PROCUREMENT PLAN (Textual Part) Project information: Mali – Reconstruction and Economic Recovery Projet / P-144442 Project Implementation agency: Ministry of Economy and Finance Date of the Procurement Plan: February 1, 2018 Period covered by this Procurement Plan: Up to November 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. PROCUREMENT Mali : Mali Reconstruction and Economic Recovery PLAN General Information Country: Mali Bank’s Approval Date of the Original Procurement Plan: 2018-02-23 2021-01-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144442 GPN Date: Project Name: Mali Reconstruction and Economic Recovery Loan / Credit No: IDA / H9010, IDA / D3730 Executing Agency(ies):Reconstruction and Economic Recovery WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CW-REF 29 / Realisation de 10 puits modernes (à grand Component 1: diamètre) : Amasrakad, Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 240,000.00 0.00 Echel, Tintibaliten, infrastructure (US$50 Envelope d'exécution 20 14 13 Tamaimara, Tin Ichmal, million equivalent) Doreye (2), N’Tillit (3) dans la commune de N’Tillit CW-REF 30 / Réalisation de Component 1: 14 forages dont 11 Positifs Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- et l’équipement de 08 IDA / H9010 A posteriori Demande de prix Open - National 215,000.00 0.00 infrastructure (US$50 Envelope d'exécution 20 14 13 Forages en PMH dans les million equivalent) Communes de Fatoma, Socoura et Kona CW-REF 31 / Soufflage, Essai de Pompage, Component 1: Réalisation de Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 110,000.00 0.00 Superstructure et Fourniture infrastructure (US$50 Envelope d'exécution 15 09 08 et Pose de PMH de 17 million equivalent) anciens forages dans les communes de Fatoma et Konna CW-REF 32 / Réalisation de Component 1: 03 Puits Moderne dans les Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- villages de Koko, Grangomé IDA / H9010 A posteriori Demande de prix Open - National 72,000.00 0.00 infrastructure (US$50 Envelope d'exécution 20 14 13 et Timé dans la commune de million equivalent) Konna cercle de Mopti CW-REF 33 / Réalisation de quatorze (14) PMH dans les commune de Diafarabé Component 1: Diaka de Diondiori de Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- Kareri, de Ouro Ardo 01 à IDA / H9010 A posteriori Demande de prix Open - National 354,000.00 0.00 infrastructure (US$50 Envelope d'exécution 15 09 08 Toko et 01 de Ouro Guiré million equivalent) de deux (02) SHVA dont 01 à Barkédaga 01 à Koubi ,réhabilitation de l'AES de Dia cercle de Ténenkou CW-REF 34 / Réalisation (10) PMH à Soni Kaguidiourou Toguéré Component 1: Coumbé Tanda Kamaka Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- Sebe Tomora Ouroguya IDA / H9010 A posteriori Demande de prix Open - National 690,000.00 0.00 infrastructure (US$50 Envelope d'exécution 15 09 08 Gueledie Oualo et million equivalent) Sareamboubou deux (02) SHVA Kona-Mali et Saremare de deux (02) AES Oualo et Sossobé CW-REF 35 / Réalisation de 17 PMH à Dogo à Yéré à Sarbéré à Baré Fétodjé Component 1: Gandétama Sarédin Karan Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- à Diamkoko Kormou Bia IDA / H9010 A posteriori Demande de prix Open - National 309,000.00 0.00 infrastructure (US$50 Envelope d'exécution 15 09 08 Owa Diou et Doukou million equivalent) N'Garwoye Bougoudji et réhabilitation de l'AES de Guidio saré Youwarou - Région de Mopti CW-REF 36 / Réalisation (12) PMH Kerbé kouna Herao Lanadjer Toulet tob Kouroudourou Component 1: Toromobiama Toulal Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 222,000.00 0.00 Toulal Sokodema Wario infrastructure (US$50 Envelope d'exécution 15 09 08 Nomade Almamor million equivalent) Toupagal sonabé touki modibo galil réhab de 03 PMH N'gniri Gnara Koubita Kora cercle de Youwarou CW-REF 37 / Realisation de trois puits pastoraux dont Component 1: 01 à Sourango commune de Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- Farimaké 01 à Kossombo et IDA / H9010 A posteriori Demande de prix Open - National 60,000.00 0.00 infrastructure (US$50 Envelope d'exécution 15 09 08 01 à Tilkal dans la commune million equivalent) de Dirma cercle de Youwarou région de Mopt CW-REF 38 / Réalisation de 12 forages positifs avec PMH à Sogo-Ouro, Saka Inguéri, Ongom Sarré Pathé, Component 1: Biro, Guédia Faou et Margou Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 364,000.00 0.00 et à Enguem et Aourédans la infrastructure (US$50 Envelope d'exécution 15 09 08 Commune de Youwarou et million equivalent) réalisation d’un AES à Sah dans la Commune de N'Dodjiga CW-REF 43 / Equipement de 03 Nouveaux forages en SHVA dans le village de Boubakoré commune de Component 1: Fatoma 01 dans le village de Rehabilitation of local public Single Stage - One En attente 2018-02- 2018-04- 2018-09- IDA / H9010 A posteriori Demande de prix Open - National 108,000.00 0.00 Némindé et 01 dans le infrastructure (US$50 Envelope d'exécution 06 03 30 village de Sina commune de million equivalent) Socoura et la réhabilitation de 01 SHVA dans le village de Koana commune de Konna CW-REF 49 / Réalisation Component 1: d'un ouvrage de Rehabilitation of local public Single Stage - One En attente 2018-02- 2018-04- 2018-09- IDA / H9010 A posteriori Demande de prix Open - National 600,000.00 0.00 franchissement (Pont) dans infrastructure (US$50 Envelope d'exécution 04 01 28 la commune de Gossi million equivalent) CW-REF 50 / Construction Component 1: Single Stage - One En attente 2018-02- 2018-04- 2018-10- de la gare routière à IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 900,000.00 0.00 Envelope d'exécution 20 17 14 Tombouctou / C de infrastructure (US$50 Tombouctou. million equivalent) CW-REF 51 / Construction Component 1: Single Stage - One En attente 2018-01- 2018-03- 2018-09- d'un CSCOM à Tondidarou IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 240,000.00 0.00 Envelope d'exécution 10 07 03 dans le cercle de Niafunké infrastructure (US$50 million equivalent) CW-REF 55 / Realisation de Component 1: Single Stage - One En attente 2018-03- 2018-05- 2018-11- 7 SHVA dans le cercle de IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 400,000.00 0.00 Envelope d'exécution 20 15 11 Menaka infrastructure (US$50 million equivalent) CW-REF 56 / Installation de Component 1: Single Stage - One En attente 2018-03- 2018-05- 2018-11- 300 lampadaires dans le IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 600,000.00 0.00 Envelope d'exécution 20 15 11 cercle de Menaka infrastructure (US$50 million equivalent) CW-REF 60 / Extension du CSCOM de Daka Fifo du CSCOM de Teherdjé t Component 1: réalisation de rampes Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 88,000.00 0.00 d’accès sur les perrons de infrastructure (US$50 Envelope d'exécution 20 14 13 bâtiments des CSCOM de million equivalent) Bellafarandi Sankoré et Kabara commune de Tombouctou CW-REF 61 / Réalisation de 25 Forages productifs équipés de PMH dans 25 Component 1: écoles et réalisation de Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- Quatre forages productifs IDA / H9010 A posteriori Demande de prix Open - National 667,000.00 0.00 infrastructure (US$50 Envelope d'exécution 20 14 13 équipés de pompe solaires million equivalent) avec fournitures et installation de château métallique de 5 m3 dans la région de Tombouctou. CW-REF 62 / Réalisation de 07 forages productifs débit ≥ 1 m3/h pour PMH Component 1: réalisation de deux forages Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 160,000.00 0.00 productifs débit ≥ 5 m3/h infrastructure (US$50 Envelope d'exécution 20 14 13 et la réhabilitation d'un million equivalent) ancien forage ( un pour AESun pour PMH) dans le Cercle de Dirre CW-REF 63 / Rréalisation de14 nouveaux forages productifs débit ≥ 1 m3/h Component 1: pour PMH la Realisation Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- d'un forage productif débit IDA / H9010 A posteriori Demande de prix Open - National 302,000.00 0.00 infrastructure (US$50 Envelope d'exécution 20 14 13 ≥ 5 m3/h pour AES et la million equivalent) Réhabilitation de 08 anciens forages pour PMH à Région de Tombouctou Page 1 CW-REF 64 / Réalisation de 10 forages PMH débit ≥à 1 m3/h d'un forage pour SHVA Component 1: avec débit ≥3m3/h Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 322,000.00 0.00 installation d'un château infrastructure (US$50 Envelope d'exécution 20 14 13 d'eau de 10 m3 de 3 puits million equivalent) modernes et d'un forage pour AES dans le cercle de Gourma Rharou. CW-REF 65 / Réalisation de 12 forages avec débit Component 1: superieur à 1 m3/h pour Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- PMH la réalisation d'un IDA / H9010 A posteriori Demande de prix Open - National 240,000.00 0.00 infrastructure (US$50 Envelope d'exécution 20 14 13 forage avec débit superieur million equivalent) ou égal à 5 m3 /h pour AES dans le cercle de Niafunké. CW-REF 66 / Réalisation de 5 forages débit ≥1m3 /h pour PMH d'un forage avec Component 1: débit ≥ 5m3/h de deux Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- forages avec débit ≥3m3/h IDA / H9010 A posteriori Demande de prix Open - National 261,000.00 0.00 infrastructure (US$50 Envelope d'exécution 20 14 13 pour SHVA Installation de million equivalent) château de 10m3 d'un forage pour PMH dans le cercle de Tombouctou et la commune de TONKA CW-REF 67 / Aménagement Component 1: Single Stage - One En attente 2018-02- 2018-04- 2018-10- 7 km de route (Bretelle RN33 IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 90,000.00 0.00 Envelope d'exécution 20 17 14 - Koyan Coura) cercle de infrastructure (US$50 Niono million equivalent) CW-REF 68 / Aménagement Component 1: de 3 km de route (Pont Abou Rehabilitation of local public Single Stage - One En attente 2018-02- 2018-04- 2018-10- IDA / H9010 A posteriori Demande de prix Open - National 39,000.00 0.00 Diarra – Nango du Sahel) infrastructure (US$50 Envelope d'exécution 20 17 14 Commune de Niono million equivalent) CW-REF 69 / Aménagement Component 1: axe routier de 2 km (RN33 à Rehabilitation of local public Single Stage - One En attente 2018-02- 2018-04- 2018-10- IDA / H9010 A posteriori Demande de prix Open - National 50,000.00 0.00 la prison en passant par le infrastructure (US$50 Envelope d'exécution 20 17 14 lycée) Commune de Niono million equivalent) CW-REF 70 / Réalisation des Component 1: Single Stage - One En attente 2018-02- 2018-04- 2018-10- ouvrages de jonction IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 400,000.00 0.00 Envelope d'exécution 20 17 14 Gayabéré - Saraféré infrastructure (US$50 million equivalent) CW-REF 71 / Réhabilitation Component 1: d'un ouvrage de Rehabilitation of local public Single Stage - One En attente 2018-02- 2018-04- 2018-10- IDA / H9010 A posteriori Demande de prix Open - National 100,000.00 0.00 franchissement (Pont) dans infrastructure (US$50 Envelope d'exécution 20 17 14 la commune d’Arham (Diré) million equivalent) CW-REF 72 / Réhabilitation Component 1: Single Stage - One En attente 2018-02- 2018-04- 2018-10- de la piste Kondi - Diré IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 200,000.00 0.00 Envelope d'exécution 20 17 14 (Accès Kondi : 7 km) infrastructure (US$50 million equivalent) CW-REF 73 / Construction Component 1: d'un pont sur le chenal de Rehabilitation of local public Single Stage - One En attente 2018-02- 2018-04- 2018-10- Kafasirta (Tessakane et IDA / H9010 A posteriori Demande de prix Open - National 200,000.00 0.00 infrastructure (US$50 Envelope d'exécution 20 17 14 Kondi) dans la commune de million equivalent) Kaneye (Goundam) CW-REF 74 / RRealisationde Component 1: Single Stage - One En attente 2017-12- 2018-02- 2018-08- 7 AES dans la région de IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 463,000.00 0.00 Envelope d'exécution 20 14 13 Tombouctou infrastructure (US$50 million equivalent) CW-REF 75 / Construction de magasins d'aliment bétail (05) de banque de céréales (02)de centre de couture (01) de vente (01) de Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 218,827.00 0.00 transformation et productive investments Envelope d'exécution 20 15 14 conservation de produits maraichers (01) de produits locaux (06) de lait (01) dans la région de Tombouctou CW-REF 76 / Atelier de Maroquinerie de réparation de moto de menuiserie plateforme) unité de fabrication de jus et yaourt Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 253,792.00 0.00 de teinture) infrastructure productive investments Envelope d'exécution 20 15 14 pour l'aviculture (01) unité de transformation de viande unité de production de pâte arachide à Tombouctou CW-REF 78 / Réalisation d'infrastructures et Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- d'équipement pour IDA / H9010 A posteriori Demande de prix Open - National 61,800.00 0.00 productive investments Envelope d'exécution 20 15 14 embouche ovine (5) dans le cercle de Abeibara, région de Kidal CW-REF 80 / Réalisation d'infrastructures et d'équipement pour Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 11,940.00 0.00 embouche ovine (8) et une productive investments Envelope d'exécution 20 15 14 ferme de vaches laitières dans le cercle de Kidal, région de Kidal CW-REF 81 / Construction et équipement de huit (08) Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 80,000.00 0.00 ateliers de tannerie dans le productive investments Envelope d'exécution 20 15 14 cercle de Kidal, région de Kidal CW-REF 82 / Travaux de construction et équipement Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 39,000.00 0.00 de (03) ateliers de tanerie productive investments Envelope d'exécution 20 15 14 dans le cercle de Kidal, région de Kidal CW-REF 84 / Aménagement et d'équipement d'un (01) Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- Périmètre maraicher (1 ha) IDA / H9010 A posteriori Demande de prix Open - National 37,314.00 0.00 productive investments Envelope d'exécution 20 15 14 dans le cercle de Kidal, région de Kidal. CW-REF 85 / Rréalisation d'infrastructure et d'équipement pour Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 37,780.00 0.00 embouche bovine (01) et productive investments Envelope d'exécution 20 15 14 ovine (02) dans le cercle de Tessalit, région de Kidal CW-REF 87 / Construction et équipement d'une (01) Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- mini-laiterie et d'une (01) IDA / H9010 A posteriori Demande de prix Open - National 37,660.00 0.00 productive investments Envelope d'exécution 20 15 14 banque de céréales, dans le cercle de Tessalit, région de Kidal CW-REF 88 / Construction et équipement de trois (03) Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- ateliers de tannerie dans le IDA / H9010 A posteriori Demande de prix Open - National 30,000.00 0.00 productive investments Envelope d'exécution 20 15 14 cercle de Tin-Essako, région de Kidal CW-REF 89 / Construction et équipement d'une (01) ferme de vaches laitières et Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- d'une (01) boutique de vente IDA / H9010 A posteriori Demande de prix Open - National 31,720.00 0.00 productive investments Envelope d'exécution 20 15 14 de produits de 1ère nécessité dans le cercle de Tin-Essako, région de Kidal CW-REF 93 / Aménagement et dotation en moto pompe Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 120,000.00 0.00 de PIV (1) pour 20 ha dans productive investments Envelope d'exécution 20 15 14 le cercle de Douentza CW-REF 94 / Aménagement de 3 étangs piscicoles dans Component 2: Support to Single Stage - One En attente 2018-01- 2018-03- 2018-09- IDA / H9010 A posteriori Demande de prix Open - National 220,000.00 0.00 la Commune de Siribala (3) productive investments Envelope d'exécution 20 17 13 dans le cercle de Niono CW-REF 95 / Réalisation de (04) périmètres maraichers et réhabilitation d'un autre Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 250,000.00 0.00 dans les communes productive investments Envelope d'exécution 20 14 13 d’Anderamboukane Alata Tindermane cercle de Ménaka CW-REF 96 / Construction 17 étables pour embouche ovine et bovine dans les Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 386,000.00 0.00 communes de Inekar productive investments