PROCUREMENT PLAN (Textual Part) Project information: Dominican Republic Proyecto de Preparación para la Reducción de Emisiones por Deforestación y Degradación Forestal (REDD+) (P151752) Project Implementation agency: Ministry of Environment and Natural Resources Date of the Procurement Plan: February 8, 2018 Period covered by this Procurement Plan: 2017-2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Procurement Law 340-06 and its modifications, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables PROCUREMENT Dominican Republic : Dominican Republic. FCPF REDD+ Readiness Preparation Project PLAN General Information Country: Dominican Republic Bank’s Approval Date of the Original Procurement Plan: 2018-02-12 2021-08-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151752 GPN Date: Project Name: Dominican Republic. FCPF REDD+ Readiness Preparation Project Loan / Credit No: TF / A1121 Ministry of Environment and Natural Resources Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DO-MMARN-45696-GO-RFQ Pending Request for Single Stage - One / Gastos de Comunicación. TF / A1121 Post Open - National 8,000.00 0.00 Implementati 2017-07-15 2017-09-09 2018-03-08 Quotations Envelope Act. 5.18 on DO-MMARN-45704-GO-RFQ Pending Request for Single Stage - One / Camisas, polo-shirt y TF / A1121 Post Open - National 914.00 0.00 Implementati 2017-09-15 2017-11-10 2019-06-30 Quotations Envelope gorras. Act. 5.22 on DO-MMARN-44608-GO-RFQ Pending Request for Single Stage - One / Seguro de vehículos. Act TF / A1121 Post Open - National 8,443.00 0.00 Implementati 2017-08-15 2017-10-10 2019-06-30 Quotations Envelope 5.17 on DO-MMARN-45698-GO-RFQ / Mantenimiento y operación REDD+ Readiness de vehículos (mano de obra, Request for Single Stage - One TF / A1121 Organization, Consultation Post Open - National 23,368.09 923.08 Completed 2017-08-15 2017-10-10 2019-08-26 2019-06-30 2020-11-23 neumáticos, piezas, Quotations Envelope and Grievance Redress combustible, lubricantes). Act 5.16 DO-MMARN-45343-GO-RFB REDD+ Readiness Under / Adquisición de 4 vehículos Single Stage - One TF / A1121 Organization, Consultation Prior Request for Bids Open - National 162,559.00 0.00 Implementati 2018-02-12 2018-02-17 2018-03-31 2018-04-30 2018-06-04 2018-12-01 para actividades de campo. Envelope and Grievance Redress on Act. 5.14 DO-MMARN-45381-GO-RFQ / Mobiliario de oficina Pending Request for Single Stage - One (cubículos con paneles y TF / A1121 Post Open - National 20,197.57 0.00 Implementati 2017-05-25 2017-07-20 2018-01-16 Quotations Envelope escritorios, archivo y sillas). on Varios Procesos. Act. 5.12 DO-MMARN-46702-GO-RFQ / Adquisición de materiales para la implementación de la Request for Single Stage - One estrategia de comunicación. TF / A1121 Post Open - National 70,000.00 726.35 Completed 2018-09-22 2019-05-31 2020-09-16 2019-05-31 2020-11-23 Quotations Envelope (Camisetas, gorras, y materiales, etc.). Act. 1b.2 - Varios Procesos DO-MMARN-44629-GO-RFQ / Adquisición Software Especializado para i) Pending Request for Single Stage - One Mecanismo de Quejas y TF / A1121 Post Open - National 36,397.00 0.00 Implementati 2017-10-25 2017-12-20 2018-12-31 Quotations Envelope Resolución de Conflicto on (MQRC), ii) la ONAMET iii) la DIARENA. Act. 1c.10 (1b.12) DO-MMARN-45356-GO-RFQ / Materiales fungibles (toners REDD+ Readiness de impresoras y del ploter, Request for Single Stage - One TF / A1121 Organization, Consultation Post Open - National 21,840.00 2,011.63 Completed 2017-04-25 2017-06-20 2019-03-19 2017-12-17 2019-04-15 resmas de papel, folders, Quotations Envelope and Grievance Redress grapadoras, etc). Varios procesos. Act. 5.19 DO-MMARN-44603-GO-RFQ / Equipos tecnológicos (laptops, computadoras, REDD+ Readiness Request for Single Stage - One impresora, ploter, cámara TF / A1121 Organization, Consultation Post Open - National 96,620.00 2,819.06 Completed 2017-05-20 2017-07-15 2020-11-12 2018-01-11 2021-02-17 Quotations Envelope fotográfica, proyector y disco and Grievance Redress duro, UPS, etc.). Varios procesos. Act. 5.11 DO-MMARN-56172-GO-RFQ Pending / Adquisición de laptops, Request for Single Stage - One TF / A1121 Post Open - National 37,690.40 0.00 Implementati 2018-04-01 2018-05-27 2018-11-23 accesorios de computadoras, Quotations Envelope on licencias, etc. Act. 5.11 DO-MMARN-107167-GO- Pending Request for Single Stage - One RFQ / Adquisición de laptops, TF / A1121 Post Open - National 65,000.00 0.00 Implementati 2019-03-25 2019-05-20 2019-11-16 Quotations Envelope PC, proyectores, etc. Act. 511 on DO-MMARN-45358-GO-RFQ / Planta eléctrica para la Request for Single Stage - One TF / A1121 Post Open - National 0.00 0.00 Canceled 2017-07-15 2017-09-09 2018-03-08 Unidad de Monitoreo Forestal. Quotations Envelope Act. 5.23 DO-MMARN-110006-GO- Request for Single Stage - One RFQ / Adquisición de servidor TF / A1121 Post Open - National 46,200.00 46,122.94 Completed 2019-04-20 2019-06-15 2019-04-24 2019-12-12 2019-10-03 Quotations Envelope para página Web REDD+. DO-MMARN-115467-GO- REDD+ Readiness RFQ / Adquisición de Equipos Request for Single Stage - One TF / A1121 Organization, Consultation Post Open - National 68,017.00 51,057.80 Completed 2019-05-22 2019-07-17 2019-06-17 2020-01-13 2019-10-25 Tecnológicos desiertos del CP- Quotations Envelope and Grievance Redress 34. Act. 5.11 Page 1 DO-MMARN-231990-GO- RFQ / Producción y diseño de REDD+ Readiness Under artículos promocionales. Act- Request for Single Stage - One TF / A1121 Organization, Consultation Post Open - National 23,110.00 0.00 Implementati 2021-05-03 2021-06-28 2021-12-25 1b.3 Quotations Envelope and Grievance Redress on (ii) Elaboración artículos promocionales. DO-MMARN-233127-GO- RFQ / Equipos técnologicos (computadoras, proyectores, REDD+ Readiness Request for Single Stage - One flotas, etc., apoyo al TF / A1121 Organization, Consultation Post Open - National 14,561.00 775.20 Completed 2021-05-12 2021-07-07 2021-01-07 2022-01-03 2021-05-11 Quotations Envelope Ministerio de Medio Ambiente and Grievance Redress y Recursos Naturales y otras entidades claves). Act, 5.22 DO-MMARN-233135-GO- RFQ / MRV forestal - adquisiciones para establecer REDD+ Readiness Pending Request for Single Stage - One el sistema MRV. Esperar TF / A1121 Organization, Consultation Post Open - National 33,000.00 0.00 Implementati 2021-05-10 2021-07-05 2022-01-01 Quotations Envelope avance para identificar and Grievance Redress on necesidades. 4a.7 (Equipamiento) DO-MMARN-241338-GO- RFQ / Equipamiento de levantamiento de información Design of a REDD+ Pending forestal para el Viceministerio Request for Single Stage - One TF / A1121 Monitoring and Evaluation Post Open - National 83,000.00 0.00 Implementati 2021-06-24 2021-07-04 2021-08-18 de Recursos Forestales, Quotations Envelope Framework on ASODEFOREST y Asociación de de Silvicultores San Ramón. 