PROCUREMENT PLAN (Textual Part) Country: Kyrgyz Republic Full Project Name: Enhancing Resilience in the Kyrgyz Republic Project (ERIK) Project Number: P162635 Project Implementation Project Implementation Unit of the Project under agency MoES Date of the Procurement December 26, 2017 Plan: Period covered by this December 26, 2017 - December 26, 2018 Procurement Plan: Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. PROCUREMENT Kyrgyz Republic : Enhancing Resilience in Kyrgyzstan Project PLAN General Information Country: Kyrgyz Republic Bank’s Approval Date of the Original Procurement Plan: 2017-12-27 2021-03-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162635 GPN Date: 2020-11-09 Project Name: Enhancing Resilience in Kyrgyzstan Project Loan / Credit No: IDA / V1060, / , IDA / 62380, IDA / 66870 M Executing Agency(ies): inistry of Emergency Situations WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-CW/RFB-10 / Improving Safety and Single Stage - One 2023-04- Procurement of civil works for IDA / 62380 Functionality of School Prior Request for Bids Open - International 0.00 Canceled 2021-11-30 2021-12-17 2022-02-15 2022-03-17 2022-04-28 Envelope 28 schools Infrastructure KG-CW/RFB-09 / Improving Safety and Pending Single Stage - One 2022-01- Procurement of civil works for IDA / 62380 Functionality of School Prior Request for Bids Open - International 0.00 Implementat 2020-08-25 2020-09-11 2020-11-10 2020-12-10 2021-01-21 Envelope 21 schools Infrastructure ion KG-CW/RFB-01/AF / Improving Safety and Pending Single Stage - One 2023-04- Procurement of civil works for IDA / 66870 Functionality of School Prior Request for Bids Open - International 0.00 Implementat 2021-10-01 2021-10-29 2021-12-13 2022-03-04 2022-04-15 Envelope 15 10 schools Infrastructure ion KG-CW/RFB-02/AF / Improving Safety and Pending Single Stage - One 2024-04- Procurement of civil works for IDA / 66870 Functionality of School Prior Request for Bids Open - International 0.00 Implementat 2022-10-01 2022-10-29 2022-12-13 2023-03-04 2023-04-15 Envelope 14 10 schools Infrastructure ion KG-CW/RFB-03/AF / Improving Safety and Pending Single Stage - One 2025-04- Procurement of civil works for IDA / 66870 Functionality of School Prior Request for Bids Open - International 0.00 Implementat 2023-10-01 2023-10-29 2023-12-13 2024-03-03 2024-04-14 Envelope 14 20 schools Infrastructure ion Pending KG-CW/RFQ-01/AF / Major Project Management and Request for Single Stage - One 2022-01- IDA / 66870 Post Open - National 0.00 Implementat 2021-06-12 2021-11-27 repairs of the PIU office Monitoring & Evaluation Quotations Envelope 26 ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-G/RFB-02 / Equipment Single Stage - One / Post Request for Bids Open - International 0.00 Canceled 2018-04-25 2018-05-23 2018-07-07 2018-08-04 2018-09-01 2019-02-28 for '112' Call Center Envelope KG-G/RFB-02B / Equipment Contingent Emergency Single Stage - One IDA / V1060 Post Request for Bids Open - International 229,590.14 Completed 2018-05-28 2018-07-20 2018-06-08 2018-07-20 2018-07-20 2018-09-04 2018-08-19 2018-09-13 2018-09-23 2018-10-02 2019-03-22 2019-02-26 for '112' Call Center Response Envelope KG-G/RFQ-02/1 / Software Project Management and (1C accounting system for PIU IDA / V1060 Post Direct Selection Direct 7,900.00 Completed 2018-05-29 2018-06-18 2018-06-01 2018-06-18 2018-06-14 2018-06-19 2018-07-14 2018-07-19 Monitoring & Evaluation under the MOES) KG-G/RFQ-01 / Equipment Project Management and Request for Single Stage - One IDA / V1060 Post Open - National 0.00 Canceled 2018-04-27 2018-05-18 2018-06-07 2018-07-17 for PIU Monitoring & Evaluation Quotations Envelope KG-G/RFQ-02 / Software (1C Project Management and Request for Single Stage - One IDA / V1060 Post Open - National 0.00 Canceled 2018-05-05 2018-06-15 2018-08-14 accounting system for MoES) Monitoring & Evaluation Quotations Envelope KG-G/RFB-01 / Equipment Contingent Emergency Single Stage - One IDA / V1060 Post Request for Bids Open - International 0.00 Canceled 2018-05-15 2018-05-29 2018-07-13 2018-08-10 2018-09-07 2019-03-06 for rescue team Response Envelope KG-G/RFB-01A / Equipment for rescue team: Lot #1- Procurement of Contingent Emergency Single Stage - One IDA / V1060 Post Request for Bids Open - National 98,060.00 Completed 2018-06-22 2018-06-28 2018-06-29 2018-06-29 2018-08-03 2018-07-27 2018-09-02 2018-08-06 2018-10-07 2018-10-01 2018-11-21 2018-10-30 rescue tools Response Envelope Lot #2- Procurement of equipment for rescue service KG-G/RFQ-01B / Furniture Project Management and Request for Single Stage - One IDA / V1060 Post Open - National 3,719.77 Completed 2018-06-29 2018-07-20 2018-08-17 2018-09-06 2018-09-16 2018-10-05 for PIU Monitoring & Evaluation Quotations Envelope KG-G/RFQ-01A / Computer Project Management and Request for Single Stage - One IDA / V1060 Post Open - National 19,146.94 Completed 2018-06-29 2018-06-29 2018-08-10 2018-07-12 2018-09-09 2018-08-24 equipment for PIU Monitoring & Evaluation Quotations Envelope KG-G/RFB-02A / Software for Contingent Emergency IDA / V1060 Post Direct Selection Direct 508,250.80 Completed 2018-07-09 2018-08-06 2018-07-14 2018-08-07 2018-08-30 2018-08-28 2019-01-17 2019-01-14 '112' call center Response KG-G/RFB-01B / Equipment for rescue team: Lot#1 - Contingent Emergency Single Stage - One Rescue equipment, Lot#2 - IDA / V1060 Post Request for Bids Open - National 18,141.96 Completed 2018-08-15 2018-08-17 2018-08-17 2018-08-17 2018-09-14 2018-09-07 2018-10-14 2018-09-20 2018-11-11 2018-10-17 2018-12-26 2018-11-23 Response Envelope Fire equipment, Lot #3 - Diving equipment. KG-G/RFB-01C / Equipment for rescue team: Lot#1 - Contingent Emergency Single Stage - One Rescue equipment, Lot#2 - IDA / V1060 Post Request for Bids Open - National 45,416.74 Completed 2018-10-04 2018-10-05 2018-10-05 2018-10-05 2018-10-26 2018-10-26 2018-11-15 2018-11-13 2018-12-10 2018-12-17 2019-01-24 2019-04-12 Response Envelope Fire equipment Re-advertisement KG-G/RFQ-04 / Procurement Enhancing Financial Request for Single Stage - One of office equipment for IDA / 62380 Post Open - National 0.00 Canceled 2019-04-11 2019-05-23 2019-07-22 Protection Quotations Envelope regional offices SIO KG-G/RFQ-05 / Procurement Enhancing Financial Request for Single Stage - One of furniture for regional IDA / 62380 Post Open - National 0.00 Canceled 2019-04-11 2019-05-30 2019-07-29 Protection Quotations Envelope offices SIO Page 1 KG-G/RFQ-07 / Procurement Enhancing Financial Request for Single Stage - One IDA / 62380 Post Open - National 0.00 Canceled 2019-07-14 2019-09-13 2019-12-12 of mobile devices for SIO Protection Quotations Envelope KG-G/RFB-05 / Establishing Strengthening Disaster Single Stage - One the Platform to Exchange the IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-03-28 2019-04-04 2019-05-19 2019-06-16 2019-07-14 2020-07-13 Envelope Data Systems KG-G/RFQ-10 / Procurement Strengthening Disaster of Software for development Request for Single Stage - One IDA / 62380 Preparedness and Response Post Open - International 55,000.00 Completed 2019-04-05 2019-04-05 2019-05-20 2019-07-09 2019-09-17 2019-09-04 of the Unified Duty- Quotations Envelope Systems Dispatching Service 112 KG-G/RFB-03 / Development of the Country-Wide Strengthening Disaster Single Stage - One Integrated Public Notification IDA / 62380 Preparedness and Response Prior Request for Bids Open - International 1,241,130.00 Signed 2019-04-04 2019-06-26 2019-04-19 2019-08-21 2019-06-03 2019-08-22 2019-07-01 2019-10-30 2019-08-12 2019-11-14 2020-02-08 Envelope and Warning System - OKSION Systems System KG-G/RFB-04 / Development of Routine Management Body - Crisis Management Center: Strengthening Disaster Lot #1 purchase of controller Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - International 103,167.69 Completed 2019-03-25 2019-04-05 2019-03-29 2019-04-05 2019-05-13 2019-05-20 2019-06-10 2019-06-19 2019-07-08 2019-07-10 2019-12-15 2019-12-10 for video wall. Lot# 2 Envelope Systems purchase of satellite equipment. Lot #3 purchase of radio station equipment. KG-G/RFB-09 / Disaster Strengthening Disaster Pending Learning Platform for Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Implementati 2020-06-22 2020-06-26 2020-08-07 2020-09-04 2020-10-16 2021-02-13 Professional Training Center Envelope Systems on MES KG-G/RFB-10 / Procurement Enhancing Financial Request for Single Stage - One of furniture for regional IDA / 62380 Post Open - National 47,782.91 Completed 2019-04-18 2019-05-13 2019-06-17 2019-07-19 2019-08-16 2019-10-22 Protection Quotations Envelope offices SIO KG-G/RFB-12 / Procurement Enhancing Financial Request for Single Stage - One of office equipment for IDA / 62380 Post Open - National 67,943.35 Completed 2019-04-18 2019-05-13 2019-06-17 2019-07-19 2019-08-16 2019-09-17 Protection Quotations Envelope regional offices SIO KG-G/RFQ-11 / Computer Project Management and IDA / V1060 Post Direct Selection Direct 3,924.70 Completed 2019-05-07 2019-05-17 2019-05-12 2019-05-21 2019-06-16 2019-05-22 2019-07-31 2019-06-05 equipment for PIU Monitoring & Evaluation KG-G/RFQ-12 / Additional Project Management and IDA / V1060 Post Direct Selection Direct 909.09 Completed 2019-05-07 2019-05-17 2019-05-12 2019-05-21 2019-05-24 2019-05-22 2019-06-23 2019-05-29 furniture for PIU Monitoring & Evaluation KG-G/RFQ-09 / Procurement of office equipment for Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - National 0.00 Canceled 2019-03-22 2019-05-08 2019-06-24 Unified Duty- Dispatching Response Quotations Envelope Service 112 KG-G/RFQ-09A / Strengthening Disaster Request for Single Stage - One Procurement of computer IDA / 62380 Preparedness and Response Post Open - National 0.00 Canceled 2019-06-14 2019-07-11 2019-07-24 2019-09-12 Quotations Envelope equipment for 112 system Systems KG-G/RFB-11 / Procurement Enhancing Financial Single Stage - One IDA / 62380 Post Request for Bids Open - International 163,420.25 Completed 2019-06-24 2019-07-22 2019-06-28 2019-07-22 2019-08-09 2019-09-02 2019-08-23 2019-10-01 2019-09-20 2019-10-18 2019-11-19 2020-02-28 of server equipment for SIO Protection Envelope KG-G/RFB-08 / Strengthening the capacity of the newly created 15 cluster interdistrict points (points) of Strengthening Disaster Single Stage - One monitoring of hazardous IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-06-17 2019-06-21 2019-08-02 2019-08-16 2019-09-13 2019-12-12 Envelope natural processes within the Systems framework of the creation of mobile monitoring points of the ESCMP Strengthening Disaster KG-G/RFQ-13 / Procurement Request for Single Stage - One IDA / V1060 Preparedness and Response Post Open - National 0.00 Canceled 2019-06-16 2019-08-23 2019-07-31 2019-09-29 of compressed air apparatus Quotations Envelope Systems KG-G/RFB-13 / Procurement of hardware for Web portal and newly created 15 cluster interdistrict points (points) of Strengthening Disaster Single Stage - One monitoring of hazardous IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-08-07 2019-08-16 2019-08-09 2019-08-16 2019-09-20 2019-11-12 2019-10-21 2019-12-04 2019-11-25 2020-02-24 Envelope natural processes within the Systems framework of the creation of mobile monitoring points of the ESCMP. KG-G/RFB-14 / Production of Pending Enhancing Financial Single Stage - One Branded and Promotional IDA / 62380 Post Request for Bids Open - National 0.00 Implementati 2019-08-12 2019-08-15 2019-09-26 2019-10-26 2019-11-26 2020-02-24 Protection Envelope Products for SIO on KG-G/RFB-04A / Development of