Documents & Reports

World Bank guarantee catalyzes private sector investment for Uch Power Project In Pakistan (English)

Abstract

The Uch Power Project is the first Partial Risk Guarantee operation since the mainstreaming of the Bank's Guarantee Program in 1994, and the second such operation after the Hub Power Project. The Project has been precedent setting in terms of a Bank Group... See More +

Details

  • 1996/09/01
  • 35889
  • 1
  • 1
  • Pakistan
  • South Asia
  • 2006/04/18
  • Disclosed
  • World Bank guarantee catalyzes private sector investment for Uch Power Project In Pakistan
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation