PROCUREMENT PLAN General 1. Project Information a. Country: Federal Republic of Somalia b. Project Name: Somalia Crisis Recovery Project c. Project Number: P173315 d. Total Finance: USD 137.5 Million 2. Project Implementation Agency: Ministry of Finance, FGS 3. Date of Project Plan: July 2020 4. Period Covered by this Procurement: July-2020 I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Document: The Bank’s standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified into Procurement Plan tables in STEP III. National Procurement Arrangements: Not applicable IV. Prequalification: Not applicable V. Leased Assets: Not Applicable VI. Procurement of Second hand Goods: Not Applicable VII. Domestic Preference: Not Applicable 1 VIII. Hands on Expanded Implementation Support (HEIS): Not Applicable IX. Other Relevant Procurement Information: Not Applicable X. Thresholds for Procurement Approaches and Method (US$ millions) Procurement Methods (US$ millions)–Goods, Works, and Non- Consulting Services Category Open Open Request for International National Quotation (RfQ) Works ≥ 5.0 <5.0 ≤ 0.2 Goods, IT, and non- ≥ 0.5 <0.5 ≤ 0.1 consulting services Thresholds for Procurement Approaches and Methods (US$, millions) – Consulting Services Category Short List of National Consultants Consulting Engineering and Services Construction Supervision Consultants (Firms) ≤ 0.1 ≤ 0.2 Individual Consultants n.a. n.a. 2 Consulting Services Re Contract Estimated Review Market Selecti Shortli Expected Expected f Description Cost (US$) by Bank Approach on sting Date of Date of No (Prior/Po (Open- Metho (Yes/N Bid Contract . st) National/ d o) Proposal Signatur Limited (QCBS Opening e etc.) , LCBCS , QBS, DS Social Development 70,200.00 July 16, C1 Prior Limited INDV N/A July 11, 2020 Specialist 2020 Agreement for Delivery of Outputs: Provision of Desert Locust Control, Emergency Support to 10,000,000. Direct Un July 16, C2 affected 00 Prior N/A July 9, 2020 Contracting Agency 2020 communities, and Re- establish the Desert Locust Surveillance and Control System. 10,070,20 Total 0.00 3 4 PROCUREMENT Somalia : Somalia Crisis Recovery Project PLAN General Information Country: Somalia Bank’s Approval Date of the Original Procurement Plan: 2020-07-09 2021-06-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173315 GPN Date: Project Name: Somalia Crisis Recovery Project Loan / Credit No: IDA / D6300 Federal Government of Somalia Ministry of Finance Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SO-MOF-188762-CW-RFB / Rehabilitation and Pending Component 2: Medium- Single Stage - One 2021-12- Reconstruction in Open River IDA / D6300 Post Request for Bids Open - International 2,400,000.00 0.00 Implementat 2021-02-28 2021-03-05 2021-04-16 2021-05-16 2021-06-20 Term Flood Recovery Envelope 17 Breakages along Jubba and ion Shabelle basin SO-MOF-188768-CW-RFB / Pending Rehabilitation of flood relief Component 2: Medium- Single Stage - One 2021-12- IDA / D6300 Post Request for Bids Open - International 1,600,000.00 0.00 Implementat 2021-02-28 2021-03-05 2021-04-16 2021-05-16 2021-06-20 canals of shabelle and Jubba Term Flood Recovery Envelope 17 ion Rivers SO-MOF-228020-CW-RFQ / Rehabilitation of River Under Component 2: Medium- Request for Single Stage - One 2021-12- Embankments (7 Sites) in IDA / D6300 Prior Limited 187,198.00 0.00 Implementat 2021-04-14 2021-05-10 2021-06-09 Term Flood Recovery Quotations Envelope 06 Beledweyn District – Somalia ion (Lot-1) SO-MOF-228024-CW-RFQ / REHABILITATION OF Under BELEDWEYNE/BUNDOWEY Component 2: Medium- Request for Single Stage - One 2021-12- IDA / D6300 Prior Limited 177,105.00 0.00 Implementat 2021-04-14 2021-04-26 2021-06-09 N/KAWANKA/BUULADA RIVER Term Flood Recovery Quotations Envelope 06 ion EMBANKMENT IN BELEDWEYN DISTRICT – SOMALIA (Lot-2) SO-MOF-228026-CW-RFQ / REHABILITATION OF Under BELEDWEYNE/XAWO Component 2: Medium- Request for Single Stage - One 2021-12- IDA / D6300 Prior Limited 109,262.00 0.00 Implementat 2021-04-14 2021-04-29 2021-06-09 TAKO/HORSEED RIVER Term Flood Recovery Quotations Envelope 06 ion EMBANKMENT IN BELEDWEYN DISTRICT – SOMALIA (Lot-3) SO-MOF-229815-CW-RFQ / BATCH-2 (Beledwyne): Request for REHABILITATION BELEDWEYN/ Quotations - Small Under BULO-KAHIN B-1 (RIGHT) AND Component 2: Medium- Request for Single Stage - One 2021-12- IDA / D6300 Prior Limited Works 188,059.52 0.00 Implementat 2021-05-05 2021-05-17 2021-06-30 BALADWEYN/BULO-KAHIN A- Term Flood Recovery Quotations Envelope 27 (Emergency) SPD - ion 1 (RIGHT) RIVER EMBANKMENT Competitive IN BELEDWEYN DISTRICT – SOMALIA (C4) SO-MOF-229841-CW-RFQ / BATCH-2 (Beledwyne): Request for REHABILITATION OF CEELKA Quotations - Small Under TOWFIQ (BEERTA HUSEEN Component 2: Medium- Request for Single Stage - One 2021-12- IDA / D6300 Prior Limited Works 85,322.57 0.00 Implementat 2021-05-03 2021-05-17 2021-06-28 DHEERE) AND HELO KILIYO TO Term Flood Recovery Quotations Envelope 25 (Emergency) SPD - ion HOODLEY RIVER Competitive EMBANKMENT IN BELEDWEYN DISTRICT – SOMALIA (C5) SO-MOF-229843-CW-RFQ / Batch-2 (Beledwyne): REHABILITATION OF Request for BELEDWEYN/DHARKEYNTA 1, Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2021-12- BELEDWEYN/DHARKEYNTA 2, IDA / D6300 Prior Limited Works 184,508.57 0.00 Implementat 2021-05-03 2021-05-17 2021-06-28 Term Flood Recovery Quotations Envelope 25 BELEDWEYN/SHINIILE 1, AND (Emergency) SPD - ion BALADWEYN/SHINIILE 2 RIVER Competitive EMBANKMENT IN BELEDWEYN DISTRICT – SOMALIA (C7) SO-MOF-229844-CW-RFQ / Batch-2 (Beledwyn): REHABILITATION OF BELEDWEYNE/ DOOLOGAAL Request for (BEERTA CIILOW) (LEFT), Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2021-12- BELEDWEYNE/XUBEEY 2, IDA / D6300 Prior Limited Works 178,350.39 0.00 Implementat 2021-05-03 2021-05-17 2021-06-28 Term Flood Recovery Quotations Envelope 25 BELEDWEYNE/ XUBEEY 3 AND (Emergency) SPD - ion BEBELEDWEYNE/XUBEEY 4 Competitive RIVER EMBANKMENT IN BELEDWEYN DISTRICT – SOMALIA (C8) SO-MOF-229845-CW-RFQ / Batch-2 (Beledwyn): Request for REHABILITATION OF Quotations - Small Under BELEDWEYNE/XUBEEY 6 AND Component 2: Medium- Request for Single Stage - One 2021-12- IDA / D6300 Prior Limited Works 184,263.07 0.00 Implementat 2021-05-03 2021-06-06 2021-06-28 BELEDWEYNE / XUBEEY 8 Term Flood Recovery Quotations Envelope 25 (Emergency) SPD - ion RIVER EMBANKMENT IN Competitive BELEDWEYN DISTRICT – SOMALIA (C9) SO-MOF-229846-CW-RFQ / Batch-2 (Beledwyn): REHABILITATION OF DAMALAW/XURIYE1, / SIIGAALOW/ KALIAGA YUUSUF Request for A, BELEDWEYNE/ SIIGAALOW / Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2021-12- KALIAGA YUUSUF B, IDA / D6300 Prior Limited Works 191,494.78 0.00 Implementat 2021-05-03 2021-06-06 2021-06-28 Term Flood Recovery Quotations Envelope 25 BELEDWEYN/BEERATA (Emergency) SPD - ion MOHAMED SALAAD 1, AND Competitive BELEDWEYN/BEERATA MOHAMED SALAAD 2 RIVER EMBANKMENT IN BELEDWEYN DISTRICT –(C10) Page 1 SO-MOF-229847-CW-RFQ / Batch-2 (Beledwyn): REHABILITATION OF BELEDWEYNE/CEELKA TAWFIIQ/ BEERTA HUSEEN Request for DHEERE1, BELEDWEYNE/ Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2021-12- LAANTA HILAAC/KALIGA ABDI IDA / D6300 Prior Limited Works 191,607.11 0.00 Implementat 2021-05-03 2021-06-06 2021-06-28 Term Flood Recovery Quotations Envelope 25 GARAAD, BELEDWEYNE/ (Emergency) SPD - ion BERDAHA/RADERKA/HILO Competitive BARDO 1AND BELEDWEYNE/ BERDAHA/RADERKA/HILO BARDO 2 RIVER EMBANKMENT ( C11) SO-MOF-229848-CW-RFQ / Batch-2 (Beledwyn): REHABILITATION OF Request for BLEDWEYNE/HAAWOTAKOBAL Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2021-12- ADWEYN-4 (LEFT) AND IDA / D6300 Prior Limited Works 178,787.84 0.00 Implementat 2021-05-03 2021-06-06 2021-06-28 Term Flood Recovery Quotations Envelope 25 BELEDWEYNE/BILIS DIID 2 (Emergency) SPD - ion RIVER EMBANKMENT IN Competitive BELEDWEYN DISTRICT – SOMALIA (C12) SO-MOF-229849-CW-RFQ / Batch-2 (Beledwyn): REHABILITATION OF Request for BELEDWEYN/ QOOQANE, Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2021-12- BELELDWAYN/XAWO TAKO, IDA / D6300 Prior Limited Works 151,245.60 0.00 Implementat 2021-05-03 2021-06-06 2021-06-28 Term Flood Recovery Quotations Envelope 25 /BELEDWEYN/BILISDIID 1 (Emergency) SPD - ion RIVER EMBANKMENT IN Competitive BELEDWEYN DISTRICT – SOMALIA (C13) SO-MOF-229852-CW-RFQ / Request for Batch-1 (Jowhar): Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2022-01- Rehabilitation of River IDA / D6300 Prior Limited Works 169,355.38 0.00 Implementat 2021-06-05 2021-05-10 2021-07-31 Term Flood Recovery Quotations Envelope 27 Embankments (Emergency) SPD - ion (Jowhar/Magadley 2) - C2 Competitive SO-MOF-229853-CW-RFQ / Request for Batch-1 (Jowhar): Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2022-01- Rehabilitation of River IDA / D6300 Prior Limited Works 141,298.08 0.00 Implementat 2021-06-05 2021-05-10 2021-07-31 Term Flood Recovery Quotations Envelope 27 Embankments (Jowhar/gafaay (Emergency) SPD - ion 1) - C3 Competitive SO-MOF-229857-CW-RFQ / Request for Batch-1 (Jowhar): Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2022-01- Rehabilitation of River IDA / D6300 Prior Limited Works 110,710.16 0.00 Implementat 2021-06-05 2021-05-10 2021-07-31 Term Flood Recovery Quotations Envelope 27 Embankments (Emergency) SPD - ion (Jowhar/Sabuun) - C7 Competitive SO-MOF-229860-CW-RFQ / Request for Batch-1 (Jowhar): Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2022-01- Rehabilitation of River IDA / D6300 Prior Limited Works 166,318.24 0.00 Implementat 2021-06-05 2021-05-10 2021-07-31 Term Flood Recovery Quotations Envelope 27 Embankments (Jowhar/Buulo (Emergency) SPD - ion haji) - C10 Competitive SO-MOF-229842-CW-RFQ / BATCH-2 (Beledwyne): REHABILITATION OF Request for BALADWEYN/BUULO KAHIN 2, Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2022-01- BALADWEYN /BUULO KAHIN 3 IDA / D6300 Prior Limited Works 198,088.80 0.00 Implementat 2021-05-15 2021-06-07 2021-07-10 Term Flood Recovery Quotations Envelope 06 AND BALADWEYN/BUULO (Emergency) SPD - ion KAHIN 4RIVER EMBANKMENT Competitive IN BELEDWEYN DISTRICT – SOMALIA (C6) SO-MOF-229854-CW-RFQ / Request for Batch-1 (Jowhar): Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2022-01- Rehabilitation of River IDA / D6300 Prior Limited Works 192,449.20 0.00 Implementat 2021-05-16 2021-06-14 2021-07-11 Term Flood Recovery Quotations Envelope 07 Embankments (Jowhar/gafaay (Emergency) SPD - ion 2) - C4 Competitive SO-MOF-229856-CW-RFQ / Request for Batch-1 (Jowhar): Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2022-01- Rehabilitation of River IDA / D6300 Prior Limited Works 192,819.06 0.00 Implementat 2021-05-15 2021-06-14 2021-07-10 Term Flood Recovery Quotations Envelope 06 Embankments (Jowhar/Geedo (Emergency) SPD - ion Barkan 2 & Buulo Ahmed) C6 Competitive SO-MOF-229855-CW-RFQ / Request for Batch-1 (Jowhar): Quotations - Small Under Component 2: Medium- Request for Single Stage - One 2022-01- Rehabilitation of River IDA / D6300 Prior Limited Works 192,449.20 0.00 Implementat 2021-05-16 2021-06-14 2021-07-11 Term Flood Recovery Quotations Envelope 07 Embankments (Jowhar/Geedo (Emergency) SPD - ion Barkan 1) - C5 Competitive SO-MOF-235264-CW-RFQ / Request for Afgoye: Rehabilitation of River Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-02- Embankments Daaf bari 1 in IDA / D6300 Prior Limited Works 145,570.00 0.00 Implementat 2021-07-05 2021-08-30 Term Flood Recovery Quotations Envelope 26 Agooye District – Somalia (Emergency) SPD - ion (C11) Competitive SO-MOF-235267-CW-RFQ / Request for Afgoye: Rehabilitation of River Quotations - Small Pending Embankments Ceelka Component 2: Medium- Request for Single Stage - One 2022-02- IDA / D6300 Prior Limited Works 145,570.00 0.00 Implementat 2021-07-05 2021-08-30 cartan/farta baabaa hasan1 in Term Flood Recovery Quotations Envelope 26 (Emergency) SPD - ion Afgooye District – Somalia Competitive (C13) SO-MOF-235272-CW-RFQ / Request for Afgoye: Rehabilitation of River Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-02- Embankments Raqayle 1 in IDA / D6300 Prior Limited Works 149,937.10 0.00 Implementat 2021-07-05 2021-08-30 Term Flood Recovery Quotations Envelope 26 Afgooye District – Somalia (Emergency) SPD - ion (C15) Competitive SO-MOF-235278-CW-RFQ / Request for Afgoye: Rehabilitation of River Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-02- Embankments Damalay1 in IDA / D6300 Prior Limited Works 189,241.00 0.00 Implementat 2021-07-05 2021-08-30 Term Flood Recovery Quotations Envelope 26 Afgooye District – Somalia (Emergency) SPD - ion (C17) Competitive SO-MOF-235281-CW-RFQ / Request for Afgoye: Rehabilitation of River Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-02- Embankments Dhagax tuurka IDA / D6300 Prior Limited Works 122,278.80 0.00 Implementat 2021-07-05 2021-08-30 Term Flood Recovery Quotations Envelope 26 1 in Afgooye District – (Emergency) SPD - ion Somalia (C19) Competitive Page 2 SO-MOF-235283-CW-RFQ / Request for Afgoye: Rehabilitation of River Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-02- Embankments Baalguri in IDA / D6300 Prior Limited Works 174,684.00 0.00 Implementat 2021-07-05 2021-08-30 Term Flood Recovery Quotations Envelope 26 Afgooye District – Somalia (Emergency) SPD - ion (C21) Competitive SO-MOF-235284-CW-RFQ / Request for Afgoye: Rehabilitation of River Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-02- Embankments Beerta IDA / D6300 Prior Limited Works 171,772.60 0.00 Implementat 2021-07-05 2021-08-30 Term Flood Recovery Quotations Envelope 26 imaaraadka 1 in Afgooye (Emergency) SPD - ion District – Somalia (C22) Competitive Request for SO-MOF-235288-CW-RFQ / Quotations - Small Pending Afgoye: Rehabilitation of River Component 2: Medium- Request for Single Stage - One 2022-02- IDA / D6300 Prior Limited Works 145,570.00 