Envelope d'exécution 20 14 13 Anderamboukane Alata, Ménaka et Tidermene cercle de Ménaka CW-REF 97 / Construction de (02) maisons d'artisans Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 224,000.00 0.00 dans les communes de productive investments Envelope d'exécution 20 14 13 Tindermène et Alata, cercle de Ménaka Page 2 ML-PRRE-54121-CW-RFQ / Component 1: Single Stage - One En attente 2018-01- 2018-03- 2018-09- Réhabilitation du quai fluvial IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 130,000.00 0.00 Envelope d'exécution 10 07 03 de Gao infrastructure (US$50 million equivalent) ML-PRRE-58951-CW-RFQ / Construction d'abris de décortiqueuse (01) de Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- moulin et décortiqueuse (02) IDA / H9010 A posteriori Demande de prix Open - National 167,141.00 0.00 productive investments Envelope d'exécution 20 15 14 d'atelier de tannerie et tissage (02) de moulin (03) dans la région de Tombouctou CW-REF 79 / Construction de trois (03) boutiques de vente de produits de 1ère Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 65,980.00 0.00 nécessité, d'un (01) atelier productive investments Envelope d'exécution 20 15 14 de tannerie dans le cercle de Abeibara, région de Kidal ML-PRRE-58940-CW-RFQ / Construction de cinq (05) boutiques de vente de Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- produits de 1ère nécessité et IDA / H9010 A posteriori Demande de prix Open - National 101,300.00 0.00 productive investments Envelope d'exécution 20 15 14 d'une (01) boutique de vente de matériel électrique dans le cercle de Kidal, région de Kidal ML-PRRE-58945-CW-RFQ / Construction d'un (01) magasin de pièces de rechange (01) atelier de tannerie d'un (01) atelier de Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 62,260.00 0.00 coupe d'un (01) atelier de productive investments Envelope d'exécution 20 15 14 menuiserie et d'une (01) boutique de vente de produits de 1ère nécessité dans le cercle de Tessalit CW-REF 90 / Aménagement Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- de (69 ha) dans la région de IDA / H9010 A posteriori Demande de prix Open - National 260,000.00 0.00 productive investments Envelope d'exécution 20 15 14 Tombouctou ML-PRRE-58931-CW-RFQ / Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- Aménagement de PIV (1) IDA / H9010 A posteriori Demande de prix Open - National 165,000.00 0.00 productive investments Envelope d'exécution 20 15 14 pour 15 ha dans la région de Gao ML-PRRE-58935-CW-RFQ / Aménagement de PIV (2) Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 463,400.00 0.00 pour 100 ha dans les productive investments Envelope d'exécution 20 15 14 cercles de Mopti et Youwarou ML-PRRE-62456-CW-RFQ / Réalisation d'une (01) AES dans le village de Koubowel 5 anciens Forages équipés Component 1: de PMH a Andji (02) Entaga Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- IDA / H9010 A posteriori Demande de prix Open - National 223,500.00 0.00 ( 01) et Tongo-tongo (02) infrastructure (US$50 Envelope d'exécution 16 29 26 'extension d'1 AES dans le million equivalent) village de Dallah réhabilitation et extension de l'AEP de Douentza ML-PRRE-62457-CW-RFQ / Réalisation de 6 forages équipés de PMH dans les villages de Ouro Djoumal Component 1: (01), Ouro Mamou (01), Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- IDA / H9010 A posteriori Demande de prix Open - National 174,500.00 0.00 Banaga (01)Koyo Sargnéré infrastructure (US$50 Envelope d'exécution 14 29 26 (01) Ouro Hamadi Nouh (01) million equivalent) et Alabengouma (01) Pétaka et de de Réalisation d'1 SHVA à Loro Foulbé ML-PRRE-62460-CW-RFQ / Réalisation de 10 forages en PMH dans les villages de Component 1: Hombori Kouri Kantakine Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- Gallou ) Boumbaki IDA / H9010 A posteriori Demande de prix Open - National 266,500.00 0.00 infrastructure (US$50 Envelope d'exécution 15 29 26 (Hordiahitt Howandé Garmi million equivalent) Bounguel Diaoullé ) Narki Doungouri et Beria et Banaye et de Réalisation d'1 SHVA à Kelmi ML-PRRE-62461-CW-RFQ / Réalisation de 2 AES dans les villages de Mougnoukana et Issez, d'1 SHVA à Component 1: Toulawendou et d'extension Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- de 3 AES àDouna (Extension IDA / H9010 A posteriori Demande de prix Open - National 299,500.00 0.00 infrastructure (US$50 Envelope d'exécution 14 28 25 réseau avec 4 BF) million equivalent) Niangassadiou (Extension réseau avec 6 BF) et Mondoro Habé (Extension réseau avec 7 BF) CW-REF 39 / Equipement de 7 nouveaux forages Component 1: positifs Q ≥ 5 M3 pour Rehabilitation of local public Single Stage - One 2018-01- 2018-03- 2018-09- 3shva /H SHVA dans la IDA / H9010 A posteriori Demande de prix Open - National 273,000.00 0.00 Annulé infrastructure (US$50 Envelope 10 07 03 commune de BAMBA 4 SHVA million equivalent) et 3 FORAGES POSITIFS Q ≥ 1 M3/H POUR PMH dans la commune de BOUREM ML-PRRE-62458-CW-DIR / Equipement de 7 nouveaux forages positifs Q ≥ 5 M3 Component 1: Passation de pour 3shva /H SHVA dans la Rehabilitation of local public En attente 2018-05- 2018-05- 2018-06- 2018-12- IDA / H9010 A posteriori marché de gré à Direct 248,000.00 0.00 commune de BAMBA 4 SHVA infrastructure (US$50 d'exécution 12 17 08 05 gré et 3 FORAGES POSITIFS Q ≥ million equivalent) 1 M3/H POUR PMH dans la commune de BOUREM CW-REF 40 / Equipement 1 forage positif Q ≥ 5 M3/H Component 1: pour AES dans la commune Rehabilitation of local public Single Stage - One 2018-01- 2018-03- 2018-09- de GABERO et 5 Forages IDA / H9010 A posteriori Demande de prix Open - National 155,000.00 0.00 Annulé infrastructure (US$50 Envelope 10 07 03 positifs Q ≥ 1 M3/H pour 5 million equivalent) PMH dans la commune de ANCHAWADJ ML-PRRE-62462-CW-DIR / Equipement 1 forage positif Component 1: Q ≥ 5 M3/H pour AES dans Passation de Rehabilitation of local public En attente 2018-05- 2018-05- 2018-06- 2018-12- la commune de GABERO et IDA / H9010 A posteriori marché de gré à Direct 204,000.00 0.00 infrastructure (US$50 d'exécution 14 19 23 20 5 Forages positifs Q ≥ 1 gré million equivalent) M3/H pour 5 PMH dans la commune de ANCHAWADJ CW-REF 41 / Equipement 4 forages positifs AVEC Q ≥ 5 Component 1: M3/H POUR 02 AES Rehabilitation of local public Single Stage - One 2018-01- 2018-03- 2018-09- (THIRISSORO BAGOUDJIE) ET IDA / H9010 A posteriori Demande de prix Open - National 312,000.00 0.00 Annulé infrastructure (US$50 Envelope 10 07 03 02 SHVA (KOSSEYE WABARIA million equivalent) DANS LA COMMUNE DE GOUNZOUREYE ML-PRRE-62463-CW-DIR / Equipement 4 forages Component 1: positifs AVEC Q 5 M3/H Passation de Rehabilitation of local public En attente 2018-05- 2018-05- 2018-06- 2018-12- POUR 02 AES THIRISSORO IDA / H9010 A posteriori marché de gré à Direct 352,000.00 0.00 infrastructure (US$50 d'exécution 14 19 23 20 BAGOUDJIE ET 02 SHVA gré million equivalent) KOSSEYE WABARIA DANS LA COMMUNE DE GOUNZOUREYE CW-REF 42 / EQUIPEMENT Component 1: DE 03 FORAGES positifs à Rehabilitation of local public Single Stage - One 2018-02- 2018-04- 2018-09- Tidjerwene, Inadhan et IDA / H9010 A posteriori Demande de prix Open - National 24,000.00 0.00 Annulé infrastructure (US$50 Envelope 06 03 30 Inabarin dans la Commune million equivalent) de Tilemsi Cercle de Gao ML-PRRE-62464-CW-DIR / Component 1: EQUIPEMENT DE 03 Passation de Rehabilitation of local public En attente 2018-05- 2018-05- 2018-06- 2018-12- FORAGES positifs à IDA / H9010 A posteriori marché de gré à Direct 96,000.00 0.00 infrastructure (US$50 d'exécution 15 17 15 12 Tidjerwene, Inadhan et gré million equivalent) Inabarin dans la Commune de Tilemsi Cercle de Gao ML-PRRE-62465-CW-DIR / Amenagement DE 12 PUITS Component 1: Passation de A GRAND DIAMETRE EN Rehabilitation of local public En attente 2018-05- 2018-05- 2018-06- 2018-12- IDA / H9010 A posteriori marché de gré à Direct 144,000.00 0.00 PUITS AVEC PMH DANS LA infrastructure (US$50 d'exécution 15 17 15 12 gré COMMUNE DE SONY ALIBER million equivalent) - Cercle de Gao ML-PRRE-62468-CW-RFQ / Construction de 4000 m/l de Component 1: caniveaux et de collecteur Rehabilitation of local public Single Stage - One En attente 2018-01- 2018-03- 2018-09- dans la Commune urbaine IDA / H9010 A posteriori Demande de prix Open - National 514,000.00 0.00 infrastructure (US$50 Envelope d'exécution 10 07 03 de Gao (Quartiers Château million equivalent) Sud-extension, Château, Est et Djidara) CW-REF 46 / Construction Component 1: Single Stage - One 2018-12- 2019-01- 2019-07- de la gare routière de IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 400,000.00 0.00 Annulé Envelope 06 31 30 Douentza - (Mopti) infrastructure (US$50 million equivalent) Page 3 ML-PRRE-62469-CW-RFQ / Component 1: Single Stage - One En attente 2018-05- 2018-06- 2018-12- Construction de la gare IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 980,000.00 0.00 Envelope d'exécution 14 26 23 routière de Douentza infrastructure (US$50 million equivalent) CW-REF 47 / Aménagement Component 1: d'un débarcadère et de 400 Rehabilitation of local public Single Stage - One 2018-12- 2019-01- 2019-07- IDA / H9010 A posteriori Demande de prix Open - National 232,000.00 0.00 Annulé mètres de caniveaux à infrastructure (US$50 Envelope 06 31 30 Youwarou Ouro million equivalent) ML-PRRE-62470-CW-RFQ / Component 1: Réalisation d'un débarcadère Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- IDA / H9010 A posteriori Demande de prix Open - National 939,189.00 0.00 et de 460 mètres de infrastructure (US$50 Envelope d'exécution 15 25 22 caniveaux à Youwarou Ouro million equivalent) Component 1: CW-REF 48 / Réhabilitation Single Stage - One 1,150,000.0 2018-01- 2018-02- 2018-03- 2018-04- 2018-05- 2018-11- IDA / H9010 Rehabilitation of local public A posteriori Appel d'offres Open - National 0.00 Annulé de la piste N'Gouma Sareféré Envelope 0 30 04 18 17 22 18 infrastructure (US$50 million equivalent) ML-PRRE-62470-CW-RFB / Component 1: Single Stage - One 1,854,500.0 En attente 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2018-12- Réhabilitation de la piste IDA / H9010 Rehabilitation of local public A posteriori Appel d'offres Open - National 0.00 Envelope 0 d'exécution 13 14 04 11 29 26 N'Gouma Sareféré infrastructure (US$50 million equivalent) Component 1: CW-REF 52 / Electrification Single Stage - One 2018-01- 2018-03- 2018-09- IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 570,000.00 0.00 Annulé de la ville de Rharouss Envelope 20 17 13 infrastructure (US$50 million equivalent) CW-REF 54 / Realisation Component 1: d'un forage profond avec Rehabilitation of local public Single Stage - One 2018-03- 2018-05- 2018-11- IDA / H9010 A posteriori Demande de prix Open - National 300,000.00 0.00 Annulé equipement solaire à EGHEID infrastructure (US$50 Envelope 20 15 11 BEDALAN million equivalent) ML-PRRE-62474-CW-RFQ / Component 1: Realisation d'un forage Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- IDA / H9010 A posteriori Demande de prix Open - National 134,070.00 0.00 profond avec equipement infrastructure (US$50 Envelope d'exécution 15 27 24 solaire à EGHEID BEDALAN million equivalent) CW-REF 53 / Rehabilitation Component 1: Single Stage - One 2018-03- 2018-05- 2018-11- d'ouvrage de Franchissement IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 840,000.00 0.00 Annulé Envelope 20 15 11 dans la region de Kidal infrastructure (US$50 million equivalent) ML-PRRE-62472-CW-RFQ / Component 1: CONSTRUCTION DE LA Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- DIGUE D'ACCES AU PONT DE IDA / H9010 A posteriori Demande de prix Open - National 335,960.00 0.00 infrastructure (US$50 Envelope d'exécution 14 27 24 ABANCO DANS LE CERCLE DE million equivalent) TIN ESSAKO, REGION DE KIDAL ML-PRRE-62476-CW-RFQ / Component 1: CONSTRUCTION D'UN Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- RADIER SUR L'OUED DE IDA / H9010 A posteriori Demande de prix Open - National 302,640.00 0.00 infrastructure (US$50 Envelope d'exécution 14 26 23 AFFARA DANS LE CERCLE DE million equivalent) TIN ESSAKO, REGION DE KIDAL ML-PRRE-62477-CW-RFQ / Component 1: CONSTRUCTION D'UN Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- RADIER SUR L'OUED DE IDA / H9010 A posteriori Demande de prix Open - National 185,380.00 0.00 infrastructure (US$50 Envelope d'exécution 15 26 23 IBADAKANE DANS LE CERCLE million equivalent) DE KIDAL, REGION DE KIDAL Component 1: CW-REF 58 / Rehabilitation Single Stage - One 2018-03- 2018-05- 2018-11- IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 400,000.00 0.00 Annulé du Lycée d’Ansongo Envelope 20 15 11 infrastructure (US$50 million equivalent) ML-PRRE-62480-CW-RFQ / Component 1: Single Stage - One En attente 2018-05- 2018-06- 2018-12- Rehabilitation du csref IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 194,829.00 0.00 Envelope d'exécution 14 25 22 d'Ansongo infrastructure (US$50 million equivalent) Component 1: CW-REF 57 / Rehabilitation Single Stage - One 2018-03- 2018-05- 2018-11- IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 500,000.00 0.00 Annulé du Lycée d’Ansongo Envelope 20 15 11 infrastructure (US$50 million equivalent) ML-PRRE-62481-CW-RFQ / Component 1: Single Stage - One En attente 2018-05- 2018-06- 2018-12- Rehabilitation du Lycée IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 612,068.00 0.00 Envelope d'exécution 17 29 26 d'Ansongo infrastructure (US$50 million equivalent) CW-REF 59 / Construction Component 1: Single Stage - One 2018-03- 2018-05- 2018-11- de la maison des Arts IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 400,000.00 0.00 Annulé Envelope 20 15 11 d'Ansongo infrastructure (US$50 million equivalent) ML-PRRE-62482-CW-RFQ / Component 1: Single Stage - One En attente 2018-05- 2018-06- 2018-12- Construction de la maison IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 712,943.00 0.00 Envelope d'exécution 17 29 26 des Arts d'Ansongo infrastructure (US$50 million equivalent) ML-PRRE-62479-CW-RFQ / Component 1: CONSTRUCTION D'UN Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- RADIER SUR L'OUED DE IDA / H9010 A posteriori Demande de prix Open - National 335,340.00 0.00 infrastructure (US$50 Envelope d'exécution 29 29 26 TAGHILIT DANS LE CERCLE million equivalent) DE TIN ESSAKO, REGION DE KIDAL ML-PRRE-62478-CW-RFQ / Component 1: CONSTRUCTION D'UN Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- RADIER SUR L'OUED DE IDA / H9010 A posteriori Demande de prix Open - National 212,140.00 0.00 infrastructure (US$50 Envelope d'exécution 14 28 25 EGHACHAR SADDIDEN DANS million equivalent) LE CERCLE DE KIDAL, REGION DE KIDAL ML-PRRE-62472-CW-RFB / Electrification de la ville de Rharouss par systèmes Component 1: hybrides (solaire PV- Rehabilitation of local public Single Stage - One 2,670,000.0 En attente 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2018-12- IDA / H9010 A posteriori Appel d'offres Open - National 0.00 thermique diesel), réseau de infrastructure (US$50 Envelope 0 d'exécution 13 14 04 11 28 25 distribution et branchements million equivalent) de la localité de Gourma- Rharouss ML-PRRE-64156-CW-RFQ / Component 1: Construction d'un radier sur Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- l'OUED de TAGHILIT dans le IDA / H9010 A posteriori Demande de prix Open - National 335,340.00 0.00 infrastructure (US$50 Envelope d'exécution 29 29 26 cercle de Tin ESSAKO région million equivalent) de Kidal ML-PRRE-67740-CW-RFQ / Réalisation de 5 clotures de périmètres maraichers 100m Component 2: Support to Single Stage - One En attente 2018-06- 2018-07- 2018-10- IDA / H9010 A posteriori Demande de prix Open - National 188,460.00 0.00 x100m et 3 maisons productive investments Envelope d'exécution 25 23 21 d'artisan àAnderaboucane Alata Tindermane à Menaka ML-PRRE-67741-CW-DIR / Construction de deux Passation de etables embouche bovine Component 2: Support to En attente 2018-06- 2018-07- 2018-07- 2018-10- IDA / H9010 A posteriori marché de gré à Direct 28,841.00 0.00 dans les communes de productive investments d'exécution 25 02 09 07 gré Telminac Fatelkairou et Sinjitugu de Moribougou à Niono ML-PRRE-67742-CW-DIR / Réalisation (07) SHVA dans les villages de Allaye Hamboye, Sikèrè