Document of The World Bank Report No: 25155-GH PROJECT APPRAISAL DOCUMENT ONA PROPOSED LEARNING AND INNOVATION LENDING (CREDIT) IN THE AMOUNT OF SDR 3.70 MILLION (US$5.0 MILLION EQUIVALENT) TO THE REPUBLIC OF GHANA FOR THE PROMOTING PARTNERSHIPS WITH TRADITIONAL AUTHORITIES PROJECT March 10, 2003 Private Sector Unit Africa Regional Office CURRENCY EQUIVALENTS (Exchange Rate Effective December 2, 2002) Cun-ency Unit = Ghanaian Cedis GHC 8,325 = US$ 1.00 US$ 0.0001201 = GHCl.00 FISCAL YEAR January 1 December 31 ABBREVIATIONS AND ACRONYMS AATC Akyem Abuakwa Traditional Council AC Asantemnan Council ARCC Ashanti Regional Coordinating Council CAS Country Assistance Strategy CDF Country Development Framework CPAR Country Procurement Assessrent Report CPPR Country Portfolio Performance Review DPP Detailed Procurement Plan ERCC Eastern Regional Coordmnating Council FMR Financial Management Report GARFUND Ghana Aids Response Fund GIMPA Ghana Institute of Management & Public Admninistration GoG Govermment of Ghana GPP Global Procurement Plan ICB International Corpetitive Bidding IMF International Monetary Fund ISSER Institute of Statistical Social & Economic Research LIL Learning & Innovation Loan MDU Manyia Development Unit MIS Managemnent Information System M&E Monitoring and Evaluation MoF Ministry of Finance NGO Non-Governmental Organisation PIP Project Implementation Plan PIU Project Implementation Unit PPN Project Procurement Notice PPOG Procurement Policy Oversight Group PRP Procurement Reform Proposal PTA Parent Teacher Association QCBS Quality & Cost Based Selection SBD Standard Bidding Document SOE Statement of Expenditures SPAM School Performance Appraisal Meeting SPN Specific Procurement Notice TA Traditional Authorities TC Traditional Councils TOR Terms of Reference Vice President: Callisto Madavo Country Manager/Director: Mats Karlsson Sector Manager/Director: Demba Ba Task Team Leader/Task Manager Kofi-Boateng Agyen GHANA PROMOTING PARTNERSHIPS WITH TRADITIONAL AUTHORITIES PROJECT CONTENTS A. LIL Justification Page 1. What is to be learned (why the piloting)? ....................................................................2 2. How are the results going to be used (vis a vis CAS objectives and any follow-on 2 operation)? 3. Other countries or situations where similar efforts have shown promise ................................ 3 B. Structure of the Pilot 1. How will the learning take place? ........................................................................3 2. Outcome-level test to be conducted ........................................................................4 3. Steps Involved in Implementing the Pilot ........................................................................4 4. Learning Expectations to be Documented in the Pilot ..........................................................5 5. Triggers for a Follow-on Operation ........................................................................6 6. Results-based Monitoring and Evaluation Arrangements ..................................................... 6 C. Components and their Implementation Arrangements 1. Project components ........................................................................6 2. Implementation arrangements ........................................................................8 a. Procurement ....................................................................... 10 b. Financial Management ....................................................................... 10 c. Other ....................................................................... 11 D. Risks 1. Social and Environmental Risks ....................................................................... 11 a. Safeguard Policies ....................................................................... 12 b. Other social risks ....................................................................... 12 2. Other Risks ....................................................................... 12 E. Main Loan/Credit Conditions 1. Effectiveness Conditions ....................................................................... 13 2. Other ....................................................................... 13 F. Readiness for Implementation ....................................................................... 13 G. Compliance with Bank Policies ........................................................................ 14 Annexes Annex 1. Project Design Suyary .15 Annex 2. Project Description .20 Annex 3. Estimated Project Costs .23 Annex 4. Financial Management .24 Annex 5. Project Processing Schedule .27 Annex 6. Procurement and Disbursement Arrangements .29 Annex 7. Documents in the Project File .38 Annex 8. Statement of Loans and Credits .39 Annex 9. Country at a Glance .41 Annex 10. Primary Schools to be Rehabilitated .................................................................... 43 Annex 11. Traditional Authorities Organizational Structure - Asanteman Council ..................... 45 Annex 12. Traditional Authorities Organizational Structure - Akyem Abuakwa Traditional 46 Authority GHANA Promoting Partnerships with Traditional Authorities Project Project Appraisal Document Africa Regional Office AFTPS Date: March 10, 2003 Team Leader: Kofi-Boateng Agyen Sector Manager/Director: Demba Ba Sector(s): Other social services (50%), General industry Country Manager/Director: Mats Karlsson and trade sector (25%), Health (25%) Project ID: P071399 Theme(s): Other human development (P), Other financial Lending Instrument: Learning and Innovation Loan and private sector development (S) (LIL) ] Loan [Xg Credit [ ] Grant [ ] Guarantee [ ] Other: For Loans/Credits/Others: Amount (US$m): 5.00 equivalent Proposed Terms (IDA): Standard Credit Grace period (years): 10 Years to maturity: 40 Commitment fee: 0.50% Service charge: 0.75% BORROWER 0.50 0.00 0.50 IDA 3.66 1.34 5.00 Total: 4.16 1.34 5.50 Borrower: GOVERNMENT OF GHANA Responsible agency: ASANTEMAN COUNCIL SECRETARIAT ASANTEMAN COUNCIL Address: MANHYIA DEVELOPMENT UNIT, MANHYIA PALACE, P.O. BOX 285, KUMASI, GHANA Contact Person: MR. K.K. MENSAH Tel: 233-20 8111791, 233-51 37462, 38774 Fax: 233-51 38774 Email: cpptap(@ africaonline.com.gh Other Agency(ies): AKYEM ABUAKWA TRADMTIONAL COUNCIL, KYEBI AHENFIE SECRETARIAT, KIBI-E/R, GHANA Address: PMB 109, CANTONMENTS, ACCRA, GHANA Contact Person: Dr. Angela Ofori-Atta Tel: 233-21 255453 Fax: 233-21 255455 Email: angielamn@africaonline.com.gh Estimated Disbursements ( Bank FY/US$m): Annual 0.20 2.50 1.80 0.50 Cumulative 0.20 2.70 4.50 5.00 Project implementation period: 3 years Expected effectiveness date: 06/15/2003 Expected closing date: 06/30/2006 A. LIIL JustificaVlorn 1. What is to be Learned (why the piloting)? The main purpose of the LIL is to test in a limited number of areas approaches to: (i) substantively integrate and improve deprived remote and rural communities' involvement in development activities; and (ii) help focus the contributions/influence of Traditional Authorities (TA) in socio-economic development. Traditional Authorities refer to community-based, traditional local governance bodies, which are recognized by the laws of Ghana, exercising their customary authority over local communities. These traditional authorities are paramount chiefs, chiefs, queenmothers, and headpersoris of these communities. Groupings of these traditional authorities for a particular area, region, or kingdom constitute the traditional councils (TC). These groups/communities are headed by a chief. These councils (organizational charts in Annexes 11 and 12) have secretariats which serve as the administrative body of the group. The operations of the secretariat are financed with, among other things, revenues from the sale of the community land, and royalties from mining activities. The proposed LIL will test enhanced roles that these chiefs, queenmothers and other community leaders should play in: (i) the decentralization efforts of central government; (ii) the control of the spread of diseases such as HIV/AIDS; (iii) closing the gap in the provision of, among other things, improved health, and equitable and quality basic education (including the rehabilitation of existing classrooms) in deprived rural and remote areas; and (iv) determining the role of cultural heritage preservation in the socio-economic development of a community. Activities under the proposed project will pilot the changing role of the traditional authorities in development issues in two regions in Ghana. 