E4162v1 Environmental Management Framework For School Sector Reform Plan (SSRP) Nepal May 2009 Acronyms BPEP Basic & Primary Education Project CM Compliance Monitoring DEO District Education Office DOE Department of Education DPs Development Partners EA Environmental Assessment EfA Education for All EIA Environmental Impact Assessment EMF Environmental Management Framework EMP Environmental Management Plan EPR Environmental Protection Rules GoN Government of Nepal IEE Initial Environmental Examination NEGFSIFMN National Environmental Guidelines for School Improvement and Facility Management in Nepal NEPAP National Environmental Policy & Action Plan PIM Program Implementation Manual PSS Physical Services Section SESP Secondary Education Support Program SMC School Management Committee SSRP School Sector Reform Plan Executive Summary School Sector Reform Plan and Construction Works Physical infrastructure development of schools and District Education Offices (DEO) constitutes an important activity in School Sector Reform Plan (SSRP). Potential environmental issues in SSRP are mainly limited to impacts from construction works and sites. These, for example, are construction of administrative buildings, schools & hostels, buildings, library & laboratory blocks, construction of new class rooms & rehabilitation of existing class rooms, provisions of toilets & water supply. Environmental Assessment (EA) The DOE, in the process of preparing this Environmental Management Framework (EMF), has undertaken an EA for SSRP (Chapter - II). The EA was based on a series of reviews of construction works undertaken in the Basic & Primary Education Project (BPEP II), Secondary Education Support Program (SESP), Education for All (EFA) including field visits and consultation with stakeholders with respect to practices related to school physical facility improvement, and operation and maintenance of facilities. The EA concluded that SSRP’s Environmental concerns are related to actions/activities under physical infrastructure. Environmental issues in SSRP are mainly limited to potential impacts from building construction works and sites. These issues relate to school site selection and planning (appropriateness of sites, orientations of buildings considering climatic factors, and use of appropriate design standards, ensuring supply of safe drinking water (e.g. arsenic-free groundwater in Terai), proper sanitation (school latrine and waste management at school), and appropriate classroom conditions (e.g. light, ventilation, temperature, noise).. Location of the school or its facilities in risky or sensitive spots such as in flood-prone/risk, or landslide risk areas, is also a concern besides risks from earthquakes as Nepal is in a high earthquake risk zone. Minor and localized impacts may arise from construction/upgrading of small scale administrative buildings or school blocks or new/additional classrooms or may be related to providing facilities such as drinking water and sanitation as well as to their operation and maintenance. Since the individual works under SSRP are small, environmental issues are assessed to be small and localized. No large, significant and/or irreversible impact is anticipated. Even cost sharing types of schools, DEO financed schools and laboratory buildings fall into the category of small to medium type construction which doesn’t require specific environmental assessment from GON and DPs perspectives. Substantial experiences has been gained from BPEP II, SESP, and EFAto manage these issues. The EA, therefore, concluded that the SSRP is not likely to present severe environmental risks and/ or highly significant potential adverse impacts in its area of influence. Hence, the nature of activities under SSRP doesn't trigger any national or environmental requirements by Development Partner institutions. The SSRP, as a whole, does not require any environmental clearance. However, in order to manage the minor and localized impacts GON has prepared an Environmental Management Framework for SSRP. Environmental Management Framework (EMF) The findings of the EA were used to prepare Environmental Management Framework (EMF) for SSRP. This has incorporated the experiences of the other projects such as EFA, emerging lessons and updating the National Environmental Guidelines for School Improvement and Facility Management in Nepal. The EMF is intended to be used as a practical tool during program formulation, design, implementation, and monitoring. The EMF defines simplified steps, procedures and guidelines or criteria and/or standards to be used while planning and developing schools’ physical infrastructure under SSRP. These, for example, are related to screening, preparation of simple environmental management and mitigation plan. It describes the steps involved in identifying and mitigating the potential adverse environmental impacts of activities. Hence, EMF in SSRP will ensure the environmentally friendly design and construction of school physical facilities and other educational infrastructures by meeting safeguard policies of the GON. Salient features of the EMF are:  SSRP activities, in general, do not require formal environmental assessment such as Environmental Impact Assessment (EIA) or Initial Environmental Examination (IEE). However, each SSRP physical infrastructure activity (school improvement activities as well as DEO administrative buildings) will be subject to environmental screening.  At the school level, each participating school will utilize the EMF while preparing the School Improvement Plan (SIP).  Emphasize effective use of already accepted policy and standards such as National Environmental Guidelines for School Improvement and Facility Management in Nepal; structural and disaster safety of buildings, child- and gender-friendly design and construction, inclusive design and constructions for disables, design guidelines for school buildings construction from environmental perspective (Annex - IX) etc.  Recommendations of environmental screening and EMF will be incorporated in the plan, design and contract documents.  The regular monitoring system of the DOE will also include indicators and monitoring mechanisms as specified in the EMF. There will be monitoring during pre-construction, construction and operational phases. Institutional Arrangements, Roles and Responsibilities for EMF implementation The Department of Education (DOE), District Education Office (DEO) and School Management Committee (SMC) are the main implementing agencies. The roles and responsibilities of these agencies for implementing EMF with respect to planning, construction, and operation of associated facilities have been assigned in the EMF. The School Improvement Plan (SIP) will incorporate the EMF requirements at school level. The school construction will be managed by communities. Some of EMF requirements would have already been incorporated in the School Building Design and Construction Manual and other manuals developed by DOE. The following paragraph presents highlights of the roles and responsibilities of difference agencies:  DEO will conduct a preliminary survey of environmental conditions of the school and its surrounding area as part of the physical survey of schools.  The proposed school improvement activities as well as administrative buildings will be subject to environmental screening. This will be done by the DEO.  The DOE/DEO ensures incorporation of EMF provisions into ASIP and SIP. For the construction of district education offices, the EMP will be prepared by the DOE and included as a part of the contract document.  The Environmental Officer at DOE/PSS will check/ verify random screening and samples of the SIP, and all screening of district education offices. Incorporation of EMP in design/tender documents will be checked by the Environmental Officer of the DOE.  The DEO regularly monitors implementation of the environmental works in the schools and reports to DOE. DOE/ PSS Environmental Officer will prepare consolidated report on environmental works. DOE/PSS and the relevant district DEO visits randomly selected samples of schools on four-monthly basis to check environmental compliance as outlined in the EMF. Findings of this will feed into government’s quarterly portfolio review meeting.  DoE will conduct annual interactions on implementation of the EMF. Annual GON and DPs joint review of SSRP will also cover implementation of the EMF.The field level monitoring will be carried out by DEO. Sub project level monitoring will be conducted by DEO at regular basis and by DOE at an intermittent basis. The compliance audit of the EMF will be an integral part of the overall monitoring and reporting system. Capacity Building Capacity building at different levels (DOE, DEO, and SMC) is necessary in order to implement the EMF successfully. The suggested capacity strengthening measures, for example, include: i) providing environmental competency/human-resources, ii) training, orientation and awareness activities on environmental planning and management of school and school-facilities, and iii) mechanisms for coordination and for accessing specific environmental services e.g. water-quality testing, climate responsive school building construction etc. In consideration of increasing workload envisaged for implementation of the EMF and the non- existence of environmental competency at centre, GoN/MOE will have a full-time Environmental Officer at DOE to look after the EMF activities for SSRP. The Officer will be responsible for implementation of the EMF and its provisions, including compliance checking, facilitation, coordination and ensuring dissemination, orientations and capacity buildings activities. Additional human resources or agency will be hired, if necessary, in order to effectively implement the EMF. DEO will develop and implement an EMF training, orientation and awareness program targeting to SMC, DEO, other district level partners as well as service providers (including engineering design team). EMF Dissemination and Disclosure GON will disclose the EMF on their web sites (MOE as well as DOE), and will also place the reports in pubic places for wider dissemination. Upon approval of EMF by MOE, the DOE will publish the document in Nepali language. The Nepali version of EMF will be circulated to DEOs and SMCs through the Program Implementation Manual (PIM). The document will be widely circulated to DOE, DEO, collaborating INGOs/NGOs. Through regular orientation program, DOE will disseminate EMF to engineers/sub engineers, district education officers, design consultant and other partners. Table of Contents Chapter I - General 1 1.1 Environmental Management Framework (EMF) 1 1.2 School Sector Reform Plan (SSRP) 1 1.3 EMF in SSRP 1 1.4 The Need for EMF in SSRP 1 1.5 Physical Infrastructure Development Activities in SSRP 2 Chapter II - Environmental Assessment 6 2.1 Methodology Used to Prepare EMF 6 2.2 Policy, Legal, and Institutional Framework for Environmental Management 7 2.2.1 Review of Nepal’s National Environmental Policies 7 2.2.2 Review of Environmental Laws 8 2.2.3 Other Related Legislations & Guidelines of the Government of Nepal 9 2.2.4 Policy for the Improvement of School Facilities 9 2.3 Summary of Provisions that are Applicable to SSRP Activities 9 2.4 Review of Safeguard Measures 11 2.5 Environmental Issues and Its Significance for Infrastructure Development under SSRP 12 2.6 Past Experiences 14 2.6.1 .Components of NEGSIFMN that Worked 14 2.6.2 Components of NEGSIFMN that did not Work 15 2.6.3 Innovative Approaches 15 2.6.4 Lessons Learned 16 2.8 Existing Capacity Assessment for the Implementation of EMF 17 Chapter III - Environmental Management Framework (EMF) 19 3.1 An Overview of Environmental Steps in SSRP 19 3.2 Mitigation 20 3.3 Implementation of Mitigation Measures 22 3.4 Capacity Development 25 3.5 Integration of EMF into regular programs: 25 3.6 Disclosure 25 Annexes 26 Annex 1 - School Selection Criteria 26 Annex 2 - Chronology of Consultation Meetings 27 Annex 3 - List of Persons Contacted 28 Annex 4 - Summary of Observations from the Field Visit 31 Annex 5 - Suggestions from Experts 34 Annex 6 - Government’s Effort towards School Physical Facilities Development through various programs (update up to 2007/2008) 35 Annex 7 – DOE Policy 36 Annex 8 - Environmental Screening 38 Annex 9 - The Design Guideline for School Buildings Construction from Environmental Perspective 40 Annex 10 - Laboratory Checklist from Environmental Perspective 56 Annex 11 - Land Acquisition and Resettlement 58 References 61 Chapter I - General 1.1 Environmental Management Framework (EMF) The Government of Nepal has set a goal of creating environmental frameworks for enabling environmental conditions, healthier learning environment in the Nepalese school campuses, but without affecting public health, surrounding environment and communities adversely in the construction and operation of the school physical facilities and other educational infrastructures. 1.2 School Sector Reform Plan (SSRP) The concept of an integrated grades 1 to 12 school system has been under consideration in Nepal from the 1980s till the Three Year Interim Plan (2007-10). The process of developing and implementing the integrated school system was initiated as an early as 1989 with the enactment of the Higher Secondary Education Act. The need for structural adjustment to the integrated school system was further emphasized by Basic and Primary Education Master Plan (1997). The achievements and experiences gain from the implementation of the EFA sub sector approach and the Secondary Education Support Program (SESP) have encouraged the GON to demonstrate a commitment to embark on School Sector Reform (SSR) with grades 1-12 as an integrated school system in the phased manner from 2009/2010 onwards. In February 2007, a Concept Paper on SSR was endorsed by the Education Policy Committee. The Concept Paper provided general directions for policy changes and served as the basis for preparation of SSR core documents. As a preparation for an integrated SSR, the core document has clearly spelled out the policy and strategy options for SSR implementation. The preparation activities of SSR will include development of an accelerated implementation/transition plan, illustrating the activities to generate knowledge and to develop local level planning capacity for systemic readiness and resilience. 1.3 EMF in SSRP The Environmental Management Framework (EMF) is developed to ensure that environmental issues are dealt by in a proper and efficient manner meeting all the legal compliance requirements of GON, and development partners supported SSRP in Nepal. The EMF will provide an environmental screening process, outline the typical mitigation measures and estimate corresponding budget and capacity building measures for the implementation of SSRP. The EMF is intended to be used as a practical tool during program formulation, design, implementation, and monitoring. It describes the steps involved in identifying and mitigating the potential adverse environmental impacts of activities. EMF ensures the protection of human health, environmental sustainability, and welfare of affected community. Hence the EMF in SSRP will ensure environmentally friendly design and construction of school physical facilities and other educational infrastructures. In addition, EMF will also safeguard the environmental policy of the GON. 1.4 The Need for EMF in SSRP EFA through DOE has set the module for the development and implementation of National Environmental Guidelines (NEG) to ensure that the school improvement and facility management under the program meet acceptable national and international norms. This guideline deals with the environmental issues associated with the planning, construction, and operational stages of the school physical facilities and other educational infrastructures, including monitoring the implementation. 