Access and Renewable Energy (P127837) Procurement Plan Country: Bolivia Region: LATIN AMERICA AND CARIBBEAN Approval Date: 27-May-2014 GPN Approval Date: 25-Jun-2016 July 9, 2010 PROCUREMENT Bolivia : Access and Renewable Energy Project PLAN General Information Country: Bolivia Banks Approval Date of the Original Procurement Plan: 2017-01-19 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-03-08 Project ID: P127837 GPN Date: Project Name: Access and Renewable Energy Project Loan / Credit No: IDA / 54540 Executing Agency(ies): Ministry of Hydrocarbons and Energy WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BO-MHE-5550-CW-RFB / Electricity Services for Unserved Single Stage - One Pending Densificacion de Redes IDA / 54540 Post Request for Bids Open - National 667,740.00 0.00 2017-01-10 2017-01-15 2017-02-26 2017-03-28 2017-05-02 2017-10-29 Areas Envelope Implementation Electricas Municipio Sopachuy BO-MHE-9459-CW-RFB / Densificación de Redes Electricity Services for Unserved Single Stage - One Pending IDA / 54540 Post Request for Bids Open - National 627,000.00 0.00 2017-04-10 2017-04-15 2017-05-13 2017-06-12 2017-07-10 2018-01-06 Eléctricas del Municipio de Areas Envelope Implementation Sacaca Departamento de Potosí BO-MHE-9463-CW-RFB / Densificación de Redes Electricity Services for Unserved Single Stage - One Pending Eléctricas de los Municipios El IDA / 54540 Post Request for Bids Open - National 351,075.00 0.00 2017-06-12 2017-06-17 2017-07-15 2017-08-14 2017-09-11 2018-01-09 Areas Envelope Implementation Villar, Presto y Tarabuco del Departamento de Chuquisaca BO-MHE-16184-CW-RFB / DENSIFICACION DE REDES Electricity Services for Unserved Single Stage - One Pending IDA / 54540 Post Request for Bids Open - National 1,715,700.00 0.00 2017-06-15 2017-06-20 2017-07-20 2017-08-19 2017-09-16 2018-05-14 ELECTRICAS DEL MUNICIPIO Areas Envelope Implementation TARVITA BO-MHE-17604-CW-RFB / Extension y Densificacion de Electricity Services for Unserved Single Stage - One Pending IDA / 54540 Post Request for Bids Open - National 2,223,950.00 0.00 2017-06-22 2017-06-27 2017-07-27 2017-08-16 2017-09-13 2018-07-10 Redes Electricas Municipio San Areas Envelope Implementation Lucas BO-MHE-18915-CW-RFB / Densificación de Redes Electricity Services for Unserved Single Stage - One Pending IDA / 54540 Post Request for Bids Open - National 756,276.00 0.00 2017-07-13 2017-07-18 2017-08-17 2017-08-27 2017-09-24 2018-02-21 Eléctricas de los Municipios Areas Envelope Implementation Sacaca y Uncia BO-MHE-28123-CW-RFB / Extensión y Densificación de Electricity Services for Unserved Single Stage - One Pending IDA / 54540 Post Request for Bids Open - National 624,966.00 0.00 2017-10-25 2017-10-30 2017-11-27 2017-12-17 2018-01-14 2018-06-18 Redes Eléctricas Municipio de Areas Envelope Implementation ñ z Zudáe BO-MHE-28125-CW-RFB / Extensión y Densificación de Electricity Services for Unserved Single Stage - One Pending Redes Eléctricas Municipios de IDA / 54540 Post Request for Bids Open - National 1,900,000.00 0.00 2017-10-25 2017-10-30 2017-11-27 2017-12-17 2018-01-14 2018-10-11 Areas Envelope Implementation Culpina, Monteagudo y Ende Cintis BO-MHE-28128-CW-RFB / Extensión y Densificación de Electricity Services for Unserved Single Stage - One Pending Redes Eléctricas Municipio