Prior to joining the Bank, Ali worked for the Government of Solomon Islands in different capacities, including Deputy Provincial Secretary, Director Planning. He then Joined UNDP Fiji Multi-Country Office as Programme Manager responsible for Fiji, Solomon Islands and Nauru. After his assignment with UNDP, Ali moved to New Zealand to serve as Pacific Program Manager for Oxfam New Zealand responsible for all Pacific Countries, and to Australia to serve as assistant Manager for ASPBAE Australia Limited and provided support to programmes in the Pacific and south Asia regions. Ali holds a bachelor’s degree in economics from the University of the South Pacific in Fiji. I am pleased to introduce your new Lead HR Business Partner, Safie Sarr. Safie is a Human Resources professional with over 20 years of global experience designing and aligning HR strategy to meet organizational goals. She is currently the Human Resource Manager for the Finance and Corporate Vice Presidencies and the Latin America and Caribbean Region. Throughout her career, she has held various positions in Client Services and in our Centers of Expertise (Compensation and Executive Recruitment). Safie has a Bachelor degree in Economics from McGill University and a MBA in Finance from the American University. She is a coach accredited by the International Coaching Federation and a trained facilitator. Safie will cover the Cote Ivoire, Congo and Mozambique Country Management Units and will also lead and coordinate various initiatives across the region. She will be based in Dakar, Senegal and will start her new assignment on September 3, 2018. Please join me in welcoming Safie to the region. . Merci de trouver ci-dessous la petite note que j’ai preparée pour mon introduction aux TTLs pour tes commentaires et observations. I am pleased to introduce our new Sr Procurement Specialist, Arcade Bigirindavyi. Arcade is a Senior Procurement Specialist working in the Governance Global Practice moved from the World Bank office in Niamey, he Joined in October 2017. Before going to Niger, Arcade worked as procurement specialist in Burundi for more than 15 years. He has in extensive experience in procurement and project management gained working for various donor fund projects (AFDB, EU, sub-regional organizations and WB). Arcade brings a solid experience in procurement and contract management in infrastructure and social sectors gained at different level of responsibility. Arcade is a graduated in architecture from the University of Blida. He started his new assignment on September 3, 2018. Please join me in welcoming Arcade to the Burundi Country office. . PROCUREMENT Burundi : Local Development for Jobs Project PLAN General Information Country: Burundi Bank’s Approval Date of the Original Procurement Plan: 2018-09-05 2021-07-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P155060 GPN Date: Project Name: Local Development for Jobs Project Loan / Credit No: IDA / D2250 Project Implementation Unit Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BI-PIU-90890-CW-RFQ / Component 2: Support for Single Stage - One 2019-12- Réhabilitation locaux du IDA / D2250 A posteriori Demande de prix Open - National 150,000.00 0.00 Annulé 2019-04-21 2019-06-16 Value Chain Development Envelope 13 Tribunal du Commerce BI-PIU-90903-CW-RFQ / Tranche 1- Construction de Component 1: Investments in Single Stage - One 2020-03- logements au Collège IDA / D2250 A posteriori Appel d'offres Open - National 145,581.00 117,625.90 Achevé 2019-06-10 2019-07-12 2019-06-15 2019-07-15 2019-07-15 2019-08-16 2019-08-14 2019-10-08 2019-09-18 2019-10-31 Local Public Infrastructure Envelope 16 Communal de NYAKABINGO à BISORO (MWARO) BI-PIU-49251-CW-RFB / Tranche 1 - Construction du Component 1: Investments in Single Stage - One 2020-03- IDA / D2250 A posteriori Appel d'offres Open - National 363,952.00 279,585.82 Achevé 2019-06-21 2019-08-08 2019-06-26 2019-08-08 2019-07-26 2019-09-12 2019-08-25 2019-12-06 2019-09-29 2020-01-15 Centre de Santé de GITEZI- Local Public Infrastructure Envelope 27 GISHINGANO à ISARE BI-PIU-49257-CW-RFB / Tranche 1 - Construction du Component 1: Investments in Single Stage - One 2020-03- Centre de Santé de IDA / D2250 A posteriori Appel d'offres Open - National 363,952.00 387,628.62 Achevé 2019-06-14 2019-07-20 2019-06-19 2019-07-22 2019-07-19 2019-08-27 2019-08-18 2019-12-09 2019-09-22 2020-01-15 Local Public Infrastructure Envelope 20 NYAMABUYE à BUGABIRA (KIRUNDO) BI-PIU-49256-CW-RFB / Tranche 1 - Construction du Component 1: Investments in Single Stage - One 2020-03- IDA / D2250 A posteriori Appel d'offres Open - National 363,952.00 354,094.25 Achevé 2019-06-14 2019-07-20 2019-06-19 2019-07-22 2019-07-19 2019-08-27 2019-08-18 2019-12-04 2019-09-22 2020-01-20 Centre de Santé de NYAKERU Local Public Infrastructure Envelope 20 à BUGENDANA (GITEGA) BI-PIU-49259-CW-RFB / Tranche 1 - Construction du Component 1: Investments in Single Stage - One 2020-03- IDA / D2250 A posteriori Appel d'offres Open - National 363,952.00 417,390.83 Achevé 2019-06-14 2019-07-20 2019-06-19 2019-07-22 2019-07-19 2019-08-27 2019-08-18 2019-10-23 2019-09-22 2019-11-15 Centre de Santé de CAGIZO à Local Public Infrastructure Envelope 20 BUTIHINDA (MUYINGA) BI-PIU-49253-CW-RFB / Tranche 1 - Construction du Component 1: Investments in Single Stage - One 2020-03- Centre de Santé de IDA / D2250 A posteriori Appel d'offres Open - National 363,952.00 324,244.33 Achevé 2019-06-21 2019-08-08 2019-06-26 2019-08-08 2019-07-26 2019-09-12 2019-08-25 2019-12-02 2019-09-29 2020-01-10 Local Public Infrastructure Envelope 27 SHURUGUMYA à GAHOMBO (KAYANZA) BI-PIU-49244-CW-RFB / Tranche1 - Extension du Component 1: Investments in Single Stage - One 2020-02- IDA / D2250 A posteriori Appel d'offres Open - National 262,707.00 172,954.46 Achevé 2019-06-10 2019-07-12 2019-06-15 2019-07-15 2019-06-18 2019-08-16 2019-07-18 2019-10-08 2019-08-22 2019-11-20 Collège Communal de Local Public Infrastructure Envelope 18 MUSENYI à RUTOVU (BURURI) BI-PIU-49176-CW-RFB / Pavage de KANYOSHA (2,220 km), voirie urbaine de BUBANZA (2 km), 4ème Avenue du quartier Component 1: Investments in Single Stage - One 2020-04- IDA / D2250 A posteriori Appel d'offres Open - National 3,607,218.00 0.00 Annulé 2019-05-06 2019-05-11 2019-06-22 2019-07-22 2019-08-26 NYAMUGARI à GITEGA (1,450 Local Public Infrastructure Envelope 22 km), de l'avenue KARONGA au quartier YOBA à GITEGA (1,500 km) et de rues à KAYANZA ( 2,2 km) BI-PIU-49204-CW-RFB / Pavage de la voirie de NGAGARA (0,980 km), MUTAKURA (1,400 km), Component 1: Investments in Single Stage - One 2020-04- IDA / D2250 A posteriori Appel d'offres Open - National 3,331,510.00 0.00 Annulé 2019-05-30 2019-06-04 2019-07-04 2019-07-25 2019-08-30 BUYENZI (1,185 km), GIHOSHA Local Public Infrastructure Envelope 26 Rural (2,200 km), MUSAGA (1,170 km) et KINANIRA I (1,700km) BI-PIU-118574-CW-RFB / Tranche 1 - Pavage de la voirie urbaine de BUBANZA (2 km) , de MUTAKURA, de Component 1: Investments in Single Stage - One En cours 2020-06- BUYENZI (17ème et 23ème IDA / D2250 A posteriori Appel d'offres Open - National 4,192,134.00 0.00 2019-07-12 2019-10-28 2019-07-17 2019-10-28 2019-08-16 2019-12-20 2019-09-15 2019-10-20 Local Public Infrastructure Envelope d'exécution 16 Avenues), de KANYOSHA (4,440Km), de la voirie de MUSAGA et du quartier KINANIRA I [en treize (13) lots] BI-PIU-73672-CW-RFB / Pavage à KAMENGE (1,600 km), de la Rue Henri 8 (0,850 km), réhabilitation d'un collecteur à MUTAKURA Component 1: Investments in Single Stage - One 2020-09- (0,700 km), pavage de IDA / D2250 A posteriori Appel d'offres Open - National 4,936,506.00 0.00 Annulé 2019-10-22 2019-10-27 2019-11-26 2019-12-17 2020-01-22 Local Public Infrastructure Envelope 18 BUBANZA (1,600 km), de NGAGARA (1,300 km), de GIHOSHA Rural (1,100 km), de BUYENZI (2,515 km) et de KANYOSHA (2,220 km) BI-PIU-73679-CW-RFB / Pavage Quartier MAGARAMA (1,750 km), routes Quartier REGIDESO (0,450 km), Component 1: Investments in Single Stage - One 2020-09- Quartier NTOBWE (1,200 km), IDA / D2250 A posteriori Appel d'offres Open - National 3,570,043.00 0.00 Annulé 2019-10-29 2019-11-03 2019-12-03 2019-12-24 2020-01-29 Local Public Infrastructure Envelope 25 Quartier RANGO (1,700 km), Quartier MUSHASHA (1,300 km) et Quartier NYABUTUTSI (1,900 km) à GITEGA Page 1 BI-PIU-73656-CW-RFB / Construction de l'Ecole Component 1: Investments in Single Stage - One 2020-07- IDA / D2250 A posteriori Appel d'offres Open - National 264,693.00 0.00 Annulé 2019-11-18 2019-11-23 2019-12-23 2020-01-13 2020-02-18 Primaire RUTEGAMA à Local Public Infrastructure Envelope 17 RUTEGAMA BI-PIU-73662-CW-RFB / Extension du Collège Component 1: Investments in Single Stage - One 2020-08- IDA / D2250 A posteriori Appel d'offres Open - National 297,779.00 0.00 Annulé 2019-12-02 2019-12-07 2020-01-06 2020-01-27 2020-03-03 Communal CANKUZO Local Public Infrastructure Envelope 30 (CANKUZO) BI-PIU-73678-CW-RFB / Pavage Kanyosha , de la 7ème Component 1: Investments in Single Stage - Two 2020-08- avenue jusqu'à la jonction de IDA / D2250 A posteriori Appel d'offres Open - National 848,824.00 0.00 Annulé 2019-09-11 2019-09-16 2019-10-28 2020-01-10 2020-02-14 Local Public Infrastructure Envelope 12 la 12ème avenue de Musaga (2,220 Km) BI-PIU-73677-CW-RFB / Component 1: Investments in Single Stage - Two 2020-08- Pavage BUYENZI : 16, 19, 22 IDA / D2250 A posteriori Appel d'offres Open - National 961,617.00 0.00 Annulé 2019-09-11 2019-09-16 2019-10-28 2020-01-10 2020-02-14 Local Public Infrastructure Envelope 12 et 24èmes Avenues (2,515 km) BI-PIU-73676-CW-RFB / Component 1: Investments in Single Stage - Two 2020-08- Pavage GIHOSHA Rural : Rue IDA / D2250 A posteriori Appel d'offres Open - National 420,588.00 0.00 Annulé 2019-09-11 2019-09-16 2019-10-28 2020-01-10 2020-02-14 Local Public Infrastructure Envelope 12 Inkondo (1,1 km) BI-PIU-73675-CW-RFB / Pavage NGAGARA: Rue Component 1: Investments in Single Stage - Two 2020-08- IDA / D2250 A posteriori Appel d'offres Open - National 497,058.00 0.00 Annulé 2019-09-11 2019-09-16 2019-10-28 2020-01-10 2020-02-14 NYABIBUYE et rue Rutovu - Local Public Infrastructure Envelope 12 Ryankona (1,300 km) BI-PIU-73673-CW-RFB / Pavage de la Rue Henri 8, Component 1: Investments in Single Stage - Two 2020-08- IDA / D2250 A posteriori Appel d'offres Open - National 325,000.00 0.00 Annulé 2019-09-11 2019-09-16 2019-10-28 2020-01-10 2020-02-14 jonction de Kinama et Carama Local Public Infrastructure Envelope 12 (KINAMA)-850 m BI-PIU-49240-CW-RFB / Tranche 1- Construction du Marché de MURAMVYA Component 1: Investments in Single Stage - One En cours 2020-06- IDA / D2250 A posteriori Appel d'offres Open - National 923,116.00 0.00 2019-08-04 2020-01-27 2019-08-09 2020-01-27 2019-09-08 2020-02-28 2019-10-08 2020-06-08 2019-11-12 (MURAMVYA) et Extension du Local Public Infrastructure Envelope d'exécution 09 Marché de MUSENYI (GIFURWE) en deux lots BI-PIU-122395-CW-RFB / Tranche 1- Pavage de la voirie urbaine de NGAGARA (Rue NYUMINKWI et Rue SIGUVYAYE), de GIHOSHA Component 1: Investments in Single Stage - One En cours 2020-07- IDA / D2250 A posteriori Appel d'offres Open - National 3,255,989.00 0.00 2019-08-13 2019-08-28 2019-08-18 2019-08-28 2019-09-17 2019-09-27 2019-10-17 2019-11-21 Rural (Avenue Muyaga), du Local Public Infrastructure Envelope d'exécution 18 Quartier NYAMUGARI à GITEGA, du Quartier YOBA à GITEGA et de rues à KAYANZA [en neuf (09) lots] BI-PIU-147452-CW-RFB / Tranche 1 - Travaux de Construction du Bureau Component 1: Investments in Single Stage - One 2020-09- IDA / D2250 A posteriori Appel d'offres Open - National 268,182.00 196,422.38 Achevé 2019-12-05 2020-02-03 2019-12-10 2020-02-04 2020-01-09 2020-03-06 2020-02-08 2020-04-14 2020-03-21 2020-04-30 Communal de GITANGA en Local Public Infrastructure Envelope 17 Commune de GITANGA de la Province RUTANA (Relance) BI-PIU-96146-CW-RFB / Travaux de Réhabilitation locaux du Tribunal du Commerce + Réhabilitation Component 2: Support for Single Stage - One En attente 2020-06- des locaux de l'Ordre des IDA / D2250 A posteriori Appel d'offres Open - National 740,000.00 0.00 2019-09-12 2019-09-17 2019-10-29 2019-11-28 2020-01-02 Value Chain Development Envelope d'exécution 30 Professionnels Ingénieurs (après étude faite par le Comité de Pilotage de l'ordre des Ingénieurs ) BI-PIU-73687-CW-RFB / Réhabilitation d'un collecteur Component 1: Investments in Single Stage - Two 2020-08- IDA / D2250 A posteriori Appel d'offres Open - National 205,882.00 0.00 Annulé 2019-09-11 2019-09-16 2019-10-28 2020-01-10 2020-02-14 des eaux de la onzième Local Public Infrastructure Envelope 12 avenue Mutakura (0,700 km) BI-PIU-194641-CW-DIR / Tranche 1 - Travaux de raccordement et d’installation électrique par courant Passation de alternatif au Centre de Santé Component 1: Investments in 2021-02- IDA / D2250 A posteriori marché de gré à Direct 40,000.00 35,077.73 Signé 2020-11-27 2020-11-05 2020-12-02 2020-11-06 2021-01-13 2020-11-30 de GAHORORO en Commune Local Public Infrastructure 12 gré MABANDA de la Province MAKAMBA par l'Entreprise ECOTRAE qui a exécuté les travaux du Contrat de base BI-PIU-146335-CW-RFB / Réhabilitation des locaux de l'Ordre des Ingénieurs du Component 1: Investments in Single Stage - One 2020-12- IDA / D2250 A posteriori Appel d'offres Open - National 200,000.00 0.00 Annulé 2020-02-25 2020-03-01 2020-03-31 2020-04-30 2020-06-04 Burundi (après étude faite par Local Public Infrastructure Envelope 01 le Comité de Pilotage de l'ordre des Ingénieurs) BI-PIU-221192-CW-RFB / Tranche 2- Construction de l’Ecole Primaire de RUHEHE (BUGABIRA), du Collège Communal de CARUBAMBO Component 1: Investments in Single Stage - One En attente 2022-04- (NTEGA), de l’Ecole Primaire IDA / D2250 A posteriori Appel d'offres Open - National 1,422,255.50 0.00 2021-05-10 2021-05-15 2021-06-14 2021-07-14 2021-08-18 Local Public Infrastructure Envelope d'exécution 15 de MASAMA (NYAMURENZA), de l’Ecole Technique de GICU (NYAMURENZA) et Extension Collège Communal de CANKUZO - 05 lots BI-PIU-221234-CW-RFB / Tranche 2- Construction du Marché de BUTWE à GATARA (KAYANZA), du Marché de BUMBA à BUTAGANZWA Component 1: Investments in Single Stage - One En attente 2022-03- IDA / D2250 A posteriori Appel d'offres Open - National 1,815,645.50 0.00 2021-05-17 2021-05-22 2021-06-21 2021-07-21 2021-08-25 (KAYANZA), du Marché de Local Public Infrastructure Envelope d'exécution 23 GASORWE à GASORWE (MUYINGA) et du Marché de MUBARAGAZA à MUTUMBA (KARUSI) - 04 lots Page 2 BI-PIU-221230-CW-RFB / Tranche 2- Pavage à KAMENGE, de la Rue Henri 8, Réhabilitation d’un collecteur Component 1: Investments in Single Stage - One En attente 2022-04- IDA / D2250 A posteriori Appel d'offres Open - National 3,738,565.02 0.00 2021-05-05 2021-05-10 2021-06-09 2021-07-09 2021-08-13 à MUTAKURA, pavage de la Local Public Infrastructure Envelope d'exécution 10 voirie urbaine de BUBANZA, NGAGARA, GIHOSHA Rural, BUYENZI et KANYOSHA BI-PIU-221242-CW-RFB / Tranche 2- Pavage au Quartier MAGARAMA, des routes Quartier REGIDESO, Component 1: Investments in Single Stage - One En cours 2022-02- IDA / D2250 A posteriori Appel d'offres Open - National 3,265,135.51 0.00 2021-04-26 2021-07-22 2021-05-01 2021-07-23 2021-06-12 2021-07-12 2021-08-16 Quartier NTOBWE, Quartier Local Public Infrastructure Envelope d'exécution 12 RANGO, Quartier MUSHASHA et Quartier NYABUTUTSI à GITEGA BI-PIU-221241-CW-RFB / Tranche 2- Extension du Collège Communal de MUYIRA Component 1: Investments in Single Stage - One En attente 2022-02- IDA / D2250 A posteriori Appel d'offres Open - National 544,693.60 0.00 2021-05-10 2021-05-15 2021-06-14 2021-07-14 2021-08-18 (KANYOSHA) et construction Local Public Infrastructure Envelope d'exécution 14 de l’Ecole fondamentale NYAMBUYE (ISARE) – 02 lots BI-PIU-221235-CW-RFB / Tranche 2- Construction du Centre de jeunes à NYAKABIGA dans la Component 1: Investments in Single Stage - One En cours 2022-04- IDA / D2250 A posteriori Appel d'offres Open - National 765,518.88 0.00 2021-04-26 2021-06-01 2021-05-01 2021-06-03 2021-05-31 2021-06-30 2021-08-04 Municipalité de BUJUMBURA et Local Public Infrastructure Envelope d'exécution 01 du Centre jeunes de VUGIZO en Commune VUGIZO de la Province MAKAMBA – 02 lots BI-PIU-221243-CW-RFB / Tranche 2 - Construction du Village des métiers au Quartier Industriel à BUYENZI, Component 1: Investments in Single Stage - One En attente 2022-07- IDA / D2250 A posteriori Appel d'offres Open - National 2,178,774.39 0.00 2021-07-29 2021-08-03 2021-09-02 2021-10-02 2021-11-06 du Centre d'Enseignement des Local Public Infrastructure Envelope d'exécution 04 Métiers à BWIZA et Aménagement Terrain de jeu à KINANIRA – 03 lots BI-PIU-227851-CW-RFB / Tranche 2- Construction de l’Ecole Primaire RUTEGAMA Component 1: Investments in Single Stage - One En cours 2022-01- (RUTEGAMA) et d’une salle IDA / D2250 A posteriori Appel d'offres Open - National 332,868.31 0.00 2021-04-30 2021-05-26 2021-05-05 2021-05-27 2021-06-04 2021-07-04 2021-08-08 Local Public Infrastructure Envelope d'exécution 05 polyvalente au Lycée communal de BURURI (BURURI) – 02 lots BI-PIU-237733-CW-RFQ / Request for Component 1: Investments in Single Stage - One En attente 2021-10- Travaux d'électrification du IDA / D2250 A posteriori Demande de prix Limited Quotations (Non 75,000.00 0.00 2021-07-07 2021-09-01 Local Public Infrastructure Envelope d'exécution 31 Centre de santé NYAMABUYE Bank-SPD) National BI-PIU-245848-CW-RFB / Procurement Component 2: Support for Single Stage - One En attente 2022-07- Réhabilitation des locaux du IDA / D2250 A posteriori Appel d'offres Open - National Document - 1 400,000.00 0.00 2021-09-30 2021-10-05 2021-11-16 2021-12-16 2022-01-20 Value Chain Development Envelope d'exécution 19 tribunal de commerce Envelope process (Non Bank-SPD) BI-PIU-245852-CW-RFQ / National Aménagement et équipement Procurement Component 2: Support for Single Stage - One En attente 2022-04- des locaux du Guichet Unique IDA / D2250 A posteriori Demande de prix Limited Document - 1 180,000.00 0.00 2021-08-10 2021-10-05 Value Chain Development Envelope d'exécution 03 de création d'entreprises de Envelope process l'API (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-PIU-49896-GO-RFQ / Fourniture du mobilier du Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Demande de prix Open - National 16,761.00 0.00 Annulé 2019-04-14 2019-06-09 2019-12-06 Centre de santé de CAGIZO à Local Public Infrastructure Envelope BUTIHINDA (MUYINGA) BI-PIU-49902-GO-RFQ / Fourniture des équipements Component 1: Investments in Single Stage - One sanitaires pour le Centre de IDA / D2250 A posteriori Demande de prix Open - National 23,466.00 0.00 Annulé 2019-02-17 2019-04-14 2019-10-11 Local Public Infrastructure Envelope santé de NYAMABUYE à BUGABIRA (KIRUNDO) BI-PIU-49890-GO-RFQ / Fourniture du mobilier du Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Demande de prix Open - National 16,761.00 0.00 Annulé 2019-04-14 2019-06-09 2019-12-06 Centres de santé de GITEZI- Local Public Infrastructure Envelope GISHINGANO à ISARE BI-PIU-73908-GO-RFQ / Fourniture du mobilier de Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Demande de prix Open - National 20,588.00 0.00 Annulé 2019-12-15 2020-02-09 2020-08-07 l'Ecole Primaire de RUHEHE à Local Public Infrastructure Envelope BUGABIRA BI-PIU-73909-GO-RFQ / Fourniture du mobilier de Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Demande de prix Open - National 20,588.00 0.00 Annulé 2019-12-15 2020-02-09 2020-08-07 l'Ecole Primaire MASAMA à Local Public Infrastructure Envelope NYAMURENZA (NGOZI) BI-PIU-73912-GO-RFQ / Fourniture du mobilier du Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Demande de prix Open - National 20,588.00 0.00 Annulé 2020-01-25 2020-03-21 2020-09-17 Collège Communal Local Public Infrastructure Envelope CARUBAMBO à NTEGA BI-PIU-73913-GO-RFQ / Fourniture du mobilier du Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Demande de prix Open - National 20,588.00 0.00 Annulé 2020-01-15 2020-03-11 2020-09-07 Collège Communal CANKUZO Local Public Infrastructure Envelope (CANKUZO) BI-PIU-73911-GO-RFQ / Fourniture du mobilier de Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Demande de prix Open - National 20,588.00 0.00 Annulé 2020-01-15 2020-03-11 2020-09-07 l'Ecole Fondamentale Local Public Infrastructure Envelope NYAMBUYE à ISARE Page 3 BI-PIU-73914-GO-RFQ / Fourniture du mobilier de la Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Demande de prix Open - National 14,706.00 0.00 Annulé 2020-01-15 2020-03-11 2020-09-07 salle polyvalente au Lycée Local Public Infrastructure Envelope Communal de BURURI (BURURI) BI-PIU-107859-GO-RFB / Équipement mobilier pour le Component 2: Support for Single Stage - One En attente Centre d'Arbitrage, OPIA, IDA / D2250 A posteriori Appel d'offres Open - National 180,000.00 0.00 2019-07-17 2019-07-22 2019-09-02 2019-10-02 2019-11-06 2020-05-04 Value Chain Development Envelope d'exécution Tribunal de commerce et SD- CDPP. BI-PIU-90882-GO-RFQ / Component 2: Support for Single Stage - One Groupe electrogène pour le IDA / D2250 A posteriori Demande de prix Limited 50,000.00 0.00 Annulé 2019-03-24 2019-05-19 2019-11-15 Value Chain Development Envelope CFCIB BI-PIU-113775-GO-RFQ / Fourniture, installation et Component 3: Project Single Stage - One mise en service d'un groupe IDA / D2250 Management, Coordination, A posteriori Demande de prix Open - National 50,323.00 47,328.81 Achevé 2019-04-08 2019-06-03 2019-04-10 2019-11-30 2019-05-27 Envelope électogène 42 KVA à la CFCIB and Monitoring pour le compte du PDLE BI-PIU-107867-GO-RFB / Tranche 1- Fourniture des équipements sanitaires pour les Centres de santé de GITEZI- GISHINGANO à ISARE, de Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Appel d'offres Open - National 115,803.00 152,605.31 Signé 2019-09-12 2020-03-30 2019-09-17 2020-03-30 2019-10-17 2020-04-30 2019-11-07 2020-08-12 2019-12-13 2021-01-29 2020-04-11 SHURUGUMYA à GAHOMBO Local Public Infrastructure Envelope (KAYANZA), de NYAKERU à BUGENDANA, de NYAMABUYE à BUGABIRA et de CAGIZO à BUTIHINDA BI-PIU-49894-GO-RFB / Tranche 1- Fourniture du mobilier pour les Centres de santé de GITEZI-GISHINGANO Component 1: Investments in Single Stage - One En cours à ISARE, de SHURUGUMYA à IDA / D2250 A posteriori Appel d'offres Open - National 82,716.00 0.00 2019-11-12 2020-04-29 2019-11-17 2020-04-29 2019-12-17 2020-05-29 2020-01-07 2020-07-28 2020-02-12 2020-04-12 Local Public Infrastructure Envelope d'exécution GAHOMBO (KAYANZA), de NYAKERU à BUGENDANA, de NYAMABUYE à BUGABIRA et de CAGIZO à BUTIHINDA BI-PIU-119031-GO-RFB / Tranche 1- Fourniture du mobilier pour le Collège Component 1: Investments in Single Stage - One Communal de MUSENYI IDA / D2250 A posteriori Appel d'offres Open - National 50,284.00 33,177.06 Achevé 2019-10-23 2020-06-04 2019-10-28 2020-06-05 2019-11-27 2020-07-08 2019-12-18 2020-08-12 2020-01-23 2020-09-29 2020-03-23 2021-02-11 Local Public Infrastructure Envelope (RUTOVU) et le Home pour enseignants de NYAKABINGO (BISORO) BI-PIU-90909-GO-RFB / Fourniture du mobilier et Component 1: Investments in Single Stage - One équipements du Centre IDA / D2250 A posteriori Appel d'offres Open - National 794,078.00 0.00 Annulé 2020-08-10 2020-08-15 2020-09-26 2020-10-26 2020-11-30 2021-05-29 Local Public Infrastructure Envelope d'Enseignement de Métier à BWIZA BI-PIU-108005-GO-RFB / Fourniture du mobilier des Collèges Communaux de MUYIRA à KANYOSHA, de CARUBAMBO à NTEGA et de Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Appel d'offres Open - National 109,186.00 0.00 Annulé 2020-03-30 2020-04-04 2020-05-04 2020-05-25 2020-06-29 2020-09-12 CANKUZO (CANKUZO), de Local Public Infrastructure Envelope l'Ecole Fondamentale NYAMBUYE à ISARE et de la salle polyvalente au Lycée Communal de BURURI (BURURI) BI-PIU-73906-GO-RFQ / Fourniture du mobilier des Ecoles Primaires RUTEGAMA à Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Appel d'offres Open - National 69,482.00 0.00 Annulé 2020-03-06 2020-03-11 2020-04-10 2020-05-01 2020-06-05 2020-08-19 RUTEGAMA, RUHEHE à Local Public Infrastructure Envelope BUGABIRA et MASAMA à NYAMURENZA BI-PIU-73917-GO-RFQ / Fourniture du mobilier de Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Appel d'offres Open - National 794,078.00 0.00 Annulé 2020-03-26 2020-03-31 2020-05-12 2020-06-02 2020-07-08 2020-11-05 l'Ecole Technique Secondaire Local Public Infrastructure Envelope GICU à NYAMURENZA (NGOZI) BI-PIU-73918-GO-RFQ / Fourniture du mobilier du Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Demande de prix Open - National 29,412.00 0.00 Annulé 2020-02-24 2020-04-20 2020-10-17 Centre jeunes de VUGIZO Local Public Infrastructure Envelope (MAKAMBA) BI-PIU-49907-GO-RFQ / Fourniture du mobilier pour Component 1: Investments in Single Stage - One les homes du Collège IDA / D2250 A posteriori Demande de prix Open - National 10,057.00 0.00 Annulé 2019-05-04 2019-06-29 2019-12-26 Local Public Infrastructure Envelope Communal de NYAKABINGO (BISORO) BI-PIU-51688-GO-RFQ / Tranche 1- Fourniture des équipements sanitaires pour Component 1: Investments in Single Stage - One IDA / D2250 A posteriori Appel d'offres Open - National 23,161.00 40,913.13 Achevé 2019-04-23 2019-10-29 2019-04-28 2019-10-30 2019-05-28 2019-11-28 2019-06-18 2019-12-16 2019-07-24 2020-01-10 2019-11-21 2020-08-27 le Centre de santé de Local Public Infrastructure Envelope GAHORORO à MABANDA (MAKAMBA) BI-PIU-49884-GO-RFQ / Tranche 1- Fourniture du Component 1: Investments in Single Stage - One mobilier du Centre de santé IDA / D2250 A posteriori Appel d'offres Open - National 16,761.00 16,415.12 Signé 2019-04-23 2019-10-29 2019-04-28 2019-10-30 2019-05-28 2019-11-28 2019-06-18 2019-12-16 2019-07-24 2020-02-04 2019-09-22 Local Public Infrastructure Envelope de GAHORORO à MABANDA (MAKAMBA) BI-PIU-147222-GO-RFB / Appui au BBN: Equipement Component 2: Support for Single Stage - One En attente IDA / D2250 A posteriori Appel d'offres Open - National 80,000.00 0.00 2020-01-22 2020-01-27 2020-03-09 2020-04-08 2020-05-13 2020-11-09 des laboratoires de la Value Chain Development Envelope d'exécution métrologie légale et industrielle Page 4 BI-PIU-154369-GO-RFB / Fourniture (+ formation) d'un logiciel (permettant la création et l’immatriculation en ligne de sociétés axées sur Component 2: Support for Single Stage - One En attente IDA / D2250 A posteriori Appel d'offres Open - National 300,000.00 0.00 2020-03-02 2020-03-07 2020-04-18 2020-05-18 2020-06-22 2020-12-19 le diagnostic du Guichet Value Chain Development Envelope d'exécution Unique) et équipements informatiques pour la mise en réseau des services du Guichet Unique à l'API BI-PIU-190881-GO-RFQ / Component 3: Project Achat et installation Single Stage - One En attente IDA / D2250 Management, Coordination, A posteriori Demande de prix Open - National 50,000.00 0.00 2020-09-20 2020-11-15 2021-05-14 d'équipement de vidéo- Envelope d'exécution and Monitoring conférence BI-PIU-198551-GO-RFQ / Equipement informatique Component 2: Support for Single Stage - One En attente pour l'informatisation du IDA / D2250 A posteriori Demande de prix Open - International 100,000.00 0.00 2021-02-21 2021-04-18 2021-10-15 Value Chain Development Envelope d'exécution guichet unique du permis de construire BI-PIU-90907-GO-RFQ / IT Component 2: Support for Single Stage - One equipement OSS of IDA / D2250 A posteriori Demande de prix Open - National 100,000.00 0.00 Annulé 2019-06-04 2019-07-30 2020-01-26 Value Chain Development Envelope Construction Permit BI-PIU-237525-GO-RFQ / Equipements informatiques et Component 1: Investments in Single Stage - One En attente IDA / D2250 A posteriori Demande de prix Limited 79,000.00 0.00 2021-06-30 2021-08-25 2021-10-24 connexes pour la CFCIB, le Local Public Infrastructure Envelope d'exécution Tribunal du commerce, MF BI-PIU-119424-GO-RFB / Equipements informatiques pour OPIA, Centre d'Arbitrage, Tribunal du commerce et SD- Component 2: Support for