PROCUREMENT PLAN (Textual Part) Project information: Burkina Faso Local Government Support Project - P162742 Project Implementation agency: Unité de Coordination du Programme d’Appui aux Collectivités Territoriales Date of the Procurement Plan: 23 September 2017 Period covered by this Procurement Plan: 13 September to 31 December 2017 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in LOI N° 039-2016/AN portant règlementation générale de la commande publique, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable Works: is not applicable PROCUREMENT Burkina Faso : Local Government Support Project PLAN General Information Country: Burkina Faso Bank’s Approval Date of the Original Procurement Plan: 2017-10-19 2019-09-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P120517 GPN Date: Project Name: Local Government Support Project Loan / Credit No: IDA / H7360, IDA / D2240 Executing Agency(ies): Unite de Coordination du Programme d Appui aux Collectivites Territoriales WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PACT-56415-CW-RFQ / Travaux d'aménagement des locaux des bureaux de Component 4: Project Single Stage - One IDA / D2240 A posteriori Demande de prix Limited 121,540.00 22,822.20 Signé 2018-06-14 2018-08-16 2018-10-15 SP/AMBF, de l'UCP/PACT, management and evaluation Envelope pavage et construction de trois boxes métalliques BF-PACT-100427-CW-RFQ / Travaux d'aménagement des Component 3 - Improving locaux AMBF régionales accountability linkages Single Stage - One En attente IDA / D2240 A posteriori Demande de prix Limited 94,000.00 0.00 2019-06-30 2019-09-02 2019-10-02 (bureaux de SP/AMBF et between local level policy Envelope d'exécution UG Composante et de makers and citizens l'UCP/PACT GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PACT-29596-GO-RFB / Component 4: Project Single Stage - One Matériel informatique et péri- IDA / H7360 A posteriori Appel d'offres Open - National 100,000.00 76,767.38 Signé 2017-11-15 2017-11-20 2017-12-20 2017-12-31 2018-01-24 2018-03-25 management and evaluation Envelope informatique BF-PACT-29716-GO-RFQ / Component 4: Project Single Stage - One Fournitures de bureau, de IDA / H7360 A posteriori Demande de prix Limited 10,000.00 41,700.25 Signé 2017-11-20 2017-12-29 2018-01-29 management and evaluation Envelope consommables informatiques BF-PACT-29722-GO-RFQ / Component 4: Project Single Stage - One Matériel et mobilier de IDA / H7360 A posteriori Demande de prix Limited 25,000.00 79,274.32 Signé 2017-11-20 2017-12-21 2018-01-21 management and evaluation Envelope bureau BF-PACT-29717-GO-RFB / Component 4: Project Single Stage - One IDA / H7360 A posteriori Appel d'offres Open - National 300,000.00 229,035.44 Achevé 2017-11-15 2017-11-20 2017-12-20 2017-12-27 2018-01-24 2018-04-24 Matériel roulant management and evaluation Envelope BF-PACT-29723-GO-DIR / Passation de Component 4: Project Fourniture de services IDA / H7360 A posteriori marché de gré à Direct 300,000.00 24,966.00 Signé 2018-01-15 2018-01-29 2018-02-19 2018-02-26 management and evaluation d’assurance gré BF-PACT-56330-GO-RFQ / Component 3 - Improving Acquisition de mobiliers de accountability linkages Single Stage - One IDA / D2240 A posteriori Demande de prix Limited 19,000.00 0.00 Annulé 2018-06-20 2018-08-22 2018-09-21 bureau pour le compte de between local level policy Envelope l’AMBF et de l’UCP/PACT makers and citizens Page 1 BF-PACT-56307-GO-RFQ / Edition de divers documents Component 1 - Establishing pour la DGCT, de nouveaux the foundations of robust référentiels de la Single Stage - One IDA / D2240 administrative and fiscal A posteriori Demande de prix Limited 63,000.00 59,650.55 Signé 2018-07-14 2018-09-01 2018-10-16 décentralisation pour le Envelope intergovernmental SP/CONAD et édition de institutions divers documents pour l’UCP/PACT BF-PACT-56351-GO-RFQ / Acquisition de fournitures de Component 4: Project Single Stage - One IDA / D2240 A posteriori