1 Similarly, it is very pertinent to develop, building on the lessons and experiences of the NEG implementation, a comprehensive new version of environmental guideline in the form of an Environmental Management Framework, which fits into the objectives of SSR. The lessons learned from the past efforts in implementation of environmental management sector in schools and on the ground implementation of activities through EFA shall be assessed and used in an improved and scientific fashion in SSR while meeting its objectives. This EMF has been developed by the Ministry of Education of the Government of Nepal especially for the proposed operation to ensure due diligence, to avoid any environmental degradation issues. The purpose of this framework also includes assisting the implementing agency in screening all the sub projects for their likely environmental impacts, identifying suitable mitigation measures and implementation of these measures though an environmental management plan. 1.5 Physical Infrastructure Development Activities in SSRP One of the main activities of the SSRP is physical infrastructure development of schools and District Education Offices. The EMF is directly related with the physical infrastructure activities of SSRP. Under the physical infrastructure component of SSRP, the following activities are envisioned; 1. Construction of administration buildings (Construction of District Education Office building, total = 20 nos.) 2. Construction of school and hostel building for disables (Total = 100 nos) 3. Construction of library and laboratory (Total = 300 nos) 4. New classroom construction (Total = 19500 nos). Out of this, 75% will be built under the regular modality and 25% by additional contribution (cost sharing basis) 5. External environmental improvement (construction of girls toilet, boys toilet, water supply) 6. Classroom rehabilitation (Total = 13000 nos). The implementation of EFA 2004-09 has been a remarkable experience and achievement’ for the Ministry of Education (MOE) of Nepal. Encouraged by these achievements, the Government has decided to enter into a new phase of program implementation. The SSR is a response to the aspirations of the people and to emerging challenges the education system of Nepal is facing. The SSR should be viewed as a combination of affirmative actions and policy changes towards attaining the EFA goals by 2015, and be seen as a commitment towards ensuring quality of education to meet the local and global needs. Table 1.1: Implementation Mechanism for Physical Infrastructure Development S.N. Activity Implementation Mechanism Responsibility Timeframe Indicators 1. Classroom School Selection School Construction selection  Physical Survey of Schools DOE/PSS criteria is Technical staff of DEO will use the given in standard format developed by EOE & annex I conduct a survey of overall school in the district  Preparation of School Physical Facilities Improvement Plan (SPIP) SMC will prepare SPIP. This includes activities to be performed in schools, DEO estimated cost to perform such activities and contribution of schools in 2 S.N. Activity Implementation Mechanism Responsibility Timeframe Indicators such activities  Analysis of Education Data SMC Insert date on Education Management Information System (EMIS) & analyze educational indicators Prioritization of Schools Selection  DEO/PSS  DEO Based on educational indicators given in Annex – I school are prioritized for support Program Setting The whole school approach concept shall be followed in order to completely include all the facilities for school & get approved from DEO. The approval of DEO/AREA officer is required prior the expenses of such construction budget by the school. Preparation of Cost Estimates Prepare cost estimates of each individual components of school physical facilities and getting approval from DEO. The district rates & GoN norms should be followed in cost estimates. The cost should include the contribution from school & program. Agreement with School Based on the cost estimate & indicating the clear cut responsibilities of local community an agreement is signed between DEO & SMC. The name of schools & list of activities/programs to be conducted in such schools, DEO will arrange technicians Release of Funds to Schools Upon technical clearance for construction of such selected schools, the fund will be released to respective schools. Expenditure by School is tied with work Progress 3 S.N. Activity Implementation Mechanism Responsibility Timeframe Indicators Based on progress of work, the fund will be released/spent by the school. Documentation DEO shall prepare a documentation related to construction of school (i.e. Physical survey form, agreement, evaluation document, measurement book, report). Each 2 sets of documents are prepared. One set will be retained at school & another set shall be forwarded to DEO. Supervision of Construction Works DEOs will assign technical personnel (Engineer/Sub Engineer) to supervise & monitor construction activities in schools. For this, there is also a practice of utilizing technicians through NGOs/INGOs as per the MOU. Construction should Comply with Agreement Construction should comply with clauses of agreement. The breach of contract, sub standard work & delay could subject to legal action by DEO to chairman of SMC & personnel involved.  The cost allocated for new classroom construction is inclusive of 5 sets of furniture.  The new classroom should have black board of size (8'X4').  There should be provision for RAMP to wheel chair users. 2. Support to 1. Mechanisms same as 1  DOE II & III School 2. Other Requirements  DEO Trimester Water a. Water Availability for drinking &  SMC Supply sanitation.  Community b. Tube well should be at least 15m System as a from soak pit or septic tank. part of c. The fencing of school & external improving environment improvement is external entirely the responsibility of school. environment 3. Separate 1. implementation Mechanism same as 1  DOE/PSS Toilet for 2. Other Requirements  DEO Boys & a. The boys & girls toilet should  SMC 4 S.N. Activity Implementation Mechanism Responsibility Timeframe Indicators Girls maintain a distance  Community b. Construction of RAMP for wheel chair users c. Availability of water in school for water supply & sanitation purposes d. Other requirements as of no. 2 4. Construction  Based on DOEs design/drawing the DoE/PSS I, II, III of District cost estimates shall be prepared. The Trimester Education norms shall follow district & GoN. The Office procurement of work shall follow as per procurement guidelines of GoN. DEO Building The tender document shall be prepared. (Including 1 set of tender document should be furniture) sent to DoE/PSS.  Publish tender notice  Evaluate the bids  Agreement with bidders. A copy shall be forwarded to DoE/PSS  Under the close supervision of technician construction work should be done 5 Chapter II - Environmental Assessment 2.1 Methodology Used to Prepare EMF The present EMF was prepared based on the following methodologies: 1. Review of existing literatures including the following: a. Plan, policies, and programs of MOE/DOE related to the improvement of school physical facilities b. Environmental Protection Act (1997), Environmental Protection Regulations (1997) c. National plan, policies in education sector in Nepal, Self Governance Act, Educational Act and Regulations d. EMIS format and data collection procedure e. Study reports (basic design, EFA reports including core document and Environmental Assessment, SESP core documents-2008) f. Alternative design of classrooms, guidelines for the development of school facilities under EFA including standard, type-designs and technologies used in different geographical regions and climatic conditions in Nepal. g. National Environmental Guidelines for School Improvement and Facility Management in Nepal, 2004. h. Other reports and documents as found suitable by the DOE for the preparation of above framework i. Practices under BPEP II and EFA with respect to the construction and rehabilitation of classrooms. j. Practices under EFA related to the school physical facilities improvement including but not limited to drinking water supply and sanitation, play grounds, compound protection, drainage, solid waste disposal, landscaping with greenery k. Current practices of Operation and Maintenance (O& M) of buildings, water supply, drainage, sanitary facilities, sports facilities, school compound and other utilities including funding for O & M of facilities l. The environmental safeguard policies of SSRP development partners m. Consultations were carried out with central, district and local stakeholders with regard to environmental considerations to be included in SSRP. n. Field visit for getting the perception of stakeholders and observe “on the ground� activities accomplished in EFA with respect to implementation status of Environmental Guidelines prepared under EFA with particular reference to its dissemination, training of personnel, institutional set up, monitoring framework, and revisions of designs and construction practices. Based on the analysis, specific and realistic actions will be recommended for improvement while implementing the SSR. The recommendations are accompanied by appropriate and practical formats that can be used during implementation and monitoring of SSRP. The lessons learned, lacunae and useful measures that could be replicated in SSR shall be assessed and used invariably in Environmental Management Framework for SSR.  The chronology of consultative meetings held were given in annex II 6  The discussions were also held with experts and the concerned staff of DOE, relevant organizations working in education sector in Nepal. The list of persons/institutions contacted during the preparation of EMF is given in annex III  The observation from the field visits are listed in annex IV  Summary of stakeholders feedbacks on environmental issues related to SSRP are listed in annex V. 2.2 Policy, Legal, and Institutional Framework for Environmental Management In this section the policies, legal and institutional framework for environmental management in Nepal are summarized including national legislations. 2.2.1 Review of Nepal’s National Environmental Policies National Policies: Development planning exercise, which was started in mid 1950 in Nepal focused on natural resources utilization agriculture production, sanitation, and sewerage facilities and infrastructure development. Only in 1970s the need for the integration of environment aspects in development planning was realized. Since then efforts are being made to ensure that environmental policies and programs will be an integral part of national planning. The Sixth Plan (1980-85) adopted policies and programs on land use, soil conservation, and watershed management, development and management of national parks and wildlife reserves. The policy focus was on the implementation of the integrated development programs, environmental studies of development projects and control of air, and water pollution in the early 1980s. Exports of forest products were banned in 1980s. Subsequently, environment was recognized in Seventh Plan (1985-1990) as an important aspect to be integrated into every development projects. Some important measures were undertaken for environmental protection and management. Importance of public participation in the decision making process, and the role of women and non-governmental organizations were also emphasized for the management of environment. The Eighth Plan (1992-97) re-enforced to sustainable economic growth, and poverty alleviation. The Plan emphasizes the need for internalizing the Environmental Impact Assessment system particularly in economic development plans and programs. A National Environmental Policy and Action Plan (NEPAP) were prepared in 1993 to facilitate the integration of the environment aspects in development process. His Majesty’s Government of Nepal’s (HMG) environmental policy was also clearly spelled out in NEPAP. There are five main aims of HMG’s environmental policy:  To manage physical resources in an efficient and sustainable manner  To balance development efforts and environmental conservation for sustainable fulfillment of the basic needs of the people  To safeguard national heritage  To mitigate the adverse environmental impacts of development projects and human actions  To integrate environment and development through appropriate institutions, adequate legislations and economic instruments, and sufficient public resources. During this period, master plans for irrigation and livestock were also prepared. Environmental aspects in the policies of hydropower, irrigation and industry were incorporated. The Agriculture Prospective Plan was prepared and implementation started. The Ninth Plan (1997-2002) was formulated to identify system for ensuring maximum participation of general public in environmental decision making process, fixation of environmental standards, establishments of strong environmental 7 information and management system, implementation of international treaties, engagement of NGOs and INGOs in environmental sector, initiation of environmental health programs etc. According to the Eighth Plan, causes for air, water and land related pollution was supposed to be investigated through on-the spot observation and management mitigation plans. In this regard emphases were laid on adopting technology required to minimizing waste and neutralizing it. However pollution control program launched during this period included limited assessment studies of existing situations in the areas of solid waste along with other sectors: water, air, noise, etc. Utilization of appropriate technologies still needs to be developed in the areas of solid wastes along with other areas. Research on the cause of air, soil, and water related problems still need to be investigated and analyzed to prepare indicators and action oriented guidelines for the utilization. The solid waste aspect has been mentioned in the Ninth Plan. The Plan includes: consideration for the engagement of NGOs and private sector for the management of solid waste, emphasis for composting for municipal wastes, setting norms and standards in this field and its strict implementation in every municipalities and capacity building of local municipalities for handling solid waste related issues. Though the development plans recognized the adverse environmental deterioration and importance of various remedial measures, the policy lacks the most needed coordination, flexibility, and responsiveness as regard to the solid waste related issues. Similarly in the Tenth Plan objectives are set up for environment conservation that is indirectly related to school environment and addressed:  To take into account that sustainable development exists through the inter relationship between environment conservation and economic development; emphasize conservation, security, re- establishment and sustainable utilization of natural environment.  Promoting sustainable development by controlling pollution and amassing public participation in a campaign to create a clean and beautiful rural environment. The main strategies in the area of environmental management in Tenth Plan are (i) internalization of environmental concerns into development projects and programs (ii) fixation and implementation of national environmental standards (iii) forging partnership with local institutions, NGOs and private sector in awareness campaign (iv) preparation of action plan and implementation of international environmental treaties and conventions. The main policies are (i) capacity development of local institutions in environmental management (ii) promotion of women participation in environmental management at national as well as at local level (iii) encourage scientific research and development to develop environmentally friendly technologies and (iv) develop appropriate legal and fiscal mechanism to manage and control industrial pollution. The main program is Environmental Conservation Program. 2.2.2 Review of Environmental Laws 2.2.2.1 The Constitution of Kingdom of Nepal 1990 Article 26(4) embodies following policy mandates: “The state shall give priority to protection of the environment and also to the prevention of its further damage due to physical development activities by increasing the awareness of the general public about environmental cleanliness and the state shall make arrangements for the special protection of the rare wildlife, the forest and the vegetation.� With the above provisions, some constitutional responsibilities and duties have been vested upon the State for safeguarding the environment against its further damage due to physical development activities. (Pant, 1998) 8 2.2.2.2 The Environmental Protection Act 1997 In order to give effect to constitutional mandates special “Environmental Protection Act 1997� (enforced from June 24, 1997) and “Environmental Protection Rules 1997 (enforced from June 26, 1996) have brought into existence. These Act and Rules have made provision dealing with pollution control, EIA, IEE, conservation of national heritage etc. Section 24 empowers the GON to frame rules including for matters relating to sources of pollution, standards, prevention and control of pollution. There are also several sectoral Acts related to environment. 2.2.3 Other Related Legislations & Guidelines of the Government of Nepal 2.2.3.1 Local Self Governance Act (1999), Local Self Governance Rule (2000): The Local Self Governance Act has been enacted to provide greater political, administrative and financial autonomy to local bodies and facilitate community participation at the local bodies and community participation at local level. In accordance with the Act, local bodies have been formed at three levels: Village of Development Committee (VDC) at village level, Municipality at town level, District Development Committee (DDC) at district level. The Act empowers these local bodies to formulate and implement periodical and annual plans within their own jurisdiction. 