JNTf;RNATIONAl, RANK FOR RECONSTRUCTION AND uJ:VELOP.HENT !.\'TEN NAT/ONA/, DEVELOPMENT ASSOCIATION RESTRICTED MONTHLY OPERATIONAL SUMMAJlY SecM70-444 OF BANK AND IDA PROPOSED PROJECTS (as of September 22, 1970) September 22, 1970 Amount & Probable Available Information Member State!/ Lender !/____ Project 11 Stage of Processing on Procurement !!_/__ I, EASTERN AFRICA BOTSWANA 25.0 (R) Infrastructure for Appraisal report being All invitations to (Bank) Shaahi mining project revised; (parallel bid withdrawn due financing being to retiming of arranged), project. To be determined Livestock Project being prepared No action, (IDA) by Government. 2.75 Gaborone-Lobatse water Appraisal report being Retroactive financing (IDA) supply prepared. (up to $100,000) of consultants' services for engineering and design to be rec- ommended. 2.0 (R) Gaborone-Lobatse Road Awaiting completion of Retroactive financing (IDA) feasibility studies, {Joint (up to $170,000) of financing may be required.) consultants' services for engineering to be recommended. CONGO, DEMOCRATIC To be determined Rubber ) Ne action. REPUBLIC OF (IDA) ) ) To be determined Cotton and food crops ) (IDA) ) ) To be determined Lake fishing ) Project preparation No action. {IDA) ) underway, ) To be determined River transport ) (IDA) ) ) To be determined Highway transport ) (IDA) ) ETHIOPIA To be determined Education II Appraisal report being Retroactive financing {IDA) prepared. (about $60,000) of consultants' services to be recommended. To be determined (R) Addis Ababa water Draft of feasibility No action. {Bank) and sewerage studies r~ceived; mission in· f:i.Qld to discuss studies with Government. !1 The Government is the proposed borrower, unless otherwise indicated. !/ The amount is in millions of U,S, dollars and is approximate and tentative. 1/ The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since the last issue of the Summary. !!_/ Confined to goods to be financed by Bank and IDA, Amounts are in millions of U.S. dollars. Distributi011: Executive Directors and Alternates President President's Council Executive Vice President, IFC Vice President, IFC Department Heads, Bank and IFC \.' - 2 - Amount & Probable Available Information Member~!/ ~ !/ Project 1/ Stage of Processing on Procurement!!_/~~ ETHIOPIA (cont'd) 8.0 (R) Coffee processing Appraisal mission No action. (Bank) planned for mid- September, (Coffee Diversification Fund may participate in joint financing,) To be determined Melka-Sadi-Amibara Awaiting results of No action. (Bank/IDA). irrigation supplementary studies on soils, water and cropping, 5.0 Livestock (Dairy) Appraisal report being No action, (IDA) prepared, To be determined Development finance Awaiting the merger of No action, (Bank) company Ill existing development finance institutions. KENYA City of Nairobi 8.3 (R) Water supply Negotiations substantially Retroactive financing (Bank) completed; awaiting Govern- (up to $50,000) for ment approval of draft loan consultants' services documents, to be recommended. Tana River 29.0 Kamburu hydroelectric Awaiting Government No action. Development Co,· (Bank) power decision on financial plan before completing appraisal report. (Joint financing possible,) To be determined Airport development Consultants' interim report No action. (Bank) received. Supplementary information requested. 12.6 {R) Road maintenance Appraisal report being Retroactive financing (Uncertain) considered, (about $150,000) for consultants' services to be recommended. LESOTHO To be determined· (R) Malibamatso River Consultants' interim No action. (Uncertain) diversion engineering report on identification expected in late September. UNDP has authorized ad(.itiona1· funds fo_r feasibility stiulies. MALAGASY 5.0 (R) Lake Alaotra Credit signed on August 17. REPUBLIC (IDA) rice development To be determined Agricultural credit ) No ·action. (IDA) ) Project preparation ) underway. To be determined Irrigation-Morondava ) No action. (IDA) ) To be determined •(N) Development finance Mission report under No action, (IDA) company review. To be determined Lilongwe Development II Awaiting completion of No action, (IDA) project preparation. Appraisal mission planned for September, See P.l for footnotes l/, !/, 1__/ and!!_/. - 3 - Amount & Probable Available Information Member State 1./ ~ :!:_I Project :}__/ Stage of Processing on Procurement!!_/~~ MAURITIUS 5.5 Tea plantation Appraisal report being Retroactive financing (IDA) prepared, for lend clearing, machinery end expa- triate staff being considered. 7.5 (R) Port of Mogadiecio Final engineering and No action. (IDA) financial position being reviewed.- (Joint and/or parallel financing will be required.) 7.0 (R) Hergeiaa-Berbera Appraisal mission planned No action. (IDA) for November or December. To be determined (R) Education Appraisal mission No-action. (IDA) in field, To be determined (R) Irrigation of Rahed Report of re-appraisal No action. (Bank/IDA) area with Roeeiree mission to be discussed water with Government. TANZANIA 9.0 (R) -Tobacco development Negotiations substantially Retroactive financing (IDA) completed, (up to $50,000) to be recommended for initial land planning, aerial photography and study. Contracts (about $500,000) awarded on negotiated basis to buy equip- ment to extend existing processing line. To be determined -Highways III Awaiting completion of No action, (Uncertain) preliminary engineering ,'. "L.J ~ and study of methods of . , 1. construction • 11,.,: 30.0 (R) Kidatu hydroel"ecttic Negotiations started . Contract fo·r access (:"'.