Single Stage - One DPP + IT Equipment OSS of IDA / D2250 A posteriori Appel d'offres Open - National 490,000.00 0.00 Annulé 2019-08-19 2019-08-24 2019-10-05 2019-11-04 2019-12-09 2020-06-06 Value Chain Development Envelope construct permit (informatisation du guichet unique pour l'octroi des permis de construire) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-PIU-113767-NC-RFQ / Component 3: Project Fourniture et installation d’un Single Stage - One En cours IDA / D2250 Management, Coordination, A posteriori Demande de prix Open - National 29,500.00 0.00 2019-07-12 2019-09-06 2020-03-04 logiciel pour l’archivage et Envelope d'exécution and Monitoring formation des utilisateurs BI-PIU-147117-NC-RFB / Acquisition du logiciel pour l'informatisation du guichet Component 2: Support for Single Stage - One En attente unique de l'octroi du permis IDA / D2250 A posteriori Appel d'offres Open - National 300,000.00 0.00 2020-01-28 2020-02-02 2020-03-15 2020-04-14 2020-05-19 2020-11-15 Value Chain Development Envelope d'exécution de construire et formation des utilisateurs (cadres et personnel d'appui) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-PIU-48783-CS-CQS / Sélection fondée Audit organisationnel et Component 1: Investments in sur les En cours IDA / D2250 A posteriori Open - National 40,000.00 0.00 2019-04-16 2019-04-12 2019-05-07 2019-06-20 2019-07-20 2019-08-24 2020-02-20 institutionnel de la Direction Local Public Infrastructure qualifications des d'exécution de Décentralisation du MDRI consultants BI-PIU-113484-CS-QCBS / Sélection fondée Component 1: Investments in En cours Diagnostic sur l'état des lieux IDA / D2250 A posteriori sur la qualité et le Open - National 50,000.00 0.00 2019-06-28 2020-05-18 2019-07-19 2020-09-10 2019-09-01 2019-09-29 2019-10-29 2019-12-03 2020-01-07 2021-01-06 Local Public Infrastructure d'exécution des routes pavées au Burundi coût BI-PIU-113471-CS-QCBS / Recrutement Cabinet spécialisé en appui institutionnel pour la préparation de renforcement Sélection fondée des capacités des Component 1: Investments in En cours IDA / D2250 A posteriori sur la qualité et le Open - National 30,000.00 0.00 2019-07-30 2020-10-28 2019-08-20 2020-12-22 2019-10-03 2019-10-31 2019-11-30 2020-01-04 2020-02-08 2021-02-07 Communautés locales, Local Public Infrastructure d'exécution coût formation et accompagnement des CCDC / CDC, évaluation des performances et besoins de renforcement des Communes BI-PIU-113470-CS-QCBS / Recruter un consultant pour l'élaboration d'un catalogue/dignostic des Sélection fondée normes et standards dans les Component 2: Support for En attente IDA / D2250 A posteriori sur la qualité et le Open - National 30,000.00 0.00 2019-06-27 2019-07-18 2019-08-31 2019-09-28 2019-10-28 2019-12-02 2020-01-06 2021-01-05 secteurs de la construction, Value Chain Development d'exécution coût de la pêche et de l'industrie des fruits et formuler des recommandations sur la base des marchés ciblés BI-PIU-49119-CS-CQS / Sélection fondée Elaboration d'un plan d'action Component 1: Investments in sur les En cours IDA / D2250 A posteriori Open - National 50,000.00 0.00 2019-05-27 2020-06-22 2019-06-17 2020-09-10 2019-07-31 2021-01-05 2019-08-30 2019-10-04 2020-04-01 du Peuple Autochtone (PAPA) Local Public Infrastructure qualifications des d'exécution des sous-projets du PDLE consultants BI-PIU-113776-CS-LCS / Component 3: Project Audit comptable et financierr Sélection au IDA / D2250 Management, Coordination, A posteriori Open - International 35,000.00 30,000.00 Signé 2019-01-18 2018-01-19 2019-02-08 2019-03-24 2018-10-19 2019-04-21 2018-11-19 2019-05-21 2018-11-19 2019-06-25 2019-04-01 2019-07-30 2019-11-07 2020-01-26 du PDLE - Exercices 2017 à moindre coût and Monitoring 2019 Page 5 BI-PIU-113773-CS-QCBS / Recrutement de Consultant Sélection fondée Component 2: Support for pour la production d'une IDA / D2250 A posteriori sur la qualité et le Open - National 40,000.00 44,148.74 Signé 2019-03-18 2019-01-29 2019-04-08 2019-05-22 2019-03-18 2019-06-19 2019-05-20 2019-07-19 2019-05-20 2019-08-23 2019-06-18 2019-09-27 2019-08-30 2020-09-26 Value Chain Development étude sur l'exploitation des coût gites de production des pavés BI-PIU-113764-CS-QCBS / Recrutement d'un Cabinet pour organiser la formation et Sélection fondée Component 1: Investments in En cours l'élaboration des PCDC sur la IDA / D2250 A posteriori sur la qualité et le Open - National 170,000.00 0.00 2019-04-24 2019-05-30 2019-05-15 2019-06-28 2019-07-26 2019-08-25 2019-09-29 2019-11-03 2020-11-02 Local Public Infrastructure d'exécution Mairie de Bujumbura et ses 3 coût Communes et la Commune de Kirundo BI-PIU-113761-CS-QCBS / Recrutement d'un Consultant Sélection fondée pour le Manuel de bonnes Component 2: Support for IDA / D2250 A posteriori sur la qualité et le Open - National 40,000.00 37,301.15 En cours d'examen 2019-04-15 2019-01-29 2019-05-06 2019-06-19 2019-03-18 2019-07-17 2019-04-23 2019-08-16 2019-05-20 2019-09-20 2019-06-10 2019-10-25 2020-10-24 pratiques d'exploitation et de Value Chain Development coût valorisation des filières de la construction (argile, pierre ). BI-PIU-113479-CS-QCBS / Cabinet d’élaboration de la Sélection fondée Component 1: Investments in En cours Stratégie de mobilisation des IDA / D2250 A posteriori sur la qualité et le Open - National 30,000.00 0.00 2019-06-28 2020-05-18 2019-07-19 2019-09-01 2019-09-29 2019-10-29 2019-12-03 2020-01-07 2021-01-06 Local Public Infrastructure d'exécution recettes dans les Communes coût pilotes BI-PIU-113473-CS-QCBS / Elaboration de Projets de la Sélection fondée réglementation des actes de Component 2: Support for En attente IDA / D2250 A posteriori sur la qualité et le Open - National 30,000.00 0.00 2019-07-30 2019-08-20 2019-10-03 2019-10-31 2019-11-30 2020-01-04 2020-02-08 2021-02-07 construction et d'urbanisme, Value Chain Development d'exécution coût de la pêche et de l'industrie des fruits BI-PIU-113468-CS-QCBS / Audit organisationnel et institutionnel du Département des finances communales + Sélection fondée Component 1: Investments in Audit organisationnel du IDA / D2250 A posteriori sur la qualité et le Open - National 120,000.00 8,233.05 Signé 2019-08-12 2020-08-17 2019-09-02 2019-10-16 2020-10-06 2019-11-13 2020-10-06 2019-12-13 2020-10-01 2020-01-17 2020-11-25 2020-02-21 2020-11-25 2021-02-20 Local Public Infrastructure Centre National de Formation coût des Acteurs Locaux CNFAL + Audit organisationnel et financier du FONIC BI-PIU-113481-CS-QCBS / Sélection fondée Audit organisationnel du Component 2: Support for En attente IDA / D2250 A posteriori sur la qualité et le Open - National 20,000.00 0.00 2019-06-24 2019-07-15 2019-08-28 2019-09-25 2019-10-25 2019-11-29 2020-01-03 2021-01-02 Bureau Burundais de Value Chain Development d'exécution coût Normalisation (BBN) BI-PIU-113784-CS-QCBS / Etudes techniques Pavage et assainissement de BUBANZA (1,6 km), de NGAGARA (Rue Nyabibuye et rue Rutovu - Sélection fondée Component 1: Investments in Ryankona: 1,30Km), de IDA / D2250 A posteriori sur la qualité et le Open - National 34,489.00 0.00 Annulé 2019-11-11 2019-12-02 2020-01-15 2020-02-12 2020-03-13 2020-04-17 2020-05-22 2021-05-22 Local Public Infrastructure GIHOSHA Rural (Rue Inkondo: coût 1,1km) , de BUYENZI ( 16, 19, 22 et 24ème Avenues: 2,515 km) et de KANYOSHA (2,220Km) BI-PIU-113786-CS-QCBS / Etudes techniques Pavage Mirango I à KAMENGE, de la Sélection fondée Rue Henri 8, jonction de Component 1: Investments in IDA / D2250 A posteriori sur la qualité et le Open - National 12,507.00 0.00 Annulé 2019-11-04 2019-11-25 2020-01-08 2020-02-05 2020-03-06 2020-04-10 2020-05-15 2021-05-15 Kinama et Carama (KINAMA) Local Public Infrastructure coût et Réhabilitation d'un collecteur des eaux de la onzième avenue Mutakura BI-PIU-113785-CS-QCBS / Etudes techniques Pavage Quartier MAGARAMA, des Sélection fondée routes du Quartier REGIDESO, Component 1: Investments in IDA / D2250 A posteriori sur la qualité et le Open - National 43,939.00 0.00 Annulé 2019-10-31 2019-11-21 2020-01-04 2020-02-01 2020-03-02 2020-04-06 2020-05-11 2021-05-11 du Quartier NTOBWE, du Local Public Infrastructure coût Quartier RANGO, du Quartier MUSHASHA et du Quartier NYABUTUTSI à Gitega BI-PIU-113788-CS-QCBS / Etudes techniques des travaux Sélection fondée Construction du Marché de Component 1: Investments in IDA / D2250 A posteriori sur la qualité et le Open - National 43,013.00 0.00 Annulé 2019-11-19 2019-12-10 2020-01-23 2020-02-20 2020-03-21 2020-04-25 2020-05-30 2021-05-30 BUTWE à GATARA( KAYANZA) Local Public Infrastructure coût et du Marché de BUMBA à BUTAGANZWA ( KAYANZA) BI-PIU-113789-CS-QCBS / Etudes techniques des travaux Construction Marché de Sélection fondée Component 1: Investments in GASORWE à GASORWE IDA / D2250 A posteriori sur la qualité et le Open - National 37,057.00 0.00 Annulé 2019-11-22 2019-12-13 2020-01-26 2020-02-23 2020-03-24 2020-04-28 2020-06-02 2021-06-02 Local Public Infrastructure (MUYINGA) et du Marché de coût MUBARAGAZA à MUTUMBA (KARUSI) BI-PIU-113791-CS-QCBS / Etudes techniques des travaux Extension Collège Communal Sélection fondée de MUYIRA à KANYOSHA, Component 1: Investments in IDA / D2250 A posteriori sur la qualité et le Open - National 34,410.00 0.00 Annulé 2019-10-21 2019-11-11 2019-12-25 2020-01-22 2020-02-21 2020-03-27 2020-05-01 2021-05-01 