Routine Strengthening Disaster Single Stage - One Management Body - Crisis IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-08-02 2019-08-13 2019-08-05 2019-08-13 2019-09-19 2019-09-25 2019-10-17 2019-12-05 2019-11-14 2020-02-12 Envelope Management Center: Purchase Systems of satellite equipment KG-G/RFB-15 / Procurement Enhancing Financial Single Stage - One IDA / 62380 Post Request for Bids Open - International 0.00 Terminated 2019-08-07 2019-08-16 2019-08-09 2019-08-16 2019-09-23 2019-09-27 2019-10-23 2019-11-18 2019-11-25 2019-12-25 2020-01-24 of mobile devices for SIO Protection Envelope KG-G/RFB-06A / Goods for operational survey of landslides: Lot #1 - Strengthening Disaster Equipment and car. Lot # 2 - Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-06-03 2019-06-07 2019-06-06 2019-06-06 2019-07-18 2019-07-19 2019-08-01 2019-08-12 2019-08-29 2019-12-17 Mobile meteorological station Envelope Systems and measuring equipment. Lot #3 - UAV and land surveying equipment KG-G/RFB-06C / Strengthening Disaster Single Stage - One Procurement of Off-road IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Canceled 2019-09-27 2019-09-16 2019-09-30 2019-09-17 2019-11-11 2019-12-26 2020-01-23 2020-05-22 Envelope Vehicle Systems KG-G/RFB-06D / Strengthening Disaster Single Stage - One Procurement of UAV and land IDA / 62380 Preparedness and Response Post Request for Bids Open - National 47,819.01 Completed 2019-10-03 2019-09-16 2019-10-07 2019-09-17 2019-11-18 2019-10-08 2020-01-02 2019-10-31 2020-01-30 2019-11-12 2020-05-29 2020-03-18 Envelope survey equipment Systems Page 2 KG-G/RFB-06Е / Strengthening Disaster Single Stage - One Procurement of Measuring IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Canceled 2019-09-27 2019-09-16 2019-09-30 2019-09-17 2019-11-11 2019-10-09 2019-12-26 2020-01-23 2020-05-22 Envelope Equipment Systems KG-G/RFB-06F / Strengthening Disaster Single Stage - One Procurement of Mobile IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-09-27 2019-10-17 2019-09-30 2019-10-18 2019-11-14 2019-12-03 2019-12-30 2019-12-19 2020-02-03 2020-06-02 Envelope Weather Station and Forecast Systems Equipment KG-G/RFQ-13A / Strengthening Disaster Request for Single Stage - One Procurement of compressed IDA / V1060 Preparedness and Response Post Open - National 19,574.61 Completed 2019-10-02 2019-09-24 2019-12-30 2019-12-06 2020-02-28 2020-02-06 Quotations Envelope air apparatus Systems KG-G/DC-01 / Procurement of Software for newly created 15 cluster interdistrict points Strengthening Disaster (points) of monitoring of IDA / 62380 Preparedness and Response Post Direct Selection Direct 176,305.00 Completed 2019-09-30 2019-09-20 2019-10-11 2019-09-26 2019-11-08 2019-10-18 2020-03-07 2019-12-03 hazardous natural processes Systems within the framework of the creation of mobile monitoring points of the ESCMP KG-G/RFQ-09A-2 / Strengthening Disaster Procurement of office Request for Single Stage - One IDA / 62380 Preparedness and Response Post Open - National 9,694.14 Completed 2019-10-05 2019-09-27 2019-11-19 2019-11-14 2020-01-08 2019-12-26 equipment for Unified Duty- Quotations Envelope Systems Dispatching Service 112 KG-G/RFB-06C-2 / Strengthening Disaster Single Stage - One Procurement of Special IDA / 62380 Preparedness and Response Post Request for Bids Open - International 55,798.40 Completed 2020-02-06 2020-01-24 2020-02-12 2020-01-23 2020-04-02 2020-03-16 2020-05-12 2020-05-18 2020-06-16 2020-06-05 2020-10-14 2020-10-01 Envelope Vehicles Systems KG-G/RFB-13-2 / Procurement of hardware for newly created 15 cluster interdistrict points (points) of Strengthening Disaster Single Stage - One monitoring of hazardous IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Canceled 2020-02-13 2020-03-11 2020-02-18 2020-03-11 2020-03-16 2020-04-01 2020-04-30 2020-06-04 2020-09-02 Envelope natural processes within the Systems framework of the creation of mobile monitoring points of the ESCMP KG-G/RFB-04A-2 / Development of Routine Strengthening Disaster Single Stage - One Management Body - Crisis IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2020-02-18 2020-02-07 2020-02-21 2020-02-07 2020-04-06 2020-05-11 2020-06-08 2020-10-06 Envelope Management Center: Purchase Systems of satellite equipment KG-G/RFB-06Е-2 / Strengthening Disaster Single Stage - One Procurement of measuring IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2020-03-10 2020-03-13 2020-03-13 2020-03-13 2020-04-30 2020-06-30 2020-06-19 2020-07-17 2020-11-14 Envelope equipment Systems KG-G/RFB-06F-2 / Strengthening Disaster Procurement of a mobile Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - International 57,208.80 Signed 2020-03-23 2020-06-04 2020-03-25 2020-06-05 2020-05-14 2020-07-27 2020-07-03 2020-08-27 2020-07-31 2020-09-14 2020-11-28 weather station and forecast Envelope Systems equipment KG/ERIK-CERC/G/RFQ/2020- 01 / Personal Protective Equipment for RRTs, 24 Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 0.00 Canceled 2020-04-07 2020-04-06 2020-04-19 2020-05-19 designated quarantine Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 02 / Disinfectants for RRTs, Contingent Emergency Request for Single Stage - One 24 designated quarantine IDA / 62380 Post Open - International 0.00 Canceled 2020-04-07 2020-04-06 2020-04-19 2020-05-19 Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 03 / Laboratory reagents needed for diagnosis for Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 71,415.39 Signed 2020-04-07 2020-04-06 2020-05-19 2020-04-29 2020-11-15 2020-05-22 RRTs, 24 designated Response Quotations Envelope quarantine hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 04 / Lifesaving essential drugs for diagnosis for RRTs, Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 