Moldova Agriculture Competitiveness Project (MACP) Project ID: P118518 Credit No. 50950-MD / Grant No. TF012145 Closing date: Jun 30. 2017 76841 Original: March 14, 2012 Update date: April 18, 2013 Procurement category Procurement method Procurement Type Component Nr. Contract # Bank's NO Bank's no Bank's review Draft Bidding objection to Bid evaluation objection to Contract Value & Contract completion Winning bidder Description of works Procurement Status Invitation for bids Bid opening Contract Number Contract signing date # (Prior/Post) Docs and SPN bidding report Contract Currency date name&Country docs/Specs award Planned 1 W ICB Prior 20-Aug-2013 4-Sep-2013 9-Sep-2013 8-Nov-2013 29-Nov-2013 6-Dec-2013 13-Dec-2013 8-Nov-2014 1 MACP/CW/ICB-1.1 Rehabilitation of Food Safety Agency's office in Chisinau Revised Actual Planned 1 W NCB Prior 8-Oct-2013 23-Oct-2013 28-Oct-2013 12-Dec-2013 2-Jan-2014 17-Jan-2014 24-Jan-2014 20-Dec-2014 2 MACP/CW/NCB-1.1 Rehabilitation of Food Safety laboratory in Cahul Revised (Works) Actual Planned 1 W NCB Prior 16-Sep-2013 1-Oct-2013 6-Oct-2013 20-Nov-2013 11-Dec-2013 26-Dec-2013 2-Jan-2014 28-Nov-2014 3 MACP/CW/NCB-1.2 Rehabilitation of RVDC reference laboratory in Balti Revised Actual Planned 1 W ICB Prior 1-Dec-2013 16-Dec-2013 21-Dec-2013 19-Feb-2014 21-Mar-2014 5-Apr-2014 10-Apr-2014 10-Apr-2015 4 MACP/CW/ICB-1.2 Construction of Border Inspection Points Revised Actual Sub Total (Works) Procurement category Procurement method Procurement Type Component Nr. Contract # Bank's NO Bank's no Bank's review Draft Bidding objection to Bid evaluation objection to Contract Value & Contract completion Winning bidder Description of goods Procurement Status Invitation for bids Bid opening Contract Number Contract signing date # (Prior/Post) Docs and SPN bidding report Contract Currency date name&Country docs/Specs award Planned 1 G ICB Prior 2-Mar-2015 1-Apr-2015 3-Apr-2015 2-Jun-2015 2-Jul-2015 3-Aug-2015 6-Aug-2015 31-Dec-2015 5 MACP/G/ICB-1.3 Laboratory equipment Revised Actual Planned 1 G NCB Post 2-Mar-2015 1-Apr-2015 3-Apr-2015 18-May-2015 8-Jun-2015 22-Jun-2015 29-Jun-2015 27-Sep-2015 6 MACP/G/NCB-1.3 Furniture for laboratories Revised Actual Planned 1 G SH Post 7-Apr-2014 N/A 8-Apr-2014 29-Apr-2014 13-May-2014 N/A 20-May-2014 19-Jul-2014 7 MACP/G/SH-1.1 Offcce furniture for Food Safety Agency Revised Actual Planned 1 G SH Post 28-Jun-2014 N/A 29-Jun-2014 20-Jul-2014 3-Aug-2014 N/A 10-Aug-2014 8-Nov-2014 8 MACP/G/SH-1.2 Computers and office equipment for Food Safety Agency Revised Actual Planned 1 G ICB Prior 1-Oct-2014 16-Oct-2014 21-Oct-2014 20-Dec-2014 19-Jan-2015 3-Feb-2015 8-Feb-2015 8-Feb-2016 Laboratory management information system (LMIS) for 9 MACP/G/ICB-1.4 Revised all three laboratories Actual Planned 1 G ICB Prior 1-May-2014 16-May-2014 21-May-2014 20-Jul-2014 19-Aug-2014 3-Sep-2014 8-Sep-2014 7-Mar-2015 (Goods) 10 MACP/G/ICB-1.5 Integrated food safety IT system Revised Actual Planned 1 G SH Post 2-Mar-2015 N/A 3-Mar-2015 24-Mar-2015 7-Apr-2015 N/A 14-Apr-2015 12-Aug-2015 11 MACP/G/SH-1.3 Chemicals and reagents for laboratories Revised Actual Planned 1 G SH Post 15-Mar-2014 N/A 16-Mar-2014 6-Apr-2014 20-Apr-2014 N/A 27-Apr-2014 26-Jul-2014 12 MACP/G/SH-1.4 Computers for Central reference laboratory Revised Actual Planned 3 G ICB Prior 28-Jan-2013 4-Feb-2013 12-Feb-2013 16-Apr-2013 7-May-2013 21-May-2013 28-May-2013 25-Sep-2013 13 MACP/G/ICB-3.1 Forestry equipment for Moldsilva Revised Actual 28-Jan-2013 4-Feb-2013 12-Feb-2013 16-Apr-2013 Planned 3 G NCB Prior 19-Apr-2013 