de IDA / 54540 Post Request for Bids Open - National 2,090,000.00 0.00 2017-11-15 2017-11-20 2017-12-18 2018-01-07 2018-02-04 2018-12-01 Areas Envelope Implementation Tarabuco 2da Fase, Presto y Tomina BO-MHE-28130-CW-RFB / Extensión y Densificación de Electricity Services for Unserved Single Stage - One Pending IDA / 54540 Post Request for Bids Open - National 1,220,120.00 0.00 2017-11-15 2017-11-20 2017-12-18 2018-01-07 2018-02-04 2018-09-02 Redes Eléctricas Municipio de Areas Envelope Implementation Villa Serrano BO-MHE-28134-CW-RFB / Extensión y Densificación de Electricity Services for Unserved Single Stage - One Pending Redes Electicas Municipios de IDA / 54540 Post Request for Bids Open - National 1,752,748.00 0.00 2017-11-01 2017-11-06 2017-12-04 2017-12-24 2018-01-21 2018-08-19 Areas Envelope Implementation Vitichi, Caiza D, Cotagaita, Puna y Arampampa BO-MHE-28132-CW-RFB / Extensión y Densificación de Electricity Services for Unserved Single Stage - One Pending Redes Electicas Municipios de IDA / 54540 Post Request for Bids Open - National 1,250,000.00 0.00 2017-11-15 2017-11-20 2017-12-18 2018-01-07 2018-02-04 2018-08-03 Areas Envelope Implementation Chayanta, Belén de Urmiri, Ocuri y San Pedro de Buena Vista BO-MHE-30520-CW-RFB / EXTENSIÓN Y DENSIFICACIÓN Electricity Services for Unserved Single Stage - One Pending DE REDES ELÉCTRICAS IDA / 54540 Post Request for Bids Open - National 1,520,000.00 0.00 2017-11-30 2017-12-05 2018-01-04 2018-01-24 2018-02-21 2018-09-19 Areas Envelope Implementation MUNICIPIOS DE PADILLA Y MOJOCOYA BO-MHE-5551-CW-RFQ / Densificacion de Redes Electricity Services for Unserved Request for Single Stage - One Pending IDA / 54540 Post Open - National 96,395.00 0.00 2017-01-15 2017-03-12 2017-05-11 Electricas de los Municipios de Areas Quotations Envelope Implementation San Pedro de Quemes y Llica BO-MHE-28124-CW-RFB / Extensión y Densificación de Electricity Services for Unserved Single Stage - One Pending IDA / 54540 Post Request for Bids Open - National 1,196,027.00 0.00 2018-01-30 2018-02-04 2018-03-04 2018-03-24 2018-04-21 2018-11-17 Redes Eléctricas Municipio de Areas Envelope Implementation Azurduy BO-MHE-43579-CW-RFB / EXTENSIÓN Y DENSIFICACIÓN Electricity Services for Unserved Single Stage - One Pending DE REDES ELÉCTRICAS IDA / 54540 Post Request for Bids Open - National 635,400.00 0.00 2018-02-15 2018-02-20 2018-03-22 2018-04-06 2018-05-02 2018-09-29 Areas Envelope Implementation MUNICIPIOS DE CULPINA, MONTEAGUDO Y MACHARETTI BO-MHE-43581-CW-RFB / EXTENSIÓN Y DENSIFICACIÓN Electricity Services for Unserved Single Stage - One Pending DE REDES ELÉCTRICAS IDA / 54540 Post Request for Bids Open - National 833,400.00 0.00 2018-02-15 2018-02-20 2018-03-22 2018-04-06 2018-05-02 2018-10-29 Areas Envelope Implementation MUNICIPIOS DE PADILLA Y MOJOCOYA Page 1 BO-MHE-43582-CW-RFB / EXTENSIÓN Y DENSIFICACIÓN Electricity Services for Unserved Single Stage - One Pending DE REDES ELÉCTRICAS IDA / 54540 Post Request for Bids Open - National 959,400.00 0.00 2018-02-15 2018-02-20 2018-03-22 2018-04-06 2018-05-02 2018-11-13 Areas Envelope Implementation MUNICIPIO DE TARABUCO 2DA FASE BO-MHE-43585-CW-RFB / EXTENSIÓN Y DENSIFICACIÓN Electricity Services for Unserved Single Stage - One Pending DE REDES ELECTRICAS IDA / 54540 Post Request