2. Hlow are the results going to be used (vis a vis CiS objectives and any cIIow-on operation)? Document number: 20185-GH Date of latest CAS discussion: 03/30/2000 The proposed project is consistent with the Bank's Country Assistance Strategy of March 2000 and the goal of assisting the Government of Ghana (GoG) implement its Poverty Reduction Strategy more effectively. The proposed project supports this objective through: (i) strengthening traditional authorities' capacity to keep track of the communities' human resources for development; (ii) enhancing the capacity of the traditional authorities to provide health information in the fight against HIV/AIDS and other endemic diseases; (iii) identifying and testing collaboration arrangements of traditional authorities and their communities in the rehabilitation of education infrastructure and the provision of other inputs to improve access to quality basic education and health services; and -2 - (iv) awareness creation on cultural heritage preservation. The lessons learned would serve as a basis to design approaches which can be replicated and which would ensure that traditional authorities and their communities participate in development activities and enable the government to reduce development expenditures to sustainable levels. The results would be used to help address the problem of inadequate government funding for development and to foster a more sustainable relationship between the government and traditional authorities. Government spending on the social sectors is estimated at about one-third of total annual national budget allocation. However, government financing is used mainly to pay wages and salaries and relatively little for capital investment. The results of the pilot would also be used to strengthen mechanisms which promote partnerships between government and civil society, an objective that would facilitate increased involvement by the Bank and other donors in the social sectors. 3. Other countries or situations where similar efforts have shown promise. Private provision of health and education services (both on a not-for-profit and a for-profit basis), has complemented government efforts and continues to grow. For example, clinics operated by the Christian and Muslim communities provide over 30 percent of health care in Ghana. Almost 50 percent of health care in Ghana is delivered by the non-public providers. In South Africa, there are a number of traditional authorities which have formed joint-venture partnerships with both public and private organizations to drive development in their communities. Examples of these development-oriented partnerships are found in the Mankwe Region, the Kingdom of Bafokeng, and the Mpungose Traditional Authority. B. Structure of the Pilot 1. How will learning take place? In Ghana, the notable contributions of traditional authorities in the provision of educational opportunities and desirable health outcomes have been reduced considerably over the last few decades due to institutional decay and the general decline in economic activity in the country. Traditional authorities who continue to be custodians of community land, and repositories of the communities' cultural heritage, face the challenge of upholding traditional practices in the modern era and making the institutions relevant to current societal needs. For example, their position as leaders in times of war and as judges during peaceful times has changed. Traditional authorities are now expected to rule by example, govem within the local govemment system, and also lead efforts to develop the community with minimal reliance on govermnent budget. The potential of these traditional authorities as key stakeholders in partnering development is once again being recognized largely because a number of them continue to make decisive contributions to their communities. The government is seeking ways to ensure sustainable changes in the state's role in development, and this would be an opportunity to look to place greater reliance on resourceful civil society organizations such as the traditional authorities. This pilot project would also be a test of the - 3 - government's ability to convince deprived rural communities of its commitment to bringing social and economic development to their areas in partnership with the communities. Under this pilot, learning will take place by documenting the response of traditional authorities (there are over 300 in the communities identified for this pilot) to capacity-building activities and enhanced advocacy roles. The pilot will also document the traditional authorities' material and other contributions to the provision of social services and to the government's decentralization activities. An assessment of the role of traditional authorities in development activities will be carried out at the beginning of the project, and a monitoring and evaluation (M&E) plan will be put in place to track the experiences under the pilot. The success of the project would be determined by the number of traditional authorities (i.e. the number of chiefs, queenmothers, traditional headpersons of the towns, villages, hamlets in the pilot communities) which will play a more effective role in educational, health, private sector collaboration and other developmental activities, through financial, and in-kind resource contributions. Success would also be measured by the financial and other support provided by the traditional authorities to community volunteers trained under the project to help create awareness; the percentage of community members demonstrating increased awareness of health issues; increased enrollment in primary schools; achievement results of primary school pupils; increased number of teachers in the selected communities up to the full complement; financial and other assistance to teachers in deprived rural and remote areas, the development of business/community development plans, promotional activities and awareness creation on cultural heritage preservation/cultural heritage-focus cottage industries, and increased effectiveness of the traditional law courts system. 2. Outcome-Revel test to be conducted The project will test whether traditional authorities contribute significant financial, human and other resources towards their communities' social and economic development in response to the provision of external resources for rehabilitation of education infrastructure, health awareness programs, and strengthening of technical support in their development units (increased enrollment in primary schools, institution of incentive schemes to retain teachers' in rural and deprived areas, increased awareness on health matters, increased awareness on environmental degradation, etc.). A comparison of traditional authority financial and other contributions in education, health, decentralization, and cultural heritage preservation will be made before and after the project interventions. 3. Steps involved in conducting the pilot The towns and villages of the Asanteman Council (AC), and Akyem Abuakwa Traditional Council (AATC) -in southem and middle Ghana, respectively- will serve as the pilot areas under the project. These traditional councils are groupings of traditional authorities (i.e.chiefs, and queenrothers of towns, villages, hamlets) that are recognised by the laws of Ghana, and are set up to, among other things, forge a conmmon development agenda in their areas of influence/rule. The traditional heads of these two pilot areas are already embarked on community development -4 - activities in the following sectors: (1) The Asanteman Council is involved in health - HIV/AIDS awareness programs, education - scholarship schemes to support needy citizens, cultural heritage preservation, and private sector development; (2) The Akyem Abuakwa Traditional Council, is also involved in health and cultural heritage-environmental activities. Of particular note is the annual HIV/AIDS awareness day this council holds in the capital of this traditional area every December, and the environmental brigade this council has set up to assist in the protection of forests in the Akyem Abuakwa area. The pilot will be carried out by (a) strengthening the development units/secretariats of the two key traditional councils; (b) identifying and developing programs to help build the traditional authorities' capacity in the government's decentralization efforts, (c) measuring baseline participation levels of rural communities/traditional authorities!lead traditional authority in component sectors, (d) developing a more robust monitoring and evaluation system which will include enhanced indicators for comparing with the baseline annual reviews, (f) analyzing and reporting on findings, (g) identifying and documenting successful approaches for involving traditional authorities in community development in a manner which is sustainable. 4. Learning expectations to be documented in the pilot FI Economic L Technical Z Social 0 Participation ] Financial Z Institutional Z Environmental FII Other Social and Environmental: The project will provide support to educate traditional authorities and their communities on socially-acceptable alternatives to traditional practices in order to create awareness and improve the health status of communities. These initiatives should lead to a reduction in HIV/AIDS infections, and the incidence of other infectious diseases. The Ministry of Health has -good baseline data on the subject Provision of education to children and training for chiefs, queenmothers and their development units would improve the basic literacy, numeracy skills of households; planning and implementation skills of traditional authorities for local development including environmentally sustainable ways of utilizing community resources. Participation: The project will rely heavily on the participation of paramount chiefs, chiefs, queenmothers and other members of the pilot communities. The key paramount chiefs would- provide leadership and additional financial and human resources in the process of improving enrollment in primary schools, while the community chiefs and other members will provide assistance in the rehabilitation of existing primary schools on original sites, creation of awareness on health issues, and sustainable use of the communities' cultural heritage resources. The existing village unit committees will be strengthened and work with the project staff, in monitoring implementation on a regular basis, and also propose improvements to implementation. Institutional: The project relies on and strengthens the chieftaincy institution so that it plays an expanded role in improving access to primary school education for their subjects, enhancing awareness creation on health matters in their communities especially the rural and remote ones, and increasing their participation in the government's decentralization efforts. The effectiveness of these traditional authorities and their supporting development units/secretariats will be documented under the LTr to gauge the facilitation role they play in partnering with government to reduce poverty and also provide good governance. - 5 - S. Triggers for a folow-on operation A follow-on would be justified if: o RHV/AIDS awareness risk rates and primary school enrollment rates are significandy increased in the pilot communities; and o there are substantive improvements in traditional authority contribution (for example, financial contributions, increased participation in community activities, etc.) to the provision of education infrastructure and education 'software', and participation in government's decentralization efforts. 6. Results-based Monitoring and Evaluation System Monitoring will be done by the delivery of inputs and project outputs, as measured by the goods and services delivered to beneficiaries, and the extent to which the project's objectives are achieved. In order to strengthen the capacity of the traditional authorities to carry out monitoring and evaluation, support will be provided to develop a monitoring and evaluation plan, including the provision of training activities. Staff of the project implementation units in the pilot traditional authorities' Secretariats will coordinate the collection, coordination, transmission, and reporting of data from the partner Ministries, the pilot communities and the traditional authorities. In addition to the monitorable indicators outlined in Annex 2, the support referred to above and the proposed management information systems (MIS) would be utilized in the development of a robust monitoring and evaluation (M&E) system. Evaluation would be on a continuing basis, and would include reviews during implementation support missions, quarterly progress reports and external reviews. Lessons learned would be incorporated in the partnership manual which is to be funded under the project. C. ProJect Componentos and lngmplen2ttaon Arrangeomnts 1. L1IL Components Traditional authorities and communities represented by the Asanteman Council, and those represented by the Akyem Abuakwa Traditional Council will serve as the pilot regions under the project. The sectors for which IDA support was requested by the traditional authorities through the GoG and the specific areas for the support are summarized below. (A) Health: The proposed project seeks to strengthen the capacities of the traditional authorities (chiefs, queenmothers, and village headpersons) and communities in the Asanteman Council areas, and the Akyem Abuakwa Traditional Council areas to effectively participate in activities to improve health and fight HIV/AIDS in their communities. This would be done through regular workshops and seminars for the traditional authorities, community volunteers and community members. The activities to be supported would focus on building the capacities -6 - of the traditional authorities in the area of basic health, particularly factors that cause ill health as well as on HIV/AIDS. Capacities of these traditional authorities would also be strengthened to enable them to provide better assistance to communities and households to ensure improved health through prevention and care. Community health registers would also be designed and instituted in the project communities. AC (US$0.27M); AATC (US$0.15M). (ii) Education: This component would focus on (a) the provision of resources for rehabilitating basic primary education facilities in select rural and deprived areas in the AC community and (b) design of a partnership method between traditional authorities and government in the provision of quality basic education. The traditional authorities constituting the Asanteman Council have identified improvements in basic education in rural areas as a goal in their community development agenda and have on their own initiative begun setting up mechanisms to achieve this goal. IDA support is therefore being sought to assist in identifying a more structured and sustainable method of partnership with government to help improve access to quality basic education in the Asanteman Council areas (schools are open to all