Page 1 Document of The World Bank Report No: 58761 v. 1 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MEKONG TRANSPORT AND FLOOD PROTECTION PROJECT CREDIT 3448-VN December 20, 2000 AND MEKONG TRANSPORT AND FLOOD PROTECTION – ADDITIONAL FINANCING CREDIT 3448-1-VN June 20, 2007 TO THE SOCIALIST REPUBLIC OF VIETNAM Page 2 2 Regional Vice President: James W. Adams Country Director: Victoria Kwakwa Sector Manager / Director: Jennifer J. Sara/ John Roome Task Team Leader: Dung Anh Hoang Page 3 3 VIETNAM — MEKONG TRANSPORT AND FLOOD PROTECTION PROJECT P042927 - CREDIT 3448-VN AND VIETNAM — MEKONG TRANSPORT AND FLOOD PROTECTION – ADD. FINANCING P105120 - CREDIT 3448-1-VN Restructuring Paper 1. The closing date for Vietnam, Mekong Transport and Flood Protection project, Credit No. 3448-VN, P042927, and Vietnam, Mekong Transport and Flood Protection – Additional Financing, Credit No. 3448-1-VN, P105120 will be extended from December 31, 2010 until June 30, 2011. 2. Implementation of the projects is considered to be satisfactory overall. With current satisfactory implementation performance, most activities under both projects have been successfully completed. Disbursements as of December 14, 2010 of the Original Project is approximately SDR 77.45 million or 90 percent of the total credit amount of SDR 86.2 million. Disbursements under the Additional Financing have reached approximately SDR 8.66 million, or 53 percent of the total additional credit amount of SDR 16.4 million. Both ‘ progress towards achieving its PDO’ and ‘ overall implementation progress ’ are rated satisfactory in the last ISR dated December 27, 2010). The Project development objectives are considered still achievable. All key covenants have been met. There are now no outstanding issues relating to audits, and reports received are of acceptable quality. There are no pending issues regarding the safeguard aspects and the project is in compliance with all Legal Covenants. 3. The proposed extension for a 6-month period beyond the closing date is necessary to complete on-going activities. The main activities to be supported by the extension are: (i) four (04) on-going works contracts (AF funds) totaling 28km; (ii) two (02) on-going works contracts for black spot improvement (Original Credit); (iii) Consultancy Services for a Feasibility Study for future project (Original Credit – under procurement); and (iv) Detailed Design Consultancy Services for remained 30km of roads (Original Credit – under procurement). The Bank Task Team has reviewed the Ministry of Transport proposed implementation plan to complete the on-going contracts and judges it is achievable within the proposed extension time. 4. This will be the third extension of the Original Project - Mekong Transport and Flood Protection project (P042927 – Cr. No. 3448-VN) since the original closing date of June 30, 2006 and will be the first extension of the Additional Financing (P105120 – Cr. No. 3448-1-VN) since the original closing date of December 31, 2010.