PROCUREMENT PLAN (Textual Part) Project information: Bangladesh, Project Preparation Advance (PPA) for Livestock Development-based Dairy Revolution and Meat Productions (DRMP), PPA No. IDA V104-BD Project Implementation agency: Department of Livestock Date of the Procurement Plan: October 2017 Period covered by this Procurement Plan: October 2017 - August 2017 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the People’s Republic of Bangladesh (Public Procurement Act 2006 - PPA, 1st amendment to PPA (2009) and the Public Procurement Rules 2008, as amended in August 2009) , such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions : a) e-GP system of the country for national competitive bidding (NCB) shall be followed using Standard/Model Procurement documents satisfactory to the Bank; b) Post bidding negotiations shall not be allowed with the lowest evaluated or any other bidder; c) Bids should be submitted and opened in public in one location immediately after the deadline for submission; d) Lottery in award of contracts shall not be allowed; e) Bidders’ qualification/experience requirement shall be mandatory; f) Bids shall not be invited or rejected on the basis of percentage above or below the estimated cost. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable/ Other Relevant Procurement Information. Procurement Responsibility: Department of Livestock (DLS) is the implementing agency (IA) who will be responsible for all procurements Procurement Threshold Bank-financed all contracts at or above the thresholds set out in the below table 1 are subject to the Bank’s procurement prior review. Table 1: Procurement Prior Review Thresholds (US$ millions) Substantial Moderate Low Type of procurement High risk risk risk risk Works (including turnkey, supply & 5 10 15 20 installation of plant and equipment, and PPP) Goods, information technology and non- 1.5 2 4 6 consulting services Consultants: firms 0.5 1 2 4 Consultants: individuals 0.2 0.3 0.4 0.5 Irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: a. procurement processes involving contract negotiations as, described in paragraphs 6.34-36 of Section VI of the Procurement Regulation for Borrowers; b. competitive dialogue; c. sustainable procurement; and d. best and final offer. The determination of whether a contract meets the procurement prior review threshold is based on the estimated value of the contract, including all taxes and duties payable under the contract. PROCUREMENT Bangladesh : Livestock and Dairy Development Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2018-05-26 2019-08-05 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161246 GPN Date: 2019-04-22 Project Name: Livestock and Dairy Development Project Loan / Credit No: IDA / V1040, IDA / 63300 Executing Agency(ies): Department of Livestock Services for DRMP WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DLS/DRMP/PPA/W-01 / Pending Civil Construction of office Project Management Single Stage - One IDA / V1040 Post Request for Bids Open - National 131,916.00 0.00 Implementati 2018-09-05 2018-09-08 2018-09-19 2018-09-24 2018-10-02 2018-12-31 building: vertical extension Monitoring and Evaluation Envelope on of Nutrition Building, DLS DLS/LDDP/WD-40 / Earth Filling, construction of new boundary wall and vertical Improving Risk Management extension of existing Pending and Climate Resilience of Single Stage - One boundary wall at Tangail IDA / 63300 Post Request for Bids Open - National 115,747.00 0.00 Implementati 2019-05-07 2019-05-15 2019-06-10 2019-06-24 2019-08-01 2020-02-01 Livestock Production Envelope and Jamalpur districts AI on Systems premises, repair of Tangail and Jamalpur AI offices, quarter etc DLS/LDDP/WD-88A / Repair and renovation of Pending Market Linkages and Value