(P159843) Metropolitan Buenos Aires Urban Transformation Project PROCUREMENT PLAN Country: Argentina Region: LATIN AMERICA AND CARIBBEAN Approval Date: 27-Feb-2017 General Procurement Notice published on: 24-Feb-2017 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. PROCUREMENT Argentina : Metropolitan Buenos Aires Urban Transformation Project PLAN General Information Country: Argentina Bank’s Approval Date of the Original Procurement Plan: 2017-10-04 2020-02-06 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159843 GPN Date: 2017-02-24 Project Name: Metropolitan Buenos Aires Urban Transformation Project Loan / Credit No: IBRD / 87070 Executing Agency(ies): Social and Urban Integration Provincial Entity WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UCEPO-58819-CW-RFB / "Completamiento y Habitat improvement of Mejoramiento de 48 Solicitud de Single Stage - One IBRD / 87070 disadvantaged neighborhoods Posterior Open - National 270,000.00 167,529.57 Firmado 2018-04-13 2018-04-18 2018-05-18 2018-06-07 2018-07-01 2018-12-28 Viviendas Barrio Carlos ofertas Envelope in Greater Buenos Aires Gardel" Partido de Morón, Provincia de Buenos Aires AR-UCEPO-59136-CW-RFB / Habitat improvement of Mejoramiento de Barrios Solicitud de Single Stage - One IBRD / 87070 disadvantaged neighborhoods Posterior Open - National 2,105,774.00 1,077,121.16 Firmado 2018-04-13 2018-04-18 2018-05-18 2018-06-07 2018-07-01 2018-12-28 Carlos Gardel - Presidente ofertas Envelope in Greater Buenos Aires Sarmiento AR-UCEPO-81641-CW-RFB / Habitat improvement of "Mejoramiento edilicio en Solicitud de Single Stage - One IBRD / 87070 disadvantaged neighborhoods Posterior Open - National 4,233,144.12 4,281,716.87 Firmado 2018-10-16 2018-10-26 2018-11-25 2018-12-25 2019-01-29 2020-03-24 Conjunto Habitacional ofertas Envelope in Greater Buenos Aires Presidente Sarmiento" AR-UCEPO-81650-CW-RFB / "Infraestructura de servicios Habitat improvement of Solicitud de Single Stage - One básicos en Conjunto IBRD / 87070 disadvantaged neighborhoods Posterior Open - National 3,711,939.00 3,899,692.88 Firmado 2018-10-16 2018-10-26 2018-11-25 2018-12-25 2019-01-29 2020-07-22 ofertas Envelope Habitacional Presidente in Greater Buenos Aires Sarmiento" AR-OPISU-95750-CW-RFB / LPN Puesta en Valor Plaza Habitat improvement of Solicitud de Single Stage - One Central y Cancha Villegas IBRD / 87070 disadvantaged neighborhoods Posterior Open - National 1,910,021.56 1,907,784.22 Firmado 2019-06-03 2019-06-08 2019-07-20 2019-08-19 2019-09-23 2020-03-21 ofertas Envelope en Conjunto Habitacional in Greater Buenos Aires Presidente Sarmiento AR-OPISU-95752-CW-RFB / Habitat improvement of Solicitud de Single Stage - One LPN Instalación de Gas IBRD / 87070 disadvantaged neighborhoods Posterior Open - National 3,240,452.69 2,242,230.02 Firmado 2019-07-01 2019-07-06 2019-08-17 2019-09-16 2019-10-21 2020-04-18 ofertas Envelope Domiciliaria in Greater Buenos Aires GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UCEPO-28864-GO-RFB / Project Management and Solicitud de Single Stage - One Equipamiento para el Equipo IBRD / 87070 Posterior Limited 10,829.00 0.00 Cancelado 2017-12-04 2018-02-27 2018-04-28 Monitoring – PBA cotizaciones Envelope central de la SSTUyV NON CONSULTING