Tamba, Component 1: Wailoubèrè Zoumane, Pèhè, Passation de Rehabilitation of local public En attente 2018-06- 2018-06- 2018-07- 2018-10- Boulel, Madougou et IDA / H9010 A posteriori marché de gré à Direct 227,590.00 0.00 infrastructure (US$50 d'exécution 25 27 13 11 Magnalé/commune de gré million equivalent) Nampalari et de (01) mini AES dans le village Massarazana commune de Sokolo dans le cercle de Niono ML-PRRE-101788-CW-RFQ Component 1: Single Stage - One En attente 2019-02- 2019-03- 2019-08- / Electrification de la ville de IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 900,000.00 0.00 Envelope d'exécution 28 29 26 Rharous réseaux H, BT et EP infrastructure (US$50 million equivalent) ML-PRRE-105410-CW-RFQ Component 1: / Collecteurs Gao 2000 m + Rehabilitation of local public Single Stage - One En attente 2019-04- 2019-06- 2019-10- IDA / D3730 A posteriori Demande de prix Open - National 754,715.00 0.00 Réhabilitation Quai Fluvial de infrastructure (US$50 Envelope d'exécution 20 01 29 Gao million equivalent) ML-PRRE-105413-CW-DIR / Réalisation d'ouvrages Component 1: Passation de supplémentaires pour Rehabilitation of local public En attente 2019-05- 2019-05- 2019-05- 2019-09- IDA / D3730 A posteriori marché de gré à Direct 377,358.00 0.00 l'amélioration du niveau de infrastructure (US$50 d'exécution 02 07 28 25 gré service de la piste N'Gouma million equivalent) - Saraféré ML-PRRE-105443-CW-RFQ / Aménagement d'un Component 2: Support to Single Stage - One En attente 2019-04- 2019-06- 2019-10- IDA / D3730 A posteriori Demande de prix Open - National 204,000.00 0.00 Périmètre Irrigué Villageois productive investments Envelope d'exécution 24 05 03 de 15 Ha à Tondibi ML-PRRE-105444-CW-RFQ Component 2: Support to Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Réalisation d'étang IDA / D3730 A posteriori Demande de prix Open - National 34,000.00 0.00 productive investments Envelope d'exécution 27 08 06 piscicole de 15*20 à TEMERA ML-PRRE-105445-CW-RFQ Component 2: Support to Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Aménagement de 04 IDA / D3730 A posteriori Demande de prix Open - National 192,000.00 0.00 productive investments Envelope d'exécution 22 03 01 étangs piscicoles à Douentza Page 4 ML-PRRE-105446-CW-RFQ / Aménagement de 3 PIV (70 Component 2: Support to Single Stage - One En attente 2019-04- 2019-06- 2019-10- IDA / D3730 A posteriori Demande de prix Open - National 294,000.00 0.00 ha) et d'une bourgoutière productive investments Envelope d'exécution 23 04 02 (10 ha) dans le cercle de Douentza ML-PRRE-105447-CW-RFQ Component 2: Support to Single Stage - One En attente 2019-05- 2019-06- 2019-10- / Aménagement de 05 PIV IDA / D3730 A posteriori Demande de prix Open - National 300,000.00 0.00 productive investments Envelope d'exécution 07 18 16 (100 ha) à Tonka ML-PRRE-105448-CW-RFQ Component 2: Support to Single Stage - One En attente 2019-05- 2019-06- 2019-10- / Aménagement de 04 PIV IDA / D3730 A posteriori Demande de prix Open - National 240,000.00 0.00 productive investments Envelope d'exécution 07 18 16 (80 ha) à Douekire ML-PRRE-105449-CW-RFQ / Réhabilitation de 2 PIV Component 2: Support to Single Stage - One En attente 2019-04- 2019-06- 2019-10- IDA / D3730 A posteriori Demande de prix Open - National 170,993.00 0.00 (34,90 ha) et réalisation d'un productive investments Envelope d'exécution 26 07 05 étang piscicole de 15*20 à Banikane ML-PRRE-105451-CW-RFQ Component 2: Support to Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Réalisation d'étang IDA / D3730 A posteriori Demande de prix Open - National 34,800.00 0.00 productive investments Envelope d'exécution 29 10 08 piscicole de 15x20 à Agoufou ML-PRRE-105452-CW-RFQ Component 2: Support to Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Réhabilitation de 3 PIV IDA / D3730 A posteriori Demande de prix Open - National 206,816.00 0.00 productive investments Envelope d'exécution 27 08 06 (52,20 ha) à Hamzakoma ML-PRRE-105453-CW-RFQ Component 2: Support to Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Réhabilitation de 2 PIV IDA / D3730 A posteriori Demande de prix Open - National 191,348.00 0.00 productive investments Envelope d'exécution 23 04 02 (26,83 ha) à Haribomo ML-PRRE-105455-CW-RFQ / Réhabilitation de 2 PIV Component 2: Support to Single Stage - One En attente 2019-04- 2019-06- 2019-10- (27,54 ha) et aménagement IDA / D3730 A posteriori Demande de prix Open - National 188,109.00 0.00 productive investments Envelope d'exécution 22 03 01 d'une bourgoutière (24 ha) à Rharous ML-PRRE-105456-CW-RFQ / Réhabilitation de 2 PIV Component 2: Support to Single Stage - One En attente 2019-04- 2019-06- 2019-10- IDA / D3730 A posteriori Demande de prix Open - National 167,682.00 0.00 (28,27 ha) et aménagement productive investments Envelope d'exécution 23 04 02 d'une bourgoutière (10 ha) à Séréré ML-PRRE-105457-CW-RFQ / Réhabilitation de PIV de Component 2: Support to Single Stage - One En attente 2019-04- 2019-06- 2019-09- IDA / D3730 A posteriori Demande de prix Open - National 58,367.00 0.00 17,5 ha à Tassakane dans la productive investments Envelope d'exécution 20 01 29 commune de Alafia ML-PRRE-105458-CW-RFQ / Réhabilitation de PIV de Component 2: Support to Single Stage - One En attente 2019-04- 2019-06- 2019-10- IDA / D3730 A posteriori Demande de prix Open - National 57,498.00 0.00 13,5 ha à Saré Keyna dans la productive investments Envelope d'exécution 24 05 03 commune de Tombouctou ML-PRRE-105459-CW-RFQ / Aménagement de 6 Component 2: Support to Single Stage - One En attente 2019-05- 2019-07- 2019-10- IDA / D3730 A posteriori Demande de prix Open - National 371,700.00 0.00 périmètres rizicoles de 30 ha productive investments Envelope d'exécution 20 01 29 chacun à Andéramboukane ML-PRRE-101783-CW-RFQ Component 1: / Electrification de la ville de Rehabilitation of local public Single Stage - One En attente 2019-05- 2019-06- 2019-10- IDA / H9010 A posteriori Demande de prix Open - National 610,460.00 0.00 Rharous Centrale thermique infrastructure (US$50 Envelope d'exécution 13 08 06 et bâtiment exploitant million equivalent) ML-PRRE-113918-CW-RFB Component 1: Single Stage - One 1,159,453.0 En attente 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-12- / Electrification de la ville de IDA / H9010 Rehabilitation of local public A posteriori Appel d'offres Open - National 0.00 Envelope 0 d'exécution 08 09 30 06 20 17 Rharous (Réseau HT et BT) infrastructure (US$50 million equivalent) ML-PRRE-101789-CW-RFQ Component 1: / Electrification de la ville de Rehabilitation of local public Single Stage - One En attente 2019-05- 2019-06- 2019-11- IDA / H9010 A posteriori Demande de prix Open - National 815,552.00 0.00 Rharous Centrale infrastructure (US$50 Envelope d'exécution 19 24 21 photovoltaïque million equivalent) ML-PRRE-113934-CW-RFQ Component 1: / Electrification de la ville de Rehabilitation of local public Single Stage - One En attente 2019-05- 2019-06- 2019-12- Rharous (Travaux IDA / H9010 A posteriori Demande de prix Open - National 868,347.00 0.00 infrastructure (US$50 Envelope d'exécution 09 10 07 d'installation des million equivalent) équipements d'hybridation) ML-PRRE-125663-CW-RFQ Component 1: Passation de En attente 2019-08- 2019-08- 2019-08- 2019-12- / Achèvement des Caniveaux IDA / D3730 Rehabilitation of local public A posteriori marché de gré à Direct 52,000.00 0.00 d'exécution 02 05 24 22 de Youwarou infrastructure (US$50 gré million equivalent) ML-PRRE-146999-CW-RFQ Component 1: / Travaux de construction Rehabilitation of local public Single Stage - One En attente 2019-12- 2020-01- 2020-06- d'un collecteur dans la IDA / H9010 A posteriori Demande de prix Open - National 574,000.00 0.00 infrastructure (US$50 Envelope d'exécution 05 09 07 commune urbaine de Gao du million equivalent) PK 1+3711 au PK 2+075 (704ml) ML-PRRE-147002-CW-RFQ Component 1: / Travaux de construction Rehabilitation of local public Single Stage - One En attente 2019-11- 2020-01- 2020-06- d'un collecteur dans la IDA / H9010 A posteriori Demande de prix Open - National 692,250.00 0.00 infrastructure (US$50 Envelope d'exécution 30 19 17 commune urbaine de Gao du million equivalent) PK 2+075 au PK 3+060 (985ml) ML-PRRE-147004-CW-RFQ Component 1: / Ouvrages de Rehabilitation of local public Single Stage - One En attente 2019-12- 2020-01- 2020-06- IDA / H9010 A posteriori Demande de prix Open - National 267,200.00 0.00 franchissement sur infrastructure (US$50 Envelope d'exécution 02 22 20 collecteurs dans la million equivalent) Commune Urbaine de Gao ML-PRRE-147006-CW-RFQ / RÉALISATION D’UN FORAGE PRODUCTIF À DÉBIT ≥ 5M3/H DANS UN RAYON DE 1,5 À 2 KM DU SITE Component 1: ÉQUIPÉ DE POMPE SOLAIRE Rehabilitation of local public Single Stage - One En attente 2019-12- 2020-01- 2020-04- IDA / H9010 A posteriori Demande de prix Open - National 70,000.00 0.00 ET RACCORDEMENT AU infrastructure (US$50 Envelope d'exécution 02 22 21 CHÂTEAU D’EAU DU CSCOM million equivalent) DE LERNEB POUR SON ALIMENTATION EN EAU POTABLE DANS LA COMMUNE TILEMSI, CERCLE DE GOUNDAM. ML-PRRE-105405-CW-RFQ Component 1: ADD / Pavage de la voie Rehabilitation of local public Single Stage - One 2020-01- 2020-03- 2020-07- IDA / D3730 A posteriori Demande de prix Open - National 60,000.00 0.00 Annulé d'accès de la route nationale infrastructure (US$50 Envelope 30 12 10 au Port de Konna million equivalent) ML-PRRE-105412-CW-RFQ Component 1: Single Stage - One En attente 2020-02- 2020-03- 2020-07- / Réalisation d'une IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 500,000.00 0.00 Envelope d'exécution 15 29 27 Adduction d'eau Potable à infrastructure (US$50 Tonka million equivalent) ML-PRRE-105414-CW-RFQ Component 1: Single Stage - One En attente 2020-02- 2020-04- 2020-08- / Construction château d'eau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 50,000.00 0.00 Envelope d'exécution 21 03 01 au CSREF de Dire infrastructure (US$50 million equivalent) ML-PRRE-105415-CW-RFQ / Réalisation du réseau de Component 1: distribution pour 02 AES à Rehabilitation of local public Single Stage - One En attente 2020-02- 2020-04- 2020-10- IDA / D3730 A posteriori Demande de prix Open - National 294,545.00 0.00 Kosseye et Wabaria et infrastructure (US$50 Envelope d'exécution 25 07 04 Réalisation des million equivalent) infrastructures pour l'AES de Bazi Gourma ML-PRRE-105416-CW-RFQ Component 1: / Réalisation d'une AES (4 BF) Rehabilitation of local public Single Stage - One En attente 2020-02- 2020-04- 2020-08- IDA / D3730 A posteriori Demande de prix Open - National 100,000.00 0.00 à Seke (Commune de infrastructure (US$50 Envelope d'exécution 25 07 05 Fittouga, Cercle de Niafunké) million equivalent) ML-PRRE-105417-CW-RFQ Component 1: Single Stage - One En attente 2020-03- 2020-04- 2020-08- / Renforcement du réseau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 450,000.00 0.00 Envelope d'exécution 02 13 11 d'adduction d'eau de Ménaka infrastructure (US$50 million equivalent) ML-PRRE-105419-CW-RFQ Component 1: Single Stage - One En attente 2020-02- 2020-04- 2020-08- / Réhabilitation du CSREF de IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 700,000.00 0.00 Envelope d'exécution 21 03 01 Ménaka infrastructure (US$50 million equivalent) ML-PRRE-153327-CW-RFQ Component 1: Single Stage - One En attente 2020-02- 2020-03- 2020-07- / Réalisation de points d’eau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 200,000.00 0.00 Envelope d'exécution 16 27 25 à Ber (4 SHVA ) infrastructure (US$50 million equivalent) ML-PRRE-153328-CW-RFQ Component 1: Single Stage - One En attente 2020-05- 2020-06- 2020-10- / Réalisation de 100 IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 200,000.00 0.00 Envelope d'exécution 03 09 07 lampadaires à Douentza infrastructure (US$50 CW-Ref 15 million equivalent) ML-PRRE-153329-CW-RFB Component 1: / Réhabilitation du réseau Rehabilitation of local public Single Stage - One 3,000,000.0 En attente 2020-02- 2020-02- 2020-03- 2020-03- 2020-04- 2020-10- routier de Gao ville, en lien IDA / D3730 A posteriori Appel d'offres Open - National 0.00 infrastructure (US$50 Envelope 0 d'exécution 04 07 08 18 16 13 avec les activités de million equivalent) réalisation de caniveaux ML-PRRE-153330-CW-RFQ Component 1: Single Stage - One En attente 2020-03- 2020-05- 2020-10- / Réalisation de 2000ml de IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 600,000.00 0.00 Envelope d'exécution 25 20 17 caniveaux à Douentza infrastructure (US$50 million equivalent) Page 5 ML-PRRE-153331-CW-RFQ Component 1: / Réalisation de réservoir de Rehabilitation of local public Single Stage - One En attente 2020-04- 2020-06- 2020-10- transit, station de pompage IDA / D3730 A posteriori Demande de prix Open - National 300,000.00 0.00 infrastructure (US$50 Envelope d'exécution 23 20 18 et réseau de transport d'eau million equivalent) potable à Taoudeni ML-PRRE-153332-CW-RFQ Component 1: Single Stage - One En attente 2020-04- 2020-05- 2020-09- / Réalisation infrastructures IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 320,000.00 0.00 Envelope d'exécution 03 23 20 de santé à Taoudeni infrastructure (US$50 million equivalent) ML-PRRE-153333-CW-RFQ Component 1: Single Stage - One En attente 2020-04- 2020-05- 2020-09- / Réalisation infrastructures IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 120,000.00 0.00 Envelope d'exécution 11 30 27 scolaires à Taoudeni infrastructure (US$50 million equivalent) ML-PRRE-153623-CW-RFQ Component 1: / Réhabilitation PIV de Rehabilitation of local public Single Stage - One En attente 2020-02- 2020-04- 2020-10- Sindiwara (Protection de la IDA / D3730 A posteriori Demande de prix Open - National 900,000.00 0.00 infrastructure (US$50 Envelope d'exécution 22 18 15 berge du fleuve au droit du million equivalent) PIV) ML-PRRE-105441-CW-RFQ / Aménagement de 08 Component 2: Support to Single Stage - One En attente 2020-03- 2020-04- 2020-08- IDA / D3730 A posteriori Demande de prix Open - National 384,000.00 0.00 étangs piscicoles dans la productive investments Envelope d'exécution 12 23 21 commune de Konna ML-PRRE-105442-CW-RFQ / Aménagement de 03 ha et Component 2: Support to Single Stage - One En attente 2020-03- 2020-04- 2020-08- IDA / D3730 A posteriori Demande de prix Open - National 398,000.00 0.00 construction de 60 magasins productive investments Envelope d'exécution 12 23 21 pour le marché de Konna ML-PRRE-153679-CW-RFQ Component 2: Support to Single Stage - One En attente 2020-02- 2020-04- 2020-08- / Réhabilitation de la digue IDA / D3730 A posteriori Demande de prix Open - National 990,000.00 0.00 productive investments Envelope d'exécution 08 04 02 de ceinture du PIV de Sindiwara ML-PRRE-153684-CW-RFQ / Réalisation station de Component 2: Support to Single Stage - One En attente 2020-02- 2020-03- 2020-07- IDA / D3730 A posteriori Demande de prix Open - National 350,000.00 0.00 pompage du PIV de productive investments Envelope d'exécution 04 31 29 Sindiwara u ML-PRRE-153689-CW-RFQ / Réalisation Réseau Component 2: Support to Single Stage - One En attente 2020-02- 2020-04- 2020-08- principal d'irrigation (Canal IDA / D3730 A posteriori Demande de prix Open - National 920,000.00 0.00 productive investments Envelope d'exécution 09 05 03 Principal et les canaux secondaires) du PIV de Sindiwara ML-PRRE-153695-CW-RFQ / Réalisation Réseau Component 2: Support to Single Stage - One En attente 2020-02- 2020-04- 2020-07- IDA / D3730 A posteriori Demande de prix Open - National 870,000.00 0.00 Tertiaire d'irrigation et productive investments Envelope d'exécution 13 02 31 Drains dPIV de Sindiwara u ML-PRRE-153894-CW-RFQ / Aménagement d'un site de Component 2: Support to Single Stage - One En attente 2020-03- 2020-04- 2020-08- périmètre maraîcher de 25 IDA / D3730 A posteriori Demande de prix Open - National 500,000.00 0.00 productive investments Envelope d'exécution 01 12 10 ha contigu à la plaine de Sindiwara ML-PRRE-153900-CW-RFQ / Construction d'un (1) magasin de conservation de Component 2: Support to Single Stage - One En attente 2020-02- 2020-04- 2020-08- 30 tonnes et d'un (1) Centre IDA / D3730 A posteriori Demande de prix Open - National 200,000.00 0.00 productive investments