Single Stage - One auditorium (+/- 350 Sq M) IDA / 63300 Post Request for Bids Open - National 109,157.00 0.00 Implementati 2019-05-07 2019-05-15 2019-06-10 2019-06-24 2019-08-01 2020-05-01 Chain Development Envelope at Officers Training Institute on (OTI) Savar, Dhaka DLS/LDDP/WD-90 / Construction of Existing DLS Under Building no-02 6th and 7th Project Management Single Stage - One IDA / 63300 Post Request for Bids Open - National 805,000.00 0.00 Implementati 2019-04-25 2019-04-30 2019-05-13 2019-05-27 2019-07-11 2020-07-11 floor including substation, Monitoring and Evaluation Envelope on lift, furniture, decoration etc for PMU DLS/LDDP/WD-108 / Improving Risk Management Pending Renovation and Repairing and Climate Resilience of Single Stage - One IDA / 63300 Post Request for Bids Open - National 273,048.00 0.00 Implementati 2019-05-07 2019-05-15 2019-06-10 2019-06-24 2019-08-01 2020-05-01 works at Rajshahi Dairy Livestock Production Envelope on Farm Systems DLS/LDDP/WD-109 / Improving Risk Management Pending Renovation and Repairing and Climate Resilience of Single Stage - One IDA / 63300 Post Request for Bids Open - National 106,795.00 0.00 Implementati 2019-05-07 2019-05-15 2019-06-10 2019-06-24 2019-08-01 2020-02-01 works at Bogura Dairy Livestock Production Envelope on Farm Systems DLS/LDDP/WD-110 / Improving Risk Management Pending Renovation and Repairing and Climate Resilience of Single Stage - One IDA / 63300 Post Request for Bids Open - National 109,217.00 0.00 Implementati 2019-05-07 2019-05-15 2019-06-10 2019-06-24 2019-08-01 2020-02-01 works at Barishal Dairy Livestock Production Envelope on Farm Systems Improving Risk Management DLS/LDDP/WD-111 / Pending and Climate Resilience of Single Stage - One Renovation and Repairing IDA / 63300 Post Request for Bids Open - National 109,217.00 0.00 Implementati 2019-05-07 2019-05-21 2019-06-10 2019-06-24 2019-08-01 2020-02-01 Livestock Production Envelope works at Sylhet Dairy Farm on Systems DLS/LDDP/WD-112 / Improving Risk Management Pending Renovation and Repairing and Climate Resilience of Single Stage - One IDA / 63300 Post Request for Bids Open - National 109,627.00 0.00 Implementati 2019-05-07 2019-05-15 2019-06-10 2019-06-24 2019-08-01 2020-02-01 works at Faridpur Dairy Livestock Production Envelope on Farm Systems Page 1 DLS/LDDP/WD-113 / Improving Risk Management Pending Renovation and Repairing and Climate Resilience of Single Stage - One IDA / 63300 Post Request for Bids Open - National 117,819.00 0.00 Implementati 2019-05-07 2019-05-15 2019-06-10 2019-06-24 2019-08-01 2020-02-01 works at Chattogram Dairy Livestock Production Envelope on Farm Systems DLS/LDDP/WD-23 / Construction of Vertical Expansion of 26 (twenty Six) Existing Upazila Livestock Under Development Centers (ULDC) Market Linkages and Value Single Stage - One IDA / 63300 Post Request for Bids Open - National 728,000.00 0.00 Implementati 2019-05-07 2019-05-15 2019-06-10 2019-06-24 2019-08-01 2020-08-01 for Training and service Chain Development Envelope on Facilities Panchagor-03 nos, Thakurgaon-02 nos, Dinajpur- 10 nos, Lalmonirhat-05 nos, Nilphamari-06 nos DLS/LDDP/WD-24 / Construction of Vertical Extension of 26 (twenty six) existing Upazila Livestock Pending Development Centers (ULDC) Market Linkages and Value Single Stage - One IDA / 63300 Post Request for Bids Open - National 728,000.00 0.00 Implementati 2019-05-26 2019-06-03 2019-06-30 2019-07-14 2019-08-21 2020-08-21 for Training and Service Chain Development Envelope on Facilities Kurigram=07 nos, Gaibandha= 03 nos, Rangpur=04 nos, Bogra=08 nos and Natore=04 nos DLS/LDDP/WD-25 / Construction of Vertical Extension of 26 (twenty six) existing Upazila Livestock Pending Development Centers (ULDC) Market Linkages and Value Single Stage - One IDA / 