Construction de l'Ecole Local Public Infrastructure coût fondamentale NYAMBUYE à ISARE et de l'Ecole Primaire RUTEGAMA à RUTEGAMA BI-PIU-113792-CS-QCBS / Etudes techniques des travaux Construction d'une salle Sélection fondée Component 1: Investments in polyvalente au Lycée IDA / D2250 A posteriori sur la qualité et le Open - National 15,882.00 0.00 Annulé 2019-10-24 2019-11-14 2019-12-28 2020-01-25 2020-02-24 2020-03-30 2020-05-04 2021-05-04 Local Public Infrastructure communal de BURURI coût (BURURI) et du Centre jeunes de VUGIZO (MAKAMBA) BI-PIU-113793-CS-QCBS / Etudes techniques des travaux Construction de l'Ecole Sélection fondée Component 1: Investments in Primaire de RUHEHE à IDA / D2250 A posteriori sur la qualité et le Open - National 23,822.00 0.00 Annulé 2019-10-23 2019-11-13 2019-12-27 2020-01-24 2020-02-23 2020-03-29 2020-05-03 2021-05-03 Local Public Infrastructure BUGABIRA et du Collège coût Communal CARUBAMBO à NTEGA Page 6 BI-PIU-113794-CS-QCBS / Etudes techniques des travaux Construction de l'Ecole Primaire MASAMA à Sélection fondée NYAMURENZA (NGOZI), de Component 1: Investments in IDA / D2250 A posteriori sur la qualité et le Open - National 38,380.00 0.00 Annulé 2019-10-21 2019-11-11 2019-12-25 2020-01-22 2020-02-21 2020-03-27 2020-05-01 2021-05-01 l'Ecole Technique Secondaire Local Public Infrastructure coût GICU à NYAMURENZA (NGOZI) et extension Collège Communal CANKUZO (CANKUZO) BI-PIU-113803-CS-QCBS / Surveillance Pavage Mirango I à KAMENGE, de la Rue Henri Sélection fondée Component 1: Investments in 8, jonction de Kinama et IDA / D2250 A posteriori sur la qualité et le Open - National 64,271.00 0.00 Annulé 2020-09-15 2020-10-06 2020-11-19 2020-12-17 2021-01-16 2021-02-20 2021-03-27 2022-03-27 Local Public Infrastructure Carama (KINAMA) et coût Réhabilitation d'un collecteur des eaux de la onzième avenue Mutakura BI-PIU-113806-CS-QCBS / Surveillance Pavage Quartier MAGARAMA, des routes du Sélection fondée Quartier REGIDESO, du Component 1: Investments in IDA / D2250 A posteriori sur la qualité et le Open - National 178,502.00 0.00 Annulé 2020-10-05 2020-10-26 2020-12-09 2021-01-06 2021-02-05 2021-03-12 2021-04-16 2022-04-16 Quartier NTOBWE, du Quartier Local Public Infrastructure coût RANGO, du Quartier MUSHASHA et du Quartier NYABUTUTSI à Gitega BI-PIU-113774-CS-QCBS / Recrutement d'un Consultant pour le Manuel de bonnes pratiques agricoles et de Sélection fondée gestion durable des terres et Component 2: Support for IDA / D2250 A posteriori sur la qualité et le Open - National 40,000.00 0.00 Annulé 2019-04-16 2019-05-07 2019-06-20 2019-07-18 2019-08-17 2019-09-21 2019-10-26 2020-10-25 de la gestion respectueuse de Value Chain Development coût l'environnement des unités de transformation et de commercialisation dans les filières de l'agro-business. BI-PIU-142788-CS-CQS / Recrutement d’un cabinet d’études pour l’étude de faisabilité technico- Sélection fondée économique et sociale du Component 1: Investments in sur les En cours IDA / D2250 A posteriori Open - International 150,000.00 0.00 2019-11-19 2020-08-03 2019-12-10 2020-09-11 2020-01-23 2020-02-22 2020-03-28 2020-09-24 projet de construction d’un Local Public Infrastructure qualifications des d'exécution centre commercial moderne consultants de type mall sur la place de l’ex-marche central de Bujumbura BI-PIU-146654-CS-QCBS / Recruter un Bureau indépendant pour l'audit des Sélection fondée Component 2: Support for En cours prestations tehniques du IDA / D2250 A posteriori sur la qualité et le Open - National 50,000.00 0.00 2020-01-14 2020-02-04 2020-03-19 2020-04-16 2020-05-16 2020-06-20 2020-07-25 2021-07-25 Value Chain Development d'exécution Cabinet d'Appui Technique à coût la gestion du Fonds Catalytique BI-PIU-146758-CS-QCBS / Recrutement d'un bureau de Sélection fondée Consultants pour l'élaboration Component 1: Investments in En cours IDA / D2250 A posteriori sur la qualité et le Open - National 200,000.00 0.00 2019-12-18 2020-03-30 2020-01-08 2020-02-21 2020-03-20 2020-04-19 2020-05-24 2020-06-28 2021-06-28 des PCDC de 6 autres Local Public Infrastructure d'exécution coût communes de la zone d'intervention du Projet BI-PIU-139669-CS-QCBS / Tranche 2 - Etudes techniques et EIES pour les travaux de pavage et Sélection fondée d'assainissement de la voirie Component 1: Investments in IDA / D2250 A posteriori sur la qualité et le Open - National 65,576.14 36,422.35 Signé 2019-12-11 2020-01-14 2020-01-01 2020-03-20 2020-02-14 2020-06-25 2020-03-13 2020-07-28 2020-04-12 2020-08-18 2020-05-17 2020-09-08 2020-06-21 2020-09-30 2020-08-30 urbaine en Communes Local Public Infrastructure coût MUKAZA et NTAHANGWA de la Municipalité de BUJUMBURA et en Commune BUBANZA de la Province de BUBANZA BI-PIU-139686-CS-QCBS / Tranche 2 - Etudes techniques et EIES pour les travaux de construction du Marché de BUTWE à GATARA Sélection fondée Component 1: Investments in (KAYANZA), du Marché de IDA / D2250 A posteriori sur la qualité et le Open - National 89,375.00 40,935.32 Signé 2019-12-23 2020-01-16 2020-01-13 2020-03-20 2020-02-26 2020-06-29 2020-03-25 2020-08-03 2020-04-24 2020-08-19 2020-05-29 2020-09-02 2020-07-03 2020-09-29 2020-09-01 Local Public Infrastructure BUMBA à BUTAGANZWA coût (KAYANZA), du Marché de GASORWE à GASORWE (MUYINGA) et du Marché de MUBARAGAZA à MUTUMBA (KARUSI) BI-PIU-139677-CS-QCBS / Tranche 2 - Etudes techniques et EIES pour les Sélection fondée Component 1: Investments in travaux de pavage et IDA / D2250 A posteriori sur la qualité et le Open - National 49,045.45 40,689.84 Signé 2019-12-11 2020-01-14 2020-01-01 2020-03-20 2020-02-14 2020-06-25 2020-03-13 2020-07-28 2020-04-12 2020-08-18 2020-05-17 2020-09-08 2020-06-21 2020-09-30 2020-08-30 Local Public Infrastructure d'assainissement de la voirie coût urbaine en Commune GITEGA de la Province de GITEGA (GITEGA) BI-PIU-139681-CS-QCBS / Tranche 2 -Etudes techniques et EIES pour les travaux de construction du Village des métiers Quartier industriel à Sélection fondée Component 1: Investments in En cours BUYENZI, du Centre IDA / D2250 A posteriori sur la qualité et le Open - National 130,000.00 0.00 2019-12-11 2020-01-16 2020-01-01 2020-02-14 2020-03-13 2020-04-12 2020-05-17 2020-06-21 2020-09-19 Local Public Infrastructure d'exécution d'Enseignement de Métier à coût BWIZA , du centre jeune à NYAKABIGA et d’Aménagement Terrain de jeu à KINANIRA BI-PIU-139838-CS-QCBS / Tranche 2 - Etudes techniques et EIES pour les travaux de construction de l’Ecole Primaire de RUHEHE, Sélection fondée Component 1: Investments in du Collège Communal IDA / D2250 A posteriori sur la qualité et le Open - National 69,431.82 33,208.08 Signé 2019-12-23 2020-01-16 2020-01-13 2020-03-20 2020-02-26 2020-06-29 2020-03-25 2020-08-03 2020-04-24 2020-08-20 2020-05-29 2020-09-08 2020-07-03 2020-10-05 2020-09-11 Local Public Infrastructure CARUBAMBO, de l’Ecole coût Primaire MASAMA, de l’Ecole Technique Secondaire GICU à et d’extension du Collège Communal CANKUZO Page 7 BI-PIU-148080-CS-CQS / Recrutement d'un Consultant Sélection fondée pour l'élaboration du Guide Component 2: Support for sur les pour l'aménagement des IDA / D2250 A posteriori Open - National 60,000.00 0.00 Annulé 2020-02-03 2020-02-24 2020-04-08 2020-05-08 2020-06-12 2020-12-09 Value Chain Development qualifications des pêcheries dans les eaux consultants intérieures face au déclin de ces dernières ; BI-PIU-148081-CS-QCBS / Recrutement d'un Consultant pour l'évaluation des Sélection fondée Pratiques de pêche au lac Component 2: Support for IDA / D2250 A posteriori sur la qualité et le Open - National 80,000.00 0.00 Annulé 2020-02-06 2020-02-26 2020-02-27 2020-04-11 2020-05-09 2020-06-08 2020-07-13 2020-08-17 2021-08-17 Tanganyika et les autres lacs Value Chain Development coût intérieurs en rapport avec la pêche excessive qui s’y pratique et les voies de solutions BI-PIU-152838-CS-CQS / Sélection fondée Recrutement d'un Cabinet des Component 1: Investments in sur les En attente Experts pour la réalisation IDA / D2250 A posteriori Open - National 60,000.00 0.00 2020-01-30 2020-02-20 2020-04-04 2020-05-04 2020-06-08 2020-12-05 Local Public Infrastructure qualifications des d'exécution d'un audit annuel technique consultants de l'ABUTIP BI-PIU-148227-CS-CQS / Sélection fondée Reconfiguration du site web Component 2: Support for sur les En cours www.investburundi.bi de l'API IDA / D2250 A posteriori Open - National 18,000.00 0.00 2020-01-30 2020-05-18 2020-02-20 2020-04-04 2020-05-04 2020-06-08 2020-12-05 Value Chain Development qualifications des d'exécution et Mise en place du Portail consultants aux investisseurs BI-PIU-147442-CS-QCBS / Recrutement d'un consultant Sélection fondée Component 1: Investments in En attente pour réaliser le diagnostic et IDA / D2250 A posteriori sur la qualité et le Open - National 150,000.00 0.00 2020-01-20 2020-02-10 2020-03-25 2020-04-22 2020-05-22 2020-06-26 2020-07-31 2021-07-31 Local Public Infrastructure d'exécution la sensibilisation sur coût l'entrepreunariat féminin BI-PIU-90368-CS-CQS / Sélection fondée Recrutement d'un Consultant Component 2: Support for sur les pour l'élaboration d'un IDA / D2250 A posteriori Open - National 50,000.00 0.00 Annulé 2019-04-30 2019-05-21 2019-07-04 2019-08-03 2019-09-07 2020-03-05 Value Chain Development qualifications des inventaire des lois applicables consultants aux MPME