Demande de prix Limited 20,000.00 16,509.43 Signé 2018-11-04 2018-12-23 2019-01-22 bureau pour le compte de management and evaluation Envelope l’UCP/PACT BF-PACT-56149-GO-RFQ / Elaboration et diffusion des Component 3 - Improving grilles de performance 2016 accountability linkages Single Stage - One et 2017, Poster Grand IDA / D2240 A posteriori Demande de prix Limited 55,200.00 45,114.04 Signé 2018-12-14 2019-01-25 2019-02-15 between local level policy Envelope format, format A3 et format makers and citizens A4 pour le compte de l'UCP/PACT BF-PACT-58310-GO-RFQ / Component 3 - Improving Acquisition de mobiliers de accountability linkages Single Stage - One En cours bureau, de matériel de froid IDA / D2240 A posteriori Demande de prix Limited 25,000.00 0.00 2018-05-25 2018-07-27 2018-09-25 between local level policy Envelope d'exécution pour le compte de l'AMBF makers and citizens et de l'UCP/PACT BF-PACT-69368-GO-RFB / Component 3 - Improving Acquisition de quatre accountability linkages Single Stage - One véhicules tout terrain pour IDA / D2240 A posteriori Appel d'offres Open - National 203,000.00 138,158.89 Signé 2018-09-05 2018-09-15 2018-10-15 2018-11-14 2018-12-19 2019-03-19 between local level policy Envelope le compte de composantes du makers and citizens projet BF-PACT-69399-GO-RFB / Component 1 - Establishing Acquisition de matériels the foundations of robust informatiques péri- Single Stage - One IDA / D2240 administrative and fiscal A posteriori Appel d'offres Open - National 125,807.00 116,441.21 Signé 2018-09-15 2018-09-30 2018-10-30 2018-11-29 2019-02-07 2019-05-08 informatiques et d'un Envelope intergovernmental serveur pour le compte des institutions composantes du PACT BF-PACT-100430-GO-RFQ / Impression des grilles de Component 3 - Improving performance 2018 Poster accountability linkages Single Stage - One En attente grand format, Poster format IDA / D2240 A posteriori Demande de prix Limited 40,000.00 0.00 2019-06-16 2019-08-20 2019-09-19 between local level policy Envelope d'exécution A3 et Poster format A4 pour makers and citizens le compte des Approches Novatrices BF-PACT-100436-GO-RFQ / Component 1 - Establishing Edition de divers documents the foundations of robust pour la DGCT et Edition et Single Stage - One En attente IDA / D2240 administrative and fiscal A posteriori Demande de prix Limited 29,000.00 0.00 2019-07-15 2019-09-13 2019-11-12 diffusion du plan NRC-AD Envelope d'exécution intergovernmental pour le compte de la institutions DGESS/MATD Component 1 - Establishing BF-PACT-100489-GO-RFQ / the foundations of robust Acquisition de fournitures de Single Stage - One IDA / D2240 administrative and fiscal A posteriori Demande de prix Limited 5,500.00 9,030.00 Achevé 2019-05-25 2019-08-03 2019-09-02 bureau pour le compte de Envelope intergovernmental DGI/MINEFID institutions BF-PACT-100412-GO-RFQ / Component 1 - Establishing Acquisition de matériels the foundations of robust informatiques et péri- Single Stage - One IDA / D2240 administrative and fiscal A posteriori Demande de prix Limited 65,000.00 59,802.60 Signé 2019-04-30 2019-06-26 2019-09-24 informatiques et d'un Envelope intergovernmental serveur pour le compte des institutions composantes du PACT Page 2 BF-PACT-100219-GO-RFB / Acquisition d'équipements Component 3 - Improving divers pour le compte de accountability linkages Single Stage - One En cours l'AMBF et de l'UCP/PACT ( IDA / D2240 A posteriori Appel d'offres Open - National 203,000.00 0.00 2019-04-01 2019-04-11 2019-05-11 2019-06-10 2019-07-16 2019-10-14 between local level policy Envelope d'exécution copieurs et accessoires, makers and citizens calculatrices et mobiliers de bureau) Component 1 - Establishing BF-PACT-100484-GO-RFQ / the foundations of robust Acquisition d'un véhicule Single Stage - One IDA / D2240 administrative and fiscal A posteriori Demande de prix Limited 40,000.00 48,161.86 Achevé 2019-07-15 2019-09-17 2019-11-16 pour le compte