101735 For Official Use Only CLR Review Independent Evaluation Group 1. CAS-ISN Data Country: Arab Republic of Egypt CAS-ISN Year: FY06-FY14 CAS-ISN Period: FY06 – FY14 CLR Period: FY06 – FY14 Date of this review: December 9, 2015 2. Ratings CLR Rating IEG Rating Development Outcome: Moderately Unsatisfactory Unsatisfactory WBG Performance: Good Fair 3. Executive Summary i. This is a difficult CLR to review, covering an unusually long period (FY06 —FY14) for a country strategy that spanned several years of entrenched political stability, followed by revolution and subsequent elections which ushered in a new regime, and culminating in its overthrow by the armed forces. Indeed, since January 2011 Egypt has been undergoing dramatic change. Such change was welcomed by some sectors of society—and fostered hope in those sectors—but brought with it substantial challenges, including for the implementation of the WBG program. Underlying political and social tensions remain. ii. Against this background, the WBG program went through two distinct phases during the review period. In January 2006-January 2011 the program described in the CAS and CAS progress report was anchored on a government development agenda that emphasized pro-growth reforms in response to a deteriorating global environment that resulted in food and financial crises. The government broadly supported the Bank program during this initial period, and—as a sign of support of Bank programs—contributed to the IDA15 replenishment. Things changed significantly in the period February 2011 to June 2014, as government commitment to the WBG program weakened after the January 2011 revolution. A modest ISN lending program envisaged an Emergency Labor Intensive project (FY12) focused on job creation and a Development Policy Loan for economic management. But the planned DPL—a key piece of the Bank strategy—could never be developed or implemented. In addition, a Health Insurance Project (FY10) that was ongoing at the start of the ISN period, and had initially broad buy in from the government, was not implemented after the revolution because government priorities changed. iii. Within this adverse policy implementation environment for the WBG program, the Bank attempted to adapt and continue contributing to Egypt’s development agenda, but its efforts did not show tangible results based on an assessment of the ISN results framework. The inability to negotiate the Bank DPL on economic management is a telling symptom of the difficulties of the Bank’s engagement with key counterparts. These difficulties mirrored complications in the IMF’s engagement with Egypt. There was no progress on an IMF program despite an agreement in principle on CLR Reviewed by: Peer Reviewed by: CLR Review Coordinator Juan J. Fernández-Ansola, Pradeep Mitra, Mark Sundberg, Surajit Goswami, Consultant Manager Consultants IEGHE IEGEC IEGHE Lourdes Pagaran CLR Coordinator IEGEC For Official Use Only CLR Review 2 Independent Evaluation Group November 20, 2012 and Egypt’s need for official financing in light of little private external financing to cover an external current account deficit of 10 percent of GDP. iv. Eleven out of thirteen objectives under the CAS and ISN program were partially achieved or not achieved under IEG’s CLR review (eight out of thirteen according to the CLR). In some areas Bank initiatives never took off the ground, in others the dialogue did not generate the expected actions or reforms, and in yet other areas there were reversals during the ISN period of progress made during the CAS period. In focus area I (economic management) the budget deficit and energy subsidies worsened during the ISN period and progress that had been achieved in public sector transparency during the CAS and CAS progress report period was reversed. Only lately there has been a decrease in the underlying budget deficit according to the IMF. In focus area II (jobs)—an area that showed some results under the Bank program —there was partial progress on the business environment, financial sector improvement, power and transport infrastructure, education, and trade, but not enough to have a significant impact on jobs. In focus area III (inclusion) there was some improvement of water and air quality, and on gender issues—most of it before the ISN period—but little progress on the rest that included improving the management of water, sanitation, and irrigation systems, expanding access to healthcare, developing targeted and sustainable safety nets, and reducing interregional disparities. In some important areas—such as energy subsidies—progress was observed after the formal ISN period, but only recently policies have been put in place to address the budget deficit. Moreover, the sea change required for a productive WBG engagement with Egypt is yet to be seen. Before the ISN there had been some progress on fiscal consolidation, public sector transparency, the business environment, and air quality. During the CAS and CAS progress report period, there were a number of initiatives and pilot programs on social sectors but it is difficult to assess if they resulted in an effective improvement of inclusion, particularly in access to healthcare, safety nets, and reduced interregional and gender disparities. Yet, the Bank can claim some progress on helping develop a poverty mapping which should contribute to set up a targeting mechanism to reach the poor in the future. v. The FY06-FY08 CAS results framework and its extension to FY11 under the June 2008 CAS progress report had an adequate design showing the country development goals, issues and obstacles, outcomes to which WBG expected to contribute, intermediate indicators (milestones), and WBG activities. The May 2012 ISN program provided a reasonable response to the challenges faced by the country at the time, focusing on implementation and obtaining results over an 18-month period. The selection of areas—macroeconomic stabilization, job creation, and governance—were appropriate to the situation of the country at the time, and were reiterated as priorities under the Systematic Country Diagnostic (2015, see footnote 1). vi. Bank interventions, however, were not always appropriate to obtaining the proposed goals. For example, for the objective of deficit reduction the interventions were mainly monitoring or policy notes. The program had an emphasis on knowledge services in some of its key areas —perhaps reflecting the difficulties of the dialogue to put together lending operations or policy loans, and poor portfolio performance. The CLR would have benefited from more evidence on whether particular pieces of AAA either influenced in-country thinking on the issues they were designed to illuminate or informed the design of Bank operations. vii. The revised CAS framework in the ISN was not as detailed as in the CAS and CAS progress report—for example it did not have a column showing issues and obstacles—and its objectives in the results framework supported goals in the areas of economic management, jobs, and inclusion. Moreover, the ISN results framework was weak because objectives in many cases were too broad for the planned Bank interventions and indicators were not representative of the objectives. In a number of instances indicators reflected poorly the objectives, several indicators stopped at the output level (no outcome targeted), and the indicators were too vague to be measurable by quantitative values. Some of the indicators and objectives referred to pilots that would be scaled up, but the scaling-up was not discussed in the program document. In addition, the scope of some objectives, such as reducing gender disparities, were too broad to be achieved during the review period with the planned For Official Use Only CLR Review 3 Independent Evaluation Group WBG interventions. IFC activities were included in the framework in the main areas of IFC interventions—for example PPPs—but in general there were no outcome indicators directly linked to the IFC activities, which made their contributions more difficult to evaluate than IBRD contributions. viii. Implementation of the WBG program was not smooth even before the ISN, and became extremely difficult during the ISN, when decision making was paralyzed owing to continuous changes in the cabinet. Supervision of Bank interventions suffered as a result, and implementation of some projects stopped altogether. The Bank responded in a piece-meal fashion, but on the whole essentially shifted from lending to knowledge dissemination and advisory work, whose results are not easy to assess. Despite IFC outcomes not being measured explicitly in the results framework, IFC contributed to key WBG program objectives and adapted to changing circumstances and priorities. Owing to the political uncertainties in Egypt during the ISN period as well as government reluctance to commit to reforms, however, IFC lost traction on PPPs, with the exception of the one for Alexandria Hospitals where progress has been extremely slow, or on other advisory activities that required government commitment, especially in investment-climate-related reforms. Negative perception of the private sector in the post-revolution period resulted in several reversals of public asset privatizations as well as legal challenges to land allocation or to concessions —for example in infrastructure, which hindered IFC’s ability to support job creating and developmental projects. Almost one-third of IFC’s existing portfolio at the time of the ISN program was being challenged in the courts for different reasons —for example Titan Cement, Omar Effendi retail, and Bank of Alexandria. ix. Joint WB and IFC activities were limited during the ISN period. For example, the two institutions collaborated on the Egypt Development Market Place initiative (FY13). The Bank generally coordinated well with development partners. Safeguard compliance was uneven under the WBG program, but there were some notable examples of good practice. There were serious fiduciary issues in energy, water, and transport sector projects, where the Integrity Vice-Presidency found evidence or strong indications of corrupt and collusive practices. x. The CLR did not adhere to the IEG-OPCS Shared Approach for Assessing Country Partnership Strategies when rating the overall development outcome while the CLR review did. The discrepancy in ratings between the two documents then is more a reflection of this than of the substance of the assessments. The rating for overall development outcome would be Unsatisfactory for the CLR under the guidelines—the same as in IEG’s CLR review—with eight out of thirteen objectives partially achieved or not achieved. xi. IEG agrees with the lessons in the CLR, particularly on the need to respond flexibly in a high risk political environment. IEG would add that following the Arab Spring the Bank Group had to try to establish itself as a trusted development partner with the new government and with a civil society that played a key role by mobilizing. The ISN and its areas of intervention were in the spirit of the WBG becoming a trusted development partner to the new actors in Egypt. With the ISN, the WBG took a calculated risk that with the benefit of hindsight did not lead to the expected results. Embedding institutional development, capacity building, and governance more systematically in program interventions would have been warranted. On a program design issue, IEG believes that setting objectives too broad in scope is invitation to missing targeted outcomes for the program. 4. Strategic Focus Relevance of the WBG Strategy: 1. Congruence with Country Context and Country Program . Egypt is a low-middle income country with a GDP per capita of US$3,315 in current 2013 US dollars, which makes it an IBRD-only WBG client country. In 2010 half of the population in the country was considered poor. Moreover, economic activity remains unevenly distributed geographically, and concentrated in a few metropolitan areas. As a result, the poverty rate in remote areas of Upper Egypt is more than 40 percentage points For Official Use Only CLR Review 4 Independent Evaluation Group higher than in metropolitan Egypt. Egypt’s growth in the past three decades was neither sustained nor inclusive, and even periods of rapid growth did not result in poverty reduction or improvements in shared prosperity. The country has long-standing structural budget and trade deficits, across-the- board energy subsidies that reached over 6 percent of GDP in 2013-14, and persistently high inflation. These pitfalls and poor job creation are largely rooted in weak public governance, including a public sector that is not transparent or accountable. Therefore the longstanding policy challenges for Egypt 1 are macroeconomic stabilization, energy reform, and improvement in public governance. The context of the period under review2 was dominated by the consequences of the political turmoil that led to the downfall of the 30-year Mubarak regime and its replacement by a government (“the revolution”) with the support of the Muslim Brotherhood. For the ISN, the Bank needed to get into broader consultations than in the past to build trust with counterparts with whom it had not worked before, create new partnerships, and focus on capacity building. The new government introduced a program —the National Initiative for Economic Recovery—and according to the ISN the overriding objective of the Bank program was to support the government program and help realize early credible economic gains that did not compromise the medium-term outlook. Actions under the program were expected to be carried out during the 18-month period of the ISN, which by necessity required some flexibility to address issues as they arose in a difficult political and economic context. The main objectives of the ISN were to improve economic management through control of the fiscal deficit and initiate reforms to enhance transparency and government operations, to help create jobs through direct emergency lending and take steps to improve the environment for private sector-led growth, and to ensure access of disadvantaged segments of the population to infrastructure, finance, social services, and participation in the design, implementation and monitoring of government operations. 2. Relevance of Design. The FY06-FY09 CAS—extended to FY11 by the June 2008 progress report—sought to support Egypt’s program to achieve growth with equity by making more use of the private sector as a development agent as well as by changing the role of government in managing the economy. The FY12 Interim Strategy Note program provided a reasonable response to the challenges faced by the country, focusing on implementation and obtaining results over an 18-month period. The selection of areas—macroeconomic stabilization, job creation, and governance—were appropriate to the situation of the country at the time, and were reiterated as priorities under the Systematic Country Diagnostic (2015, see footnote 1). Bank interventions, however, were not always appropriate to obtaining the proposed goals. For example, for the objective of deficit reduction the interventions were mainly monitoring or policy notes. The program had an emphasis on knowledge services in some of its key areas—perhaps reflecting the difficulties of the dialogue to put together lending operations or policy loans, and poor portfolio performance—which makes difficult an assessment given the absence of Bank evaluation tools for these interventions. Both IFC and MIGA had significant operations during this ISN—indeed Egypt is IFC’s largest exposure in the MENA region with a committed portfolio of US$1.1 billion. But the CLR does not analyze in detail coordination under the WBG Micro, Small, and Medium Enterprise Facility or a joint initiative under the Deauville Partnership process. There is wide donor support to Egypt from USAID, the European Union, Saudi Arabia, Germany, Kuwait Fund, UNDP, African Development Bank, IMF and the Islamic Development Bank. The Bank coordinated with the IMF, and the CLR does not report on coordination with other development partners. 3. IFC’s program focused on supporting the achievement of objectives 3—business environment— and 4—financial sector competitiveness and efficiency. To this end, IFC put in a place a substantial volume of investments projects, often coupled with advisory services that addressed firm or sectoral issues. Overall, these interventions were appropriate for attaining the proposed objectives. In addition, IFC provided adequate support for improving the management of water, sanitation, and irrigation systems (for example, the Cairo Wastewater Public Private Partnership). 1 Egypt: Promoting Poverty Reduction and Shared Prosperity , A Systematic Country Diagnostic, Middle East and Africa Region, World Bank Group, September 2015. 2 Covering the FY09-FY11 Country Assistance Strategy and the Interim Strategy Note for FY12-FY14. For Official Use Only CLR Review 5 Independent Evaluation Group Selectivity 4. The FY06-FY09 CAS—extended to FY11 by the June 2008 progress report—concentrated resources on private sector development, enhancing the provision of public services, and promoting equity through a broadly adequate combination of lending and knowledge services. The FY12 ISN program had few lending interventions planned, on a labor-intensive investment project, two significant energy projects, an urban transport project, and a DPL for economic management. Analytic work and technical assistance would support the three areas of the ISN. Sustainability is difficult to assess because at the outset this was a fairly risky program with an 18 month horizon. On the whole, the program was not particularly well balanced across the focus areas. The DPL for economic management for example, depended on anticipated conditions of dialogue and government commitment that never materialized. Therefore there was no DPL delivered under this ISN or a fall back strategy in its absence that would contribute to achieve the program objectives. The jobs area had a significant lending intervention. But there were no significant lending interventions planned under the rest of the inclusion area, which was supported primarily by dialogue on aspects of education and health policies. Continuing with work started under the CAS, the bulk of the Bank engagement was in infrastructure lending—energy, transport, and finance. The Bank Group had comparative advantage in the areas of job creation, inclusion, and infrastructure, but some aspects of economic management—such as fiscal policy—are more part of the working scope of other partners, like the IMF. It appears that—understandably under an ISN—the choice of areas reflected more what was possible at the time than a well thought-out strategy with longer term aims of institutional change, capacity development, scaling up of interventions, and sustainability. Alignment 5. The CAS and ISN did not address specifically issues related to eliminating poverty and increasing shared prosperity. The ISN devoted little space in the text or the results framework to link WBG interventions to the reduction of poverty, promotion of inclusive growth, or pro-poor growth. Moreover, the WBG engagement under this CAS and ISN had negligible results at the end of the review period on macroeconomic management, reducing subsidies, targeting of social programs, or governance, in part because progress made under the CAS was reversed under the ISN. Yet, the Bank can claim some progress on helping develop a poverty mapping which should contribute to set up a targeting mechanism to reach the poor in the future. This CLR Review 6. The period for this review (FY06-FY14) is unusually long for a Country Assistance Strategy. Nevertheless—and in line with the approach taken by the CLR—IEG will use the ISN FY12-FY14 results framework as a basis for the review, and —where possible with evidence—give credit to progress made before the ISN period. 