PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Senegal : Community-based Sustainable Land Management Project PLAN General Information Country: Senegal Bank’s Approval Date of the Original Procurement Plan: 2018-02-23 2021-06-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P124018 GPN Date: Project Name: Community-based Sustainable Land Management Project Loan / Credit No: IDA / 53340 AGRIBUSINESS DEVELOPMENT PROJECT Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned T-PDIDAS-001-2017 / Component 1: Support to Single Stage - One 2018-04- Travaux de serres de 3000 IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 Annulé 2017-09-04 2017-10-30 sector actors Envelope 28 m2 à Saint-Louis T-PDIDAS-002-2017 / Component 1: Support to Single Stage - One 2018-06- Travaux de réhabilitation de IDA / 53340 A posteriori Appel d'offres Open - National 100,000.00 0.00 Annulé 2017-08-31 2017-09-05 2017-10-17 2017-11-16 2017-12-21 sector actors Envelope 19 l'Agropole de MPAL T-PDIDAS-003-2017 / Component 1: Support to Single Stage - One En attente 2018-05- Travaux d'aménagement des IDA / 53340 A posteriori Demande de prix Limited 28,000.00 0.00 2017-09-10 2017-11-05 sector actors Envelope d'exécution 04 mares et toufndés T-PDIDAS-004-2017 / Component 1: Support to Single Stage - One En attente 2018-04- Travaux d'aménagement des IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2017-09-05 2017-10-31 sector actors Envelope d'exécution 29 pare feu T-PDIDAS-005-2017 / Component 1: Support to Single Stage - One En attente 2018-06- Travaux de matérialisation IDA / 53340 A posteriori Appel d'offres Open - National 220,000.00 0.00 2017-08-25 2017-08-30 2017-10-11 2017-11-10 2017-12-15 sector actors Envelope d'exécution 13 des POAS T-PDIDAS-006-2017 / Travaux de construction des Component 1: Support to Single Stage - One En attente 2017-10- IDA / 53340 A posteriori Appel d'offres Open - National 900,000.00 0.00 2016-12-23 2016-12-28 2017-02-08 2017-03-10 2017-04-14 bureaux fonciers des neuf sector actors Envelope d'exécution 11 communes cibles T-PDIDAS-007-2017 / Component 2: Development Travaux d'aménagement du of irrigation infrastructure Single Stage - One En attente 2018-06- IDA / 53340 A posteriori Appel d'offres Open - National 340,000.00 0.00 2017-08-14 2017-08-19 2017-09-30 2017-10-30 2017-12-04 site pilote de Ngnith( relance and natural resources Envelope d'exécution 02 lots1,2 et 3) management T-PDIDAS-011-2017 / Component 2: Development Travaux d'aménagement de of irrigation infrastructure Single Stage - One En attente 2018-06- pépinière communautaire par IDA / 53340 A posteriori Appel d'offres Open - National 160,000.00 0.00 2017-08-14 2017-08-19 2017-09-30 2017-10-30 2017-12-04 and natural resources Envelope d'exécution 02 forêt ou réserve( clôtures, management points d'eau, magasins etc.) T-PDIDAS-001-2018 / Component 2: Development Travaux du canal du shunt et of irrigation infrastructure Single Stage - One 14,257,539.8 En cours 2019-01- IDA / 53340 A priori Appel d'offres Open - International 0.00 2018-04-09 2018-06-13 2018-04-14 2018-05-26 2018-06-25 2018-07-30 ouvrages associés dans le and natural resources Envelope 3 d'exécution 26 cadre du PDIDAS management T-PDIDAS-002-2018 / Travaux de faucardage, de Component 2: Development curage et de génie civil pour of irrigation infrastructure Single Stage - One 11,771,595. 2018-10- IDA / 53340 A priori Appel d'offres Open - National 9,468,098.42 Signé 2017-12-24 2017-12-29 2017-12-29 2018-02-09 2018-02-22 2018-03-11 2018-03-01 2018-04-15 2018-07-23 la remise en eau du bassin du and natural resources Envelope 66 12 Ngalam incluant la zone des management trois marigots T-PDIDAS-024-2018 / Travaux de réfection de la Component 1: Support to Single Stage - One En attente 2019-02- salle d'archives du cadastre et IDA / 53340 A posteriori Appel d'offres Open - National 100,000.00 0.00 2018-04-30 2018-05-05 2018-06-16 2018-07-16 2018-08-20 sector actors Envelope d'exécution 16 domaines de Saint-louis et Louga Component 2: Development T-PDIDAS-025-2018 / of irrigation infrastructure Single Stage - One En attente 2019-02- Travaux des infrastructures IDA / 53340 A posteriori Appel d'offres Open - National 2,200,000.00 0.00 2018-05-07 2018-05-12 2018-06-23 2018-07-23 2018-08-27 and natural resources Envelope d'exécution 23 d'irrigations secondaires management Component 2: Development T-PDIDAS-026-2018 / of irrigation infrastructure Single Stage - One En attente 2019-01- Travaux d'aménagement du IDA / 53340 A posteriori Appel d'offres Open - National 400,000.00 0.00 2018-03-20 2018-03-25 2018-05-06 2018-06-05 2018-07-10 and natural resources Envelope d'exécution 06 site pilote de Ngnith management T-PDIDAS-027-2018 / Component 2: Development Travaux d'aménagement de of irrigation infrastructure Single Stage - One En cours 2019-01- Pépinière communautaire par IDA / 53340 A posteriori Appel d'offres Open - National 300,000.00 0.00 2018-03-28 2020-04-24 2018-04-02 2018-05-14 2018-06-13 2018-07-18 and natural resources Envelope d'exécution 14 forêt ou réserve (Clôtures, management Points d'eau, Magasins etc.) T-PDIDAS-028-2018 / Component 2: Development Travaux de matérialisation of irrigation infrastructure Single Stage - One En attente 2019-01- IDA / 53340 A posteriori Appel d'offres Open - National 190,000.00 0.00 2018-03-19 2018-03-24 2018-05-05 2018-06-04 2018-07-09 des limites des forêts et and natural resources Envelope d'exécution 05 réserves (Bornage, management pancartage, etc.) T-PDIDAS-016-2017 / Travaux de construction des Component 1: Support to Single Stage - One En attente 2017-10- IDA / 53340 A posteriori Appel d'offres Open - National 900,000.00 0.00 2016-12-22 2016-12-27 2017-02-07 2017-03-09 2017-04-13 bureaux fonciers des 9 sector actors Envelope d'exécution 10 communes cibles T-PDIDAS-012-2017 / Component 2: Development Travaux de matérialisation of irrigation infrastructure Single Stage - One En attente 2018-06- des limites des forêts et IDA / 53340 A posteriori Appel d'offres Open - National 180,000.00 0.00 2017-08-14 2017-08-19 2017-09-30 2017-10-30 2017-12-04 and natural resources Envelope d'exécution 02 réserves(Bornage, pancartage management etc.) Page 1 T-PDIDAS-029-2018 / Réalisation des travaux et de prestations de services de la Component 2: Development parcelle test goutte à goutte of irrigation infrastructure Single Stage - One En attente 2019-02- et d'aspersion par IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2018-07-03 2018-08-28 and natural resources Envelope d'exécution 24 solaire/Relance du lot 3 du management marché de travaux d'aménagement du site pilote de Gnith T-PDIDAS-001-2019 / Travaux de réfection de la Component 1: Support to Single Stage - One En cours 2019-12- IDA / 53340 A posteriori Appel d'offres Open - National 100,000.00 0.00 2019-03-04 2019-05-09 2019-03-09 2019-04-20 2019-05-20 2019-06-24 salle d'archives du cadastre et sector actors Envelope d'exécution 21 domaines de st-louis et Louga T-PDIDAS-002-2019 / Component 2: Development Travaux du canal du shunt et of irrigation infrastructure Single Stage - One 14,000,000.0 2019-12- IDA / 53340 A priori Appel d'offres Open - International 0.00 Annulé 2019-02-28 2019-03-05 2019-04-16 2019-05-16 2019-06-20 ouvrages associés dans le and natural resources Envelope 0 17 cadre du PDIDAS management Component 2: Development T-PDIDAS-003-2019 / of irrigation infrastructure Single Stage - One 16,000,000.0 En attente 2020-02- Travaux des infrastructures IDA / 53340 A posteriori Appel d'offres Open - International 0.00 2019-04-16 2019-04-21 2019-06-02 2019-07-02 2019-08-06 and natural resources Envelope 0 d'exécution 02 secondaires management Component 2: Development T-PDIDAS-004-2019 / of irrigation infrastructure Single Stage - One 10,000,000.0 En attente 2019-12- Travaux des infrastructures IDA / 53340 A posteriori Appel d'offres Open - International 0.00 2019-03-12 2019-03-17 2019-04-28 2019-05-28 2019-07-02 and natural resources Envelope 0 d'exécution 29 tertiaires management Component 2: Development T-PDIDAS-005-2019 / of irrigation infrastructure Single Stage - One 2020-02- Travaux pour les sous projets IDA / 53340 A posteriori Appel d'offres Open - National 2,800,000.00 0.00 Annulé 2019-04-23 2019-04-28 2019-06-09 2019-07-09 2019-08-13 and natural resources Envelope 09 de st louis management Component 2: Development T-PDIDAS-006-2019 / of irrigation infrastructure Single Stage - One 2020-02- Travaux pour les sous projets IDA / 53340 A posteriori Appel d'offres Open - National 1,600,000.00 0.00 Annulé 2019-04-25 2019-04-30 2019-06-11 2019-07-11 2019-08-15 and natural resources Envelope 11 de Louga management T-PDIDAS-008-2019 / Travaux de substitution aux Component 2: Development offres foncières de Yetty Yone of irrigation infrastructure Single Stage - One En attente 2020-03- IDA / 53340 A posteriori Appel d'offres Open - National 682,000.00 0.00 2019-06-06 2019-06-11 2019-07-23 2019-08-22 2019-09-26 ,Khatète ,Khelcom Diop, and natural resources Envelope d'exécution 24 Bidieum Mouride et Gantour management du PDIDAS. Component 2: Development T-PDIDAS-009-2019 / of irrigation infrastructure Single Stage - One 30,246,475.7 31,886,141. 2020-06- Travaux des infrastructures IDA / 53340 A priori Appel d'offres Open - International Signé 2019-08-16 2019-08-08 2019-08-21 2019-09-09 2019-10-02 2019-10-31 2019-11-01 2019-12-12 2019-12-06 2020-03-09 and natural resources Envelope 9 40 03 secondaires et tertiaires management T-PDIDAS-001-2020 / Réalisation des travaux Component 2: Development d'infrastructures d'irrigation of irrigation infrastructure Single Stage - One En cours 2020-11- de substitution dans les sites IDA / 53340 A posteriori Appel d'offres Open - National 700,000.00 0.00 2020-02-05 2020-03-05 2020-02-10 2020-03-23 2020-04-22 2020-05-27 and natural resources Envelope d'exécution 23 de Niet Yoon, Gantour, management Khatète, Khelcom Diop, Bidiem Mouride SN-PDIDAS-204880-CW-RFQ Component 2: Development / Travaux de substitution des of irrigation infrastructure Single Stage - One En cours 2021-07- sites de Gantour et Khelcom ( IDA / 53340 A posteriori Demande de prix Limited 600,000.00 0.00 2020-11-25 2021-01-04 2021-01-20 and natural resources Envelope d'exécution 19 réalisation de mini forages et management faucardage etc..) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual F- PDIDAS-002-2017 / Acquisition de matériaux et Component 1: Support to Single Stage - One de matériels pour la mise en IDA / 53340 A posteriori Appel d'offres Open - National 100,000.00 0.00 Annulé 2017-07-31 2018-02-12 2017-08-05 2017-09-16 2017-10-16 2017-11-20 2018-05-19 sector actors Envelope place de dispositif anti- corrosif F- PDIDAS-006-2017 / Component 1: Support to Single Stage - One Acquisition de mobilier de IDA / 53340 A posteriori Demande de prix Limited 2,600.00 0.00 Annulé 2017-08-13 2017-10-08 2018-04-06 sector actors Envelope bureau pour l'UEP APIX F- PDIDAS-007-2017 / Component 1: Support to Single Stage - One Acquisition de boutures IDA / 53340 A posteriori Demande de prix Limited 10,000.00 0.00 Annulé 2017-08-16 2017-10-11 2018-04-09 sector actors Envelope (matériel végétal)pour l'ISRA F- PDIDAS-013-2017 / Component 1: Support to Single Stage - One En attente Acquisition de carburant pour IDA / 53340 A posteriori Demande de prix Limited 10,800.00 0.00 2017-08-07 2017-10-02 2018-03-31 sector actors Envelope d'exécution les agents fonciers F- PDIDAS-014-2017 / Acquisition de matériels Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 18,960.00 0.00 2017-08-19 2017-10-14 2018-04-12 informatiques pour les agents sector actors Envelope d'exécution fonciers de l'UCP et la DHORT F- PDIDAS-015-2017 / Component 1: Support to Single Stage - One En attente Acquisition d'images IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2017-09-08 2017-11-03 2018-05-02 sector actors Envelope d'exécution satellitaires F- PDIDAS-016-2017 / Acquisition de 15 GPS de levées parcellaires, d'un GPS Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Appel d'offres Open - National 82,000.00 0.00 2017-08-07 2017-08-12 2017-09-23 2017-10-23 2017-11-27 2018-05-26 différentiel pour le cadastre sector actors Envelope d'exécution de louga, de 15 GPS et tablettes pour les enquêteurs Page 2 F- PDIDAS-017-2017 / Acquisition d'une station Component 1: Support to Single Stage - One En attente totale pour le cadastre de IDA / 53340 A posteriori Demande de prix Limited 30,000.00 0.00 2017-08-28 2017-10-23 2018-04-21 sector actors Envelope d'exécution louga pour la sécurisation foncière F- PDIDAS-018-2017 / Location de bureau pour Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 7,200.00 0.00 2017-08-27 2017-10-22 2018-04-20 l'équipe de la régularisation sector actors Envelope d'exécution foncière Component 2: Development F- PDIDAS-019-2017 / of irrigation infrastructure Single Stage - One En attente Acquisition d'équipements de IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2017-08-09 2017-08-14 2017-09-25 2017-10-25 2017-11-29 2018-05-28 and natural resources Envelope d'exécution pépinières communautaires management F- PDIDAS-020-2017 / Component 2: Development Acquisition de matériel of irrigation infrastructure Single Stage - One En attente d'inventaire et de géo IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2017-08-09 2017-08-14 2017-09-25 2017-10-25 2017-11-29 2018-05-28 and natural resources Envelope d'exécution référencement pour l'UEP management ANGMV F- PDIDAS-021-2017 / Component 2: Development Acquisition d'un logiciel of irrigation infrastructure Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 28,000.00 0.00 2017-08-21 2017-10-16 2018-04-14 TOMPRO multi projet et d'un and natural resources Envelope d'exécution logiciel MS PROJECT management F- PDIDAS-022-2017 / Component 3: Coordination, Acquisition d'équipements de Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 30,000.00 0.00 2017-09-06 2017-11-01 2018-04-30 téléconférence et de Evaluation (GEF: US$0.5 Envelope d'exécution téléphonie million; IDA: US$6 million) F- PDIDAS-023-2017 / Component 3: Coordination, Acquisition d'équipements Impact Monitoring and Single Stage - One En attente informatiques et de IDA / 53340 A posteriori Appel d'offres Open - National 80,000.00 0.00 2017-08-08 2017-08-13 2017-09-24 2017-10-24 2017-11-28 2018-05-27 Evaluation (GEF: US$0.5 Envelope d'exécution géolocalisation pour le suivi million; IDA: US$6 million) évaluation F- PDIDAS-024-2017 / Component 3: Coordination, Acquisition de matériels de Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 3,000.00 0.00 2017-08-15 2017-10-10 2018-04-08 bureau et bureautique pour la Evaluation (GEF: US$0.5 Envelope d'exécution DHORT million; IDA: US$6 million) Component 3: Coordination, F- PDIDAS-025-2017 / Impact Monitoring and Single Stage - One Acquisition d'équipements IDA / 53340 A posteriori Demande de prix Limited 6,000.00 0.00 Annulé 2017-08-23 2017-10-18 2018-04-16 Evaluation (GEF: US$0.5 Envelope informatiques pour la DAPSA million; IDA: US$6 million) Component 3: Coordination, F- PDIDAS-026-2017 / Impact Monitoring and Single Stage - One Acquisition d'outils de IDA / 53340 A posteriori Demande de prix Limited 6,000.00 0.00 Annulé 2017-09-11 2017-11-06 2018-05-05 Evaluation (GEF: US$0.5 Envelope collectes pour la DAPSA million; IDA: US$6 million) Component 3: Coordination, F- PDIDAS-027-2017 / Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 6,000.00 0.00 Annulé 2017-08-25 2017-10-20 2018-04-18 Acquisition d'espace drop box Evaluation (GEF: US$0.5 Envelope million; IDA: US$6 million) F-PDIDAS-029-2017 / Acquisition de petits matériels Component 2: Development agricoles et de laboratoire of irrigation infrastructure Single Stage - One pour la multiplication in vitro IDA / 53340 A posteriori Demande de prix Limited 8,000.00 0.00 Annulé 2017-08-23 2017-10-18 2018-04-16 and natural resources Envelope de la variété Beauregard et management des variétés Covington, Rubina et Bostok par l'ISRA F-PDIDAS-030-2017 / Acquisition d'intrants,produits Component 2: Development chimiques et consommables of irrigation infrastructure Single Stage - One pour la multiplication in vitro IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 Annulé 2017-08-26 2017-10-21 2018-04-19 and natural resources Envelope de la variété Beauregard et management des variétés Covington, Rubina et Bostok par l'ISRA Component 2: Development F-PDIDAS-031-2017 / of irrigation infrastructure Single Stage - One Fournitures de bureau IDA / 53340 A posteriori Demande de prix Limited 8,000.00 0.00 Annulé 2017-08-27 2017-10-22 2018-04-20 and natural resources Envelope destinées à l'ISRA management F-PDIDAS-032-2017 / Component 2: Development Acquisition d'intrants pour les of irrigation infrastructure Single Stage - One IDA / 53340 A posteriori Appel d'offres Open - National 243,619.00 0.00 Annulé 2017-08-24 2017-08-29 2017-10-10 2017-11-09 2017-12-14 2018-06-12 5 GIE du programme pilote de and natural resources Envelope Ngnith(200 ha) management F-PDIDAS-001-2018 / Component 1: Support to Single Stage - One Fourniture et pose de parcelle IDA / 53340 A posteriori Demande de prix Limited 10,000.00 12,331.79 Achevé 2018-04-02 2018-05-22 2018-05-28 2018-06-12 2018-11-24 2018-07-04 sector actors Envelope test F-PDIDAS-002-2018 / Fourniture et pose de Component 1: Support to Single Stage - One IDA / 53340 A posteriori Appel d'offres Open - National 324,000.00 159,650.19 Signé 2018-04-10 2018-11-12 2018-04-15 2018-05-27 2018-12-12 2018-06-26 2019-01-25 2018-07-31 2019-04-08 2019-01-27 parcelles de démonstration sector actors Envelope agro écologiques F-PDIDAS-003-2018 / Component 1: Support to Single Stage - One Acquisition d'engrais IDA / 53340 A posteriori Demande de prix Limited 40,000.00 33,922.31 Achevé 2018-03-24 2018-05-22 2018-05-19 2018-08-08 2018-11-15 2018-10-16 sector actors Envelope biologiques F-PDIDAS-004-2018 / Component 1: Support to Single Stage - One En attente Acquisition d'échantillons de IDA / 53340 A posteriori Demande de prix Limited 2,000.00 0.00 2018-04-14 2018-06-09 2018-12-06 sector actors Envelope d'exécution foyers améliorés F-PDIDAS-005-2018 / Production de supports techniques (Présentations Component 1: Support to Single Stage - One En attente techniques, Brochures, IDA / 53340 A posteriori Demande de prix Limited 30,000.00 0.00 2018-03-25 2018-05-20 2018-11-16 sector actors Envelope d'exécution cahiers, fiches produits..) en diverses langues par l'UEP de l'APIX Page 3 F-PDIDAS-006-2018 / Acquisition d'équipements et Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 4,000.00 1,960.05 Achevé 2018-03-26 2018-05-16 2018-05-21 2018-05-29 2018-11-17 2018-06-25 d'outils d'archivage pour sector actors Envelope l'UCP et la DGID F-PDIDAS-007-2018 / Acquisition de onze (11) Component 1: Support to Single Stage - One En cours véhicules pick-up pour les IDA / 53340 A posteriori Appel d'offres Open - National 338,000.00 0.00 2018-03-30 2018-07-02 2018-04-04 2018-05-16 2018-08-03 2018-06-15 2018-10-16 2018-07-20 2019-01-16 sector actors Envelope d'exécution neuf bureaux fonciers et les cadastres de st-louis et Louga F-PDIDAS-008-2018 / Acquisition de divers Component 2: Development matériels informatiques of irrigation infrastructure Single Stage - One En attente (ordinateurs, appareil photo IDA / 53340 A posteriori Demande de prix Limited 39,400.00 0.00 2018-03-28 2018-05-23 2018-11-19 and natural resources Envelope d'exécution etc...) et de consommables management informatiques pour l'UCP et de l'ANGMV F-PDIDAS-009-2018 / Component 1: Support to Single Stage - One En attente Impression de formulaires et IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2018-03-18 2018-05-13 2018-11-09 sector actors Envelope d'exécution registres fonciers F-PDIDAS-010-2018 / Acquisition de carburant pour Component 1: Support to Single Stage - One En attente les véhicules des bureaux IDA / 53340 A posteriori Appel d'offres Open - National 110,000.00 0.00 2018-03-23 2018-03-28 2018-05-09 2018-06-08 2018-07-13 2019-01-09 sector actors Envelope d'exécution fonciers, de la DGID et de l'UCP F-PDIDAS-011-2018 / Acquisition de matériels informatiques et de communication Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2018-04-22 2018-06-17 2018-12-14 complémentaires selon le sector actors Envelope d'exécution modèle du Système d'Information Foncière(SIF) retenu F-PDIDAS-012-2018 / Acquisition Soft et Hardware Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2018-04-11 2018-04-16 2018-05-28 2018-06-27 2018-08-01 2019-01-28 selon le modèle SIF et options sector actors Envelope d'exécution technologiques retenues F-PDIDAS-013-2018 / Component 1: Support to Single Stage - One En cours Acquisition d'images IDA / 53340 A posteriori Appel d'offres Open - National 100,000.00 0.00 2018-04-16 2018-08-07 2018-04-21 2018-06-02 2018-09-18 2018-07-02 2018-10-03 2018-08-06 2019-02-02 sector actors Envelope d'exécution satellitaires F-PDIDAS-014-2018 / Acquisition de 02 stations GPS permanentes, de GPS de levés Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Appel d'offres Open - National 162,000.00 0.00 2018-03-30 2018-04-04 2018-05-16 2018-06-15 2018-07-20 2019-01-16 parcellaires et de tablettes sector actors Envelope d'exécution