SERVICES Page 1 Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UCEPO-29446-CS-INDV Habitat improvement of Organizaciones sin / Programa Fortalecimiento IBRD / 87070 disadvantaged neighborhoods Posterior Limited 105,882.00 0.00 Cancelado 2018-01-24 2018-02-07 2018-03-09 2018-04-13 2019-04-08 fines de lucro de Consorcios. in Greater Buenos Aires AR-UCEPO-27888-CS-QCBS / Estudio para la realización de un Diagnóstico Integral Urbano Ambiental y Plan Habitat improvement of Selección basada Maestro para el Barrio IBRD / 87070 disadvantaged neighborhoods Posterior Open - National 400,000.00 0.00 Cancelado 2017-09-29 2017-11-03 2017-12-12 2018-01-27 2018-02-26 2018-03-18 2018-04-13 2018-11-09 en calidad y costo Presidente Sarmiento en in Greater Buenos Aires Morón. Subprograma de renovación urbana en conjuntos habitacionales. AR-UCEPO-27317-CS-QCBS / Estudio para Diagnóstico Integral y Diseño de Habitat improvement of Proyectos Ejecutivos de las Selección basada IBRD / 87070 disadvantaged neighborhoods Posterior Open - National 620,000.00 0.00 Cancelado 2017-09-29 2017-11-03 2017-12-12 2018-01-27 2018-02-26 2018-03-18 2018-04-13 2018-09-10 condiciones edilicias e en calidad y costo in Greater Buenos Aires infraestructura urbana para el barrio Presidente Sarmiento ( Morón) AR-OPISU-146994-CS-QCBS / Servicios de Inspección Técnica de Obras de la Habitat improvement of Intervención Integral del Selección basada IBRD / 87070 disadvantaged neighborhoods Posterior Open - National 668,000.00 0.00 Bajo Revision 2020-01-06 2020-03-31 2020-05-21 2020-06-25 2020-12-22 Barrio Carlos Gardel y en calidad y costo in Greater Buenos Aires Puesta en Valor del Conjunto Habitacional Presidente Sarmiento INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UCEPO-27884-CS-CDS / Habitat improvement of Selección directa Relevamiento Socio- IBRD / 87070 disadvantaged neighborhoods Posterior Direct 130,000.00 112,058.03 Finalizado 2017-09-29 2017-10-20 2017-11-03 2018-01-02 de consultores Habitacional. in Greater Buenos Aires AR-UCEPO-75184-CS-INDV Project Management and / Especialista en IBRD / 87070 Posterior Individual Limited 11,650.00 6,614.38 Firmado 2018-08-24 2018-08-27 2018-09-03 2018-09-04 2018-12-31 Monitoring – PBA Regularización Dominial AR-UCEPO-75189-CS-INDV Project Management and / Especialista Coordinador de IBRD / 87070 Posterior Individual Limited 10,000.00 5,617.98 Firmado 2018-08-24 2018-08-27 2018-09-03 2018-09-04 2018-12-31 Monitoring – PBA la Gestión AR-UCEPO-75246-CS-INDV Project Management and / Especialista de Proyectos IBRD / 87070 Posterior Individual Limited 13,350.00 7,559.29 Finalizado 2018-08-24 2018-08-27 2018-09-03 2018-09-04 2018-12-31 Monitoring – PBA de Obra de Equipamientos Page 2 AR-UCEPO-75247-CS-INDV Project Management and / Coordinador General IBRD / 87070 Posterior Individual Limited 9,170.00 5,127.86 Firmado 2018-08-24 2018-08-27 2018-09-03 2018-09-04 2018-12-31 Monitoring – PBA SocioProductivo AR-UCEPO-75248-CS-INDV Project Management and / Especialista en Desarrollo IBRD / 87070 Posterior Individual Limited 9,170.00 5,149.81 Firmado 2018-08-24 2018-08-27 2018-09-03 2018-09-04 2018-12-31 Monitoring – PBA Comercial e Institucional AR-UCEPO-75249-CS-INDV / Especialista en Project Management and IBRD / 87070 Posterior Individual Limited 9,170.00 5,149.81 Firmado 2018-08-24 2018-08-27 2018-09-03 2018-09-04 2018-12-31 Formulación de Programas Monitoring – PBA SocioProductivos AR-UCEPO-75250-CS-INDV / Consultoría Individual para la elaboración de la Evaluación de Impacto Project Management and IBRD / 87070 Posterior Individual Limited 6,670.00 5,327.65 Finalizado 2018-08-24 2018-08-27 2018-09-03 2018-09-04 2018-12-31 Ambiental y Social de Villa Monitoring – PBA Itatí y Villa Azul, y actualización del Marco de Gestión Ambiental y Social AR-UCEPO-75252-CS-INDV / Consultoría para la Project Management and Elaboración del Marco y IBRD / 87070 Posterior Individual Limited 6,670.00 7,325.52 Finalizado 2018-08-24 2018-08-27 2018-09-03 2018-09-04 2018-12-31 Monitoring – PBA Plan de Reasentamiento Involuntario del Programa AR-UCEPO-75253-CS-INDV / Consultoría para la Project Management and Elaboración de la Evaluación IBRD / 87070 Posterior Individual Limited 9,170.00 7,325.52 Finalizado 2018-08-24 2018-08-27 2018-09-03 2018-09-04 2018-12-31 Monitoring – PBA Ambiental y Social del Programa Habitat improvement of AR-UCEPO-29449-CS-INDV IBRD / 87070 disadvantaged neighborhoods Posterior Individual Limited 205,000.00 0.00 Cancelado 2017-11-30 2017-12-05 2017-12-26 2018-01-30 2019-01-25 / Fortalecimiento SSTUYV in Greater Buenos Aires AR-UCEPO-69018-CS-INDV Project Management and / Coordinador de IBRD / 87070 Posterior Individual Limited 19,240.00 0.00 Cancelado 2018-07-11 2018-07-12 2018-07-16 2018-07-17 2018-12-31 Monitoring – PBA Planificación Urbana AR-UCEPO-69029-CS-INDV Project Management and / Especialista Urbanista IBRD / 87070 Posterior Individual Limited 14,790.00 0.00 Cancelado 2018-07-11 2018-07-13 2018-07-16 2018-07-17 2018-12-31 Monitoring – PBA Ambiental AR-UCEPO-69033-CS-INDV / Especialista en Project Management and IBRD / 87070 Posterior Individual Limited 13,000.00 0.00 Cancelado 2018-07-11 2018-07-13 2018-07-15 2018-07-17 2018-12-31 Seguimiento, Monitoreo y Monitoring – PBA Evaluación AR-UCEPO-29447-CS-INDV Habitat improvement of / Programa de inclusión IBRD / 87070 disadvantaged neighborhoods Posterior Individual Limited 240,000.00 0.00 Cancelado 2018-01-10 2018-01-15 2018-02-05 2018-03-12 2018-09-08 deportiva in Greater Buenos Aires AR-OPISU-97188-CS-INDV / Habitat improvement of Consultor para la Edición IBRD / 87070 disadvantaged neighborhoods Posterior Individual Limited 7,800.00 0.00 Cancelado 2019-03-01 2019-03-06 2019-03-27 2019-05-01 2019-10-28 del Plan Maestro del Barrio in Greater Buenos Aires Carlos Gardel AR-OPISU-103129-CS-INDV / Fortalecimiento de la Project Management and UCIBa-MISP: Especialista en IBRD / 87070 Posterior Individual Limited 87,000.00 12,673.43 Firmado 2019-02-28 2019-03-05 2019-03-26 2019-04-30 2023-12-31 Monitoring – PBA Gestión Ambiental y Social de Obras. Page 3 AR-OPISU-103139-CS-INDV / Fortalecimiento de UCIBa- Project Management and IBRD / 87070 Posterior Individual Limited 87,000.00 0.00 En ejecución 2019-02-28 2019-03-05 2019-03-26 2019-04-30 2023-12-31 MISP: Especialista en Monitoring – PBA Adquisiciones AR-OPISU-115018-CS-INDV Habitat improvement of / Dos Consultores Senior IBRD / 87070 disadvantaged neighborhoods Posterior Individual Limited 24,418.00 7,008.76 Firmado 