5. Development Outcome Overview of Achievement by Objective: Focus Area I: Economic Management 7. Objective 1 (# I.1):3 Implement government plan to gradually reduce the fiscal deficit by the end of the ISN period. The indicator referred to launching a gradual phasing out of energy subsidies for energy intensive industries, a fairly partial measure of what was required to achieve the objective of 3 IEG’s CLR review will use the same numbering of objectives as the CLR for ease of reference. For Official Use Only CLR Review 6 Independent Evaluation Group gradually reducing the fiscal deficit by the end of the ISN period. Increases in energy prices to energy- intensive sectors in 2012/13 reported by the CLR did not prevent energy subsidies to continue increasing as a share of the budget. 4 Moreover, the budget deficit increased from 10½ percent of GDP in 2011/12 to 13.6 percent of GDP in 2013/14 because the government did not introduce a coherent energy subsidy reduction plan until July 2014—beyond the ISN period. The budgetary cost of untargeted energy subsidies reached over 6 percent of GDP in 2013/14 according to the IMF, reflecting their universal provision as well as high international oil prices. Little progress on energy subsidies was one of the key barriers to an IMF program on which the Bank DPL in this area was contingent. In July 2014, the government launched a strategy to gradually reduce energy subsidies (see also paragraph 14). The Bank prepared an Energy Efficiency Strategy AAA (FY12), and Energy Efficiency Strategy (FY11) ESW piece, and Energy/Social Safety Nets Sector Reform (FY14)—a trust funded TA, as a basis for discussion of energy subsidies, but with energy prices remaining high there was little progress in this area during the ISN period. There was some progress on fiscal consolidation before the ISN period reported inter alia by the CAS Progress Report, but this was reversed after 2011. Similarly, progress on public sector transparency before the ISN period—as measured by the Open Budget Index—was reversed after 2011. Bank dialogue during and after the ISN centered on improving Egypt’s fiscal position. The most recent IMF visit to Egypt in September 2015 confirms that the authorities have reduced significantly the underlying budget deficit thanks to reforms to energy subsidies, and progress in containing the wage bill and increasing tax revenues. (Partially Achieved) 8. Objective 2 (# I.2): Increase transparency of public sector management. The Bank program envisaged an improvement in the ratings on governance and transparency scorecards by major observatories of perceptions of transparency. Reforms in this area during the ISN period did not go far enough in increasing transparency, and the progress that had been achieved during the CAS period on increased transparency has been reversed according to the Open Budget Index (OBI). The OBI increased from 18 in 2006 to 49 in 2010 (peak of period) and then decreased to 13 in 2014. A planned Bank DPL to address governance and safety net reforms in parallel with an expected IMF program never materialized. During the CAS period the Bank focused on policy dialogue on macroeconomic targets, and the findings of sectoral Public Expenditure Review notes were published on the internet. (Not Achieved) 9. Based on the rating of its two objectives, IEG rates Focus Area I as Unsatisfactory. The budget deficit and energy subsidies worsened during the ISN period, and progress that had been achieved in public sector transparency during the CAS period was reversed during the ISN. The inability to negotiate a Bank DPL on economic management is a telling symptom of the difficulties of the Bank’s engagement with Egypt in this area. These difficulties mirrored complications in the IMF’s engagement with Egypt. There was no progress on an IMF program despite an agreement in principle on November 20, 2012 and the need for official financing in light of little private external financing to cover an external current account deficit of 10 percent of GDP. The IMF required inter alia progress on energy subsidy reform to contain the budget deficit. Focus Area II: Jobs 10. Objective 3 (# II.1): Improve the business environment. The indicator on improving the Doing Business ranking during the ISN period was not met. The ranking improved from 141 in 2006 to 94 in 2011, but then fell to 128 in 2014. Some regulatory reforms were done, but the indicators on reforms lacked specificity to assess if these reforms were the ones envisaged under the Bank program. In any event, some of the reforms—such as simplification of registration procedures for foreign companies and simplification of construction permit procedures—seem to foster a better environment for business, at least in a formal sense. The Bank contributed TA on Transport Regulations (FY12) and IFC contributed 4 According to the IMF, in 2011 natural gas and fuel oil were available for Egyptian companies at less than 40 percent of the cost recovery price. This resulted in distortions, generating a bias in favor of capital- and energy intensive industries that encouraged diversion of resources—including foreign direct investment—to these sectors, to the detriment of more energy-efficient or labor intensive industries. For Official Use Only CLR Review 7 Independent Evaluation Group in the area of PPPs. Bank work on a Power Sector PPP Framework (FY15) came late in the process to have an impact on ISN results. (Partially Achieved) 11. IFC implemented a number of advisory services projects that addressed issues related to improving the investment climate, such as business start-up regulations, and an Alternative Dispute Resolution (ADR). Use of mediation is expected to release assets locked up in disputes and eventually increase private sector savings, but buy-in from the government is required for this mechanism to become effective. IFC also had many investment projects supporting the objective of private-sector led growth and employment creation but their impact was not captured by the indicators for this objective. On PPPs, the one on program support Ministry of Finance is on track, the PPP on potable water in Cairo was rated unsuccessful, and the Alexandria hospitals PPP showed lack of progress after 8 years and $3.2 million in expenditure. On the latter, risk remains that the private sponsors are not satisfied with the compensation and perceive it as not enough to cover the costs for the delays incurred. Moreover, a recent debt resolution and business exit AS initiative was terminated. 12. Objective 4 (# II.2): Improve financial sector competitiveness and efficiency. It is not clear whether the indicator on introducing a sound strategic approach to expand access to finance to the poorest was met. The CLR reports on the launching of a Micro and Small Enterprise Development Strategy (2009-13), but is silent on whether the strategy has been implemented and is making progress towards providing access to finance to the poorest. Credit to the private sector increased in nominal terms during the ISN but appears to have contracted in real terms because of high inflation. Moreover the ratio of private credit to total credit fell from 47 percent in 2006 to 23 percent in 2015. According to the CLR, financial intermediation to the private sector declined because of developments following the January 25th revolution and private borrowers disinterest in borrowing owing to the poor macroeconomic environment and uncertain security situation. In addition the IMF notes that ample banking sector liquidity was used to invest in high-yielding, zero risk-weighted government debt at the expense of low credit to the private sector and minor nominal growth in mortgages. Although mortgages increased by 7 percent in nominal terms in 2011-13, inflation during the period was at least double that amount. The indicators on developing a regulator for non-bank financial institutions and improving the soundness of the Egyptian Financial Supervisory authority were met, and Egypt’s Central Bank has strengthened corporate governance in the banking system by issuing corporate governance regulations on July 5, 2011. In addition the central bank improved its own governance through amendments to the Central Bank, Banking System, and Money Law No. 88. The CLR notes interventions (MSME TA and Inclusive Regulations for Microfinance) that came too late to have an impact during ISN period, and it is unclear how or which Bank interventions contributed to improving regulations and governance in the banking system during the ISN period. A DPL series (FY06, FY08, and FY10) set the basis for the progress observed in this area prior to the ISN. There was also a Mortgage Finance project (FY06) 5 and additional financing for it (FY09). (Partially Achieved) 13. IFC delivered a significant program in support of this objective, such as investments that were critical for the privatization of banks, or the creation of credit bureaus, mortgage refinancing, and support of factoring and leasing. None of them, however, were captured in the results framework for the program. IFC also supported the development of two microfinance institutions. 14. Objective 5 (# II.3): Expand and improve power and transport infrastructure. The goal of expanding power generation by 27,000 MW was not met, although the Bank contributed to an expansion of energy production according to the CLR. The CLR does not report on whether the share of renewable sources in the energy generation mix increased as envisaged under the program —the wind and solar component is currently 1½ percent of the mix. The Gas Infrastructure project (FY08) 5 The Project Performance Assessment Report for the Mortgage Finance project rated it as moderately unsatisfactory noting that the mortgage liquidity facility—which was incorporated as the Egyptian Mortgage Refinancing Company or EMRC—has not started performing its most important role as a centralized issuer of corporate bonds to mobilize long- term funding from domestic capital markets. For Official Use Only CLR Review 8 Independent Evaluation Group helped increase household connections to natural gas and the respective target was met. The CLR reports some progress on energy pricing and subsidies, especially more recently (July 2014). To put the issue in perspective, the government plan required fuel prices to increase by about 20 percent every year to reach close to cost recovery by 2018/19. However, at current global oil prices, the phasing out of the subsidies could be achieved sooner or with lower annual price increases. Regarding transport, the CLR reports that the financial viability of Egypt National railways improved but was subsequently set back by political instability and unfavorable economic developments. The overall safety of the railways remains an issue that will take time to be overcome. The average number of fatalities due to rail accidents on the ENR network measured as the annual number of victims per one million passenger- km increased from 0.6 in 2008 to 4.9 in March 2015. Improvements of financing and regularity of road maintenance are difficult to gauge from the CLR. The urban transport authority for Greater Cairo is not yet operational as envisaged under the ISN, and the ISN did not provide a measure for quantifying improvements in public transportation. Although some cost reduction in telecommunication services may have taken place they cannot be attributed to Bank Reimbursable Advisory Services provided in this area. The Bank also contributed with technical assistance in the Energy Pricing and Subsidy TA (FY15), but this is beyond the ISN period. The Urban Transport Regulatory Authority is supported by an IDF grant under execution (TF 14420 – FY2014). (Partially Achieved) 15. The advisory role of IFC in the Dairut independent power project is on track.6 Only one of IFC’s investments in energy appears to lead to sustainable gas production. The Cairo-Alexandria Highway did not progress beyond a study, and the Cairo Airport PPP AS project was unsuccessful. Capacity of Cairo and Sharm el Sheik airports improved, but the government failed to delegate management of airports to the private sector. 16. Objective 6 (# II.4): Increase the relevance of education for the labor market . The indicator referred to testing for an eventual scaling-up of pilot schemes for improving the quality/relevance of higher education, skills development, and early childhood development. The Bank contributed to establishing quality assurance units in all universities and a fund to improve higher education through the Higher Education Enhancement Project (FY02). The CLR argues contributions through the Skills Development Project (FY04), but this project was closed in FY10 so the contribution was prior to the ISN. More recently, during the ISN period, there was a Skills Upgrading and Institutional Development TA (FY11). A Systems Approach for Better Education Results—Workforce Development TA (FY13) is the basis for next steps on the dialogue on skills development according to the CLR. IFC is providing support to bridge the skills gap for the ICT industry and improve the employability of students, although no data was provided on the impact of this initiative. The CLR notes an expansion in access to early childhood education (ECE) provided by NGOs, with Bank support through the Early Childhood Education Enhancement Project (FY05). An additional 35,823 students enrolled in kindergarten, meeting the target. Regarding an improved education curriculum, the Ministry of Education recently approved a new curriculum framework for secondary education but the ideas contained therein have not translated into a well-developed new curriculum document. The Higher Education Enhancement (FY02) project—closed in FY09—contributed with quality assurance and accreditation before the ISN period, and the CLR mentions that AAA on education led to development of new approaches to university entrance and secondary education graduation exams. (Mostly Achieved) 17. The ICT Sector TA has progressed as planned—and is at an early stage for outputs but no outcomes to report yet—but the TA on regulatory reform of the sector has been on hold for more than a year. The planned opening to private participation in higher education also has not materialized. 18. Objective 7 (# II.5): Increase trade with regional and global partners. IFC helped improve linkages across value chains but no quantitative measure of increased sales is provided in the CLR. The proposed indicator to develop schemes for improving linkages between suppliers and external 6 With financial closure planned for 6/30/16, the project is reporting the highest rating (4) on outputs and the next to highest rating (3) on outcomes. This, however, does not guarantee final success of the PPP. For Official Use Only CLR Review 9 Independent Evaluation Group markets is a weak measure of the objective. Moreover, WBG interventions were not commensurate with the objective. (Partially Achieved) 19. IFC’s significant initiative in this area was the 2013 Egypt Trade Logistics which after $1.2 million of expenditure is on hold. Similarly, a logistics industry development AS project was terminated in 2014. The Business Edge initiative (FY07-09) has been successful in developing SME entrepreneurs but there is no way to demonstrate that this has had an effect on export company value chains. 20. Progress made under the CAS on business environment was reversed after 2011 according to Doing Business reports. Moreover, Egypt ranked 119 out of 144 in the World Economic Forum Competitiveness Index owing to a deteriorated macroeconomic environment and particularly poor scores on labor and goods market efficiency, financial market development and education. During FY06-FY08 there was progress in lending to MSMEs and for mortgages —but private sector lending then fell as a share total lending and contracted in real terms —and improved governance for the overall banking sector. In addition the Bank helped develop energy, transport, and telecommunications infrastructure. 