pour la sécurisation foncière et bureaux fonciers F-PDIDAS-015-2018 / Acquisition de fournitures de Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 22,000.00 20,308.89 Signé 2018-04-14 2018-07-09 2018-06-09 2018-08-16 2018-12-06 2018-10-09 bureau et de consommables sector actors Envelope pour l'UCP et la DGID F-PDIDAS-016-2018 / Acquisition de matériels Component 1: Support to Single Stage - One En cours IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2018-04-16 2018-06-11 2018-12-08 informatiques et de mobiliers sector actors Envelope d'exécution de bureau pour la DGID F-PDIDAS-017-2018 / Component 2: Development Acquisition de supports de of irrigation infrastructure Single Stage - One IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 Annulé 2018-04-17 2018-12-12 2018-04-22 2018-06-03 2018-07-03 2018-08-07 2019-02-03 communication pour l'UCP et and natural resources Envelope l'ANGMV management F-PDIDAS-018-2018 / Component 2: Development Acquisition de matériel of irrigation infrastructure Single Stage - One En attente IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2018-04-19 2018-04-24 2018-06-05 2018-07-05 2018-08-09 2019-02-05 d'inventaire et de géo and natural resources Envelope d'exécution référencement pour l'ANGMV management Component 2: Development F-PDIDAS-019-2018 / of irrigation infrastructure Single Stage - One En attente Acquisition de matériel IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2018-04-17 2018-06-12 2018-12-09 and natural resources Envelope d'exécution bureautique pour l'ANGMV management Component 2: Development F-PDIDAS-020-2018 / of irrigation infrastructure Single Stage - One En attente Acquisition de matériels de IDA / 53340 A posteriori Demande de prix Limited 10,000.00 0.00 2018-04-23 2018-06-18 2018-12-15 and natural resources Envelope d'exécution jardin pour l'ANGMV management F-PDIDAS-021-2018 / Component 3: Coordination, Acquisition d'équipements de Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 30,000.00 0.00 2018-06-03 2018-07-29 2019-01-25 téléconférence et de Evaluation (GEF: US$0.5 Envelope d'exécution téléphonie million; IDA: US$6 million) Component 3: Coordination, F-PDIDAS-022-2018 / Impact Monitoring and Single Stage - One Acquisition de licence IDA / 53340 A posteriori Demande de prix Limited 2,000.00 1,455.96 Achevé 2018-04-18 2018-09-28 2018-06-13 2018-10-18 2018-12-10 2018-11-07 Evaluation (GEF: US$0.5 Envelope antivirus million; IDA: US$6 million) F- PDIDAS-009-2017 / Acquisition de supports de communication(plaquette,flyer Component 1: Support to Single Stage - One En cours IDA / 53340 A posteriori Demande de prix Limited 44,000.00 0.00 2017-08-20 2017-10-15 2018-04-13 s,kakémono,enseignes,vidéog sector actors Envelope d'exécution ramme ...) pour l'UCP et l'ANGMV F-PDIDAS-014-2017 / Component 3: Coordination, Acquisition de matériels Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 18,960.00 18,095.91 Achevé 2017-10-10 2017-10-10 2017-12-05 2018-01-03 2018-06-03 2018-03-22 informatiques pour les agents Evaluation (GEF: US$0.5 Envelope fonciers de l'UCP et la DHORT million; IDA: US$6 million) F-PDIDAS-017-2017 / Acquisition d'une station Component 1: Support to Single Stage - One totale pour le cadastre de IDA / 53340 A posteriori Demande de prix Limited 30,000.00 18,277.32 Achevé 2017-10-10 2017-10-10 2017-12-05 2018-03-08 2018-06-03 2018-05-09 sector actors Envelope Louga pour la sécurisation foncière Page 4 F-PDIDAS-016-2017 / Acquisition de 15 GPS à levés parcellaires, d'un (01) GPS Component 1: Support to Single Stage - One En cours IDA / 53340 A posteriori Appel d'offres Open - National 92,000.00 0.00 2017-09-04 2017-09-15 2017-09-09 2017-10-21 2017-11-20 2017-12-25 2018-06-23 différentiel pour le Cadastre sector actors Envelope d'exécution de Louga et de 15 tablettes pour les enquêteurs F-PDIDAS-010-2017 / Acquisition de véhicules et de Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Appel d'offres Open - National 199,600.00 0.00 2017-07-21 2017-07-26 2017-09-06 2017-10-06 2017-11-10 2018-05-09 motos pour la CFAHS, sector actors Envelope d'exécution l'ANGMV, la DHORT et l'UCP F-PDIDAS-028-2017 / Acquisition de fournitures et de consommables Component 1: Support to Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 30,000.00 0.00 2017-03-25 2017-05-20 2017-11-16 informatiques pour l'UCP, sector actors Envelope d'exécution DHORT, cadastre st-louis et Louga F- PDIDAS-012-2017 / Component 1: Support to Single Stage - One En attente Fourniture de formulaires et IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2017-08-26 2017-10-21 2018-04-19 sector actors Envelope d'exécution de registres fonciers Component 3: Coordination, F-PDIDAS-023-2018 / Impact Monitoring and Single Stage - One Acquisition d'un(01) logiciel IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 Annulé 2018-04-15 2018-08-30 2018-06-10 2018-12-07 Evaluation (GEF: US$0.5 Envelope MS-Project million; IDA: US$6 million) F-PDIDAS-001-2019 / Acquisition de matériels et Component 1: Support to Single Stage - One IDA / 53340 A posteriori Appel d'offres Open - National 110,000.00 23,403.50 Achevé 2019-02-19 2019-11-13 2019-02-24 2019-11-18 2019-04-07 2019-12-19 2019-05-07 2019-12-26 2019-06-11 2020-02-07 2019-12-08 2020-07-02 d'intrants pour la mise en sector actors Envelope œuvre du système de qualité F-PDIDAS-002-2019 / Acquisition de matériels informatique et de Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 26,500.00 23,363.47 Achevé 2019-03-17 2019-08-26 2019-05-12 2019-10-15 2019-11-08 2019-12-05 communication sector actors Envelope complémentaires pour l'UCP et les agents SIF F-PDIDAS-003-2019 / Acquisition d'équipements et Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 40,000.00 28,430.51 Achevé 2019-02-18 2019-11-12 2019-04-15 2020-01-08 2019-10-12 2020-05-06 d'outils d'archivage pour sector actors Envelope l'UCP et la DGID F-PDIDAS-005-2019 / Acquisition d'équipements Component 1: Support to Single Stage - One des CTAF (matériels IDA / 53340 A posteriori Demande de prix Limited 10,000.00 21,892.51 Achevé 2019-03-23 2019-05-17 2019-05-18 2019-07-17 2019-11-14 2019-08-27 sector actors Envelope informatiques, fournitures de bureau et consommables) F-PDIDAS-006-2019 / Acquisition de carburant pour Component 1: Support to Single Stage - One En attente les véhicules des bureaux IDA / 53340 A posteriori Appel d'offres Open - National 110,000.00 0.00 2019-02-14 2019-02-19 2019-04-02 2019-05-02 2019-06-06 2019-12-03 sector actors Envelope d'exécution fonciers, de la DGID et de l'UCP F-PDIDAS-007-2019 / Acquisition Soft et Hardware Component 1: Support to Single Stage - One IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 Annulé 2019-03-05 2019-03-10 2019-04-21 2019-05-21 2019-06-25 2019-12-22 selon le modèle SIF et options sector actors Envelope technologiques retenues F-PDIDAS-008-2019 / Component 1: Support to Single Stage - One Acquisition de 02 stations GPS IDA / 53340 A posteriori Appel d'offres Open - National 140,000.00 83,223.63 Achevé 2019-02-28 2019-05-14 2019-03-05 2019-04-16 2019-06-14 2019-05-16 2019-08-01 2019-06-20 2019-09-09 2019-12-17 2020-03-27 sector actors Envelope permanentes pour la DGID F-PDIDAS-009-2019 / Acquisition de fournitures de Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 16,000.00 14,110.29 Achevé 2019-03-10 2019-05-20 2019-05-05 2019-08-07 2019-11-01 2019-09-24 bureau et de consommables sector actors Envelope pour l'UCP et la DGID F-PDIDAS-010-2019 / Acquisition de matériels Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 40,000.00 38,571.53 Signé 2019-03-16 2019-02-08 2019-05-11 2019-04-12 2019-11-07 2019-06-14 informatiques et de mobiliers sector actors Envelope de bureau pour la DGID Component 2: Development F-PDIDAS-011-2019 / of irrigation infrastructure Single Stage - One En cours IDA / 53340 A posteriori Appel d'offres Open - National 160,000.00 0.00 2019-03-27 2019-04-01 2019-05-13 2019-06-12 2019-07-17 2020-01-13 Fourniture et pose de clôture and natural resources Envelope d'exécution management Component 2: Development F-PDIDAS-012-2019 / of irrigation infrastructure Single Stage - One En attente Acquisition de matériel IDA / 53340 A posteriori Demande de prix Limited 26,000.00 0.00 2019-03-11 2019-05-06 2019-11-02 and natural resources Envelope d'exécution bureautique pour l'ANGMV management F-PDIDAS-013-2019 / Component 3: Coordination, Acquisition d'équipements de Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 20,000.00 3,268.38 Achevé 2019-03-25 2019-06-27 2019-05-20 2019-07-02 2019-11-16 2019-08-05 téléconférence et de Evaluation (GEF: US$0.5 Envelope téléphonie million; IDA: US$6 million) Component 3: Coordination, F-PDIDAS-014-2019 / Impact Monitoring and Single Stage - One Acquisition de licence IDA / 53340 A posteriori Demande de prix Limited 2,000.00 1,137.32 Signé 2019-03-18 2019-10-03 2019-05-13 2019-10-21 2019-11-09 Evaluation (GEF: US$0.5 Envelope antivirus million; IDA: US$6 million) F-PDIDAS-015-2019 / Component 3: Coordination, Acquisition d'un (01) logiciel Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 16,000.00 0.00 Annulé 2019-03-11 2019-05-06 2019-11-02 Office 365 intégrant MS- Evaluation (GEF: US$0.5 Envelope Project million; IDA: US$6 million) F-PDIDAS-016-2019 / Acquisition de matériels Component 3: Coordination, bureautiques pour l'UCP et la Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 17,000.00 10,494.04 Achevé 2019-03-12 2019-10-30 2019-05-07 2020-01-29 2019-11-03 2020-03-27 DHORT (appareil photo Evaluation (GEF: US$0.5 Envelope numérique, imprimante et million; IDA: US$6 million) photocopieuse) F-PDIDAS-017-2019 / Component 3: Coordination, Acquisition d'espace dans les Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2019-04-11 2019-04-16 2019-05-28 2019-06-27 2019-08-01 2020-01-28 médias nationaux et Evaluation (GEF: US$0.5 Envelope d'exécution internationaux million; IDA: US$6 million) Page 5 F-PDIDAS-004-2019 / Component 3: Coordination, Acquisition de supports de Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 40,000.00 53,662.61 Achevé 2019-05-06 2019-11-20 2019-07-01 2020-01-10 2019-12-28 2020-03-30 communication et de Evaluation (GEF: US$0.5 Envelope documents de capitalisation million; IDA: US$6 million) Component 3: Coordination, F-PDIDAS-025-2018 / Passation de Impact Monitoring and En attente Acquisition d'un logiciel MS IDA / 53340 A posteriori marché de gré à Direct 20,000.00 0.00 2018-12-06 2018-12-06 2019-01-10 2019-07-09 Evaluation (GEF: US$0.5 d'exécution Project gré million; IDA: US$6 million) F-PDIDAS-0006-2019 / Acquisition de carburant pour Component 1: Support to Single