63300 Post Request for Bids Open - National 728,000.00 0.00 Implementati 2019-06-13 2019-06-23 2019-07-18 2019-08-01 2019-09-09 2020-09-09 for Training and Service Chain Development Envelope on Facilities Rajshahi=06, Nawgaon=07 nos, Pabna=06 nos, Sirajgonj=05 nos and Joypurhat=02 nos DLS/LDDP/WD-26 / Construction of Vertical Extension of 26 (twenty six) existing ULDC for Training and Service Facilities Pending Dhaka=04 nos, Manikgonj=04 Market Linkages and Value Single Stage - One IDA / 63300 Post Request for Bids Open - National 728,000.00 0.00 Implementati 2019-06-27 2019-07-07 2019-08-01 2019-08-14 2019-09-19 2020-09-19 nos, Narrayongonj=02 nos, Chain Development Envelope on Gazipur=02 nos, Munshigonj=03 nos, Narshingdi=03 nos, Shariatpur=04 nos and Madaripur=04 nos DLS/LDDP/WD-31 / Construction of Vertical Extension of 30 (thirty) existing ULDC for Training Pending and Service Facilities Market Linkages and Value Single Stage - One IDA / 63300 Prior Request for Bids Open - National 840,000.00 0.00 Implementati 2019-08-13 2019-08-21 2019-09-16 2019-09-30 2019-10-28 2020-10-28 Chapainababgonj=03, Chain Development Envelope on Mymensingh=06, Netrokona=07, Jamalpur=01, Sherpur=04, Tangail=06 and Gopalgonj=03 nos DLS/LDDP/WD-27 / Construction of Vertical Extension of 26 (twenty six) existing ULDC for Training Pending Market Linkages and Value Single Stage - One and Service Facilities IDA / 63300 Post Request for Bids Open - National 728,000.00 0.00 Implementati 2019-08-27 2019-09-04 2019-09-30 2019-10-14 2019-11-11 2020-11-11 Chain Development Envelope Faridpur=06 nos, on Kishorgonj=07 nos, Khulna=06 nos, Satkhira=05 nos and Feni=02 nos Page 2 DLS/LDDP/WD-28 / Construction of Vertical Extension of 26 (twenty six) existing ULDC for Training and Service Facilities Rajbari=02 nos, Pending Market Linkages and Value Single Stage - One Chottogram=05, Kustia=02 IDA / 63300 Post Request for Bids Open - National 728,000.00 0.00 Implementati 2019-09-30 2019-10-07 2019-10-28 2019-11-11 2019-12-17 2020-12-17 Chain Development Envelope nos, Meherpur=01, on Chuadanga=02 nos, Jhenaidah=04 nos, Magura=03, Narail=02, Jessore=03 and B. Baria=02 nos DLS/LDDP/WD-29 / Construction of Vertical Extension of 26 (twenty six) existing ULDC for Training Pending and Service Facilities Market Linkages and Value Single Stage - One IDA / 63300 Post Request for Bids Open - National 728,000.00 0.00 Implementati 2019-10-14 2019-10-21 2019-11-11 2019-11-25 2019-12-23 2020-12-23 Barishal=04, Barguna=02, Chain Development Envelope on Patuakhali=03, Jhalkhati=02, bhola=03, Pirojpur=03, Bagerhat=04, Lakhipur=03 and Noakhali=02 nos DLS/LDDP/WD-30 / Construction of Vertical Extension of 26 (twenty six) existing ULDC for Training Pending Market Linkages and Value Single Stage - One and Service Facilities IDA / 63300 Post Request for Bids Open - National 728,000.00 0.00 Implementati 2019-11-12 2019-11-19 2019-12-10 2019-12-25 2020-01-22 2021-01-22 Chain Development Envelope Sylhet=04, Moulbai on Bazar=04, Sunamgonj=02, Hobogonj=03, Cumilla=05, Chadpur=04 and Coxes Bazar=04 GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DLS/DRMP/PPA/G-06 / 16 sets of Desktop Computers/ Project Management Single Stage - One IDA / V1040 Post Request for Bids Open - National 34,579.12 28,014.20 Signed 2018-04-03 2018-04-08 2018-05-20 2018-06-19 2018-07-24 2019-01-20 Laptop Computers, Printers, Monitoring and Evaluation Envelope UPS and accessories DLS/DRMP/PPA/G-07 / 1 no. Digital Camera, 5 nos. Digital Photocopiers, 2 nos. Project Management Single Stage - One Fax Machine , 2 nos. IDA / V1040 Post Request for Bids Open - National 23,565.58 12,745.56 Signed 2018-04-19 2018-04-24 2018-06-05 2018-07-05 2018-08-09 2019-02-05 Monitoring and Evaluation Envelope Scanner, and 2 nos. Digital