2b.3 DO-MMARN-241348-GO- RFQ / Adquisición e Development of a Forest Pending instalación de equipos para Request for Single Stage - One TF / A1121 Reference Emission Level and Post Open - National 18,000.00 0.00 Implementati 2021-07-19 2021-08-05 2021-09-19 medición de 25 parcelas Quotations Envelope Forest Reference Level on forestales permanentes. Act. 4a.2 (antes 3.5) DO-MMARN-241350-GO- RFQ / Equipos técnologicos (computadoras, proyectores, REDD+ Readiness Pending Request for Single Stage - One flotas, etc., apoyo al TF / A1121 Organization, Consultation Post Open - National 11,789.00 0.00 Implementati 2021-06-24 2021-07-07 2021-09-05 Quotations Envelope Ministerio de Medio Ambiente and Grievance Redress on y Recursos Naturales y otras entidades claves). Act. 5.22 DO-MMARN-241349-GO- RFQ / Adquisición Equipo REDD+ Readiness Pending Request for Single Stage - One Tecnológico para Apoyo del TF / A1121 Organization, Consultation Post Open - National 5,000.00 0.00 Implementati 2021-06-24 2021-07-08 2021-08-22 Quotations Envelope Viceministerio de Cooperación and Grievance Redress on Internacional. Act. 5.22 DO-MMARN-233126-GO- RFQ / Materiales fungibles REDD+ Readiness Pending (toners de impresoras y del Request for Single Stage - One TF / A1121 Organization, Consultation Post Open - National 6,000.00 0.00 Implementati 2021-05-05 2021-05-18 2021-07-02 ploter, resmas de papel, Quotations Envelope and Grievance Redress on folders, grapadoras, etc). Act. 5.27 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DO-MMARN-45367-NC-RFQ Pending Request for Single Stage - One / Construcción de escenarios TF / A1121 Post Open - National 0.00 0.00 Implementati 2017-10-15 2017-12-10 2018-06-08 Quotations Envelope climáticos on DO-MMARN-45415-NC-RFQ / Visitas para la evaluación de desempeño del Personal de las Direcciones Provinciales y Pending Request for Single Stage - One Municipales, respecto a los TF / A1121 Post Open - National 0.00 0.00 Implementati 2018-02-20 2018-04-17 2018-10-14 Quotations Envelope aspectos de REDD+ el on mecanismo de quejas y reclamos entre otros. Act, 1c.7 DO-MMARN-45419-NC-RFQ / Diseño del Sistema de Monitoreo de múltiples Pending Request for Single Stage - One beneficios socio ambientales, TF / A1121 Post Open - National 0.00 0.00 Implementati 2017-08-06 2017-10-01 2018-03-30 Quotations Envelope gobernanza y potenciales on impactos. MRV (36 reuniones / 12 por año). DO-MMARN-51798-NC-RFQ Pending / R-Package - Difusión. La Request for Single Stage - One TF / A1121 Post Open - National 0.00 0.00 Implementati 2018-03-05 2018-04-30 2018-10-27 difusión la realizará el Quotations Envelope on consultor Pending DO-MMARN-51802-NC-RFQ Request for Single Stage - One TF / A1121 Post Open - National 20,000.00 0.00 Implementati 2018-03-05 2018-04-30 2019-06-30 / Imprevistos. Act. 5.25 Quotations Envelope on DO-MMARN-46713-NC-RFQ REDD+ Readiness / Publicaciones para las Request for Single Stage - One TF / A1121 Organization, Consultation Post Open - National 13,016.14 1,301.32 Completed 2017-05-25 2017-07-20 2020-06-17 2019-06-30 2020-07-24 adquisiciones. Varios Quotations Envelope and Grievance Redress procesos. 5.20 DO-MMARN-75991-NC-RFQ / Talleres de validación del R- Pending Request for Single Stage - One Package (1 nacional y 3 TF / A1121 Post Open - National 10,243.00 0.00 Implementati 2018-10-06 2018-12-01 2019-05-30 Quotations Envelope regionales). Varios procesos. on Act. 4a.5-1 DO-MMARN-46745-NC-RFQ / Logística para cursos en Pending Request for Single Stage - One Manejo de Bosques y Manejo TF / A1121 Post Open - National 40,000.00 0.00 Implementati 2018-11-06 2019-03-31 2019-03-31 Quotations Envelope de Áreas Protegidas. Varios on procesos. Act. 1a.7 Page 2 DO-MMARN-76055-NC-RFQ / Talleres de validación de la Estrategia Nacional REDD+ (3 Request for Single Stage - One talleres regionales, una (1) TF / A1121 Post Open - National 8,100.00 1,016.18 Completed 2018-09-08 2018-11-03 2019-05-08 2019-05-02 2019-05-08 Quotations Envelope consulta con expertos, 1 taller nacional). Varios procesos. 2a.9.1 DO-MMARN-44598-NC-RFQ / Curso en en Manejo de Request for Single Stage - One TF / A1121 Post Open - National 25,040.00 0.00 Canceled 2017-05-15 2017-07-10 2018-01-06 Bosques y Restauración de Quotations Envelope Paisajes Forestales. Act. 1a.5 DO-MMARN-51793-NC-RFQ / Reuniones de coordinación, Request for Single Stage - One TF / A1121 Post Open - National 8,500.00 1,670.44 Completed 2018-03-05 2018-04-30 2019-04-04 2019-06-30 2019-05-08 colaboración y seguimiento Quotations Envelope con instituciones clave. 1c.11 DO-MMARN-55993-NC-RFQ Pending Request for Single Stage - One / Lanzamiento de la Estrategia TF / A1121 Post Open - National 18,000.00 0.00 Implementati 2019-03-09 2019-03-17 2019-03-31 Quotations Envelope REDD+. Act. 2a.10 on DO-MMARN-46755-NC-RFQ Pending / Logística para los trabajos Request for Single Stage - One TF / A1121 Post Open - National 34,083.00 0.00 Implementati 2018-02-04 2018-04-01 2019-06-30 de campo (Viáticos y Quotations Envelope on transporte). Act. 2d.4 DO-MMARN-77298-NC-RFQ / Capacitación del personal nacional responsable del monitoreo y reporte de datos Pending concernientes a las emisiones Request for Single Stage - One TF / A1121 Post Open - National 2,000.00 0.00 Implementati 2018-10-06 2018-12-01 2019-05-30 por deforestación y Quotations Envelope on degradación forestal.. (cálculos establecimiento y actualización de los niveles de referencia). Act. 3.2 DO-MMARN-45087-NC-RFQ / Apoyo logístico de la UTG a los talleres de la Consultoría Request for Single Stage - One TF / A1121 Post Open - National 0.00 0.00 Canceled 2017-10-20 2017-12-15 2018-06-13 SESA con los actores Quotations Envelope involucrados (9 talleres). 1c.1 (1b.3). DO-MMARN-83528-NC-RFQ / Capacitación en Manejo de Request for Single Stage - One Áreas Protegidas en el TF / A1121 Post Open - National 25,040.00 0.00 Canceled 2018-11-03 2018-12-28 2019-06-26 Quotations Envelope contexto de Cambio Climático. Act. 1a.6 DO-MMARN-103655-NC- RFQ / Capacitación sobre Request for Single Stage - One ganadería compatible con TF / A1121 Post Open - National 26,718.00 0.00 Canceled 2019-01-07 2019-02-11 2019-02-28 Quotations Envelope cambio climático. Varios procesos. Act. 1a.8 DO-MMARN-83542-NC-RFQ / Días de Campo con sectores Request for Single Stage - One Ganadería, Café y Cacao y TF / A1121 Post Open - National 30,000.00 7,359.05 Completed 2019-01-07 2019-02-12 2020-07-17 2019-06-28 2020-07-17 Quotations Envelope Forestal (5 días de campo). Varios procesos. Act. 2d.5 DO-MMARN-45412-NC-RFQ / Implementación de la Request for Single Stage - One estrategia de comunicación. TF / A1121 Post Open - National 42,000.00 37,607.55 Completed 2017-10-06 2017-12-01 2019-05-28 2018-05-30 2020-01-23 Quotations Envelope (divulgación en radio). Act. 1b.2 DO-MMARN-83641-NC-DIR / Curso Teórico-Práctico Sobre Sistema de Información Pending Geográfica (SIG) y Elaboración TF / A1121 Post Direct Selection Direct 21,406.00 0.00 Implementati 2018-10-29 2018-11-03 2018-12-08 2019-03-08 de Mapa con Áreas de Acción on REED+ por Región de Planificación DO-MMARN-103666-NC-DIR / Talleres de Validación de la Estrategia Nacional REDD+ (3 TF / A1121 Post Direct Selection Direct 900.00 0.00 Canceled 2019-02-28 2019-02-25 2019-03-05 2019-04-09 2019-10-06 talleres regionales, Una consulta con expertos, 1 taller nacional - Azua DO-MMARN-107002-NC- RFB / Implementación de la REDD+ Readiness Under estrategia de comunicación. Single Stage - One TF / A1121 Organization, Consultation Prior Request for Bids Open - National 157,198.00 0.00 Implementati 2019-03-19 2019-03-24 2019-05-05 2019-06-04 2019-07-09 2020-01-05 (Materiales impresos, Envelope and Grievance Redress on brochures, entre otros). Act. 1b.2 DO-MMARN-46724-NC-RFQ / Reuniones de de trabajo Request for Single Stage - One extraordinarias de los TF / A1121 Post Open - National 15,367.00 961.07 Completed 2018-02-10 2018-04-07 2019-03-03 2019-06-30 2019-05-03 Quotations Envelope Comités Especiales. (Varios procesos). 