Stage - One les véhicules des bureaux IDA / 53340 A posteriori Demande de prix Limited 49,800.00 44,910.42 Achevé 2019-06-01 2019-06-07 2019-07-27 2019-07-01 2020-01-23 2019-07-24 sector actors Envelope fonciers, de la DGID et de l'UCP F-PDIDAS-100-2019 / Acquisition d'un GPS Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 80,000.00 38,282.98 Achevé 2019-09-21 2019-09-26 2019-11-16 2019-11-18 2020-05-14 2019-12-20 différentiel pour le Cadastre sector actors Envelope de Louga Component 3: Coordination, F-PDIDAS-001-2020 / Impact Monitoring and Single Stage - One Acquisition de mobiliers de IDA / 53340 A posteriori Demande de prix Limited 7,000.00 4,482.63 Achevé 2020-02-15 2020-02-04 2020-04-11 2020-03-16 2020-10-08 2020-05-12 Evaluation (GEF: US$0.5 Envelope bureau million; IDA: US$6 million) F-PDIDAS-002-2020 / Component 3: Coordination, Acquisition de consommables Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 10,000.00 19,711.57 Achevé 2020-02-10 2020-01-30 2020-02-28 2020-03-12 2020-03-13 2020-04-21 informatiques et bureautiques Evaluation (GEF: US$0.5 Envelope en deux (02) lots million; IDA: US$6 million) Component 3: Coordination, F-PDIDAS-003-2020 / Impact Monitoring and Single Stage - One En cours IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2020-03-03 2020-02-03 2020-03-26 2020-12-31 Acquisition de carburant Evaluation (GEF: US$0.5 Envelope d'exécution million; IDA: US$6 million) SN-PDIDAS-183243-GO-RFQ / Acquisition d'équipements Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 20,000.00 17,971.06 Signé 2020-07-13 2020-08-06 2020-09-07 2020-10-15 2021-03-06 d'archivage et de bureau du sector actors Envelope Cadastre de Saint Louis SN-PDIDAS-183249-GO-RFQ / Acquisition d'ombrières Component 1: Support to Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 30,000.00 56,054.66 Signé 2020-07-13 2020-07-14 2020-09-07 2020-08-21 2021-03-06 pour la protection des plants sector actors Envelope et pépinières SN-PDIDAS-187447-GO-RFQ Component 3: Coordination, / Acquisition de pneus pour Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 40,000.00 14,723.05 Achevé 2020-08-21 2020-08-21 2020-10-16 2020-10-12 2021-04-14 2020-12-09 l'UCP et le parc automobile Evaluation (GEF: US$0.5 Envelope des bureaux fonciers million; IDA: US$6 million) Component 3: Coordination, F-PDIDAS-004-2020 / Impact Monitoring and Single Stage - One Acquisition de supports de IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 Annulé 2020-04-21 2020-11-20 2020-05-26 2020-11-22 Evaluation (GEF: US$0.5 Envelope communication million; IDA: US$6 million) SN-PDIDAS-235643-GO-RFQ Component 3: Coordination, / Réalisation et installation de Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 14,000.00 0.00 2021-05-29 2021-06-10 2021-06-18 pancartage des réalisations du Evaluation (GEF: US$0.5 Envelope d'exécution PDIDAS million; IDA: US$6 million) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual S-PDIDAS-001-2017 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente pour la couverture assurance IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2017-08-19 2017-10-14 2018-04-12 Evaluation (GEF: US$0.5 Envelope d'exécution maladie du personnel du million; IDA: US$6 million) PDIDAS S-PDIDAS-002-2017 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 10,800.00 0.00 2017-08-19 2017-10-14 2018-04-12 pour le gardiennage des Evaluation (GEF: US$0.5 Envelope d'exécution locaux du PDIDAS million; IDA: US$6 million) S-PDIDAS-003-2017 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 12,000.00 0.00 2017-08-19 2017-10-14 2018-04-12 pour le nettoiement des Evaluation (GEF: US$0.5 Envelope d'exécution locaux du PDIDAS million; IDA: US$6 million) S-PDIDAS-029-2018 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 40,000.00 0.00 2018-04-04 2018-05-30 2018-11-26 pour l'assurance maladie du Evaluation (GEF: US$0.5 Envelope d'exécution personnel du PDIDAS million; IDA: US$6 million) S-PDIDAS-030-2018 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 10,800.00 0.00 2018-04-02 2018-05-28 2018-11-24 pour le gardiennage des Evaluation (GEF: US$0.5 Envelope d'exécution locaux PDIDAS à Saint-Louis million; IDA: US$6 million) et Dakar S-PDIDAS-031-2018 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 12,000.00 0.00 2018-03-31 2018-05-26 2018-11-22 pour le nettoiement des Evaluation (GEF: US$0.5 Envelope d'exécution locaux PDIDAS à Saint-Louis million; IDA: US$6 million) F-PDIDAS-011-2017 / Sélection d'un consultant Component 1: Support to Single Stage - One En attente individuel pour la conception IDA / 53340 A posteriori Demande de prix Limited 6,000.00 0.00 2017-04-08 2017-06-03 2017-11-30 sector actors Envelope d'exécution et le développement d'un site web pour la CFAHS S-PDIDAS-0005-2019 / Component 1: Support to Single Stage - One En attente Impression de formulaires et IDA / 53340 A posteriori Demande de prix Limited 20,000.00 0.00 2019-03-18 2019-05-13 2019-11-09 sector actors Envelope d'exécution registres fonciers Page 6 S-PDIDAS-0001-2019 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2019-02-04 2019-02-09 2019-03-23 2019-04-22 2019-05-27 2019-11-23 pour l'entretien et réparation Evaluation (GEF: US$0.5 Envelope d'exécution des matériels roulants million; IDA: US$6 million) S-PDIDAS-0002-2019 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Appel d'offres Open - National 50,000.00 0.00 2019-02-05 2019-02-10 2019-03-24 2019-04-23 2019-05-28 2019-11-24 pour l'assurance maladie du Evaluation (GEF: US$0.5 Envelope d'exécution personnel du PDIDAS million; IDA: US$6 million) S-PDIDAS-0003-2019 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 12,000.00 0.00 2019-02-10 2019-04-07 2019-10-04 pour l'entretien et Evaluation (GEF: US$0.5 Envelope d'exécution nettoiement des locaux du million; IDA: US$6 million) PDIDAS S-PDIDAS-0004-2019 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One En attente IDA / 53340 A posteriori Demande de prix Limited 10,800.00 0.00 2019-02-12 2019-04-09 2019-10-06 pour le gardiennage des Evaluation (GEF: US$0.5 Envelope d'exécution locaux du PDIDAS million; IDA: US$6 million) S-PDIDAS-001-2020 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 16,000.00 0.00 Annulé 2020-02-08 2020-04-04 2020-10-01 pour les services de Evaluation (GEF: US$0.5 Envelope restauration million; IDA: US$6 million) S-PDIDAS-002-2020 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 24,000.00 0.00 Annulé 2020-02-09 2020-04-05 2020-10-02 pour les services Evaluation (GEF: US$0.5 Envelope d'hébergement million; IDA: US$6 million) S-PDIDAS.003-2020 / Component 3: Coordination, Sélection d'un prestataire Impact Monitoring and Single Stage - One pour l'entretien et la IDA / 53340 A posteriori Demande de prix Limited 6,000.00 0.00 Annulé 2020-02-22 2020-04-18 2020-10-15 Evaluation (GEF: US$0.5 Envelope maintenance des climatiseurs million; IDA: US$6 million) et autres équipements de froid SN-PDIDAS-160664-NC-RFQ Component 3: Coordination, / Sélection d'un prestataire Impact Monitoring and Single Stage - One pour l'entretien et la IDA / 53340 A posteriori Demande de prix Limited 6,000.00 0.00 Annulé 2020-02-22 2020-04-18 2020-10-15 Evaluation (GEF: US$0.5 Envelope maintenance du matériel million; IDA: US$6 million) bureautique C-PDIDAS-002-2020 / Component 3: Coordination, Sélection d'un photographe Impact Monitoring and Single Stage - One IDA / 53340 A posteriori Demande de prix Limited 10,000.00 7,184.59 Achevé 2020-02-29 2020-07-06 2020-04-25 2020-07-07 2020-10-22 2020-07-10 chargé de la réalisation de la Evaluation (GEF: US$0.5 Envelope capitalisation du projet million; IDA: US$6 million) SN-PDIDAS-207262-NC-RFQ Component 3: Coordination, / Sélection d'un consultant Impact Monitoring and Single Stage - One En cours IDA / 53340 A posteriori Demande de prix Limited 14,000.00 12,746.51 2021-05-19 2021-06-17 2021-06-02 2021-06-17 pour la réalisation d'un film Evaluation (GEF: US$0.5 Envelope d'exécution de capitalisation million; IDA: US$6 million) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C-PDIDAS-001-2017 / Sélection fondée Sélection d'un cabinet pour la Component 1: Support to En attente IDA / 53340 A posteriori sur la qualité et le Open - National 200,000.00 0.00 2017-08-21 2017-09-11 2017-10-25 2017-11-22 2017-12-22 2018-01-26 2018-03-02 2019-03-02 préparation de l'évaluation sector actors d'exécution coût sociale des 13 400 ha C-PDIDAS-012-2017 / Sélection d'un consultant pour l'étude diagnostique Sélection fondée technique des infra existantes Component 1: Support to IDA / 53340 A posteriori sur la qualité et le Open - International 40,000.00 0.00 Annulé 2017-08-24 2017-09-14 2017-10-28 2017-11-25 2017-12-25 2018-01-29 2018-03-05 2019-03-05 et élaboration d'un sector actors coût programme de développement de l'Agropole de Fassstructures C-PDIDAS-013-2017 / Sélection d'un consultant pour Sélection fondée Component 1: Support to la réalisation de l'audit IDA / 53340 A posteriori sur la qualité et le Open - International 40,000.00 0.00 Annulé 2017-08-17 2017-09-07 2017-10-21 2017-11-18 2017-12-18 2018-01-22 2018-02-26 2019-02-26 sector actors environnemental de coût l'Agropole de Mpal C-PDIDAS-016-2017 / Component 2: Development Sélection fondée Sélection d'un consultant pour of irrigation infrastructure sur les En attente l'évaluation sociale du IDA / 53340 A posteriori Open - National 40,000.00 0.00 2017-08-14 2017-09-04 2017-10-18 2017-11-17 2017-12-22 2018-06-20 and natural resources qualifications des d'exécution processus foncier des offres management consultants foncières C-PDIDAS-017-2017 / Component 2: Development Sélection d'un cabinet de Sélection fondée of irrigation infrastructure En attente supervision et de contrôle des IDA / 53340 A posteriori sur la qualité et le Open - International 1,476,030.00 0.00 2017-08-24 2017-09-14 2017-10-28 2017-11-25 2017-12-25 2018-01-29 2018-03-05 2019-03-05 and natural resources d'exécution travaux des infrastructures coût management primaires du Ngalam C-PDIDAS-018-2017 / Sélection d'un cabinet chargé Component 2: Development Sélection fondée de l'étude d'impact of irrigation infrastructure sur les En cours environnemental et social des IDA / 53340 A posteriori Open - National 80,000.00 0.00 2017-08-16 2019-05-20 2017-09-06 2017-10-20 2017-09-19 2017-11-19 2018-02-16 2017-12-24 2018-06-22 and natural resources qualifications des d'exécution infrastructures d'irrigation management consultants primaires incluant les trois marigots et le Gandiolais C-PDIDAS-019-2017 / Component 2: Development Sélection d'un cabinet de Sélection fondée of irrigation infrastructure En attente supervision et de contrôle des