REPUBLIKA HRVATSKA REPUBLIC OF CROATIA PROJEKT Kontrole oneÄ?išćenja okoliÅ¡a Jadranskog mora (I) ASEP Control Project (I) DAROVNICA BROJ TF017706 GRANT NUMBER TF017706 PLAN NABAVE RADOVA I ROBE PROCUREMENT OF WORKS AND GOODS 29. rujna 2016. September 29th 2016 NatjeÄ?ajna NatjeÄ?ajni dokument / Ocjena ponuda / Nabava / Procurement procedura / Bidding Ugovor / Contract Bidding Document Bid Evaluation Procedure Izvoditelj Datum (naziv, objave adresa) / Broj projekta / Project Identification No natjeÄ?aja / Predaja i Contractor Datum slanja Advertise otvaranje Objava (name, NaÄ?in Revizija dokumenta Odobrenj Bid Date Datum Datum Odobrenje Datum ZavrÅ¡etak Predkval ponuda / dodjele address) nabave / svjetske na odobrenje e WB / izdavanja slanja WB / WB ugovara posla / ifikacija / Submittin ugovora / Procurem banke / / Request for WB no- / Issuing izvješća no- nja / Contract Prequali g and Notify for ent WB approval of objection of Bidding / Report objection Contract completion fication Opening Award of Method revision Bidding obtained Document date obtained signed date of the Contract Document Bids 1 4 5 6 7 8 14 15 16 17 18 19 20 21 22 Works on remediation of landfill Sitnica W/1 ICB prior 02/17 03/17 03/17 03/17 06/17 06/17 07/17 08/17 08/17 08/18 with closed leachate system G/1 Equipment for monitoring. ICB prior 03/17 04/17 04/17 04/17 07/17 08/17 08/17 09/17 10/17 02/18 0 U POSTUPKU NABAVE / PROCUREMENT PROCEDURE ONGOING PROVEDBA UGOVORA U TIJEKU / CONTRACT UNDER RUNNING DOVRSENO / FINISHED REPUBLIKA HRVATSKA REPUBLIC OF CROATIA PROJEKT Kontrole oneÄ?išćenja okoliÅ¡a Jadranskog mora (I) ASEP Control Project (I) DAROVNICA BROJ TF017706 GRANT NUMBER TF017706 PLAN NABAVE USLUGA PROCUREMENT OF SERVICES 29. rujna 2016. September 29th 2016 Predkvalifikacija / Prequalification NatjeÄ?ajna procedura / Ocjena ponuda / Bid Nabava / Procurement Projektni zadatak / ToR Ugovor / Contract Iskazivanje interesa / Expression of Kratka lista kvalificiranih Bidding Procedure Evaluation Interest izvoÄ‘aÄ?a / Short List Konzultant (naziv, adresa) / Datum Consultant (name, Predaja i Datum slanja Datum slanja Objava address) Datum otvaranje ZavrÅ¡etak NaÄ?in Revizija Predkvali dokumenta na Odobrenje WB Slanje dostave kvalificirane Odobrenje Datum Odobrenje dodjele Datum objave ponuda / Datum slanja posla / nabave / svjetske fikacija / odobrenje / / WB no- oglasa banci ponude / liste na WB / WB no- izdavanja / WB / WB no- ugovora / ugovaranja oglasa / Submitting izvješća / Contract Procuremen banke / WB Prequalif Request for objection / Sending Submitting odobrenje / objection Issuing of objection Notify for / Contract Advertise and Opening Report date completion t Method revision ication approval of obtained notice to WB of the Request for obtained RFP obtained Award of signed notice date of the date ToR expressions approval of Contract Proposals Short List 4 5 6 8 9 10 11 12 13 15 16 17 18 19 20 21 22 Technical assistance Preparation of the Feasibility study (FS) with Cost-benefit analysis (CBA), employer’s requirements, conceptual JV: SAFEGE design with location permit and Consulting Engineeers, application for EU co-financing of Institut IGH d.d., TA/1-1 remediation Diklo landfill with leachate QCBS prior 19/11/14 18/12/14 19/11/14 20/11/14 02/12/14 18/12/14 29/01/15 30/01/15 09/03/15 15/05/15 01/06/15 12/06/15 03/06/15 07/17 PanGeo Projekt capture and leachate treatment plant d.o.o., SAFEGE (Addendum No. 2. for the preparation d.o.o., of