The World Bank Implementation Status & Results Report Earthquake Recovery and Public Health Preparedness Project (P173998) Earthquake Recovery and Public Health Preparedness Project (P173998) EUROPE AND CENTRAL ASIA | Croatia | Urban, Resilience and Land Global Practice | IBRD/IDA | Investment Project Financing | FY 2020 | Seq No: 2 | ARCHIVED on 26-Apr-2021 | ISR46094 | Implementing Agencies: Ministry of Construction and Physical Planning and State Assets, Republic of Croatia, Ministry of Health Key Dates Key Project Dates Bank Approval Date: 26-Jun-2020 Effectiveness Date: 16-Dec-2020 Planned Mid Term Review Date: 28-Nov-2022 Actual Mid-Term Review Date: Original Closing Date: 30-Jun-2024 Revised Closing Date: 30-Jun-2024 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective (PDO) is to assist Croatia with earthquake reconstruction efforts in Zagreb and the surrounding areas, improve institutional capacity for reconstruction, and strengthen national systems for public health preparedness. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Earthquake Recovery and Reconstruction:(Cost $180.00 M) Public Health Surveillance and Preparedness:(Cost $15.00 M) Project Management:(Cost $5.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Unsatisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions The project became effective in December 2020 and is in early stages of implementation. In December 2020, Croatia was affected by a series of earthquakes, with the Ministry of Physical Planning, Construction and State Assets (MoPPCSA) in charge of damage assessment, among other tasks. The latest series of earthquakes have delayed project implementation. Critical next steps include strengthening of the Project Implementation Unit within MoPPCSA with additional external experts, the establishment of the Project Steering Committee, and identification of first batch of investments for which technical studies need to be conducted. 4/26/2021 Page 1 of 7 The World Bank Implementation Status & Results Report Earthquake Recovery and Public Health Preparedness Project (P173998) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate Substantial Moderate Macroeconomic High High Substantial Sector Strategies and Policies Substantial Substantial Substantial Technical Design of Project or Program Moderate Moderate Moderate Institutional Capacity for Implementation and Substantial Substantial Substantial Sustainability Fiduciary Moderate Moderate Moderate Environment and Social Substantial Substantial Substantial Stakeholders Substantial Substantial Substantial Other Moderate Moderate Moderate Overall Substantial Substantial Substantial Results PDO Indicators by Objectives / Outcomes To assist Croatia with earthquake reconstruction efforts, improve capacity for reconstruction IN00973777 ►Rehabilitated or reconstructed health and education buildings with restored operational capacity and higher seismic performance (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 16-Jun-2020 28-Sep-2020 09-Apr-2021 16-Jun-2024 This indicator will measure the percentage of the rehabilitated or reconstructed health and education buildings with restored operational capacity and improved seismic performance financed by the project. Health facilities can include hospital and health centers (sub-component 1.2) as well as public health laboratories (sub-component 2.1), while education facilities can include kindergartens, primary and Comments: secondary schools, university buildings, and research institutes (sub-component 1.2). Seismic performance refers to the probable consequences of a building's response to earthquake shaking. The denominator will be the total number of rehabilitated or reconstructed health and education buildings financed by the Project. IN00973779 ►Buildings which have benefited from debris removal and/or repair (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 35.00 4/26/2021 Page 2 of 7 The World Bank Implementation Status & Results Report Earthquake Recovery and Public Health Preparedness Project (P173998) Date 25-Jun-2020 28-Sep-2020 09-Apr-2021 25-Jun-2024 This indicators measures the buildings which have benefited from removal and repairs. Interventions include debris removal and removal of damaged roofs and chimneys, along with minor repairs to Comments: nonstructural elements of communal parts of buildings. The percentage refers to the share of the buildings covered under the Project out of the total percentage of buildings supported by the Government through its own resources. IN00973780 ►Croatia has developed policy options for the design of a financial support program for housing reconstruction (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 25-Jun-2020 28-Sep-2020 09-Apr-2021 25-Jun-2024 Country-specific policy options have been developed to inform and guide the establishment of a housing Comments: reconstruction program. and to strengthen public health preparedness systems IN00973778 ►Reported suspected cases of a selected health condition (a selected tracer condition) reported and investigated per approved protocol (disaggregated by gender) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 80.00 Date 16-Jun-2020 28-Sep-2020 09-Apr-2021 16-Jun-2024 This indicator will use COVID-19 as a tracer condition to assess the strength of public health preparedness systems. The numerator will be the total number of suspected COVID-19 cases, which are Comments: investigated based on MoH guidelines, including contact tracing. The denominator will be the total number of reported, suspected COVID-19 cases. The data collection will be disaggregated by gender and age. Intermediate Results Indicators by Components Component 1: Earthquake Recovery and Reconstruction IN00973786 ►Designs for rehabilitation or reconstruction of health and education buildings completed (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 09-Jun-2020 28-Sep-2020 09-Apr-2021 16-Jun-2024 This indicator will measure the number of detailed engineering assessments of the damaged health and Comments: education buildings financed by the project. IN00973788 ►Health and education buildings rehabilitated or reconstructed that have gender-responsive and universal access design features (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target 4/26/2021 Page 