IDA / 53340 A posteriori sur la qualité et le Open - International 800,000.00 0.00 2017-08-23 2017-09-13 2017-10-27 2017-11-24 2017-12-24 2018-01-28 2018-03-04 2019-03-04 and natural resources d'exécution travaux des infrastructures coût management d'irrigation secondaires C-PDIDAS-020-2017 / Sélection d'un consultant pour Component 2: Development Sélection fondée la réalisation de l'étude of irrigation infrastructure En attente IDA / 53340 A posteriori sur la qualité et le Open - National 120,000.00 0.00 2017-08-25 2017-09-15 2017-10-29 2017-11-26 2017-12-26 2018-01-30 2018-03-06 2019-03-06 d'impact environnemental et and natural resources d'exécution coût social des aménagements management secondaires et tertiaires Page 7 C-PDIDAS-021-2017 / Component 2: Development Sélection d'un consultant pour Sélection fondée of irrigation infrastructure En attente la réalisation de l'audit IDA / 53340 A posteriori sur la qualité et le Open - National 200,000.00 0.00 2017-08-22 2017-09-12 2017-10-26 2017-11-23 2017-12-23 2018-01-27 2018-03-03 2019-03-03 and natural resources d'exécution environnemental détaillé du coût management Delta C-PDIDAS-022-2017 / Sélection d'un consultant pour Component 2: Development la réalisation de l'étude Sélection fondée of irrigation infrastructure En attente d'actualisation du plan IDA / 53340 A posteriori sur la qualité et le Open - National 40,000.00 0.00 2017-08-28 2017-09-18 2017-11-01 2017-11-29 2017-12-29 2018-02-02 2018-03-09 2019-03-09 and natural resources d'exécution d'exploitation et d'entretien coût management des barrages de Diama et de Manantali C-PDIDAS-032-2018 / Sélection fondée Sélection d'un cabinet pour la Component 1: Support to sur les En attente IDA / 53340 A posteriori Open - National 154,000.00 0.00 2018-03-26 2018-04-16 2018-05-30 2018-06-29 2018-08-03 2019-01-30 préparation de l'évaluation sector actors qualifications des d'exécution sociale des 19 364 ha consultants C-PDIDAS-039-2018 / Sélection d'un Consultant pour le diagnostic du Système Sélection fondée Component 1: Support to En attente d'Information sur le IDA / 53340 A posteriori sur la qualité et le Open - National 160,000.00 0.00 2018-04-23 2018-05-14 2018-06-27 2018-07-25 2018-08-24 2018-09-28 2018-11-02 2019-11-02 sector actors d'exécution Foncier(SIF), études coût architecturales et développement du SIF C-PDIDAS-043-2018 / Sélection d'un cabinet pour la réalisation de l'Étude d'impact Component 2: Development Sélection fondée environnemental et social et of irrigation infrastructure sur les En attente du Plan d'Action de IDA / 53340 A posteriori Open - National 120,000.00 0.00 2018-04-17 2018-05-08 2018-06-21 2018-07-21 2018-08-25 2019-02-21 and natural resources qualifications des d'exécution Réinstallation des management consultants infrastructures d'irrigation primaires incluant les trois marigots C-PDIDAS-044-2018 / Component 2: Development Sélection d'un cabinet de Sélection fondée of irrigation infrastructure En cours supervision et de contrôle des IDA / 53340 A posteriori sur la qualité et le Open - National 160,000.00 0.00 2018-04-02 2018-04-23 2018-06-06 2018-07-04 2018-08-03 2018-09-07 2018-10-23 2018-10-12 2019-10-12 and natural resources d'exécution travaux des infrastructures coût management d'irrigation secondaires C-PDIDAS-045-2018 / Sélection d'un consultant pour la réalisation de l'étude Component 2: Development Sélection fondée d'impact Environnemental et of irrigation infrastructure sur les En attente Social et évaluation sociale et IDA / 53340 A posteriori Open - National 120,000.00 0.00 2018-04-10 2018-05-01 2018-06-14 2018-07-14 2018-08-18 2019-02-14 and natural resources qualifications des d'exécution du Plan d'Action de management consultants Réinstallation des aménagements secondaires et tertiaires C-PDIDAS-046-2018 / l'audit environnemental et l'élaboration du schéma Component 2: Development Sélection fondée d'aménagement et de gestion of irrigation infrastructure IDA / 53340 A posteriori sur la qualité et le Open - National 200,000.00 0.00 En cours d'examen 2018-04-19 2018-05-10 2018-06-23 2018-07-21 2018-08-20 2018-09-24 2018-10-29 2019-10-29 des ressources naturelles et and natural resources coût de l'environnement dans le management delta et la moyenne vallée du fleuve Sénégal C-PDIDAS-047-2018 / Sélection d'un consultant pour la réalisation de l'Etude sur les Component 2: Development risques d'inondation et le Sélection fondée of irrigation infrastructure En attente déversement non contrôlé des IDA / 53340 A posteriori sur la qualité et le Open - National 448,059.54 0.00 2018-04-05 2018-04-26 2018-06-09 2018-07-07 2018-08-06 2018-09-10 2018-10-15 2019-10-15 and natural resources d'exécution barrages de Diama et de coût management Manantali et le Plan de Préparation aux situations d'urgence C-PDIDAS-048-2018 / Sélection d'un consultant pour Component 2: Development la réalisation de l'Etude Sélection fondée of irrigation infrastructure En attente d'actualisation du Plan IDA / 53340 A posteriori sur la qualité et le Open - National 40,000.00 0.00 2018-05-23 2018-06-13 2018-07-27 2018-08-24 2018-09-23 2018-10-28 2018-12-02 2019-12-02 and natural resources d'exécution d'exploitation et d'entretien coût management des Barrages de Diama et Manantali C-PDIDAS-055-2018 / Component 3: Coordination, Sélection fondée Sélection d'un consultant pour Impact Monitoring and En attente IDA / 53340 A posteriori sur la qualité et le Open - National 60,000.00 0.00 2018-04-06 2018-04-27 2018-06-10 2018-07-08 2018-08-07 2018-09-11 2018-10-16 2019-10-16 l'établissement de la situation Evaluation (GEF: US$0.5 d'exécution coût de référence du carbone million; IDA: US$6 million) C-PDIDAS-056-2018 / Component 3: Coordination, Sélection fondée Sélection d'un consultant pour Impact Monitoring and En attente IDA / 53340 A posteriori sur la qualité et le Open - National 40,000.00 0.00 2018-04-09 2018-04-30 2018-06-13 2018-07-11 2018-08-10 2018-09-14 2018-10-19 2019-10-19 l'informatisation du système Evaluation (GEF: US$0.5 d'exécution coût suivi-évaluation million; IDA: US$6 million) C-PDIDAS-042-2018 / Component 2: Development Sélection d'un cabinet de Sélection fondée of irrigation infrastructure En attente supervision et de contrôle des IDA / 53340 A posteriori sur la qualité et le Open - International 1,520,000.00 0.00 2018-04-02 2018-04-23 2018-06-06 2018-07-04 2018-07-25 2018-08-29 2018-10-03 2019-10-03 and natural resources d'exécution travaux des infrastructures coût management primaires à Ngalam C-PDIDAS-0001-2019 / Sélection d'un Consultant pour le diagnostic du Système Sélection fondée Component 1: Support to d'Information sur le IDA / 53340 A posteriori sur la qualité et le Open - National 160,000.00 0.00 Annulé 2019-02-22 2019-03-15 2019-04-28 2019-05-26 2019-06-25 2019-07-30 2019-09-03 2020-09-02 sector actors Foncier(SIF), études coût architecturales et développement du SIF C-PDIDAS-0002-2019 / Sélection d'un cabinet pour la réalisation de l'Étude d'Impact Component 2: Development Sélection fondée Environnemental et Social et of irrigation infrastructure sur les du Plan d'Action de IDA / 53340 A posteriori Open - National 97,000.00 0.00 En cours d'examen 2019-02-26 2019-05-13 2019-03-19 2019-05-02 2019-06-01 2019-07-06 2020-01-02 and natural resources qualifications des Réinstallation des management consultants aménagements secondaires et tertiaires de la zone du lac de Guiers Page 8 C-PDIDAS-0003-2019 / Sélection d'un cabinet pour la réalisation de l'Étude d'Impact Component 2: Development Sélection fondée Environnemental et Social et of irrigation infrastructure sur les En cours du Plan d'Action de IDA / 53340 A posteriori Open - National 60,000.00 0.00 2019-03-09 2019-05-13 2019-03-30 2019-05-13 2019-06-12 2019-07-17 2020-01-13 and natural resources qualifications des d'exécution Réinstallation des management consultants aménagements secondaires et tertiaires de la zone du Ngalam C-PDIDAS-0005-2019 / Component 2: Development Sélection d'un cabinet de Sélection fondée of irrigation infrastructure En attente supervision et de contrôle des IDA / 53340 A posteriori sur la qualité et le Open - National 700,000.00 0.00 2019-03-11 2019-04-01 2019-05-15 2019-06-12 2019-07-12 2019-08-16 2019-09-20 2020-09-19 and natural resources d'exécution travaux des infrastructures coût management d'irrigation tertiaires C-PDIDAS-0006-2019 / Sélection d'un consultant pour la réalisation de l'audit environnemental et Component 2: Development Sélection fondée l'élaboration du schéma of irrigation infrastructure IDA / 53340 A posteriori sur la qualité et le Open - National 200,000.00 0.00 Annulé 2019-02-11 2019-09-14 2019-03-04 2019-04-17 2019-05-15 2019-06-14 2019-07-19 2019-08-23 2020-08-22 d'aménagement et de gestion and natural resources coût des ressources naturelles et management de l'environnement dans le delta et la moyenne vallée du fleuve Sénégal C-PDIDAS-0007-2019 / Sélection d'un consultant pour Component 2: Development la réalisation de l'Etude Sélection fondée of irrigation infrastructure En attente d'actualisation du Plan IDA / 53340 A posteriori sur la qualité et le Open - National 40,000.00 0.00 2019-03-26 2019-04-16 2019-05-30 2019-06-27 2019-07-27 2019-08-31 2019-10-05 2020-10-04 and natural resources d'exécution d'exploitation et d'entretien coût management des Barrages de Diama et Manantali C-PDIDAS-0008-2019 / Component 2: Development Sélection fondée Sélection d'un consultant pour of irrigation infrastructure sur les En cours IDA / 53340 A posteriori Open - National 20,000.00 0.00 2019-03-08 2019-03-29 2019-05-12 2019-06-11 2019-07-16 2020-01-12 le renforcement des capacités and natural resources qualifications des d'exécution sur le logiciel SIG management consultants C-PDIDAS-0009-2019 / Component 2: Development Sélection fondée Sélection d'un consultant pour of irrigation infrastructure sur les la formation en hygiène IDA / 53340 A posteriori Open - National 20,000.00 0.00 Annulé 2019-03-15 2019-05-17 2019-04-05 2019-05-19 2019-06-18 2019-07-23 2020-01-19 and natural resources qualifications des Qualité Sécurité management consultants Environnement C-PDIDAS-0004-2019 / Component 2: Development Sélection d'un cabinet de Sélection fondée of irrigation infrastructure supervision et de contrôle des IDA / 53340 A priori sur la qualité et le Open - National 1,000,000.00 0.00 En cours d'examen 2019-02-12 2019-12-09 2019-03-05 2019-04-18 2020-01-09 2019-05-16 2020-04-14 2019-06-15 2020-04-25 2019-07-20 2019-08-24 2020-08-23 and natural resources travaux des infrastructures coût management d'irrigation secondaires SN-PDIDAS-145861-CS-CQS Sélection fondée / Sélection