de la Envelope intergovernmental DGI/MINEFID institutions Component 1 - Establishing BF-PACT-104095-GO-RFQ / the foundations of robust Acquisition de dix (10) Single Stage - One IDA / D2240 administrative and fiscal A posteriori Demande de prix Limited 36,000.00 34,934.25 Achevé 2019-06-30 2019-09-08 2019-11-07 motos pour le compte de la Envelope intergovernmental DGI/MINEFID institutions NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PACT-56336-NC-DIR / Passation de Acquisition Tom 2 PRO et Component 4: Project IDA / D2240 A posteriori marché de gré à Direct 40,000.00 7,064.20 Achevé 2018-04-15 2018-04-30 2018-07-04 2018-09-02 migration et acquisition d’un management and evaluation gré logiciel de paie BF-PACT-100475-NC-RFQ / Recrutement d’une société de Component 4: Project Single Stage - One IDA / D2240 A posteriori Demande de prix Limited 9,600.00 8,136.39 Signé 2019-06-30 2019-09-10 2020-09-09 nettoyage pour les locaux management and evaluation Envelope du PACT BF-PACT-100433-NC-DIR / Fourniture de service Component 4: Project Single Stage - One IDA / D2240 A posteriori Demande de prix Limited 28,000.00 20,900.28 Signé 2019-04-30 2019-07-09 2020-07-08 d’assurance au profit du management and evaluation Envelope personnel du PACT BF-PACT-100456-NC-DIR / Recrutement d'un consultant Component 4: Project Single Stage - One IDA / D2240 A posteriori Demande de prix Limited 1,700.00 0.00 Annulé 2019-05-14 2019-07-23 2020-07-22 pour le suivi et hébergement management and evaluation Envelope du site web du PACT CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PACT-29760-CS-QCBS / Sélection fondée Component 4: Project Audit financier et comptable IDA / H7360 A posteriori sur la qualité et Open - National 90,000.00 17,546.46 Signé 2018-03-10 2018-03-15 2018-04-03 2018-05-08 2018-05-13 2018-06-04 2018-06-28 2019-03-01 management and evaluation de trois exercices le coût BF-PACT-29763-CS-QCBS / Sélection fondée Audit des marchés des Component 4: Project IDA / H7360 A posteriori sur la qualité et Open - National 150,000.00 264,083.13 Signé 2018-01-10 2018-01-15 2018-02-06 2018-03-15 2018-03-22 2018-04-15 2018-05-13 2018-06-27 communes pour cinq management and evaluation le coût exercices BF-PACT-29746-CS-CQS / Component 3 - Improving Sélection fondée Mise en œuvre de la accountability linkages Open - IDA / H7360 A priori sur la qualité et 1,000,000.00 136,734.33 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-30 2019-04-30 composante C région du between local level policy International le coût Plateau Central makers and citizens Page 3 BF-PACT-29732-CS-CQS / Component 3 - Improving Sélection fondée Mise en œuvre de la accountability linkages Open - IDA / H7360 A priori sur la qualité et 1,000,000.00 116,160.69 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-30 2019-04-30 composante C région du between local level policy International le coût Centre makers and citizens BF-PACT-29749-CS-CQS / Component 3 - Improving Sélection fondée Mise en œuvre de la accountability linkages Open - IDA / H7360 A priori sur la qualité et 1,000,000.00 133,427.67 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-30 2019-04-30 composante C région du between local level policy International le coût Centre Est makers and citizens BF-PACT-29734-CS-CQS / Component 3 - Improving Sélection fondée Mise en œuvre de la accountability linkages Open - IDA / H7360 A priori sur la qualité et 1,000,000.00 115,975.59 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-30 2019-04-30 composante C du Centre between local level policy International le coût Ouest makers and citizens BF-PACT-29728-CS-CQS / Component 3 - Improving Sélection fondée Mise en œuvre de la accountability linkages Open - IDA / H7360 A priori sur la qualité et 1,000,000.00 174,459.94 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-29 2019-04-29 composante C région du Sud- between local level policy International le coût Ouest makers