Multimedia Projector with Screens DLS/DRMP/PPA/G-08 / 4 nos. split type 2 ton capacity Air Conditioners, 1 Project Management Single Stage - One no. Water Heater, 2 nos. IDA / V1040 Post Request for Bids Open - National 11,526.15 0.00 Canceled 2018-04-09 2018-04-14 2018-05-26 2018-06-25 2018-07-30 2019-01-26 Monitoring and Evaluation Envelope Microwave Oven, 2 nos. Water Purifier, Electronic Appliances DLS/DRMP/PPA/G-12 / Office Furniture, Fixture, Project Management Single Stage - One IDA / V1040 Post Request for Bids Open - National 12,806.72 8,785.69 Signed 2018-04-23 2018-04-28 2018-06-09 2018-07-09 2018-08-13 2019-02-09 File Cabinet, helves, Closet, Monitoring and Evaluation Envelope Almirah DLS/DRMP/PPA/G-01 / Project Management Request for Single Stage - One Procurement of Office IDA / V1040 Post Limited 3,842.61 3,515.98 Signed 2018-04-03 2018-05-29 2018-11-25 Monitoring and Evaluation Quotations Envelope Supplies, and Consumables Page 3 DLS/DRMP/PPA/G-03 / Procurement of Biding Project Management Request for Single Stage - One Machine, Shredder, Vacuum IDA / V1040 Post Limited 3,842.61 3,538.46 Signed 2018-04-16 2018-06-11 2018-12-08 Monitoring and Evaluation Quotations Envelope Cleaner, Water Dispenser, etc. DLS/DRMP/PPA/G-08A / Split type air conditioner 3 Project Management Request for Single Stage - One IDA / V1040 Post Limited 5,763.00 5,336.11 Signed 2018-06-15 2018-08-10 2019-02-06 nos. for immediate Monitoring and Evaluation Quotations Envelope requirement DLS/DRMP/PPA/G-08B / 1 no. Water Heater, 2 nos. Microwave Oven, 2 nos. Pending Project Management Request for Single Stage - One Water Purifier, Electronic IDA / V1040 Post Limited 5,763.15 0.00 Implementati 2018-06-19 2018-08-14 2019-02-10 Monitoring and Evaluation Quotations Envelope Appliances and 1 no. split on type 2 ton capacity Air Conditioner DLS/DRMP/PPA/G-09 / Office Refurbishing for the Project Management Request for Single Stage - One offices of the Project IDA / V1040 Post Limited 3,842.61 3,422.28 Signed 2018-04-06 2018-06-01 2018-11-28 Monitoring and Evaluation Quotations Envelope Director and Deputy Project Director DLS/DRMP/PPA/G-10 / Repair & reconstruction of civil works, sanitary & Project Management Single Stage - One IDA / V1040 Post Request for Bids Open - National 19,209.68 16,093.48 Signed 2018-05-24 2018-05-29 2018-07-10 2018-08-09 2018-09-13 2019-03-12 water supply line, electrical Monitoring and Evaluation Envelope & thai glass fitting -Office Refurbishing DLS/DRMP/PPA/G-13 / Pending Project Management Request for Single Stage - One Computer Accessories and IDA / V1040 Post Limited 5,520.00 0.00 Implementati 2018-09-10 2018-09-23 2018-10-08 Monitoring and Evaluation Quotations Envelope software. MS office & etc. on Pending DLS/DRMP/PPA/G-14 / Split Project Management Request for Single Stage - One IDA / V1040 Post Limited 6,404.00 0.00 Implementati 2018-09-11 2018-09-23 2018-10-08 type Air-Conditioner -3 nos. Monitoring and Evaluation Quotations Envelope on Pending DLS/DRMP/PPA/G-15 / Project Management Request for Single Stage - One IDA / V1040 Post Limited 4,265.00 0.00 Implementati 2018-09-07 2018-09-18 2018-10-02 Procurement of 3 nos. laptop Monitoring and Evaluation Quotations Envelope on DLS/DRMP/PPA/G-16 / Water Heater, Microwave Pending Project Management Request for Single Stage - One Oven, Freezer, Water IDA / V1040 Post Limited 5,123.00 0.00 Implementati 2018-09-11 2018-09-25 2018-10-10 Monitoring and Evaluation Quotations Envelope Purifier, Electronic on Appliances, etc. DLS/DRMP/PPA/G-17 / Phone set (land ph 02 nos, Pending Project Management Request for Single Stage - One Cell phone 2 nos, Tab 2 IDA / V1040 Post Limited 2,945.00 0.00 Implementati 2018-09-06 2018-09-17 2018-10-04 Monitoring and Evaluation Quotations Envelope