24-Apr-2013 27-Apr-2013 27-May-2013 10-Jun-2013 24-Jun-2013 1-Jul-2013 29-Sep-2013 13.1 MACP/G/NCB-3.1 Forestry equipment for Moldsilva (Lot 7) Revised Actual Planned 4 G SH Post 14 MACP/G/SH-4.1 Field monitoring car Revised Actual Sub Total (Goods) Procurement category Procurement method Procurement Type Component Nr. Contract # Bank's NO Bank's no Bank's review Draft Bidding objection to Bid evaluation objection to Contract Value & Contract completion Winning bidder Description of goods Procurement Status Invitation for bids Bid opening Contract Number Contract signing date # (Prior/Post) Docs and SPN bidding report Contract Currency date name&Country docs/Specs award Planned 1 G SH Post 2-Feb-2015 N/A 3-Feb-2015 24-Feb-2015 10-Mar-2015 N/A 17-Mar-2015 15-Jul-2015 15 MACP/NCS/SH-1.1 Accreditation for all laboratories Revised Actual Planned 1 G SH Post 1-May-2015 N/A 2-May-2015 23-May-2015 6-Jun-2015 N/A 13-Jun-2015 11-Oct-2015 Inter-comparative tests and metrological calibration and 16 MACP/NCS/SH-1.2 Revised certification of animal health laboratory Actual Planned 1 G SH Prior 15-Apr-2013 22-Apr-2013 23-Apr-2013 14-May-2013 28-May-2013 N/A 4-Jun-2013 3-Aug-2013 Technical design for Food Safety Agency's office in 17 MACP/NCS/SH-1.3 Revised Chisinau Consulting Services) Actual Planned 1 G SH Post 20-May-2013 N/A 21-May-2013 11-Jun-2013 25-Jun-2013 N/A 2-Jul-2013 31-Aug-2013 18 MACP/NCS/SH-1.4 Technical design for RVDC reference laboratory in Balti Revised Actual Planned 1 G SH Post 25-Jun-2013 N/A 26-Jun-2013 17-Jul-2013 31-Jul-2013 N/A 7-Aug-2013 6-Oct-2013 19 MACP/NCS/SH-1.5 Technical design for Food Safety laboratory in Cahul Revised Actual -1- (Non Planned 1 G SH Post 5-Aug-2013 N/A 6-Aug-2013 27-Aug-2013 10-Sep-2013 N/A 17-Sep-2013 16-Nov-2013 20 MACP/NCS/SH-1.6 Technical design for Border Inspection Points Revised Actual Planned 1 G SH Post 1-Oct-2013 N/A 2-Oct-2013 23-Oct-2013 6-Nov-2013 N/A 13-Nov-2013 12-Jan-2014 21 MACP/NCS/SH-1.7 Logistics for FSA training Revised Actual Planned 1 G SH Post 1-Jul-2014 N/A 2-Jul-2014 23-Jul-2014 6-Aug-2014 N/A 13-Aug-2014 12-Oct-2014 22 MACP/NCS/SH-1.8 Logistics for FBO training Revised Actual Sub Total (Goods) Procurement category Procurement method Procurement Type Component Nr. Bank's no Contract # Bank's Bank's no Bank's no Preparation of Technical and objection for Review objection for objection to Contract Value & Contract completion Winning bidder Description of Assignment Procurement Status TOR, Selection RFP/LOI issued Financial Proposal Technical (and Contract Number Contract signing date (Prior/ TOR, Selection contract Currency date name&Country criteria, budget receipt Financial) Post) criteria, budget signature evaluation Planned 1 CS CQ Prior 22-Mar-2013 29-Mar-2013 5-Apr-2013 20-May-2013 19-Jun-2013 26-Jun-2013 28-Jun-2013 31-Dec-2015 23 MACP/CS/CQ-2.1 Promotion campaign. Awareness for producers groups Revised Actual 18-Mar-2013 27-Mar-2013 29-Mar-2013 Planned 1 CS QBS Prior 15-Jan-2013 15-Mar-2013 29-Mar-2013 13-May-2013 12-Jun-2013 19-Jun-2013 21-Jun-2013 30-Jun-2017 24 MACP/CS/QBS-2.1 Business support to producers groups. Revised Actual 15-Jan-2013 Planned 1 CS CQ Prior 25-Apr-2013 2-May-2013 9-May-2013 23-Jun-2013 23-Jul-2013 30-Jul-2013 1-Aug-2013 30-Jun-2017 (Consultant Services - Consulting Firms) 25 MACP/CS/CQ-3.1 Training on IPM in horticulture sector Revised Actual Planned 1 CS CQ Prior 30-Apr-2013 7-May-2013 14-May-2013 28-Jun-2013 28-Jul-2013 4-Aug-2013 6-Aug-2013 30-Jun-2017 26 MACP/CS/CQ-3.2 Public awareness on IPM and outreach for SLM