PROCUREMENT PLAN (Textual Part) Project information: FYR of Macedonia Project Implementation agency: Ministry of Labor and Social Policy Date of the Procurement Plan: October 2018 Period covered by this Procurement Plan: Duration of the Project Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. PROCUREMENT North Macedonia : Social Services Improvement Project PLAN General Information Country: North Macedonia Bank’s Approval Date of the Original Procurement Plan: 2018-10-22 2020-10-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162246 GPN Date: 2018-09-18 Project Name: Social Services Improvement Project Loan / Credit No: / , IBRD / 89020 Executing Agency(ies): Ministry of Labor and Social Policy WORKS Procureme Bid Evaluation Activity Reference No. / Actual Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Contract Description Component Review Type Method Amount Document / Signed Contract No. Approach Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Completion (US$) Justification Type Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MLSP-72220-CW-RFB- 1. Promoting social 134 / Renovation of MLSP, inclusion through improved Single Stage - One SWCs, Municipalities, NEA / Prior Request for Bids Open - National 0.00 Canceled 2019-08-01 2019-08-31 2019-10-05 2019-10-22 2019-10-30 2020-04-27 access to social benefits and Envelope and other institutions services included in the SP system MK-MLSP-96745-CW-RFB- 1. Promoting social Pending Request for Single Stage - One 1313 / Renovation of local IBRD / 89020 inclusion through improved Prior Open - National 0.00 Implementat 2019-02-06 2019-04-03 2019-09-30 Quotations Envelope offices access to social benefits and ion services MK-MLSP-122572-CW-RFB- 2. Expanding the access TRANSFERS-2.1.1 / Civil Single Stage - One IBRD / 89020 to and improving of the Prior Request for Bids Open - National 850,675.56 Signed 2019-07-14 2019-08-01 2019-08-13 2019-09-17 2019-10-04 2019-10-07 2019-12-11 2019-10-29 2020-01-03 2021-02-20 works-Kindergarten in Envelope quality of preschool services Kavadarci MK-MLSP-123252-CW-RFB- 2. Expanding the access TRANSFERS-2.1.1.2 / Civil Single Stage - One IBRD / 89020 to and improving of the Post Request for Bids Open - National 1,071,451.87 Signed 2019-07-19 2019-09-20 2019-08-18 2019-09-22 2019-11-05 2019-10-12 2019-12-10 2019-11-06 2020-01-02 2021-02-28 works-Kindergarten in Envelope quality of preschool services Negotino MK-MLSP-123255-CW-RFB- 2. Expanding the access TRANSFERS-2.1.1.3 / Civil Single Stage - One IBRD / 89020 to and improving of the Post Request for Bids Open - National 934,707.05 Signed 2019-07-21 2019-10-01 2019-08-20 2019-09-24 2019-11-21 2019-10-14 2019-12-10 2019-11-08 2020-01-03 2021-03-02 works-Kindergarten in Envelope quality of preschool services Kocani MK-MLSP-123257-CW-RFB- 2. Expanding the access TRANSFERS-2.1.1.4 / Civil Single Stage - One IBRD / 89020 to and improving of the Post Request for Bids Open - National 698,448.30 Signed 2019-07-25 2019-09-27 2019-08-24 2019-09-28 2019-11-15 2019-10-18 2019-12-09 2019-11-12 2020-01-03 2019-11-15 works-Kindergarten in Kisela Envelope quality of preschool services Voda MK-MLSP-129124-CW-RFQ- 1315 / Renovation of part of 1. Promoting social the Special Institution Demir inclusion through improved Request for Single Stage - One Kapija and part of the IBRD / 89020 Post Open - National 0.00 Canceled 2019-09-15 2019-10-11 2019-12-20 access to social benefits and Quotations Envelope Public Institution for services rehabilitation of children and youth MK-MLSP-142028-CW-RFB- 2. Expanding the access Pending 2.1.1.5 / Civil works- Single Stage - One IBRD / 89020 to and improving of the Post Request for Bids Open - National 0.00 Implementat 2019-10-25 2019-11-14 2019-12-29 2020-01-18 2020-03-06 2021-06-29 Kindergarten in Kriva Envelope quality of preschool services ion Palanka MK-MLSP-142030-CW-RFB- 2. Expanding the access 2.1.1.6 / Civil works- Single Stage - One IBRD / 89020 to and improving of the Post Request for Bids Open - National 1,553,358.14 Signed 2019-10-25 2019-10-31 2019-11-14 2019-12-29 2019-12-17 2020-01-18 2019-12-15 2020-03-06 2020-01-13 2021-06-29 Kindergarten in Gjorce Envelope quality of preschool services Petrov MK-MLSP-142033-CW-RFQ- 2. Expanding the access Request for Single Stage - One 2.1.1.7 / Civil works- IBRD / 89020 to and improving of the Post Open - National 181,276.15 Signed 2019-11-14 2020-02-11 2019-12-17 2020-08-09 Quotations Envelope Kindergarten in Bogovinje quality of preschool services Page 1 MK-MLSP-142036-CW-RFB- 2. Expanding the access Single Stage - One 2.1.1.8 / Civil works- IBRD / 89020 to and improving of the Post Request for Bids Open - National 404,688.09 Signed 2019-10-25 2019-12-13 2019-11-14 2019-12-29 2019-12-16 2020-01-18 2019-12-13 2020-03-06 2020-01-02 2021-06-29 Envelope Kindergarten in Resen quality of preschool services MK-MLSP-142040-CW-RFB- 2. Expanding the access Single Stage - One 2.1.1.9 / Civil works- IBRD / 89020 to and improving of the Post Request for Bids Open - National 1,945,032.97 Signed 2019-10-25 2019-10-29 2019-11-14 2019-12-29 2019-12-13 2020-01-18 2019-12-11 2020-03-06 2020-01-03 2021-06-29 Envelope Kindergarten in Strumica quality of preschool services MK-MLSP-151802-CW-RFB- 2. Expanding the access Pending Single Stage - One 2.1.1.10 / Civil works- IBRD / 89020 to and improving of the Post Request for Bids Open - National 0.00 Implementat 2020-02-10 2020-03-01 2020-03-15 2020-03-22 2020-05-09 2021-10-31 Envelope