FEDERAL REPUBLIC OF NIGERIA STATE EDUCATION PROGRAMME INVESTMENT PROJECT (SEPIP) Procurement Plan I. General 1. Project information: Country: Federal Republic of Nigeria Borrower: Federal Republic of Nigeria Project Name: State Education Programme Investment Project (SEPIP) Project Implementing Agency: Anambra State Government Ministry of Education Bauchi State Government Ministry of Education Ekiti State Government Ministry of Education Federal Ministry of Education Universal Basic Education Commission 2. Bank’s approval Date of the procurement Plan December 10, 2013 3. Date of General Procurement Notice: TBD 4. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 5. Prior Review Threshold Prior Review Threshold S/N Procurement Method Comments US$ ’000 1. Shopping-Works <200 None 2. International Competitive Bidding (Goods) >1000 All 3. National Competitive Bidding (Goods) <1000 None 4. Shopping (Goods) <100 None 5. Direct Contracting All values All 6. Limited International Bidding (goods) All values All 6. Prequalification: None 7. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines): None 8. Reference to (if any) Project Operational/Procurement Manual: (i) Project Implementation Manual; (ii) Procurement Manual 9. Any Other Special Procurement Arrangements: NA. 2 10. Procurement Packages with Methods and Time Schedule Procurement of Goods: A. Federal Ministry of Education Component of SEPIP Expected Estimated Domestic Review by Ref Procurement Pre or Bid- Completion Contract (Description) Cost US$ Preference Bank (Prior No. Method Post qual Opening Date '000s (yes/no) / Post) Date 1. Two Vehicle for monitoring, Vehicle insurance and June implementation support Dec. 2014 2014 89 NS Post No Post - Stationery, printing of manuals June 2. 69 NS Post No Post Dec. 2014 and operating cost 2014 3. Office Equipment and furniture consumables, photo copiers, EMIS Goods, Computers hardware , communication June equipment, Multimedia 27 NS Post No Post 2014 Dec. 2014 Projectors, Flip Chart Stands, Boards, TV/Video/Radio/Recorders, etc. 4 One Generating set 30 NS POST NO POST June Dec. 2014 2014 Total 215 B. Universal Basic Education Commission Component of SEPIP Expected Estimated Domestic Review by Ref Procurement Pre or Bid- Completion Contract (Description) Cost US$ Preference Bank (Prior No. Method Post qual Opening Date '000s (yes/no) / Post) Date 1. One Vehicle for monitoring and implementation support June Dec. 2016 2014 50 NS Post No Post Stationery, printing of manuals June 2. 50 NS Post No Post Dec. 2016 and operating cost 2014 3. Office Equipment and furniture consumables, photo copiers, EMIS Goods, Computers hardware , communication June equipment, Multimedia 100 NS Post No Post 2014 Dec. 2016 Projectors, Flip Chart Stands, Boards, TV/Video/Radio/Recorders, etc. Total 200 B. Goods – Each Participating State of Anambra, Bauchi and Ekiti 3 Domestic Review Pre- Ref. Contract Procurement Prefrence by Bank Expected Bid Opening Estimated Cost qualification Comments No. (Description) Method (Yes or (Prior Date (Yes or No) No) or Post) US$ N 000 Start Finish s Heavy duty Printing machines, computers, laptops, Dot matrix printers, UPS, Scanners, Rizo machines and Laserjet 1 contract 1 Printers 50 NS No No Post June-2014 Dec. 2016 with 2 lots Exam result sheets, flash drives, Exam question paper and accessories for printing machines (learning assessment) Network cabling, Network equipment and installation of the August- December- 2 equipments 50 NS No No Post 2014 2016 for Exam Board complex. Development of internet website (1) Procurement of laptops, Desktop computers, Printers and internet modems Equipmen Procurement March. t for 4 50 NS No No Post Sept. 2014 of training 2016 Education equipments; Districts Interactive Boards, computers, laptops, printers, multi- media projectors, public address systems etc. 4 Domestic Review Pre- Ref. Contract Procurement Prefrence by Bank Expected Bid Opening Estimated Cost qualification Comments No. (Description) Method (Yes or (Prior Date (Yes or No) No) or Post) US$ N 000 Start Finish s V-SAT internet connections 5 with 50 NS No No Post Sept-2014 Dec.