Revised Actual Planned 1 CS CQ Prior 1-Oct-2015 8-Oct-2015 15-Oct-2015 29-Nov-2015 29-Dec-2015 5-Jan-2016 7-Jan-2016 5-Jul-2016 27 MACP/CS/CQ-3.3 M&E on application of SLM practicies Revised Actual Planned 1 CS SSS Prior 30-Apr-2013 15-May-2013 N/A N/A N/A 30-May-2013 6-Jun-2013 6-Jun-2015 28 MACP/CS/SSS-3.1 Forest designing and management Revised Actual Planned 4 CS LCS Post 1-Nov-2013 16-Nov-2013 21-Nov-2013 5-Jan-2014 N/A N/A 4-Feb-2014 5-Apr-2014 29 MACP/CS/LCS-4.1 Project Financial Audit Revised Actual Planned 1 CS LCS Prior 1-Mar-2015 16-Mar-2015 21-Mar-2015 5-May-2015 20-May-2015 19-Jun-2015 29-Jun-2015 28-Aug-2015 30 MACP/CS/LCS-4.2 Operational Grants Audit Revised Actual Planned 1 CS CQ Post 1-Aug-2016 16-Aug-2016 21-Aug-2016 5-Oct-2016 N/A N/A 4-Nov-2016 2-Feb-2017 31 MACP/CS/CQ-4.1 Impact assessment Revised Actual Planned 1 CS IC Post 5-Aug-2013 20-Aug-2013 21-Aug-2013 11-Sep-2013 N/A N/A 2-Oct-2013 31-Dec-2016 Harmonization of legislation on laboratories (Lump-sum 32 MACP/CS/IC-1.1.1 Revised contract). FTA Actual Planned 2 CS IC Post 5-Aug-2013 20-Aug-2013 21-Aug-2013 4-Sep-2013 N/A N/A 25-Sep-2013 31-Dec-2016 Harmonization of legislation on laboratories (Lump-sum 33 MACP/CS/IC-1.1.2 Revised contract). LTA Actual Planned 1 CS IC Post 1-Mar-2014 16-Mar-2014 19-Mar-2014 9-Apr-2014 N/A N/A 30-Apr-2014 30-Apr-2015 Regulatory framework. Harmonization on auto-controls 34 MACP/CS/IC-1.2 Revised for FBO (Lump-sum contract). 3 consultants Actual Planned 1 CS IC Post 1-Apr-2014 16-Apr-2014 19-Apr-2014 10-May-2014 N/A N/A 31-May-2014 31-May-2015 Training for Food safety agency EC Reg. 882. Training 35 MACP/CS/IC-1.3 Revised in implementation of EC Reg. 882 (Time-based contract) Actual Planned 1 CS IC Post 20-Apr-2013 5-May-2013 8-May-2013 29-May-2013 N/A N/A 19-Jun-2013 19-Jun-2014 Training for Food safety agency manuals. Training in 36 MACP/CS/IC-1.4 Revised manuals for control procedures (Time-based contract) Actual Training for Food safety agency HACCP. Audit of FBO Planned 1 CS IC Post 20-Mar-2014 4-Apr-2014 7-Apr-2014 28-Apr-2014 N/A N/A 19-May-2014 19-May-2015 37 MACP/CS/IC-1.5.1 safety control systems - animal origin (Time-based Revised contract) Actual Training for Food safety agency HACCP. Audit of FBO Planned 1 CS IC Post 20-Mar-2014 4-Apr-2014 7-Apr-2014 28-Apr-2014 N/A N/A 19-May-2014 19-May-2015 38 MACP/CS/IC-1.5.2 safety control systems - non-animal origin (Time-based Revised contract) Actual Training for Food safety agency HACCP. Audit of FBO Planned 1 CS IC Post 20-Mar-2014 4-Apr-2014 7-Apr-2014 28-Apr-2014 N/A N/A 19-May-2014 19-May-2015 39 MACP/CS/IC-1.5.3 safety control systems - processing industry (Time-based Revised contract) Actual Planned 1 CS IC Post 20-Apr-2013 5-May-2013 8-May-2013 29-May-2013 N/A N/A 19-Jun-2013 19-Jun-2014 Training for Food safety agency inspections (Time-based 40 MACP/CS/IC-1.6 Revised contaract) Actual Planned 1 CS IC Post 1-Dec-2013 16-Dec-2013 19-Dec-2013 9-Jan-2014 N/A N/A 30-Jan-2014 30-Apr-2014 Training for Food safety agency sampling (Time-based 41 MACP/CS/IC-1.7 Revised contract) Actual Planned 1 CS IC Post 26-Feb-2013 13-Mar-2013 16-Mar-2013 6-Apr-2013 N/A N/A 27-Apr-2013 27-Apr-2014 42 MACP/CS/IC-1.8 Support to Food Safety Laboratories Revised Actual 26-Feb-2013 Planned 2 CS IC Post 21-May-2013 11-Jun-2013 14-Jun-2013 5-Jul-2013 N/A N/A 26-Jul-2013 26-Jul-2015 Training on border control activities (Time-based 43 MACP/CS/IC-1.9 Revised contract). 