Procurement Plan I. General 2. Bank’s approval Date of the procurement Plan: March ......, 2017 3. Date of General Procurement Notice: ............................ 4. Period covered by this procurement plan: March 17 to Jan 2018. II. Goods, Works, Consultant and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement Prior Review Threshold (PRT) Comments US$ (Millions) 1. Works (Including turnkey, supply & 5 High installation of plant and equipment and PPP) 2. (Goods; Information Technology & Non- 1.5 High Consulting Services) 3. Consultant Services (Firms) 0.5 High 4. Consultant Services (Individual Consultants) 0.2 High 2. Pre-qualification NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Available in Project files 5. Any Other Special Procurement Arrangements NA 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. All TORs for the procurement of consultants services irrespective of the estimated cost of the assignment shall be reviewed and cleared by the TTL 8. Operating expenditures are neither subject to the Procurement and Consultant Guidelines nor prior or post reviews. Operating expenditures are normally verified by TTLs and FM specialists and obtained using the Borrower’s national procurement and administrative procedures. 9. Renewal or extension of individual consultants contracts hired for technical assistance and which are intended for a long-term period but signed for an initial period shorter than the duration of the project, and that have been prior reviewed, do not require procurement clearance if there is no substantial change in the terms and conditions of the contract. March 17, 2017 PROCUREMENT Uganda : Uganda Energy for Rural Transformation III PLAN General Information Country: Uganda Banks Approval Date of the Original Procurement Plan: 2017-03-24 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-06-25 Project ID: P133312 GPN Date: Project Name: Uganda Energy for Rural Transformation III Loan / Credit No: IDA / 56530 Executing Agency(ies): Ministry of Energy and Mineral Development, Rural Electrification Agency WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-MEMD-6015-CW-RFB / Contingency Procurement of works for Supply, On-grid Energy Access installation and maintenance of Single Stage - One IDA / 56530 Off-grid Energy Access Prior Request for Bids Open - International 1,500,000.00 0.00 Under Review 2017-05-28 2017-10-27 2017-08-06 2017-11-13 2017-10-30 2018-01-19 2018-01-01 2018-03-11 2019-05-09 Energy Packages for 100 Post Envelope Institutional Strengthening and Primary Education Institutions in Impacts Monitoring Lots 1&2(MOES) Contingency UG-MEMD-6022-CW-RFQ / On-grid Energy Access Request for Single Stage - One Pending Minor Civil Works for pico/micro IDA / 56530 Off-grid Energy Access Post Limited 60,000.00 0.00 2018-04-06 2018-06-01 2018-11-28 Quotations Envelope Implementation sites (6 Sites)-PSFU Institutional Strengthening and Impacts Monitoring Contingency UG-REA-14709-CW-RFB / On-grid Energy Access Construction of ERT-3 grid Single Stage - One Pending IDA / 56530 Off-grid Energy Access Prior Request for Bids Open - International 9,603,000.00 0.00 2018-12-18 2019-02-05 2019-04-23 2019-06-07 2019-09-23 2021-02-24 extension projects in Lot C Envelope Implementation Institutional Strengthening and (220km) Impacts Monitoring Contingency UG-REA-14712-CW-RFB / On-grid Energy Access Construction of ERT-3 grid Single Stage - One Pending IDA / 56530 Off-grid Energy Access Prior Request for Bids Open - International 15,439,600.00 0.00 2018-10-18 2018-12-11 2019-02-18 2019-03-20 2019-07-23 2020-12-23 extension projects in Lot B Envelope Implementation Institutional Strengthening and (320km) Impacts Monitoring Contingency UG-REA-14892-CW-RFB / On-grid Energy Access Construction of ERT-3 grid Single Stage - One Pending IDA / 56530 Off-grid Energy Access Prior Request for Bids Open - International 9,803,600.00 0.00 2018-04-21 2018-04-26 2018-06-07 2018-07-07 2018-08-11 2019-02-07 extension projects in Lot E Envelope Implementation Institutional Strengthening and (214km) Impacts Monitoring Contingency UG-REA-14896-CW-RFB / On-grid Energy Access Construction of ERT-3 grid Single Stage - One Pending IDA / 56530 Off-grid Energy Access Prior Request for Bids Open - International 11,757,137.00 0.00 2018-04-21 2018-04-26 2018-06-07 2018-07-07 2018-08-11 2019-02-07 extension projects in Lot A Envelope Implementation Institutional Strengthening and (307km) Impacts Monitoring UG-REA-14909-CW-RFB / Contingency Construction of ERT-3 grid On-grid Energy Access extension projects in Fast Track Single Stage - One Pending IDA / 56530 Off-grid Energy Access Prior Request for Bids Open - International 13,070,400.00 0.00 2017-08-05 2017-08-10 2017-09-21 2017-10-21 2017-11-25 2018-05-24 Lot 3 (Wandi-Yumbe-Moyo) and Envelope Implementation Institutional Strengthening and Fast Track Lot 4 (Onduparika- Impacts Monitoring Odramachu-Abiria) Contingency UG-REA-18290-CW-RFB / On-grid Energy Access Construction of ERT-3 grid Single Stage - One Pending IDA / 56530 