Nos, LED Pocket/Mini on Projector-01) DLS/LDDP/GD-78A / Pending Project Management Request for Single Stage - One Furniture for Project IDA / 63300 Post Limited 2,410.00 0.00 Implementati 2019-04-23 2019-05-21 2019-05-28 Monitoring and Evaluation Quotations Envelope Management Unit (PMU) on DLS/LDDP/GD-102 / A) Intercom for Project Pending Project Management Request for Single Stage - One Management unit (50 user), IDA / 63300 Post Limited 8,434.00 0.00 Implementati 2019-04-23 2019-05-21 2019-06-11 Monitoring and Evaluation Quotations Envelope B) Surveillance System on (Camera-minimum 10 nos) NON CONSULTING SERVICES Page 4 Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DLS/DRMP/PPA/NC-03A / Pending Study tour in India for Project Management IDA / V1040 Prior Direct Selection Direct 32,017.81 0.00 Implementati 2018-06-10 2018-06-15 2018-07-20 2019-01-16 Insurance, co-operative and Monitoring and Evaluation on Dairy Hub model in India DLS/DRMP/PPA/NC-01C / Pending Project Management Request for Single Stage - One Workshop, Conference, IDA / V1040 Post Limited 6,300.00 0.00 Implementati 2018-09-04 2018-10-30 2019-04-28 Monitoring and Evaluation Quotations Envelope Meeting, FGD on DLS/DRMP/PPA/NC-01 / Workshop, Conference, Meeting, FGD: In some Project Management Request for Single Stage - One cases Direct Procurement IDA / V1040 Post Limited 6,300.00 5,917.16 Signed 2018-06-25 2018-08-20 2019-02-16 Monitoring and Evaluation Quotations Envelope and in some cases Request for Quotation, as and when required basis. DLS/DRMP/PPA/ NC-03 / Foreign Study tour on Food Pending safety value chain practices Project Management IDA / V1040 Post Direct Selection Direct 64,036.00 0.00 Implementati 2018-09-17 2018-09-22 2018-10-05 2018-11-19 in USA/Canada/Europe for Monitoring and Evaluation on DG, DLS, Secretary, MOFL including govt. team DLS/LDDP/S-72 / Vehicle Rent for PMU (12 Months, Pending Effective from January, Project Management IDA / 63300 Post Direct Selection Direct 11,566.00 0.00 Implementati 2019-04-18 2019-04-22 2019-05-09 2019-12-31 2019). The Agreement Monitoring and Evaluation on signing date between 2 parties is 19/12/2018 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DLS/DRMP/PPA/S-17 / Designing and Costing of Integrated Livestock Manure Project Management Quality And Cost- Pending IDA / V1040 Post Open - National 6,403.00 0.00 2018-09-16 2018-09-19 2018-09-26 2018-09-30 2018-10-05 2018-10-14 2018-10-30 2018-12-04 Management Plant for Monitoring and Evaluation Based Selection Implementation Central Cattle Breeding & Dairy Firm - CCDF DLS/LDDP/S-39 / Engineering Consulting Firm Selection for site survey, Project Management Quality And Cost- Open - Pending IDA / 63300 Prior 3,750,000.00 0.00 2019-04-18 2019-04-22 2019-05-12 2019-05-16 2019-05-20 2019-05-27 2019-06-17 2023-12-31 Drawing, Design and Monitoring and Evaluation Based Selection International Implementation Supervision of construction works DLS/LDDP/S-40 / Website Project Management Quality And Cost- Pending Development and Operation IDA / 63300 Post Open - National 120,482.00 0.00 2019-04-18 2019-04-22 2019-05-12 2019-05-16 2019-05-20 2019-05-30 2019-06-20 2023-12-31 Monitoring and Evaluation Based Selection Implementation for PMU DLS/LDDP/S-41 / Developed Project Management Project Management Quality And Cost- Pending IDA / 63300 Post Open - National 100,000.00 0.00 2019-06-30 2019-07-14 2019-08-04 2019-08-18 2019-08-25 2019-09-22 2019-10-06 2020-10-05 Information System (PMIS) Monitoring and Evaluation Based Selection Implementation and Accounting Software Page 5 DLS/LDDP/S-67 / Agro- Business Planning, Technology and Marketing Quality And Cost- Open - Pending Advice and Implementation IDA / 63300 Productivity Improvement Prior 6,000,000.00 0.00 