-2015 installation and accessories 6 Hilux truck/ 50 NS No No Post June 2014 Dec 2015 14 seat Hiace bus Total 250 III. Selection of Consultants 11. Prior Review Threshold Prior Review Threshold Item No. Selection Method Comments US$ ’000 1. Quality and Cost Based Selection (QCBS) >300 All 2. Single Source (Firms) (SSS) All values All 3 Consultants Qualification (CQ) <300 None 4 Least cost selection (LS) <200 None 5 Selection of Individual Consultants (IC) >100 All 6 Single Source Selection (Individuals) All values All 7 Quality Base Selection (QBS) >300 All 12. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000.00 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 13. Any Other Special Selection Arrangements: NA IV. Procurement of Consultants with Assignments, Selection Methods and Time Schedule A. Federal Ministry of Education Component of NIPEP Review Expected Ref. Estimated Cost Selection by Bank Proposals Completion Description of Assignment No. US$ '000s Method (Prior / Submission date Post) Date 1 Individual Consultant (IC) Consultancy on up-grading of 23 IC Prior June Dec. 2015 NEMIS Unit 2014 2 Consultancy for capacity building for 22 IC Prior June Dec. 2015 5 procurement and supporting officers of 2014 SEPIP project 3 Consultancy for capacity building on 20 IC Post June Dec. 2015 monitoring and evaluation of SEPIP project 2014 in the three (3) participating States 4 Consultancy on Flexible 14 IC Post June Dec. 2015 Accounting Software 2014 Firms 1 Consultancy for capacity building for 70 CQS Post June Dec. 2015 SEPIP stakeholders, CSO and SBMC 2014 Consultancy on Third Party Monitoring 45 CQS Post Sept. 2014 Jun. 2015 of DLIs in the 3 states External Audit 2 Monitoring & Evaluation of state 20 CQS Post Sept. 2014 Jun. 2015 activities Annual Audit 100 Least Cost Post Sept. 2014 Jun. 2015 Audit of IDA support to states, 150 CQS Post Sept. 2014 Jun. 2015 assessment of progress, review and evaluation by external consultant TOTAL 464 B. Universal Basic Education Commission Component of SEPIP Review Expected Ref. Estimated Cost Selection by Bank Proposals Completion Description of Assignment No. US$ '000s Method (Prior / Submission date Post) Date 1 Individual Consultant (IC) Preparation for Selected State Pre- 100 IC Prior June Dec. 2014 primary and primary School 2014 improvement Plan 1 Short Term Procurement consultant 100 IC Post June Dec. 2014 2014 1 Short Term Financial Management 100 IC Post June Dec. 2014 Consultant 2014 I Short term Monitoring and Evaluation 100 IC Post June Dec. 2014 Consultant 2014 2 Firms Consultancy for assessment of 150 CQS Post Sept. 2014 Jun. 2014 infrastructure improvement, cost and financial management review to scale up integration of Islamiyya and pre-primary schools within basic education service delivery 3 External Audit Monitoring & Evaluation of state 150 CQS Post Sept. 2014 Jun. 2014 activities Annual Audit 120 Least Cost Post Sept. 2014 Jun. 2014 Audit of IDA support to states, 150 CQS Post Sept. 2014 Jun. 2014 assessment of progress, review and 6 evaluation by external consultant Total 970 C. Consultancy- For each of the five Participating states Review by Ref. Description of Selection Bank Expected Proposal Estimated Cost Comments No. Assignment Method (Prior or Submission Date Post) N US$ ‘000s Start Finish I Long Term National Consultant Support Dec- 1 IC Post July 2014 Project 2014 Implementati 100 on I Long term To support international and assist on Consultant Project Implementati Dec- on on 2 IC Post July 2014 2014 activities such as grants and scholarship 100 components 6 local consultants Each State consultants to Dec- be selected at 3 CQ Post July 2014 2014 1 