Off-grid Energy Access Prior Request for Bids Open - International 8,374,800.00 0.00 2018-11-20 2019-01-04 2019-03-19 2019-04-02 2019-08-21 2021-01-21 extension projects in Lot D Envelope Implementation Institutional Strengthening and (219km) Impacts Monitoring UG-REA-40437-CW-RFB / Construction of ERT-3 grid extension projects in Fast Track Contingency Lot 1 (Kiganda-Mile 16 with tee- On-grid Energy Access Single Stage - One Under off Katabalanga & Kibyamirizi) IDA / 56530 Off-grid Energy Access Prior Request for Bids Open - International 10,652,600.00 0.00 2017-10-30 2017-12-22 2018-01-05 2017-12-28 2018-02-23 2018-05-14 2018-07-18 2019-12-18 Envelope Implementation and Construction of ERT-3 grid Institutional Strengthening and extension projects in Fast Track Impacts Monitoring Lot 2: Ruhumba - Kashwa with tee-off Rwebishuri (123km) UG-REA-14928-CW-RFB / On-grid Energy Access Construction of ERT-3 grid Contingency Single Stage - One Under extension projects in Fast Track IDA / 56530 Institutional Strengthening and Prior Request for Bids Open - International 5,688,800.00 0.00 2017-08-17 2017-09-25 2017-12-12 2018-04-03 2018-01-11 2018-05-14 2019-10-15 Envelope Implementation Lot 1 (Kiganda-Mile 16 with tee- Impacts Monitoring off Katabalanga & Kibyamirizi) Off-grid Energy Access UG-REA-18286-CW-RFB / On-grid Energy Access Construction of ERT-3 grid Contingency Single Stage - One Under extension projects in Fast Track IDA / 56530 Institutional Strengthening and Prior Request for Bids Open - International 4,963,800.00 0.00 2017-08-17 2017-09-25 2017-12-12 2018-04-03 2018-01-11 2018-05-16 2019-09-13 Envelope Implementation Lot 2: Ruhumba - Kashwa with Impacts Monitoring tee-off Rwebishuri (123km) Off-grid Energy Access UG-REA-59119-CW-RFB / Procurement of contractors to Contingency implement works for grid On-grid Energy Access Single Stage - One intensification in Western, IDA / 56530 Off-grid Energy Access Prior Request for Bids Open - National 4,499,122.00 0.00 Under Review 2018-06-28 2018-07-19 2018-09-10 2018-11-26 2019-01-07 2020-06-12 Envelope Central and Rwenzori service Institutional Strengthening and territories under Lot 1, Lot 2 and Impacts Monitoring Lot 3 GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Contingency UG-MEMD-6029-GO-RFQ / On-grid Energy Access Product Software upgrade- Request for Single Stage - One Pending IDA / 56530 Off-grid Energy Access Post Limited 50,000.00 0.00 2017-03-20 2017-05-15 2017-11-11 (Accounting system ) for Quotations Envelope Implementation Institutional Strengthening and UECCC Impacts Monitoring Page 1 Contingency UG-MEMD-6048-GO-RFB / On-grid Energy Access Supply and installation of Single Stage - One Pending IDA / 56530 Off-grid Energy Access Post Request for Bids Open - National 360,000.00 0.00 2018-02-01 2018-02-06 2018-03-20 2018-04-19 2018-05-24 2018-11-20 distribution lines for Household Envelope Implementation Institutional Strengthening and access (6 sets) -PSFU Impacts Monitoring UG-MEMD-13496-GO-RFB / Procurement of works for Supply Contingency & Installation maintenance of On-grid Energy Access Single Stage - One Energy Packages for Water IDA / 56530 Off-grid Energy Access Prior Request for Bids Open - International 2,700,000.00 2,437,674.95 Signed 2017-05-15 2017-05-20 2017-05-12 2017-07-01 2017-07-07 2017-07-31 2017-10-25 2017-09-04 2018-01-18 2018-03-03 Envelope Supply Schemes in Small Towns Institutional Strengthening and and Rural Growth Centres (12-14 Impacts Monitoring schemes)-MoWE Contingency UG-MEMD-7337-GO-RFB / On-grid Energy Access Supply and installation of solar Single Stage - One IDA / 56530 Off-grid Energy Access Prior Request for Bids Open - International 4,500,000.00 2,288,650.61 Signed 2017-02-14 2017-02-19 2017-04-02 2017-07-10 2017-05-02 2018-01-10 2017-06-06 2018-02-01 2017-12-03 energy packages for 374 Health Envelope Institutional Strengthening and centres (MoH) Impacts Monitoring Contingency On-grid Energy Access UG-MEMD-7437-GO-RFB / Single Stage - One IDA / 56530 Off-grid Energy Access Post Request for Bids Open - National 40,000.00 51,874.23 Signed 2016-12-30 2017-01-04 2017-02-15 2017-07-14 2017-03-17 2017-07-14 2017-04-21 2017-08-01 2017-10-18 Procurement of a Double cabin Envelope Institutional Strengthening and Impacts Monitoring Contingency UG-REA-14924-GO-RFQ / On-grid Energy Access Request for Single Stage - One Pending Supply of Inspector's IDA / 56530 Off-grid Energy Access Post Limited 10,765.00 0.00 2017-08-07 2017-10-18 2019-01-16 Quotations Envelope Implementation Measurement Equipment Institutional Strengthening and Impacts Monitoring Contingency UG-MEMD-15330-GO-RFQ / On-grid Energy Access Request for Single Stage - One Procurement of 50 Tablets for the IDA / 56530 Off-grid Energy Access Post Limited 30,000.00 26,914.05 Signed 2017-06-06 2017-07-14 2017-07-29 2017-07-17 2017-09-10 Quotations Envelope ERT III Baseline Survey Institutional Strengthening and Impacts Monitoring UG-REA-14619-GO-RFB / Contingency Supply of (02) Double Cabin Pick- On-grid Energy Access Single Stage - One ups and (01) Station Wagon for IDA / 56530 Off-grid Energy Access Prior Request for Bids Open - National 244,000.00 0.00 Canceled 2017-09-11 2017-10-16 2017-11-15 2017-11-29 2018-01-10 2018-03-26 Envelope REA and (01) Double Cabin Pick- Institutional Strengthening and up for UNBS Impacts Monitoring On-grid Energy Access UG-REA-8728-GO-RFB / Supply Contingency Single Stage - One of a Double Cabin Pick-up for IDA / 56530 Institutional Strengthening and Post Request for Bids Open - National 49,000.00 0.00 Canceled 2017-05-30 2017-06-04 2017-07-16 2017-08-15 2017-09-19 2018-03-18 Envelope UNBS Impacts Monitoring Off-grid Energy Access UG-REA-14929-GO-RFB / Design, supply, installation and training of PV testing equipment On-grid Energy Access for:- Contingency Lot 1: PV modules Single Stage - One IDA / 56530 Institutional Strengthening and Post Request for Bids Open - National 300,000.00 0.00 Canceled 2017-05-30 2017-06-04 2017-07-16 2017-08-15 2017-09-19 2018-03-18 Lot 2: Charge controllers Envelope Impacts Monitoring Lot 3: PV batteries Off-grid Energy Access Lot 4: PV inverters Lot 5: PV lights Lot 6: PV Field testing kits" On-grid Energy Access UG-REA-14916-GO-RFQ / Contingency Request for Single Stage - One Supply of ICT Equipment IDA / 56530 Institutional Strengthening and Post Open - National 27,750.00 0.00 Canceled 2017-07-10 2017-11-30 2018-04-02 Quotations Envelope (Laptops, Tablets & Projector) Impacts Monitoring Off-grid Energy Access On-grid Energy Access UG-MEMD-15112-GO-RFB / Contingency Single Stage - One Procurement of Satellite Imagery IDA / 56530 Institutional Strengthening and Prior Request for Bids Open - International 988,041.00 0.00 Canceled 2017-05-18 2017-05-31 2017-07-14 2017-08-04 2017-09-20 2017-12-20 Envelope Requirements for ERT III Impacts Monitoring Off-grid Energy Access UG-MEMD-6011-GO-RFB / Institutional Strengthening and Supply and maintenance tool kits Impacts Monitoring and training of District Single Stage - One Pending IDA / 56530 Contingency Post Request for Bids Open - National 100,000.00 0.00 2018-03-30 2018-04-04 2018-05-16 2018-06-15 2018-07-20 2019-01-16 Technicians in solar PV systems Envelope Implementation On-grid Energy Access installation and maintenance Off-grid Energy Access (MoH) UG-MEMD-47591-GO-DIR / Supply, Installation & training a Institutional Strengthening and Pending IDA / 56530 Post Direct Selection Direct 15,000.00 0.00 2018-02-15 2018-02-20 2018-03-27 2018-09-23 geophysical data processing Impacts Monitoring Implementation software EMpower UG-MEMD-48035-GO-DIR / Supply, Installation & training of geophysical data processing Institutional Strengthening and Pending IDA / 56530 Post Direct Selection Direct 15,000.00 0.00 2018-02-21 2018-02-26 2018-04-02 2018-09-29 software Geotools Impacts Monitoring Implementation (Magnetotelluric and TDEM Intepretation software) UG-MEMD-48036-GO-DIR / Supply of six (6) porous pot Institutional Strengthening and Pending IDA / 56530 Post Direct Selection Direct 15,000.00 0.00 2018-02-21 2018-02-26 2018-04-02 2018-09-29 electrode for Magnetotelluric Impacts Monitoring Implementation equipment Contingency UG-REA-54564-GO-RFQ / On-grid Energy Access Request for Single Stage - One Pending Supply of (02) Double Cabin Pick- IDA / 56530 Off-grid Energy Access Post Limited 195,000.00 0.00 2018-04-03 2018-06-08 2018-09-06 Quotations Envelope Implementation ups and (01) Station Wagon Institutional Strengthening and Impacts Monitoring UG-MEMD-40434-GO-RFB / Procurement of AERIAL Imagery Single Stage - One Under IDA / 56530 Off-grid Energy Access Post Request for Bids Open - National 48,420.00 0.00 2018-04-20 2018-06-04 2018-04-25 2018-06-06 2018-07-06 2018-08-10 2019-02-06 Equipment and Software for Envelope Implementation MEMD Contingency UG-REA-59113-GO-RFQ / On-grid Energy Access Request for Single Stage - One Pending Supply of the aerial imagery IDA / 56530 Off-grid Energy Access Post Limited 48,420.00 0.00 2018-05-02 2018-06-15 2018-08-06 Quotations Envelope Implementation equipment and software Institutional Strengthening and Impacts Monitoring Page 2 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Contingency UG-REA-14661-NC-DIR / On-grid Energy Access Services for Independent Under IDA / 56530 Off-grid Energy Access Prior Direct Selection Direct 770,000.00 0.00 2017-05-24 2017-10-11 2017-06-07 2017-11-17 2020-05-15 Verification Agent for non-OBA Implementation Institutional Strengthening and connections Impacts Monitoring UG-REA-14710-NC-DIR / Procurement of an Independent Contingency Verification Agent (IVA) for the On-grid Energy Access Pending Rural Electricity Household IDA / 56530 Off-grid Energy Access Prior Direct Selection Direct 462,057.80 0.00 2016-08-01 2016-08-01 2016-11-07 2017-07-29 Implementation Connections under OBA Project: Institutional Strengthening and Lot 1: Umeme and non Umeme Impacts Monitoring Connections On-grid Energy Access UG-REA-14708-NC-DIR / Contingency Procurement of a wayleaves IDA / 56530 Institutional Strengthening and Post Direct Selection Direct 135,000.00 0.00 Canceled 2017-06-19 2017-07-24 2017-12-27 2020-06-24 management software Impacts Monitoring Off-grid Energy Access UG-MEMD-48039-NC-DIR / Repair & field test Institutional Strengthening and Pending IDA / 56530 Post Direct Selection Direct 20,000.00 0.00 2018-02-21 2018-02-26 2018-04-02 2018-09-29 Magnetotelluric equipment MTU- Impacts Monitoring Implementation 4359 UG-MEMD-48038-NC-DIR / Consultancy services for training Institutional Strengthening and Pending IDA / 56530 Post Direct Selection Direct 27,000.00 0.00 2018-02-28 2018-03-05 2018-04-09 2018-10-06 of three (3) engineers in Impacts Monitoring Implementation geothermal drilling technology CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-MEMD-13578-CS-CQS / TA Contingency to facilitate the development of On-grid Energy Access Consultant the strategic framework and IDA / 56530 Off-grid Energy Access Post Qualification Open - National 62,500.00 70,214.60 Signed 2016-05-30 2018-01-12 2017-01-05 2017-03-17 2018-01-12 2017-07-31 2018-02-01 2017-09-04 2017-11-08 2018-03-03 establishment of institutional Institutional Strengthening and Selection systems for the Uganda Solar Impacts Monitoring Energy Association UG-MEMD-13583-CS-QCBS / Contingency TA to support provision of On-grid Energy Access electricity to isolated places Quality And Cost- Under IDA / 56530 Off-grid Energy Access Post Open - International 250,000.00 0.00 2015-12-11 2016-06-15 2016-06-17 2017-01-20 2017-05-05 2017-06-30 2017-07-30 2017-09-26 2017-09-03 2017-10-08 2018-10-08 through development of Based Selection Implementation Institutional Strengthening and pico/micro hydro Impacts Monitoring schemes(PSFU) UG-MEMD-13562-CS-CQS / Contingency Preparation of a Master On-grid Energy Access Consultant guarantee agreement and a IDA / 56530 Off-grid Energy Access Post Qualification Open - International 100,000.00 98,800.00 Signed 2015-10-10 2016-04-13 2016-06-16 2016-06-21 2016-07-21 2016-09-15 2016-09-15 2016-10-20 2017-03-01 2017-04-18 working capital facility Institutional Strengthening and Selection agreement(UECCC) Impacts Monitoring UG-MEMD-13559-CS-QCBS / Contingency Designs preparation and On-grid Energy Access Quality And Cost- Pending supervision of water supply solar IDA / 56530 Off-grid Energy Access Post Open - International 450,000.00 0.00 2014-11-04 2015-02-20 2015-05-18 2015-07-07 2015-07-21 2015-09-30 2015-12-15 2017-11-13 Based Selection Implementation energy packages rural Institutional Strengthening and centres(MoWE) Impacts Monitoring Contingency UG-MEMD-13593-CS-QCBS / On-grid Energy Access Needs assessment and Quality And Cost- Pending IDA / 56530 Off-grid Energy Access Post Open - International 220,000.00 0.00 2015-03-27 2015-07-02 2015-07-31 2015-11-30 2015-12-30 2016-06-22 2016-09-14 2017-05-19 Supervison of installation of Based Selection Implementation Institutional Strengthening and Energy Packages for MoES Impacts Monitoring UG-MEMD-15599-CS-CQS / Designing of UECCC Working Consultant Pending capital facility for solar IDA / 56530 Off-grid Energy Access Post Qualification Open - International 290,000.00 0.00 2016-04-13 2016-05-31 2016-07-20 2016-09-14 2016-12-21 2017-06-30 Implementation companies and partial risk Selection guarantee for PFIS UG-REA-14931-CS-QCBS / Consultancy Services for Contingency construction supervision of Fast On-grid Energy Access Track Lot 1 (Kiganda-Mile 16 with Quality And Cost- IDA / 56530 Off-grid Energy Access Prior Open - International 580,000.00 0.00 Under Review 2016-11-16 2017-09-24 2016-12-07 2017-05-31 2017-10-13 2017-06-28 2017-07-28 2018-04-10 2017-09-01 2017-10-06 2018-10-06 tee-off Katabalanga & Based Selection Institutional Strengthening and Kibyamirizi) and Fast Track Lot 2 Impacts Monitoring (Ruhumba-Kashwa with tee-off Rwebishuri) UG-REA-14274-CS-QCBS / Consultancy Services for RAPs, Contingency review of engineering designs, On-grid Energy Access preparation of bidding Quality And Cost- IDA / 56530 Off-grid Energy Access Prior Open - International 1,930,000.00 0.00 Under Review 2017-05-31 2017-10-04 2017-06-21 2017-08-04 2018-01-15 2017-09-01 2018-03-29 2017-10-01 2017-11-05 2017-12-10 2018-12-10 documents, procurement Based Selection Institutional Strengthening and support, construction supervision Impacts Monitoring and project management for Lot 1 UG-REA-16031-CS-QCBS / Consultancy Services for RAPs, Contingency review of engineering designs, On-grid Energy Access preparation of bidding Quality And Cost- Under IDA / 56530 Off-grid Energy Access Prior Open - International 2,010,000.00 0.00 2017-05-31 2017-10-04 2017-06-21 2017-07-15 2017-08-04 2018-01-15 2017-09-01 2018-03-29 2017-10-01 2017-11-05 2017-12-10 2018-12-10 documents, procurement Based Selection Implementation Institutional Strengthening and support, construction supervision Impacts Monitoring and project management for Lot 2. Contingency UG-REA-14862-CS-CQS / On-grid Energy Access Consultant Under Consultancy Services for EIA for IDA / 56530 Off-grid Energy Access Post Qualification Open - National 150,000.00 0.00 2015-08-13 2015-08-13 2015-09-03 2016-06-16 2016-12-02 2017-05-31 2017-09-26 Implementation Lot B Institutional Strengthening and Selection Impacts Monitoring Page 3 Contingency UG-REA-14869-CS-CQS / On-grid Energy Access Consultant Under Consultancy Services for EIA for IDA / 56530 Off-grid Energy Access Post Qualification Open - National 100,000.00 0.00 2015-07-13 2015-07-13 2015-08-03 2016-06-10 2016-12-02 2017-05-31 2017-09-26 Implementation Lot D Institutional Strengthening and Selection Impacts Monitoring Contingency UG-REA-14849-CS-CQS / On-grid Energy Access Consultant Under Consultancy Services for EIA for IDA / 56530 Off-grid Energy Access Post Qualification Open - National 140,000.00 0.00 2015-09-13 2015-09-13 2015-10-04 2016-06-24 2016-12-02 2017-05-31 2017-09-26 Implementation Lot A Institutional Strengthening and Selection Impacts Monitoring Contingency UG-REA-14864-CS-CQS / On-grid Energy Access Consultant Under Consultancy Services for EIA for IDA / 56530 Off-grid Energy Access Post Qualification Open - National 100,000.00 0.00 2015-07-13 2015-07-13 2015-08-03 2016-06-10 2016-07-10 2017-05-31 2017-09-26 Implementation Lot E Institutional Strengthening and Selection Impacts Monitoring Contingency UG-REA-14836-CS-CQS / On-grid Energy Access Consultant Under Consultancy Services for EIA for IDA / 56530 Off-grid Energy Access Post Qualification Open - National 100,000.00 0.00 2015-07-13 2015-07-13 2015-08-05 2016-06-10 2016-07-10 2017-05-31 2017-09-26 Implementation Lot C Institutional Strengthening and Selection Impacts Monitoring UG-REA-8819-CS-QCBS / Consultancy Services for Review On-grid Energy Access of Engineering Designs, Contingency Quality And Cost- Preparation of Bidding IDA / 56530 Institutional Strengthening and Prior Open - International 599,200.00 0.00 Canceled 2015-05-19 2015-06-09 2015-07-23 2015-08-20 2015-09-19 2015-10-24 2015-11-28 2016-11-27 Based Selection Documents and construction Impacts Monitoring supervision for Lot 12: Ngeta & Off-grid Energy Access Lot 13: Dokolo UG-REA-14841-CS-QCBS / On-grid Energy Access Consultancy services for Contingency construction supervision of Fast Quality And Cost- IDA / 56530 Institutional Strengthening and Prior Open - International 862,500.00 0.00 Canceled 2017-06-15 2017-07-06 2019-05-08 2019-06-05 2019-07-05 2019-08-30 2019-11-15 2020-08-24 Track Lot 3 (Wandi-Yumbe- Based Selection Impacts Monitoring Moyo) and Fast Track Lot 4 Off-grid Energy Access (Onduparika-Odramachu-Abiria) Contingency UG-REA-18292-CS-QCBS / On-grid Energy Access Consultancy Services for Quality And Cost- IDA / 56530 Off-grid Energy Access Prior Open - International 1,000,000.00 0.00 Canceled 2017-06-20 2017-07-24 2017-09-29 2017-12-15 2017-12-15 2018-03-09 2018-06-25 2021-01-21 Community mobilisation to Based Selection Institutional Strengthening and achieve Connections Impacts Monitoring UG-REA-18282-CS-QCBS / Contingency Consultancy services for On-grid Energy Access construction supervision of Fast Quality And Cost- IDA / 56530 Off-grid Energy Access Prior Open - International 862,500.00 0.00 Under Review 2017-10-16 2017-12-20 2017-11-06 2018-02-06 2018-01-29 2018-03-19 2018-05-03 2018-06-25 2018-09-24 2021-06-17 Track Lot 3 (Wandi-Yumbe- Based Selection Institutional Strengthening and Moyo) and Fast Track Lot 4 Impacts Monitoring (Onduparika-Odramachu-Abiria) On-grid Energy Access Contingency UG-MEMD-7449-CS-QCBS / Quality And Cost- IDA / 56530 Institutional Strengthening and Prior Open - International 700,000.00 0.00 Canceled 2017-02-16 2017-03-09 2017-04-22 2017-05-20 2017-06-19 2017-07-24 2017-08-28 2018-08-28 Cost of Service Study Based Selection Impacts Monitoring Off-grid Energy Access UG-MEMD-16946-CS-CQS / Consultancy Services for Consultant Institutional Strengthening and Environmental Audit of the Solar IDA / 56530 Post Qualification Open - National 65,000.00 63,415.40 Signed 2017-06-15 2018-04-24 2017-07-12 2017-08-25 2018-04-24 2017-09-24 2018-04-24 2017-10-29 2018-04-05 2018-04-27 Impacts Monitoring PV Energy Packages UNDER Selection ERT-II UG-MEMD-7466-CS-CQS / Consultancy services On-grid Energy Access Environmental and Social Impact Contingency Consultant Assessment (ESIA) of the IDA / 56530 Institutional Strengthening and Prior Qualification Open - National 300,000.00 0.00 Canceled 2017-02-16 2017-03-09 2017-04-22 2017-05-22 2017-06-26 2017-06-30 Impact of the Isimba Hydropower Impacts Monitoring Selection Project on the Kalagala Offset Off-grid Energy Access Area UG-MEMD-13564-CS-CQS / On-grid Energy Access Designing of UECCC Working Contingency Consultant capital facility for solar IDA / 56530 Institutional Strengthening and Post Qualification Open - International 290,000.00 0.00 Canceled 2015-10-10 2016-06-17 2016-07-20 2016-09-15 2017-04-24 2017-10-21 companies and partial risk Impacts Monitoring Selection guarantee for PFIS (UECCC) Off-grid Energy Access UG-REA-30858-CS-CQS / Contingency Consultancy Services for an On-grid Energy Access Consultant Integrated Environmental, Health Pending