0.00 Implementat 2021-07-05 2021-08-30 Embankment (1 Site) in Term Flood Recovery Quotations Envelope 26 (Emergency) SPD - ion Afgoye District – Somalia Competitive (C24) SO-MOF-235315-CW-RFB / Request for Bids - Pending Supply and Installation of Component 5: Contingent Single Stage - One Small Works SPD 2022-05- IDA / D6300 Prior Request for Bids Open - National 300,000.00 0.00 Implementat 2021-07-31 2021-08-05 2021-09-16 2021-10-16 2021-11-20 Solar panels to hospitals Emergency Response Envelope (1 envelope 19 ion (Martini & Banadir) process) SO-MOF-229850-CW-RFQ / Request for Batch-2 (Beledwyn): Quotations - Small REHABILITATION OF Component 2: Medium- Request for Single Stage - One 2021-12- IDA / D6300 Prior Limited Works 195,549.20 0.00 Canceled 2021-05-03 2021-06-28 BELEDWEYN/HOODLEY RIVER Term Flood Recovery Quotations Envelope 25 (Emergency) SPD - EMBANKMENT IN BELEDWEYN Competitive DISTRICT – SOMALIA (C4) SO-MOF-238412-CW-RFQ / Request for Bardhere: Rehabilitation of Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-02- River Embankments Shimbiro IDA / D6300 Prior Limited Works 113,480.00 0.00 Implementat 2021-07-05 2021-08-30 Term Flood Recovery Quotations Envelope 26 east, Baardhere District – (Emergency) SPD - ion Somalia (C1) Competitive SO-MOF-238415-CW-RFQ / Request for Baardhere: Rehabilitation of Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-02- River Embankments Bandar 2, IDA / D6300 Prior Limited Works 170,220.00 0.00 Implementat 2021-07-05 2021-08-30 Term Flood Recovery Quotations Envelope 26 Baardhere District – Somalia (Emergency) SPD - ion (C2) Competitive SO-MOF-238416-CW-RFQ / Request for Baardhere: Rehabilitation of Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-02- River Embankments Bandar 3, IDA / D6300 Prior Limited Works 167,616.00 0.00 Implementat 2021-07-05 2021-08-30 Term Flood Recovery Quotations Envelope 26 Baardhere District – Somalia (Emergency) SPD - ion (C3) Competitive SO-MOF-238417-CW-RFQ / Request for Baardhere: Rehabilitation of Quotations - Small Pending River Embankments Hilo Component 2: Medium- Request for Single Stage - One 2022-02- IDA / D6300 Prior Limited Works 192,947.20 0.00 Implementat 2021-07-05 2021-08-30 baneed 1 and Hilo baneed 2, Term Flood Recovery Quotations Envelope 26 (Emergency) SPD - ion Baardhere District – Somalia Competitive (C4) SO-MOF-238418-CW-RFQ / Request for Baardhere: Rehabilitation of Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-02- River Embankments Hilo IDA / D6300 Prior Limited Works 192,916.00 0.00 Implementat 2021-07-05 2021-08-30 Term Flood Recovery Quotations Envelope 26 baneed 3, Baardhere District – (Emergency) SPD - ion Somalia (C5) Competitive SO-MOF-238419-CW-RFQ / Request for Baardhere: Rehabilitation of Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-02- River Embankments Hilo IDA / D6300 Prior Limited Works 192,916.00 0.00 Implementat 2021-07-05 2021-08-30 Term Flood Recovery Quotations Envelope 26 baneed 6, Baardhere District – (Emergency) SPD - ion Somalia (C6) Competitive SO-MOF-238421-CW-RFQ / Request for Baardhere: Rehabilitation of Quotations - Small Pending River Embankments Bandar 1, Component 2: Medium- Request for Single Stage - One 2022-02- IDA / D6300 Prior Limited Works 164,564.00 0.00 Implementat 2021-07-05 2021-08-30 Bulo cesan 1 and Bulo-cesan Term Flood Recovery Quotations Envelope 26 (Emergency) SPD - ion 2, Baardhere District – Somalia Competitive (C7) SO-MOF-238422-CW-RFQ / Dollow: Procurement of: Qansaxlay,Qansaxlay/Beerta Aadan Modoobe 1, Request for Qansaxlay/Beerta Aadan Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-03- Modoobe 2, Dollow/ IDA / D6300 Prior Limited Works 121,151.00 0.00 Implementat 2021-08-05 2021-09-30 Term Flood Recovery Quotations Envelope 29 Qansaxlay/Beerta osman (Emergency) SPD - ion Abdikadir1, Dollow/ Competitive Qansaxlay/Beerta osman Abdikadir2. In Jubba-land Somalia (C1) SO-MOF-238426-CW-RFQ / Request for Dollow: Procurement of Lot2 Quotations - Small Pending in Dollow/ Cambaha/ Component 2: Medium- Request for Single Stage - One 2022-03- IDA / D6300 Prior Limited Works 147,888.00 0.00 Implementat 2021-08-05 2021-09-30 Dhumadhumay1/ Term Flood Recovery Quotations Envelope 29 (Emergency) SPD - ion Dhumadhumay2 Dhuudhhumy Competitive 3 of Jubaland - Somalia (C2) SO-MOF-238428-CW-RFQ / Dollow: Procurement of: [Five Request for villages Dollow/Una/Beerta Quotations - Small Pending Component 2: Medium- Request for Single Stage - One 2022-03- Zakaria Abdirashid1, IDA / D6300 Prior Limited Works 169,758.00 0.00 Implementat 2021-08-05 2021-09-30 Term Flood Recovery