Hunan Integrated Management of Agricultural Land Pollution (P153115) Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [original: June 27, 2017; 1st Revision: August 17, 2017; 2nd Revision: June 8, 2018; 3rd Revision: Aug. 10, 2018; 4th Revision: April 4, 2019; 5th Revision: December 20, 2019; 6th Revision: March 4, 2020; 7th Revision: March 30, 2020; 8th Revision: April 9, 2020; 9th Revision: May 21, 2020; 10th Update: June 5, 2020; 11th Update: June 28, 2020; 12th Update: July 13, 2020; 13th Update: August 28, 2020; 14th Update: January 10, 2021] 2. Date of General Procurement Notice: August 16, 2017 3. Period covered by this procurement plan: January 2021 to December 2021 II. Goods, Works, non-consulting services and Community participation in procurement under Component 1. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Prior Review Procurement Method Procurement Method Threshold Threshold US$ US$ ICB and LIB (Goods and Greater than or equal to 1. Non-Consulting Services ) All US$ 10 million Greater than or NCB (Goods and Non- Greater than or equal to 2. Consulting Services ) equal to US$ 0.5 million 2 million Greater than or equal to 3. ICB (Works) All US$ 40 million Greater than or Greater than or equal to 4. NCB (Works) equal to US$ 0.5 million 10 million to be specified in Community participation in 5 procurement No Threshold the operation manual 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Detailed procedures for community participation are specified in operation manual. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P153115 has been prepared by Hunan PPMO. 5. Any Other Special Procurement Arrangements [including advance procurement and retroactive financing, if applicable]: None 6 Summary of the Procurement Packages planned during January 2021 to December 2021 . 1 2 3 4 5 6 7 Ref. Descriptio Estimate Packages Domesti Review Commen No. n d c by Bank ts Cost Preferen (Prior / US$ ce Post) thousan (yes/no) d Summary of the National 2506.5 Competitiv 4 Post 8 e Bidding (Works) Summary of the 1068.7 Shopping 3 Post 9 (Works) Summary of the National Competitiv e Bidding (Goods( Summary of the Shopping 330.61 5 Post (Goods) Summary of the Shopping (Non- Consultant Services) Cancellatio n (Works) Cancellatio n (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Greater than or equal to US$ 1,000,000 2. Single Source (Firms) Greater than or equal to US$ 1,000,000 3. Individual Greater than or equal to US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements [including advance procurement and retroactive financing, if applicable or delete if not applicable]: None 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Estimate Description d Review Ref. No. of Cost by Bank Packages Comments Assignment US$ (Prior / thousan Post) d Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods Cancellatio n PROCUREMENT China : Hunan Integrated Management of Agricultural Land Pollution Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2017-09-04 2021-03-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P153115 GPN Date: 2017-08-16 Project Name: Hunan Integrated Management of Agricultural Land Pollution Project Loan / Credit No: IBRD / 87770, / H Executing Agency(ies): unan Integrated Management of Agriculture PMO WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned HNYDG001 / Construction of Component 1: Demonstration Under Request for Single Stage - One 2018-05- drainage ditches, irrigation IBRD / 87770 of Risk-based Agricultural Post Limited 495,870.00 0.00 Implementat 2017-09-15 2019-01-10 2017-11-10 Quotations Envelope 09 ditches, sand and gravel Land Pollution Management. ion traps. HNYXG001 / Construction of Component 1: Demonstration Request for Single Stage - One 2018-05- irrigation ditches, sand and IBRD / 87770 of Risk-based Agricultural Post Limited 347,610.00 0.00 Canceled 2017-09-15 2017-11-10 Quotations Envelope 09 gravel traps, field roads. Land Pollution Management. HNYXG002 / Construction of Component 1: Demonstration Request for Single Stage - One 2018-05- drainage ditches, sand and IBRD / 87770 of Risk-based Agricultural Post Limited 171,190.00 0.00 Canceled 2017-09-15 2017-11-10 Quotations Envelope 09 gravel traps. Land Pollution Management. HNYXG003 / Construction of irrigation ditches, drainage Component 1: Demonstration Request for Single Stage - One 2018-05- ditches, sand and gravel IBRD / 87770 of Risk-based Agricultural Post Limited 419,250.00 0.00 Canceled 2017-09-15 2017-11-10 Quotations Envelope 09 traps, ecological interception Land Pollution Management. ditches and pumping stations. HNYXG004 / Construction of Component 1: Demonstration Request for Single Stage - One 2018-05- irrigation ditches, sand and IBRD / 87770 of Risk-based Agricultural Post Limited 60,150.00 0.00 Canceled 2017-09-15 2017-11-10 Quotations Envelope 09 gravel traps. Land Pollution Management. HNYXG005 / Construction of Component 1: Demonstration Request for Single Stage - One 2018-05- irrigation ditches and IBRD / 87770 of Risk-based Agricultural Post Limited 224,030.00 0.00 Canceled 2017-09-15 2017-11-10 Quotations Envelope 09 drainage ditches. Land Pollution Management. Component 1: Demonstration HNHYG001 / Construction of Request for Single Stage - One 2018-06- IBRD / 87770 of Risk-based Agricultural Post Limited 310,700.00 0.00 Canceled 2017-10-10 2017-12-05 irrigation canals and ditches Quotations Envelope 03 Land Pollution Management. Component 1: Demonstration HNHYG002 / Construction of Request for Single Stage - One 2018-06- IBRD / 87770 of Risk-based Agricultural Post Limited 105,100.00 0.00 Canceled 2017-10-10 2017-12-05 irrigation canals and ditches. Quotations Envelope 03 Land Pollution Management. Component 1: Demonstration HNHYG003 / Construction of Request for Single Stage - One 2018-06- IBRD / 87770 of Risk-based Agricultural Post Limited 154,210.00 0.00 Canceled 2017-10-10 2017-12-05 irrigation canals and ditches. Quotations Envelope 03 Land Pollution Management. HNHYG004 / Construction of Component 1: Demonstration Request for Single Stage - One 2018-06- Sand and gravel traps &Field IBRD / 87770 of Risk-based Agricultural Post Limited 118,340.00 0.00 Canceled 2017-10-10 2017-12-05 Quotations Envelope 03 roads. Land Pollution Management. HNHNG001 / Construction of irrigation system, gravel or Component 1: Demonstration Single Stage - One 2020-06- dirt road, Sediment desilting IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 1,048,810.00 0.00 Canceled 2019-03-01 2019-03-06 2019-04-17 2019-05-17 2019-06-21 Envelope 21 and landfill in Hengnan Land Pollution Management. county. HNZFG001 / Construction of irrigation system, gravel or Component 1: Demonstration Under Request for Single Stage - One 2019-12- dirt road, Sediment desilting IBRD / 87770 of Risk-based Agricultural Post Open - National 302,990.00 0.00 Implementat 2019-03-06 2019-05-01 Quotations Envelope 27 and landfill in Zhongfang Land Pollution Management. ion county. HNZFG002 / Construction of irrigation system, gravel or Component 1: Demonstration Under Request for Single Stage - One 2019-12- dirt road, Sediment desilting IBRD / 87770 of Risk-based Agricultural Post Open - National 320,930.00 0.00 Implementat 2019-03-06 2019-05-01 Quotations Envelope 27 and landfill in Zhongfang Land Pollution Management. ion county. HNLSTG001 / Construction of irrigation system, gravel or Component 1: Demonstration Single Stage - One 2020-06- dirt road, Sediment desilting IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 888,370.00 0.00 Canceled 2019-03-01 2019-03-06 2019-04-17 2019-05-17 2019-06-21 Envelope 21 and landfill in Leng Shuitan Land Pollution Management. county. HNYSG001 / Construction of irrigation system ,gravel or Component 1: Demonstration Under Request for Single Stage - One 2019-11- dirt road, sediment desilting IBRD / 87770 of Risk-based Agricultural Post Open - National 452,330.00 0.00 Implementat 2019-03-06 2019-05-01 Quotations Envelope 01 and landfill in Yongshun Land Pollution Management. ion county . HNHYG004-1 / Component 2: Strengthening Request for Single Stage - One 2019-11- Reconstruction of heavy metal IBRD / 87770 Agricultural Environmental Post Open - National 32,240.00 34,365.20 Completed 2019-04-04 2019-05-30 2020-03-02 Quotations Envelope 26 detection laboratory. Monitoring and Management. HNHYG002-1 / Construction Component 1: Demonstration of Irrigation system and gravel Request for Single Stage - One 2020-05- IBRD / 87770 of Risk-based Agricultural Post Open - National 123,000.00 0.00 Canceled 2019-03-06 2019-05-01 or dirt road in Hengyang Quotations Envelope 01 Land Pollution Management. county. HNHYG003-1 / Construction Component 1: Demonstration of Irrigation system and gravel Request for Single Stage - One 2020-05- IBRD / 87770 of Risk-based Agricultural Post Open - National 375,480.00 0.00 Canceled 2019-03-06 2019-05-01 or dirt road in Hengyang Quotations Envelope 01 Land Pollution Management. county. HNCLG001 / Construction of Component 1: Demonstration irrigation system, gravel or Request for Single Stage - One 2020-08- IBRD / 87770 of Risk-based Agricultural Post Open - National 476,110.00 484,282.61 Signed 2019-10-15 2019-12-10 2019-12-09 dirt road, Sediment desilting Quotations Envelope 06 Land Pollution Management. and landfill in Cili county. Page 1 HNCLG003 / Construction of Component 1: Demonstration irrigation system, gravel or Request for Single Stage - One 2020-08- IBRD / 87770 of Risk-based Agricultural Post Open - National 333,760.00 338,393.70 Signed 2019-10-15 2019-12-10 2019-12-09 dirt road, Sediment desilting Quotations Envelope 06 Land Pollution Management. and landfill in Cili county. HNCLG004 / Construction of Component 1: Demonstration Under irrigation system, gravel or Request for Single Stage - One 2020-08- IBRD / 87770 of Risk-based Agricultural Post Open - National 320,560.00 0.00 Implementat 2019-10-15 2019-12-10 dirt road, Sediment desilting Quotations Envelope 06 Land Pollution Management. ion and landfill in Cili county. HNCLG005 / Construction of Component 1: Demonstration Under irrigation system, gravel or Request for Single Stage - One 2020-08- IBRD / 87770 of Risk-based Agricultural Post Open - National 90,710.00 0.00 Implementat 2019-10-15 2019-12-10 dirt road, Sediment desilting Quotations Envelope 06 Land Pollution Management. ion and landfill in Cili county. HNCLG002-1 / Construction Component 1: Demonstration of irrigation system, gravel or Single Stage - One 2020-09- IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 653,460.00 526,815.01 Signed 2019-10-10 2019-12-19 2019-10-15 2019-11-26 2020-01-10 2019-12-26 2020-01-10 2020-01-30 2020-04-07 dirt road, Sediment desilting Envelope 26 Land Pollution Management. and landfill in Cili county. HNCLG002 / Construction of Component 1: Demonstration irrigation system, gravel or Request for Single Stage - One 2020-08- IBRD / 87770 of Risk-based Agricultural Post Open - National 492,150.00 0.00 Canceled 2019-10-15 2019-12-10 dirt road, Sediment desilting Quotations Envelope 06 Land Pollution Management. and landfill in Cili county. HNBJG001-1 / Construction Component 1: Demonstration Under of irrigation system ,gravel or Request for Single Stage - One 2020-06- IBRD / 87770 of Risk-based Agricultural Post Open - National 286,570.00 0.00 Implementat 2019-10-20 2019-12-15 dirt road, sediment desilting Quotations Envelope 12 Land Pollution Management. ion and landfill in Baojing county . HNBJG001 / Construction of irrigation system ,gravel or Component 1: Demonstration Single Stage - One 2019-12- dirt road, sediment desilting IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 672,420.00 0.00 Canceled 2019-03-01 2019-03-06 2019-04-17 2019-05-17 2019-06-21 Envelope 21 and landfill in Baojing county Land Pollution Management. . HNQYG002 / Construction of Component 1: Demonstration Request for Single Stage - One 2021-02- irrigation system and a gravel IBRD / 87770 of Risk-based Agricultural Post Limited 432,840.00 427,591.73 Signed 2019-12-15 2020-02-09 2020-06-05 Quotations Envelope 08 or dirt road in Qiyang county . Land Pollution Management. HNQYG003 / Construction of Component 1: Demonstration Request for Single Stage - One 2021-02- irrigation system and a gravel IBRD / 87770 of Risk-based Agricultural Post Limited 328,360.00 305,880.90 Signed 2019-12-15 2020-02-09 2020-06-05 Quotations Envelope 08 or dirt road in Qiyang county . Land Pollution Management. HNHNG002 / Construction of irrigation system, gravel or Component 1: Demonstration Request for Single Stage - One 2020-07- dirt road, Sediment desilting IBRD / 87770 of Risk-based Agricultural Post Open - National 291,040.00 265,814.39 Signed 2019-11-15 2020-04-26 2020-01-10 2020-04-28 Quotations Envelope 08 and landfill in Hengnan Land Pollution Management. county. HNHYG001-1 / Construction of irrigation system and Component 1: Demonstration Single Stage - One 2020-06- gravel or dirt road in Tai Yuan IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 880,000.00 727,944.26 Signed 2019-03-01 2020-06-18 2019-03-06 2019-04-17 2020-07-23 2019-05-17 2020-07-23 2019-06-21 2020-09-16 Envelope 21 demostration area of Land Pollution Management. Hengyang county. HNHYG002-2 / Construction of irrigation system and Component 1: Demonstration Request for Single Stage - One 2021-01- gravel or dirt road in Xi Du IBRD / 87770 of Risk-based Agricultural Post Limited 344,780.00 307,699.25 Completed 2019-12-06 2019-12-23 2020-01-31 2020-02-28 Quotations Envelope 30 demostration area of Land Pollution Management. Hengyang county. HNHYG003-2 / Construction of irrigation system and Component 1: Demonstration Request for Single Stage - One 2021-01- gravel or dirt road in Hong Shi IBRD / 87770 of Risk-based Agricultural Post Limited 246,270.00 220,794.25 Completed 2019-12-06 2019-12-23 2020-01-31 2020-02-28 Quotations Envelope 30 demostration area of Land Pollution Management. Hengyang county. HNQYG001 / Construction of Component 1: Demonstration Pending Request for Single Stage - One 2021-03- irrigation system and a gravel IBRD / 87770 of Risk-based Agricultural Post Open - National 253,700.00 0.00 Implementat 2020-01-06 2020-03-02 Quotations Envelope 02 or dirt road in Qiyang county . Land Pollution Management. ion HNHNG003 / Construction of irrigation system, gravel or Component 1: Demonstration Request for Single Stage - One 2021-02- dirt road, Sediment desilting IBRD / 87770 of Risk-based Agricultural Post Limited 388,060.00 378,536.77 Signed 2020-01-04 2020-01-15 2020-02-29 2020-04-28 Quotations Envelope 28 and landfill in Hengnan Land Pollution Management. county. HNHNG004 / Construction of irrigation system, gravel or Component 1: Demonstration Request for Single Stage - One 2021-02- dirt road, Sediment desilting IBRD / 87770 of Risk-based Agricultural Post Limited 462,690.00 464,926.72 Signed 2020-01-04 2020-04-15 2020-02-29 2020-04-28 Quotations Envelope 28 and landfill in Hengnan Land Pollution Management. county. HNYZG001 / Construction of Component 1: Demonstration irrigation system and a gravel Request for Single Stage - One 2021-05- IBRD / 87770 of Risk-based Agricultural Post Limited 490,000.00 502,951.28 Signed 2020-03-15 2020-11-02 2020-05-10 2020-11-22 or dirt road etc. in Yizhang Quotations Envelope 10 Land Pollution Management. county . HNYDG002 / Field Engineering Construction of Wentang Neighborhood Component 1: Demonstration Pending Request for Single Stage - One 2021-05- Committee, Taiping Village, IBRD / 87770 of Risk-based Agricultural Post Open - National 477,610.00 0.00 Implementat 2020-03-15 2020-05-10 Quotations Envelope 10 Heitan Village, Dingjiazhuang Land Pollution Management. ion Village and Bajiao Village in yongding county. HNYDG003 / Field Engineering Construction of Component 1: Demonstration Pending Request for Single Stage - One 2021-05- Changtan Village, Hongxing IBRD / 87770 of Risk-based Agricultural Post Open - National 465,670.00 0.00 Implementat 2020-03-15 2020-05-10 Quotations Envelope 10 Village and Gaoping Village in Land Pollution Management. ion yongding county HNAHG001 / Construction of Component 1: Demonstration Pending irrigation system, gravel or Single Stage - One 2021-07- IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 655,070.00 0.00 Implementat 2020-04-10 2020-04-15 2020-05-27 2020-06-26 2020-07-31 dirt road, Sediment desilting Envelope 31 Land Pollution Management. ion etc. in Anhua county. Page 2 HNAHG002 / Construction of Component 1: Demonstration Pending irrigation system, gravel or Request for Single Stage - One 2021-06- IBRD / 87770 of Risk-based Agricultural Post Limited 209,130.00 0.00 Implementat 2020-04-15 2020-06-10 dirt road, Sediment desilting Quotations Envelope 10 Land Pollution Management. ion etc. in Anhua county. HNAHG003 / Construction of Component 1: Demonstration Pending irrigation system, gravel or Request for Single Stage - One 2021-06- IBRD / 87770 of Risk-based Agricultural Post Limited 200,600.00 0.00 Implementat 2020-04-15 2020-06-10 dirt road, Sediment desilting Quotations Envelope 10 Land Pollution Management. ion etc. in Anhua county. HNANG004 / Construction of Component 1: Demonstration Pending irrigation system, gravel or Request for Single Stage - One 2021-06- IBRD / 87770 of Risk-based Agricultural Post Limited 228,130.00 0.00 Implementat 2020-04-15 2020-06-10 dirt road, Sediment desilting Quotations Envelope 10 Land Pollution Management. ion etc. in Anhua county. HNAHG005 / Construction of Component 1: Demonstration Pending irrigation system, gravel or Request for Single Stage - One 2021-06- IBRD / 87770 of Risk-based Agricultural Post Limited 357,610.00 0.00 Implementat 2020-04-15 2020-06-10 dirt road, Sediment desilting Quotations Envelope 10 Land Pollution Management. ion etc. in Anhua county. HNQYG004 / Construction of Component 1: Demonstration Request for Single Stage - One 2021-06- irrigation system and a gravel IBRD / 87770 of Risk-based Agricultural Post Limited 193,880.00 236,567.19 Signed 2020-04-15 2020-06-10 2020-06-05 Quotations Envelope 10 or dirt road in Qiyang county . Land Pollution Management. HNLSTG002 / Construction of Component 1: Demonstration Under Request for Single Stage - One 2021-01- field engineering in Leng IBRD / 87770 of Risk-based Agricultural Post Limited 455,220.00 0.00 Implementat 2020-06-04 2020-09-15 2020-07-30 Quotations Envelope 26 Shuitan county. Land Pollution Management. ion HNXXHYG002 / Construction of irrigation system, gravel or Component 1: Demonstration Request for Single Stage - One 2021-05- dirt road, Sediment desilting IBRD / 87770 of Risk-based Agricultural Post Open - National 368,510.00 319,053.63 Signed 2020-09-15 2020-11-10 2020-12-01 Quotations Envelope 09 and landfill in Huayuan Land Pollution Management. county. HNXXHYG001 / Construction of irrigation system, gravel or Component 1: Demonstration Request for Single Stage - One 2021-05- dirt road, Sediment desilting IBRD / 87770 of Risk-based Agricultural Post Open - National 412,240.00 331,232.18 Signed 2020-09-15 2020-11-10 2020-12-01 Quotations Envelope 09 and landfill in Huayuan Land Pollution Management. county. HNXXHYG003 / Construction Component 1: Demonstration Request for Single Stage - One 2021-05- of field engineering in IBRD / 87770 of Risk-based Agricultural Post Limited 497,310.00 502,524.40 Signed 2020-09-15 2020-11-10 2020-12-01 Quotations Envelope 09 huayuan county. Land Pollution Management. HNBJG002 / Construction of Component 1: Demonstration Under Request for Single Stage - One 2021-06- field engineering in Baojing IBRD / 87770 of Risk-based Agricultural Post Open - National 298,280.00 0.00 Implementat 2020-10-25 2020-12-20 Quotations Envelope 18 county. Land Pollution Management. ion HNLWG002 / Construction of Component 1: Demonstration Pending Request for Single Stage - One 2021-12- field engineering in lin wu IBRD / 87770 of Risk-based Agricultural Post Open - National 434,300.00 0.00 Implementat 2020-11-05 2020-12-31 Quotations Envelope 31 county Land Pollution Management. ion HNLWG003 / Construction of Component 1: Demonstration Pending Request for Single Stage - One 2021-12- field engineering in lin wu IBRD / 87770 of Risk-based Agricultural Post Open - National 338,300.00 0.00 Implementat 2020-11-05 2020-12-31 Quotations Envelope 31 county Land Pollution Management. ion HNLWG004 / Construction of Component 1: Demonstration Pending Request for Single Stage - One 2021-12- field engineering in lin wu IBRD / 87770 of Risk-based Agricultural Post Open - National 308,000.00 0.00 Implementat 2020-11-05 2020-12-31 Quotations Envelope 31 county. Land Pollution Management. ion HNLWG001 / Construction of Component 1: Demonstration Pending Request for Single Stage - One 2021-07- field engineering in lin wu IBRD / 87770 of Risk-based Agricultural Post Open - National 498,510.00 0.00 Implementat 2020-12-05 2021-01-30 Quotations Envelope 29 county Land Pollution Management. ion HNYDG004 / Field Component 1: Demonstration Pending Single Stage - One 2022-05- engineering construction in IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 938,580.00 0.00 Implementat 2021-01-30 2021-02-04 2021-03-18 2021-04-17 2021-05-22 Envelope 22 Yongding district. Land Pollution Management. ion HNHNG007 / Field Component 1: Demonstration Pending Single Stage - One 2022-05- engineering construction in IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 553,000.00 0.00 Implementat 2021-01-30 2021-02-04 2021-03-18 2021-04-17 2021-05-22 Envelope 22 Hengnan county. Land Pollution Management. ion HNHNG005 / Field Component 1: Demonstration Pending Request for Single Stage - One 2022-04- engineering construction in IBRD / 87770 of Risk-based Agricultural Post Limited 301,490.00 0.00 Implementat 2021-02-04 2021-04-01 Quotations Envelope 01 Hengnan county. Land Pollution Management. ion HNHNG006 / Field Component 1: Demonstration Pending Request for Single Stage - One 2022-04- engineering construction in IBRD / 87770 of Risk-based Agricultural Post Limited 271,640.00 0.00 Implementat 2021-02-04 2021-04-01 Quotations Envelope 01 Hengnan county. Land Pollution Management. ion HNHNG008 / Field Component 1: Demonstration Pending Single Stage - One 2022-05- engineering construction in IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 505,000.00 0.00 Implementat 2021-01-30 2021-02-04 2021-03-18 2021-04-17 2021-05-22 Envelope 22 Hengnan county. Land Pollution Management. ion HNLSTG003 / Field Component 1: Demonstration Pending Single Stage - One 2022-05- engineering construction in IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 510,000.00 0.00 Implementat 2021-01-30 2021-02-04 2021-03-18 2021-04-17 2021-05-22 Envelope 22 Lengshuitan district. Land Pollution Management. ion HNXXHYG004 / Field Component 1: Demonstration Pending Request for Single Stage - One 2021-09- engineering construction in IBRD / 87770 of Risk-based Agricultural Post Limited 179,100.00 0.00 Implementat 2021-02-04 2021-04-01 Quotations Envelope 28 Huayuan county. Land Pollution Management. ion HNYZG002 / Construction of Component 1: Demonstration Pending Request for Single Stage - One 2022-04- field engineering in Yizhang IBRD / 87770 of Risk-based Agricultural Post Limited 353,520.00 0.00 Implementat 2021-03-05 2021-04-30 Quotations Envelope 30 county. Land Pollution Management. ion HNYZG003 / Construction of Component 1: Demonstration Pending Request for Single Stage - One 2022-04- field engineering in Yizhang IBRD / 87770 of Risk-based Agricultural Post Limited 234,630.00 0.00 Implementat 2021-03-05 2021-04-30 Quotations Envelope 30 county. Land Pollution Management. ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 HNH002 / Procurement of sampling inspection vehicles Component 2: Strengthening to facilitate project Request for Single Stage - One / Agricultural Environmental Post Limited 492,540.00 0.00 Canceled 2017-12-13 2018-02-07 2018-08-06 management and supervion Quotations Envelope Monitoring and Management. and sample transpotation in 15 project counties. HNHYH002 / Procurement of Component 1: Demonstration Request for Single Stage - One comprehensive pest and IBRD / 87770 of Risk-based Agricultural Post Open - National 360,300.00 0.00 Canceled 2019-03-06 2019-05-01 2019-12-27 Quotations Envelope disease control equipment. Land Pollution Management. HNH001 / Procurement of desktop computers , laptops , multi func printers , scanners, digital cameras , DVs , Component 2: Strengthening Under projectors , GPS locators , Request for Single Stage - One IBRD / 87770 Agricultural Environmental Post Limited 149,250.00 0.00 Implementati 2019-03-06 2019-06-26 2019-05-01 2019-07-30 projection screens and digital Quotations Envelope Monitoring and Management. on recorders , which aims to promote the management efficency and ability of PMO staffs HNHYH001 / Procurement of Component 2: Strengthening testing equipment for the Request for Single Stage - One IBRD / 87770 Agricultural Environmental Post Open - National 303,300.00 332,047.76 Completed 2019-04-04 2019-05-30 2019-12-31 2019-11-26 2020-06-19 Agricultural Bureau in Quotations Envelope Monitoring and Management. Hengyang County. HNH003 / Procurement of desktop computers , laptops , multi func printers , scanners, digital cameras , DVs , Component 2: Strengthening Under Request for Single Stage - One projectors , GPS locators , etc. IBRD / 87770 Agricultural Environmental Post Open - National 74,630.00 0.00 Implementati 2019-10-25 2019-12-20 2020-02-18 Quotations Envelope , which aims to promote the Monitoring and Management. on management efficency and ability of Anhua county and Yizhang county PMO staffs. HNYSH001 / Procurement of Component 1: Demonstration Under comprehensive pest and Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Open - National 119,400.00 0.00 Implementati 2020-03-15 2020-05-10 2020-10-31 disease control equipment in Quotations Envelope Land Pollution Management. on Yongshun county. HNLWH001 / Procurement of Component 1: Demonstration Pending Request for Single Stage - One integrated pest control IBRD / 87770 of Risk-based Agricultural Post Limited 29,850.00 0.00 Implementati 2020-03-15 2020-05-10 2020-11-06 Quotations Envelope equipment for Linwu county. Land Pollution Management. on HNHYH003 / Procurement of comprehensive agricultural Component 1: Demonstration Single Stage - One pest and disease control IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 358,210.00 345,258.67 Signed 2020-04-15 2020-09-11 2020-04-20 2020-06-01 2020-10-15 2020-07-01 2020-10-15 2020-08-05 2020-11-13 2021-08-05 Envelope equipment in Hengyang Land Pollution Management. county . HNAHH001 / Procurement of Component 1: Demonstration Pending comprehensive agricultural Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 141,790.00 0.00 Implementati 2020-04-20 2020-06-15 2021-06-15 pest and disease control Quotations Envelope Land Pollution Management. on equipment in Anhua county . HNQYH001 / Procurement of Component 1: Demonstration comprehensive agricultural Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 41,790.00 42,115.36 Completed 2020-04-20 2020-05-28 2020-06-15 2020-07-01 2021-06-15 2020-07-15 pest and disease control Quotations Envelope Land Pollution Management. equipment in Qiyang county . HNQYH002 / Procurement of Component 2: Strengthening Request for Single Stage - One heavy metal detector in IBRD / 87770 Agricultural Environmental Post Open - National 67,160.00 69,312.13 Signed 2020-06-04 2020-07-30 2020-07-27 2020-08-29 Quotations Envelope Qiyang county. Monitoring and Management. HNBJH001 / Procurement of Component 2: Strengthening Request for Single Stage - One heavy metal detector in IBRD / 87770 Agricultural Environmental Post Open - National 67,160.00 69,474.11 Signed 2020-06-04 2020-07-30 2020-08-07 2020-08-29 Quotations Envelope Baojing county. Monitoring and Management. HNXXHYH001 / Procurement Component 2: Strengthening Request for Single Stage - One of heavy metal detector in IBRD / 87770 Agricultural Environmental Post Limited 67,160.00 69,283.24 Signed 2020-06-15 2020-07-03 2020-08-10 2020-08-04 2020-09-09 Quotations Envelope Huayuan county. Monitoring and Management. Component 1: Demonstration Pending HNLWH002 / Procurement of Request for IBRD / 87770 of Risk-based Agricultural Post 14,920.00 0.00 Implementati 2020-06-15 2020-08-10 2020-09-09 straw baler Quotations Land Pollution Management. on HNYSH002 / Procurement of Component 2: Strengthening heavy metal rapid measuring Request for Single Stage - One IBRD / 87770 Agricultural Environmental Post Open - National 67,160.00 69,524.09 Signed 2020-07-10 2020-09-04 2020-08-07 2020-10-04 instrument in Yongshun Quotations Envelope Monitoring and Management. county . HNQYH003 / Procument of Component 1: Demonstration Request for Single Stage - One machine for straw baling in IBRD / 87770 of Risk-based Agricultural Post Open - National 38,800.00 38,569.91 Signed 2020-07-25 2020-09-19 2020-09-05 2020-10-19 Quotations Envelope Qiyang county. Land Pollution Management. HNCLH002 / Procument of Component 1: Demonstration Request for Single Stage - One machine for straw baling in IBRD / 87770 of Risk-based Agricultural Post Open - National 26,870.00 27,318.19 Signed 2020-07-25 2020-09-19 2020-08-28 2020-10-19 Quotations Envelope Cili county. Land Pollution Management. HNCLH001 / Procurement of Component 2: Strengthening Request for Single Stage - One heavy metal detector in Cili IBRD / 87770 Agricultural Environmental Post Open - National 67,160.00 69,422.15 Signed 2020-07-25 2020-09-19 2020-08-28 2020-10-19 Quotations Envelope county. Monitoring and Management. HNAHH002 / Procurement of Component 2: Strengthening Pending heavy metal detection Request for Single Stage - One IBRD / 87770 Agricultural Environmental Post Open - National 398,210.00 0.00 Implementati 2020-07-25 2020-09-19 2021-03-18 laboratory instruments and Quotations Envelope Monitoring and Management. on equipment in Anhua county. HNAHH003 / Procurement of Component 2: Strengthening Pending Request for heavy metal detector in Anhua IBRD / 87770 Agricultural Environmental Post 134,330.00 0.00 Implementati 2021-01-15 2021-03-12 2021-09-08 Quotations county. Monitoring and Management. on HNYDH001 / Procurement of Component 1: Demonstration Pending comprehensive pest and Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Open - National 15,670.00 0.00 Implementati 2021-01-15 2021-03-12 2021-05-11 disease control equipment in Quotations Envelope Land Pollution Management. on Yongding district. Page 4 HNYDH002 / Procurement of Component 2: Strengthening Pending Request for Single Stage - One heavy metal detector in IBRD / 87770 Agricultural Environmental Post Open - National 62,690.00 0.00 Implementati 2021-01-15 2021-03-12 2021-05-11 Quotations Envelope Yongding county. Monitoring and Management. on HNJSH001 / Procurement of Component 2: Strengthening Pending heavy metal detector and crop Request for Single Stage - One IBRD / 87770 Agricultural Environmental Post Open - National 68,660.00 0.00 Implementati 2021-02-04 2021-04-01 2021-05-31 protection equipment in Quotations Envelope Monitoring and Management. on Jishou city. HNQYH004 / Procurement of Component 1: Demonstration Pending Request for Single Stage - One crop protection device in IBRD / 87770 of Risk-based Agricultural Post Open - National 49,260.00 0.00 Implementati 2021-02-04 2021-04-01 2021-04-07 Quotations Envelope Qiyang county. Land Pollution Management. on HNHYH004 / Procurement of Component 2: Strengthening Pending equipments for heavy metal Request for Single Stage - One IBRD / 87770 Agricultural Environmental Post Open - National 335,820.00 0.00 Implementati 2021-02-04 2021-04-01 2021-09-28 detection laboratory in Quotations Envelope Monitoring and Management. on Hengyang county. HNXXHYH002 / Procurement of comprehensive pest and Component 1: Demonstration Pending Request for Single Stage - One disease control equipment in IBRD / 87770 of Risk-based Agricultural Post Open - National 194,300.00 0.00 Implementati 2021-03-05 2021-04-30 2021-06-29 Quotations Envelope Huayuan county, Xiangxi Land Pollution Management. on prefecture. HNBJH002 / Procurement of comprehensive pest and Component 1: Demonstration Pending Request for Single Stage - One disease control equipment in IBRD / 87770 of Risk-based Agricultural Post Open - National 94,030.00 0.00 Implementati 2021-03-05 2021-04-30 2021-06-29 Quotations Envelope Baojing county, Xiangxi Land Pollution Management. on Autonomous Prefecture. HNYZH001 / Procurement of Component 1: Demonstration Pending comprehensive pest and Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Open - National 89,550.00 0.00 Implementati 2021-03-05 2021-04-30 2021-06-29 disease control equipment in Quotations Envelope Land Pollution Management. on Yizhang county. HNYZH002 / Procurement of Component 2: Strengthening Pending Request for Single Stage - One heavy metal detector in IBRD / 87770 Agricultural Environmental Post Open - National 201,490.00 0.00 Implementati 2021-03-05 2021-04-30 2021-05-30 Quotations Envelope Yizhang county. Monitoring and Management. on HNLWH003 / Procurement of Component 2: Strengthening Pending Request for Single Stage - One heavy metal detector in Linwu IBRD / 87770 Agricultural Environmental Post Open - National 67,000.00 0.00 Implementati 2021-04-10 2021-06-05 2021-07-05 Quotations Envelope county. Monitoring and Management. on HNCLH003 / Procurement of Component 1: Demonstration Pending comprehensive agricultural Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 89,600.00 0.00 Implementati 2021-04-05 2021-05-31 2022-05-31 pest and disease control Quotations Envelope Land Pollution Management. on equipment in Cili county . NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HNYDFZ001 / Sampling from Component 1: Demonstration Request for Single Stage - One fields and detection of the IBRD / 87770 of Risk-based Agricultural Post Limited 28,940.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope samples. Land Pollution Management. HNYXFZ001 / Detection of agricultural products, Component 1: Demonstration irrigation water, underground Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 13,490.