PROCUREMENT PLAN (Textual Part) Project information: [West Bank and Gaza] [Early Childhood Development in WB&G] [P-168295] Project Implementation agency: [Ministry of Education and Ministry of health] Date of the Procurement Plan: [17-Feb-2020] Period covered by this Procurement Plan: [17-Feb-2020 – 31-Jan-2025] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [Domestic preference is not applicable for those contracts identified in the Procurement Plan tables]; Works: [Domestic preference is not applicable for those contracts identified in the Procurement Plan tables] PROCUREMENT West Bank and Gaza : Improving Early Childhood Development in the West Bank and Gaza PLAN General Information Country: West Bank and Gaza Bank’s Approval Date of the Original Procurement Plan: 2020-10-07 2021-02-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P168295 GPN Date: 2020-07-29 Project Name: Improving Early Childhood Development in the West Bank and Gaza Loan / Credit No: TF / B1614 M Executing Agency(ies): inistry of Health WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOH-WB/ECD.G1 / Supply of Promoting early healthy Single Stage - One TF / B1614 Post Request for Bids Open - National 0.00 Canceled 2020-12-01 2020-12-06 2021-01-17 2021-02-16 2021-03-23 2021-07-21 Medical Equipment development Envelope MOH-WB/ECD.G2 / Supply of Promoting early healthy Single Stage - One TF / B1614 Post Request for Bids Open - National 0.00 Canceled 2021-06-01 2021-06-06 2021-07-18 2021-08-17 2021-09-21 2022-01-19 Medical Equipment development Envelope Pending MOH-WB/ECD-G1 / Supply of Promoting early healthy Single Stage - One TF / B1614 Post Request for Bids Open - International 0.00 Implementati 2021-03-01 2021-03-06 2021-04-17 2021-05-17 2021-06-21 2021-12-18 Medical Equipment development Envelope on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOH-WB/ECD.CS1 / Content Development and Production Promoting early healthy Quality And Cost- Pending TF / B1614 Post Open - National 0.00 2020-11-01 2020-11-08 2020-12-22 2021-01-19 2021-02-18 2021-03-25 2021-04-29 2021-08-27 of Parenting Intervention development Based Selection Implementation Materials INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1