2.2.3.2 Forest Act (1993), Forest Regulations (1995): The use of forest land is subject to forest act and regulations. The school projects need to comply with the provisions of forest law when it requires the use of forest land. 2.2.4 Policy for the Improvement of School Facilities The Government of Nepal’s effort towards school physical facilities development though various programs till date is presented in Annex –VI. The DOE has joined hands with INGO/NGO in quality supervision for the construction of school physical facilities. Out of 75 districts, in 32 districts INGO/NGO is active in providing quality supervision of the construction of school physical facilities. Among those are the Save the children Norway are working in 20 districts, Plan International in 6 districts, Room to read in 3 districts, Save the Children (US) in 2 districts, and Save the Children Japan in 1 district. The DOE policy for the design and construction of school buildings are presented in Annex-VII. 2.3 Summary of Provisions that are Applicable to SSRP Activities The environmental issues in SSRP were not anticipated to be grave. No large scale, significant/or irreversible impact is anticipated. The environmental review has identified several small scales & local environmental potentially associated with the program activities. According to Environmental Protection Regulation (EPR 97), there are two levels of environmental assessment, namely, IEE & EIA. Schedule 1 of EPR lists projects that require IEE & schedule 2 lists projects that require EIA. There criteria are based on the nature of size of the project & its cost. In addition, the EPR also list environmentally sensitive areas, where any proposal, regardless of the size & cost will require & EIA. Since the nature of activities under SSRP doesn't trigger any national or international environmental screening requirements, a workable environmental manager plan has been proposed in EMF for SSRP. In order to perceive of environmental encroachment, a generic environmental screening has 9 been prepared Annex – VIII. Based on the generic screening, a workable environment management/mitigation activity has been tailored. SSRP No EA Required Generic Environmental Screening EMF Incorporate EM Recommendations in SIP & Detail Design Monitor EMF Compliance during Construction and Operation 10 2.4 Review of Safeguard Measures The following paragraph analyses safeguard measures assessed by different development partners. The assessment also reveals status of the safeguard in relation SSR Plan implementation. S.N. Development Partners Safeguard Policies 1. International EA policy OP 4.07 is triggered. According to this SSRP has been Development categorized as Environmental Category B Project. Thus in case of Association (IDA) SSRP, environmental impacts due to program activities and likely to include loss of vegetation, soil erosion, water pollution, air pollution, health impacts are children, proper sanitation measures must be fully identified & appropriate mitigation measures clearly defined & cost to be incorporated into program's overall budget. 2. Aus AID The SSRP falls under scenario 1 of environmental marker set by Aus AID, which states no significant environmental impact. The monitoring of Unexpected environmental impacts should be incorporated into activity's monitoring & evaluation process. 3. EU The liability for environmental damage falls into three categories namely; protected species & natural habitats, water & soil. The SSRP activities won't trigger any negative implications in above three categories. 4. ADB The SSRP falls under category C (unlikely to have significant environmental impacts). No environmental assessment is required for category C projects although their environmental implications nevertheless need to be reviewed. 5 UNICEF Helping schools provide supplies, safe water and sanitation. Water, sanitation and hygiene are crucial to getting and keeping girls in school, as they bear the brunt of unhygienic or non-existent latrines. The lack of clean and separate sanitation facilities in schools discourages many girls from attending school full time and forces some of them to drop out altogether, particularly as they approach adolescence and the onset of menstruation. Lack of water in the household also keeps girls away, as they are usually the ones designated to walk long distances to fetch the household’s water supplies. And children of both sexes are sapped of nutrients, energy and the ability to learn if they are infected with water-borne parasites. This issue has been well addressed in EMF of SSRP. 6 FINLAND Emphasize the importance of environmental considerations in all activities with a view to forestalling threats, and creating conditions conducive to prosperity based on the sustainable use of natural resources;  support environmental programmes and the development of environmental administration;  take into account the principles of sustainable development in supporting agricultural and forestry programmes; 11 S.N. Development Partners Safeguard Policies  support developing countries in fulfilling their environmental obligations; and  Practiceand further develop procedures emphasizing the independent decision-making authority and participation of the partner in cooperation and relevant interest groups. The SSRP is not likely to present any perceived environmental risks and potential adverse impacts in its area of influence. Hence, the nature of activities under SSRP doesn't trigger any national or DP's specific environmental assessment requirements. 2.5 Environmental Issues and Its Significance for Infrastructure Development under SSRP Environmental Assessment (EA) is a process whose breadth, depth, and type of analysis depend on the nature, scale and potential environmental impacts of the proposed program. For SSRP, EA takes in account the environmental issues highlighted above below. The SSRP is not likely to present risks and potential adverse environmental impacts in its area of influence. However, the associated risks posed by seismic hazards should be given due consideration during planning of SSRP activities as well as to the risks of floods, landslides, fire etc. Thus in the case of SSRP, the environmental and social issues addressed below have been categorized and the appropriate mitigation measures and its implementation arrangements, capacity building programs associated with it are clearly elaborated in EMF. Multi hazard risks should be addressed appropriately. This EMF has been designed to address such environmental and social issues at the planning, construction and operational stages under the physical infrastructure development activities of SSRP S.N Environmental Issues Significance Remarks 1. Slope stability and land slides Moderate Schools in mountain and hill region of Nepal fall on slopes. Poor site selection for school building construction lead to instability, and lead high cost on account of earth retaining structures. 2. Location of school and Moderate This is very important as it determines orientation magnitude, natural heating, and lighting available inside the building. Orientations should be based on the climate type of the place where school facilities are planned 3. Sanitation Moderate Adequate sanitation facility in school (toilets, personal hygiene practices) should be encouraged. 4. Water Quantity/Quality Moderate An easily accessible water supply that provides sufficient safe water to meet school needs. Schools in Nepal are found using sources like protected springs, dug wells, boreholes, and piped water supply. The problem of arsenic contamination in ground water in schools of Terai should be 12 S.N Environmental Issues Significance Remarks given special attention. 5. Wastes Low to Solid waste should be disposed of properly. moderate Key strategies for improving solid waste management and disposal are to minimize the waste by schools and to recycle waste whenever possible. 6. Day Lighting and windows Moderate Poor indoor lighting in classroom can have many harmful effects on health and well being of teachers and students. 7. Pollution (Air, Water, and Low to The air, water and noise pollution issues Noise) moderate during the construction and operation phases of the school and administration building construction should be addressed. The air pollution caused by old school buses is a subject of concern and need attention for regular repair and replacement. The air pollution caused by vehicular movement in school areas is another issue to be considered. Proper speed control measures and air pollution control measures shall be incorporated. In many schools, teaching-learning activity in one class room disturbs the other class room(s) (because class room designs are inappropriate from noise consideration). 8. Ventilation systems Moderate The poor ventilation in schools may lead to respiratory problems, and easier transmission of infectious diseases. Constructing schools with sufficient number of windows may improve ventilation. 9. Seismic Hazard High Earthquake safe school and administrative building should be encouraged. 10. Natural Hazards (storm, wind, Moderate to Maximum care should be taken during Thunder, Hail stone etc) High design of structures and emergency planning measures should be integrated. 11. Drainage and flood Moderate to Drainage management should be an integral management High part of construction of schools. Construction of schools in flood plain areas shall be given special attention. Necessary control, emergency measures should be an integral part of the program. 12. Health and Hygiene Moderate The health and hygiene education and practices offered in schools was felt to be inadequate. 13. Construction materials use Moderate The use of local materials should be encouraged. Avoid use of wood in construction of schools in Terai. Special attention should be given to control deforestation. 13 S.N Environmental Issues Significance Remarks The quarrying of sand from River should be limited to avoid any negative environmental impacts. Local quarrying of stone and other raw materials should be within limit not jeopardizing the local environment. Design and implementation of climate friendly school building construction. 14. Laboratory safety and Moderate The laboratory safety and hazardous waste hazardous waste management in majority school laboratories in Nepal is poor. So, it is advisable that all recipient schools for the laboratory under SSRP should the checklist included in annex of this EMF. 15. Safeguarding the school Moderate To define school land, to safeguard facilities students, school buildings and resources, to prevent entry of animals to limit the public access to public access to school and for various safety and security purpose, fencing of school is essential. 16. Class room temperature Moderate In hot climate, e.g. in Tarai plain area, using GI sheet roof in school means subjecting school kids to high temperatures. Innovative ways need to be looked at to address this issue. 2.6 Past Experiences 2.6.1 .Components of NEGSIFMN that Worked The school building design and construction standard developed by the DOE has incorporated the standards and good practices prescribed in NEGSIFMN. This standard has clearly spelled out that all the construction should follow the National Building Code, and child friendly constructions. This has been reflected in their guiding principal, which states “Child friendly (well lighted and well ventilated), seismically resistant, aesthetically pleasing school maximizing the use of local construction material and resources with no adverse effect on environment like deforestation, and having low maintenance requirements.� In program implementation guideline prepared by the DOE (2007-2008), the following aspects of NEGSIFMN have been incorporated in component 1 annex of the above manual.  The school must meet the drinking water quantity/quality standards.  The distance of 15 meter must be maintained between the septic tank and tube well.  The school boundary/fencing wall should be constructed by the school from their own source to make the school safe.  Provision of Rs 1 lakh has been allocated for the construction of separate toilet for boys and girls  The guideline has discouraged the use of “timber� in Terai and promotion of steel tubular truss.  The provision of ramp in classrooms and toilet for disable students. 14 The following aspects were improved during the period through the intervention of NEGSIFMN.  The awareness has been raised regarding the arsenic contamination in wells of Terai Schools and safe drinking water.  Promotion of hygiene awareness programs in schools  Separate construction of girls toilet  The partnership with INGO/NGO for the effective monitoring in school physical facilities construction.  The environmentally friendly design guidelines for the construction of school under EFA are very useful. In SSRP, this aspect is also recommended for inclusion through EMF see Annex IX. 2.6.2 Components of NEGSIFMN that did not Work There are several components of NEGSIFMN that were less successful during EFA. However, even failures can teach valuable lessons. Some of the aspects that didn’t work in NEGSIFMN are explained below. Integration of NEGSIFMN in planning process i.e. School Improvement Plan (SIP) was missing. The capacity building activities for the implementation of NEGSIFMN was spelled out in the document but failed to incorporate it in the project cycle in EFA. The non allocation of budget and program for the implementation of NEGSIFM were some of the shortcomings. Due to this reason, the proper dissemination of NEGSIFMN and its implementation couldn’t take place in EFA. The research and development aspect in alternative of school design, selection of construction material was also found missing. 2.6.3 Innovative Approaches Some of the innovative approaches so far being adopted by DOE are highlighted below.  Alternative designs prepared with the use of local materials (22 type model, compressed stabilized earth blocks (CSEB) model under approval).  The community must get an approval from the Department of Urban Development and Building Construction (DUDBC) for their own designs.  Trainings were provided to engineers and sub engineers for earthquake safe design and construction.  Provided orientation to SMC, teachers and masons on construction quality.  Construction of physical facilities through community participation (at least 25% community participation)  Design of RCC school building is available and school willing to construct such RCC building (through cost sharing provision) is selected. For the construction of such building DOE shall allocate Rs. 825000.00 per scheme.  DOE has a provision for the construction of separate toilet for boys and girls (Rs. 100,000.00 per school) has been allocated under this scheme.  In order to improve the water supply system in schools, DOE has allocated Rs. 10000.00 for the improvement of school water supply systems  Bardiya District Education Office in collaboration with MS Nepal, and BASE Bardiya built tow pilot models of the new design in Bardiya districts. The blocks/bricks are produced using Compressed Stabilized Earth Block (CSEB). The design is based on climate responsive (also called bio-climate) principles to nationally maintain a relatively comfortable temperature in all seasons. The research and development is ongoing regarding this technology.  DOE has pilot tested Carbon Fiber UPVC roofing in schools. This roofing material is easy to fix, inflammable, acid/alkali erode proof, sound and heat insulation properties. The detail technical and financial feasibility is yet to be done by DOE prior its use in schools. 15  In order to establish good water quality system in schools, DOE has collaborated with Department of Water Supply and Sewerage and UNICEF in improving water supply systems in schools  As agreed with DOE some INGO/NGOs have provided technical support for school building construction in 32 districts. 2.6.4 Lessons Learned The development of NEGSIFMN was an innovative approach. Clearly defining and specifying the coverage, contents, and applicable standards of such components in EMF would eliminate the issues in SSRP. The extended and revised version of NEGSIFMN would definitely overcome such lacunas in meeting the overall objectives of SSRP. Considering these, the positive aspects of NEGSIFMN should be maximized and the shortcomings in EFA should beovercome through the application of the EMF under SSRP. These aspects are dealt with under the capacity building for implementing the EMF in SSRP. 2.7 MECHANISMS FOR IMPLEMENTATION OF EMF IN SSRP S.N. Activities Responsibilities Remarks 1. Preparation of EMF, Its Approval, Circulation & Incorporation in Program 1.1 Approval of EMF for SSRP MoE 1.2 Printing, Publication of EMF in Nepali & its DoE DOE provides EMF guidelines to wider circulation DEOs for implementation 1.3 Dissemination of EMF through Program DoE/DEO DoE will ensure that stakeholders Implementation Manual (PIM) e.g. DEO, SMC and others understands the EMF requirements and EMF provisions are followed while planning and implementation of School Physical Improvement programs (SPIP) and DEO Office buildings. 