Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 82 5 No Prior the ICB (Works) Summary of 43.77 15 No Prior the ICB (Goods) Summary of 64.53 18 No Post 1st the NCB contract (Works) for Prior Review Summary of 1.86 4 No Post 1st the NCB contract (Goods) for Prior Review Summary of 0.45 1 No Prior the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise July 9, 2010 entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 4.17 7 Prior number of contracts that will be let under QCBS Summary of 0.83 1 Prior CQS number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Brazil : BRAZIL BAHIA SUSTAINABLE RURAL DEVELOPMENT PROJECT PLAN General Information Country: Brazil Bank’s Approval Date of the Original Procurement Plan: 2017-06-01 2020-11-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P147157 GPN Date: Project Name: BRAZIL BAHIA SUSTAINABLE RURAL DEVELOPMENT PROJECT Loan / Credit No: IBRD / 84150 Executing Agency(ies): Company for Water Engeneering and for Sanitation of Bahia WORKS Bid Evaluation Activity Reference No. / Procurement Estimated Actual Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Contract Description Component Review Type Method Document Amount Amount Document / Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Completion Type (US$) (US$) Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BR-CERB-BA-24986-CW- RFP / NCB para Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 6,060,606.00 0.00 Cancelado 2018-02-01 2018-02-06 2018-03-20 2018-04-19 2018-05-24 2019-05-19 Recuperação e Ampliação de Sanitation Ofertas Envelope SAA 2018 BR-CERB-BA-24987-CW- Household Water and Solicitação de Single Stage - One RFP / NCB para IBRD / 84150 Posterior Open - National 11,666,667.00 0.00 Cancelado 2018-02-01 2018-02-06 2018-03-20 2018-04-19 2018-05-24 2019-05-19 Sanitation Ofertas Envelope implantação de SAA 2018 BR-CERB-BA-24985-CW- RFP / NCB 002/2017 para ampliação e adequação de 51 Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 4,690,000.00 2,561,829.74 Assinado 2017-08-30 2017-11-14 2017-11-30 2018-03-15 2017-11-14 2018-04-14 2018-04-05 2018-05-19 2018-06-07 2019-05-14 de SAAs, 750 MSDS com Sanitation Ofertas Envelope serviço social (região central de Jacobina). BR-CERB-BA-24984-CW- RFP / NCB 003/2017 para adequação e ampliação de 61 Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 5,392,000.00 3,155,904.16 Assinado 2017-08-30 2018-03-19 2017-11-30 2017-12-29 2018-01-22 2018-01-28 2018-02-07 2018-03-04 2018-05-28 2019-02-27 SAAs, 750 MSDs com Sanitation Ofertas Envelope serviço social (região da central de Seabra). BR-CERB-BA-55632-CW- RFB / NCB 001/2018 - Construção de 150 poços - Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 1,192,357.00 1,009,110.36 Assinado 2018-03-23 2018-02-09 2018-03-23 2018-04-03 2018-03-23 2018-03-12 2018-03-23 2018-03-13 2018-04-13 2018-03-23 2018-10-10 Em substituição da licitação Sanitation Ofertas Envelope fracassada BR-CERB-BA- 22146-CW-RFP. BR-CERB-BA-22146-CW- RFP / NCB 001/2017 PARA Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 1,818,182.00 0.00 Cancelado 2017-08-30 2018-03-13 2017-09-04 2017-11-30 2017-12-30 2018-02-03 2018-08-02 CONSTRUÇÃO DE POÇOS Sanitation Ofertas Envelope TUBULARES. BR-CERB-BA-69078-CW- RFB / NCB para execução de obra do SIAA (Sistema Household Water and Solicitação de Single Stage - One Implementaç IBRD / 84150 Posterior Open - National 2,652,064.00 0.00 2018-07-31 2018-08-05 2018-09-16 2018-10-16 2018-11-20 2019-11-15 Integrado de Abastecimento Sanitation Ofertas Envelope ão Pendente de Água) e Serviço Social no municipio de Rio de Contas. Page 1 