Envelope d'exécution 19 15 13 de transformation (des produits horticoles pour les exploitants des PM) ML-PRRE-153898-CW-RFQ / Construction de 1 Magasin Component 2: Support to Single Stage - One En attente 2020-03- 2020-04- 2020-06- IDA / D3730 A posteriori Demande de prix Open - National 60,000.00 0.00 de stockage de 30 tonnes productive investments Envelope d'exécution 07 04 03 pour les exploitants de Sindiwara ML-PRRE-105406-CW-RFQ Component 1: / Construction d'un Centre Rehabilitation of local public Single Stage - One En attente 2020-03- 2020-05- 2020-09- IDA / D3730 A posteriori Demande de prix Open - National 110,000.00 0.00 de Développement de la infrastructure (US$50 Envelope d'exécution 30 12 09 Petite Enfance à KONNA million equivalent) ML-PRRE-105407-CW-RFQ Component 1: Single Stage - One En attente 2020-03- 2020-05- 2020-08- / Réhabilitation de la maison IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 205,000.00 0.00 Envelope d'exécution 30 13 11 des jeunes de Konna infrastructure (US$50 million equivalent) ML-PRRE-105408-CW-RFQ Component 1: Single Stage - One En attente 2020-04- 2020-05- 2020-10- / Construction d'un IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 290,000.00 0.00 Envelope d'exécution 02 15 12 complexe sportif de Konna infrastructure (US$50 million equivalent) ML-PRRE-176039-CW-DIR Component 1: Passation de 3,800,000.0 En attente 2020-05- 2020-05- 2020-06- 2020-10- / Construction d'une route IDA / D3730 Rehabilitation of local public A posteriori marché de gré à Direct 0.00 0 d'exécution 29 31 19 17 2x2 voies dans la ville de infrastructure (US$50 gré Gao million equivalent) ML-PRRE-176199-CW-RFQ Component 1: Single Stage - One En attente 2020-05- 2020-07- 2020-09- / Achevement de la gare IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 280,000.00 0.00 Envelope d'exécution 31 02 30 routière de Douentza infrastructure (US$50 million equivalent) ML-PRRE-176201-CW-RFQ Component 1: Single Stage - One En attente 2020-07- 2020-08- 2020-11- / Réalisation d'un forage IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 80,000.00 0.00 Envelope d'exécution 10 14 12 équipé de château d'eau infrastructure (US$50 million equivalent) ML-PRRE-179775-CW-RFQ Component 1: / Installation de 150 Rehabilitation of local public Single Stage - One En attente 2020-07- 2020-08- 2020-10- IDA / H9010 A posteriori Demande de prix Open - National 120,000.00 0.00 lampadaires pour l'éclairage infrastructure (US$50 Envelope d'exécution 14 13 12 public à Gourma rarhous million equivalent) ML-PRRE-184274-CW-DIR Passation de Component 2: Support to En attente 2020-07- 2020-07- 2020-08- 2020-11- / Réalisation de 5ha de IDA / D3730 A posteriori marché de gré à Direct 400,000.00 0.00 productive investments d'exécution 14 16 04 02 palmier dattiers à Taoudéni gré ML-PRRE-184276-CW-DIR Passation de Component 2: Support to En attente 2020-07- 2020-07- 2020-08- 2020-10- / Réalisation du Périmètre IDA / D3730 A posteriori marché de gré à Direct 959,804.00 0.00 productive investments d'exécution 14 17 01 30 maraîcher d’Ansongo (53 ha) gré ML-PRRE-153902-CW-RFQ / Aménagement de 10 ha de Component 2: Support to Single Stage - One 2020-02- 2020-03- 2020-06- IDA / D3730 A posteriori Demande de prix Open - National 80,000.00 0.00 Annulé palmeraie à titre productive investments Envelope 15 28 26 expérimental à Taoudenit ML-PRRE-186433-CW-DIR / réalisation du volet Passation de Aménagement Agronomique Component 2: Support to En attente 2020-08- 2020-08- 2020-08- 2020-11- IDA / D3730 A posteriori marché de gré à Direct 140,000.00 0.00 du Périmètre palmiers productive investments d'exécution 01 04 13 11 gré dattiers dans la zone d’agricole de Taoudénit. ML-PRRE-186437-CW-RFQ Component 1: / Réalisation de 978 ml de Rehabilitation of local public Single Stage - One En attente 2020-08- 2020-08- 2020-11- IDA / D3730 A posteriori Demande de prix Open - National 990,000.00 0.00 collecteur de la mare nord infrastructure (US$50 Envelope d'exécution 02 25 23 le long de la nationale million equivalent) ML-PRRE-186442-CW-RFQ Component 1: / Réalisation de 312 ml de Rehabilitation of local public Single Stage - One En attente 2020-08- 2020-08- 2020-11- Collecteur de la mare Nord IDA / D3730 A posteriori Demande de prix Open - National 467,500.00 0.00 infrastructure (US$50 Envelope d'exécution 03 26 24 des amorces de caniveaux et million equivalent) du Dalot sur la RN6 ML-PRRE-186444-CW-RFQ Component 1: Single Stage - One En attente 2020-08- 2020-08- 2020-11- / Surcreusement de la marre IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 414,000.00 0.00 Envelope d'exécution 03 25 23 Nord à Ansongo infrastructure (US$50 million equivalent) ML-PRRE-210541-CW-RFQ Component 1: / Réalisation infrastructure Rehabilitation of local public Single Stage - One En attente 2020-12- 2021-02- 2021-04- IDA / D3730 A posteriori Demande de prix Open - National 560,000.00 0.00 hydraulique à Taoudenit infrastructure (US$50 Envelope d'exécution 30 02 03 (phase 1) million equivalent) ML-PRRE-210918-CW-DIR Passation de / Réparation de 15 cages Component 2: Support to En attente 2020-12- 2021-01- 2021-01- 2021-03- IDA / D3730 A posteriori marché de gré à Direct 15,600.00 0.00 flottantes pour la zone de productive investments d'exécution 31 02 22 23 gré KONNA GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GO-REF 1 / Equipements Component 1: des écoles du cercle de Rehabilitation of local public Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 200,000.00 0.00 Douentza (15 SDC et 5 infrastructure (US$50 Envelope d'exécution 20 15 14 Bureaux -Magasins) million equivalent) GO-REF 2 / Equipements Component 1: des écoles du cercle de Rehabilitation of local public Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 160,000.00 0.00 Youwarou (12 SDC et 05 infrastructure (US$50 Envelope d'exécution 20 15 14 Bureaux -Magasins) million equivalent) Page 6 GO-REF 3 / Equipement Component 1: pour le CSCOM de eguedech Rehabilitation of local public Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 80,000.00 0.00 Commune de Bamba, Cercle infrastructure (US$50 Envelope d'exécution 20 15 14 de Bourem, Région de Gao million equivalent) GO-REF 4 / Equipements Component 1: pour le CSCOM de Niasso et Rehabilitation of local public Single Stage - One En attente 2017-12- 2018-02- 2018-08- de Diondiori / Commune de IDA / H9010 A posteriori Demande de prix Open - National 100,000.00 0.00 infrastructure (US$50 Envelope d'exécution 15 09 08 Diondiori/ Cercle de million equivalent) Tenenkou GO-REF 5 / Equipements Component 1: Single Stage - One En attente 2018-01- 2018-03- 2018-09- pour le CSCOM à Tondidarou IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 120,000.00 0.00 Envelope d'exécution 20 17 13 dans le cercle de Niafunké. infrastructure (US$50 million equivalent) GO-REF 6 / Equipements Component 1: Single Stage - One En attente 2018-01- 2018-03- 2018-09- pour l'intitut de Formation IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 490,000.00 0.00 Envelope d'exécution 20 17 13 Professionnel (IFP) de Diré infrastructure (US$50 million equivalent) GO-REF 7 / Equipements Component 1: pour une école dans les Rehabilitation of local public Single Stage - One En attente 2017-10- 2017-11- 2018-05- communes de Diabaly de IDA / H9010 A posteriori Demande de prix Open - National 11,000.00 0.00 infrastructure (US$50 Envelope d'exécution 05 30 29 l'académie d'enseignement million equivalent) de Ségou, CAP de Niono GO-REF 9 / Equipements pour une école dans la Component 1: commune de Siribala, et Rehabilitation of local public Single Stage - One En attente 2017-10- 2017-11- 2018-05- deux écoles dans la IDA / H9010 A posteriori Demande de prix Open - National 33,000.00 0.00 infrastructure (US$50 Envelope d'exécution 05 30 29 commune de Sirifila Boundy , million equivalent) de l'académie d'enseignement de Ségou, CAP de Niono GO-REF 10 / Equipements pour un CSCOM dans la cmmune de Sokolo, Component 1: équipement une salle Rehabilitation of local public Single Stage - One En attente 2017-10- 2017-12- 2018-05- IDA / H9010 A posteriori Demande de prix Open - National 110,000.00 0.00 d’observation des malades infrastructure (US$50 Envelope d'exécution 07 02 31 et d'un magasin pour un million equivalent) CSCOM dans la commune de Torridagako GO-REF 11 / Equipements Component 1: pour les écoles de Rehabilitation of local public Single Stage - One En attente 2017-10- 2017-12- 2018-05- IDA / H9010 A posteriori Demande de prix Open - National 88,000.00 0.00 l'académie d'enseignement infrastructure (US$50 Envelope d'exécution 07 02 31 de Tombouctou, CAP de million equivalent) Diré,. GO-REF 12 / Equipements Component 1: pour les écoles de Rehabilitation of local public Single Stage - One En attente 2017-10- 2017-12- 2018-05- l'académie d'enseignement IDA / H9010 A posteriori Demande de prix Open - National 44,000.00 0.00 infrastructure (US$50 Envelope d'exécution 07 02 31 de Tombouctou, CAP de million equivalent) Goundam, GO-REF 13 / Equipements Component 1: pour les écoles de Rehabilitation of local public Single Stage - One En attente 2017-10- 2017-12- 2018-05- l'académie d'enseignement IDA / H9010 A posteriori Demande de prix Open - National 55,000.00 0.00 infrastructure (US$50 Envelope d'exécution 07 02 31 de Tombouctou, CAP de million equivalent) Gourma Rharous, GO-REF 14 / Equipements pour les écoles de Component 1: l'académie d'enseignement Rehabilitation of local public Single Stage - One En attente 2017-10- 2017-12- 2018-05- IDA / H9010 A posteriori Demande de prix Open - National 55,000.00 0.00 de Tombouctou, CAP de infrastructure (US$50 Envelope d'exécution 07 02 31 Niafunké et Leré, dans le million equivalent) cercle de Niafunké. GO-REF 15 / Equipements pour les écoles de Component 1: l'académie d'enseignement Rehabilitation of local public Single Stage - One En attente 2017-10- 2017-12- 2018-05- IDA / H9010 A posteriori Demande de prix Open - National 71,000.00 0.00 de Tombouctou, CAP de infrastructure (US$50 Envelope d'exécution 07 02 31 Tombouctou, dans le cercle million equivalent) de Tombouctou. GO-REF 16 / Equipements pour un CSCOM dans la Component 1: commune de Douékiré, un Rehabilitation of local public Single Stage - One En attente 2017-10- 2017-12- 2018-05- CSCOM dans la commune de IDA / H9010 A posteriori Demande de prix Open - National 240,000.00 0.00 infrastructure (US$50 Envelope d'exécution 07 02 31 Tilemsi, un CSCOM dans la million equivalent) commune de Tin Aicha, dans le cercle de Goundam. GO-REF 17 / Equipementsde la maternité du CSCOM de DAGAFIFO Component 1: dans la commune de Rehabilitation of local public Single Stage - One En attente 2017-10- 2017-12- 2018-05- IDA / H9010 A posteriori Demande de prix Open - National 100,000.00 0.00 Haribomo dans le cercle de infrastructure (US$50 Envelope d'exécution 07 02 31 Gourma Rharous, et un million equivalent) CSCOM dans la commune de Soumpi dans le cercle de Niafunké. GO-REF 18 / Equipement pour cinq (05) unités de Component 2: Support to Single Stage - One En attente 2017-11- 2018-01- 2018-07- IDA / H9010 A posteriori Demande de prix Open - National 70,080.00 0.00 tannerie/maroquinerie dans productive investments Envelope d'exécution 20 15 14 le cercle de Kidal GO-REF 19 / Pose d'équipement d'agricultuere , d'embouche ovine et bovine, de magasin de stockage et de vente de Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- céréale, unité de IDA / H9010 A posteriori Demande de prix Open - National 31,760.00 0.00 productive investments Envelope d'exécution 15 09 08 transformation des produits locaux dans les communes de: Adarmalane,Gargando,TINAI CHA et M'Bouna cercle de Goundam GO-REF 20 / Equipements pour les activités Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- d’embouche, d’artisanat et IDA / H9010 A posteriori Demande de prix Open - National 64,000.00 0.00 productive investments Envelope d'exécution 15 09 08 de commerce dans trois (03) communes du cercle de Goundam. GO-REF 21 / Equipements pour poulailler, atelier de menuiserie bois, magasins de stockage et de vente de céréales, unités de Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 334,000.00 0.00 transformation des produits productive investments Envelope d'exécution 15 09 08 locaux , les activités d’embouche et de savonnerie dans six (06) communes du cercle de Goundam. GO-REF 22 / Equipement et pose de matériels ( Décortiqueuses, Moulins et Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- Moto Pompes) dans les IDA / H9010 A posteriori Demande de prix Open - National 72,000.00 0.00 productive investments Envelope d'exécution 15 09 08 commune de: Ansongo , Bara, Bourra et Talataye , cercle d'Ansongo GO-REF 23 / Equipements et pose de matériels ( équipements de pêche, transformation de pousson Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 48,000.00 0.00 et savonnerie) dans les productive investments Envelope d'exécution 15 09 08 commune de: Tessit, Til hama, Ouatagouna,Ango et Bourra, cercle d'Ansongo GO-REF 24 / Equipements et pose de matériels pour 2 magasins de stockage et 3 Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- maisons d'artisans dans les IDA / H9010 A posteriori Demande de prix Open - National 52,000.00 0.00 productive investments Envelope d'exécution 15 09 08 communes de Ouatagouna, Talataye, Tessit et Tin Hama, cercle d'Ansongo GO-REF 25 / Equipements et pose de matériels pour embouche ovine et bovine Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- IDA / H9010 A posteriori Demande de prix Open - National 26,000.00 0.00 dans les communes de productive investments Envelope d'exécution 15 09 08 Talataye, Tessit et Tin Hama, cercle d'Ansongo GO-REF 26 / Equipements et pose de matériels pour les activités d'aviculture et Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- d'embouche ovine et bovine IDA / H9010 A posteriori Demande de prix Open - National 30,000.00 0.00 productive investments Envelope d'exécution 15 09 08 dans les communes de Ouatagouna, Ansongo, Bara et Bourra, cercle d'Ansongo GO-REF 27 / Equipements et pose de matériels pour embouche ovine et bovine Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- dans les communes de IDA / H9010 A posteriori Demande de prix Open - National 90,000.00 0.00 productive investments Envelope d'exécution 20 14 13 Inekar, Anderamboukane, Alata, Ménaka et Tidermene, cercle de Ménaka Page 7 GO-REF 28 / Equipements et pose de matériels pour (02) maisons d'artisan dans Component 2: Support to Single Stage - One En attente 2017-12- 2018-02- 2018-08- les communes de boukane, IDA / H9010 A posteriori Demande de prix Open - National 30,000.00 0.00 productive investments Envelope d'exécution 20 14 13 Alata, Ménaka et Tidermene, dans les communes de Tindermène et Alata, cercle de Menaka ML-PRRE-62223-GO-RFQ / Component 1: Single Stage - One En attente 2018-05- 2018-06- 2018-12- Equipement CSRéf IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 105,840.00 0.00 Envelope d'exécution 10 28 25 d'Ansongo infrastructure (US$50 million equivalent) ML-PRRE-62445-GO-RFQ / Component 1: Single Stage - One En attente 2018-05- 2018-06- 2018-12- Equipements du Lycée IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 58,830.00 0.00 Envelope d'exécution 14 27 24 d'Ansongo infrastructure (US$50 million equivalent) ML-PRRE-62444-GO-RFQ / Component 1: Single Stage - One En attente 2018-05- 2018-06- 2018-12- Equipements de la maison IDA / H9010 Rehabilitation of local public A posteriori Demande de prix Open - National 74,000.00 0.00 Envelope d'exécution 15 26 23 des arts d'Ansongo infrastructure (US$50 million equivalent) ML-PRRE-62475-GO-RFQ / Equipements pour deux (02) Component 1: écoles dans la commune de Rehabilitation of local public Single Stage - One En attente 2018-05- 2018-06- 2018-12- Niono et une école dans le IDA / H9010 A posteriori Demande de prix Open - National 33,000.00 0.00 infrastructure (US$50 Envelope d'exécution 15 29 26 commune Kala Siguida, de million equivalent) l'académie d'enseignement de Ségou, CAP deNiono ML-PRRE-64155-GO-DIR / Component 1: Passation de En attente 2018-05- 2018-05- 2018-06- 2018-12- Un Bac à perche de 5 tonnes IDA / H9010 Rehabilitation of local public A