IDA / 56530 Off-grid Energy Access Post Qualification Open - National 80,000.00 0.00 2017-10-10 2017-10-31 2017-12-14 2018-01-13 2018-02-17 2018-08-16 and Safety Management System Implementation Institutional Strengthening and Selection for the Rural Electrification Impacts Monitoring Program On-grid Energy Access UG-REA-14902-CS-INDV / Contingency Consultant Technical Consultant to identify IDA / 56530 Institutional Strengthening and Post Qualification Open - National 64,960.00 0.00 Canceled 2017-06-16 2017-06-30 2017-08-30 2017-10-10 2018-05-08 equipment and training needs for Impacts Monitoring Selection UNBS technical staff Off-grid Energy Access On-grid Energy Access UG-REA-14899-CS-CQS / Contingency Consultant Accreditation to Test Laboratory IDA / 56530 Institutional Strengthening and Post Qualification Open - International 20,000.00 0.00 Canceled 2017-06-16 2017-06-30 2017-07-27 2017-08-30 2017-09-19 2018-05-02 as per ISO/IEC 17025 Impacts Monitoring Selection Off-grid Energy Access Contingency UG-MEMD-7867-CS-CQS / TA On-grid Energy Access Consultant to develop interventions to scale IDA / 56530 Off-grid Energy Access Post Qualification Open - National 40,000.00 44,323.11 Signed 2017-04-19 2018-01-12 2017-04-19 2017-04-19 2018-01-12 2017-04-19 2018-01-12 2017-05-10 2017-07-12 2017-11-06 up wiring installations across the Institutional Strengthening and Selection (PSFU) Impacts Monitoring On-grid Energy Access UG-REA-14905-CS-CQS / Contingency Consultant Accreditation of UNBS Inspection IDA / 56530 Institutional Strengthening and Post Qualification Open - International 21,500.00 0.00 Canceled 2017-08-28 2017-09-11 2017-10-07 2017-11-11 2017-12-01 2018-07-14 Services (Imports & Market Impacts Monitoring Selection Surveillance) to ISO 17020 Off-grid Energy Access Contingency UG-REA-4445-CS-QCBS / On-grid Energy Access Consultancy services for Quality And Cost- Under IDA / 56530 Off-grid Energy Access Prior Open - International 2,750,000.00 0.00 2018-05-18 2018-05-16 2018-07-02 2018-08-30 2018-11-08 2018-12-08 2019-02-22 2019-05-16 2022-03-11 marketing and mobilisation for Based Selection Implementation Institutional Strengthening and connections Impacts Monitoring Page 4 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Contingency UG-MEMD-7871-CS-INDV / On-grid Energy Access Individual Consultant Pending Procurement of a Treasury IDA / 56530 Off-grid Energy Access Post Open 65,397.00 0.00 2016-09-30 2017-04-05 2017-04-26 2017-05-31 2017-11-27 Selection Implementation Specialist (UECCC) Institutional Strengthening and Impacts Monitoring Contingency UG-MEMD-13579-CS-INDV / On-grid Energy Access Individual Consultant Pending Recruitment of Risk Specialist IDA / 56530 Off-grid Energy Access Post Open 139,886.00 0.00 2015-10-10 2016-07-20 2016-09-15 2016-10-17 2019-10-17 Selection Implementation (three year contract) Institutional Strengthening and Impacts Monitoring Contingency UG-MEMD-13576-CS-CDS / TA- On-grid Energy Access Project management services - IDA / 56530 Off-grid Energy Access Post Direct Selection Direct 170,000.00 138,080.88 Signed 2016-06-20 2017-09-28 2016-06-20 2017-09-28 2016-09-09 2016-07-01 2018-09-10 Component Manager, PSFU Institutional Strengthening and component Impacts Monitoring UG-REA-14704-CS-CDS / Contingency Consultancy Services for RAPs On-grid Energy Access for Fast Track Lot 3 (Wandi- Pending IDA / 56530 Off-grid Energy Access Post Direct Selection Direct 220,000.00 0.00 2015-05-20 2015-07-27 2016-05-30 2016-11-26 Yumbe-Moyo) and Fast Track Implementation Institutional Strengthening and Lot 4 (Onduparika-Odramachu- Impacts Monitoring Abiria) Contingency On-grid Energy Access UG-REA-15974-CS-INDV / Individual Consultant Under IDA / 56530 Off-grid Energy Access Prior Open 270,000.00 0.00 2017-05-26 2017-07-06 2017-07-24 2017-10-17 2017-11-06 2021-11-12 Project Engineer (01) Selection Implementation Institutional Strengthening and Impacts Monitoring Contingency On-grid Energy Access UG-REA-15975-CS-INDV / Individual Consultant Under IDA / 56530 Off-grid Energy Access Prior Open 270,000.00 0.00 2017-05-26 2017-07-06 2017-07-24 2017-10-17 2017-11-06 2021-11-12 Project Engineer (01) Selection Implementation Institutional Strengthening and Impacts Monitoring UG-REA-16000-CS-CDS / Contingency Consultancy services for review On-grid Energy Access of engineering designs & bidding Pending IDA / 56530 Off-grid Energy Access Post Direct Selection Direct 54,500.00 0.00 2015-05-20 2015-07-27 2016-06-13 2018-07-30 documents for Fast Track Lot 1 Implementation Institutional Strengthening and (Kiganda-Mile 16 with tee-off Impacts Monitoring Katabalanga & Kibyamirizi) Contingency On-grid Energy Access UG-REA-14313-CS-INDV / Individual Consultant Under IDA / 56530 Off-grid Energy Access Post Open 105,000.00 0.00 2016-04-08 2016-11-16 2017-03-02 2017-03-24 2019-03-24 Procurement Specialist Selection Implementation Institutional Strengthening and Impacts Monitoring UG-REA-8825-CS-CDS / Contingency Consultancy Services for Review On-grid Energy Access of Engineering