21. Based on the rating of objectives for Focus Area II IEG rates it as Unsatisfactory. There was partial progress on the business environment, financial sector improvement, power and transport infrastructure, education, and trade, but not enough to have a significant impact on jobs. Focus Area III: Inclusion 22. Objective 8 (# III.1): Improve management of water, sanitation, and irrigation systems. The indicator referred to testing for an eventual scaling-up of pilot projects for expanding network sanitation, increase efficiency and beneficiary participation in irrigation management, and developing PPPs by the end of the ISN. The Sanitation and Sewerage Infrastructure Projects (FY08, FY11) made modest progress in expanding networked sanitation into rural areas owing to delays in design, bidding procedures, environment and social impact assessments, land acquisition issues, and local communities’ opposition. The CLR notes some improvements in irrigation and beneficiary participation in irrigation management with support from the Integrated Irrigation Improvement and Management Project (FY05). Water savings of 10-30 percent were reported based on conveyance improvements, land leveling, and adoption of agronomic practices through improved farmer awareness. IFC through an AS project helped develop the first waste water PPP in Egypt through the implementation of the New Cairo Wastewater project. (Partially Achieved) 23. Objective 9 (# III.2): Improve water and air quality. The indicators were to test a pilot for reduction of industrial air pollution and waste management, and improve regulations for environmental standards. The first Pollution Abatement project closed in FY05 but was scaled up by the Second Pollution Abatement project (FY06). There were improvements in air quality between 1999 and 2010, and pollution reduction has been sustained according to the project’s IC R. The CLR reports that a waste water treatment plant was financed by Bank projects after testing of waste water pollution abatement. However, both projects supporting the plant were rated Moderately Unsatisfactory by management on progress toward achieving their development objectives. The Integrated Sanitation and Sewerage Infrastructure I project (FY08) is near closure, but Egypt’s budget tightness has contributed to delaying payments to contractors and completion of works, which are affecting adversely the achievement of project development objectives. The Integrated Sanitation and Sewerage Infrastructure II project (FY11) had to be restructured in light of implementation delays. These delays reflected inter alia issues of budget tightness compounded by insufficient training of local implementing staff, which the restructuring of the project intends to amend. Although legislation for improving environmental standards was approved, the ISN indicator does not specify how improved results from these new regulations would be measured. (Partially Achieved) 24. Objective 10 (# III.3): Expand access to healthcare. The proposed indicator—introduction of health insurance reform —is a poor measure of access to healthcare. In any case, health insurance For Official Use Only CLR Review 10 Independent Evaluation Group reform was not introduced. The Bank supported this objective through Health Care Quality Improvement project (FY10), and Health Insurance Development Project approved in FY10 but not implemented because of a change in priorities by the new government. (Not Achieved) 25. Objective 11 (# III.4): Develop targeted and sustainable safety nets. The two indicators for this objective were to introduce a sound plan to move towards more transparent and sustainable safety nets system, and to develop and implement new pension regulations reflecting international best practice in the area. On the first indicator, it was not possible to transition away from the subsidy system to a more efficient and targeted social safety net. The CLR is not clear on why this was the case, although it may have to do with the government having other priorities. The issue of poor targeting extends to energy subsidies. The IMF—based on household surveys conducted between 2003 and 2009 —notes that 90 percent of the benefits from energy subsidies accrue to the top quintile of the income distribution while only 7 percent go to the bottom quintile of the distribution. At the same time, IEG recognizes that the Labor Intensive Works Program (FY12) was geographically targeted using the poverty map that the Bank helped develop, and that according to the Egypt team, targeting has improved for cash transfer programs and food subsidies. On the second indicator, new pension regulations were developed but not implemented. The Bank provided technical assistance for this objective through the Dialogue on Safety Nets TA (FY08) and the Energy / Social Safety Nets Sectors Reforms Technical Assistance (FY14). A recent project—Strengthening Social Safety Nets (FY15)—continues with work in this area. (Partially Achieved) 26. Objective 12 (# III.5): Reduce interregional disparities. The indicator—which was not met—was to strengthen pro-poor targeting of public investment in Upper Egypt. It was not pointed enough to specify how strengthened pro-poor targeting of public investment in Upper Egypt would be measured. In any case, according to the CLR there has been uneven and non-sustained dialogue on this issue with the authorities, which is attributed to an unfavorable political environment. The Emergency Labor Intensive project (FY12) allotted 70 percent of disbursements to efforts in Upper Egypt. The Youth Study (FY12) is the basis of continued dialogue in this area according to the CLR. ( Partially Achieved) 27. Objective 13 (# III.6): Reduce gender disparities. The indicators for this objective were to have informed advocacy and policy making on gender issues, and enhance women’s access to finance through specialized windows. Although the indicators were met, a reduction in gender disparities can only take place over a time frame beyond the period under review. Moreover achievement of the indicators does not guarantee achievement of the objective. Indeed the Gender Equity Index reports no progress between 2009 and 2012.7 The Bank issued a number of reports on gender issues, including a Gender Assessment Update (FY10). According to the CLR there were a number of gender-informed operations in Egypt, including the Egypt Development Marketplace Program (FY16) and Promoting Innovation for Inclusive Financial Access (FY14)—both approved too recently to have an impact on the targeted outcomes—and the Facilitating Access to Finance (FY10). According to the Egypt team women beneficiaries constitute 32 percent of the projects on facilitating access to finance and promoting innovation and inclusive financial access, and both are making satisfactory progress based on supervision reports. Specialized finance windows were offered but evidence is thin on the number of women that actually benefited. The CLR states that Bank AAA on gender had an impact on policy dialogue in the country and the design of gender-informed operations. All in all, IEG recognizes a significant effort in this area that is expected to pay off over time and is relevant for a country like Egypt. (Mostly Achieved) 28. There was progress before the ISN on air quality which has been sustained, and efforts to reduce gender disparities that are expected to yield results in the future. Moreover the Bank undertook a number of initiatives and pilot programs under the CAS, but it is difficult to assess if they resulted in an effective improvement of inclusion, particularly in access to healthcare, safety nets, and interregional disparities. In practice, already lagging social outcomes deteriorated further post-2011. Unemployment 7 HTTP://WWW.SOCIALWATCH.ORG/TAXONOMY/TERM/527 For Official Use Only CLR Review 11 Independent Evaluation Group peaked at 13.4 percent in 2013/14, with the highest levels found among youth and women. Almost half of the population was still considered poor in 2012/23. 29. Based on the rating of objectives, IEG rates Focus Area III as Unsatisfactory. There was some improvement of water and air quality—most of it before the ISN period—but little progress on the rest that included improving the management of water, sanitation, and irrigation systems, expanding access to healthcare, developing targeted and sustainable safety nets, and reducing interregional and gender disparities. Overall Assessment and Rating 30. IEG rates the overall outcome under Egypt’s CPS and ISN C12 as Unsatisfactory. All but two of the thirteen objectives under the program were partially achieved or not achieved. The ISN was clearly affected adversely by the political climate in Egypt after the revolution. Some Bank initiatives never took off the ground, in others the dialogue did not generate the expected actions or reforms, and in yet other areas there were reversals of progress that had been made during the CAS. The inability to negotiate a Bank DPL to reform economic management—contingent on an IMF program that never happened—is a telling symptom of the difficulties of the Bank’s engagement with Egypt on polic y reforms. In focus area I (economic management) the budget deficit and energy subsidies worsened during the ISN period and progress that had been achieved in public sector transparency during the CAS period was reversed. In focus area II (jobs)—an area that showed some results under the Bank program—there was partial progress on the business environment, financial sector improvement, power and transport infrastructure, education, and trade, but not enough to have a significant impact on jobs. In focus area III (inclusion) there was some improvement of water and air quality, and gender issues—although most of it took place before the ISN period—but little progress on the rest that included improving the management of water, sanitation, and irrigation systems, expanding access to healthcare, developing targeted and sustainable safety nets, and reducing interregional disparities. Before the ISN there had been some progress on fiscal consolidation, public sector transparency, the business environment, and air quality. During the CAS period, there were a number of initiatives and pilot programs on social sectors but it is difficult to assess if they resulted in an effective improvement of inclusion, particularly in access to healthcare, safety nets, and reduced interregional and gender disparities. 31. The main differences in ratings between the CLR and IEG’s CLR review are on the objectives about the business environment and improving the financial sector in the Jobs Focus Area II, and the objective on improving water and air quality in the Inclusion Focus Area III. IEG recognizes that continuing to improve—or at least not reversing previous improvement—in the business environment after January 2011 was an uphill battle for the WBG. In addition, a number of initiatives that were not part of the results matrix, such as IFC’s doing a subnational Doing Business Survey collaboratively with government ministries, are likely to have set the basis for future progress in this area. At the same time various measures, including from the World Economic Forum, show no improvement in the business environment during the review period. Such lack of improvement had a deleterious effect on the economy, which is still being felt in Egypt. As regards improving the financial sector’s competitiveness and efficiency, the fact is that the financial sector became a drag on the private sector during the review period because its access to finance was reduced in relative terms. The indicators for this objective were not as specific or quantitatively measured as IEG would have hoped to gauge the financial sector’s improvement in competitiveness and efficiency. In terms of air and water quality, IEG recognizes improvements in water quality during the CAS period which have been sustained, but waste water treatment projects are delayed substantially and the ISN indicator on legislation for improving environmental standards does not specify how improved results from these new regulations would be measured. 32. The CLR did not adhere to the IEG-OPCS Shared Approach for Assessing Country Partnership Strategies when rating the overall development outcome while the CLR review did. The discrepancy in ratings between the two documents then is more a reflection of this than of the substance of the assessments. The rating for overall development outcome would be Unsatisfactory for the CLR under For Official Use Only CLR Review 12 Independent Evaluation Group the guidelines—the same as IEG’s CLR review—with eight out of thirteen objectives partially achieved or not achieved. Objectives CLR Rating IEG Rating Focus Area I: Economic Management Moderately Unsatisfactory Unsatisfactory Objective 1 (# I.1) Partially Achieved Partially Achieved Objective 2 (# I.2) Partially Achieved Not Achieved Focus Area II: Jobs Moderately Satisfactory Unsatisfactory Objective 3 (II.1) Achieved Partially Achieved Objective 4 (II.2) Achieved Partially Achieved Objective 5 (II.3) Partially Achieved Partially Achieved Objective 6 (II.4) Mostly Achieved Mostly Achieved Objective 7 (II.5) Partially Achieved Partially Achieved Focus Area III: Inclusion Moderately Unsatisfactory Unsatisfactory Objective 8 (III.1) Partially Achieved Partially Achieved Objective 9 (III.2) Achieved Partially Achieved Objective 10 (III.3) Not Achieved Not Achieved Objective 11 (III.4) Partially Achieved Partially Achieved Objective 12 (III.5) Partially Achieved Partially Achieved Objective 13 (III.6) Achieved Mostly Achieved 6. WBG Performance Lending and Investments 33. There were six projects ongoing at the start of the CAS/ISN period totaling $581 million in the areas of environment, education, and infrastructure, including irrigation. During the CAS and ISN period, IBRD made commitments totaling $6,8 billion for twenty eight operations in social protection, education, transport, energy, solid waste and other infrastructure, agriculture, water and sanitation, environment, and financial sector. Thirty nine trust funded activities and grants for $380 million provided complementary financing for energy, environment, pollution abatement and other sectors. 34. On overage for the period FY06-15 IBRD committed resources were disbursed at a slower rate than for the MNA region and the Bank. The average disbursement ratio for Egypt’s investment operations during the period was 15 percent, as compared to 21 percent and 23 percent for the MNA region and Bank-wide, respectively. 35. The Egypt portfolio was less risky than the MNA region and Bank wide portfolios. During FY06-15, the Egypt portfolio had 17 percent of the projects at risk compared to 25 percent for the MNA region and Bank-wide. On a commitment basis the Egypt portfolio also performed better, with 9 percent of the commitments at risk compared to 17 percent for the MNA region and 17 percent Bank-wide. IEG reviewed the ICRs of twenty one projects that closed during the FY06-FY15 period and rated sixteen as moderately satisfactory or above. With respect to active projects management assessments report that thirteen projects out of seventeen were making satisfactory progress towards achieving their development objectives—four were not. For Official Use Only CLR Review 13 Independent Evaluation Group 36. There were 4 IFC investment projects—with US$96.4 million of net commitment—at the beginning of FY06. During FY06-FY15 IFC committed another US$1.53 billion through 49 investments —the two largest in the chemical and financial sectors. The CLR did not assess the IFC portfolio, which has mostly been implemented as planned. IEG reviewed seven IFC closed investment projects and rated six of them mostly successful or better, and one unsuccessful. 37. MIGA gave guarantee coverage of US$210 million for four projects that supported manufacturing and oil and gas exploration/production. Analytic and Advisory Activities and Services 38. A program of analytic work and advisory activities and services including 39 Economic and Sector Works (ESWs) and 100 Technical Assistance (TA) tasks were delivered during the FY06-FY15 period. The Bank provided advice to the government on education, energy, financial sector, health, gender, environment and air quality, jobs, public expenditure, social protection, infrastructure, public private partnerships and other. In addition, the Bank prepared poverty policy notes and a gender assessment update. All in all, the program of AAA supported well the Bank’s lending program, although the CLR does not go into the details of how it contributed to results under the program. A number of the technical assistance projects were delivered under the fee-for-services format. 39. IFC had 4 advisory service (AS) projects approved before the review period for US$1.74 million, which were implemented during the review period. During the review period, IFC approved 43 new AS projects amounting to over US$24.73 million of total funds. Of these 47 projects, 10 were terminated, 4 are on hold and 6 were rated Mostly Unsuccessful/ Unsuccessful at completion. 