posteriori marché de gré à Direct 90,000.00 0.00 d'exécution 28 31 14 11 pour SARAFERE infrastructure (US$50 gré million equivalent) ML-PRRE-67738-GO-RFQ / Equipements agricoles et d'embouches (Motoculteurs, Component 2: Support to Single Stage - One En attente 2018-06- 2018-07- 2018-09- batteuses, décortiqueuses, IDA / H9010 A posteriori Demande de prix Open - National 127,960.00 0.00 productive investments Envelope d'exécution 25 23 21 mangeoires et abreuvoirs) dans les sept (07) communes du cercle d'Ansongo. ML-PRRE-67739-GO-RFQ / Equipements d'agriculture, d'embouche, de transport, de pêche et de Component 2: Support to Single Stage - One En attente 2018-06- 2018-07- 2018-09- commercialisation de IDA / H9010 A posteriori Demande de prix Open - National 47,060.00 0.00 productive investments Envelope d'exécution 25 23 21 poissons dans les communes d'Inekar, Anderamboukane, Alata, Ménaka et Tidermene, cercle de Ménaka ML-PRRE-105462-GO-RFQ Component 1: Single Stage - One En attente 2019-04- 2019-06- 2019-09- / Renforcement plateau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 496,132.00 0.00 Envelope d'exécution 20 01 29 technique CSREF D'Ansongo infrastructure (US$50 million equivalent) ML-PRRE-105464-GO-RFQ Component 1: Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Renforcement plateau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 199,594.00 0.00 Envelope d'exécution 27 08 06 technique CSREF Bourem infrastructure (US$50 million equivalent) ML-PRRE-105465-GO-RFQ Component 1: Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Renforcement plateau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 292,776.00 0.00 Envelope d'exécution 27 08 06 technique CSREF Gao infrastructure (US$50 million equivalent) ML-PRRE-105468-GO-RFQ Component 1: Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Renforcement plateau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 224,510.00 0.00 Envelope d'exécution 30 11 09 technique CSREF Douentza infrastructure (US$50 million equivalent) ML-PRRE-105470-GO-RFQ Component 1: Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Renforcement plateau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 157,220.00 0.00 Envelope d'exécution 24 05 03 technique CSREF TENENKOU infrastructure (US$50 million equivalent) ML-PRRE-105471-GO-RFQ Component 1: Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Renforcement plateau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 293,776.00 0.00 Envelope d'exécution 27 08 06 technique CSREF Youwarou infrastructure (US$50 million equivalent) ML-PRRE-105472-GO-RFQ Component 1: Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Renforcement plateau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 247,298.00 0.00 Envelope d'exécution 26 07 05 technique CSREF Diré infrastructure (US$50 million equivalent) ML-PRRE-105474-GO-RFQ Component 1: Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Renforcement plateau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 244,275.00 0.00 Envelope d'exécution 28 09 07 technique CSREF Goundam infrastructure (US$50 million equivalent) ML-PRRE-105476-GO-RFQ Component 1: Single Stage - One En attente 2019-05- 2019-06- 2019-10- / Renforcement plateau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 493,860.00 0.00 Envelope d'exécution 01 12 10 technique CSREF Niafunké infrastructure (US$50 million equivalent) ML-PRRE-105477-GO-RFQ Component 1: / Renforcement plateau Rehabilitation of local public Single Stage - One En attente 2019-05- 2019-06- 2019-10- IDA / D3730 A posteriori Demande de prix Open - National 323,925.00 0.00 technique CSREF Gourma infrastructure (US$50 Envelope d'exécution 04 15 13 Rharous million equivalent) ML-PRRE-105479-GO-RFQ Component 1: Single Stage - One En attente 2019-04- 2019-06- 2019-10- / Renforcement plateau IDA / D3730 Rehabilitation of local public A posteriori Demande de prix Open - National 353,625.00 0.00 Envelope d'exécution 29 10 08 technique CSREF infrastructure (US$50 Tombouctou million equivalent) ML-PRRE-105604-GO-RFQ / Cages flottantes (4 par Component 2: Support to Single Stage - One En attente 2019-05- 2019-07- 2019-10- IDA / D3730 A posteriori Demande de prix Open - National 498,000.00 0.00 village) dans 16 villages de productive investments Envelope d'exécution 20 01 29 la commune de Konna Component 4: Project ML-PRRE-105608-GO-RFQ management, monitoring Single Stage - One En attente 2019-04- 2019-05- 2019-06- IDA / D3730 A posteriori Demande de prix Open - National 22,000.00 0.00 / Fourniture de bureau and evaluation (US$5 million Envelope d'exécution 15 27 26 equivalent) Component 4: Project ML-PRRE-105612-GO-RFQ management, monitoring Single Stage - One En attente 2019-04- 2019-05- 2019-06- / Fourniture de gadgets IDA / D3730 A posteriori Demande de prix Open - National 8,000.00 0.00 and evaluation (US$5 million Envelope d'exécution 10 22 21 publicitaires equivalent) Component 4: Project ML-PRRE-105615-GO-RFQ management, monitoring Single Stage - One En attente 2019-04- 2019-05- 2019-06- IDA / D3730 A posteriori Demande de prix Open - National 8,000.00 0.00 / Fourniture de Tee shirt and evaluation (US$5 million Envelope d'exécution 15 27 26 equivalent) Component 4: Project ML-PRRE-105619-GO-RFQ management, monitoring Single Stage - One En attente 2019-04- 2019-05- 2019-06- / Fournitures Equipements IDA / D3730 A posteriori Demande de prix Open - National 40,000.00 0.00 and evaluation (US$5 million Envelope d'exécution 10 22 21 UCP/AR equivalent) ML-PRRE-105460-GO-RFB Component 1: / Renforcement des plateaux Rehabilitation of local public Single Stage - One En attente 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-10- IDA / D3730 A posteriori Appel d'offres Open - National 850,000.00 0.00 techniques des centres de infrastructure (US$50 Envelope d'exécution 09 12 02 12 29 27 santé de Mopti (KONNA) million equivalent) ML-PRRE-101791-GO-RFQ Component 1: / Equipements Rehabilitation of local public Single Stage - One En attente 2019-05- 2019-06- 2019-10- IDA / H9010 A posteriori Demande de prix Open - National 182,497.00 0.00 d'électrification de la ville de infrastructure (US$50 Envelope d'exécution 20 20 18 Rharous (Transformateurs million equivalent) HT BT) ML-PRRE-114543-GO-RFQ Component 4: Project / Fourniture de Smartphones management, monitoring Single Stage - One En attente 2019-05- 2019-06- 2019-12- IDA / D3730 A posteriori Demande de prix Open - National 3,000.00 0.00 pour le suivi évaluation des and evaluation (US$5 million Envelope d'exécution 14 10 07 activités equivalent) ML-PRRE-125154-GO-RFQ / DOTATION DE 10 CSCOM NIAMBOURGOU LERNEB DAKA FIFO KOKONTO ET Component 1: TONDIDAROU Rehabilitation of local public Single Stage - One En attente 2019-08- 2019-08- 2019-09- IDA / H9010 A posteriori Demande de prix Open - National 20,000.00 0.00 MASSARAZANA DOUENTZA infrastructure (US$50 Envelope d'exécution 03 31 03 5E QUARTIER ET DIAFARABE million equivalent) EUGUEDECH ET TONDIBI EN MEDICAMENTS ESSENTIELS ET CONSOMMABLES ML-PRRE-153909-GO-RFQ / Dotation en équipements Component 2: Support to Single Stage - One En attente 2020-01- 2020-03- 2020-06- IDA / D3730 A posteriori Demande de prix Open - National 20,000.00 0.00 modernes d'exploitation du productive investments Envelope d'exécution 29 18 16 sel à Taoudeni ML-PRRE-153910-GO-RFQ / Dotation des exploitants en equipelment agricoles Component 2: Support to Single Stage - One En attente 2020-02- 2020-04- 2020-05- IDA / D3730 A posteriori Demande de prix Open - National 220,000.00 0.00 Motoculteurs,bateuse ) et en productive investments Envelope d'exécution 29 25 04 matéeirels pour entretien courant du PIV de sindiwara ML-PRRE-153907-GO-RFQ / Equipement du magasin de conservation de 30 tonnes et d'un (1) Centre de Component 2: Support to Single Stage - One En attente 2020-05- 2020-06- 2020-08- IDA / D3730 A posteriori Demande de prix Open - National 180,000.00 0.00 transformation (équipements productive investments Envelope d'exécution 04 29 28 de transformation des produits horticoles) pour les exploitants des PM Page 8 ML-PRRE-105599-GO-RFQ / Dotation de PPIV de 2 motopompes (GMP) adaptées Component 2: Support to Single Stage - One En cours 2020-03- 2020-05- 2020-08- par site sur 4 sites avec IDA / D3730 A posteriori Demande de prix Open - National 290,000.00 0.00 productive investments Envelope d'exécution 29 11 09 formation des beneficiaires des 4 sites et montage sur site ML-PRRE-176204-GO-RFQ / Acquisition et mise à Component 1: disposition de 382 poteaux Passation de Rehabilitation of local public En attente 2020-07- 2020-07- 2020-07- 2020-09- en béton armé (dont 150 à IDA / H9010 A posteriori marché de gré à Direct 120,000.00 0.00 infrastructure (US$50 d'exécution 09 11 26 24 Tombouctou et 232 à gré million equivalent) Rharous pour extension future du réseau) ML-PRRE-184271-GO-RFQ Component 1: / Acquisition d'équipements Rehabilitation of local public Single Stage - One En attente 2020-07- 2020-08- 2020-10- IDA / D3730 A posteriori Demande de prix Open - National 89,640.00 0.00 numériques pour la maison infrastructure (US$50 Envelope d'exécution 15 13 12 des jeunes de Konna million equivalent) ML-PRRE-184272-GO-DIR / Passation de Dotation des pécheurs en Component 2: Support to En attente 2020-07- 2020-07- 2020-08- 2020-09- IDA / D3730 A posteriori marché de gré à Direct 38,000.00 0.00 équipement de pèche dans productive investments d'exécution 14 17 01 30 gré la zone de LONNA ML-PRRE-105606-GO-RFQ Component 2: Support to Single Stage - One 2020-02- 2020-03- 2020-06- / Dotation des pêcheurs en IDA / D3730 A posteriori Demande de prix Open - National 38,000.00 0.00 Annulé productive investments Envelope 05 18 16 équipements de pêche ML-PRRE-184273-GO-DIR / Passation de Dotation en équipements Component 2: Support to En attente 2020-07- 2020-07- 2020-08- 2020-10- IDA / D3730 A posteriori marché de gré à Direct 20,000.00 0.00 modernes d’exploitation de productive investments d'exécution 24 24 23 22 gré sel ML-PRRE-184269-GO-RFQ Component 1: / Dotation d'équipements Rehabilitation of local public Single Stage - One En attente 2020-12- 2021-01- 2021-02- IDA / D3730 A posteriori Demande de prix Open - National 36,000.00 0.00 pour la maison des jeunes infrastructure (US$50 Envelope d'exécution 22 20 19 de KONNA million equivalent) ML-PRRE-153995-GO-RFQ Component 1: / Equipement d'un Centre de Rehabilitation of local public Single Stage - One En attente 2020-03- 2020-04- 2020-06- IDA / D3730 A posteriori Demande de prix Open - National 16,000.00 0.00 Développement de la Petite infrastructure (US$50 Envelope d'exécution 18 24 23 Enfance à KONNA million equivalent) ML-PRRE-210550-GO-RFQ Component 1: / Dotation Equipements Bio Rehabilitation of local public Single Stage - One En attente 2021-01- 2021-02- 2021-05- IDA / D3730 A posteriori Demande de prix Open - National 40,000.00 0.00 médicaux du CSCOM de infrastructure (US$50 Envelope d'exécution 01 02 03 Taoudéni million equivalent) ML-PRRE-210959-GO-RFQ Component 3: Community / Dotation d'équipements engagement and local Single Stage - One En attente 2021-01- 2021-02- 2021-03- IDA / D3730 A posteriori Demande de prix Open - National 25,000.00 0.00 sportif pour les équipes de governance (US$10 million Envelope d'exécution 06 09 02 KONNA equivalent). Component 4: Project ML-PRRE-210963-GO-RFQ management, monitoring Single Stage - One En attente 2020-12- 2021-01- 2021-01- IDA / D3730 A posteriori Demande de prix Open - National 10,000.00 0.00 / Calendriers PRRE2021 and evaluation (US$5 million Envelope d'exécution 23 07 21 equivalent) Component 4: Project ML-PRRE-210964-GO-RFQ management, monitoring Single Stage - One En attente 2021-01- 2021-01- 2021-02- / Equipements et IDA / D3730 A posteriori Demande de prix Open - National 20,000.00 0.00 and evaluation (US$5 million Envelope d'exécution 05 20 04 consommables de bureau equivalent) NON CONSULTING SERVICES Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PRRE-101794-NC-DIR / Component 1: Passation de Manutention et transports de Rehabilitation of local public En attente 2019-02- 2019-02- 2019-03- 2019-03- IDA / H9010 A posteriori marché de gré à Direct 80,000.00 0.00 groupe électrogènes de infrastructure (US$50 d'exécution 26 27 08 23 gré Gourma Rharous million equivalent) Component 4: Project ML-PRRE-105480-NC-RFQ management, monitoring Single Stage - One En cours 2019-03- 2019-05- 2019-08- / Acquisition images IDA / D3730 A posteriori Demande de prix Open - National 60,000.00 0.00 and evaluation (US$5 million Envelope d'exécution 20 01 29 satellitaires equivalent) Component 4: Project ML-PRRE-154436-NC-RFQ management, monitoring Single Stage - One En attente 2020-01- 2020-03- 2020-05- / Archivage des documents IDA / D3730 A posteriori Demande de prix Open - National 24,000.00 0.00 and evaluation (US$5 million Envelope d'exécution 21 04 03 du Projet equivalent) ML-PRRE-153326-CW-RFQ Component 1: / Installation d'un système Rehabilitation of local public Single Stage - One En attente 2020-03- 2020-04- 2020-07- informatisé de gestion de IDA / D3730 A posteriori Demande de prix Open - National 40,000.00 0.00 infrastructure (US$50 Envelope d'exécution 07 22 21 l'eau au niveau de l'AEP de million equivalent) Tonka Component 4: Project ML-PRRE-211102-NC-RFQ management, monitoring Single Stage - One En attente 2020-12- 2021-01- 2021-06- / Entretien matériels IDA / D3730 A posteriori Demande de prix Open - National 10,500.00 0.00 and evaluation (US$5 million Envelope d'exécution 22 09 30 informatiques equivalent) Component 4: Project ML-PRRE-211114-NC-RFQ management, monitoring Single Stage - One En attente 2020-12- 2021-02- 2021-04- / Archivage document 2020 IDA / D3730 A posteriori Demande de prix Open - National 12,000.00 0.00 and evaluation (US$5 million Envelope d'exécution 26 14 15 2021 du Projet equivalent) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-REF 98 / Sercice de consultances pour la Component 4: Project Sélection fondée réalisation des etudes management, monitoring sur les En attente 2017-09- 2017-11- 2017-12- 2018-01- 2018-07- IDA / H9010 A posteriori Open - National 100,000.00 0.00 2017-09-02 techniques and evaluation (US$5 million qualifications des d'exécution 23 06 06 10 09 ,environnementales et socio equivalent) consultants du Port de pêche de KONNA CS-REF 99 / Sercice de Component 4: Project Sélection fondée consultances pour l'Audit management, monitoring En cours 2018-02- 2018-04- 2018-04- 2018-05- 2018-07- 2018-08- 2019-08- IDA / H9010 A priori sur la qualité et le Open - National 40,000.00 0.00 2018-01-26 externe (audit 2018 et fin de and evaluation (US$5 million d'exécution 16 01 29 29 03 07 07 coût projet) equivalent) CS-REF 100 / Sercice de consultances Etudes Contrôle et surveillance de la réhabilitation du quai fluvial Component 1: Sélection fondée la Construction de 4000 m/l Rehabilitation of local public sur les En attente 2017-08- 2017-10- 2017-11- 2017-12- 2018-06- IDA / H9010 A posteriori Open - National 46,000.00 0.00 2017-07-30 de caniveaux et de collecteur infrastructure (US$50 qualifications des d'exécution 20 03 02 07 05 dans la Commune urbaine million equivalent) consultants de Gao (Quartiers Château Sud-extension, Château Est et Djidara) CS-REF 101 / Sercice de Component 1: Sélection fondée consultances Etudes Rehabilitation of local public sur les En attente 2017-08- 2017-10- 2017-11- 2017-12- 2018-06- ,Contrôle et surveillance de IDA / H9010 A posteriori Open - National 40,000.00 0.00 2017-07-30 infrastructure (US$50 qualifications des d'exécution 20 03 02 07 05 la Construction de la gare million equivalent) consultants routière de Douentza CS-REF 102 / Sercice de consultances Etudes Component 1: Sélection fondée ,Contrôle et surveillance de l' Rehabilitation of local public sur les En attente 2017-08- 2017-10- 2017-11- 2017-12- 2018-06- aménagement d'un IDA / H9010 A posteriori Open - National 32,560.00 0.00 2017-07-30 infrastructure (US$50 qualifications des d'exécution 20 03 02 07 05 débarcadère à youwarou et million equivalent) consultants construction de 400 metres de canniveaux à Youwarou Ouro CS-REF 103 / Sercice de Component 1: Sélection fondée consultances Etudes Rehabilitation