1.4 Incorporation of EMF aspects in SIP DEO/ SMC DoE will ensure that EMF is an integral part of decision making for SSRP activities. 1.5 Dissemination of EMF through regular DoE/ DEO/ Partner Engineers, Sub-Engineers and orientation programs organized for Engineers, INGOs Partner INGO's representatives are Sub-Engineers, District Education Officers, involved in exercises on how to I/NGOs and other partners working in incorporate EMF provisions in collaboration with DoE. planning and implementing SIP 2 Environmental Assessment & Management 2.1 No special EA is required as construction activities are of very small threshold, i.e. less than NRs 825,000.00 2.2 Prepare Generic Environmental Screening of DEO Follow approved EMF Activities 2.3 Incorporate EMF requirements in SIP DOE Follow approved EMF preparation guidelines 2.4 Utilize EMF requirements in school SMC construction, as spelled out in SIP 2.5 For DEO Building Construction in DEO Clauses in tender document should Corporation of EMP Aspects in contract be clearly defined document 3. Monitoring & Auditing 16 S.N. Activities Responsibilities Remarks a. Field Level Monitoring DEO (as an integral Checks generic screening report &  During implementation part of ASIP incorporation of EMF  Four monthly, feeding into government's monitoring system) recommendations into subproject, quarterly portfolio review meeting field implementation, & record keeping also check progress report  Site visited to representation samples b. Sub Project Level Monitoring By DEO at regular Keeps updated records of the  During pre-construction, construction & basis & DoE by mitigation works undertaken operation stages intermittent & as  Regularly cross check Report to DoE/PSS Prepare status report challenges, obstacles faced c. Compliance Audit Central Level Team Verifies overall compliance to  During Implementation (As an integral part EMF & other env. & social  Annually of overall program safeguard requirements implementation audit) Visits random representative 4 Annul Reporting & Feedback DoE (DoE reports DoE will conduct an annual  Interactions/Workshops status on the ground interaction to replicate the best  Reports reality, & practices & to avoid/ mitigate recommendations for obstacles problem improvement to MoE) 2.8 Existing Capacity Assessment for the Implementation of EMF S.N. Organization/ Existing Capacity Agency Knowledge/Expe Manpower Budget Logistics rience of Env. Mgmt 1 MOE X X X X 2 DOE Engineer assigned additional environmental √ X X tasks, over and above engineering tasks. 3 DEO Engineer assigned additional X environmental X X tasks, over and above engineering 17 S.N. Organization/ Existing Capacity Agency Knowledge/Expe Manpower Budget Logistics rience of Env. Mgmt tasks. 4 SMC X X X X Note: X: Lack of capacity, √: Adequate capacity The physical services section of the DOE is taking responsibility for the physical infrastructure related activities since BPEP II. This responsibility of DOE has been continued for SSRP as well. DOE based on pre set district targeting criteria allocates program and budget to all 75 DEOs. DEOs based on pre set school selection criteria allocate program and budget to recipient school. Schools are fully responsible to implement the program under the technical supervision of DEO. The DOE, DEO has very limited technical staff, hardly sufficient to run their annual programs. There is no environmental specialist at any tiers (neither at MOE, nor at DOE or DEO). The SMC and schools also do not have access to environmental manpower and knowledge to deal with issues related to environment mentioned in NEGSIFMIN and EMF of SSRP. Their capacity in terms of manpower and resources is required in order to implement EMF in SSRP. At least one full time environmental specialist/officer is, therefore, necessary at the center (such as at the DOE) in order to provide overall environmental oversight, coordination and help implement the EMF. Besides, the officer should promote mainstreaming of environmental best practices, emerging lessons & innovative ideas, and coordinate/facilitate environmental management through various schools and DEOs in the country, as well as promote, develop and implement capacity building activities. 18 Chapter III - Environmental Management Framework (EMF) 3.1 An Overview of Environmental Steps in SSRP The EMF has been developed by the Ministry of Education, Nepal for the SSRP in order to ensure due diligence and to avoid any environmental degradation issues. The purpose of this framework includes assisting the SSRP implementing agency DOE in screening all the sub-projects for their environmental impacts, identifying suitable mitigation measures and implementation of these measures through an environmental management plan. Environmental Assessment (EAs) Considering the nature and magnitude of potential environmental impacts from relatively limited small scale construction, renovation, refurbishing construction work and other associated components of SSRP, the proposed operation is to be classified as category “B�. The SSRP is not likely to present any perceived environmental risks and potential adverse impacts in its area of influence. Hence, the nature of activities under SSRP doesn't trigger any national or international extensive environmental requirements. The SSRP, as a whole, doesn’t require any environmental clearance. However, in order to manage the minor and localized impacts GON has suggested developing a generic screening and preparation of EMP for schools. The proposed EA suggests the following steps; 1. Prepare generic environmental screening of activities For any program/activity which will involve infrastructure construction, renovation/refurbishing, construction works, district level offices and institutions fulfilling them eligibility criteria will use a checklist (Annex VIII) to identify activity that may have environmental impacts. This aspect has to be integrated in the School Master Plan/School Improvement Plan (SIP) and DEO will include this as one of the criteria for selecting the school. The Design Guidelines for School Building from Environmental Perspective is given in Annex IX 2. Integration of EMF in SIP The primary objective of the environmental management and monitoring is to record environmental impacts resulting from SSR activities and to ensure implementation of the “mitigation measures� identified earlier in order to reduce adverse impacts and enhance positive impacts from specific activities. Having identified the potential impacts of the relevant activities through screening, the next step is the identification and development of mitigation measures to eliminate, or reduce impacts to levels that are environmentally acceptable during implementation and operation of the SSRP through the preparation and implementation of an Environmental Management/Mitigation. EMF provides an essential link between the impacts predicted and mitigation measures specified. The EMF will be integrated as an integral part of the SIP. The EMF includes the following components: i) a site map showing environmental features of the school and its surroundings, ii) concise description of the environmental risks/ concerns relevant to the school, and proposed SIP as well as potential solution to the risks/ problems identified (summarize these in a table). 19 3.2 Mitigation The EMF identifies site-specific, cost-effective and detailed measures that will reduce the identified adverse environmental impacts to acceptable levels. The plan should include compensatory measures if mitigation measures are not feasible, cost-effective, or sufficient. Examples of the environmental mitigation measures that may be appropriate to SSRP are shown in table below. The specific EMP must have its own mitigation measures that are appropriate to the issues/ risks/ difficulties identified through the process of screening and EMP preparation. Environmental Mitigation Measures Category Potential Problem Appropriate Mitigation Measures Slope stability Landslide or other forms of Geological/geomorphologic considerations shall be mass instability on the slopes incorporated in design Civil engineering structures and bio-engineering measures used. Measures taken to avoid undercutting of slope toes. Quarrying prohibited in river beds, where flood discharge is significant Development of erosion or Check dams and bio-engineering measures used as gullying in school premises necessary Spoil disposal High volume of water/spoil Minimize spoil by balancing cut and fill wherever possible in school building construction Water Water logging, poor drainage Proper drainage management, Improve and increase slope Management drainage measures Water Sub standard or inadequate Ensure that enough drinking water is supplied to school. Quality/Quantity drinking water provided to School shall request the drinking water supply system students construction/repair budget from the program. Regular testing of drinking water at least 2 times a year is recommended In schools of Terai, arsenic detection in ground water is recommended. The arsenic monitoring and mitigation plan suggested in EFA shall be continued Land acquisition Land transfer will be completed Resettlement and or land acquisition problems are not and resettlement through registration, with land anticipated in SSRP. The DoE will not do any title vested in the School, involuntary land acquisition. All donations and purchases will be voluntary. DoE will not only ensure that any land Leasing of land or rights of use donations are fully voluntary, but also that such donations of land for schools will be duly do not involve physical displacement or any significant documented adverse impacts upon incomes of the donor household. All voluntary land transactions will meet the criteria as mentioned in annex VI. Plants Trees being removed in school Felled trees replaced, using the same species if premises appropriate. Trees planted wherever land is available. 20 Category Potential Problem Appropriate Mitigation Measures Quarries and Pollution, disturbance and Construct bunds to screen noise and dust. borrow pits for danger from quarry operations obtaining Enforce access restrictions. construction materials Safety risks from abandoned Quarries made safe by re-grading slopes and installing quarries or borrow pits structures as necessary. Land seriously disturbed or lost Quarry and borrow areas rehabilitated to productive from production plantations using bio-engineering techniques. Quarries continue to be used by Unauthorized quarrying stopped, where necessary by unauthorized persons working with the District Development Committee. Stone crushing Dust and noise pollution Spray water in crusher machine, Use it in off hours of schools. The facilities should be away from school premises. Air and noise Dust generated from If water is available, the road surface can be sprayed on a pollution construction works, and frequent schedule. approach roads to school Air pollution generated due to Old school buses should be regularly phased out. Regular old school buses repair and maintenance of vehicles. Traffic sign should be kept mentioning “School Zone�, Speed control Dust and noise generated by measures bumps etc should be kept vehicles passing by schools Noise during construction of Work schedule to minimize disturbance. schools Social issues Local people excluded from Designs incorporate methods within the skills of local project activities people. Contractors encouraged using local labor wherever possible. Promises were made to local Checks to ensure that the promises are fulfilled; if they people during feasibility and prove to be not possible, reasonable alternatives must be planning phases negotiated. Solid waste Spreading of waste, pungent Proper solid waste management system should be management smell, deterioration of introduced in schools which includes segregation of aesthetics waste, and its proper disposal. The environmentally friendly management measures like composting should be encouraged. Awareness regarding the management of solid waste, discouraging use of plastic products etc should be promoted in schools The use of recycled Use batteries, laboratory materials should be promoted. Hazardous waste chemicals etc Safe disposal of hazardous waste should be encouraged. Health and Unhealthy living condition in Promote health measures in schools. (hand washing 21 Category Potential Problem Appropriate Mitigation Measures hygiene, and schools, disease facilities, safe disposal of human excreta, availability of food safety water, etc). The norms prescribed for toilet by NEGSIFMIN should be followed. Water Lack of quantity of water, poor Water conservation measures should be incorporated in Conservation sanitation schools such as (efficient and rational use of water, incorporation of rain water harvesting systems in schools) Energy Use of non energy efficient Use energy efficient systems in schools, the natural Efficiency bulbs, and equipments in lighting and orientation of school building should be schools integral part of design. Use of renewable energy like solar should be promoted in schools School safety Theft, burglary, damage of Adequate fencing of schools is required. The windows of physical facilities classrooms should be secured by “grill� for any kind of trespassing by students and outsiders. Construction Deforestation The use of wood for the construction of school physical materials facilities in Terai has been banned. The innovativeness to avoid use in hills and mountains should be integrated in Use of Wood schools. The recycled materials to reduce use of raw materials. The use of local materials as much as possible Material The new innovations should be integrated in design for specifications making schools more child and environmentally friendly. School safety Damages to school properties Incorporate safety measures during design of physical and possible human casualties facilities (Fire, earthquake, of different scale hail stone, Create awareness about natural calamities to teachers and thunder storm students etc) 3.3 Implementation of Mitigation Measures a) Program Design: The mitigation measures should be integrated in the design of the program itself. Such a step will enhance the mitigation measures in terms of specific mitigation measures in terms of specific mitigation design, cost estimation of the mitigation measure, and specific implementation criteria. The mitigation measures integration in the design phase will also help in strengthening the benefits and sustainability of the program b) Implementation Modality: Most of physical construction works (new classroom construction, rehabilitation of old classrooms etc) are directly done through SMC. So, it is important to develop the capacity of SMC in environmental monitoring and mitigation. The SMC should ensure that monitoring and mitigation components as spelled out in EMF are properly carried out. The construction of DEO building and other structures when tendered out by DOE/DEO, then the project 22 contractor should be bound by the parameters identified in the environmental and social assessment pertaining to specific mitigation measures in the contract. c) Bill of Quantities: The tender instruction to bidders should explicitly mention the site specific mitigation measures to be performed, the materials to be used, waste disposal areas, as well other site specific environmental requirements. d) Supervision and Monitoring: The purpose of supervision is to make sure that specific mitigation parameters identified in the environmental assessment and as bound by the contract is satisfactorily implemented. In addition, monitoring is necessary such that the mitigation measures are actually put into practice. Environmental monitoring during project implementation should include systematic assessment of key environmental indicators that determine the degree of environmental impacts of the project and effectiveness of mitigation measures. Such information enables the GON/MOE and the DPs to evaluate the success of mitigation as part of project supervision, and allows specifies the type of monitoring with linkages to the impacts assessed in the EA report and the mitigation described in the EMF. Monitoring activities for project are divided in three types 1. Pre Construction Monitoring 2. Construction Phase Monitoring 3. Operation Phase Monitoring Pre Construction Monitoring Types of Monitoring S.N. Indicators of Monitoring Monitoring/ Method Responsibility Frequency of Monitoring 1. Printing, Publication & Direct Observation Once DoE Distribution of EMF to All Stakeholders (DoE, DEO, SMC) 2. Full-time Environmental Evidence Once MoE Officer in place at DoE DoE 3. Incorporation of EMF in SIP Review of Documents Once DEO 4. Incorporation EMF in Design, Direct Observation Once DoE Tender Document Construction Phase Monitoring Types of Monitoring/ Monitoring S.N. Indicators of Monitoring Responsibility Method of Monitoring Frequency 23 Types of Monitoring/ Monitoring S.N. Indicators of Monitoring Responsibility Method of Monitoring Frequency 1. Drinking Water Quality  Sampling, lab Annual SMC testing & Note: DEO comparison with shall coordinate generic standards with district Dept. of water  For Arsenic, testing supply & follow protocols sanitation, mentioned in EFA NGO, INGOs document working in water & sanitation sectors. 