2019-05-17 2019-05-22 2019-06-12 2019-07-17 2019-12-31 Supervisores de Obra para in Greater Buenos Aires el Fortalecimiento de UCIBa AR-OPISU-115020-CS-INDV Habitat improvement of / Consultor Semi Senior IBRD / 87070 disadvantaged neighborhoods Posterior Individual Limited 7,849.00 0.00 En ejecución 2019-05-17 2019-05-22 2019-06-12 2019-07-17 2019-12-31 Supervisor de Obra para el in Greater Buenos Aires fortalecimiento de UCIBa AR-OPISU-115446-CS-INDV / Consultor Administrativo Project Management and Ejecución para fortalecer al área de IBRD / 87070 Posterior Individual Limited 35,406.00 0.00 2020-03-01 2020-03-06 2020-03-27 2020-05-01 2022-05-02 Monitoring – PBA pendiente Adquisiciones del Municipio de Morón. AR-OPISU-115442-CS-INDV / Consultor para la Gestión Social y Articulación Project Management and Ejecución IBRD / 87070 Posterior Individual Limited 40,465.00 0.00 2020-03-01 2020-03-06 2020-03-27 2020-05-01 2022-05-02 Interinstitucional del Monitoring – PBA pendiente Programa para Fortalecer al Municipio de Morón AR-OPISU-115444-CS-INDV / Consultor para la Gestión de Obra y Articulación Project Management and Ejecución IBRD / 87070 Posterior Individual Limited 40,465.00 0.00 2020-03-01 2020-03-06 2020-03-27 2020-05-01 2022-05-02 Interinstitucional para Monitoring – PBA pendiente fortalecer al Municipio de Moron AR-OPISU-115440-CS-INDV / 3 (tres) Consultores Habitat improvement of Ejecución Inspectores de Obra para IBRD / 87070 disadvantaged neighborhoods Posterior Individual Limited 20,930.00 0.00 2020-03-01 2020-03-06 2020-03-27 2020-05-01 2022-05-02 pendiente Fortalecer al Municipio de in Greater Buenos Aires Morón AR-OPISU-115441-CS-INDV Habitat improvement of / Consultor Inspector de Ejecución IBRD / 87070 disadvantaged neighborhoods Posterior Individual Limited 12,210.00 0.00 2020-03-01 2020-03-06 2020-03-27 2020-05-01 2022-05-02 Obra Senior para fortalecer pendiente in Greater Buenos Aires al Municipio de Morón AR-OPISU-96262-CS-INDV / Project Management and IBRD / 87070 Previa Individual Limited 87,000.00 0.00 En ejecución 2020-03-01 2020-03-07 2020-03-16 2020-04-02 2024-12-30 Coordinador de Adquisiciones Monitoring – PBA AR-OPISU-97187-CS-INDV / Implementación del Plan de Habitat improvement of Reasentamiento de Carlos Ejecución IBRD / 87070 disadvantaged neighborhoods Posterior Individual Limited 24,000.00 0.00 2020-03-01 2020-03-06 2020-03-27 2020-05-01 2020-10-28 Gardel: Equipo de pendiente in Greater Buenos Aires Acompañamiento Social (2 consultores) AR-OPISU-157563-CS-INDV / Asistente Legal para la Project Management and Ejecución IBRD / 87070 Posterior Individual Direct 8,318.00 0.00 2020-02-05 2020-02-06 2020-02-14 2020-02-14 2020-12-31 Dirección Provincial Técnica Monitoring – PBA pendiente Legal del MIySP AR-OPISU-157572-CS-INDV / Analista Legal para la Project Management and Ejecución IBRD / 87070 Posterior Individual Direct 10,396.00 0.00 2020-02-05 2020-02-06 2020-02-14 2020-02-14 2020-12-31 Dirección Provincial Técnica Monitoring – PBA pendiente Legal del MIySP Page 4 AR-OPISU-157574-CS-INDV / Asistente en Redeterminaciones de Precios Project Management and Ejecución IBRD / 87070 Posterior Individual Direct 6,519.00 0.00 2020-02-05 2020-02-06 2020-02-14 2020-02-14 2020-12-31 para la Dirección