Kindergarten in Aracinovo quality of preschool services ion MK-MLSP-151803-CW-RFB- 2. Expanding the access Pending Single Stage - One 2.1.1.11 / Civil works- IBRD / 89020 to and improving of the Post Request for Bids Open - National 0.00 Implementat 2020-02-10 2020-03-01 2020-03-15 2020-03-22 2020-05-09 2021-10-31 Envelope Kindergarten in Valandovo quality of preschool services ion MK-MLSP-151804-CW-RFB- 2. Expanding the access Pending Single Stage - One 2.1.1.12 / Civil works- IBRD / 89020 to and improving of the Post Request for Bids Open - National 0.00 Implementat 2020-02-10 2020-03-01 2020-03-15 2020-03-22 2020-05-09 2021-10-31 Envelope Kindergarten in Karposh 2 quality of preschool services ion MK-MLSP-151805-CW-RFB- 2. Expanding the access Pending Single Stage - One 2.1.1.13 / Civil works- IBRD / 89020 to and improving of the Post Request for Bids Open - National 0.00 Implementat 2020-02-10 2020-03-01 2020-03-15 2020-03-22 2020-05-09 2021-10-31 Envelope Kindergarten in Probistip quality of preschool services ion MK-MLSP-167801-CW-RFQ- 1.3.15 / Renovation of part 1. Promoting social of the Special Institution inclusion through improved Request for Single Stage - One Demir Kapija and part of IBRD / 89020 Post Open - National 240,879.84 Signed 2020-04-11 2020-06-06 2019-11-01 2020-12-03 access to social benefits and Quotations Envelope the Public Institution for services rehabilitation of children and youth MK-MLSP-178969-CW-RFB- 2. Expanding the access Pending Single Stage - One 2.1.1.16 / Civil works- IBRD / 89020 to and improving of the Post Request for Bids Open - National 0.00 Implementat 2020-07-01 2020-07-06 2020-08-17 2020-09-16 2020-10-21 2022-02-13 Envelope Kindergarten in Bitola quality of preschool services ion MK-MLSP-178973-CW-RFB- 2. Expanding the access Pending Single Stage - One 2.1.1.17 / Civil works- IBRD / 89020 to and improving of the Post Request for Bids Open - National 0.00 Implementat 2020-07-01 2020-07-06 2020-08-17 2020-09-16 2020-10-21 2022-02-13 Envelope Kindergarten in Lipkovo quality of preschool services ion MK-MLSP-178976-CW-RFB- 2. Expanding the access Pending Single Stage - One 2.1.1.18 / Civil works- IBRD / 89020 to and improving of the Post Request for Bids Open - National 0.00 Implementat 2020-07-01 2020-07-06 2020-08-17 2020-09-16 2020-10-21 2022-02-13 Envelope Kindergarten in Gostivar quality of preschool services ion MK-MLSP-178979-CW-RFB- 2. Expanding the access Pending Single Stage - One 2.1.1.19 / Civil works- IBRD / 89020 to and improving of the Post Request for Bids Open - National 0.00 Implementat 2020-07-01 2020-07-06 2020-08-17 2020-09-16 2020-10-21 2022-02-13 Envelope Kindergarten in Karposh 2 quality of preschool services ion GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MLSP-72180-GO-RFB- 131 / Development of an 1. Promoting social Pending integrated social welfare IS inclusion through improved Open - Single Stage - One / Prior Request for Bids 0.00 Implementati 2019-01-15 2019-02-14 2019-03-21 2019-04-07 2019-04-15 2020-04-14 covering both social access to social benefits and International Envelope on assistance benefits and services services MK-MLSP-72182-GO-RFB- 1. Promoting social Pending 132 / Hardware equipment inclusion through improved Single Stage - One / Post Request for Bids Open - National 0.00 Implementati 2019-03-01 2019-03-21 2019-04-25 2019-05-05 2019-05-13 2019-11-09 for the MLSP and the social access to social benefits and Envelope on institutions services Page 2 MK-MLSP-72678-GO-RFB- 2. Expanding the access Single Stage - One 223 / Training for pre- / to and improving of the Post Request for Bids Open - National 0.00 Canceled 2019-01-15 2019-02-04 2019-03-11 2019-03-21 2019-03-29 2020-03-28 Envelope primary school program quality of preschool services MK-MLSP-72679-GO-RFB- 2. Expanding the access Single Stage - One 224 / In service teacher / to and improving of the Post Request for Bids Open - National 0.00 Canceled 2019-02-15 2019-03-07 2019-04-11 2019-04-21 2019-04-29 2020-04-28 Envelope training quality of preschool services MK-MLSP-77087-GO-RFQ- 3. Project Management, Request for Single Stage - One / Post Open - National 26,617.47 Terminated 2019-01-09 2019-02-04 2019-12-10 2019-04-05 3118 / Equipment (4 years ) Monitoring and Evaluation Quotations Envelope MK-MLSP-93096-GO-DIR- 1. Promoting social 1310 / Maintenance and IBRD / 89020 inclusion through improved Prior Direct Selection Direct 0.00 Canceled 2019-01-03 2019-01-08 2019-02-12 2021-01-02 Upgrade of CBMIS access to social benefits and services MK-MLSP-94588-GO-RFQ- 3. Project Management, Request for Single Stage - One 3121 / Camera and IBRD / 89020 Post Open - National 15,750.48 Signed 2019-02-09 2019-03-07 2019-07-22 2019-04-06 Monitoring and Evaluation Quotations Envelope Recording devices MK-MLSP-94585-GO-DIR- 1. Promoting social Under 1310 / Maintenance and IBRD / 89020 inclusion through improved Prior Direct Selection Direct 191,372.36 2019-01-21 2019-01-28 2019-01-26 2019-01-30 2019-03-02 2019-02-08 2021-03-01 Review Upgrade of CBMIS access to social benefits and services MK-MLSP-96729-GO-RFB- 1. Promoting social 1311 / Hardware equipment inclusion through improved Single Stage - One IBRD / 89020 Prior Request for Bids Open - National 192,099.49 Signed 2019-02-01 2019-09-24 2019-03-03 2019-04-07 2019-11-08 2019-04-24 2019-11-21 2019-05-02 2019-12-19 2019-10-29 for the local offices and the access to social benefits and Envelope MLSP services MK-MLSP-96739-GO-RFQ- 1. Promoting