residents irrespective of regional origin and hence benefits are intended for all residents). Assistance will also include support to improve traditional authorities incentive schemes with the objective of retaining teachers in these remote areas, scholarships schemes for primary school pupils, and improved enrollment. The project will also support the strengthening of the Akyem Abuakwa Traditional Council's Secretariat to assist this group of traditional authorities review the state of basic education in their communities and propose actions to improve it. AC(US$2.90M); AATC (US$O.1OM) (iii) Capacity Building : The project would seek to improve (a) the financial and management capabilities of the two councils' respective secretariats and (b) the capacities of the traditional authorities who are members of these two councils, on decentralization and community development issues. A monitoring and evaluation system would be established to ensure feedback on project implementation, monitorable indicators and other administrative issues is readily available. An integral component of the LIL will be regular monitoring and evaluation. Both quantitative and qualitative techniques will be employed in tracking the project indicators (inputs, processes, outputs effects and impact) as indicated in the project logical framework. The MIS to be established in the secretariats/development offices would be utilized to facilitate the flow of information. This will enable the project team to efficiently apply "lessons learned" at the earliest possible opportunity, continually assess progress toward objectives and goal, and respond efficiently to information needs of stakeholders. Baseline data to measure performance will be gathered where possible. In this regard pre and post tests will be conducted as one key - 7- activity of training programs to establish knowledge levels on project output indicators before and after training programmes. This will also be supported with focus group discussions at community levels. Monitoring and evaluation consultants will be engaged to, among other things, ensure that valid reliable data is gathered. This will also ensure that M&E results are incorporated in all activities to maximise the achievement of project goals and objectives. Review meetings and the periodic and specialised reports will be some of the ways that results on progress and achievements will be disseminated. AC (US$0.64M); AATC (US$0.20M). (iv) Cultral JHeriia: Support would be provided to both councils to improve their communities' ability to carry out programs that would help them to preserve and benefit from their cultural heritage; through, for example, the development of educational activities/curriculum in schools on cultural heritage, linkages to environmental degradation, private sector-community business partnerships to set up for example, eco-tourism projects. Support would also be provided for updating the inventory of cultural heritage artificats/practises. This component would also seek to assist traditional authorities review the operations of the traditional law courts system with the view to reducing the incidence of chieftaincy disputes, land litigation, etc. The study will serve to, among other things, identify needs for revision, codification, and dissemination of traditional laws, and identification of ways to increase the accessibility and effectiveness of traditional law courts. AC (US$0.24M); AATC (US$0.1OM) 1>g ! ~~-., J -~ - '- "-V '!'. r 4| j' ? i'| -- -. - r, t S 4 - j'C ~--.- -;;-_; --j-,-'-r ^ ;~~~~~~~~ .,,vJ > Jg1 S _ .* J$ ~ -=- ¢ . = trl Health 0.48 8.7 0.42 8.4 Education 3.30 60.0 3.00 60.0 Capacity Building 0.93 16.9 0.84 16.8 Cultural Heritage 0.39 7.1 0.34 6.8 Unallocated 0.40 7.3 0.40 8.0 Total Project Cost 0.0 0.00 0.0 Total Financing Required 0.0 0.00 0.0 Totes Project costs 5.50 100.0 5.00 100.0 Total IFlnmenring iRequinred 5.50 100.0 5.00 100.0 2. Implementation Arrangements In view of the partnership and decentralization goals of this pilot, the project will be implemented by the Asanteman Council and the Akyem Abuakwa Traditional Council which are responsible for the implementation of the project components in their respective areas and have set up project implementation units within their traditional structures. The Councils will report to the GoG and IDA on the progress of implementation of their components.The Government of Ghana (GoG), through the Ministry of Finance (MoF), would oversee implementation. The - 8 - Government will ensure that the TA maintain policies and procedures that enable them to implement the project. As discussed below, representatives of the Ministries of Education and Health will participate in the committees established by the Traditional Councils to provide guidance to the Councils on project implementation. The Government - through the Ministry of Finance will review the results of the monitoring and evaluation system with a view to designing future programs of support, and oversee and coordinate the activities of the implementing agencies with the assistance of the project managers. (i) Asanteman Council sub-component: The council has established a Project Implementation Unit (PIU), called the Manhyia Development Unit (MDU), within its secretariat which is charged with the day to day implementation of the project. This implementation unit is managed by a project manager who reports to the traditional head of the communities in the region and includes a project accountant and a procurement specialist. The staff are experienced and have already carried out work under other Bank-assisted projects and participated in the preparation of this L1L. The MDU will carry out procurement, financial management, and project monitoring as indicated below. The Asanteman Council has also established an Oversight Committee which is made up of a representative each from the Ashanti Regional Coordinating Council (ARCC) representing central and local governments, the Traditional Council (TC), the Regional Directors of Education, and Health, and the manager of the MDU. This committee will provide guidance and policy direction for project inplementation and monitoring of the partnership process. The MNDU will report on project status on a quarterly basis to the AC and the Ashanti Regional Minister (the government's representative in the region). The MDU will implement and coordinate all activities under this sub-component, and will contract out all assignments and activities, and follow-up and report regularly on progress to the GoG and IDA. During project preparation and appraisal the government and the AC requested the Bank to fund the initial cost of some equipment such as computers and three key personnel to be engaged by the Secretariat, to help them reorganize the MDU in the secretariat of AC, bring in professionalism and effective management practices to the unit to achieve the development goals of the Council. This unit will also be responsible for the management and implementation of the Asanteman sub-component of the Partnership project. To ensure that the team was in place and worked with the Bank team, it was agreed that the key staff be engaged by June 1, 2002. The staff was competitively selected. The startup costs of the MDU and the initial set up costs for the Akyem Abuakwa Traditional Council would therefore require retroactive funding for expenditures incurred between June 1, 2002 and the date of Credit signing and for an amount not to exceed SDR 300,000 equivalent. Funding for the initial set up costs, including the engagement of a firm to carry out the responsibilities of the Akyem Abuakwa Council's P1U was included in the retroactive financing amount stated above. (ii) Akyem Abuakwa Traditional Council sub-component The secretariat (office of administration) of the Akyem Abuakwa Traditional Council, will have the