14 were rated Mostly Successful/ Successful at completion (70 percent). IEG has validated 11 of the closed projects and found 8 of them Mostly Successful/ Successful (73 percent). Of 13 active projects, 10 appear to be on track. Results Framework 40. The FY06-FY08 CAS and the extension through FY11 under the CAS progress report results framework had an adequate design showing the country development goals, issues and obstacles, outcomes to which WBG expects to contribute, intermediate indicators (milestones), and WBG activities. The revised CAS framework in the ISN was not as detailed—for example it did not have a column showing issues and obstacles—and objectives the framework under the ISN supported goals in the areas of economic management, jobs, and inclusion. Although the causal chain was not explicitly discussed in the text, the annex with the results framework lends itself for inference of causal links that on the whole appear credible. At the same time, the ISN results framework was weak because objectives in many cases were too broad for the planned Bank interventions and indicators were not representative of the objectives in a number of instances. For instance, some indicators reflected poorly the objectives, several indicators stopped at the output level (no outcome targeted), and indicators were too vague to be measurable by quantitative values. Some of the indicators and objectives referred to pilots that would be scaled up, but the scaling-up was not discussed in the program document. Moreover the scope of some objectives, such as reducing gender disparities, were too broad to be achieved during the review period with the planned interventions. IFC activities were included in the framework in the main areas of IFC interventions (for example PPPs) but in general there were no indicators directly linked to the IFC activities which made their contributions more difficult to evaluate than IBRD contributions. Partnerships and Development Partner Coordination 41. The main development partners in Egypt include USAID, the European Commission, the European Investment Bank, Japan, European Union countries, the Gulf countries, and the African Development Bank. There is a Development Partners Group (DPG) in which the Bank participates. The Bank has chaired several thematic groups in DPG to promote coordination mechanisms in priority sectors For Official Use Only CLR Review 14 Independent Evaluation Group (MSMEs, energy and environment, and education for example). Donor consultations were conducted as part of the preparation of the CAS and the ISN, and the Bank also initiated a quarterly program of macroeconomic briefings and discussions with development partners. Donor coordination as part of Emergency Labor Intensive project (FY12) helped smooth access to grant financing in the social sectors. There is also a multi-donor technical assistance initiative started in 2012 on financial inclusion, and joint financing with other donors in the energy sector for the Helwan South Power project (FY13). The latter was driven by the government, and the Bank has coordinated design and implementation with the Islamic Development Bank, the Kuwait Fund, and the Arab Fund. Safeguards and Fiduciary Issues 42. The CLR does not indicate fiduciary problems. During the FY06-FY14 period, however, the World Bank received 35 complaints claiming fraud or corruption—the majority in the energy (9), water (8), and transport (4) sectors. In response, INT undertook investigations into the Integrated Irrigation Improvement and Management Project (FY05)—where several indicators of corrupt and collusive practices were found and referred to the government for follow-up action; the Cairo Airport Development Project (FY12)—where INT substantiated fraud and corruption; and both the El Tebbin Power Project (FY06) and the Giza North Power Project. In the latter two, the general manager of the company providing engineering, procurement, and construction management services was convicted in the United States for corruption. The matter is currently under investigation by INT. 43. IEG’s review of ICRs reveals that safeguard compliance was uneven during the review period. For example, the El Tebbin Power operation8 did not undertake a recommended industrial hazard assessment. The project was rated Moderately Unsatisfactory owing to not meeting expected power targets due to a fire that occurred at the plant as the project was closing, underscoring the costs of safeguard noncompliance. The West Delta water conservation and irrigation rehabilitation project triggered multiple safeguard policies. But the project was cancelled, and by project closing no work had been initiated. The airports development project triggered an Environmental Assessment and the respective Environmental Management Plans were fully implemented. The only detailed environmental analysis in the Sohag rural development project9 was for water supply projects where water quality tests were undertaken. At the same time, the lack of due diligence with respect to cultural heritage suggests that the relevant safeguard should have been triggered, and was not appropriately handled. In a number of other projects safeguards were triggered but there is not enough information in the ICRs to validate full compliance—for example for the Avian and Human Influenza control and prevention project no evidence is available on whether safeguard procedures for biosecurity or safe carcass disposal were followed during culling activities. The rehabilitation of health facilities under the WBG program had mixed results on safeguard compliance owing to different levels of training and staff awareness, and uneven management strictness in implementing environmental practices across facilities. On the positive side, the Kureimat Solar Thermal Hybrid project illustrated good practice with respect to safeguard compliance by recognizing low awareness of environmental safeguards in the early phase of implementation, showing strong Bank support for improving environmental performance, and ensuring full compliance with safeguard policies. The Early Childhood Education Enhancement project also fully complied with Bank safeguard policies. Moreover, the Second Pollution Abatement was the first project in MENA to use country systems instead Bank safeguard policies. According to the ICR, all agreed measures were implemented and no major safeguards issues arose during implementation. 8 A category “A” project because it was likely to have significant adverse environmental impacts of sensitive, diverse, or unprecedented nature. All, El Tebbin Power, West Delta water, and airports development are category A projects. 9 Category "B" for safeguard purposes — not in the top tier of needed attention for safeguard compliance. Projects discussed in this paragraph after the Sohag rural development projects are all in the B category. For Official Use Only CLR Review 15 Independent Evaluation Group Ownership and Flexibility 44. Government ownership showed two distinct periods. During the period January 2006 to January 2011 the program described in the CAS and CAS progress report was anchored on a government national development agenda that emphasized pro-growth reforms in response to a deteriorating global environment (food and financial crisis). The government broadly supported the Bank program, and—as a sign of support of Bank programs—contributed to the IDA15 replenishment. Things changed in the period February 2011 to June 2014, as government commitment weakened significantly after the revolution. A modest ISN lending program based on the Emergency Labor Intensive project (FY12) focused on job creation. But a planned DPL for economic management—a key piece of the Bank strategy—could never be implemented. In addition, the Health Insurance Project (FY10) that had initially broad buy in from the government was not implemented after the revolution because government priorities changed. Within this adverse policy implementation environment the Bank attempted to adapt to continue contributing to Egypt’s development agenda, but its efforts did not show tangible results based on an assessment of the ISN results framework. WBG Internal Cooperation 45. Joint WB and IFC activities were limited. For example, the Egypt Development Market Place initiative (FY13) was launched jointly in Upper Egypt’s major cities to target underdeveloped rural areas. Risk Identification and Mitigation 46. The May 2012 ISN10 identified political, constitutional and legal risks, possible macroeconomic instability adverse attitudes toward the WBG, unpopularity of reforms having adverse effects on the business climate and governance. Political, constitutional, and legal risks materialized. Both the Bank and IMF were ready to provide budget support based on the program of the government elected in 2012. Political upheaval, however, prevented implementation of the government program, and thus neither a planned IMF program nor a planned Bank DPL—a key component of Bank engagement— could be developed. Macroeconomic instability and weakening international reserve and fiscal positions fostered a difficult policy-making environment. Against this background, the government attitude became more adverse to the WBG, and an ISN strategy focused on institutions and jobs—key areas of grievance of the revolution—was adapted somewhat to the political realities after the revolution. The Bank program thus shifted away from lending to focus on knowledge dissemination and advisory work. Overall Assessment and Rating 47. IEG rates WBG performance as Fair, with the caveat that in the period of dramatic change after the January 11 revolution it is difficult to disentangle issues external to the WBG program from WBG performance. The ISN program provided a reasonable response to the challenges faced by the country, focusing on implementation and obtaining results over an 18-month period. The selection of areas— macroeconomic stabilization, job creation, and governance—was appropriate to the situation of the country at the time, and reiterated as priorities under the Systematic Country Diagnostic (2015, see footnote 1). Bank interventions, however, were not always appropriate to obtaining the proposed goals. For example, for the objective of deficit reduction the interventions were mainly monitoring or policy notes. The program had an emphasis on knowledge services in some of its key areas —perhaps reflecting the difficulties of the dialogue to put together lending operations or policy loans, and poor portfolio performance—which makes an assessment difficult in the absence of Bank evaluation tools for knowledge service interventions. The FY06-FY08 CAS results framework and its extension to FY11 under the June 2008 progress report had an adequate design showing the country development goals, 10 The May 2005 CAS had identified WBG program risks to external shocks from greater integration with the EU, US, and regional partners and to deficiencies in institutional capacities to implement the program. For Official Use Only CLR Review 16 Independent Evaluation Group issues and obstacles, outcomes to which WBG expects to contribute, intermediate indicators (milestones), and WBG activities. The revised CAS framework in the ISN was not as detailed—for example it did not have a column showing issues and obstacles —and its objectives of the results framework supported goals in the areas of economic management, jobs, and inclusion. At the same time the ISN results framework was weak because objectives in many cases were too broad for the planned Bank interventions and indicators were not representative of the objectives. Moreover, in a number of instances indicators reflected poorly the objectives, several indicators stopped at the output level (no outcome targeted), and the indicators were too vague to be measurable by quantitative values. Some of the indicators and objectives referred to pilots that would be scaled up, but the scaling- up was not discussed in the program document. IFC activities were included in the framework in the main areas of IFC interventions (for example PPPs) but in general there were no indicators directly linked to the IFC activities, which made their contributions more difficult to evaluate than IBRD contributions. Implementation of the WBG program was not smooth even before the ISN, and became extremely difficult during the ISN, when decision making was paralyzed owing to continuous changes in the cabinet and government officials’ fear of reprisal. Supervision of Bank interventions suffered as a result, and implementation of some projects stopped altogether. The Bank responded in a piece-meal way, but on the whole essentially shifting from lending to knowledge dissemination and advisory work, whose results are not easy to assess. IFC contributed to key WBG program objectives and adapted to changing circumstances and priorities. Owing to the political uncertainties in Egypt during the ISN period as well as government reluctance to commit to reforms, however, IFC had no traction on PPPs, with the exception of the one for Alexandria Hospitals where progress has been extremely slow, or on other advisory activities that required government commitment, especially in investment climate related reforms. Negative perception of the private sector in the post-revolution resulted in several reversals of public asset privatizations as well as legal challenges to land allocation or to concessions (for example in infrastructure), which hindered IFC’s ability to support job creating and developmental projects. Almost one-third of IFC’s existing portfolio at the time of the ISN program was being challenged in the courts for different reasons—for example Titan Cement, Omar Effendi retail, and Bank of Alexandria. Joint WB and IFC activities were limited during the ISN period, like in the Egypt Development Market Place initiative (FY13). The Bank generally coordinated well with development partners. Safeguard compliance was uneven under the WBG program, but there were some notable examples of good practice. There were serious fiduciary issues in energy, water, and transport sector projects, where the Integrity Vice-Presidency found evidence or strong indications of corrupt and collusive practices. 7. Assessment of CLR Completion Report 48. The CLR framework of analysis is broadly consistent with the CAS and, especially, the May 2012 ISN framework. It discusses the evidence on program indicators, and while candid, it could have discussed in more detail program implementation issues, the effect of government ownership on program outcomes, the difficulties of IFC to implement its program, IBRD-IFC cooperation, and WBG’s cooperation with other development partners. Moreover, the CLR is not sufficiently clear in distinguishing the progress made before the ISN and the results under the ISN, which in many instances reversed the previous progress in the observed results. In addition, much of the evidence presented is thin, without the needed analysis of WBG program contributions to country outcomes. For example, the CLR would have benefited from more evidence on whether particular pieces of AAA either influenced in-country thinking on the issues they were designed to illuminate or informed the design of Bank operations. There also is a need of a more thorough discussion of Bank performance with respect to safeguard, and fiduciary issues, where there were serious problems. The CLR did not adhere to the IEG-OPCS Shared Approach for Assessing Country Partnership Strategies when rating the overall development outcome. For Official Use Only CLR Review 17 Independent Evaluation Group 8. Findings and Lessons 49. IEG agrees with the lessons in the CLR, particularly on the need to respond flexibly in a high risk political environment. IEG would add that following the Arab Spring the Bank Group had to try to establish itself as a trusted development partner with the new government and with a civil society that played a key role by mobilizing. The ISN and its areas of intervention were in the spirit of the WBG becoming a trusted development partner to the new actors in Egypt. With the ISN, the WBG took a calculated risk that with the benefit of hindsight did not lead to the expected results. Embedding institutional development, capacity building, and governance more systematically in program interventions would have been warranted. On a program design issue, IEG believes that setting objectives too broad in scope is invitation to missing targeted outcomes for the program. Annexes CLR Review 19 Independent Evaluation Group Annex Table 1: Summary of Achievements of CPS and ISN Objectives Annex Table 2: Planned and Actual Lending for Egypt, FY06-14 Annex Table 3: Analytical and Advisory Work for Egypt, FY06-15 Annex Table 4: Grants and Trust Funds Active in FY08-15 (in US$ million) Annex Table 5: IEG Project Ratings for Egypt, FY06-15 Annex Table 6: IEG Project Ratings for Egypt and Comparators, FY06-15 Annex Table 7: Portfolio Status for Egypt and Comparators, FY06-15 Annex Table 8: Disbursement Ratio for Egypt, FY06-15 Annex Table 9: .List of IFC Investments in Egypt Annex Table 10: List of IFC Advisory Services for Egypt Annex Table 11: List of MIGA Activities in Egypt Annex Table 12: Net Disbursement and Charges for Egypt, FY06-15 Annex Table 13: Total Net Disbursements of Official Development Assistance and Official Aid for Egypt Annex Table 14: Economic and Social Indicators for Egypt, FY06-15 Annexes CLR Review 20 Independent Evaluation Group Annex Table 1: Summary of Achievements of CPS and ISN Objectives CPS FY06-FY14: Focus Actual Results Area 1 – Economic IEG Comments (as of current month/year) Management 1. CPS Objective # I.1 : Effective implementation of government plan to gradually reduce fiscal deficit by end ISN period (Partially Achieved) Indicator: Gradual phasing The Government’s plan to reduce the Source: CLR and Egypt out of energy subsidies for fiscal deficit involved lowering energy Team energy intensive industries subsidies. One of the key focus areas for is launched Bank dialogue has been the energy subsidies and there has been some Baseline: No progress recently. Egypt has launched an ambitious energy subsidy reform initiative Target: Yes (2014) aimed at liberalizing energy prices over the coming 5-10 years. While smaller steps were taken in 2012-13, mainly to raise prices for energy-intensive sectors, broader price increases for both firms and households were implemented in July 2014 reducing subsidies by 25-30 percent and yielding fiscal savings of around 2% of GDP. The Bank provided supported this Major objective through policy dialogue. In this Outcome sense, the Bank maintained dialogue with Measures the Government on energy subsidies in the context of the proposed development policy lending that did not materialize. The Bank also delivered two AAA activities that supported this dialogue: (i) Energy Efficiency Strategy (Phase2) (P124688) and Energy/Social Safety Nets Sector Reforms Technical Assistance (P144305). 2. CPS Objective # I.2: Increased transparency of public sector management (Not Achieved) Indicator: Ratings on The reforms undertaken during the ISN Source: CLR and Open governance and period did not go far enough in increasing Budget Index transparency scorecards transparency and progress achieved issued by major during the CPS period has been reversed independent observatories according to the Open Budget Index. of perceptions of transparency Open Budget Index 2006: 18 Baseline: Not provided 2008: 43 2010: 49 Target: > Baseline 2012: 13 2015: 16 CPS FY06-FY14: Focus Actual Results IEG Comments Area 2 - Jobs (as of current month/year) 3. CPS Objective: Improve the business environment (Partially Achieved) Annexes CLR Review 21 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 2 - Jobs (as of current month/year) Indicator: Ranking in Doing Doing Business Rankings Source: CLR and Doing Business Surveys 2006: 141 Business Reports 2007: 165 Baseline: 108 (2011) 2008: 126 2009: 114 Target: < 108 (2014) 2010: 106 2011: 94 2012: 110 2013: 109 2014: 128 2015: 128 Indicator: Regulatory The following regulatory reform activities Source: CLR reforms that would lead to a were undertaken with support from the level playing field and a IFC and World Bank: The proposed indicator more competitive  Simplification of procedures to was not specific, and thus, environment successfully establish industrial projects by it did not provide details on completed canceling the initial approval of the the regulatory reforms that General Authority for Industrial were expected. Baseline: 108 (2011) Development.  Simplification of registration Target: Yes (2014) procedures of companies’ foreign branches by reducing time to 3 days (instead of 4-6 months). Simplification of procedures, documents.  Simplification of registration procedures of foreign companies’ representative offices (Reduce time to 3 days (instead of 40 days). Simplification of procedures.  Second phase of electronic business registration (Electronic payment).  Abolish security approval for the press companies.  Issuance of imports certificate valid for 3-5 years instead of stamping invoices on a regular basis and issuance of exports certificate valid for 3-5 years instead of issuing letter on a yearly basis  Simplification of Construction Permitting procedures and issuance of the Unified Construction Law executive regulations.  