BR-CERB-BA-112210-CW- RFP / Execução do Sistema Integrado de Abastecimento de Água de Lagoa da Laje, Em fase de Baraúnas, Várzea da Pedra, Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 2,621,690.40 0.00 Implementaç 2019-05-15 2019-05-09 2019-05-20 2019-05-09 2019-07-01 2019-07-19 2019-07-31 2019-09-16 2019-09-04 2020-03-02 Jurema, Abóbora, Lagoa dos Sanitation Ofertas Envelope ão Patos, Várzea Comprida, Olhos D'água, Pé da Ladeira e Tróia, no município de Ituaçu. BR-CERB-BA-132956-CW- RFQ / NCB - Execução Obras de Implantação de Sistemas de Abastecimento Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 2,387,505.71 2,796,589.98 Assinado 2019-09-16 2019-10-04 2019-09-21 2019-10-17 2019-11-02 2019-11-11 2019-12-02 2019-10-07 2020-01-06 2020-03-04 2020-07-04 de Água (SAA) e Módulos Sanitation Ofertas Envelope Sanitários nos municípios de abrangência da Central de Jacobina. BR-CERB-BA-139408-CW- RFB / Contratação de Empresa especializada para Execução de Obras de Em fase de Implantação de Sistemas de Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 4,600,000.00 3,718,668.02 Implementaç 2019-10-16 2019-11-01 2019-10-21 2019-11-05 2019-12-02 2019-12-04 2020-01-01 2019-11-11 2020-02-05 2020-08-03 Abastecimento de Água Sanitation Ofertas Envelope ão (SSA) e Módulos Sanitários nos municípios de abrangência da Central de Seabra. BR-CERB-BA-155200-CW- RFP / Contratação de Empresa para Construção das Obras do SIAA das Em fase de Localidades de Cristalândia, Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 2,910,342.68 2,173,088.78 Implementaç 2020-01-31 2020-02-20 2020-02-05 2020-03-16 2020-03-18 2020-04-16 2020-04-17 2020-04-08 2020-05-22 2020-11-18 Tapera, Morrinhos, Barreiro Sanitation Ofertas Envelope ão Branco, Umburanas, Roça de Baixo, Várzea do Mocó e Várzea da Areia, no Município de Brumado/BA BR-CERB-BA-156504-CW- RFB / Contratação de empresa das obras de implantação de Sistemas de Em fase de Abastecimento de Água nos Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 4,295,942.72 2,071,005.88 Implementaç 2020-01-31 2020-05-06 2020-02-05 2020-06-23 2020-03-18 2020-06-29 2020-04-17 2020-07-28 2020-05-22 2020-11-18 municípios de área de Sanitation Ofertas Envelope ão abrangência da Central de Associações para manutenção de Sistema de Água da região de Caitité/BA BR-CERB-BA-164078-CW- RFP / Obras de Implantação de Sistemas Integrado de Abastecimento de Água (SIAA) no município de Miguel calmon, nas Em fase de Household Water and Solicitação de Single Stage - One localidades de Mocó, Faísca IBRD / 84150 Posterior Open - National 2,700,000.00 0.00 Implementaç 2020-03-18 2020-04-06 2020-03-23 2020-04-29 2020-05-04 2020-06-01 2020-06-03 2020-07-08 2021-01-04 Sanitation Ofertas Envelope Um, Cajazeiras, Lagoa ão Grande, Ponte do Massambão, Salgado Grande, Tanque Novo, Formosa, Formosa Um, Maxixe, Maxixe Um BR-CERB-BA-171526-CW- RFB / NCB - Contratação de Empresa especializada Em fase de para Execução de Obras do Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 690,298.51 539,835.47 Implementaç 2020-05-10 2020-05-21 2020-05-15 2020-05-21 2020-06-26 2020-06-29 2020-07-26 2020-07-27 2020-08-30 2021-02-26 Sistemas de Abastecimento Sanitation Ofertas Envelope ão de Água na localidade de Pindorama, no Município de Iuiu Page 2 BR-CERB-BA-181717-CW- RFP / Contratação de Empresa especializada para Execução de Obras do SIAA (Sistema Integrado de Em fase de Abastecimento de Água) nas Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 2,500,000.00 0.00 Implementaç 2020-08-05 2020-08-28 2020-08-10 2020-08-28 2020-09-21 2020-10-21 2020-11-25 2021-05-24 localidades de Olhos D'água Sanitation Ofertas Envelope ão de Cima, Olhos D'água de Baixo e Jenipapo nos municípios de Miguel Calmon e Jacobina, integrante do Programa B BR-CERB-BA-203214-CW- RFB / Contratação de Empresa especializada para a implantação de 23 sistemas de abastecimento Em fase de de água (padrão PBSAA-BP), Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 4,663,925.82 0.00 Implementaç 2020-11-16 2020-11-11 2020-11-21 2020-11-16 2021-01-02 2021-02-01 2021-03-08 2021-09-04 e serviço social, nos Sanitation Ofertas Envelope ão municípios de Caetité, Ituaçu, Macaúbas, Riacho de Santana, Malhada, Urandi e Tanque Novo - no Estado da Bahia BR-CERB-BA-203209-CW- RFB / SISTEMA INTEGRADO DE Em fase de ABASTECIMENTO DE Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 1,589,993.83 0.00 Implementaç 2020-11-16 2020-11-11 2020-11-21 2020-11-16 2021-01-02 2021-02-01 2021-03-08 2021-09-04 ÁGUA DE SÃO DOMINGOS Sanitation Ofertas Envelope ão E OUTRAS LOCALIDADES, NO MUNICÍPIO DE SOUTO SOARES - BAHIA. BR-CERB-BA-203210-CW- RFB / SISTEMA INTEGRADO DE Em fase de Household Water and Solicitação de Single Stage - One ABASTECIMENTO DE IBRD / 84150 Posterior Open - National 674,373.80 0.00 Implementaç 2020-11-16 2020-11-11 2020-11-21 2020-11-16 2021-01-02 2021-02-01 2021-03-08 2021-09-04 Sanitation Ofertas Envelope ÁGUA DE IBIAJARA, NO ão MUNICÍPIO DE RIO DO PIRES - BAHIA BR-CERB-BA-205137-CW- RFB / SISTEMA INTEGRADO DE ABASTECIMENTO DE ÁGUA DAS LOCALIDADES Household Water and Solicitação de Single Stage - One Implementaç DE CANTINHO, NÚCLEO IBRD / 84150 Posterior Open - National 1,926,782.27 0.00 2020-11-25 2020-11-30 2021-01-11 2021-02-10 2021-03-17 2021-09-13 Sanitation Ofertas Envelope ão Pendente HABITACIONAL I - NHI, CONGONHA, FLORES, PIRANHA E LAGOA GRANDE, NO MUNICÍPIO DE URANDI - BAHIA. GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-CERB-BA-24488-GO-RFB / Aquisição de materiais Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 2,387,812.00 1,605,136.05 Assinado 2017-08-30 2017-11-23 2017-09-04 2018-05-11 2017-12-12 2017-12-12 2018-01-11 2018-04-03 2018-02-15 2018-05-18 2018-08-14 para sistemas, Pregão Sanitation Ofertas Envelope Eletrônico 170079 BR-CERB-BA-24487-GO-RFB / Aquisição de materiais Household Water and Solicitação de Single Stage - One IBRD / 84150 Prévia Open - National 4,386,797.00 0.00 Cancelado 2017-12-27 2018-01-01 2018-02-12 2018-03-14 2018-04-18 2018-10-15 para sistema, Pregão Sanitation Ofertas Envelope Eletrônico 170078 Page 3 BR-CERB-BA-60625-GO-RFB / Aquisição de materiais para sistemas, Pregão Household Water and Solicitação de Single Stage - One IBRD / 84150 Prévia Open - National 4,541,614.99 3,959,251.76 Assinado 2018-05-11 2018-06-04 2018-05-11 2018-08-08 2018-06-22 2018-06-18 2018-07-22 2019-03-25 2018-08-26 2018-08-01 2019-02-22 Eletrônico 180024 (em Sanitation Ofertas Envelope substituição ao BR-CERB-BA- 24487-GO-RFB) NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-CERB-BA-16687-NC-RFQ / Pregão Eletrônico para Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 223,200.00 52,957.56 Assinado 2017-08-30 2018-02-09 2017-09-04 2017-10-16 2018-03-13 2017-11-15 2018-03-12 2017-12-20 2018-04-09 2018-12-15 Analises Fisico Quimica de Sanitation Ofertas Envelope Água. BR-CERB-BA-26127-NC-RFB / Pregão Eletrônico para Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 230,000.00 170,530.29 Assinado 2017-08-30 2018-02-09 2017-09-04 2017-10-16 2018-03-14 2017-11-15 2018-03-09 2017-12-20 2018-04-17 2018-10-16 Testes de Bombeamento de Sanitation Ofertas Envelope poços existentes. BR-CERB-BA-65686-NC-RFB / Pregao Eletronico para Household Water and