1a.3 DO-MMARN-110856-NC- Pending Request for Single Stage - One RFQ / Reuniones del CD 2 TF / A1121 Post Open - National 1,901.00 0.00 Implementati 2019-04-21 2019-06-16 2019-12-13 Quotations Envelope reuniones. Act.1a.2 on DO-MMARN-110858-NC- Request for Single Stage - One RFQ / Reuniones ordinarias TF / A1121 Post Open - National 8,345.00 1,720.89 Completed 2019-04-21 2019-06-16 2020-01-29 2019-12-13 2020-05-08 Quotations Envelope del CTA. 4 por año. 1a.1 DO-MMARN-107007-NC-DIR / Taller Retroalimentación TF / A1121 Post Direct Selection Direct 1,500.00 815.41 Completed 2019-03-19 2019-03-20 2019-03-24 2019-03-22 2019-04-28 2019-03-22 2019-10-25 2019-06-03 PMA`s en Áreas Prioritarias - Santiago Rodríguez. Act. 1a.9 DO-MMARN-107005-NC-DIR / Taller Retroalimentación TF / A1121 Post Direct Selection Direct 1,500.00 834.81 Completed 2019-03-19 2019-03-20 2019-03-24 2019-03-13 2019-04-28 2019-03-21 2019-10-25 2019-05-22 PMA`s en Áreas Prioritarias - San Fco. Macorís. 1a.9 Page 3 DO-MMARN-107008-NC-DIR / Taller Retroalimentación TF / A1121 Post Direct Selection Direct 1,500.00 711.56 Completed 2019-03-19 2019-03-11 2019-03-24 2019-03-13 2019-04-28 2019-03-22 2019-10-25 2020-02-18 PMA`s en Áreas Prioritarias - Las Matas de Farfán. Act 1a.9 DO-MMARN-107006-NC-DIR / Taller Retroalimentación TF / A1121 Post Direct Selection Direct 1,500.00 2,030.34 Completed 2019-03-19 2019-03-12 2019-03-24 2019-03-12 2019-04-28 2019-04-17 2019-10-25 2019-09-12 PMA`s en Áreas Prioritarias - Azua. Act 1a.9 DO-MMARN-107010-NC-DIR / Taller Retroalimentación TF / A1121 Post Direct Selection Direct 1,500.00 572.73 Completed 2019-03-19 2019-03-20 2019-03-24 2019-03-20 2019-04-28 2019-03-21 2019-10-25 2019-06-03 PMA`s en Áreas Prioritarias - Cotui Act 1a.9 DO-MMARN-125946-NC-DIR / Adquisición de Servicios de REDD+ Readiness Capacitación Cursos TF / A1121 Organization, Consultation Post Direct Selection Direct 237,315.72 218,185.76 Completed 2019-08-01 2019-10-04 2019-08-06 2019-10-15 2019-09-10 2019-10-15 2020-03-08 2020-06-08 Ganadería Sostenible, Manejo and Grievance Redress Forestal Sostenible y Manejo Áreas Protegidas DO-MMARN-39906-NC-RFQ / Actividades de participación Request for Single Stage - One en eventos TF / A1121 Post Open - International 10,367.00 3,772.37 Completed 2018-03-14 2018-05-09 2019-06-25 2018-11-05 2019-08-15 Quotations Envelope internacionales.Act. 1c.8 (1b.10) - Varios procesos DO-MMARN-100643-NC- Request for Single Stage - One RFQ / Logística para talleres. TF / A1121 Post Open - National 42,311.00 468.68 Completed 2019-02-18 2019-04-15 2019-12-10 2019-06-30 2020-07-24 Quotations Envelope 1a.9 Varios procesos DO-MMARN-153239-NC-DIR Pending / Taller Consulta PDB en San TF / A1121 Post Direct Selection Direct 1,676.00 0.00 Implementati 2020-01-09 2020-01-14 2020-02-18 2020-08-16 Francisco de Macorís. Act. on 1a.7 (antes 1a.8) DO-MMARN-154380-NC-DIR / Desayuno y almuerzo taller TF / A1121 Post Direct Selection Direct 1,558.00 1,449.40 Completed 2020-01-17 2019-01-04 2020-01-22 2020-01-09 2020-02-26 2020-01-13 2020-08-24 2020-02-18 consulta PDB en Santiago Rodríguez. Act. 1a.7 DO-MMARN-154384-NC-DIR / Desayuno y almuerzo taller TF / A1121 Post Direct Selection Direct 825.00 927.62 Completed 2020-01-17 2019-03-21 2020-01-22 2020-01-07 2020-02-26 2020-01-17 2020-08-24 2020-04-13 consulta PDB en Cotui. Act. 1a.7 DO-MMARN-159247-NC- RFQ / Impresión manual de sistema café bajo sombra en Pending el marco de REDD+ Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Implementati 2020-02-19 2020-04-15 2020-10-30 (incluyendo sección de Quotations Envelope on Salvaguardas). Act. 1c3.2.e Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-231979-NC- RFP / Paquete técnico REDD+ Readiness Request for Single Stage - Two pedagógico y capacitación TF / A1121 Organization, Consultation Post Open - National 121,200.00 0.00 Canceled 2021-05-03 2021-05-08 2021-06-19 2021-09-01 2021-10-06 2022-04-04 Proposals Envelope para el PREDD en República and Grievance Redress Dominicana. Act.2b.5 DO-MMARN-231984-NC- RFQ / Producción de REDD+ Readiness Contenido Audiovisual. Act. Request for Single Stage - One TF / A1121 Organization, Consultation Post Open - National 72,423.00 68,321.22 Signed 2021-05-03 2021-06-28 2021-05-14 2021-12-25 1b.1.1 Quotations Envelope and Grievance Redress (i) Cápsulas Educativas (ii) Producción videos DO-MMARN-241329-NC- RFQ / Primera Reunión Design of a National Forest Pending Request for Single Stage - One Ordinaria del Comité Técnico TF / A1121 and Safeguards Monitoring Post Open - National 1,500.00 0.00 Implementati 2021-07-19 2021-07-31 2021-08-30 Quotations Envelope Asesor del Programa REDD+ System on 2021 DO-MMARN-241330-NC- Design of a National Forest Pending Request for Single Stage - One RFQ / Primera reunión del TF / A1121 and Safeguards Monitoring Post Open - National 750.00 0.00 Implementati 2021-07-19 2021-07-31 2021-08-30 Quotations Envelope Comité Directivo 2021 System on DO-MMARN-243484-NC- Design of a National Forest Pending RFQ / Segunda Reunión Request for Single Stage - One TF / A1121 and Safeguards Monitoring Post Open - National 1,500.00 0.00 Implementati 2021-11-01 2021-11-13 2021-12-13 Ordinaria del Comité Técnico Quotations Envelope System on Asesor del Programa REDD+ DO-MMARN-243488-NC- REDD+ Readiness Pending Request for Single Stage - One RFQ / Segunda reunión del TF / A1121 Organization, Consultation Post Open - National 750.00 0.00 Implementati 2021-11-01 2021-11-13 2021-12-13 Quotations Envelope Comité Directivo and Grievance Redress on DO-MMARN-159308-NC- REDD+ Readiness Request for Single Stage - One RFQ / Manejo de aspectos TF / A1121 Organization, Consultation Post Open - National 2,264.15 0.00 Canceled 2020-02-17 2020-04-13 2020-10-30 Quotations Envelope financieros and Grievance Redress DO-MMARN-159286-NC- RFQ / Impresión Manual de sistema cacao bajo sombra en el marco de REDD+ Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Canceled 2020-07-06 2020-08-31 2020-10-30 (incluyendo sección de Quotations Envelope Salvaguardas). Act. 1c3.2.d Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159292-NC- RFQ / Impresión manual de regeneración natural en zonas degradadas en el marco de Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Canceled 