2. Transportation of CM/Direct Observation Regular SMC construction material in during covered contains and safe construction loading & unloading of construction materials. 3. Water sprinkling in dusty CM/Direct Observation Every Day SMC construction area & access earthen roads 4. Stockpiling of excavated CM/Direct Observation Everyday SMC materials 5. Reuse of excavated materials CM/Direct Observation Everyday SMC 6. Solid waste segregation CM/Direct Observation Everyday SMC disposal 7. Encroachment of forest CM/Direct Observation During DEO/SMC construction once in 3 months 8. Quarry & Borrow Pits Direct Observation Quarterly DEO/SMC Operation Phase Monitoring Types of Monitoring S.N. Indicators of Monitoring Monitoring/ Method Responsibility Frequency of Monitoring 1. Preparation of monitoring Records/Documents Monthly DOE reports 2. Drinking water quality Samples taken from Quarterly DEO different points, Arsenic testing and mitigation source, delivery Bi Annual DOE points Laboratory testing 3. Number of orientation and Number of orientation Regular DOE/DEO training and trainings conducted 4. Impact audit Compliance with Annual DOE/DEO EMF 24 3.4 Capacity Development As noted in Section 2.8, environmental capacity is generally very weak at all levels (MOE, DOE, DEO and SMC). MOE, DOE, DEO, and SMC capacity, therefore, needs to be strengthened so that they can take up the responsibilities assigned to them. GON will implement capacity strengthening measures, such as: i) providing environmental competency/human-resources, ii) training, orientation and awareness activities on environmental planning and management of school and school-facilities, and iii) mechanism for coordination and for accessing specific environmental services e.g. water-quality testing, climate responsive school building construction etc, If necessary, specific EMF recommends specific, targeted training for the staff, contractors, SMCs to ensure the implementation of environmental recommendations. In addition, the EMF when necessary also provides specific recommendations for operational arrangements to carry out mitigation and monitoring measures. In order to implement the EMF, following is the minimum capacity building necessary. The capacity development program is designed based on the existing capacity need assessment of the SSRP implementing partners/entities. This has included as one of the sub component under SSRP overall capacity development program. Capacity Development and Training Program for EMF in SSRP S. No. Particular of Activities Remarks EMF translation to Nepali, Printing & 1. Publication 2. Technical Strengthening of DOE In order to safeguard environmental concerns 2.1 Recruitment of full-time Environmental GON will recruit a separate environmental Officer officer at DOE  Capacity Building Program to MOE, DOE, (Training, Research & Development) Detail Capacity Building Program will be 3. Developed by DOE as per need for EMF  Monitoring & Supervision Implementation Arrangements for DOE, DEO etc) The overall capacity building plan, which forms part of the SSR Plan, will incorporate capacity development for construction, maintenance and rehabilitation related works including the capacity in EMF implementation. 3.5 Integration of EMF into regular programs: The EMF should be site specific and detailed in its description of individual mitigation and monitoring measures and its assignment of institutional responsibilities. It must integrated into program’s overall planning, design, budget, and implementation. The EMF must be prepared if SSRP sub component has to be constructed through tendering. 3.6 Disclosure The EMF will be shared by the MOE with concerned stakeholders. After the final approval, this will be translated in Nepali version, printed in several copies and distributed to relevant stakeholders. The EMF will be posted in official web site of MOE. 25 Annexes Annex 1 - School Selection Criteria 1. 1st Phase: Evaluate all the district level school The Schools destroyed by wind, fire, landslides, earthquakes & other natural calamities which required new construction. The school whose classroom is borrowed by resource centre Community managed schools Schools running special programs Based on different educational indicators like enrollment of dalit students (X), enrollment of girl students (Y) ratio of grade 5 to grade 1 students (Z) Index = 0.4x + 0.3y + 0.3z The school with highest index will get the highest priority & low index as lowest priority. 2. 2nd Phase No of classroom in primary level Adequacy of classroom = Total no of classes running in primary level (including sections) If, ACR < 1, then construction of new classroom & furniture could be provided Area of all the classrooms in primary level (m2) Classroom Pressure = Total no of students in primary level If CP<0.75 m2, then construction of new classroom & furniture could be provided. Total no of students in primary level Student Density = Total no of classroom in primary level If SD>50, In Kathmandu & Terai new classroom & furniture could be provided If SD>45, New classroom & furniture could be provided in hilly region If SD>40, New classroom & furniture could be provided in mountain region 26 Annex 2 - Chronology of Consultation Meetings 1. Consultation meeting held with DOE/PSS, Kathmandu – Date: 2 April 2009 2. Consultation meeting held at Tanahu District – 17 April 2009 a. Shree Satyadevi Lower Secondary School, Bharwa – 5, Tanahu. b. Shree Pabitra Higher Secondary School, Bandipur – 1, Nahala c. Bishnu Secondary School, Nahala, Tanahu d. District Education Office, Tanahu e. Hoste Hainse Child Development Society, Damauli, Tanahu 3. Consultation Meetings Held in Palpa District – 19 April, 2009 a. Joint Movement for Children (JMC) b. Adarsha Secondary School, Deurali VDC c. Bhairav Janta Higher Secondary School, Bhairavsthan d. Adarsha Higher Secondary School, Deurali e. Saraswoti Higher Secondary School, Kharsyauli, Palpa 4. Consultation Meeting Held in Pokhara – April 20, 2009 a. DEO Office, Bagar, Pokhara b. Sanskrit Secondary School, Bagar c. Bal Mandir Secondary School, Nadipur, Pokhara - 3 27 Annex 3 - List of Persons Contacted Local Stakeholders S.N. Name/Position Organization Remarks 1. Mr. Damber Bdr. Gurung (Head Satyawati Devi Lower Secondary School Master) Bhansar, Tanahu Mr. Asha B. Lama, SMC, Chairman 2. Mr. Bishwo Raj Adhikari Asst. Shree Pawitra Higher Secondary School, Head Master Bandipur – 1, Nahala, Tanahu 3. Mr. Ram Saran Adhikari Nahala 4. Mr. Min Prasad Nepal, Head Sir Adarsha Ma. Vi. Laguwa, Deusali 5. Mr. Hari Prasad Gyawali Adarsha Ma. Vi. Laguwa, Deusali 6. Mr. Narayan Dhakal Laguwa, Deurali 7. Mr. Rishi Ram Dhakal, Teacher Palpa 8. Mr. Min Prasad Dhakal, Teacher Palpa 9. Mr. Kul Bdr. Kunwar Palpa 10. Mr. Krishna P. Nepal, Teacher Palpa 11. Mr. Bhim Khanal, Educationist Palpa 12. Mr. Tika Khanal Palpa 13. Mr. Lava Pandey Palpa 14. Mr. Binod Kunwar, Educationist Palpa 15. Mr. Dil Bdr. Khanal, Guardian Palpa 16. Mr. Punam G.M., Guardian Palpa 17. Mr. Saroj P. Nepal, Head Sir Adarsha Higher Secondary School, Deurali 18. Mr. Devi P. Adhikari, Guardian Deurali 19. Mr. Moti Raj Adhikari, Teacher 20. Mr. Bishnu P. Khanal, SMC, Shree Saraswoti H. S. School, Kharsyauli, Chairman Palpa 21. Mr. Hira Dhar Acharya, Principal Shree Saraswoti H. S. School, Kharsyauli, 28 Palpa 22. Mr. Damodar Bastola, Headmaster Shree Sanskrit H. S. School, Bagar, Pokhara 23. Mr. Cheej Man Gurung, Chairman, Shree Sanskrit H. S. School, Bagar, SMC Pokhara 24. Mr. Bishnu Adhikari, Teacher Shree Sanskrit H. S. School, Bagar, Pokhara 25. Mr. Atma Ram Bastola, Teacher Shree Sanskrit H. S. School, Bagar, Pokhara 26. Mr. Prem Raj Gautam, Educationist Pokhara 27. Mr. Govinda P. Adhikari, Pokhara Educationist 28. Mr. Sushil Basnet, Head Sir Bal Mandir S. S., Nadipul, Pokhara List of District Level Stakeholders Contacted S.N. Name Organization/Address Position 1. Mr. Prem Poudel DEO, Tanahu DEO 2. Mr. Hem P. Acharya DEO, Pokhara Asst. DEO 3. Mr. Ghanashyam Adhikari DEO, Pokhara Program Officer 4. Mr. Kulananda Chaudhari DEO, Pokhara Overseer 5. Mr. Dinesh K. Yadav DEO, Pokhara Overseer 6. Mr. Chet Bdr. Thapa Hoste – Hainse Child Program Coordinator Development Society, Tanahu 7. 8. Mr. Chandra Mishre Save The Children Norway for Engineer DEO School Supervision, Palpa 9. Mr. Rudra Masarang Save The Children, Norway, Program Officer Palpa 10. Mr.Hari Krishna Sharma Save The Children, Norway, Officer Palpa 11. Mr. Ashbir Saru Save The Children, Norway, Officer 29 Palpa 12. Mr. Ganesh Shrestha Gorkha Foundation, Gorkha Manager List of Experts Consulted S.N. Name Organization Position 1. Mr. Lava Dev Awasthi Ministry of Education Joint Secretary 2. Mr. Arjun Bhandari MoE Joint Secretary 3. Mr. Mahasram Sharma DoE Director General 4. Mr. Lekh Nath Poudel MoE Under Secretary 5. Mr. Prakash Raj Pande DOE Director 6. Mr. Hari Prasad Lamsal DOE, Program and Budget Director 7. Mr. Shambhu P. Upreti DoE/PSS Senior Div. Engineer 8. Mr. Yuba Raj Poudel DoE/PSS S.D. Engineer 9. Mr. Uddhav Nepal DoE/PSS Engineer 10. Mr. V. Sundararaman World Bank 11. Mr. Mohan Aryal World Bank 12. Mr. Drona Ghimire World Bank Environment Specialist 13. Mr. Shiva L. Bhusal Embassy of Denmark 14. Mr. Ujjwal Man Shakya Innovative Creators (P) Architect Ltd. 15. Mr. Sonam Wangchuk MS Nepal 30 Annex 4 - Summary of Observations from the Field Visit School Selection Criteria Most of the schools/SMCs visited during this study period were not satisfied with the school support selection criteria practiced by GON. They felt that the school selection for support should be based on the proper need assessment of individual school rather than generic mechanism developed by DOE. Some of the very old and structurally unsafe school should be include under the priority for support. Some of the schools situated in urban areas with ample spaces could rent their space or building to generate financial resources. Such schools were even found dependent to GON funding rather than being innovative. Such schools should be encouraged to explore the sustainable means on using their available resources to funds for academic purposes. Financial Support Most of the schools visited during the study have shown dissatisfaction over the amount of financial support being allocated through GON for the construction of classrooms. The cost of the construction material and labor is very high which doesn’t match with cost allocated for classroom construction. The amount of Rs. 10000.00 allocated for improvement in water supply system of school is inadequate. For 4 roomed RCC building constructed in schools through cost sharing mechanisms (LAGAT approach), the DOE has allocated a budget of Rs. 825000.00. Due to the shortage of areas, schools are attracted towards this approach. Lessons learned from some of the schools with this kind of recipient have clearly shown that the amount allocated is not enough and school needs to plunge in some money on their own to complete the building. This circumstances has created financial crunches in schools. Construction Materials Used Though schools are using locally available construction materials (sand, gravel, wood etc) for construction of classrooms, most of the sites visited were found using substandard materials. The sand used was not found of high quality, it was found mixed with soil. The different sizes and shapes of gravel were found used in the construction. In two of the sites visited, unseasoned wood in found used in practice. The use of wood in hilly areas has been limited to window and doors. However, instead of using tubular iron poles as support, some of the schools were found using wooden post and support. The water is not available in some of the schools visited. Design and Drawings The typical design provided by DOE has been followed. There is lack of technical understanding with regards to technical specifications provided by DEOs among the masons, bar benders, and other technicians in schools situation in rural settings. In some schools, innovativeness in construction has been seen. During the construction, spaces for books corner (by providing inner buttress) , visible red stitch band of brick to show earthquake friendly design in construction, well planned landscaping in 31 limited spaces, smooth edged stone masonry wall construction, installation of rain water harvesting system, use of cement concrete pillar in construction to avoid wood etc. School safety: Most of the schools visited were found unsafe as there are no restrictions to enter into the school premises. Due to this toilet doors, water faucet, classroom doors, windows are found broken, wall paintings inside the school are also observed. In some schools, there is no iron grill in windows resulting in burglary and damage of structure by external means. Though external school improvement is school safety falls under the jurisdiction of school and SMC, very little attention has been paid in this aspect. School Environment (Orientation, Water supply, sanitation, ventilation, solid waste management) Orientation: The orientation of school building is satisfactory some exceptions. Water supply: The amount allocated for water supply improvement is inadequate. Majority of schools don’t have water supply systems. Even in schools with water supply system are not properly functioning. Water quality is not satisfactory. Sanitation: Litters were found scattered in most of the schools visited. Except few schools, sanitation measures were found sub standard. It is due to scarcity of water and habits of students. In addition, the number of toilets proposed in EFA is grossly neglected. Drainage: Majority of schools don’t have proper drainage system. Solid waste management: 80% of the school visited doesn’t have any kind of solid waste management system. Dust: Due to barren land, lack of vegetation, school grounds are dusty and prone to dust pollution Noise: The schools visited have CGI sheet roof. This is unsuitable from climatic considerations. The SMC and school teacher, student informed that during summer season, classroom with CGI roof would be extremely hot and making teaching-learning uncomfortable and even torturous for students. During rainy season CGI roof creates noise making teaching-learning impossible. Noise related problem is also observed in two adjacent classes, due to thin non acoustic nature of walls. Electricity as a backup energy: Majority of schools don’t have electric supply. School sites: Few schools are in landslide prone areas and by the bank of River, and in ridge. Fencing and external environment: Note satisfactory in majority of schools. Monitoring Mechanism The DEO does monitoring of school construction activities in 43 districts. In remaining 32 districts, the DOE has signed an agreement with INGOs/NGOs . During the field visit, it was observed that both the mechanism have pros and cons. 32 In direct DEO monitoring system, there are no incentives to school inspector so they are not motivated to go for monitoring of school construction activities. In majority of hilly and mountainous region, schools are sparse and the number of personnel, logistics required is found to be inadequate. The monitoring through NGO/INGO is functioning satisfactorily. It was observed in some schools they are in impression that this kind of monitoring is not related to DEO. There is no regular coordination meeting and interaction among NGO/INGO monitoring team and DEO. Suggestions and Recommendations: 1. The school shall be designed to be relatively more comfortable in all seasons. 2. The selection of environmentally friendly and cost effective technology should be gradually introduced by DOE. 3. The use of timber in Terai should be restricted and its use in hilly and mountainous areas should be limited to frame of doors and windows. In hills and mountains also this should be gradually phased out. 4. Encouragement of use of local materials has to be tied with quality and monitoring system. 5. The school construction monitoring should be regularize and frequent. 6. The DEO should arrange incentives for their school inspectors in order make the monitoring effective. 33 Annex 5 - Suggestions from Experts 1. The lessons learned from EFA in implementation of NEGSIFMN should be reviewed (what worked during EFA and What didn’t work should be mentioned) 2. The implementation modality, and roles and responsibilities of DOE, DEO, SMC, NGO, and community should be clearly spelled out. 3. The innovativeness and environmentally friendly technology should be gradually introduced in school construction. 4. The environmental requirements in SSRP should be clearly spelled out including the type of environmental screening (if required) 5. The R&D in climate responsive building construction has to be an integral part of SSRP. 6. The linkages with other organizations working in similar field should be established. 