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 water, air, sediment, organic Quotations Envelope Land Pollution Management. fertilizer, and pesticides for heavy matal determination. HNHYFZ001 / detection of agricultural products, Component 1: Demonstration irrigation water, underground Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 155,010.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 water, air, sediment, organic Quotations Envelope Land Pollution Management. fertilizer, and pesticides for heavy matal determination. HNYDFZ002 / detection of agricultural products, Component 1: Demonstration irrigation water, underground Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 92,250.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 water, air, sediment, organic Quotations Envelope Land Pollution Management. fertilizer, and pesticides for heavy matal determination HNYDFZ002-2-2 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments, agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 121,190.00 0.00 Implementati 2018-03-10 2018-09-06 2018-05-05 2019-06-30 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Yongding District and detection of the samples. HNYXFZ001-2-2 / Sampling of water, soil, crops, Component 1: Demonstration sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 36,790.00 0.00 Canceled 2018-03-10 2018-05-05 2019-06-30 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. Yongxing County and detection of the samples. HNJSFZ001-2 / Sampling of water, soil, crops, Component 1: Demonstration Pending sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 26,040.00 0.00 Implementati 2018-03-10 2018-05-05 2018-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Jishou City and detection of the samples. HNYSFZ001-2 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 30,450.00 0.00 Implementati 2018-03-10 2018-08-15 2018-05-05 2018-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Yongshun County and detection of the samples. Page 5 HNBJFZ001-2 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 59,600.00 0.00 Implementati 2018-03-10 2018-08-24 2018-05-05 2018-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Baojing County and detection of the samples. HNXXHYFZ001-2 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 30,600.00 0.00 Implementati 2018-03-10 2018-08-24 2018-05-05 2018-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Huayuan County and detection of the samples. HNQYFZ001-2 / Sampling of water, soil, crops, Component 1: Demonstration sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 24,330.00 14,849.62 Completed 2018-03-10 2018-08-22 2018-05-05 2018-09-28 2018-12-31 2018-12-30 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. Qiyang County and detection of the samples. HNCLFZ001-2 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 31,940.00 0.00 Implementati 2018-03-10 2018-08-17 2018-05-05 2018-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Cili County and detection of the samples. HNYZFZ001-2 / Sampling of water, soil, crops, Component 1: Demonstration sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 20,150.00 0.00 Canceled 2018-03-10 2018-05-05 2018-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. Yizhang County and detection of the samples. HNZFFZ001-2 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 44,160.00 0.00 Implementati 2018-03-10 2018-08-31 2018-05-05 2018-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Zhongfang County and detection of the samples. HNAHFZ001-2 / Sampling of water, soil, crops, Component 1: Demonstration sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 31,340.00 0.00 Canceled 2018-03-10 2018-05-05 2018-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. Anhua County and detection of the samples. HNLSTFZ001-2 / Sampling of water, soil, crops, Component 1: Demonstration Pending sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 28,130.00 0.00 Implementati 2018-03-10 2018-05-05 2018-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Lengshuitan District and detection of the samples. HNYDFZ003 / Sampling of water, soil, crops, sediments, Component 1: Demonstration Under agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 356,270.00 0.00 Implementati 2019-03-06 2019-05-23 2019-05-01 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Yongding District and detection of the samples. HNQYFZ002 / Sampling of water, soil, crops, sediments, Component 1: Demonstration agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 262,690.00 266,630.82 Signed 2019-03-06 2019-03-10 2019-05-01 2019-05-05 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. Qiyang county and detection of the samples. HNLWFZ001-2 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 154,030.00 0.00 Implementati 2019-03-06 2019-04-22 2019-05-01 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Linwu County and detection of the samples. HNZFFZ002 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 296,670.00 0.00 Implementati 2019-03-06 2019-04-23 2019-05-01 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Zhongfang County and detection of the samples. HNLSTFZ002 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 235,630.00 0.00 Implementati 2019-03-06 2019-05-27 2019-05-01 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Leng Shuitan District and detection of the samples. HNXXHYFZ002 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 262,120.00 0.00 Implementati 2019-03-06 2019-07-22 2019-05-01 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Huayuan County and detection of the samples. HNBJFZ002 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 248,540.00 0.00 Implementati 2019-03-06 2020-03-19 2019-05-01 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Baojing County and detection of the samples. HNYSFZ002 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 119,400.00 0.00 Implementati 2019-03-06 2019-04-08 2019-05-01 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Yongshun County and detection of the samples. Page 6 HNHYFZ002 / Publicize the measures and effects of the project in Hengyang, so as to enhance the visibility of the Component 1: Demonstration project and the value of Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 74,630.00 76,401.41 Signed 2019-03-06 2020-08-24 2019-05-01 2020-09-22 2024-03-31 agricultural products in the Quotations Envelope Land Pollution Management. project area, and popularize the knowledge of heavy metal pollution control at the same time. HNHNFZ001-2 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 477,610.00 0.00 Implementati 2019-03-06 2019-07-02 2019-05-01 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Hengnan County and detection of the samples. HNCLFZ002 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 239,530.00 0.00 Implementati 2019-03-06 2019-04-02 2019-05-01 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Cili County and detection of the samples. HNHYFZ001-2-2 / Sampling of water, soil, crops, Component 1: Demonstration Under sediments,agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 492,540.00 0.00 Implementati 2019-06-25 2019-06-27 2019-08-20 2024-04-20 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Hengyang County and detection of the samples. HNLSTFZ003 / Hiring a third- party organization to train farmers and project managers Component 3: Capacity Under in project background, Request for Single Stage - One IBRD / 87770 Development and Knowledge Post Open - National 262,610.00 0.00 Implementati 2019-10-25 2019-12-20 2023-12-31 agronomic measures, and Quotations Envelope Distribution. on integrated pest ,disease control techniques, etc. in Leng Shuitan district. HNQYFZ003 / Hiring a third- party organization to train farmers and project managers Component 3: Capacity Under in project background, Request for Single Stage - One IBRD / 87770 Development and Knowledge Post Limited 280,600.00 0.00 Implementati 2019-10-25 2019-11-06 2019-12-20 2023-12-31 agronomic measures, and Quotations Envelope Distribution. on integrated pest ,disease control techniques, etc. in Qiyang county. HNYZFZ001 / Sampling of water, soil, crops, sediments, Component 1: Demonstration Under agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 222,940.00 0.00 Implementati 2019-11-15 2020-03-06 2020-01-10 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. on Yi Zhang County and detection of the samples. HNXXHYFZ003 / Hiring a third-party organization to train farmers and project Component 3: Capacity Under managers in project Request for Single Stage - One IBRD / 87770 Development and Knowledge Post Limited 134,330.00 0.00 Implementati 