Provincial Monitoring – PBA pendiente de Redeterminación de precios del MIySP AR-OPISU-157578-CS-INDV / Especialista en Análisis de Project Management and Ejecución IBRD / 87070 Posterior Individual Direct 10,396.00 0.00 2020-02-05 2020-02-06 2020-02-14 2020-02-14 2020-12-31 Viabilidad para la UCEPO Monitoring – PBA pendiente del MIySP AR-OPISU-157579-CS-INDV / Asistente en Seguimiento y Project Management and Ejecución IBRD / 87070 Posterior Individual Direct 6,519.00 0.00 2020-02-05 2020-02-06 2020-02-14 2020-02-14 2020-12-31 Monitoreo de Obras para la Monitoring – PBA pendiente UCEPO del MIySP AR-OPISU-157584-CS-INDV / Especialista en Proyectos Project Management and Ejecución IBRD / 87070 Posterior Individual Direct 10,396.00 0.00 2020-02-05 2020-02-06 2020-02-14 2020-02-14 2020-12-31 de Infraestructura Barrial Monitoring – PBA pendiente para UCIBA del MIySP AR-OPISU-157586-CS-INDV / Analista de Proyectos de Project Management and Ejecución IBRD / 87070 Posterior Individual Direct 8,840.00 0.00 2020-02-05 2020-02-06 2020-02-14 2020-02-14 2020-12-31 Infraestructura Barrial para Monitoring – PBA pendiente UCIBA del MIySP AR-OPISU-157587-CS-INDV / Experto en Proyectos de Project Management and Ejecución IBRD / 87070 Posterior Individual Direct 16,628.00 0.00 2020-02-05 2020-02-06 2020-02-14 2020-02-14 2020-12-31 Infraestructura Barrial para Monitoring – PBA pendiente UCIBA del MIySP AR-OPISU-157589-CS-INDV / Experto en Proyectos de Project Management and Ejecución IBRD / 87070 Posterior Individual Direct 16,628.00 0.00 2020-02-05 2020-02-06 2020-02-14 2020-02-14 2020-12-31 Infraestructura Barrial para Monitoring – PBA pendiente UCIBA del MIySP AR-OPISU-157591-CS-INDV / Experto en Proyectos de Project Management and Ejecución IBRD / 87070 Posterior Individual Direct 16,628.00 0.00 2020-02-05 2020-02-06 2020-02-14 2020-02-14 2020-12-31 Infraestructura Barrial para Monitoring – PBA pendiente UCIBA del MIySP AR-OPISU-157592-CS-INDV / Especialista en Project Management and Ejecución IBRD / 87070 Posterior Individual Direct 10,396.00 0.00 2020-02-05 2020-02-06 2020-02-14 2020-02-14 2020-12-31 Coordinación Administrativa Monitoring – PBA pendiente para la UCIBA del MIySP AR-OPISU-157594-CS-INDV / Especialista en Gestión Project Management and Ejecución IBRD / 87070 Posterior Individual Direct 10,396.00 0.00 2020-02-05 2020-02-06 2020-02-14 2020-02-14 2020-12-31 Presupuestaria para la Monitoring – PBA pendiente UCIBA del MIySP AR-OPISU-157602-CS-INDV Project Management and Ejecución / Especialista en IBRD / 87070 Posterior Individual Limited 10,396.00 0.00 2020-02-05 2020-02-10 2020-03-02 2020-04-06 2020-12-31 Monitoring – PBA pendiente Adquisiciones para OPISU AR-OPISU-157603-CS-INDV / Experto en Gestión y Project Management and Ejecución Seguimiento de Proyectos IBRD / 87070 Posterior Individual Limited 16,628.00 0.00 2020-02-05 2020-02-10 2020-03-02 2020-04-06 2020-12-31 Monitoring – PBA pendiente Integrales de Urbanización para OPISU AR-OPISU-157604-CS-INDV / Coordinador Experto en Project Management and Ejecución Monitoreo de Proyectos con IBRD / 87070 Posterior Individual Limited 11,917.00 0.00 2020-02-05 2020-02-10 2020-03-02 2020-04-06 2020-12-31 Monitoring – PBA pendiente Financiamiento Externo para OPISU Page 5