Development of smart regulations for Investment Zone regimes in Egypt.  Completion and launch of the Egypt Subnational Doing Business Annexes CLR Review 22 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 2 - Jobs (as of current month/year) (SNDB) 2014 report, catalyzing reform activities by Government.  Successful Completion of pilot PPPs in selected sectors, including education and irrigation. IFC has successfully advised the PPP Central Unit of the Ministry of Finance and Ministry of Higher Education in the implementation of the Alexandria Hospitals PPP Project. First waste water PPP in Egypt successfully completed. 4. CPS Objective: Improve financial sector competitiveness and efficiency (Partially Achieved) Indicator: Sound strategic Through the Social Fund for Development Source: CLR approach to expand access (SFD), the WBG has supported the to finance to the poorest launching of a Micro and Small Enterprise The proposed indicators adopted by the Government Development Strategy (2009–2013) was not specific and did aimed at improving the environment for not provide a definition of Baseline: No (2011) Micro and Small Enterprises (MSEs). the “poorest”. From the results reported, it can be Target: Yes (2014) assumed that the indicator referred only to Micro and Small Enterprises (MSEs). The CLR does not report on whether the strategy has been implemented and on whether it is making progress towards the achievement of its objectives. Indicator: Access to The CLR reports that the private sector’s Source: CLR and Egypt finance improved as share in total credit increased from 45.2% Team measured by rise in credit. in January 2011 to 53% in January 2012. However, the CLR reports that this The proposed indicator Baseline: No (2011) improvement in financial intermediation to was not specific and the private sector was not maintained, lacked a quantitative Target: > Baseline (2014) owing to: (i) the developments associated baseline and target. with the January 25th revolution, and (ii) private borrowers not being interested in borrowing due to the overall macroeconomic environment and the uncertain security situation. According to the Central Bank of Egypt (CBE), the private sector credit to total credit was as follows: June 2006: 47% June 2007: 50.6% June 2008: 51.1% June 2009: 43.8% June 2010: 42.1% June 2011: 36.2% Annexes CLR Review 23 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 2 - Jobs (as of current month/year) June 2012: 31.8% June 2013: 27.5% June 2014: 24% June 2015: 22.7% Indicator: Annual mortgage Market-based mortgage loans extended Source: CLR loans extended by primary by primary lenders: lenders 2006: LE 300 million Egyptian pounds The proposed indicator (LE) lacked a quantitative Baseline: No (2011) 2011: LE 4.5 billion Egyptian pounds (LE) baseline and target. March 2013: 4.8 billion Egyptian pounds The CLRs notes that this Target: > Baseline (2014) (LE) results can be attributed to the reforms implemented by the Bank’s Mortgage Finance Project (P093470). IEG rated the project development outcome of the project as Satisfactory. Indicator: (i) Non-bank (i) Non-bank financial institutions (NBFI) Source: CLR and Egypt financial institutions (NBFI) regulator developed Team. regulator developed and (ii) The Non-Bank Financial Sector Law No. soundness of Egyptian 10 of 2009 established the Egyptian The second indicator (ii) Financial Supervisory Financial Supervisory Authority (EFSA). was not specific. Authority (EFSA) improved The Bank supported the achievement of Baseline: (i) No (2011); (ii) this target through the Financial Sector No (2011) Development Policy Loan series (DPLs I, II, and III—P088877, P094551, Target: (i) Yes (2014); (ii) P120470), amounting to US$ 1.5 billion in Yes (2014) total. This DPL series had components dedicated to reforming the non-bank financial sector, and strengthening the regulatory and supervisory framework of the non-bank financial sector, with clear prior actions, policy measures, and triggers outlined in the relevant Development Policy Matrices. (ii) Soundness of Egyptian Financial Supervisory Authority (EFSA) improved Technical assistance and capacity building was provided to EFSA through a number of trust funds, namely: the Egypt MSME Development Facility (P132470/TF012894), and the Inclusive Regulations for Microfinance Transition Fund project (P149677). As of January 2011, the following results had been achieved: (i) the first organizational chart of EFSA had been approved, where EFSA was able to fully integrate its departments based on functions; (ii) the EFSA supervision department had Annexes CLR Review 24 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 2 - Jobs (as of current month/year) undergone restructuring; (iii) the salary scheme of all EFSA employees had been restructured to guarantee leveled and fair compensation for all employees; (iv) EFSA had succeeded in unifying the regulations and disclosures throughout the nonbanking financial sector; and (v) EFSA has contributed substantially to reducing any systemic risk after the revolution and the reopening of the Egyptian Stock Market. Indicator: Corporate The Central Bank of Egypt (CBE) has Source: CLR and Egypt Governance Code for the strengthened corporate governance in the Team. banking sector preventing banking system by issuing Corporate potential conflict of interest, Governance Regulations on July 5, 2011. improving transparency, and establishing good The Egypt team reports that corporate governance issued governance was tackled under DPL III (P120470), specifically Component I: Baseline: No (2011) Financial and Operation Restructuring of Commercial and Specialized State-owned Target: Yes (2014) Banks. During supervision missions, the 2011 Banking Sector Corporate Governance Code, as well as amendments to the law, were reviewed by the team. The development outcome of this project was rated a Satisfactory by IEG. Indicator: Central Bank The Central Bank of Egypt (CBE) has Source: CLR and Egypt Money and Banking Law amended the Central Bank, Banking Team. amended to improve the System, and Money Law No. 88 of 2003 governance of the Central in October 8, 2011, introducing changes Bank of Egypt (CBE) regarding improving CBE’s own governance, reconstituting its own board Baseline: No (2011) of directors to remove conflicts of interest, and tightening supervisory capacity and Target: Yes (2014) processes. In addition, the CBE is conducting periodic stress testing of the aggregate balance sheet of the banking sector and individual banks annually since 2008, and stress testing has become an integral part of the CBE’s systemic surveillance of the banking sector. Stress testing was a main action supported under the Bank Third Financial Sector DPL). In addition, the Bank has provided technical assistance to the CBE to strengthen its stress testing framework (Egypt #10240 Financial Projection Model - P130432). The technical assistance was completed as of June 2013. Annexes CLR Review 25 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 2 - Jobs (as of current month/year) 5. CPS Objective: Expand and improve power and transport infrastructure (Partially Achieved) Energy (i) The CLR reports that, although the Source: CLR and Egypt Indicator: (i) Additional goal of expansion of power generation Team. megawatts of power capacity by 27,000 MW was not generation capacity (ii) achieved, the Government fast track share of renewables in power generation program added 2,600 generation mix MW and was one of the main drivers for bringing installed capacity to over 27,000 Baseline: (i) 0 (2011); (ii) MW in total. Not provided The Egypt team reports that the Bank Target: (i) 27,000 (2014); supported this indicator via two projects: (ii) > Baseline (2014) Power III (P116194) and Ain Sokhna Power Project (P100047). According to the team, the first project added 1,200 MW and the second 1,300 MW. The Egypt team reports that the current total capacity reached 36,500 MW in September 2015. (ii) The CLR only reports that the Bank supported the Kureimat Solar Thermal Hybrid Project (P050567) that added 140 MW. IEG rated the outcome of this project as moderately satisfactory. The CLR does not report on whether the share of renewables in the generation mix increased. The Egypt team reports that the share of renewables in the generation mix will likely increase in the near future. However, no precise quantitative measures are provided. Energy In 2008, the Bank approved the Natural Source: CLR Indicator: Number of Gas Connections Project (P095392) to household consuming highly increase household connections to subsidized liquified natural gas. This project has now closed petroleum gas (LPG) and management has rated the outcome converted to natural gas as satisfactory. Through support provided by this project, conversion to natural gas Baseline: 0 (2011) consumption for 333,000 households has been achieved. Target: 300,000 (2014) Energy (i) While smaller steps were taken in Source: CLR and Egypt Indicator: (i) Energy pricing; 2012-13, mainly to raise prices for Team. and (ii) subsidies reform to energy-intensive sectors, broader price reduce the fiscal impact of increases for both firms and households increases in global prices were implemented in July 2014 reducing completed subsidies by 25-30% and yielding fiscal savings of around 2% of GDP. Baseline: No (2011) Annexes CLR Review 26 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 2 - Jobs (as of current month/year) Target: Yes (2014) (iI) Egypt has launched an ambitious energy subsidy reform initiative aimed at liberalizing energy prices over the coming 5-10 years. The Egypt team reports that the Bank supported the energy pricing and subsidy reform via technical assistances. First, the Bank delivered support via two related technical assistances: (a) Energy Pricing and Subsidy (P129680) (FY15) Phase I and Phase II Support on Energy Subsidy Reforms (P155336) (FY16). These two technical assistances delivered analytical work on energy pricing, capacity building on modelling of price reforms and a communication strategy. Second, the Bank delivered support through the Energy/Social Safety Nets Sector Reforms Technical Assistance (P144305). These technical assistance has an energy pricing component, a communication component, and a social component. Transport (i) The construction of a new airport Source: CLR Indicator: Capacity of key terminal has been completed in Cairo international airports (Cairo airport (terminal 3) and Sharm El Sheikh and Sharm El Sheikh); (ii) airport. The CLR reports that airport delegation of airports’ capacity will improve from 3.5 to 7.5 management to the private million passengers per annum. In sector addition, the rehabilitation/extension of the terminal 2 in Cairo airport is underway Baseline: (i) Not provided to expand further the overall capacity. (2011); (ii) No (ii) The CLR reports that the Bank has Target: (i) > Baseline supported the elaboration of an air (2014); (ii) Yes (2014) transport liberalization study and that the implementation of its recommendations is ongoing. In addition, the Bank has also supported the Government in setting up management contracts for the airports Transport (i) The CLR reports that the financial Source: CLR and Egypt Indicator: (i) Financial viability improved but was set back by the Team. viability Egypt National political instability and economic situation. Railways (ENR); and (ii) The Egypt National Railways The proposed indicator Safety of Egypt National Restructuring Project (P101103) was not specific and Railways (ENR) supported the achievement of this lacked a quantitative indicator. The Egypt team reports that, at baseline and target. Baseline: (i) Not provided the onset of the project, support was (2011); (ii) Not provided provided to develop a financial recovery Results reported in the plan. The plan was on track to improve CLR are vague and do not the financial sustainability of ENR as offer any quantitative measured by ENR’s earnings before measures to judge Annexes CLR Review 27 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 2 - Jobs (as of current month/year) Target: (i) > Baseline interests and taxes. This progress was progress in terms of (2014); (ii) > Baseline reversed after the revolution of January – financial viability and (2014) February 2011 as the Government safety. dramatically reduced its contribution to the public service obligations (PSO) to be paid to ENR and wages were significantly increased without the possibility of raising fares. The CLR also reports that the Bank is discussing railways reform with the authorities to improve governance and efficiency of railways management. (ii) The CLR reports that the modernization of signaling on Cairo- Assiut line is also under implementation. However, the CLR acknowledges that the overall safety of the railways is still an issue and will take a longer time to overcome. The Egypt team reports that the Egypt National Railways Restructuring Project (P101103) aims at improving the safety of the railways’ services on targeted sections of the rail network through modernization of signaling systems, track renewal, and modernization of management and operating practices. It is therefore monitoring the average number of fatalities due to railway accidents on the ENR network measured as the total annual number of victims on ENR network per one million passenger- km. The 2008 baseline was 0.60, while the current value (as of 31 March 2015) is 4.90, for a target of 0.30 at project completion in 2019. This shows that safety has not improved yet and is likely to remain an issue until the project is completed. Transport (i) and (ii): Government has adopted a Source: CLR and Egypt Indicator: (i) financing for road asset management strategy aiming, Team. road maintenance; and (ii) among others, to improve road regularity of road maintenance. The CLR does not report The proposed indicator maintenance on whether financing of road was not specific and maintenance and regularity of road lacked a quantitative Baseline: (i) Not provided maintenance have increased. baseline and target. (2011); (ii) Not provided The Egypt team reports that there were Results reported in the no quantitative measures put in place to CLR are not specific and do not offer any Annexes CLR Review 28 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 2 - Jobs (as of current month/year) Target: (i) > Baseline assess whether financing for and quantitative measures to (2014); (ii) > Baseline regularity of road maintenance improved. judge progress in terms of (2014) whether financing for and regularity of road maintenance improved. Transport The CLR reports that an Urban Transport Source: CLR and Egypt Indicator: Improve public Regulatory Authority for Greater Cairo Team. urban transport in Great has been established but is not yet Cairo as measured by [not operational. The Bank is providing The proposed indicator provided] support to the Government to make it fully was not specific and, thus, operational. This support is delivered via it did not specify how Baseline: Not provided an IDF grant currently under improved public urban (2011) implementation (P143569 - Establishment transport in Great Cairo of a Transport Regulatory Authority in would be measured. The Target: (i) > Baseline Greater Cairo) Egypt team reports that (2014) there were no quantitative measures put in place to assess progress towards improving public transport in Great Cairo. Transport The Bank involvement was framed under Source: CLR Indicator: Cost of two Reimbursable Advisory Services telecommunications (RAS) program that did not pertain The proposed indicator services specifically to costs decrease, but rather was not specific and, thus, to capacity building on statistics, legal it did not specify how cost Baseline: Not provided and broadband policy. These two of telecommunications (2011) activities were used by the government to would be measured. In formulate the eMisr Strategy, a addition, Bank Target: (i) < Baseline comprehensive sector development interventions do not (2014) strategy to provide access to broadband commensurate with the to 8 million Egyptian households. The proposed indicator. CLR notes that some cost reduction may have happened but there is no evidence that it can be attributed to Bank RAS program. 6. CPS Objective: Increase relevance of education for labor market (Mostly Achieved) Indicator: Successful (i) Higher education Source: CLR and Egypt testing (for an eventual Bank support was delivered through the Team. scaling-up) of pilot schemes Higher Education Enhancement Project for improving quality / (P056236) which was rated as relevance of: (i) higher Moderately Satisfactory by IEG. This education; (ii) skills project supported the establishment of a development; (iii) early National Authority for Quality Assurance childhood development and Accreditation in Education (NAQAAE) and quality assurance units in Baseline: (i) No; (ii) No; (iii) all universities. In addition, the project No (2011) supported the establishment of a Competitive Fund for the Improvement of Target: (i) Yes; (ii) Yes; (iii) Higher Education that funded 159 small Yes (2014) projects aiming at improving quality, efficiency and relevance of teaching and research in public universities. These 159 Annexes CLR Review 29 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 2 - Jobs (as of current month/year) projects were selected on a competitive basis out of 563 proposals. (ii) Skill development On skills upgrading, the IBRD-financed Skills Development Project (P049702) (IEG: Satisfactory) developed a funding mechanism that supported training for in- service and prospective workers through a cost-shared and competitive approach. In addition, a SABER-WfD technical assistance (P132543) was provided to facilitate next steps for policy dialogue in skills development. SABER WfD helps countries evaluate the skills development policy options for improvement The WBG is also providing support that aims to bridge the skills gap for the ICT industry and improve the employability of students. In this sense, IFC has signed an agreement with the Information Technology Industry Development Agency (ITIDA) to help enhance the skills of prospective information and communication technology (ICT) workers in Egypt, develop sector specific education and training, and improve the employability of ICT graduates. IFC’s E4E Reports are the following: E4E Arab World: 579127 – Regional MENA Study and E4E MENA: 590749 – Egypt and Morocco assessment Finally, the WBG has also supported the Work Force Development study in MNA countries and E4E study. These studies have highlighted for policy makers the mismatch between the type and level of skills needed by the labor market and those being supplied by the education and training system. (iii) Early childhood development The Bank supported ECD through the Early Childhood Education Enhancement Project (ECEEP) (P082952) (IEG: Moderately Satisfactory). An additional 35,823 KG students enrolled in kinder garden, which met the target of 30,000 enrollments in the Bank-funded facilities (i.e., 120% of original target). Annexes CLR Review 30 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 2 - Jobs (as of current month/year) Indicator: Improved The CLR reports that achievements in Source: CLR curriculum especially with relation to the improvement of the regard to the transition from curriculum for secondary education have The proposed indicator secondary to post- been mixed. On the one hand, the was not specific and, thus, secondary education and to Ministry of Education recently approved it did not specify how an the labor market the new curriculum framework for improved curriculum would secondary education, but on the other it be measured. Baseline: No (2011) has not been able to translate the ideas of the new framework into a well- Target: Yes (2014) developed new curriculum document. 