of local public sur les En attente 2017-08- 2017-10- 2017-11- 2017-12- 2018-06- ,Contrôle et surveillance des IDA / H9010 A posteriori Open - National 92,000.00 0.00 2017-07-30 infrastructure (US$50 qualifications des d'exécution 20 03 02 07 05 travaux de rehabilitation de million equivalent) consultants la piste N' Gouma -Saraféré CS-REF 105 / Sercice de Component 1: Sélection fondée consultances Etudes Rehabilitation of local public sur les En attente 2017-08- 2017-10- 2017-11- 2017-12- 2018-06- Contrôle et surveillance des IDA / H9010 A posteriori Open - National 40,000.00 0.00 2017-07-30 infrastructure (US$50 qualifications des d'exécution 20 03 02 07 05 travaux de construction d'un million equivalent) consultants CSCOM à Tondidarou cercle de Niafunké CS-REF 106 / Sercice de Component 1: Sélection fondée consultances Contrôle et Rehabilitation of local public sur les En attente 2017-12- 2018-01- 2018-02- 2018-04- 2018-09- surveillance des travaux de IDA / H9010 A posteriori Open - National 60,000.00 0.00 2017-11-24 infrastructure (US$50 qualifications des d'exécution 15 28 27 03 30 construction de la Gare million equivalent) consultants routiere de Tombouctou Page 9 CS-REF 107 / Services de Consultant pour les études et controle et surveillance des travaux de rehabilitation Component 1: Sélection fondée de centre de santé et de Rehabilitation of local public sur les En attente 2018-01- 2018-03- 2018-04- 2018-05- 2018-11- IDA / H9010 A posteriori Open - National 48,200.00 0.00 2018-01-05 points d'eau dans les cercles infrastructure (US$50 qualifications des d'exécution 26 11 10 15 11 de Bourem et de Gao et million equivalent) consultants realisation d'infrastructures dans la commune de tarkint cercle de Bourem CS-REF 108 / Services de Consultant pour les études techniques, le contrôle et la Component 1: Sélection fondée surveillance des travaux de Rehabilitation of local public sur les En attente 2018-02- 2018-03- 2018-04- 2018-05- 2018-11- IDA / H9010 A posteriori Open - National 127,200.00 0.00 2018-01-16 construction, de infrastructure (US$50 qualifications des d'exécution 06 22 21 26 22 réhabilitation et/ ou million equivalent) consultants d’extension d’infrastructures dans la Région de Kidal CS-REF 109 / Services de Consultant pour les études techniques, le contrôle et la Component 1: Sélection fondée surveillance des travaux de Rehabilitation of local public sur les En attente 2018-02- 2018-03- 2018-04- 2018-05- 2018-11- IDA / H9010 A posteriori Open - National 144,400.00 0.00 2018-01-16 construction, de infrastructure (US$50 qualifications des d'exécution 06 22 21 26 22 réhabilitation et/ ou million equivalent) consultants d’extension d’infrastructures dans la Région de Menaka CS-REF 110 / Services de Consultant pour les études techniques, le contrôle et la Component 1: Sélection fondée surveillance des travaux de Rehabilitation of local public sur les En attente 2018-02- 2018-03- 2018-04- 2018-05- 2018-11- IDA / H9010 A posteriori Open - National 23,000.00 0.00 2018-01-16 construction, de infrastructure (US$50 qualifications des d'exécution 06 22 21 26 22 réhabilitation et/ ou million equivalent) consultants d’extension d’infrastructures dans le cercle d'ANSONGO CS-REF 111 / Service de consultant pour les études Sélection fondée techniques, le contrôle et la Component 2: Support to sur les En attente 2017-10- 2017-11- 2017-12- 2018-01- 2018-07- surveillance des travaux de IDA / H9010 A posteriori Open - National 200,876.00 0.00 2017-09-13 productive investments qualifications des d'exécution 04 17 17 21 20 réalisation de micro-projets consultants dans lesregions de Menaka et de Gao (cercle Ansongo) ML-PRRE-55911-CS-CQS / Sercice de consultances Component 1: Sélection fondée Etudes ,Contrôle et Rehabilitation of local public sur les En attente 2017-08- 2017-10- 2017-11- 2017-12- 2018-06- surveillance de la réalisation IDA / H9010 A posteriori Open - National 48,000.00 0.00 2017-07-30 infrastructure (US$50 qualifications des d'exécution 20 03 02 07 05 d'un ouvrage de million equivalent) consultants franchissement (Pont) dans la commune de Gossi Component 1: Sélection fondée ML-PRRE-62447-CS-CQS / Rehabilitation of local public sur les En attente 2018-05- 2018-06- 2018-06- 2018-07- 2019-01- Contrôle Technique Gare IDA / H9010 A posteriori Open - National 15,450.00 0.00 2018-05-12 infrastructure (US$50 qualifications des d'exécution 15 08 15 20 16 routière de Tombouctou million equivalent) consultants ML-PRRE-62451-CS-CQS / Component 1: Sélection fondée Contrôle Technique de Rehabilitation of local public sur les En attente 2018-05- 2018-06- 2018-06- 2018-07- 2019-01- IDA / H9010 A posteriori Open - National 240,000.00 0.00 2018-05-14 l'Electrification de la ville de infrastructure (US$50 qualifications des d'exécution 28 08 13 13 09 Rharouss million equivalent) consultants ML-PRRE-105652-CS-CQS Component 4: Project Sélection fondée / Communication autour des management, monitoring sur les En cours 2019-06- 2019-05- 2019-06- 2019-07- 2019-08- 2020-11- IDA / D3730 A posteriori Open - National 40,000.00 0.00 2019-04-15 activités de l'Alliance Sahel and evaluation (US$5 million qualifications des d'examen 06 06 19 19 09 20 et des autres activités du equivalent) consultants projet Component 4: Project Sélection fondée ML-PRRE-105672-CS-CQS management, monitoring sur les En cours 2020-03- 2019-04- 2019-05- 2019-05- 2019-05- 2019-09- / ONG locale spécialisée aux IDA / D3730 A posteriori Open - National 100,000.00 0.00 2019-04-10 and evaluation (US$5 million qualifications des d'exécution 11 13 02 09 26 23 activités de VBG/EAS equivalent) consultants Component 4: Project Sélection fondée ML-PRRE-105680-CS-CQS management, monitoring sur les En attente 2019-04- 2019-05- 2019-05- 2019-06- 2019-12- / Appui alphabétisation IDA / D3730 A posteriori Open - National 50,000.00 0.00 2019-04-10 and evaluation (US$5 million qualifications des d'exécution 24 13 23 13 10 numérique equivalent) consultants ML-PRRE-105682-CS-CQS / Etudes, contrôle et suivi Sélection fondée des travaux d'aménagement Component 2: Support to sur les En cours 2019-07- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- de 08 étangs piscicoles et IDA / D3730 A posteriori Open - National 78,182.00 0.00 2019-04-12 productive investments qualifications des d'exécution 27 17 04 11 25 09 l'aménagement de 03 ha du consultants marché avec construction de 60 magasins à Konna. ML-PRRE-105683-CS-CQS Sélection fondée / Appui à l'étude technique Component 2: Support to sur les En attente 2019-03- 2019-04- 2019-04- 2019-05- 2019-06- IDA / D3730 A posteriori Open - National 10,000.00 0.00 2019-03-20 et au contrôle des cages productive investments qualifications des d'exécution 23 16 26 10 09 flottantes de Konna consultants ML-PRRE-105710-CS-CQS Sélection fondée / Etudes et contrôle des Component 2: Support to sur les En attente 2019-03- 2019-04- 2019-04- 2019-05- 2019-06- IDA / D3730 A posteriori Open - National 35,000.00 0.00 2019-03-27 travaux PIV productive investments qualifications des d'exécution 29 19 26 13 12 d'Anderamboucane-Ménaka consultants à Andéramboukane Sélection fondée ML-PRRE-105713-CS-CQS Component 2: Support to sur les En attente 2019-03- 2019-04- 2019-04- 2019-05- 2019-06- / Etudes et contrôle de 5 PIV IDA / D3730 A posteriori Open - National 80,000.00 0.00 2019-03-28 productive investments qualifications des d'exécution 30 20 27 11 10 (100 ha) à Tonka consultants ML-PRRE-105716-CS-CQS Sélection fondée / Etudes et contrôle de 04 Component 2: Support to sur les En attente 2019-03- 2019-04- 2019-04- 2019-05- 2019-06- IDA / D3730 A posteriori Open - National 64,000.00 0.00 2019-03-27 PIV (80 ha) à Douekire CS- productive investments qualifications des d'exécution 30 18 25 09 08 Ref 10 consultants ML-PRRE-105721-CS-CQS / Contrôle de 4 étangs Sélection fondée piscicoles de 15x20, de 3 Component 2: Support to sur les En cours 2019-07- 2019-03- 2019-04- 2019-04- 2019-05- 2019-06- IDA / D3730 A posteriori Open - National 56,000.00 0.00 2019-03-22 PIV (70 ha) et d'une productive investments qualifications des d'exécution 27 25 15 22 06 05 bourgoutière (10 ha) dans le consultants cercle de Douentza ML-PRRE-105724-CS-CQS Sélection fondée / Contrôle d'un Périmètre Component 2: Support to sur les En cours 2019-07- 2019-03- 2019-04- 2019-04- 2019-05- 2019-06- Irrigué Villageois de 15 Ha et IDA / D3730 A posteriori Open - National 14,000.00 0.00 2019-03-22 productive investments qualifications des d'exécution 27 25 15 22 06 05 d'un étang piscicole dans le consultants cercle de Bourem ML-PRRE-105725-CS-CQS / Contrôle de 10 PIV (177,21 Sélection fondée ha) et aménagement de 2 Component 2: Support to sur les En cours 2019-07- 2019-03- 2019-04- 2019-04- 2019-05- 2019-06- IDA / D3730 A posteriori Open - National 90,000.00 0.00 2019-03-27 étangs piscicoles de 15*20 productive investments qualifications des d'exécution 27 29 17 22 06 05 et de 2 bourgoutières (34 consultants ha) dans le cercle de Gourma Rharous ML-PRRE-105702-CS-CQS / Mise en œuvre des activités Component 3: Community Sélection fondée d'engagement engagement and local En attente 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- 2020-07- IDA / D3730 A posteriori sur la qualité et le Open - National 650,000.00 0.00 2019-05-03 communautaire governance (US$10 million d'exécution 17 21 11 16 26 08 07 coût gouvernance locale et equivalent). violence basée sur le genre dans la zone économique de Konna ML-PRRE-105707-CS-CQS / Mise en œuvre des activités Component 3: Community Sélection fondée d'engagement engagement and local En attente 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- 2020-07- IDA / D3730 A posteriori sur la qualité et le Open - National 650,000.00 0.00 2019-05-03 communautaire governance (US$10 million d'exécution 17 21 11 16 26 10 09 coût gouvernance locale et equivalent). violence basée sur le genre dans la zone économique d'Ansongo ML-PRRE-105709-CS-CQS / Mise en œuvre des activités Component 3: Community d'engagement Sélection fondée engagement and local En attente 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- 2020-07- communautaire IDA / D3730 A posteriori sur la qualité et le Open - National 650,000.00 0.00 2019-05-03 governance (US$10 million d'exécution 17 25 15 20 30 14 13 gouvernance locale et coût equivalent). violence basée sur le genre dans la zone économique de Goundam ML-PRRE-113946-CS-CQS Component 4: Project Sélection fondée / Convention maitrise management, monitoring sur les En cours 2019-07- 2019-05- 2019-05- 2019-05- 2019-06- 2019-09- d'ouvrage délégué pour l' IDA / H9010 A posteriori Open - National 17,125.00 0.00 2019-05-08 and evaluation (US$5 million qualifications des d'exécution 10 22 26 31 14 12 achèvement de 31 MPP dans equivalent) consultants le cercle de Niono ML-PRRE-113947-CS-CQS / Convention pour l'achèvement de 30 MPP Component 4: Project Sélection fondée dans les cercles de management, monitoring sur les En cours 2019-07- 2019-05- 2019-06- 2019-06- 2019-06- 2019-12- IDA / H9010 A posteriori Open - National 27,828.00 0.00 2019-05-08 Ténenkou, Niafunké, and evaluation (US$5 million qualifications des d'exécution 11 22 01 08 22 19 Ansongo, Gao, Bourem et equivalent) consultants Douentza suite à l'expiration des conventions MOD du Financement Initial ML-PRRE-105729-CS-CQS / Etudes techniques, Component 1: Sélection fondée contrôle et suivi des travaux Rehabilitation of local public sur les En cours 2019-08- 2019-05- 2019-06- 2019-06- 2019-06- 2019-12- IDA / D3730 A posteriori Open - National 50,910.00 0.00 2019-05-13 d'aménagement et de infrastructure (US$50 qualifications des d'exécution 20 16 04 09 19 16 réhabilitation de la ville de million equivalent) consultants Konna Page 10 ML-PRRE-105732-CS-CQS Component 1: Sélection fondée / Etudes Techniques et Rehabilitation of local public sur les En attente 2019-05- 2019-06- 2019-06- 2019-06- 2019-07- contrôle de l'adduction d'eau IDA / D3730 A posteriori Open - National 54,540.00 0.00 2019-05-12 infrastructure (US$50 qualifications des d'exécution 15 05 12 26 26 potable à Tonka, AES Cs réf million equivalent) consultants de Diré et AES DE SéKé ML-PRRE-105734-CS-CQS / Etudes, Contrôle et Component 1: Sélection fondée Surveillance des travaux de Rehabilitation of local public sur les En attente 2019-05- 2019-06- 2019-06- 2019-06- 2019-12- réalisation du réseau de IDA / D3730 A posteriori Open - National 20,000.00 0.00 2019-05-13 infrastructure (US$50 qualifications des d'exécution 16 04 09 19 16 distribution pour 03 AES à million equivalent) consultants Kosseye, Wabaria et Bazi Gourma ML-PRRE-113965-CS-CQS Component 1: Sélection fondée / Etudes et contrôle et Rehabilitation of local public sur les En cours 2019-08- 2019-05- 2019-06- 2019-06- 2019-06- 2019-09- surveillance renforcement IDA / D3730 A posteriori Open - National 118,200.00 0.00 2019-05-08 infrastructure (US$50 qualifications des d'exécution 22 22 01 08 22 20 AEP et réhabilitation cref de million equivalent) consultants Ménaka ML-PRRE-114541-CS-CQS / études techniques, environnementales et socio- Sélection fondée économiques centrées sur Component 2: Support to sur les En attente 2019-05- 2019-06- 2019-06- 2019-06- 2019-12- IDA / D3730 A posteriori Open - National 290,000.00 0.00 2019-05-11 l'approche filière, le contrôle productive investments qualifications des d'exécution 12 02 09 21 18 et la surveillance des travaux consultants de réhabilitation du périmètre de Sindiwara ML-PRRE-105718-CS-CQS / Etudes techniques et environnementales, le Sélection fondée contrôle et la surveillance Component 2: Support to sur les En attente 2019-03- 2019-04- 2019-04- 2019-05- 2019-06- IDA / D3730 A posteriori Open - National 200,000.00 0.00 2019-03-21 des travaux de réhabilitation productive investments qualifications des d'exécution 24 14 21 05 04 du périmètre irrigué de consultants Sindiwara de la zone économiques d'Ansongo ML-PRRE-105694-CS-CQS Sélection fondée / Formation des pêcheurs Component 2: Support to sur les En cours 2020-03- 2020-03- 2020-04- 2020-04- 2020-05- 2020-05- sur les techniques de la IDA / D3730 A posteriori Open - National 47,000.00 0.00 2020-03-20 productive investments qualifications des d'exécution 19 23 13 20 04 11 pisciculture dans la zone de consultants Konna ML-PRRE-153922-CS-CQS / Etudes et contrôle pour la Sélection fondée construction de magasin de Component 2: Support to sur les En cours 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2020-04- stockage de céréales et de IDA / D3730 A posteriori Open - National 60,000.00 0.00 2020-01-15 productive investments qualifications des d'exécution 07 17 07 14 28 28 Magasin de conservation de consultants produits maraîchers, et centre de transformation ML-PRRE-153925-CS-CQS Sélection fondée / Etudes et contrôle pour le Component 2: Support to sur les En cours 2020-04- 2020-01- 2020-01- 2020-01- 2020-02- 2020-08- mécanisme d'irrigation des IDA / D3730 A posteriori Open - National 60,000.00 0.00 2020-01-16 productive investments qualifications des d'exécution 26 18 20 27 10 08 Périmètres maraîchers avec consultants le système solaire ML-PRRE-153928-CS-CQS Sélection fondée / Etudes technique et Component 2: Support to sur les En cours 2020-02- 2020-01- 2020-02- 2020-03- 2020-03- 2020-04- contrôle aménagement de IDA / D3730 A posteriori Open - National 60,000.00 0.00 2020-01-17 productive investments qualifications des d'exécution 07 20 04 18 26 07 10 ha de palmeraie dans la consultants ville de Taoudenit ML-PRRE-153967-CS-CQS Component 1: Sélection fondée / Etudes techniques contrôle Rehabilitation of local public sur les En cours 2020-04- 2020-01- 2020-02- 2020-03- 2020-04- 2020-06- IDA / D3730 A posteriori Open - National 80,000.00 0.00 2020-01-20 des Caniveaux et infrastructure (US$50 qualifications des d'exécution 26 25 22 23 09 08 lampadaires de Douentza million equivalent) consultants ML-PRRE-153978-CS-CQS Component 1: Sélection fondée / Etudes techniques et Rehabilitation of local public sur les En cours 2020-02- 2020-01- 2020-01- 2020-02- 2020-02- 2020-04- IDA / D3730 A posteriori Open - National 180,000.00 0.00 2020-01-20 contrôle réhabilitation infrastructure (US$50 qualifications des d'exécution 07 22 