome Rating: Low 62. The risk to the achieved outcome of deepening Minas Gerais’ management model is considered to be low for a number of reasons. First, the model is now 17 embedded in the State’s institutional structure and its processes, and has reached a mature status of integration and implementation. This is strengthened by a wide support of technical staff as graduates from the State School of Government and others recruited into the government are firmly schooled and committed to the model. Furthermore, it fits seamlessly into federal budget legal requirements to consult, prioritize programs and incorporate indicators. Finally, the model’s success has been widely recognized and generally acclaimed state-wide, nationally and internationally and has become a source of pride of the GoMG and its public servants. 63. The Choque de Gestão and follow-up reforms were launched and supported by the highest level of government. With elections scheduled in October 2014 there is the possibility of a change in policy priorities which could move away from the previous reform process and/or diminish the Minas Gerais management model. However, a more likely outcome is that if policy priorities changed, the model, which is by now well entrenched, would be used to implement these changes. Conversely, it is expected that the next administration will follow its predecessor’s priorities and continue with the reform processes. 5. Assessment of Bank and Borrower Performance 5.1 Bank Performance (a) Bank Performance in Ensuring Quality at Entry Rating: Moderately Satisfactory 64. This operation was designed within the overarching context of the Development Partnership Series .The strategy to deepen and expand the reach of previous reforms was a rational progression agreed by the Government and the Bank and provided the basis for the design of this operation. This was a very timely operation, properly conceived with reasonable Prior Actions, objectives and desired outcomes selected within the overarching context of the Minas Gerais Development Partnership Series. 65. The one area where greater care should have been exercised is the results framework and specifically the coverage and definition of Results Indicators. Some had technical design flaws, such as the government not controlling the results, tenuous links between Prior Actions and Results Indicators, and multiple causal chains. As a result, the link between the results framework and the PDO had shortcomings with several indicators not directly measuring the desired PDO outcome. (b) Quality of Supervision Rating: Satisfactory 66. Supervision was given close attention because of the loan size and its importance as a Partnership Series operation. The long-standing collaboration and close relations between State officials and Bank staff facilitated the supervision. The Bank was able to exploit synergies since the SWAp and this operation overlapped in terms of implementation 18 time and sector coverage, resulting in regular communication and supervision of the operation. In addition to formal supervision missions the Bank team was in continual contact with the State, to advice on issues and problems as they developed. (c) Justification of Rating for Overall Bank Performance Rating: Satisfactory 67. Overall Bank performance is rated satisfactory as the overall project design and implementation support contributed to the desired outcome of the operation, which facilitated the continuous and enhanced collaboration with the State of Minas Gerais. 5.2 Borrower Performance (a) Government Performance Rating: Highly Satisfactory 68. The Government was fully committed to this operation. The Government of Minas Gerais was and remains fully committed to the continuous reform process supported under this and previous Bank operations in the Minas Gerais Development Partnership Series. It is noteworthy that this operation also had the full support of the Governor, Vice Governor and senior officials who have spearheaded past operations of the Partnership Series. The involvement of stakeholders such as the civil society was addressed in a specific component and high priority was given to this policy area. 69. High technical and institutional capacity facilitated the implementation. The high technical capacity of the government staff, intergovernmental coordination and implementation mechanisms embedded in the Government’s existing M&E framework facilitated an efficient implementation process and timely and technically sound resolution of arising implementation issues, for example, the adaption of the pilot methodology for citizen participation. 