2020-08-07 2020-10-02 2020-10-30 REDD+ (incluyendo sección de Quotations Envelope Salvaguardas). Act. 1c3.2.g Subcomponente 1c. Procesos de Consulta Participación Page 4 DO-MMARN-159268-NC- RFQ / Impresión manual de sistema café bajo sombra en el marco de REDD+ Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Canceled 2020-05-08 2020-07-03 2020-10-01 (incluyendo sección de Quotations Envelope Salvaguardas). Act. 1c3.2.a Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159298-NC- RFQ / Manual de plantaciones dendroenergéticas en el Request for Single Stage - One marco de REDD+ (incluyendo TF / A1121 Post Open - National 1,773.58 0.00 Canceled 2020-08-19 2020-10-14 2020-10-30 Quotations Envelope sección de Salvaguardas). Act. 1c3.2.h Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159250-NC- RFQ / Impresión manual de sistemas silvopastoriles en el marco de REDD+ (incluyendo Request for Single Stage - One TF / A1121 Post Open - National 1,173.58 0.00 Canceled 2020-06-06 2020-08-01 2020-10-30 sección de Salvaguardas). Act. Quotations Envelope 1c3.2.f Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159278-NC- RFQ / Impresión manual de manejo forestal sostenible en el marco de REDD+ Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Canceled 2020-06-19 2020-08-14 2020-11-12 (incluyendo sección de Quotations Envelope Salvaguardas). Act. 1c3.2.b Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159241-NC- RFQ / Impresión Manual de Reforestación en el marco de Request for Single Stage - One REDD+ (incluyendo sección de TF / A1121 Post Open - National 1,773.58 0.00 Canceled 2020-05-09 2020-07-04 2020-10-30 Quotations Envelope salvaguardas). Act. 1c3.2c Subcomponente 1c, Procesos de Consulta y Participación DO-MMARN-159306-NC- RFQ / Impresión de la Guía para el uso adecuado de plaguicidas y la correcta Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Canceled 2020-08-25 2020-09-19 2020-10-09 disposición de envases. Act. Quotations Envelope 1c3.2.j Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159303-NC- RFQ / Manual de conservación de bosques en áreas protegidas en el marco de Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Canceled 2020-08-07 2020-09-07 2020-09-27 REDD+ (incluyendo sección de Quotations Envelope Salvaguardas). Act. 1c3.2.i Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-45086-NC-RFQ Request for Single Stage - One TF / A1121 Post Open - National 0.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 / Seguro de salud. Act. 5.28 Quotations Envelope REDD+ Readiness DO-MMARN-51801-NC-RFQ Request for Single Stage - One TF / A1121 Organization, Consultation Post Open - National 5,500.00 0.00 Canceled 2018-03-05 2018-04-30 2018-10-27 / Gastos bancarios. Act. 5.24 Quotations Envelope and Grievance Redress DO-MMARN-241407-NC- RFQ / Diseño artes brochures, Design of a National Forest Pending cuadernillos, infografías, Request for Single Stage - One TF / A1121 and Safeguards Monitoring Post Open - National 17,577.00 0.00 Implementati 2021-06-25 2021-07-13 2021-08-27 flyers, banner y diagramación Quotations Envelope System on de 2 documentos tipo revistas. Sub Act. 1b.1.2 DO-MMARN-241335-NC- RFQ / Refrigerios Coordinación con instituciones claves para REDD+ (Ministerios: Design of a National Forest Pending Request for Single Stage - One Agricultura, MEPyD, TF / A1121 and Safeguards Monitoring Post Open - National 700.00 0.00 Implementati 2021-06-29 2021-07-19 2021-09-15 Quotations Envelope HACIENDA, DIGEGA, System on INDOCAFE, UTEPDA, ASOC. San Ramón, ASODEFOREST,etc.). Act. 1c.1.1 DO-MMARN-241337-NC- RFQ / Capacitación y Design of a National Forest Pending certificación en manejo de Request for Single Stage - One TF / A1121 and Safeguards Monitoring Post Open - National 12,000.00 0.00 Implementati 2021-06-24 2021-07-31 2021-08-30 proyectos vinculados con la Quotations Envelope System on reducción de emisiones y cambio climático. 1c.5 DO-MMARN-241336-NC- RFQ / Socialización de criterios y procedimientos a beneficiarios y sus Design of a National Forest Pending Request for Single Stage - One organizaciones para participar TF / A1121 and Safeguards Monitoring Post Open - National 15,200.00 0.00 Implementati 2021-07-05 2021-07-21 2021-10-19 Quotations Envelope en el PREDD+. (SE DEFINEN System on LOS BENEFICIARIOS CONFORME SE AVANCE CON LAS EE). 1c.2 DO-MMARN-241339-NC- RFQ / Desarrollo del plan de capacitación de actores / Capacitación basica REDD+ 3 Design of a REDD+ Pending modulos (REDD+, Cambio Request for Single Stage - One TF / A1121 Monitoring and Evaluation Post Open - National 20,000.00 0.00 Implementati 2021-06-24 2021-07-07 2021-08-21 Climático y Bosques; Quotations Envelope Framework on Salvaguardas/OP BM). Dirigida a actores con los que trabajan las EE en el marco de REDD+. Act. 2b.4 Page 5 DO-MMARN-241340-NC- RFQ / Continuación del primer ciclo y ampliacion al segundo ciclo de capacitacion a partir de la inscripcion de los Design of a REDD+ Pending Request for Single Stage - One beneficiarios en REDD+ queda TF / A1121 Monitoring and Evaluation Post Open - National 75,954.00 0.00 Implementati 2021-06-24 2021-07-17 2021-11-14 Quotations Envelope previsto para el proximo año Framework on e incluiria: modulo 1 (MQRC, SIS; SESA, MGAS, PMAS) y modulo 2 (PDB, MRV). Act. 2b.4.1 DO-MMARN-241341-NC- Design of a REDD+ Pending RFQ / Elaboración y firma de Request for Single Stage - One TF / A1121 Monitoring and Evaluation Post Open - National 4,925.00 0.00 Implementati 2021-06-24 2021-07-06 2021-07-27 Acuerdos con las Entidades Quotations Envelope Framework on Ejecutoras. Act. 2c.1 DO-MMARN-247361-NC- RFQ / Hoja de Ruta Planificación Estratégica 2021- Design of a REDD+ Pending Request for Single Stage - One 2024" donde se acordaran las TF / A1121 Monitoring and Evaluation Post Open - National 5,263.00 0.00 Implementati 2021-08-09 2021-08-26 2021-08-31 Quotations Envelope acciones concretas para Framework on institucionalizar el mecanismo REDD+ CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DO-MMARN-45422-CS-CQS / Diseño de una estrategia de comunicación nacional para Consultant REDD, más analisis y TF / A1121 Post Qualification Open - National 50,000.00 42,809.42 Terminated 2017-08-30 2017-11-17 2017-09-20 2017-11-03 2018-01-09 2017-12-03 2018-03-15 2018-01-07 2018-03-15 2018-07-06 propuesta de mejora a Selection plataforma web del proyecto. Act. 1b.1 DO-MMARN-51385-CS-CQS / Establecimiento de nivel de referencia, estimación del Consultant potencial de reducción de TF / A1121 Post Qualification Open - National 327,957.00 0.00 Canceled 2018-03-05 2018-03-26 2018-03-26 2018-05-09 2018-06-08 2018-07-13 2019-01-09 emisiones/aumento de Selection reservorios y sistema de monitoreo de emsiones forestales. 