749,828.10 Completed 2020-04-07 2020-04-06 2020-05-19 2020-04-23 2020-11-15 2020-07-06 24 designated quarantine Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 05 / Medical devices for diagnosis for RRTs, 24 Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 2,510.00 Completed 2020-04-07 2020-04-06 2020-04-19 2020-04-23 2020-05-19 2020-06-29 designated quarantine Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 09 / Procurement of 13 fully Contingent Emergency Request for Single Stage - One equipped ambulances - IDA / 62380 Post Open - International 764,900.00 Signed 2020-04-07 2020-04-06 2020-04-19 2020-04-22 2020-06-18 Response Quotations Envelope Advanced Life Support (ALS) vehicles KG/ERIK-CERC/G/RFQ/2020- 06 / Medical equipment for diagnosis for RRTs, 24 Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 571,333.53 Signed 2020-04-07 2020-04-06 2020-04-19 2020-04-28 2020-06-18 2020-10-14 designated quarantine Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 08 / Other products (paper Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 0.00 Canceled 2020-04-07 2020-04-06 2020-04-19 2020-05-19 towels, shipping containers, Response Quotations Envelope etc.) KG/ERIK-CERC/G/RFQ/2020- Contingent Emergency Request for Single Stage - One 07 / Respiratory Support IDA / 62380 Post Open - International 1,431,298.56 Signed 2020-04-07 2020-04-06 2020-04-19 2020-05-07 2020-06-18 2020-10-21 Response Quotations Envelope Equipment Page 3 KG/ERIK-CERC/G/RFQ/2020- 01B / PPEs for RRTs, 24 Contingent Emergency Request for Single Stage - One designated quarantine IDA / 62380 Post Open - International 330,763.38 Completed 2020-04-17 2020-04-17 2020-04-29 2020-05-08 2020-05-29 2020-08-03 Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals - 2 lots KG/ERIK-CERC/G/RFQ/2020- 02B / Disinfectants for RRTs, Contingent Emergency Request for Single Stage - One 24 designated quarantine IDA / 62380 Post Open - International 33,803.70 Completed 2020-04-17 2020-04-17 2020-04-29 2020-04-30 2020-05-29 2020-05-18 Response Quotations Envelope hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 08B / Other products (paper Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 6,157.70 Signed 2020-04-17 2020-04-17 2020-04-29 2020-05-08 2020-05-29 2020-07-19 towels, liquid soap, shipping Response Quotations Envelope containers, etc.) G/ERIK-CERC/G/RFQ/2020- 05B / Medical devices for diagnosis for RRTs, 24 designated quarantine Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 21,614.87 Completed 2020-04-20 2020-04-20 2020-05-02 2020-05-04 2020-06-01 2020-06-01 hospitals, PHC, ICUs and Response Quotations Envelope designated hospitals - Lot No 2 - Consumables for medicament injection KG/ERIK-CERC/G/RFQ/2020- 04B / Procurement of lifesaving essential drugs for Contingent Emergency Request for Single Stage - One diagnosis for RRTs, 24 IDA / 62380 Post Open - International 152,657.78 Completed 2020-04-23 2020-04-23 2020-05-05 2020-05-04 2020-06-04 2020-06-04 Response Quotations Envelope designated quarantine hospitals, PHC, ICUs and designated hospitals KG/ERIK-CERC/G/RFQ/2020- 03B / Laboratory reagents needed for diagnosis for Contingent Emergency Request for Single Stage - One RRTs, 24 designated IDA / 62380 Post Open - International 0.00 Canceled 2020-05-11 2020-05-11 2020-06-24 2020-07-24 Response Quotations Envelope quarantine hospitals, PHC, ICUs and designated hospitals -Lot No 1 KG-G/DC-02 / Procurement Enhancing Financial of database of residential IDA / 62380 Post Direct Selection Direct 0.00 Canceled 2020-05-10 2020-05-27 2020-05-15 2020-05-28 2020-05-25 2020-07-24 Protection properties for SIO KG/ERIK-CERC/G/RFQ/2020- 06B / Medical equipment for diagnosis for RRTs, 24 Contingent Emergency Request for IDA / 62380 Post 135,183.56 Signed 2020-05-18 2020-05-19 2020-06-09 2020-08-11 2020-08-08 2020-10-05 designated quarantine Response Quotations hospitals, PHC, ICUs and designated hospitals. KG/ERIK-CERC/G/RFQ/2020- 10 / Procurement of Contingent Emergency Request for Single Stage - One equipment for disinfection IDA / 62380 Post Open - International 196,854.00 Completed 2020-05-26 2020-05-28 2020-06-22 2020-07-07 2020-08-21 2020-11-13 Response Quotations Envelope and reduction of medical waste KG-G/RFB-13-2B / Procurement of hardware for newly created 15 cluster interdistrict points (points) of Strengthening Disaster Single Stage - One monitoring of hazardous IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Canceled 2020-06-22 2020-06-22 2020-06-25 2020-06-22 2020-07-25 2020-07-15 2020-08-29 2020-08-28 2020-09-08 2020-12-07 Envelope natural processes within the Systems framework of the creation of mobile monitoring points of the ESCMP KG/ERIK- CERC/G/UNA/2020/1 / Contingent Emergency UN Agencies Procurement of Personel IDA / 62380 Post Direct 679,275.58 Signed 2020-07-01 2020-06-25 2020-07-03 2020-06-24 2020-07-10 2020-06-25 2020-08-29 Response (Direct) Protective Equipment and medical drugs KG/ERIK-CERC/G/DC/2020- 02 / Procurement of lifesaving Contingent Emergency IDA / 62380 Post Direct Selection Direct 70,575.11 Completed 2020-07-01 2020-06-30 2020-07-01 2020-07-01 2020-07-04 2020-07-04 2020-07-29 2020-08-21 essential drugs for RRTs of Response health care organizations KG/ERIK-CERC/G/DC/2020- 03 / Procurement of lifesaving Contingent Emergency IDA / 62380 Post Direct Selection Direct 843,411.22 Completed 2020-07-01 2020-06-30 2020-07-01 2020-07-01 2020-07-04 2020-07-04 2020-07-29 2020-07-18 essential drugs for RRTs of Response health care organizations KG/ERIK-CERC/G/DC/2020- 04 / Procurement of lifesaving Contingent Emergency IDA / 62380 Post Direct Selection 52,596.49 Completed 2020-07-01 2020-06-30 2020-07-01 2020-07-01 2020-07-04 2020-07-04 2020-07-06 2020-07-21 essential drugs for RRTs of Response