consultant per sub- 150 component 1 long term international Dec- for learning 4 CQ Post July 2014 consultant for 2014 assessment in learning assessment 200 each state Consultancy for test item development on learning Dec- 5 achievement in Core SSS Prior July 2014 For pre- 2014 primary and subjects primary 100 schools Consultancy for test item moderation on learning Dec- 6 achievements in core SSS Prior July 2014 For pre- 2014 primary and subjects primary 50 schools Advisory on Exam procedure and Dec- 7 IC Post July 2014 editing of test items 2014 50 System Aug- Feb- programming/ 2014 2015 engineering, 8 IC Post system/network administration 100 7 Review by Ref. Description of Selection Bank Expected Proposal Estimated Cost Comments No. Assignment Method (Prior or Submission Date Post) N US$ ‘000s Start Finish Data analysis and Oct-2014 Feb- 9 statistical tracking of IC Post 2015 pupils performance 50 Consultancy services Nov- March- The 3 subject to CSO/NGO 2014 15 associations already exist 10 SSS Prior and the objective is to strengthen 200 them 1 week Training Nov- March 11 Teachers in Literacy QCBS Prior 2014 -15 200 1 week Training of Nov- March 12 Teachers in QCBS Prior 2014 -15 Numeracy 200 1 week Training of Nov- March teachers in Pedagogy 2014 -15 13 QCBS Prior & Psychosocial support. 200 Development and Dec-2014 Aug-15 administration of 14 CQ Post conversion test for teachers 150 Conversion courses Sept- Aug-15 15 for teachers QCBS Prior 2014 500 5 long-term local Sept- Aug-15 consultant to support 2014 16 CQ Post the M & E unit of the FPSU/SPTC 100 Local consultant to Sept- Aug-15 support the Teacher 2014 17 professional CQ Post Development Component 100 Technical Assistance Sept- Aug-15 18 to conduct project IC Post 2014 evaluation 50 Total 2,600 D. Others including Grants and training – For each of the Five Participating States 1 Total Grants for five participating states 20,000 2 Total training 8,250 2a Federal Ministry of Education 1,000 2b UBEC 1,000 2c Five Participating states 6,250 ‘Summary of procurement items 1 Goods 665 8 2 Consultancy 4,034 3 Grants for five participating states 20,000 4 Training 8,250 Grand Total 32,949 9 PROCUREMENT Nigeria : Nigeria - State Education Program Investment Project PLAN General Information Country: Nigeria Bank’s Approval Date of the Original Procurement Plan: 2018-04-19 2020-02-10 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P122124 GPN Date: Project Name: Nigeria - State Education Program Investment Project Loan / Credit No: IDA / 58480 Executing Agency(ies): YOBE SEPIP WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual YBSEPIP-AF/GO/001/2018 / Off/furns, 3 F/proof cabs, 1 Tilt, 3 D/Compt & ac-sories, 20 Lap/Compt, 10 Nwk Printers, 4 H/Duty Laser Results-based Component: Pending P/copiers, 5 Shred mach, 1 IDA / 58480 Support to States' Education Post Direct Selection Direct 99,500.00 0.00 Implementati 2018-02-04 2018-02-09 2018-03-16 2018-09-12 S/proof 15kva gen, 1 Sector Program on projector, 2 V/cams, 1 Dgt/cam, Solar inv & ac- sories, 5 UPS, 1 Scanner & a S/ binding mach YBSEPIP-AF/GO/002/2018 / Results-based Component: Pending Procurement of 2 No. 4WD IDA / 58480 Support to States' Education Post Direct Selection Direct 100,000.00 0.00 Implementati 2018-02-15 2018-02-20 2018-03-27 2018-09-23 Double Cabin Hilux Project Sector Program on Vehicle YBSEPIP-AF/GO/003/2018 / Procurement of assorted Office Furniture for Results-based Component: Pending Teachers, Pupils and IDA / 58480 Support to States' Education Post Direct Selection Direct 100,000.00 0.00 Implementati 2018-05-01 2018-05-06 2018-06-10 2018-12-07 Students for 30 schools (5 Sector Program on Schools per LGA) in 6 LGAs YBSEPIP-AF/GO/004/2018 / Procurement of assorted Text Books (English, Maths, Health Habits, Unit Colour, Drawing books, Letter Results-based Component: Pending words, Primers 1&2, IDA / 58480 Support to