for Bids Open - National 729,000.00 0.00 2018-02-15 2018-02-20 2018-03-22 2018-04-06 2018-05-02 2018-10-14 Areas Envelope Implementation MUNICIPIO DE CARIPUYO, CHAYANTA Y OCURI BO-MHE-43587-CW-RFB / EXTENSIÓN Y DENSIFICACIÓN DE REDES ELECTRICAS Electricity Services for Unserved Single Stage - One Pending MUNICIPIO DE ACASIO, SAN IDA / 54540 Post Request for Bids Open - National 812,298.00 0.00 2018-02-15 2018-02-20 2018-03-22 2018-04-06 2018-05-02 2018-11-28 Areas Envelope Implementation PEDRO DE BUENA VISTA, BELEN DE URMIRI Y ARAMPAMPA BO-MHE-43583-CW-RFB / EXTENSIÓN Y DENSIFICACIÓN Electricity Services for Unserved Single Stage - One Pending DE REDES ELECTRICAS IDA / 54540 Post Request for Bids Open - National 1,674,976.00 0.00 2018-02-15 2018-02-20 2018-03-22 2018-04-06 2018-05-02 2019-01-27 Areas Envelope Implementation MUNICIPIOS DE VITICHI, CAIZA D, COTAGAITA Y PUNA BO-MHE-5551-CW-RFB / Densificacion de Redes Electricity Services for Unserved Single Stage - One IDA / 54540 Post Request for Bids Open - National 96,395.00 0.00 Canceled 2017-01-10 2017-01-15 2017-02-26 2017-03-28 2017-05-02 2017-07-01 Electricas de los Municipios de Areas Envelope San Pedro de Quemes y Llica GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BO-MHE-5654-GO-RFQ / Request for Single Stage - One Pending Adquisición de Estantes IDA / 54540 Project Management Post Open - National 4,000.00 0.00 2017-02-20 2017-04-17 2017-05-27 Quotations Envelope Implementation Metalicos para Archivo BO-MHE-10964-GO-RFQ / Ropa Request for Single Stage - One Pending de Promoción de la Imagen IDA / 54540 Project Management Post Limited 3,200.00 0.00 2017-04-25 2017-05-28 2017-06-27 Quotations Envelope Implementation Institucional del Proyecto BO-MHE-13200-GO-RFQ / Ropa Request for Single Stage - One Pending de trabajo y equipo de protección IDA / 54540 Project Management Post Open - National 6,300.00 0.00 2017-05-28 2017-06-30 2017-07-30 Quotations Envelope Implementation personal BO-MHE-13201-GO-RFQ / Request for Single Stage - One Pending IDA / 54540 Project Management Post Open - National 3,800.00 0.00 2017-05-29 2017-06-29 2017-07-29 Adquisición de GPS Quotations Envelope Implementation BO-MHE-9476-GO-RFB / Provisión de Sistemas Support to Access and Clean Single Stage - One Fotovoltaicos para la Evaluación IDA / 54540 Prior Request for Bids Open - International 1,250,000.00 0.00 Under Review 2017-09-18 2018-01-10 2017-09-23 2018-01-11 2017-11-04 2017-11-24 2017-12-22 2018-03-22 Energy Strategies Envelope del Servicio de Energía Eléctrica con SFV BO-MHE-28521-GO-DIR / Adquisición de 15 sistemas Support to Access and Clean Pending IDA / 54540 Prior Direct Selection Direct 10,000.00 0.00 2017-11-15 2017-11-20 2017-12-18 2018-01-17 fotovoltaicos demostrativos 3G Energy Strategies Implementation con baterías de litio BO-MHE-28649-GO-RFQ / Request for Single Stage - One Pending Adquisición de 3 equipos de IDA / 54540 Project Management Post Open - National 40,000.00 0.00 2017-10-16 2017-11-18 2017-12-18 Quotations Envelope Implementation Vídeo Conferencia BO-MHE-5622-GO-RFQ / Adquisicion de Muebles para la Request for Single Stage - One Pending IDA / 54540 Project Management Post Limited 40,000.00 0.00 2017-01-17 2017-03-14 2017-04-28 Unidad de Coordinacion del Quotations Envelope Implementation Proyecto