health care organizations KG/ERIK-CERC/G/DC/2020- 05 / Procurement of lifesaving Contingent Emergency IDA / 62380 Post Direct Selection Direct 9,465.82 Completed 2020-07-01 2020-06-30 2020-07-01 2020-07-04 2020-07-04 2020-07-04 2020-07-29 2020-07-07 essential drugs for RRTs of Response health care organizations KG/ERIK-CERC/G/RFQ/2020- 03B-2 / Purchase of Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 181,860.95 Completed 2020-07-13 2020-07-08 2020-08-08 2020-08-11 2020-09-07 2020-09-21 consumables for polymerase Response Quotations Envelope chain reaction (PCR) analysis KG/ERIK-CERC/G/RFQ/2020- 10-2 / Procurement of Contingent Emergency Request for Single Stage - One IDA / 62380 Post Open - International 632,322.65 Signed 2020-07-15 2020-07-09 2020-08-15 2020-08-21 2020-11-13 Microwave equipment for Response Quotations Envelope disinfection of medical waste KG/ERIK-CERC/G/DC/2020- 01 / Procurement of lifesaving Contingent Emergency essential drugs for diagnosis IDA / 62380 Post Direct Selection Direct 4,056.78 Completed 2020-07-08 2020-06-30 2020-07-08 2020-07-01 2020-07-09 2020-07-09 2020-08-03 2020-07-15 Response for RRTs of health care organization KG-G/RFQ-14 / Procurement Enhancing Financial Request for Single Stage - One of mobile devices for OJSC IDA / 62380 Post Open - International 90,477.34 Signed 2020-08-20 2020-08-27 2020-10-14 2020-10-21 2020-12-13 Protection Quotations Envelope State Insurance Organization Page 4 KG/ERIK-CERC- Under COVID19/G/RFB/2020-01 / Contingent Emergency Single Stage - One IDA / 62380 Prior Request for Bids Open - International 0.00 Implementati 2020-08-21 2020-08-23 2020-08-28 2020-08-25 2020-09-14 2020-09-09 2020-10-29 2020-11-24 2021-03-24 Procurement of computer Response Envelope on tomographs KG-G/DC-02-2 / Procurement of database of Enhancing Financial residential properties for IDA / 62380 Post Direct Selection Direct 28,740.25 Signed 2020-09-10 2020-09-04 2020-09-15 2020-09-04 2020-10-13 2020-09-16 2020-12-12 Protection OJSC "State Insurance Organization" Strengthening Disaster KG-G/DC-03 / Procurement IDA / 62380 Preparedness and Response Post Direct Selection Direct 34,099.00 Signed 2020-09-10 2020-09-08 2020-09-24 2020-09-08 2020-10-29 2020-10-21 2021-01-27 of measuring equipment Systems KG-G/RFQ-06/AF / Project Management and Request for Single Stage - One Procurement of Office IDA / 66870 Post Open - National 3,314.50 Signed 2020-12-15 2020-11-27 2021-04-01 2021-01-12 2021-06-10 Monitoring & Evaluation Quotations Envelope Furniture for PIU KG-G/RFQ-07/AF / Office Project Management and Request for Single Stage - One IDA / 66870 Post Open - National 0.00 Canceled 2020-12-01 2020-11-27 2021-03-18 2021-05-27 Equipment for PIU Monitoring & Evaluation Quotations Envelope KG-G/RFB-06/AF / Project Management and Single Stage - One IDA / 66870 Post Request for Bids Open - National 0.00 Canceled 2020-11-26 2020-12-01 2021-01-15 2021-02-14 2021-03-28 2021-07-26 Procurement cars for PIU Monitoring & Evaluation Envelope KG-G/RFB-02/AF / Strengthening Disaster Pending Procurement of necessary fire Single Stage - One IDA / 66870 Preparedness and Response Post Request for Bids Open - International 0.00 Implementati 2022-07-15 2022-08-12 2022-09-26 2022-11-25 2023-01-27 2023-04-27 extinguishing means and Envelope Systems on other equipment KG-G/RFB-04/AF / Improving Safety and Pending Single Stage - One Procurement of Furniture for IDA / 66870 Functionality of School Post Request for Bids Open - International 0.00 Implementati 2023-03-01 2023-03-29 2023-05-13 2023-08-02 2023-09-13 2024-04-10 Envelope 10 schools Infrastructure on KG-G/RFB-05/AF / Improving Safety and Pending Single Stage - One Procurement of Furniture for IDA / 66870 Functionality of School Prior Request for Bids Open - International 0.00 Implementati 2024-03-01 2024-03-29 2024-05-13 2024-08-02 2024-09-13 2025-04-11 Envelope 20 schools Infrastructure on KG-G/RFB-03/AF / Improving Safety and Pending Single Stage - One Improving IT infrastructure of IDA / 66870 Functionality of School Post Request for Bids Open - International 0.00 Implementati 2021-09-01 2021-09-29 2021-11-13 2022-02-02 2022-03-16 2022-09-12 Envelope the MOeS Infrastructure on KG-G/RFB-13-2C / Procurement of hardware for newly created 15 cluster interdistrict points (points) of Strengthening Disaster Single Stage - One monitoring of hazardous IDA / 62380 Preparedness and Response Post Request for Bids Open - National 65,562.40 Signed 2020-10-22 2020-11-25 2020-10-27 2020-11-25 2020-11-17 2020-12-15 2020-12-27 2020-12-22 2021-01-06 2021-01-21 2021-04-06 Envelope natural processes within the Systems framework of the creation of mobile monitoring points of the ESCMP KG-G/RFB-01/AF / Procurement of vehicles Lot Strengthening Disaster Pending Single Stage - One No 1 - Firefighting vehicle; IDA / 66870 Preparedness and Response Prior Request for Bids Open - International 0.00 Implementati 2021-07-15 2021-08-12 2021-09-26 2021-12-16 2022-01-27 2023-01-27 Envelope Lot No 2- Feet maintaining Systems on vehicles KG-G/RFB-13A / Strengthening Disaster Under Single Stage - One Procurement of hardware for IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Implementati 2020-11-20 2020-12-03 2020-11-25 2020-12-03 2021-01-11 2021-01-20 2021-02-25 2021-03-25 2021-07-23 Envelope Web portal of the USCEMF Systems on Strengthening Disaster Pending KG-G/RFB-07 / Scaling-up of Single Stage - One IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Implementati 2021-01-25 2021-02-01 2021-03-18 2021-04-15 2021-05-13 2021-11-09 the operational monitoring Envelope Systems on KG-G/RFQ-07/AF-2 / Project Management and Request for Single Stage - One Procurement of office IDA / 66870 Post Open - National 11,839.09 Signed 2020-12-25 2021-06-07 2021-02-16 2021-08-16 