responsibility for the -9- day to day implementation of this sub-component. This council has selected a firm with adequately qualified personnel in project management, financial management and procurement to be based in this secretariat and will serve as the implementation unit under this sub-component. The project manager will report to the head of this council. The unit will contract oiat all assignments and activities, and will monitor, follow-up and report regularly on progress lo the Council, which will submit progress reports to the GoG and IDA. The council has an advisory body (Mentors group) made up of academicians, regional and local government representatives, including the Ministry of Health and other professionals. The Mentors' group will have direct oversight responsibilities, provide guidance and advice in the implementation of this sub-component. Implementation will be based on annual work programs and budgets prepared by the project implementation units and approved by the oversight committees for the respective TC. The TC and government representatives, supported by the respective development units/secretariats will conduct with IDA, quarterly project implementation support reviews in the first two years of implementation and then semi-annual reviews in the third year of implementation. The Government will ensure that the TA maintain policies and procedures to monitor and evaluate their respective sub-components on the periodic basis indicated above and document progress in accordance with the Project Design Summary (PDS) (Annex 2), the respective Project Implementation Manuals and the monitoring and evaluation system proposed to be financed under the credit. The financial management reports (defined in Annex 4) covering project implementation status will be provided to IDA and the GoG no later than 45 days after the end of each quarter. The respective development units will also submnit quarterly monitoring and evaluation reports beginning in the second quarter after Credit effectiveness. a. Procurement The Manhyia Development Unit (MDU) for the Asanteman Council and the implementation unit in the secretariat for the Akyem Abuakwa Traditional Council will each be responsible for procurement planning, implementing procurement and processing of works, goods and service contracts for their sub-component of the project. These units will track the accumulation of contracts under each procurement method and will consolidate the informnation so as to ensure that the aggregate amounts under the non-international competitive bidding (ICB) procurement methods are not exceeded. Details of procurement planning arrangements are provided in Annex 6. b. Financial Management The Manhyia Development Unit (MDU) will perform the day- to-day management of the Asanteman Council sub-component and will be responsible for the financial management aspects under this sub-component. The accounts unit of the AC Secretariat, would independently maintain adequate financial management systems to properly record all accounting transactions (sources and uses), maintain satisfactory books of accounts, and produce satisfactory financial reports on project activities. A financial assessment was carried out for this project, and (i) the Asanteman Council's Secretariat's financial management systems were found to be adequate for the purposes of managing the project; and (ii) the Secretariat of the Akyem Abuakwa Traditional - 10- Council's financial management system were found to be unsatisfactory for the purposes of carrying out the proposed project and will be required to be properly set up and strengthened to meet the Bank's minimum financial management requirement prior to disbursement of any funds under the AATC sub-component. This Council has recruited a qualified firm to assist it in meeting this requirement. The Bank will review the financial management system to ensure that the proposed accounting system and procedures put in place are adequate and meet the World Bank's financial management requirements. The financial statements and all financial reports including the financial monitoring reports (FMRs) will be prepared by the implementing units, and audited by independent auditors acceptable to the Bank. The audit shall also cover the special accounts (SA) and statements of expenditures (SOEs) used under the project. Details of financial management arrangements, disbursements, SA operations, reporting and audit requirements are included in Annex 4. c. Other A monitoring and evaluation system will be financed under the project, and the system will be monitored by the MoF and the village/town development committees in collaboration with the district assemblies and needed technical assistance. D. Risks 1. Social and Environmental Risk There will be no significant environmental and social risks emanating from implementation of activities under the proposed project. Since the proposed project will not finance any large scale infrastructure investments such as the rehabilitation or new construction of hospitals, roads, and clinics, no significant environmental and social risks are expected. The project would provide resources for civil works only for the rehabilitation of existing primary school buildings on the original sites, and no new school block constructions would be undertaken. However, if the Borrower decides during project implementation to construct a new classroom block, project-specific environmental and social assessments acceptable to the Bank would have to be undertaken prior to any construction. Within the pilot communities, the role proposed for the traditional authorities is neither new nor would it be perceived by the community as unbecoming and perhaps lead to clashes and the destoolment of the traditional authorities with the consequent social upheaval. Enstoolment and destoolment of traditional authorities in the pilot communities is also immune from political influences, and therefore social risks as a result of this project would be negligible. Additionally, these communities have long-established and tested conflict-resolution mechanisms that would be available to resolve any potential conflicts. a. Safeguaird Poleices No safeguard policies will be triggered as a result of the proposed LIL. Environmental Category: C (Not Required) b. other Social Eisks 2. Other (external, reflectng the failure of the assumplons in the fourth colunm of Annex Ii) z r_ '~RIsk - RId Ri$1t1l1ngj l R ;-b OtDgatIbn Ciaouire From Outputs to Objective l.Traditional authorities do not remain M Pilot conmmunities have been an integral part of commnitted to methodology. the preparation process and have subjected the methodology to extensive discussions before finalizing it. 2. Chieftaincy disputes. M Pilot communities were selected on the basis on the prevailing stable conditions, and the active involvement of the whole community in the program and the top chief, who would ensure that there are no derailments. 3.Traditional heads and community M Personalities involved have an agreement members do not remain motivated to (pact) with their top chief to remain committed, participate in program. which is in line with practices of the chiefancy institution. 4.Pilot communities do not identify and S Risk will be offset by strong support for the invest resources for improvement in project from key stakeholders. health and education. 5. New set of key, committed and M There is strong support for grassroots resourceful Traditional Authorities/ development with traditional authonties in the communities cannot be identified. lead. 6.Qualified Borrower Implementation S TA committed to engage additional qualified team is not engaged. project staff and to provide improved regular training for existing secretariat staff. From Components to Outputs 1. Traditional Authorities not committed M Pilot traditional authorities already to productive partnership with implementing development activities, and government in the development of the additional government support is seen as a education and health sectors. bonus. 