2020-01-04 2020-01-06 2020-02-29 2023-02-28 background, agronomic Quotations Envelope Distribution. on measures, and integrated pest ,disease control techniques, etc. in HuaYuan county. HNYSFZ003 / Hiring a third- party organization to train farmers and project managers Component 3: Capacity Under in project background, Request for Single Stage - One IBRD / 87770 Development and Knowledge Post Limited 134,330.00 0.00 Implementati 2020-01-04 2020-01-03 2020-02-29 2023-02-28 agronomic measures, and Quotations Envelope Distribution. on integrated pest ,disease control techniques, etc. in YongShun county. HNJSFZ003 / Hiring a third- party organization to train farmers and project managers Component 3: Capacity Under in project background, Request for Single Stage - One IBRD / 87770 Development and Knowledge Post Limited 134,330.00 0.00 Implementati 2020-01-04 2020-01-03 2020-02-29 2023-02-28 agronomic measures, and Quotations Envelope Distribution. on integrated pest ,disease control techniques, etc. in JiShou city. HNYZFZ002 / Hiring a third- party organization to train farmers and project managers Component 3: Capacity Under in project background, Request for Single Stage - One IBRD / 87770 Development and Knowledge Post Open - National 179,100.00 0.00 Implementati 2020-03-15 2020-05-10 2023-12-31 agronomic measures, and Quotations Envelope Distribution. on integrated pest ,disease control techniques, etc. in Yizhang county. HNJSFZ002 / Sampling of water, soil, crops, sediments, Component 1: Demonstration agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 119,400.00 123,472.03 Signed 2020-03-15 2020-05-15 2020-05-10 2020-07-02 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. Jishou city and detection of the samples. Component 3: Capacity Under HNLWFZ002 / Farmer training Request for Single Stage - One IBRD / 87770 Development and Knowledge Post Open - National 205,970.00 0.00 Implementati 2020-03-15 2020-05-10 2023-12-31 in linwu county. Quotations Envelope Distribution. on HNAHFZ001 / Sampling of water, soil, crops, sediments, Component 1: Demonstration agriculture inputs, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 179,100.00 215,643.67 Signed 2020-04-15 2020-07-09 2020-06-10 2020-07-27 2023-12-31 atmosphere deposition, etc. in Quotations Envelope Land Pollution Management. Anhua county and detection of the samples. HNHNFZ002 / Training of Component 3: Capacity Request for Single Stage - One Farmers and Project Managers IBRD / 87770 Development and Knowledge Post Limited 186,570.00 293,817.46 Signed 2020-04-15 2020-04-08 2020-06-10 2020-05-20 2023-12-31 Quotations Envelope in Hengnan county. Distribution. Page 7 Component 3: Capacity HNHYFZ003 / Training of Request for Single Stage - One IBRD / 87770 Development and Knowledge Post Limited 210,820.00 208,359.05 Signed 2020-06-04 2020-05-28 2020-07-30 2020-07-02 2023-12-31 farmers in Hengyang county . Quotations Envelope Distribution. Component 3: Capacity HNAHFZ002 / Training of Request for Single Stage - One IBRD / 87770 Development and Knowledge Post Limited 246,490.00 386,913.05 Signed 2020-06-04 2020-07-09 2020-07-30 2020-08-20 2023-12-31 farmers in Anhua county. Quotations Envelope Distribution. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Demonstration Consultant HNYXZ001 / Screening of low IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 44,790.00 0.00 Canceled 2017-09-20 2017-10-11 2017-11-24 2017-12-24 2018-01-28 2021-01-28 metal-accumulating variety. Land Pollution Management. Selection HNYDZ005 / Comparing the differences of heavy metal Component 1: Demonstration Consultant uptaking between the "with IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 15,650.00 0.00 Canceled 2017-09-20 2017-10-11 2017-11-24 2017-12-24 2018-01-28 2022-12-31 project"and"without project" Land Pollution Management. Selection situations HNYDZ006 / Disseminate knowledge gained from Component 3: Capacity Consultant demonstrations for increasing IBRD / 87770 Development and Knowledge Post Qualification Open - National 37,300.00 0.00 Canceled 2017-09-20 2017-10-11 2017-11-24 2017-12-24 2018-01-28 2022-12-31 awareness and building ability Distribution. Selection to make informed choices among alternatives. Component 4: Project Consultant HNYXZ002 / Project IBRD / 87770 Management and Monitoring Post Qualification Open - National 74,650.00 0.00 Canceled 2017-09-20 2017-10-11 2017-11-24 2017-12-24 2018-01-28 2022-12-31 monitoring and evaluation. and Evaluation Selection Component 4: Project Consultant HNYXZ003 / Supervision of IBRD / 87770 Management and Monitoring Post Qualification Open - National 94,050.00 0.00 Canceled 2017-09-20 2017-10-11 2017-11-24 2017-12-24 2018-01-28 2022-12-31 agronomic measures. and Evaluation Selection HNZ005 / Screening experiment on simultaneous Component 1: Demonstration Consultant passivation agents for IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 208,960.00 131,501.60 Completed 2018-06-10 2018-07-27 2018-07-01 2019-06-23 2018-08-14 2018-07-27 2018-09-13 2018-08-20 2018-10-18 2018-08-31 2019-12-31 2019-01-26 combined pollution of Land Pollution Management. Selection cadmium and arsenic. HNZ008 / Conduction of annual environmental Component 4: Project Consultant assessment (produce one IBRD / 87770 Management and Monitoring Post Qualification Open - National 283,580.00 0.00 Canceled 2018-11-10 2018-12-01 2019-01-14 2019-02-13 2019-03-20 2024-06-30 environmental assessment and Evaluation Selection report every six months) HNHYZ001 / Screening Component 1: Demonstration Consultant experiment of low cadmium IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 98,510.00 99,850.51 Signed 2019-03-01 2019-07-14 2019-03-22 2019-05-05 2019-07-24 2019-06-04 2019-08-01 2019-07-09 2019-08-08 2022-07-09 accumulation varieties in Land Pollution Management. Selection Hengyang county. HNHYZ002 / Experiment on the effect of harvesting at Component 1: Demonstration Consultant different maturity on IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 44,300.00 43,122.75 Signed 2019-03-01 2019-06-25 2019-03-22 2019-05-05 2019-07-24 2019-06-04 2019-08-01 2019-07-09 2019-08-08 2021-07-09 cadmium accumulation in Land Pollution Management. Selection rice, to be conducted in Hengyang county. HNHYZ003 / Comparison of effects of agronomic Component 1: Demonstration Consultant measures in different regions IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 47,000.00 48,743.08 Signed 2019-03-01 2019-06-25 2019-03-22 2019-05-05 2019-07-24 2019-06-04 2019-08-01 2019-07-09 2019-08-08 2023-12-31 and monitoring experiment of Land Pollution Management. Selection soil cadmium balance in Hengyang county. HNHYZ006 / Local policies Component 2: Strengthening Consultant Pending and standards development in IBRD / 87770 Agricultural Environmental Post Qualification Open - National 89,550.00 0.00 2019-03-01 2019-03-22 2019-05-05 2019-06-04 2019-07-09 2023-12-31 Implementation Hengyang county. Monitoring and Management. Selection Component 4: Project Consultant HNYDZ003 / Project IBRD / 87770 Management and Monitoring Post Qualification Open - National 52,250.00 0.00 Canceled 2017-09-20 2017-10-11 2017-11-24 2017-12-24 2018-01-28 2022-12-31 monitoring and evaluation. and Evaluation Selection Component 4: Project Consultant HNYDZ007 / Supervision of IBRD / 87770 Management and Monitoring Post Qualification Open - National 189,650.00 0.00 Canceled 2017-09-20 2017-10-11 2017-11-24 2017-12-24 2018-01-28 2022-12-31 agronomic measures. and Evaluation Selection HNQYZ001 / Screening Component 1: Demonstration Consultant experiment of low cadmium IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 98,510.00 109,072.34 Signed 2019-03-01 2019-03-22 2019-03-22 2019-05-05 2019-04-05 2019-06-04 2019-04-25 2019-07-09 2019-05-24 2022-07-09 accumulation varieties in Land Pollution Management. Selection Qiyang county. HNCLZ001 / Screening Component 1: Demonstration Consultant experiment of low cadmium Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 98,510.00 0.00 2019-03-01 2019-03-21 2019-03-22 2019-05-05 2019-04-29 2019-06-04 2019-05-06 2019-07-09 2022-07-09 accumulation varieties in Cili Implementation Land Pollution Management. Selection county. HNHNZ001 / Screening Component 1: Demonstration Consultant experiment of low cadmium Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 98,510.00 0.00 2019-03-01 2019-03-28 2019-03-22 2020-04-27 2019-05-05 2019-04-04 2019-06-04 2019-04-10 2019-07-09 2022-07-09 accumulation varieties in Implementation Land Pollution Management. Selection Hengnan