Monitoring & Evaluation Quotations Envelope equipment for PIU KG-G/RFB-06/AF-2 / Project Management and Single Stage - Two IDA / 66870 Post Request for Bids Open - National 0.00 Canceled 2020-10-15 2020-12-11 2020-10-20 2020-12-10 2020-11-24 2021-01-05 2021-02-08 2021-02-25 2021-06-25 Procurement of cars for PIU Monitoring & Evaluation Envelope KG-G/RFB-06/AF-4 / Pending Project Management and Single Stage - One Procurement of vehicles for IDA / 66870 Post Request for Bids Open - National 0.00 Implementati 2021-10-01 2021-10-01 2021-11-15 2021-12-15 2022-01-05 2022-04-05 Monitoring & Evaluation Envelope PIU on Under KG-G/RFB-06/AF-3 / Project Management and Single Stage - One IDA / 66870 Post Request for Bids Open - National 0.00 Implementati 2021-01-25 2021-01-22 2021-01-30 2021-01-22 2021-02-17 2021-02-09 2021-03-03 2021-03-11 2021-03-20 2021-06-18 Procurement of vehicle for PIU Monitoring & Evaluation Envelope on Strengthening Disaster KG-G/RFB-01/AF-2 / Single Stage - Two IDA / 66870 Preparedness and Response Prior Request for Bids Open - International 0.00 Under Review 2021-02-19 2021-03-19 2021-05-10 2021-08-20 2021-09-17 2022-09-17 Procurement of vehicles Envelope Systems KG-G/RFB-16/ERIK / Development of Routine Strengthening Disaster Pending Single Stage - One Management Body (CMC): IDA / 62380 Preparedness and Response Post Request for Bids Open - National 0.00 Implementati 2021-03-23 2021-03-26 2021-04-16 2021-05-31 2021-06-17 2021-10-15 Envelope Procurement of radio Systems on equipment NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-G/RFB-06B / Strengthening Disaster Single Stage - One Procurement of Digital terrain IDA / 62380 Preparedness and Response Post Request for Bids Open - International 0.00 Canceled 2019-04-05 2019-04-12 2019-05-24 2019-06-21 2019-08-02 2019-12-20 Envelope model (DTM) and Systems orthophotographs CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 5 KG-CS/QCBS-02 / Business process review for Enhancing Financial Quality And Cost- IDA / V1060 Prior Open - International 1,333,333.33 Signed 2018-03-15 2018-03-25 2018-04-14 2018-05-11 2018-05-12 2018-06-25 2018-06-09 2018-07-25 2018-06-29 2018-09-12 2018-08-03 2018-11-26 2018-09-18 2018-12-26 2020-09-17 catastrophe insurance and Protection Based Selection supporting IT customization services KG-CS/LCS-01 / Financial Least Cost audit (annual) of project for / Post Open - International 0.00 Canceled 2018-02-25 2018-03-03 2018-03-27 2018-04-24 2018-05-22 2018-06-11 2018-07-09 2018-07-23 2019-12-31 Selection 2018-2020 KG-CS/QCBS-01 / Preparation of Feasibility Studies and Designs for Quality And Cost- Improved Seismic Safety and / Prior Open - International 0.00 Canceled 2018-04-25 2018-05-25 2018-06-22 2018-07-20 2018-08-09 2018-09-13 2018-10-29 2020-10-28 Based Selection Energy Efficiency of Schools and Technical Supervision of construction. KG-CS/QCBS-01/2 / Preparation of Feasibility Studies and Designs for Improving Safety and Quality And Cost- Improved Seismic Safety and IDA / V1060 Functionality of School Post Open - International 0.00 Canceled 2020-03-02 2020-03-23 2020-04-27 2020-06-08 2020-06-28 2020-08-02 2020-09-11 2021-04-09 Based Selection Energy Efficiency of Schools Infrastructure and Technical Supervision of construction. KG-CS/LCS-01/A / Financial Project Management and Least Cost IDA / 62380 Post Open - International 76,832.00 Signed 2019-01-18 2019-02-05 2019-02-03 2019-02-08 2019-02-24 2019-03-06 2019-03-24 2019-04-03 2019-04-07 2019-04-10 2019-04-22 2019-04-19 2019-05-13 2019-05-17 2024-01-31 audit of project (annual) Monitoring & Evaluation Selection KG-CS/QCBS-01/1 / Preparation of Feasibility Improving Safety and Studies and Designs for Quality And Cost- IDA / V1060 Functionality of School Prior Open - International 0.00 Under Review 2019-06-28 2020-01-16 2019-07-12 2020-02-03 2019-08-12 2020-08-11 2019-09-11 2020-09-28 2019-10-09 2021-01-15 2019-11-13 2019-12-18 2020-12-17 Improved Seismic Safety and Based Selection Infrastructure Energy Efficiency of Schools and Author supervision KG-CS/QCBS-01/3 / Preparation of Feasibility Improving Safety and Studies and Designs for Quality And Cost- IDA / V1060 Functionality of School Prior Open - International 0.00 Canceled 2020-07-28 2020-08-27 2020-09-27 2020-10-27 2020-11-24 2020-12-29 2021-02-02 2022-10-25 Improved Seismic Safety and Based Selection Infrastructure Energy Efficiency of Schools and Author supervision Improving Safety and Consultant KG-CS/CQS-02 / Supervision IDA / V1060 Functionality of School Post Qualification Open - National 0.00 Canceled 2021-04-01 2021-04-15 2021-05-13 2021-05-27 2021-07-03 2022-06-28 and monitoring Infrastructure Selection Improving Safety and KG-CS/QCBS-05 / Quality And Cost- Pending IDA / V1060 Functionality of School Prior Open - International 0.00 2021-02-02 2021-02-23 2021-04-08 2021-05-06 2021-06-05 2021-07-10 2021-08-14 2022-12-27 Supervision and monitoring Based Selection Implementation Infrastructure KG-CS/CQS-03 / Strengthening Disaster Consultant Establishing a Platform to IDA / 62380 Preparedness and Response Post Qualification Open - International 131,370.00 Signed 2019-08-05 2019-08-27 2019-08-26 2019-09-06 2019-10-09 2019-12-02 2019-10-16 2020-02-25 2019-11-13 2020-03-17 2020-02-11 Exchange the Data Systems Selection KG-CS/QCBS-03 / Enhancing Financial Quality And Cost- Pending Optimisation of SIO core IDA / 62380 Prior Open - International 0.00 2020-10-01 2020-10-15 2020-12-10 2021-01-07 2021-02-06 2021-03-03 2021-04-18 2022-04-18 Protection Based Selection Implementation business processes KG-CS/CQS-04 / Risk Consultant Enhancing Financial Pending management and regulatory IDA / 62380 Post Qualification Open - International 0.00 2020-10-15 2020-10-29 2020-12-14 2021-01-25 2021-03-01 2021-03-13 