2.Traditional Authorities do not provide M same adequate and timely resources. 3.Communities are not supportive of N same efforts of traditional authorities. 4. School Performance Appraisal M Min. of Education has agreed to initiate Meeting (SPAM) is not initiated in SPAMs where they do not exist. community. 5. Schools in the pilot areas are M Ministry of Education in the pilot districts are adequately not staffed. aware of this pilot and are working to provide - 12- teachers and educational materials where there are shortages. 6. Parent Teacher Associations (PTA) are M Village development committees will be not strengthened or initiated. strengthened and or initiated where they do not exist. Overall Risk Rating M Risk Rating - H (High Risk), S (Substantial Risk), M (Modest Risk), N(Negligible or Low Risk) E. Main Loan Conditions 1. Effectiveness Condition 1. Legal Opinion from Government 2. Disbursement Conditions: For the Akyem Abuakwa Traditional Council Sub-Component (on excentional basis) - Adoption of a project implementation manual. - Open Project Account with a fixed initial deposit. - Setup of a financial management and accounting system satisfactory to IDA; - Furnish to the Association a procurement plan for the first twelve months of carrying out of its activities under the Project. 2. Other (classify according to covenant types used in the Legal Agreements.) - The Asanteman Council and Akyem Abuakwa Traditional Council to maintain project implementation units with qualified staff. - Project accounts audited by auditors with qualifications and experience satisfactory to IDA (auditors already appointed) F. Readiness for Implementation a 1. a) The engineering design documents for the first year's activities are complete and ready for the start of project implementation. 3 1. b) Not applicable. 3 2. The procurement documents for the first six months' activities are complete and ready for the start of project implementation; and a framework has been established for agreement on standard bidding documents that will be used for ongoing procurement throughout the life of LIL 3. The LlL's Implementation Plan has been appraised and found to be realistic and of satisfactory quality. 0 4. The following items are lacking and are discussed under loan conditions (Section G): Given the level of preparation and the capacity of the Borrower's project preparation staff, the above schedule is reliable. - 13- 0 1. This project complies with all applicable Bank policies. O 2. The following exceptions to Bank policies are recommended for approval. The projea complies with all other applicable Bank policies. 4 i, %4.ts Xaj!j3eb 'r819' LeaCar a6ct§r Manego? C§uFvrr Mvanagor Annex 1: Project Design Summary GXA4UA: Promoting Partnerships with Traditional Authorities Project Key Performaice, - ata Qollection Strategy r L jfllrarchy of Obiecr[Nevsr Indicators r -t - tical AssUmptionst '- Sector-related CAS Goal: Sector Indicatoro: Sector country reporto (from Goal to Bank Mission) Government strategy of 'Partner' traditional WBAIMP statistics. Sustainable improvement improved social sector authorities contribution in school enrollment in development efficiently to health information Mm. of Health Annual deprived conimunities implemented on the access, and quality basic Reports. ground education in depnved areas. increased by at Mm of Education report least 1% of total govemment expenditure ISSER annual report on health & education) witfin 2 years of LUL Government's Annual closing Budget Policy guidelines on Sustained reduction in community participation number of persons instituted reporting illnesses in depnved commumuities Follow-on Development Objective: Effective implementation Macroeconomic stability of government strategy of reducing hard core poverty on the ground. Project Development Outcome I Impact Project reports: (from Objective to Goal) Objective: Indicators: Test approaches to Methodology used in at Quarterly Project report. Sustained government substantively integrate least 2 other comrnunities commitment to reducing and improve traditional within the nation by end Annual Surveys. poverty and political will authonties involvement of project to fostering partnerships. and help focus their Ministry of Health & contributions in Ministry of Education socio-economrc reports development in their communities Development plans of traditional authonty -15 - Output from each Output Indicators: Project reports: (from Outputs to Objective) Component: 1. Methodology 1.L At least 50% of Project KIS and Traditional authorities identified and validated Traditional leadership in Beneficiary Assessments committed to pilot districts participate methodology. in the enhancement of Mid-term and end of basic health and fight project evaluation Absence of Chieftaincy against HIV/AIDS Reports disputes 1.2 50% of activities carried out by Traditional Traditional heads and Authorities include Quarterly progress community members HIV/AIDS and health reports remain motivated to issues by end of project. participate in program 1.3 At least 50% of Annual Audited accounts traditional leadership in pilot districts participate Economic development in the enhancement of reports primary school enrolment and retention rates by end of project. Annual Enrollment 1.4 At least 10 % Statistical Census increase in girls conducted by MOE enrolment/completion rates in basic education by end of project Teacher attendance 1.5 20% increase in records in selected teacher attendance in schools selected schools by end of project. 2. Capacity building program 2.1 Traditional leaders Pilot communities implemented participate in minimum identify and invest of 4 community resources for development training improvement in health, programs by end of education, other sectors. project. 2.2 All community volunteers in the pilot districts participate in health and education specific training programs. 2.3 Community development /business -_16 - plans developed. 2.4 Formal communication lines established between traditional authorities, and MDAs by end of project. 3. Replication/scaling up 3.1. Area and sector New set of key, method and guidance specific scaling up committed and manuals developed and methods and manuals resourceful Traditional disseminated developed. Authorities/communities identified 3.2 Training on manual use organized in two other sectors besides health and education by end of project. 4. LIL Project 4.1 Project annual plans Qualified borrower Management system developed with implementation team installed and operational participation of selected engaged and working. communities and implemented. 4.2 Development office/Project management team in place. 4.3 Monitoring and evaluation system developed and being implemented by end of year 1. Project Components / Inputs: (budget for each Project reports: (from Components to Sub-components: component) Outputs) 1.1HlV/AIDS/Health 1.US$0.48M Mid-term and end of 1. Traditional Authorities Advocacy Modules / project reports committed to productive workshops/ partnership with training/outreach Supervision Mission government in the -17 - activities Reports development of the education and health 1.2Design Community Audits Reports sectors. Health Register/Planning for Healthy Outcomes 2.Traditional Authorities provide adequate and 1.3 Periodic Public fora timely resources. 3.Communities supportive of efforts of traditional authorities. 4. School Performance Appraisal Meeting (SPAM) is initiated in community. 5. Schools in the pilot areas are adequately staffed. 6. PTAs are strengthened or initiated. 