States' Education Post Direct Selection Direct 200,000.00 0.00 Implementati 2018-09-03 2018-09-08 2018-10-13 2019-04-11 Creative Arts, Rhymes, Sector Program on Arabic Language and Hausa for 255 ECCDE schools and Computer Studies Books 1,2 & 3 for 173 JSS. Page 1 Component 3: Improving Access to Quality Education YBSEPIP-AF/GO/006/2018 / and Learning Environment Procurement of 210 Nos. in North East States Pending tracking devices (Handheld IDA / 58480 Post Direct Selection Direct 91,000.00 0.00 Implementati 2018-11-20 2018-11-25 2018-12-30 2019-06-28 Tablets) embedded with soft Component 3.1: Improving on ware for real time tracking Access to Quality Education of SEPIP - AF activities. Component 3.2: Improving Learning Environment YBSEPIP-AF/GO/2019-1 / Results-based Component: Pending Request for Single Stage - One Procurement of 1No. Sound- IDA / 58480 Support to States' Education Post Limited 20,000.00 0.00 Implementati 2019-02-16 2019-04-13 2019-10-10 Quotations Envelope proof 30kva diesel generator Sector Program on Component 3: Improving Access to Quality Education and Learning Environment in North East States YBSEPIP-AF/GO/2019-2 / Pending Request for Single Stage - One Procurement of Solar Power IDA / 58480 Post Limited 10,000.00 0.00 Implementati 2019-02-16 2019-04-13 2019-10-10 Component 3.1: Improving Quotations Envelope System on Access to Quality Education Component 3.2: Improving Learning Environment YBSEPIP-AF/GO/2019-3 / Results-based Component: Pending Request for Single Stage - One Procurement of 8 No IDA / 58480 Support to States' Education Post Limited 10,000.00 0.00 Implementati 2019-02-16 2019-04-13 2019-10-10 Quotations Envelope Airconditioners Sector Program on Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/GO/2019-4 / in North East States Procurement of Science & Under Technical (STAN) Books for IDA / 58480 Post Direct Selection Direct 130,000.00 95,616.83 Implementati 2019-03-06 2019-03-11 2019-04-15 2019-10-12 Component 3.1: Improving 15 schools in each of the 10 on Access to Quality Education LGAs Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/GO/2019-5 / in North East States Pending Procurement of School Request for Single Stage - One IDA / 58480 Post Limited 250,000.00 0.00 Implementati 2019-03-12 2019-05-07 2019-11-03 Uniforms & Sandals for the Component 3.1: Improving Quotations Envelope on IDPS Access to Quality Education Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment in North East States YBSEPIP-AF/GO/2019-6 / Pending Request for Single Stage - One Procurement of Office/school IDA / 58480 Post Limited 250,000.00 0.00 Implementati 2019-03-12 2019-05-07 2019-11-03 Component 3.1: Improving Quotations Envelope furniture and school desk on Access to Quality Education Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment in North East States YBSEPIP-AF/GO/2019-7 / Pending Request for Single Stage - One Procurement of 1 No. 4WD IDA / 58480 Post Limited 100,000.00 0.00 Implementati 2019-03-12 2019-05-07 2019-11-03 Component 3.1: Improving Quotations Envelope Double Cabin Project Vehicle on Access to Quality Education Component 3.2: Improving Learning Environment Page 2 Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/GO/2019-8 / in North East States Under Procurement of assorted Request for Single Stage - One IDA / 58480 Post Limited 200,000.00 0.00 Implementati 2019-05-08 2019-07-03 2019-12-30 Text Books for Junior Component 3.1: Improving Quotations Envelope on Secondary Schools Access to Quality Education Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/GO/2019-9 / in North East States Pending Procurement/erection of IDA / 58480 Post Direct Selection Direct 100,000.00 0.00 Implementati 2019-06-06 2019-06-11 2019-07-16 2020-01-12 classrooms tents for rural Component 3.1: Improving on schools in the ten LGAs Access to Quality Education Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/GO/2019-10 / in North East States Procurement of 250 Nos. Pending tablets with tracking IDA / 58480 Post Direct Selection Direct 205,000.00 0.00 Implementati 2019-10-03 2019-10-08 2019-11-12 2020-05-10 Component 3.1: Improving software for project on Access to Quality Education activities. Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education YBSEPIP-AF/REF and Learning Environment 5/GO/2020 / Provision of in North East States Data capturing tools and Pending Request for Single Stage - One Tablets to a number of IDA / 58480 Post Limited 100,000.00 0.00 Implementati 2020-03-08 2020-05-03 2020-10-30 Component 3.1: Improving Quotations Envelope selected basic primary and on Access to Quality Education secondary schools across 7 LGEAs Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/REF in North East States Pending 1/GO/2020 / Provision of IDA / 58480 Post Direct Selection Direct 200,000.00 0.00 Implementati 2020-02-10 2020-02-15 2020-03-21 2020-09-17 STAN Books for JSS by The Component 3.1: Improving on STAN Place Ltd Access to Quality Education Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/REF in North East States Pending 2/GO/2020 / Provision of Request for Single Stage - One IDA / 58480 Post Limited 100,000.00 0.00 Implementati 2020-02-15 2020-04-11 2020-10-08 English & Maths text books Component 3.1: Improving Quotations Envelope on for JSS schools Access to Quality Education Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment in North East States YBSEPIP-AF/REF Pending Request for Single Stage - One 3/GO/2020 / Learning IDA / 58480 Post Limited 100,000.00 0.00 Implementati 2020-02-15 2020-04-11 2020-10-08 Component 3.1: Improving Quotations Envelope materials for SS schools on Access to Quality Education Component 3.2: Improving Learning Environment Page 3 Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/REF in North East States Pending 4/GO/2020 / Provision of Request for Single Stage - One IDA / 58480 Post Limited 75,000.00 0.00 Implementati 2020-03-08 2020-05-03 2020-10-30 learning materials to Component 3.1: Improving Quotations Envelope on STEAM Schools Access to Quality Education Component 3.2: Improving Learning Environment NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Improving Access to Quality Education and Learning Environment in North East States YBSEPIP-AF/CS/2019-3 / Consultant Pending Training of teachers on core IDA / 58480 Post Qualification Open - National 200,000.00 0.00 2019-04-04 2019-04-25 2019-06-08 2019-07-08 2019-08-12 2020-02-08 Component 3.1: Improving Implementation subjects in Yobe State Selection Access to Quality Education Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education YBSEPIP-AF/CS/2019-8 / and Learning Environment School Management training in North East States Consultant for Head Teachers and Pending IDA / 58480 Post Qualification Open - National 360,000.00 0.00 2019-09-05 2019-09-26 2019-11-09 2019-12-09 2020-01-13 2020-07-11 environmental and safeguard Component 3.1: Improving Implementation Selection training for asst. head Access to Quality Education teachers Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/CS/2019-9 / in North East States Training of School Based Consultant Pending Management Committee IDA / 58480 Post Qualification Open - National 300,000.00 0.00 2019-04-09 2019-04-30 2019-06-13 2019-07-13 2019-08-17 2020-02-13 Component 3.1: Improving Implementation members in 10 LGAs of Selection Access to Quality Education Yobe State Component 3.2: Improving Learning Environment Component 3: Improving YBSEPIP-AF/CS/2019-10 / Access to Quality Education Monitoring and and Learning Environment evaluation/school based in North East States Consultant education management Pending IDA / 58480 Post Qualification Open - National 220,000.00 0.00 2019-08-01 2019-08-22 2019-10-05 2019-11-04 2019-12-09 2020-06-06 information system training Component 3.1: Improving Implementation