Solicitação de Single Stage - One Implementaçã IBRD / 84150 Posterior Open - National 236,593.06 0.00 2018-07-30 2018-08-04 2018-09-15 2018-10-15 2018-11-19 2019-05-18 Contratacao de Servico de Sanitation Ofertas Envelope o Pendente Topografia. BR-CERB-BA-66382-NC-RFB / Pregão eletrônico para Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 236,593.06 0.00 Cancelado 2018-07-30 2019-04-30 2018-08-04 2018-09-15 2018-10-15 2018-11-19 2019-05-18 Contratação de Serviço de Sanitation Ofertas Envelope Geotécnia. BR-CERB-BA-120963-NC- RFQ / Pregão Eletrônico Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 61,490.45 0.00 Cancelado 2019-06-28 2019-07-30 2019-07-03 2019-08-14 2019-09-13 2019-10-18 2020-04-15 para contratação de Serviço Sanitation Ofertas Envelope de Geotecnia BR-CERB-BA-146245-GO- RFB / Pregao Eletronico Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 61,490.45 0.00 Cancelado 2019-06-28 2019-11-28 2019-07-03 2019-08-14 2019-08-09 2019-09-13 2019-10-02 2019-10-18 2020-04-15 para contratacao de Servico Sanitation Ofertas Envelope de Geotecnia e Sondagem BR-CERB-BA-147034-NC- RFB / Pregao Eletronico Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 61,490.45 48,602.39 Assinado 2019-11-19 2019-11-28 2019-11-24 2019-12-11 2020-01-05 2019-12-17 2020-02-04 2019-12-17 2020-03-10 2020-06-09 2020-09-06 para contratacao de Servico Sanitation Ofertas Envelope de Geotecnia BR-CERB-BA-189496-NC- RFB / Pregão Eletrônico. Contratação de Laboratório para prestação de serviços de 30 (trinta) análises físico- Em fase de químicas , além Household Water and Solicitação de Single Stage - One IBRD / 84150 Posterior Open - National 100,000.00 0.00 Implementaçã 2020-09-16 2020-11-10 2020-09-21 2020-11-16 2020-11-02 2020-12-02 2021-01-06 2021-07-05 de análises para urânio e Sanitation Ofertas Envelope o outros elementos radioativos, em amostras de águas subterrâneas nos municípios de Caetité, Lagoa Real e Livra CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 4 BR-CERB-BA-38782-CS- QCBS / Consultoria para Seleção Baseada delimitação de perímetro de Household Water and IBRD / 84150 Posterior na Qualidade e Open - National 270,000.00 0.00 Cancelado 2017-11-30 2018-02-20 2018-04-05 2018-05-03 2018-06-02 2018-07-07 2018-08-11 2019-08-11 segurança da provincia Sanitation Custo uranifera de Caétite/Lagoa Real. BR-CERB-BA-24988-CS- Household Water and Seleção Baseada QCBS / Consultoria para IBRD / 84150 Posterior Open - National 3,065,330.00 2,287,721.97 Assinado 2018-06-30 2018-06-07 2018-07-21 2018-08-22 2018-09-03 2019-10-10 2018-10-01 2019-07-24 2018-10-31 2019-07-24 2018-12-05 2019-08-06 2019-01-09 2019-11-14 2020-01-04 Sanitation no Menor Custo Ações Sociais BR-CERB-BA-26128-CS- Seleção Baseada Household Water and QCBS / Consultoria para IBRD / 84150 Posterior na Qualidade e Open - National 1,000,000.00 0.00 Cancelado 2017-09-30 2017-10-21 2017-12-04 2018-01-01 2018-01-31 2018-03-07 2018-04-11 2019-04-06 Sanitation elaboração de projetos. Custo BR-CERB-BA-67167-CS- QCBS / Consultoria para Seleção Baseada delimitação de perímetro de Household Water and IBRD / 84150 Posterior na Qualidade e Open - National 721,585.71 303,213.51 Assinado 2018-06-19 2018-06-29 2018-09-09 2018-07-25 2018-10-23 2018-10-18 2018-11-20 2019-02-25 2018-12-20 2019-04-03 2019-01-24 2019-05-30 2019-02-28 2019-07-24 2020-02-28 segurança da provincia Sanitation Custo uranifera de Caétite/Lagoa Real. BR-CERB-BA-69079-CS-LCS / Consultoria para Household Water and Seleção Baseada Open - IBRD / 84150 Prévia 3,282,646.29 0.00 Cancelado 2018-07-31 2018-08-21 2018-10-04 2018-11-01 2018-12-01 2019-01-05 2019-02-09 2019-08-08 Supervisão de Obras e Sanitation no Menor Custo International Elaboração de Projetos BR-CERB-BA-24990-CS- QCBS / Consultoria para Household Water and Seleção Baseada IBRD / 84150 Posterior Open - National 3,282,646.29 0.00 Cancelado 2018-06-30 2018-06-26 2018-07-21 2018-09-03 2018-10-01 2018-10-31 2018-12-05 2019-01-09 2020-01-04 Supervisão de Obras e Sanitation no Menor Custo Elaboração de Projetos BR-CERB-BA-79461-CS-LCS Household Water and Seleção Baseada Open - / Consultoria para IBRD / 84150 Prévia 2,000,000.00 0.00 Cancelado 2018-09-28 2018-12-14 2018-10-19 2018-12-02 2018-12-30 2019-01-29 2019-03-05 2019-04-09 2019-10-06 Sanitation no Menor Custo International Elaboração de Projetos. BR-CERB-BA-107154-CS- LCS / CONTRATACAO DE CONSULTORIA PARA ELABORACAO DE PROJETOS TECNICOS DE Household Water and Seleção Baseada Open - IBRD / 84150 Posterior 155,200.00 0.00 Cancelado 2019-03-20 2019-04-10 2019-05-24 2019-06-21 2019-07-21 2019-08-25 2019-09-29 2020-03-27 ENGENHARIA DE Sanitation no Menor Custo International SISTEMAS DE ABASTECIMENTO DE AGUA PARA O PROGRAMA BAHIA PRODUTIVA BR-CERB-BA-118473-CS- CQS / ELABORAÇÃO DE DOIS PROJETOS Seleção Baseada EXECUTIVOS DE SISTEMA Household Water and Em fase de IBRD / 84150 Posterior nas Qualificações Open - National 265,923.20 0.00 2019-06-07 2019-06-07 2019-06-28 2019-07-15 2019-08-11 2019-10-10 2019-09-10 2019-11-08 2019-10-15 2020-04-12 DE ABASTECIMENTO DE Sanitation Implementação dos Consultores ÁGUA NOS MUNICÍPIOS DE MIGUEL CALMON E JAGUARARI BR-CERB-BA-79460-CS-LCS Household Water and Seleção Baseada Open - / Consultoria para IBRD / 84150 Prévia 2,000,000.00 0.00 Cancelado 2018-09-26 2018-10-08 2018-10-17 2018-10-19 2018-11-30 2018-12-28 2019-01-27 2019-03-03 2019-04-07 2019-10-04 Sanitation no Menor Custo International Supervisão de Obras BR-CERB-BA-121532-CS- Household Water and Seleção Baseada Open - LCS / Consultoria para IBRD / 84150 Prévia 2,000,000.00 0.00 Cancelado 2019-06-28 2019-07-10 2019-07-19 2019-09-01 2019-09-02 2019-09-29 2019-10-02 2019-10-29 2019-12-23 2019-12-03 2020-01-07 2020-07-05 Sanitation no Menor Custo International Supervisão de Obras BR-CERB-BA-167196-CS- Household Water and Seleção Baseada Open - LCS / Consultoria para IBRD / 84150 Prévia 2,000,000.00 0.00 Em Análise 2019-06-28 2020-04-07 2019-07-19 2019-09-01 2020-04-13 2019-09-29 2020-04-01 2019-10-29 2020-04-23 2019-12-03 2020-01-07 2020-07-05 Sanitation no Menor Custo International supervisao de obras Page 5 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-CERB-BA-63416-CS- INDV / Contratação de um Consultor Individual (CI) Household Water and para assessorar a CERB na IBRD / 84150 Posterior Individual Open 131,517.94 72,434.29 Assinado 2018-09-30 2019-03-27 2018-11-18 2019-07-31 2018-12-09 2019-01-13 2019-11-07 2019-07-12 Sanitation criação, estruturação e capacitação da CENTRAL Caetité BR-CERB-BA-126191-CS- INDV / Consultoria para Apoiar a CERB na Análise e Aprovação dos produtos apresentados pela empresa Household Water and Implementação IBRD / 84150 Posterior Individual Open 63,500.00 0.00 2019-08-11 2019-09-29 2019-10-20 2019-11-24 2020-05-22 contratada para a Sanitation Pendente Delimitação de Perímetro de Segurança da Província Uranífera de Caetité/Lagoa Real. BR-CERB-BA-155236-CS- INDV / CONSULTOR INDIVIDUAL PARA ASSESSORAR A CERB NA Household Water and Em fase de IBRD / 84150 Posterior Individual Open 71,599.04 0.00 2020-01-22 2020-02-11 2020-03-11 2020-04-27 2020-04-01 2020-05-29 2020-05-06 2020-11-02 FORMALIZAÇÃO JURÍDICA Sanitation Implementação DA CENTRAL CAETITÉ COM OS MUNICÍPOS DE ATUAÇÃO Page 6