3.1 DO-MMARN-45095-CS-CQS Consultant Pending / Diseño de base de datos TF / A1121 Post Qualification Open - National 0.00 0.00 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 Implementation para MRV. Selection DO-MMARN-46717-CS-CQS / Establecimiento del marco logico y acuerdos institucionales necesarios Consultant para MRV. Desarrollo de una Pending TF / A1121 Post Qualification Open - International 0.00 0.00 2017-05-10 2017-05-31 2017-07-14 2017-08-13 2017-09-17 2018-03-16 plataforma de informacion Implementation Selection prototipo para monitorear los bosques y actividades UTCUTS (Uso de la Tierra, Cambio Uso de la Tierra y Silvicultura). DO-MMARN-45376-CS-CQS / Soporte tecnico para el desarrollo y envio del nivel de Consultant referencia (REL/FREL) a la Pending TF / A1121 Post Qualification Open - National 0.00 0.00 2017-08-01 2017-08-22 2017-10-05 2017-11-04 2017-12-09 2018-06-07 UNFCCC. Generar factores de Implementation Selection expansión y/o ecuaciones alométricas por tipo de bosque. DO-MMARN-46708-CS-CQS / Análisis de las causas directas e indirectas (Drivers) de deforestación y degradación de los bosques REDD+ Readiness Consultant (DD) en Rep. Dom. y TF / A1121 Organization, Consultation Post Qualification Open - International 182,304.00 151,470.00 Completed 2017-05-15 2017-06-07 2017-06-05 2017-07-19 2017-10-03 2017-08-18 2017-12-01 2017-09-22 2017-12-12 2018-03-21 2018-07-24 Propuestas de alternativas de and Grievance Redress Selection uso sostenible del suelo que disminuyen la DD aumentan los reservorios de carbono. Act. 2a.1 2a.2 2a.3 DO-MMARN-45407-CS-CQS / Propiedad del carbono forestal, sistema de registro y Consultant Pending transferencia de titulos de TF / A1121 Post Qualification Open - National 0.00 0.00 2017-08-01 2017-08-22 2017-10-05 2017-11-04 2017-12-09 2018-06-07 Implementation reduccion de emisiones en Selection Republica Dominicana. Act. 2c.2 DO-MMARN-55977-CS-CQS / Estudio sobre condiciones ambientales y sociales a nivel Consultant nacional y a nivel local en las TF / A1121 Post Qualification Open - International 0.00 0.00 Canceled 2018-03-26 2018-04-16 2018-05-30 2018-06-29 2018-08-03 2019-01-30 zonas específicas de Selection intervención y Planes de Manejo de dichas áreas. 1c2 )1b.5). Enmienda MGAS DO-MMARN-45082-CS-CQS / Desarrollo del Mecanismo de Quejas y Solución de Consultant Conflictos. Consultoría para el TF / A1121 Post Qualification Open - International 334,535.00 334,535.39 Completed 2017-08-15 2017-08-08 2017-09-05 2017-10-19 2017-10-09 2017-11-18 2017-12-06 2017-12-23 2017-12-12 2018-12-18 2019-04-25 desarrollo del Marco de Selection Gestión Ambiental y Social (MGAS) para REDD+ Act.1c.2 (1b.5) DO-MMARN-51796-CS-CQS Consultant / Análisis de impacto de TF / A1121 Post Qualification Open - International 33,446.71 0.00 Canceled 2018-02-28 2019-08-25 2018-03-21 2018-05-04 2018-06-03 2018-07-08 2019-01-04 empleos verdes. 2a.11 Selection Page 6 Consultant DO-MMARN-67606-CS-CQS TF / A1121 Post Qualification Open - National 0.00 0.00 Canceled 2018-07-16 2018-08-06 2018-09-19 2018-10-19 2018-11-23 2019-05-22 / Culminación MRV (Act. 3.2) Selection DO-MMARN-39916-CS-CQS / Evaluación de los Costos y Beneficios y Preparación de un Plan de Financiación para el Consultant Programa de Reducción de TF / A1121 Post Qualification Open - National 53,701.00 50,000.00 Completed 2017-12-08 2017-06-22 2017-12-29 2018-02-11 2017-09-28 2018-03-13 2017-12-12 2018-04-17 2017-12-12 2018-10-14 2019-02-25 Emisiones en República Selection Dominicana. Análisis de la brecha financiera. Act. 2a.4 y 2a.5 DO-MMARN-39915-CS-CQS / Inventario de No Bosque de REDD+ Readiness Consultant la República Dominicana. TF / A1121 Organization, Consultation Post Qualification Open - National 203,114.71 203,114.71 Completed 2017-12-08 2017-08-22 2017-12-29 2018-02-11 2017-12-11 2018-03-13 2019-03-01 2018-04-17 2018-01-04 2018-10-14 2018-12-10 Evaluación del contenido de and Grievance Redress Selection Biomasa y Carbono ..... Act. 4a.6 DO-MMARN-45362-CS- REDD+ Readiness Quality And Cost- Under QCBS / Evaluaciones externas TF / A1121 Organization, Consultation Post Open - National 15,888.00 0.00 2017-04-01 2021-01-07 2017-04-22 2017-06-05 2021-01-07 2017-07-03 2017-08-02 2017-09-06 2017-10-11 2018-10-11 Based Selection Implementation y auditorias anuales. Act. 5.3 and Grievance Redress DO-MMARN-39912-CS- QCBS / Elaboración del Quality And Cost- Inventario Nacional Forestal TF / A1121 Post Open - International 538,870.00 538,870.00 Completed 2017-12-08 2017-06-01 2017-12-29 2018-02-11 2017-07-05 2018-03-11 2017-09-29 2018-04-10 2017-10-12 2018-05-15 2017-09-09 2018-06-19 2017-12-12 2019-06-19 2019-10-29 Based Selection de la República Dominicana (INF-RD). Act. 4a.3 DO-MMARN-75965-CS-CQS Consultant / Plataforma WEB Registro de TF / A1121 Post Qualification Open - National 55,000.00 0.00 Canceled 2020-03-29 2020-04-17 2020-04-19 2020-06-02 2020-07-02 2020-08-06 2020-09-26 Proyectos, Programas y Selection Participantes. (Act. 4b.2) DO-MMARN-208156-CS- CQS / Diseño e REDD+ Readiness Consultant implementación del Sistema TF / A1121 Organization, Consultation Post Qualification Open - National 55,000.00 0.00 Canceled 2020-12-04 2020-12-08 2020-12-25 2021-02-07 2021-02-24 2021-03-09 2021-04-13 2021-10-10 Nacional de Registro de and Grievance Redress Selection Programas, Proyectos y Acciones REDD+. Act. 4b.1 DO-MMARN-51794-CS-CQS / Diseño e implementación REDD+ Readiness Consultant del Sistema de Información de TF / A1121 Organization, Consultation Post Qualification Open - International 60,000.00 69,974.00 Signed 2020-12-04 2020-12-08 2020-12-25 2021-02-07 2021-02-26 2021-03-09 2021-04-19 2021-04-13 2021-04-19 2021-10-10 Salvaguardas REDD+ (SIS). and Grievance Redress Selection 1c.4 DO-MMARN-208159-CS- CQS / Diseño e implementación del Sistema REDD+ Readiness Consultant de Atención a Quejas, TF / A1121 Organization, Consultation Post Qualification Open - National 65,000.00 69,974.00 Signed 2020-12-04 2020-12-08 2020-12-25 2021-02-07 2021-03-01 2021-03-09 2021-04-15 2021-04-13 2021-04-19 2021-10-10 Reclamos y Manejo de and Grievance Redress Selection Conflictos en el Marco de REDD+ (SQRC). Act. 1c.5 DO-MMARN-233124-CS- CQS / Paquete técnico REDD+ Readiness Consultant Under pedagógico y capacitación TF / A1121 Organization, Consultation Post Qualification Open - International 121,200.00 0.00 2021-05-07 2021-05-28 2021-05-28 2021-07-11 2021-07-06 2021-08-10 2021-09-14 2022-03-13 Implementation para el PREDD en República and Grievance Redress Selection Dominicana. Act.2b.5 DO-MMARN-233133-CS- CQS / Diseño e REDD+ Readiness Consultant implementación del Sistema TF / A1121 Organization, Consultation Post Qualification Open - National 55,000.00 53,500.00 Signed 2021-05-05 2020-12-08 2021-05-26 2021-07-09 2021-04-12 2021-08-08 2021-06-10 2021-09-12 2021-06-14 2022-03-11 Nacional de Registro de and Grievance Redress Selection Programas, Proyectos y Acciones REDD+. Act. 4b.1 DO-MMARN-238595-CS- CQS / Fortalecimiento de REDD+ Readiness Consultant capacidades de Under TF / A1121 Organization, Consultation Post Qualification Open - National 21,100.00 0.00 2021-06-10 2021-06-08 2021-07-01 2021-08-14 2021-09-13 2021-10-18 2022-04-16 ASODEFOREST y Asociación de Implementation and Grievance Redress Selection Silvicultores San Ramón en el Marco de REDD+. Act. 2b.2 DO-MMARN-241441-CS- CQS / Capacitación sobre prevención de incendios Design of a National Forest Consultant Pending forestales y afectación del TF / A1121 and Safeguards Monitoring Post Qualification Open - National 160,000.00 0.00 2021-06-25 2021-07-25 2021-08-27 2021-09-01 2021-09-08 2021-12-07 Implementation bosque por plagas y System Selection enfermedades. Act. 4a.4 (Antes 3.6) INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DO-MMARN-45411-CS-INDV REDD+ Readiness Individual / Especialista en TF / A1121 Organization, Consultation Post Consultant Open 0.00 0.00 Canceled 2017-08-01 2019-06-17 2017-09-19 2017-10-10 2017-11-14 2018-05-13 Comunicaciones and Grievance Redress Selection DO-MMARN-67601-CS-INDV / Establecimiento de nivel de referencia, estimación del REDD+ Readiness Individual potencial de reducción de TF / A1121 Organization, Consultation Post Consultant Open 61,644.00 61,643.83 Completed 2018-06-14 2018-06-14 2018-08-02 2018-06-15 2018-08-23 2018-08-20 2018-09-27 2018-07-02 2019-03-26 2018-11-23 emisiones/aumento de and Grievance Redress Selection reservorios y sistema de monitoreo de emisiones forestales. 3.1 DO-MMARN-67607-CS-INDV / Desarrollo de un Estudio de Individual Género para REDD+ (Act. Esta TF / A1121 Post Consultant Open 0.00 0.00 Canceled 2018-07-16 2018-09-03 2018-09-24 2018-10-29 2019-04-27 consultoría la cubrirá el Banco Selection Mundial. 1c.3) Page 7 DO-MMARN-75815-CS-INDV Individual / Revisor y analista de TF / A1121 Post Consultant Open 14,174.00 43,014.68 Completed 2018-08-27 2018-08-28 2018-10-01 2019-01-01 2018-10-22 2019-01-01 2018-11-26 2019-01-01 2019-05-25 2020-06-30 informes técnicos (área Selection biofísica) (Act. 5.28) DO-MMARN-83548-CS-INDV REDD+ Readiness Individual / Técnico en Uso de Suelo, TF / A1121 Organization, Consultation Post Consultant Open 28,690.64 42,427.63 Signed 2017-12-12 2017-10-20 2018-01-30 2017-10-20 2018-02-20 2018-03-27 2017-12-12 2019-06-30 Agricultura y Bosque. Act. and Grievance Redress Selection 5.10 REDD+ Readiness Individual DO-MMARN-50912-CS-INDV TF / A1121 Organization, Consultation Post Consultant Open 29,507.00 37,174.76 Signed 2017-12-12 2018-12-13 2018-01-30 2019-11-05 2018-02-20 2019-12-01 2018-03-27 2019-12-01 2019-06-30 / Técnico Social. Act. 5.9 and Grievance Redress Selection DO-MMARN-50898-CS-INDV REDD+ Readiness Individual / Chófer Apoyo logístico 2. TF / A1121 Organization, Consultation Post Consultant Open 15,424.54 25,167.03 Signed 2017-06-27 2017-05-01 2017-08-15 2017-08-18 2017-09-05 2017-07-01 2017-10-10 2017-07-03 2019-06-30 Act. 5.8 and Grievance Redress Selection DO-MMARN-50906-CS-INDV REDD+ Readiness Individual / Chófer. Apoyo logístico 1. TF / A1121 Organization, Consultation Post Consultant Open 15,447.33 21,579.62 Signed 2017-07-03 2017-03-31 2017-08-21 2017-05-01 2017-09-11 2017-06-27 2017-10-16 2017-06-27 2019-06-30 Act. 5.7 and Grievance Redress Selection DO-MMARN-50873-CS-INDV REDD+ Readiness Individual / Secretaria Administrativa. TF / A1121 Organization, Consultation Post Consultant Open 49,439.13 16,693.73 Completed 2016-10-21 2016-08-01 2016-12-09 2016-10-22 2016-12-30 2017-10-23 2017-02-03 2017-10-23 2019-06-30 2018-06-01 Act. 5.6 and Grievance Redress Selection DO-MMARN-50883-CS-INDV REDD+ Readiness Individual / Encargado de Operaciones. TF / A1121 Organization, Consultation Post Consultant Open 64,870.40 55,748.51 Completed 2017-02-23 2019-06-17 2017-04-13 2017-02-13 2017-05-04 2017-02-13 2017-06-08 2017-02-23 2019-06-30 2019-06-30 Act. 5.5 and Grievance Redress Selection DO-MMARN-55997-CS-INDV Individual / Diseño conceptual de la Pending TF / A1121 Post Consultant Open 11,999.54 0.00 2018-03-27 2018-05-15 2018-06-05 2018-07-10 2019-01-06 Plataforma Web para Implementation Selection monitoreo forestal. Act. 4a.8 DO-MMARN-51797-CS-INDV / Preparación del documento REDD+ Readiness Individual R-Package y su difusión. El TF / A1121 Organization, Consultation Post Consultant Open 29,979.45 29,980.00 Completed 2018-02-28 2018-09-08 2018-04-18 2018-08-10 2018-05-09 2018-08-27 2018-06-13 2018-09-10 2018-12-10 2018-12-20 Consultor se encargará de la and Grievance Redress Selection difusión. (Act. 4a.5) DO-MMARN-76003-CS-INDV / Capacitación del personal nacional responsable del monitoreo y reporte de datos Individual concernientes a las emisiones Pending TF / A1121 Post Consultant Open 5,000.00 0.00 2018-10-01 2018-11-19 2018-12-10 2019-01-14 2019-06-30 por deforestación y Implementation Selection degradación forestal.. (cálculos establecimiento y actualización de los niveles de referencia). Act. 3.2 DO-MMARN-76044-CS-INDV / Evaluación de la Tenencia de REDD+ Readiness Individual la Tierra y de Recursos para el TF / A1121 Organization, Consultation Post Consultant Open 32,777.78 28,635.38 Completed 2018-09-17 2018-08-13 2018-11-05 2018-08-14 2018-11-26 2018-09-27 2018-12-31 2018-08-20 2019-06-30 2019-11-06 Programa Nacional de and Grievance Redress Selection Emisiones de la República Dominicana. (Act. 2c.3) DO-MMARN-77147-CS-INDV REDD+ Readiness Individual / Especialista en TF / A1121 Organization, Consultation Prior Consultant Open 66,092.45 0.00 Under Review 2017-08-30 2019-06-12 2017-10-18 2017-07-28 2017-11-08 2017-12-13 2019-06-30 Adquisiciones. Act. 1a.4 and Grievance Redress Selection DO-MMARN-77159-CS-INDV Individual / Elaboración de material Pending TF / A1121 Post Consultant Open 94,530.00 0.00 2018-10-01 2018-11-19 2018-12-10 2019-01-14 2019-05-31 didáctico sobre Salvaguarda. Implementation Selection Act. 1.b4 DO-MMARN-51052-CS-INDV REDD+ Readiness Individual / Especialista en TF / A1121 Organization, Consultation Post Consultant Open 28,800.00 26,025.67 Completed 2018-02-26 2019-06-17 2018-04-16 2018-05-25 2018-05-07 2018-05-27 2018-06-11 2018-07-02 2019-06-30 2020-06-30 Comunicaciones. Act. 1b.3 and Grievance Redress Selection (1b.4) DO-MMARN-45340-CS-INDV REDD+ Readiness Individual / Especialista Social. Act. 1c.9 TF / A1121 Organization, Consultation Post Consultant Open 59,142.00 57,497.88 Completed 2017-05-01 2017-03-08 2017-06-19 2018-05-15 2017-07-10 2018-07-02 2017-08-14 2018-07-02 2019-06-30 2020-07-15 (1b.11) and Grievance Redress Selection DO-MMARN-51372-CS-INDV / Coordinador Técnico REDD+ Readiness Individual Especialista en Uso de Suelo, TF / A1121 Organization, Consultation Post Consultant Open 78,699.00 146,465.18 Signed 2018-02-26 2018-05-04 2018-04-16 2016-06-01 2018-05-07 2017-03-20 2018-06-11 2017-03-30 2019-06-30 Agricultura y Bosque. Act. and Grievance Redress Selection 2a.6 DO-MMARN-50905-CS-INDV REDD+ Readiness Individual / Coordinación del Proyecto. TF / A1121 Organization, Consultation Post Consultant Open 128,570.78 3,647.84 Completed 2016-12-19 2019-06-13 2017-02-06 2017-04-04 2017-02-27 2017-12-20 2017-04-03 2017-03-01 2019-06-30 2020-06-30 Act. 5.2 and Grievance Redress Selection DO-MMARN-51799-CS-INDV REDD+ Readiness Individual / Asistente Administrativo. TF / A1121 Organization, Consultation Post Consultant Open 12,480.00 10,410.27 Signed 2018-02-28 2018-07-18 2018-04-18 2018-06-01 2018-05-09 2018-06-01 2018-06-13 2018-06-01 