BI-PIU-90365-CS-CQS / Recrutement d'un Consultant Sélection fondée pour l'élaboration d'un Cadre Component 2: Support for sur les de réforme sur le climat des IDA / D2250 A posteriori Open - National 75,000.00 0.00 Annulé 2019-03-20 2019-04-10 2019-05-24 2019-06-23 2019-07-28 2020-01-24 Value Chain Development qualifications des affaires: diagnostic, consultants recommandation de communication BI-PIU-165723-CS-QCBS / Tranche 2-Etudes techniques et EIES pour travaux d’extension du Collège Sélection fondée Communal de MUYIRA, de Component 1: Investments in IDA / D2250 A posteriori sur la qualité et le Open - National 44,318.00 30,895.53 Signé 2020-04-01 2020-03-30 2020-04-22 2020-05-22 2020-06-05 2020-09-18 2020-07-03 2020-10-20 2020-08-02 2020-11-10 2020-09-06 2020-12-04 2020-10-11 2021-01-04 2020-12-10 construction de l’Ecole Local Public Infrastructure coût Fondamentale NYAMBUYE, de l’Ecole Primaire RUTEGAMA et d’une salle polyvalente au Lycée communal de BURURI BI-PIU-165732-CS-QCBS / Tranche 2 -Etudes techniques et EIES pour les travaux de construction du Village des Sélection fondée Component 1: Investments in En cours métiers Quartier industriel à IDA / D2250 A posteriori sur la qualité et le Open - National 111,364.00 0.00 2020-04-01 2020-03-30 2020-04-22 2020-05-22 2020-06-05 2020-09-18 2020-07-03 2020-10-20 2020-08-02 2020-09-06 2020-10-11 2021-01-19 Local Public Infrastructure d'exécution BUYENZI, du Centre coût d'Enseignement de Métier à BWIZA et d’Aménagement Terrain de jeu à KINANIRA BI-PIU-165741-CS-QCBS / Tranche 2 -Etudes techniques et EIES pour les travaux de construction du Centre de Sélection fondée Component 1: Investments in jeunes à NYAKABIGA dans la IDA / D2250 A posteriori sur la qualité et le Open - National 35,455.00 15,640.97 Signé 2020-04-01 2020-03-30 2020-04-22 2020-05-22 2020-06-05 2020-09-18 2020-07-03 2020-10-20 2020-08-02 2020-11-06 2020-09-06 2020-11-24 2020-10-11 2020-12-28 2020-12-20 Local Public Infrastructure Municipalité de BUJUMBURA et coût du Centre jeunes de VUGIZO en Commune VUGIZO de la Province MAKAMBA BI-PIU-190754-CS-QCBS / Tranche 2 - Surveillance des travaux de construction du Marché de BUTWE à GATARA (KAYANZA), du Marché de Sélection fondée Component 1: Investments in En cours BUMBA à BUTAGANZWA IDA / D2250 A posteriori sur la qualité et le Open - National 86,073.05 0.00 2020-09-25 2020-10-30 2020-10-16 2020-12-04 2020-11-29 2020-12-27 2021-01-26 2021-03-02 2021-04-06 2022-11-02 Local Public Infrastructure d'exécution (KAYANZA), du Marché de coût GASORWE à GASORWE (MUYINGA) et du Marché de MUBARAGAZA à MUTUMBA (KARUSI) BI-PIU-190761-CS-QCBS / Tranche 2 - Surveillance des travaux de pavage et d'assainissement de la voirie Sélection fondée Component 1: Investments in En cours urbaine en Communes IDA / D2250 A posteriori sur la qualité et le Open - National 189,890.98 0.00 2020-09-25 2020-10-30 2020-10-16 2020-12-04 2020-11-29 2021-06-16 2020-12-27 2021-01-26 2021-03-02 2021-04-06 2022-12-02 Local Public Infrastructure d'exécution MUKAZA et NTAHANGWA de coût la Municipalité de BUJUMBURA et en Commune BUBANZA de la Province de BUBANZA BI-PIU-190764-CS-QCBS / Tranche 2 - Surveillance des travaux de pavage et Sélection fondée Component 1: Investments in En cours d'assainissement de la voirie IDA / D2250 A posteriori sur la qualité et le Open - National 165,844.32 0.00 2020-09-25 2020-10-30 2020-10-16 2020-12-04 2020-11-29 2020-12-27 2021-01-26 2021-03-02 2021-04-06 2022-12-02 Local Public Infrastructure d'exécution urbaine en Commune GITEGA coût de la Province de GITEGA (GITEGA) Page 8 BI-PIU-190766-CS-QCBS / Tranche 2 - Surveillance des travaux de construction du Village des métiers au quartier Sélection fondée Industriel à BUYENZI Component 1: Investments in En cours IDA / D2250 A posteriori sur la qualité et le Open - National 110,665.35 0.00 2020-10-15 2021-02-24 2020-11-05 2020-12-19 2021-01-16 2021-02-15 2021-03-22 2021-04-26 2022-12-22 (MUKAZA), du Centre Local Public Infrastructure d'exécution coût d'enseignement des métiers à BWIZA (MUKAZA) et d’Aménagement d'un terrain de jeux à KINANIRA (MUHA) BI-PIU-190769-CS-QCBS / Tranche 2 - Surveillance des travux d’extension du Collège Communal de MUYIRA, de Sélection fondée construction de l’Ecole Component 1: Investments in En cours IDA / D2250 A posteriori sur la qualité et le Open - National 43,088.63 0.00 2020-10-15 2021-01-21 2020-11-05 2021-03-01 2020-12-19 2021-01-16 2021-02-15 2021-03-22 2021-04-26 2022-10-23 Fondamentale de NYAMBUYE, Local Public Infrastructure d'exécution coût de l’Ecole Primaire de RUTEGAMA et d’une salle polyvalente au Lycée communal de BURURI BI-PIU-190771-CS-QCBS / Tranche 2 - Surveillance des travaux de construction du Centre de jeunes à Sélection fondée Component 1: Investments in En cours NYAKABIGA dans la IDA / D2250 A posteriori sur la qualité et le Open - National 33,814.41 0.00 2020-10-15 2021-01-21 2020-11-05 2021-03-01 2020-12-19 2021-01-16 2021-02-15 2021-03-22 2021-04-26 2022-12-22 Local Public Infrastructure d'exécution Municipalité de BUJUMBURA et coût du Centre jeunes de VUGIZO en Commune VUGIZO de la Province MAKAMBA BI-PIU-190757-CS-QCBS / Tranche 2 - Surveillance des travaux de construction de l’Ecole Primaire de RUHEHE, du Collège Communal de Sélection fondée Component 1: Investments in En cours CARUBAMBO, de l’Ecole IDA / D2250 A posteriori sur la qualité et le Open - National 61,220.24 0.00 2020-09-25 2020-10-30 2020-10-16 2020-12-04 2020-11-29 2020-12-27 2021-01-26 2021-03-02 2021-04-06 2022-10-03 Local Public Infrastructure d'exécution Primaire de MASAMA, de coût l’Ecole Technique Secondaire de GICU et d’extension du Collège Communal de CANKUZO BI-PIU-68333-CS-INDV / Sélection fondée Recrutement d'un Cabinet en Component 2: Support for sur les IDA / D2250 A posteriori Open - National 100,000.00 0.00 Annulé 2019-02-28 2021-01-16 2019-03-21 2019-05-04 2019-06-03 2019-07-08 2020-01-04 charge de l'Assistance Value Chain Development qualifications des Technique de l'UGP consultants BI-PIU-139834-CS-QCBS / Tranche 2-Etudes techniques et EIES pour travaux d’extension du Collège Communal de MUYIRA, de Sélection fondée Component 1: Investments in construction de l’Ecole IDA / D2250 A posteriori sur la qualité et le Open - National 56,136.36 0.00 Annulé 2019-12-23 2020-01-16 2020-01-13 2020-02-26 2020-03-25 2020-04-24 2020-05-29 2020-07-03 2020-09-11 Local Public Infrastructure Fondamentale NYAMBUYE, de coût l’Ecole Primaire RUTEGAMA, d’une salle polyvalente au Lycée communal de BURURI et du Centre jeunes de VUGIZO BI-PIU-90065-CS-CQS / Sélection fondée Recruter un Consultant pour Component 2: Support for sur les la préparation des IDA / D2250 A posteriori Open - National 50,000.00 0.00 Annulé 2019-06-27 2019-07-18 2019-08-31 2019-09-30 2019-11-04 2020-05-02 Value Chain Development qualifications des instruments de sauvegarde consultants liés aux sous- Projets Sélection fondée BI-PIU-49102-CS-CQS / Component 2: Support for sur les Elaboration de la IDA / D2250 A posteriori Open - National 20,000.00 0.00 Annulé 2020-02-16 2020-03-08 2020-04-21 2020-05-21 2020-06-25 2020-12-22 Value Chain Development qualifications des règlementation de la Pêche consultants BI-PIU-148233-CS-CQS / Appui au BBN: Constitution de Sélection fondée la plate forme d'achat et de Component 2: Support for sur les IDA / D2250 A posteriori Open - National 13,000.00 0.00 Annulé 2020-02-02 2020-02-23 2020-04-07 2020-05-07 2020-06-11 2020-12-08 vente en ligne des normes Value Chain Development qualifications des (accessibilités aux normes et consultants documents connexes) BI-PIU-90669-CS-CQS / Sélection fondée Service de Consultant chargé Component 1: Investments in sur les d'appuyer le PDLE pour la IDA / D2250 A posteriori Open - National 20,000.00 0.00 Annulé 2019-03-27 2019-04-17 2019-05-31 2019-06-30 2019-08-04 2020-01-31 Local Public Infrastructure qualifications des Formation sur la planification consultants communale BI-PIU-118796-CS-CQS / Recrutement d'un Consultant ONG, Cabinet pour ( vulgarisation) la formation et Sélection fondée la sensibilisation à la notion Component 1: Investments in sur les de redevabilité sur base du IDA / D2250 A posteriori Open - National 15,000.00 0.00 Annulé 2019-07-23 2019-08-13 2019-08-13 2019-09-26 2019-10-26 2019-11-30 2020-05-28 Local Public Infrastructure qualifications des guide du ministère de la consultants Décentralisation pour les acteurs administratifs locaux dans les communes pilotes du proj BI-PIU-154305-CS-CQS / Recrutement d'un Consultant Sélection fondée pour l'Actualisation de l'étude Component 2: Support for sur les IDA / D2250 A posteriori Open - National 15,000.00 0.00 Annulé 2020-02-25 2020-03-17 2020-04-30 2020-05-30 2020-07-04 2020-12-31 faite à l'API pour la mise en Value Chain Development qualifications des réseau Informatique du consultants guichet unique de l'API BI-PIU-113480-CS-QCBS / Sélection fondée Recrutement du cabinet pour Component 1: Investments in IDA / D2250 A posteriori sur la qualité et le Open - National 50,000.00 0.00 Annulé 2020-12-30 2021-01-20 2021-03-05 2021-04-02 2021-05-02 2021-06-06 2021-07-11 2022-07-11 l'évaluation des Communes Local Public Infrastructure coût appuyées par le projet BI-PIU-113462-CS-QCBS / Recrutement d’un Cabinet d’élaboration d’un guide de gestion des infrastructures et Sélection fondée équipements et