Protection Implementation compliance Selection KG-CS/QCBS-01/AF / Preparation of Feasibility Studies and Designs for Improving Safety and Quality And Cost- Pending Improved Seismic Safety and IDA / 66870 Functionality of School Prior Open - International 0.00 2020-12-25 2021-01-01 2021-02-27 2021-04-13 2021-05-04 2021-06-15 2021-08-10 2022-08-10 Based Selection Implementation Energy Efficiency of Schools Infrastructure and Author supervision for 10 schools KG-CS/QCBS-03/AF / Preparation of Feasibility Studies and Designs for Improving Safety and Quality And Cost- Pending Improved Seismic Safety and IDA / 66870 Functionality of School Prior Open - International 0.00 2021-12-25 2022-01-01 2022-03-01 2022-04-15 2022-05-06 2022-06-17 2022-08-12 2023-08-12 Based Selection Implementation Energy Efficiency of Schools Infrastructure and Author supervision for 20 schools KG-CS/LCS-01/AF / Financial Project Management and Least Cost Pending IDA / 66870 Post Open - International 0.00 2021-04-16 2021-05-01 2021-06-28 2021-07-26 2021-08-15 2021-09-05 2021-10-09 2025-09-28 audit (annual) - 2021-2027 Monitoring & Evaluation Selection Implementation KG-CS/QCBS-02/AF / Improving Safety and Quality And Cost- Pending Technical supervision for 10 IDA / 66870 Functionality of School Prior Open - International 0.00 2022-08-18 2022-09-15 2022-10-28 2022-12-12 2023-01-02 2023-02-13 2023-04-10 2024-04-09 Based Selection Implementation schools Infrastructure KG-CS/QCBS-04/AF / Improving Safety and Quality And Cost- Pending Technical supervision for 20 IDA / 66870 Functionality of School Prior Open - International 0.00 2023-09-01 2023-09-15 2023-10-26 2023-12-10 2023-12-31 2024-02-04 2024-04-07 2025-04-07 Based Selection Implementation schools Infrastructure KG-CS/CQS-01/AF / Strengthening Disaster Consultant Pending Development of Fire Service IDA / 66870 Preparedness and Response Post Qualification Open - International 0.00 2021-11-01 2021-11-22 2022-01-05 2022-01-21 2022-02-25 2022-08-24 Implementation Program Systems Selection KG-CS/CQS-02/AF / Improving Safety and Consultant Development of special Pending IDA / 66870 Functionality of School Post Qualification Open - National 0.00 2021-01-01 2021-01-22 2021-02-21 2021-03-14 2021-04-27 2021-10-24 technical conditions for 30 Implementation Infrastructure Selection schools KG-CS/CQS-03/AF / Improving Safety and Consultant Pending Development of IDA / 66870 Functionality of School Post Qualification Open - National 0.00 2021-01-01 2021-01-22 2021-03-07 2021-04-06 2021-04-27 2025-08-31 Implementation communication strategy Infrastructure Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 6 KG-IOC/IC-07 / Local Individual Project Management and Coordinator for the IDA / V1060 Post Consultant Open 12,731.86 Completed 2018-02-15 2018-02-15 2018-03-29 2018-04-02 2018-03-30 2018-04-02 2018-04-17 2018-04-16 2020-04-06 2019-04-30 Monitoring & Evaluation Component 1 Selection KG-IOC/IC-08 / Local Individual Project Management and Coordinator for the IDA / V1060 Post Consultant Open 11,086.74 Completed 2018-02-15 2018-02-19 2018-03-29 2018-04-25 2018-03-30 2018-04-28 2018-04-17 2018-05-14 2020-04-06 2019-04-30 Monitoring & Evaluation Component 2 Selection KG-IOC/IC-09 / Local Individual Project Management and Coordinator for the IDA / V1060 Post Consultant Open 13,404.13 Completed 2018-02-15 2018-02-15 2018-03-29 2018-04-04 2018-03-30 2018-04-06 2018-04-17 2018-04-23 2020-04-06 2019-04-30 Monitoring & Evaluation Component 3 Selection Individual KG-IOC/IC-03 / Local Project Management and IDA / V1060 Prior Consultant Direct 20,923.36 Completed 2018-02-15 2018-03-02 2018-03-08 2018-03-19 2018-03-22 2018-04-04 2018-03-29 2018-04-01 2019-11-19 2019-04-30 Financial Manager Monitoring & Evaluation Selection Individual KG-IOC/IC-04 / Local Project Management and IDA / V1060 Post Consultant Open 11,986.87 Completed 2018-02-15 2018-02-19 2018-03-20 2018-04-03 2018-03-22 2018-04-03 2018-04-08 2018-04-18 2019-04-03 2019-04-30 Disbursment Specialist Monitoring & Evaluation Selection KG-IOC/IC-05 / Local Individual Project Management and assistant of Procurement IDA / V1060 Post Consultant Open 4,791.60 Terminated 2018-02-15 2018-02-19 2018-03-29 2018-04-03 2018-03-30 2018-04-05 2018-04-19 2018-04-16 2019-04-14 Monitoring & Evaluation Specialist Selection Individual KG-IOC/IC-06 / Local Project Management and IDA / V1060 Post Consultant Open 8,286.74 Terminated 2018-02-15 2018-02-19 2018-03-29 2018-04-02 2018-03-30 2018-04-02 2018-04-19 2018-04-16 2019-04-14 Translator-office-manager Monitoring & Evaluation Selection Individual KG-CS/IC-02 / Selection of Project Management and / Post Consultant Limited 3,235.30 Terminated 2017-12-29 2018-01-09 2017-12-30 2018-01-17 2018-01-05 2018-01-23 2018-01-17 2018-02-28 Local Social Consultant Monitoring & Evaluation Selection KG-CS/IC-01 / Selection of Individual Local Environmental / Post Consultant Limited 3,970.59 Completed 2017-12-29 2018-01-30 2017-12-31 2018-01-17 2018-01-05 2018-01-22 2018-01-17 2018-02-04 2018-02-28 2018-04-06 Consultant Selection Individual KG-IOC/IC-02 / Local Senior Project Management and IDA / V1060 Prior Consultant Direct 13,575.10 Terminated 2018-02-22 2018-03-02 2018-02-22 2018-03-19 2018-02-22 2018-04-04 2018-04-01 2018-04-01 2019-11-22 Procurement Specialist Monitoring & Evaluation Selection Individual KG-MES-54500-CS-INDV / Project Management and IDA / V1060 Prior Consultant Limited 14,390.21 Completed 2018-03-19 2018-03-22 2018-03-19 2018-04-06 2018-04-02 2018-04-24 2018-04-26 2018-05-16 2019-04-21 2019-04-30 Local Director PIU Monitoring & Evaluation Selection Individual KG-IOC/IC-01 / Local / Prior Consultant Open 0.00 Canceled 2018-02-15 2018-02-19 2018-03-29 2018-04-12 2018-05-17 2020-05-06 Director PIU Selection KG-CS/IC-03 / Selection of Local Consultant for Individual preparation of bidding / Post Consultant Open 0.00 Canceled 2018-04-15 2018-05-27 2018-06-10 2018-06-24 2019-06-19 documents for goods for Selection MoES KG-CS/IC-03-2 / Local IT Consultant for preparation of Individual Project Management and bidding documents for IDA / V1060 Post Consultant Limited 0.00 Canceled 2018-05-10 2018-05-15 2018-06-05 2018-07-03 2019-07-03 Monitoring & Evaluation Component #1 and Selection Component #3 KG-CS/IC-03/1 / Local Individual Consultant for Business Project Management and IDA / V1060 Post Consultant Open 12,778.57 Completed 2018-06-21 2018-06-21 2018-07-30 2018-08-06 2018-08-02 2018-08-06 2018-08-21 2018-08-22 2019-08-21 2019-08-21 Processes and Information Monitoring & Evaluation Selection Technologies Improving Safety and Individual KG-CS/IC-04 / International IDA / V1060 Functionality of School Post Consultant Open 0.00 Canceled 2018-10-26 2018-12-05 2018-12-21 2019-01-09 2020-12-29 Сivil engineer Infrastructure Selection Improving Safety and Individual KG-CS/IC-04/A / Local civil IDA / 62380 Functionality of School Post Consultant Open 26,288.61 Terminated 2019-02-17 2019-03-01 2019-03-14 2019-04-10 2019-03-21 2019-04-24 2019-04-11 2019-04-25 2020-04-10 engineer Infrastructure Selection Improving Safety and Individual KG-CS/IC-05 / Local Social & IDA / 62380 Functionality of School Post Consultant Open 0.00 Canceled 2019-02-27 2019-02-25 2019-04-04 2019-04-10 2019-04-11 2019-05-02 2020-05-01 Environment Consultant Infrastructure Selection Strengthening Disaster Individual KG-CS/IC-07 / Local IT IDA / V1060 Preparedness and Response Post Consultant Open 5,213.26 Terminated 2019-03-25 2019-04-10 2019-04-19 2019-06-04 2019-04-22 2019-05-31 2019-05-10 2019-06-19 2020-05-09 Consultant for MES KR Systems Selection KG-CS/IC-09 / Local Improving Safety and Individual Translator Consultant for IDA / 62380 Functionality of School Post Consultant Open 0.00 Canceled 2019-03-25 2019-04-02 2019-04-11 2019-06-28 2019-04-12 2019-04-29 2020-04-28 Component #2 Infrastructure Selection KG-CS/IC-10 / Local Individual Enhancing Financial Translator Consultant for IDA / 62380 Post Consultant Open 0.00 Canceled 2019-03-25 2019-04-02 2019-04-11 2019-07-02 2019-04-12 2019-04-29 2020-04-28 Protection Component #3 Selection Improving Safety and Individual KG-CS/IC-05-2 / Local IDA / 62380 Functionality of School Post Consultant Limited 18,631.04 Terminated 2019-05-03 2019-05-15 2019-05-10 2019-05-21 2019-05-24 2019-05-31 2019-06-14 2019-07-04 2020-06-13 Social&Enviroment Consultant Infrastructure Selection KG-CS/IC-08 / Local Strengthening Disaster Individual Translator Consultant for IDA / 62380 Preparedness and Response Post Consultant Open 0.00 Canceled 2019-03-25 2019-04-02 2019-04-11 2019-07-17 2019-04-12 2019-04-29 2020-04-28 Component #1 Systems Selection KG-CS/IC-03/2 / Local Individual Consultant for Business Enhancing Financial IDA / 62380 Post Consultant Direct 12,808.23 Signed 2019-08-21 2019-09-06 2019-08-21 2019-08-20 2019-08-21 2019-08-20 2019-08-22 2019-08-20 2020-08-31 Processes and Information Protection Selection Technologies KG/CS/SSS-01/SDC / Improving Safety and Development of special IDA / 62380 Functionality of School Post Direct Selection Direct 48,252.84 Signed 2020-07-01 2020-06-24 2020-07-15 2020-07-23 2020-09-09 2020-09-25 2020-11-08 design criteria Infrastructure Page 7 Strengthening Disaster Individual KG-CS/IC-07/B / Local IT IDA / 62380 Preparedness and Response Post Consultant Open 10,085.87 Signed 2020-05-22 2020-06-12 2020-06-20 2020-08-24 2020-07-04 2020-08-24 2020-07-07 2020-09-09 2021-07-07 Consultant for MES Systems Selection KG-CS/IC-03/3 / Local Individual Consultant for Business Enhancing Financial IDA / 62380 Post Consultant Direct 6,441.33 Signed 2020-08-28 2020-08-24 2020-08-31 2020-08-25 2020-08-31 2020-08-25 2020-09-01 2020-09-01 2021-03-31 Processes and Information Protection Selection Technologies KG-CS/IC-01/AF / Improving Safety and Individual Communications Strategy IDA / 66870 Functionality of School Post Consultant Open 10,522.20 Signed 2020-10-26 2020-10-13 2020-12-02 2021-01-11 2020-12-09 2021-01-11 2020-12-30 2021-01-25 2025-08-31 Specialist Infrastructure Selection Strengthening Disaster Individual KG-CS/IC-02/AF / Fire Safety IDA / 66870 Preparedness and Response Post Consultant Open 0.00 Canceled 2020-10-27 2020-12-10 2020-12-17 2020-12-31 2021-12-31 Specialist Systems Selection KG-CS/IC-11 / Local Improving Safety and Individual Under Сonsultant Engineer on IDA / 62380 Functionality of School Post Consultant Open 0.00 2021-02-03 2021-02-03 2021-03-17 2021-03-12 2021-03-24 2021-03-27 2021-07-25 Implementation energy efficiency Infrastructure Selection KG-CS/IC-12 / Local Improving Safety and Individual Under Сonsultant Engineer on IDA / 62380 Functionality of School Post Consultant Open 0.00 2021-02-03 2021-02-03 2021-03-17 2021-03-12 2021-03-24 2021-03-27 2021-07-25 Implementation energy efficiency Infrastructure Selection KG-CS/IC-13 / Local Improving Safety and Individual Consultant on water supply IDA / 62380 Functionality of School Post Consultant Open 0.00 Canceled 2021-02-03 2021-02-03 2021-03-17 2021-03-12 2021-03-24 2021-03-27 2021-07-25 and sanitation Infrastructure Selection KG-CS/IC-13-2 / Local Improving Safety and Individual Pending Consultant on water supply IDA / 62380 Functionality of School Post Consultant Limited 0.00 2021-03-30 2021-04-13 2021-04-27 2021-05-11 2021-09-08 Implementation and sanitation Infrastructure Selection Improving Safety and Individual KG-CS/IC-03/AF / IT Pending IDA / 66870 Functionality of School Post Consultant Open 0.00 2021-04-01 2021-05-06 2021-05-13 2021-05-27 2023-05-27 Consultant for Component 2 Implementation Infrastructure Selection Page 8