30 06 25 25 réseau routier Gao ville million equivalent) consultants ML-PRRE-153991-CS-CQS / Etudes et controles du Component 1: Sélection fondée réservoir de transit, station Rehabilitation of local public sur les En attente 2020-01- 2020-02- 2020-02- 2020-02- 2020-05- IDA / D3730 A posteriori Open - National 30,000.00 0.00 2020-01-16 de pompage et réseau de infrastructure (US$50 qualifications des d'exécution 17 01 08 16 16 transport d'eau potable à million equivalent) consultants Taoudeni ML-PRRE-153992-CS-CQS Component 4: Project Sélection fondée / VISIBILITE DES ACTIONS management, monitoring sur les En attente 2020-01- 2020-01- 2020-01- 2020-02- 2020-08- IDA / D3730 A posteriori Open - National 120,000.00 0.00 2020-01-15 DU PROJET AVEC UNE and evaluation (US$5 million qualifications des d'exécution 16 20 25 09 07 AGENCE DE equivalent) consultants COMMUNICATION. ML-PRRE-154123-CS-CQS / Etudes techniquezs Component 1: Sélection fondée controe et suivi des activités Rehabilitation of local public sur les En cours 2020-05- 2020-01- 2020-02- 2020-02- 2020-03- 2020-09- d'infrasteuctures IDA / D3730 A posteriori Open - National 140,000.00 0.00 2020-01-17 infrastructure (US$50 qualifications des d'exécution 05 20 13 20 06 02 hydrauliques ,de santé million equivalent) consultants ,scolaires de Taoudeni et des points d'eau à BER ML-PRRE-105728-CS-CQS / Formation des Component 3: Community Sélection fondée bénéficiaires à la maîtrise engagement and local sur les En attente 2019-06- 2019-07- 2019-07- 2019-07- 2019-08- technique des Botteleuses, IDA / D3730 A posteriori Open - National 40,000.00 0.00 2019-06-17 governance (US$10 million qualifications des d'exécution 20 09 14 24 23 Hache-paille, Matériels de la equivalent). consultants Laiterie et autres fournis lors de la phase1du Projet ML-PRRE-105727-CS-CQS / Renforcement de capacités dez entreprises locales dans la zone du prrojet sur des Component 3: Community Sélection fondée modules techniques engagement and local sur les En cours 2020-06- 2019-06- 2019-07- 2019-07- 2019-07- 2019-08- (Formation pour soumission IDA / D3730 A posteriori Open - National 270,000.00 0.00 2019-06-16 governance (US$10 million qualifications des d'examen 01 19 08 13 27 26 aux dossiers de consultation equivalent). consultants DAO DC , la gestion des chantiers, le planning des chantiers, la gestion des contrats ML-PRRE-153913-CS-CQS / Formation action des OCB /OSP du Perimetre Irrigué Component 3: Community Sélection fondée Villageoiset du Perimetre engagement and local sur les En attente 2020-03- 2020-03- 2020-04- 2020-05- 2020-06- IDA / D3730 A posteriori Open - National 80,000.00 0.00 2020-02-28 Maraicher d’Ansongo sur la governance (US$10 million qualifications des d'exécution 04 19 09 14 13 maitrise technique, equivalent). consultants l’entretien des equipements fournis et sur la chaine de valeur ML-PRRE-180009-CS-CQS Component 3: Community Sélection fondée / formation des jeunes de engagement and local sur les En attente 2020-06- 2020-07- 2020-07- 2020-07- 2020-08- IDA / D3730 A posteriori Open - National 40,000.00 0.00 2020-06-16 KONNA sur le leadership et governance (US$10 million qualifications des d'exécution 17 04 11 23 22 la citoyenneté. equivalent). consultants Component 1: Sélection fondée ML-PRRE-184277-CS-CQS Rehabilitation of local public sur les En cours 2020-12- 2020-07- 2020-08- 2020-08- 2020-08- 2020-10- / Etudes Techniques de la IDA / D3730 A posteriori Open - National 140,000.00 0.00 2020-07-14 infrastructure (US$50 qualifications des d'exécution 15 15 03 08 22 21 voirie de Diré million equivalent) consultants INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PRRE-62450-CS-CDS / Component 1: Protocole avec EDM pour la Sélection de Rehabilitation of local public En attente 2018-05- 2018-06- 2018-12- supervision de IDA / H9010 A posteriori consultants par Direct 90,000.00 0.00 2018-05-15 infrastructure (US$50 d'exécution 22 29 26 l'Electrification de la ville de entente directe million equivalent) Rharouss ML-PRRE-64108-CS-INDV / Revu du CPRP et élaboration des instruments de Component 4: Project sauvegarde management, monitoring En attente 2018-06- 2018-06- 2018-06- 2018-12- IDA / H9010 A posteriori Individuel Direct 29,000.00 0.00 2018-05-28 environnementale et sociale and evaluation (US$5 million d'exécution 06 11 18 15 relatifs aux investissements equivalent) prévus au financement additionnel du PRRE ML-PRRE-69950-CS-CDS / Mobilisation sociale, Component 3: Community l'information, la Sélection de engagement and local En attente 2018-10- 2018-10- 2019-04- sensibilisation des IDA / H9010 A posteriori consultants par Direct 36,804.00 0.00 2018-10-11 governance (US$10 million d'exécution 12 21 19 communautés et la révision entente directe equivalent). /élaboration des PDSEC de Niono à Ségou (12 communes) ML-PRRE-69947-CS-CDS / Mobilisation sociale, l'information, la Component 3: Community Sélection de sensibilisation des engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 32,700.00 0.00 2018-10-11 communautés et la révision governance (US$10 million d'exécution 12 21 19 entente directe /élaboration des PDSEC dans equivalent). le cercle de Ténenkou, région de Mopti (10 communes) Page 11 ML-PRRE-69951-CS-CDS / Mobilisation sociale, l'information, la Component 3: Community sensibilisation des Sélection de engagement and local En attente 2018-10- 2018-10- 2019-04- communautés et la révision IDA / H9010 A posteriori consultants par Direct 27,819.00 0.00 2018-10-11 governance (US$10 million d'exécution 12 30 28 /élaboration des PDSEC de entente directe equivalent). Nianfunké dans la région de Tombouctou dans (8 communes) ML-PRRE-69952-CS-CDS / Mobilisation sociale, l'information, la Component 3: Community sensibilisation des Sélection de engagement and local En attente 2018-10- 2018-10- 2019-04- communautés et la révision IDA / H9010 A posteriori consultants par Direct 40,342.00 0.00 2018-10-11 governance (US$10 million d'exécution 12 21 19 /élaboration des PDSEC de entente directe equivalent). Diré dans la région de Tombouctou dans (13 communes) ML-PRRE-69953-CS-CDS / Mobilisation sociale, l'information, la Component 3: Community sensibilisation des Sélection de engagement and local En attente 2018-10- 2018-10- 2019-04- communautés et la révision IDA / H9010 A posteriori consultants par Direct 25,820.00 0.00 2018-10-11 governance (US$10 million d'exécution 17 21 19 /élaboration des PDSEC de entente directe equivalent). Goundam dans la région de Tombouctou dans (16 communes) ML-PRRE-69954-CS-CDS / Mobilisation sociale, Component 3: Community l'information, la Sélection de engagement and local En attente 2018-10- 2018-10- 2019-04- sensibilisation des IDA / H9010 A posteriori consultants par Direct 25,820.00 0.00 2018-10-11 governance (US$10 million d'exécution 13 21 19 communautés et la révision entente directe equivalent). /élaboration des PDSEC dans sept (7) communes d'Ansongo ML-PRRE-69955-CS-CDS / La mobilisation sociale, Component 3: Community l'information, la Sélection de engagement and local En attente 2018-10- 2018-10- 2019-04- sensibilisation des IDA / H9010 A posteriori consultants par Direct 21,785.00 0.00 2018-10-11 governance (US$10 million d'exécution 13 21 19 communautés et la révision entente directe equivalent). /élaboration des PDSEC dans cinq (5) communes de Ménaka ML-PRRE-69956-CS-CDS / Etudes techniques, le Sélection de contrôle et la surveillance Component 2: Support to En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 50,490.00 0.00 2018-10-12 des travaux de réalisation de productive investments d'exécution 18 22 20 entente directe micro-projets dans le cercle de Niono, région de Ségou ML-PRRE-69957-CS-CDS / Etudes techniques, le Sélection de contrôle et la surveillance Component 2: Support to En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 36,239.00 0.00 2018-10-11 des travaux de réalisation de productive investments d'exécution 13 21 19 entente directe micro-projets dans le cercle de Ténenkou, région de Mopti ML-PRRE-69959-CS-CDS / Etudes techniques, le contrôle et la surveillance Sélection de Component 2: Support to En attente 2018-10- 2018-10- 2019-04- des travaux de réalisation de IDA / H9010 A posteriori consultants par Direct 70,441.00 0.00 2018-10-12 productive investments d'exécution 14 22 20 micro-projets dans les entente directe cercles de Niafunké, Diré et Goundam, région de Tombouctou ML-PRRE-69958-CS-CDS / Contrôles et Surveillances de Sélection de Component 2: Support to En attente 2018-10- 2018-10- 2019-04- microprojets simples dans IDA / H9010 A posteriori consultants par Direct 44,309.00 0.00 2018-10-11 productive investments d'exécution 13 21 19 les cercles d'Ansongo et entente directe Ménaka région de Gao et de Ménaka ML-PRRE-69941-CS-CDS / Accompagnement des OCB Component 3: Community Sélection de bénéficiaires de microprojets engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 8,264.00 0.00 2018-10-11 des communes de Ber, governance (US$10 million d'exécution 13 21 19 entente directe Bourem Inaly et Lafia (3) du equivalent). cercle de Tombouctou ML-PRRE-69942-CS-CDS / Accompagnement des OCB Component 3: Community bénéficiaires de microprojets Sélection de engagement and local En attente 2018-10- 2018-10- 2019-04- des communes de Bamba, IDA / H9010 A posteriori consultants par Direct 9,172.00 0.00 2018-10-11 governance (US$10 million d'exécution 13 21 19 Temera, Bourem, Taboye, entente directe equivalent). Tarkint (5) dans le cercle de Bourem ML-PRRE-69943-CS-CDS / Accompagnement des OCB bénéficiaires de microprojets Component 3: Community Sélection de des communes de Gao, engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 12,008.00 0.00 2018-10-12 Anchawadi, Gabéro, governance (US$10 million d'exécution 14 22 20 entente directe Gounzoureye, N'Tillit, Sony equivalent). Ali Ber et Tilemsi (7) dans le cercle de Gao ML-PRRE-69944-CS-CDS / Accompagnement des OCB Component 3: Community Sélection de bénéficiaires de microprojets engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 6,948.00 0.00 2018-07-17 des communes de Abeibara, governance (US$10 million d'exécution 12 20 18 entente directe Boghassa, Tinzawatène (3) equivalent). dans le cercle de Abeibara ML-PRRE-69945-CS-CDS / Accompagnement des OCB Component 3: Community Sélection de bénéficiaires de microprojets engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 6,948.00 0.00 2018-10-12 des communes de Kidal, governance (US$10 million d'exécution 13 22 20 entente directe Anefif et Essouk (3) dans le equivalent). cercle de Kidal ML-PRRE-69946-CS-CDS / Accompagnement des OCB Component 3: Community Sélection de bénéficiaires de microprojets engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 6,948.00 0.00 2018-07-17 des communes de Tessalit, governance (US$10 million d'exécution 11 20 18 entente directe Adjelhoc et Tintaghène (3) equivalent). dans le cercle de Tessalit ML-PRRE-69948-CS-CDS / Accompagnement des OCB Component 3: Community Sélection de bénéficiaires de microprojets engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 6,282.00 0.00 2018-07-17 des communes de Tin- governance (US$10 million d'exécution 11 19 17 entente directe Essako et Intadjedite (2) du equivalent). cercle de Tin Essako ML-PRRE-69940-CS-CDS / Accompagnement des OCB Component 3: Community Sélection de bénéficiaires de microprojets engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 8,264.00 0.00 2018-10-11 des communes de Salam, governance (US$10 million d'exécution 13 21 19 entente directe Alafia et Tombouctou (3) equivalent). dans le cercle de Tombouctou ML-PRRE-69939-CS-CDS / Accompagnement des OCB bénéficiaires de microprojets Component 3: Community Sélection de des communes de de engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 10,080.00 0.00 2018-10-11 Ouinerden, Gossi et governance (US$10 million d'exécution 13 21 19 entente directe Inadiatafane et Bambara equivalent). Maoudé (4) dans le cercle de Gourma Rharous ML-PRRE-69938-CS-CDS / Services de consultants pour le contrôle et la surveillance en vue de l'achèvement des Sélection de Component 2: Support to En attente 2018-10- 2018-10- 2019-04- travaux relatifs aux IDA / H9010 A posteriori consultants par Direct 21,227.00 0.00 2018-10-11 productive investments d'exécution 14 22 20 microprojets dans les cercles entente directe de Tombouctou et Gourma Rharous, Région de Tombouctou ML-PRRE-69937-CS-CDS / Accompagnement des OCB Component 3: Community Sélection de bénéficiaires de microprojets engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 7,044.00 0.00 2018-10-11 des communes de Soyé, governance (US$10 million d'exécution 13 21 19 entente directe Fatoma, Konna et Socoura equivalent). (4) du cercle de Mopti ML-PRRE-69936-CS-CDS / Accompagnement des OCB Component 3: Community Sélection de bénéficiaires de microprojets engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 7,852.00 0.00 2018-10-11 des communes de governance (US$10 million d'exécution 13 21 19 entente directe Youwarou, Bimbere Tama et equivalent). Farimaka (3) dans le cercle de Youwarou ML-PRRE-69867-CS-CDS / contrôle et surveillance en vue de l'achèvement des travaux d'aménagement d'un Sélection de Component 2: Support to En attente 2018-10- 2018-10- 2019-04- (01) Périmètre Irrigué IDA / H9010 A posteriori consultants par Direct 28,640.00 0.00 2018-10-11 productive investments d'exécution 15 21 19 Villageois (PIV) et de 63 entente directe microprojets dans les cercles de Gao et de Bourem, Région de Gao Page 12 ML-PRRE-69935-CS-CDS / Accompagnement des OCB Component 3: Community Sélection de bénéficiaires de microprojets engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 7,100.00 0.00 2018-10-11 des communes de Dongo, governance (US$10 million d'exécution 13 21 19 entente directe N'Djodjina, Dima et Deboye equivalent). (4) du cercle de Youwarou ML-PRRE-69934-CS-CDS / Accompagnement des OCB Component 3: Community Sélection de bénéficiaires de microprojets engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 7,884.00 0.00 2018-10-11 des communes de governance (US$10 million d'exécution 13 21 19 entente directe Douantza, Kerena, equivalent). Dianwelly, Petaka, Koubelwel ML-PRRE-69933-CS-CDS / Accompagnement des OCB Component 3: Community Sélection de bénéficiaires de microprojets engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 8,684.00 0.00 2018-10-11 des communes de Dallah, governance (US$10 million d'exécution 13 20 18 entente directe Hombori, Haire et Mondoro equivalent). (4) dans le cercle de Douentza ML-PRRE-69866-CS-CDS / Contrôle et la surveillance en Sélection de vue de l'achèvement des Component 2: Support to En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 36,904.00 0.00 2018-10-11 travaux d'aménagement de productive investments d'exécution 18 26 24 entente directe microprojets dans le cercle de Douentza, Région de Mopti. ML-PRRE-69932-CS-CDS / Accompagnement des OCB Component 3: Community bénéficiaires de microprojets Sélection de engagement and local En attente 2018-10- 2018-10- 2019-04- des communes de Djaptodji, IDA / H9010 A posteriori consultants par Direct 9,812.00 0.00 2018-10-11 governance (US$10 million d'exécution 12 20 18 Korarou, Gandamia, Débéré entente directe equivalent). et Dangol Boré (5) dans le cercle de Douentza ML-PRRE-69931-CS-CDS / Contrôle et la surveillance en vue de l'achèvement des Sélection de travaux d'aménagement d'un Component 2: Support to En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 16,700.00 0.00 2018-10-11 Périmètre Irrigué Villageois productive investments d'exécution 13 20 18 entente directe (PIV) et 27 microprojets dans les cercles de Mopti et de Youwarou, Région de Mopti ML-PRRE-81519-CS-CDS / Accompagnement des OCB Component 3: Community Sélection de bénéficiaires de microprojets engagement and local En attente 2018-10- 2018-10- 2019-04- IDA / H9010 A posteriori consultants par Direct 7,044.00 0.00 2018-10-11 des communes de Ber, governance (US$10 million d'exécution 14 26 24 entente directe Bourem Inaly et Lafia (3) du equivalent). cercle de Tombouctou ML-PRRE-81522-CS-CDS / Accompagnement des OCB Component 3: Community bénéficiaires de microprojets Sélection de engagement and local