social Pending Request for Single Stage - One 1312 / Furniture for the IBRD / 89020 inclusion through improved Post Open - National 0.00 Implementati 2019-02-10 2019-03-08 2019-09-04 Quotations Envelope local offices access to social benefits and on services MK-MLSP-77092-GO-RFQ- 3. Project Management, Request for Single Stage - One / Prior Open - National 0.00 Canceled 2019-02-15 2019-03-18 2019-05-17 326 / Vehicles (2) Monitoring and Evaluation Quotations Envelope MK-MLSP-122570-GO-RFQ- 3. Project Management, Request for Single Stage - One 328 / Procurement of IBRD / 89020 Prior Open - National 0.00 Canceled 2019-07-27 2019-09-02 2019-12-01 Monitoring and Evaluation Quotations Envelope Vehicles (2) MK-MLSP-129121-GO-RFQ- 1. Promoting social Request for Single Stage - One 1314 / Furniture for the IBRD / 89020 inclusion through improved Post Open - National 22,554.84 Signed 2019-09-10 2019-10-24 2019-11-19 2019-12-23 Quotations Envelope Center for Cerebral palsy access to social benefits and services MK-MLSP-129129-GO-DIR- 1. Promoting social 1316 / Upgrade of CBMIS- IBRD / 89020 inclusion through improved Post Direct Selection Direct 10,079.30 Signed 2019-09-10 2019-10-01 2019-09-15 2019-10-01 2019-09-25 2019-11-25 2020-03-23 SSIP Financial module access to social benefits and services MK-MLSP-169710-GO-RFQ- 2.1.1.14 / Furnishing and equipment for the 2. Expanding the access kindergarten in the Request for Single Stage - One IBRD / 89020 to and improving of the Post Open - National 97,878.71 Signed 2020-05-06 2020-07-01 2020-08-07 2020-08-30 municipality of Bogovinje Quotations Envelope quality of preschool services (village of Kamenjane), including outside playground equipment MK-MLSP-173421-GO-RFQ- 2.1.1.15 / Furnishing and equipment for the 2. Expanding the access Request for Single Stage - One kindergarten in the IBRD / 89020 to and improving of the Post Open - National 131,723.10 Signed 2020-06-06 2020-08-01 2020-08-04 2020-09-10 Quotations Envelope municipality of Resen , quality of preschool services including outside playground equipment MK-MLSP-173425-GO-RFQ- 3. Project Management, Request for Single Stage - One IBRD / 89020 Post Open - National 27,217.36 Signed 2020-06-06 2020-08-01 2020-08-07 2020-08-31 3.1.32 / Antivirus licenses Monitoring and Evaluation Quotations Envelope Page 3 MK-MLSP-173432-GO-RFQ- 3. Project Management, Request for Single Stage - One 3.2.9 / Procurement of IBRD / 89020 Post Open - National 33,581.06 Signed 2020-07-06 2020-08-31 2020-08-24 2020-11-29 Monitoring and Evaluation Quotations Envelope hardware equipment MK-MLSP-178981-GO-RFQ- 2. Expanding the access Pending 2.2.18 / Printing of age Request for Single Stage - One IBRD / 89020 to and improving of the Post Open - National 0.00 Implementati 2020-07-06 2020-08-31 2020-09-30 appropriate teaching-learning Quotations Envelope quality of preschool services on materials MK-MLSP-196377-GO-DIR- 2. Expanding the access Under 2.2.19 / Distribution of age IBRD / 89020 to and improving of the Post Direct Selection Direct 0.00 Implementati 2020-09-30 2020-10-06 2020-10-05 2020-10-06 2020-11-09 2020-12-24 appropriate teaching-learning quality of preschool services on materials NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MLSP-72163-CS-CQS- 1. Promoting social Consultant 112 / Technical assistance inclusion through improved / Post Qualification Open - National 0.00 Canceled 2019-02-15 2019-02-23 2019-03-20 2019-03-27 2019-04-04 2020-04-03 for activation of GMI access to social benefits and Selection beneficiaries services MK-MLSP-72166-CS-CQS- 122 / Technical assistance 1. Promoting social Consultant for legislative changes inclusion through improved Pending / Post Qualification Open - National 0.00 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 regarding the implementation access to social benefits and Implementation Selection of reformed licensing services system MK-MLSP-72168-CS-CQS- 1. Promoting social Consultant 123 / Social service needs / inclusion through improved Post Qualification Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 assessment access to social benefits and Selection services MK-MLSP-72170-CS-CQS- 1. Promoting social 124 / Developing system for Consultant inclusion through improved financing of social services / Post Qualification Open - National 0.00 Canceled 2019-05-01 2019-05-09 2019-06-03 2019-06-10 2019-06-18 2020-06-17 access to social benefits and including determination of Selection services cost of services, MK-MLSP-72172-CS-CQS- 127 / Transformation of the large institutional capacities 1. Promoting social into small group homes, Consultant inclusion through improved living with support, / Post Qualification Open - National 0.00 Canceled 2019-01-15 2019-01-23 2019-02-17 2019-02-24 2019-03-04 2020-03-03 access to social benefits and deinstitutionalization through Selection services foster families and other appropriate forms of protection MK-MLSP-72175-CS-CQS- 1. Promoting social 128 / Outreach activities inclusion through improved Quality And Cost- / Prior Open - National 0.00 Canceled 2019-03-01 2019-03-15 2019-04-26 2019-05-01 2019-05-09 2019-05-22 2019-05-30 2020-05-29 includeing Citizen access to social benefits and Based Selection Angegement activities services Page 4 MK-MLSP-72676-CS-CQS- 2. Expanding the access Consultant 222 / Developing a new / to and improving of the Post Qualification Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 capitation formula quality of preschool services