and citizens BF-PACT-29726-CS-CQS / Component 3 - Improving Sélection fondée Mise en œuvre de la accountability linkages Open - IDA / H7360 A priori sur la qualité et 1,000,000.00 175,544.75 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-30 2019-04-30 composante C région des between local level policy International le coût Hauts-Bassins makers and citizens Component 3 - Improving BF-PACT-29736-CS-CQS / Sélection fondée accountability linkages Open - Mise en œuvre de la IDA / H7360 A priori sur la qualité et 1,000,000.00 142,548.98 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-30 2019-04-30 between local level policy International composante C région de l’Est le coût makers and citizens BF-PACT-29729-CS-CQS / Component 3 - Improving Sélection fondée Mise en œuvre de la accountability linkages Open - IDA / H7360 A priori sur la qualité et 1,000,000.00 200,144.95 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-30 2019-04-30 composante C région du between local level policy International le coût Sahel makers and citizens BF-PACT-29730-CS-CQS / Component 3 - Improving Sélection fondée Mise en œuvre de la accountability linkages Open - IDA / H7360 A priori sur la qualité et 1,000,000.00 132,933.98 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-30 2019-04-30 composante C région du between local level policy International le coût Boucle du Mouhoun makers and citizens BF-PACT-29747-CS-CQS / Component 3 - Improving Sélection fondée Mise en œuvre de la accountability linkages Open - IDA / H7360 A priori sur la qualité et 1,000,000.00 159,035.61 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-30 2019-04-30 composante C région du between local level policy International le coût Centre Sud makers and citizens BF-PACT-29737-CS-CQS / Component 3 - Improving Sélection fondée Mise en œuvre de la accountability linkages Open - IDA / H7360 A priori sur la qualité et 1,000,000.00 173,286.85 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-30 2019-04-30 composante C région du between local level policy International le coût Centre Nord makers and citizens BF-PACT-29743-CS-CQS / Component 3 - Improving Sélection fondée Mise en œuvre de la accountability linkages Open - IDA / H7360 A priori sur la qualité et 1,000,000.00 164,481.06 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-30 2019-04-30 composante C région des between local level policy International le coût Cascades makers and citizens BF-PACT-29745-CS-CQS / Component 3 - Improving Sélection fondée Mise en œuvre de la accountability linkages Open - IDA / H7360 A priori sur la qualité et 1,000,000.00 178,266.78 Signé 2017-11-20 2017-12-04 2018-01-03 2018-02-02 2018-02-16 2018-04-01 2018-04-30 2019-04-30 composante C région du between local level policy International le coût Nord makers and citizens BF-PACT-56343-CS-QCBS / Component 1 - Establishing Etude sur les potentialités the foundations of robust Sélection fondée financières non fiscales des IDA / D2240 administrative and fiscal A posteriori sur la qualité et Open - National 40,000.00 0.00 Annulé 2018-06-30 2018-07-21 2018-08-19 2018-09-16 2018-10-16 2018-11-20 2018-12-25 2019-03-25 Collectivités Locales intergovernmental le coût (DGTCP) institutions Page 4 BF-PACT-56393-CS-QCBS / Audit organisationnel et Component 1 - Establishing fonctionnel de la DGCT en the foundations of robust Sélection fondée En cours lien avec les nouveaux IDA / D2240 administrative and fiscal A posteriori sur la qualité et Open - National 40,000.00 0.00 2018-07-05 2018-07-26 2018-09-08 2018-10-06 2018-11-05 2018-12-10 2019-01-14 2019-04-14 d'exécution référentiels de la intergovernmental le coût décentralisation assorti d'un institutions plan stratégique BF-PACT-56378-CS-QCBS / Etude pour la collecte de Component 3 - Improving Sélection fondée données et suivi externe de accountability linkages En cours IDA / D2240 A posteriori sur la qualité et Open - National 124,000.00 0.00 2018-09-30 2018-10-21 2018-12-04 2019-01-01 2019-01-31 2019-03-07 2019-04-11 2019-10-08 l’approche organisation between local level policy d'exécution le coût communautaire de base makers and citizens (OCB) BF-PACT-56367-CS-QCBS / Component 3 - Improving Sélection fondée Recrutement d'un organisme accountability linkages IDA / D2240 A posteriori sur la qualité et Open - National 436,410.00 375,950.34 Signé 2018-04-30 2018-05-21 2018-07-04 2018-08-03 2018-09-02 2018-10-07 2018-11-11 2019-11-11 pour la mise en œuvre de between local level policy le coût la sous composante C.4 makers and citizens BF-PACT-56180-CS-CQS / Sélection fondée Recrutement d’un cabinet de Component 4: Project sur les recrutement du personnel IDA / D2240 A posteriori Open - National 10,000.00 0.00 Annulé 2018-04-10 2018-04-24 2018-05-22 2018-06-05 2018-07-10 2018-07-25 management and evaluation qualifications des complémentaire de consultants l’UCP/PACT BF-PACT-56155-CS-CQS / Sélection fondée Recrutement d'un consultant Component 4: Project sur les pour la collecte de données IDA / D2240 A posteriori Open - National 80,170.00 0.00 Annulé 2018-06-06 2018-06-20 2018-08-03 2018-08-17 2018-09-21 2018-11-20 management and evaluation qualifications des finales au niveau citoyen consultants dans la région du Sahel BF-PACT-100444-CS-CQS / Etablissement d’une situation Component 1 - Establishing Sélection fondée de référence de la fourniture the foundations of robust sur les des services publics locaux IDA / D2240 administrative and fiscal A posteriori Open - National 25,000.00 0.00 Annulé 2019-04-19 2019-05-10 2019-06-23 2019-07-23 2019-09-05 2019-11-04 qualifications des dans des CT et élaboration intergovernmental consultants des normes et standards de institutions qualité BF-PACT-100442-CS-CQS / Component 1 - Establishing Sélection fondée Elaboration d’un répertoire the foundations of robust sur les des services publics locaux IDA / D2240 administrative and fiscal A posteriori Open - National 25,000.00 0.00 Annulé 2019-04-19 2019-05-10 2019-06-23 2019-07-23 2019-08-27 2019-10-26 qualifications des essentiels à fournir aux intergovernmental consultants populations institutions BF-PACT-100486-CS-CQS / Component 1 - Establishing Sélection fondée Elaboration d’un répertoire the foundations of robust sur les des normes et standards IDA / D2240 administrative and fiscal A posteriori Open - National 25,000.00 0.00 Annulé 2019-04-19 2019-05-10 2019-06-23 2019-07-23 2019-08-27 2019-10-26 qualifications des d’accessibilité géographique intergovernmental consultants des SPL institutions Component 1 - Establishing BF-PACT-100445-CS-CQS / Sélection fondée the foundations of robust Elaboration d’un guide sur sur les IDA / D2240 administrative and fiscal A posteriori Open - National 13,000.00 0.00 Annulé 2019-06-01 2019-06-22 2019-08-05 2019-09-04 2019-10-09 2020-01-07 l'obligation redditionnelle qualifications des intergovernmental pour le compte de la DGCT consultants institutions BF-PACT-100480-CS-CQS / Sélection fondée Réalisation d’un film Component 4: Project sur les En cours IDA / D2240 A posteriori Open - National 40,000.00 0.00 2019-09-10 2019-10-01 2019-11-14 2019-12-14 2020-01-18 2020-03-18 documentaire de 26 mn pour management and evaluation qualifications des d'exécution le compte de l’UCP/PACT consultants BF-PACT-134178-CS-CQS / Component 1 - Establishing Sélection fondée Élaboration d'un guide the foundations of robust sur les En attente d'exercice de la redevabilité IDA / D2240 administrative and fiscal A posteriori Open - National 15,000.00 0.00 2019-10-14 2019-11-04 2019-12-18 2020-01-17 2020-02-28 2020-04-28 qualifications des d'exécution au profit des collectivités intergovernmental consultants territoriales institutions Page 5 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PACT-29766-CS-INDV / Relecture, suivi et Component 4: Project IDA / H7360 A posteriori Individuel Limited 5,000.00 4,802.71 Signé 2017-11-05 