Selection for teachers and Local Access to Quality Education Government Education Officers Component 3.2: Improving Learning Environment Page 4 Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/REF 2/CS/2020 in North East States Consultant / Conduct training of Pending IDA / 58480 Post Qualification Open - National 100,000.00 0.00 2020-03-11 2020-04-01 2020-05-15 2020-06-14 2020-07-19 2021-01-15 teachers and Education Component 3.1: Improving Implementation Selection Managers Access to Quality Education Component 3.2: Improving Learning Environment INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual YBSEPIP-AF/CS/001/2018 / Development of Psyco-social & Pedagogical Training Manuals for Teachers and Results-based Component: Pending SBMC in Ten (10) LGAs: IDA / 58480 Support to States' Education Post Direct Selection Direct 140,000.00 0.00 2018-03-15 2018-03-25 2018-05-29 2018-11-25 Implementation Damaturu, Yunusari, Fune, Sector Program Potiskum,Gujba, Yusufari, Fika, Geidam, Tarmuwa & Gulani. YBSEPIP-AF/CS/002/2018 / 5-Day training of 231 SBMCs (693 Members) (11 schools in each of the 6 Results-based Component: LGAs: Damaturu, Yunusari, Pending IDA / 58480 Support to States' Education Post Direct Selection Direct 210,000.00 0.00 2018-04-02 2018-04-12 2018-06-16 2018-12-13 Fune, Potiskum, Gujba, Implementation Sector Program Yusufari & 15 schools in each of the other 11 LGAs.) in School Management and Accountability. YBSEPIP-AF/CS/003/2018 / Development and administration of Results-based Component: Individual Pending quantitative supervision IDA / 58480 Support to States' Education Post Consultant Direct 40,000.00 0.00 2018-06-04 2018-06-14 2018-07-05 2018-08-09 2019-02-05 Implementation checklist to track Sector Program Selection performance over time and trouble - shoot problems YBSEPIP-AF/CS/004/2018 / Conduct and Develop Data on SBMCs with /without Results-based Component: School improvement plans Pending IDA / 58480 Support to States' Education Post Direct Selection Direct 90,000.00 0.00 2018-06-11 2018-06-21 2018-08-25 2019-02-21 in affected locations within Implementation Sector Program the 10 LGAs as well as data on teachers, School's populations and locations YBSEPIP-AF/CS/005/2018 / Review of School Educational Results-based Component: Individual Expenditure against Pending IDA / 58480 Support to States' Education Post Consultant Direct 35,000.00 0.00 2018-06-21 2018-07-01 2018-07-22 2018-08-26 2019-02-22 allocations for prudent school Implementation Sector Program Selection financial Mgt and best practices YBSEPIP-AF/CS/006/2018 / Educational Survey on teaching and learning Results-based Component: Individual Situation in identified Nine Pending IDA / 58480 Support to States' Education Post Consultant Direct 55,000.00 0.00 2018-07-16 2018-07-26 2018-08-16 2018-09-20 2019-03-19 (9) LGAs: Damaturu, Implementation Sector Program Selection Yunusari, Fune, Potiskum, Gulani, Yusufari, Fika, Geidam, Tarmuwa & Gujba. Page 5 YBSEPIP-AF/CS/007/2018 / Mapping of all Primary and Junior Seconday Schools in Results-based Component: Ten (10) LGAs: Damaturu, Pending IDA / 58480 Support to States' Education Post Direct Selection Direct 90,000.00 0.00 2018-08-01 2018-08-11 2018-10-15 2019-04-13 Yunusari, Fune, Implementation Sector Program Potiskum,Gujba, Yusufari, Fika, Geidam, Tarmuwa & Gulani. YBSEPIP-AF/CS/008/2018 / Development of baseline information on CSOs/NGOs Results-based Component: operating within Identified Pending IDA / 58480 Support to States' Education Post Direct Selection Direct 90,000.00 0.00 2018-08-09 2018-08-19 2018-10-23 2019-04-21 Nine (9) LGAs: Damaturu, Implementation Sector Program Yunusari, Fune, Potiskum, Gujba, Yusufari, Fika, Geidam & Gulani. YBSEPIP-AF/CS/009/2018 / Training for 360 (60 Each per subject) Teachers on Results-based Component: Maths, English Language, Pending IDA / 58480 Support to States' Education Post