de la Component 1: Investments in En cours IDA / D2250 A posteriori sur la qualité et le Open - National 85,000.00 0.00 2019-07-16 2021-01-05 2019-08-06 2021-06-17 2019-09-19 2019-10-17 2019-11-16 2019-12-21 2020-01-25 2021-01-24 formation sur la gestion et la Local Public Infrastructure d'exécution coût maintenance des infrastructures dans les Communes bénéficiaires du projet Page 9 BI-PIU-200689-CS-CQS / Sélection fondée Recrutement d'un Cabinet en Component 2: Support for sur les En attente IDA / D2250 A posteriori Open - National 100,000.00 0.00 2020-11-30 2020-12-21 2021-02-03 2021-03-05 2021-04-09 2021-10-06 charge de l'Assistance Value Chain Development qualifications des d'exécution Technique de l'UGP consultants BI-PIU-207046-CS-LCS / Recrutement d’un Cabinet en charge de préparer les études d’impacts environnemental et Component 2: Support for Sélection au En cours IDA / D2250 A posteriori Open - National 50,000.00 0.00 2020-12-08 2020-12-10 2020-12-29 2020-12-22 2021-02-11 2021-03-11 2021-04-10 2021-05-15 2021-06-19 2021-12-16 social pour les Micros Petites Value Chain Development moindre coût d'exécution et Moyennes Entreprises financées par le fonds catalytique BI-PIU-90074-CS-CQS / Recruter un Consultant pour Sélection fondée mener une enquête sur la Component 2: Support for sur les IDA / D2250 A posteriori Open - National 50,000.00 0.00 Annulé 2019-03-18 2019-04-08 2019-04-08 2019-05-22 2019-06-21 2019-07-26 2020-01-22 situation de départ (baseline) Value Chain Development qualifications des en vue de mesurer l'impact du consultants Projet BI-PIU-211468-CS-QCBS / Recruter un Cabinet International de Consultants pour mener une étude sur la Sélection fondée Component 2: Support for stratégie de développement, IDA / D2250 A posteriori sur la qualité et le Open - International 350,000.00 0.00 En cours d'examen 2021-01-12 2021-03-04 2021-02-02 2021-03-18 2021-04-15 2021-05-15 2021-06-19 2021-07-24 2022-07-24 Value Chain Development actualisation du cadre coût juridique et institutionnel et sécurisation du commerce électronique au Burundi BI-PIU-114695-CS-CQS / Sélection fondée Étude diagnostic et Component 2: Support for sur les élaboration du DAO pour les IDA / D2250 A posteriori Open - National 43,798.00 0.00 Annulé 2019-06-11 2020-01-15 2019-07-02 2019-08-15 2019-09-14 2019-10-19 2020-04-16 Value Chain Development qualifications des travaux de réhabilitation du consultants tribunal du commerce BI-PIU-200709-CS-QCBS / Recrutement d'un BET pour l'étude technique et Sélection fondée élaboration du Dossier Component 2: Support for IDA / D2250 A posteriori sur la qualité et le Open - National 30,000.00 0.00 Annulé 2020-11-03 2020-11-24 2021-01-07 2021-02-04 2021-03-06 2021-04-10 2021-05-15 2022-05-15 d’Appel d’Offres pour la Value Chain Development coût réhabilitation de l’immeuble du Tribunal de commerce de Bujumbura BI-PIU-114698-CS-CQS / Sélection fondée Contrôle et surveillance des Component 2: Support for sur les IDA / D2250 A posteriori Open - National 20,996.00 0.00 Annulé 2019-06-19 2019-07-29 2019-07-10 2019-08-23 2019-09-22 2019-10-27 2020-04-24 travaux de réhabilitation du Value Chain Development qualifications des tribunal de commerce consultants BI-PIU-113794-CS-QCBS-2 / Recrutement d'un BET pour l’élaboration du Dossier Sélection fondée Component 2: Support for d’Appel d’Offres pour la IDA / D2250 A posteriori sur la qualité et le Open - National 15,000.00 0.00 Annulé 2020-02-13 2020-03-05 2020-04-18 2020-05-16 2020-06-15 2020-07-20 2020-08-24 2021-08-24 Value Chain Development réhabilitation de l’immeuble coût du Tribunal de commerce de Bujumbura BI-PIU-155273-CS-QCBS / Sélection fondée Etude sur le développement Component 2: Support for IDA / D2250 A posteriori sur la qualité et le Open - International 300,000.00 0.00 Annulé 2020-02-27 2020-03-19 2020-05-02 2020-05-30 2020-06-29 2020-08-03 2020-09-07 2021-09-07 du Commerce électronique au Value Chain Development coût Burundi BI-PIU-147560-CS-QCBS / Etude sur le cadre juridique, la Sélection fondée Component 2: Support for régulation et la sécurisation IDA / D2250 A posteriori sur la qualité et le Open - National 200,000.00 0.00 Annulé 2020-01-19 2020-02-09 2020-03-24 2020-04-21 2020-05-21 2020-06-25 2020-07-30 2021-07-30 Value Chain Development du commerce électronique au coût Burundi BI-PIU-146983-CS-QCBS / Etude diagnostique Sélection fondée d'assainissement global (eaux Component 1: Investments in En attente IDA / D2250 A posteriori sur la qualité et le Open - International 250,000.00 0.00 2020-12-28 2021-01-18 2021-03-03 2021-03-31 2021-04-30 2021-06-04 2021-07-09 2022-07-09 pluviales et eaux usées) des Local Public Infrastructure d'exécution coût Villes de Bujumbura, Gitega, Ngozi et Rumonge BI-PIU-178226-CS-CQS / Sélection fondée ONG pour la supervision des Component 1: Investments in sur les IDA / D2250 A posteriori Open - National 300,000.00 270,489.27 Signé 2018-05-23 2021-02-07 2018-06-13 2018-07-27 2017-08-23 2018-08-26 2017-12-06 2018-09-30 2018-05-23 2019-03-29 travaux à haute intensité de la Local Public Infrastructure qualifications des Main d'œuvre consultants BI-PIU-113770-CS-QCBS / Etude diagnostique et Sélection fondée Component 2: Support for évaluation du fonctionnement IDA / D2250 A priori sur la qualité et le Open - National 161,683.00 0.00 Annulé 2019-02-07 2020-08-11 2019-02-28 2019-04-13 2019-05-11 2019-06-10 2019-07-15 2019-08-19 2020-08-18 Value Chain Development de la justice commerciale au coût Burundi BI-PIU-148083-CS-CQS / "Appui à la mise en place Sélection fondée d'une centrale des bilans Component 2: Support for sur les IDA / D2250 A posteriori Open - National 40,000.00 0.00 Annulé 2020-01-27 2020-02-17 2020-04-01 2020-05-01 2020-06-05 2020-12-02 (OPC): mise en place d'un Value Chain Development qualifications des cadre légal, Formation du consultants personnel et matériel d'arc BI-PIU-148117-CS-CQS / Sélection fondée Vulgarisation des textes Component 2: Support for sur les portant création des Centres IDA / D2250 A posteriori Open - National 50,000.00 0.00 Annulé 2020-02-04 2020-02-25 2020-04-09 2020-05-09 2020-06-13 2020-12-10 Value Chain Development qualifications des de Gestion Agréés et leur consultants mise en place (OPC) BI-PIU-147463-CS-CQS / Mise en oeuvre du mécanisme Sélection fondée de gestion des plaintes : (i) Component 1: Investments in sur les IDA / D2250 A posteriori Open - National 60,000.00 0.00 Annulé 2020-01-14 2020-01-20 2020-02-04 2020-12-22 2020-03-19 2020-04-18 2020-05-23 2020-11-19 Recrutement d'un Consultant Local Public Infrastructure qualifications des pour la traduction et consultants l'illustration du MGP; BI-PIU-237441-CS-LCS / Audit comptable et financier Component 3: Project Sélection au deux exercices : 1er Juillet IDA / D2250 Management, Coordination, A posteriori Open - International 30,000.00 0.00 En cours d'examen 2021-07-12 2021-07-28 2021-07-19 2021-08-25 2021-09-24 2021-10-09 2021-11-13 2021-12-04 2022-06-02 moindre coût 2020 - 30 Juin 2021 et 1er and Monitoring Juillet 2021 - 30 Juin 2022 Page 10 BI-PIU-233095-CS-CDS / Recrutement d'un BET pour la Sélection fondée finalisation de l'étude Component 2: Support for sur les technique et élaboration du IDA / D2250 A posteriori Open - National 30,000.00 0.00 Annulé 2021-05-15 2021-06-05 2021-07-03 2021-07-24 2021-08-08 2021-11-06 Value Chain Development qualifications des DAO pour la réhabilitation de consultants l’immeuble du Tribunal de commerce de Bujumbura INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-PIU-90063-CS-INDV / Recrutement d'un Consultant Component 2: Support for En cours IDA / D2250 A posteriori Individuel Open 20,000.00 0.00 2019-04-30 2019-07-26 2019-06-18 2019-07-09 2019-08-13 2020-02-09 pour l'élaboration du guide de Value Chain Development d'exécution l'investisseur BI-PIU-90070-CS-INDV / Recruter un Consultant pour Component 2: Support for En cours appuyer l'UGP à l'accélération IDA / D2250 A posteriori Individuel Open 21,700.00 0.00 2019-03-30 2021-01-21 2019-05-18 2019-06-08 2019-07-13 2020-01-09 Value Chain Development d'exécution des activités de la composante 2 BI-PIU-49077-CS-INDV / Assistance Technique à la Component 2: Support for Chambre de la Construction IDA / D2250 A posteriori Individuel Open 36,000.00 0.00 Annulé 2019-01-04 2019-02-22 2019-03-15 2019-04-19 2019-10-16 Value Chain Development (1 consultant local- Secrétaire Exécutif) BI-PIU-49117-CS-CQS / Recrutement d'un Consultant pour le manuel d'utilisation et de gestion des pesticides pour Component 2: Support for En cours protéger l'environnement et la IDA / D2250 A posteriori Individuel Open 20,000.00 0.00 2019-05-28 2019-06-26 2019-07-16 2020-06-18 2019-08-06 2020-09-25 2019-09-10 2020-03-08 Value Chain Development d'exécution santé des manipulateurs et des populations avec production des supports de sensibilisation. BI-PIU-113777-CS-INDV / Assistance Technique à la Component 2: Support for En cours Chambre de la Construction IDA / D2250 A posteriori Individuel Open 36,000.00 0.00 2019-06-27 2019-10-08 2019-08-15 2019-09-05 2019-10-10 2020-04-07 Value Chain Development d'exécution (1 consultant local- Secrétaire Exécutif) BI-PIU-113990-CS-INDV / Component 3: Project En cours Recrutement d'un comptable IDA / D2250 Management, Coordination, A posteriori Individuel Open 42,000.00 0.00 2019-05-30 2020-03-24 2019-07-18 