3 of 7 The World Bank Implementation Status & Results Report Earthquake Recovery and Public Health Preparedness Project (P173998) Value 0.00 0.00 0.00 10.00 Date 16-Jun-2020 28-Sep-2020 09-Apr-2021 16-Jun-2024 This indicator will monitor the number of health and education buildings rehabilitated under the project (sub-component 1.2 and 2.1). Rehabilitation” is defined as structural strengthening of existing buildings to meet a higher seismic performance; “reconstruction” is defined as demolishment of existing building and Comments: subsequent construction new buildings in replacement. The rehabilitation and reconstruction will also consider gender-sensitive and universal access design features, such as universal accessibility standards, women’s safety, compliant ramps, bathroom design, adequate lighting, etc. IN00973789 ►Institutional coordination mechanism operational and key technical capacity in engineering, procurement and contract management in place (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 16-Jun-2020 28-Sep-2020 09-Apr-2021 16-Jun-2024 This indicator will monitor the establishment and functioning of institutional arrangements, including of the Project Steering Committee, to implement and coordinate rehabilitation and reconstruction efforts. It will Comments: monitor the implementation capacity within the PIU established under the MoCPP, including hiring of experts consultants as needed to fill identified technical and project management gaps. IN00973790 ►Technical recommendations for the design of a housing reconstruction program developed (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 09-Jun-2020 28-Sep-2020 28-Sep-2020 16-Jun-2024 This indicator will monitor the delivery of consultancy services to provide guidance to the establishment of Comments: a financial support program for rehabilitation and reconstruction of private housing. IN00973792 ►People reached through informative community meetings (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2,500.00 Date 09-Jun-2020 28-Sep-2020 09-Apr-2021 16-Jun-2024 The users of health and education buildings to be rehabilitated or reconstructed will be informed and Comments: consulted in a timely manner about the nature, planned timeline and expected outcomes of the intervention. This may include in-person and online consultations. IN00973795 Percentage of which female (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 48.00 IN00973796 ►Beneficiaries satisfied with rehabilitated or reconstruction health and education buildings (disaggregated by gender) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target 4/26/2021 Page 4 of 7 The World Bank Implementation Status & Results Report Earthquake Recovery and Public Health Preparedness Project (P173998) Value 0.00 0.00 0.00 70.00 Date 16-Jun-2020 28-Sep-2020 09-Apr-2021 17-Jun-2024 This indicator will measure the percentage of surveyed beneficiaries of selected education and health facilities with positive responses (satisfied, very satisfied) with key aspects of the rehabilitation and Comments: reconstruction process, including aspects such as information available, facilities, disaggregated by gender and by people with a disability. Component 2: Public Health Surveillance and Preparedness IN00973791 ►National guidelines for surveillance system updated including 15 health conditions (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 15.00 Date 16-Jun-2020 28-Sep-2020 09-Apr-2021 17-Jun-2024 This indicator will monitor the updating of guidelines for preventing and detecting 15 conditions, which Comments: draw on international clinical norms, are issued by the Ministry of Health. In this context, 15 refers to the total number of guidelines across the life of the project. IN00973793 ►Sentinel sites for respiratory viruses providing quarterly reports (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.00 Date 16-Jun-2020 28-Sep-2020 09-Apr-2021 17-Jun-2024 This indicator will measure the number of sites established and providing quarterly reports. The quarterly Comments: reports should demonstrate weekly data collection. Sentinel sites are selected reporting units, with a high probability of identifying relevant disease. IN00973794 ►Assessments of the surveillance system conducted (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 09-Jun-2020 28-Sep-2020 09-Apr-2021 17-Jun-2024 A detailed national or international assessment of the surveillance system, either through a Joint External Comments: Evaluation (or equivalent) or an independent national report, which highlights areas of progress and areas for development. IN00973797 ►Surveillance sites established for the surveillance of gender-related violence or domestic violence, with data collection disaggregated by gender (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.00 Date 16-Jun-2020 28-Sep-2020 09-Apr-2021 17-Jun-2024 Number of surveillance sites (appropriate health care facilities and/or social welfare facilities and/or Comments: NGOs) established for the surveillance of gender-related violence or domestic violence. Data collection will be based on a protocol informed by international norms and standards, and disaggregated by gender. 4/26/2021 Page 5 of 7 The World Bank Implementation Status & Results Report Earthquake Recovery and Public Health Preparedness Project (P173998) Component 3: Project Management IN00973787 ►Grievances responded to in the stipulated time (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 16-Jun-2020 28-Sep-2020 09-Apr-2021 16-Jun-2024 The indicator will measure the proportion of grievances responded to in the stipulated time, as defined by Comments: the safeguards documents. Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P173998 IBRD-91270 Effective USD 200.00 200.00 0.00 0.00 200.00 0% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P173998 IBRD-91270 Effective 26-Jun-2020 02-Jul-2020 16-Dec-2020 30-Jun-2024 30-Jun-2024 Cumulative Disbursements 4/26/2021 Page 6 of 7 The World Bank Implementation Status & Results Report Earthquake Recovery and Public Health Preparedness Project (P173998) PBC Disbursement Achievement Disbursed amount in Disbursement % PBC ID PBC Type Description Coc PBC Amount Status Coc for PBC Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 4/26/2021 Page 7 of 7