En attente 2018-10- 2018-10- 2019-04- des communes de IDA / H9010 A posteriori consultants par Direct 7,356.00 0.00 2018-10-11 governance (US$10 million d'exécution 15 25 23 Hamzakoma, Séréré, Gourma entente directe equivalent). Rharous, Banikane et du cercle de Gourma Rharous ML-PRRE-86885-CS-CDS / APPUI A LA FINALISATION DU Component 4: Project Sélection de CADRE STRATEGIQUE POUR management, monitoring En attente 2018-11- 2018-11- 2018-12- IDA / H9010 A posteriori consultants par Direct 66,475.00 0.00 2018-11-12 LA RELANCE ECONOMIQUE and evaluation (US$5 million d'exécution 14 20 27 entente directe ET LE DEVELOPPEMENT equivalent) DURABLE DU MALI (CREDD) ML-PRRE-105629-CS-CDS Component 4: Project Sélection de / Convention maitrise management, monitoring 2020-01- 2019-03- 2018-12- 2019-05- 2019-07- 2019-09- IDA / D3730 A priori consultants par Direct 1,345,714.00 1,145,317.24 Signé 2019-03-11 d'ouvrage délégué SOS and evaluation (US$5 million 09 21 14 11 01 08 entente directe SAHEL equivalent) ML-PRRE-105632-CS-CDS Component 4: Project / Supervision par tierce Sélection de management, monitoring En attente 2019-03- 2019-05- 2019-09- partie des activités réalisées IDA / D3730 A posteriori consultants par Direct 577,500.00 0.00 2019-03-11 and evaluation (US$5 million d'exécution 21 11 08 du Projet entente directe equivalent) TPM GISSE ML-PRRE-105726-CS-INDV Component 2: Support to En attente 2019-04- 2019-04- 2019-04- 2019-05- / Diagnostic rapide dans les IDA / D3730 A posteriori Individuel Open 15,000.00 0.00 2019-03-20 productive investments d'exécution 11 16 26 26 zones de Goundam Component 4: Project Sélection de ML-PRRE-105677-CS-CDS management, monitoring En attente 2019-05- 2019-06- 2019-08- IDA / D3730 A posteriori consultants par Direct 40,000.00 0.00 2019-05-04 / Protocole ODPADIN and evaluation (US$5 million d'exécution 14 02 31 entente directe equivalent) ML-PRRE-105689-CS-CQS / Appui à l'étude technique Component 2: Support to En attente 2019-05- 2019-06- 2019-06- 2019-07- IDA / D3730 A posteriori Individuel Open 6,000.00 0.00 2019-05-03 et au contrôle des productive investments d'exécution 29 05 19 19 équipements de pêches de Konna ML-PRRE-105661-CS-CQS Component 4: Project / Supervision des activités management, monitoring En attente 2019-05- 2019-05- 2019-06- 2019-12- IDA / D3730 A posteriori Individuel Open 50,000.00 0.00 2019-05-03 déjà visitées par la Tierce and evaluation (US$5 million d'exécution 26 31 24 21 partie. equivalent) ML-PRRE-105736-CS-CDS Component 1: Sélection de / Contrôle et surveillance Rehabilitation of local public En attente 2019-03- 2019-04- 2019-10- IDA / D3730 A posteriori consultants par Direct 22,560.00 0.00 2019-03-18 des travaux supplémentaires infrastructure (US$50 d'exécution 28 14 11 entente directe de la piste N'Gouma - million equivalent) Saraféré ML-PRRE-114001-CS-INDV Component 4: Project / Audit environnemental du management, monitoring En attente 2019-05- 2019-05- 2019-06- 2019-12- IDA / D3730 A posteriori Individuel Open 24,000.00 0.00 2019-05-07 projet (octobre 2017_ and evaluation (US$5 million d'exécution 25 28 07 04 Décembre 2018 equivalent) ML-PRRE-125124-CS-INDV Component 4: Project / Recrutement d’un management, monitoring En attente 2019-08- 2019-08- 2019-09- 2020-11- IDA / D3730 A posteriori Individuel Open 55,373.00 0.00 2019-07-29 spécialiste en and evaluation (US$5 million d'exécution 17 29 26 30 développement social pour equivalent) l’AR de Mopti ML-PRRE-105642-CS-CDS Component 4: Project Sélection de / Supervision par tierce management, monitoring En attente 2019-03- 2019-05- 2020-07- IDA / D3730 A posteriori consultants par Direct 920,000.00 0.00 2019-03-11 partie des activités en cours and evaluation (US$5 million d'exécution 21 11 31 entente directe et en perspectives du Projet equivalent) ML-PRRE-125669-CS-CDS Component 1: Sélection de / Suivi des travaux Rehabilitation of local public En attente 2019-08- 2019-08- 2019-12- IDA / D3730 A posteriori consultants par Direct 10,000.00 0.00 2019-08-02 d’achèvement des caniveaux infrastructure (US$50 d'exécution 08 27 25 entente directe de youwarou million equivalent) ML-PRRE-125675-CS-CDS Component 1: Sélection de / ONG pour l’approche Rehabilitation of local public En cours 2019-09- 2019-08- 2019-09- 2019-12- IDA / D3730 A posteriori consultants par Direct 20,000.00 0.00 2019-08-02 communautaire du HIMO de infrastructure (US$50 d'exécution 05 12 02 01 entente directe la piste de Konna million equivalent) Component 4: Project ML-PRRE-105623-CS-CDS Sélection de management, monitoring 2018-12- 2019-03- 2019-03- 2019-05- 2019-04- 2020-11- / Convention maitrise IDA / D3730 A posteriori consultants par Direct 900,566.00 763,882.63 Signé 2019-03-11 and evaluation (US$5 million 20 21 25 25 04 20 d'ouvrage délégué AGETIPE entente directe equivalent) ML-PRRE-125163-CS-INDV Component 4: Project / COLLECTE DE DONNEES management, monitoring En attente 2019-08- 2019-08- 2019-08- 2019-08- SUR LA RENAISSANCE DU IDA / D3730 A posteriori Individuel Direct 7,000.00 0.00 2019-07-29 and evaluation (US$5 million d'exécution 08 13 27 28 VILLAGE DE KONNA DANS LE equivalent) CADRE DE LA MONOGRAPHIE ML-PRRE-147007-CS-INDV / APPUI A LA MAIRIE DE LA COMMUNE RURALE DE Component 4: Project KONNA (CERCLE DE MOPTI) management, monitoring En attente 2019-12- 2019-12- 2019-12- 2020-02- EN VUE DE SELECTIONNER IDA / D3730 A posteriori Individuel Open 7,000.00 0.00 2019-12-05 and evaluation (US$5 million d'exécution 17 19 31 29 UN PROFESSIONNEL POUR equivalent) ASSRER LA GESTION DES INFRASTRUCTURES DU PORT DE PECHE DE KONNA ML-PRRE-147423-CS-CDS Component 1: / Contrôle et surveillance Sélection de Rehabilitation of local public En attente 2019-12- 2020-01- 2020-06- des travaux de construction IDA / H9010 A posteriori consultants par Direct 52,000.00 0.00 2019-12-03 infrastructure (US$50 d'exécution 10 11 09 1690 ml de caniveaux et de entente directe million equivalent) collecteur dans la ville de Gao ML-PRRE-153917-CS-INDV Component 3: Community / Formation sur la maitrise engagement and local En attente 2020-03- 2020-04- 2020-04- 2020-05- technique des equipements IDA / D3730 A posteriori Individuel Open 20,000.00 0.00 2020-03-05 governance (US$10 million d'exécution 31 07 15 15 pour l’OCB beneficiares de la equivalent). laiterie de Dire ML-PRRE-153920-CS-INDV Component 3: Community / Formation sur la maitrise engagement and local En attente 2020-03- 2020-03- 2020-04- 2020-05- technique des équipements IDA / D3730 A posteriori Individuel Open 10,000.00 0.00 2020-02-19 governance (US$10 million d'exécution 14 28 12 12 et l’exploitation et la gestion equivalent). des palmerai à Taoudeni Page 13 ML-PRRE-153937-CS-CDS / Mise enoeuvre des activités Component 3: Community de’engagement Sélection de engagement and local En cours 2020-02- 2020-01- 2020-02- 2020-08- communautaire IDA / D3730 A posteriori consultants par Direct 60,000.00 0.00 2020-01-20 governance (US$10 million d'exécution 07 30 14 12 ,gouvernance locale et entente directe equivalent). violence basée sur le gentre dans la zone de Taoudeni ML-PRRE-153966-CS-CDS Component 1: / Etudes techniques et Sélection de Rehabilitation of local public En cours 2020-02- 2020-01- 2020-02- 2020-04- contrôles dans le cadre de IDA / D3730 A posteriori consultants par Direct 150,000.00 0.00 2020-01-16 infrastructure (US$50 d'exécution 07 21 22 22 de l'assainissement de la entente directe million equivalent) ville de Ansongo ML-PRRE-153981-CS-CQS Component 1: Sélection de En attente 2020-01- 2020-02- 2020-08- / Plan d’aménagement de la IDA / D3730 Rehabilitation of local public A posteriori consultants par Direct 80,000.00 0.00 2020-01-21 d'exécution 23 17 15 ville de Taoudeni infrastructure (US$50 entente directe million equivalent) ML-PRRE-153983-CS-INDV Component 1: / Consultant individuel Rehabilitation of local public En attente 2020-02- 2020-02- 2020-02- 2020-07- IDA / D3730 A posteriori Individuel Open 70,000.00 0.00 2020-01-15 Spécialiste en Equipement infrastructure (US$50 d'exécution 05 12 27 26 Biomédical million equivalent) ML-PRRE-160927-CS-INDV / Consutant individuel Component 4: Project chargé du suivi des aspects management, monitoring En cours 2020-01- 2020-03- 2020-03- 2020-03- 2020-09- IDA / D3730 A posteriori Individuel Open 30,000.00 0.00 2020-02-28 de sauvegardes and evaluation (US$5 million d'exécution 29 15 18 25 21 Environnementale et sociales equivalent) du Projet ( A temps partiel) Component 4: Project ML-PRRE-176387-CS-INDV management, monitoring En cours 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- / Audit environnemental et IDA / D3730 A posteriori Individuel Open 30,000.00 0.00 2020-07-09 and evaluation (US$5 million d'exécution 22 29 05 19 18 social de fin de projet equivalent) Component 4: Project ML-PRRE-176393-CS-INDV management, monitoring En cours 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- / Audit technique de fin de IDA / D3730 A posteriori Individuel Limited 48,000.00 0.00 2020-07-09 and evaluation (US$5 million d'exécution 22 12 19 29 01 projet equivalent) ML-PRRE-179763-CS-CDS Sélection de / Controle et surveillance Component 2: Support to 2020-06- 2020-07- 2020-10- IDA / D3730 A posteriori consultants par Direct 58,800.00 0.00 Annulé 2020-06-12 amenagement de 10 ha de productive investments 19 11 09 entente directe palmerai à Taoudenit ML-PRRE-176282-CS-CDS / Etudes techniques Sélection de contrôle et surveillance pour Component 2: Support to En attente 2020-06- 2020-06- 2020-07- IDA / D3730 A posteriori consultants par Direct 108,801.00 0.00 2020-05-29 l' aménagement de 10 ha de productive investments d'exécution 05 16 16 entente directe palmeraie dans la ville de Taoudenit Component 3: Community ML-PRRE-186427-CS-CDS Sélection de engagement and local En attente 2020-08- 2020-08- 2020-11- / Suivi et contrôle travaux IDA / D3730 A posteriori consultants par Direct 12,200.00 0.00 2020-08-01 governance (US$10 million d'exécution 02 11 09 HIMO a Ansongo entente directe equivalent). Component 4: Project ML-PRRE-176425-CS-INDV management, monitoring En attente 2021-04- 2021-04- 2021-05- 2021-05- / Elaboration du rapport IDA / D3730 A posteriori Individuel Limited 30,000.00 0.00 2021-03-30 and evaluation (US$5 million d'exécution 13 18 09 15 d'achevement du projet equivalent) ML-PRRE-210999-CS-CDS / AVENANT N°01 A LA Component 4: Project Sélection de CONVENTION DE MAITRISE management, monitoring En attente 2020-12- 2020-12- 2021-06- IDA / D3730 A posteriori consultants par Direct 22,642.00 0.00 2020-12-25 D’OUVRAGE DELEGUEE and evaluation (US$5 million d'exécution 27 31 30 entente directe AGETIPE N°013/2018/IP equivalent) (00377/DGMP/2019 ML-PRRE-211009-CS-CDS / AVENANT N°1 RELATIF A LA CONVENTION DE Component 4: Project MAITRISE D’OUVRAGE Sélection de management, monitoring En attente 2020-12- 2020-12- 2021-06- DELEGUEE POUR LA MISE EN IDA / D3730 A posteriori consultants par Direct 33,000.00 0.00 2020-12-26 and evaluation (US$5 million d'exécution 28 31 30 ŒUVRE DE LA COMPOSANTE entente directe equivalent) 2 ET DE LA COMPOSANTE 3 DU PROJET DE RECONSTRUCTION ET DE RELANCE ECONOMIQUE ML-PRRE-210916-CS-CDS / Protocole Assistance entre Component 1: Sélection de AGETIC et AGTIPE pour la Rehabilitation of local public En attente 2021-01- 2021-01- 2021-03- IDA / D3730 A posteriori consultants par Direct 110,633.00 0.00 2020-12-28 création d'un Centre infrastructure (US$50 d'exécution 02 19 20 entente directe numérique à la maison des million equivalent) jeunes de KONNA ML-PRRE-211263-CS-CDS Component 4: Project Sélection de / Avenant au contrat audit management, monitoring En attente 2021-03- 2021-05- 2021-06- IDA / D3730 A posteriori consultants par Direct 9,300.00 0.00 2021-02-23 des comptes 2019 2020 en and evaluation (US$5 million d'exécution 05 09 08 entente directe vue de l'audit des comptes equivalent) 2021 Component 4: Project ML-PRRE-211080-CS-CDS Sélection de management, monitoring En attente 2020-12- 2020-12- 2021-06- / spécialiste gouvernance IDA / D3730 A posteriori consultants par 23,688.00 0.00 2020-12-25 and evaluation (US$5 million d'exécution 27 30 30 locale Gao entente directe equivalent) Component 4: Project ML-PRRE-211001-CS-CDS Sélection de management, monitoring En attente 2020-12- 2020-12- 2021-06- / Rémunération IDA / D3730 A posteriori consultants par Direct 47,374.00 0.00 2020-12-25 and evaluation (US$5 million d'exécution 27 31 30 Coordinateur du Projet entente directe equivalent) ML-PRRE-211092-CS-CDS Sélection de Component 5: Contingent En attente 2020-12- 2020-12- 2021-06- / Rémunération spécialiste IDA / D3730 A posteriori consultants par Direct 17,766.00 0.00 2020-12-25 emergency response d'exécution 27 30 01 en infrastructure Gao entente directe ML-PRRE-211002-CS-CDS Component 4: Project Sélection de / Rémunération consultant management, monitoring En attente 2020-12- 2021-01- 2021-06- IDA / D3730 A posteriori consultants par Direct 25,200.00 0.00 2020-12-25 environnement et and evaluation (US$5 million d'exécution 27 01 30 entente directe sauvegardes equivalent) Component 4: Project ML-PRRE-211004-CS-CDS Sélection de management, monitoring En attente 2020-12- 2020-12- 2021-06- / Rémunération Spécialiste IDA / D3730 A posteriori consultants par Direct 35,534.00 0.00 2020-12-24 and evaluation (US$5 million d'exécution 26 29 26 Suivi-Evaluation entente directe equivalent) Component 4: Project ML-PRRE-211006-CS-CDS Sélection de management, monitoring En attente 2020-12- 2020-12- 2021-06- / Rémunération Spécialiste IDA / D3730 A posteriori consultants par Direct 35,534.00 0.00 2020-12-25 and evaluation (US$5 million d'exécution 27 30 30 Mobilisation communautaire entente directe equivalent) Component 4: Project ML-PRRE-211007-CS-CDS Sélection de management, monitoring En attente 2020-12- 2020-12- 2021-06- / Rémunération Spécialiste IDA / D3730 A posteriori consultants par Direct 35,534.00 0.00 2020-12-25 and evaluation (US$5 million d'exécution 27 30 30 Infrastructures entente directe equivalent) Component 4: Project Sélection de ML-PRRE-211008-CS-CDS management, monitoring En attente 2020-12- 2020-12- 2021-06- IDA / D3730 A posteriori consultants par 22,108.00 0.00 2020-12-25 / Rémunération Comptable and evaluation (US$5 million d'exécution 27 31 30 entente directe equivalent) Component 4: Project ML-PRRE-211003-CS-CDS Sélection de management, monitoring En attente 2020-12- 2021-01- 2021-06- / Rémunération Spécialistes IDA / H9010 A posteriori consultants par Direct 35,534.00 0.00 2020-12-25 and evaluation (US$5 million d'exécution 27 01 30 Gestion financière entente directe equivalent) Component 4: Project ML-PRRE-211005-CS-CDS Sélection de management, monitoring En attente 2020-12- 2021-01- 2021-06- / Rémunération Spécialiste IDA / D3730 A posteriori consultants par Direct 35,534.00 0.00 2020-12-25 and evaluation (US$5 million d'exécution 27 01 30 Passation des Marchés entente directe equivalent) ML-PRRE-211085-CS-CDS Component 4: Project Sélection de / Rémunération spécialiste management, monitoring En attente 2020-12- 2020-12- 2021-06- IDA / D3730 A posteriori consultants par Direct 17,766.00 0.00 2020-12-25 en infrastructure and evaluation (US$5 million d'exécution 27 31 30 entente directe Tombouctou equivalent) Component 4: Project ML-PRRE-211087-CS-CDS Sélection de management, monitoring En attente 2020-12- 2020-12- 2021-06- / Rémunération spécialiste IDA / D3730 A posteriori consultants par Direct 17,766.00 0.00 2020-12-25 and evaluation (US$5 million d'exécution 27 31 30 en infrastructure Mopti entente directe equivalent) Component 4: Project ML-PRRE-211084-CS-CDS Sélection de management, monitoring En attente 2020-12- 2020-12- 2021-06- / spécialiste gouvernance IDA / D3730 A posteriori consultants par Direct 23,688.00 0.00 2020-12-25 and evaluation (US$5 million d'exécution 27 31 30 locale Mopti entente directe equivalent) ML-PRRE-211076-CS-CDS Component 4: Project Sélection de / Rémunération spécialiste management, monitoring En attente 2020-12- 2020-12- 2021-06- IDA / D3730 A posteriori consultants par Direct 23,688.00 0.00 2020-12-25 gouvernance locale and evaluation (US$5 million d'exécution 27 30 30 entente directe Tombouctou equivalent) Page 14