2019-07-25 2019-08-15 2019-09-28 2019-10-26 2019-11-25 2019-12-30 2020-02-03 2021-02-02 Based Selection International Implementation Support Livestock and Dairy Development Project (LDDP) LDDP/S-39 / Consulting Services for Design and Supervision of Civil, Project Management Quality And Cost- Open - Pending IDA / 63300 Prior 3,750,000.00 0.00 2019-07-21 2019-08-11 2019-09-15 2019-10-06 2019-11-05 2019-12-10 2020-01-14 2021-01-13 Electrical & Mechanical Monitoring and Evaluation Based Selection International Implementation works and other procurement INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DLS/DRMP/PPA/S-03 / Individual Project Management Pending Project Management IDA / V1040 Post Consultant Open 44,183.56 0.00 2018-04-25 2018-06-13 2018-07-04 2018-08-08 2019-02-04 Monitoring and Evaluation Implementation Consultant (Team Leader) Selection DLS/DRMP/PPA/S-05 / Individual Development Project Proposal Project Management Pending IDA / V1040 Post Consultant Limited 22,091.78 0.00 2018-04-09 2018-04-14 2018-05-05 2018-06-09 2018-12-06 (DPP) Preparation Monitoring and Evaluation Implementation Selection Specialist DLS/DRMP/PPA/S-07 / Individual Project Management Pending Monitoring & Evaluation IDA / V1040 Post Consultant Limited 22,091.78 0.00 2018-04-26 2018-05-01 2018-05-22 2018-06-26 2018-12-23 Monitoring and Evaluation Implementation Specialist Selection Individual DLS/DRMP/PPA/S-08 / Project Management Pending IDA / V1040 Post Consultant Limited 14,727.85 0.00 2018-06-03 2018-06-08 2018-06-29 2018-08-03 2019-01-30 Gender Specialist Monitoring and Evaluation Implementation Selection DLS/DRMP/PPA/S-12 / Individual Project Management Pending Market Development and IDA / V1040 Post Consultant Limited 29,455.71 0.00 2018-05-08 2018-05-13 2018-06-03 2018-07-08 2019-01-04 Monitoring and Evaluation Implementation Value Chain Specialist Selection Individual DLS/DRMP/PPA/S-15 / Project Management Pending IDA / V1040 Post Consultant Limited 22,091.78 0.00 2018-04-10 2018-04-15 2018-05-06 2018-06-10 2018-12-07 Cattle Insurance Specialist Monitoring and Evaluation Implementation Selection DLS/DRMP/PPA/S-16 / Other Specialist in the areas Individual of (i) Engineer Consultant Project Management Pending IDA / V1040 Post Consultant Limited 36,819.64 0.00 2018-06-28 2018-07-03 2018-07-24 2018-08-28 2019-02-24 and (ii) Project Monitoring and Evaluation Implementation Selection Implementation and Management DLS/LDDP/S-36A / PMU Individual will hired Procurement Project Management Under IDA / 63300 Prior Consultant Open 202,409.00 0.00 2019-04-18 2019-05-16 2019-05-23 2019-06-27 2023-12-31 Specialist (1 nos) for 48 Monitoring and Evaluation Implementation Selection month DLS/LDDP/S-38A / PMU Individual will hired Financial Project Management Under IDA / 63300 Post Consultant Open 180,723.00 0.00 2019-04-18 2019-05-16 2019-05-30 2019-06-27 2023-12-31 Management Specialist (1 Monitoring and Evaluation Implementation Selection nos) for 50 month DLS/LDDP/S-36B / PMU Individual Project Management Under will hire 01 procurement IDA / 63300 Prior Consultant Open 202,409.00 0.00 2019-04-18 2019-05-16 2019-05-23 2019-06-27 2023-12-31 Monitoring and Evaluation Implementation specialist for 48 MM Selection Page 6 DLS/LDDP/S-38B / PMU Individual will hired Financial Project Management Under IDA / 63300 Post Consultant Open 180,723.00 0.00 2019-04-18 2019-05-16 2019-05-30 2019-06-27 2023-12-31 Management Specialist (1 Monitoring and Evaluation Implementation Selection nos) for 50 month DLS/LDDP/SD-22 / PMU Individual Project Management Under will hire engineering Expert IDA / 63300 Post Consultant Open 202,409.00 0.00 2019-04-23 2019-07-03 2019-07-05 2019-08-09 2023-01-20 Monitoring and Evaluation Implementation (01 Person) for 42 month Selection Page 7