•.- (Bank) power Sepi:ember 14, (Joinl roads awarded. Bids financing expected invited for- civil 1·J11 with Sweden) · works. 4.1 (R) Education III Negotiations began, on No action, (IDA)· (formerly described August 28 and have been as "Agricultural substantially completed, Education".) UGANDA 6.0 Education II Appraisal report No action, (IDA) being prepared, J:,n ZAMBIA 5.0 (R) Livestock II Pre-spprsisel mission_ No action. (Bank) in field, 10.0 (N) 'Telecommunications Project identified by No action. (Bank) consultants; awaiting project application from Government. See P.1 for footnotes}:_/,:!:_/,'}_/ and!!_/, - 4 - Amount & Probable Available Information Member State!/ Lender !/_ _ __ !_t!!ll.e of Processing on Procurement~'~~ II. WESTERN AFRICA CAMEROON To be determined Tea development Draft feasibility report No action. (Uncertain) (West Cameroon) being revi-ed. To be determined (R) SEMRY rice Pre-appraisal mission No action. ·(IDA) scheduled for November/ December. 1.3 (R) Port (Douala- Negotiators invited. No action. (Bank) Bonaberi) CENTRAL To be determined Road construction Feasibility study being No action. AFRICAN (IDA) (Sibut-Bambari) reviewed. REPUBLIC - -- To be determined Education Unesco reconnaissance No action. (IDA) mission preparing report. To be determined Teleconnnunicatione Awaiting Government's No action; (IDA) comments on findings of reconnaissance mission. CHAD 1.0 Livestock development Negotiations substantially Retroactive financing (IDA) completed. of consultants' services (about $5,000) to be recommended. Bidding documents being reviewed. 1.0 (R) Education II Reappraisal mission No action. (IDA) scheduled for September. To be determined Telecommunications Awaiting Government's No action. (IDA) views on findings of reconnaissance mission. CONGO, PEOPLE'S To be determined Education Appraisal report being REPUBLIC OF (IDA) prepared. To be determined Livestock development Feasibility studies No action. (IDA) being prepared. To be determined Road construction Detailed engineering being No action. (IDA) (Sibiti-Zanaga) carried out by consultants. To be determined Railway engineering Feasibility study being No action. (IDA) prepared. DAHOMEY 3.5 (R) Road maintenance Credit signed on Septemher 9. (IDA) and engineering To be determined (R) Cotton development Awaiting report of pre- No action. (IDA) appraisal mission. GABON To be determined Roede III Feasibility report No action. (Banlt) being prepared. To be determined (N) Railways Awaiting Government's cotmnente · ·No action. (Bank) on report of project preparation mission. See P.l for footnotes!/,!/,)/ and~/. J· --5 - Amount & Probable Available Information Member State !/ ~ !I Project :}__/ Stage of Processing on Procurement!!._/_ _ 'THE GAMBIA To be determined (R) Rice development FAO project preparation No action. (IDA) report heing prepared. 7, 1 (R) Power distribution II Negotiations substantially Bide received and (IDA) completed. (Parallel being analyzed. financing with Germany being arranged.) To be determined Road rehabilitation Awaiting preparation of No action. (IDA) and maintenance project. To be determined National Investment Awaiting receipt of No action. (IDA) Bank project proposal. To be determined (R) Education Draft r~port of Uneeco No action. (IDA) identification mission being . studied, IVORY COAST To be determined Road_ conf!truction I:I Feasibility studies and No action. (Bank) detailed engineering being prepared, To be determined Coconut devel?pment Awaiting report of No action. (Bank) project preparation, To be determined (r.) .Urban transport Pro.tee.~ prE!paration No action. (Bank) mission· in field, To be determined Rubber rehabilitation Appraisal report being No action. (Bank/IDA) prepared. 3.0 Power transmission Feasibility study being No action, .,,.,;,vi: (Bank) and distribution prepared by consultants. ..l9\.Ult. HALI To be determined (R) Telecommunications Application for Study of No action. --_}!:1:-,:. (IDA) Poet and Telecommunications agency being reviewed by UNDP. To be determined Rice development Feasibility study being No action. (Uncertain) prepared by consultants, . MAURITANIA To be determined (R) Livestock Timing of project under No action. (IDA) review, To be determined Telecommunications Awaiting Government's No action. (IDA) response to findings of reconnaissance mission and decision on source of financing, To be determined (R) Port Extension. Project preparation mission No action. ol:i'.>C (Uncertain) scheduled for September. NIGER To be determined Road construction Appraisal report being No action. (IDA) prepared. To be determined Livestock development Feasibility study No action. (Uncertain) being prepared. To be determined Education Project preparation mission No action. (Uncertain) scheduled for October. ·See P,l for footnotes!