2019-06-30 5.26 and Grievance Redress Selection DO-MMARN-51800-CS-INDV REDD+ Readiness Individual / Coordinador Inter- TF / A1121 Organization, Consultation Post Consultant Open 25,000.00 57,473.35 Signed 2018-02-28 2019-06-17 2018-04-18 2018-08-27 2018-05-09 2018-09-03 2018-06-13 2018-09-03 2019-06-30 Institucional Alto Nivel. Act. and Grievance Redress Selection 5.27 DO-MMARN-79611-CS-INDV Individual / Definición de Bosque según Pending TF / A1121 Post Consultant Open 5,000.00 0.00 2018-11-05 2018-12-24 2019-01-14 2019-02-18 2019-08-30 sus funciones (cumplimiento Implementation Selection al Art. 155 Ley 64-00) DO-MMARN-79613-CS-INDV / Técnico apoyo a DIARENA en Individual Pending la instalación del Sistema de TF / A1121 Post Consultant Open 4,608.00 0.00 2018-11-12 2018-12-31 2019-01-21 2019-06-30 2019-12-27 Implementation Monitoreo para REDD+ y Selection Forestal. Page 8 DO-MMARN-79615-CS-INDV / Técnico apoyo a DIARENA en REDD+ Readiness Individual la instalación del Sistema de TF / A1121 Organization, Consultation Post Consultant Open 4,608.00 40,849.76 Signed 2018-11-12 2018-11-27 2018-12-31 2019-03-25 2019-01-21 2019-04-01 2019-02-25 2019-06-30 2019-06-30 Monitoreo para REDD+ y and Grievance Redress Selection Forestal DO-MMARN-79617-CS-INDV REDD+ Readiness Individual / Técnico para apoyo del MRV TF / A1121 Organization, Consultation Post Consultant Open 5,100.00 16,877.64 Signed 2018-11-30 2019-11-30 2019-01-18 2019-05-20 2019-02-08 2019-12-02 2019-03-15 2019-12-01 2019-06-30 en el sector AFOLU y and Grievance Redress Selection Agricultura DO-MMARN-79737-CS-INDV / Técnico de apoyo en REDD+ Readiness Individual planificación y seguimiento a TF / A1121 Organization, Consultation Post Consultant Open 5,400.00 16,877.64 Signed 2018-11-12 2019-11-30 2018-12-31 2019-05-02 2019-01-21 2020-01-02 2019-02-25 2020-01-02 2019-06-30 la Dirección de Cambio and Grievance Redress Selection Climático DO-MMARN-51384-CS-INDV REDD+ Readiness Individual / Elaboración documento TF / A1121 Organization, Consultation Post Consultant Open 34,246.58 34,246.58 Completed 2018-03-01 2018-05-29 2018-04-19 2018-05-03 2018-05-10 2018-05-30 2018-06-14 2018-06-29 2018-12-11 2021-06-25 Estrategia Nacional REDD+. and Grievance Redress Selection 2a.9 DO-MMARN-45091-CS-INDV / Análisis marco legal, institucional y de Pending TF / A1121 Post Direct Selection Direct 38,013.70 0.00 2018-11-22 2018-11-22 2018-12-12 2019-02-25 cumplimiento para las Implementation salvaguardas de REDD. Act. 2d.1 DO-MMARN-45355-CS-INDV Individual Pending / Técnico de apoyo en TF / A1121 Post Consultant Open 5,400.00 0.00 2018-11-01 2018-12-20 2019-01-10 2019-02-14 2019-06-30 Implementation mitigación Selection DO-MMARN-66228-CS-INDV / Caracterización y Plan de Manejo Ambiental y Social en REDD+ Readiness Individual las Áreas Geográficas TF / A1121 Organization, Consultation Post Consultant Open 32,039.00 18,353.03 Terminated 2018-06-11 2018-06-14 2018-07-30 2018-06-01 2018-08-20 2018-06-29 2018-09-24 2018-06-29 2019-03-23 Priorizadas de Intervención and Grievance Redress Selection REDD+ en República Dominicana. 1c.2 )1b.5). DO-MMARN-66049-CS-CDS / Elaborar un análisis multi- REDD+ Readiness temporal de cambio de uso Under TF / A1121 Organization, Consultation Post Direct Selection Direct 6,000.00 0.00 2018-06-08 2018-06-12 2018-06-18 2018-08-22 2018-09-21 del suelo años 2005-2010- Implementation and Grievance Redress 2015 en República Dominicana (act. 2a.7) DO-MMARN-45417-CS-CDS / Elaboración de mapas de uso y cobertura del suelo Pending TF / A1121 Post Direct Selection Direct 35,000.00 0.00 2017-07-01 2017-07-11 2017-09-14 2018-03-13 2015, análisis de cambio y Implementation deforestación en la República Dominicana. Act. 2a.7. DO-MMARN-115453-CS- CDS / Curso en en Manejo de Pending TF / A1121 Post Direct Selection Direct 25,040.00 0.00 2019-05-17 2019-05-27 2019-07-31 2020-01-27 Bosques y Restauración de Implementation Paisajes Forestales. Act. 1a.5 DO-MMARN-120511-CS- Individual INDV / Técnico de apoyo en Under TF / A1121 Post Consultant Open 27,252.00 0.00 2019-06-24 2019-08-12 2019-09-02 2019-10-07 2020-04-04 las Relaciones Implementation Selection Interinstitucioales Individual DO-MMARN-125432-CS- TF / A1121 Post Consultant Open 28,235.00 0.00 Canceled 2019-07-29 2019-09-16 2019-10-07 2019-11-11 2020-05-09 INDV / Técnico Social 2 Selection Individual DO-MMARN-79736-CS-INDV TF / A1121 Post Consultant Open 21,600.00 25,771.20 Completed 2019-08-01 2017-09-20 2019-09-19 2017-08-10 2019-10-10 2017-12-11 2019-11-14 2017-12-12 2020-05-12 2019-06-30 / Técnico Social 1 Selection DO-MMARN-135407-CS- REDD+ Readiness Individual INDV / Encargado de TF / A1121 Organization, Consultation Post Consultant Open 30,900.00 24,941.26 Signed 2019-09-23 2019-10-02 2019-11-11 2019-11-01 2019-12-02 2019-11-01 2020-01-06 2019-11-01 2020-07-04 Fortalecimiento de and Grievance Redress Selection Capacidades Locales. Act. 5. DO-MMARN-159248-CS- INDV / Manual de sistemas silvopastoriles en el marco de REDD+ Readiness Individual Under REDD+ (incluyendo sección de TF / A1121 Organization, Consultation Post Consultant Open 2,000.00 0.00 2020-02-14 2020-03-23 2020-04-03 2020-10-30 2020-04-24 2021-01-11 2020-05-29 2020-10-30 Implementation Salvaguardas). Act. 1c3.2.f and Grievance Redress Selection Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159272-CS- INDV / Manual de manejo forestal sostenible en el REDD+ Readiness Individual marco de REDD+ (incluyendo TF / A1121 Organization, Consultation Post Consultant Open 2,000.00 11,000.00 Signed 2020-03-22 2020-03-23 2020-05-10 2020-06-29 2020-05-31 2020-11-06 2020-07-05 2020-12-15 2020-10-03 sección de Salvaguardas). Act. and Grievance Redress Selection 1c3.2.b Subcomponente 1b. Procesos de Consulta Participación DO-MMARN-159281-CS- INDV / Manual de sistema cacao bajo sombra en el Individual marco de REDD+ (incluyendo Pending TF / A1121 Post Consultant Open 2,000.00 0.00 2020-04-12 2020-05-31 2020-06-21 2020-07-26 2020-10-24 sección de Salvaguardas). Act. Implementation Selection 1c3.2.d Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159295-CS- INDV / Manual de plantaciones Individual dendroenergéticas en el Pending TF / A1121 Post Consultant Open 2,000.00 0.00 2020-03-22 2020-04-20 2020-05-11 2020-06-15 2020-08-14 marco de REDD+ (incluyendo Implementation Selection sección de Salvaguardas). Act. 1c3.2.h Subcomponente 1c. Procesos de Consulta Participación Page 9 DO-MMARN-182519-CS- REDD+ Readiness Individual INDV / Análisis de impacto de TF / A1121 Organization, Consultation Post Consultant Open 33,446.71 24,750.00 Completed 2020-06-29 2019-10-01 2020-08-17 2019-11-26 2020-09-07 2020-09-14 2020-10-12 2020-11-01 2021-04-10 2021-06-25 empleos verdes. 