Page 1 INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5451 Date ISDS Prepared/Updated: 09/14/2010 I. BASIC INFORMATION A. Basic Project Data Country: Mauritania Project ID: P118974 Project Name: Skills Development Support Project Task Team Leader: Cherif Diallo Estimated Appraisal Date: January 31, 2011 Estimated Board Date: April 26, 2011 Managing Unit: AFTED Lending Instrument: Specific Investment Loan Sector: Vocational training (70%);Central government administration (30%) Theme: Education for the knowledge economy (34%);Gender (33%);Social analysis and monitoring (33%) IBRD Amount (US$m.): 0.00 IDA Amount (US$m.): 12.00 GEF Amount (US$m.): 0.00 PCF Amount (US$m.): 0.00 Other financing amounts by source: BORROWER/RECIPIENT 1.20 1.20 B. Project Objectives [from section 2 of PCN] The Development Objective of the proposed Skills Development Support Project is to increase the efficiency of the production of skilled workers by: (i) strengthening the Technical and Vocational Training Support Fund (TVTF) and (ii) improving institutional efficiency of TVET. C. Project Description [from section 3 of PCN] The project is comprised of two main components: Part A: Strengthening Technical and Vocational Training Support Fund (TVTF) (US$7.0 million): a) Strengthening the current TVTF to allow financial support to new training modes and program such as internship, apprenticeship and sandwich program developed by the training institutions; b) Adjusting and improving the Fund's financing mechanisms and administrative procedures in order to expand its capacity to promote innovative training scheme; Page 2 c) Developing short term job insertion training and apprenticeship by expanding the Technical and Vocational Training Support Fund (TVTF) for insertion of about 15,000 youth over a five-year period; d) Creating several funding windows under the TVTF to accommodate informal sector, formal sector, public sector etc. Part B: Improving institutional efficiency of TVET (US$5.0 million). a) Implementing performance contracts in 16 existing TVET institutions to increase their capacity from 3,200 to 7,200 students and the relevance of their programs by upgrading the skills of training instructors, involving employers, renewing curriculum. (The WB projects will finance 3 to 4 TVET institutions the other being financed by other donors); b) Strengthening the capacity of the National Institute for the Promotion of Technical Training (INAP/FTP) and the Ministry of TVET to implement a results based policy for TVET by improving the management information system, training the administrators to provide managerial support to TVET institutions, updating the regulatory framework and implementing a monitoring an evaluation system. D. Project location (if known) Nation wide E. Borrower’s Institutional Capacity for Safeguard Policies [from PCN] N/A F. Environmental and Social Safeguards Specialists Ms Alexandra C. Bezeredi (AFTQK) II. SAFEGUARD POLICIES THAT MIGHT APPLY Safeguard Policies Triggered Yes No TBD Environmental Assessment (OP/BP 4.01) X Natural Habitats (OP/BP 4.04) X Forests (OP/BP 4.36) X Pest Management (OP 4.09) X Physical Cultural Resources (OP/BP 4.11) X Indigenous Peoples (OP/BP 4.10) X Involuntary Resettlement (OP/BP 4.12) X Safety of Dams (OP/BP 4.37) X Projects on International Waterways (OP/BP 7.50) X Projects in Disputed Areas (OP/BP 7.60) X Environmental Category: C - Not Required Page 3 III. SAFEGUARD PREPARATION PLAN A. Target date for the Quality Enhancement Review (QER), at which time the PAD-stage ISDS would be prepared: 10/25/2010 B. For simple projects that will not require a QER, the target date for preparing the PAD-stage ISDS: N/A C. Time frame for launching and completing the safeguard-related studies that may be needed. The specific studies and their timing 1 should be specified in the PAD-stage ISDS. This is a category C project and will not require any safeguards studies. No construction or rehabilitation of any kind is envisaged as part of this project and there are no issues regarding indigenous people in Mauritania. The Financing Agreement (FA) will exclude the option to fund civil works of any kind but if at any given time during the life of the project it were decided that construction/rehabilitation is necessary, it will be mandatory to: (i) modify the FA; (ii) adjust the safeguards category in light of the new activities; and (iii) prepare and disclose the appropriate safeguards tools. IV. APPROVALS Signed and submitted by: Task Team Leader: Mr Cherif Diallo 09/08/2010 Approved by: Regional Safeguards Coordinator: Ms Alexandra C. Bezeredi 09/08/2010 Comments: Sector Manager: Mr Christopher J. Thomas 09/09/2010 Comments: 1 Reminder: The Bank's Disclosure Policy requires that safeguard-related documents be disclosed before appraisal (i) at the InfoShop and (ii) in-country, at publicly accessible locations and in a form and language that are accessible to potentially affected persons. Page 4