Designs & Pending IDA / 56530 Off-grid Energy Access Prior Direct Selection Direct 61,500.00 0.00 2015-04-26 2015-05-06 2015-07-10 2016-01-06 Preparation of Bidding Document Implementation Institutional Strengthening and for Fast Track Lot 2: Ruhumba- Impacts Monitoring Kashwa with tee-off Rwebishuri Contingency On-grid Energy Access UG-REA-013 / Senior Social Individual Consultant Under IDA / 56530 Off-grid Energy Access Prior Open 210,000.00 0.00 2017-06-19 2017-07-21 2017-08-21 2017-10-23 2017-11-30 2021-12-01 Development Officer (01) Selection Implementation Institutional Strengthening and Impacts Monitoring Contingency UG-MEMD-13563-CS-CDS / TA On-grid Energy Access - Project management services - Individual Consultant IDA / 56530 Off-grid Energy Access Post Open 68,000.00 68,000.00 Signed 2016-05-30 2017-11-22 2016-10-24 2016-11-03 2017-11-22 2016-11-10 2016-11-08 2018-11-10 Project Officer- PSFU Selection Institutional Strengthening and Component Impacts Monitoring UG-REA-14881-CS-CDS / Consultancy services for review On-grid Energy Access of engineering designs & bidding Contingency documents for Fast Track Lot 3 IDA / 56530 Institutional Strengthening and Post Direct Selection Direct 172,900.00 0.00 Canceled 2017-05-15 2017-06-07 2017-11-10 2018-12-05 (Wandi-Yumbe-Moyo) and Fast Impacts Monitoring Track Lot 4 (Onduparika- Off-grid Energy Access Odramachu-Abiria) UG-REA-18276-CS-CDS / Consultancy services for review Contingency of engineering designs & bidding On-grid Energy Access Under documents for Fast Track Lot 3 IDA / 56530 Off-grid Energy Access Prior Direct Selection Direct 172,900.00 0.00 2017-06-19 2017-08-22 2017-07-12 2017-11-24 2017-11-13 2019-01-28 Implementation (Wandi-Yumbe-Moyo) and Fast Institutional Strengthening and Track Lot 4 (Onduparika- Impacts Monitoring Odramachu-Abiria) UG-REA-8815-CS-CDS / On-grid Energy Access Consultancy Services for Contingency environmental audit for three lines IDA / 56530 Institutional Strengthening and Post Direct Selection Direct 95,000.00 0.00 Canceled 2016-11-30 2016-12-10 2017-02-13 2017-08-12 constructed under ERT II Impacts Monitoring restructuring, intensification of Off-grid Energy Access the 9 lines and agricultural farms UG-REA-14921-CS-CDS / On-grid Energy Access Consultancy Services for update Contingency of EIA and RAPs for Fast track IDA / 56530 Institutional Strengthening and Post Direct Selection Direct 75,000.00 0.00 Canceled 2016-11-30 2017-06-30 2016-12-10 2017-02-13 2017-08-12 Lot 2 (Ruhumba-Kashwa with tee- Impacts Monitoring off Rwebishuri) Off-grid Energy Access On-grid Energy Access UG-MEMD-7457-CS-CDS / Contingency Contract for Coordination IDA / 56530 Institutional Strengthening and Prior Direct Selection Direct 297,000.00 0.00 Canceled 2017-02-16 2017-02-26 2017-05-02 2018-06-30 Manager-ERT III(2 Years) Impacts Monitoring Off-grid Energy Access Page 5 On-grid Energy Access UG-MEMD-7460-CS-CDS / Contingency Contract for Project Accountant IDA / 56530 Institutional Strengthening and Prior Direct Selection Direct 198,000.00 0.00 Canceled 2017-02-16 2017-02-26 2017-05-02 2018-06-30 -ERT III &ESDP(2 Years) Impacts Monitoring Off-grid Energy Access UG-MEMD-7468-CS-INDV / On-grid Energy Access Consultancy Services for Contingency Environmental Audit of the Solar IDA / 56530 Institutional Strengthening and Prior Direct Selection Direct 65,000.00 0.00 Canceled 2017-05-05 2017-05-10 2017-07-14 2018-01-10 PV Energy Packages UNDER Impacts Monitoring ERT-II Off-grid Energy Access On-grid Energy Access UG-MEMD-7868-CS-INDV / Contingency Individual Consultant Investment short-term IDA / 56530 Institutional Strengthening and Post Open 36,000.00 0.00 Canceled 2016-09-30 2017-04-04 2017-04-25 2017-05-30 2017-11-26 Selection consultant (6 months)-UECCC Impacts Monitoring Off-grid Energy Access Contingency On-grid Energy Access UG-REA-8888-CS-INDV / Individual Consultant Under IDA / 56530 Off-grid Energy Access Post Open 80,925.00 0.00 2017-10-02 2017-08-17 2018-01-08 2018-04-05 2018-05-10 2020-05-11 Wayleaves Officer Selection Implementation Institutional Strengthening and Impacts Monitoring Contingency On-grid Energy Access UG-REA-29005-CS-INDV / Individual Consultant Under IDA / 56530 Off-grid Energy Access Post Open 80,295.00 0.00 2017-10-02 2018-01-08 2018-04-05 2018-05-10 2020-05-11 Wayleaves Officer (01) Selection Implementation Institutional Strengthening and Impacts Monitoring Contingency On-grid Energy Access UG-REA-29654-CS-INDV / Individual Consultant Under IDA / 56530 Off-grid Energy Access Post Open 80,925.00 0.00 2017-10-02 2018-01-01 2018-04-05 2018-05-10 2020-05-11 Wayleaves Officer Selection Implementation Institutional Strengthening and Impacts Monitoring Contingency On-grid Energy Access UG-REA-29624-CS-INDV / Individual Consultant Under IDA / 56530 Off-grid Energy Access Post Open 80,925.00 0.00 2017-10-02 2018-01-08 2018-04-05 2018-05-10 2020-05-11 Wayleaves Officer Selection Implementation Institutional Strengthening and Impacts Monitoring UG-MEMD-29492-CS-CDS / Tendering and Evaluation Support for the Supply, Installation, Commissioning and Maintenance of Solar Energy Packages For IDA / 56530 Off-grid Energy Access Post Direct Selection Direct 20,977.00 20,977.00 Signed 2017-09-29 2017-09-28 2017-10-09 2018-04-04 2017-12-13 2017-11-09 2018-06-11 Ministry of Education and Sports under the Energy for Rural Transformation Phase 3 Project (ERT III) On-grid Energy Access UG-REA-14914-CS-INDV / Contingency Individual Consultant Training Consultant to train 30 IDA / 56530 Institutional Strengthening and Post Open 23,940.00 0.00 Canceled 2017-06-16 2017-07-26 2017-08-30 2017-09-11 2018-05-02 Selection Inspector Staff in ISO 17020 Impacts Monitoring Off-grid Energy Access UG-REA-18269-CS-CDS / On-grid Energy Access Consultancy Services for update Contingency of EIA and RAPs for fast track IDA / 56530 Institutional Strengthening and Prior Direct Selection Direct 80,000.00 0.00 Canceled 2017-06-19 2017-07-06 2017-11-13 2018-02-20 Lot 1(Kiganda - Mile 16 with tee - Impacts Monitoring off Katabalanga &Kibyamirizi) Off-grid Energy Access UG-REA-40445-CS-CDS / Consultancy Services for Review Contingency and Update of the Resettlement On-grid Energy Access Action Plans (RAPs) for Fast Pending IDA / 56530 Off-grid Energy Access Prior Direct Selection Direct 127,439.00 0.00 2016-11-30 2017-08-03 2017-10-19 2018-02-05 Track Lot 1 Kiganda Mile 16 Implementation Institutional Strengthening and and Fast Track Lot 2- Ruhumba Impacts Monitoring Kashwa with tee off to Rwebushuri projects Contingency UG-REA-59054-CS-INDV / On-grid Energy Access Individual Consultant Under Senior Project Engineer - short IDA / 56530 Off-grid Energy Access Post Open 72,000.00 0.00 2018-04-24 2018-06-11 2018-06-27 2018-07-31 2019-07-31 Selection Implementation term consultant Institutional Strengthening and Impacts Monitoring Contingency UG-REA-59036-CS-INDV / On-grid Energy Access Individual Consultant Under Senior Project Engineer - short IDA / 56530 Off-grid Energy Access Post Open 72,000.00 0.00 2018-04-24 2018-06-11 2018-06-27 2018-07-31 2019-07-31 Selection Implementation term consultant Institutional Strengthening and Impacts Monitoring Contingency UG-REA-59070-CS-INDV / On-grid Energy Access Individual Consultant Under Senior Project Engineer - short IDA / 56530 Off-grid Energy Access Post Open 72,000.00 0.00 2018-04-26 2018-06-11 2018-06-27 2018-07-31 2019-07-31 Selection Implementation term consultant Institutional Strengthening and Impacts Monitoring Contingency UG-REA-59081-CS-INDV / On-grid Energy Access Individual Consultant Under Senior Project Engineer - short IDA / 56530 Off-grid Energy Access Post Open 72,000.00 0.00 2018-04-16 2018-05-30 2018-06-29 2018-07-19 2019-07-19 Selection Implementation term consultant Institutional Strengthening and Impacts Monitoring UG-REA-8806-CS-CQS / Procurement of a Consultant to determine baseline status and Contingency develop a strategy to strengthen On-grid Energy Access Individual Consultant Under the national Quality Assurance IDA / 56530 Off-grid Energy Access Post Open 118,000.00 0.00 2018-07-03 2018-10-30 2018-11-20 2018-12-18 2020-01-17 Selection Implementation framework for Solar Home Institutional Strengthening and Systems (SHS), Pico-Solar Impacts Monitoring products and individual solar PV components in Uganda UG-REA-14700-CS-CDS / Contingency Consultancy Services for EIA for On-grid Energy Access Under Fast Track Lot 3 (Wandi-Yumbe- IDA / 56530 Off-grid Energy Access Post Direct Selection Direct 180,000.00 0.00 2015-05-20 2015-07-27 2016-03-30 2017-02-20 Implementation Moyo) and Fast Track Lot 4 Institutional Strengthening and (Onduparika-Odramachu-Abiria). Impacts Monitoring Page 6 UG-MEMD-65578-CS-CDS / Procurement of consultancy Services for the Coordination Institutional Strengthening and Pending IDA / 56530 Prior Direct Selection Direct 152,207.80 0.00 2018-06-11 2018-06-21 2018-06-30 2018-12-27 Manager -Energy for Rural Impacts Monitoring Implementation Transformation Phase III for a period of two years. On-grid Energy Access UG-REA-46700-CS-INDV / Contingency Individual Consultant Senior Project Management IDA / 56530 Institutional Strengthening and Prior Open 364,320.00 0.00 Canceled 2018-02-06 2018-02-06 2018-05-29 2018-07-20 2018-09-05 2022-09-05 Selection Advisor Impacts Monitoring Off-grid Energy Access Contingency On-grid Energy Access UG-REA-66944-CS-INDV / Individual Consultant Pending IDA / 56530 Off-grid Energy Access Prior Open 364,320.00 0.00 2018-06-25 2018-12-08 2019-01-07 2019-02-16 2021-02-15 Project Management Advisor Selection Implementation Institutional Strengthening and Impacts Monitoring UG-REA-59142-CS-CDS / Addendum for Procurement of an On-grid Energy Access Independent Verification Agent Contingency (IVA) for the Rural Electricity IDA / 56530 Institutional Strengthening and Prior Direct Selection Direct 588,420.00 0.00 Canceled 2018-04-16 2018-05-04 2018-06-11 2019-03-08 Household Connections under Impacts Monitoring OBA Project for Umeme Off-grid Energy Access connections and other service providers Page 7