2a.11 and Grievance Redress Selection DO-MMARN-207348-CS- REDD+ Readiness Individual INDV / Especialista Financiero TF / A1121 Organization, Consultation Post Consultant Open 80,160.00 33,303.62 Signed 2020-11-30 2020-12-07 2021-01-18 2020-12-09 2021-02-08 2020-12-15 2021-03-15 2017-02-23 2021-09-11 del Proyecto Act. 5.2 and Grievance Redress Selection DO-MMARN-207349-CS- REDD+ Readiness Individual Under INDV / Especialista en TF / A1121 Organization, Consultation Post Consultant Open 66,092.00 30,596.09 2020-11-30 2020-12-08 2021-01-18 2020-12-09 2021-02-08 2020-12-09 2021-03-15 2021-09-11 Implementation Adquisiciones. Act. 5.3 and Grievance Redress Selection DO-MMARN-208187-CS- REDD+ Readiness Individual INDV / Especialista Social. Act. TF / A1121 Organization, Consultation Post Consultant Open 51,788.00 0.00 Canceled 2020-12-07 2020-12-08 2021-01-25 2021-02-15 2021-03-22 2021-09-18 Act. 5.5 (1b.11) and Grievance Redress Selection DO-MMARN-212001-CS- REDD+ Readiness CDS / Especialista Social. Act. TF / A1121 Organization, Consultation Post Direct Selection Direct 34,902.00 0.00 Under Review 2020-12-30 2018-06-07 2020-12-30 2021-01-21 2021-12-15 5.5 (1b.11) and Grievance Redress DO-MMARN-216399-CS- INDV / Técnico en Comunicaciones (Diseño de REDD+ Readiness Individual materiales, mantenimiento TF / A1121 Organization, Consultation Post Consultant Open 13,332.00 7,715.24 Signed 2021-01-27 2021-02-02 2021-03-17 2021-06-11 2021-04-07 2021-06-11 2021-05-12 2021-07-01 2021-11-08 página web REDD+, apoyo and Grievance Redress Selection con estrategias de comunicacion). Act. 1b.2 DO-MMARN-218947-CS- INDV / Especialista en REDD+ Readiness Individual Planificación Estratégica para TF / A1121 Organization, Consultation Post Consultant Open 21,810.00 14,473.68 Signed 2021-02-11 2021-02-16 2021-04-01 2021-06-08 2021-04-22 2021-07-01 2021-05-27 2021-07-01 2021-11-23 Cooperación Internacional . and Grievance Redress Selection Act. 5.23 DO-MMARN-222389-CS- REDD+ Readiness Individual INDV / Técnico/a TF / A1121 Organization, Consultation Post Consultant Open 13,332.00 13,314.63 Signed 2021-03-03 2021-03-04 2021-04-21 2021-03-16 2021-05-12 2021-03-17 2021-06-16 2021-03-17 2021-12-13 Capacitación y Divulgación. and Grievance Redress Selection Act. 5.23 DO-MMARN-230052-CS- CDS / Elaboración de Guías REDD+ Readiness Técnicas y Capacitación sobre TF / A1121 Organization, Consultation Post Direct Selection Direct 255,000.00 153,460.00 Signed 2021-04-19 2021-04-28 2021-04-29 2021-05-24 2021-07-03 2021-07-15 2021-12-30 REDD+ en República and Grievance Redress Dominicana. Act. 2c.3.2; 2c.8; 4a.5 (antes 3.7) DO-MMARN-233130-CS- REDD+ Readiness Individual INDV / Auxiliar Técnico TF / A1121 Organization, Consultation Post Consultant Open 9,391.00 9,477.01 Signed 2021-05-05 2018-03-14 2021-06-23 2021-03-08 2021-07-14 2021-03-08 2021-08-18 2021-03-15 2022-02-14 Administrativo. Act. 5.14 and Grievance Redress Selection DO-MMARN-233131-CS- INDV / Asistente Tecnico- REDD+ Readiness Individual Under Administrativo (Antes TF / A1121 Organization, Consultation Post Consultant Open 16,435.00 0.00 2021-05-05 2019-06-17 2021-06-23 2021-07-14 2021-08-18 2022-02-14 Implementation Secretaria Administrativa), and Grievance Redress Selection ACT 5.8 DO-MMARN-159245-CS- INDV / Manual de sistema café bajo sombra en el marco Individual de REDD+ (incluyendo sección TF / A1121 Post Consultant Open 2,000.00 0.00 Canceled 2020-03-13 2020-03-23 2020-05-01 2020-10-30 2020-05-22 2020-11-16 2020-09-27 2021-02-28 de Salvaguardas). Act. 1c3.2.e Selection Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-244189-CS- REDD+ Readiness Under CDS / Coordinadora del TF / A1121 Organization, Consultation Post Direct Selection Direct 21,900.00 0.00 2021-07-15 2021-06-25 2021-07-15 2021-07-15 2021-12-15 Implementation Proyecto. Act. 5.1 and Grievance Redress DO-MMARN-244202-CS- CDS / Consultor de Apoyo a la UTG para la Gestión Development of a Forest Under Ambiental, el MRV de TF / A1121 Reference Emission Level and Post Direct Selection Direct 25,400.00 0.00 2021-07-15 2021-07-09 2021-07-15 2021-08-19 2021-12-15 Implementation Emisiones Forestales y Forest Reference Level Sistemas de Registros REDD+. Act. 5.20 DO-MMARN-50858-CS-INDV Individual / Especialista Financiero. Act. TF / A1121 Post Consultant Open 74,117.42 0.00 Canceled 2017-02-23 2019-06-12 2017-04-13 2017-01-05 2017-05-04 2021-04-28 2017-06-08 2019-06-30 5.4 Selection DO-MMARN-159299-CS- INDV / Manual de conservación de bosques en Individual áreas protegidas en el marco TF / A1121 Post Consultant Open 2,000.00 0.00 Canceled 2020-04-01 2020-04-30 2020-05-21 2020-06-25 2020-08-24 de REDD+ (incluyendo sección Selection de Salvaguardas). Act. 1c3.2.i Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159305-CS- INDV / Guía para el uso adecuado de plaguicidas y la Individual correcta disposición de TF / A1121 Post Consultant Open 2,000.00 0.00 Canceled 2020-04-26 2020-05-25 2020-05-30 2020-06-25 2020-08-24 envases. Act. 1c3.2.k Selection Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159264-CS- INDV / Manual para el establecimiento y manejo de Individual viveros forestales (incluyendo TF / A1121 Post Consultant Open 2,000.00 0.00 Canceled 2020-05-03 2020-06-21 2020-07-12 2020-08-16 2020-10-30 sección de Salvaguardas). Act. Selection 1c3.2.a Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159237-CS- INDV / Manual de reforestación en el marco de Individual REDD+ (incluyendo sección de TF / A1121 Post Consultant Open 2,000.00 0.00 Canceled 2020-02-14 2020-04-03 2020-04-24 2020-05-29 2020-11-25 salvaguardas). Act. 1c3.2c Selection Subcomponente 1c, Procesos de Consulta y Participación Page 10 DO-MMARN-159289-CS- INDV / Manual de regeneración natural Individual degradadas en el marco de TF / A1121 Post Consultant Open 2,000.00 0.00 Canceled 2020-03-31 2020-05-19 2020-06-09 2020-06-28 2020-08-27 REDD+ (incluyendo sección de Selection Salvaguardas). Act. 1c3.2.g Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-83531-CS-INDV Individual / Capacitación sobre TF / A1121 Post Consultant Open 13,000.00 0.00 Canceled 2019-01-02 2019-02-20 2019-02-20 2019-02-20 2019-02-28 ganadería compatible con Selection cambio climático. Act. 1a.8 DO-MMARN-233132-CS- REDD+ Readiness Individual Under INDV / Encargado de TF / A1121 Organization, Consultation Post Consultant Open 27,391.00 0.00 2021-05-04 2019-09-30 2021-05-10 2021-05-12 2021-05-20 2021-11-15 Implementation Operaciones and Grievance Redress Selection DO-MMARN-241347-CS- INDV / Diseño de Individual instrumentos para el MRV y Development of REDD+ Pending TF / A1121 Post Consultant Open 25,000.00 0.00 2021-06-24 2021-07-06 2021-07-11 2021-07-19 2021-09-02 capacitación en su uso a las Strategy Implementation Selection instituciones nacionales y locales. Act. 4a.1 (antes 3.3) DO-MMARN-241438-CS- CDS / Niveles de referencia de Design of a National Forest Pending las emisiones forestales/ TF / A1121 and Safeguards Monitoring Post Direct Selection Direct 8,500.00 0.00 2021-06-25 2021-06-29 2021-07-09 2021-10-29 Implementation niveles de referencia forestal. System Act. 3 DO-MMARN-247552-CS- REDD+ Readiness Individual Pending INDV / Especialista en TF / A1121 Organization, Consultation Post Consultant Open 28,718.00 0.00 2017-08-01 2017-09-19 2017-10-10 2017-11-14 2018-05-13 Implementation Comunicaciones and Grievance Redress Selection Page 11