2017-11-10 2017-11-20 2017-12-14 2018-01-14 hébergement du site web du management and evaluation PACT BF-PACT-29770-CS-INDV / Component 4: Project Elaboration d’une base de IDA / H7360 A posteriori Individuel Limited 5,000.00 4,364.45 Signé 2017-10-20 2017-10-25 2017-11-05 2017-11-27 2017-12-27 management and evaluation données BF-PACT-29815-CS-INDV / Audits municipaux et Component 2 - Assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 55,000.00 22,634.16 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 11 local development communes BF-PACT-29816-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 38,895.89 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 1) BF-PACT-29789-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 37,429.71 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 2) BF-PACT-29790-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 38,133.48 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 3) BF-PACT-29779-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 40,344.23 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 4) BF-PACT-29817-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 38,344.24 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 5) BF-PACT-29795-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 38,753.13 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 6) BF-PACT-29799-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 37,747.70 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 7) Page 6 BF-PACT-29787-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 38,346.28 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 8) BF-PACT-29791-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 40,334.67 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 9) BF-PACT-29809-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 37,429.71 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 10) BF-PACT-29793-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 38,075.89 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 11) BF-PACT-29797-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 40,025.77 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 12) BF-PACT-29796-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 39,852.29 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 13) BF-PACT-29813-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 38,888.86 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 14) BF-PACT-29792-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 38,346.09 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 15) BF-PACT-29785-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 38,378.15 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 16) BF-PACT-29802-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 38,291.59 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 17) Page 7 BF-PACT-29788-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 39,681.98 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 18) BF-PACT-29804-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 44,054.48 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 19) BF-PACT-29805-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 37,492.56 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 20) BF-PACT-29818-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 41,890.56 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 21) BF-PACT-29812-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 22,574.64 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 22) BF-PACT-29806-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 22,530.77 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 23) BF-PACT-29798-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 22,310.52 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 24) BF-PACT-29814-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 22,573.70 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 25) BF-PACT-29808-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 22,187.27 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 26) BF-PACT-29781-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 22,152.79 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 27) Page 8 BF-PACT-29807-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 22,153.18 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 28) BF-PACT-29794-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 22,585.63 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 29) BF-PACT-29753-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 23,293.57 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 30) BF-PACT-29786-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 20,624.60 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 31) BF-PACT-29800-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 20,722.77 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 32) BF-PACT-29811-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 23,293.95 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 33) BF-PACT-29801-CS-INDV / Audits municipaux et Component 2 - assistance à l’élaboration des Strengthening capacity of IDA / H7360 A posteriori Individuel Limited 50,000.00 23,158.71 Achevé 2017-11-25 2017-11-30 2017-12-14 2018-01-28 2018-03-14 Plans de Développements municipalities to manage Institutionnels (PDI) de 10 local development communes (groupe 34) Component 3 - Improving BF-PACT-29819-CS-CDS / Sélection de accountability linkages Collecte de données finales IDA / H7360 A posteriori consultants par Direct - National 153,507.00 0.00 Annulé 2017-09-18 2017-10-11 2017-10-30 2018-01-28 between local level policy du Projet au niveau citoyen entente directe makers and citizens BF-PACT-56421-CS-INDV / Consultant pour la formation Component 1 - Establishing des membres de la the foundations of robust gouvernance administrative IDA / D2240 administrative and fiscal A posteriori Individuel Limited 40,000.00 0.00 Annulé 2018-05-30 2018-06-04 2018-06-25 2018-07-30 2018-08-29 et locale et les membres des intergovernmental GTS (MATD & MINEFID) institutions en planification et suivi évaluation BF-PACT-56340-CS-INDV / Consultant pour la formation Component 1 - Establishing des membres du réseau sur the foundations of robust les politiques de IDA / D2240 administrative and fiscal A posteriori Individuel Limited 14,560.00 0.00 Annulé 2018-05-20 2018-06-04 2018-07-04 2018-08-08 2018-08-23 décentralisation et les intergovernmental problèmes émergents institutions (RPDDL) Page 9 BF-PACT-56153-CS-INDV / Component 1 - Establishing Conception d’un logiciel de the foundations of robust gestion des effectifs des IDA / D2240 administrative and fiscal A posteriori Individuel Limited 12,000.00 11,043.88 Signé 2018-06-01 2018-06-15 2018-07-06 2018-08-10 2018-10-09 collectivités territoriales intergovernmental (DGFPT) institutions Component 1 - Establishing BF-PACT-56326-CS-INDV / the foundations of robust Elaboration d’une base de IDA / D2240 administrative and fiscal A posteriori Individuel Limited 40,000.00 34,281.20 Signé 2018-06-01 2018-06-15 2018-07-15 2018-08-19 2018-10-18 données pour le SNSE (SP intergovernmental CONAD) institutions BF-PACT-56160-CS-INDV / Elaboration d’une base de données géo référencé Component 4: Project IDA / D2240 A posteriori Individuel Limited 12,000.00 12,070.45 Signé 2018-05-10 2018-05-24 2018-06-14 2018-07-19 2018-09-02 couplée avec un logiciel de management and evaluation cartographie et formation des utilisateurs (UCP/PACT) BF-PACT-56174-CS-INDV / Component 2 - Elaboration du Plan de Strengthening capacity of Développement IDA / D2240 A posteriori Individuel Limited 65,000.00 48,435.36 Signé 2018-05-15 2018-05-29 2018-06-19 2018-07-24 2018-10-22 municipalities to manage Institutionnels de treize local development régions du Burkina BF-PACT-69397-CS-CDS / Recrutement d’un bureau Sélection de Component 4: Project