7. At district level DEO should work in collaboration with other line agencies like (DWSSO, DOUDBC, etc) 8. The partnership approach with INGO/ NGOs, CBOs should be continued. 9. The capacity building measures for the implementation of EMF in SSRP at different agencies responsible for SSRP implementation should be assessed. 10. The DOE has suggested to tie EMF of SSRP with field reality and in consistent with the improvements in the existing practices and it has to be implemented based on “ground reality�. Non achievable and very ambitious thing should not be included in the EMF. 34 Annex 6 - Government’s Effort towards School Physical Facilities Development through various programs (update up to 2007/2008) S. No. Programs New Rehabilitation Toilet & Maintenance Classroom of Classrooms Water Training Supply 1 SERDP (1981) 941 1,170 2 PEP (1985-1990) 951 1,047 3 EAARRP (1988- 15,578 0 0 0 1996) 4 PEDP ( 1990) 2,392 0 0 0 5 BPEP – I (1993- 11,154 7,122 191 4,854 1998) 6 BPEP – II (1999- 5,392 10,794 5,093 4,860 2004) 7 EFA (2004 – 2009) 18,000 5,810 3,495 0 8 JICA (1994 – 2006) 8,028 0 1,747 0 9 Others 4,284 2,217 0 0 Total 66,720 28,160 10,526 9,714 35 Annex 7 – DOE Policy A. DOE Policy for Improvement of School Physical Facilities (Classrooms, Toilet & WS)  Decentralization (Construction through Community) o Need Identification through community o Program implementation through Community o Ensuring ownership & thereby ensuring sustainability of the created facilities  Collaboration with I/INGOs – (Out of 75 Districts – 32 Districts – SCNN- 20, Plan International-6, Room to Read – 3, SCUS-2, SCJ-1) o Harmonization o Quality Supervision o Involvement of Social Mobilization o Better Transparency (Public Audit) o Effective in awareness Raising 36 B. DOE Policy on Design & Construction of School Building  Structural Safety of buildings o Design and construction as per National Building Code o Safe against Earthquake and strong storms o Construction supervision by qualified Engineers/Sub-Engineers.  Child-friendly design & construction o Classrooms (0.75 sqm per children, T:50, H:45, M:35 students per classroom) o Furniture (Floor seating for grade 1 and 2) o Water supply facilities o Separate toilets for girls & boys  Environment-friendly design & construction o Enforcement of National Environmental Guidelines for School Improvement and Facility Management in Nepal  Inclusive design & construction for disables o Ramp construction for wheel chair movement o One bigger door in every classroom & toilet for wheel chair movement  Community contribution in facility development o Creates ownership feeling o Ensure sustainability of the created facilities o Ensure regular repair & maintenance 37 Annex 8 - Environmental Screening Checklist Medium/Area Screening Question Yes No Possible (-ve) Impact Slope Stability  Are there any landslides or other forms of mass instability on the slopes?  Is there erosion or gully development? Spoil Disposal  Can spoil be reduced?  Is spoil being tipped away from designated areas?  Is spoil falling or being washed on to farmland? Water  Are slope drainage designs adequate? Management  Are drainage outfalls unprotected against scour and erosions?  Is there any disruption of drinking or irrigation water supplies? Land Use  Has there been any loss of land for which landowner should be compensated? Plants and  Are large numbers of trees being wildlife removed?  Is any form of wildlife being disturbed? Stone crushing  Is the project operating stone crushing? and? Hazardous  Is there project using any type of Materials hazardous material (e.g. bitumen, cement paint, explosive fuels, lubricants etc)  Laboratory chemicals Dust  Is dust generated from construction works or by construction traffic? Renovation Will construction, renovation work disturb other academic activities? Noise Are there increased traffic noise from construction and transportation of vehicles and machinery? Water supply Will it temporarily stop water supply and and sanitation sanitation system? Ecosystem Will the renovation work have any indirect impact on environment and ecosystem? Surface water Does construction of pit latrines, septic tanks and soak ways could cause seepage of contaminated water into aquifers Ground water Is there any pollution of Ground water from improper practice by SSRP school 38 construction activities? Laboratory  Are there pollution from laboratory Applicable to safety and waste disposal schools with hazardous waste  Injuries from poor chemical recipient of handling laboratory support under SSRP Health and  Are there any issues related to Safety health and safety issues? Social Issues  Does construction involve local people, skills and material?  Does contractor have grievance addressing mechanism?  Does project built up rapport with local people and community?  Are there conflicts between project and the local people? Use of  Does construction material construction (prescribed) have lowest materials environmental impact? Material  Use of locally available suitable specification material, practices of reduce reuse, recycle of materials during construction. 39 Annex 9 - The Design Guideline for School Buildings Construction from Environmental Perspective 6.1 Background The technical-fix for achieving a healthy environmental solution depends on different variables. This chapter proposes the practically achievable options through the understanding of different combinations of those variables. A host of interrelated considerations-from site design to transportation issues-factor into the creation of a "high-performance" environmentally friendly school. To effectively integrate environmentally friendly strategies, these options must be evaluated together from a whole school building perspective early in the design process. To do this, school will required to form a team of players from the community and school to work in collaboration with design team. The school design team must have expertise in integrating energy and environmental considerations into school design. Inputs from all stakeholders factor into good functional design to ensure the environmentally friendly construction of school. The following list provides basic information about some key elements to consider when designing a high performance environmentally friendly school building. District education office and Department of Education include these elements in their Request for Qualifications (RFQ) or Request for Proposals (RFP) for design professionals. Once a design team is selected, comprehensive design guidelines available through Department of Education can provide the team with detailed information on the following strategies. 6.2 Commitment and Motivation There is no doubt that the single most important factor in achieving environmentally friendly school is the presence of committed and informed people. The emphasis should be given on the commitment. People are often well aware of the health risks and the theories of contamination but do not act on that knowledge. There is no simple formula for making people committed. However, recognizing and valuing people’s effort, and ensuring that there is sufficient scope for their own decision-making and creativity can go a long way towards encouraging sustained commitment. This point is particularly important since, it argues against standard designs. The success of efforts in promoting environmentally friendly school relies on the awareness and commitment of the community to want such a program and to ensure that it is maintained within the community. The collective recognition and understanding of the problem by families and community members can help to bring about support and action for ongoing efforts to influence behaviors and conditions that will improve the environmental situation in school 40 Community commitment is strengthened/marked by  Acknowledgement of the importance of the problem from education, environment and other groups  Allocating local resources, e.g. public money for incorporating environmentally friendly products in schools  Combining the program with other programs in the community, such as primary health care and sanitary environment  Ongoing efforts to attract media attention  Involving existing councils, school committee, organizations such as women's group, NGO, Eco clubs etc  Use of both problem solving as well as environment promoting approaches to improve school environment 6.2.1 Supportive school policies/practices: Development of supportive school policies and practices related to environmental improvement is improvement to make a program sustainable. For example; regulations for improving and maintaining adequate sanitary facilities and a safe water supply at school are essential. Also, collaboration and coordination between the education and environment sectors, and between the school and the community are important requirements for success. Examples of supportive policies and regulations  Required periodic coordination between environment and education authorities at local, district, and national levels  Rules about cleanliness for students and personnel, and about the proper use of latrines and water supply facilities  Rules about keeping the school environment clean Examples of supportive practices in schools  School curriculum includes environment/environment preservation  Proper use of hygienic toilets/latrines  Regular cleaning of toilets/latrines  Existence and use of proper hand washing facilities  Safe food and water  Formation of eco clubs, environmental awareness campaigns in schools  Teacher's training on environment related subjects  School/community projects and outreach 6.3 School Building Siting 6.3.1 Orientation: School building orientation is very important as it determines magnitude, natural heating, and lighting available inside the building. Orientations are based on the climate type of the 41 place where school facilities are planned. In Nepal three geo-zones are available viz: Terai, Mountain, and Hill. The orientation of school building in each of the above type is described below. Terai Region Arrange the school buildings in such a way that the prevailing winds can be used in cooling rooms. The school buildings should be oriented facing between West to North. In case, the building can’t be avoided facing East, West or South, evergreen trees have to be planted to prevent direct sunlight entering the building. Orientation criteria sometimes are influenced by the change in the school timing. For instance, during the summer in some parts of the Terai, there is a practice of conducting the classes early in the morning (6.30 hrs to 10.30 hrs with no break); in such a particular case North or North-East facing causes direct glare in the class rooms; other side of the coin is that in such a case and when the site does not permit the ideal orientation, orientating the classrooms towards West- West-South supported by other measures may be permitted. Mountain Region In the mountain region, making use of sun to heat the rooms is a good design concept. Therefore, building orientation should be between East and West. One-way to blocking the seeping winter wind is to plant trees in the direction of the prevailing wind. Hill Area It is advisable to provide deciduous trees and at the same time allow winter sun to heat up the buildings. Understanding the location and the surroundings including the contour is very important for developing the Master Plan. A building that looks good and fits well at one site may not necessarily 42 look good at another site. Poor site selection for school buildings can lead to high costs on account of earth retaining structures. A careful study of the terrain can easily help to reduce this as shown in the illustration and table. For any given location, a site that results in the mi nimum cut height “h� should be selected. 6.2.2 Site Selection and Planning: Both, site selection and site planning have a major input on the relative "greening" of any school facility being planned. Site selection for school includes such issues as transportation and travel distances for students, impacts on wildlife corridors, and impact on the hydrology. Decisions that school make during the site planning will impact the immediate natural community as well as the school building, energy consumption and student comfort. Good site planning minimizes site clearing; preservation of existing vegetation may provide a low maintenance landscape and avoids supplemental irrigation. Mature stands of native vegetation in school compound often provide the desired energy conserving shade and wind control that would otherwise required years to develop for expensive new plantings. Thoughtful placement of a school building on a site promotes energy conservation by taking advantage of natural site features such as topography, sunlight, shade and breezes. While selecting the site or laying the school building, it is very important to note of features like religious objects, protected forests, river, stream, landslides etc. within and around the site. These are additional factors that need attention apart from other factors. It goes without saying that school building should protect its occupants from rain, wind, sun and snow. But it need only offer, as much protection is necessary. A classroom of a standard requirement in mountain regions may be quite unnecessary and inappropriate in a tarsi region. Schools should be designed to prevent extremes of temperatures inside classrooms. 6.2.3 Approximation for earth cutting and retaining wall The Site Development Requirements form the Perspective of Earth Cutting, Filling, and Retaining Wall Structures: Schools in mountain and hill region of Nepal fall on slopes. Poor site selection for school buildings can lead high cost on account of earth retaining structures. A careful study of terrain can easily help to reduce this as illustrated in the table. For any given location, a site that results in the minimum cut height “h’ should be selected. Small Multipurpose Large hall Multipurpose hall Angle B H SL B H SL 5 19.7 1.72 19.78 24.3 2.13 24.39 10 19.7 3.47 19.97 24.3 4.28 24.63 15 19.7 5.26 20.32 24.3 6.49 25.07 20 19.7 7.17 20.97 24.3 8.85 25.86 43 25 19.7 9.18 21.72 24.3 11.32 26.79 30 19.7 11.37 22.73 24.3 14.02 28.04 Large multipurpose hall B H SL Academic buildings 24.3 2.13 24.39 Angle B H SL 24.3 4.28 24.63 5 11.7 1.02 11.74 24.3 6.49 25.07 10 11.7 2.06 11.86 24.3 8.85 25.86 15 11.7 3.12 12.07 24.3 11.32 26.79 20 11.7 4.26 12.45 24.3 14.02 28.04 25 11.7 5.45 12.90 30 11.7 6.75 13.50 This table will help to guide during the site selection and site development. The following illustrations show some of the real site situations. The Master Pan may not show the full details of earth cut and fill and wall construction. The site engineers can refer to these illustrations to find optimal solutions. Site situations and earth cutting 44 Here the ground is at 50 slopes and it is cut to fit the building. As such, no retaining wall is required if the cut surface is riveted with vegetation. In this case, the building is placed with minimum disturbance to the ground. This is possible if the slope of the ground is less than 50. However, some filling may be required to bring the rooms in one level. Between 100 and 150 slopes, massive retaining wall is not necessary. Study the topography of the site and go for low height retaining or gabion wall. If the ground is not loose or marshy, the heights of these walls can be of half the cut height. The upper half height can be manipulated as per the table given depending on the angle of repose. If a gabion wall is built, cover the top of the walls with good soil and plant greenery for beautification. For a grade between 150-200, the height of the retaining wall can be approximately 2/3 rd of the cut. However, as the ground becomes steeper to 200, this rule-of-thumb may not be applicable. In this case, follow the illustration given below. In such a situation, a split retention wall is used. When this type of wall is built, it should be ensured that the active resultant force of the upper retaining wall falls on middle third of the lower wall foundation. Here, the left half of the building falls on a steep slope as compared to right hand side half. In such a situation, one option can be the use of combined single and split retention wall or adopt the cut and fill 45 method on the left portion, and only cut method on the right. However, before making the decisions, economic advantages have to be considered. Here the ground is at 50 slopes and it is cut to fit the building. As such, no retaining wall is required if the cut surface is riveted with vegetation. In this case, the building is placed with minimum disturbance to the ground. This is possible if the slope of the ground is less than 50. However, some filling may be required to bring the rooms in one level. Between 100 and 150 slopes, massive retaining wall is not necessary. Study the topography of the site and go for low height retaining or gabion wall. If the ground is not loose or marshy, the heights of these walls can be of half the cut height. The upper half height can be manipulated as per the table given depending on the angle of repose. If a gabion wall is built, cover the top of the walls with good soil and plant greenery for beautification. For a grade between 150-200, the height of the retaining wall can be approximately 2/3 rd of the cut. However, as the ground becomes steeper to 200, this rule-of-thumb may not be applicable. In this case, follow the illustration given below. In such a situation, a split retention wall is used. When this type of wall is built, it should be ensured that the active resultant force of the upper retaining wall falls on middle third of the lower wall foundation. Here, the left half of the building falls on a steep slope as compared to right hand side half. In such a situation, one option can be the use of combined single and split retention wall or adopt the cut and fill method on the left portion, and only cut method on the right. However, before making the decisions, economic advantages have to be considered. Both site selection and site planning have a major input on the relative "greening" of any school facility being planned. Site selection for school includes such issues as transportation and travel distances for students, impacts on wildlife corridors, and impact on the hydrology. Decisions that school make during the site planning will impact the immediate natural community as well as the school building, energy consumption and student comfort. Good site planning minimizes site clearing; preservation of existing vegetation may provide a low maintenance landscape and avoids supplemental irrigation. Mature stands of native vegetation in school compound often provide the desired energy conserving shade and wind control that would otherwise required years to develop for expensive new plantings. Thoughtful placement of a school building on a site promotes energy conservation by taking advantage of natural site features such as topography, sunlight, shade and breezes. While selecting the site or laying the school building, it is very important to note of features like religious objects, protected forests, river, stream, landslides etc. within and around the site. These are additional factors that need attention apart from other factors. 