Selection MK-MLSP-77086-CS-LCS- 3. Project Management, Least Cost IBRD / 89020 Prior Open - National 28,373.17 Signed 2019-01-01 2020-02-26 2019-01-15 2019-02-26 2020-03-23 2019-03-03 2020-05-05 2019-03-11 2020-06-05 2019-03-24 2020-06-18 2019-04-01 2020-07-10 2024-03-30 3117 / Project Audit Monitoring and Evaluation Selection MK-MLSP-77089-CS-CQS- 321 / Operational and Consultant Performance Audit of the 3. Project Management, / Post Qualification Open - National 78,345.50 Signed 2019-02-01 2020-02-18 2019-02-09 2019-03-06 2020-04-23 2019-03-13 2020-06-03 2019-03-21 2020-06-09 2024-02-17 implementation of the ECDE Monitoring and Evaluation Selection Grant program for infrastructure projects MK-MLSP-77090-CS-CQS- 322 / Operational and Performance Audit for the Consultant implementation of the grant 3. Project Management, / Post Qualification Open - National 78,536.61 Signed 2019-02-01 2020-02-18 2019-02-09 2019-03-06 2020-04-23 2019-03-13 2020-06-03 2019-03-21 2020-06-09 2024-02-17 mechanism that will promote Monitoring and Evaluation Selection development of (non- institutional) social services at local level MK-MLSP-77091-CS-CQS- 323 / Baseline and Follow Consultant 3. Project Management, up Institutional Assessment / Post Qualification Open - National 188,037.85 Signed 2019-02-01 2019-10-10 2019-02-09 2019-03-06 2019-12-06 2019-03-13 2019-12-25 2019-03-21 2019-12-30 2024-02-17 Monitoring and Evaluation of the preschool quality Selection process MK-MLSP-72681-CS-QCBS- 225 / Developing a system 2. Expanding the access Quality And Cost- Open - for evaluation of quality in IBRD / 89020 to and improving of the Post 0.00 Canceled 2019-01-01 2019-01-09 2019-02-15 2019-02-20 2019-02-25 2019-03-07 2019-03-15 2020-03-14 Based Selection International the preschool education quality of preschool services system MK-MLSP-72232-CS-QCBS- 2. Expanding the access 221 / Developing of age Quality And Cost- Open - Pending IBRD / 89020 to and improving of the Post 0.00 2019-04-01 2019-04-09 2019-05-16 2019-05-21 2019-05-26 2019-06-05 2019-06-13 2020-06-12 appropriate teaching-learning Based Selection International Implementation quality of preschool services materials MK-MLSP-72229-CS-QCBS- 2. Expanding the access Quality And Cost- Open - Pending 212 / Project designs for IBRD / 89020 to and improving of the Prior 0.00 2019-01-01 2019-01-15 2019-02-26 2019-03-03 2019-03-11 2019-03-24 2019-04-01 2023-12-31 Based Selection International Implementation kindergartens quality of preschool services MK-MLSP-72682-CS-QCBS- 226 / Training of ECED administrators and other 2. Expanding the access Quality And Cost- Open - decision makers to improve IBRD / 89020 to and improving of the Post 0.00 Canceled 2019-01-15 2019-01-23 2019-03-01 2019-03-06 2019-03-11 2019-03-21 2019-03-29 2020-03-28 Based Selection International capacity and development of quality of preschool services monitoring programs and tools MK-MLSP-76978-CS-QCBS- 2. Expanding the access 227 / Outreach activities Quality And Cost- Open - IBRD / 89020 to and improving of the Post 0.00 Canceled 2019-01-01 2019-01-09 2019-02-15 2019-02-20 2019-02-25 2019-03-07 2019-03-15 2020-03-14 including Citizen Based Selection International quality of preschool services Engagement activities MK-MLSP-71874-CS-CQS- 1. Promoting social 111 / Technical assistance Consultant inclusion through improved for legislative changes / Prior Qualification Open - National 0.00 Canceled 2019-01-15 2019-01-29 2019-02-28 2019-03-10 2019-03-18 2020-03-17 access to social benefits and regarding the implementation Selection services of GMI MK-MLSP-72164-CS-CQS- 1. Promoting social 121 / Technical assistance Consultant inclusion through improved for legislative changes / Post Qualification Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 access to social benefits and regarding the implementation Selection services of social services reform Page 5 MK-MLSP-72171-CS-CQS- 125 / Development of quality 1. Promoting social Consultant standards including licensing inclusion through improved / Post Qualification Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 and accreditation and system access to social benefits and Selection for monitoring for their services achievement MK-MLSP-95692-CS-CQS- Consultant 327 / Outreach activities 3. Project Management, IBRD / 89020 Post Qualification Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2021-04-17 including Citizen Monitoring and Evaluation Selection Engagement activities MK-MLSP-98479-CS-CQS- Consultant 327 / Outreach activities 3. Project Management, IBRD / 89020 Post Qualification Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2021-04-17 including Citizen Monitoring and Evaluation Selection Engagement activities MK-MLSP-99426-CS-CQS- 1. Promoting social Consultant 114 / Counselling and inclusion through improved IBRD / 89020 Prior Qualification Open - National 0.00 Canceled 2019-02-07 2019-02-07 2019-02-28 2019-04-13 2019-05-13 2019-06-17 2020-06-16 Motivation for activation of access to social benefits and Selection GMA beneficiaries services MK-MLSP-115906-CS-CQS- 1. Promoting social Consultant 1213 / Social service needs IBRD / 89020 inclusion through improved Post Qualification Open - National 61,155.24 Signed 2019-06-03 2019-06-11 2019-06-11 2019-07-06 2019-07-11 2019-07-13 2019-07-25 2019-07-21 2019-07-25 2020-01-17 assessment access to social benefits and Selection services MK-MLSP-115916-CS-CQS- Consultant 324 / Public campaign 3. Project Management, IBRD / 89020 Post