d’un consultant Component 1: Support to sur les pour la réalisation de l’étude IDA / 53340 A posteriori Open - National 120,000.00 110,751.87 Signé 2019-11-24 2019-12-18 2019-12-15 2020-01-28 2020-01-28 2020-01-24 2020-02-27 2020-03-19 2020-04-02 2020-03-23 2020-09-29 sector actors qualifications des et l’analyse foncière dans la consultants zone du PDIDAS SN-PDIDAS-145862-CS-CQS / Sélection d'un consultant Component 2: Development Sélection fondée individuel pour l’évaluation de of irrigation infrastructure sur les En attente IDA / 53340 A posteriori Open - National 30,000.00 0.00 2019-11-24 2019-12-15 2020-01-28 2020-02-27 2020-04-02 2020-09-29 l’impact environnemental et and natural resources qualifications des d'exécution Social des travaux management consultants d’infrastructures SN-PDIDAS-146486-CS-CQS / Sélection d'un consultant firme pour chargé de l'actualisation , le déploiement Sélection fondée Component 1: Support to En cours , la mise en application et la IDA / 53340 A posteriori sur la qualité et le Open - National 336,000.00 0.00 2020-02-20 2020-02-01 2020-03-12 2020-04-25 2020-05-23 2020-06-22 2020-07-27 2020-08-31 2021-08-31 sector actors d'exécution connexion du système coût d'information foncière des bureaux foncier du PDIDAS au NICAD SN-PDIDAS-207256-CS-CQS Component 2: Development Sélection fondée / Sélection d'un consultant of irrigation infrastructure sur les firme pour la formation et IDA / 53340 A posteriori Open - National 70,000.00 0.00 Annulé 2020-12-14 2020-12-14 2021-01-04 2021-02-10 2021-02-17 2021-03-19 2021-04-23 2021-10-20 and natural resources qualifications des l'accompagnement sur les management consultants violences basées sur le genre Component 3: Coordination, Sélection fondée SN-PDIDAS-224066-CS-CQS Impact Monitoring and sur les En cours / Sélection d'une firme pour IDA / 53340 A posteriori Open - National 160,000.00 0.00 2021-03-12 2021-03-15 2021-03-27 2021-04-19 2021-04-29 2021-05-14 2021-08-16 Evaluation (GEF: US$0.5 qualifications des d'exécution l'évaluation d’impact du Projet million; IDA: US$6 million) consultants C-PDIDAS-0002-2020 / Sélection d’un consultant pour la supervision et le contrôle Component 2: Development Sélection fondée des travaux de réalisation de of irrigation infrastructure sur les En cours mini-forages avec ouvrages IDA / 53340 A posteriori Open - National 160,855.00 0.00 2020-05-20 2020-06-01 2020-06-10 2020-07-24 2020-08-23 2020-09-27 2021-03-26 and natural resources qualifications des d'exécution connexes pour irrigation et management consultants réfection des périmètres irrigués dans le cadre du PDIDAS INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C-PDIDAS-002-2017 / Sélection d'un consultant Component 1: Support to En attente individuel pour la formation IDA / 53340 A posteriori Individuel Limited 32,000.00 0.00 2017-08-16 2017-08-21 2017-09-11 2017-10-16 2018-04-14 sector actors d'exécution sur l'hygiène et la sécurité sanitaire des aliments C-PDIDAS-003-2017 / Sélection d'un consultant Component 1: Support to individuel pour la formation IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 Annulé 2017-08-17 2017-08-22 2017-09-12 2017-10-17 2018-04-15 sector actors sur l'usage sécurisé des pesticides Page 9 C-PDIDAS-004-2017 / Sélection d'un consultant individuel pour la Component 1: Support to En attente IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 2017-08-17 2017-08-22 2017-09-12 2017-10-17 2018-04-15 sensibilisation sur les normes sector actors d'exécution privées volontaires(GLOBAL GAP,BIO, etc.) C-PDIDAS-005-2017 / Sélection d'un consultant Component 1: Support to individuel sur la traçabilité et IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 Annulé 2017-08-17 2017-08-22 2017-09-12 2017-10-17 2018-04-15 sector actors la mise en place de système de traçabilité C-PDIDAS-006-2017 / Sélection d'un consultant Component 1: Support to En attente IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 2017-08-18 2017-08-23 2017-09-13 2017-10-18 2018-04-16 individuel en infographie pour sector actors d'exécution l'UEP APIX C-PDIDAS-007-2017 / Sélection d'un consultant Component 1: Support to En attente individuel pour l'analyse de la IDA / 53340 A posteriori Individuel Limited 24,000.00 0.00 2017-08-18 2017-08-23 2017-09-13 2017-10-18 2018-04-16 sector actors d'exécution chaîne de valeurs patate douce C-PDIDAS-008-2017 / Sélection d'un consultant Component 1: Support to IDA / 53340 A posteriori Individuel Limited 24,000.00 0.00 Annulé 2017-08-16 2017-08-21 2017-09-11 2017-10-16 2018-04-14 individuel pour l'analyse de la sector actors chaîne de valeurs oignon C-PDIDAS-009-2017 / Sélection d'un consultant individuel chargé de l'étude Component 1: Support to IDA / 53340 A posteriori Individuel Limited 14,000.00 0.00 Annulé 2017-08-22 2017-08-27 2017-09-17 2017-10-22 2018-04-20 de faisabilité pour la mise en sector actors place d'une plateforme de services aux membres C-PDIDAS-010-2017 / Sélection d'un consultant individuel pour le Component 1: Support to renforcement du cadre de IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 Annulé 2017-08-22 2017-08-27 2017-09-17 2017-10-22 2018-04-20 sector actors dialogue permanent public privé autour de la filière patate douce C-PDIDAS-011-2017 / Sélection d'un consultant Component 1: Support to En attente individuel pour la conception IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 2017-08-16 2017-08-21 2017-09-11 2017-10-16 2018-04-14 sector actors d'exécution et le développement d'un site web pour la CFAHS C-PDIDAS-014-2017 / Sélection d'un consultant Component 1: Support to En attente individuel pour l'actualisation IDA / 53340 A posteriori Individuel Limited 14,000.00 0.00 2017-08-24 2017-08-29 2017-09-19 2017-10-24 2018-04-22 sector actors d'exécution du système d'information sur le foncier C-PDIDAS-015-2017 / Sélection d'un consultant pour la conception interface de Component 1: Support to En attente IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 2017-08-30 2017-09-04 2017-09-25 2017-10-30 2018-04-28 l'observatoire sur le sector actors d'exécution foncier(PM 1.2 formation et recherche appliquée) C-PDIDAS-023-2017 / Sélection d'un consultant Component 2: Development individuel pour la of irrigation infrastructure IDA / 53340 A posteriori Individuel Limited 14,600.00 0.00 Annulé 2017-08-29 2017-09-03 2017-09-24 2017-10-29 2018-04-27 classification and natural resources environnementale des sous management projets(screening) C-PDIDAS-024-2017 / Component 2: Development Sélection d'un consultant of irrigation infrastructure En attente individuel pour les études APD- IDA / 53340 A posteriori Individuel Limited 60,000.00 0.00 2017-08-24 2017-08-29 2017-09-19 2017-10-24 2018-04-22 and natural resources d'exécution EPI et évaluation management environnementale et sociale C-PDIDAS-025-2017 / Component 2: Development Sélection d'un consultant of irrigation infrastructure IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2017-08-23 2017-08-28 2017-09-18 2017-10-23 2018-04-21 individuel en appui technique and natural resources en communication management Component 3: Coordination, C-PDIDAS-026-2017 / Impact Monitoring and En cours Sélection d'un auditeur IDA / 53340 A priori Individuel Limited 48,000.00 0.00 2017-08-14 2017-08-19 2017-09-09 2017-10-14 2018-04-12 Evaluation (GEF: US$0.5 d'exécution interne million; IDA: US$6 million) C-PDIDAS-027-2017 / Component 3: Coordination, Sélection d'un consultant pour Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 14,000.00 0.00 2017-08-16 2017-08-21 2017-09-11 2017-10-16 2018-04-14 l'évaluation du personnel du Evaluation (GEF: US$0.5 d'exécution PDIDAS million; IDA: US$6 million) C-PDIDAS-028-2017 / Component 3: Coordination, Sélection d'un consultant pour Impact Monitoring and En attente la culture organisationnelle et IDA / 53340 A posteriori Individuel Limited 14,000.00 0.00 2017-08-28 2017-09-02 2017-09-23 2017-10-28 2018-04-26 Evaluation (GEF: US$0.5 d'exécution le développement million; IDA: US$6 million) institutionnel C-PDIDAS-029-2017 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 Annulé 2017-08-28 2017-09-02 2017-09-23 2017-10-28 2018-04-26 individuel formateur sur le Evaluation (GEF: US$0.5 Process de Communication million; IDA: US$6 million) Component 3: Coordination, C-PDIDAS-030-2017 / Impact Monitoring and En attente Sélection d'un consultant pour IDA / 53340 A posteriori Individuel Limited 30,000.00 0.00 2017-08-22 2017-08-27 2017-09-17 2017-10-22 2018-04-20 Evaluation (GEF: US$0.5 d'exécution la formation en MS Project million; IDA: US$6 million) C-PDIDAS-031-2017 / Component 3: Coordination, Sélection d'un consultant pour Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 Annulé 2017-08-28 2017-09-02 2017-09-23 2017-10-28 2018-04-26 l'appui à la revue à mi- Evaluation (GEF: US$0.5 parcours du projet million; IDA: US$6 million) Page 10 C-PDIDAS-032-2017 / Sélection d'un consultant Component 3: Coordination, individuel pour l'élaboration Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 16,000.00 0.00 Annulé 2017-08-29 2017-09-03 2017-09-24 2017-10-29 2018-04-27 de la situation de référence et Evaluation (GEF: US$0.5 base de données million; IDA: US$6 million) environnementales et sociales C-PDIDAS-033-2017 / Sélection d'un consultant pour Component 3: Coordination, les analyses Impact Monitoring and physicochimiques,biologiques IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2017-08-31 2017-09-05 2017-09-26 2017-10-31 2018-04-29 Evaluation (GEF: US$0.5 , bactériologiques et analyses million; IDA: US$6 million) toxicologiques et suivi épidémiologique et sanitaire C-PDIDAS-034-2017 / Component 3: Coordination, Sélection d'un consultant pour Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 Annulé 2017-09-01 2017-09-06 2017-09-27 2017-11-01 2018-04-30 l'élaboration du manuel de Evaluation (GEF: US$0.5 bonnes pratiques agricoles million; IDA: US$6 million) C-PDIDAS-035-2017 / Sélection d'un consultant pour Component 3: Coordination, l'élaboration et diffusion de Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 12,000.00 0.00 Annulé 2017-09-05 2017-09-10 2017-10-01 2017-11-05 2018-05-04 supports de communication Evaluation (GEF: US$0.5 pour la prévention des risques million; IDA: US$6 million) et dangers liés aux pesticides C-PDIDAS-036-2017 / Component 3: Coordination, Sélection d'un consultant pour Impact Monitoring and la formation sur les bonnes IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2017-09-06 2017-09-11 2017-10-02 2017-11-06 2018-05-05 Evaluation (GEF: US$0.5 pratiques agroécologiques et million; IDA: US$6 million) les normes