70. Many of the Prior Actions and Results Indicators are part of the State’s development agenda, enjoyed high ownership and political support, and the Government mostly overachieved the indicators that it controlled. When the design flaws of some indicators were recognized, the Government took mitigating measures, drew lessons learned and has demonstrated its seriousness in addressing these issues and is doing due diligence. (b) Implementing Agency or Agencies Performance Rating: Highly Satisfactory 71. All secretariats involved were highly committed to the implementation of this operation, and communication and coordination during preparation and implementation was excellent. The implementing agencies have done an excellent job of implementing this operation, including the use of their internal M&E system for follow-up and early recognition of potential implementation issues, which then were addressed immediately. 19 Furthermore, the liaison with and providing information to Bank counterparts was timely and of high quality. (c) Justification of Rating for Overall Borrower Performance Rating: Highly Satisfactory 72. The very positive outcomes of this operation are mainly due to the strong government commitment to the reform process, the technical capacity of the government staff and the continuous effective and efficient collaboration with the Bank team. Hence, following the criteria suggested under the ICR methodology, which focuses on the government and implementing agencies’ commitment, ownership and provision of an enabling environment, overall Borrower performance is rated Highly Satisfactory. 6. Lessons Learned 73. Results-based Management models cannot be implemented in isolation. While evidence seems to suggest that there is a particularly positive impact of results agreements on service delivery outcomes 6, the adoption of the model has not been done in isolation. Fiscal reforms are an important condition to the successful adoption of RBM. In Minas Gerais, the fiscal rationalization was a key objective of the first phase of the reform. The combination of institutional context and interventions, known as “performance regime”, is what really drives performance for specific services. 74. Reform processes require a long-term commitment and relationship. As in the case of the Results-based Management reform in Minas Gerais, the process evolved over time, it must be adapted and refined. Minas Gerais is a microcosm of Brazil and previously the State was poorly managed and displayed many of the chronic problems found elsewhere in badly managed states in Brazil and in other countries. The Choque de Gestão approach transformed the State and made it easier for future Government’s to implement their priorities. There are important lessons to be learned from Minas Gerais’ experience that will doubtless be of use to other governments. However, the experience of Minas Gerais indicates that there is no unique template of processes and institutions for a successful management model. The iterative application of the system led to considerable adjustments. Supporting a client with a strong program over an extended period has shown to be successful. The decade-long collaboration with Minas Gerais through the Partnership Series of loans created the possibility for continued collaboration, which benefited both the GoMG and the Bank. The strong relationship can be said to have contributed significantly to the success of the reform process. 75. Replication to other States. Numerous countries, Brazilian states and large domestic municipalities have visited the State to learn about the Choque de Gestão, and to draw lessons on how to implement similar reforms in other places. The challenge for the Bank is how to disseminate the case of Minas Gerais more broadly and on how to effectively replicate this experience elsewhere. 6 See Review and Research Agenda on Results-Based Management in Brazilian States (2013) 20 76. Reforms need sustained champions. One of the main factors of the success of the Choque de Gestão was the dedication of an incoming administration with a team of highly trained, dedicated professionals and a mission to implant results-based management. It is perhaps worth looking more closely at this dynamic to understand the importance of champions and how the Minas Gerais experience might be replicated. 77. Cooperation with other public and private institutions to provide innovative financing arrangements. This DPL is a good example of successful cooperation and combined efforts with other development institutions (AFD) and private actors (Credit Suisse). In particular, it is noteworthy that the Bank program with GoMG conveyed reassurance to leverage the partnership with AFD, and ultimately the involvement of the three institutions provided the State with the financial and technical resources it needed to solve the CEMIG debt and to improve the State’s debt sustainability. 78. Identifying results indicators for reforms is a challenge. Great care must be taken with the technical definition of Results Indicators and subsequent supervision. Despite this DPL having been designed by experienced Bank and State officials, the Results Indicators had various technical flaws, some causality chains were tenuous and not all Prior Actions had indicators. 7. Comments on Issues Raised by Borrower/Implementing Agencies/Partners (a) Borrower/Implementing agencies 79. The Borrower provided the Bank with their comments on the ICR (See Annex 4). The majority of the comments referred to revisions or further explanations on indicators and is addressed below. Small editorial comments were also addressed. 