2 consultants Actual Planned 1 CS IC Post IT consultant. International consultant for integrated 44 MACP/CS/IC-1.10 Revised information system (Lump-sum contract) Actual Planned 1 CS IC Post 28-Jan-2013 4-Feb-2013 8-Feb-2013 22-Feb-2013 N/A N/A 18-Mar-2013 31-Dec-2014 Ion Raileanu es - Individual Consultants) 45 MACP/CS/IC-1.11 Civil engineer (Lump-sum contract) Revised MACP/CS/IC-1.11 USD39,330 Moldova Actual 1 CS IC Post 28-Jan-2013 4-Feb-2013 8-Feb-2012 22-Feb-2013 N/A N/A 22-Mar-2013 Planned 2 CS IC Post 1-May-2014 16-May-2014 19-May-2014 9-Jun-2014 N/A N/A 30-Jun-2014 29-Jun-2016 46 MACP/CS/IC-2.1 M&E support to Paying Agency (Time-based contract) Revised Actual Planned 4 CS IC Post Continious Expertise for PGs. On-demand FTA/LTA (Lump-sum 47 MACP/CS/IC-2.2 Revised on-demand contract). 4 consultants Actual Methodological and analytical work for soil quality & Planned 2 CS IC Post 15-Apr-2013 30-Apr-2013 3-May-2013 24-May-2013 N/A N/A 14-Jun-2013 14-Jun-2014 -2- (Consultant Service 48 MACP/CS/IC-3.1 land degradation risk assessment, land quality Revised certification (agriculturist) Actual Methodological and analytical work for soil quality & Planned 1 CS IC Post 15-Apr-2013 30-Apr-2013 3-May-2013 24-May-2013 N/A N/A 14-Jun-2013 14-Jun-2014 49 MACP/CS/IC-3.2 land degradation risk assessment, land quality Revised certification (lawyer) Actual Planned 1 CS IC Post 15-Apr-2013 30-Apr-2013 3-May-2013 24-May-2013 N/A N/A 14-Jun-2013 6-Dec-2014 Capacity building for SLM - land conservation practicies 50 MACP/CS/IC-3.3 Revised (agriculturist) Actual Planned 1 CS IC Post 15-Apr-2013 30-Apr-2013 3-May-2013 24-May-2013 N/A N/A 14-Jun-2013 6-Dec-2014 Capacity building for SLM - land conservation practicies 51 MACP/CS/IC-3.4 Revised (forestry specialist) Actual Planned 1 CS IC Post 25-Oct-2012 30-Oct-2012 9-Nov-2012 22-Nov-2013 N/A N/A 1-Jan-2013 30-Jun-2017 52 MACP/CS/IC-4.1 Project staff. Part A Coordinator Revised 4/S/2013/5095 USD18,216 Eugen Voinitchi Actual 1 IC IC Post 25-Oct-2012 30-Oct-2012 9-Nov-2012 22-Nov-2013 N/A N/A 1-Jan-2013 Planned 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 30-Jun-2017 53 MACP/CS/IC-4.2 Project staff. Part B Coordinator Revised 6/S/2013/5095 USD25,812 Olga Sainciuc Actual 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 Planned 3 CS DC Prior 1-Nov-2012 N/A N/A N/A N/A 21-Dec-2012 1-Jan-2013 30-Jun-2017 54 MACP/CS/IC-4.3 Project staff. Part C Coordinator Revised A2-01/C/2011/099602 USD13,200 Sergiu Magdil Actual 3 CS DC Prior 1-Nov-2012 N/A N/A N/A N/A 21-Dec-2012 1-Jan-2013 Planned 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 30-Jun-2017 55 MACP/CS/IC-4.4 Project staff. CAPMU Director Revised 1/S/2013/CAPMU USD36,984 Liviu Gumovschi Actual 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 Planned 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 30-Jun-2017 56 MACP/CS/IC-4.5 Project staff. Senior Financial Manager Revised 2/S/2013/CAPMU USD26,772 Marina Botnaru Actual 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 Planned 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 30-Jun-2017 57 MACP/CS/IC-4.6 Project staff. Senior Procurement Officer Revised 3/S/2013/CAPMU USD23,472 Veaceslav Shokin Actual 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 Planned 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 21-Jan-2013 1-Jan-2013 30-Jun-2017 58 MACP/CS/IC-4.7 Project staff. Procurement specialist Revised 7/S/2013/CAPMU USD20,952 Cornel Bordeianu Actual 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 21-Jan-2013 1-Jan-2013 Planned 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 30-Jun-2017 59 MACP/CS/IC-4.8 Project staff. Disbursement