y el VMEEA BO-MHE-43365-GO-RFB / Adquisicion de Vagonetas para Single Stage - One Pending IDA / 54540 Project Management Post Request for Bids Open - National 120,000.00 0.00 2017-01-12 2017-01-17 2017-02-28 2017-03-30 2017-05-04 2017-06-13 Unidad de Coordinacion del Envelope Implementation Proyecto BO-MHE-5622-GO-RFB / Adquisicion de Muebles para la Single Stage - One IDA / 54540 Project Management Post Request for Bids Open - National 40,000.00 0.00 Canceled 2017-01-12 2017-01-17 2017-02-28 2017-03-30 2017-05-04 2017-06-18 Unidad de Coordinación del Envelope Proyecto y el VMEEA BO-MHE-5618-GO-RFB / Adquisicion de Vagonetas para Single Stage - One IDA / 54540 Project Management Post Request for Bids Open - National 120,000.00 0.00 Canceled 2017-01-12 2017-01-17 2017-02-28 2017-03-30 2017-05-04 2017-06-13 Unidad de Coordinación del Envelope Proyecto NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BO-MHE-10968-NC-RFQ / Request for Single Stage - One Pending Servicios de Impresión de IDA / 54540 Project Management Post Limited 11,000.00 0.00 2017-04-30 2017-06-02 2017-06-22 Quotations Envelope Implementation Material de Difusión del Proyecto BO-MHE-10969-NC-RFQ / Servicio de producción de cuña Request for Single Stage - One Pending IDA / 54540 Project Management Post Limited 27,000.00 0.00 2017-05-01 2017-06-03 2017-07-03 radial, video educativo y spot Quotations Envelope Implementation publicitario BO-MHE-10970-NC-DIR / Pending Difusión de cuña radial y spot IDA / 54540 Project Management Post Direct Selection Direct 47,000.00 0.00 2017-06-07 2017-06-12 2017-06-24 2017-07-24 Implementation publicitario Page 2 BO-MHE-20549-NC-RFQ / Request for Single Stage - One Pending Material de promoción del IDA / 54540 Project Management Post Open - National 3,000.00 0.00 2017-08-28 2017-09-30 2017-10-20 Quotations Envelope Implementation Proyecto IDTR II BO-MHE-20551-NC-RFQ / Producción del manual Request for Single Stage - One Pending corporativo, portal institucional y IDA / 54540 Project Management Post Limited 8,000.00 0.00 2017-08-28 2017-09-30 2017-10-30 Quotations Envelope Implementation boletín informativo digital del Proyecto IDTR II CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BO-MHE-8026-CS-QCBS / Población sin cobertura eléctrica Support to Access and Clean Quality And Cost- Pending IDA / 54540 Post Open - National 180,000.00 0.00 2017-03-15 2017-04-05 2017-05-19 2017-06-16 2017-07-16 2017-08-20 2017-09-24 2017-12-23 básica en Bolivia - Principales Energy Strategies Based Selection Implementation características BO-MHE-9485-CS-CQS / Supervisión Densificación de Consultant Electricity Services for Unserved Pending Redes Eléctricas del Municipio IDA / 54540 Post Qualification Open - National 51,100.00 0.00 2017-03-30 2017-04-13 2017-05-07 2017-05-28 2017-06-25 2017-12-22 Areas Implementation de Sacaca del Departamento de Selection Potosí BO-MHE-8368-CS-QCBS / Estudio de Sostenibilidad Integral Support to Access and Clean Quality And Cost- IDA / 54540 Post Open - National 180,000.00 0.00 Canceled 2017-03-14 2017-04-04 2017-05-18 2017-06-15 2017-07-15 2017-08-19 2017-09-23 2018-02-20 en el Uso de Sistemas Energy Strategies Based Selection Fotovoltaicos BO-MHE-13758-CS-QBS / Estudio de Sostenibilidad Integral Support to Access and Clean Quality Based Pending