Qualification Open - National 0.00 Canceled 2019-06-03 2019-06-11 2019-07-06 2019-07-13 2019-07-21 2023-12-31 including Citizen Monitoring and Evaluation Selection Engagement activities MK-MLSP-119370-CS-QCBS- 325 / Public campaign 3. Project Management, Quality And Cost- IBRD / 89020 Prior Open - National 415,933.50 Signed 2019-06-17 2019-07-15 2019-07-01 2019-07-16 2019-08-12 2019-11-12 2019-08-17 2019-12-03 2019-08-25 2019-12-06 2019-09-09 2020-02-21 2019-09-22 2020-03-11 2024-06-30 including Citizen Monitoring and Evaluation Based Selection Engagement activities MK-MLSP-122574-CS-CQS- 2121 / Project designs for 2. Expanding the access Consultant new kindergartens in IBRD / 89020 to and improving of the Prior Qualification Open - National 93,887.86 Signed 2019-07-15 2019-07-26 2019-07-29 2019-08-23 2020-02-05 2019-09-07 2020-04-07 2019-09-15 2019-11-08 2020-01-13 Arachinovo, Bitola, Lipkovo quality of preschool services Selection and Valandovo MK-MLSP-122578-CS-CQS- 2123 / Revision of basic Project designs for 2. Expanding the access Consultant kindergartens in Arachinovo, IBRD / 89020 to and improving of the Post Qualification Open - National 12,335.25 Signed 2019-08-01 2019-08-07 2019-08-15 2019-09-14 2019-12-23 2019-09-24 2020-01-02 2019-10-05 2020-01-08 2020-04-02 Bitola, Lipkovo, Valandovo quality of preschool services Selection ,Probishtip, Gostivar, Karposh 1 and Karposh 2 MK-MLSP-122576-CS-CQS- 2122 / Project designs for 2. Expanding the access Consultant upgrades of kindergartens in IBRD / 89020 to and improving of the Post Qualification Open - National 74,081.25 Signed 2019-07-30 2019-08-01 2019-08-13 2019-09-12 2019-10-10 2019-09-22 2019-10-30 2019-10-06 2019-11-08 2020-01-04 Probishtip, Gostivar, Karposh quality of preschool services Selection 1 and Karposh 2 MK-MLSP-129132-CS-CQS- 213 / Supervision of works 2. Expanding the access Consultant for construction of IBRD / 89020 to and improving of the Post Qualification Open - National 31,454.12 Signed 2019-09-09 2019-09-24 2019-09-17 2019-10-12 2019-12-05 2019-10-19 2019-12-25 2019-10-27 2019-12-30 2021-03-10 kindergartens in Negotino quality of preschool services Selection and Kavadarci MK-MLSP-129133-CS-CQS- 214 / Supervision of works 2. Expanding the access Consultant for construction of IBRD / 89020 to and improving of the Post Qualification Open - National 25,130.45 Signed 2019-09-09 2019-11-12 2019-09-17 2019-10-12 2019-12-06 2019-10-19 2019-12-27 2019-10-27 2019-12-30 2019-12-16 kindergartens in Kocani and quality of preschool services Selection Kisela Voda Page 6 MK-MLSP-129135-CS-CQS- 215 / Project for interior 2. Expanding the access Consultant design for Kindergardens in IBRD / 89020 to and improving of the Post Qualification Open - National 39,061.04 Signed 2019-09-09 2020-01-24 2019-09-17 2019-10-12 2020-02-25 2019-10-19 2020-03-16 2019-10-27 2020-03-27 2020-01-25 Kocani, Negotino, Kisela quality of preschool services Selection Voda, Kavadarci and Bogovinje MK-MLSP-129136-CS-CQS- 216 / Project for interior 2. Expanding the access Consultant design for Kindergartens in IBRD / 89020 to and improving of the Post Qualification Open - National 41,802.26 Signed 2019-09-09 2020-01-24 2019-09-17 2019-10-12 2020-02-27 2019-10-19 2020-03-16 2019-10-27 2020-03-20 2020-01-25 Gjorce Petrov, Resen, Kriva quality of preschool services Selection Palanka and Strumica MK-MLSP-135022-CS-CQS- 1214 / Company for providing support to the 1. Promoting social Consultant municipalities/ potential inclusion through improved IBRD / 89020 Post Qualification Open - National 127,667.71 Signed 2019-09-20 2019-09-27 2019-10-04 2019-10-14 2019-12-02 2019-10-17 2019-12-25 2019-10-23 2019-12-30 2023-07-04 service providers in access to social benefits and Selection preparation of application services documents including the project proposals MK-MLSP-146042-CS-CQS- 2.1.7 / Supervision of works for construction of 2. Expanding the access Consultant kindergartens in the IBRD / 89020 to and improving of the Post Qualification Open - National 55,893.58 Signed 2019-11-20 2019-11-19 2019-11-28 2019-12-23 2019-12-23 2019-12-30 2019-12-27 2020-02-03 2020-01-02 2021-10-25 municipalities of Strumica, quality of preschool services Selection Resen, Gjorce Petrov, Bogovinje and Kriva Palanka MK-MLSP-147511-CS-CQS- 2.2.16 / Consultants' firm 2. Expanding the access Consultant delivering services for IBRD / 89020 to and improving of the Post Qualification Open - National 99,693.98 Signed 2019-11-29 2019-12-13 2019-12-13 2020-01-01 2019-12-20 2020-01-06 2020-02-21 2020-02-01 2020-02-24 2021-01-31 supporting the process of quality of preschool services Selection improving the quality of preschool system MK-MLSP-201117-CS-CQS- 2.1.8 / Supervision of works 2. Expanding the access Consultant for construction of Pending IBRD / 89020 to and improving of the Post Qualification Open - National 0.00 2020-12-01 2020-12-22 2021-02-04 2021-03-06 2021-04-10 2023-03-31 kindergartens in Probishtip, Implementation quality of preschool services Selection Lipkovo, Bitola and Valandovo MK-MLSP-201118-CS-CQS- 2.1.9 / Supervision of works 2. Expanding the access Consultant Pending for construction of IBRD / 89020 to and improving of the Post Qualification Open - National 0.00 2020-12-01 2020-12-22 2021-02-04 2021-03-06 2021-04-10 2023-03-31 Implementation kindergartens in Gostivar, quality of preschool services Selection Arachinovo and Karposh MK-MLSP-201119-CS-CQS- 2.1.10 / Project for interior 2. Expanding the access