2.1 Traditional 2.JLS$3.3@M Min. of Education reports Authorities' role in schools' administration ( Scholarship schemes, lands, enrollment drives, etc) training module 2.2 School resources/ facilities and rehabilitation plan 2.3 Survey/study - to identify constraints to enrollment, teacher retention incentives, baseline 3.1 Traditional 3. US$0D.93M Mid-term and end of authorities secretariats / project reports MIS Supervision Mission - 18 - 3.2 Training needs Reports assessment /training program 3.3 Monitoring & Evaluation system 3.4 Office equipment/vehicles /auditloperations. 3.5 Partnership Module 4.1 Cultural Heritage 4. US$0.39M Mid-term and end of Preservation project reports study/inventory of artifacts Supervision Mission Reports 4.2 Traditional courts/ museums study 4.3 Cultural Heritage curriculum /multi-purpose center study - 19- Annex 2: Datefled Pro=30,000 NCB Contracts over $20,000 Below US$ 30,000 Price Comparison Contracts over All values Direct contracting $20,000 All contracts Goods US$ 100,000 or above ICB LIB will be All contracts used only if there is a limited number of -34 - suppliers >=US$ 30,000 - Ex e~nc§titUi'.eB1 teqnL . . .Ainimt In UL$4milli3fn - .- - a. c_ Works 2.70 100% of foreign and 90% of local (Asanteman $2.60M expenditures Akyem Abuakwa $0. 10M) Goods & Equipment 0.50 100% of foreign and 90% of local (Asanteman $0.40M expenditures Akyem Abuakwa $0.10M) Consultant Services, Training and 1.20 90% for all expenditures Audit Costs (Asanteman $1.05M Akyem Abuakwa $0. 15M) Operating Costs 0.20 90% for all expenditures (Asanteman $0.150M Akyem Abuakwa $0.05M) Unallocated 0.40 Total Project Costs 5.00 Total 5.00 Staements of Expenditures 24. Disbursements for all expenditures would be against full documentation, except for items of expenditures under contracts and purchase orders below US$20,000 equivalent each, for works, goods and consulting firms, and below US$ 10,000 for consultant services (individuals), training and incremental costs for which disbursements would be based on statement of expenditures (SOEs). Supporting documentation for SOEs incurred by the Development Units (PIUs) would be retained by the unit for review by IDA missions and external auditors. Special Account (SA) 25. To facilitate disbursements, one Special Accounts (SA) would be opened and managed by the Development unit of the Asanteman Council. A second SA would also be opened and managed by the Secretariat of the Akyem Abuakwa Traditional Council when the financial management system put in place at the secretariat is found to have met the financial management requirements of the Bank. This will be a disbursement condition. The SAs would be established and operated in US$ at commercial banks, under terms and conditions satisfactory to the IDA. Upon credit effectiveness, a sum of US$ 400,000 would be deposited into the special account to be managed under the Asanteman Council's sub-component, and US$ 50,000 deposited into the special account to be managed by the Akyem Abuakwa traditional Council, when the -36 - disbursement condition have been met. Further deposits would be made into the accounts against withdrawal applications supported by appropriate documentation. -37 - Annext 7: Documents On ets Project File* GHlANA: Pronoting Pair2nrshlps with Traditon&D AuthorKies Project A. Project Dmplementation Plen * Asanteman Council PIP * Akyem Abuakwa Traditional Council PIP B. Bank Staff Assessments C. Other 1. Healthy Outcomes - PHRD Funded Study 2. Cultural Heritage Review - Norwegian Heritage Organization aide memoire 3. World Bank review - Preserving Cultural Heritage 4. Traditional Authorities' role in Primary School Education in the Ashanti Region-PHRD funded study 5. Capacity Building for Traditional Authorities - PHRD Funded Study 6. *Pre-appraisal and Appraisal Aide-memoires Including electronic files - 38 - Annex 8: Statement of Loans and Credits GHANA: Promoting Partnerships with Traditional Authorities Project 06-Feb-2003 Difference between epected and actual Original Amount In US$ Millions disbursements Project ID FY Purpose IBRD IDA GEF Cancel Undisb Org Fnn ReVd P050623 2002 ROAD SECTOR DEVELOPMENT PROGRAM 000 220 00 0 00 000 232 55 33 82 0 00 P067685 2002 GhanaGEF-NorthemSavanna-TF050723 000 000 790 000 782 238 000 P000968 2001 AGRIC SERVICES 000 67 00 0 00 000 64 94 73 63 0 00 P071617 2001 Ghana AIDS Response Prect (untr3lla) 000 2500 000 000 21 86 -4 57 000 P050624 2000 URBAN5 000 1083 000 000 652 527 041 POSO616 2000 COMMUNITY WATERII 000 2500 000 000 1807 -717 000 P069465 2000 RURAL FINANCIAL SERVICES PROJECT 000 513 000 000 4.88 1283 000 P000970 1999 TRADE GATEWAY&INV 000 5050 000 000 2961 2063 000 P000974 1999 NATFUNCUTPROG 000 3200 000 000 2489 1230 383 P050015 1999 PUBSECTORMNGTPROG 0.00 1430 000 000 409 445 000 P040659 1999 COMMUNrYOEV 000 500 000 000 475 467 1 37 P040557 199 ERSOII 000 17820 000 1841 2740 045 000 P045188 1998 GHFORESTBIODIVERSITY 000 000 890 000 661 349 00o P000946 1998 NAT RES MANAGEMENT 000 9 30 0 00 000 060 0 89 0 00 P041150 1997 VILLAGEINFRASTRUCTURE 000 3000 000 000 1051 1002 000 P045588 1997 PUB FIN MGMT TAP 000 2090 000 000 368 530 000 P000973 196 URBAN ENVIRONMENTAL SANITATION 000 71 00 000 000 682 1428 614 P042516 1996 PUBUC ENTERPRISE/PR 000 2645 000 000 762 949 000 P000926 1995 GH THERMAL (P-VII) 0 00 175 60 0 00 000 27 01 3179 31 08 P000936 1994 LOCALGOVTDEV 000 3850 000 000 140 254 000 Total. 000 100471 16.80 1841 51153 23848 4283 - 39 - GHANA STATEMENT OF IFC's Held and Disbursed Portfolio Jun 30 - 2002 In Millions US Dollars Conmned Disbunsed IUFC EUFC FY Approval Company Loan Equity Quasi Panic Loan Equity Quasi Partic 1993 AEF Afariwaa 0.16 0.00 0.00 0.00 0.16 0.00 0.00 0.00 1995 AEF Antelope Co. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2000 AEF Computer Sch 0.23 0.00 0.00 0.00 0.23 0.00 0.00 0.00 2001 AEF GPPI 1.70 0.00 0.00 0.00 1.70 0.00 0.00 0.00 1998 AEF NCS 0.00 0.00 0.53 0.00 0.00 0.00 0.53 0.00 1997 AEF PTS 0.00 0.00 0.31 0.00 0.00 0.00 0.31 0.00 1999 AEF PhannaCare 0.28 0.00 0.00 0.00 0.28 0.00 0.00 0.00 1994 AEF Shangri-la 0.93 0.00 0.00 0.00 0.93 0.00 0.00 0.00 1996 AEF Tacks Fanns 0.43 0.00 0.00 0.00 0.43 0.00 0.00 0.00 1989/91/93 Cont Acceptances 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2001 Diamond Cement 5.00 1.00 0.00 0.00 0.00 0.00 000 0.00 2000 ELAC 0.00 0.10 0.00 0.00 0.00 0.10 0.00 0.00 GAGL 0.00 0.00 3.26 0.00 0.00 0.00 3.26 0.00 1990/91/96 GHANAL 0.00 0.44 0.00 0.00 0.00 0.44 0.00 0.00 1991 Ghana Leasing 0.00 0.15 0.00 0.00 0.00 0.15 0.00 0.00 MFI SSLC 0.00 0.48 0.00 0.00 0.00 0.48 0.00 0.00 1992/93 Wahome Steel 0.23 0.00 0.00 0.00 0.23 0.00 0.00 0.00 2001 1989/92 Total Portfolio: 8.96 2 17 4.10 0.00 3.96 1.17 4.10 0.00 I Approvals Pending Commitment FY Approval Company Loan Equity Quasi Panic Total Pending Comrnitmnent: 0.00 0.00 0.00 0.00 -40 - Annex 9: Country at a Glance GHANA: Promoting Partnerships with Traditional Authorities Project Sub- POVERTY and SOCIAL Saharan Low- Ghana Africa Incoffe Development diamond 2001 Population mid-year (millons) 19.7 674 2,511 Ufe expectanrcy GNI per capita (Atlas method, US$) 290 470 430 GN (Atlas method, USS billions) 57 317 1,069 Average annual growth, 1995-01 Population (%) 2.2 2.5 1 9 GNI Gross Labor force (%) 2.5 2.6 2.3 GI per primary Most recent estimate (latest year available, 1995-01) capita enrollment Poverty (% of population below national poverty line) Urban population (% of total population) 36 32 31 Ufe expectancy at birth (years) 57 47 59 Infant mortality (per 1.000 live bIrths) 58 91 76 Child malnutrifton (% of children under 5) 25 Access to Improved water source Access to an improved water source (% of population) 64 55 76 illiteracy (% of population age 15+) 27 37 37 Gross primary enrollment (% of school-age population) 78 78 96 Ghana - ---- Low-ncome group Male 82 85 103 Female 74 72 88 KEY ECONOMIC RATIOS and LONG-TERM TRENDS 1981 1991 2000 2001 Economic ratlos' GDP (USS billions) 42 6.6 5 0 