80. Updated information on Indicator 8 (Share of students reaching adequate learning levels or higher on the annual PROEB exam) was provided by the Borrower; however, indicator still was underachieved. The necessary sections were updated accordingly. 81. As for Indicator 9 (Share of irregular business undertakings monitored after being identified through the Special Inspection Operations to ensure mitigation measures are implemented), the Borrower emphasized that as documented in the Aide Memoire from the January 2013 mission, it was agreed to monitor two irregular business undertakings in 2013, in addition to two other that were already monitored during the previous year. Overall, 100 percent of the four irregular business undertakings identified through the Special Inspection Operations defined at the beginning of 2014 were monitored, achieving the target. (b) Cofinanciers N/A (c) Other partners and stakeholders N/A 21 Annex 1. Bank Lending and Implementation Support/Supervision Processes (a) Task Team members Names Title Unit Lending Gianfranco Bertozzi Senior Financial Officer FABBK Roland N. Clarke Lead Economist and Sector Lead LCSPR Joseph Kizito Mubiru Sr Financial Management Specialist LCSFM Tarsila Ortenzio Velloso Consultant LCSPR Pablo Fajnzylber Sector Manager PREM Rafael Barroso Economist LCSPE Fanny Weiner Public Sector Management Specialist LCSPS Miguel Navarro Lead Financial Officer FABBK Leandro Costa ET Consultant LCSHE Anna Fruttero Senior Economist LCSHS Tiago Peixoto Governance Specialist WBIOG Barbara Farinelli Operations Analyst LCSAR Augusto Mendonça Consultant LCSSD Alberto Costa Senior Social Development Specialist LCSSO Rogerio Santarosa ET Consultant LCSPP José Manuel Rodríguez Senior Public Sector Specialist LCSPS Alessandra Campanaro Senior Infrastructure Specialist LCSDU Flavia Nahmias Program Assistant ECRBX Tatianna Schlottfeldt Program Assistant LCSPS Patricia Mendez Executive Assistant LCSPR Rocio Manrique Program Assistant LCSPS Supervision/ICR Garo Batmanian Lead Environmental Specialist EASCS Barbara Bruns Lead Education Economist LCSHE Roland N. Clarke Lead Economist and Sector Lead LCSPR Fanny Weiner Public Sector Management Specialist LCSPS Laura de Castro Zoratto Economist LCSPS Ludmila Vidigal Silva Voice Secondee LCSPS Ana Mie Horigoshi Reis Junior Professional Associate LCSPS Angela Nieves Marques Porto E T Temporary LCSPS Brianna Rojas-Elton E T Temporary LCSPS (b) Staff Time and Cost Staff Time and Cost (Bank Budget Only) Stage US$ Thousands (including No. of staff weeks travel and consultant costs) Lending 53 367 Total: 53 367 Supervision/ICR 14 91 Total: 14 91 22 Annex 2. Beneficiary Survey Results N/A Annex 3. Stakeholder Workshop Report and Results N/A 23 Annex 4. Summary of Borrower's ICR and/or Comments on Draft ICR The task team received the following comments on the draft ICR: (i) On Indicator 2: the Borrower pointed that the Indicator was misrepresented in the ICR as 14.5 percent, instead of 1.45 percent. Considering the corrected number the indicators was overachieved. (ii) On indicator 8: the Borrower provided updated data with respect to the share of students reaching adequate learning levels or higher on the annual PROEB exam. (iii) On Indicator 9 the Borrower had the following comment: Inicialmente, foram planejadas 10 Operações. Entretanto, conforme apontada na Ajuda a Memória da Missão de Janeiro de 2013: “para o ano de 2013 serão fiscalizadas e acompanhadas 2 (duas) operações especiais, de acordo com o Planejamento Operacional. Destaca-se que estas 2 (duas) são adicionais às outras 2 (duas) que já estão sendo monitoradas, a saber: Serra da Moeda e Suinocultura. As metodologias de monitoramento pós fiscalização serão desenvolvidas para cada uma dessas 2 (duas) Operações Especiais a partir do planejamento específico da operação.” As quatro operações estipuladas no início do ano foram realizadas, ao final do mesmo. (iv) On Section 3.2 “Achievement of Program Development Objectives”: the Borrower noted that a revision was necessary, considering the revised indicator referent to Policy Area 1: Conforme demonstrado acima, o indicador teve meta atingida. 