/,'!:__/, ll and!!/, ., - 6 - Amount & Probable Available Information tlember State ll Lender],/ Project 1/ Stage of Processing on Procurement!!_/~~ KICEJ?IA 11.0 Cocoa development Appraisal report being No action. (Bank) (Western State) prepared, To be determined Cocoa development r.evised project proposal No action • (Bank) .(!!idwestern State) being reviewed. To be determine·d Rubber development ) No action, (Bani) (Western State) ) Proposals will he prepared ) and submitted to Bank after To be determined Palm o:i.1 develop1"ent ) cocoa project is completed, No action. (Bank) (Western State) ) 25.0 Federal and State Pre-appraisal mission No action. (Bank) Roads scheduled for September. Electricity 15.0 (R) Power transmission ) Consultants' reconnaissance· No ·action:.: Corporation of (Bank) and distribution ) report received on reorgan- l'!igeria (EC!'!) ) ization of power sector, ) Supervisory mission in field Niger Dams 11.0 (R) Additional ) will also review state of No action. Authority (NDA) (Bank) generating units ) project preparation, Nigerian 10.0 (R) Development finance Loan signed on August 21. Industrial (Bank) company It Development Bank SENEGAL 4.5 (R) Rice development Appraisal mission scheduled No action. (IDA) (CASAMANCE) for October, 1.5 (R) Teleconununications Government request for financing No action. (IDA) of feasibility study being reviewed by UNDP, To be determined (R) Agricultural Settlement Follow-up appraisal report No action. (IDA) (Terres Neuves) being prepared, To be determined (R) Education Appraisal mission in field, No action. (rnA) To be determined (R) Power Feasibility study being No action, (Uncertain) completed. To be determined (R) Water Supply, Sewerage Awaiting completion of project No action. (Uncertain) and Drainage meeter plan by coneultante and Government's views on agency reorganization. SIERRA LEONE 3.7 (Bank) (R) Roods Negotiations completed, Rett·oactive fin- 3.5 (IDA) Presentation to Executive ancing ($350,000) Directors scheduled for October, for detailed eng- ineering of two roads to be reconunended. To be determined Cocoa and rice Feasibility study and project No action. (Bank/IDA) regional development preparation underway. TOGO To be determined Cocoa development Feasibility study being No action. (IDA) prepared, To be determined Road construction Feasibility studies being No action. (ID.\) prepared, Ciments de To be determined (N) Cement Factory Feasibility study being P1·eliminary pro- L' Afrique de (Bank) reviewed, (Joint financing posals for turnkey L'ouest being considered.) clinker plant re- quested by promoters. UPPER VOLTA 6.3 (R) Cotton development Negotiators being invited. No action, (IDA) (Joint financing probable,) See P.l for footnotes!/,]./, 1/ and!!._/, l - 7 - Amount & Probable Available Information Member State,!/ ~ J j____ Project ll Stage of Processing on Procurement 4/~~ III. EAST AStA AND PACIFIC AUSTRALIA Papua and· 19.5 (R) Upper Ramu Re-appraisal mission No action. New Guinea (Bank) hydroelectric power planned for October. To be determined Ports Awaiting loan application. No action, (IDA) j CHINA 20.0 (Bank) (R) Railways IV Appraisal mission tentatively planned for November. No action. 15.0 Taipei sewerage Awaiting completion of No action. (Bank) feasibility study by · consultants. 6.0 (R) Education II Awaiting consultants' No action. (Bank) feasibility report. Taiwan Power 60.0 (R) Third Power Project Appraisal mission planned No action. Company (Bank) for October. INDONESIA 14.5 (R) Irrigation Negotiators being invited. No action. (IDA) Rehabilitation III To be determined Rice seeds production Consultants' study being No action. (IDA) reviewed. 4.6 (R) Education Negotiations substantially No action. (IDA) completed. 28.0 (R) Highways II Awaiting completion of Retroactive financing (IDA) consultants' feasibility of foreign exchange studies. cost of engineering .ou~ (estimated at $3.3) may be recommended. 4.0 (R) Technical Assistance II Credit signed on (IDA) September 15. ,Ol:; 0 .· To be determined .{R) Irrigation Project identification and (IDA) Rehabilitation IV preparation in process. rG.fJ.'.Ji 8.5 (R) Tea estate development Awaiting project identification No action. (IDA) report from consultants. 3.0 (R) Population Government prepar'ing five-year No action. (IDA) family planning program on basis ,w1 of reconnaissance·mission report. .o~r.~.' h,il!' 10.0 Development finance · Agreement in principle No action. J· lo ,· (IDA) company' reached with Govermnent sd r_. on further steps in re- , h~t1n• organiz~tion of BAPINDO. To be determined (ti) Tourism in Bali Project being prepared. (IDA) See P.l for footnotes!/,]:_/, ll and ~/. - 8 - Amount & Probable Available· Information Member State!/ Lender I-'~~~~ Project.1/ Stage o!.._!._r_.5!.ceeeing on Procurement!!._/~~ <: KOREA 20.0 (R) Irrigation-- Awaiting completion of No action, (Bank) Yong San Gang project preparation. 6.0 (R) Livestock Appraisal report being No action. (IDA) considered. 8.0 Seed production Project preparation by No action. (Bank) consultants underway. 10.0 Agricultural credit Reports of FAO/IBRD No action. (Uncertain) project preparation mission being 8.0 Fisheries studied. (Uncertain) 45.0 (R) Highway construction Appraisal mission tentatively No action, (Bank) scheduled for November. KDFC 25.0 (R) Development finance Appraisal mission No action. (Bank) company planned for October. MALAYSIA National To be determined (R) Power VI Awaiting mission report No action, Electricity (Bank) regarding other sources Board (NEB) of finance. To be determined (R) Telecommunications II Appraisal mission No action, (Bank) planned for November/Deceniber. To be determined (R) Sabah Ports Appraisal mission tentatively No action. (Bank) planned for November. To be determined Agricultural credit Awaiting implementation of No action, (Bank) consultants' studies. To be determined Federal Highway Awaiting completion of No action, (Bank) supplementary economic a~.- studies and detailed engineering. Js.h _~. o~j :: To be determined Livestock PAO project identification No:. action. (Bank) mission report being prepared. NEW ZEALAND 15.0 Railroads Appraisal report being No action. (Bank) prepared. Development To be determined Development finance Awaiting Government action No action, Finance (Bank) company to strengthen DFC. Corporation of New Zealand (DPC) PHILIPPINES 14.3 (R) Rice proceesirig (formerly Negotiations substantially No action. (Barik) "grain storage") completed. 8,0 (R) Highways Appraisal report on reduced Retroactive financing (Bank) project being prepared. Part of foreign exchange of original project being fin- coats of engineering anced by bilateral assistance. (estimated at $0,9) being considered. See P,l for footnotes!/,~/. 1./ and!!_!. - 9 - Amount & Probable Available Information Member State !/ ~!/ Project 1/ Staie of Processing on Procurement!±/~- PHILIPPINES 1S.O (R) National Power Pre-appraisal mission No action. (cont 1 d) (!lank) Corporation V planned for October/ November, 20.0 Development finance Appraisal mission planned No action. (!lank) company IV tentatively for January. 10.0 Education II Awaiting completion of No action. (Bank) education sector study (expected in late 1970). SINGAPORE Public 7.0 Jurong Power Station II Negotiations aubstantially Main equipment con- Utilities (Bank) completed. tracts financed from lloard non-bank sources already awarded. Retroactive financing to be recouunended for contracts placed after August 1. Tenders for about $3 issued and contracts ready to be awarded. Public To be determined Power distribution III Project being prepared. No action. Utilities (Bank) Board To be determined Higher technical Awaiting completion of No action. (Bank) education pre-investment studies (expected second half 1970). Development To be determined Development finance Supervision mission in No action. Bank of (Bank) company II February/March to determine Singapore (DIIS) timing of new loan. dcin !!_IAILAND Industrial s.o Development finance Further consideration Finance Corp. (Bank) company postponed until late 1970. of Thailand 10.0 (R) Xasetsart University Appraisal mission in field. No action. (Bank) 2S.O (R) Highways V Appraisal mission No action. (Bank) in field. (R) MeKlong Irrigation II Project withdrawn by Government. To be determined Quai Yai Dam Feasibility studies received No action. (Bank) and under study, (Possible joint financing with ADB.) 15.0 Bangkok water aupply Awaiting completion of No action. (Bank) project rreparation by Government, See P,1 for footnotes!/,!/, 11 and!±/, - 10 Amount & Probable Available Information Member State!/ LendeE_ !/_\___ ~age of Proceeeing on Procurement!!._/_ _ THAILAND (cont'd) To be determined Telecommunications Awaiting completion of No action •. (Bank) feasibility atudiee, expected in December, i'-1 (Possible joint financing with ADD,) 27.0 (N) Pitaanulohe Awaiting completion of No action, (Bank) Irrigation feaeibility studies. 25.0 .(N) South Bangkok Awaiting feasibility Optione to purchaee (Bank) Thermal Power (Unit 4) report, equipment were obtained under inter- national competitive bidding in con- junction with equipment financed under Loan 655-TR. UNITED KINGDOM Government of 12.0 (R) Highways (Suva-Nandi) Appraieal report being No action, Fiji (Bank) prJ!pared. 2.0 (R) Navua and Reva Project reinstated and No action. (Bank) Irrigation appraisal planned for March, IV, SOUTH ASIA 4,0 (R) Kunduz-Khanabad Awaiting completion of No action. (IDA) irrigation FAO project preparation.report expected 9hortly, Appraieal mieeion planned for October. 3.0 Kabul airport Awaiting completion of No action. (IDA) improvement program feasibility etudy; ex- pected in Fall, 1970. CEYLON 7.0 Power tranemiseion Awaiting Government vieve No action. (IDA) on priorities and timing of project. To be determined Touriem Type of aeeietance to No action. (Uncertain) be diecueeed with Government, To be determined Education Awaiting Government No action. (Uncertain) reactions to rec- ommendations of reconnaissance mission. To be determined Development finance Need for additional No action. (Bank) company III foreign exchange to be determined. 40.0 Power transmission II Appraieal report being No action. (IDA) considered, Awaiting · clarification of pro- curement ieeuee. 21.0 (R) Cauvery Delta Negotiations delayed at No action. (IDA) irrigation Government request, See P.l for footnotes!/,!/,:}_/ and!!._/. - 11 - Amount & Probable Availebie Information Member State 1/ ~ !I Project 1/ Stage of Processing onProcurement !!_/__ ~ (cont'd) 40,0 (R) Pochmnpad irrigation ~liasion in field to update No action. (IDA) appraisal report; awaiting Government decision on size of project. 6.0 {R) Agricultural aviation Negotiations substanti.Bfly No action. {IDA) ·completed. 40.0 Expansion of Cochin Awaiting additional No action. (IDA) and Nangal' fertilizer information needed to plants prepare appraisal. 10.0 (R) Population Pre-appraisal mission No action. (IDA) preparing report. 30.0 Highways II Appraisal mission deferred; No action. (IDA) awaiting further project preparation. 26.0 (R) Agricultural credit Appraisal report being No action, (IDA) in Andhra Pradesh considered. 35.0 (R) Agricultural credit · Appraisal mission No action. (IDA) in Tamil Nadu in field, 35.0 (R) Agricultural credit Draft application under No action. (IDA) in Haryana ·review; appraisal mission scheduled for November. 30.0 . (R) Tawa irrigation Appr.aiaal mission planned No action. (IDA) for October. s.o Grain storage Appraisal report being No action, · (IDA) prepared, (Joint financing with SIDA for $S,0 being discussed.) r 1.:.>B 60.0· Power transmission III Awaiting discussions on No action, (IDA) second power transmission· project. 60.0 (R) Telecommunications IV Appraisal mission planned No action. (IDA) for late 1970. 1S.O Bombay water supply Awaiting feasibility No action. (IDA) report (expected in December). 1S.O (R) Education Negotia~ions 'in progress.· No action. (Bank) 60.0 (R) Power transmission Negotiations subetent!elly No action. (Bank) and distribution completed. .._, 't:.1:>.& oi. 3S.O Telecommunications Appraisal report being Bide being invited (Bank) considered. for telex equipment and cables (11.0). See P.l for footnotes!/, 3._/, ~ and 1/, - 12 - Amount & Probable Available Information Member State !/ Lender.!/. Pro1ect :l_/ Stage of Proceaeins on Procurement i/~~- NEPAL 2,4 (R) Highways Negotiations expected to Bidding documents for (IDA) begin about October l~- bridge construction reviewed. Retro- active financing (about $30,000) for consulting services to be recommended, PAKISTAN 5.0 (R) Eeet Pakistan tea Appraisal report being No action, (IDA) machinery and prepared, irrigation 5.0 Lahore water Appraisal mission No action, (IDA) supply and scheduled for late 1970. sewerage (Sweden may join in financing,) 5.0 (R) East Pakistan Appraisal report being Ho action, (IDA) foodgrain storage 11- prepared. (Sweden may join in financing,) 30.0 (R) Dacca Southwest Appraisal mission Ho action. (IDA) irrigation and in field. flood control 2.0 (R) EPWAPDA consultants Appraisal.mission No action, (IDA) on irrigation and in field, flood control 11- 15.0 Karachi port Awaiting detailed Ho action, (IDA) construction engineering. 5.0 Salinity control Government pr~paring No action. (IDA) and reclamation feasibility report, 10.0 Industrial Development Project to await No action. (IDA) Bank commitment of current credit, 15.0 Agricultural Development Report of end-use No action, (IDA) Bank IV mission being reviewed. J n.1:.~t .o'.} Karachi Electric 10.0 (R) Karachi power Appraisal mission No action, Supply Corp. (Bank) transmission and scheduled for -. distribution October. ~t"· PICIC 30,0 (R) Development finance Appraisal mission No action. (Bank) company IX scheduled for October/November. See P,l for footnotes l_/, !/, 1/ and!±/, - 13 - Amount & Probable Available Information Member State·!/ ~ ! /____ Stag_e of Processing on Procurement!!._/~- V, EUROPE, MIDDLE EAST AND NORTH AFRICA 3.2 Sewerage (Nicosia) Awaiting passage of sewerage Retroactive financing (Bank) legislation, up to $77,000 for consultant's ser- vices being con- sidered. 1.5 Sewerage (Famaguata) Awaiting passage of sewerage Retroactive financing (Ban1':) legislation. up to $40,000 for consultants' ser- vices being con- sidered, 2.0 (R) Roads Pre-appraisal mission Retroactive financing (Bank) preparing report. (about $100,000) for for consultants may be recommended, 4.0 (N) Water use improvement Awaiting feasibility No action, (Bank) study. 12.5 Highways Reappraisal mission scheduled No action. (Bank) for September/October. -Industrialization 20,0 (R) Development finance Negotiations substantially No action. Fund of Finland (Bank) company completed, 15.0 (R) Roads Pre-appraisal report being No action. (Bank) considered. 13.0 (R) Technical Education Negotiations began on No action. (Bank) September 21. 110.!:J'.>. ICELAND 4.1 (R) Roads Negotiations substantially· Prequalification of (Bank) completed, bidders completed, Bids issued Eor two road sections. Retro- active financing for ·.m..t.1!H sma11· amount of con- struction work to be recommended. IRELAND i::,~, industrial 15.0 (R) Development finance Appraisal report being No action. Credit Co, (Bank) company prepared. 10113! Electricity 10.0 Thermal Power II Appraisal report being Bids invited for Supply Board (Bank) prepared. · boiler and turbo equipment, 10.0 (N) Education Project preparation by No action, (Bank) Government underway. 10.0 (R) Microwave communica- Feasibility report being No action, (Bank) tiona reviewed by ~vernment. Appraisal mission tentatively scheduled for September. To ·be determined Irrigation (Lower Consultants preparing No action. (Bank) Khalia) feasibility study. To be determined (N) Education Uneaco project identification No action. (Bank) report being reviewed. To be determined Grain storage Government considering con- No action, (Bank) sultants' proposal for feasibility study. See ·P.l for footnotes!/,]/, 11 and~/. - 14 - Amount & Probable Available Information Member State!/ Lender !/ Project '}/ Stage of Processing ori Procurement!!._/~~ 20.0 (R) Agricultural credit Negotiations substantially No action. (Bank) completed. To be determined Highway construction Pre-appraisal mission No action. (Bank) in field. 5.0 Amman-Zarqa highway Appraisal report being Invitations issued (IDA) prepared. to pre-qualify for bidding. 5.0 (R) Education Appraisal mission No action. (IDA) postponed. To be determined _Power generation Awaiting completion of No action. (IDA) feasibility study (expected in September). 31.0 Expressway construction Awaiting Government's pro- Retroactive financing (Bank) and Engineering posals for financing plan. may be recommended (Beirut-Tripoli) for consultant services. 15.0 South Beqaa Irrigation Awaiting completion of No ac:ti_on. (Bank) feasibility study (expected in September). MOROCCO 5.0 (Bank) (R) Education II Project ·preparation mirsion No action. 5.0 (IDA) t1cheduled"for September/October. 20.0 (R) Rabat/Casablanca Final feasibility study Retroactive financing (Uncertain) water supply being prepared. for consulting services and initial dam construction being considered. Pre-qualification of bidders underway. Caisse Nationale 10.0 (R) Agricultural credit II Awaiting loan application No action. de Credit Agricole (Bank) from CNCA. Appraisal (CNCA) planned for November. Banque Nationale 20.0 (R) Development finance · App1:aisal misfiiori" in No action. pour le Developpe- (Bank) company V field; ment Economique Credit Immobilier. 15.0 (N) Tourism II Awaiting ·s·ubstanthJ. . No action •. et Hotelier (Bank) (hotel projects) coimnitment of first loari. SOUTHERN YEMEN 1.5 (R) Roads Appraisal report being No·action. (IDA) prepared. 50.0 (R) Railways III Appraisal mission tentatively (Bank) scheduled for November. · 12.0 (R) Agricultural research Report of follow-up mission No action. (Bank) and extension being considered. 40.0 (N) Porte II Awaiting preparation of No action. (Bank) project. 4.0 _Population Appraisal report being No action. (IDA) prepared. 18.0 (R) Road construction Appraisal mission scheduled No action. (Bank) for November. See P.1 for footnotes!/,!/,'}_/ and!!._/. - 15 - Amount & Probable Available.Information Member State!/ ~ ! /____ Stage of Processing on Procurement!!/~- TUNISIA (cont'd) To be determined Tourism infrastructure Awaiting feasibility No action. (IDA) study, 7.5 (R) Gas pipeline Appraisal report being Bids on pipe received (Bank) prepared. (Joint lending and being reviewed. with Kuwait Fund being Invitations issued arranged). to bid on pipelaying and compression and gas treatment station. To be determined (N) Fisheries Appraisal mission No action. (Bank) scheduled for February. Banque Nationale To be determined Agricultural credit Appraisal report being No action, de Tunieie (Uncertain) prepared. Societe Nationale 10.0 Development finance Awaiting further No action. d'Investissements (Bank) company IV commitment of latest loan. 4.5 Livestock I (Dairy) Negotiations in progress. No action. (IDA) To be determined (R) Power transmission Appraisal mission No .action, (Bank) fnfield, To be determined (N) Power - Cukurova IV Appraisal·mission M11jor contracts· awarded (Bank) (Supplemental) iri field. under previous loan; 5.0 Tourism Discussions proceeding with No action, (Bank) possible foreign partners and consultants, _,: ~,- .l·b 15.0 (R) Education--Management, Appraisal mission No action. ·.-s.,,· r (Bank) Technical and Vocational ln field. Training J', 11:- 10;0 Istanbul water supply· Feasibility studies being No action. (Bank) prepared. J' l, 15.0 (R) Fruit and vegetables Appraisal mission tentatively No action. (IDA) plsnn.ed for October. 15.0 (R) Livestock II Project preparation mission No action, ~ . ,.,: ) (Bank) in field; · 20.0 (N) Fertilizer-Ipras Pre-appraisal report being No action. (Bank) prepared, Industrial Bank 30.0 Development finance Appraisal report being No actio~. · of Turkey ·(TSKB) (Bank) company considered. UNITED ARAB 24.0 Railway improvement Appraisal report being No action. REPUBLIC (IDA) prepared. To be determined Inland waterways ) . No action. (IDA) ) Awaiting further ) project preparation. To be determined Port of Alexandria ) No action. (IDA) ) See P,1 for footnotes!/,!/,~_/ and f!/. - 16 - Amount & Probable Available Information Member State l/ Lender !