5.3 Gross domestic InvestmenVGDP 4.6 15 9 237 24 0 Trade Exports of goods and services/GDP 4 8 170 492 522 Gross domestic savings/GDP 4 0 7 3 3.3 5 8 Gross nafional savinsGDP 3 7 8 8 13 4 17.0 Current account balance/GDP -1 2 0 -8 9 1 1 114 o Ivestment Interest payments/GDP 0.7 1 0 24 1.5 savine n Total debt/GDP 36.4 66.4 1336 1262 Total debt service/exports 142 27.1 19 1 15.3 Present value of debVGDP 788 Present value of debt/exports 10nt. 1600 Indebteriness 198141 199101 2000 2001 2001-05 (average annual growth) GDP 4.0 4 2 3.7 4 0 5 0 Ghana Low-income group GDP per capita 0.3 1.9 1.3 1 9 3 5 Exports of goods and services 4.9 10.4 -2.3 0 3 2.8 STRUCTURE of the ECONOMY 1i98 1991 2000 2001 Growth of Investnent and GOP () (% of GDP) 20 Agnculture 53.1 45 5 35 3 35.9 _ Industry 9.2 17.0 25 4 25.2 o Manufacturlng 6.0 9.3 90 92 7 Services 37.8 375 39 3 389 2 Private consumpton 87 2 83 2 81 4 78 7 x4 General govemment consumption 8 8 95 15 3 158 GOI GDP Imports of goods and services 5.3 25 5 69 6 70.5 (average annual growth) 1981-91 1991-01 2000 2001 Growth of exports and Imports (%) Agriculture 17 3 5 21 3 7 so Industry 5 6 3 0 3 8 4 0 ManutacturIng 62 -1 2 3 7 76 25 ServIces 6.5 53 5.1 4.3 o'r Pnvate consumption 3.9 4 0 -2.2 1.4 General govemment consumPtion 2 7 5 5 20 1 15 0 .25 Gross domestic investment 63 1.4 -191 -11 - Exports fiImports imports of goods and services 4.1 10.3 -17 3 2 0 Note 2001 data are prelimnrary estimates -41 - Ghana PRICES and GOVERNMENT FINANCE 1981 1991 20D 2001 lnfctUon (%) Domestic prfces so (% change) Consumerptices 116.5 181 25.0 330 r, Implicdt GDP deflator 75 6 20.0 27 2 346 40 Government flr.nce F0 (% of GDP, Indudes current grenfs) Current revenue 6 6 20.8 18 6 20.6 so 57 es os oo 1 Current budget balance - 2 9 5 0.1 1.2 DP deflator *OCPI Overall surplus/defict .. 1.7 -9 1 -100 TRADE (1981 19m 2000 2S01 Export cnd Import les (US$ rli.) (US$ n-lllons) Total exports (fob) 998 2,189 2,380 Cocoa . 347 452 503 Timber 124 199 215 o.000 Manufactures Total imports (dc) 1,412 3,608 3,781 2Do Food . 39 . .010 Fuel and energy .. 175 232 257 Captal goods 247 2 Exportprioelndex(1995=000) 84 101 106 S5 g8 07 Oa 9 00 o Importpricelndex(1995=100) 79 79 83 QExports oQiports Terms of trade (1995=1OO) 107 127 129 BALANCE of PAYMENTS 1981 1991 2003 2001 Current account balance to GDP (%) (US$ mill}onsJ Exports of goods and services 30 1,098 2,418 2,452 o Imports of goods and services 1,246 1,852 3,525 3,554 Resource balance -416 Ism -1,107 -1,103 -5 Net inrome -66 -119 -147 -178 Net current transfers -4 219 650 788 -10 Current account balance 4508 -454 -605 -602 Financing items (net) 472 625 632 681 Changes in net reserves 36 -171 -27 -79 20 Memo: Reserves nicluding gold (US$ millions) . . 224 431 Conversion rate (DEC, localAJS$) 17 2 367 8 5,455 1 7,170.8 EXTERNAL DEBT and RESOURCE FLOWS 1M81 1991 20 201 (USS millions) Coftiposttion of 20031 d3bt (US$ mill.) Total debt outstanding and disbursed 1,539 4,380 6,648 6,690 IBRD 129 103 9 6 Ake IDA 111 1,522 3,130 3,172 G 604 Total debt service 119 300 467 380 Fate IBRD 12 21 9 4 F .I IDA 1 12 47 59 Composition of net resource flows : Offical grants 34 470 226 Otfical crditors 79 353 179 223 E 122. Prtvate reditors -3 35 -59 76 Foreign direct investment 16 20 110 Portfolio equity 0 0 17 DS" c:284 Wortd Bank program Commitments 28 168 93 433 A - IBRD E - Bilatersa Disbursements 31 199 204 193 B-IDA 0-Otherrnuttllaterml F-Private Principal repayments 5 14 33 37 C- IMF G - Short-term Net flows 26 185 171 156 Interest payments 9 19 23 25 Net transfers 17 167 148 130 Note' nis taole was poucea irom mie ueveiopment tconomrics centrar cmaoase FAMi53 -42 - Additional Annex 10: [Primary Schools to be Rehabilitated GHANA: Promoting Partnerships with Traditional Authorities Project INVENTORY OF PHYSICAL STRUCTURES OF EDUCATIONAL FACILITIES IN FORTY TARGET COMMtlNITIES FROM EIGHTEEN DISTRICTS DISTRICT COMMUNlTY/ DESCRIPTION CONDITION SCHOOL NAME AFIGYA- I.Asamang RCP Old Building Floor & walls SEKYERE 2.Boama-Moase LAP Mud Building deteriorating Collapsing KWABRE 3.Maase-Brofoyedru LAP Mud Building 4.Amanfrom LAP Roofing Staged level Studying under tree AMANSIE 5.Adimposo LAP Temporary shed Poor WEST 6.Nkaasu LAP 3 classroom no office Needs rehab. SEKYERE 7.Sarnso LAP Temporary shed Poor EAST 8.Funsua LAP Brick structure Very weak 9.Asisiwa LAP Mud building Very weak 10.Seneso LAP Temporary shed Poor EJURA/ 1 l.Dromankoma AP Classroom under shed Destroyed by rain SEKYEDUMAS 12.Bema LAP Mud Building Deteriorated E 13.Ejura LAP No classroom Destroyed by rain ADANSI EAST 14.Pipiiso LAP Four room Building Poor 15.Nsokote LAP Temporary Building Bad structure AMANSIE 16.Asamama LAP Wooden structure Poor EAST 17.Feneso No. 3 LAP Mud Building Poor SEKYERE 18.Atonsuagya LAP ud Building Poor condition WEST 19.Birem LAP Sandcrete Block Building Needs rehab. & extension AHAFO-ANO 20.Suponso DAP Make shift classroom Very Poor condition NORTH 21.Konkori DAP Mud Building Collapsing ATWIMA 22.Asuofua LAP ud Building Structure very weak 23.Anhwiafotu LAP Temporary Building Structure very weak - 43 - Df $TPJCT CMoUNE]TYI IDESCELf0N CONDIITIIN SCIHIOOL NAME No ceiling/no plaster of BOSOMTWII 24.weesoRC ATWB W/ 24.Nweneso RCP Small classroom Structures need rehab. KWANWOMA 25.Trabuom RCP Addition ASANTE-AKIM 26.Kyempo PP Needs to be re-constructed Needs rehabilitation SOUTH 27.Saabo LAP 3 unit classroom ASANTE-AKIM 28.Dwease MP Mud Building Weak structure NORTH 29.Woraponso LAP Old mud building Weak structure ADANSI WEST 30.Wamase LAP remporary Building Building collapsing 3 l.Kramokrom LAP Mud Building Weak structure EJISU/ JUABEN 32.Boamodumasi MP Weak building Rehab. & extension 33.Domakwai LAP 3 unit classroom need 34.Adadientem RCP 3 unit classroom 35.Hwereso PP 3 unit classroom OFFINSO 36.Kwapanin RCP Temporary shed Femporary building 37.Dwendabi LAP Mud building Weak structure KUMASI 38.Asokore Mampong Building collapsing Very poor state RCP AHAFO-ANO 39.Mpasaaso no.2 LAP Temporary Very weak SOUTIH 40.Bonkwaso LAP Building Weak I____________ ___________M ud Building AP Anglican Primary DAP District Assembly Primary LAP Local Authority Primary MP Methodist Primary PP Presbyterian Primary Presby Presbyterian RCP Roman Catholic Primary SOURCE: RAFIL CONSULTANTS (DEC. 2001, FINAL REPORT-EDUCATION, PHRD FUNDED STUDY) -44 - Additional Annex 11 :Traditlonal Authorities Organizational Structure - Asanteman Council GHANA: Promoting Partnerships with Traditional Authorities Project STRUCTURE ASANTEHENE KING ASANTSMAN | ASANTEMIAN COUNCIL COIJNCIL OF TRADMONAL AUrHORnTIES PARAMOUNT CHIEF PARAMOUNTCES Traditinl Area #1L Traditional Azas #2-35 IT ChlIeDOmI. ChiallQns TOWn/VIllage # TownViDlla #2 #35 H geadpDerso (HP) | 2 Headpersn (HP) Village #11 VIllage #~~~2i1p Headperson ||Htadperson| Village tl2 Village J |Header,son IIHeadperson| VUa#13 VIlae#23 IMPLEMENTATION ARRANGEMENTS ASANTEHENE KING ASANTEMAN Asanteman Council - Council of Traditional Authorties (Paramount Chiefs, Queenmothers, Chiefs, etc) Overslght ommnittee Rep. of regionalocal govt. Rep. of Trad. Counci& Head of PIU Regional Directors - Mmn.of Health & Education I Secretariat| Offir,e of Administration | Manhyia Development Unft - PIU| - 45 - Additons0 An&nsu 12: Traditional AuthorltIes Orgenlational Strucurs - Ahyam Abushwa Traitional CounclI GHANA: PromotOng Partnerzhips with T7adional AuthorOtts Project ST]RUCT'URE Okyonh3nz (King) Akyem Abuakwm Treditionsl Am Akyom Abuakwo Traditlonal Council Council of tradUonml m9tharitil 4Dvisional ChiIguesenmothar| Su-chDslfzusesnmoth'asm IMPLEMENTATOEN ARRANGEMENT _ SYEI;A 3!AGUAMA Akyern Abuakwta Traditional CounicEl -Council of Tmcditional authorities (Chiefs, Queenmothers, etc) |ESdTRS GROUP Policy& Implementation Guidance Rep. of local govt; academics, otherprofessionals Secetariat - Akyem Abuakwa Trad. CounciD Project Impflemontation Unil -46 -