environnementales C-PDIDAS-037-2017 / Component 3: Coordination, Sélection d'un consultant pour Impact Monitoring and la formation sur l'utilisation et IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2017-09-07 2017-09-12 2017-10-03 2017-11-07 2018-05-06 Evaluation (GEF: US$0.5 la gestion des pesticides et million; IDA: US$6 million) des OGM C-PDIDAS-038-2017 / Component 3: Coordination, Sélection d'un consultant en Impact Monitoring and En attente création et édition de IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2017-08-24 2017-08-29 2017-09-19 2017-10-24 2018-04-22 Evaluation (GEF: US$0.5 d'exécution supports de communication( million; IDA: US$6 million) infographie) pour l'UCP C-PDIDAS-033-2018 / Sélection d'un consultant individuel pour la formation Component 1: Support to technique (Champ Ecole IDA / 53340 A posteriori Individuel Limited 16,000.00 12,508.36 Signé 2018-04-13 2018-05-16 2018-04-18 2018-05-24 2018-05-09 2018-07-31 2018-06-13 2018-10-16 2018-12-10 sector actors Producteur CEP/Gestion Intégrée e la Production et des Prédateurs GIPD) C-PDIDAS-034-2018 / Sélection d'un consultant pour Component 1: Support to En attente la formation en gestion des IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2018-03-27 2018-04-01 2018-04-22 2018-05-27 2018-11-23 sector actors d'exécution conflits et en gestion de stress des communautés C-PDIDAS-035-2018 / Sélection d'un consultant Component 1: Support to En attente individuel pour l'appui aux IDA / 53340 A posteriori Individuel Limited 30,000.00 0.00 2018-04-11 2018-04-16 2018-05-07 2018-06-11 2018-12-08 sector actors d'exécution communautés à la production de foyers améliorés C-PDIDAS-036-2018 / Sélection d'un consultant Component 1: Support to En cours individuel pour l'appui aux IDA / 53340 A posteriori Individuel Limited 30,000.00 0.00 2018-04-16 2018-03-28 2018-04-21 2018-05-12 2018-06-16 2018-12-13 sector actors d'exécution communautés à la production de cultures fourragères C-PDIDAS-037-2018 / Sélection d'un consultant individuel chargé de la production de supports Component 1: Support to En attente IDA / 53340 A posteriori Individuel Limited 30,000.00 0.00 2018-04-13 2018-04-18 2018-05-09 2018-06-13 2018-12-10 techniques (présentations sector actors d'exécution techniques, brochures, cahiers, fiches produits...) en divers langues C-PDIDAS-038-2018 / Component 1: Support to En attente Sélection d'un consultant IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 2018-04-06 2018-04-11 2018-05-02 2018-06-06 2018-12-03 sector actors d'exécution individuel en infographie C-PDIDAS-040-2018 / Component 1: Support to En attente Sélection de trois (03) IDA / 53340 A posteriori Individuel Limited 36,000.00 0.00 2018-03-28 2018-04-02 2018-04-23 2018-05-28 2018-11-24 sector actors d'exécution géomaticiens pour la DGID C-PDIDAS-041-2018 / Sélection de trois (03) Component 1: Support to IDA / 53340 A posteriori Individuel Limited 36,000.00 0.00 Annulé 2018-03-29 2018-04-03 2018-04-24 2018-05-29 2018-11-25 techniciens pour le cadastre sector actors de St louis et de Louga C-PDIDAS-049-2018 / Component 2: Development Sélection d'un assistant pour of irrigation infrastructure En attente IDA / 53340 A posteriori Individuel Limited 14,000.00 0.00 2018-04-16 2018-04-21 2018-05-12 2018-06-16 2018-12-13 le suivi de la mise en œuvre and natural resources d'exécution du FFP management C-PDIDAS-050-2018 / Component 2: Development Sélection d'un consultant of irrigation infrastructure En attente individuel pour les études IDA / 53340 A posteriori Individuel Limited 40,000.00 0.00 2018-03-28 2018-04-02 2018-04-23 2018-05-28 2018-11-24 and natural resources d'exécution APD-EPI des sous projets management restants C-PDIDAS-051-2018 / Component 2: Development Sélection d'un consultant of irrigation infrastructure En attente IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2018-03-26 2018-03-31 2018-04-21 2018-05-26 2018-11-22 individuel pour les études EES and natural resources d'exécution des sous projets restants management Page 11 C-PDIDAS-052-2018 / Sélection d'un consultant Component 2: Development individuel pour la mise en of irrigation infrastructure En attente place d'un dispositif IDA / 53340 A posteriori Individuel Limited 40,000.00 0.00 2018-04-12 2018-04-17 2018-05-08 2018-06-12 2018-12-09 and natural resources d'exécution cartographique pour les management agents forestiers et les communautés C-PDIDAS-053-2018 / Component 2: Development Sélection d'un consultant of irrigation infrastructure En cours individuel pour le suivi des IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2018-03-23 2018-05-17 2018-03-28 2018-04-18 2018-05-23 2018-11-19 and natural resources d'exécution travaux de bornage et management pancartage C-PDIDAS-054-2018 / Component 2: Development Sélection d'un consultant of irrigation infrastructure En cours individuel pour le suivi des IDA / 53340 A posteriori Individuel Limited 30,000.00 0.00 2018-03-22 2018-05-16 2018-03-27 2018-04-17 2018-05-22 2018-11-18 and natural resources d'exécution travaux d'aménagement des management pépinières C-PDIDAS-057-2018 / Component 3: Coordination, Sélection d'un consultant pour Impact Monitoring and En attente l'élaboration d'une des PME IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2018-04-18 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Evaluation (GEF: US$0.5 d'exécution spécialisées dans million; IDA: US$6 million) l'horticulture C-PDIDAS-058-2018 / Component 3: Coordination, Sélection d'un consultant pour Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 2018-04-09 2018-04-14 2018-05-05 2018-06-09 2018-12-06 la réalisation d'une vidéo sur Evaluation (GEF: US$0.5 d'exécution les bureaux fonciers million; IDA: US$6 million) C-PDIDAS-059-2018 / Component 3: Coordination, Sélection d'un consultant pour Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 12,000.00 0.00 Annulé 2018-04-10 2018-06-01 2018-04-15 2018-05-06 2018-06-10 2018-12-07 la mise en place d'un système Evaluation (GEF: US$0.5 de capitalisation au fil de l'eau million; IDA: US$6 million) C-PDIDAS-0010-2018 / Component 2: Development Sélection d'un assistant pour of irrigation infrastructure En attente IDA / 53340 A posteriori Individuel Open 15,400.00 0.00 2019-03-20 2019-05-08 2019-05-29 2019-07-03 2019-12-30 le suivi de la mise en œuvre and natural resources d'exécution du FFP management C-PDIDAS-0011-2019 / Component 2: Development Sélection d'un consultant of irrigation infrastructure IDA / 53340 A posteriori Individuel Open 20,000.00 0.00 En cours d'examen 2019-03-26 2019-05-20 2019-05-14 2019-06-04 2019-07-09 2020-01-05 individuel pour les études and natural resources EIES des sous projets restants management C-PDIDAS-0012-2019 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and En attente individuel pour la mise à jour IDA / 53340 A posteriori Individuel Open 5,100.00 0.00 2019-02-22 2019-04-12 2019-05-03 2019-06-07 2019-12-04 Evaluation (GEF: US$0.5 d'exécution des logiciels de gestion million; IDA: US$6 million) financière TOMPRO et TOMFIN C-PDIDAS-0013-2019 / Component 3: Coordination, Sélection d'un consultant pour Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 48,000.00 0.00 2019-04-09 2019-04-14 2019-05-05 2019-06-09 2019-12-06 la réalisation d'un publi- Evaluation (GEF: US$0.5 d'exécution reportage million; IDA: US$6 million) C-PDIDAS-0014-2019 / Component 3: Coordination, Sélection d'un consultant pour Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Open 12,000.00 0.00 2019-03-08 2019-04-26 2019-05-17 2019-06-21 2019-12-18 la mise en place d'un système Evaluation (GEF: US$0.5 d'exécution de capitalisation au fil de l'eau million; IDA: US$6 million) Component 3: Coordination, C-PDIDAS-0015-2019 / Impact Monitoring and En attente Sélection d'une agence pour la IDA / 53340 A posteriori Individuel Open 50,000.00 0.00 2019-03-14 2019-05-02 2019-05-23 2019-06-27 2019-12-24 Evaluation (GEF: US$0.5 d'exécution production audiovisuelle million; IDA: US$6 million) C-PDIDAS-016-2019 / Sélection d'un consultant Component 2: Development individuel pour la réalisation of irrigation infrastructure En cours des études environnementales IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2019-05-20 2019-09-19 2019-05-25 2019-06-15 2019-07-20 2020-01-16 and natural resources d'exécution sommaires pour les sous management projets des petits producteurs de la région de Louga C-PDIDAS-00009-2019 / Component 2: Development Sélection d'un consultant pour of irrigation infrastructure la formation en hygiène IDA / 53340 A posteriori Individuel Limited 20,000.00 22,871.18 Achevé 2019-05-27 2019-08-15 2019-06-01 2019-09-06 2019-06-22 2019-12-24 2019-07-27 2019-12-24 2020-01-23 2021-04-08 and natural resources Qualité Sécurité management Environnement C-PDIDAS-00008-2019 / Component 2: Development Sélection d'un consultant pour of irrigation infrastructure IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 Annulé 2019-05-31 2019-06-05 2019-06-26 2019-07-31 2020-01-27 le renforcement des capacités and natural resources sur le logiciel SIG management Component 3: Coordination, C-PDIDAS-018-2019 / Impact Monitoring and En cours Sélection d'un Spécialiste en IDA / 53340 A posteriori Individuel Open 60,000.00 0.00 2019-07-12 2019-07-09 2019-08-30 2019-09-20 2019-10-25 2020-04-22 Evaluation (GEF: US$0.5 d'exécution Communication million; IDA: US$6 million) C-PDIDAS-019-2019 / Component 3: Coordination, Sélection d'un Spécialiste Impact Monitoring and En attente Mesures de Sauvegarde IDA / 53340 A posteriori Individuel Open 60,000.00 0.00 2019-01-30 2019-03-20 2019-04-10 2019-05-15 2019-11-11 Evaluation (GEF: US$0.5 d'exécution Sociale et Développement million; IDA: US$6 million) Communautaire C-PDIDAS-020-2019 / Sélection d'un consultant pour la réalisation du Plan de Component 2: Development Gestion Environnementale et of irrigation infrastructure En cours IDA / 53340 A posteriori Individuel Open 50,000.00 0.00 2019-08-25 2019-09-19 2019-10-13 2019-11-03 2019-12-08 2020-06-05 Sociale des infrastructures de and natural resources d'exécution substitution dans les management communes de Ronkh, Fass Ngom et Ndiébène Gandiole C-PDIDAS-017-2019 / Component 3: Coordination, Sélection d'un Spécialiste Impact Monitoring and En cours IDA / 53340 A posteriori Individuel Direct 80,000.00 0.00 2019-09-09 2019-09-10 2019-09-12 2019-09-12 2019-09-13 2020-12-31 Principal en Passation de Evaluation (GEF: US$0.5 d'exécution Marchés million; IDA: US$6 million) Page 12 SN-PDIDAS-137800-CS-CDS / Contractualisation avec le cabinet IDYAL pour le Sélection de diagnostic du système Component 