46 6.3 Day Lighting and Windows Poor indoor lighting in classroom can have many harmful effects on health and well being of teachers and students. A poorly lit classroom can lead to eyesight problems. Poor lighting within the classroom can also make students feel more depressed. Generally, these problems can be remediate by adding windows to the classroom to increase the amount of natural light, however because of different climatic condition of Nepal, window selection should be based where facility is planned. Increasing natural light is also important for classroom cleanliness; if a classroom is dark, it is more difficult to see dust and dirt and thus more difficult to clean properly. Increased use of daylight helps to reduce electric lighting usage, and avoiding the heat generated by lighting fixtures. High performance windows with low e-glazing also help to minimize heat gain in warmer months and heat loss in colder. It was noted that in Terai of Nepal, people try to increase ventilation, which may result in a teacher standing against the glare from an open window. In mountain, because of cold, the tendency is to build small window resulting in dark classrooms. An alternative to large windows is the perforated screen wall. This is a solid masonry wall punctured by numerous closely spaced holes through which light can filter. If the wall is built of bricks the perforation effect can be achieved by simply leaving spaces between the bricks at regular intervals. If it is made of concrete (or earth-cement) blocks, special moulds can be used to produce blocks with decorative holes. Where masonry is not used for construction, or where there do exist large window openings, other kinds of screens can be created, for example using horizontal bamboos. A perforated window is an alternative to a window opening in A louvered window could provide glare- warm climates. It provides security and relatively even free light at the front of classroom distribution of light. The advantages of perforated screen wall are that it provides security and a relatively even distribution of light. The disadvantages are that it does not protect against wind, cold and dust, and classroom (particularly if large) can remain rather dark unless the internal walls are also light colored. Care must be taken to orient the building so that direct sunlight does not penetrate the screen wall, since this will almost certainly lead to glare. 47 In mountains, where small windows are necessary to reduce heat loss, it makes sense to maximize the light which light that can enter through a small opening. A roof light lets in considerably more light than a window of equal size in a wall. A provision of sky light in CGI roof is found in schools in mountain. This arrangement helps to bring more light into the center of the classroom, which is often poorly served by wall windows. However, care has to be taken to avoid direct sunlight falling onto desks. It is also important to make the best use of any light once it has entered the room. Untreated mud-and dung plaster on the walls, for instance will make a room relatively dark. The underside of a thatched roof will absorb lot of light. The level of light can be dramatically increased with a light colored ceiling and lime wash on the walls. These can also reduce glare by ensuring that light is reflected from all directions. In addition, adoption of matt-finished blackboard and regular repainting it can be relatively cheap way of mitigating the impact of poor lighting. 6.4 Renewable Energy Systems Use of solar and wind technologies with battery storage can provide emergency power supply, or a source of steady power. Renewable energy system in school can increase maintenance requirements, but they also reduce utility costs. Some schools located in hills of Nepal have no electricity. So for the lighting and other purposes like operation of basic science equipment, computer, it is very necessary to find alternative means of electricity. So renewable energy could become an important element for meeting school energy demand. In mountains of Nepal, majority of children don’t take shower because of unavailability of hot water. Even school with necessary infrastructure and other facilities lacks this facility. Introducing solar technologies for water heating purposes could solve this problem. 6.5 Ventilation Systems Adequate school ventilation is important. The poor ventilation in schools can lead to respiratory problems, and make tuberculosis and easier transmission of infectious diseases. Constructing schools with a sufficient number of windows may improve ventilation. Alternatively, schools can be constructed using bricks with holes drilled through them ("air- bricks"), which allow fresh air to circulate within the classroom. Using the whole-building approach, school designers can factor in energy saving choices that reduce heating and cooling loads. 6.6 School Sanitation The high incidence of disease, particularly among children is largely attributed to unsafe drinking water, poor personal hygiene practices and unsanitary environment. Each and every school should have adequate safe water supply system and sanitation facility. But majority of rural schools in Nepal neither have proper water supply nor sanitation system, particularly toilets. 6.6.1 General Criteria for Hygienic Facilities and Safe Water Supply in School: There are many methods that can be used to provide hygienic sanitation facilities and a safe water supply at school. 48 The principles and criteria involved in the selection of appropriate methods stipulate that those chosen should be:  Technically and environmentally sound  Financially affordable  Socially and culturally acceptable  Reliant on labor and resources available in the community  Simple to install, operate and maintain  Easily accessible by the students  Related to reducing public health problems that are perceived as priorities within the community 6.7 Drinking Water A "safe water supply" is a source of water that is not contaminated by dirt, bacteria, parasites, or anything else that could cause contamination. To promote school health an easily accessible water supply should be available that provides sufficient safe water to meet school needs. School water needs, can be estimated by questioning stakeholders of school about their daily water use. If this is not possible, minimum water need should be calculated. To ensure that the water is potable, either the water supply should be protected or the water should be treated before use. Often, unprotected water sources such as springs, traditional wells and ponds, can be improved and this may be preferable to constructing new supplies. However, unprotected sources are open to contamination and pose a potential health risk. School environmental health program should therefore promote the use of protected drinking water source. Some countries have set minimum standards for the supply of safe drinking water to pupils. For instance, in Viet Nam, every school is supposed to provide 0.33 liters of boiled water per pupil per day in summer and 0.1 liters in winter. Characteristics of low-risk water sources  The water source is fully enclosed or protected (capped) and no surface water can run directly into it.  People do not step into the water while collecting it.  Latrines are located as far away as possible (minimum 15 meters away) from the water source and preferably not on higher ground. If there are community concerns about this, expert advice should be sought  Solid waste pits, animal excreta and other pollution sources are located as far as possible from the water source.  There is no stagnant water within 5 meters of the water source  If wells are used, the collection buckets are kept clean and off the ground or a hand pump is used. The water source protection technique is mentioned in annex 2. 49 Checklist for schools considering water supply improvements  Have stakeholders of school been fully consulted about the type of water supply?  Have stakeholders of school had previous experiences with water supply improvements and have these been relayed to the relevant agency?  How will the water supply be managed to ensure that it is reasonably accessible to everyone in the school?  What are the long-term financial implications of the choice of water supply?  Can the school afford to pay expected operation and maintenance cost?  What spare parts are required and how often should they be replaces?  Who will be trained to operate and maintain the water supply?  Will the quality of the water be tested? Among the many types of water sources schools in Nepal are found using the sources like protected springs, dug wells, boreholes, and piped water supply. 6.7.1 The Available Types of Water Sources in Nepalese Schools 6.7.1.1 Protected Springs: A spring is where underground water flows to the surface. Springs may occur when the water table meets the ground surface, these are called gravity springs. In some cases, ground water is held under pressure and spring come to the surface because of a natural break in the rock, or because a shallow excavation is made. Springs can make very good water supplies provided they are properly protected against contamination. If springs are found above the school, they can feed a pipe system for providing water close to school. When a spring is at the same or lower level than the school, it can still be protected, but greater care is needed and it is unlikely that water will flow through the pipe system by gravity. The first step in deciding whether a spring should be protected is to determine whether it provides enough water for expected number of students. Measuring the time it takes for the spring to fill a bucket of known volume easily does this. 6.7.1.2 Dug wells: Dug wells are usually shallow wells dug by hand, although some may be quite deep, and they are often lined with bricks. However, unless artesian water is tapped, many dug wells go dry or have every little water in dry periods because it is difficult to sink wells below the water table without using more sophisticated techniques. 6.7.1.3 Boreholes: Boreholes are narrow holes drilled into the ground that tap into groundwater. Generally as the borehole is drilled, a lining of plastic, steel or iron is sunk to protect the hole from collapse. The lining has slots in the bottom of section to allow entering the borehole and gravel is placed around the bottom of lining to improve flow and provide filtration. The top few meters around the borehole should be sealed using concrete, and a concrete apron is cast around the top of the borehole to prevent surface water from flowing into the lined shaft. A stand is usually cast into the apron to provide a stable base for the pump. Once the borehole is completed it should be cleaned with chlorine and the pump installed. Majority of schools in hill and tarsi of Nepal are using boreholes with handpumps. Boreholes usually provide good quality water, but the water sometimes contains harmful chemicals, such as fluoride and arsenic, or nuisance chemicals such as iron, etc. The school should 50 carry out chemical analysis of water in a regular interval as discussed under the monitoring protocol of this guideline. 6.7.1.4 Piped water supply: Many schools in Nepal have piped water systems. These piped water systems are often small and rely on community management. Most piped water supplies include storage tanks so that water is always available, even when demand is heaviest. Such tanks are usually necessary because the rate of water use at peak times of the day in school is greater than the average rate of use throughout the day. The tanks also provide emergency storage in the event of a breakdown. Piped system in a school requires regular maintenance. Pipe leaks likely to be used heavily by student. As a result, the taps are more likely to break and will need frequent replacement. One-way of dealing with these issues is to give someone in the school responsibility for school taps and making repairs. To prevent the accumulation of stagnant water around school taps, school could build a concrete “apron� at the base of taps and include a drain and soakage pit. Another problem with piped systems is that students do not consider the impact of how much water they use, and may not think it is important to turn off the tap after use. When there is a lot of water, this may not have negative consequences. However, where the amount of water available is limited, there will be shortage of water. Schools with piped water systems should thus be aware of these impacts of their water use and good water use should be promoted. need to be repaired rapidly to prevent water loss, and to prevent surface water from entering the pipes and contaminating the supply. Also taps are 6.8 Rainwater harvesting scheme in schools Although rainwater can be a good source of water for drinking and other purposes in school, it may be seasonal, and it is often difficult for a school to rely on rainwater alone. This technology could be used in conjunction with other available sources of water. Schools for their own use could collect rainwater. If the rainwater is to be used for drinking purpose it is better to collect it from a roof, rather than from a ground catchments where it may become contaminated. Ground catchments are more appropriate for use in garden and watering of grounds. Using roofs to collect rainwater is relatively easy and a lot of water can be collected. For example; 50 mm of rainfall on a 4-m2 roof yields 200 liters of water. All that is required are gutters around the roof that discharge into a collection tank. The roofing material is important and hard surfaces, such as iron sheets or tiles. Hard surfaces are also easier to keep clean and are less likely to have insects and animals living in them. Any roof used to collect rainwater for human consumption must be thoroughly cleaned at the start of the rainy period. Birds and animals may leave faeces on the roof and these can be a source of pathogens. There should be a system for diverting the flow of water in gutters away from the tank, so that the first rain (which are more likely to pick up contamination from the roof) are not collected. A small filter may be added to the top of the collection tank as an added protection. The tank should also be cleaned every year and any silt or algal matter removed. After cleaning and before use, the tank should be scrubbed using a chlorine solution (bleach). Water should be drawn from a tap at the base of the tank, rather than with a bucket, which may contaminate the water. It is better not to bury the collection tank, even partially, since contaminated 51 water from the soil can enter the tank. Covering the tank is also essential for preventing contamination of the water and for reducing opportunities for disease vectors to breed. Protection of above mentioned water sources that could be used in a school in Nepal is a matter of discussion in this guideline. The protection measures for different water sources are highlighted in 6.9 School Water Treatment and Safe Handling of Water The best option for improving the school water quality is to treat water in the school by filtering, chlorinating, boiling or leaving the water to settle. Individual school could select the options as appropriate. These options are discussed in more detail in following sections. 