2020-10-07 2019-08-08 2019-09-12 2020-03-10 d'exécution du projet PDLE and Monitoring BI-PIU-113991-CS-CDS / Mission d'assistance Sélection de technique relative à la Component 2: Support for En cours IDA / D2250 A posteriori consultants par Direct 100,000.00 0.00 2019-06-24 2019-07-15 2019-07-04 2019-09-07 2020-03-05 préparation et mise en oeuvre Value Chain Development d'exécution entente directe de l'informatisation du OSS de permis de construire MOF-REF-1 / Reconduction Sélection de du contrat du Cabinet local Component 2: Support for En cours IDA / D2250 A posteriori consultants par Direct 350,000.00 0.00 2020-02-10 2020-08-07 2020-02-20 2020-08-13 2020-04-25 2020-10-22 d'appui à la Gestion du fonds Value Chain Development d'exécution entente directe catalytique BI-PIU-161397-CS-INDV / Component 3: Project En cours Recrutement d'un Auditeur IDA / D2250 Management, Coordination, A posteriori Individuel Open 37,200.00 0.00 2020-03-20 2020-03-24 2020-05-08 2021-02-11 2020-05-29 2020-07-03 2020-12-30 d'exécution interne du PDLE and Monitoring BI-PIU-162191-CS-INDV / Recrutement d'un Consultant pour l'évaluation des Pratiques de pêche au lac Component 2: Support for En cours IDA / D2250 A posteriori Individuel Open 80,000.00 0.00 2020-04-29 2020-04-13 2020-06-17 2020-07-08 2020-08-12 2021-02-08 Tanganyika et les autres lacs Value Chain Development d'exécution intérieurs en rapport avec la pêche excessive qui s’y pratique et les voies de solutions BI-PIU-162189-CS-INDV / Recrutement d'un Consultant pour l'élaboration du Guide Component 2: Support for En cours pour l'aménagement des IDA / D2250 A posteriori Individuel Open 60,000.00 0.00 2020-04-28 2020-04-13 2020-06-16 2020-07-07 2020-08-11 2021-02-07 Value Chain Development d'exécution pêcheries dans les eaux intérieures face au déclin de ces dernières ; BI-PIU-190904-CS-INDV / Component 3: Project En cours Recrutement d'un Spécialiste IDA / D2250 Management, Coordination, A posteriori Individuel Open 50,000.00 0.00 2020-05-04 2020-03-19 2020-06-22 2020-07-13 2020-08-17 2021-02-13 d'exécution en Passation des Marchés and Monitoring BI-PIU-191060-CS-INDV / Component 3: Project En cours Recrutement d'un Chef- IDA / D2250 Management, Coordination, A posteriori Individuel Open 29,400.00 0.00 2020-09-14 2020-09-25 2020-11-02 2020-11-23 2020-12-28 2021-06-26 d'exécution Comptable du Projet and Monitoring BI-PIU-190737-CS-CDS / Complément et mise à jour de Sélection de Component 1: Investments in l'audit fonctionnel de l'ABUTIP IDA / D2250 A posteriori consultants par Direct 13,025.58 6,969.37 Signé 2020-09-03 2020-09-14 2020-09-13 2020-10-06 2020-11-17 2020-10-29 2021-01-16 Local Public Infrastructure réalisée par le Cabinet FENRAJ entente directe Conseil s.a. BI-PIU-196353-CS-INDV / Consultant en charge de Component 1: Investments in En attente l'exploitation des rapports des IDA / D2250 A posteriori Individuel Open 10,000.00 0.00 2020-10-19 2020-12-07 2020-12-28 2021-02-01 2021-07-31 Local Public Infrastructure d'exécution audits pour le renforcement des capacités des CLs BI-PIU-166114-CS-INDV / Component 3: Project Recrutement d'un Spécialiste IDA / D2250 Management, Coordination, A priori Individuel Open 50,000.00 0.00 Annulé 2020-05-04 2020-04-21 2020-06-22 2020-07-13 2020-08-17 2021-02-13 en Passation des Marchés and Monitoring Page 11 BI-PIU-90895-CS-INDV / Recrutement d'un consultant international en charge de Component 2: Support for l'assistance technique pour la IDA / D2250 A posteriori Individuel Open - International 75,000.00 0.00 Annulé 2019-04-09 2019-04-09 2019-04-09 2019-04-09 2019-04-09 Value Chain Development formation sur les chaînes de valeur et partenariat y inclus l'éducation financière BI-PIU-153589-CS-INDV / Component 3: Project Recrutement de l’assistant(e) IDA / D2250 Management, Coordination, A posteriori Individuel Open 21,000.00 0.00 Annulé 2020-02-10 2020-02-28 2020-03-30 2020-04-20 2020-05-25 2020-11-21 en passation des marchés du and Monitoring PDLE BI-PIU-204025-CS-INDV / Consultant d'appui à l'UGP Component 2: Support for En attente IDA / D2250 A posteriori Individuel Open 10,000.00 0.00 2020-11-30 2021-01-18 2021-02-08 2021-03-15 2021-09-11 dans le cadre des procédures Value Chain Development d'exécution juridiques BI-PIU-205148-CS-INDV / Recrutement d’un consultant international en charge de Component 2: Support for En cours l’assistance technique pour la IDA / D2250 A posteriori Individuel 75,000.00 0.00 2020-12-08 2020-12-18 2020-12-08 2020-12-08 2020-12-08 2020-12-08 Value Chain Development d'exécution formation sur les chaînes de valeur et partenariat y inclus l'éducation financière BI-PIU-201984-CS-INDV / Recrutement d'un Consultant pour appuyer l'UGP à la mise en place d'un système de Component 3: Project vidéo-conférence (élaborer les En attente IDA / D2250 Management, Coordination, A posteriori Individuel Open 10,000.00 0.00 2020-11-24 2021-01-12 2021-02-02 2021-03-09 2021-09-05 spécifications techniques, d'exécution and Monitoring réceptionner les équipements, contrôler l'installation et former les utilisateurs) BI-PIU-193681-CS-INDV / Recrutement d'un Consultant pour appuyer l'UGP à la Component 3: Project En cours préparation de la Revue à mi- IDA / D2250 Management, Coordination, A posteriori Individuel Open 50,000.00 0.00 2020-12-20 2020-12-18 2021-02-07 2021-02-28 2021-04-04 2021-10-01 d'exécution parcours du Projet de and Monitoring Développement Local pour l'Emploi BI-PIU-211372-CS-INDV / Recrutement d’un Consultant indépendant pour Component 3: Project l’établissement de la situation En cours IDA / D2250 Management, Coordination, A posteriori Individuel Open 50,000.00 0.00 2021-01-11 2021-01-05 2021-03-01 2021-03-22 2021-04-26 2021-10-23 de référence pour mesurer d'exécution and Monitoring l’impact du Projet de Développement Local pour l’Emploi (PDLE) BI-PIU-49116-CS-CQS / Recrutement d'un Consultant pour le Manuel de bonnes Component 2: Support for pratiques d'exploitation et de IDA / D2250 A posteriori Individuel Open 20,000.00 0.00 Annulé 2018-10-25 2019-01-29 2018-12-13 2019-01-03 2019-02-07 2019-08-06 Value Chain Development valorisation des filières de la construction (argile, pierre et bois). BI-PIU-211329-CS-INDV / Recrutement du Component 3: Project En cours Coordonnateur du Projet de IDA / D2250 Management, Coordination, A posteriori Individuel Open 36,720.00 0.00 2021-01-15 2021-02-05 2021-03-05 2021-03-26 2021-04-30 2021-10-27 d'exécution Développement Local pour and Monitoring l'Emploi BI-PIU-226495-CS-CDS / Reconduction du Contrat du Component 3: Project Sélection de Responsable Sauvegardes IDA / D2250 Management, Coordination, A posteriori consultants par Direct 23,417.24 0.00 En cours d'examen 2021-03-29 2021-03-31 2021-03-31 2021-03-31 2022-03-31 Environnementales et Sociales- and Monitoring entente directe Monsieur NICAYENZI Felix BI-PIU-226497-CS-CDS / Component 3: Project Sélection de Reconduction du contrat du IDA / D2250 Management, Coordination, A posteriori consultants par Direct 15,000.61 0.00 En cours d'examen 2021-03-29 2021-03-31 2021-03-31 2021-03-31 2022-03-31 Comptable au PDLE, Monsieur and Monitoring entente directe Aimé Césaire INGABIRE BI-PIU-226492-CS-CDS / Reconduction du Contrat du Component 3: Project Sélection de Responsable Suivi-Evaluation IDA / D2250 Management, Coordination, A posteriori consultants par Direct 23,915.26 0.00 En cours d'examen 2021-03-29 2021-03-31 2021-03-31 2021-03-31 2022-03-31 du PDLE, Monsieur Libérat and Monitoring entente directe NIYOYUNGURUZA BI-PIU-226493-CS-CDS / Reconduction du Contrat du Component 3: Project Sélection de En cours Responsable Infrastructures IDA / D2250 Management, Coordination, A posteriori consultants par Direct 23,417.24 24,659.21 2021-03-29 2021-03-31 2021-03-31 2021-04-01 2021-03-31 2022-03-31 d'exécution au PDLE, Monsieur BIPFUBUSA and Monitoring entente directe Joseph BI-PIU-237443-CS-INDV / Component 3: Project Recrutement d'un deuxième IDA / D2250 Management, Coordination, A posteriori Individuel Limited 40,000.00 0.00 En cours d'examen 2021-06-17 2021-06-25 2021-06-20 2021-07-20 2021-08-11 2022-07-31 consultant en passation de and Monitoring marchés BI-PIU-235077-CS-INDV / Recrutement d'un premier Component 3: Project consultant en Passation de En cours IDA / D2250 Management, Coordination, A posteriori Individuel Limited 40,000.00 0.00 2021-05-29 2021-07-26 2021-06-01 2021-06-16 2021-07-01 2022-06-30 Marchés pour appuyer dans d'exécution and Monitoring l'avancement rapide de la passation de marchés BI-PIU-237613-CS-CDS / Reconduction du contrat de l'ONG CARITAS INTERNATIONAL BELGIQUE Sélection de Component 1: Investments in pour la poursuite IDA / D2250 A posteriori consultants par Direct 250,000.00 0.00 En cours d'examen 2021-07-06 2021-07-14 2021-07-10 2021-07-30 2022-07-30 Local Public Infrastructure d'accompagner les Tavaux entente directe sous l'approche HIMO et la mise en œuvre du mécanisme de gestion des plaintes Page 12 BI-PIU-242338-CS-CDS / Recrutement du Cabinet IC&IB pour la finalisation de l'étude Sélection de Component 2: Support for En attente technique et élaboration du IDA / D2250 A posteriori consultants par Direct 30,000.00 0.00 2021-07-27 2021-08-06 2021-10-10 2022-04-08 Value Chain Development d'exécution DAO pour la réhabilitation de entente directe l’immeuble du Tribunal de commerce de Bujumbura Page 13