24 Annex 5. Comments of Cofinanciers and Other Partners/Stakeholders N/A 25 Annex 6. Citizen Engagement in Policy Priorization: The Estado em Rede experience 7 The set of planning and management strategies adopted by the Government of Minas Gerais since 2003 and known as Management Shock (Choque de Gestão) can be divided in three distinct phases. The first phase (2003-2006) focused on fiscal balance; the second phase (2007-2010) focused on creating a goal-oriented system, with results agreements and awards for performance; and the final and third phase, particularly tackled under this operation, focused on Management for Citizenship (Gestão para a cidadania). The concept of Management for Citizenship, and more specifically of the Estado em Rede program, proposed the restructuring of the alignment of state structures through the following: (i) the use of transverse and intersectoral networks; the horizontalization and flexibilization of organizational structures; (ii) the development of new forms of participation of the organized civil society; (iii) the regionalization of public policy strategies and goals; and (iv) the improvement of management information systems. The program’s design was based on two pillars: Regionalized Management, which aimed to bring the strategy of the State Government closer to the specific needs and characteristics of each region; and Participatory Management, where the government presents its strategies and actions and asks for suggestions and opinions of representatives of the organized civil society on the priorities of each region. These two pillars would complement each other in supporting the Government to provide a more regionalized view of the government strategies and goals, increasing the adequacy of the execution of public policies in all of the state’s regions and contributing to the reduction of existing inequalities. Overall, the program aimed to identify priorities within the strategies, based on regional peculiarities and in partnership with society, therefore allowing for the creation of mechanisms for monitoring the implementation of the strategies. The Estado em Rede Program (as originally envisioned) The program was originally composed of a very complex structure that comprised three governmental bodies and several instances of meetings between government and civil society representatives. For a series of reasons, including the lack of political buy-in and preparation for civil society preparation, the program was not fully successful. While it can be said that the “Regionalized Management” pillar had good results and succeeded in improving according to lessons learned during implementation, the “Participatory Management” pillar did not achieve the expected results and the program was not expanded beyond the two initial pilots. Nevertheless, the experience improved the 7 Based on report prepared by the Government of Minas Gerais, “Gestão Regionalizada e Gestão Participativa: Avaliação da implantação do projeto piloto”. 26 government’s understanding of the difficulties associated with the citizen participation process and many lessons were learned that can be used in future experiences. I. Regionalized Management In order to carry out the objectives of this pillar, three governmental bodies were created: the Regional Committees (Comitês Regionais), a Multi-sectoral Council (Conselho Multissetorial), and a Strategic Committee (Comitê Estratégico). Regional Committees (Comitês Regionais) The Regional Committees were composed of representatives from all the secretariats and public entities whose internal structures are organized by region, as well as other secretariats that have an active participation in specific regions. The State Secretariat of Planning and Management (SEPLAG) is responsible for the technical coordination of the Committees and other strategic actors, often Third Sector organizations, may be invited to join the Committees, due to their specific qualifications and expertise. Those committees were formed for ten regions and their mandate included: (i) the dissemination of sectoral government information; (ii) the promotion of coordination between representatives of government entities in the regions; (iii) discussion and proposal of solutions to cross-cutting problems; (iv) supporting technical cooperation in the monitoring of the government strategy; (v) identification of regional priorities for implementation of the government strategy, and (vi) proposing goals for the achievement of outlined regional strategies. Meetings of the Regional Committees occur periodically, in key cities of the regions, with the purpose of presenting the public policy strategies and discussing them in a regional and intersectoral context. The topics for discussion are organized into three Integrated Development Networks (Redes de Desenvolvimento Integrado): Education and Human Development, Identity and Social Development and Protection; Infrastructure, Cities, Sustainable Economic Development and Rural Development; Security and Health. Performance indicators are also presented and discussed in each network group. During the initial meetings of the Regional Committees, a socio-economic diagnosis of the region was presented as a starting-point for informed discussion. The diagnosis provides information from different areas, so that regional managers may have a territorial, temporal and multi-sectoral perspective of the locality in which they operate. Based on the diagnosis presented, regional managers are able to think beyond the challenges of their specific area and see the region as a whole, and are thus encouraged to discuss the challenges facing the region and the strategies that should be prioritized in order to overcome them. This dynamic allows for the identification and discussion of new indicators, which are then added to the regional diagnosis. 27 Multi-sectoral Council (Conselho Multissetorial) The Multi-sectoral Council is a collegiate body composed of deputy secretaries of all the State Secretariats to: (i) discuss and find solutions to problems that have been identified; (ii) request and gather information pertaining to regional demands; (iii) ensure strategic alignment of regional development entities; (iv) generate and disseminate regional data and information for the Regional Committees and the general public, and (v) filter and define the demands to be presented to the Strategic Committee. Strategic Committee (Comitê Estratégico) The Governor and all of the State Secretaries compose the Strategic Committee, which meets sporadically in order to define the government’s strategy and its regional impact; deliberate on regional demands, and revise the strategy based on information presented by the Multi-sectoral Council. II. Participatory Management Regional Meetings The Regional Meetings were meant to be a first step in the process of social participation at the state level in terms of government strategy. In those meetings the Regional Committee and representatives of the civil society would meet with the goal to present and discuss the government strategy in the various networks, and allow participants the opportunity to identify priorities among the long-term government strategies in accordance with the specificities of the region. More specifically, the objectives of the Regional Meetings were to: (i) contribute to the strengthening of the concept of network governance, emphasizing regionalization and citizen participation in the state; (ii) promote, qualify and strengthen the participation of civil society in the direction of long-term public policies, and (iii) form the Regional Forum as a way to permanently integrate regional government representatives and organized civil society. In order to ensure their participation in the Regional Meetings a mapping of all civil society organizations in the region was undertaken. Invitations were sent to all the organizations, with an attached registration form so as to allow for the registration of those in remote areas with no access to the Internet. Leaders of organizations were mobilized to ensure broad involvement of society. The Regional Meetings had an average participation of 200 organizations in each region. Working groups were formed during the Regional Meetings based on the three Integrated Development Networks (Education and Human Development, Identity and Social Development and Protection; Infrastructure, Cities, Sustainable Economic 28 Development and Rural Development; Security and Health). The working groups discussed a section of the State Integrated Development Plan (Plano Mineiro de Desenvolvimento Integrado – PMDI), focusing on the main goal, objectives and strategies. The expected outcomes of the working groups, which were formed of representatives from civil society organizations, members of public administration entities, and representatives of the Regional Committees, were the prioritization of strategies related to their networks and the election of a representative to be sworn in as a member of the Regional Forum. Regional Forum The representatives of civil society organizations elected in the working groups during the Regional meetings are tasked with monitoring the implementation of the identified priorities in the region, along with representatives of the Regional Committees, in the Regional Forum. The intention is for the Regional Forums, composed of regional representatives of both the government and civil society, to define and monitor the major strategic priorities laid out in the government strategy. By the end of the pilot, a set of regional priorities will have been compiled and included in the Results Agreement. The Estado em Rede Program (implementation) III. Successes and failures during implementation The Estado em Rede program was piloted in two regions of the State: Rio Doce and Norte de Minas. The intention was to expand it to another five regions within the timespan of the Project and that was included as a results indicator of the Project. However, many unforeseen difficulties were identified, and the expansion was not carried out. The Regional Committees provided a productive environment for discussion and collaboration and have produced satisfactory results. Not only did the committees succeed in encouraging the dialogue between different sectors interested in the same themes within government, but the space for strategic actors participation opened space for civil society participation even if not in such a structured manner as predicted by the Regional Forums. One good example of regional solution that was developed from one of the committees was the Dia do Cidadão Rural. The Committee identified that in the Northwest of Minas Gerais 80 percent of the population is rural 8 and most people were simply not aware of many of the services provided by the state government. In order to tackle this, the four largest municipalities in the area jointly organized an event that consists of bringing services that are normally provided by the state closer to the citizens. The event was funded with resources from local associations, municipal governments, etc. 8 According to their own criteria which takes into account the work situation, instead of the living situation, as the national statistics consider. 