Main Design with Bill of Quantites, in CONSEKO- SAFEGE S.A. preparation, planned amount: 93.841,64 USD) Updating the EIA with public consultation and dissemination process Dvokut ECRO TA/1-2 including control investigation works CQS prior 15/12/14 22/12/14 22/12/14 23/12/14 19/01/15 06/02/15 13/02/16 16/02/15 17/03/15 15/05/15 01/06/15 12/06/15 03/06/15 11/16 ltd. and monitoring for Diklo landfill Preparation of the Strategic Environmental Assessment (SEA) of the Croatia Waste and Leachate Management Plan and Guidelines for JV: SAFEGE preparation of Waste and Leachate Consulting Management Plans Engineeers, TA/2 QCBS prior 28/05/13 17/07/13 22/12/15 09/07/13 26/07/13 02/08/13 12/08/13 19/08/13 07/01/14 25/03/14 26/03/14 02/04/14 31/03/14 10/15 ENVECO S.A.,K ACTIMAR,CER, SAFEGE d.o.o. ASEPC I – Update of Strategic Environmental Assessment of the JV: SAFEGE TA/2-1 Croatia Waste and Leachate SSS prior 05/05/16 19/05/16 19/05/16 24/05/16 25/5/16 2/6/16 8/6/16 03/06/16 03/08/16 SAS and SAFEGE d.o.o. Management Plan Analysis of the environmental measures and EMP for the remediation TA/3-1 CQS post 10/16 10/16 11/16 11/16 12/16 12/16 12/16 01/17 01/17 01/17 02/17 02/17 12/16 10/18 of Landfill Sitnica with assessment of nutrient contribution Predkvalifikacija / Prequalification NatjeÄ?ajna procedura / Ocjena ponuda / Bid Nabava / Procurement Projektni zadatak / ToR Ugovor / Contract Iskazivanje interesa / Expression of Kratka lista kvalificiranih Bidding Procedure Evaluation Interest izvoÄ‘aÄ?a / Short List Konzultant (naziv, adresa) / Datum Consultant (name, Predaja i Datum slanja Datum slanja Objava address) Datum otvaranje ZavrÅ¡etak NaÄ?in Revizija Predkvali dokumenta na Odobrenje WB Slanje dostave kvalificirane Odobrenje Datum Odobrenje dodjele Datum objave ponuda / Datum slanja posla / nabave / svjetske fikacija / odobrenje / / WB no- oglasa banci ponude / liste na WB / WB no- izdavanja / WB / WB no- ugovora / ugovaranja oglasa / Submitting izvješća / Contract Procuremen banke / WB Prequalif Request for objection / Sending Submitting odobrenje / objection Issuing of objection Notify for / Contract Advertise and Opening Report date completion t Method revision ication approval of obtained notice to WB of the Request for obtained RFP obtained Award of signed notice date of the date ToR expressions approval of Contract Proposals Short List 4 5 6 8 9 10 11 12 13 15 16 17 18 19 20 21 22 Preparation of Main Design with Bill of Quantities and TOR for works contract for remediation of landfill Sitnica with closed leachate system (Addendum TA/3-2 No. 1 for the option analysis of leachet SSS prior 04/16 04/16 05/16 05/16 06/16 06/16 08/16 08/16 03/17 management, in preparation, planned amount: 5.865 USD) Supervision Services for remediation of TA/3-3 CQS post 03/17 03/17 04/17 04/17 05/17 05/17 06/17 06/17 06/17 07/17 08/17 08/17 08/17 08/18 landfill Sitnica Preparation of the Feasibility study (FS) with Cost-benefit analysis (CBA) and application for EU co-financing of TA/4 remediation of Karepovac landfill with QCBS/CQ post 04/17 05/17 05/17 05/17 06/17 06/17 06/17 06/17 08/17 08/17 09/17 09/17 09/17 10/18 S leachate capture and leachate treatment Other Studies required for EU review and compliance QCBS/CQ prior / TA/5 S post 02/17 02/17 03/17 04/17 05/17 06/17 07/17 07/17 08/17 09/17 10/17 11/17 12/17 12/18 U POSTUPKU NABAVE / PROCUREMENT PROCEDURE ONGOING PROVEDBA UGOVORA U TIJEKU / CONTRACT UNDER RUNNING DOVRSENO / FINISHED