IDA / 54540 Post Open - National 97,425.00 0.00 2017-04-24 2017-05-15 2017-06-28 2017-07-26 2017-08-16 2017-08-30 2017-09-20 2017-12-19 de Sistemas Fotovoltaicos para Energy Strategies Selection Implementation á ea rural electrificación en el r BO-MHE-16215-CS-QCBS / SUPERVISIÓN TÉCNICA AMBIENTAL DENSIFICACIÓN Electricity Services for Unserved Quality And Cost- Pending IDA / 54540 Post Open - National 151,057.00 0.00 2017-09-03 2018-05-01 DE REDES ELÉCTRICAS DE Areas Based Selection Implementation LOS MUNICIPIOS EL VILLAR, PRESTO Y TARABUCO BO-MHE-17609-CS-QCBS / Supervisión Técnica Ambiental Electricity Services for Unserved Quality And Cost- Pending IDA / 54540 Post Open - National 177,737.00 0.00 2017-06-21 2017-07-05 2017-07-20 2017-08-17 2017-09-01 2017-09-11 2017-10-07 2018-08-03 Densificación Redes Eléctricas Areas Based Selection Implementation del Municipio de San Lucas BO-MHE-5657-CS-CQS / Consultant Supervisión Técnica Ambiental Electricity Services for Unserved Pending IDA / 54540 Post Qualification Open - National 59,000.00 0.00 2017-01-23 2017-02-13 2017-03-29 2017-04-28 2017-06-02 2018-01-28 Densificación Redes Eléctricas Areas Implementation Selection Municipio De Sopachuy. BO-MHE-18914-CS-CQS / SUPERVISIÓN TÉCNICA AMBIENTAL DENSIFICACION Consultant Electricity Services for Unserved Pending DE REDES ELÉCTRICAS DE IDA / 54540 Post Qualification Open - National 72,631.00 0.00 2017-06-27 2017-07-11 2017-07-25 2017-08-24 2017-09-21 2018-02-18 Areas Implementation LOS MUNICIPIOS SAN PEDRO Selection DE QUEMES, LLICA, SACACA Y UNCIA BO-MHE-28146-CS-CQS / Supervisión Técnica Ambiental Consultant Electricity Services for Unserved Pending Extensión y Densificación de IDA / 54540 Post Qualification Open - National 58,614.00 0.00 2017-10-25 2017-11-08 2017-11-25 2017-12-25 2018-01-22 2018-07-21 Areas Implementation Redes Eléctricas Municipio de Selection ñ z Zudáe BO-MHE-28147-CS-CQS / Supervisión Técnica Ambiental Consultant Electricity Services for Unserved Pending Extensión y Densificación de IDA / 54540 Post Qualification Open - National 77,228.00 0.00 2017-10-25 2017-11-08 2017-11-25 2017-12-25 2018-01-22 2018-09-19 Areas Implementation Redes Eléctricas Municipio de Selection Azurduy BO-MHE-28148-CS-CQS / Supervisión Técnica Ambiental Consultant Extensión y Densificación de Electricity Services for Unserved Pending IDA / 54540 Post Qualification Open - National 96,535.00 0.00 2017-10-25 2017-11-08 2017-11-25 2017-12-25 2018-01-22 2018-11-18 Redes Eléctricas Municipios de Areas Implementation Selection Culpina, Monteagudo y Ende Cintis BO-MHE-28149-CS-QCBS / Supervisión Técnica Ambiental Extensión y Densificación de Electricity Services for Unserved Quality And Cost- Pending IDA / 54540 Post Open - National 175,072.00 0.00 2017-11-15 2017-11-29 2017-12-16 2018-01-13 2018-01-28 2018-02-18 2018-03-18 2019-02-11 Redes Eléctricas Municipio de Areas Based Selection Implementation Tarabuco 2da Fase, Presto y Tomina BO-MHE-30523-CS-CQS / SUPERVISIÓN TÉCNICA Consultant AMBIENTAL EXTENSIÓN Y Electricity Services for Unserved Pending IDA / 54540 Post Qualification Open - National 84,164.00 0.00 2017-10-18 2017-11-01 2017-11-25 2017-12-25 2018-01-22 2018-09-19 DENSIFICACIÓN DE REDES Areas Implementation Selection ELÉCTRICAS MUNICIPIO DE VILLA SERRANO BO-MHE-28150-CS-QCBS / Supervisión Técnica Ambiental Electricity Services for Unserved Quality And Cost- Pending Extensión y Densificación de IDA / 54540 Post Open - National 129,946.00 0.00 2017-11-15 2017-11-29 2017-12-16 2018-01-13 2018-01-28 2018-02-18 2018-03-18 2018-11-13 Areas Based Selection Implementation Redes Eléctricas Municipios de Padilla y Mojocoya BO-MHE-28151-CS-QCBS / Supervisión Técnica Ambiental Extensión y Densificación de Electricity Services for Unserved Quality And Cost- Pending IDA / 54540 Post Open - National 127,325.00 0.00 2017-11-15 2017-11-29 2017-12-16 2018-01-13 2018-01-28 2018-02-18 2018-03-18 2018-10-14 Redes Electicas Municipio de Areas Based Selection Implementation Chayanta, Belén de Urmiri, Ocuri y San Pedro de Buena Vista Page 3 BO-MHE-28152-CS-QCBS / Supervisión Técnica Ambiental Extensión y Densificación de Electricity Services for Unserved Quality And Cost- IDA / 54540 Post Open - National 140,332.00 0.00 Canceled 2017-11-15 2017-11-29 2017-12-16 2018-01-13 2018-01-28 2018-02-18 2018-03-18 2018-11-13 Redes Electicas Municipios de Areas Based Selection Vitichi, Caiza D, Cotagaita, Puna y Arampampa BO-MHE-43589-CS-CQS / SUPERVISIÓN TECNICA AMBIENTAL EXTENSIÓN Y Consultant Electricity Services for Unserved Pending DENSIFICACIÓN DE REDES IDA / 54540 Post Qualification Open - National 38,124.00 0.00 2018-02-28 2018-03-21 2018-05-04 2018-06-03 2018-07-08 2019-01-04 Areas Implementation ELÉCTRICAS MUNICIPIOS DE Selection CULPINA, MONTEAGUDO Y MACHARETTI BO-MHE-43591-CS-CQS / SUPERVISIÓN TECNICA Consultant AMBIENTAL EXTENSIÓN Y Electricity Services for Unserved Pending IDA / 54540 Post Qualification Open - National 50,004.00 0.00 2018-02-28 2018-03-21 2018-05-04 2018-06-03 2018-07-08 2019-02-03 DENSIFICACIÓN DE REDES Areas Implementation Selection ELÉCTRICAS MUNICIPIOS DE PADILLA Y MOJOCOYA BO-MHE-43592-CS-CQS / SUPERVISIÓN TECNICA Consultant AMBIENTAL EXTENSIÓN Y Electricity Services for Unserved Pending IDA / 54540 Post Qualification Open - National 57,564.00 0.00 2018-02-28 2018-03-21 2018-05-04 2018-06-03 2018-07-08 2019-02-18 DENSIFICACIÓN DE REDES Areas Implementation Selection ELÉCTRICAS MUNICIPIO DE TARABUCO 2DA FASE BO-MHE-43596-CS-CQS / SUPERVISIÓN TECNICA AMBIENTAL EXTENSIÓN Y Consultant Electricity Services for Unserved Pending DENSIFICACIÓN DE REDES IDA / 54540 Post Qualification Open - National 43,740.00 0.00 2018-02-28 2018-03-21 2018-05-04 2018-06-03 2018-07-08 2019-01-19 Areas Implementation ELECTRICAS MUNICIPIO DE Selection CARIPUYO, CHAYANTA Y OCURI BO-MHE-43598-CS-QCBS / SUPERVISIÓN TECNICA AMBIENTAL EXTENSIÓN Y Electricity Services for Unserved Quality And Cost- Pending DENSIFICACIÓN DE REDES IDA / 54540 Post Open - National 137,484.00 0.00 2018-02-28 2018-03-21 2018-05-04 2018-06-01 2018-07-01 2018-08-05 2018-09-09 2019-07-06 Areas Based Selection Implementation ELECTRICAS MUNICIPIOS DE VITICHI, CAIZA D, COTAGAITA Y PUNA BO-MHE-43594-CS-CQS / SUPERVISIÓN TECNICA AMBIENTAL EXTENSIÓN Y Consultant DENSIFICACIÓN DE REDES Electricity Services for Unserved Pending IDA / 54540 Post Qualification Open - National 48,738.00 0.00 2018-02-28 2018-03-21 2018-05-04 2018-06-03 2018-07-08 2019-03-05 ELECTRICAS MUNICIPIO DE Areas Implementation Selection ACASIO, SAN PEDRO DE BUENA VISTA, BELEN DE URMIRI Y ARAMPAMPA BO-MHE-48055-CS-CQS / Supervisión Técnica Ambiental Consultant Extensión y Densificación de Electricity Services for Unserved Pending IDA / 54540 Post Qualification Open - National 100,499.00 0.00 2018-02-27 2018-03-20 2018-05-03 2018-06-02 2018-07-07 2019-03-04 Redes Eléctricas Municipios de Areas Implementation Selection Vitichi, Caiza D, Cotagaita y Puna BO-MHE-48178-CS-CDS / Pending IDA / 54540 Project Management Post Least Cost Selection Open - National 15,300.00 0.00 2018-02-28 2018-03-01 2018-03-09 2018-04-06 2018-05-06 2018-06-10 2018-07-08 2018-09-06 Auditoria Financiera Implementation INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BO-MHE-5549-CS-INDV / Individual Consultant Pending Consultor Individual Especialista IDA / 54540 Project Management Post Open 23,000.00 0.00 2017-01-30 2017-03-20 2017-04-10 2017-05-15 2017-11-11 Selection Implementation del Area Tecnica BO-MHE-5655-CS-INDV / Contratación Directa Consultor Individual Consultant Pending IDA / 54540 Project Management Prior Direct 25,000.00 0.00 2017-01-16 2017-01-26 2017-02-16 2017-03-23 2017-12-31 Individual Coordinador Proyecto Selection Implementation IDTR BO-MHE-5658-CS-INDV / Consultoria Individual Encargado Individual Consultant Pending IDA / 54540 Project Management Post Open 22,000.00 0.00 2017-01-13 2017-02-09 2017-03-02 2017-03-21 2017-12-31 en Extensión y Densificación de Selection Implementation Redes BO-MHE-5673-CS-INDV / Consultoría Individual Encargado Individual Consultant Pending IDA / 54540 Project Management Post Open 21,000.00 0.00 2017-02-09 2017-03-30 2017-04-20 2017-05-25 2017-12-31 de Planificación, Monitoreo y Selection Implementation Seguimiento BO-MHE-8022-CS-INDV / Individual Consultant Pending IDA / 54540 Project Management Post Open 15,934.00 0.00 2017-03-08 2017-04-02 2017-04-07 2017-04-17 2017-12-31 Supervisor de Campo 5 Selection Implementation BO-MHE-8023-CS-INDV / Individual Consultant Pending IDA / 54540 Project Management Post Open 15,934.00 0.00 2017-03-08 2017-04-02 2017-04-07 2017-04-17 2017-12-31 Profesional In Situ Chuquisaca Selection Implementation BO-MHE-8024-CS-INDV / Supervisiob Tecnica Proyecto Electricity Services for Unserved Individual Consultant Pending Densificación de Redes IDA / 54540 Post Open 8,750.00 0.00 2017-03-08 2017-04-26 2017-05-17 2017-06-05 2017-11-02 Areas Selection Implementation Eléctricas de los Municipios de San Pedro de Quemes y Llica BO-MHE-9455-CS-INDV / Especialista en Gestión de Support to Access and Clean Individual Consultant Pending IDA / 54540 Post Open 17,000.00 0.00 2017-03-20 2017-04-09 2017-04-14 2017-05-03 2017-12-31 Proyectos Intersectoriales - Energy Strategies Selection Implementation Sistemas Fotovoltaicos BO-MHE-13197-CS-INDV / Individual Consultant Pending IDA / 54540 Project Management Post Limited 5,900.00 0.00 2017-05-10 2017-05-15 2017-05-22 2017-06-03 2017-12-31 Auxiliar Administrativo Selection Implementation Page 4 BO-MHE-13198-CS-INDV / Individual Consultant Pending IDA / 54540 Project Management Post Limited 12,300.00 0.00 2017-05-17 2017-05-22 2017-05-29 2017-06-08 2017-12-31 Supervisor de Campo 6 Selection Implementation BO-MHE-13199-CS-INDV / Support to Access and Clean Individual Consultant Pending Encargado en Prevención y IDA / 54540 Post Limited 14,000.00 0.00 2017-05-16 2017-05-21 2017-05-28 2017-06-07 2017-12-31 