Consultant Pending design for Kindergartens in IBRD / 89020 to and improving of the Post Qualification Open - National 0.00 2020-12-01 2020-12-22 2021-02-04 2021-03-06 2021-04-10 2023-03-31 Implementation Lipkovo, Aracinovo and quality of preschool services Selection Valandovo MK-MLSP-201120-CS-CQS- 2.1.11 / Project for interior 2. Expanding the access Consultant Pending design for Kindergartens in IBRD / 89020 to and improving of the Post Qualification Open - National 0.00 2020-12-01 2020-12-22 2021-02-04 2021-03-06 2021-04-10 2023-03-31 Implementation Probishtip, Bitola, Gostivar quality of preschool services Selection and Karposh INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Actual Amount Draft Negotiated Description Component Review Type Method Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. Approach (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 7 MK-MLSP-72221-CS-CDS- 1. Promoting social 135 / Actuary in the Unit inclusion through improved IBRD / 89020 Prior Direct Selection Direct 79,664.25 Signed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-02 2024-02-07 for Analysis, Evaluation and access to social benefits and Monitoring services MK-MLSP-72223-CS-CDS- 1. Promoting social Individual 136 / IT in the Unit for inclusion through improved IBRD / 89020 Prior Consultant Open 65,337.88 Signed 2019-01-01 2018-10-25 2019-01-29 2018-11-23 2019-02-08 2018-11-28 2019-02-16 2018-11-29 2024-02-15 Analysis, Evaluation and access to social benefits and Selection Monitoring services MK-MLSP-72225-CS-CDS- 1. Promoting social 137 / Researcher in the Unit inclusion through improved IBRD / 89020 Prior Direct Selection Direct 75,392.24 Signed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-02 2024-02-07 for Analysis, Evaluation and access to social benefits and Monitoring services MK-MLSP-72228-CS-CDS- 1. Promoting social 139 / Legal Advisor in the inclusion through improved IBRD / 89020 Prior Direct Selection Direct 197,332.13 Signed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-02 2024-02-07 Unit for Analysis, Evaluation access to social benefits and and Monitoring services MK-MLSP-76981-CS-INDV- 228 / Capacity building of 2. Expanding the access Individual local architects and IBRD / 89020 to and improving of the Post Consultant Open 84,037.50 Signed 2019-03-01 2019-02-04 2019-03-24 2019-03-29 2019-03-31 2019-05-10 2019-04-08 2019-05-10 2019-10-05 engineers for such innovative quality of preschool services Selection and highly energy-efficient infrastructure MK-MLSP-77005-CS-CDS- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 221,782.58 Signed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-02 2024-02-07 311 / Project Manager Monitoring and Evaluation MK-MLSP-77006-CS-CDS- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 188,548.95 Signed 2019-01-01 2018-11-12 2019-01-21 2019-02-08 2018-10-02 2024-02-07 312 / Procurement manager Monitoring and Evaluation Individual MK-MLSP-77007-CS-INDV- 3. Project Management, / Prior Consultant Open 0.00 Canceled 2019-01-01 2019-01-29 2019-02-08 2019-02-16 2024-02-13 313 / Coordinator for ECDE Monitoring and Evaluation Selection MK-MLSP-77008-CS-INDV- Individual 3. Project Management, 314 / Coordinator for Social IBRD / 89020 Prior Consultant Open 177,444.70 Signed 2019-01-01 2019-05-15 2019-01-29 2019-05-31 2019-02-08 2019-06-03 2019-02-16 2019-05-31 2024-02-15 Monitoring and Evaluation services development Selection MK-MLSP-77009-CS-INDV- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 175,079.26 Signed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-02 2024-02-07 315 / IT manager Monitoring and Evaluation MK-MLSP-77010-CS-CDS- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 175,923.56 Signed 2019-01-01 2018-11-12 2019-01-21 2019-02-08 2018-10-02 2024-02-07 316 / Financial manager Monitoring and Evaluation MK-MLSP-77016-CS-INDV- Individual 3. Project Management, 3111 / Environmental/social IBRD / 89020 Prior Consultant Open 79,853.27 Signed 2019-01-01 2019-01-24 2019-01-29 2019-03-18 2019-02-08 2019-03-26 2019-02-16 2019-03-29 2024-02-15 Monitoring and Evaluation safeguards specialist Selection MK-MLSP-72227-CS-CDS- 1. Promoting social 138 / Social Consultant in inclusion through improved IBRD / 89020 Prior Direct Selection Direct 117,990.67 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-04 2024-06-30 the Unit for Analysis, access to social benefits and Evaluation and Monitoring services MK-MLSP-77011-CS-CDS- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 52,996.74 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-02 2024-06-30 317 / Civil engineer/architect Monitoring and Evaluation MK-MLSP-77012-CS-CDS- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 67,944.00 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-02 2024-06-30 318 / Civil engineer/architect Monitoring and Evaluation MK-MLSP-77013-CS-CDS- 3. Project Management, IBRD / 89020 Prior Direct Selection Direct 51,827.41 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-02 2024-06-30 319 / Civil engineer/architect Monitoring and Evaluation Page 8 MK-MLSP-77014-CS-CDS- 3. Project Management, 3110 / Civil IBRD / 89020 Prior Direct Selection Direct 155,023.10 Under Review 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-02 2024-06-30 Monitoring and Evaluation engineer/architect MK-MLSP-77022-CS-CDS- Individual 3. Project Management, Pending 3114 / Grant application IBRD / 89020 Prior Consultant Open 0.00 2019-01-01 2019-01-29 2019-02-08 2019-02-16 