Quotations Envelope 29 Dollow/Una/Beerta Zakaria (Emergency) SPD - ion Abdirashid2 district Jubaland Competitive state of Somalia. (C3) SO-MOF-238430-CW-RFQ / Request for Dollow: Procurement of: Five Quotations - Small Pending villages in Dollow/Una/Hilo, Component 2: Medium- Request for Single Stage - One 2022-03- IDA / D6300 Prior Limited Works 162,279.00 0.00 Implementat 2021-08-05 2021-09-30 Una/Beerta Abdi dool and Term Flood Recovery Quotations Envelope 29 (Emergency) SPD - ion Una/Beerta Abdikawi Competitive mohamed (C4) SO-MOF-238431-CW-RFQ / Request for Dollow: Procurement of: Quotations - Small Pending Dollow/Suul Guduud/Abdiyo Component 2: Medium- Request for Single Stage - One 2022-03- IDA / D6300 Prior Limited Works 165,321.00 0.00 Implementat 2021-08-05 2021-09-30 Abdi Baale, Suul Term Flood Recovery Quotations Envelope 29 (Emergency) SPD - ion Guduud/mohamed Abdullahi Competitive (C5) Page 3 SO-MOF-238432-CW-RFQ / Request for Dollow: Procurement of: Quotations - Small Pending [Suulgudud/Ali sharif , Component 2: Medium- Request for Single Stage - One 2022-03- IDA / D6300 Prior Limited Works 181,429.00 0.00 Implementat 2021-08-05 2021-09-30 Quracleey/Keli Dahir, Term Flood Recovery Quotations Envelope 29 (Emergency) SPD - ion Suulgudud/Adam Ibrahim] in Competitive Dollow Juba land Somalia. (C6) SO-MOF-238433-CW-RFQ / Request for Dollaw: Procurement of: [Five Quotations - Small Pending villages in dollaw Component 2: Medium- Request for Single Stage - One 2022-03- IDA / D6300 Prior Limited Works 197,103.00 0.00 Implementat 2021-08-05 2021-09-30 Suulgudud/Ali sharif, Term Flood Recovery Quotations Envelope 29 (Emergency) SPD - ion Quracleey/Keli Dahir district Competitive Jubaland state of Somalia. (C7) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOF-214333-GO-RFQ / Under Component 4: Project Request for Single Stage - One Procurement of 2 Vehicle for IDA / D6300 Prior Limited 85,000.00 0.00 Implementati 2021-04-05 2021-05-31 2021-11-27 Management Quotations Envelope PIU on SO-MOF-214334-GO-RFQ / Under Component 4: Project Request for Single Stage - One Fittings and furniture for PIU IDA / D6300 Prior Limited 60,000.00 0.00 Implementati 2021-04-05 2021-04-26 2021-05-31 2021-11-27 Management Quotations Envelope Office on SO-MOF-230645-GO-RFQ / Under Component 4: Project Request for Single Stage - One Procurement of IT equipment IDA / D6300 Prior Limited 40,000.00 0.00 Implementati 2021-05-06 2021-07-01 2021-12-28 Management Quotations Envelope for PIU Office on SO-MOF-235305-GO-RFB / Procurement of Locally made Pending Component 5: Contingent Single Stage - One cloth face masks for the IDA / D6300 Prior Request for Bids Open - National 300,000.00 0.00 Implementati 2021-06-30 2021-07-05 2021-08-16 2021-09-15 2021-10-20 2022-04-18 Emergency Response Envelope general public (schools, on mosques, etc) SO-MOF-235307-GO-RFB / Pending Procure Hygiene supplies Component 5: Contingent Single Stage - One IDA / D6300 Prior Request for Bids Open - National 150,000.00 0.00 Implementati 2021-06-30 2021-07-05 2021-08-16 2021-09-15 2021-10-20 2022-04-18 (Clorox, soaps, disinfectants, Emergency Response Envelope on hand sanitizers etc) SO-MOF-235309-GO-DIR / Procurement, commissioning Pending Component 5: Contingent and installation of two oxygen IDA / D6300 Prior Direct Selection Direct 957,918.63 0.00 Implementati 2021-06-30 2021-07-05 2021-08-09 2022-02-05 Emergency Response plants for Southwest and on Jubaland States of Somalia SO-MOF-235310-GO-RFB / Procurement of Continuous Pending Component 5: Contingent Single Stage - One supply of oxygen to hospitals IDA / D6300 Prior Request for Bids Open - National 250,000.00 0.00 Implementati 2021-06-30 2021-07-05 2021-08-16 2021-09-15 2021-10-20 2022-04-18 Emergency Response Envelope to be used for Covid-19 on patients SO-MOF-235311-GO-RFB / Procurement of Essential Pending Component 5: Contingent Single Stage - One Covid-19 medicines and kits, IDA / D6300 Prior Request for Bids Open - International 565,000.00 0.00 Implementati 2021-07-31 2021-08-05 2021-09-16 2021-10-16 2021-11-20 2022-05-19 Emergency Response Envelope laboratory reagents and other on essentials countrywide SO-MOF-233802-GO-RFQ / Batch-2 (Beledwyn): REHABILITATION OF Component 2: Medium- Request for Single Stage - One IDA / D6300 Prior Limited 195,549.20 0.00 Canceled 2021-05-16 2021-07-11 2022-01-07 BELEDWEYN/HOODLEY RIVER Term Flood Recovery Quotations Envelope EMBANKMENT IN BELEDWEYN DISTRICT – SOMALIA (C14) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOF-174236-NC-UN / Agreement for Delivery of Outputs: Provision of Desert Locust Control, Emergency Component 1: Immediate UN Agencies Support to affected IDA / D6300 Basic Services and Livelihood Prior Direct 10,000,000.00 10,000,000.00 Signed 2020-07-09 2020-07-10 2020-07-14 2020-07-10 2020-08-18 2020-07-27 2021-02-14 (Direct) communities, and Re- Support establish the Desert Locust Surveillance and Control System. SO-MOF-190204-NC-DIR / Non-consulting Service contract with the INGO- Building Resilience Component 1: Immediate Under Communities in Somalia (BRC IDA / D6300 Basic Services and Livelihood Prior Direct Selection Direct 10,000,000.00 0.00 Implementati 2020-12-31 2020-10-28 2021-01-05 2021-02-24 2021-02-09 2021-08-08 for the implementation of Support on Immediate basic services and livelihood support for early recovery SO-MOF-217511-NC-UN / AGREEMENT FOR DELIVERY OF OUTPUTS WITH UNICEF: Component 5: Contingent UN Agencies IDA / D6300 Prior Direct 1,409,912.37 0.00 Canceled 2021-03-15 2021-03-20 2021-04-24 2021-10-21 SOMALIA COVID-19 Emergency Response (Direct) OUTBREAK RESPONSE UNDER SOMALIA CRISIS RESPONSE SO-MOF-223676-NC-UN / AGREEMENT FOR DELIVERY OF Component 5: Contingent UN Agencies OUTPUTS WITH IOM- SOMALIA IDA / D6300 Prior Direct 871,500.00 0.00 Under Review 2021-04-30 2021-04-07 2021-05-05 2021-04-12 2021-06-09 2021-12-06 Emergency Response (Direct) COVID-19 RESPONSE UNDER SCRP Page 4 SO-MOF-223678-NC-UN / AGREEMENT FOR DELIVERY OF OUTPUTS WITH WHO - Component 5: Contingent UN Agencies IDA / D6300 Prior Direct 8,175,120.00 8,175,120.00 Signed 2021-04-30 2021-04-07 2021-05-05 2021-04-12 2021-06-09 2021-04-24 2021-12-06 SOMALIA COVID-19 Emergency Response (Direct) RESPONSE UNDER SCRP PROJECT SO-MOF-223679-NC-DIR / Agreement with SomRep consortia for the provision of Component 1: Immediate Under Early Recovery Support to The IDA / D6300 Basic Services and Livelihood Prior Direct Selection Direct 5,000,000.00 0.00 Implementati 2021-04-30 2021-04-12 2021-05-05 2021-04-29 2021-06-09 2021-12-06 Flood Affected Communities Support on in Hirshabelle, Jubaland And Southwest SO-MOF-223686-NC-DIR / Agreement with NEXUS Consortia for the provision of Component 1: Immediate Pending early recovery Support to The IDA / D6300 Basic Services and Livelihood Prior Direct Selection Direct 5,000,000.00 0.00 Implementati 2021-05-31 2021-06-05 2021-07-10 2022-01-06 Flood Affected Communities Support on in Hirshabelle, Jubaland And Southwest States of Somalia SO-MOF-226047-NC-UN / AGREEMENT FOR DELIVERY OF OUTPUTS WITH UNICEF: Component 5: Contingent UN Agencies IDA / D6300 Prior Direct 4,416,965.11 4,416,509.11 Signed 2021-03-31 2021-03-23 2021-04-05 2021-04-01 2021-05-10 2021-04-12 2021-11-06 SOMALIA COVID-19 Emergency Response (Direct) OUTBREAK RESPONSE UNDER SOMALIA CRISIS RESPONSE CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOF-183832-CS-CDS / Technical assistance agency Component 4: Project UN Agencies IDA / D6300 Prior Direct 4,458,313.00 4,437,254.00 Signed 2020-08-28 2020-09-14 2022-08-28 for the provision of Project Management (Direct) Management Support SO-MOF-187653-CS-QCBS / SCRP Project Audit and Component 4: Project Least Cost Under IDA / D6300 Prior Open - International 500,000.00 0.00 2020-10-31 2020-11-05 2020-11-21 2020-11-19 2021-01-04 2021-02-24 2021-02-01 2021-04-03 2021-03-03 2021-06-28 2021-04-07 2021-05-12 2021-11-08 Independent Verification Management Selection Implementation Agent IVA SO-MOF-188776-CS-UN / Development of Designs & Component 2: Medium- UN Agencies Pending IDA / D6300 Prior Direct 2,000,000.00 0.00 2020-11-09 2021-05-08 Supervision of Construction Term Flood Recovery (Direct) Implementation Works INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOF-183841-CS-INDV / Individual Component 5: Contingent Health/COVID19 Response IDA / D6300 Prior Consultant Limited 60,000.00 60,000.00 Signed 2020-08-20 2020-08-19 2020-08-27 2020-12-12 2020-09-01 2021-01-07 2020-09-04 2021-01-17 2021-06-01 Emergency Response Facilitation Consultant Selection SO-MOF-186983-CS-CDS / Forecasting, Aid Tracking Component 3: Longer- System & Needs Assessment IDA / D6300 Term Disaster Risk Prior Direct Selection Direct 664,000.00 769,060.00 Signed 2020-08-31 2020-11-16 2020-09-10 2020-12-19 2020-11-14 2021-03-28 2021-05-13 to Integrate COVID-19 Preparedness Country Wide efforts Individual SO-MOF-184256-CS-INDV / Component 4: Project IDA / D6300 Prior Consultant Limited 70,200.00 70,200.00 Signed 2020-08-17 2020-09-03 2020-08-22 2020-10-07 2020-09-12 2020-10-09 2020-10-17 2020-10-10 2021-04-15 Recovery Planning Specialist Management Selection SO-MOF-183833-CS-QCBS / Component 4: Project Security Risk Management IDA / D6300 Prior Direct Selection Direct 1,000,000.00 1,206,064.71 Signed 2020-10-31 2020-09-04 2020-11-10 2020-09-23 2021-01-14 2021-01-04 2021-07-13 Management Consulting Services SO-MOF-183838-CS-INDV / Individual Component 4: Project Monitoring & Evaluation IDA / D6300 Prior Consultant Direct 70,200.00 70,200.00 Signed 2020-08-15 2020-09-03 2020-08-25 2020-09-09 2020-09-15 2020-09-17 2020-10-20 2020-09-23 2021-04-18 Management Specialist Selection SO-MOF-183836-CS-INDV / Individual Component 4: Project Financial Management IDA / D6300 Prior Consultant Direct 70,200.00 70,200.00 Signed 2020-08-15 2020-09-04 2020-08-25 2020-09-09 2020-09-15 2020-09-17 2020-10-20 2020-09-23 2021-04-18 Management Specialist Selection Individual SO-MOF-183837-CS-INDV / Component 4: Project IDA / D6300 Prior Consultant Direct 70,200.00 70,200.00 Signed 2020-08-15 2020-09-03 2020-08-20 2020-09-09 2020-09-10 2020-09-17 2020-10-15 2020-09-23 2021-04-13 Project Engineer Management Selection Individual SO-MOF-183834-CS-CDS / Component 4: Project IDA / D6300 Prior Consultant Direct 111,480.00 111,480.00 Signed 2020-08-15 2020-09-03 2020-08-25 2020-09-01 2020-09-15 2020-09-17 2020-10-20 2020-09-23 2021-04-18 Project Coordinator Management Selection Individual SO-MOF-183835-CS-INDV / Component 4: Project IDA / D6300 Prior Consultant Direct 73,080.00 73,080.00 Signed 2020-08-15 2020-09-04 2020-08-25 2020-09-09 2020-09-15 2020-09-17 2020-10-20 2020-09-23 2021-04-18 Procurement Specialist Management Selection SO-MOF-183839-CS-INDV / Individual Component 4: Project Environmental Safeguard IDA / D6300 Prior Consultant Direct 93,600.00 70,200.00 Signed 2020-08-15 2020-09-03 2020-08-25 2020-09-09 2020-09-15 2020-09-17 2020-10-20 2020-09-24 2021-04-18 Management Specialist Selection Individual SO-MOF-183157-CS-INDV / Component 4: Project IDA / D6300 Prior Consultant Limited 70,200.00 0.00 Canceled 2020-07-09 2020-07-09 2020-07-14 2020-08-04 2020-09-08 2021-03-07 Social Development Specialist Management Selection Individual SO-MOF-187526-CS-INDV / Component 4: Project IDA / D6300 Prior Consultant Limited 70,200.00 0.00 Canceled 2020-08-15 2020-08-20 2020-09-10 2020-10-15 2021-04-13 Social Development Specialist Management Selection Page 5 SO-MOF-190535-CS-INDV / Individual Component 4: Project Stakeholder Engagement IDA / D6300 Prior Consultant Limited 73,080.00 70,200.00 Signed 2020-10-31 2020-10-05 2020-11-05 2020-12-09 2020-11-26 2020-12-15 2020-12-31 2020-12-19 2021-06-29 Management Specialist Selection Individual SO-MOF-190539-CS-INDV / Component 4: Project IDA / D6300 Prior Consultant Limited 52,800.00 49,920.00 Signed 2020-10-31 2020-10-05 2020-11-05 2021-02-25 2020-11-26 2021-03-01 2020-12-31 2021-03-01 2021-06-29 Project Administrative Officer Management Selection SO-MOF-190541-CS-INDV / Individual Component 4: Project Toll-free Hotline Operator IDA / D6300 Prior Consultant Limited 52,800.00 52,800.00 Signed 2020-12-31 2020-11-05 2021-01-05 2020-11-16 2021-01-26 2020-11-20 2021-03-02 2020-12-06 2021-08-29 Management (GRM) Selection Individual SO-MOF-190545-CS-INDV / Component 4: Project Under IDA / D6300 Prior Consultant Limited 52,800.00 0.00 2020-11-30 2020-10-05 2020-12-05 2021-03-22 2020-12-26 2021-04-21 2021-01-30 2021-07-29 Project Security Officer Management Implementation Selection Individual SO-MOF-190709-CS-INDV / Component 4: Project IDA / D6300 Prior Consultant Limited 73,080.00 73,080.00 Signed 2020-08-31 2020-10-05 2020-09-05 2020-08-18 2020-09-26 2020-10-08 2020-10-31 2020-09-01 2021-04-29 Social Development Specialist Management Selection SO-MOF-196562-CS-INDV / Individual Environmental Safeguard Component 4: Project Under IDA / D6300 Prior Consultant Open 30,000.00 0.00 2020-11-15 2020-11-16 2021-01-03 2021-01-24 2021-02-28 2021-08-27 Officer, Hirshabelle State Management Implementation Selection Project Team SO-MOF-196565-CS-INDV / Individual Environmental Safeguard Component 4: Project Under IDA / D6300 Prior Consultant Open 30,000.00 0.00 2020-12-15 2020-11-16 2021-02-02 2021-05-17 2021-02-23 2021-06-07 2021-03-30 2021-09-26 Officer, Southwest State Management Implementation Selection Project Team SO-MOF-196570-CS-INDV / Individual Component 4: Project Under Project Engineer, Southwest IDA / D6300 Prior Consultant Open 30,000.00 0.00 2020-11-15 2020-11-16 2021-01-03 2021-05-17 2021-01-24 2021-06-06 2021-02-28 2021-08-27 Management Implementation State Selection SO-MOF-196571-CS-INDV / Individual Component 4: Project Under Project Engineer, Hirshabelle IDA / D6300 Prior Consultant Open 