29 and succeeded in attracting approximately 2,000 families in its first version. Since its launch, four Dias do Cidadão Rural were held. On the other hand, the Regional Meetings and Forums, in which civil society participation was formally included, did not achieve the results expected. The expectation was that the civil society representatives selected would function as leaders and spread the information discussed in the Forum to the other civil society organizations. However, this capillarity was not achieved and the passive behavior of civil society participants during the Forums didn’t allow for more productive discussions. One possible explanation is that there was great heterogeneity between the elected representatives and they might have needed further training and capacitation. Many of the representatives had very humble backgrounds and were not aware of most of government’s services and programs and when those were presented there were no criticisms to be made. After the experience with the two pilots the government chose to refrain from expanding the “Participatory Management” pillar and decided to focus on the “Regional Management”. While the limited capillarity of the proposed system and the passivity of civil society representatives are challenges to be reckoned, small changes could have been made to the program in order to fine-tune it to achieve better results. The lack of a strong buy-in of the process by the high management level in addition to the fact that 2014 is an election year hindered further efforts on the “Participatory Management” pillar. IV. Lessons Learned The state of Minas Gerais has been in the forefront in Brazil in promoting deconcentration of authority and decentralization of resources. The Gestão em Rede Program was an ambitious plan to improve intra-government governance and to reach out to and incorporate civil society in the process of definition of governmental strategies and priorities. While not all envisioned goals were achieved, particularly on the “Participatory Management” pillar, great strides were made on the “Regional Management” pillar and important lessons were learned for both Minas Gerais and other Brazilian states to take into consideration when implementing similar programs in the future. Firstly, a strong buy-in of the high management level is needed for such a program to succeed. While the technical team was strong and made great efforts to advance the participatory model, it is a difficult task and many adjustments would need to be made to fine-tune the model. Strong political support would allow time for the technical team to test different solutions before discarding the model. Secondly, a greater initial investment in social mobilization and a more robust communication plan could have contributed to a better outcome. The level of participation expected from the civil society representatives proved to be incompatible with their level of knowledge and preparation for the task. An initial investment in social mobilization and a greater communication plan could be part of the solution for the passivity problem observed. 30 Thirdly, there is a lesson to be learned from the difficulty within government to tackle inter-sectoral issues. As public policies become increasingly more complex and encompass several sectors simultaneously, sectors need to work together to find better solutions. In order to tackle this, different strategies can be used, from a continuous and comprehensive sensitization process to the adoption of different management routines that encourage knowledge-sharing. V. Conclusion The third phase of the Choque de Gestão promoted deconcentration, institutional collaboration, and intersectoral work as a way to find local solutions to regional problems. The Estado em Rede project thus proposed a new management model that fostered creating decentralized networks and making better use of local knowledge to identify regional solutions. While the “Regional Management” pillar achieved great results in improving intra-government governance, the “Participatory Management” pillar did not fully succeed in integrating civil society in the decision government’s strategy and priorities. Nevertheless, some level of civil society participation was achieved indirectly through the first pillar, and many lessons were learned for future efforts in that direction. 