2024-06-30 Monitoring and Evaluation Implementation officer Selection Individual MK-MLSP-77083-CS-INDV- 3. Project Management, IBRD / 89020 Prior Consultant Open 150,188.17 Completed 2019-01-01 2019-11-19 2019-01-24 2019-12-07 2019-01-31 2019-12-10 2019-02-08 2019-12-11 2024-06-30 2019-12-31 3115 / M&E Officer Monitoring and Evaluation Selection MK-MLSP-77018-CS-CDS- 3. Project Management, 31112 / Grant IBRD / 89020 Prior Direct Selection Direct 178,697.43 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-02 2024-06-30 Monitoring and Evaluation Administrative Coordinator MK-MLSP-77020-CS-CDS- 3. Project Management, 3113 / Financial and IBRD / 89020 Prior Direct Selection Direct 88,621.61 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-02 2024-06-30 Monitoring and Evaluation administrative officer Individual MK-MLSP-77085-CS-CDS- 3. Project Management, Under IBRD / 89020 Prior Consultant Open 0.00 2019-01-01 2019-02-05 2019-01-29 2019-02-08 2019-02-16 2024-06-30 3116 / IT officer Monitoring and Evaluation Implementation Selection MK-MLSP-94587-CS-INDV- Individual 3. Project Management, 3120 / Environmental/social IBRD / 89020 Post Consultant Open 10,139.92 Signed 2019-03-01 2020-05-20 2019-03-24 2020-06-09 2019-03-31 2020-06-29 2019-04-08 2020-07-01 2024-04-06 Monitoring and Evaluation safeguards assistance Selection Individual MK-MLSP-94589-CS-INDV- 3. Project Management, IBRD / 89020 Post Consultant Open 152,884.40 Signed 2019-03-01 2019-02-07 2019-03-24 2019-04-12 2019-03-31 2019-04-15 2019-04-08 2019-04-16 2024-04-06 3122 / Interior Designer Monitoring and Evaluation Selection Individual MK-MLSP-94590-CS-INDV- 3. Project Management, IBRD / 89020 Post Consultant Open 29,590.53 Signed 2019-02-01 2019-02-24 2019-03-18 2019-03-03 2019-04-01 2019-03-11 2019-04-05 2024-03-09 3123 / Business Analyst Monitoring and Evaluation Selection MK-MLSP-94593-CS-INDV- 1. Promoting social Individual 113 / Social Safety Net IBRD / 89020 inclusion through improved Post Consultant Open 96,631.92 Signed 2019-02-01 2019-02-04 2019-02-24 2019-03-29 2019-03-03 2019-04-09 2019-03-11 2019-05-15 2024-03-09 Specialist access to social benefits and Selection services MK-MLSP-94594-CS-INDV- 129 / Development of norms 1. Promoting social Individual and standards for inclusion through improved IBRD / 89020 Post Consultant Open 13,459.20 Signed 2019-03-01 2019-02-06 2019-03-24 2019-04-15 2019-03-31 2019-05-20 2019-04-08 2019-05-23 2020-04-07 establishing of social services access to social benefits and Selection and for ensuring quality in services the service delivery MK-MLSP-94596-CS-INDV- 1210 / Support for 1. Promoting social Development of norms and Individual inclusion through improved standards for establishing of IBRD / 89020 Post Consultant Open 8,335.63 Signed 2019-03-01 2019-02-06 2019-03-24 2019-04-15 2019-03-31 2019-05-22 2019-04-08 2019-05-28 2020-04-07 access to social benefits and social services and for Selection services ensuring quality in the service delivery MK-MLSP-94598-CS-INDV- 1. Promoting social 1211 / Developing a system Individual inclusion through improved Pending for evaluation of quality in IBRD / 89020 Post Consultant Open 0.00 2019-03-01 2019-03-24 2019-03-31 2019-04-08 2020-04-07 access to social benefits and Implementation the social services delivery Selection services system MK-MLSP-95684-CS-INDV- 1. Promoting social 1212 / Preparation of Cost Individual inclusion through improved Methodology for Establishing IBRD / 89020 Post Consultant Open 22,275.54 Signed 2019-02-01 2019-02-06 2019-02-24 2019-04-17 2019-03-03 2019-05-27 2019-03-11 2019-05-27 2019-09-07 access to social benefits and of Social Services including Selection services pricing list Page 9 MK-MLSP-95686-CS-INDV- 2. Expanding the access Individual 229 / Developing a new IBRD / 89020 to and improving of the Post Consultant Open 7,761.25 Signed 2019-05-01 2019-10-18 2019-05-24 2019-12-04 2019-05-31 2019-12-17 2019-06-08 2019-12-18 2019-12-05 capitation formula quality of preschool services Selection MK-MLSP-96725-CS-INDV- Individual 3. Project Management, 3124 / Business Analyst IBRD / 89020 Post Consultant Direct 0.00 Canceled 2019-02-01 2019-01-30 2019-02-14 2019-04-01 2019-02-24 2019-04-08 2019-03-04 2024-03-02 Monitoring and Evaluation Assistant Selection MK-MLSP-97638-CS-CDS- 1. Promoting social 114 / Counselling and inclusion through improved IBRD / 89020 Prior Direct Selection Direct 0.00 Canceled 2019-02-01 2019-02-11 2019-04-17 2020-04-16 Motivation for activation of access to social benefits and GMA beneficiaries services MK-MLSP-119013-CS-INDV- Individual 3. Project Management, 3125 / Business Analyst IBRD / 89020 Post Consultant Limited 102,630.85 Signed 2019-06-13 2019-01-30 2019-06-23 2019-04-01 2019-06-30 2019-04-04 2019-07-08 2019-04-11 2020-01-04 Monitoring and Evaluation Assistant Selection Individual MK-MLSP-129139-CS-INDV- 3. Project Management, IBRD / 89020 Post Consultant Open 117,305.19 Signed 2019-09-09 2019-12-03 2019-10-02 2019-12-28 2019-10-09 2019-12-30 2019-10-24 2019-12-31 2024-07-29 3126 / Civil engineer Monitoring and Evaluation Selection Individual MK-MLSP-129140-CS-INDV- 3. Project Management, Pending IBRD / 89020 Post Consultant Open 0.00 2019-09-09 2019-10-02 2019-10-09 2019-10-24 2024-07-29 3127 / Civil engineer/arhitect Monitoring and Evaluation Implementation Selection Individual MK-MLSP-129143-CS-INDV- 3. Project Management, Pending IBRD / 89020 Post Consultant Open 0.00 2019-09-09 2019-10-02 2019-10-09 