7. CPS Objective: Increase trade with regional and global partners (Partially Achieved) Indicator: Development of IFC helped improve linkages across value Source: CLR and Egypt schemes for improving the chains through (i) the development of a Team. linkages between suppliers supply chain management tool for an and external markets in (i) agribusiness lead firm; (ii) the The proposed indicator is services; (ii) agriculture in development of a contract farming model a weak measure of the upper Egypt in the poultry sector; and (iii) capacity CPS Objective. In building of suppliers and distributors in addition, the WBG Baseline: No (2011) the value chains of lead firms, focusing interventions are not on improving management skills through commensurate with the Target: Yes (2014) the IFC Business Edge program. In total, CPS Objective. 1,721 persons from 130 different SMEs, part of the value chain of four large lead firms in the ICT, Fast Moving Consumer Goods (FMCG), Pharmaceutical, and Telecommunications sector, were trained. Finally, IFC committed US$428.2 million into 13 South-South projects with sponsors from India, Turkey, Saudi Arabia, Lebanon and other nationalities. Furthermore, to promote trade finance, IFC committed US$95.2 million during the period through its GTFP program. The CLR reports these value chain interventions helped to strengthen the overall value chain and to improve the relationship with the lead firm, resulting in increased sales of firms. However, no quantitative measures of increased sales are provided. CPS FY06-FY14: Focus Actual Results IEG Comments Area 3 - Inclusion (as of current month/year) 8. CPS Objective: Improve management of water, sanitation, and irrigation systems (Partially Achieved) Major Indicator: Successful (i) Networked sanitation Source: CLR and Egypt Outcome testing (for an eventual The goal of expansion of networked Team. Measures scaling-up) of pilot schemes sanitation infrastructure into the rural for (i) expanding networked areas is progressing under the Bank- Integrated Sanitation & sanitation; and (ii) increased financed Integrated Sanitation and Sewerage Infrastructure Annexes CLR Review 31 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 3 - Inclusion (as of current month/year) efficiency and beneficiary Sewerage Infrastructure Projects (ISSIP1 Project ISSIP 1 (P094311) participation in irrigation - P094311 and ISSIP2 - P120161 – Latest Management management; and (iii) accompanied by a Sanitation Trust Fund) Assessment: Moderately developing PPPs by end of but was delayed due to delay in detailed Unsatisfactory ISN. designs, bidding processes and environmental and social impact Integrated Sanitation & Baseline: (i) No; (ii) No; (iii) assessment; local communities’ Sewerage Infrastructure No (2011) obstructions; and land acquisition issues. Project ISSIP 2 (P120161) – Latest Management Target: (i) Yes; (ii) Yes; (iii) (ii) Increased efficiency and beneficiary Assessment: Moderately Yes (2014) participation in irrigation management Unsatisfactory - Improved irrigation and drainage services provided to over 300,000 farmers - 1,465 water user associations (WUAs) have been established, of which 711 have been fully operational. - 122 branch canal WUAs fully operational and 14 integrated irrigation water districts fully operational. - Decentralized sanitation has been pilot tested under ISSIP1, which is to be expanded under ISSIP2 and new Projects. Due to delay in implementation of the decentralized schemes under ISSIP1, it is still in pilot stage, not expansion stage. The Egypt team reports that irrigation efficiency has improved through the Integrated Irrigation Improvement and Management Project (P073977) (latest Management Assessment: Moderately Satisfactory). In this sense, water savings of 10-30% have been reported under the project based on a combinations of interventions, including conveyance improvement (mesqa and marwa improvements), land leveling and adoption of different agronomic practices through improved farmer awareness raising. (iii) Developing PPPs First waste water PPP in Egypt successfully completed (IFC) via the implementation of the New Cairo Wastewater project. The project attracted US$120 million of private investment and reached financial close in 2010 and is now fully operational. Finally, a pilot Annexes CLR Review 32 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 3 - Inclusion (as of current month/year) scheme for PPP in irrigation has been launched but the procurement aborted due to lack of sufficient qualified bids. 9. CPS Objective: Improve air and water quality (Partially Achieved) Indicator: (i) Reduction of (i) Industrial Air Pollution Source: CLR and Egypt industrial air pollution pilot As to pilot schemes for reduction of Team. scheme successfully tested; industrial air pollution, the pilot phase (ii) Waste management pilot Egyptian Pollution Abatement Project Egypt Pollution Abatement scheme successfully tested (1999-2005) was successful and was Project (P054958) (Closed scaled up by the Second Pollution FY05) Baseline: (i) No; (ii) No Abatement Project (EPAP II) (2006- (2006) 2014). Below the achievements of each Second Pollution of these projects: Abatement Project Target: (i) Yes; (ii) Yes - EPAP I pipeline remained strong (P090073) (Approved (2009) despite the unstable situation in FY06) – IEG: Satisfactory Egypt after the Arab Spring with increasing number of companies showing interest to participate. In addition, EPAP I stimulated similar projects such as the Private Public Sector Industry Project (PPSI) financed by KfW. - EPAP II contributed to the improvements of emissions notably from cement sector and brick factories, one of the most polluting sectors. Recent Cairo Air Quality ESW observed improvements in the air quality. The finding shows that concentrations of PM10 and PM2.5 were lower in fall 2010 than in fall 1999. This decline may be attributed to several factors, namely, the expansion of the road and highway network, improved car efficiency, industrial pollution control, and efforts to contain open burning. In addition, a technical assistance (TA) component of EPAP II supported (i) the issuance of revised environmental impact assessment guidelines, stipulating a provision that severe penalties would be promulgated for establishments constructed/ operated without EIA, and (ii) the issuance of new sectoral EIA guidelines for thermal power plants and manufacturing of petrochemicals, textiles, cement, and fertilizers. Finally, the Bank has also been involved in other sectors that would lead to the Annexes CLR Review 33 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 3 - Inclusion (as of current month/year) improvement of the air quality, such as the Natural Gas Connections Project, the taxi scrapping program, and the Cairo Congestion Study. (ii) Waste Management After the successful testing of waste water pollution abatement, the CLR reports that a waste water treatment plant was financed by the following Bank projects: - Integrated Sanitation& Sewerage Infrastructure Project I (P094311) (Approved FY08). Latest Management Assessment: Moderately Unsatisfactory. - Integrated Sanitation& Sewerage Infrastructure Project II (P120161) (Approved FY11). Latest Management Assessment: Moderately Unsatisfactory. Indicator: Environmental The CLR reports that there has been Source: CLR standards regulations progress in adopting legal and improved institutional measures for improving air The proposed indicator quality such as amendment of the was not specific and, thus, Baseline: No (2006) environmental protection Law #4 of 1994 it did not specify how by Law #9 of 2009 which prohibits waste improved environmental Target: Yes (2009) burning by imposing heavy fines on standards regulations offenders. In addition, the air quality improvement would be standards set forth in the executive measured. regulations of 1995 were revised in 2005 and further revised as a result of the enactment of Law 9 of 2009, although these executive regulations have not yet been issued by the Council of Ministers. These Government efforts were support by the Bank financed Egyptian Pollution Abatement Project (P090073) (Closed FY15). IEG Rating: Satisfactory. 10. CPS Objective: Expand access to healthcare (Not Achieved) Indicator: Health insurance The adoption of health insurance reform Source: CLR reform reflecting has not taken place. Bank support came international best practice via the Health Insurance Development The proposed indicator adopted Project (P080228). Although approved in was not specific and, thus, FY10, the project was not implemented it did not specify how the Baseline: No (2006) by the new government at the time as it achievement of a health was not in line with its priorities. The insurance reform reflecting Target: Yes (2009) Health Insurance Systems Development international best practice Project has been redesigned to better would be measured. In target the poorest 1,000 villages in Egypt addition, the indicator is by accrediting family health facilities that not a measure of access, meet the national healthcare quality and thus, it cannot standards. accurately reflect the Annexes CLR Review 34 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 3 - Inclusion (as of current month/year) achievement of the IFC has financed four private sector- objective. managed health facilities, three of which are now fully operational. 11. CPS Objective: Develop targeted and sustainable safety nets (Partially Achieved) Indicator: Sound plan to Despite Bank’s sustained effort, it was not Source: CLR and Egypt move towards a more possible to transition away from the Team transparent and sustainable subsidy system to a more efficient and safety nets (SSN) system poverty targeted SSN system although a defined and implemented sustained dialogue on this issue was ongoing. In spite of this setback, the Bank Baseline: No (2006) is using the Energy/Social Safety Nets Sector Reforms Technical Assistance Target: Yes (2014) (P144305) (approved FY14) and the Social Safety Nets TA (P132258) (to be completed / delivered in May 2016) to continue to push for SSN reform. One of the main achievements of the Bank in this area has been support to the development of a poverty map for better targeting of social safety net interventions. Indicator: New pension In June 2010, the Egyptian Parliament Source: CLR and Egypt regulations reflecting approved a new Social Insurance and Team. international best practice Pensions Law that introduced a systemic defined and implemented reform which was expected to constitute The Egypt team reports a landmark in the Middle East region. The the following interventions Baseline: No (2006) new system was to be effective in supporting the January 2012, but the implementation achievement of this Target: Yes (2014) was delayed after the revolution and in indicator: early 2013 the Government decided to - Energy/Social Safety cancel the law. The Bank provided Nets Sector Reforms technical assistance through a multiyear Technical Assistance program developed in two phases. The (P144305) (approved decision of the Government to cancel the FY14) Social Insurance and Pensions Law - Social Safety Nets delays the solution to critical TA (P132258) (to be shortcomings of the current pension completed / delivered system, notably concerning the fiscal in May 2016) implications of projected deficits in the existing schemes (in spite of a high tax wedge on labor), the lack of coverage of a significant number of Egyptian workers, the high volatility of the real value of pensions due to the practice of “ad hoc” arbitrary indexation, and the inadequate targeting of non-contributory pensions. 12. CPS Objective: Reduce interregional disparities (Partially Achieved) Indicator: Pro-poor The Bank supported this objective via the Source: CLR targeting of public Emergency Labor Intensive Investment investment in Upper Egypt Project (P126339). The project focused The proposed indicator strengthened on upper Egypt (70% of disbursements was not specific and, thus, are allotted for upper Egypt, much of it did not specify how Annexes CLR Review 35 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 3 - Inclusion (as of current month/year) Baseline: No (2006) which have been disbursed). Due to the strengthened pro-poor prevailing political environment, the Bank targeting of public Target: Yes (2009) was unable to establish a sustained investment in Upper Egypt dialogue in this area so the goal is would be measured. considered only partially achieved. The Bank did release a study on youth and women in upper Egypt which enabled a continued dialogue in this area. 13. Reduce gender disparities (Mostly Achieved) Indicator: Effective During the ISN period the Bank released Source: CLR contribution to informed and widely disseminated a number of advocacy and policymaking important reports on gender issues, Bank interventions were on gender issues including: (i) World Development Report not commensurate with 2012 on Gender and Development; (ii) the proposed objective. Baseline: No (2006) Opening Doors: Gender Equality and Development in the Middle East and Target: Yes (2009) North Africa (2013) - a regional companion report to the WDR 2012; (iii) Gender Assessment “Narrowing the Gap: Improving Labor Market Opportunities for Women in Egypt (2011); and (iv) “Reclaiming their Voice: New Perspectives From Young Women and Men in Upper Egypt” (2012). The strong emphasis on policy dialogue on gender has also been accompanied with a renewed corporate, regional and sectoral commitment on mainstreaming gender into Bank-financed operations. In the last couple of years, regions, networks and sectors have developed gender action plans. Specifically, the MENA Regional Gender Action Plan (2012) adopted a two-pronged approach, supplementing support to country programs with an explicit focus on informing dialogue and providing a platform for debate. Indicator: Specialized The intense policy dialogue on gender Source: CLR windows for women to has resulted in a number of gender- improve their access to informed operations in Egypt, focused on According to Bank finance increasing female employment through systems, the Egypt business development training and Development Marketplace Baseline: No (2006) access to finance including: Program (P129863) was - In June 2013, the Egypt approved in August 2015. Target: Yes (2014) Development Marketplace Program (P129863) awarded grants of US$1.25 million to 45 organizations, to contribute to job creation in agribusiness and handicrafts projects across Egypt, with special focus on Upper (Southern) Egypt. Annexes CLR Review 36 Independent Evaluation Group CPS FY06-FY14: Focus Actual Results IEG Comments Area 3 - Inclusion (as of current month/year) - TA Middle East and North Africa: Enhancing Microfinance Amongst Women and Youth in MENA (P144655) (approved June 2013) that seeks to enhance microfinance access and usage amongst women and youth in Morocco, Tunisia, and Egypt through demand-side analysis of access to finance constraints amongst women and youth; developing financial literacy modules targeted to women and youth; and South-South learning and training. - Enhancing Access to Finance for Micro and Small Enterprises Project (P116011) (approved in April 2012). To date, a total of 77,818 loans have been disbursed to MSEs leading to the creation of over 111 thousand job opportunities Annexes CLR Review 37 Independent Evaluation Group Annex Table 2: Planned and Actual Lending for Egypt, FY06-14 Proposed Approved Proposed Approval Closing Outcome Project ID Project name IBRD IBRD FY FY FY Rating Amount Amount Project Planned Under CPS/CPSPR and ISN Period West Delta Irrigation P087970 2006 2007 2011 150 145 LIR: U Infrastructure P091945 El Tebbin Power 2006 2006 2012 250 260 IEG: MU P093470 Mortgage Finance 2006 2007 2012 50 37 IEG: S Ports Sector Development 2006 100 DROPPED P090073 Pollution Abatement II 2006 2006 2015 20 20 IEG: S Urban/Alexandria Growth P094229 2007 2008 2013 100 100 NR Pole Integrated Governorates 2007 100 DROPPED Development Social Funds IV 2007 75 DROPPED Education Enhancement II 2007 60 DROPPED Solar Thermal 2007 2 DROPPED Financial Sector Restructuring 2007 DROPPED Loan Transport/Road Asset 2008 100 DROPPED Management Integrated Governorates II 2008 100 DROPPED P101103 Railways 2008 2009 2019 100 270 LIR: MS Delta Integrated Sanitation P094311 2008 2008 2016 120 120 LIR: MU and Sewerage Infr P094551 Financial Sector Loan II 2008 2008 2010 500 IEG: S Family Health 2008 75 Additional Financing for P112346 2009 2010 2015 50 300 LIR: S Mortgage Low Income Social Housing 2009 200 DROPPED P100047 Ain Sokhna Power Project 2009 2009 2017 600 600 LIR: S P117356 Railways Restructuring 2009 2011 120 330 NA P111040 National Drainage (AF) 2009 2010 70 30 NA P116011 Facilitating Access to Finance 2010 2010 2016 50 300 LIR: S P095392 Gas Infrastructure 2010 2008 2015 150 75 IEG: S P105750 Airports II 2010 2008 230 40 Roads Assets Management 2010 200 DROPPED Post-Basic Education Reform 2010 50 DROPPED Social Protection DPL 2010 200 DROPPED Health Insurance System P080228 2010 2010 2017 50 75 LIR: U Development Upper Egypt Integrated 2010 200 DROPPED Development P116194 Power III 2011 2010 2017 600 LIR: MS P113416 Clean Technology for Energy 2011 2010 2018 70 LIR: MS Urban Transport Infrastructure 2011 DROPPED Solid Waste 2011 DROPPED Agriculture/Poultry Industry P117745 2011 2011 2016 100 LIR: MS Recovery P116198 Giza North (AF) 2012 2012 240 NA P126339 Emergency Labor Intensive 2012 2012 2017 200 200 LIR: S Annexes CLR Review 38 Independent Evaluation Group Proposed Approved Proposed Approval Closing Outcome Project ID Project name IBRD IBRD FY FY FY Rating Amount Amount Project Planned Under CPS/CPSPR and ISN Period P117407 Helwan South Power Project 2013 2013 2019 537 585 LIR: MS Kom Ombo Solar 2013 170 DROPPED Urban Transport Infrastructure 2014 150 DROPPED Project Total Planned 4629 4997 Approved Unplanned Projects during the CPS, Approval Closing Outcome IBRD CPSPR and ISN Period FY FY Rating Amount EG- FINANCIAL SECTOR P088877 2006 2007 500 IEG: S REFORM DPL P120470 Financial Sector DPL III 2010 2012 500 IEG: S EG-Cairo Airport P101201 2010 2016 280 LIR: S Development Project-TB2 EG-Integrated Sanitation & P120161 2011 2018 200 LIR: MU Sew. Infra. 2 Promoting Innovation for P146244 2014 2020 300 LIR: S Inclusive FA Total Unplanned - 1,780 Approved On-going Projects during the Approval Closing Outcome IBRD CPS/CPSPR and ISN Period FY FY Rating Amount P045499 EG-NATIONAL DRAINAGE II 2000 2015 50 LIR: MS EG-HIGHER EDUCATION P056236 2002 2009 50 IEG: MS ENHANCEMENT PROG EG-AIRPORTS P082914 2004 2009 335 IEG: HS DEVELOPMENT PROJECT P049702 EG-SKILLS DEVELOPMENT 2004 2010 6 IEG: S EG-Early Childhood P082952 2005 2014 20 IEG: MS Education Enhancement EG-INTEGRATED P073977 2005 2016 120 LIR: MS IRRIGATION IMPR. & MGT Total On-going 581 Source: Egypt CPS, CPSPR and ISN AO Table 2a.1, 2a.4 and 2a.7 as of 10/21/15 *LIR: Latest internal rating. MU: Moderately Unsatisfactory. MS: Moderately Satisfactory. S: Satisfactory. HS: Highly Satisfactory. Annex Table 3: Analytical and Advisory Work for Egypt, FY06-15 Fiscal Proj ID Economic and Sector Work Output Type year P101219 Egypt Dev. Policy Review (DPR) FY08 Development Policy Review (DPR) P102748 EG-Affordable Housing and Subsidies FY08 Not assigned P105095 CCGPP: Egypt SOE Assessment FY08 Corporate Governance Assessment (ROSC) Country Financial Accountability Assessment FY08 P106517 EGYPT: CFAA (CFAA) P106520 Egypt ROSC Accounting and Auditing FY08 Accounting and Auditing Assessment (ROSC) P107027 EG-Housing Sector Review FY08 Not assigned P107110 EG PER Policy Notes FY08 Not assigned P096690 Egypt IFMCA FY09 Other Public Sector Study P104888 ESMAP: EG-Design of Load Mgt Program FY09 Not assigned Annexes CLR Review 39 Independent Evaluation Group Fiscal Proj ID Economic and Sector Work Output Type year P107462 EG Poverty Policy Notes FY09 Not assigned Egypt Investment Climate Assessment FY09 P108292 2009 Investment Climate Assessment (ICA) P109073 EG: Capital Market Development FY09 Other Financial Sector Study P112682 Egypt-AML/CFT assessment FY09 AML/CFT Assessment P112699 Egypt - Macro Notes FY09 Economic Updates and Modeling P114066 GCMCG: Egypt III Country Assessment FY09 Corporate Governance Assessment (ROSC) P107017 EG Growth in Upper Egypt FY10 Other Poverty Study EG: Tertiary Education Review (WB- FY10 P107704 OECD) Other Education Study P112209 Egypt GAC - Health Pets FY10 Other Public Sector Study General Economy, Macroeconomics, and Growth FY10 P112344 EG: Trade Study P112810 Egypt - Gender Assessment Update FY10 Country Gender Assessment (CGA) P113136 EGYPT - Programmatic PER FY10 Not assigned General Economy, Macroeconomics, and Growth FY10 P113558 Egypt: Competitiveness Note Study P118581 EGYPT - PER POLICY NOTES FY10 Not assigned P118587 EGYPT - Macro Notes FY11 Economic Updates and Modeling P121254 EG-Energy Efficiency Strategy FY11 Not assigned P122907 EGYPT - Savings Study FY11 Not assigned P107028 EG-Youth Study FY12 Not assigned P122909 Egypt - Reshaping Egypt geography FY12 Not assigned P124688 EG-Energy Efficiency Strategy (Phase2) FY12 Not assigned P127912 Egypt Inequality Study FY12 Not assigned P128773 Expanding Opportunities for the Next Gen FY12 Other Social Protection Study P097251 EG-Assessment of Air Quality in Cairo FY13 Sector or Thematic Study/Note P112378 Financial Development & Growth in Egypt FY13 Sector or Thematic Study/Note P129136 EG-Stakeholder Mapping FY13 Sector or Thematic Study/Note P121712 EG-Cairo Congestion Study FY14 Sector or Thematic Study/Note P133651 Pol Dialogue - 5yr Strategy Pre-Uni Educ FY14 Sector or Thematic Study/Note P130359 Egypt Jobs Study FY15 Other Poverty Study P149491 Egypt Power Sector PPP Framework FY15 Sector or Thematic Study/Note P149518 Strategic Public Expenditure Assessment FY15 Public Expenditure Review (PER) Fiscal Proj ID Technical Assistance Output Type year P089140 CA: Alexandria (Egypt) CDS for Sust. Dev FY06 Institutional Development Plan ESMAP: EG-DEMAND MANAGEMENT FY06 P098092 WORKSHOP Knowledge-Sharing Forum P098489 Egypt -- Gender Policy Forum FY06 Knowledge-Sharing Forum EG-Income, Environment & Health FY07 P080859 Linkages Institutional Development Plan P093520 EG-Catalytic Role of Women in Environ FY07 Knowledge-Sharing Forum EG:Enhancing Women Economic FY07 P096440 Participatio "How-To" Guidance P102491 Egypt Trade FY07 Institutional Development Plan P103751 EG RTA Natl Telecom Regulatory Auth'y FY07 Client Document Review P105161 EG RTA Regulatory Reform, Gov'ce, Invest FY07 "How-To" Guidance P105312 EG-Combined Cycle Workshop FY07 Knowledge-Sharing Forum P088155 EG Child Labor Prevention Grant FY08 "How-To" Guidance P101867 EG RTA MOCIT Support FY08 Client Document Review Annexes CLR Review 40 Independent Evaluation Group Fiscal Proj ID Economic and Sector Work Output Type year EG-REGULATORY REFORM & FY08 P102465 GOVERNANCE "How-To" Guidance P102555 Egypt Health Technical Assistance FY08 "How-To" Guidance P103749 EG RTA Egyptian National Post Org Suppt FY08 Client Document Review P105467 FIRST #343: Credit reporting strength FY08 "How-To" Guidance P107551 EG-Support to Public Private Partnership FY08 "How-To" Guidance P107705 Dialogue on Safety net FY08 "How-To" Guidance P107922 EG-International Youth Forum FY08 Knowledge-Sharing Forum P110524 Egypt Diabetes TA FY08 Knowledge-Sharing Forum P110763 EG RTA MCIT Second Fixed-line License FY08 "How-To" Guidance P067244 EG-CDM TA for Egypt FY09 "How-To" Guidance P103750 EG RTA Info Tech Industry Dev Support FY09 Client Document Review P107068 EG-Energy Pricing Strategy FY09 "How-To" Guidance P107584 Dialogue on TVET FY09 Institutional Development Plan EG Commercial Wind Development FY09 P110330 Framework "How-To" Guidance P112367 Egypt Country Policy Dialogue FY09 Client Document Review P113461 EG MOCIT: Measuring FDI in ICT FY09 "How-To" Guidance P113780 EGYPT - Governance and Anti-Corruption FY09 "How-To" Guidance P113932 EG: Cap Bldg in ICT - Econ and Stats FY09 Institutional Development Plan P113934 EG: ENPO Finan Invest & Asset Mgmt FY09 Institutional Development Plan EG-RTA Strategic Options Broadband FY10 P117621 (Ph.2 Institutional Development Plan P119276 EG Integrity and Transparency TA FY10 "How-To" Guidance EG-ALEXANDRIA DEVELOPMENT FY10 P089803 STRATEGY Institutional Development Plan P107463 Egypt Supply Chain and Trade FY10 Client Document Review P111340 EG-Inventory of POPs Materials FY10 "How-To" Guidance P111559 EG-RTA Social Health Insurance FY10 Client Document Review P113228 EG Health and Population TA FY10 "How-To" Guidance P113715 EG-Agriculture TA FY10 "How-To" Guidance EG-RTA Cyber-security Leg and Reg FY10 P113930 (Ph.2) Institutional Development Plan P114297 EG-TA for Dev. of WSS Strategy FY10 Institutional Development Plan P117576 EG Measuring Foreign Direct Investments FY10 Model/Survey EGYPT - PROGRAMMATIC POVERTY FY11 P118171 MONITORING "How-To" Guidance P124758 EG (FBS) GDP deflator of ICT FY11 "How-To" Guidance P124759 EG (FBS) Rapid Resp in ICT Stats / FDI FY11 "How-To" Guidance P079934 EG Nile Basin Initiative Support FY11 Institutional Development Plan P110669 Egypt-EITI Development FY11 "How-To" Guidance P116956 Skills Upgrading & Institutional Dev FY11 Institutional Development Plan EG: RTA Market Development and Debt FY12 P117982 Mgmt "How-To" Guidance EG Investment Climate Assessment FY12 P118497 Update TA/IAR P122576 EG-RTA Green ICT (Phase III) FY12 TA/EPD P122612 TA on Labor Market Reform in Egypt FY12 TA/EPD EG-RTA Broadband Impact FY12 P123362 Assessment(Ph.3) Institutional Development Plan P127518 Egypt NHA Institutionalization FY12 TA/EPD Annexes CLR Review 41 Independent Evaluation Group Fiscal Proj ID Economic and Sector Work Output Type year P128638 StAR - Egypt FY12 TA/IAR P115896 EG-TA on Egypt Transport Regulations FY12 TA/IAR P117378 EG-Energy Sector FY12 TA/IAR P115896 EG-TA on Egypt Transport Regulations FY12 Not assigned EG Investment Climate Assessment FY12 P118497 Update Not assigned P122576 EG-RTA Green ICT (Phase III) FY12 Not assigned P122612 TA on Labor Market Reform in Egypt FY12 Not assigned P127518 Egypt NHA Institutionalization FY12 Not assigned P128638 StAR - Egypt FY12 Not assigned P126551 EG Carbon Capture and Storage Tech. FY13 TA/IAR P130004 EG - Reproductive Health Rights FY13 TA/IAR P130432 Egypt #10240 Financial Projection Model FY13 TA/IAR P132543 Egypt SABER WfD FY13 TA/IAR P111534 EG-RTA Pension 2 FY13 TA/EPD P126551 EG Carbon Capture and Storage Tech. FY13 Not assigned P130004 EG - Reproductive Health Rights FY13 Not assigned P130432 Egypt #10240 Financial Projection Model FY13 Not assigned P132543 Egypt SABER WfD FY13 Not assigned P122531 RTAPost-Strategy for Logistics (Ph.3) FY14 TA/IAR P127017 EG-Bldg Platform Urban Upgrading GCR FY14 TA/IAR P127432 Egypt Hackathon, Djibouti-Yemen ICT FY14 TA/IAR P128352 Egypt Public Sector Governance TA FY14 TA/IAR P132357 Egypt-Income Inequality Study - Phase II FY14 TA/IAR P144853 Egypt Country Engagment FY14 TA/IAR P149290 Egypt-Allocative Efficiency of Social Ex FY14 TA/IAR P151341 Egypt White Paper FY14 TA/IAR P151342 Universal Health Coverage/Social Justice FY14 TA/EPD P122531 RTAPost-Strategy for Logistics (Ph.3) FY14 Not assigned P127017 EG-Bldg Platform Urban Upgrading GCR FY14 Not assigned P127432 Egypt Hackathon, Djibouti-Yemen ICT FY14 Not assigned P128352 Egypt Public Sector Governance TA FY14 Not assigned P132357 Egypt-Income Inequality Study - Phase II FY14 Not assigned P144853 Egypt Country Engagment FY14 Not assigned P149290 Egypt-Allocative Efficiency of Social Ex FY14 Not assigned P151341 Egypt White Paper FY14 Not assigned P151342 Universal Health Coverage/Social Justice FY14 Not assigned P129680 EG Energy Pricing and Subsidy FY15 TA/IAR P146535 Egypt Public Sector TA Phase II FY15 TA/IAR P148192 Data Analytics for Urban transport FY15 TA/IAR P151345 Senior Health Policy Seminar FY15 TA/EPD P153631 Review of Education Development Fund FY15 TA/IAR White Paper: EG Energy Sector FY15 P153970 Challenges TA/EPD P129680 EG Energy Pricing and Subsidy FY15 Not assigned P146535 Egypt Public Sector TA Phase II FY15 Not assigned P148192 Data Analytics for Urban transport FY15 Not assigned P151345 Senior Health Policy Seminar FY15 Not assigned Source: WB Business Warehouse Table ESW/TA 8.1.4 as of 10/20/15 Annexes CLR Review 42 Independent Evaluation Group Annex Table 4: Grants and Trust Funds Active in FY08-15 (in US$ million) Project Approval Closing Approved Project name TF ID ID FY FY Amount P146143 Emergency Employment Investment Project TF 17007 2015 2018 87,352,504 P149677 Inclusive Regulations for Microfinance TF 17864 2015 2019 4,000,000 P116230 Egypt: Sustainable POPs Management Project TF 17336 2015 2019 8,100,000 P119483 Egypt Vehicle Scrapping and Recycling Program TF 17503 2015 2017 742,530 P143569 Establishment of a Transport Regulatory Authority TF 14420 2014 2017 300,000 in Greater Cairo P149704 EG-Urban Transport Infrastructure Development TF 15328 2014 2016 1,000,000 P144305 EGYPT Energy/Social Safety Nets Sector TF 16152 2014 2017 6,500,000 Reforms Technical Assistance P127482 Youth Employment TF 10201 2013 2014 30,000 P118090 EG-Enhanced Water Resources Management TF 12952 2013 2017 6,682,000 P130801 Regional Coordination for Improved Water TF 12960 2013 2017 1,050,000 Resources Mgt. & Capacity P117745 EGYPT-Farm-level Irrigation Modernization TF 13794 2013 2016 3,875,410 P124683 Participatory Farm-level Irrigation Modernization TF 98199 2012 2016 2,750,300 P124940 EG-Strengthening the Capacity of SIOIRAFI in TF 99523 2012 2015 project coordination, Monitoring & 247,510 Supervision P116230 Egypt: Sustainable POPs Management Project TF 97823 2011 2012 100,000 P113416 Egypt - Wind Power Development Project TF 96929 2011 2018 250,000 P119805 EG - Sanitation TF 95965 2011 2016 9,000,000 P094311 Integrated Sanitation& Sewerage TF 95516 2011 2016 2,911,175 Infrastructure Project P113416 Egypt - Wind Power Development Project TF 96930 2010 2018 149,750,000 P113416 Egypt - Wind Power Development Project TF 95224 2010 2012 490,000 P119483 Egypt Vehicle Scrapping and Recycling Program TF 15263 2010 2017 2,718,267 P119483 Egypt Vehicle Scrapping and Recycling Program TF 96553 2010 2017 2,583,766 P119483 Egypt Vehicle Scrapping and Recycling Program TF 96554 2010 2015 2,564,018 P095925 Alexandria Coastal Zone Management Project TF 96365 2010 2017 (Under the Investment Fund for the Mediterranean 7,150,000 Sea Large Marine Ecosystem ) P119401 Egypt Job Readiness & Job Placement for TF 95830 2010 2014 2,850,000 Marginalized Youth P114857 EG-Monitoring & Evaluation Systems for TF 94425 2009 2014 406,900 Decentralization P110935 EG-LAND FILLING AND PROCESING TF 92102 2008 2016 950,000 SERVICES FOR SOUTHERN ZONE IN CAIRO P105337 Enhance Capital Market Authority Monitoring TF 90813 2008 2011 309,000 Capacity P050567 KUREIMAT SOLAR THERMAL HYBRID TF 91289 2008 2012 49,800,000 PROJECT P102807 Avian and Human Influenza Control and TF 58320 2008 2011 7,141,842 Prevention P115837 EG-UT Infrastructure Development (to be TF 57140 2008 2014 720,000 dropped) P080228 Health Care Quality Improvement Project TF 57802 2007 2011 770,000 P101103 Egypt National Railways Restructuring Project TF 57785 2007 2009 800,000 P095392 EG-Natural Gas Connections Project TF 56583 2007 2008 500,000 P105358 Egypt Poverty Alleviation and Legal Rights for TF 56265 2007 2011 1,940,262 Women & Adolescents Annexes CLR Review 43 Independent Evaluation Group Project Approval Closing Approved Project name TF ID ID FY FY Amount P097326 Upper Egypt Integrated Governorates TF 56898 2007 2010 730,000 Development P095925 Alexandria Coastal Zone Management Project TF 56983 2007 2009 (Under the Investment Fund for the Mediterranean 350,000 Sea Large Marine Ecosystem ) P090073 Second Pollution Abatement Project TF 57016 2007 2011 1,170,506 P098737 ONYX solid Waste Alexandria - Carbon TF 56124 2006 2016 6,875,426 P088155 Egypt Child Labor Prevention Grant TF 52886 2004 2008 1,877,487 Total 377,338,903 Annex Table 5: IEG Project Ratings for Egypt, FY06-15 Total Exit LN Proj ID Project name Evaluated IEG Outcome IEG Risk to DO FY ($M) MODERATELY 1 2006 P052705 EG-SOCIAL FUND III 53.6 MODERATE SATISFACTORY EG-ED.ENHANCEMENT MODERATELY 2 2007 P005169 70.9 MODERATE PROG. SATISFACTORY MODERATELY 3 2007 P005173 EG Irrigation Improvement 69.9 SIGNIFICANT SATISFACTORY EG- FINANCIAL SECTOR 4 2007 P088877 500.0 SATISFACTORY MODERATE REFORM DPL EG - SOHAG Rural MODERATELY 5 2008 P040858 27.1 SIGNIFICANT Development SATISFACTORY EG Pumping Station Rehab MODERATELY 6 2008 P041410 99.5 MODERATE III SATISFACTORY MODERATELY 7 2009 P045175 EG-HEALTH SECTOR 93.9 SIGNIFICANT UNSATISFACTORY EG-Kureimat Solar Thermal MODERATELY 8 2009 P050567 0.0 SIGNIFICANT Hybrid SATISFACTORY EG-HIGHER EDUCATION MODERATELY NEGLIGIBLE TO 9 2009 P056236 50.0 ENHANCEMENT PROG SATISFACTORY LOW EG-AIRPORTS HIGHLY 10 2009 P082914 374.9 MODERATE DEVELOPMENT PROJECT SATISFACTORY EG-FINANCIAL SECTOR MODERATELY 11 2009 P094551 500.0 MODERATE DPL II SATISFACTORY MODERATELY 12 2010 P049166 EG East Delta Ag. Serv. 15.9 MODERATE SATISFACTORY 13 2010 P049702 EG-SKILLS DEVELOPMENT 5.5 SATISFACTORY MODERATE 14 2010 P120470 Financial Sector DPL III 500.0 SATISFACTORY SIGNIFICANT West Delta Water Conserv. & 15 2011 P087970 0.0 NOT APPLICABLE NOT APPLICABLE Irrig. Rehab 16 2011 P093470 EG-MORTGAGE FINANCE 39.1 SATISFACTORY SIGNIFICANT EG-Avian and Human 17 2011 P102807 0.0 UNSATISFACTORY HIGH Influenza Control and MODERATELY 18 2012 P091945 EG-El Tebbin Power 259.6 SIGNIFICANT UNSATISFACTORY EG Secondary Education MODERATELY 19 2013 P050484 52.1 HIGH Enhancement Proj UNSATISFACTORY Annexes CLR Review 44 Independent Evaluation Group Total Exit LN Proj ID Project name Evaluated IEG Outcome IEG Risk to DO FY ($M) EG-Early Childhood MODERATELY 20 2014 P082952 19.2 SIGNIFICANT Education Enhancement SATISFACTORY EG-Second Pollution 21 2015 P090073 20.0 SATISFACTORY MODERATE Abatement Total 2,751.4 Source: AO Key IEG Ratings as of 10/17/15 Annex Table 6: IEG Project Ratings for Egypt and Comparators, FY06-15 RDO % RDO % Total Total Outcome Outcome Moderate or Moderate or Region Evaluated Evaluated % Sat ($) % Sat (No) Lower Lower ($M) (No) Sat ($) Sat (No) Egypt 2,751.4 21 85.3 80.0 61.4 47.6 MNA 10,790.0 189 66.9 63.6 46.3 34.3 World 203,914.5 2,470 82.7 72.8 65.3 53.9 Annexes CLR Review 45 Independent Evaluation Group Annex Table 7: Portfolio Status for Egypt and Comparators, FY06-15 Fiscal year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Average Mali # Proj 16 15 18 15 22 23 22 25 26 26 21 # Proj At Risk 1 2 2 4 1 2 6 6 5 7 4 % Proj At Risk 6.3 13.3 11.1 26.7 4.5 8.7 27.3 24.0 19.2 26.9 16.8 Net Comm Amt 1,795.1 1,321.6 1,988.5 1,793.7 3,400.5 3,893.5 4,071.8 4,614.9 4,907.7 5,921.4 3,370.9 Comm At Risk 15.0 140.0 27.1 292.1 145.0 57.2 405.0 406.8 1,004.0 1,058.0 355.0 % Commit at Risk 0.8 10.6 1.4 16.3 4.3 1.5 9.9 8.8 20.5 17.9 9.2 MNA # Proj 110 116 147 140 159 164 151 160 169 159 148 # Proj At Risk 10 24 28 29 40 44 54 47 39 61 38 % Proj At Risk 9.1 20.7 19.0 20.7 25.2 26.8 35.8 29.4 23.1 38.4 24.8 Net Comm Amt 6,621.3 6,118.5 7,022.1 6,779.4 8,720.5 9,450.1 8,532.3 9,082.0 12,335.1 13,628.7 8,829.0 Comm At Risk 254.3 1,148.5 991.2 1,204.0 1,913.2 1,478.6 1,839.9 1,817.0 2,284.4 2,931.5 1,586.3 % Commit at Risk 3.8 18.8 14.1 17.8 21.9 15.6 21.6 20.0 18.5 21.5 17.4 World # Proj 1,468 1,485 1,832 1,925 1,990 2,059 2,029 1,964 2,048 2,022 1,882 # Proj At Risk 199 243 312 386 410 382 387 414 412 444 359 % Proj At Risk 13.6 16.4 17.0 20.1 20.6 18.6 19.1 21.1 20.1 22.0 18.8 Net Comm Amt 95,193.6 100,357.1 110,835.9 135,706.0 162,975.3 171,755.3 173,706.1 176,202.6 192,610.1 201,045.2 152,038.7 Comm At Risk 11,000.1 15,354.3 18,967.7 20,857.8 28,963.1 23,850.0 24,465.0 40,805.6 40,933.5 45,987.7 27,118.5 % Commit at