Energy Strategies Selection Implementation Control Socio Ambiental BO-MHE-12010-CS-INDV / Individual Consultant Pending ENCARGADO DE TESORERÍA IDA / 54540 Project Management Post Open 15,400.00 0.00 2017-05-23 2017-06-25 2017-07-02 2017-07-28 2017-12-31 Selection Implementation Y PRESUPUESTOS BO-MHE-9471-CS-INDV / Supervisión Densificación de Electricity Services for Unserved Individual Consultant Redes Eléctricas de los IDA / 54540 Post Open 23,336.00 0.00 Canceled 2017-03-30 2017-05-03 2017-05-24 2017-06-21 2017-11-18 Areas Selection Municipios El Villar y Presto del Departamento de Chuquisaca BO-MHE-20205-CS-INDV / Individual Consultant Pending Encargado de Tesorería y IDA / 54540 Project Management Post Open 10,357.00 0.00 2017-08-15 2017-09-18 2017-10-02 2017-10-19 2017-12-31 Selection Implementation Presupuestos BO-MHE-20206-CS-INDV / Individual Consultant Pending IDA / 54540 Project Management Post Open 9,472.00 0.00 2017-08-15 2017-09-10 2017-09-15 2017-09-27 2017-12-31 Profesional In Situ Chuquisaca Selection Implementation BO-MHE-20207-CS-INDV / Individual Consultant Pending IDA / 54540 Project Management Post Open 9,472.00 0.00 2017-08-15 2017-09-10 2017-09-15 2017-09-27 2017-12-31 Supervisor de Campo 5 Selection Implementation BO-MHE-20208-CS-INDV / Individual Consultant Pending IDA / 54540 Project Management Post Limited 9,472.00 0.00 2017-08-15 2017-08-29 2017-09-05 2017-09-15 2017-12-31 Supervisor de Campo 6 Selection Implementation BO-MHE-20209-CS-INDV / Individual Consultant Pending IDA / 54540 Project Management Post Open 9,472.00 0.00 2017-08-15 2017-09-10 2017-09-15 2017-09-27 2017-12-31 Profesional GIS Selection Implementation BO-MHE-20210-CS-INDV / Individual Consultant Pending IDA / 54540 Project Management Post Open 7,933.00 0.00 2017-08-15 2017-09-10 2017-09-15 2017-09-27 2017-12-31 Chofer 1 y 2 Selection Implementation BO-MHE-20503-CS-INDV / Encargado en Gestión de Support to Access and Clean Individual Consultant Pending IDA / 54540 Post Open 10,357.00 0.00 2017-08-15 2017-09-10 2017-09-15 2017-09-27 2017-12-31 Proyectos Intersectoriales - Energy Strategies Selection Implementation Sistemas Fotovoltaicos BO-MHE-40774-CS-INDV / Individual Consultant Pending Profesional en Comunicación IDA / 54540 Project Management Post Limited 22,732.00 0.00 2018-01-10 2018-01-15 2018-02-05 2018-02-19 2018-12-31 Selection Implementation Social BO-MHE-40777-CS-INDV / Individual Consultant Pending Encargado de Planificación, IDA / 54540 Project Management Post Limited 24,857.00 0.00 2018-01-10 2018-01-15 2018-02-05 2018-02-19 2018-12-31 Selection Implementation Monitoreo y Seguimiento BO-MHE-40780-CS-INDV / Individual Consultant Pending IDA / 54540 Project Management Post Limited 22,732.00 0.00 2018-01-10 2018-01-15 2018-02-05 2018-02-19 2018-12-31 Supervisor de Campo Selection Implementation BO-MHE-40782-CS-INDV / Individual Consultant Pending IDA / 54540 Project Management Post Limited 22,458.00 0.00 2018-01-10 2018-01-15 2018-02-05 2018-02-19 2018-12-31 Encargado de Asuntos Jurídicos Selection Implementation BO-MHE-40783-CS-INDV / Individual Consultant Pending Encargado en Extensión y IDA / 54540 Project Management Post Limited 20,417.00 0.00 2018-01-10 2018-01-15 2018-02-05 2018-02-19 2018-12-31 Selection Implementation Densificación de Redes Page 5