county. HNZFZ001 / Screening Component 1: Demonstration Consultant experiment of low cadmium Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 98,510.00 0.00 2019-03-01 2019-04-10 2019-03-22 2019-05-05 2019-05-20 2019-06-04 2019-05-25 2019-07-09 2022-07-09 accumulation varieties in Implementation Land Pollution Management. Selection Zhongfang county. HNLSTZ001 / Screening Component 1: Demonstration Consultant experiment of low cadmium Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 98,510.00 0.00 2019-03-01 2019-03-25 2019-03-22 2019-05-05 2019-06-04 2019-07-09 2022-07-09 accumulation varieties in Implementation Land Pollution Management. Selection Lengshuitan district. Page 8 HNXXHYZ001 / Screening Component 1: Demonstration Consultant experiment of low cadmium Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 98,510.00 0.00 2019-03-01 2019-03-25 2019-03-22 2019-05-05 2019-05-06 2019-06-04 2019-05-10 2019-07-09 2022-07-09 accumulation varieties in Implementation Land Pollution Management. Selection Huayuan county. HNYSZ001 / Screening Component 1: Demonstration Consultant experiment of low cadmium Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 98,510.00 0.00 2019-03-01 2019-03-01 2019-03-22 2019-05-05 2019-04-28 2019-06-04 2019-04-29 2019-07-09 2022-07-09 accumulation varieties in Implementation Land Pollution Management. Selection Yongshun county. HNZ001 / Development of a risk-based land management tool and use the tool to map all farmland sat the county Component 2: Strengthening and provincial levels to Quality Based IBRD / 87770 Agricultural Environmental Post Open - National 1,000,000.00 1,025,020.33 Signed 2019-03-10 2020-05-19 2019-03-31 2020-08-07 2019-05-14 2020-09-10 2019-06-11 2020-10-10 2019-07-11 2020-10-10 2019-08-10 2020-11-19 2019-09-14 2020-12-17 2022-09-14 classify areas with different Selection Monitoring and Management. risk levels, crops for different soil types and conditions, and identify risk management options. HNZ002 / Studies on sustainable financing models Component 2: Strengthening Consultant and eco-compensation IBRD / 87770 Agricultural Environmental Post Qualification Open - National 74,630.00 46,262.85 Signed 2019-03-17 2019-09-20 2019-03-27 2019-05-10 2020-09-10 2019-06-09 2020-12-09 2019-07-14 2020-12-18 2022-07-14 mechanisms for long-term Monitoring and Management. Selection agricultural land management. HNZ003 / Establish a database of all relevant Component 2: Strengthening Consultant information, and give early IBRD / 87770 Agricultural Environmental Post Qualification Open - National 89,550.00 123,460.22 Signed 2019-03-17 2020-06-08 2019-04-07 2019-05-21 2020-09-10 2019-06-20 2020-10-20 2019-07-25 2020-11-25 2021-07-25 warning of possible risks to Monitoring and Management. Selection farmland and crops according to data changes. HNZ004 / Monitoring the progress of project, finance, procurement and training.And summarize the situation of Component 4: Project Consultant social tracking monitoring, IBRD / 87770 Management and Monitoring Post Qualification Open - National 223,880.00 0.00 Canceled 2018-11-10 2018-12-01 2019-01-14 2019-02-13 2019-03-20 2024-06-30 environmental tracking and Evaluation Selection monitoring and project implementation effectiveness assessment (a report is produced every six months). HNZ006 / Monitoring the Component 1: Demonstration Consultant whole process of sampling IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 268,660.00 270,349.61 Signed 2018-08-13 2019-08-28 2018-09-03 2018-10-17 2018-11-06 2018-11-16 2018-03-27 2018-12-21 2019-05-24 2023-12-31 and detection of the samples Land Pollution Management. Selection for quality control HNZ007 / Conduction of Social evaluation annually (tracking monitoring one Component 4: Project Consultant natural village per county and IBRD / 87770 Management and Monitoring Post Qualification Open - National 268,660.00 269,424.92 Signed 2019-03-02 2019-05-08 2019-03-23 2019-05-06 2019-06-13 2019-06-05 2019-07-10 2019-11-07 2023-12-31 produce a social evaluation and Evaluation Selection report each year) and dam safety assessment annually. HNZ009 / Screening experiment on simultaneous Component 1: Demonstration Consultant passivation agents for Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 253,730.00 0.00 2019-03-05 2019-03-27 2019-03-26 2019-05-09 2019-06-08 2019-07-13 2021-07-13 combined pollution of Implementation Land Pollution Management. Selection cadmium and arsenic for the second time. HNHYZ005 / Analysis and Component 1: Demonstration Consultant evaluation of heavy metal Pending IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 71,640.00 0.00 2019-03-05 2019-03-26 2019-05-09 2019-06-08 2019-07-13 2023-12-31 pollution data in Hengyang Implementation Land Pollution Management. Selection county. HNYDZ004 / Screening of low Component 1: Demonstration Consultant Under metal-accumulating variety in IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 98,510.00 0.00 2019-03-01 2019-04-01 2019-03-22 2019-05-05 2019-04-30 2019-06-04 2019-05-20 2019-07-09 2022-07-09 Implementation Yongding district. Land Pollution Management. Selection HNBJZ001 / Screening Component 1: Demonstration Consultant experiment of low cadmium IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 98,510.00 0.00 Canceled 2019-03-02 2019-03-23 2019-05-06 2019-06-05 2019-07-10 2022-07-10 accumulation varieties in Land Pollution Management. Selection Baojing county. HNZ008-2 / Conduction of annual environmental Component 4: Project Quality And Cost- Under assessment (produce one IBRD / 87770 Management and Monitoring Post Open - International 343,280.00 0.00 2019-04-01 2019-05-19 2019-04-22 2019-05-19 2019-06-05 2019-07-16 2019-07-03 2019-08-19 2019-08-02 2019-08-19 2019-09-06 2019-08-20 2019-10-11 2023-12-31 Based Selection Implementation environmental assessment and Evaluation report every six months) HNLSTZ002 / Hire a third party to supervise the Component 1: Demonstration Consultant Under implementation of agronomic IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 156,720.00 0.00 2019-04-01 2019-03-15 2019-04-22 2019-06-05 2019-07-05 2019-08-09 2023-12-31 Implementation measures in Leng Shuitan Land Pollution Management. Selection District. HNQYZ003 / Hire a third Component 1: Demonstration Consultant party to supervise the IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 114,730.00 153,567.37 Signed 2019-03-25 2019-04-21 2019-04-15 2019-05-29 2019-04-30 2019-06-28 2019-05-30 2019-08-02 2019-06-14 2023-12-31 implementation of agronomic Land Pollution Management. Selection measures in Qi Yang county. HNHNZ002 / Hire a third Component 1: Demonstration Consultant party to supervise the Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 231,690.00 0.00 2019-04-06 2019-05-05 2019-04-27 2019-06-10 2019-07-10 2019-08-14 2023-12-31 implementation of agronomic Implementation Land Pollution Management. Selection measures in Heng Nan county. HNLWZ001 / Screening Component 1: Demonstration Consultant experiment of low cadmium Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 98,510.00 0.00 2019-04-10 2019-07-22 2019-05-01 2019-06-14 2019-07-14 2019-08-18 2022-08-18 accumulation varieties in Lin Implementation Land Pollution Management. Selection Wu county. HNZ004-2 / Evaluation of the Component 4: Project Quality And Cost- implementation effect of the IBRD / 87770 Management and Monitoring Post Open - International 522,390.00 531,070.69 Signed 2019-06-06 2019-06-26 2019-06-27 2019-07-09 2019-08-10 2019-08-09 2019-09-07 2019-10-16 2019-10-07 2019-10-16 2019-11-11 2020-03-10 2019-12-16 2020-04-20 2023-12-31 Based Selection project . and Evaluation Page 9 HNXXHYZ002 / Hire a third party to provide technical Component 1: Demonstration Consultant Under support for the treatment of IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 44,780.00 0.00 2019-06-06 2019-12-02 2019-06-27 2019-08-10 2020-01-27 2019-09-09 2020-02-17 2019-10-14 2021-12-31 Implementation heavy metal contaminated Land Pollution Management. Selection farmland in Huayuan County. HNYSZ002 / Hire a third party to provide technical Component 1: Demonstration Consultant Under support for the treatment of IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 44,780.00 0.00 2019-06-06 2019-12-02 2019-06-27 2019-08-10 2020-03-03 2019-09-09 2019-10-14 2021-12-31 Implementation heavy metal contaminated Land Pollution Management. Selection farmland in Yongshun County. HNJSZ001 / Hire a third party to provide technical support Component 1: Demonstration Consultant Under for the treatment of heavy IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 44,780.00 0.00 2019-06-06 2019-12-02 2019-06-27 2019-08-10 2020-01-29 2019-09-09 2020-02-25 2019-10-14 2021-12-31 Implementation metal contaminated farmland Land Pollution Management. Selection in Jishou City. HNHYZ007 / Hire a third party to supervise the Component 1: Demonstration Consultant implementation of agricultural IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 92,450.00 96,047.34 Signed 2019-06-06 2019-06-25 2019-06-27 2019-08-10 2020-07-24 2019-09-09 2019-08-01 2019-10-14 2019-08-08 2023-12-31 measures in Hengyang Land Pollution Management. Selection County. HNJSZ002 / Screening Component 1: Demonstration Consultant experiment of low cadmium Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 89,550.00 0.00 2019-12-30 2020-01-01 2020-01-20 2020-03-04 2020-01-29 2020-04-03 2020-02-28 2020-05-08 2023-05-09 accumulation varieties in Implementation Land Pollution Management. Selection JiShou city. HNYSZ003 / Screening Component 1: Demonstration Consultant experiment of low cadmium Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 89,550.00 0.00 2019-12-30 2019-12-29 2020-01-20 2020-03-04 2020-03-03 2020-04-03 2020-05-08 2023-05-09 accumulation varieties in Implementation Land Pollution Management. Selection YongShun county. HNXXHYZ003 / Screening Component 1: Demonstration Consultant experiment of low cadmium Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 89,550.00 0.00 2019-12-30 2019-04-01 2020-01-20 2020-03-04 2020-01-27 2020-04-03 2020-02-20 2020-05-08 2023-05-09 accumulation varieties in Implementation Land Pollution Management. Selection HuaYuan county. HNYZZ001 / Screening Component 1: Demonstration Consultant experiment of low cadmium Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 104,480.00 0.00 2020-03-10 2020-03-05 2020-03-31 2020-05-14 2020-03-30 2020-06-13 2020-03-30 2020-07-18 2022-12-31 accumulation varieties in Implementation Land Pollution Management. Selection Yizhang county. HNYZZ002 / Hire a third Component 1: Demonstration Consultant party to supervise the Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 111,940.00 0.00 2020-03-10 2020-03-06 2020-03-31 2020-05-14 2020-03-30 2020-06-13 2020-04-03 2020-07-18 2023-12-31 implementation of agronomic Implementation Land Pollution Management. Selection measures in Yizhang county. HNLWZ003 / Hire a third Component 1: Demonstration Consultant party to supervise the Pending IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 74,630.00 0.00 2020-03-10 2020-03-31 2020-05-14 2020-06-13 2020-07-18 2023-12-31 implementation of agronomic Implementation Land Pollution Management. Selection measures in Linwu county. HNAFZ001 / Screening Component 1: Demonstration Consultant experiment of low cadmium Under IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 89,550.00 0.00 2020-05-30 2021-02-05 2020-06-20 2020-08-03 2020-09-02 2020-10-07 2022-12-31 accumulation rice varieties in Implementation Land Pollution Management. Selection Anhua county. HNZ010 / Conduct social Component 4: Project Consultant evaluation of the new project IBRD / 87770 Management and Monitoring Post Qualification Open - National 30,000.00 24,584.75 Signed 2020-11-30 2020-11-24 2020-12-21 2021-02-03 2021-01-04 2021-03-05 2021-02-03 2021-04-09 2021-02-06 2021-10-06 area. and Evaluation Selection HNZ011 / Conduct Component 4: Project Consultant environment assessment of IBRD / 87770 Management and Monitoring Post Qualification Open - National 60,000.00 52,242.59 Signed 2020-11-30 2020-11-24 2020-12-21 2020-12-09 2021-02-03 2021-01-04 2021-03-05 2021-02-03 2021-04-09 2021-02-04 2021-10-06 the new project area. and Evaluation Selection HNQYZ004 / Comparative Component 1: Demonstration Consultant experiment on the effect of Pending IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 44,780.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2023-12-31 agronomic measures in Implementation Land Pollution Management. Selection Qiyang county. HNCLZ003 / Comparative Component 1: Demonstration Consultant experiment on the effect of Pending IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 59,700.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2023-12-31 agronomic measures in Cili Implementation Land Pollution Management. Selection county. HNYDZ001 / Comparative Component 1: Demonstration Consultant experiment on the effect of Pending IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 59,700.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2023-12-31 agronomic measures in Implementation Land Pollution Management. Selection Yongding district. HMLWZ004 / Comparative Component 1: Demonstration Consultant experiment on the effect of Pending IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 58,210.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2023-12-31 agronomic measures in Linwu Implementation Land Pollution Management. Selection county. HNYZZ004 / Comparative Component 1: Demonstration Consultant experiment on the effect of Pending IBRD / 87770 of Risk-based Agricultural Post Qualification Open - National 17,910.00 0.00 2021-03-31 2021-04-21 2021-06-04 2021-07-04 2021-08-08 2023-12-31 agronomic measures in Implementation Land Pollution Management. Selection Yizhang county. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HNQYZ002 / Technical guidance for district Component 1: Demonstration Individual treatment of cadmium - IBRD / 87770 of Risk-based Agricultural Post Consultant Open 44,780.00 46,070.21 Signed 2019-03-01 2019-05-10 2019-04-19 2019-06-25 2019-05-10 2019-06-25 2019-06-14 2019-06-25 2022-06-14 arsenic compound pollution Land Pollution Management. Selection project in Qiyang county. HNCLZ002 / Technical guidance for district Component 1: Demonstration Individual Under treatment of cadmium - IBRD / 87770 of Risk-based Agricultural Post Consultant Open 44,780.00 0.00 2019-03-01 2019-07-20 2019-04-19 2019-06-14 2019-05-10 2019-06-24 2019-06-14 2022-06-14 Implementation arsenic compound pollution Land Pollution Management. Selection project in Cili county. Page 10 HNLWZ002 / Technical guidance for regional Component 1: Demonstration Individual treatment of cadmium-arsenic Under IBRD / 87770 of Risk-based Agricultural Post Consultant Open 89,550.00 0.00 2019-03-01 2019-06-15 2019-04-19 2020-04-20 2019-05-10 2019-06-14 2022-06-14 combined pollution and Implementation Land Pollution Management. Selection arsenic pollution in linwu county. HNHNZ003 / Technical guidance for regional Component 1: Demonstration Individual treatment of cadmium-arsenic Under IBRD / 87770 of Risk-based Agricultural Post Consultant Open 89,550.00 0.00 2019-05-15 2019-05-01 2019-07-03 2019-06-06 2019-07-24 2019-06-20 2019-08-28 2021-12-31 combined pollution and Implementation Land Pollution Management. Selection arsenic pollution in Hengnan county. HNLSTZ003 / Technical guidance for treatment of Component 1: Demonstration Individual Under Heavy Metal contaminated IBRD / 87770 of Risk-based Agricultural Post Consultant Open 44,780.00 0.00 2019-05-15 2019-05-10 2019-07-03 2019-07-24 2019-08-28 2021-12-31 Implementation farmland in Lengshuitan Land Pollution Management. Selection district. HNYZZ003 / Technical Component 1: Demonstration Individual guidance for heavy metal Under IBRD / 87770 of Risk-based Agricultural Post Consultant Open 80,600.00 0.00 2020-03-10 2020-03-06 2020-04-28 2020-03-29 2020-05-19 2020-04-10 2020-06-23 2023-06-23 pollution control in Yizhang Implementation Land Pollution Management. Selection county. HNZFZ002 / Technical Component 1: Demonstration Individual guidance for heavy metal Under IBRD / 87770 of Risk-based Agricultural Post Consultant Open 44,780.00 0.00 2020-03-10 2020-04-24 2020-04-28 2020-05-15 2020-05-19 2020-05-21 2020-06-23 2023-06-23 pollution control in Implementation Land Pollution Management. Selection Zhongfang county HNAHZ001 / Technical Component 1: Demonstration Individual guidance for district Pending IBRD / 87770 of Risk-based Agricultural Post Consultant Open 44,780.00 0.00 2020-04-10 2020-05-29 2020-06-19 2020-07-24 2023-07-25 treatment of heavy metal Implementation Land Pollution Management. Selection pollution project in Anhua county. HNHYZ004 / Technical guidance for the Component 1: Demonstration Individual implementation of agronomic IBRD / 87770 of Risk-based Agricultural Post Consultant Open 85,075.00 77,170.02 Signed 2020-06-10 2020-05-20 2020-07-29 2020-06-23 2020-08-19 2020-06-28 2020-09-23 2020-07-02 2023-12-31 measures in Hengyang Land Pollution Management. Selection county. Page 11