31 Annex 7. Forest Plantation Policy: Limitations to State intervention 9 During design of the present DPL, it was assessed that Minas Gerais had an effective environmental regulatory system, yet there was a need for continued efforts to improve its efficiency. Also, as the State is the largest national producer of steel and iron, there was a need for fostering lower carbon emissions growth in those sectors. Building on these challenges, the operation supported increasing the capacity of the State to sustainably manage the environment (Policy Area 3) through two prior actions: (i) to restructure the environmental management institutions and (ii) to foster alternatives to promote tree plantations for charcoal production 10. I. Policy Area 3: Prior Actions and Results Indicators In order to improve the efficiency of the environmental regulatory system, the State undertook major structural reorganization of the Secretariat of Environment and Sustainable Development (Secretaria Estadual de Meio Ambiente e Desenvolvimento Sustentavel – SEMAD). The creation of the Under-Secretariat for Environmental Control and Supervision (Subsecretaria de Controle e Fiscalização Ambiental Integrada – SGRAI) and the Under-Secretariat for Management and Regularization (Subsecretaria de Gestão e Regularização Ambiental Integrada – SUCFIS) allowed the consolidation of the procedures for issuance of environmental permits by a single under-secretariat and the placement of the enforcement role into another one. As a result, the processing of the permits would be faster, and monitoring of compliance would be more effective. Moreover, other environmental agencies in the State – the State Forest Institute (Instituto Estadual de Florestas – IEF), the State Institute for Water Management (Instituto Mineiro de Gestão das Águas – IGAM), and the State Environment Foundation (Fundação Estadual do Meio Ambiente – FEAM) – had their competencies reviewed in order to adjust to the new work flow. These enhancing measures were duly recognized as a Prior Action in the DPL, and a Results Indicator linked to the key outcome that 100 percent of enterprises found in non-compliance with environmental regulations, according to Special Inspection Operations, are closely monitored to ensure that the mitigation measures are fully implemented was established and successfully achieved (see Section 3.2). Another Prior Action referred to the enactment of measures to incentivize forest plantation in the State to supply raw input to state industries, aiming at the promotion of sustainable charcoal production. In due course the State implemented the policies it agreed to with the Bank: approval of the State Forest and Biodiversity Policy. The legal ruling defines the financial and technical mechanisms to promote tree plantations under strict environmental sustainability parameters for all sizes on rural landholdings, 9 Based on technical note prepared by the Government of Minas Gerais. 10 The Bank has supported Minas Gerais initiatives for the reduction on greenhouse gases (GHG) and for sustainable environment since 2001. The Prototype Carbon Fund Minas Gerais Plantar Project (TF050682) financed projects which are expected to generate GHG emission reductions. It is a model for expanding the use of renewable coal in the State and in the rest of the country. 32 establishes a programmatic Clean Development Mechanism (CDM) under the Kyoto Protocol, with the aim to increase attractiveness of the plantations and provide key initial resources to the farmers, and ensures the connectedness of the entire production chain. This notwithstanding, the expected outcome this DPL supported was frustrated: instead of an increase, 2013 estimates point to a decrease in the area of new plantations of sustainable charcoal to 74,000 ha. II. Limitations to State policy: the strategy behind The observed result is evidence that despite the direct intervention of the State in fostering renewable charcoal plantations, the decision of increasing the plantation area is strategic, and as such is a consequence of a favorable business environment for investment. An assessment by the GoMG 11 has shown that the decrease in the plantation area follows a decelerating trend set after the 2008 crisis (see Figure below). Source: Nota Técnica, Government of Minas Gerais After the crisis, the decrease in the price of charcoal has undermined investor’s appetite for new commercial tree plantations. Most of Eucalyptus plantations in Minas Gerais are used as fuel and as thermo-reducing agent input for state metallurgy industries. Given that the supposed investment takes on average 6 years to mature, reduced prices and the grim macro outlook represent a challenge to reversing investors’ unwillingness to pursue operational risk. Strict regulations to forest products production and trade further hinder the increase in tree plantations. For instance, it is prohibited for national enterprises with 11 2013, Governo do Estado de Minas Gerais. “Nota Técnica. Ref: Operação de Crédito do Estado de Minas Gerais com o Banco Mundial; Contextualização da Área de Florestas Plantadas no estado de Minas Gerais; Ações desenvolvidas pelo Estado a fim de direcionar o desenvolvimento da Política Florestal Produtiva.” Belo Horizonte. November 29, 2013. 