/ Project '}_/ Stage of Processing on Procurement!!./~~ YUGOSLAVlA 10.0 (R) Tourism (Babin Kuk) Appraisal report being No action. (Bank) prepared. 8.0 (R) Tourism (Portoroz) Appraisal report being No action. (Bank) prepared. 34.0 Multipurpose water Appraisal report being No action. (Bank) supply - Ibar/Lepernac prepared. 30.0 (R) Roads V Appraisal mission No action. (Bank) in field. To be determined Development finance Nev proposals for Bank No action. (Bank) company financing being explored. VI. _£ENTRAL AMERICA AND CARIBBEAN COSTA RICA 17.5 Port of Limon Appraisal report being Small amount of (Bank) prepared. retroactive· fin~ ancing to be rec- ommended for con- sultants' services. Banco Cetttral 10.0 Agricultural credit Awaiting completion of No action. (Bank) project preparation. DOMINICAN 4.0 (R) Education Appraisal report being No action. REPU"iliic" (IDA) co·ns1a-er1::1~. To be determined (R) Livestock Appraisal mission in No action. (IDA) field. To be determined Irrigation (Yaque Appraisal deferred pending No action. (IDA) del Norte) completion of .consultant's study. 8.0 Olomega Irrigation Project in abeyance pending No action. (Bank) enactment of required legislation. Adminiatracion 5.0 ANTE!.. expansion Appraisal mission No action. Nacional de (Bank) program II planned for September. Telecommunicaciones (ANTEL) 5.0 Power generation Appraisal report being No action. (IDA) and transmission prepared. GUATEMALA To be determined Highway construction Proposal for redesigned No action. (Bank) project expected to be ready by Fall 1970. To be determined Power transmission and Revisions in feasibility No action. (Bank) distribution report awaited. 4.0 Telecommunications Appraisal mission tentatively No action. (Bank) expansion program planned for October. 4.0 Livestock credit Negotiations deferred pending No action. (Bank) economic policy diacuaaione with new government. GUYANA 2.0 (IDA) (R) Livestock Appraisal report being No action. considered. 5.0 Roads Detailed feasibility study No action. (Bank) being carried out with Canadian aaeietance. See P.l for footnotes l,I, !I,'}__/ and!!_/. - 17 - Amount & Probable Available Information Member State Y ~ 1 1____ Project 3/ Stage of Processing on Procurement!!_/~~ GUYANA (cont'd) To be determined Georgetown Sea Defenses Feasibility study being No action. (Bank) prepared. To be determined Power I Project being prepared with · No action. (Bank) help of Bank staff. HONDURAS 3.5 (Bank) _Highway (Tegucigalpa- Project to be undertaken in No action. 3.5 (IDA) Talanga) two stages; detailed engineering being prepared. Empreea Nacional To be determined Porte Feasibility study being No action. Portuaria (Bank) completed. JAMAICA Jamaica 4.0 Agriculture! credit Appraisal report being No action. Development (Bank) prepared. Bank (JDB) 10.0 (R) Education Appraisal report No action. (Bank) under review. Water Commission 5.0 (R) Sewerage (Kingston) Feasibility study No action. of Jamaica (Bank) under review. Jamaica To be determined Development finance Appraisal mission tentatively No action. Development (Bank) company planned for January. Bank (JDB) To be determined (rr) Tourism on Pacific Appraisal mieeion tentatively No action. (Bank) Coast planned for January. · .. · · ,, .i.;) To be determined Forest industries Awaiting preparation of No action. (Bank) project. , 11~··: NICARAGUA Autoridad 5.25 (R) Port expansion at Awaiting fiscal action Smal1 amount of Portuari,F (Bank) Corinto ·before up-dating approved. retroactive f-inancing de Corinto for engineering services may be recommended. Empress Nacional 11.0 Power expansion Awaiting results of No action. de Luz y Fuerza (Bank) program feasibility study. 2.6 Fisheries Project identification No action (Bank) report submitted to Government. To be determined (R-) Tocumen airport Appraisal mission No action. (Bank)· in fielci. · TRINIDAD & 2.0 Development finance Consideration deferred No action. ~ (Benk) company until 1971. Port Authority 5.0 Port of Port-of-Spain Feasibility etudy to be No action. (Bank) up-dated by Port Authorit~ To be de.termined (R) Population Appraisal mission tentatively No action. (Bank) planned for October. See P.l for footnotes Y, 11, :}_/and!!_/. - 18 - Amount & Probable Available Information Member State !/ ~:!:_/_ _ __ Stage of Processing on Procurement !lf_ _ VENl!ZUl!LA C.A. Nacional 35. 0 (R) Telecommunications 'foi;otlations began on No action. Telefonoa de {Bank) 5eptember 17. Venezuela {CANTV) Banco de To be determined Livestock credit Project preparation report No action. Desarrollo (Bank) ·submitted to Government. Agropecuario 30.0 (R) Maiquetia airport Appraisal mission tentatively No action. (Bank) planned for December. Corporacion To be determined Orinoco agriculture Project identification No action. Venezolana de (Bank) report being reviewed. Guayana ARGENTINA 35.0 Roads III Appraisal report being No action. {Bank) prepared. Ferrocarriles To be determined {R) Railways Appraisal report being No action. Argentinos {Bank) considered. To be determined Meat packing Preparation of project by No action. {Bank) Government proceeding •. To be determined (tl) Roads IV Appraisal report