2019-10-24 2024-07-29 3128 / Electrical engineer Monitoring and Evaluation Implementation Selection Individual MK-MLSP-129144-CS-INDV- 3. Project Management, Pending IBRD / 89020 Post Consultant Open 0.00 2019-09-09 2019-10-02 2019-10-09 2019-10-24 2024-07-29 3129 / Mechanical engineer Monitoring and Evaluation Implementation Selection MK-MLSP-129624-CS-INDV- 1. Promoting social Individual 1317 / Economist in the inclusion through improved IBRD / 89020 Post Consultant Limited 157,335.13 Signed 2019-08-29 2019-09-13 2019-09-06 2019-09-17 2019-09-11 2019-09-17 2019-10-10 2019-09-18 2024-08-14 Unit for Analysis, Evaluation access to social benefits and Selection and Monitoring services Individual MK-MLSP-129625-CS-INDV- 3. Project Management, IBRD / 89020 Post Consultant Open 112,906.32 Signed 2019-09-18 2019-09-19 2019-10-11 2019-10-18 2019-10-26 2019-10-20 2019-11-03 2019-10-21 2020-05-01 3130 / Procurement officer Monitoring and Evaluation Selection MK-MLSP-135381-CS-INDV- 2. Expanding the access Individual 1.2.10 / Principal IBRD / 89020 to and improving of the Post Consultant Open 109,940.00 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-04 2019-10-26 2020-01-20 2019-11-12 2020-01-21 2024-06-18 Investigator quality of preschool services Selection MK-MLSP-135385-CS-INDV- 2. Expanding the access Individual 2211 / Local Support to the IBRD / 89020 to and improving of the Post Consultant Open 70,345.79 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-11 2019-10-31 2019-12-14 2019-11-22 2019-12-18 2024-06-28 Principal Investigator quality of preschool services Selection MK-MLSP-135386-CS-INDV- 2.2.12 / National Coordinator 2. Expanding the access Individual for Measuring Early IBRD / 89020 to and improving of the Post Consultant Open 55,651.68 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-03 2019-10-31 2019-12-14 2019-11-08 2019-12-18 2024-06-14 Learning Environment quality of preschool services Selection (MELE) MK-MLSP-135387-CS-INDV- 2.2.13 / National Coordinator 2. Expanding the access Individual for Measurement of IBRD / 89020 to and improving of the Post Consultant Open 55,651.68 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-03 2019-10-31 2019-12-14 2019-11-08 2019-12-18 2024-06-14 Development and Early quality of preschool services Selection Learning (MODEL) Page 10 MK-MLSP-135389-CS-INDV- 2.2.14 / Local Consultant for 2. Expanding the access Individual strengthening the preschool IBRD / 89020 to and improving of the Post Consultant Open 55,651.68 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-03 2019-10-31 2019-12-14 2019-11-08 2019-12-18 2024-06-14 system for pre-service and in- quality of preschool services Selection service teacher training MK-MLSP-147510-CS-INDV- 2.2.15 / International 2. Expanding the access Individual Teacher Training and IBRD / 89020 to and improving of the Post Consultant Open 52,793.46 Signed 2019-11-27 2019-12-10 2019-12-14 2019-12-13 2019-12-19 2020-02-21 2020-01-16 2020-02-24 2024-06-23 Program Design Expert quality of preschool services Selection Consultant MK-MLSP-173423-CS-INDV- 2. Expanding the access Individual Under 2.2.17 / Developing a new IBRD / 89020 to and improving of the Post Consultant Open 0.00 2020-06-01 2020-08-18 2020-07-20 2020-08-10 2020-09-14 2021-01-12 Implementation capitation formula quality of preschool services Selection MK-MLSP-173424-CS-INDV- Individual 3. Project Management, 3.1.31 / System IBRD / 89020 Prior Consultant Limited 119,029.21 Signed 2020-05-15 2020-05-29 2020-05-20 2020-06-01 2020-06-10 2020-06-15 2020-07-15 2020-06-16 2024-06-30 Monitoring and Evaluation administrator Selection MK-MLSP-173426-CS-INDV- Individual 3. Project Management, 3.1.33 / Assistant Civil IBRD / 89020 Prior Consultant Limited 6,847.73 Under Review 2020-05-15 2020-05-20 2020-05-20 2020-06-08 2020-06-10 2020-06-26 2020-07-15 2020-07-01 2024-06-30 Monitoring and Evaluation engineer Selection MK-MLSP-201109-CS-INDV- 1. Promoting social Individual 1.3.18 / Researcher/Analyst inclusion through improved Pending IBRD / 89020 Prior Consultant Open 0.00 2020-11-18 2021-01-06 2021-01-27 2021-03-03 2024-06-30 in the Unit for Analysis, access to social benefits and Implementation Selection Evaluation and Monitoring services Individual MK-MLSP-201121-CS-INDV- 3. Project Management, Pending IBRD / 89020 Prior Consultant Open 0.00 2020-12-01 2021-01-19 2021-02-09 2021-03-16 2024-06-30 3.1.34 / Interior Designer Monitoring and Evaluation Implementation Selection MK-MLSP-201123-CS-INDV- Individual 3. Project Management, Pending 3.1.35 / Civil IBRD / 89020 Prior Consultant Open 0.00 2020-12-01 2021-01-19 2021-02-09 2021-03-16 2024-06-30 Monitoring and Evaluation Implementation engineer/architect Selection MK-MLSP-201124-CS-INDV- Individual 3. Project Management, Pending 3.1.36 / Assistant IBRD / 89020 Prior Consultant Open 0.00 2020-12-01 2021-01-19 2021-02-09 2021-03-16 2024-06-30 Monitoring and Evaluation Implementation Coordinator for ECDE Selection MK-MLSP-201125-CS-INDV- Individual 3.1.37 / Assistant 3. Project Management, Pending IBRD / 89020 Prior Consultant Open 0.00 2020-12-01 2021-01-19 2021-02-09 2021-03-16 2024-06-30 Coordinator for Social Monitoring and Evaluation Implementation Selection services development MK-MLSP-201126-CS-INDV- Individual 3. Project Management, Pending 3.1.38 / Civil IBRD / 89020 Prior Consultant Open 0.00 2020-12-01 2021-01-19 2021-02-09 2021-03-16 2024-06-30 Monitoring and Evaluation Implementation engineer/architect Selection Page 11