33 majority of foreign stakeholders to hold land in Brazil. In addition, bureaucratic processes and long lead time for issuance of permits serve as disincentives for new projects on forest industries – which the GoMG has started tackling through the first Prior Action under Policy Area 3. Reduced competitiveness of Brazilian forest products in international markets represents a toll on investment prospects as well. In the international front, the discontinuation of the CDM under the Kyoto Protocol, albeit not affecting the voluntary market for reduced emissions, may have contributed to the decline in the plantation area. The GoMG has reassessed its policy actions towards creation of profitable opportunities in the forest sector. An analysis of the factors – exogenous, structural and specific market-related – that affect the returns to the business has led to redesigning State interventions to encompass less short-term direct financial resources yet enhanced strategic planning on how to promote sustainable forest plantations. III. Way forward Aiming at developing projects/activities that would sustainably promote a strategic and geographic view of a productive forest policy, prior to fostering the expansion per se in the area of commercial tree plantation, the GoMG is redirecting its 2014 program of incentives to the acquisition and plantation of sustainable forests. Certifica Minas – Florestas The project stands for certifying forest activities that comply with sustainable management standards established in the national and state-level legislations. It is intended to integrate and coordinate productive and environmental control efforts among the state institutions with a view to streamline requisites for harvesting, transport and trade of forest products for rural producers. Índice de Atratividade ao Investimento Florestal – IAIF and Processo de Melhoria do Clima de Negócios para Investimento Florestal – PROMECIF The objective of the IAIF is to measure factors that affect the business environment, returns and, thus, the attractiveness of the forest sector for direct investment (DI). It shall allow: a) comparing the performance of municipalities or microregions in a said period of time; b) assisting investors to pre-identify municipalities or microregions with higher potential of success for DI in sustainable forest sector; and c) supporting municipalities or microregions to identify key factors that affect allocation of DI in sustainable forest sector in order to facilitate the design of strategies and policies for attracting DI. Based on the knowledge acquired through the IAIF and good practices, the GoMG will adopt the methodology PROMECIF to strengthen the business environment for sustainable forest sector to attract DI in the different municipalities or microregions. The PROMECIF will involve diagnostics, strategic planning, implementation, monitoring 34 and evaluation of the process to boost opportunities for DI in sustainable forest sector in MG. Pró-Macaúba This project stimulates the diversification of forest species for commercial tree plantation by fostering the upscale of the value chain for the products derived from the Macaúba palm tree. It is expected that it will benefit mainly small landholders that grow subsistence crops and cattle, given it may easily be integrated to the landscape. IV. Lessons Learned While the State of Minas Gerais has the largest area of commercial tree plantations in Brazil and is in the forefront of development of state environmental and social legislations, not all expected outcomes regarding increasing environmental sustainability were achieved, particularly the increase in the area of forest plantations. From this episode, two important lessons were learned for Minas Gerais and should be taken into account when designing and implementing similar programs in the future. Firstly, although perceived benefits may exceed costs, forest plantations have similar characteristics from a traditional long-term investment. This said, government intervention in providing direct financial resources may have a stricter – and unsustainable – impact in comparison to more long-term enabling business environment measures. Secondly, given the missed Result Indicator involved reaction of entrepreneurs towards increasing their investments and the nature of government action might not determine investor behavior in the short-run, there should be greater attention to the causality chain when establishing the results framework. Results Indicators should reflect the ability of the counterpart to deliver and be attributed to it, with a risk of failure otherwise. V. Conclusion Forest plantations may play an important role in the production of raw input to metallurgy and agro- industries, and in the generation of jobs, income and well-being. This notwithstanding, the expansion of the sector is driven by traditional long-term investment considerations. Therefore, there must be a more strategical, rather than operational assessment and approach to the design of related public policies in order to realize the potential benefits it may yield. 35 MAP 36