being No action. · (Bank) prepared. BOLIVIA 6.8 (R) Livestock III · Negotiators invited. No action. (IDA) BRAZIL To be determined (R) Education Project being modified No action. (Bank) after discussions with Government. To be determined (R) Port of Santos Appraisal mission Retroactive financing (Bank) in field. for consultant's services may be recommended. To be determined Industrial finance Awaiting Brazilian proposals No action, (Bank) (R) Sao Francisco irrigation Project deleted after completion of appraisal and discussions with Governmen·t. To be determined Highways III Awaiting completion of No action. {Bank) detailed engineering. To be determined {R) Railways Appraisal mission achedul~d. No action. (Bank) · for October. Mineracoes To be determined (R) Iron ore mining and Appraisal mission scheduled No action. Brasileiras (Bank) transportation for October. Reunidas Sao Paulo State 30.0 (R) Sao Paulo water Appraisal mission No action. or Municipality (Bank) supply and sewerage 1n u .. 1c1. Centrais Eletricas To be determined Sao Simao hydropower Awaiting completion of No action. de Minas Gerais (Bank) feasibility study. See P.1 for footnotes];_/,:!:_/, ]_I and !if. - 19 - Amount & Probable Available Information Member State):_/ ~- ~'~~~~ ~.!lie of Processing on Procurement!!_/~~ BRAZIL (cont'd) Eletro Sul To be determined (R) Saito Osorio hydropower Appraisal mission No act:i.on. (Bank) in field. Sao Paulo State· To be determined Sao Paulo beltway Awaiting completion of No action. (Bank) detailed engineering. 8.0 Port improvement Awaiting Government's No action. (Bank) response on conditions for starting negotiations. 25.0 Livestock Appraisal report being No action. (Bank) prepared. 50.0 Power Appraisal tentatively planned No action. (Bank) for December. 15.0 (R) Irrigation Project preparation mission No action. (Bank) (Aconcagua) scheduled for November. 26.0 (R) Railroad rehabilitation Project preparation mission No action. (Bank) ln field. COLO!iBIA Institute:> de 5.0 Development Finance Negotiations in suspense. No action. Fomento Industrial (Bank) Institute pending resolution of certain issues. Empresa-,Nacionel 13.0 (R) Telecoinmunications 0 Appraisal report being No action. de Tele- (Bank) prepared •. comunicaciones I '~I,. ! Corporacion de 6.0 Bucarsmsngs sewerage Presentation to Executive No action·. Defense de le (Bank) and erosion control Directors awaiting municipal Meaets de tax increase needed to finance Buce1:amanga project. l"t;•· Empress, r. 2.0 Palmira water supply Negotiations temporarily No action, Municipales de (Bank) and sewerage suspended. J ( Palmira ·J1", I Ins ti tu to 5.0 Land settlement Appraisal report being No action; Colombiano de (Bank) (Caqueta) prepared. ls Reforms Agraria Inst:ltuto 1.2 Atlsntico Irrigation II Awaiting completion of No action. Colombisno de (Bank) feasibility study. ls Reforms Agraria ''It~ I Banco de ls 30.0 (R) Development finance Appraisal mission scheduled No action. Republics (Bank) companies IV for September/Octobe_r. Private Investment Fund Ferrocarriles 10.0 (N) Railways VI Project preparation mission No action, Necionales (Bank) scheduled for October. de Colombia Empress de 40.0--50.0 (N) Bogota Water Supply II Awaiting completion of No action. Acueducto y (Bank) feasibility study. Appraisal Alcsntsrillado scheduled for October. de Bogota See P.l for footnotes):_/,~/,]/ and!!._/. ', - 20 - Amount & Probable Available Information Member State};/ Lender !/_ _ __ Stage of Processing on Procurement!!./_ _ ECUADOR 8.0 Development finance Negotiations substantially No action. (Bank) companies completed. Presentation to Executive Directors awaiting Government's approval of draft loan documents. Port Authority 5.0 (R) Port of Guayaquil II Awaiting up-dating of No action. of Guayquil (IDA) feasibility study. 5.0 Forestry Project preparation delayed. No action. (Bank) 2.0 (R) Irrigation (Milagro) Project preparation No action. (Bank) delayed. 10.0 (R} Livestock III Negotiations substantially No action. (IDA) completed. Presentation to Executive Directors awaiting Government's approval of draft credit agreement. PARAGUAY 8.5 Road improvement Appraisal scheduled for No action. (Bank) December. 5.0 Education I Project preparation mission No action. (llank) scheduled for October. (R) Education Project to be deleted because Government baa suspended project preparation. Banco To be determined (R) Agricultural credit Awaiting clarification of No action. Agropecuario (Bank) Government's balance of payments prospects. (R) Livestock Project to be deleted because Government has suspended project preparation. To be determined (R) Irrigation (Chira Piura} Project review mission pre- No action. (Bank) paring report but Bank also awaiting clarification of Government's balance of payments prospects. 30.0 (R) Road reconstruction Loan eigned on Septcnber 14. (Bank) in earthquake area URUGUAY Adminiatracion 18.0 (R} Power Negotiations began and have No action. General de las (Bank) been suspended pending Uainaa Electricaa resolution of certain issues. y loa Telefonoa del Estado (UTE) See P.1 for footnotes};__/,!/, 1_/ and f!_/.