Risk 11.6 15.3 17.1 15.4 17.8 13.9 14.1 23.2 21.3 22.9 17.2 Source: WB AO as of 10/16/15 Annex Table 8: Disbursement Ratio for Egypt, FY06-15 Fiscal Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Overall Result Egypt Disbursement Ratio (%) 18.54 26.26 23.83 24.99 13.62 6.70 10.15 14.44 11.42 23.19 15.13 Inv Disb in FY 133.20 222.24 193.43 225.46 209.89 180.97 304.52 452.82 374.13 762.20 3,058.87 Inv Tot Undisb Begin 718.58 846.41 811.63 902.21 1,540.55 2,701.70 3,001.05 3,135.32 3,275.45 3,286.34 20,219.25 FY MNA Disbursement Ratio (%) 18.19 23.21 25.44 26.18 24.05 14.16 15.56 18.58 21.23 21.60 20.47 Annexes CLR Review 46 Independent Evaluation Group Fiscal Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Overall Result Inv Disb in FY 721.59 924.42 1,086.72 1,089.80 1,088.32 795.34 890.18 1,090.02 1,250.88 1,333.97 10,271.24 Inv Tot Undisb Begin 3,967.45 3,982.48 4,272.12 4,162.43 4,524.81 5,615.28 5,722.23 5,866.73 5,892.44 6,176.22 50,182.19 FY World Disbursement Ratio (%) 23.97 22.80 22.18 26.51 26.91 22.38 20.79 20.60 20.79 21.78 22.59 Inv Disb in FY 13,087.51 13,143.69 14,561.67 18,062.48 20,928.83 20,933.36 21,048.24 20,510.39 20,756.98 21,852.73 184,885.87 Inv Tot Undisb Begin 54,609.47 57,653.48 65,651.93 68,133.54 77,760.85 93,516.54 101,234.29 99,588.04 99,852.72 100,343.74 818,344.61 FY * Calculated as IBRD/IDA Disbursements in FY / Opening Undisbursed Amount at FY. Restricted to Lending Instrument Type = Investment. AO disbursement ratio table as of 10/16/15 Annex Table 9: .List of IFC Investments in Egypt Investments Committed in FY06-FY15 Project Project ID Cmt FY Primary Sector Name Greenfield Code Project Size Net Loan Net Equity Net Comm Status 25769 2015 Active Oil, Gas and Mining E 173,000 50,000 50,000 Construction and Real 33294 2015 Active G 60,000 60,000 60,000 Estate 36743 2015 Active Finance & Insurance E 6,588 6,588 6,588 36816 2015 Active Health Care E 967 821 821 33138 2014 Active Finance & Insurance E 20,000 20,000 - 20,000 33338 2014 Active Chemicals G 15,500 15,500 - 15,500 Textiles, Apparel & 31441 2013 Active E 11,000 11,000 - 11,000 Leather 31920 2013 Active Finance & Insurance G 6,000 6,000 6,000 32875 2013 Active Oil, Gas and Mining G 42,000 36,500 8,000 44,500 33324 2013 Active Oil, Gas and Mining G 310,000 100,000 - 100,000 33611 2013 Active Finance & Insurance E 12,500 2,784 - 2,784 30323 2012 Active Education Services G 31,000 11,000 - 11,000 30974 2012 Closed Chemicals G 50,000 50,000 50,000 31182 2012 Active Chemicals G 41,000 8,000 - 8,000 31426 2012 Active Chemicals E 400,000 200,000 - 200,000 32004 2012 Closed Utilities E 100,000 - - - Annexes CLR Review 47 Independent Evaluation Group Project Project ID Cmt FY Primary Sector Name Greenfield Code Project Size Net Loan Net Equity Net Comm Status 32281 2012 Active Finance & Insurance E 6,202 6,212 6,212 28332 2011 Active Pulp & Paper G 84,600 10,000 10,000 28878 2011 Active Chemicals G 91,000 35,000 - 35,000 29246 2011 Active Chemicals G 30,000 12,000 - 12,000 26256 2010 Active Finance & Insurance E 20,000 116,299 - 116,299 Nonmetallic Mineral 27022 2010 Closed G 223,864 120,256 120,256 Product Manufacturing Collective Investment 27632 2010 Active G 25,000 15,500 15,500 Vehicles 28833 2010 Active Finance & Insurance G 100,000 20,000 20,000 29128 2010 Active Chemicals G 120,000 85,000 85,000 Agriculture and 29309 2010 Active E 99,600 25,000 - 25,000 Forestry 26092 2009 Active Finance & Insurance G 200,000 196,672 196,672 26554 2009 Closed Education Services G 37,140 2,740 - 2,740 Collective Investment 26638 2009 Active G 17,000 2,530 2,530 Vehicles Collective Investment 26936 2009 Active G 20,000 7,852 7,852 Vehicles 27485 2009 Closed Pulp & Paper G 8,600 5,200 - 5,200 Agriculture and 26138 2008 Active E 47,000 12,500 - 12,500 Forestry 26485 2008 Active Health Care E 30,000 15,000 - 15,000 26869 2008 Closed Health Care E 15,000 15,000 - 15,000 Textiles, Apparel & 27155 2008 Active G 82,400 8,000 - 8,000 Leather 27320 2008 Closed Chemicals G 131,000 35,000 - 35,000 24373 2007 Closed Oil, Gas and Mining G 76,800 25,000 - 25,000 24418 2007 Active Health Care G 4,168 2,110 2,110 25052 2007 Closed Finance & Insurance G 13,522 3,522 3,522 25136 2007 Active Pulp & Paper G 80,200 26,400 - 26,400 Wholesale and Retail 25700 2007 Active G 175,600 38,500 5,667 44,167 Trade 25825 2007 Closed Health Care E 82,400 17,000 - 17,000 Annexes CLR Review 48 Independent Evaluation Group Project Project ID Cmt FY Primary Sector Name Greenfield Code Project Size Net Loan Net Equity Net Comm Status Textiles, Apparel & 26260 2007 Closed G 14,000 14,000 - 14,000 Leather 24142 2006 Closed Food & Beverages E 14,000 14,000 - 14,000 24311 2006 Closed Oil, Gas and Mining G 4,281 762 762 24586 2006 Closed Finance & Insurance E 20,000 20,000 - 20,000 24681 2006 Active Finance & Insurance G 24,000 23,280 23,280 24822 2006 Closed Finance & Insurance E 4,000 4,000 - 4,000 25041 2006 Closed Finance & Insurance G 720 477 477 Sub-Total 3,181,653 955,424 571,247 1,526,671 Investments Committed pre-FY06 but active during FY06-15 Loan Equity Project Project Greenfield Project Net Net CMT FY Primary Sector Name Net Comm Risk Risk ID Status Code Size Loan Equity Rating Rating 23919 2005 Active Finance & Insurance G 3,000 3,000 3,000 5B 7290 1997 Active Finance & Insurance G 884 884 884 5B 2975 1993 Active Oil, Gas and Mining E 45,660 13,000 13,000 3A 25707 1900 Active Finance & Insurance E - 40,000 39,554 79,554 3B 4B Sub-Total 49,544 40,000 56,438 96,438 TOTAL 3,231,196 995,424 627,684 1,623,109 Source: IFC-MIS Extract as of end June 30, 2015 Annexes CLR Review 49 Independent Evaluation Group Annex Table 10: List of IFC Advisory Services for Egypt Advisory Services Approved in FY06-15 Impl Impl Primary Total Project Project Project Name Start End Business Funds, ID Status FY FY Line US$ 599631 Low Income Housing Assiut Egypt 2015 2017 TERMINATED A2F 9,977 600152 Maadi Technology Park in Egypt 2015 2017 ACTIVE CAS 258,227 600466 AlexBank SME 2015 2016 ACTIVE FIG 40,700 600784 Cairo International Airport O&M 2015 2017 TERMINATED CAS 0 582547 Egypt Secured Lending Project 2014 2015 TERMINATED FAM 59,999 599516 Investment Readiness Platform 2014 2017 TERMINATED SBA 17,895 599870 E4E Regulatory Reform Egypt 2014 2016 HOLD TAC 62,950 600142 E4E ICT Sector Egypt 2014 2017 ACTIVE TAC 787,041 582927 Egypt Leasing Development 2013 2016 TERMINATED FAM 47,335 595247 Egypt Trade Logistics 2013 2016 HOLD TAC 1,232,417 Corporate Governance Other MENA 598147 2013 2017 ACTIVE ESG 450,000 Regional Project II 598647 Egypt Debt Resolution & Business Exit 2013 2015 TERMINATED FAM 250,034 Egypt PPP Program - Extension of 599055 2013 2016 ACTIVE CAS 396,416 Memorandum of Understanding 599882 Al Tadamun 2013 2017 ACTIVE FIG 605,000 569900 Egypt SME Corporate Governance Project 2012 2016 ACTIVE ESG 656,409 579547 MF & CB Egypt 2012 2015 TERMINATED FAM 190,654 590687 Egypt BAS Program 2012 2013 TERMINATED A2F 23,520 590749 E4E MENA Region 2012 2015 ACTIVE TAC 2,707,500 592727 MENA Clean Energy Program 2012 2016 ACTIVE CAS 85,000 594787 Egypt SubNational Doing Business 2013 2012 2016 ACTIVE TAC 1,387,474 30051 Dairut IPP 2011 2017 ACTIVE CAS 958,532 569954 DBACD TA 2011 2016 ACTIVE FIG 909,146 576867 Logistics Industry Development Egypt 2011 2014 TERMINATED IC 135,247 577707 Women A2F Study 2011 2012 TERMINATED A2F 90,733 569849 Alternative Dispute Resolution Project Egypt 2010 2016 ACTIVE FAM 2,555,980 573387 Advocacy for Reform II - Egypt 2010 2013 CLOSED IC 160,248 553805 iScore Egypt 2 2008 2009 CLOSED A2F 44,332 Cairo-Alexandria- Marsa Matrouh Technical 559966 2008 2011 CLOSED PPP 1,278,138 Studies Business Start-up Simplification Project, 561596 2008 2010 CLOSED IC 802,671 Egypt, Phase 2 561669 Highway Study 2008 2009 CLOSED PPP 369,351 25405 New Cairo Water 2007 2010 CLOSED PPP 371,103 25533 New Schools PPP 2007 2011 CLOSED PPP 988,712 26249 Alexandria University Hospitals PPP 2007 2016 ACTIVE CAS 3,201,599 539181 Mining Policy Reform Egypt 2007 2009 CLOSED IC 366,028 552647 New Cairo Waste 2007 2010 CLOSED PPP 1,573,486 Egyptian Mortgage Refinance Company 554071 2007 2008 CLOSED A2F 194,115 Advisory 554365 Subnational Doing Business Egypt 2007 2009 CLOSED IC 168,848 555045 Business Edge Egypt 2007 2009 CLOSED SBA 308,321 557286 ABA - Private Sector Observatory 2007 2009 CLOSED IC 94,211 539183 Bus Strtup Rg P1 2006 2008 CLOSED IC 599,264 Annexes CLR Review 50 Independent Evaluation Group Impl Impl Primary Total Project Project Project Name Start End Business Funds, ID Status FY FY Line US$ Industrial Estates in Alexandria: Improving 545784 Management Mechanisms and Regulatory 2006 2008 CLOSED IC 194,528 Framework 546905 CIB II follow up on CIB I 2006 2009 CLOSED A2F 85,857 548566 Egyptian Liquidity Facility - TA Assessment 2006 2007 CLOSED A2F 12,490 Sub-Total 24,731,488 Advisory Services Approved pre-FY06 but active during FY06-15 Impl Impl Primary Total Project Project Project Name Start End Business Funds, ID Status FY FY Line US$ 533924 EBFP Egypt Siwa Oasis 2005 2015 ACTIVE CAS 1,582,810 533975 EBFP - Egypt Energy Efficiency Project 2005 2006 CLOSED SBA 66,589 543088 EBFP Egypt EE BNP Paribas 2005 2007 CLOSED A2F 68,342 EBFP - United Company for Light Industries 532427 2000 2006 CLOSED SBA 20,767 S.A.E.- PILCO Sub-Total 1,738,508 TOTAL 26,469,996 Source: IFC AS Data as of June 30, 2015 Annex Table 11: List of MIGA Activities in Egypt Max Project ID Contract Enterprise FY Sector Investor Gross Status Issuance 11051 Egyptian Refining Company 2015 Active Oil and Gas Germany 23 11695 Elif Global Packaging S.A.E 2015 Active Manufacturing Turkey 10 11695 Elif Global Packaging S.A.E 2014 Active Manufacturing Turkey 26 10572 Apache Egypt 2013 Active Oil and Gas United States 150 Total 210 Source: MIGA 10-22-15 Annex Table 12: Net Disbursement and Charges for Egypt, FY06-15 Period Disb. Amt. Repay Amt. Net Amt. Charges Fees Net Transfer Jul 2005 - Jun 2006 134,017,682 111,910,798 22,106,883 32,192,051 2,508,128 (12,593,296) Jul 2006 - Jun 2007 722,239,804 107,807,658 614,432,146 38,766,638 4,912,920 570,752,588 Jul 2007 - Jun 2008 189,379,774 148,238,123 41,141,650 67,155,335 8,525,386 (34,539,071) Jul 2008 - Jun 2009 678,824,766 128,926,739 549,898,027 49,087,314 13,950,096 486,860,618 Jul 2009 - Jun 2010 808,069,575 148,485,601 659,583,974 41,644,041 16,401,528 601,538,405 Jul 2010 - Jun 2011 181,304,489 146,367,088 34,937,401 36,977,913 11,955,561 (13,996,074) Jul 2011 - Jun 2012 404,031,774 138,936,726 265,095,048 38,042,480 13,044,969 214,007,599 Jul 2012 - Jun 2013 452,165,178 146,472,506 305,692,671 44,542,672 11,325,379 249,824,621 Jul 2013 - Jun 2014 372,614,108 172,164,391 200,449,718 38,597,924 10,458,051 151,393,742 Jul 2014 - Jun 2015 839,448,359 219,716,772 619,731,588 37,527,793 10,211,392 571,992,403 Report Total 4,782,095,509 1,469,026,402 3,313,069,106 424,534,162 103,293,410 2,785,241,535 Source: World Bank Client Connection 10/19/15 Annexes CLR Review 51 Independent Evaluation Group Annex Table 13: Total Net Disbursements of Official Development Assistance and Official Aid for Egypt Development Partners 2006 2007 2008 2009 2010 2011 2012 2013 2014 Australia 9.02 9.02 9.02 9.02 4.22 9.02 9.02 2.63 .. Austria 21.12 26.15 28.02 11.47 7.36 8.75 6.81 5.01 .. Belgium -1.33 -2.51 -1.57 -1.54 -1.3 1.1 -0.15 -0.29 .. Canada 15.85 17.65 14.45 16.96 8.89 15.17 6.82 8.1 .. Czech Republic 1.35 0.17 0.19 0.2 0.23 0.39 0.37 0.48 0.3 Denmark 29.4 30.33 47.42 16.49 18.45 12 13.83 3.84 3.03 Finland 4.25 4.21 1.12 1.02 1.86 1.95 1.45 1.99 2.24 France 62.71 77.13 141.99 111.55 140.13 115.84 140.31 54.67 .. Germany 140.61 153.91 170.27 138.84 104.49 164.33 103.44 188.1 .. Greece 3.27 6.94 12.75 14.3 9.11 8.4 1.95 0.69 .. Iceland .. .. .. .. .. .. .. .. .. Ireland 0.4 0.36 0.34 0.28 0.12 0.76 0.53 0.29 .. Italy -10.39 -11.27 6.87 10.13 -2.15 14.47 4.33 3.87 .. Japan -5.2 -27.04 11.64 -18.81 -17.74 -91.29 -20.33 -92.46 .. Korea 5.64 5.77 7.47 5.57 4.16 3.8 4.14 2.93 .. Luxembourg 0.12 0.07 0.12 0.16 0.09 0.17 0.13 0.13 0.14 Netherlands 13.12 14.6 19.72 17.79 10.96 10.06 6.05 3.53 0.88 New Zealand 0.01 .. 0.14 .. .. 0.47 .. .. .. Norway 0.54 0.36 0.22 0.69 0.67 1.87 1.16 2.07 .. Poland 0.02 0.02 0.04 0.02 0.09 0.09 0.16 0.06 .. Portugal 0.01 0.07 0.09 0.03 0.01 0.09 0.09 0.12 .. Slovak Republic .. .. .. .. .. 0.12 .. 0.01 .. Slovenia .. .. 0.01 .. 0.04 0.03 0.04 0.01 .. Spain 33.16 11.36 15.63 20.6 7.24 16.25 1.07 1.69 .. Sweden 1.99 2.42 2.18 1.74 1.41 5.6 8.92 10.69 .. Switzerland 2.85 7.17 1.66 8.99 6.35 11.85 14.37 16.81 .. United Kingdom 18.77 0.13 8.76 35.64 8.99 17.42 14.1 32.83 .. United States 195.6 462.41 470.78 185.07 49.39 -98.33 -14.85 58.46 .. DAC Countries, Total 542.89 789.43 969.33 586.21 363.07 230.38 303.76 306.26 6.59 AfDB (African Dev. .. .. .. .. .. 1.33 0.91 0.67 1.63 Bank) AfDF (African 4.17 1.56 11.45 -5 -5.97 -6.37 -6.24 -6.37 -7.23 Dev.Fund) Arab Fund (AFESD) .. .. 47.64 74.82 33.21 39.77 157.05 66.76 73.77 Climate Investment .. .. .. .. .. .. .. 0.33 .. Funds (CIF) EU Institutions 228.47 220.66 203.63 204.68 136.86 67.56 769.43 -1.91 .. GEF 0.91 10.52 54.48 26.51 .. 1.72 1.71 2.73 .. Global Fund 1.21 2.57 4.67 4.13 2.65 0.05 3.86 1.15 0.46 IAEA 1.02 0.85 0.84 0.63 0.68 0.37 0.23 0.79 0.63 IBRD .. .. .. .. .. .. .. .. .. IDA 14.36 -33.3 -39.18 -50.47 -44.13 -54.05 -53.68 -60.55 .. IFAD 6.2 5.51 6.54 -2.71 -5.51 -1.73 0.38 -3.09 .. IFC .. .. .. .. .. .. .. .. .. Isl.Dev Bank 3.13 1.01 4.08 3.66 -1.41 -0.26 -1.48 0.25 8.19 OFID 15.26 16.35 11.51 26.12 14.76 4.09 14.83 22.46 14.18 UNAIDS 0.29 0.56 0.32 0.46 0.45 0.46 0.23 0.12 0.09 Annexes CLR Review 52 Independent Evaluation Group Development Partners 2006 2007 2008 2009 2010 2011 2012 2013 2014 UNDP 1.52 1.94 2.62 2.98 2.34 1.57 1.22 2.43 1.7 UNFPA 2.86 2.41 2.66 2.52 2.64 3.02 2.72 2.01 2.58 UNHCR 1.09 1.05 1.51 2 5.98 9.23 .. 1.79 .. UNICEF 3.03 3.21 2.96 3.45 3.84 3.72 2.91 3.13 .. UNTA 2.23 2.92 1.41 .. .. .. .. .. .. WFP 1.1 0.41 0.53 2.46 1.13 1.73 0.76 1.37 4.5 WHO .. .. .. .. .. 1.43 0.68 1.42 1.58 Multilateral, Total 286.85 238.23 317.67 296.24 147.52 73.64 895.52 35.49 102.08 Cyprus .. 0.41 0.18 0.23 0.26 0.15 0.01 .. .. Estonia .. .. .. .. .. .. .. .. .. Hungary .. 0.11 0.02 0.11 0.1 0.17 0.12 0.09 0.09 Israel 0.34 0.85 0.67 0.1 0.08 .. .. .. .. Kuwait (KFAED) 19.7 60.05 88.24 59.8 54.45 94.66 90.48 20.78 -4.01 Latvia .. 0 .. .. .. 0.01 .. .. .. Lithuania .. .. .. .. .. 0.01 .. .. .. Romania .. .. .. .. 0.06 0.1 0.22 0.26 .. Russia .. .. .. .. .. .. 0.07 .. .. Thailand 0.1 0.07 0.04 0.05 0.02 0.01 0.03 0.04 0.02 Turkey 0.62 0.72 0.95 0.91 1.3 3.51 503.92 538.83 .. United Arab Emirates 48.24 42.91 365.22 56.38 22.28 11.68 11.02 4605.6 .. Non-DAC Countries, 69 105.12 455.32 117.58 78.55 110.3 605.87 5165.6 -3.9 Total Development 898.74 1132.78 1742.32 1000.03 589.14 414.32 1805.15 5507.35 104.77 Partners Total Source: OECD Stat, [DAC2a] as of October 20, 2015 Annexes CLR Review 53 Independent Evaluation Group Annex Table 14: Economic and Social Indicators for Egypt, FY06-15 Egypt MNA World Series Name 2006 2007 2008 2009 2010 2012 2012 2013 2014 2015 Average 2006-2015 Growth and Inflation GDP growth (annual %) 6.8 7.1 7.2 4.7 5.1 1.8 2.2 2.1 2.2 .. 4.4 4.2 2.4 GDP per capita growth 5.0 5.3 5.3 2.8 3.1 (0.3) (0.0) (0.2) (0.0) .. 2.3 2.0 1.2 (annual %) GNI per capita, PPP 7,930.0 8,610.0 9,240.0 9,490.0 9,700.0 9,810.0 10,000.0 10,100.0 10,260.0 .. 9,460.0 15,854.6 12,868.0 (current international $) GNI per capita, Atlas 1,330.0 1,550.0 1,860.0 2,140.0 2,390.0 2,590.0 2,810.0 2,940.0 3,050.0 .. 2,295.6 6,559.6 9,426.1 method (current US$) Inflation, consumer 7.6 9.3 18.3 11.8 11.3 10.1 7.1 9.4 10.1 .. 10.6 4.4 4.3 prices (annual %) Composition of GDP (%) Agriculture, value 14.1 14.1 13.2 13.6 14.0 14.5 14.5 14.5 14.5 .. 14.1 6.6 3.1 added (% of GDP) Industry, value added 38.4 36.8 37.9 37.6 37.5 37.6 39.2 39.2 39.9 .. 38.2 51.1 27.3 (% of GDP) Services, etc., value 47.5 49.2 48.9 48.8 48.5 47.9 46.3 46.3 45.6 .. 47.7 42.3 69.6 added (% of GDP) Gross fixed capital 18.7 20.9 22.3 18.9 19.2 16.7 15.6 13.8 13.3 .. 17.7 23.5 22.4 formation (% of GDP) Gross domestic savings 17.1 16.3 16.8 12.6 14.3 13.0 8.0 7.5 5.2 .. 12.3 37.6 23.0 (% of GDP) External Accounts Exports of goods and 29.9 30.2 33.0 25.0 21.3 20.6 17.4 18.1 15.2 .. 23.4 52.1 28.7 services (% of GDP) Imports of goods and 31.6 34.8 38.6 31.6 26.6 24.7 25.8 24.8 24.1 .. 29.2 41.0 28.7 services (% of GDP) Current account 2.5 0.3 (0.9) (1.8) (2.1) (2.3) (2.7) (1.3) (2.0) .. (1.1) balance (% of GDP) External debt stocks (% 27.5 25.8 20.3 18.3 16.8 15.3 15.6 16.7 .. .. 19.5 of GNI) Total debt service (% of 2.3 2.2 2.0 1.6 1.4 1.5 1.3 1.3 .. .. 1.7 GNI) Total reserves in 7.4 7.0 6.0 7.4 6.7 3.3 2.5 2.7 2.2 .. 5.0 26.3 13.0 months of imports Fiscal Accounts /1 General government 28.6 27.7 28.0 27.7 25.1 22.0 22.1 23.0 25.0 23.7 25.3 revenue (% of GDP) General government total expenditure (% of 37.8 35.3 36.0 34.6 33.4 31.8 32.7 37.1 38.6 35.4 35.3 GDP) Annexes CLR Review 54 Independent Evaluation Group Egypt MNA World Series Name 2006 2007 2008 2009 2010 2012 2012 2013 2014 2015 Average 2006-2015 General government net lending/borrowing (9.2) (7.5) (8.0) (6.9) (8.3) (9.8) (10.5) (14.1) (13.6) (11.7) (10.0) (% of GDP) General government 90.3 80.2 70.2 73.0 73.2 76.6 78.9 89.0 90.5 90.0 81.2 gross debt (% of GDP) Social Indicators Health Life expectancy at birth, 69.6 69.8 70.0 70.2 70.5 70.7 70.9 71.1 .. .. 70.4 71.6 70.1 total (years) Immunization, DPT (% of children ages 12-23 98.0 98.0 97.0 97.0 97.0 96.0 93.0 97.0 94.0 .. 90.9 83.6 months) Improved sanitation facilities (% of 91.1 92.2 93.3 94.4 94.7 94.7 94.7 94.7 94.7 94.7 88.3 65.1 population with access) Improved water source, rural (% of rural 96.1 96.4 96.7 97.1 97.4 97.7 98.0 98.3 98.7 99.0 97.5 84.5 80.7 population with access) Mortality rate, infant 28.1 27.1 26.1 25.1 24.3 23.4 22.6 21.8 21.0 20.3 24.0 22.9 37.0 (per 1,000 live births) Education School enrollment, 18.6 18.2 23.5 25.2 30.8 27.4 27.5 29.5 .. .. 26.7 48.7 preprimary (% gross) School enrollment, 107.2 108.3 .. 111.4 112.3 108.6 113.4 114.8 .. .. 106.5 107.8 primary (% gross) School enrollment, .. .. .. 73.7 75.9 85.6 86.3 89.0 .. .. 76.8 70.2 secondary (% gross) Population Population, total 76,274,28 77,605,327.0 78,976,122.0 80,442,443.0 82,040,994.0 83,787,634.0 85,660,902.0 87,613,909.0 89,579,670.0 .. 82,442,365.1 385,289,526.0 6,925,381,990.6 (Millions) 5.0 Population growth 1.8 1.7 1.8 1.8 2.0 2.1 2.2 2.3 2.2 .. 2.0 2.1 1.2 (annual %) Urban population (% of 43.1 43.1 43.1 43.0 43.0 43.0 43.0 43.0 43.1 .. 43.0 62.4 51.5 total) Source: WDI Central 10/14/15 *International Monetary Fund, World Economic Outlook Database, October 2015 ** Estimates