Direct Selection Direct 140,000.00 0.00 2018-08-20 2018-08-30 2018-11-03 2019-05-02 Biology, chemistry, Physics Implementation Sector Program in Senior Secondary School and Integrated science in Junior Secondary schools YBSEPIP-AF/CS/010/2018 / 5 Days Training on Results-based Component: Pyschosocial & Pedagogy for Pending IDA / 58480 Support to States' Education Post Direct Selection Direct 220,000.00 0.00 2018-11-12 2018-11-22 2019-01-26 2019-07-25 Teachers in 5 LGAs: 300 Implementation Sector Program per LGA (Fika, Tarmuwa, Geidam, Gulani and Gujba) Component 3: Improving Access to Quality Education YBSEPIP-AF/CS/2019-1 / and Learning Environment Impact assessment of the in North East States Individual psychosocial training Pending IDA / 58480 Post Consultant Limited 70,000.00 0.00 2019-02-11 2019-02-16 2019-03-09 2019-04-13 2019-10-10 conducted Traumatic Component 3.1: Improving Implementation Selection Teachers, pupils and Access to Quality Education students in identified LGAs. Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education YBSEPIP-AF/CS/2019-2 / and Learning Environment Development of baseline in North East States information on Civil Individual Pending Societies and Non- IDA / 58480 Post Consultant Limited 90,000.00 0.00 2019-06-06 2019-06-11 2019-07-02 2019-08-06 2020-02-02 Component 3.1: Improving Implementation governmental Organisations Selection Access to Quality Education operating within Identified areas of Yobe State Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education YBSEPIP-AF/CS/2019-4 / and Learning Environment Review of School Educational in North East States Individual Expenditure against Pending IDA / 58480 Post Consultant Limited 60,000.00 0.00 2019-09-05 2019-09-10 2019-10-01 2019-11-05 2020-05-03 allocations for prudent school Component 3.1: Improving Implementation Selection financial Managementt and Access to Quality Education best practices Component 3.2: Improving Learning Environment Page 6 Component 3: Improving Access to Quality Education YBSEPIP-AF/CS/2019-5 / and Learning Environment Development and in North East States administration of Individual Pending quantitative supervision IDA / 58480 Post Consultant Limited 60,000.00 0.00 2019-11-04 2019-11-09 2019-11-30 2020-01-04 2020-07-02 Component 3.1: Improving Implementation checklist to track Selection Access to Quality Education performance over time and trouble - shoot problems Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/CS/2019-6 / in North East States Sensitization of education Pending IDA / 58480 Post Direct Selection Direct 100,000.00 0.00 2019-10-04 2019-10-14 2019-12-18 2020-06-15 stakeholders on Component 3.1: Improving Implementation sustainability Access to Quality Education Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/CS/2019-7 / in North East States Retainership with Pending Community Radio stations IDA / 58480 Post Direct Selection Direct 100,000.00 0.00 2019-06-06 2019-06-16 2019-08-20 2020-02-16 Component 3.1: Improving Implementation on project activities in the Access to Quality Education 17 LGAs. Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/REF 1/CS/2020 in North East States / Professional Training for Pending Teachers on standard IDA / 58480 Post Direct Selection Direct 100,000.00 0.00 2020-02-19 2020-02-29 2020-05-04 2020-10-31 Component 3.1: Improving Implementation teaching procedures by Access to Quality Education TRCN Component 3.2: Improving Learning Environment Component 3: Improving Access to Quality Education and Learning Environment YBSEPIP-AF/REF 3/CS/2020 in North East States / Leadership and Pending Management training for IDA / 58480 Post Direct Selection Direct 100,000.00 0.00 2020-03-18 2020-03-28 2020-06-01 2020-11-28 Component 3.1: Improving Implementation School Headteachers and Access to Quality Education Principals through NIEPA Component 3.2: Improving Learning Environment Page 7