specialist Revised 8/S/2013/CAPMU USD15,024 Ecaterina Zgardan Actual 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 Planned 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 30-Jun-2017 60 MACP/CS/IC-4.9 Project staff. Translator Revised 9/S/2013/CAPMU USD12,084 Victoria Sargu Actual 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 Planned 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 30-Jun-2013 61 MACP/CS/IC-4.10 Project staff. Lawyer Revised 10/S/2013/CAPMU USD3,870 Victor Burac Actual 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 Planned 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 30-Jun-2017 62 MACP/CS/IC-4.11 Project staff. Driver 1 Revised 11/S/2013/CAPMU USD7,632 Andrei Maritoi Actual 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 Planned 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 30-Jun-2017 63 MACP/CS/IC-4.12 Project staff. Driver 2 Revised 12/S/2013/CAPMU USD7,632 Victor Maritoi Actual 4 CS DC Prior 27-Dec-2012 N/A N/A N/A N/A 11-Jan-2013 1-Jan-2013 Sub Total (Consultant Services) Procurement category Procurement method Procurement Type Component Nr. Contract # Bank's Bank's no Bank's no Bank's no Review Preparation of Technical Proposal objection for objection to Contract Value & Contract completion Winning bidder Description items Procurement Status objection for RFP/ REI issued Contract Number Contract signing date (Prior/ TOR receipt Technical contract Currency date name&Country TOR Post) proposal signature 64 MACP/TR/AP-1.1 Training for RVDC animal health laboratory Planned 1 TR AP Prior N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 65 MACP/TR/AP-1.2 Training for RVDC animal origin products laboratory Planned 1 TR AP Prior N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A (Training ) 66 MACP/TR/AP-1.3 Training for food safety laboratory Planned 1 TR AP Prior N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 67 MACP/TR/AP-2.1 Training for AIPA Planned 2 TR AP Prior N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 68 MACP/TR/AP-2.2 Training for professional associations Planned 2 TR AP Prior N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Total Training Procurement category Procurement method Procurement Type Component Nr. Contract # Bank's Bank's no Bank's no Bank's no Bank's no objection Review Preparation of Technical Proposal objection for objection to Contract Value & Contract completion Winning bidder Description items Procurement Status objection for RFP/ REI issued to contract Contract signing date (Prior/ TOR receipt Technical contract Currency date name&Country TOR signature Post) proposal signature transfering) 69 MACP/GR/2.1 Investment grants to producers groups Planned 2 GR N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A (Grants 70 MACP/GR/3.1 Grants Suistanable Land Management. Planned 3 GR N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Total Grants Operating Procurement category Procurement method Procurement Type Component Nr. Contract # Bank's Bank's no Bank's no Bank's no Bank's no objection Review Preparation of Technical Proposal objection for objection to Contract Value & Contract completion Winning bidder Description items Procurement Status objection for RFP/ REI issued to contract Contract signing date (Prior/ TOR receipt Technical contract Currency date name&Country TOR signature Post) proposal signature (Incremental Costs) 71 N/A Multiple based on the Annual Planning Actual 4 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Total Operating Costs GRAND TOTAL -3-