30,000.00 0.00 2020-12-15 2020-11-16 2021-02-02 2021-02-23 2021-03-30 2021-09-26 Management Implementation State Selection SO-MOF-196572-CS-INDV / Individual Component 4: Project Under Project Coordinator, IDA / D6300 Prior Consultant Open 36,000.00 0.00 2020-11-15 2020-11-16 2021-01-03 2021-05-19 2021-01-24 2021-06-06 2021-02-28 2021-08-27 Management Implementation Southwest SPT Selection SO-MOF-196574-CS-INDV / Individual Component 4: Project Under Project Coordinator, IDA / D6300 Prior Consultant Open 36,000.00 0.00 2020-12-15 2020-11-16 2021-02-02 2021-02-23 2021-03-30 2021-09-26 Management Implementation Hirshabelle SPT Selection Individual SO-MOF-197348-CS-INDV / Component 4: Project IDA / D6300 Prior Consultant Limited 52,800.00 52,800.00 Signed 2020-10-31 2020-11-16 2020-11-05 2021-02-07 2020-11-26 2021-02-12 2020-12-31 2021-02-15 2021-06-29 GBV Officer Management Selection SO-MOF-196560-CS-INDV / Individual Component 4: Project Under Environmental Safeguard IDA / D6300 Prior Consultant Open 30,000.00 0.00 2020-12-31 2020-11-25 2021-02-18 2021-03-11 2021-04-15 2021-10-12 Management Implementation Officer, Jubalad SPT Selection SO-MOF-196555-CS-INDV / Individual Component 4: Project Under Project Coordinator, Jubaland IDA / D6300 Prior Consultant Open 36,000.00 0.00 2020-12-31 2020-11-25 2021-02-18 2021-03-11 2021-04-15 2021-10-12 Management Implementation State SPT Selection Individual SO-MOF-196556-CS-INDV / Component 4: Project Under IDA / D6300 Prior Consultant Open 30,000.00 0.00 2020-12-31 2020-11-25 2021-02-18 2021-03-11 2021-04-15 2021-10-12 Project Engineer, Jubaland SPT Management Implementation Selection SO-MOF-196568-CS-INDV / Individual Component 4: Project Under Administration & Finance IDA / D6300 Prior Consultant Open 30,000.00 0.00 2020-12-15 2020-11-25 2021-02-02 2021-05-17 2021-02-23 2021-06-06 2021-03-30 2021-09-26 Management Implementation Officer, Southwest SPT Selection SO-MOF-196567-CS-INDV / Individual Component 4: Project Under Administration & Finance IDA / D6300 Prior Consultant Open 30,000.00 0.00 2020-12-31 2020-11-30 2021-02-18 2021-03-11 2021-04-15 2021-10-12 Management Implementation Officer, Hirshabelle SPT Selection SO-MOF-196558-CS-INDV / Individual Component 4: Project Under Administration & Finance IDA / D6300 Prior Consultant Open 30,000.00 0.00 2020-12-31 2020-11-30 2021-02-18 2021-03-11 2021-04-15 2021-10-12 Management Implementation Officer, Jubaland SPT Selection SO-MOF-210970-CS-INDV / Component 3: Longer- Individual Under MOH Senior Coordinator for IDA / D6300 Term Disaster Risk Prior Consultant Limited 60,000.00 0.00 2021-01-31 2021-02-10 2021-02-05 2021-03-04 2021-02-26 2021-03-17 2021-04-02 2021-09-29 Implementation SCRP Project Preparedness Selection Component 3: Longer- Individual SO-MOF-214330-CS-INDV / Under IDA / D6300 Term Disaster Risk Prior Consultant Limited 30,000.00 0.00 2021-02-28 2021-02-09 2021-03-05 2021-05-10 2021-03-26 2021-06-06 2021-04-30 2021-10-27 Financial Specialist, MOH Implementation Preparedness Selection Component 3: Longer- Individual SO-MOF-214331-CS-INDV / Under IDA / D6300 Term Disaster Risk Prior Consultant Limited 30,000.00 0.00 2021-03-01 2021-03-15 2021-03-06 2021-03-04 2021-03-27 2021-03-18 2021-05-01 2021-10-28 MOH Communication Officer Implementation Preparedness Selection SO-MOF-210968-CS-INDV / Individual Component 5: Contingent Under MOH COVID-19 RESPONSE & IDA / D6300 Prior Consultant Limited 77,000.00 0.00 2021-03-31 2021-03-15 2021-04-05 2021-03-04 2021-04-26 2021-03-18 2021-05-31 2021-11-27 Emergency Response Implementation RECOVERY COORDINATOR Selection Individual SO-MOF-217509-CS-INDV / Component 4: Project Under IDA / D6300 Prior Consultant Direct 90,000.00 80,280.00 2021-04-30 2021-04-16 2021-05-10 2021-05-17 2021-05-31 2021-06-07 2021-07-05 2022-01-01 SCRP Operations Manager Management Implementation Selection Individual SO-MOF-190538-CS-INDV / Component 4: Project IDA / D6300 Prior Consultant Limited 73,080.00 0.00 Canceled 2020-10-31 2020-10-05 2020-11-05 2020-11-26 2020-12-31 2021-06-29 Communication Specialist Management Selection SO-MOF-229866-CS-INDV / Individual Component 4: Project Under PIU Communications IDA / D6300 Prior Consultant Open 73,080.00 0.00 2021-04-30 2021-05-21 2021-06-18 2021-07-09 2021-08-13 2022-02-09 Management Implementation Specialist Selection SO-MOF-239607-CS-CDS / AGREEMENT FOR DELIVERY OF Component 4: Project Pending IDA / D6300 Prior Direct Selection Direct 1,030,585.00 0.00 2021-07-01 2021-07-11 2021-09-14 2022-03-13 OUTPUTS WITH UNOPS: Management Implementation TECHNICAL STUDIES & DESIGN Page 6