1: Support to IDA / 53340 A posteriori consultants par Direct 336,000.00 0.00 Annulé 2019-10-13 2019-10-11 2019-10-23 2019-12-27 2020-06-24 d'Information sur le Foncier sector actors entente directe (SIF), l'élaboration des études architecturales et le développement du SIF SN-PDIDAS-142809-CS-CDS / Contractualisation avec le Centre de Suivi Écologique Component 3: Coordination, Sélection de (CSE) pour le renforcement Impact Monitoring and En cours IDA / 53340 A posteriori consultants par Direct 80,000.00 0.00 2019-10-27 2020-01-22 2019-11-06 2020-01-10 2020-07-08 des capacités des acteurs à Evaluation (GEF: US$0.5 d'exécution entente directe suivre les émissions de gaz à million; IDA: US$6 million) effet de serre dans les zones d'intervention du PDIDAS C-PDIDAS-001-2020 / Component 3: Coordination, Sélection d'un consultant Impact Monitoring and En attente chargé de l'animation de IDA / 53340 A posteriori Individuel Limited 6,000.00 0.00 2020-03-02 2020-03-07 2020-03-28 2020-05-02 2020-10-29 Evaluation (GEF: US$0.5 d'exécution l'atelier national de million; IDA: US$6 million) capitalisation Component 2: Development SN-PDIDAS-187449-CS- of irrigation infrastructure INDV / Recrutement d'un IDA / 53340 A posteriori Individuel Limited 80,000.00 41,316.42 Signé 2020-08-16 2020-08-13 2020-08-21 2020-08-25 2020-09-11 2020-10-12 2020-10-16 2020-10-12 2021-04-14 and natural resources consultant en Biodiversité management SN-PDIDAS-202790-CS- Component 2: Development INDV / Recrutement d'un of irrigation infrastructure En cours consultant chargé de la IDA / 53340 A posteriori Individuel Limited 20,000.00 0.00 2020-11-16 2020-11-16 2020-11-21 2020-12-12 2021-01-16 2021-07-15 and natural resources d'exécution formation sur les violences management basées sur le genre SN-PDIDAS-202798-CS- INDV / Recrutement d'un consultant chargé d'élaborer Component 2: Development des rapports d'analyse of irrigation infrastructure IDA / 53340 A posteriori Individuel Limited 60,000.00 0.00 En cours d'examen 2020-11-16 2020-11-07 2020-11-21 2020-12-12 2021-01-16 2021-07-15 environnementale initiale des and natural resources infrastructures de substitution management ( approche Ministère de l'Environnement ) SN-PDIDAS-204900-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour faire l'analyse Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2020-12-11 2020-12-16 2021-01-06 2021-02-10 2021-08-09 de la communication et de Evaluation (GEF: US$0.5 l’inclusion sociale dans les million; IDA: US$6 million) activités du PDIDAS SN-PDIDAS-204901-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour mener les Impact Monitoring and études d'évaluation de IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2020-12-15 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Evaluation (GEF: US$0.5 l'impact des financements du million; IDA: US$6 million) PDIDAS sur la création d’emplois SN-PDIDAS-137825-CS-CDS Component 2: Development / Sélection d'un consultant Sélection de of irrigation infrastructure pour la supervision et le IDA / 53340 A posteriori consultants par Direct 60,000.00 0.00 Annulé 2020-11-16 2020-11-26 2021-01-30 2021-07-29 and natural resources contrôle des travaux des entente directe management infrastructures de substitution SN-PDIDAS-206221-CS-CDS Component 3: Coordination, / Contractualisation avec le Sélection de Impact Monitoring and En cours cabinet AMCS pour l'audit des IDA / 53340 A posteriori consultants par Direct 32,000.00 0.00 2020-11-30 2020-12-16 2020-12-10 2021-02-13 2021-08-12 Evaluation (GEF: US$0.5 d'exécution comptes du PDIDAS pour les entente directe million; IDA: US$6 million) exercices 2020 et 2021 SN-PDIDAS-216973-CS- INDV / Sélection d’un consultant individuel pour la Component 3: Coordination, réalisation du Plan de Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 35,000.00 27,879.90 Signé 2021-02-12 2021-01-08 2021-02-17 2021-01-21 2021-03-10 2021-04-19 2021-04-14 2021-05-11 2021-05-14 renforcement des capacités Evaluation (GEF: US$0.5 des bénéficiaires (Présidents million; IDA: US$6 million) de GIE, Bénéficiaires des fonds à frais partagés et PME) SN-PDIDAS-216978-CS- INDV / Sélection d’un consultant individuel pour la réalisation de Modules de Component 3: Coordination, formation pour les acteurs Impact Monitoring and IDA / 53340 A posteriori Individuel 35,000.00 29,175.39 Signé 2021-02-15 2021-01-08 2021-02-20 2021-01-25 2021-03-13 2021-04-19 2021-04-17 2021-05-11 2021-05-17 techniques de Saint-Louis et Evaluation (GEF: US$0.5 Louga impliqués dans la mise million; IDA: US$6 million) en œuvre des mesures environnementales et sociales du PDIDAS. SN-PDIDAS-218350-CS- INDV / Sélection d’un Component 3: Coordination, consultant individuel pour le Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 50,000.00 32,324.55 Signé 2021-02-05 2021-01-08 2021-02-10 2021-01-25 2021-03-03 2021-04-19 2021-04-07 2021-05-11 2021-05-07 suivi de la mise en œuvre des Evaluation (GEF: US$0.5 mesures environnementales et million; IDA: US$6 million) sociales des activités (PGES) SN-PDIDAS-204893-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour la Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 12,000.00 0.00 Annulé 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2021-07-29 capitalisation de Evaluation (GEF: US$0.5 l'accompagnement des million; IDA: US$6 million) communautés (PAC et FFP) SN-PDIDAS-204887-CS- Component 3: Coordination, INDV / Sélection d'un Impact Monitoring and consultant pour la IDA / 53340 A posteriori Individuel Limited 12,000.00 0.00 Annulé 2021-02-10 2021-02-15 2021-03-08 2021-04-12 2021-05-12 Evaluation (GEF: US$0.5 capitalisation du modèle million; IDA: US$6 million) d’agrobusiness du PDIDAS SN-PDIDAS-204896-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour l'évaluation Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2020-12-03 2020-12-08 2020-12-29 2021-02-02 2021-08-01 de la prise en compte des Evaluation (GEF: US$0.5 questions Environnementales million; IDA: US$6 million) et Sociales Page 13 SN-PDIDAS-204898-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour mener les Impact Monitoring and études d'évaluation de la prise IDA / 53340 A posteriori Individuel Limited 12,000.00 0.00 Annulé 2021-02-15 2021-02-20 2021-03-13 2021-04-17 2021-05-17 Evaluation (GEF: US$0.5 en compte du Genre et million; IDA: US$6 million) l’inclusion sociale (y compris la communication SN-PDIDAS-204902-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour faire Impact Monitoring and l'évaluation du Financement IDA / 53340 A posteriori Individuel Limited 15,000.00 0.00 Annulé 2020-12-16 2020-12-21 2021-01-11 2021-02-15 2021-08-14 Evaluation (GEF: US$0.5 du secteur privé dans le million; IDA: US$6 million) développement de l’Agrobusiness SN-PDIDAS-204895-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour la Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 16,000.00 0.00 Annulé 2021-02-09 2021-02-14 2021-03-07 2021-04-11 2021-04-14 capitalisation des réalisation Evaluation (GEF: US$0.5 des Infrastructures million; IDA: US$6 million) hydroagricoles SN-PDIDAS-204891-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour la Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 8,000.00 0.00 Annulé 2020-11-30 2020-12-05 2020-12-26 2021-01-30 2021-07-29 capitalisation de l'expérience Evaluation (GEF: US$0.5 des bureaux fonciers et la million; IDA: US$6 million) sécurisation foncière SN-PDIDAS-204882-CS- Component 3: Coordination, INDV / Sélection d'un Impact Monitoring and En cours consultant pour l'élaboration IDA / 53340 A posteriori Individuel Limited 30,000.00 0.00 2021-03-11 2021-03-15 2021-03-16 2021-04-06 2021-04-30 2021-06-10 Evaluation (GEF: US$0.5 d'exécution du rapport d’achèvement du million; IDA: US$6 million) Projet SN-PDIDAS-204881-CS- Component 3: Coordination, INDV / Sélection d'un Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 40,000.00 0.00 Annulé 2020-11-23 2020-11-28 2020-12-19 2021-01-23 2021-07-22 consultant individuel pour Evaluation (GEF: US$0.5 l'évaluation d’impact du Projet million; IDA: US$6 million) SN-PDIDAS-204885-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour la Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 14,000.00 0.00 Annulé 2020-11-25 2020-11-30 2020-12-21 2021-01-25 2021-07-24 documentation et Evaluation (GEF: US$0.5 capitalisation des réalisations million; IDA: US$6 million) du projet SN-PDIDAS-224073-CS-CDS Component 3: Coordination, / Sélection d'un consultant en Sélection de Impact Monitoring and appui de la réactualisation de IDA / 53340 A posteriori consultants par Direct 20,000.00 23,222.75 Signé 2021-03-15 2021-03-16 2021-03-23 2021-03-16 2021-04-19 2021-04-13 2021-05-20 Evaluation (GEF: US$0.5 la capitalisation des entente directe million; IDA: US$6 million) expériences du PDIDAS C-PDIDAS-0001-2020 / Mise en œuvre du Plan d’Action et Component 2: Development de Réinstallation (PAR) des of irrigation infrastructure infrastructures des IDA / 53340 A posteriori Individuel Limited 66,611.00 0.00 Annulé 2020-08-17 2020-08-22 2020-09-12 2020-10-17 2021-04-15 and natural resources infrastructures d’irrigation management secondaires dans les bassins du Lac de Guiers et du Ngalam SN-PDIDAS-216916-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour l'évaluation Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2021-02-04 2021-02-09 2021-03-02 2021-04-06 2021-05-21 de l’impact des financements Evaluation (GEF: US$0.5 des Sous Projets du Fonds à million; IDA: US$6 million) Frais Partagés SN-PDIDAS-233977-CS- INDV / Sélection d’un Component 2: Development consultant individuel pour la of irrigation infrastructure IDA / 53340 A posteriori Individuel Limited 60,000.00 46,435.97 Signé 2021-05-11 2021-05-19 2021-05-13 2021-06-01 2021-05-16 2021-06-08 2021-05-19 2021-06-10 2021-06-18 réalisation de l’audit de and natural resources réinstallation des activités du management PDIDAS SN-PDIDAS-235638-CS- INDV / Recrutement d’un Component 3: Coordination, consultant pour les services Impact Monitoring and En attente IDA / 53340 A posteriori Individuel Limited 8,000.00 0.00 2021-05-21 2021-05-22 2021-05-27 2021-05-30 2021-06-14 de couverture et de Evaluation (GEF: US$0.5 d'exécution documentation photos du million; IDA: US$6 million) PDIDAS SN-PDIDAS-204897-CS- INDV / Sélection d'un Component 3: Coordination, consultant pour l'évaluation Impact Monitoring and IDA / 53340 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2020-12-08 2020-12-13 2021-01-03 2021-02-07 2021-08-06 du mécanisme de gestion des Evaluation (GEF: US$0.5 plaintes (Violences Basées sur million; IDA: US$6 million) le Genre) Page 14