d’étude pour la collecte de IDA / D2240 A priori consultants par Direct 578,933.00 0.00 Annulé 2018-09-15 2018-10-30 2019-01-28 2019-08-26 management and evaluation données finales au niveau entente directe citoyen BF-PACT-77154-CS-INDV / Recrutement d'un chef de Component 3 - Improving projet pour le compte de accountability linkages IDA / D2240 A posteriori Individuel Open 30,346.00 2,166.24 Signé 2018-09-10 2018-10-29 2018-11-19 2018-12-24 2019-12-19 l'Association des between local level policy Municipalités du Burkina makers and citizens Faso (AMBF) BF-PACT-77415-CS-INDV / Recrutement d'un Component 3 - Improving gestionnaire financier pour le accountability linkages IDA / D2240 A posteriori Individuel Open 23,076.00 1,561.96 Signé 2018-09-10 2018-10-29 2018-11-19 2018-12-24 2019-12-19 compte de l'Association des between local level policy Municipalités du Burkina makers and citizens (AMBF) BF-PACT-77418-CS-INDV / Recrutement d'un Spécialiste Component 3 - Improving en suivi évaluation pour le accountability linkages IDA / D2240 A posteriori Individuel Open 22,076.00 1,561.96 Signé 2018-09-10 2018-10-29 2018-11-19 2018-12-24 2019-12-19 compte de l'Association des between local level policy Municipalités du Burkina makers and citizens (AMBF) BF-PACT-72263-CS-CDS / Consultant pour la formation des utilisateurs (comptables Sélection de PACT et autres projets) sur Component 4: Project IDA / D2240 A posteriori consultants par Direct 59,000.00 51,799.35 Signé 2018-10-15 2018-11-19 2019-01-23 2019-02-22 la version 2 du logiciel de management and evaluation entente directe gestion financière et comptable TomAcquisition Tom 2 PRO BF-PACT-91274-CS-CDS / Sélection de Étude pour la collecte de Component 4: Project IDA / H7360 A posteriori consultants par Direct 578,933.00 481,231.78 Signé 2018-12-15 2019-01-19 2019-03-25 2019-09-21 données finales au niveau management and evaluation entente directe citoyen BF-PACT-110843-CS-INDV / Component 1 - Establishing Elaboration d’un répertoire the foundations of robust des services publics locaux IDA / D2240 administrative and fiscal A posteriori Individuel Limited 25,000.00 0.00 Annulé 2019-08-20 2019-08-25 2019-09-15 2019-10-20 2019-12-19 essentiels à fournir aux intergovernmental populations institutions Page 10 Component 1 - Establishing BF-PACT-110848-CS-INDV / the foundations of robust Elaboration d’un guide sur IDA / D2240 administrative and fiscal A posteriori Individuel Limited 13,000.00 0.00 Annulé 2019-05-25 2019-05-30 2019-06-20 2019-07-25 2019-10-23 l'obligation redditionnelle intergovernmental pour le compte de la DGCT institutions Component 2 - BF-PACT-110852-CS-INDV / Strengthening capacity of Suivi et hébergement du site IDA / D2240 A posteriori Individuel Limited 1,700.00 1,359.23 Signé 2019-04-30 2019-05-05 2019-05-26 2019-06-30 2020-06-29 municipalities to manage web du PACT local development BF-PACT-110853-CS-INDV / Etablissement d'une situation Component 1 - Establishing de référence de la fourniture the foundations of robust En cours des services publics locaux IDA / D2240 administrative and fiscal A posteriori Individuel Limited 25,000.00 0.00 2019-04-25 2019-04-30 2019-05-21 2019-06-25 2019-09-03 d'exécution dans des CT et élaboration intergovernmental des normes et standards de institutions qualité BF-PACT-112734-CS-INDV / Component 1 - Establishing Elaboration d’un répertoire the foundations of robust En cours des normes et standards IDA / D2240 administrative and fiscal A posteriori Individuel Limited 25,000.00 0.00 2019-05-25 2019-05-30 2019-06-20 2019-07-25 2020-01-21 d'exécution d’accessibilité géographique intergovernmental des SPL institutions BF-PACT-134146-CS-INDV / Recrutement d'une Assistante Component 4: Project En attente IDA / D2240 A posteriori Individuel Limited 8,094.00 0.00 2019-10-07 2019-10-12 2019-11-02 2019-12-07 2020-12-06 à l'Assistantye de direction management and evaluation d'exécution de l'UCP/PACT Page 11