6.9.1 Boiling: Bringing water to a rolling boil (20 minutes) will destroy pathogens in the water and make it safe to drink. 6.9.2 Candle filters: Candle filters are hollow, porous ceramic cartridges, commonly found used in schools of Nepal. Although they do not filter out all pathogens, they remove the larger ones such as protozoa, worms, and bacteria (but not viruses). Ceramic candles need careful maintenance and should be cleaned and boiled at least once a week, even if they are not clogged. If a candle filter becomes clogged, it should be scrubbed under running water with a stiff brush free of soap. To reduce the risk that water will pass through a candle without being filtered, such as through small crack, candle filters should be regularly inspected and replaced if necessary. 6.9.3 Chlorination: This will kill most bacteria and some viruses. Since that taste of chlorine disappears when water is left in open containers, very small lump of bleaching powder can be added to a 20-liter water container and the mix left to stand for at least 30 minutes. After this time, if a faint smell of chlorine can be detected in the water, it should be low –risk and palatable to drink. Chlorine should only be added to clear water otherwise the dirt in the water would absorb it. Other disinfections systems that have been developed for treating water, particularly through the use of solar radiation. This technology is commonly known as “SODIS� in Nepal. This is effective in treating water, although this may take longer than chlorine disinfections. Frequently water collected from a communal point and transported back to school for use becomes contaminated because of poor handling. Stakeholders of school should therefore be aware of the risks of contaminating the water and how it can be prevented. 6.10 Water Conservagtion: Although it is important that students use enough water for good hygiene, in areas where water is scarce it is also important not to waste water. As mentioned above, piped water supplies are particularly vulnerable to wastage, if they are not properly managed, the surrounding community of school may suffer water shortages. Most piped water systems leak and need to be checked regularly and repaired as soon as faults are discovered. Taps should be turned off immediately after use and students discouraged from playing with taps. Key Points  Functional water pints providing adequate supplies of safe water are rarely found in schools  Hand washing facilities are very rarely observed in schools 52  Although environment and hygiene education forms part of curricula in Nepal, teachers have usually not received adequate training in those areas  Other environmental issues weigh heavily on the school community, disposal of solid waste and repairs to school buildings, inadequate infrastructures to support basic environmental practices. The methods of protecting different water sources used in schools are shown in annex 2 6.11 Sanitation Facilities: Safe disposal of excreta, so that it doesn't contaminate the environment, water, food, or hands is essential for ensuring a healthy school environment and for protecting personal health. This can be accomplished in many ways, some requiring water, others requiring little or none. Regardless of method, the safe disposal of human faeces in school is one of the principal ways of breaking the faecal-oral disease transmission cycle. Sanitation is therefore a critical barrier to disease transmission. One reason why latrines are often out of order in Nepalese schools is that they are frequently inappropriately designed for use by children to use. Latrines in Nepalese schools vary in design from communal three to six hole latrines served in schools in Sindhupalchowk, to simple pit latrines. The number of latrines available/observed in schools during the field visit was without exception insufficient to meet the needs of students, particularly at time of peak usage such as break. The situation contrasts with the standards generally accepted within the health, environment and education sectors, which are shown in box discussed below. The provision of one latrine for approximately thirty pupils is generally recommended, if urinals are also available. This represents one latrine for every twenty girls and one for every forty boys. When planning the number of latrines for a school, certain issues should be considered:  Are separate urinals available for boys? If so, fewer latrines will be needed.  What is the proportion of boys to girls? If urinals are available, boys need fewer latrines.  Are children allowed to leave the classroom during classes to use the latrine? If not, the pressure on latrines at break/recreational time will great and more latrines will be required.  Do all children have breaks from classes at the same time? If so more latrines will be required. Could breaks be staggered? 6.12 Drainage: The planning and implementation of proper drainage system is very important. The following guidelines must be considered for drainage designing and in its construction.  The design should be as simple s possible considering for future development  Generally, if the drains are not wider than 150X 150 mm, it can be left open but any drain bigger than 150 mm should be covered.  Drains carrying off surface water can be open or covered  In both the cases, silt traps at appropriate distances should be provided. However, if there is sudden level difference created by walls or land profiles, two silt traps may be required  General rule of thumb is to provide silt traps at every 20 meters intervals for easy cleaning.  All drainage should be self-cleaning and should function at minimum running maintenance costs.  The main collection drain should always be covered or laid under ground.  Normal roof drains are 150X100 mm at 5% slope. The slope and depth will increase as the roof drain reaches the outlet of the collecting drain. 53  Minimum size recommended for the collecting drain is 300 X250 mm and should be covered with concrete slab with perforation to take in surface runoff waters  The depth of the collecting drain will depend on the local and distance from the sub-drains, such as roof drain, retaining wall drains, etc.  While collecting and discharging surface waters, it should not cause public nuisance or pose danger to health and property.  Beside the roof drains, it is an advantage and desirous to construct surface water drains around the school buildings, playgrounds, open spaces etc to prevent flooding during the monsoon.  It is not advisable to seal off the manhole and inspection chamber with concrete completely if intermediate ventilation is not provided. This will cause cracks of pipes, disintegration of joints etc  Any drain provided around or within the courtyard must be concealed. 6.13 Technologies for excreta disposal in school The off set latrine system is economic, easy in design, could be constructed with local available materials and easy to built and maintain for schools. Though the choice of technology to be adopted for toilet purely depends on the water availability, budget, soil type etc. This particular type is found very useful to recommend as standard design in Nepal. This latrine do not require periodic emptying, once a pit is full it is sealed and a new pit is dug. The feacal matter is left to decompose in dry conditions for at least two years, the contents can be safely and the pit reused. These latrines could also be designed to allow faecal matter to compost and be reused in agriculture. Other designs that could be incorporated are two alternating pits, reducing the need for new pits. As shown in design, ventilation is installed to remove odor and flies, basic and locally available materials could be used. Mostly the toilets constructed in Nepal were problem of chocking; students throw carelessly all the solid waste (paper, plastics etc) in toilet resulting in blocking the trap. As per the standard, the number of toilet required for each school will be calculated, and the toilet is proposed in series as shown above. The urinals could be built to reduce the number of toilets required emptied manually One main reason for poor maintenance of the school toilets was due to separate toilets for staff and student usages. These arrangements create less emphasis and inadequate monitoring of student's toilet. This was observed even in one of those schools where there was plenty of water available for maintaining the toilet. It is suggested that in order to improve the sanitary condition of toilet, and to gain students confidence towards cleanliness, all the stakeholders of school should share toilets. 54 For a school latrine to function properly it must be maintained and cleaned on a daily basis. Somebody must have specific responsibility for this and compliance must be checked. Groups of school children might do the cleaning in rotation. 55 Annex 10 - Laboratory Checklist from Environmental Perspective S. No. Screening Question Yes No Remarks 1. Will the research academic work be laboratory based? [ If the answer of question 1 is No, then go to question 4] 2. Does the laboratory have i environment, health and safety protocol or guidelines? ii adequate fire safety provision? iii safety provision for gas cylinder handling? iv proper waste disposal facilities? v adequate liquid waste management facilities? vi proper storage facilities for hazardous chemicals, pesticides etc? vii adequate ventilation system? viii first-aid facilities? ix emergency exit facilities? x trained professional to guide the researchers/students about safety procedures? 3. Will the laboratory based research work i produce hazardous waste materials? ii generate infectious waste? iii cause significant emissions of gas harmful to ions of gas harmful to health? iv generate liquid waste? v cause any major noise? 56 S. No. Screening Question Yes No Remarks 4. Will the research work require interventions at field level? 5. Will the field based research work i located at or near an environmentally sensitive area? ii discharge any liquid waste in the environment? iii discharge large quantities of waste/used water? iv generate hazardous waste? v Impair downstream water quality? vi have any possible degradation in land and ecosystem? vii cause local air pollution from any plants/system operation? viii generate excessive noise and/or dust? 6. Will medical, biophysical or clinical research be conducted using human subjects? 7. Will the project have any indirect impact on environment and ecosystem? 8. Will the research work involve permission or clearance of any government department or agency? 9. Will future expansion or implementation of research finding cause any major environment problem? 57 Annex 11 - Land Acquisition and Resettlement Based on the findings of the Social Assessment Team’ review of the EFA, Resettlement and or land acquisition problems are not anticipated in SSRP. However, there is always risk of exploitation and marginalization of Dalits, Women, marginalized and endangered Janjatis 1 and other vulnerable groups by dominant groups. Nepalese society remains semi-feudal in character and the caste hierarchy, though officially illegal, remains very much in play in the rural areas. In order to ensure that the Dalits, Women, marginalized and endangered Janjatis and other vulnerable groups are not further marginalized in the course of development, it is recommended that the following approach be incorporated into the procedures for financing new classrooms or other school infrastructure of schools established during the SSRP period. Rules of taking possession of land Experience of implementing EFA reveals that Resettlement and or land acquisition problems are not anticipated in SSRP. The DoE will not do any involuntary land acquisition. All donations and purchases will be voluntary. DoE will not only ensure that any land donations are fully voluntary, but also that such donations do not involve physical displacement or any significant adverse impacts upon incomes of the donor household. All voluntary land transactions will meet the following criteria: (i) The land in question will be free of squatters, encroachers or other claims. (ii) Verification of the Voluntary nature of land donations in each case through formal public hearing. (iii) Land transfer will be completed through registration, with land title vested in the School; and (iv) Leasing of land or rights of use of land for schools will be duly documented. (v) Program Implementation Guidelines will include the principles of land acquisition described in this document. (vi) For any government building to be constructed under SSRP the land will be purchased from the open market. The DoE already has established practices in this regard and will follow the procedures while acquisition of land. Procedure for school Land Revenue office is responsible for land administration and registration of all types land in Nepal. The Survey Offices prepare land record through cadastral mapping. Major three types of land ownership are in practice i) registered private land, ii) registered public land and iii) un- registered (but cadastral mapped) government land (Ailani). Normally the community approach to the land owner for contribution of land to the school. In this case either individual donate land free of cost or can ask for payment. To arrange the cash requirement there is practice that community people contribute cash to the school and school will make payment against the land take. These procedures are normally completed following willing sell or willing buy procedure of land administration. 1 As per NEFIn classification. 58 DEO will arrange for a public hearing when the schools established during the period of SSRP seeks grants for construction as per Rule XXXX. This public hearing shall verify the information provided in the land assessment data sheet. Minutes of the meeting will be made available at DEO office. If grievances/claims raised during public meeting are not settled during the public hearing the funds will not be granted to the school. All land transactions will be subject to registration (as per market transactions) under the ownership of the School that is involved in the project and will be done only after ensuring that new school infrastructure or additional classroom construction will indeed be built in that particular piece of land. A grievance redress mechanism will be in place to hear complaints regarding land acquisition. and SMC are using the Ailani land for the establishment of the school. Such types of land are used by the schools with the communities or local body consent. In case of land requirement from the individual or group of people, school Sample Formats Land Acquisition assessment data sheet (to be used to record all land acquired for the schools) a) Location map 59 b) Land/ assets acquired Plot Area, Area, Description Date of Previous owner Name Method of acquisition Previous use (choose No. local Sq.Ft of assets in acquisition (choose one of the of the (choose one of the one of the following: unit equivalent the land, if (year, following: owner† following: donation, barren land, farm any month, Individual/ sell- land, squatter, day) Government/ purchase/lease/rights describe in case of Public) of use other uses) c) Documentary proofs of land ownership or rights of use. (Notarized or witnessed statements) † Provide name of the office in case of the government and name of the VDC in case of the public land. References 1. Green Schools to Promote 'Education for All' in Nepal, Sonam Wangchuk, MS Nepal, 2009 2. Manual of School Building Construction In Hilly and Terai Region, Department of Education/Nepal, 2008 3. Design of RCC School Building (Four room Two and Three Storied) at Urban Areas, Department of Education/Nepal, 2008 4. Environmental & Social Management Framework (ESMF) Rural Access Improvement and Decentralization Project (RAIDP), Nepal, 2004 5. Program Implementation Document, Ministry of Education, Nepal, 2008 6. National Environmental Guidelines for School Improvement & Facility Management in Nepal, Department of Education, Nepal, 2004 7. Core Document, School Sector Reform, Ministry of Education, Government of Nepal, 2008 8. Environmental Management Framework, Higher Education Quality Enhancement Project, Bangladesh 9. Environmental Protection Act 1996, Environmental Protection Regulation 1997 10. Forest Act, 1992 11. GoN, Tenth Plan, NPC 61